{"feed_info":{"update_date":"2026-06-06T02:31:36.8618584+00:00","publisher":"Arcadis","version":"4.1","data_sources":[{"data_source_id":"TRANSCOM","organization_name":"TRANSCOM","update_date":"2026-06-06T02:31:36Z"}]},"type":"FeatureCollection","features":[{"id":"rlXec53IKehXq4RYXmWqHv8vD0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Northeast Corridor Line"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, Northeast Corridor Line at Metropark (Woodbridge Twp) the sidewalk leading to Wood Avenue will be closed due to the enhancement of Metropark Station, including the installation of a new shared pedestrian and bicycle path. During this time, we ask that customers be aware of the construction activity and follow all posted signage. The pedestrian tunnel will remain open to access the southbound platform and all points north of Metropark Station, as well as sidewalks along Middlesex Turnpike, Wood Avenue, and Lincoln Highway. Please allow for extra travel time. We appreciate your patience during this adjustment., Continuous Monday May 19th, 2025 09:00 AM thru Monday November 30th, 2026 11:59 PM","update_date":"2025-05-13T14:10:51Z"},"road_event_id":"rlXec53IKehXq4RYXmWqHv8vD0Y=","beginning_cross_street":"Metropark","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.329394,40.56864]]}},{"id":"yAAs9JjyB2g6h95lmlZy0Cjm72Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATERSIDE DR"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on WATERSIDE DR both directions between US-6 (Farmington) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone., Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:37:22Z"},"road_event_id":"yAAs9JjyB2g6h95lmlZy0Cjm72Q=","beginning_cross_street":"US-6","ending_cross_street":"US-6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.814566,41.707049]]}},{"id":"FiIFB6T5OEd/tI79iEAgElfByB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHURCH ST N"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on CHURCH ST N both directions between CENTRAL AVE (New Hartford) and BRIDGE ST at CENTRAL AVE (New Hartford) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone., Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:37:50Z"},"road_event_id":"FiIFB6T5OEd/tI79iEAgElfByB4=","beginning_cross_street":"CENTRAL AVE","ending_cross_street":"CENTRAL AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.980474,41.878083]]}},{"id":"LSD1dfzDw2qT4L0Qp6O8+AKZC2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAIL RD"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on VAIL RD both directions between GARELLA RD (Bethel) and US-6 (Bethel) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:36:09Z"},"road_event_id":"LSD1dfzDw2qT4L0Qp6O8+AKZC2Q=","beginning_cross_street":"GARELLA RD","ending_cross_street":"US-6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.393217,41.420046]]}},{"id":"V/94/R36/bGzxoG6cg2WDJs30XI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SEYMOUR RD"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on SEYMOUR RD both directions between HATCHETT HILL RD (East Granby) and INTERNATIONAL DR (East Granby) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone., Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:36:39Z"},"road_event_id":"V/94/R36/bGzxoG6cg2WDJs30XI=","beginning_cross_street":"HATCHETT HILL RD","ending_cross_street":"INTERNATIONAL DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.73938,41.917057]]}},{"id":"144306CQ5NquQRQAE4V1Z+xctug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hHSgStOq7BLCTlrUTgwlfPEpUX0="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"144306CQ5NquQRQAE4V1Z+xctug=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"hHSgStOq7BLCTlrUTgwlfPEpUX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"o9MmKy8/5lv3JmYVQibUigRefFI="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"hHSgStOq7BLCTlrUTgwlfPEpUX0=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"o9MmKy8/5lv3JmYVQibUigRefFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"3v3nKeDbRvpbfC5r7xYqy/H5NWM="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"o9MmKy8/5lv3JmYVQibUigRefFI=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"3v3nKeDbRvpbfC5r7xYqy/H5NWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"pdcaH8ldUX6va420ywESUi8L8KU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"3v3nKeDbRvpbfC5r7xYqy/H5NWM=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"pdcaH8ldUX6va420ywESUi8L8KU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"3mGVHXF7mZCZRZzk6nfKp6KxSLE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"pdcaH8ldUX6va420ywESUi8L8KU=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"3mGVHXF7mZCZRZzk6nfKp6KxSLE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"0NghRKJ7m1lwH8wRRfuz1BtvpbY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"3mGVHXF7mZCZRZzk6nfKp6KxSLE=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"0NghRKJ7m1lwH8wRRfuz1BtvpbY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"mN5dQCkz6VEvG4pYiJDI9QOq7Bw="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"0NghRKJ7m1lwH8wRRfuz1BtvpbY=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"mN5dQCkz6VEvG4pYiJDI9QOq7Bw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"iCuKSaHbg3TKaaHREjTGRnljehI="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"mN5dQCkz6VEvG4pYiJDI9QOq7Bw=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"iCuKSaHbg3TKaaHREjTGRnljehI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"fKXIsAtCSX+g9/wthU/fK1vLO5E="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"iCuKSaHbg3TKaaHREjTGRnljehI=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"fKXIsAtCSX+g9/wthU/fK1vLO5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"YUUKsD8MAWry7ZGl9v/o5EeoPho="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"fKXIsAtCSX+g9/wthU/fK1vLO5E=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"YUUKsD8MAWry7ZGl9v/o5EeoPho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"mYzXIpMkUHmaf1HfQxTclJHb/p0="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"YUUKsD8MAWry7ZGl9v/o5EeoPho=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"mYzXIpMkUHmaf1HfQxTclJHb/p0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"o9n3QxbVT4y2gEfPmTb3NZRdO9E="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"mYzXIpMkUHmaf1HfQxTclJHb/p0=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"o9n3QxbVT4y2gEfPmTb3NZRdO9E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"K6Cw9syRU/DOASpDW9HpOJgiXcI="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"o9n3QxbVT4y2gEfPmTb3NZRdO9E=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"K6Cw9syRU/DOASpDW9HpOJgiXcI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"1lrwuTqTFI9lvH8OYZTHGj7LBAM="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"K6Cw9syRU/DOASpDW9HpOJgiXcI=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"1lrwuTqTFI9lvH8OYZTHGj7LBAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"B5X36S2QdK03kEtqFES7kYqAzk8="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"1lrwuTqTFI9lvH8OYZTHGj7LBAM=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"B5X36S2QdK03kEtqFES7kYqAzk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"0pMaZ8WAb4anHow3g7cSVEBTFmA="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"B5X36S2QdK03kEtqFES7kYqAzk8=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"0pMaZ8WAb4anHow3g7cSVEBTFmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"TzCnjwdsKYfE4riOD8QB/BniLAs="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"0pMaZ8WAb4anHow3g7cSVEBTFmA=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"TzCnjwdsKYfE4riOD8QB/BniLAs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"iTu45+AlIMq50ilINRPwgATT+HI="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"TzCnjwdsKYfE4riOD8QB/BniLAs=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"iTu45+AlIMq50ilINRPwgATT+HI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"yFjyissflhgVyjwLA9BQ6lmsTVY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"iTu45+AlIMq50ilINRPwgATT+HI=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"yFjyissflhgVyjwLA9BQ6lmsTVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="},{"type":"next-occurrence","id":"Ew0oG8Sf/PvvCiSLzZYYnPYV2h8="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"yFjyissflhgVyjwLA9BQ6lmsTVY=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"Ew0oG8Sf/PvvCiSLzZYYnPYV2h8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"144306CQ5NquQRQAE4V1Z+xctug="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"Ew0oG8Sf/PvvCiSLzZYYnPYV2h8=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"ORC300447958","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","description":"Roadwork on US 9 Northbound between North of CR 571/Indian Head Rd (Toms River Twp) and CR 620/Church Rd (Toms River Twp) Monday June 9, 2025 09:00 PM thru Saturday June 14, 2025 05:00 AM, All lanes closed and detoured","update_date":"2025-06-14T09:00:01Z"},"road_event_id":"ORC300447958","beginning_cross_street":"North of CR 571/Indian Head Rd","ending_cross_street":"CR 620/Church Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-06T20:39:28Z","end_date":"2025-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.211662,39.99551]]}},{"id":"8NjQcL6lhdR3CmNAgtHTt5OgYdc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JMJaVOZ4CoIxKz0ZWLH/ZF16Z1Q="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"8NjQcL6lhdR3CmNAgtHTt5OgYdc=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:01:00Z","end_date":"2026-06-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"JMJaVOZ4CoIxKz0ZWLH/ZF16Z1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8NjQcL6lhdR3CmNAgtHTt5OgYdc="},{"type":"next-occurrence","id":"ndU8zzdhcgaBrjZHfl9syggdUqM="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"JMJaVOZ4CoIxKz0ZWLH/ZF16Z1Q=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T04:01:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"ndU8zzdhcgaBrjZHfl9syggdUqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8NjQcL6lhdR3CmNAgtHTt5OgYdc="},{"type":"next-occurrence","id":"C3pF0sRN5yxC+g3LdUg7rW6C86U="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"ndU8zzdhcgaBrjZHfl9syggdUqM=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T04:10:00Z","end_date":"2026-06-06T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"C3pF0sRN5yxC+g3LdUg7rW6C86U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8NjQcL6lhdR3CmNAgtHTt5OgYdc="},{"type":"next-occurrence","id":"OYQ3mg/istQV4yQ9U4+mr4mgE1c="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"C3pF0sRN5yxC+g3LdUg7rW6C86U=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T04:10:00Z","end_date":"2026-06-07T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"OYQ3mg/istQV4yQ9U4+mr4mgE1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8NjQcL6lhdR3CmNAgtHTt5OgYdc="},{"type":"next-occurrence","id":"GdAr8jwdKKgypytPp2OvS2uiwwc="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"OYQ3mg/istQV4yQ9U4+mr4mgE1c=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"GdAr8jwdKKgypytPp2OvS2uiwwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8NjQcL6lhdR3CmNAgtHTt5OgYdc="},{"type":"next-occurrence","id":"UANBlwpK6trQAM4KjgrlosET2/E="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"GdAr8jwdKKgypytPp2OvS2uiwwc=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"UANBlwpK6trQAM4KjgrlosET2/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8NjQcL6lhdR3CmNAgtHTt5OgYdc="},{"type":"next-occurrence","id":"xE4RJmj6y0fZW7q6q0Tlo4eDGsg="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"UANBlwpK6trQAM4KjgrlosET2/E=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"xE4RJmj6y0fZW7q6q0Tlo4eDGsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8NjQcL6lhdR3CmNAgtHTt5OgYdc="},{"type":"next-occurrence","id":"kVAid/miydMqoQ9kbjf+lqRMGBQ="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"xE4RJmj6y0fZW7q6q0Tlo4eDGsg=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"kVAid/miydMqoQ9kbjf+lqRMGBQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8NjQcL6lhdR3CmNAgtHTt5OgYdc="},{"type":"next-occurrence","id":"Nym50ztC7XnEm/I+ZSvC0G6DlGo="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"kVAid/miydMqoQ9kbjf+lqRMGBQ=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T04:01:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"Nym50ztC7XnEm/I+ZSvC0G6DlGo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8NjQcL6lhdR3CmNAgtHTt5OgYdc="},{"type":"next-occurrence","id":"tElt6+kWYS3AfyVtWRuX+wJASSc="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"Nym50ztC7XnEm/I+ZSvC0G6DlGo=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T04:10:00Z","end_date":"2026-06-13T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"tElt6+kWYS3AfyVtWRuX+wJASSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8NjQcL6lhdR3CmNAgtHTt5OgYdc="},{"type":"next-occurrence","id":"0SgNWkYmW1sSWncjO6Lizusitak="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"tElt6+kWYS3AfyVtWRuX+wJASSc=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T04:10:00Z","end_date":"2026-06-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"0SgNWkYmW1sSWncjO6Lizusitak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8NjQcL6lhdR3CmNAgtHTt5OgYdc="},{"type":"next-occurrence","id":"dGCa+3MIbbJJP1242uvm9nOLAOQ="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"0SgNWkYmW1sSWncjO6Lizusitak=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T02:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"dGCa+3MIbbJJP1242uvm9nOLAOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8NjQcL6lhdR3CmNAgtHTt5OgYdc="},{"type":"next-occurrence","id":"mMcy95OAZF+ngxu+Cooc1QFm9D0="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"dGCa+3MIbbJJP1242uvm9nOLAOQ=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T02:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"mMcy95OAZF+ngxu+Cooc1QFm9D0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8NjQcL6lhdR3CmNAgtHTt5OgYdc="},{"type":"next-occurrence","id":"7jZzAPHtorMsJ6KH0CXy9NyMehU="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"mMcy95OAZF+ngxu+Cooc1QFm9D0=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T02:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"7jZzAPHtorMsJ6KH0CXy9NyMehU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8NjQcL6lhdR3CmNAgtHTt5OgYdc="},{"type":"next-occurrence","id":"TgW/SFtTEnTVYMv8Nx/XukqajkM="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"7jZzAPHtorMsJ6KH0CXy9NyMehU=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T02:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"TgW/SFtTEnTVYMv8Nx/XukqajkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8NjQcL6lhdR3CmNAgtHTt5OgYdc="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"TgW/SFtTEnTVYMv8Nx/XukqajkM=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T02:00:00Z","end_date":"2026-06-20T04:01:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"c8Pvqd9IMRBQgJKoMTMV5pYF524=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fWNgst1KNUYvUSWfh9bH/q1exCY="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"c8Pvqd9IMRBQgJKoMTMV5pYF524=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T05:00:00Z","end_date":"2026-06-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"fWNgst1KNUYvUSWfh9bH/q1exCY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c8Pvqd9IMRBQgJKoMTMV5pYF524="},{"type":"next-occurrence","id":"OSdFjnjYu6TqyKlla8OzsIKOkF4="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"fWNgst1KNUYvUSWfh9bH/q1exCY=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"OSdFjnjYu6TqyKlla8OzsIKOkF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c8Pvqd9IMRBQgJKoMTMV5pYF524="},{"type":"next-occurrence","id":"svs7F81zLvDYE+Ei3bWFdVE34zo="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"OSdFjnjYu6TqyKlla8OzsIKOkF4=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T04:10:00Z","end_date":"2026-06-07T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"svs7F81zLvDYE+Ei3bWFdVE34zo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c8Pvqd9IMRBQgJKoMTMV5pYF524="},{"type":"next-occurrence","id":"AM8IxBW/wnOa7qzOOyQ+EhD3SLM="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"svs7F81zLvDYE+Ei3bWFdVE34zo=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"AM8IxBW/wnOa7qzOOyQ+EhD3SLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c8Pvqd9IMRBQgJKoMTMV5pYF524="},{"type":"next-occurrence","id":"jz9BjaA6T71Fni3aXrwzdlZE6+I="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"AM8IxBW/wnOa7qzOOyQ+EhD3SLM=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"jz9BjaA6T71Fni3aXrwzdlZE6+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c8Pvqd9IMRBQgJKoMTMV5pYF524="},{"type":"next-occurrence","id":"SMns4omteMEefd7ZqxVRLvC5vpA="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"jz9BjaA6T71Fni3aXrwzdlZE6+I=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"SMns4omteMEefd7ZqxVRLvC5vpA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c8Pvqd9IMRBQgJKoMTMV5pYF524="},{"type":"next-occurrence","id":"oGXGhTTvltYanRwNbWT9L9gNTY0="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"SMns4omteMEefd7ZqxVRLvC5vpA=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"oGXGhTTvltYanRwNbWT9L9gNTY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c8Pvqd9IMRBQgJKoMTMV5pYF524="},{"type":"next-occurrence","id":"YERp14GryOXslRACc7WFUYIHBJM="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"oGXGhTTvltYanRwNbWT9L9gNTY0=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"YERp14GryOXslRACc7WFUYIHBJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c8Pvqd9IMRBQgJKoMTMV5pYF524="},{"type":"next-occurrence","id":"L6WSOMUNf2vJeepChHO8a6c5/kQ="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"YERp14GryOXslRACc7WFUYIHBJM=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T04:10:00Z","end_date":"2026-06-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"L6WSOMUNf2vJeepChHO8a6c5/kQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c8Pvqd9IMRBQgJKoMTMV5pYF524="},{"type":"next-occurrence","id":"RfHpvTgdtJaMzhG92EIAit2Lm+Q="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"L6WSOMUNf2vJeepChHO8a6c5/kQ=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T02:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"RfHpvTgdtJaMzhG92EIAit2Lm+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c8Pvqd9IMRBQgJKoMTMV5pYF524="},{"type":"next-occurrence","id":"EzY1lK5U8g13D3RrnN7qfIkluLM="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"RfHpvTgdtJaMzhG92EIAit2Lm+Q=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T02:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"EzY1lK5U8g13D3RrnN7qfIkluLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c8Pvqd9IMRBQgJKoMTMV5pYF524="},{"type":"next-occurrence","id":"OP37HU2wZQnDPjiqv3XSeuDhip8="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"EzY1lK5U8g13D3RrnN7qfIkluLM=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T02:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"OP37HU2wZQnDPjiqv3XSeuDhip8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c8Pvqd9IMRBQgJKoMTMV5pYF524="},{"type":"next-occurrence","id":"Y63qinCMzRX7j4PmcSN0GrhDtzw="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"OP37HU2wZQnDPjiqv3XSeuDhip8=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T02:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"Y63qinCMzRX7j4PmcSN0GrhDtzw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c8Pvqd9IMRBQgJKoMTMV5pYF524="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"Y63qinCMzRX7j4PmcSN0GrhDtzw=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T02:00:00Z","end_date":"2026-06-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"2ihOeDCSM7pi70BkvFd2b4mZoIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on US 9W both directions between Hickory Circle and Pictuay Rd (Bethlehem) one lane open in both directions, NB lane shift in place, Continuous Tuesday August 5th, 2025 04:00 PM thru Friday July 3rd, 2026 05:00 PM All lanes open","update_date":"2025-08-06T13:45:02Z"},"road_event_id":"2ihOeDCSM7pi70BkvFd2b4mZoIQ=","beginning_cross_street":"between Hickory Circle and Pictuay Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805826,42.534051]]}},{"id":"aI25mkOxTDlE1zjikBtGqhYm1PQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["South Ave"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation and longterm construction on South Ave southbound ramp to I-490 Eastbound (Rochester) RAMP CLOSED, Continuous Thursday August 15th, 2024 12:00 AM thru Thursday December 31st, 2026 11:59 PM All lanes closed and detoured","update_date":"2026-01-27T12:13:56Z"},"road_event_id":"aI25mkOxTDlE1zjikBtGqhYm1PQ=","beginning_cross_street":"I-490 Eastbound","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.607328,43.152443]]}},{"id":"uue8FlExG+WTAgIl0HjwAtGgoKs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-99"],"direction":"unknown","related_road_events":[],"description":"Traffic signal repairs on CT-99 southbound between CT-314 (Wethersfield) and PARSONAGE ST (Rocky Hill) Intermittent lane closures may be expected, Thursday January 30th, 2025 thru Friday November 20th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2025-01-30T17:52:30Z"},"road_event_id":"uue8FlExG+WTAgIl0HjwAtGgoKs=","beginning_cross_street":"CT-314","ending_cross_street":"PARSONAGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.668152,41.723666]]}},{"id":"jsI/tfXqNPCTnc6NXF7vl5UnRTs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-99"],"direction":"unknown","related_road_events":[],"description":"Traffic signal repairs on CT-99 northbound between PARSONAGE ST (Rocky Hill) and CT-314 (Wethersfield), Thursday January 30th, 2025 thru Friday November 20th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2025-01-30T17:50:20Z"},"road_event_id":"jsI/tfXqNPCTnc6NXF7vl5UnRTs=","beginning_cross_street":"PARSONAGE ST","ending_cross_street":"CT-314","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.645502,41.672583]]}},{"id":"ORC300365075","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","description":"Bridge work and roadwork on I-86 both directions Exit 25 - NY 953E Buffalo Street; Ramp (Olean) to Exit 27 - NY 16 (Hinsdale) Not currently Scheduled","update_date":"2024-11-23T22:00:00Z"},"road_event_id":"ORC300365075","beginning_cross_street":"Exit 25 - NY 953E Buffalo Street; Ramp","ending_cross_street":"Exit 27 - NY 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2024-04-25T11:13:40Z","end_date":"2024-11-24T04:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-78.458461,42.088168]]}},{"id":"FKsircM2KHE22sY+/ixNjZSRkws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on US-44 both directions between ASHPOHTAG RD (Norfolk) and RIVER PL (Norfolk) There will be a temporary signal installed to coordinate one-way alternating traffic on Route 44 in Norfolk , Continuous Monday December 2nd, 2024 12:00 AM thru Wednesday September 16th, 2026 11:59 PM All lanes open","update_date":"2024-12-10T21:01:50Z"},"road_event_id":"FKsircM2KHE22sY+/ixNjZSRkws=","beginning_cross_street":"ASHPOHTAG RD","ending_cross_street":"RIVER PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220881,42.001768]]}},{"id":"8CnIKt6dDLcdPZpBXm5TJhxQ42k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[],"description":"Longterm construction on I-87 Major Deegan Expressway northbound at East 138th Street; Ramp (New York), Continuous Monday April 25th, 2022 12:00 AM thru Friday June 26th, 2026 11:59 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-15T16:31:28Z"},"road_event_id":"8CnIKt6dDLcdPZpBXm5TJhxQ42k=","beginning_cross_street":"East 138th Street; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931267,40.813337]]}},{"id":"9iiLKK7AEU7KeD9Hbc46pGIK+iA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[],"description":"Longterm construction on I-87 Major Deegan Expressway southbound at East 138th Street (New York), Continuous Monday April 25th, 2022 12:00 AM thru Friday June 26th, 2026 11:59 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-15T16:32:29Z"},"road_event_id":"9iiLKK7AEU7KeD9Hbc46pGIK+iA=","beginning_cross_street":"East 138th Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931187,40.813903]]}},{"id":"CuspRsRpU9/Mm/GLDgbnsuomhWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-86 eastbound ramp to Exit 9 closed. Use Exit 10. (Ellery), Continuous Wednesday April 3rd, 2024 12:00 AM thru Monday November 30th, 2026 11:59 PM All lanes closed","update_date":"2024-04-11T14:09:59Z"},"road_event_id":"CuspRsRpU9/Mm/GLDgbnsuomhWI=","beginning_cross_street":"ramp to Exit 9 closed.  Use Exit 10.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.382971,42.152015]]}},{"id":"0rm2H4CMwAVw5hipdaRIqTmHQXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RqsFvljgyTLxKsoX9fAHr2SqKoc="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"0rm2H4CMwAVw5hipdaRIqTmHQXA=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"RqsFvljgyTLxKsoX9fAHr2SqKoc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rm2H4CMwAVw5hipdaRIqTmHQXA="},{"type":"next-occurrence","id":"Ez+ksyRtm43YYXZrw86N2hY/Uuw="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"RqsFvljgyTLxKsoX9fAHr2SqKoc=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T01:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"Ez+ksyRtm43YYXZrw86N2hY/Uuw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rm2H4CMwAVw5hipdaRIqTmHQXA="},{"type":"next-occurrence","id":"wxQamDkVaECf7QyeMtZkFSgLhv0="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"Ez+ksyRtm43YYXZrw86N2hY/Uuw=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"wxQamDkVaECf7QyeMtZkFSgLhv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rm2H4CMwAVw5hipdaRIqTmHQXA="},{"type":"next-occurrence","id":"Ckr8y2tcsQ4RRYKEMwC/A9om8w4="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"wxQamDkVaECf7QyeMtZkFSgLhv0=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"Ckr8y2tcsQ4RRYKEMwC/A9om8w4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rm2H4CMwAVw5hipdaRIqTmHQXA="},{"type":"next-occurrence","id":"onyTFF4mAYQQaJda2uUnFMklg8k="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"Ckr8y2tcsQ4RRYKEMwC/A9om8w4=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"onyTFF4mAYQQaJda2uUnFMklg8k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rm2H4CMwAVw5hipdaRIqTmHQXA="},{"type":"next-occurrence","id":"pnO9AyBtUln0l5sZwJlFe4ROTNk="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"onyTFF4mAYQQaJda2uUnFMklg8k=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"pnO9AyBtUln0l5sZwJlFe4ROTNk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rm2H4CMwAVw5hipdaRIqTmHQXA="},{"type":"next-occurrence","id":"G0xh6+kMktERF8sHEuWs2RLPqiE="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"pnO9AyBtUln0l5sZwJlFe4ROTNk=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T01:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"G0xh6+kMktERF8sHEuWs2RLPqiE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rm2H4CMwAVw5hipdaRIqTmHQXA="},{"type":"next-occurrence","id":"P5Zot+AkR1YtpXBB2OujQ8mcc58="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"G0xh6+kMktERF8sHEuWs2RLPqiE=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T01:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"P5Zot+AkR1YtpXBB2OujQ8mcc58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rm2H4CMwAVw5hipdaRIqTmHQXA="},{"type":"next-occurrence","id":"Nj712FKYBmefPsIj213Lmfb2yZY="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"P5Zot+AkR1YtpXBB2OujQ8mcc58=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T01:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"Nj712FKYBmefPsIj213Lmfb2yZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rm2H4CMwAVw5hipdaRIqTmHQXA="},{"type":"next-occurrence","id":"T2s9Iq0i0Niy9NQbLFJgnd1fYOk="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"Nj712FKYBmefPsIj213Lmfb2yZY=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T01:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"T2s9Iq0i0Niy9NQbLFJgnd1fYOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rm2H4CMwAVw5hipdaRIqTmHQXA="},{"type":"next-occurrence","id":"djwt4u7lWFD13L8uQRz6paAHLXE="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"T2s9Iq0i0Niy9NQbLFJgnd1fYOk=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T01:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"djwt4u7lWFD13L8uQRz6paAHLXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rm2H4CMwAVw5hipdaRIqTmHQXA="},{"type":"next-occurrence","id":"bTyDmFCcERc5u2Eo0kABg5p55pg="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"djwt4u7lWFD13L8uQRz6paAHLXE=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T01:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"bTyDmFCcERc5u2Eo0kABg5p55pg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rm2H4CMwAVw5hipdaRIqTmHQXA="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"bTyDmFCcERc5u2Eo0kABg5p55pg=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T01:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"4NqK14yuknlp6XHO74ceZeHjunY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IJ42Ghvm4bqJdgyO977K00SvC+g="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"4NqK14yuknlp6XHO74ceZeHjunY=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"IJ42Ghvm4bqJdgyO977K00SvC+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"PofVEBnVP8gK1cOhikSPnE109Kg="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"IJ42Ghvm4bqJdgyO977K00SvC+g=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"PofVEBnVP8gK1cOhikSPnE109Kg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"YShQL8aarMer9NoyzPFwUMlpTx0="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"PofVEBnVP8gK1cOhikSPnE109Kg=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"YShQL8aarMer9NoyzPFwUMlpTx0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"R55T3KQC/sNfJTEA1KY371yDZzE="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"YShQL8aarMer9NoyzPFwUMlpTx0=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"R55T3KQC/sNfJTEA1KY371yDZzE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"xJUIrmzNXzldQicRcg4j45nJDj8="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"R55T3KQC/sNfJTEA1KY371yDZzE=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"xJUIrmzNXzldQicRcg4j45nJDj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"8HC79r0ZqiyaBeG3podMHtQwTGs="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"xJUIrmzNXzldQicRcg4j45nJDj8=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"8HC79r0ZqiyaBeG3podMHtQwTGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"IfDqNomgRjPsHA401adbIMe91t8="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"8HC79r0ZqiyaBeG3podMHtQwTGs=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"IfDqNomgRjPsHA401adbIMe91t8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"JLp5qGKIkns2WUksycIY8i2J848="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"IfDqNomgRjPsHA401adbIMe91t8=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"JLp5qGKIkns2WUksycIY8i2J848=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"iiB9EqHeT9u6s/iTgtM6XbdYz7g="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"JLp5qGKIkns2WUksycIY8i2J848=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"iiB9EqHeT9u6s/iTgtM6XbdYz7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"1M7ewqhPpG+euYo9LgNG6h2k7d8="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"iiB9EqHeT9u6s/iTgtM6XbdYz7g=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"1M7ewqhPpG+euYo9LgNG6h2k7d8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"1vS1NQsdy7rieZr8BmHGApcMQy0="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"1M7ewqhPpG+euYo9LgNG6h2k7d8=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"1vS1NQsdy7rieZr8BmHGApcMQy0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"YLunQTj4O0IjwbTMQ+USs6RHkSs="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"1vS1NQsdy7rieZr8BmHGApcMQy0=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"YLunQTj4O0IjwbTMQ+USs6RHkSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"WNA/B9xe5OuN/5EZz2db38rih5k="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"YLunQTj4O0IjwbTMQ+USs6RHkSs=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"WNA/B9xe5OuN/5EZz2db38rih5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"VH3U4hfOVPablV3+mJKJb09qpa0="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"WNA/B9xe5OuN/5EZz2db38rih5k=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"VH3U4hfOVPablV3+mJKJb09qpa0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"+3G1pigMeJCLHi6Ce5LD9isUeKk="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"VH3U4hfOVPablV3+mJKJb09qpa0=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"+3G1pigMeJCLHi6Ce5LD9isUeKk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"AZgkeLYlFK4z/r94TSiMKdajn3M="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"+3G1pigMeJCLHi6Ce5LD9isUeKk=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"AZgkeLYlFK4z/r94TSiMKdajn3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"dDdeZnp9OCAjJHorUwsueMuxgiA="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"AZgkeLYlFK4z/r94TSiMKdajn3M=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"dDdeZnp9OCAjJHorUwsueMuxgiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"GEiXH7gzGmhy4rwPjZua+hOdOqs="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"dDdeZnp9OCAjJHorUwsueMuxgiA=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"GEiXH7gzGmhy4rwPjZua+hOdOqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"4iGYFBvpzW+Eb5Y5p0eKLLm+slg="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"GEiXH7gzGmhy4rwPjZua+hOdOqs=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"4iGYFBvpzW+Eb5Y5p0eKLLm+slg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"UozO37ENouileutgpzvkY6uB0GA="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"4iGYFBvpzW+Eb5Y5p0eKLLm+slg=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"UozO37ENouileutgpzvkY6uB0GA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="},{"type":"next-occurrence","id":"Ub68pk0Kd/9CpnkXdAxt85yBJqg="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"UozO37ENouileutgpzvkY6uB0GA=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"Ub68pk0Kd/9CpnkXdAxt85yBJqg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NqK14yuknlp6XHO74ceZeHjunY="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"Ub68pk0Kd/9CpnkXdAxt85yBJqg=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"nMEjqMXpQgS/X8FTEZ8FlhKWRno=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aVL9CsD213TJWPyq7toknv68vJA="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"nMEjqMXpQgS/X8FTEZ8FlhKWRno=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"aVL9CsD213TJWPyq7toknv68vJA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMEjqMXpQgS/X8FTEZ8FlhKWRno="},{"type":"next-occurrence","id":"eIYCKHacqAikbVICE7yVIODFhDc="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"aVL9CsD213TJWPyq7toknv68vJA=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T01:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"eIYCKHacqAikbVICE7yVIODFhDc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMEjqMXpQgS/X8FTEZ8FlhKWRno="},{"type":"next-occurrence","id":"m1YccneZ4qxXOq7JXXjc2rHiZUA="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"eIYCKHacqAikbVICE7yVIODFhDc=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"m1YccneZ4qxXOq7JXXjc2rHiZUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMEjqMXpQgS/X8FTEZ8FlhKWRno="},{"type":"next-occurrence","id":"mqHzuA/fd0oocs97+BseeK6CIvY="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"m1YccneZ4qxXOq7JXXjc2rHiZUA=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"mqHzuA/fd0oocs97+BseeK6CIvY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMEjqMXpQgS/X8FTEZ8FlhKWRno="},{"type":"next-occurrence","id":"WSIOgSlRIO2vrV2VdMnXRV4Mi3Y="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"mqHzuA/fd0oocs97+BseeK6CIvY=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"WSIOgSlRIO2vrV2VdMnXRV4Mi3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMEjqMXpQgS/X8FTEZ8FlhKWRno="},{"type":"next-occurrence","id":"ovouBWjiyKP6DPy+60a5ewvammA="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"WSIOgSlRIO2vrV2VdMnXRV4Mi3Y=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"ovouBWjiyKP6DPy+60a5ewvammA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMEjqMXpQgS/X8FTEZ8FlhKWRno="},{"type":"next-occurrence","id":"ieZme3NJpRbS9fGpe5NEp9qbitQ="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"ovouBWjiyKP6DPy+60a5ewvammA=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"ieZme3NJpRbS9fGpe5NEp9qbitQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMEjqMXpQgS/X8FTEZ8FlhKWRno="},{"type":"next-occurrence","id":"rRy9zwtO22aWvgZyXueE7aRZZAY="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"ieZme3NJpRbS9fGpe5NEp9qbitQ=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"rRy9zwtO22aWvgZyXueE7aRZZAY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMEjqMXpQgS/X8FTEZ8FlhKWRno="},{"type":"next-occurrence","id":"A1St+W86zd15HzyWKqZjofcJ8hs="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"rRy9zwtO22aWvgZyXueE7aRZZAY=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T01:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"A1St+W86zd15HzyWKqZjofcJ8hs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMEjqMXpQgS/X8FTEZ8FlhKWRno="},{"type":"next-occurrence","id":"QWWzNlVVx7Xw89XufuwrbMV1HiU="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"A1St+W86zd15HzyWKqZjofcJ8hs=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"QWWzNlVVx7Xw89XufuwrbMV1HiU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMEjqMXpQgS/X8FTEZ8FlhKWRno="},{"type":"next-occurrence","id":"6x/yaQtWiyXWA9yULG7loEazV4k="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"QWWzNlVVx7Xw89XufuwrbMV1HiU=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T01:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"6x/yaQtWiyXWA9yULG7loEazV4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMEjqMXpQgS/X8FTEZ8FlhKWRno="},{"type":"next-occurrence","id":"CHWcDi5z8caBxj+wv/pzGoWaRRM="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"6x/yaQtWiyXWA9yULG7loEazV4k=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"CHWcDi5z8caBxj+wv/pzGoWaRRM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMEjqMXpQgS/X8FTEZ8FlhKWRno="},{"type":"next-occurrence","id":"X01B4zzWyJTW3Fxl73hP1sBUJIc="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"CHWcDi5z8caBxj+wv/pzGoWaRRM=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"X01B4zzWyJTW3Fxl73hP1sBUJIc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMEjqMXpQgS/X8FTEZ8FlhKWRno="},{"type":"next-occurrence","id":"vAwF98ZpR+ekErWL/pA7eZbd+6g="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"X01B4zzWyJTW3Fxl73hP1sBUJIc=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"vAwF98ZpR+ekErWL/pA7eZbd+6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMEjqMXpQgS/X8FTEZ8FlhKWRno="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"vAwF98ZpR+ekErWL/pA7eZbd+6g=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JrDBCWjcOIHiZX1ekvqGfKrvTNU="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"JrDBCWjcOIHiZX1ekvqGfKrvTNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"QFeiCuo46hNeK0bqX98BlesfTmM="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"JrDBCWjcOIHiZX1ekvqGfKrvTNU=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"QFeiCuo46hNeK0bqX98BlesfTmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"9VLcl6sjaxInjA8mov6Ln8UnHJY="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"QFeiCuo46hNeK0bqX98BlesfTmM=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"9VLcl6sjaxInjA8mov6Ln8UnHJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"AqvAFatqgosEMmhE1Gm8fUGGQlI="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"9VLcl6sjaxInjA8mov6Ln8UnHJY=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"AqvAFatqgosEMmhE1Gm8fUGGQlI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"Zbum820lQSlpiC2Oj1weC4V2UGA="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"AqvAFatqgosEMmhE1Gm8fUGGQlI=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"Zbum820lQSlpiC2Oj1weC4V2UGA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"NnrejU4/+4FEW5GWZX8PwZkmupw="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"Zbum820lQSlpiC2Oj1weC4V2UGA=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"NnrejU4/+4FEW5GWZX8PwZkmupw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"HS8rOZ+rBBDBRCY5A4e0u5v2x1U="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"NnrejU4/+4FEW5GWZX8PwZkmupw=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"HS8rOZ+rBBDBRCY5A4e0u5v2x1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"If0z64qFNSTfgDM1aPIQ2xtc6mU="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"HS8rOZ+rBBDBRCY5A4e0u5v2x1U=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"If0z64qFNSTfgDM1aPIQ2xtc6mU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"UroBKFPjuhuObq0ICrqemFaP+AU="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"If0z64qFNSTfgDM1aPIQ2xtc6mU=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"UroBKFPjuhuObq0ICrqemFaP+AU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"RVQSHvwtKID+puImw1mo6KjR2VE="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"UroBKFPjuhuObq0ICrqemFaP+AU=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"RVQSHvwtKID+puImw1mo6KjR2VE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"wiAnmTQvvXvy7kQlr6SB8BepNSY="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"RVQSHvwtKID+puImw1mo6KjR2VE=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"wiAnmTQvvXvy7kQlr6SB8BepNSY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"3TEj0GrYrgB52DIaHvkT4PgRsLs="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"wiAnmTQvvXvy7kQlr6SB8BepNSY=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"3TEj0GrYrgB52DIaHvkT4PgRsLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"UoJCW74OCQQq1TYj+MinciAIKLU="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"3TEj0GrYrgB52DIaHvkT4PgRsLs=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"UoJCW74OCQQq1TYj+MinciAIKLU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"lMN4b8Ew52cvCc4GfROCH+ETLIA="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"UoJCW74OCQQq1TYj+MinciAIKLU=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"lMN4b8Ew52cvCc4GfROCH+ETLIA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"jJWWvdUQyOaGdALnwyGMKwuRPHg="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"lMN4b8Ew52cvCc4GfROCH+ETLIA=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"jJWWvdUQyOaGdALnwyGMKwuRPHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"7nkbHcG8nUsX5njxKU+7UPnNHMA="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"jJWWvdUQyOaGdALnwyGMKwuRPHg=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"7nkbHcG8nUsX5njxKU+7UPnNHMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"vqjtGYeHDpvqyLs+0nxcqSrXKos="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"7nkbHcG8nUsX5njxKU+7UPnNHMA=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"vqjtGYeHDpvqyLs+0nxcqSrXKos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"vqCt0y+vJO8b4+neyb5SossCNIg="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"vqjtGYeHDpvqyLs+0nxcqSrXKos=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"vqCt0y+vJO8b4+neyb5SossCNIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"Q3xwx7LIpAxX81tiPcvO/5rLic0="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"vqCt0y+vJO8b4+neyb5SossCNIg=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"Q3xwx7LIpAxX81tiPcvO/5rLic0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"9oeQqOgf/iWoCKojvJqTRsL8xho="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"Q3xwx7LIpAxX81tiPcvO/5rLic0=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"9oeQqOgf/iWoCKojvJqTRsL8xho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="},{"type":"next-occurrence","id":"6rAP9DMwoG7dTJBvmAnB26xbZkM="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"9oeQqOgf/iWoCKojvJqTRsL8xho=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"6rAP9DMwoG7dTJBvmAnB26xbZkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w90J3U7LyUjhLvH/j4+ZcIdMPNo="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"6rAP9DMwoG7dTJBvmAnB26xbZkM=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"1tq4Vlw2P1mctB0dzlal9v9wns4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MiFarPXXQAWnrnXxB+CIMmuyFnE="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"1tq4Vlw2P1mctB0dzlal9v9wns4=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"MiFarPXXQAWnrnXxB+CIMmuyFnE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"bzeEaRRpKgs2rN7J6TjbrtVW5xg="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"MiFarPXXQAWnrnXxB+CIMmuyFnE=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"bzeEaRRpKgs2rN7J6TjbrtVW5xg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"oqyQ1uYiMJ3rQQBIf3+uCb9G7TU="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"bzeEaRRpKgs2rN7J6TjbrtVW5xg=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"oqyQ1uYiMJ3rQQBIf3+uCb9G7TU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"EZxBjfkAaIiS3DZuQLHg3eF8lb8="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"oqyQ1uYiMJ3rQQBIf3+uCb9G7TU=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"EZxBjfkAaIiS3DZuQLHg3eF8lb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"tw8K2nQ99JQKfTvCRpHaPB/cp4E="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"EZxBjfkAaIiS3DZuQLHg3eF8lb8=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"tw8K2nQ99JQKfTvCRpHaPB/cp4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"DUZsxgw2maSqy1zkBi4Lhhcj1H0="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"tw8K2nQ99JQKfTvCRpHaPB/cp4E=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"DUZsxgw2maSqy1zkBi4Lhhcj1H0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"+LC2HVMXXI/sAyXmbP3KJkSZnX0="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"DUZsxgw2maSqy1zkBi4Lhhcj1H0=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"+LC2HVMXXI/sAyXmbP3KJkSZnX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"EsDnOpWIpzh+ZDTHM63f6Sr28ek="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"+LC2HVMXXI/sAyXmbP3KJkSZnX0=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"EsDnOpWIpzh+ZDTHM63f6Sr28ek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"Prg3QrPO/trAp0xpbPN2uX0wJPQ="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"EsDnOpWIpzh+ZDTHM63f6Sr28ek=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"Prg3QrPO/trAp0xpbPN2uX0wJPQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"6UDg71LmraM1a2giya/Tuj+GxbQ="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"Prg3QrPO/trAp0xpbPN2uX0wJPQ=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"6UDg71LmraM1a2giya/Tuj+GxbQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"4hN7ADViJgDZX2IC17woWPEXqJ8="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"6UDg71LmraM1a2giya/Tuj+GxbQ=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"4hN7ADViJgDZX2IC17woWPEXqJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"J8aeSHxEq9ihFLNhf74YZIyQfmI="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"4hN7ADViJgDZX2IC17woWPEXqJ8=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"J8aeSHxEq9ihFLNhf74YZIyQfmI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"acGQJC41DGMryaqGMe7AN/0ShyU="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"J8aeSHxEq9ihFLNhf74YZIyQfmI=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"acGQJC41DGMryaqGMe7AN/0ShyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"6xp0xn2eX+4Fo7Dg4eZF5ZtG41M="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"acGQJC41DGMryaqGMe7AN/0ShyU=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"6xp0xn2eX+4Fo7Dg4eZF5ZtG41M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"TBfznNFBb3gKBepnGohkeqo7Y/s="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"6xp0xn2eX+4Fo7Dg4eZF5ZtG41M=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"TBfznNFBb3gKBepnGohkeqo7Y/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"jf4GswGdeLPlMvEktsU4kb5fDe8="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"TBfznNFBb3gKBepnGohkeqo7Y/s=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"jf4GswGdeLPlMvEktsU4kb5fDe8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"mh4/Dc4T3F2Sjn6/tnSDv/rIzOo="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"jf4GswGdeLPlMvEktsU4kb5fDe8=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"mh4/Dc4T3F2Sjn6/tnSDv/rIzOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"SCWP+bTc49vScVwOKxgCn/doyxY="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"mh4/Dc4T3F2Sjn6/tnSDv/rIzOo=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"SCWP+bTc49vScVwOKxgCn/doyxY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"1+oUCsXmIBHVLNRPjuEsoncm6IE="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"SCWP+bTc49vScVwOKxgCn/doyxY=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"1+oUCsXmIBHVLNRPjuEsoncm6IE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"7gpQzquo0TuyeTPtiH7gUQO3jBs="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"1+oUCsXmIBHVLNRPjuEsoncm6IE=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"7gpQzquo0TuyeTPtiH7gUQO3jBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="},{"type":"next-occurrence","id":"61M4q50cTnI0/EX0BpipHiWwJ8E="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"7gpQzquo0TuyeTPtiH7gUQO3jBs=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"61M4q50cTnI0/EX0BpipHiWwJ8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1tq4Vlw2P1mctB0dzlal9v9wns4="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"61M4q50cTnI0/EX0BpipHiWwJ8E=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"NF198QoGoJ1RCrr8lH6MsyeK7Fc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cLJ8VpmIfHKRWCnSdxGZPsteZfc="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"NF198QoGoJ1RCrr8lH6MsyeK7Fc=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"cLJ8VpmIfHKRWCnSdxGZPsteZfc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NF198QoGoJ1RCrr8lH6MsyeK7Fc="},{"type":"next-occurrence","id":"NJlaJrw1VoPpiKDoWvEimEUr4tA="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"cLJ8VpmIfHKRWCnSdxGZPsteZfc=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"NJlaJrw1VoPpiKDoWvEimEUr4tA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NF198QoGoJ1RCrr8lH6MsyeK7Fc="},{"type":"next-occurrence","id":"pSjw/1i3LXTeAQKKpjosFEFvcD8="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"NJlaJrw1VoPpiKDoWvEimEUr4tA=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"pSjw/1i3LXTeAQKKpjosFEFvcD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NF198QoGoJ1RCrr8lH6MsyeK7Fc="},{"type":"next-occurrence","id":"qqGkgLdjvZzuBdPy/dFo3ZOO0Vo="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"pSjw/1i3LXTeAQKKpjosFEFvcD8=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"qqGkgLdjvZzuBdPy/dFo3ZOO0Vo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NF198QoGoJ1RCrr8lH6MsyeK7Fc="},{"type":"next-occurrence","id":"pdMBbA/fpAjSLi3cPKCZQpmvZT0="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"qqGkgLdjvZzuBdPy/dFo3ZOO0Vo=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"pdMBbA/fpAjSLi3cPKCZQpmvZT0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NF198QoGoJ1RCrr8lH6MsyeK7Fc="},{"type":"next-occurrence","id":"+0KizuSBhNEL1LMr44gxrv2v2+M="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"pdMBbA/fpAjSLi3cPKCZQpmvZT0=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"+0KizuSBhNEL1LMr44gxrv2v2+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NF198QoGoJ1RCrr8lH6MsyeK7Fc="},{"type":"next-occurrence","id":"PYerYo9/GBFAo04S29x6Uc89r8c="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"+0KizuSBhNEL1LMr44gxrv2v2+M=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"PYerYo9/GBFAo04S29x6Uc89r8c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NF198QoGoJ1RCrr8lH6MsyeK7Fc="},{"type":"next-occurrence","id":"KpNxjx301qpiUlcnLbsmkxkwWxk="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"PYerYo9/GBFAo04S29x6Uc89r8c=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"KpNxjx301qpiUlcnLbsmkxkwWxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NF198QoGoJ1RCrr8lH6MsyeK7Fc="},{"type":"next-occurrence","id":"Ph5HVPyIXnxaiOs0GeO+YZ2VzAg="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"KpNxjx301qpiUlcnLbsmkxkwWxk=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"Ph5HVPyIXnxaiOs0GeO+YZ2VzAg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NF198QoGoJ1RCrr8lH6MsyeK7Fc="},{"type":"next-occurrence","id":"QmAVQ++QkKa2HJLj3wH8W2mUQs0="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"Ph5HVPyIXnxaiOs0GeO+YZ2VzAg=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"QmAVQ++QkKa2HJLj3wH8W2mUQs0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NF198QoGoJ1RCrr8lH6MsyeK7Fc="},{"type":"next-occurrence","id":"6ZYOqdVnSu4jP916tUKpSaNGWXc="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"QmAVQ++QkKa2HJLj3wH8W2mUQs0=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T01:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"6ZYOqdVnSu4jP916tUKpSaNGWXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NF198QoGoJ1RCrr8lH6MsyeK7Fc="},{"type":"next-occurrence","id":"b4o1Tg4l+uUUopEQFyvJ/WDyZL8="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"6ZYOqdVnSu4jP916tUKpSaNGWXc=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"b4o1Tg4l+uUUopEQFyvJ/WDyZL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NF198QoGoJ1RCrr8lH6MsyeK7Fc="},{"type":"next-occurrence","id":"t4g08fo1DcW0rZzV2ME8gmPbU2g="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"b4o1Tg4l+uUUopEQFyvJ/WDyZL8=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"t4g08fo1DcW0rZzV2ME8gmPbU2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NF198QoGoJ1RCrr8lH6MsyeK7Fc="},{"type":"next-occurrence","id":"pOiNxgiaYJL02uPJLwes2V/0kvA="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"t4g08fo1DcW0rZzV2ME8gmPbU2g=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"pOiNxgiaYJL02uPJLwes2V/0kvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NF198QoGoJ1RCrr8lH6MsyeK7Fc="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"pOiNxgiaYJL02uPJLwes2V/0kvA=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"shEjKNFRofFzA+gRJd2XxtEKHIo="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"shEjKNFRofFzA+gRJd2XxtEKHIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"MPZbE01iIHaMZggYE5qNp7AnTY8="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"shEjKNFRofFzA+gRJd2XxtEKHIo=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"MPZbE01iIHaMZggYE5qNp7AnTY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"J7+661zm+M7crJsgKQPqbIT+elI="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"MPZbE01iIHaMZggYE5qNp7AnTY8=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T23:00:00Z","end_date":"2026-06-07T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"J7+661zm+M7crJsgKQPqbIT+elI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"mWEDHW3TO2mDJxPKZuxeS3YvtvU="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"J7+661zm+M7crJsgKQPqbIT+elI=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"mWEDHW3TO2mDJxPKZuxeS3YvtvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"dYeV5IY5NgP0dNwJprjYO7hv3fQ="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"mWEDHW3TO2mDJxPKZuxeS3YvtvU=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"dYeV5IY5NgP0dNwJprjYO7hv3fQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"c7op7D1b1e7UkM7ijNQR93GvdwY="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"dYeV5IY5NgP0dNwJprjYO7hv3fQ=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"c7op7D1b1e7UkM7ijNQR93GvdwY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"XZyW1KcXXRveOH99DF+XBwvUAiI="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"c7op7D1b1e7UkM7ijNQR93GvdwY=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"XZyW1KcXXRveOH99DF+XBwvUAiI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"pzRM31N4Eul5fk1oLq0LQ62Sxd8="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"XZyW1KcXXRveOH99DF+XBwvUAiI=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"pzRM31N4Eul5fk1oLq0LQ62Sxd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"I7n3Wq774qYIupdFGIR2+J9Fsdk="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"pzRM31N4Eul5fk1oLq0LQ62Sxd8=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"I7n3Wq774qYIupdFGIR2+J9Fsdk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"/ErWHl+MwY2oXKWG4VAOwe8uu2Y="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"I7n3Wq774qYIupdFGIR2+J9Fsdk=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"/ErWHl+MwY2oXKWG4VAOwe8uu2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"HEwFejAzS00io8uvvCfkwSeCTFA="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"/ErWHl+MwY2oXKWG4VAOwe8uu2Y=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"HEwFejAzS00io8uvvCfkwSeCTFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"D1QCEGeIsiYMllG1aF8nPxmZhQw="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"HEwFejAzS00io8uvvCfkwSeCTFA=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"D1QCEGeIsiYMllG1aF8nPxmZhQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"0AMS3iBCjZB2E/LkZ50Qq4wJ8SY="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"D1QCEGeIsiYMllG1aF8nPxmZhQw=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"0AMS3iBCjZB2E/LkZ50Qq4wJ8SY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"5hITX4yFwJKnkbXIJtCh8boon1w="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"0AMS3iBCjZB2E/LkZ50Qq4wJ8SY=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T23:00:00Z","end_date":"2026-06-14T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"5hITX4yFwJKnkbXIJtCh8boon1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"lb8TdBU055IbCmtX/K1GNMVGUC4="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"5hITX4yFwJKnkbXIJtCh8boon1w=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"lb8TdBU055IbCmtX/K1GNMVGUC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"UC9OwgJfj+3qpIyOY/MdV4aV3fk="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"lb8TdBU055IbCmtX/K1GNMVGUC4=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"UC9OwgJfj+3qpIyOY/MdV4aV3fk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"vcMPIjuyXOcHbYJGJz2GeoatFqY="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"UC9OwgJfj+3qpIyOY/MdV4aV3fk=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"vcMPIjuyXOcHbYJGJz2GeoatFqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"3ro2B7MIpSPTXYdbRJvUXEUtgbs="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"vcMPIjuyXOcHbYJGJz2GeoatFqY=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"3ro2B7MIpSPTXYdbRJvUXEUtgbs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"ARcyeNJpGkLUAV+Xb/pIJR2j0rI="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"3ro2B7MIpSPTXYdbRJvUXEUtgbs=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"ARcyeNJpGkLUAV+Xb/pIJR2j0rI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"zUeW5cBtlot4Y/EFRA/c0D1v1Js="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"ARcyeNJpGkLUAV+Xb/pIJR2j0rI=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"zUeW5cBtlot4Y/EFRA/c0D1v1Js=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"NITJfXWBmU521IJMIl9B66b7qDc="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"zUeW5cBtlot4Y/EFRA/c0D1v1Js=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"NITJfXWBmU521IJMIl9B66b7qDc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"QADMxJF55Jh1p0m2gmFOje5OCEY="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"NITJfXWBmU521IJMIl9B66b7qDc=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"QADMxJF55Jh1p0m2gmFOje5OCEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="},{"type":"next-occurrence","id":"DODdqkanUbmYyN4RlXs495wre9A="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"QADMxJF55Jh1p0m2gmFOje5OCEY=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"DODdqkanUbmYyN4RlXs495wre9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DcyhJqv0l9Qkq+BLwToE0Za+5Pg="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"DODdqkanUbmYyN4RlXs495wre9A=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"ORC300447034","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","description":"Construction on NJ 70 Westbound between East of CR 674/Greentree Rd (Cherry Hill Twp) and East of New Jersey Turnpike (Cherry Hill Twp) Wednesday June 4, 2025 07:00 AM thru 03:30 PM, 1 right lane of 4 lanes closed","update_date":"2025-06-04T19:30:01Z"},"road_event_id":"ORC300447034","beginning_cross_street":"East of CR 674/Greentree Rd","ending_cross_street":"East of New Jersey Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-03T19:06:31Z","end_date":"2025-06-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.971145,39.90459]]}},{"id":"kV+gWmboPqNKVJFkFtKTpxD4vhk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BxM11 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction southbound, BxM11 Bus between Bronx River Pky/Boston Rd (New York) and Madison Av/E 99 St (New York) are detouring from E 177th St at Bronx River Parkway to Bruckner Blvd at Bruckner Expy - no stops will be missed. , Continuous Saturday May 24th, 2025 12:00 AM thru Friday December 31st, 2027 11:59 PM","update_date":"2025-05-23T18:34:58Z"},"road_event_id":"kV+gWmboPqNKVJFkFtKTpxD4vhk=","beginning_cross_street":"Bronx River Pky/Boston Rd","ending_cross_street":"Madison Av/E 99 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.872369,40.853637]]}},{"id":"Q5HVvpnA6cwUmUEd3q5VgZW4UXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+QwhQLtooFKL6Ul3qDxT+KVTXX0="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lanes closures","update_date":"2026-05-26T20:00:19Z"},"road_event_id":"Q5HVvpnA6cwUmUEd3q5VgZW4UXo=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"+QwhQLtooFKL6Ul3qDxT+KVTXX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q5HVvpnA6cwUmUEd3q5VgZW4UXo="},{"type":"next-occurrence","id":"d5VEGBvlhRmAh+ZbazVwxuCf8tg="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lanes closures","update_date":"2026-05-26T20:00:19Z"},"road_event_id":"+QwhQLtooFKL6Ul3qDxT+KVTXX0=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"d5VEGBvlhRmAh+ZbazVwxuCf8tg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q5HVvpnA6cwUmUEd3q5VgZW4UXo="},{"type":"next-occurrence","id":"n4XE3bE8ReFHGVkXN9U6UGpHDOI="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lanes closures","update_date":"2026-05-26T20:00:19Z"},"road_event_id":"d5VEGBvlhRmAh+ZbazVwxuCf8tg=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"n4XE3bE8ReFHGVkXN9U6UGpHDOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q5HVvpnA6cwUmUEd3q5VgZW4UXo="},{"type":"next-occurrence","id":"bkuv6LOB/wQH6ZVehC/4nno/wEg="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lanes closures","update_date":"2026-05-26T20:00:19Z"},"road_event_id":"n4XE3bE8ReFHGVkXN9U6UGpHDOI=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"bkuv6LOB/wQH6ZVehC/4nno/wEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q5HVvpnA6cwUmUEd3q5VgZW4UXo="},{"type":"next-occurrence","id":"+72nsGNDRsvxnlkEjz4uaUIRNFk="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lanes closures","update_date":"2026-05-26T20:00:19Z"},"road_event_id":"bkuv6LOB/wQH6ZVehC/4nno/wEg=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"+72nsGNDRsvxnlkEjz4uaUIRNFk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q5HVvpnA6cwUmUEd3q5VgZW4UXo="},{"type":"next-occurrence","id":"aXcn3jRk4X3ebwSclpDyyfjLPVs="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lanes closures","update_date":"2026-05-26T20:00:19Z"},"road_event_id":"+72nsGNDRsvxnlkEjz4uaUIRNFk=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"aXcn3jRk4X3ebwSclpDyyfjLPVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q5HVvpnA6cwUmUEd3q5VgZW4UXo="},{"type":"next-occurrence","id":"/IHW7BDroKsY5+92IdKObeEe5VA="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lanes closures","update_date":"2026-05-26T20:00:19Z"},"road_event_id":"aXcn3jRk4X3ebwSclpDyyfjLPVs=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"/IHW7BDroKsY5+92IdKObeEe5VA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q5HVvpnA6cwUmUEd3q5VgZW4UXo="},{"type":"next-occurrence","id":"supW2cK1ZVf31s3dtHgKTZ4k9fc="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lanes closures","update_date":"2026-05-26T20:00:19Z"},"road_event_id":"/IHW7BDroKsY5+92IdKObeEe5VA=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"supW2cK1ZVf31s3dtHgKTZ4k9fc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q5HVvpnA6cwUmUEd3q5VgZW4UXo="},{"type":"next-occurrence","id":"HtzfFRWRkrR3FGAuxj+zq0OEfXE="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lanes closures","update_date":"2026-05-26T20:00:19Z"},"road_event_id":"supW2cK1ZVf31s3dtHgKTZ4k9fc=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"HtzfFRWRkrR3FGAuxj+zq0OEfXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q5HVvpnA6cwUmUEd3q5VgZW4UXo="},{"type":"next-occurrence","id":"L1Z87eWr1sBNuRTHYRDJCEq5aVo="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lanes closures","update_date":"2026-05-26T20:00:19Z"},"road_event_id":"HtzfFRWRkrR3FGAuxj+zq0OEfXE=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"L1Z87eWr1sBNuRTHYRDJCEq5aVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q5HVvpnA6cwUmUEd3q5VgZW4UXo="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lanes closures","update_date":"2026-05-26T20:00:19Z"},"road_event_id":"L1Z87eWr1sBNuRTHYRDJCEq5aVo=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"OxxsEcWuxhHFhQHNnbzogXKJsao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PNv+hzLKVweLEb+qzJDUwfBql80="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"OxxsEcWuxhHFhQHNnbzogXKJsao=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"PNv+hzLKVweLEb+qzJDUwfBql80=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OxxsEcWuxhHFhQHNnbzogXKJsao="},{"type":"next-occurrence","id":"Xz/ZXRfEkiVDmWG74LKbNxMUEHk="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"PNv+hzLKVweLEb+qzJDUwfBql80=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"Xz/ZXRfEkiVDmWG74LKbNxMUEHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OxxsEcWuxhHFhQHNnbzogXKJsao="},{"type":"next-occurrence","id":"Oz/Eptj1IUSiFrGqvJnq+dph94A="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"Xz/ZXRfEkiVDmWG74LKbNxMUEHk=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"Oz/Eptj1IUSiFrGqvJnq+dph94A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OxxsEcWuxhHFhQHNnbzogXKJsao="},{"type":"next-occurrence","id":"cSp2EVOIgL+8+TqTNUzBurlnIlw="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"Oz/Eptj1IUSiFrGqvJnq+dph94A=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"cSp2EVOIgL+8+TqTNUzBurlnIlw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OxxsEcWuxhHFhQHNnbzogXKJsao="},{"type":"next-occurrence","id":"b0QolNnfczNGDRb63sfFEwFPKMs="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"cSp2EVOIgL+8+TqTNUzBurlnIlw=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"b0QolNnfczNGDRb63sfFEwFPKMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OxxsEcWuxhHFhQHNnbzogXKJsao="},{"type":"next-occurrence","id":"Yw9ycSdqaXlFqs9T01nFyDDzNlw="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"b0QolNnfczNGDRb63sfFEwFPKMs=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"Yw9ycSdqaXlFqs9T01nFyDDzNlw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OxxsEcWuxhHFhQHNnbzogXKJsao="},{"type":"next-occurrence","id":"MKN4d4e5lFpQMcMHcbgymDu5e7c="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"Yw9ycSdqaXlFqs9T01nFyDDzNlw=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"MKN4d4e5lFpQMcMHcbgymDu5e7c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OxxsEcWuxhHFhQHNnbzogXKJsao="},{"type":"next-occurrence","id":"LdIQZGhYcm8ouFArYsAqhgzMbfk="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"MKN4d4e5lFpQMcMHcbgymDu5e7c=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"LdIQZGhYcm8ouFArYsAqhgzMbfk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OxxsEcWuxhHFhQHNnbzogXKJsao="},{"type":"next-occurrence","id":"2GYJli2EE+KcWLK5iPAi4+2+cZ8="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"LdIQZGhYcm8ouFArYsAqhgzMbfk=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"2GYJli2EE+KcWLK5iPAi4+2+cZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OxxsEcWuxhHFhQHNnbzogXKJsao="},{"type":"next-occurrence","id":"bjO2hadrHEzuSu7k66QO2O/mQvw="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"2GYJli2EE+KcWLK5iPAi4+2+cZ8=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"bjO2hadrHEzuSu7k66QO2O/mQvw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OxxsEcWuxhHFhQHNnbzogXKJsao="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"bjO2hadrHEzuSu7k66QO2O/mQvw=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"ThDhO3y+CRdKyjEVGJYAFMY5pC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Traffic shift on I-95 northbound between Exit 73 - Society Road (East Lyme), Continuous Monday December 9th, 2024 12:00 AM thru Monday November 30th, 2026 11:59 PM All lanes shift","update_date":"2024-11-26T21:04:12Z"},"road_event_id":"ThDhO3y+CRdKyjEVGJYAFMY5pC4=","beginning_cross_street":"Exit 73 - Society Road","ending_cross_street":"Exit 73 - Society Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.214689,41.356571]]}},{"id":"ORC300428891","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONROE AVE"],"direction":"unknown","description":"Crane operations on MONROE AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Not currently Scheduled","update_date":"2025-02-24T19:00:02Z"},"road_event_id":"ORC300428891","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-02-17T19:56:48Z","end_date":"2025-02-25T04:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.906672,40.844662]]}},{"id":"1g66jpsBoviSHphXCtbdiElyLBY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Construction on I-95 northbound Entrance ramp Exit 43 - CT 122/First Avenue (West Haven) The Exit 43 on-ramp to I-95 northbound which is located on First Avenue in West Haven will be closed on July 21, 2025, until November 2027. Motorists traveling to I-95 northbound may take the detour route to Interchange 44 via First Avenue southbound, Route 122 (Kimberly Avenue), and Ella T. Grasso Boulevard in New Haven. Alternatively, motorists traveling to I-95 northbound may take the detour route to Interchange 44 via Campbell Avenue northbound, Boston Post Road, and Ella T. Grasso Boulevard in New Haven., Continuous Monday July 21st, 2025 12:00 AM thru Monday November 1st, 2027 11:59 PM All lanes closed","update_date":"2025-07-23T15:56:14Z"},"road_event_id":"1g66jpsBoviSHphXCtbdiElyLBY=","beginning_cross_street":"Exit 43 - CT 122/First Avenue","ending_cross_street":"Exit 43 - CT 122/First Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.950021,41.283375]]}},{"id":"AzDgUnyKdng4rcGYSl+9icfW+BQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Ob9QLQ+6he7HpAPqld9WQrRMntY="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"AzDgUnyKdng4rcGYSl+9icfW+BQ=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"Ob9QLQ+6he7HpAPqld9WQrRMntY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzDgUnyKdng4rcGYSl+9icfW+BQ="},{"type":"next-occurrence","id":"aVgAo9A13VUl8eLSC4X0Tekb9xU="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"Ob9QLQ+6he7HpAPqld9WQrRMntY=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"aVgAo9A13VUl8eLSC4X0Tekb9xU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzDgUnyKdng4rcGYSl+9icfW+BQ="},{"type":"next-occurrence","id":"O00sA4qwMMsm9H03Wwu4MTuxjIQ="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"aVgAo9A13VUl8eLSC4X0Tekb9xU=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"O00sA4qwMMsm9H03Wwu4MTuxjIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzDgUnyKdng4rcGYSl+9icfW+BQ="},{"type":"next-occurrence","id":"Y1vKd/jvaMs/Qn/OSBYhEF0UMN4="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"O00sA4qwMMsm9H03Wwu4MTuxjIQ=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"Y1vKd/jvaMs/Qn/OSBYhEF0UMN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzDgUnyKdng4rcGYSl+9icfW+BQ="},{"type":"next-occurrence","id":"0EzX1ZDTfBCi462YyrT1TbVdxgM="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"Y1vKd/jvaMs/Qn/OSBYhEF0UMN4=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"0EzX1ZDTfBCi462YyrT1TbVdxgM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzDgUnyKdng4rcGYSl+9icfW+BQ="},{"type":"next-occurrence","id":"U6P/3RS4nTEG6Pfd//8Ejg9YH54="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"0EzX1ZDTfBCi462YyrT1TbVdxgM=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"U6P/3RS4nTEG6Pfd//8Ejg9YH54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzDgUnyKdng4rcGYSl+9icfW+BQ="},{"type":"next-occurrence","id":"BI1HeMvOVMimG+WukHEZX7nfE8k="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"U6P/3RS4nTEG6Pfd//8Ejg9YH54=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"BI1HeMvOVMimG+WukHEZX7nfE8k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzDgUnyKdng4rcGYSl+9icfW+BQ="},{"type":"next-occurrence","id":"ugJj7Kbl71cIvb1sRdsKeTz7bas="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"BI1HeMvOVMimG+WukHEZX7nfE8k=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"ugJj7Kbl71cIvb1sRdsKeTz7bas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzDgUnyKdng4rcGYSl+9icfW+BQ="},{"type":"next-occurrence","id":"l6bpzfmYRkotZ67FD5Qq3dPxXEE="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"ugJj7Kbl71cIvb1sRdsKeTz7bas=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"l6bpzfmYRkotZ67FD5Qq3dPxXEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzDgUnyKdng4rcGYSl+9icfW+BQ="},{"type":"next-occurrence","id":"M4TukwZqgS+PrIW6x2iEq1zOuSE="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"l6bpzfmYRkotZ67FD5Qq3dPxXEE=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"M4TukwZqgS+PrIW6x2iEq1zOuSE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzDgUnyKdng4rcGYSl+9icfW+BQ="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"M4TukwZqgS+PrIW6x2iEq1zOuSE=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"ORC300448420","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","description":"Roadwork on NJ 18 Northbound between South of Exit 19 - NJ 34 (Colts Neck Twp) and South of Exit 29 - Tennent Rd/CR 3/CR 520 (Marlboro Twp), Thursday June 12, 2025 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2025-06-12T19:00:12Z"},"road_event_id":"ORC300448420","beginning_cross_street":"South of Exit 19 - NJ 34","ending_cross_street":"South of Exit 29 - Tennent Rd/CR 3/CR 520","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-09T20:06:10Z","end_date":"2025-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.134445,40.281414]]}},{"id":"ORC300448421","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","description":"Roadwork on NJ 18 Southbound between South of Exit 29 - Tennent Rd/CR 3/CR 520 (Marlboro Twp) and South of Exit 19 - NJ 34 (Colts Neck Twp), left shoulder","update_date":"2025-06-12T19:00:12Z"},"road_event_id":"ORC300448421","beginning_cross_street":"South of Exit 29 - Tennent Rd/CR 3/CR 520","ending_cross_street":"South of Exit 19 - NJ 34","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-09T20:06:09Z","end_date":"2025-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.280418,40.341743]]}},{"id":"mi3lVpDPJMJdc7A9ozKKAzyouKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qr7HzIhOR0NQwFwgBI684wjNqss="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"mi3lVpDPJMJdc7A9ozKKAzyouKc=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T05:00:00Z","end_date":"2026-06-05T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"qr7HzIhOR0NQwFwgBI684wjNqss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mi3lVpDPJMJdc7A9ozKKAzyouKc="},{"type":"next-occurrence","id":"Vgz8m1fZUQv6uo7y5m2KlfX22Qg="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"qr7HzIhOR0NQwFwgBI684wjNqss=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"Vgz8m1fZUQv6uo7y5m2KlfX22Qg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mi3lVpDPJMJdc7A9ozKKAzyouKc="},{"type":"next-occurrence","id":"8TYGP/NSSZU5vVSX/fs29wHZe1g="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"Vgz8m1fZUQv6uo7y5m2KlfX22Qg=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T05:00:00Z","end_date":"2026-06-07T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"8TYGP/NSSZU5vVSX/fs29wHZe1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mi3lVpDPJMJdc7A9ozKKAzyouKc="},{"type":"next-occurrence","id":"y4729Vxz1j9ZRhbtCGuqsBq2MAQ="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"8TYGP/NSSZU5vVSX/fs29wHZe1g=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T05:00:00Z","end_date":"2026-06-08T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"y4729Vxz1j9ZRhbtCGuqsBq2MAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mi3lVpDPJMJdc7A9ozKKAzyouKc="},{"type":"next-occurrence","id":"SvtSPUs6drXV9plX3AMHD/YBL50="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"y4729Vxz1j9ZRhbtCGuqsBq2MAQ=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"SvtSPUs6drXV9plX3AMHD/YBL50=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mi3lVpDPJMJdc7A9ozKKAzyouKc="},{"type":"next-occurrence","id":"QY8+P9ZBOXFSEyf2Eb2Or7sBHPY="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"SvtSPUs6drXV9plX3AMHD/YBL50=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"QY8+P9ZBOXFSEyf2Eb2Or7sBHPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mi3lVpDPJMJdc7A9ozKKAzyouKc="},{"type":"next-occurrence","id":"PtIoDJ5/Yv0oyZAu5EjxOx5PrSk="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"QY8+P9ZBOXFSEyf2Eb2Or7sBHPY=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"PtIoDJ5/Yv0oyZAu5EjxOx5PrSk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mi3lVpDPJMJdc7A9ozKKAzyouKc="},{"type":"next-occurrence","id":"84sl13xVVTPWVWS7f3n87BFRIcg="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"PtIoDJ5/Yv0oyZAu5EjxOx5PrSk=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"84sl13xVVTPWVWS7f3n87BFRIcg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mi3lVpDPJMJdc7A9ozKKAzyouKc="},{"type":"next-occurrence","id":"EVuDl3PGjg0cRPWjvVfFQrwXxGs="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"84sl13xVVTPWVWS7f3n87BFRIcg=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"EVuDl3PGjg0cRPWjvVfFQrwXxGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mi3lVpDPJMJdc7A9ozKKAzyouKc="},{"type":"next-occurrence","id":"+Ecrk+3D/ISLZS5odNPed0/1f+o="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"EVuDl3PGjg0cRPWjvVfFQrwXxGs=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T05:00:00Z","end_date":"2026-06-14T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"+Ecrk+3D/ISLZS5odNPed0/1f+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mi3lVpDPJMJdc7A9ozKKAzyouKc="},{"type":"next-occurrence","id":"9/baTVsa8DRnzAJ6YwmRCH4zD54="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"+Ecrk+3D/ISLZS5odNPed0/1f+o=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T05:00:00Z","end_date":"2026-06-15T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"9/baTVsa8DRnzAJ6YwmRCH4zD54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mi3lVpDPJMJdc7A9ozKKAzyouKc="},{"type":"next-occurrence","id":"THzpz9UinMp1z+1nZbjAkdu3SSA="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"9/baTVsa8DRnzAJ6YwmRCH4zD54=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T02:00:00Z","end_date":"2026-06-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"THzpz9UinMp1z+1nZbjAkdu3SSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mi3lVpDPJMJdc7A9ozKKAzyouKc="},{"type":"next-occurrence","id":"+4179FwUfDPNnvc2Cb1A+WDHcPM="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"THzpz9UinMp1z+1nZbjAkdu3SSA=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T02:00:00Z","end_date":"2026-06-17T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"+4179FwUfDPNnvc2Cb1A+WDHcPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mi3lVpDPJMJdc7A9ozKKAzyouKc="},{"type":"next-occurrence","id":"Ouk9KqUHAmfDjnvwfPcHzeW4310="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"+4179FwUfDPNnvc2Cb1A+WDHcPM=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T02:00:00Z","end_date":"2026-06-18T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"Ouk9KqUHAmfDjnvwfPcHzeW4310=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mi3lVpDPJMJdc7A9ozKKAzyouKc="},{"type":"next-occurrence","id":"wHp9jSdKuCuaaNP/bs97Muvwn1U="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"Ouk9KqUHAmfDjnvwfPcHzeW4310=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T02:00:00Z","end_date":"2026-06-19T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"wHp9jSdKuCuaaNP/bs97Muvwn1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mi3lVpDPJMJdc7A9ozKKAzyouKc="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"wHp9jSdKuCuaaNP/bs97Muvwn1U=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T02:00:00Z","end_date":"2026-06-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"N/tQulVaYBFWTeVaSR4vv7Qt+Vo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zWTdbjFfWVMmmC46p+VLJG2uqeY="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"N/tQulVaYBFWTeVaSR4vv7Qt+Vo=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T05:00:00Z","end_date":"2026-06-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"zWTdbjFfWVMmmC46p+VLJG2uqeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N/tQulVaYBFWTeVaSR4vv7Qt+Vo="},{"type":"next-occurrence","id":"4AxcLLlKS0UjsQjVhCCqJZk5kdE="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"zWTdbjFfWVMmmC46p+VLJG2uqeY=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"4AxcLLlKS0UjsQjVhCCqJZk5kdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N/tQulVaYBFWTeVaSR4vv7Qt+Vo="},{"type":"next-occurrence","id":"4s+oc4IYUYkUQktiVEKSxY5XMDQ="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"4AxcLLlKS0UjsQjVhCCqJZk5kdE=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T05:00:00Z","end_date":"2026-06-07T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"4s+oc4IYUYkUQktiVEKSxY5XMDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N/tQulVaYBFWTeVaSR4vv7Qt+Vo="},{"type":"next-occurrence","id":"g7JA8k7hB6XgqQrKJYpy7tRsxFw="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"4s+oc4IYUYkUQktiVEKSxY5XMDQ=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T05:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"g7JA8k7hB6XgqQrKJYpy7tRsxFw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N/tQulVaYBFWTeVaSR4vv7Qt+Vo="},{"type":"next-occurrence","id":"Nm4AcIMVCkqFuwTSlwHQ7IxQwW8="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"g7JA8k7hB6XgqQrKJYpy7tRsxFw=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"Nm4AcIMVCkqFuwTSlwHQ7IxQwW8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N/tQulVaYBFWTeVaSR4vv7Qt+Vo="},{"type":"next-occurrence","id":"Q6VxqMP2G8JFK1Nm/I8/+bHn8Yo="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"Nm4AcIMVCkqFuwTSlwHQ7IxQwW8=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"Q6VxqMP2G8JFK1Nm/I8/+bHn8Yo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N/tQulVaYBFWTeVaSR4vv7Qt+Vo="},{"type":"next-occurrence","id":"x8kpvQ1vwgmVLocszzfc6zhWcHU="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"Q6VxqMP2G8JFK1Nm/I8/+bHn8Yo=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"x8kpvQ1vwgmVLocszzfc6zhWcHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N/tQulVaYBFWTeVaSR4vv7Qt+Vo="},{"type":"next-occurrence","id":"0CNPDu2ag7F9XYMzfvxbnFJQ3cQ="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"x8kpvQ1vwgmVLocszzfc6zhWcHU=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"0CNPDu2ag7F9XYMzfvxbnFJQ3cQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N/tQulVaYBFWTeVaSR4vv7Qt+Vo="},{"type":"next-occurrence","id":"zXHPSCLkzGq27ozqzVH/8jdWw/w="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"0CNPDu2ag7F9XYMzfvxbnFJQ3cQ=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"zXHPSCLkzGq27ozqzVH/8jdWw/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N/tQulVaYBFWTeVaSR4vv7Qt+Vo="},{"type":"next-occurrence","id":"nXh78mS60rNmbV/s4PDJZlfJu90="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"zXHPSCLkzGq27ozqzVH/8jdWw/w=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T05:00:00Z","end_date":"2026-06-14T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"nXh78mS60rNmbV/s4PDJZlfJu90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N/tQulVaYBFWTeVaSR4vv7Qt+Vo="},{"type":"next-occurrence","id":"tssGIsYIjIfMQtajmpFulNUamlo="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"nXh78mS60rNmbV/s4PDJZlfJu90=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T05:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"tssGIsYIjIfMQtajmpFulNUamlo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N/tQulVaYBFWTeVaSR4vv7Qt+Vo="},{"type":"next-occurrence","id":"L8tPbkq7loIUjC6M80wNOZnL4OE="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"tssGIsYIjIfMQtajmpFulNUamlo=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T02:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"L8tPbkq7loIUjC6M80wNOZnL4OE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N/tQulVaYBFWTeVaSR4vv7Qt+Vo="},{"type":"next-occurrence","id":"sjKSM/5ad57MkfcVuOMOVFlDsl0="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"L8tPbkq7loIUjC6M80wNOZnL4OE=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T02:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"sjKSM/5ad57MkfcVuOMOVFlDsl0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N/tQulVaYBFWTeVaSR4vv7Qt+Vo="},{"type":"next-occurrence","id":"04JNFAtnnDDjR/0b16cyVaFlblw="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"sjKSM/5ad57MkfcVuOMOVFlDsl0=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T02:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"04JNFAtnnDDjR/0b16cyVaFlblw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N/tQulVaYBFWTeVaSR4vv7Qt+Vo="},{"type":"next-occurrence","id":"avBHJABNWzYtk23jPqprL6+d2nQ="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"04JNFAtnnDDjR/0b16cyVaFlblw=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T02:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"avBHJABNWzYtk23jPqprL6+d2nQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N/tQulVaYBFWTeVaSR4vv7Qt+Vo="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"avBHJABNWzYtk23jPqprL6+d2nQ=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T02:00:00Z","end_date":"2026-06-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"ib8jwhZkSZjT1UCC0db3VrThdag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+8VGvx/p8rDQdnVTSlC25nDbc5g="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"ib8jwhZkSZjT1UCC0db3VrThdag=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"+8VGvx/p8rDQdnVTSlC25nDbc5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ib8jwhZkSZjT1UCC0db3VrThdag="},{"type":"next-occurrence","id":"SwPzaEuCYd2EPizFksncDJcc25c="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"+8VGvx/p8rDQdnVTSlC25nDbc5g=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"SwPzaEuCYd2EPizFksncDJcc25c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ib8jwhZkSZjT1UCC0db3VrThdag="},{"type":"next-occurrence","id":"ZsKJ1TeG0HrtERGnJsNfL6KD9U8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"SwPzaEuCYd2EPizFksncDJcc25c=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"ZsKJ1TeG0HrtERGnJsNfL6KD9U8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ib8jwhZkSZjT1UCC0db3VrThdag="},{"type":"next-occurrence","id":"XJDEb/IKHOMUbJjAhfDkICwkyX8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"ZsKJ1TeG0HrtERGnJsNfL6KD9U8=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"XJDEb/IKHOMUbJjAhfDkICwkyX8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ib8jwhZkSZjT1UCC0db3VrThdag="},{"type":"next-occurrence","id":"16MoiLkfd+O9M1iB6Q2qSZRI4kQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"XJDEb/IKHOMUbJjAhfDkICwkyX8=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"16MoiLkfd+O9M1iB6Q2qSZRI4kQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ib8jwhZkSZjT1UCC0db3VrThdag="},{"type":"next-occurrence","id":"dxFOL9qdSq+nIoWFFY/vi4MNRrA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"16MoiLkfd+O9M1iB6Q2qSZRI4kQ=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"dxFOL9qdSq+nIoWFFY/vi4MNRrA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ib8jwhZkSZjT1UCC0db3VrThdag="},{"type":"next-occurrence","id":"8ZLadn14S6X2EnuyS5uWrNF0DaI="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"dxFOL9qdSq+nIoWFFY/vi4MNRrA=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"8ZLadn14S6X2EnuyS5uWrNF0DaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ib8jwhZkSZjT1UCC0db3VrThdag="},{"type":"next-occurrence","id":"7OUJYwZeknvl8nYnAXlvGA2o40g="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"8ZLadn14S6X2EnuyS5uWrNF0DaI=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"7OUJYwZeknvl8nYnAXlvGA2o40g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ib8jwhZkSZjT1UCC0db3VrThdag="},{"type":"next-occurrence","id":"d6lBrdX2whMtoWdYRg3deViKRAw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"7OUJYwZeknvl8nYnAXlvGA2o40g=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"d6lBrdX2whMtoWdYRg3deViKRAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ib8jwhZkSZjT1UCC0db3VrThdag="},{"type":"next-occurrence","id":"ZDt8dNYncAX4ECs6dbJ7eD/hxNY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"d6lBrdX2whMtoWdYRg3deViKRAw=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"ZDt8dNYncAX4ECs6dbJ7eD/hxNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ib8jwhZkSZjT1UCC0db3VrThdag="},{"type":"next-occurrence","id":"ta7+SUfeK9y8XXpnRUQJRRYl8bE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"ZDt8dNYncAX4ECs6dbJ7eD/hxNY=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"ta7+SUfeK9y8XXpnRUQJRRYl8bE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ib8jwhZkSZjT1UCC0db3VrThdag="},{"type":"next-occurrence","id":"fFIHuH1wQSeLlLHVRRI7HYfKO9M="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"ta7+SUfeK9y8XXpnRUQJRRYl8bE=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"fFIHuH1wQSeLlLHVRRI7HYfKO9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ib8jwhZkSZjT1UCC0db3VrThdag="},{"type":"next-occurrence","id":"Ovdo7ezN54YxuMJdjk9vNMprIG4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"fFIHuH1wQSeLlLHVRRI7HYfKO9M=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"Ovdo7ezN54YxuMJdjk9vNMprIG4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ib8jwhZkSZjT1UCC0db3VrThdag="},{"type":"next-occurrence","id":"xYO4hrnlnG087sBkXYGoPukgsBU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"Ovdo7ezN54YxuMJdjk9vNMprIG4=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"xYO4hrnlnG087sBkXYGoPukgsBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ib8jwhZkSZjT1UCC0db3VrThdag="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"xYO4hrnlnG087sBkXYGoPukgsBU=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"oxoc0/goNkRQ9RYe2JKlfB8K+iQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FbNu0GZkQpfzP2IdxyQ6I/qDCPk="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"oxoc0/goNkRQ9RYe2JKlfB8K+iQ=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"FbNu0GZkQpfzP2IdxyQ6I/qDCPk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oxoc0/goNkRQ9RYe2JKlfB8K+iQ="},{"type":"next-occurrence","id":"w1gw7q+SyAH5Wx1VXCOhZdw8IUM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"FbNu0GZkQpfzP2IdxyQ6I/qDCPk=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T21:00:00Z","end_date":"2026-06-07T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"w1gw7q+SyAH5Wx1VXCOhZdw8IUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oxoc0/goNkRQ9RYe2JKlfB8K+iQ="},{"type":"next-occurrence","id":"pC3L83SoSQcGFhhQYXyN/oz/q3c="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"w1gw7q+SyAH5Wx1VXCOhZdw8IUM=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T20:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"pC3L83SoSQcGFhhQYXyN/oz/q3c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oxoc0/goNkRQ9RYe2JKlfB8K+iQ="},{"type":"next-occurrence","id":"w/DcKUhgw9gNPm02bPNXoSkkbu4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"pC3L83SoSQcGFhhQYXyN/oz/q3c=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"w/DcKUhgw9gNPm02bPNXoSkkbu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oxoc0/goNkRQ9RYe2JKlfB8K+iQ="},{"type":"next-occurrence","id":"irWp+RelDlKUx5N2NP5N3RaAPDE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"w/DcKUhgw9gNPm02bPNXoSkkbu4=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"irWp+RelDlKUx5N2NP5N3RaAPDE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oxoc0/goNkRQ9RYe2JKlfB8K+iQ="},{"type":"next-occurrence","id":"7xS5FgUimoRtNzgoOr83I89jszQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"irWp+RelDlKUx5N2NP5N3RaAPDE=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"7xS5FgUimoRtNzgoOr83I89jszQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oxoc0/goNkRQ9RYe2JKlfB8K+iQ="},{"type":"next-occurrence","id":"FmLL1EJKPJ3FAZ4sE6inYu7zY4s="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"7xS5FgUimoRtNzgoOr83I89jszQ=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"FmLL1EJKPJ3FAZ4sE6inYu7zY4s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oxoc0/goNkRQ9RYe2JKlfB8K+iQ="},{"type":"next-occurrence","id":"UNQHwkutBBWl834umKr47NhUaEc="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"FmLL1EJKPJ3FAZ4sE6inYu7zY4s=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"UNQHwkutBBWl834umKr47NhUaEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oxoc0/goNkRQ9RYe2JKlfB8K+iQ="},{"type":"next-occurrence","id":"uZNlRCpjVpN/6b6v25qgCS5TKiY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"UNQHwkutBBWl834umKr47NhUaEc=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T21:00:00Z","end_date":"2026-06-14T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"uZNlRCpjVpN/6b6v25qgCS5TKiY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oxoc0/goNkRQ9RYe2JKlfB8K+iQ="},{"type":"next-occurrence","id":"dEATTkPAKeJaOZpjNTE0r2x4+Hw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"uZNlRCpjVpN/6b6v25qgCS5TKiY=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T20:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"dEATTkPAKeJaOZpjNTE0r2x4+Hw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oxoc0/goNkRQ9RYe2JKlfB8K+iQ="},{"type":"next-occurrence","id":"X2PuHcQwa0qg1k7PIDuzNaP/+ts="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"dEATTkPAKeJaOZpjNTE0r2x4+Hw=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"X2PuHcQwa0qg1k7PIDuzNaP/+ts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oxoc0/goNkRQ9RYe2JKlfB8K+iQ="},{"type":"next-occurrence","id":"FEr2604wNf7nlzrbY6ZpRNPg0ms="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"X2PuHcQwa0qg1k7PIDuzNaP/+ts=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"FEr2604wNf7nlzrbY6ZpRNPg0ms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oxoc0/goNkRQ9RYe2JKlfB8K+iQ="},{"type":"next-occurrence","id":"gJOoXCQ/oVwIRNqGmUQzXRzlxU8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"FEr2604wNf7nlzrbY6ZpRNPg0ms=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"gJOoXCQ/oVwIRNqGmUQzXRzlxU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oxoc0/goNkRQ9RYe2JKlfB8K+iQ="},{"type":"next-occurrence","id":"dAcsCXqOPHvINYrCns7pIYtDF4A="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"gJOoXCQ/oVwIRNqGmUQzXRzlxU8=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"dAcsCXqOPHvINYrCns7pIYtDF4A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oxoc0/goNkRQ9RYe2JKlfB8K+iQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"dAcsCXqOPHvINYrCns7pIYtDF4A=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"IpWD+6du8ZZDSnnbYD7XKq7Po38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2wJTMam0X/Ezx+MC1mpLnLFoyJg="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"IpWD+6du8ZZDSnnbYD7XKq7Po38=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"2wJTMam0X/Ezx+MC1mpLnLFoyJg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpWD+6du8ZZDSnnbYD7XKq7Po38="},{"type":"next-occurrence","id":"HP1VTLvbMG1nOY+Q42UqIqHY/W4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"2wJTMam0X/Ezx+MC1mpLnLFoyJg=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T21:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"HP1VTLvbMG1nOY+Q42UqIqHY/W4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpWD+6du8ZZDSnnbYD7XKq7Po38="},{"type":"next-occurrence","id":"hrv/e+fNQVa3cuVpV8fHlbgRQFY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"HP1VTLvbMG1nOY+Q42UqIqHY/W4=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"hrv/e+fNQVa3cuVpV8fHlbgRQFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpWD+6du8ZZDSnnbYD7XKq7Po38="},{"type":"next-occurrence","id":"b25rYTZGG0c7JES1HfZif2JDEs4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"hrv/e+fNQVa3cuVpV8fHlbgRQFY=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"b25rYTZGG0c7JES1HfZif2JDEs4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpWD+6du8ZZDSnnbYD7XKq7Po38="},{"type":"next-occurrence","id":"B+GzMRznpGFxEKgPi1W+JxWLDFI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"b25rYTZGG0c7JES1HfZif2JDEs4=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"B+GzMRznpGFxEKgPi1W+JxWLDFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpWD+6du8ZZDSnnbYD7XKq7Po38="},{"type":"next-occurrence","id":"9jWLWJtwfHDqsq4xb2ncotarFLg="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"B+GzMRznpGFxEKgPi1W+JxWLDFI=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"9jWLWJtwfHDqsq4xb2ncotarFLg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpWD+6du8ZZDSnnbYD7XKq7Po38="},{"type":"next-occurrence","id":"Cevo269g61HUDDO1EwB13/oGoQI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"9jWLWJtwfHDqsq4xb2ncotarFLg=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"Cevo269g61HUDDO1EwB13/oGoQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpWD+6du8ZZDSnnbYD7XKq7Po38="},{"type":"next-occurrence","id":"pF04JaHcQ4TqRRbhXbx9GYcqEvI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"Cevo269g61HUDDO1EwB13/oGoQI=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"pF04JaHcQ4TqRRbhXbx9GYcqEvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpWD+6du8ZZDSnnbYD7XKq7Po38="},{"type":"next-occurrence","id":"dnpykJ7F6HUqqW8pbBL+WTGa6lI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"pF04JaHcQ4TqRRbhXbx9GYcqEvI=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T21:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"dnpykJ7F6HUqqW8pbBL+WTGa6lI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpWD+6du8ZZDSnnbYD7XKq7Po38="},{"type":"next-occurrence","id":"63WfIFl3OpwQssKvoVMvqS2DA9c="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"dnpykJ7F6HUqqW8pbBL+WTGa6lI=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"63WfIFl3OpwQssKvoVMvqS2DA9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpWD+6du8ZZDSnnbYD7XKq7Po38="},{"type":"next-occurrence","id":"v/pJ0L1rwz7tLQNd/sQdoZGxC/k="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"63WfIFl3OpwQssKvoVMvqS2DA9c=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"v/pJ0L1rwz7tLQNd/sQdoZGxC/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpWD+6du8ZZDSnnbYD7XKq7Po38="},{"type":"next-occurrence","id":"ASr70vLVVa3gvmVIn8ww+Jk7myk="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"v/pJ0L1rwz7tLQNd/sQdoZGxC/k=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"ASr70vLVVa3gvmVIn8ww+Jk7myk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpWD+6du8ZZDSnnbYD7XKq7Po38="},{"type":"next-occurrence","id":"fpemH8m3dBvW55EoUq8SGJ+S1YE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"ASr70vLVVa3gvmVIn8ww+Jk7myk=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"fpemH8m3dBvW55EoUq8SGJ+S1YE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpWD+6du8ZZDSnnbYD7XKq7Po38="},{"type":"next-occurrence","id":"Lm9PKy1BKnY0mUVV9+CRF3HT6Rc="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"fpemH8m3dBvW55EoUq8SGJ+S1YE=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"Lm9PKy1BKnY0mUVV9+CRF3HT6Rc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpWD+6du8ZZDSnnbYD7XKq7Po38="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"Lm9PKy1BKnY0mUVV9+CRF3HT6Rc=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"PqUspeuFcyX63tKj4Uk8t8KSeDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HnZ/VUjM9gUR8ai+ccd+VzCHQys="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"PqUspeuFcyX63tKj4Uk8t8KSeDg=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"HnZ/VUjM9gUR8ai+ccd+VzCHQys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PqUspeuFcyX63tKj4Uk8t8KSeDg="},{"type":"next-occurrence","id":"69zGjWRB/7g0Q57RQQT6S9XLH7M="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"HnZ/VUjM9gUR8ai+ccd+VzCHQys=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T22:00:00Z","end_date":"2026-06-07T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"69zGjWRB/7g0Q57RQQT6S9XLH7M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PqUspeuFcyX63tKj4Uk8t8KSeDg="},{"type":"next-occurrence","id":"1crCTwWpFre0+Zg5+v3uPirfIiM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"69zGjWRB/7g0Q57RQQT6S9XLH7M=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T21:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"1crCTwWpFre0+Zg5+v3uPirfIiM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PqUspeuFcyX63tKj4Uk8t8KSeDg="},{"type":"next-occurrence","id":"soVmtA0fBcP1LTEgTxmefS4cJzc="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"1crCTwWpFre0+Zg5+v3uPirfIiM=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"soVmtA0fBcP1LTEgTxmefS4cJzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PqUspeuFcyX63tKj4Uk8t8KSeDg="},{"type":"next-occurrence","id":"6gmKsBtYfm2goSHd3aTRDfVeFsg="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"soVmtA0fBcP1LTEgTxmefS4cJzc=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"6gmKsBtYfm2goSHd3aTRDfVeFsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PqUspeuFcyX63tKj4Uk8t8KSeDg="},{"type":"next-occurrence","id":"4l2o3bcfVVH7lI+6yMkfuJ8eOMc="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"6gmKsBtYfm2goSHd3aTRDfVeFsg=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"4l2o3bcfVVH7lI+6yMkfuJ8eOMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PqUspeuFcyX63tKj4Uk8t8KSeDg="},{"type":"next-occurrence","id":"tvOQPxN6X4SHEm4yx5NYpBEJKoc="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"4l2o3bcfVVH7lI+6yMkfuJ8eOMc=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"tvOQPxN6X4SHEm4yx5NYpBEJKoc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PqUspeuFcyX63tKj4Uk8t8KSeDg="},{"type":"next-occurrence","id":"NBvgcy+hlviqhJfmikSqE6Pe24I="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"tvOQPxN6X4SHEm4yx5NYpBEJKoc=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T22:00:00Z","end_date":"2026-06-14T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"NBvgcy+hlviqhJfmikSqE6Pe24I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PqUspeuFcyX63tKj4Uk8t8KSeDg="},{"type":"next-occurrence","id":"aounZ8qOp0IX9sco8CmzEf1Svhg="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"NBvgcy+hlviqhJfmikSqE6Pe24I=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T21:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"aounZ8qOp0IX9sco8CmzEf1Svhg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PqUspeuFcyX63tKj4Uk8t8KSeDg="},{"type":"next-occurrence","id":"TERZnkLZxxvhTyOLPBAeMr/kpz4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"aounZ8qOp0IX9sco8CmzEf1Svhg=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"TERZnkLZxxvhTyOLPBAeMr/kpz4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PqUspeuFcyX63tKj4Uk8t8KSeDg="},{"type":"next-occurrence","id":"eSmYhtn7a6fzvMaFnYU3+h6ZY/Q="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"TERZnkLZxxvhTyOLPBAeMr/kpz4=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"eSmYhtn7a6fzvMaFnYU3+h6ZY/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PqUspeuFcyX63tKj4Uk8t8KSeDg="},{"type":"next-occurrence","id":"nAaMvPlW718CB0wRi83BVb0uuFs="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"eSmYhtn7a6fzvMaFnYU3+h6ZY/Q=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"nAaMvPlW718CB0wRi83BVb0uuFs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PqUspeuFcyX63tKj4Uk8t8KSeDg="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"nAaMvPlW718CB0wRi83BVb0uuFs=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"Mzqer+xi408FRQroA9bUf9zRQ4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"j31pBwKQDNCvK5zP/pvaPoHLQlI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"Mzqer+xi408FRQroA9bUf9zRQ4E=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"j31pBwKQDNCvK5zP/pvaPoHLQlI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mzqer+xi408FRQroA9bUf9zRQ4E="},{"type":"next-occurrence","id":"7AdRyFJh+Sqnx48/lQBfx1NKu/8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"j31pBwKQDNCvK5zP/pvaPoHLQlI=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T21:00:00Z","end_date":"2026-06-07T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"7AdRyFJh+Sqnx48/lQBfx1NKu/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mzqer+xi408FRQroA9bUf9zRQ4E="},{"type":"next-occurrence","id":"nX/lk0c8EbB1yewn8HK9HS9j9sE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"7AdRyFJh+Sqnx48/lQBfx1NKu/8=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"nX/lk0c8EbB1yewn8HK9HS9j9sE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mzqer+xi408FRQroA9bUf9zRQ4E="},{"type":"next-occurrence","id":"DCsMidMHRjFCSL/sJV34ftvYsLM="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"nX/lk0c8EbB1yewn8HK9HS9j9sE=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"DCsMidMHRjFCSL/sJV34ftvYsLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mzqer+xi408FRQroA9bUf9zRQ4E="},{"type":"next-occurrence","id":"RzP9CVZo/xsdzbo9zHv0D/jSHP4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"DCsMidMHRjFCSL/sJV34ftvYsLM=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"RzP9CVZo/xsdzbo9zHv0D/jSHP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mzqer+xi408FRQroA9bUf9zRQ4E="},{"type":"next-occurrence","id":"qgPgmt2+nAZkrDbXiIoIzRBEmpw="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"RzP9CVZo/xsdzbo9zHv0D/jSHP4=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"qgPgmt2+nAZkrDbXiIoIzRBEmpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mzqer+xi408FRQroA9bUf9zRQ4E="},{"type":"next-occurrence","id":"KOV2uQYvQ+eV9mEtugvuobbX61s="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"qgPgmt2+nAZkrDbXiIoIzRBEmpw=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"KOV2uQYvQ+eV9mEtugvuobbX61s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mzqer+xi408FRQroA9bUf9zRQ4E="},{"type":"next-occurrence","id":"oj9MCQPsjNLCDvbEJswhlnhDThY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"KOV2uQYvQ+eV9mEtugvuobbX61s=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"oj9MCQPsjNLCDvbEJswhlnhDThY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mzqer+xi408FRQroA9bUf9zRQ4E="},{"type":"next-occurrence","id":"pMmV0P6Agind4pba60zNfHdb5Y0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"oj9MCQPsjNLCDvbEJswhlnhDThY=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T21:00:00Z","end_date":"2026-06-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"pMmV0P6Agind4pba60zNfHdb5Y0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mzqer+xi408FRQroA9bUf9zRQ4E="},{"type":"next-occurrence","id":"OJJUgv4BUr2RQYM4BpKA9GqFMDY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"pMmV0P6Agind4pba60zNfHdb5Y0=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"OJJUgv4BUr2RQYM4BpKA9GqFMDY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mzqer+xi408FRQroA9bUf9zRQ4E="},{"type":"next-occurrence","id":"hmmmtULs5WskezsPYTZbWGex63k="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"OJJUgv4BUr2RQYM4BpKA9GqFMDY=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"hmmmtULs5WskezsPYTZbWGex63k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mzqer+xi408FRQroA9bUf9zRQ4E="},{"type":"next-occurrence","id":"hy8ZLAoEqnhtYBgStdJAhqk6GY4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"hmmmtULs5WskezsPYTZbWGex63k=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"hy8ZLAoEqnhtYBgStdJAhqk6GY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mzqer+xi408FRQroA9bUf9zRQ4E="},{"type":"next-occurrence","id":"n5AjPP0l+MQcpnS3u3exEdWPP8Q="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"hy8ZLAoEqnhtYBgStdJAhqk6GY4=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"n5AjPP0l+MQcpnS3u3exEdWPP8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mzqer+xi408FRQroA9bUf9zRQ4E="},{"type":"next-occurrence","id":"VEcZneaQ0QaLx29RqZUMHbMI0jc="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"n5AjPP0l+MQcpnS3u3exEdWPP8Q=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"VEcZneaQ0QaLx29RqZUMHbMI0jc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mzqer+xi408FRQroA9bUf9zRQ4E="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"VEcZneaQ0QaLx29RqZUMHbMI0jc=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"IJuKebmRiItWS5xYtTnd/9wxLRY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"omJuItIOzbqiQcZAlgeE5DRhRqE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"IJuKebmRiItWS5xYtTnd/9wxLRY=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"omJuItIOzbqiQcZAlgeE5DRhRqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IJuKebmRiItWS5xYtTnd/9wxLRY="},{"type":"next-occurrence","id":"i0UL/CjgJ2A07aXwKz7hIUozr+I="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"omJuItIOzbqiQcZAlgeE5DRhRqE=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T02:00:00Z","end_date":"2026-06-07T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"i0UL/CjgJ2A07aXwKz7hIUozr+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IJuKebmRiItWS5xYtTnd/9wxLRY="},{"type":"next-occurrence","id":"u7tNkaZaE3L+fX3ou/rG/0THKR4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"i0UL/CjgJ2A07aXwKz7hIUozr+I=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T02:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"u7tNkaZaE3L+fX3ou/rG/0THKR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IJuKebmRiItWS5xYtTnd/9wxLRY="},{"type":"next-occurrence","id":"X+YCGEzKrgoPrdB0ko4I+mzwv/w="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"u7tNkaZaE3L+fX3ou/rG/0THKR4=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"X+YCGEzKrgoPrdB0ko4I+mzwv/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IJuKebmRiItWS5xYtTnd/9wxLRY="},{"type":"next-occurrence","id":"fD8y7DB0/8W3NSru4e3J3d+OfR0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"X+YCGEzKrgoPrdB0ko4I+mzwv/w=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"fD8y7DB0/8W3NSru4e3J3d+OfR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IJuKebmRiItWS5xYtTnd/9wxLRY="},{"type":"next-occurrence","id":"GjEia31uvGI8KwVca5Q9W+SC9ww="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"fD8y7DB0/8W3NSru4e3J3d+OfR0=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"GjEia31uvGI8KwVca5Q9W+SC9ww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IJuKebmRiItWS5xYtTnd/9wxLRY="},{"type":"next-occurrence","id":"P8garAr+NtjXFAzrLUraONHwaD4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"GjEia31uvGI8KwVca5Q9W+SC9ww=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"P8garAr+NtjXFAzrLUraONHwaD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IJuKebmRiItWS5xYtTnd/9wxLRY="},{"type":"next-occurrence","id":"YbD+tabZ4fFh3NzeJUAjMJfqAc0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"P8garAr+NtjXFAzrLUraONHwaD4=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"YbD+tabZ4fFh3NzeJUAjMJfqAc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IJuKebmRiItWS5xYtTnd/9wxLRY="},{"type":"next-occurrence","id":"eZ6HOR/893GbwbOf4U+U7kQ9hVY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"YbD+tabZ4fFh3NzeJUAjMJfqAc0=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T02:00:00Z","end_date":"2026-06-14T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"eZ6HOR/893GbwbOf4U+U7kQ9hVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IJuKebmRiItWS5xYtTnd/9wxLRY="},{"type":"next-occurrence","id":"ckalxeq6QapL20KtOAIt295068k="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"eZ6HOR/893GbwbOf4U+U7kQ9hVY=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T02:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"ckalxeq6QapL20KtOAIt295068k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IJuKebmRiItWS5xYtTnd/9wxLRY="},{"type":"next-occurrence","id":"8Ah/IG8YEArsM4kLPU19khF2tVQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"ckalxeq6QapL20KtOAIt295068k=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T01:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"8Ah/IG8YEArsM4kLPU19khF2tVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IJuKebmRiItWS5xYtTnd/9wxLRY="},{"type":"next-occurrence","id":"9peCeAIdOFl9xN9ezvX+5rfgnD0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"8Ah/IG8YEArsM4kLPU19khF2tVQ=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T01:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"9peCeAIdOFl9xN9ezvX+5rfgnD0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IJuKebmRiItWS5xYtTnd/9wxLRY="},{"type":"next-occurrence","id":"pVdUH2gX6GGt7Is2KU9hVK1+NAs="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"9peCeAIdOFl9xN9ezvX+5rfgnD0=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T01:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"pVdUH2gX6GGt7Is2KU9hVK1+NAs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IJuKebmRiItWS5xYtTnd/9wxLRY="},{"type":"next-occurrence","id":"cEOIdUvLgTb1VEkbD/K+BZ+tva8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"pVdUH2gX6GGt7Is2KU9hVK1+NAs=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T02:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"cEOIdUvLgTb1VEkbD/K+BZ+tva8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IJuKebmRiItWS5xYtTnd/9wxLRY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"cEOIdUvLgTb1VEkbD/K+BZ+tva8=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T02:00:00Z","end_date":"2026-06-20T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"te8pPKUX5Zh7j5qa+2tuaFz5EWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DKYJoP7BCvU+fEPPjKiBjzPnadA="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"te8pPKUX5Zh7j5qa+2tuaFz5EWQ=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"DKYJoP7BCvU+fEPPjKiBjzPnadA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"te8pPKUX5Zh7j5qa+2tuaFz5EWQ="},{"type":"next-occurrence","id":"RycPU1z7SmUq3p7VAsJDiO+F6so="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"DKYJoP7BCvU+fEPPjKiBjzPnadA=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"RycPU1z7SmUq3p7VAsJDiO+F6so=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"te8pPKUX5Zh7j5qa+2tuaFz5EWQ="},{"type":"next-occurrence","id":"HNuWr9We7EsSkpUzCzgoRVs4Ytc="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"RycPU1z7SmUq3p7VAsJDiO+F6so=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"HNuWr9We7EsSkpUzCzgoRVs4Ytc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"te8pPKUX5Zh7j5qa+2tuaFz5EWQ="},{"type":"next-occurrence","id":"9kLFmTF+3k7XHfGkMysu9B5dBkk="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"HNuWr9We7EsSkpUzCzgoRVs4Ytc=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"9kLFmTF+3k7XHfGkMysu9B5dBkk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"te8pPKUX5Zh7j5qa+2tuaFz5EWQ="},{"type":"next-occurrence","id":"NKlTZWoyQ1egKaOjQj0EMwOiLFY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"9kLFmTF+3k7XHfGkMysu9B5dBkk=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"NKlTZWoyQ1egKaOjQj0EMwOiLFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"te8pPKUX5Zh7j5qa+2tuaFz5EWQ="},{"type":"next-occurrence","id":"2xCZk/FbJ6xeiQaBb8ohF/QpLtY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"NKlTZWoyQ1egKaOjQj0EMwOiLFY=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"2xCZk/FbJ6xeiQaBb8ohF/QpLtY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"te8pPKUX5Zh7j5qa+2tuaFz5EWQ="},{"type":"next-occurrence","id":"JhvgdYJ59G2TeRUwpOda+wqaCc8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"2xCZk/FbJ6xeiQaBb8ohF/QpLtY=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"JhvgdYJ59G2TeRUwpOda+wqaCc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"te8pPKUX5Zh7j5qa+2tuaFz5EWQ="},{"type":"next-occurrence","id":"uvJVdTASn25JrYXFm1B4AmX848A="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"JhvgdYJ59G2TeRUwpOda+wqaCc8=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"uvJVdTASn25JrYXFm1B4AmX848A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"te8pPKUX5Zh7j5qa+2tuaFz5EWQ="},{"type":"next-occurrence","id":"1T1BZzZYhOzUlyK9hyhwg3lCj2s="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"uvJVdTASn25JrYXFm1B4AmX848A=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"1T1BZzZYhOzUlyK9hyhwg3lCj2s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"te8pPKUX5Zh7j5qa+2tuaFz5EWQ="},{"type":"next-occurrence","id":"vtMZ34Iai//9AcqxBo2yQfRwPpE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"1T1BZzZYhOzUlyK9hyhwg3lCj2s=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"vtMZ34Iai//9AcqxBo2yQfRwPpE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"te8pPKUX5Zh7j5qa+2tuaFz5EWQ="},{"type":"next-occurrence","id":"RjgKS4JA09+kFxjKHKPJJwXHy10="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"vtMZ34Iai//9AcqxBo2yQfRwPpE=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"RjgKS4JA09+kFxjKHKPJJwXHy10=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"te8pPKUX5Zh7j5qa+2tuaFz5EWQ="},{"type":"next-occurrence","id":"S5JHrIBHyLwXpQDucL5dKycY0UA="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"RjgKS4JA09+kFxjKHKPJJwXHy10=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"S5JHrIBHyLwXpQDucL5dKycY0UA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"te8pPKUX5Zh7j5qa+2tuaFz5EWQ="},{"type":"next-occurrence","id":"+bRqvw0h+DRAJeWupk69BdC+cz8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"S5JHrIBHyLwXpQDucL5dKycY0UA=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"+bRqvw0h+DRAJeWupk69BdC+cz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"te8pPKUX5Zh7j5qa+2tuaFz5EWQ="},{"type":"next-occurrence","id":"JqVLQgqeIbhvyRLJm9C+hpSMQlc="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"+bRqvw0h+DRAJeWupk69BdC+cz8=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"JqVLQgqeIbhvyRLJm9C+hpSMQlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"te8pPKUX5Zh7j5qa+2tuaFz5EWQ="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"JqVLQgqeIbhvyRLJm9C+hpSMQlc=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"NbprT3il/JzgLAOAhCvSUGXMB2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Wl7KjLxbY0pKCNNeU9QfORlRc1Q="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"NbprT3il/JzgLAOAhCvSUGXMB2A=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"Wl7KjLxbY0pKCNNeU9QfORlRc1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbprT3il/JzgLAOAhCvSUGXMB2A="},{"type":"next-occurrence","id":"KHHoaoIrtEwCjsvlFwez6NgI5XI="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"Wl7KjLxbY0pKCNNeU9QfORlRc1Q=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"KHHoaoIrtEwCjsvlFwez6NgI5XI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbprT3il/JzgLAOAhCvSUGXMB2A="},{"type":"next-occurrence","id":"DDqHeK2ILtwuR1k8IH9Uwl/GAFs="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"KHHoaoIrtEwCjsvlFwez6NgI5XI=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"DDqHeK2ILtwuR1k8IH9Uwl/GAFs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbprT3il/JzgLAOAhCvSUGXMB2A="},{"type":"next-occurrence","id":"XHFxWrt6EpDdgLIvD46aZCFPXVU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"DDqHeK2ILtwuR1k8IH9Uwl/GAFs=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"XHFxWrt6EpDdgLIvD46aZCFPXVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbprT3il/JzgLAOAhCvSUGXMB2A="},{"type":"next-occurrence","id":"VToDyNHZmPXz5Lqbq0nK4c3pwyc="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"XHFxWrt6EpDdgLIvD46aZCFPXVU=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"VToDyNHZmPXz5Lqbq0nK4c3pwyc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbprT3il/JzgLAOAhCvSUGXMB2A="},{"type":"next-occurrence","id":"5F46vTJ0rOv4wfnnhrwrZHt4Ji8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"VToDyNHZmPXz5Lqbq0nK4c3pwyc=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"5F46vTJ0rOv4wfnnhrwrZHt4Ji8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbprT3il/JzgLAOAhCvSUGXMB2A="},{"type":"next-occurrence","id":"RI1u4YaovuW8KLNx7Ef36Az7mns="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"5F46vTJ0rOv4wfnnhrwrZHt4Ji8=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"RI1u4YaovuW8KLNx7Ef36Az7mns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbprT3il/JzgLAOAhCvSUGXMB2A="},{"type":"next-occurrence","id":"f//Jj07nF36lQQ0/vIR1zJOGfPU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"RI1u4YaovuW8KLNx7Ef36Az7mns=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"f//Jj07nF36lQQ0/vIR1zJOGfPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbprT3il/JzgLAOAhCvSUGXMB2A="},{"type":"next-occurrence","id":"HXGyByc8UH205BEjcBhkECTFjlE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"f//Jj07nF36lQQ0/vIR1zJOGfPU=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"HXGyByc8UH205BEjcBhkECTFjlE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbprT3il/JzgLAOAhCvSUGXMB2A="},{"type":"next-occurrence","id":"sG6KlyXIOYMsEgugx8Fmbsjl61I="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"HXGyByc8UH205BEjcBhkECTFjlE=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"sG6KlyXIOYMsEgugx8Fmbsjl61I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbprT3il/JzgLAOAhCvSUGXMB2A="},{"type":"next-occurrence","id":"QcuXSfmr26LVdqveTplJBuWCxOo="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"sG6KlyXIOYMsEgugx8Fmbsjl61I=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"QcuXSfmr26LVdqveTplJBuWCxOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbprT3il/JzgLAOAhCvSUGXMB2A="},{"type":"next-occurrence","id":"R644hdMrVIRCslbkYmBMjW1Apj4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"QcuXSfmr26LVdqveTplJBuWCxOo=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"R644hdMrVIRCslbkYmBMjW1Apj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbprT3il/JzgLAOAhCvSUGXMB2A="},{"type":"next-occurrence","id":"+qC1jgzRkPu4aXdIWRx6e6yS63M="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"R644hdMrVIRCslbkYmBMjW1Apj4=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"+qC1jgzRkPu4aXdIWRx6e6yS63M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbprT3il/JzgLAOAhCvSUGXMB2A="},{"type":"next-occurrence","id":"szBYxWs06wwqqaWYWEWLqaBOFIM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"+qC1jgzRkPu4aXdIWRx6e6yS63M=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"szBYxWs06wwqqaWYWEWLqaBOFIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbprT3il/JzgLAOAhCvSUGXMB2A="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"szBYxWs06wwqqaWYWEWLqaBOFIM=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"bFLbdHKblR78eTHTCiISiT4XzKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZOPah0p/fd+aMfX/cMemSI9mbJI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"bFLbdHKblR78eTHTCiISiT4XzKI=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"ZOPah0p/fd+aMfX/cMemSI9mbJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bFLbdHKblR78eTHTCiISiT4XzKI="},{"type":"next-occurrence","id":"ZyImhjqRA0PcI1HjApwwMkbQqAc="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"ZOPah0p/fd+aMfX/cMemSI9mbJI=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T20:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"ZyImhjqRA0PcI1HjApwwMkbQqAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bFLbdHKblR78eTHTCiISiT4XzKI="},{"type":"next-occurrence","id":"UyBAtHGPd4pLM3NN3RFqC4Dt38A="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"ZyImhjqRA0PcI1HjApwwMkbQqAc=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T21:00:00Z","end_date":"2026-06-08T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"UyBAtHGPd4pLM3NN3RFqC4Dt38A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bFLbdHKblR78eTHTCiISiT4XzKI="},{"type":"next-occurrence","id":"a0u5Q76ctFEPnLmWaHqpioC7LS0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"UyBAtHGPd4pLM3NN3RFqC4Dt38A=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"a0u5Q76ctFEPnLmWaHqpioC7LS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bFLbdHKblR78eTHTCiISiT4XzKI="},{"type":"next-occurrence","id":"9SbQ90OLxRWslo2VHoXU32p2fi4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"a0u5Q76ctFEPnLmWaHqpioC7LS0=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"9SbQ90OLxRWslo2VHoXU32p2fi4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bFLbdHKblR78eTHTCiISiT4XzKI="},{"type":"next-occurrence","id":"nWav6Mr8cdqxf0Ftc8lS/LUNJ/0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"9SbQ90OLxRWslo2VHoXU32p2fi4=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"nWav6Mr8cdqxf0Ftc8lS/LUNJ/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bFLbdHKblR78eTHTCiISiT4XzKI="},{"type":"next-occurrence","id":"1SeLTMf9MDG6YxudI7fNDPgxpYE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"nWav6Mr8cdqxf0Ftc8lS/LUNJ/0=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"1SeLTMf9MDG6YxudI7fNDPgxpYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bFLbdHKblR78eTHTCiISiT4XzKI="},{"type":"next-occurrence","id":"zmzPCQfQuLUIGdSJwa+uLPOsvFE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"1SeLTMf9MDG6YxudI7fNDPgxpYE=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"zmzPCQfQuLUIGdSJwa+uLPOsvFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bFLbdHKblR78eTHTCiISiT4XzKI="},{"type":"next-occurrence","id":"/Jp7ZWAFbWrWJioDup4EOO3Lsy0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"zmzPCQfQuLUIGdSJwa+uLPOsvFE=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T20:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"/Jp7ZWAFbWrWJioDup4EOO3Lsy0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bFLbdHKblR78eTHTCiISiT4XzKI="},{"type":"next-occurrence","id":"JyxZT+HZWtfeUfiI5zxFVR1PINY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"/Jp7ZWAFbWrWJioDup4EOO3Lsy0=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T21:00:00Z","end_date":"2026-06-15T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"JyxZT+HZWtfeUfiI5zxFVR1PINY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bFLbdHKblR78eTHTCiISiT4XzKI="},{"type":"next-occurrence","id":"Rn4lzz2vJx67Me817gCbTOLR4/o="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"JyxZT+HZWtfeUfiI5zxFVR1PINY=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"Rn4lzz2vJx67Me817gCbTOLR4/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bFLbdHKblR78eTHTCiISiT4XzKI="},{"type":"next-occurrence","id":"ADOJqDmzsV1ovdyILmWtvztGQW4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"Rn4lzz2vJx67Me817gCbTOLR4/o=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"ADOJqDmzsV1ovdyILmWtvztGQW4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bFLbdHKblR78eTHTCiISiT4XzKI="},{"type":"next-occurrence","id":"IewL/swzZH/aU61RpOQyRNNiivo="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"ADOJqDmzsV1ovdyILmWtvztGQW4=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"IewL/swzZH/aU61RpOQyRNNiivo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bFLbdHKblR78eTHTCiISiT4XzKI="},{"type":"next-occurrence","id":"h/oB5cRFjqEnGH6REeV89z8HPX4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"IewL/swzZH/aU61RpOQyRNNiivo=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"h/oB5cRFjqEnGH6REeV89z8HPX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bFLbdHKblR78eTHTCiISiT4XzKI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"h/oB5cRFjqEnGH6REeV89z8HPX4=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"aU/dVM5FKKdyZIXUlmIY1xc+7To=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WUWL7LtnQtlqtXAUEqJr1DwZkKw="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"aU/dVM5FKKdyZIXUlmIY1xc+7To=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"WUWL7LtnQtlqtXAUEqJr1DwZkKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aU/dVM5FKKdyZIXUlmIY1xc+7To="},{"type":"next-occurrence","id":"u1NaobKxnb7WIU4PmqnM3ahXAv4="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"WUWL7LtnQtlqtXAUEqJr1DwZkKw=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T03:00:00Z","end_date":"2026-06-07T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"u1NaobKxnb7WIU4PmqnM3ahXAv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aU/dVM5FKKdyZIXUlmIY1xc+7To="},{"type":"next-occurrence","id":"yuglZ1swZdWbiHkZZFixn2++w/I="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"u1NaobKxnb7WIU4PmqnM3ahXAv4=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T03:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"yuglZ1swZdWbiHkZZFixn2++w/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aU/dVM5FKKdyZIXUlmIY1xc+7To="},{"type":"next-occurrence","id":"FPt3SsxoFC+6rt8fhzYLGEZogv4="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"yuglZ1swZdWbiHkZZFixn2++w/I=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"FPt3SsxoFC+6rt8fhzYLGEZogv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aU/dVM5FKKdyZIXUlmIY1xc+7To="},{"type":"next-occurrence","id":"X7VD88SLSAC81xXEVXNTKPOh/qk="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"FPt3SsxoFC+6rt8fhzYLGEZogv4=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"X7VD88SLSAC81xXEVXNTKPOh/qk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aU/dVM5FKKdyZIXUlmIY1xc+7To="},{"type":"next-occurrence","id":"fic/Y76Kg7AhaYExam0HBow+16o="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"X7VD88SLSAC81xXEVXNTKPOh/qk=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"fic/Y76Kg7AhaYExam0HBow+16o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aU/dVM5FKKdyZIXUlmIY1xc+7To="},{"type":"next-occurrence","id":"Nl7ogDSYUOhPF83VJLGQHevuw+s="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"fic/Y76Kg7AhaYExam0HBow+16o=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"Nl7ogDSYUOhPF83VJLGQHevuw+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aU/dVM5FKKdyZIXUlmIY1xc+7To="},{"type":"next-occurrence","id":"N+29r0fTUexiiTzjIpbnVbNr2YM="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"Nl7ogDSYUOhPF83VJLGQHevuw+s=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T03:00:00Z","end_date":"2026-06-13T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"N+29r0fTUexiiTzjIpbnVbNr2YM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aU/dVM5FKKdyZIXUlmIY1xc+7To="},{"type":"next-occurrence","id":"FilXTDD275Wbs9r8A4LBN3zSTes="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"N+29r0fTUexiiTzjIpbnVbNr2YM=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T03:00:00Z","end_date":"2026-06-14T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"FilXTDD275Wbs9r8A4LBN3zSTes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aU/dVM5FKKdyZIXUlmIY1xc+7To="},{"type":"next-occurrence","id":"XBRD9ciEjawt9fu/zF54dGOcSrg="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"FilXTDD275Wbs9r8A4LBN3zSTes=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T03:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"XBRD9ciEjawt9fu/zF54dGOcSrg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aU/dVM5FKKdyZIXUlmIY1xc+7To="},{"type":"next-occurrence","id":"Wcwl6diTSSnFQHWwSM9qbAO+AcA="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"XBRD9ciEjawt9fu/zF54dGOcSrg=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T01:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"Wcwl6diTSSnFQHWwSM9qbAO+AcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aU/dVM5FKKdyZIXUlmIY1xc+7To="},{"type":"next-occurrence","id":"9FdMBa3aye6tB5hWvnzplXv65Xo="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"Wcwl6diTSSnFQHWwSM9qbAO+AcA=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T01:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"9FdMBa3aye6tB5hWvnzplXv65Xo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aU/dVM5FKKdyZIXUlmIY1xc+7To="},{"type":"next-occurrence","id":"htjeJ2W/i3WgfmCGFxqfX0G8bew="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"9FdMBa3aye6tB5hWvnzplXv65Xo=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T01:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"htjeJ2W/i3WgfmCGFxqfX0G8bew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aU/dVM5FKKdyZIXUlmIY1xc+7To="},{"type":"next-occurrence","id":"g0MUKNtWtIfTYHel2AxQJq40vkU="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"htjeJ2W/i3WgfmCGFxqfX0G8bew=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T01:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"g0MUKNtWtIfTYHel2AxQJq40vkU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aU/dVM5FKKdyZIXUlmIY1xc+7To="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"g0MUKNtWtIfTYHel2AxQJq40vkU=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T03:00:00Z","end_date":"2026-06-20T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"kdXquHeCiWvqUXMUzKF9etWPep8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"m67tl0n4QUTAhd7up3O6B+7BoWo="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"kdXquHeCiWvqUXMUzKF9etWPep8=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"m67tl0n4QUTAhd7up3O6B+7BoWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kdXquHeCiWvqUXMUzKF9etWPep8="},{"type":"next-occurrence","id":"bMS7Fqs3Z7uMQyLTVUbDkSWvAu8="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"m67tl0n4QUTAhd7up3O6B+7BoWo=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T03:00:00Z","end_date":"2026-06-07T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"bMS7Fqs3Z7uMQyLTVUbDkSWvAu8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kdXquHeCiWvqUXMUzKF9etWPep8="},{"type":"next-occurrence","id":"oWxlQq67bacdYNtAAFfsW2t8D+8="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"bMS7Fqs3Z7uMQyLTVUbDkSWvAu8=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T03:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"oWxlQq67bacdYNtAAFfsW2t8D+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kdXquHeCiWvqUXMUzKF9etWPep8="},{"type":"next-occurrence","id":"nM1R2ibCW24cYIlSsDtdSWVvAgo="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"oWxlQq67bacdYNtAAFfsW2t8D+8=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"nM1R2ibCW24cYIlSsDtdSWVvAgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kdXquHeCiWvqUXMUzKF9etWPep8="},{"type":"next-occurrence","id":"BrECuug+bDFkQklG7NsdQaNokkI="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"nM1R2ibCW24cYIlSsDtdSWVvAgo=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"BrECuug+bDFkQklG7NsdQaNokkI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kdXquHeCiWvqUXMUzKF9etWPep8="},{"type":"next-occurrence","id":"a/EJhowwG4pHyp4UZcyTPWL95uE="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"BrECuug+bDFkQklG7NsdQaNokkI=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"a/EJhowwG4pHyp4UZcyTPWL95uE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kdXquHeCiWvqUXMUzKF9etWPep8="},{"type":"next-occurrence","id":"FwA3+Jo/e1MIYJfT2IYPMR3jkEo="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"a/EJhowwG4pHyp4UZcyTPWL95uE=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"FwA3+Jo/e1MIYJfT2IYPMR3jkEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kdXquHeCiWvqUXMUzKF9etWPep8="},{"type":"next-occurrence","id":"YSAsTAInAnw9F47rszC2vf2tbaI="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"FwA3+Jo/e1MIYJfT2IYPMR3jkEo=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T03:00:00Z","end_date":"2026-06-13T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"YSAsTAInAnw9F47rszC2vf2tbaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kdXquHeCiWvqUXMUzKF9etWPep8="},{"type":"next-occurrence","id":"+nNK+5GeJZrdXfSIfwkCcOQ4NYs="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"YSAsTAInAnw9F47rszC2vf2tbaI=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T03:00:00Z","end_date":"2026-06-14T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"+nNK+5GeJZrdXfSIfwkCcOQ4NYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kdXquHeCiWvqUXMUzKF9etWPep8="},{"type":"next-occurrence","id":"cc8r6Sx+Ege5sothHA3awVWvxsk="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"+nNK+5GeJZrdXfSIfwkCcOQ4NYs=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T03:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"cc8r6Sx+Ege5sothHA3awVWvxsk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kdXquHeCiWvqUXMUzKF9etWPep8="},{"type":"next-occurrence","id":"L26pocX19wf7A4d43jon33DQt0I="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"cc8r6Sx+Ege5sothHA3awVWvxsk=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"L26pocX19wf7A4d43jon33DQt0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kdXquHeCiWvqUXMUzKF9etWPep8="},{"type":"next-occurrence","id":"OEqoiXUW+JDGyhiO5rRRzCQ+MSc="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"L26pocX19wf7A4d43jon33DQt0I=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"OEqoiXUW+JDGyhiO5rRRzCQ+MSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kdXquHeCiWvqUXMUzKF9etWPep8="},{"type":"next-occurrence","id":"w7lC9sbI6tM0o9igrRj9ZmFUq1M="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"OEqoiXUW+JDGyhiO5rRRzCQ+MSc=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"w7lC9sbI6tM0o9igrRj9ZmFUq1M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kdXquHeCiWvqUXMUzKF9etWPep8="},{"type":"next-occurrence","id":"fwiQYf4YsVqjry6UJ2Phq8q70m4="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"w7lC9sbI6tM0o9igrRj9ZmFUq1M=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"fwiQYf4YsVqjry6UJ2Phq8q70m4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kdXquHeCiWvqUXMUzKF9etWPep8="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"fwiQYf4YsVqjry6UJ2Phq8q70m4=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T03:00:00Z","end_date":"2026-06-20T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"hFjFzMmBNz4Z8gNjqc1XKIZOdgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9u60HRB/4Ki8i8skd676+0iwzXY="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"hFjFzMmBNz4Z8gNjqc1XKIZOdgA=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"9u60HRB/4Ki8i8skd676+0iwzXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hFjFzMmBNz4Z8gNjqc1XKIZOdgA="},{"type":"next-occurrence","id":"oJ0oyAoxgx5WZkSUN5s+3w1IlLQ="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"9u60HRB/4Ki8i8skd676+0iwzXY=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T03:00:00Z","end_date":"2026-06-07T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"oJ0oyAoxgx5WZkSUN5s+3w1IlLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hFjFzMmBNz4Z8gNjqc1XKIZOdgA="},{"type":"next-occurrence","id":"AslquYQTgIwDjqeQmM/92EWu0/s="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"oJ0oyAoxgx5WZkSUN5s+3w1IlLQ=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T03:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"AslquYQTgIwDjqeQmM/92EWu0/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hFjFzMmBNz4Z8gNjqc1XKIZOdgA="},{"type":"next-occurrence","id":"/tdvI1pdo36Ygqwxvhxl9OuCNIM="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"AslquYQTgIwDjqeQmM/92EWu0/s=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"/tdvI1pdo36Ygqwxvhxl9OuCNIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hFjFzMmBNz4Z8gNjqc1XKIZOdgA="},{"type":"next-occurrence","id":"18mB5E/gXKUKgp5LN5u5df1EnqQ="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"/tdvI1pdo36Ygqwxvhxl9OuCNIM=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"18mB5E/gXKUKgp5LN5u5df1EnqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hFjFzMmBNz4Z8gNjqc1XKIZOdgA="},{"type":"next-occurrence","id":"roj/eYIBIQF0vMgxlMESCr+QNUI="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"18mB5E/gXKUKgp5LN5u5df1EnqQ=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"roj/eYIBIQF0vMgxlMESCr+QNUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hFjFzMmBNz4Z8gNjqc1XKIZOdgA="},{"type":"next-occurrence","id":"g4jZKHSic/2iWFTintkdSKKNPis="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"roj/eYIBIQF0vMgxlMESCr+QNUI=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"g4jZKHSic/2iWFTintkdSKKNPis=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hFjFzMmBNz4Z8gNjqc1XKIZOdgA="},{"type":"next-occurrence","id":"w0UAFIOF0IKLYB94qO5+9NV4gKU="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"g4jZKHSic/2iWFTintkdSKKNPis=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T03:00:00Z","end_date":"2026-06-13T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"w0UAFIOF0IKLYB94qO5+9NV4gKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hFjFzMmBNz4Z8gNjqc1XKIZOdgA="},{"type":"next-occurrence","id":"Dxt99e+DSAgdHLXRn089Mcp6I1Y="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"w0UAFIOF0IKLYB94qO5+9NV4gKU=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T03:00:00Z","end_date":"2026-06-14T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"Dxt99e+DSAgdHLXRn089Mcp6I1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hFjFzMmBNz4Z8gNjqc1XKIZOdgA="},{"type":"next-occurrence","id":"jM+l/tZgeK77moD40OtrWkFcVR8="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"Dxt99e+DSAgdHLXRn089Mcp6I1Y=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T03:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"jM+l/tZgeK77moD40OtrWkFcVR8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hFjFzMmBNz4Z8gNjqc1XKIZOdgA="},{"type":"next-occurrence","id":"Myk5dSTNpjZJI35b3Q+U9EK/pGU="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"jM+l/tZgeK77moD40OtrWkFcVR8=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T01:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"Myk5dSTNpjZJI35b3Q+U9EK/pGU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hFjFzMmBNz4Z8gNjqc1XKIZOdgA="},{"type":"next-occurrence","id":"f21ezn1nU+UEFeb9OyQs2Yx60ME="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"Myk5dSTNpjZJI35b3Q+U9EK/pGU=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T01:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"f21ezn1nU+UEFeb9OyQs2Yx60ME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hFjFzMmBNz4Z8gNjqc1XKIZOdgA="},{"type":"next-occurrence","id":"HAh5DLOSatc2B4IRm5rbPKJhCH4="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"f21ezn1nU+UEFeb9OyQs2Yx60ME=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T01:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"HAh5DLOSatc2B4IRm5rbPKJhCH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hFjFzMmBNz4Z8gNjqc1XKIZOdgA="},{"type":"next-occurrence","id":"aMG2b7AfQfanWt0Z0TC++oQ4JdA="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"HAh5DLOSatc2B4IRm5rbPKJhCH4=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T01:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"aMG2b7AfQfanWt0Z0TC++oQ4JdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hFjFzMmBNz4Z8gNjqc1XKIZOdgA="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"aMG2b7AfQfanWt0Z0TC++oQ4JdA=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T03:00:00Z","end_date":"2026-06-20T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"ORC300435990","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","description":"Bridge rehabilitation and longterm construction on BRIDGE ST eastbound CHAMPION ST (West Carthage) to NY 126 at Town of Wilna; Town of Champion Line (Wilna) All lanes and shoulders are open to traffic. Motorists can expect occasional lane/shoulder closures on weekdays Not currently Scheduled","update_date":"2026-05-31T03:59:01Z"},"road_event_id":"ORC300435990","beginning_cross_street":"CHAMPION ST","ending_cross_street":"Town of Wilna; Town of Champion Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-04-04T20:08:47Z","end_date":"2026-08-01T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-75.614861,43.974362]]}},{"id":"sNUPPq4ytwk4HLAOcBtNZXbfNYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gR1+p409XiFBoAWUj5DiF4IOmAo="}],"description":"Drainage improvements and longterm construction and road rehabilitation on NY 3 both directions (Piercefield) No active work at this time. All lanes and shoulders open to traffic, Wednesday April 2nd, 2025 thru Tuesday June 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:19:05Z"},"road_event_id":"sNUPPq4ytwk4HLAOcBtNZXbfNYE=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.593809,44.24]]}},{"id":"gR1+p409XiFBoAWUj5DiF4IOmAo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNUPPq4ytwk4HLAOcBtNZXbfNYE="},{"type":"next-occurrence","id":"ACiV507oUUwN6+SeqYoXv9U94OQ="}],"description":"Drainage improvements and longterm construction and road rehabilitation on NY 3 both directions (Piercefield) No active work at this time. All lanes and shoulders open to traffic, Wednesday April 2nd, 2025 thru Tuesday June 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:19:05Z"},"road_event_id":"gR1+p409XiFBoAWUj5DiF4IOmAo=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T04:00:00Z","end_date":"2026-06-13T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.593809,44.24]]}},{"id":"ACiV507oUUwN6+SeqYoXv9U94OQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNUPPq4ytwk4HLAOcBtNZXbfNYE="}],"description":"Drainage improvements and longterm construction and road rehabilitation on NY 3 both directions (Piercefield) No active work at this time. All lanes and shoulders open to traffic, Wednesday April 2nd, 2025 thru Tuesday June 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:19:05Z"},"road_event_id":"ACiV507oUUwN6+SeqYoXv9U94OQ=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T04:00:00Z","end_date":"2026-06-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.593809,44.24]]}},{"id":"PrBXP+DRHwQImpioJkVt3EAMQss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"jWByZBBt+0V+TBUbptbPCzGcNn4="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"PrBXP+DRHwQImpioJkVt3EAMQss=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T05:00:00Z","end_date":"2026-06-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"jWByZBBt+0V+TBUbptbPCzGcNn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PrBXP+DRHwQImpioJkVt3EAMQss="},{"type":"next-occurrence","id":"X0Zrg5NgxSUYZDpJZ6K0rtj9aVs="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"jWByZBBt+0V+TBUbptbPCzGcNn4=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"X0Zrg5NgxSUYZDpJZ6K0rtj9aVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PrBXP+DRHwQImpioJkVt3EAMQss="},{"type":"next-occurrence","id":"tur7XQaXtuHdklvtByo97wXPlOE="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"X0Zrg5NgxSUYZDpJZ6K0rtj9aVs=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T05:00:00Z","end_date":"2026-06-07T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"tur7XQaXtuHdklvtByo97wXPlOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PrBXP+DRHwQImpioJkVt3EAMQss="},{"type":"next-occurrence","id":"mtekcMRfFROyQE577VxzFXltuZY="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"tur7XQaXtuHdklvtByo97wXPlOE=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"mtekcMRfFROyQE577VxzFXltuZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PrBXP+DRHwQImpioJkVt3EAMQss="},{"type":"next-occurrence","id":"TL5qgxy25+sp9/P4UPq6aWcSq7A="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"mtekcMRfFROyQE577VxzFXltuZY=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"TL5qgxy25+sp9/P4UPq6aWcSq7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PrBXP+DRHwQImpioJkVt3EAMQss="},{"type":"next-occurrence","id":"Wn3FWJUrdjEayebGA5790VcCN8I="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"TL5qgxy25+sp9/P4UPq6aWcSq7A=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"Wn3FWJUrdjEayebGA5790VcCN8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PrBXP+DRHwQImpioJkVt3EAMQss="},{"type":"next-occurrence","id":"U9/HD10BNHtyTmPCTR4c0Qgy33U="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"Wn3FWJUrdjEayebGA5790VcCN8I=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"U9/HD10BNHtyTmPCTR4c0Qgy33U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PrBXP+DRHwQImpioJkVt3EAMQss="},{"type":"next-occurrence","id":"aUDA0PJEt0SRcWU7fR3h/1NJReE="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"U9/HD10BNHtyTmPCTR4c0Qgy33U=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"aUDA0PJEt0SRcWU7fR3h/1NJReE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PrBXP+DRHwQImpioJkVt3EAMQss="},{"type":"next-occurrence","id":"ZEElvqjMNIbuY7D0uH2FxPU5RhY="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"aUDA0PJEt0SRcWU7fR3h/1NJReE=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T05:00:00Z","end_date":"2026-06-14T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"ZEElvqjMNIbuY7D0uH2FxPU5RhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PrBXP+DRHwQImpioJkVt3EAMQss="},{"type":"next-occurrence","id":"uW7kdvQKT2YxzUO9J/qOLmXkwIw="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"ZEElvqjMNIbuY7D0uH2FxPU5RhY=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T02:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"uW7kdvQKT2YxzUO9J/qOLmXkwIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PrBXP+DRHwQImpioJkVt3EAMQss="},{"type":"next-occurrence","id":"jvtkWuWtIm5s2JaRCGQX7AmBaWE="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"uW7kdvQKT2YxzUO9J/qOLmXkwIw=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T02:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"jvtkWuWtIm5s2JaRCGQX7AmBaWE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PrBXP+DRHwQImpioJkVt3EAMQss="},{"type":"next-occurrence","id":"iB0CS9MXmfH8n3tkxxwoGWE9P2w="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"jvtkWuWtIm5s2JaRCGQX7AmBaWE=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T02:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"iB0CS9MXmfH8n3tkxxwoGWE9P2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PrBXP+DRHwQImpioJkVt3EAMQss="},{"type":"next-occurrence","id":"dKzIvZi+58yE1lEXnjcYyQOOww8="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"iB0CS9MXmfH8n3tkxxwoGWE9P2w=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T02:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"dKzIvZi+58yE1lEXnjcYyQOOww8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PrBXP+DRHwQImpioJkVt3EAMQss="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"dKzIvZi+58yE1lEXnjcYyQOOww8=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T02:00:00Z","end_date":"2026-06-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"un8ufiwy/dB1WGCuRsa/qi3HcMI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"S2Fdj+02A2OBvC2icRDYIPiAves="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"un8ufiwy/dB1WGCuRsa/qi3HcMI=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T05:00:00Z","end_date":"2026-06-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"S2Fdj+02A2OBvC2icRDYIPiAves=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"un8ufiwy/dB1WGCuRsa/qi3HcMI="},{"type":"next-occurrence","id":"c+8bSS6lnZVukYDyM49J5HChung="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"S2Fdj+02A2OBvC2icRDYIPiAves=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"c+8bSS6lnZVukYDyM49J5HChung=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"un8ufiwy/dB1WGCuRsa/qi3HcMI="},{"type":"next-occurrence","id":"VY9j+yCdxF5NHvjeo+2t5tmInJc="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"c+8bSS6lnZVukYDyM49J5HChung=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T05:00:00Z","end_date":"2026-06-07T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"VY9j+yCdxF5NHvjeo+2t5tmInJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"un8ufiwy/dB1WGCuRsa/qi3HcMI="},{"type":"next-occurrence","id":"tbd7VZEaKPZgN6ST+mQGqqvYpEU="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"VY9j+yCdxF5NHvjeo+2t5tmInJc=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T03:00:00Z","end_date":"2026-06-08T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"tbd7VZEaKPZgN6ST+mQGqqvYpEU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"un8ufiwy/dB1WGCuRsa/qi3HcMI="},{"type":"next-occurrence","id":"7CRviZAdXDso8GjkfLPW+rO3/Tg="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"tbd7VZEaKPZgN6ST+mQGqqvYpEU=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T05:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"7CRviZAdXDso8GjkfLPW+rO3/Tg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"un8ufiwy/dB1WGCuRsa/qi3HcMI="},{"type":"next-occurrence","id":"Gm0ckQek+eWfdNnDrHmPg3zkehg="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"7CRviZAdXDso8GjkfLPW+rO3/Tg=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T05:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"Gm0ckQek+eWfdNnDrHmPg3zkehg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"un8ufiwy/dB1WGCuRsa/qi3HcMI="},{"type":"next-occurrence","id":"C/uhhsuq5jbhUZb13NB1bx+TeNI="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"Gm0ckQek+eWfdNnDrHmPg3zkehg=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T05:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"C/uhhsuq5jbhUZb13NB1bx+TeNI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"un8ufiwy/dB1WGCuRsa/qi3HcMI="},{"type":"next-occurrence","id":"8GXrK50HSntHB04IxRKHuPASlZA="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"C/uhhsuq5jbhUZb13NB1bx+TeNI=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T05:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"8GXrK50HSntHB04IxRKHuPASlZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"un8ufiwy/dB1WGCuRsa/qi3HcMI="},{"type":"next-occurrence","id":"KZuyVgR1xdq4UZcGQuub/f04c2Q="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"8GXrK50HSntHB04IxRKHuPASlZA=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T03:00:00Z","end_date":"2026-06-13T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"KZuyVgR1xdq4UZcGQuub/f04c2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"un8ufiwy/dB1WGCuRsa/qi3HcMI="},{"type":"next-occurrence","id":"X4FheyY27CnI3jd8RD5Ptsb/6/k="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"KZuyVgR1xdq4UZcGQuub/f04c2Q=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T05:00:00Z","end_date":"2026-06-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"X4FheyY27CnI3jd8RD5Ptsb/6/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"un8ufiwy/dB1WGCuRsa/qi3HcMI="},{"type":"next-occurrence","id":"aqjhKRfDKNBZSbozumrnxqSH/9Y="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"X4FheyY27CnI3jd8RD5Ptsb/6/k=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T03:00:00Z","end_date":"2026-06-15T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"aqjhKRfDKNBZSbozumrnxqSH/9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"un8ufiwy/dB1WGCuRsa/qi3HcMI="},{"type":"next-occurrence","id":"ZPR6IKJBbHZiTmte70BBvf8N90I="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"aqjhKRfDKNBZSbozumrnxqSH/9Y=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T05:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"ZPR6IKJBbHZiTmte70BBvf8N90I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"un8ufiwy/dB1WGCuRsa/qi3HcMI="},{"type":"next-occurrence","id":"QSaKG8iA+P8rKSkDVGNW+3unjTQ="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"ZPR6IKJBbHZiTmte70BBvf8N90I=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T05:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"QSaKG8iA+P8rKSkDVGNW+3unjTQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"un8ufiwy/dB1WGCuRsa/qi3HcMI="},{"type":"next-occurrence","id":"VaSPphO0l3foQD1387lypRx9B4Y="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"QSaKG8iA+P8rKSkDVGNW+3unjTQ=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T05:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"VaSPphO0l3foQD1387lypRx9B4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"un8ufiwy/dB1WGCuRsa/qi3HcMI="},{"type":"next-occurrence","id":"sJKETXMzCtvXLhXcMbL2s5dB4Xs="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"VaSPphO0l3foQD1387lypRx9B4Y=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T05:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"sJKETXMzCtvXLhXcMbL2s5dB4Xs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"un8ufiwy/dB1WGCuRsa/qi3HcMI="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"sJKETXMzCtvXLhXcMbL2s5dB4Xs=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T03:00:00Z","end_date":"2026-06-20T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"PR1ah2evpcxxzaFNbYd4lT2s7Bk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2pEzqxfGnnM3+cv7fwbB6AMzZdM="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"PR1ah2evpcxxzaFNbYd4lT2s7Bk=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"2pEzqxfGnnM3+cv7fwbB6AMzZdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PR1ah2evpcxxzaFNbYd4lT2s7Bk="},{"type":"next-occurrence","id":"9W457sX3KCAADjHf3mXVOWkWnY8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"2pEzqxfGnnM3+cv7fwbB6AMzZdM=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T20:00:00Z","end_date":"2026-06-07T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"9W457sX3KCAADjHf3mXVOWkWnY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PR1ah2evpcxxzaFNbYd4lT2s7Bk="},{"type":"next-occurrence","id":"AmqBbYaq09/3b66cxcCOLeOS/sk="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"9W457sX3KCAADjHf3mXVOWkWnY8=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T21:00:00Z","end_date":"2026-06-08T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"AmqBbYaq09/3b66cxcCOLeOS/sk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PR1ah2evpcxxzaFNbYd4lT2s7Bk="},{"type":"next-occurrence","id":"XGD6WTLBPadY8+PckGWAP8Hc+wM="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"AmqBbYaq09/3b66cxcCOLeOS/sk=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"XGD6WTLBPadY8+PckGWAP8Hc+wM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PR1ah2evpcxxzaFNbYd4lT2s7Bk="},{"type":"next-occurrence","id":"nz8fjAlKywjdJSA5aiuQN8X1V0U="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"XGD6WTLBPadY8+PckGWAP8Hc+wM=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"nz8fjAlKywjdJSA5aiuQN8X1V0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PR1ah2evpcxxzaFNbYd4lT2s7Bk="},{"type":"next-occurrence","id":"h6md5oWvOHpW/WV0QqSbjwWXUyk="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"nz8fjAlKywjdJSA5aiuQN8X1V0U=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"h6md5oWvOHpW/WV0QqSbjwWXUyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PR1ah2evpcxxzaFNbYd4lT2s7Bk="},{"type":"next-occurrence","id":"258GXDr7JWqoMgug5erWNaBssJM="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"h6md5oWvOHpW/WV0QqSbjwWXUyk=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"258GXDr7JWqoMgug5erWNaBssJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PR1ah2evpcxxzaFNbYd4lT2s7Bk="},{"type":"next-occurrence","id":"nk2WvzUXjJDZRaHYpp89fg+UYqo="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"258GXDr7JWqoMgug5erWNaBssJM=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"nk2WvzUXjJDZRaHYpp89fg+UYqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PR1ah2evpcxxzaFNbYd4lT2s7Bk="},{"type":"next-occurrence","id":"tZ46QI0LtGwyBuDXM5Q9h+TM7r4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"nk2WvzUXjJDZRaHYpp89fg+UYqo=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T20:00:00Z","end_date":"2026-06-14T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"tZ46QI0LtGwyBuDXM5Q9h+TM7r4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PR1ah2evpcxxzaFNbYd4lT2s7Bk="},{"type":"next-occurrence","id":"GbSj95UoDkRAWVyByC69VFwlCQA="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"tZ46QI0LtGwyBuDXM5Q9h+TM7r4=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T21:00:00Z","end_date":"2026-06-15T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"GbSj95UoDkRAWVyByC69VFwlCQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PR1ah2evpcxxzaFNbYd4lT2s7Bk="},{"type":"next-occurrence","id":"MUrsiik8IPD+voQW/kkTasBgvGY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"GbSj95UoDkRAWVyByC69VFwlCQA=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"MUrsiik8IPD+voQW/kkTasBgvGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PR1ah2evpcxxzaFNbYd4lT2s7Bk="},{"type":"next-occurrence","id":"hUxiTd9IYt7a7XaZUdL5p4y+DUU="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"MUrsiik8IPD+voQW/kkTasBgvGY=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"hUxiTd9IYt7a7XaZUdL5p4y+DUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PR1ah2evpcxxzaFNbYd4lT2s7Bk="},{"type":"next-occurrence","id":"O4hjEHkXrVxAlfzJlwBPGP7lKuc="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"hUxiTd9IYt7a7XaZUdL5p4y+DUU=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"O4hjEHkXrVxAlfzJlwBPGP7lKuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PR1ah2evpcxxzaFNbYd4lT2s7Bk="},{"type":"next-occurrence","id":"M4dbquW333dg5M1tRQ+8m6Ut6q4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"O4hjEHkXrVxAlfzJlwBPGP7lKuc=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"M4dbquW333dg5M1tRQ+8m6Ut6q4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PR1ah2evpcxxzaFNbYd4lT2s7Bk="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"M4dbquW333dg5M1tRQ+8m6Ut6q4=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"I1Jm6KXe+vu1pyyh0zjlb9pZ9cQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FgU0eq+wYwt9mtxje+uYz/zs4BA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"I1Jm6KXe+vu1pyyh0zjlb9pZ9cQ=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"FgU0eq+wYwt9mtxje+uYz/zs4BA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I1Jm6KXe+vu1pyyh0zjlb9pZ9cQ="},{"type":"next-occurrence","id":"+1YfwHK4GmJ+Q5269KlYZlx7ZGs="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"FgU0eq+wYwt9mtxje+uYz/zs4BA=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T23:00:00Z","end_date":"2026-06-07T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"+1YfwHK4GmJ+Q5269KlYZlx7ZGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I1Jm6KXe+vu1pyyh0zjlb9pZ9cQ="},{"type":"next-occurrence","id":"9Vg9Fn5GPmL5hCSlhwL6iT5JfH4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"+1YfwHK4GmJ+Q5269KlYZlx7ZGs=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T21:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"9Vg9Fn5GPmL5hCSlhwL6iT5JfH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I1Jm6KXe+vu1pyyh0zjlb9pZ9cQ="},{"type":"next-occurrence","id":"N1LsSYhF3eL8jsXBDlr80BVleMU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"9Vg9Fn5GPmL5hCSlhwL6iT5JfH4=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"N1LsSYhF3eL8jsXBDlr80BVleMU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I1Jm6KXe+vu1pyyh0zjlb9pZ9cQ="},{"type":"next-occurrence","id":"A2ubQqRj8qHUTlI0TrwzI7lESTM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"N1LsSYhF3eL8jsXBDlr80BVleMU=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"A2ubQqRj8qHUTlI0TrwzI7lESTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I1Jm6KXe+vu1pyyh0zjlb9pZ9cQ="},{"type":"next-occurrence","id":"E7TL9Rfeo9DJjuIhldSZ/8kKY+4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"A2ubQqRj8qHUTlI0TrwzI7lESTM=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"E7TL9Rfeo9DJjuIhldSZ/8kKY+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I1Jm6KXe+vu1pyyh0zjlb9pZ9cQ="},{"type":"next-occurrence","id":"F0PJAnIa6LAPUqE55sdWDxZWDcA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"E7TL9Rfeo9DJjuIhldSZ/8kKY+4=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"F0PJAnIa6LAPUqE55sdWDxZWDcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I1Jm6KXe+vu1pyyh0zjlb9pZ9cQ="},{"type":"next-occurrence","id":"IQXJzjC+HcHdgwWBhxhIIqC8ALw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"F0PJAnIa6LAPUqE55sdWDxZWDcA=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"IQXJzjC+HcHdgwWBhxhIIqC8ALw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I1Jm6KXe+vu1pyyh0zjlb9pZ9cQ="},{"type":"next-occurrence","id":"1gc8Gr8fm8Tf65YqF607EeOwkLA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"IQXJzjC+HcHdgwWBhxhIIqC8ALw=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T23:00:00Z","end_date":"2026-06-14T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"1gc8Gr8fm8Tf65YqF607EeOwkLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I1Jm6KXe+vu1pyyh0zjlb9pZ9cQ="},{"type":"next-occurrence","id":"vX+P4TdNpsTR/pmC4XfmnPybqXE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"1gc8Gr8fm8Tf65YqF607EeOwkLA=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T21:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"vX+P4TdNpsTR/pmC4XfmnPybqXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I1Jm6KXe+vu1pyyh0zjlb9pZ9cQ="},{"type":"next-occurrence","id":"oKHYeGftJe20h/OTHAZ/0D56BD8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"vX+P4TdNpsTR/pmC4XfmnPybqXE=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"oKHYeGftJe20h/OTHAZ/0D56BD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I1Jm6KXe+vu1pyyh0zjlb9pZ9cQ="},{"type":"next-occurrence","id":"y2LGP7eHRCIM6XAGcFBXubIlHTk="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"oKHYeGftJe20h/OTHAZ/0D56BD8=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"y2LGP7eHRCIM6XAGcFBXubIlHTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I1Jm6KXe+vu1pyyh0zjlb9pZ9cQ="},{"type":"next-occurrence","id":"prAGpYOmPLhIEzJNUAGEYltfmlM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"y2LGP7eHRCIM6XAGcFBXubIlHTk=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"prAGpYOmPLhIEzJNUAGEYltfmlM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I1Jm6KXe+vu1pyyh0zjlb9pZ9cQ="},{"type":"next-occurrence","id":"FbJJnBFefL9GAD4UQn5/NgBUrJE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"prAGpYOmPLhIEzJNUAGEYltfmlM=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"FbJJnBFefL9GAD4UQn5/NgBUrJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I1Jm6KXe+vu1pyyh0zjlb9pZ9cQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"FbJJnBFefL9GAD4UQn5/NgBUrJE=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"7WZWpCiXQX69bA8JDHa2nQ96NwA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cYuSe1nPMFLjHzOX/5zV7kwxm3o="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"7WZWpCiXQX69bA8JDHa2nQ96NwA=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"cYuSe1nPMFLjHzOX/5zV7kwxm3o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7WZWpCiXQX69bA8JDHa2nQ96NwA="},{"type":"next-occurrence","id":"jsJbgXMjqP4L8EZgo9xzLC9cpjU="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"cYuSe1nPMFLjHzOX/5zV7kwxm3o=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T22:00:00Z","end_date":"2026-06-07T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"jsJbgXMjqP4L8EZgo9xzLC9cpjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7WZWpCiXQX69bA8JDHa2nQ96NwA="},{"type":"next-occurrence","id":"JKR+Co78GEVV0uxSZAbea15QlHw="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"jsJbgXMjqP4L8EZgo9xzLC9cpjU=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"JKR+Co78GEVV0uxSZAbea15QlHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7WZWpCiXQX69bA8JDHa2nQ96NwA="},{"type":"next-occurrence","id":"VWBOAIcWCi2e8e4HReb9SrGvo/M="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"JKR+Co78GEVV0uxSZAbea15QlHw=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"VWBOAIcWCi2e8e4HReb9SrGvo/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7WZWpCiXQX69bA8JDHa2nQ96NwA="},{"type":"next-occurrence","id":"dv7vSyjkTOzhloEWrtXbMoLhG8A="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"VWBOAIcWCi2e8e4HReb9SrGvo/M=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"dv7vSyjkTOzhloEWrtXbMoLhG8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7WZWpCiXQX69bA8JDHa2nQ96NwA="},{"type":"next-occurrence","id":"kx7Ih6gMYb/Z9nzXDZXxXk4KduY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"dv7vSyjkTOzhloEWrtXbMoLhG8A=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"kx7Ih6gMYb/Z9nzXDZXxXk4KduY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7WZWpCiXQX69bA8JDHa2nQ96NwA="},{"type":"next-occurrence","id":"yn8LUdn3Zc5vETdvhV0zYF3vVUY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"kx7Ih6gMYb/Z9nzXDZXxXk4KduY=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"yn8LUdn3Zc5vETdvhV0zYF3vVUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7WZWpCiXQX69bA8JDHa2nQ96NwA="},{"type":"next-occurrence","id":"1Y6W26gKzWsv4Xq/gAO81Wt5pgU="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"yn8LUdn3Zc5vETdvhV0zYF3vVUY=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"1Y6W26gKzWsv4Xq/gAO81Wt5pgU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7WZWpCiXQX69bA8JDHa2nQ96NwA="},{"type":"next-occurrence","id":"pGV+oPlciFsc1Obt3FNL+CulyiM="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"1Y6W26gKzWsv4Xq/gAO81Wt5pgU=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T22:00:00Z","end_date":"2026-06-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"pGV+oPlciFsc1Obt3FNL+CulyiM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7WZWpCiXQX69bA8JDHa2nQ96NwA="},{"type":"next-occurrence","id":"uwarRaTnIxGDqpIApzuy5B8LjSo="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"pGV+oPlciFsc1Obt3FNL+CulyiM=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"uwarRaTnIxGDqpIApzuy5B8LjSo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7WZWpCiXQX69bA8JDHa2nQ96NwA="},{"type":"next-occurrence","id":"rO/KcGdq383pQoHwRDuC5IySMrI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"uwarRaTnIxGDqpIApzuy5B8LjSo=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"rO/KcGdq383pQoHwRDuC5IySMrI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7WZWpCiXQX69bA8JDHa2nQ96NwA="},{"type":"next-occurrence","id":"j6sYpTVXhDqImdszqQzaTmcaNvo="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"rO/KcGdq383pQoHwRDuC5IySMrI=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"j6sYpTVXhDqImdszqQzaTmcaNvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7WZWpCiXQX69bA8JDHa2nQ96NwA="},{"type":"next-occurrence","id":"1Z4qgurc+iKkE+NMHHeSAoEgBO4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"j6sYpTVXhDqImdszqQzaTmcaNvo=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"1Z4qgurc+iKkE+NMHHeSAoEgBO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7WZWpCiXQX69bA8JDHa2nQ96NwA="},{"type":"next-occurrence","id":"MJU3TRDnKTs51ZQHFjV7f79zhYY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"1Z4qgurc+iKkE+NMHHeSAoEgBO4=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"MJU3TRDnKTs51ZQHFjV7f79zhYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7WZWpCiXQX69bA8JDHa2nQ96NwA="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"MJU3TRDnKTs51ZQHFjV7f79zhYY=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"VYQICBrDW61HoqnEUvkg3ZVei/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+J2VX3+EMgL5T4YGNjLPxE7fSUU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"VYQICBrDW61HoqnEUvkg3ZVei/g=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"+J2VX3+EMgL5T4YGNjLPxE7fSUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VYQICBrDW61HoqnEUvkg3ZVei/g="},{"type":"next-occurrence","id":"gC8L6RuEg3Nf9MOuoum57+XRlZg="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"+J2VX3+EMgL5T4YGNjLPxE7fSUU=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T22:00:00Z","end_date":"2026-06-07T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"gC8L6RuEg3Nf9MOuoum57+XRlZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VYQICBrDW61HoqnEUvkg3ZVei/g="},{"type":"next-occurrence","id":"N1a3AH/QC+B74D8Vpw4NC/nqOxg="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"gC8L6RuEg3Nf9MOuoum57+XRlZg=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T21:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"N1a3AH/QC+B74D8Vpw4NC/nqOxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VYQICBrDW61HoqnEUvkg3ZVei/g="},{"type":"next-occurrence","id":"xIDiZozY86h3GfsBNDvX0I5Smic="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"N1a3AH/QC+B74D8Vpw4NC/nqOxg=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"xIDiZozY86h3GfsBNDvX0I5Smic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VYQICBrDW61HoqnEUvkg3ZVei/g="},{"type":"next-occurrence","id":"/AGZu6oThLy/7X9kGkY4x+LUFnQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"xIDiZozY86h3GfsBNDvX0I5Smic=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"/AGZu6oThLy/7X9kGkY4x+LUFnQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VYQICBrDW61HoqnEUvkg3ZVei/g="},{"type":"next-occurrence","id":"xx2c2aFYr0oa5+y3+/VX0mVbT0A="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"/AGZu6oThLy/7X9kGkY4x+LUFnQ=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"xx2c2aFYr0oa5+y3+/VX0mVbT0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VYQICBrDW61HoqnEUvkg3ZVei/g="},{"type":"next-occurrence","id":"pQL/NpR132sJFWC0ln4Qe3sK/fk="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"xx2c2aFYr0oa5+y3+/VX0mVbT0A=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"pQL/NpR132sJFWC0ln4Qe3sK/fk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VYQICBrDW61HoqnEUvkg3ZVei/g="},{"type":"next-occurrence","id":"zRMfVFzBI+Ks3hJx28qBWxtUc4Y="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"pQL/NpR132sJFWC0ln4Qe3sK/fk=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"zRMfVFzBI+Ks3hJx28qBWxtUc4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VYQICBrDW61HoqnEUvkg3ZVei/g="},{"type":"next-occurrence","id":"fGxIVzlQ58myV5f6WibRNvtjm7s="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"zRMfVFzBI+Ks3hJx28qBWxtUc4Y=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T22:00:00Z","end_date":"2026-06-14T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"fGxIVzlQ58myV5f6WibRNvtjm7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VYQICBrDW61HoqnEUvkg3ZVei/g="},{"type":"next-occurrence","id":"x37uuxagYiZsvjh1O3+vnRa1L2c="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"fGxIVzlQ58myV5f6WibRNvtjm7s=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T21:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"x37uuxagYiZsvjh1O3+vnRa1L2c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VYQICBrDW61HoqnEUvkg3ZVei/g="},{"type":"next-occurrence","id":"lvmR01dE//AmwO0nb7qOHbJyKzY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"x37uuxagYiZsvjh1O3+vnRa1L2c=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"lvmR01dE//AmwO0nb7qOHbJyKzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VYQICBrDW61HoqnEUvkg3ZVei/g="},{"type":"next-occurrence","id":"bkebNAgK+iwv4WwgiIScdzTE+kI="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"lvmR01dE//AmwO0nb7qOHbJyKzY=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"bkebNAgK+iwv4WwgiIScdzTE+kI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VYQICBrDW61HoqnEUvkg3ZVei/g="},{"type":"next-occurrence","id":"qR8TGW95UtGeCyLbQqmUiG2Igk4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"bkebNAgK+iwv4WwgiIScdzTE+kI=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"qR8TGW95UtGeCyLbQqmUiG2Igk4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VYQICBrDW61HoqnEUvkg3ZVei/g="},{"type":"next-occurrence","id":"8lPTjHuc7BaLqNMDj0ot3EBu/fY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"qR8TGW95UtGeCyLbQqmUiG2Igk4=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"8lPTjHuc7BaLqNMDj0ot3EBu/fY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VYQICBrDW61HoqnEUvkg3ZVei/g="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"8lPTjHuc7BaLqNMDj0ot3EBu/fY=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"i5SCkDd80840NdKNXD4YG22mmz0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qkwkvHbEik0v2GawYTGGZUpv244="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"i5SCkDd80840NdKNXD4YG22mmz0=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"qkwkvHbEik0v2GawYTGGZUpv244=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i5SCkDd80840NdKNXD4YG22mmz0="},{"type":"next-occurrence","id":"za1l8OvDjYYS5X230w3rKMNp0Rk="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"qkwkvHbEik0v2GawYTGGZUpv244=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T23:00:00Z","end_date":"2026-06-07T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"za1l8OvDjYYS5X230w3rKMNp0Rk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i5SCkDd80840NdKNXD4YG22mmz0="},{"type":"next-occurrence","id":"/LTAQw+XXUodwF0Gvd4YQjXHdKM="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"za1l8OvDjYYS5X230w3rKMNp0Rk=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"/LTAQw+XXUodwF0Gvd4YQjXHdKM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i5SCkDd80840NdKNXD4YG22mmz0="},{"type":"next-occurrence","id":"WwkKCgSvpJT0/cQpPuSBVbwgMz8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"/LTAQw+XXUodwF0Gvd4YQjXHdKM=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"WwkKCgSvpJT0/cQpPuSBVbwgMz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i5SCkDd80840NdKNXD4YG22mmz0="},{"type":"next-occurrence","id":"zu7XInKQucOtKd2qsDNY/iyXX5A="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"WwkKCgSvpJT0/cQpPuSBVbwgMz8=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"zu7XInKQucOtKd2qsDNY/iyXX5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i5SCkDd80840NdKNXD4YG22mmz0="},{"type":"next-occurrence","id":"ygUJ4nllZtYz4nFKD+gzjch5Xjg="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"zu7XInKQucOtKd2qsDNY/iyXX5A=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"ygUJ4nllZtYz4nFKD+gzjch5Xjg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i5SCkDd80840NdKNXD4YG22mmz0="},{"type":"next-occurrence","id":"AE1JypaJVIEMFTf0GxwR0GvAngc="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"ygUJ4nllZtYz4nFKD+gzjch5Xjg=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"AE1JypaJVIEMFTf0GxwR0GvAngc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i5SCkDd80840NdKNXD4YG22mmz0="},{"type":"next-occurrence","id":"22xdaodxgTSbXcydmKuUaS5WpbM="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"AE1JypaJVIEMFTf0GxwR0GvAngc=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"22xdaodxgTSbXcydmKuUaS5WpbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i5SCkDd80840NdKNXD4YG22mmz0="},{"type":"next-occurrence","id":"Zmk07/iwbMER0muVPG2ZLZB1esw="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"22xdaodxgTSbXcydmKuUaS5WpbM=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T23:00:00Z","end_date":"2026-06-14T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"Zmk07/iwbMER0muVPG2ZLZB1esw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i5SCkDd80840NdKNXD4YG22mmz0="},{"type":"next-occurrence","id":"16ktF1IwX0rLO4vMxt3VRWMcQlA="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"Zmk07/iwbMER0muVPG2ZLZB1esw=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"16ktF1IwX0rLO4vMxt3VRWMcQlA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i5SCkDd80840NdKNXD4YG22mmz0="},{"type":"next-occurrence","id":"1nkI5+SAdNwdWcX0spIVW/hp+X0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"16ktF1IwX0rLO4vMxt3VRWMcQlA=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"1nkI5+SAdNwdWcX0spIVW/hp+X0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i5SCkDd80840NdKNXD4YG22mmz0="},{"type":"next-occurrence","id":"NYRi52Qi2GXJo0acqlT4MJnDN5E="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"1nkI5+SAdNwdWcX0spIVW/hp+X0=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"NYRi52Qi2GXJo0acqlT4MJnDN5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i5SCkDd80840NdKNXD4YG22mmz0="},{"type":"next-occurrence","id":"/oBSbJw3KceFu8h5YQzlZK2elZs="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"NYRi52Qi2GXJo0acqlT4MJnDN5E=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"/oBSbJw3KceFu8h5YQzlZK2elZs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i5SCkDd80840NdKNXD4YG22mmz0="},{"type":"next-occurrence","id":"u5w7FXObZ8whJfc7OOMnZdq/V+g="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"/oBSbJw3KceFu8h5YQzlZK2elZs=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"u5w7FXObZ8whJfc7OOMnZdq/V+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i5SCkDd80840NdKNXD4YG22mmz0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"u5w7FXObZ8whJfc7OOMnZdq/V+g=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"0fyrmzIf0rOSst+iI7fNU/iRp4M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vtAFxY+bV9s79PH4X7b/G/E46Do="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"0fyrmzIf0rOSst+iI7fNU/iRp4M=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"vtAFxY+bV9s79PH4X7b/G/E46Do=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0fyrmzIf0rOSst+iI7fNU/iRp4M="},{"type":"next-occurrence","id":"iIgl4dGGHVaQokHBlC7PomUjXMQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"vtAFxY+bV9s79PH4X7b/G/E46Do=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T22:00:00Z","end_date":"2026-06-07T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"iIgl4dGGHVaQokHBlC7PomUjXMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0fyrmzIf0rOSst+iI7fNU/iRp4M="},{"type":"next-occurrence","id":"9gsJZy1CvPe9iXrKtvvcencLKuw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"iIgl4dGGHVaQokHBlC7PomUjXMQ=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T21:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"9gsJZy1CvPe9iXrKtvvcencLKuw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0fyrmzIf0rOSst+iI7fNU/iRp4M="},{"type":"next-occurrence","id":"3fgbzta2MAc26Xj3YZYPGp7EMTE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"9gsJZy1CvPe9iXrKtvvcencLKuw=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"3fgbzta2MAc26Xj3YZYPGp7EMTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0fyrmzIf0rOSst+iI7fNU/iRp4M="},{"type":"next-occurrence","id":"N2PbiQMvFyFAHlHSKecj2vgBtpU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"3fgbzta2MAc26Xj3YZYPGp7EMTE=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"N2PbiQMvFyFAHlHSKecj2vgBtpU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0fyrmzIf0rOSst+iI7fNU/iRp4M="},{"type":"next-occurrence","id":"nHu88OYxpOdd6Ma/9en/lQ1uP8M="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"N2PbiQMvFyFAHlHSKecj2vgBtpU=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"nHu88OYxpOdd6Ma/9en/lQ1uP8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0fyrmzIf0rOSst+iI7fNU/iRp4M="},{"type":"next-occurrence","id":"1+m3JZzEbceJnFmruqXYhn6UZe0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"nHu88OYxpOdd6Ma/9en/lQ1uP8M=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"1+m3JZzEbceJnFmruqXYhn6UZe0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0fyrmzIf0rOSst+iI7fNU/iRp4M="},{"type":"next-occurrence","id":"VpDnyVfZpWB8PKVokMqANX6vjHs="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"1+m3JZzEbceJnFmruqXYhn6UZe0=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"VpDnyVfZpWB8PKVokMqANX6vjHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0fyrmzIf0rOSst+iI7fNU/iRp4M="},{"type":"next-occurrence","id":"QFZTiNObc67hK3YfEWNH+yXakgg="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"VpDnyVfZpWB8PKVokMqANX6vjHs=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T22:00:00Z","end_date":"2026-06-14T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"QFZTiNObc67hK3YfEWNH+yXakgg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0fyrmzIf0rOSst+iI7fNU/iRp4M="},{"type":"next-occurrence","id":"l/xseRdigCJY/VnczDdokGmDaag="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"QFZTiNObc67hK3YfEWNH+yXakgg=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T21:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"l/xseRdigCJY/VnczDdokGmDaag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0fyrmzIf0rOSst+iI7fNU/iRp4M="},{"type":"next-occurrence","id":"yb3TYEqKtigP5xGBDoOnew7PkoQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"l/xseRdigCJY/VnczDdokGmDaag=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"yb3TYEqKtigP5xGBDoOnew7PkoQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0fyrmzIf0rOSst+iI7fNU/iRp4M="},{"type":"next-occurrence","id":"mCkKzi0C9UwTLYrs9bnnSIq+QRk="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"yb3TYEqKtigP5xGBDoOnew7PkoQ=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"mCkKzi0C9UwTLYrs9bnnSIq+QRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0fyrmzIf0rOSst+iI7fNU/iRp4M="},{"type":"next-occurrence","id":"YkFBFlnzH2tGa1ZVblkxVMO/660="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"mCkKzi0C9UwTLYrs9bnnSIq+QRk=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"YkFBFlnzH2tGa1ZVblkxVMO/660=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0fyrmzIf0rOSst+iI7fNU/iRp4M="},{"type":"next-occurrence","id":"ZTZ5nfl1jnC+y9afWN3b0gu8Nig="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"YkFBFlnzH2tGa1ZVblkxVMO/660=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"ZTZ5nfl1jnC+y9afWN3b0gu8Nig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0fyrmzIf0rOSst+iI7fNU/iRp4M="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"ZTZ5nfl1jnC+y9afWN3b0gu8Nig=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"4x+P3GJewwxgGJkmdQ5YUdGNu7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/eRhSMzAUff/c6H56c+/4SBrSEk="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"4x+P3GJewwxgGJkmdQ5YUdGNu7U=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"/eRhSMzAUff/c6H56c+/4SBrSEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4x+P3GJewwxgGJkmdQ5YUdGNu7U="},{"type":"next-occurrence","id":"6s/S4kTZ089Agk7IBDr2PHPNl9U="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"/eRhSMzAUff/c6H56c+/4SBrSEk=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T21:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"6s/S4kTZ089Agk7IBDr2PHPNl9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4x+P3GJewwxgGJkmdQ5YUdGNu7U="},{"type":"next-occurrence","id":"eVVZMUHhH7BPzHO1vVqAnIavEJE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"6s/S4kTZ089Agk7IBDr2PHPNl9U=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T21:00:00Z","end_date":"2026-06-08T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"eVVZMUHhH7BPzHO1vVqAnIavEJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4x+P3GJewwxgGJkmdQ5YUdGNu7U="},{"type":"next-occurrence","id":"Z+mUiBn9SRq6ndTJMMQoxkLtsoc="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"eVVZMUHhH7BPzHO1vVqAnIavEJE=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"Z+mUiBn9SRq6ndTJMMQoxkLtsoc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4x+P3GJewwxgGJkmdQ5YUdGNu7U="},{"type":"next-occurrence","id":"lvFg7BhlwMZKEt7MbjsXhIW7TWs="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"Z+mUiBn9SRq6ndTJMMQoxkLtsoc=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"lvFg7BhlwMZKEt7MbjsXhIW7TWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4x+P3GJewwxgGJkmdQ5YUdGNu7U="},{"type":"next-occurrence","id":"Z5WemnPhQ3jk82LPCKOd86JWbmQ="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"lvFg7BhlwMZKEt7MbjsXhIW7TWs=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"Z5WemnPhQ3jk82LPCKOd86JWbmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4x+P3GJewwxgGJkmdQ5YUdGNu7U="},{"type":"next-occurrence","id":"u2Rf5jRjAo4nOo0s4J3VQz9aYGo="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"Z5WemnPhQ3jk82LPCKOd86JWbmQ=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"u2Rf5jRjAo4nOo0s4J3VQz9aYGo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4x+P3GJewwxgGJkmdQ5YUdGNu7U="},{"type":"next-occurrence","id":"O7jaTf7nyD5h77Ddt4g9g8q2PV0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"u2Rf5jRjAo4nOo0s4J3VQz9aYGo=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"O7jaTf7nyD5h77Ddt4g9g8q2PV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4x+P3GJewwxgGJkmdQ5YUdGNu7U="},{"type":"next-occurrence","id":"d9TzO5nM5OuJ/r2K/Azm/zCMaxk="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"O7jaTf7nyD5h77Ddt4g9g8q2PV0=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T21:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"d9TzO5nM5OuJ/r2K/Azm/zCMaxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4x+P3GJewwxgGJkmdQ5YUdGNu7U="},{"type":"next-occurrence","id":"tmYryMH2jbNfQ/iW+ISPGwroSp0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"d9TzO5nM5OuJ/r2K/Azm/zCMaxk=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T21:00:00Z","end_date":"2026-06-15T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"tmYryMH2jbNfQ/iW+ISPGwroSp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4x+P3GJewwxgGJkmdQ5YUdGNu7U="},{"type":"next-occurrence","id":"OkM0cPOhmdErAvlKr4LozfFbmlc="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"tmYryMH2jbNfQ/iW+ISPGwroSp0=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"OkM0cPOhmdErAvlKr4LozfFbmlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4x+P3GJewwxgGJkmdQ5YUdGNu7U="},{"type":"next-occurrence","id":"NLC12mFV2icd7z+GWShFR2N6IPM="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"OkM0cPOhmdErAvlKr4LozfFbmlc=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"NLC12mFV2icd7z+GWShFR2N6IPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4x+P3GJewwxgGJkmdQ5YUdGNu7U="},{"type":"next-occurrence","id":"TT5jXI7WOm4u5MlmxPXvuCxeAOc="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"NLC12mFV2icd7z+GWShFR2N6IPM=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"TT5jXI7WOm4u5MlmxPXvuCxeAOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4x+P3GJewwxgGJkmdQ5YUdGNu7U="},{"type":"next-occurrence","id":"NL1wuy581XZIhrlIXDa7P5SiGBo="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"TT5jXI7WOm4u5MlmxPXvuCxeAOc=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"NL1wuy581XZIhrlIXDa7P5SiGBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4x+P3GJewwxgGJkmdQ5YUdGNu7U="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"NL1wuy581XZIhrlIXDa7P5SiGBo=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"tPQJcUyjpy/laa8n3lndRUki4/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AIXKV28A1Q9ssd8H+Thi5PDNKm4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"tPQJcUyjpy/laa8n3lndRUki4/s=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"AIXKV28A1Q9ssd8H+Thi5PDNKm4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPQJcUyjpy/laa8n3lndRUki4/s="},{"type":"next-occurrence","id":"o2sL9ay55zcN6xsyBoUdq9ybRrM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"AIXKV28A1Q9ssd8H+Thi5PDNKm4=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T22:00:00Z","end_date":"2026-06-07T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"o2sL9ay55zcN6xsyBoUdq9ybRrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPQJcUyjpy/laa8n3lndRUki4/s="},{"type":"next-occurrence","id":"58gyWNsyY2fx274uETcFpIBX7BU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"o2sL9ay55zcN6xsyBoUdq9ybRrM=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T21:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"58gyWNsyY2fx274uETcFpIBX7BU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPQJcUyjpy/laa8n3lndRUki4/s="},{"type":"next-occurrence","id":"zz67bMEtbjilQ1Jk4PhFQxJrE1s="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"58gyWNsyY2fx274uETcFpIBX7BU=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"zz67bMEtbjilQ1Jk4PhFQxJrE1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPQJcUyjpy/laa8n3lndRUki4/s="},{"type":"next-occurrence","id":"J2kzlHXwlq5htZbway7Sb0AcAFk="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"zz67bMEtbjilQ1Jk4PhFQxJrE1s=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"J2kzlHXwlq5htZbway7Sb0AcAFk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPQJcUyjpy/laa8n3lndRUki4/s="},{"type":"next-occurrence","id":"39e8uCXuTjdiXVuZ36IaVLyJjsw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"J2kzlHXwlq5htZbway7Sb0AcAFk=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"39e8uCXuTjdiXVuZ36IaVLyJjsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPQJcUyjpy/laa8n3lndRUki4/s="},{"type":"next-occurrence","id":"gdlW3rZqtpLiuTJudJB/T5Tfk74="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"39e8uCXuTjdiXVuZ36IaVLyJjsw=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"gdlW3rZqtpLiuTJudJB/T5Tfk74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPQJcUyjpy/laa8n3lndRUki4/s="},{"type":"next-occurrence","id":"6Qgt0sV5xzZ+0TJxA4onWugfqsQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"gdlW3rZqtpLiuTJudJB/T5Tfk74=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"6Qgt0sV5xzZ+0TJxA4onWugfqsQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPQJcUyjpy/laa8n3lndRUki4/s="},{"type":"next-occurrence","id":"2kfwS67MSkiEoF5ZEunT61+vXp4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"6Qgt0sV5xzZ+0TJxA4onWugfqsQ=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T22:00:00Z","end_date":"2026-06-14T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"2kfwS67MSkiEoF5ZEunT61+vXp4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPQJcUyjpy/laa8n3lndRUki4/s="},{"type":"next-occurrence","id":"xzkUK18qrCkFzOF36sLLSr/QVC4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"2kfwS67MSkiEoF5ZEunT61+vXp4=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T21:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"xzkUK18qrCkFzOF36sLLSr/QVC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPQJcUyjpy/laa8n3lndRUki4/s="},{"type":"next-occurrence","id":"7pLUhd6sFUi35rHWfARdLjdjAqY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"xzkUK18qrCkFzOF36sLLSr/QVC4=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"7pLUhd6sFUi35rHWfARdLjdjAqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPQJcUyjpy/laa8n3lndRUki4/s="},{"type":"next-occurrence","id":"5vLwVqjWe/6M3u++3j2tdVpXmxY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"7pLUhd6sFUi35rHWfARdLjdjAqY=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"5vLwVqjWe/6M3u++3j2tdVpXmxY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPQJcUyjpy/laa8n3lndRUki4/s="},{"type":"next-occurrence","id":"8HK2KiOwav9wPmTq+D+86RVxeGE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"5vLwVqjWe/6M3u++3j2tdVpXmxY=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"8HK2KiOwav9wPmTq+D+86RVxeGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPQJcUyjpy/laa8n3lndRUki4/s="},{"type":"next-occurrence","id":"ZPLhOGLBhHHqfDj901gLOzmeJME="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"8HK2KiOwav9wPmTq+D+86RVxeGE=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"ZPLhOGLBhHHqfDj901gLOzmeJME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tPQJcUyjpy/laa8n3lndRUki4/s="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"ZPLhOGLBhHHqfDj901gLOzmeJME=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"NUnDLXeYpvQZuxE+3I7nMMmM3U8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"v2hGAPzPYprd2z+rNLxT+qfuwA8="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"NUnDLXeYpvQZuxE+3I7nMMmM3U8=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T05:00:00Z","end_date":"2026-06-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"v2hGAPzPYprd2z+rNLxT+qfuwA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUnDLXeYpvQZuxE+3I7nMMmM3U8="},{"type":"next-occurrence","id":"r8RMT8ASP+aJ3iG7iH8vPvrAfGM="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"v2hGAPzPYprd2z+rNLxT+qfuwA8=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"r8RMT8ASP+aJ3iG7iH8vPvrAfGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUnDLXeYpvQZuxE+3I7nMMmM3U8="},{"type":"next-occurrence","id":"7jBWzLh2d5tQf01QpFXN4Ug45GM="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"r8RMT8ASP+aJ3iG7iH8vPvrAfGM=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T05:00:00Z","end_date":"2026-06-07T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"7jBWzLh2d5tQf01QpFXN4Ug45GM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUnDLXeYpvQZuxE+3I7nMMmM3U8="},{"type":"next-occurrence","id":"19jMUojff5ndIpicmi+oV6IWjr4="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"7jBWzLh2d5tQf01QpFXN4Ug45GM=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T05:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"19jMUojff5ndIpicmi+oV6IWjr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUnDLXeYpvQZuxE+3I7nMMmM3U8="},{"type":"next-occurrence","id":"Ao9y5xT9qCvnrQ0z/QZBc5ppibQ="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"19jMUojff5ndIpicmi+oV6IWjr4=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"Ao9y5xT9qCvnrQ0z/QZBc5ppibQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUnDLXeYpvQZuxE+3I7nMMmM3U8="},{"type":"next-occurrence","id":"uUuBgU0SNHWWBANm2mX5XHHH1+A="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"Ao9y5xT9qCvnrQ0z/QZBc5ppibQ=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"uUuBgU0SNHWWBANm2mX5XHHH1+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUnDLXeYpvQZuxE+3I7nMMmM3U8="},{"type":"next-occurrence","id":"fJ+DDmciyE1TyiiRRCEiEpL9ID0="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"uUuBgU0SNHWWBANm2mX5XHHH1+A=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"fJ+DDmciyE1TyiiRRCEiEpL9ID0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUnDLXeYpvQZuxE+3I7nMMmM3U8="},{"type":"next-occurrence","id":"neH9zqyz5egVVKHGqQlP39ERYfw="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"fJ+DDmciyE1TyiiRRCEiEpL9ID0=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"neH9zqyz5egVVKHGqQlP39ERYfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUnDLXeYpvQZuxE+3I7nMMmM3U8="},{"type":"next-occurrence","id":"0CLYfieZLwczdc7ZTWIM2tjQY5Y="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"neH9zqyz5egVVKHGqQlP39ERYfw=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"0CLYfieZLwczdc7ZTWIM2tjQY5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUnDLXeYpvQZuxE+3I7nMMmM3U8="},{"type":"next-occurrence","id":"lCc4nuS2XwYY0HgIOAm74Th0OHo="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"0CLYfieZLwczdc7ZTWIM2tjQY5Y=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T05:00:00Z","end_date":"2026-06-14T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"lCc4nuS2XwYY0HgIOAm74Th0OHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUnDLXeYpvQZuxE+3I7nMMmM3U8="},{"type":"next-occurrence","id":"qb9QKm2IkAJl5L479ycf1Go+LqY="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"lCc4nuS2XwYY0HgIOAm74Th0OHo=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T05:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"qb9QKm2IkAJl5L479ycf1Go+LqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUnDLXeYpvQZuxE+3I7nMMmM3U8="},{"type":"next-occurrence","id":"vyCMf40AvA/cjCISebr42boTayI="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"qb9QKm2IkAJl5L479ycf1Go+LqY=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T02:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"vyCMf40AvA/cjCISebr42boTayI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUnDLXeYpvQZuxE+3I7nMMmM3U8="},{"type":"next-occurrence","id":"3lhvj4Omfi1LYfKVAENNWYtpxvw="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"vyCMf40AvA/cjCISebr42boTayI=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T02:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"3lhvj4Omfi1LYfKVAENNWYtpxvw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUnDLXeYpvQZuxE+3I7nMMmM3U8="},{"type":"next-occurrence","id":"CMNcml5583at1V7kc3dxwzI/R90="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"3lhvj4Omfi1LYfKVAENNWYtpxvw=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T02:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"CMNcml5583at1V7kc3dxwzI/R90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUnDLXeYpvQZuxE+3I7nMMmM3U8="},{"type":"next-occurrence","id":"1A6MA/+LvidVKtg7FPYKClyEWwE="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"CMNcml5583at1V7kc3dxwzI/R90=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T02:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"1A6MA/+LvidVKtg7FPYKClyEWwE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUnDLXeYpvQZuxE+3I7nMMmM3U8="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"1A6MA/+LvidVKtg7FPYKClyEWwE=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T02:00:00Z","end_date":"2026-06-20T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"1DdGIgWAABC+nlngEKt0MSrEEcQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HOLABIRD AVE"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on HOLABIRD AVE both directions between WHITING ST (Winchester) and CT-8 (Winchester) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T02:07:15Z"},"road_event_id":"1DdGIgWAABC+nlngEKt0MSrEEcQ=","beginning_cross_street":"WHITING ST","ending_cross_street":"CT-8","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.059289,41.923719]]}},{"id":"8p4rM+ux+TkxIM013znY0PkBFRg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLAY ST"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on CLAY ST both directions between RANDOLPH AVE (Thomaston) and UNION ST at ELM ST (Thomaston) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:50:21Z"},"road_event_id":"8p4rM+ux+TkxIM013znY0PkBFRg=","beginning_cross_street":"RANDOLPH AVE","ending_cross_street":"ELM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.077,41.677265]]}},{"id":"ThtVWviNZDf9fNhM3T1zB3aRtQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-262"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on CT-262 eastbound between FERN HILL RD (Watertown) and CT-262 (Watertown) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T02:02:58Z"},"road_event_id":"ThtVWviNZDf9fNhM3T1zB3aRtQw=","beginning_cross_street":"FERN HILL RD","ending_cross_street":"CT-262","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107738,41.621755]]}},{"id":"wo8WZEjJlKLVMMtjYLK3uxQpJhI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ELM ST"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on ELM ST both directions between UNION ST (Thomaston) and MEADOW ST at CENTER ST (Thomaston) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:48:12Z"},"road_event_id":"wo8WZEjJlKLVMMtjYLK3uxQpJhI=","beginning_cross_street":"UNION ST","ending_cross_street":"CENTER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.07382,41.671079]]}},{"id":"ORC300447549","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","description":"Roadwork on NJ 38 Eastbound At Cherry Hill Mall (Cherry Hill Twp) Friday June 6, 2025 09:00 AM thru 03:00 PM, 1 left lane of 3 lanes closed","update_date":"2025-06-06T19:00:18Z"},"road_event_id":"ORC300447549","beginning_cross_street":"Cherry Hill Mall","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-05T21:01:14Z","end_date":"2025-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-75.022666,39.939041]]}},{"id":"HOjz09EJ5ve4OWy2ad6VvyMKyYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MOUNTAIN RD"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on MOUNTAIN RD both directions between CT-189 (Simsbury) and CT-189 (Bloomfield) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:35:42Z"},"road_event_id":"HOjz09EJ5ve4OWy2ad6VvyMKyYs=","beginning_cross_street":"CT-189","ending_cross_street":"CT-189","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.761415,41.908119]]}},{"id":"RJy6kFiKKaP0iWUDb9fMPrz4Qj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q32 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction eastbound, Q32 Bus at Roosevelt Av/61 St (New York) stop has been relocated through September 2026. Buses are making a temporary stop on Roosevelt Ave at 61st St before the intersection., Continuous Friday September 15th, 2023 11:45 AM thru Wednesday September 30th, 2026 11:59 PM","update_date":"2026-01-07T13:19:57Z"},"road_event_id":"RJy6kFiKKaP0iWUDb9fMPrz4Qj4=","beginning_cross_street":"Roosevelt Av/61 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903548,40.745562]]}},{"id":"DtVXdlG7VlZSNM9S8HpubL1u8ss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M20 Bus and M55 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, M20 Bus and M55 Bus at State St/Bridge St (New York) stop is closed. Use the temporary stop on State St before the intersection instead., Continuous Monday April 14th, 2025 12:00 AM thru Monday November 30th, 2026 11:59 PM","update_date":"2025-04-13T22:07:57Z"},"road_event_id":"DtVXdlG7VlZSNM9S8HpubL1u8ss=","beginning_cross_street":"State St/Bridge St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.014524,40.70335]]}},{"id":"1mxpAt684LqbQCfSqU6JMIr2X0Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"e7KFQIpk1w4T3oIjtQpwgUzxfqw="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for East Side Coast Resiliency., Saturday March 8th,2025 thru Saturday April 1st,2028, Saturday, 08:00 AM thru 04:00 PM All lanes closed eastbound,","update_date":"2025-03-28T20:00:04Z"},"road_event_id":"1mxpAt684LqbQCfSqU6JMIr2X0Q=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975417,40.73297]]}},{"id":"e7KFQIpk1w4T3oIjtQpwgUzxfqw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1mxpAt684LqbQCfSqU6JMIr2X0Q="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for East Side Coast Resiliency., Saturday March 8th,2025 thru Saturday April 1st,2028, Saturday, 08:00 AM thru 04:00 PM All lanes closed eastbound,","update_date":"2025-03-28T20:00:04Z"},"road_event_id":"e7KFQIpk1w4T3oIjtQpwgUzxfqw=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975417,40.73297]]}},{"id":"jRQ+UqhuqzKoQGvLh2ThzecoRvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, Hudson bypassing Breakneck Ridge (Fishkill), Continuous Monday April 21st, 2025 12:00 AM thru Wednesday April 21st, 2027 11:59 PM bypassing","update_date":"2025-04-14T15:42:22Z"},"road_event_id":"jRQ+UqhuqzKoQGvLh2ThzecoRvE=","beginning_cross_street":"Breakneck Ridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982449,41.450181]]}},{"id":"ORC300410421","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 126"],"direction":"unknown","description":"Intersection improvements on NY 126 both directions (Wilna) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Not currently Scheduled","update_date":"2026-06-01T03:59:01Z"},"road_event_id":"ORC300410421","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2024-09-24T13:56:09Z","end_date":"2026-06-01T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-75.609625,43.977898]]}},{"id":"2ZNRBHl6DKXLovXyG1OuWGLBjWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"eUyocqpyn4v20dyqzBAyDlHbyjE="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:05Z"},"road_event_id":"2ZNRBHl6DKXLovXyG1OuWGLBjWM=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"eUyocqpyn4v20dyqzBAyDlHbyjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZNRBHl6DKXLovXyG1OuWGLBjWM="},{"type":"next-occurrence","id":"4OSCKdgqRf2DZunex5W7Re7wLek="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:05Z"},"road_event_id":"eUyocqpyn4v20dyqzBAyDlHbyjE=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"4OSCKdgqRf2DZunex5W7Re7wLek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZNRBHl6DKXLovXyG1OuWGLBjWM="},{"type":"next-occurrence","id":"mgQ/0RyUJ9H51IqbZGZHNUjB1C4="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:05Z"},"road_event_id":"4OSCKdgqRf2DZunex5W7Re7wLek=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"mgQ/0RyUJ9H51IqbZGZHNUjB1C4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZNRBHl6DKXLovXyG1OuWGLBjWM="},{"type":"next-occurrence","id":"kNygIeTr/H/ArAXXFSvJ6VGE1UA="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:05Z"},"road_event_id":"mgQ/0RyUJ9H51IqbZGZHNUjB1C4=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"kNygIeTr/H/ArAXXFSvJ6VGE1UA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZNRBHl6DKXLovXyG1OuWGLBjWM="},{"type":"next-occurrence","id":"ii2kmLiyvyxFI/aCvmhyL8eqlZQ="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:05Z"},"road_event_id":"kNygIeTr/H/ArAXXFSvJ6VGE1UA=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"ii2kmLiyvyxFI/aCvmhyL8eqlZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZNRBHl6DKXLovXyG1OuWGLBjWM="},{"type":"next-occurrence","id":"n9+1caI4MJD3WjTT0FLMjpnInBc="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:05Z"},"road_event_id":"ii2kmLiyvyxFI/aCvmhyL8eqlZQ=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"n9+1caI4MJD3WjTT0FLMjpnInBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZNRBHl6DKXLovXyG1OuWGLBjWM="},{"type":"next-occurrence","id":"dLH+V8DTBjy8wfZ1JZzNZtKOe4s="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:05Z"},"road_event_id":"n9+1caI4MJD3WjTT0FLMjpnInBc=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"dLH+V8DTBjy8wfZ1JZzNZtKOe4s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZNRBHl6DKXLovXyG1OuWGLBjWM="},{"type":"next-occurrence","id":"bPiVU/B6X073mL0fNV5HAvtSXmM="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:05Z"},"road_event_id":"dLH+V8DTBjy8wfZ1JZzNZtKOe4s=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"bPiVU/B6X073mL0fNV5HAvtSXmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZNRBHl6DKXLovXyG1OuWGLBjWM="},{"type":"next-occurrence","id":"/QVp3FYB6sVaaQ/Akszny3Ejf8o="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:05Z"},"road_event_id":"bPiVU/B6X073mL0fNV5HAvtSXmM=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"/QVp3FYB6sVaaQ/Akszny3Ejf8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZNRBHl6DKXLovXyG1OuWGLBjWM="},{"type":"next-occurrence","id":"XGXCDwKDyBGQhP5jkcP82Y/R1oI="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:05Z"},"road_event_id":"/QVp3FYB6sVaaQ/Akszny3Ejf8o=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"XGXCDwKDyBGQhP5jkcP82Y/R1oI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ZNRBHl6DKXLovXyG1OuWGLBjWM="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:05Z"},"road_event_id":"XGXCDwKDyBGQhP5jkcP82Y/R1oI=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"XvHrK7/qh9Ecv8gD7Ic6nCLcAL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"d5ygl+VUnjrm2xwSY5E6GDFjHK0="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"XvHrK7/qh9Ecv8gD7Ic6nCLcAL8=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"d5ygl+VUnjrm2xwSY5E6GDFjHK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XvHrK7/qh9Ecv8gD7Ic6nCLcAL8="},{"type":"next-occurrence","id":"okFs2NCutvhjjIiV52T6IiBpkG0="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"d5ygl+VUnjrm2xwSY5E6GDFjHK0=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"okFs2NCutvhjjIiV52T6IiBpkG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XvHrK7/qh9Ecv8gD7Ic6nCLcAL8="},{"type":"next-occurrence","id":"caWGAnn2bTUxvA/kX4zOWCkz7UQ="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"okFs2NCutvhjjIiV52T6IiBpkG0=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"caWGAnn2bTUxvA/kX4zOWCkz7UQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XvHrK7/qh9Ecv8gD7Ic6nCLcAL8="},{"type":"next-occurrence","id":"pDrjutotJcbJdNCQgxZpwcygyDQ="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"caWGAnn2bTUxvA/kX4zOWCkz7UQ=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"pDrjutotJcbJdNCQgxZpwcygyDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XvHrK7/qh9Ecv8gD7Ic6nCLcAL8="},{"type":"next-occurrence","id":"sCqvGgJ6BCLJ6tk+LPRqJhFuRgo="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"pDrjutotJcbJdNCQgxZpwcygyDQ=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"sCqvGgJ6BCLJ6tk+LPRqJhFuRgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XvHrK7/qh9Ecv8gD7Ic6nCLcAL8="},{"type":"next-occurrence","id":"2PpVZ1KoCNoPxIdQ0OLtZXJDvRY="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"sCqvGgJ6BCLJ6tk+LPRqJhFuRgo=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"2PpVZ1KoCNoPxIdQ0OLtZXJDvRY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XvHrK7/qh9Ecv8gD7Ic6nCLcAL8="},{"type":"next-occurrence","id":"E80cumjLmPHr3DloIU8dvMTuhEM="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"2PpVZ1KoCNoPxIdQ0OLtZXJDvRY=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"E80cumjLmPHr3DloIU8dvMTuhEM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XvHrK7/qh9Ecv8gD7Ic6nCLcAL8="},{"type":"next-occurrence","id":"JiHkjI4gyz/fctsY/ZbQXc4znsk="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"E80cumjLmPHr3DloIU8dvMTuhEM=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"JiHkjI4gyz/fctsY/ZbQXc4znsk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XvHrK7/qh9Ecv8gD7Ic6nCLcAL8="},{"type":"next-occurrence","id":"gxojbmzAJToSBUA6iExp2Q/dQ50="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"JiHkjI4gyz/fctsY/ZbQXc4znsk=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"gxojbmzAJToSBUA6iExp2Q/dQ50=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XvHrK7/qh9Ecv8gD7Ic6nCLcAL8="},{"type":"next-occurrence","id":"5UihigbYKZZnnzC4qbvqifFrbJI="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"gxojbmzAJToSBUA6iExp2Q/dQ50=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"5UihigbYKZZnnzC4qbvqifFrbJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XvHrK7/qh9Ecv8gD7Ic6nCLcAL8="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"5UihigbYKZZnnzC4qbvqifFrbJI=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"WaVUnSp49dnqlOzdrLm3plBoVcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0EO7NAjCzVhz38dkLZLoHhZD1p4="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"WaVUnSp49dnqlOzdrLm3plBoVcA=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"0EO7NAjCzVhz38dkLZLoHhZD1p4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WaVUnSp49dnqlOzdrLm3plBoVcA="},{"type":"next-occurrence","id":"QugmOzQa+Ma4jVNojiMFkfEnlMQ="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"0EO7NAjCzVhz38dkLZLoHhZD1p4=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"QugmOzQa+Ma4jVNojiMFkfEnlMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WaVUnSp49dnqlOzdrLm3plBoVcA="},{"type":"next-occurrence","id":"34NfUzEs8YQtoTohkFYXd4zGKMI="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"QugmOzQa+Ma4jVNojiMFkfEnlMQ=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"34NfUzEs8YQtoTohkFYXd4zGKMI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WaVUnSp49dnqlOzdrLm3plBoVcA="},{"type":"next-occurrence","id":"ybkqmKB3PotUTlEKAn2zgvojBCU="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"34NfUzEs8YQtoTohkFYXd4zGKMI=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"ybkqmKB3PotUTlEKAn2zgvojBCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WaVUnSp49dnqlOzdrLm3plBoVcA="},{"type":"next-occurrence","id":"GLr4V7D2my4mYztsS8kqU1bgmC8="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"ybkqmKB3PotUTlEKAn2zgvojBCU=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"GLr4V7D2my4mYztsS8kqU1bgmC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WaVUnSp49dnqlOzdrLm3plBoVcA="},{"type":"next-occurrence","id":"4f0vZJGwyCtCivQ2BX96WeP/mjE="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"GLr4V7D2my4mYztsS8kqU1bgmC8=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"4f0vZJGwyCtCivQ2BX96WeP/mjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WaVUnSp49dnqlOzdrLm3plBoVcA="},{"type":"next-occurrence","id":"ksbAEgzU5l2kBZ11IIoLGwxjGVg="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"4f0vZJGwyCtCivQ2BX96WeP/mjE=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"ksbAEgzU5l2kBZ11IIoLGwxjGVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WaVUnSp49dnqlOzdrLm3plBoVcA="},{"type":"next-occurrence","id":"mjoYlEevrq9jA/l/qldxAOQrSK4="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"ksbAEgzU5l2kBZ11IIoLGwxjGVg=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"mjoYlEevrq9jA/l/qldxAOQrSK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WaVUnSp49dnqlOzdrLm3plBoVcA="},{"type":"next-occurrence","id":"WWMmRQggWBHTWvAg2DKmu7uGNg4="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"mjoYlEevrq9jA/l/qldxAOQrSK4=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"WWMmRQggWBHTWvAg2DKmu7uGNg4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WaVUnSp49dnqlOzdrLm3plBoVcA="},{"type":"next-occurrence","id":"XxKQB0FHBWBKiNAyfXLIJDWlJ1I="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"WWMmRQggWBHTWvAg2DKmu7uGNg4=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"XxKQB0FHBWBKiNAyfXLIJDWlJ1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WaVUnSp49dnqlOzdrLm3plBoVcA="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"XxKQB0FHBWBKiNAyfXLIJDWlJ1I=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"Ejwnu9wcWotuYX/LDG2CTTmBiH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"afkMxb8gHn/C+TbRqIlkUTFBkPw="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"Ejwnu9wcWotuYX/LDG2CTTmBiH8=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"afkMxb8gHn/C+TbRqIlkUTFBkPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ejwnu9wcWotuYX/LDG2CTTmBiH8="},{"type":"next-occurrence","id":"lZ2UBwcUDu23dNZOiUvZdb/nTJI="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"afkMxb8gHn/C+TbRqIlkUTFBkPw=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"lZ2UBwcUDu23dNZOiUvZdb/nTJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ejwnu9wcWotuYX/LDG2CTTmBiH8="},{"type":"next-occurrence","id":"pBHRHxyiGhHrZuv6qEFFPSQb7DI="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"lZ2UBwcUDu23dNZOiUvZdb/nTJI=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"pBHRHxyiGhHrZuv6qEFFPSQb7DI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ejwnu9wcWotuYX/LDG2CTTmBiH8="},{"type":"next-occurrence","id":"L/TupwbKNIWJTDflPRpCOrRLQS0="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"pBHRHxyiGhHrZuv6qEFFPSQb7DI=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"L/TupwbKNIWJTDflPRpCOrRLQS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ejwnu9wcWotuYX/LDG2CTTmBiH8="},{"type":"next-occurrence","id":"wtxdt5wJStDith22oRs/s8uYmr8="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"L/TupwbKNIWJTDflPRpCOrRLQS0=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"wtxdt5wJStDith22oRs/s8uYmr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ejwnu9wcWotuYX/LDG2CTTmBiH8="},{"type":"next-occurrence","id":"UQJBRN3pRqUfg0FAxLo8Yg6fof8="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"wtxdt5wJStDith22oRs/s8uYmr8=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"UQJBRN3pRqUfg0FAxLo8Yg6fof8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ejwnu9wcWotuYX/LDG2CTTmBiH8="},{"type":"next-occurrence","id":"uHhAzGCbfH9kGc3bN4Df64x+5D4="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"UQJBRN3pRqUfg0FAxLo8Yg6fof8=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"uHhAzGCbfH9kGc3bN4Df64x+5D4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ejwnu9wcWotuYX/LDG2CTTmBiH8="},{"type":"next-occurrence","id":"wVTYGg1NinvwFxWUzutmcIJ8Kes="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"uHhAzGCbfH9kGc3bN4Df64x+5D4=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"wVTYGg1NinvwFxWUzutmcIJ8Kes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ejwnu9wcWotuYX/LDG2CTTmBiH8="},{"type":"next-occurrence","id":"ghaKbSW2e0T/1XYRTiAaMxqYLDY="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"wVTYGg1NinvwFxWUzutmcIJ8Kes=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"ghaKbSW2e0T/1XYRTiAaMxqYLDY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ejwnu9wcWotuYX/LDG2CTTmBiH8="},{"type":"next-occurrence","id":"DtKBbQMrhU0nmkqHv5T+qwm2mlY="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"ghaKbSW2e0T/1XYRTiAaMxqYLDY=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"DtKBbQMrhU0nmkqHv5T+qwm2mlY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ejwnu9wcWotuYX/LDG2CTTmBiH8="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"DtKBbQMrhU0nmkqHv5T+qwm2mlY=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"Df5XSa7DEe31Zd21gsU13DksdXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5p3WDjcoF+F56I489Wdf/4zmRhI="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:25Z"},"road_event_id":"Df5XSa7DEe31Zd21gsU13DksdXA=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"5p3WDjcoF+F56I489Wdf/4zmRhI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Df5XSa7DEe31Zd21gsU13DksdXA="},{"type":"next-occurrence","id":"BNWpbq8EaekmEyfCnGqjd6E18XQ="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:25Z"},"road_event_id":"5p3WDjcoF+F56I489Wdf/4zmRhI=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"BNWpbq8EaekmEyfCnGqjd6E18XQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Df5XSa7DEe31Zd21gsU13DksdXA="},{"type":"next-occurrence","id":"scaVbBmqX8DaS76oXyORbBTDk/c="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:25Z"},"road_event_id":"BNWpbq8EaekmEyfCnGqjd6E18XQ=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"scaVbBmqX8DaS76oXyORbBTDk/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Df5XSa7DEe31Zd21gsU13DksdXA="},{"type":"next-occurrence","id":"CmVLZh13REEjWJnVt5x590qXEbw="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:25Z"},"road_event_id":"scaVbBmqX8DaS76oXyORbBTDk/c=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"CmVLZh13REEjWJnVt5x590qXEbw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Df5XSa7DEe31Zd21gsU13DksdXA="},{"type":"next-occurrence","id":"oqpAZsPF9NrV3PP52UbR4oLmjxk="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:25Z"},"road_event_id":"CmVLZh13REEjWJnVt5x590qXEbw=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"oqpAZsPF9NrV3PP52UbR4oLmjxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Df5XSa7DEe31Zd21gsU13DksdXA="},{"type":"next-occurrence","id":"lI+QZp40/dpnLl0iC9cgyLXpwwk="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:25Z"},"road_event_id":"oqpAZsPF9NrV3PP52UbR4oLmjxk=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"lI+QZp40/dpnLl0iC9cgyLXpwwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Df5XSa7DEe31Zd21gsU13DksdXA="},{"type":"next-occurrence","id":"jF/eGRRHX6+Bu7119Q8SsfP+wfM="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:25Z"},"road_event_id":"lI+QZp40/dpnLl0iC9cgyLXpwwk=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"jF/eGRRHX6+Bu7119Q8SsfP+wfM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Df5XSa7DEe31Zd21gsU13DksdXA="},{"type":"next-occurrence","id":"rWfZCkuCQXmK1Vxqm7tUqz9qU4I="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:25Z"},"road_event_id":"jF/eGRRHX6+Bu7119Q8SsfP+wfM=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"rWfZCkuCQXmK1Vxqm7tUqz9qU4I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Df5XSa7DEe31Zd21gsU13DksdXA="},{"type":"next-occurrence","id":"Is+2tcYHF6Pv+am7RfGrDbiZkHo="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:25Z"},"road_event_id":"rWfZCkuCQXmK1Vxqm7tUqz9qU4I=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"Is+2tcYHF6Pv+am7RfGrDbiZkHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Df5XSa7DEe31Zd21gsU13DksdXA="},{"type":"next-occurrence","id":"YRnwiBSJPaJORnHou0zEr97O9kc="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:25Z"},"road_event_id":"Is+2tcYHF6Pv+am7RfGrDbiZkHo=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"YRnwiBSJPaJORnHou0zEr97O9kc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Df5XSa7DEe31Zd21gsU13DksdXA="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656-202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:25Z"},"road_event_id":"YRnwiBSJPaJORnHou0zEr97O9kc=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"pHZ4tn0f6A/kHfzDx2n4F+KQqLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fOIMveewS9zRuHRIp2b8lh/3pUA="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"pHZ4tn0f6A/kHfzDx2n4F+KQqLc=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"fOIMveewS9zRuHRIp2b8lh/3pUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pHZ4tn0f6A/kHfzDx2n4F+KQqLc="},{"type":"next-occurrence","id":"mFyA6xECTM707IEW/4GhvVEc/bY="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"fOIMveewS9zRuHRIp2b8lh/3pUA=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"mFyA6xECTM707IEW/4GhvVEc/bY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pHZ4tn0f6A/kHfzDx2n4F+KQqLc="},{"type":"next-occurrence","id":"I1u+K55sny/tuky52UnRATzxk2Q="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"mFyA6xECTM707IEW/4GhvVEc/bY=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"I1u+K55sny/tuky52UnRATzxk2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pHZ4tn0f6A/kHfzDx2n4F+KQqLc="},{"type":"next-occurrence","id":"Uyf/FF7kYOo3tLCwBbLHG3jR724="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"I1u+K55sny/tuky52UnRATzxk2Q=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"Uyf/FF7kYOo3tLCwBbLHG3jR724=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pHZ4tn0f6A/kHfzDx2n4F+KQqLc="},{"type":"next-occurrence","id":"OMFEsNuF5VvnlOHe5DLognkgKVQ="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"Uyf/FF7kYOo3tLCwBbLHG3jR724=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"OMFEsNuF5VvnlOHe5DLognkgKVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pHZ4tn0f6A/kHfzDx2n4F+KQqLc="},{"type":"next-occurrence","id":"JY5LV857GqF3A10ZL/CRONlYUig="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"OMFEsNuF5VvnlOHe5DLognkgKVQ=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"JY5LV857GqF3A10ZL/CRONlYUig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pHZ4tn0f6A/kHfzDx2n4F+KQqLc="},{"type":"next-occurrence","id":"pDNL8J1o21lYpGNGG28cABZlgtU="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"JY5LV857GqF3A10ZL/CRONlYUig=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"pDNL8J1o21lYpGNGG28cABZlgtU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pHZ4tn0f6A/kHfzDx2n4F+KQqLc="},{"type":"next-occurrence","id":"FayCvsRTthhJl/R/89Tm1enZutc="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"pDNL8J1o21lYpGNGG28cABZlgtU=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"FayCvsRTthhJl/R/89Tm1enZutc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pHZ4tn0f6A/kHfzDx2n4F+KQqLc="},{"type":"next-occurrence","id":"x+m+raJfsvcdo/PCGOhWNJZ/2LA="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"FayCvsRTthhJl/R/89Tm1enZutc=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"x+m+raJfsvcdo/PCGOhWNJZ/2LA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pHZ4tn0f6A/kHfzDx2n4F+KQqLc="},{"type":"next-occurrence","id":"sUodV6wSTWS6Al6YWuCpnehmguY="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"x+m+raJfsvcdo/PCGOhWNJZ/2LA=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"sUodV6wSTWS6Al6YWuCpnehmguY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pHZ4tn0f6A/kHfzDx2n4F+KQqLc="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"sUodV6wSTWS6Al6YWuCpnehmguY=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"SSpw1HFUNY2cuYwDaUA2l5VzMWY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1TjGkTcySZdfVyfxGqbntHJA1co="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"SSpw1HFUNY2cuYwDaUA2l5VzMWY=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"1TjGkTcySZdfVyfxGqbntHJA1co=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SSpw1HFUNY2cuYwDaUA2l5VzMWY="},{"type":"next-occurrence","id":"JpuAlHGJ9ZwjdJ0O79BSUdaGhq0="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"1TjGkTcySZdfVyfxGqbntHJA1co=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"JpuAlHGJ9ZwjdJ0O79BSUdaGhq0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SSpw1HFUNY2cuYwDaUA2l5VzMWY="},{"type":"next-occurrence","id":"Masa2R+wn05NmDQyAtYHortZk9g="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"JpuAlHGJ9ZwjdJ0O79BSUdaGhq0=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"Masa2R+wn05NmDQyAtYHortZk9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SSpw1HFUNY2cuYwDaUA2l5VzMWY="},{"type":"next-occurrence","id":"+muRUJBE8jb740L1h2WV9SB412E="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"Masa2R+wn05NmDQyAtYHortZk9g=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"+muRUJBE8jb740L1h2WV9SB412E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SSpw1HFUNY2cuYwDaUA2l5VzMWY="},{"type":"next-occurrence","id":"G4SZok0kgSKdPVi/GwcUHCMJCGo="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"+muRUJBE8jb740L1h2WV9SB412E=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"G4SZok0kgSKdPVi/GwcUHCMJCGo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SSpw1HFUNY2cuYwDaUA2l5VzMWY="},{"type":"next-occurrence","id":"qKyW9Xk4utH2Ni9njZtJcXWY22A="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"G4SZok0kgSKdPVi/GwcUHCMJCGo=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"qKyW9Xk4utH2Ni9njZtJcXWY22A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SSpw1HFUNY2cuYwDaUA2l5VzMWY="},{"type":"next-occurrence","id":"lPmA7zJu/9DzdgJQ1BorEKTqwhI="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"qKyW9Xk4utH2Ni9njZtJcXWY22A=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"lPmA7zJu/9DzdgJQ1BorEKTqwhI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SSpw1HFUNY2cuYwDaUA2l5VzMWY="},{"type":"next-occurrence","id":"IcTNizD2Q3cYaKZsqrgOIQ/YcqA="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"lPmA7zJu/9DzdgJQ1BorEKTqwhI=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"IcTNizD2Q3cYaKZsqrgOIQ/YcqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SSpw1HFUNY2cuYwDaUA2l5VzMWY="},{"type":"next-occurrence","id":"2jv25z5a3Y/jL8peb0YHPSWp7/8="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"IcTNizD2Q3cYaKZsqrgOIQ/YcqA=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"2jv25z5a3Y/jL8peb0YHPSWp7/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SSpw1HFUNY2cuYwDaUA2l5VzMWY="},{"type":"next-occurrence","id":"OEKyRycTfTxELg513BeRTxf2iE4="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"2jv25z5a3Y/jL8peb0YHPSWp7/8=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"OEKyRycTfTxELg513BeRTxf2iE4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SSpw1HFUNY2cuYwDaUA2l5VzMWY="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"OEKyRycTfTxELg513BeRTxf2iE4=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"ORC300410369","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","description":"Intersection improvements on NY 26 both directions Route 26 at Trinity Ave and Parkway Drive (Lowville) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Not currently Scheduled","update_date":"2026-06-01T03:59:02Z"},"road_event_id":"ORC300410369","beginning_cross_street":"Route 26 at Trinity Ave and Parkway Drive","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2024-09-24T12:22:26Z","end_date":"2026-06-01T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-75.493499,43.788297]]}},{"id":"ORC300410366","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","description":"Intersection improvements on NY 3 both directions Route 3 - Arsenal Street at North Meadow Street (Watertown) to Route 3 - Arsenal Street at North Meadow Street (Watertown) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers. Not currently Scheduled","update_date":"2026-06-01T03:59:01Z"},"road_event_id":"ORC300410366","beginning_cross_street":"Route 3 - Arsenal Street at North Meadow Street","ending_cross_street":"Route 3 - Arsenal Street at North Meadow Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2024-09-24T12:15:25Z","end_date":"2026-06-01T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-75.920656,43.97639]]}},{"id":"n+RcA2R4NP7IJ/g9v2SvYJ88oEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MiByd/7LnrE5887fni66qP1XLiA="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"n+RcA2R4NP7IJ/g9v2SvYJ88oEo=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"MiByd/7LnrE5887fni66qP1XLiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+RcA2R4NP7IJ/g9v2SvYJ88oEo="},{"type":"next-occurrence","id":"xM/U3ZHtBex5N75IHpgo02RcHRs="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"MiByd/7LnrE5887fni66qP1XLiA=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"xM/U3ZHtBex5N75IHpgo02RcHRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+RcA2R4NP7IJ/g9v2SvYJ88oEo="},{"type":"next-occurrence","id":"8Wawhm9n+L/SLgr5+wCfkMgx1Q8="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"xM/U3ZHtBex5N75IHpgo02RcHRs=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"8Wawhm9n+L/SLgr5+wCfkMgx1Q8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+RcA2R4NP7IJ/g9v2SvYJ88oEo="},{"type":"next-occurrence","id":"mpZE3+RVwsgZZhKuIFElIAjYAZA="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"8Wawhm9n+L/SLgr5+wCfkMgx1Q8=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"mpZE3+RVwsgZZhKuIFElIAjYAZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+RcA2R4NP7IJ/g9v2SvYJ88oEo="},{"type":"next-occurrence","id":"HNylangD3FzYtLZNtPiYWllYYN8="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"mpZE3+RVwsgZZhKuIFElIAjYAZA=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"HNylangD3FzYtLZNtPiYWllYYN8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+RcA2R4NP7IJ/g9v2SvYJ88oEo="},{"type":"next-occurrence","id":"NLzxwjPtvle72o7wSbCx6JA6Vno="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"HNylangD3FzYtLZNtPiYWllYYN8=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"NLzxwjPtvle72o7wSbCx6JA6Vno=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+RcA2R4NP7IJ/g9v2SvYJ88oEo="},{"type":"next-occurrence","id":"9ezyDipepoGl3WH2OLmzn1fxFYU="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"NLzxwjPtvle72o7wSbCx6JA6Vno=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"9ezyDipepoGl3WH2OLmzn1fxFYU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+RcA2R4NP7IJ/g9v2SvYJ88oEo="},{"type":"next-occurrence","id":"ctMeOISqfY8LpYkqrufza8vBIlc="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"9ezyDipepoGl3WH2OLmzn1fxFYU=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"ctMeOISqfY8LpYkqrufza8vBIlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+RcA2R4NP7IJ/g9v2SvYJ88oEo="},{"type":"next-occurrence","id":"j5uJL+befl/Rmi7II5QgN9Kvomc="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"ctMeOISqfY8LpYkqrufza8vBIlc=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"j5uJL+befl/Rmi7II5QgN9Kvomc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+RcA2R4NP7IJ/g9v2SvYJ88oEo="},{"type":"next-occurrence","id":"H8sT5SvcYbAXmgCpxQilAVIPLs0="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"j5uJL+befl/Rmi7II5QgN9Kvomc=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"H8sT5SvcYbAXmgCpxQilAVIPLs0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+RcA2R4NP7IJ/g9v2SvYJ88oEo="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"H8sT5SvcYbAXmgCpxQilAVIPLs0=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"jNIhFJKdj8pxuH24NRg7nythVgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ezgfsuw2BgUYBmKZ4TVtjdtTKU8="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"jNIhFJKdj8pxuH24NRg7nythVgA=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"ezgfsuw2BgUYBmKZ4TVtjdtTKU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jNIhFJKdj8pxuH24NRg7nythVgA="},{"type":"next-occurrence","id":"Al5xhSRadq5GVzujOh4gIW9QGfk="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"ezgfsuw2BgUYBmKZ4TVtjdtTKU8=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"Al5xhSRadq5GVzujOh4gIW9QGfk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jNIhFJKdj8pxuH24NRg7nythVgA="},{"type":"next-occurrence","id":"eQNQChLDf7Rh4wOFMbyEDzgol8E="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"Al5xhSRadq5GVzujOh4gIW9QGfk=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"eQNQChLDf7Rh4wOFMbyEDzgol8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jNIhFJKdj8pxuH24NRg7nythVgA="},{"type":"next-occurrence","id":"uEZ0Cn9q12lYON9laM0gdbb0V5I="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"eQNQChLDf7Rh4wOFMbyEDzgol8E=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"uEZ0Cn9q12lYON9laM0gdbb0V5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jNIhFJKdj8pxuH24NRg7nythVgA="},{"type":"next-occurrence","id":"7OrhFjIUKZV0XC+2EASIhZdRojM="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"uEZ0Cn9q12lYON9laM0gdbb0V5I=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"7OrhFjIUKZV0XC+2EASIhZdRojM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jNIhFJKdj8pxuH24NRg7nythVgA="},{"type":"next-occurrence","id":"QVgG5wljTKK3M/KqZocv2aCiXJc="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"7OrhFjIUKZV0XC+2EASIhZdRojM=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"QVgG5wljTKK3M/KqZocv2aCiXJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jNIhFJKdj8pxuH24NRg7nythVgA="},{"type":"next-occurrence","id":"n8BEjBXNCZdzkM/iO6G0kq4nqKY="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"QVgG5wljTKK3M/KqZocv2aCiXJc=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"n8BEjBXNCZdzkM/iO6G0kq4nqKY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jNIhFJKdj8pxuH24NRg7nythVgA="},{"type":"next-occurrence","id":"EzY4pjGY+eYBbIyX+P7Nk4e1qNY="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"n8BEjBXNCZdzkM/iO6G0kq4nqKY=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"EzY4pjGY+eYBbIyX+P7Nk4e1qNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jNIhFJKdj8pxuH24NRg7nythVgA="},{"type":"next-occurrence","id":"9LLe4fIcLyobsABQVqS9BMdoVbE="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"EzY4pjGY+eYBbIyX+P7Nk4e1qNY=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"9LLe4fIcLyobsABQVqS9BMdoVbE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jNIhFJKdj8pxuH24NRg7nythVgA="},{"type":"next-occurrence","id":"0x+TFHLTRSE79Mlv3tDtDsYaENk="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"9LLe4fIcLyobsABQVqS9BMdoVbE=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"0x+TFHLTRSE79Mlv3tDtDsYaENk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jNIhFJKdj8pxuH24NRg7nythVgA="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"0x+TFHLTRSE79Mlv3tDtDsYaENk=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"Y2J83dBMZ5HYouojIoeWUXYDBoU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Z0y8e6kzNtdU+iZpmpCTQjseDA0="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"Y2J83dBMZ5HYouojIoeWUXYDBoU=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"Z0y8e6kzNtdU+iZpmpCTQjseDA0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y2J83dBMZ5HYouojIoeWUXYDBoU="},{"type":"next-occurrence","id":"ibOcVkkOAK9qf78QNVZFHZ3Gm7s="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"Z0y8e6kzNtdU+iZpmpCTQjseDA0=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"ibOcVkkOAK9qf78QNVZFHZ3Gm7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y2J83dBMZ5HYouojIoeWUXYDBoU="},{"type":"next-occurrence","id":"7xWC4SXJ6iQOaOqxy2hIr7kG7bk="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"ibOcVkkOAK9qf78QNVZFHZ3Gm7s=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"7xWC4SXJ6iQOaOqxy2hIr7kG7bk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y2J83dBMZ5HYouojIoeWUXYDBoU="},{"type":"next-occurrence","id":"lXrgdYUPX6Wfw9ytFjHY5oh3cPo="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"7xWC4SXJ6iQOaOqxy2hIr7kG7bk=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"lXrgdYUPX6Wfw9ytFjHY5oh3cPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y2J83dBMZ5HYouojIoeWUXYDBoU="},{"type":"next-occurrence","id":"77jg/wuIxnqyWzXsMjdUWIhBUpY="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"lXrgdYUPX6Wfw9ytFjHY5oh3cPo=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"77jg/wuIxnqyWzXsMjdUWIhBUpY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y2J83dBMZ5HYouojIoeWUXYDBoU="},{"type":"next-occurrence","id":"hJIMMOTwuQjXwOM1oelBSsYo26A="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"77jg/wuIxnqyWzXsMjdUWIhBUpY=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"hJIMMOTwuQjXwOM1oelBSsYo26A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y2J83dBMZ5HYouojIoeWUXYDBoU="},{"type":"next-occurrence","id":"g09El0w5JPxJnb8nADV4+ByjH9A="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"hJIMMOTwuQjXwOM1oelBSsYo26A=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"g09El0w5JPxJnb8nADV4+ByjH9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y2J83dBMZ5HYouojIoeWUXYDBoU="},{"type":"next-occurrence","id":"LMIffo+htNznc+/KUmEtM9kaDsU="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"g09El0w5JPxJnb8nADV4+ByjH9A=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"LMIffo+htNznc+/KUmEtM9kaDsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y2J83dBMZ5HYouojIoeWUXYDBoU="},{"type":"next-occurrence","id":"9G5Msn9vbR36LfhC7rgOLj0rqEw="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"LMIffo+htNznc+/KUmEtM9kaDsU=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"9G5Msn9vbR36LfhC7rgOLj0rqEw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y2J83dBMZ5HYouojIoeWUXYDBoU="},{"type":"next-occurrence","id":"UCqkn4kNYyL0Wfe99OL0ERQd+gg="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"9G5Msn9vbR36LfhC7rgOLj0rqEw=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"UCqkn4kNYyL0Wfe99OL0ERQd+gg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y2J83dBMZ5HYouojIoeWUXYDBoU="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"UCqkn4kNYyL0Wfe99OL0ERQd+gg=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"8v4KC1l+KK66/1UJwQ7jZfMLhYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UrxstUlwRFJWPw1XeKcsTT3rIJI="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"8v4KC1l+KK66/1UJwQ7jZfMLhYI=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"UrxstUlwRFJWPw1XeKcsTT3rIJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8v4KC1l+KK66/1UJwQ7jZfMLhYI="},{"type":"next-occurrence","id":"xH2D0UqzIlkQrfojrj7SW4BbNrM="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"UrxstUlwRFJWPw1XeKcsTT3rIJI=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"xH2D0UqzIlkQrfojrj7SW4BbNrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8v4KC1l+KK66/1UJwQ7jZfMLhYI="},{"type":"next-occurrence","id":"RxMTcy5nq4H5CkQg36KE+LKGP8U="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"xH2D0UqzIlkQrfojrj7SW4BbNrM=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"RxMTcy5nq4H5CkQg36KE+LKGP8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8v4KC1l+KK66/1UJwQ7jZfMLhYI="},{"type":"next-occurrence","id":"jvfGzKvD/9UOLVON8muIX7B/bU4="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"RxMTcy5nq4H5CkQg36KE+LKGP8U=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"jvfGzKvD/9UOLVON8muIX7B/bU4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8v4KC1l+KK66/1UJwQ7jZfMLhYI="},{"type":"next-occurrence","id":"sGxBujUpFLM06Z96nsVahjZ4INA="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"jvfGzKvD/9UOLVON8muIX7B/bU4=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"sGxBujUpFLM06Z96nsVahjZ4INA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8v4KC1l+KK66/1UJwQ7jZfMLhYI="},{"type":"next-occurrence","id":"RIthV5Y2/KUI+hwBDK4y9GvgrWg="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"sGxBujUpFLM06Z96nsVahjZ4INA=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"RIthV5Y2/KUI+hwBDK4y9GvgrWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8v4KC1l+KK66/1UJwQ7jZfMLhYI="},{"type":"next-occurrence","id":"o6jEoMavTJQD5D3hOzdxwhqzAGA="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"RIthV5Y2/KUI+hwBDK4y9GvgrWg=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"o6jEoMavTJQD5D3hOzdxwhqzAGA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8v4KC1l+KK66/1UJwQ7jZfMLhYI="},{"type":"next-occurrence","id":"lg4g/ECx7tkLSnmi8eg8l9oFdYU="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"o6jEoMavTJQD5D3hOzdxwhqzAGA=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"lg4g/ECx7tkLSnmi8eg8l9oFdYU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8v4KC1l+KK66/1UJwQ7jZfMLhYI="},{"type":"next-occurrence","id":"2joXizVL5257oIpQs7kurJDNzLg="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"lg4g/ECx7tkLSnmi8eg8l9oFdYU=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"2joXizVL5257oIpQs7kurJDNzLg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8v4KC1l+KK66/1UJwQ7jZfMLhYI="},{"type":"next-occurrence","id":"pxDyjSrlRsPM9GtqP8wed7ybq/s="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"2joXizVL5257oIpQs7kurJDNzLg=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"pxDyjSrlRsPM9GtqP8wed7ybq/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8v4KC1l+KK66/1UJwQ7jZfMLhYI="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"pxDyjSrlRsPM9GtqP8wed7ybq/s=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"Hf3A06iYVXauYAMTMWcKL51P4Sk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction southbound, SIM15 Bus, SIM35 Bus and SIM5 Bus at State St/Bridge St (New York) is closed. Use the temporary stop on State St closer to Bridge St instead., Continuous Friday May 2nd, 2025 12:00 AM thru Monday November 30th, 2026 11:59 PM","update_date":"2025-05-01T21:11:26Z"},"road_event_id":"Hf3A06iYVXauYAMTMWcKL51P4Sk=","beginning_cross_street":"State St/Bridge St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.014192,40.704209]]}},{"id":"B7Q582narGpkeQ63AWJZa84doZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["City Zone"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations both directions, City Zone at Forest Hills (New York) You must be in the first four cars to exit westbound trains., Continuous Saturday May 3rd, 2025 01:29 AM thru Friday December 31st, 2027 11:59 PM","update_date":"2026-06-04T11:40:00Z"},"road_event_id":"B7Q582narGpkeQ63AWJZa84doZ4=","beginning_cross_street":"Forest Hills","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.844814,40.719575]]}},{"id":"BzsebIGd6ZrzR8c1aelVjG1l5i0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on I-91 southbound Entrance ramp Exit 31 - Founders Bridge/Asylum Avenue (Hartford) The State Street on-ramp to I-91 southbound at the Founders Bridge will be closed for the duration of the project to facilitate the temporary traffic patterns on I-91 southbound during staged construction. Detours will be posted to direct motorists seeking I-91 southbound to use either the South Morgan Street on-ramp to I-91 southbound at Columbus Boulevard, or the Sheldon Street on-ramp to the Whitehead Highway at Columbus Boulevard where they can access I-91 southbound. Motorists on I-84 eastbound seeking I-91 southbound will be required to merge with I-91 southbound traffic due to the temporary traffic patterns on I-91 southbound during staged construction. Currently, I-84 eastbound motorists entering I-91 southbound traffic have a dedicated lane provided., Continuous Monday March 10th, 2025 12:00 AM thru Wednesday September 30th, 2026 11:59 PM All lanes closed","update_date":"2025-02-26T21:18:30Z"},"road_event_id":"BzsebIGd6ZrzR8c1aelVjG1l5i0=","beginning_cross_street":"Exit 31 - Founders Bridge/Asylum Avenue","ending_cross_street":"Exit 31 - Founders Bridge/Asylum Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66881,41.765463]]}},{"id":"GywKB1NELheVqG4pT54tIfJT9Cw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/NYFKhgyzPnih/UPQ02JqIuh6/E="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"GywKB1NELheVqG4pT54tIfJT9Cw=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"/NYFKhgyzPnih/UPQ02JqIuh6/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GywKB1NELheVqG4pT54tIfJT9Cw="},{"type":"next-occurrence","id":"4seIlmQnS4D4891y+UL3VKN5Aq4="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"/NYFKhgyzPnih/UPQ02JqIuh6/E=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T23:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"4seIlmQnS4D4891y+UL3VKN5Aq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GywKB1NELheVqG4pT54tIfJT9Cw="},{"type":"next-occurrence","id":"etpCH5vcYUSto1SBPFKieK8L+pE="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"4seIlmQnS4D4891y+UL3VKN5Aq4=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"etpCH5vcYUSto1SBPFKieK8L+pE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GywKB1NELheVqG4pT54tIfJT9Cw="},{"type":"next-occurrence","id":"5PkdnwNlN/LURX7w60XAFqplrZo="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"etpCH5vcYUSto1SBPFKieK8L+pE=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"5PkdnwNlN/LURX7w60XAFqplrZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GywKB1NELheVqG4pT54tIfJT9Cw="},{"type":"next-occurrence","id":"d06kwwWXlfQTVNEeI1y3HZHC8ls="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"5PkdnwNlN/LURX7w60XAFqplrZo=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"d06kwwWXlfQTVNEeI1y3HZHC8ls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GywKB1NELheVqG4pT54tIfJT9Cw="},{"type":"next-occurrence","id":"eMmdf+HFoihmxg8lwLWzJSCY1eI="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"d06kwwWXlfQTVNEeI1y3HZHC8ls=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"eMmdf+HFoihmxg8lwLWzJSCY1eI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GywKB1NELheVqG4pT54tIfJT9Cw="},{"type":"next-occurrence","id":"o83pEX2mEXOTffnd8tKFd+rbJKc="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"eMmdf+HFoihmxg8lwLWzJSCY1eI=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"o83pEX2mEXOTffnd8tKFd+rbJKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GywKB1NELheVqG4pT54tIfJT9Cw="},{"type":"next-occurrence","id":"7fcjFnxSpIZsDb6FRxpfLTLpFDY="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"o83pEX2mEXOTffnd8tKFd+rbJKc=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"7fcjFnxSpIZsDb6FRxpfLTLpFDY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GywKB1NELheVqG4pT54tIfJT9Cw="},{"type":"next-occurrence","id":"J+p1tcecFgRQBdquxUNeUiOlB/s="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"7fcjFnxSpIZsDb6FRxpfLTLpFDY=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T23:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"J+p1tcecFgRQBdquxUNeUiOlB/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GywKB1NELheVqG4pT54tIfJT9Cw="},{"type":"next-occurrence","id":"SKj7MqG6uJ00d+0P3vscP42uUdE="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"J+p1tcecFgRQBdquxUNeUiOlB/s=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"SKj7MqG6uJ00d+0P3vscP42uUdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GywKB1NELheVqG4pT54tIfJT9Cw="},{"type":"next-occurrence","id":"801kdILoGUyVnQ8QABVdVd9qlVA="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"SKj7MqG6uJ00d+0P3vscP42uUdE=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"801kdILoGUyVnQ8QABVdVd9qlVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GywKB1NELheVqG4pT54tIfJT9Cw="},{"type":"next-occurrence","id":"NSvGG4hZ2sqzeLj8Ka/k+oKyKHY="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"801kdILoGUyVnQ8QABVdVd9qlVA=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"NSvGG4hZ2sqzeLj8Ka/k+oKyKHY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GywKB1NELheVqG4pT54tIfJT9Cw="},{"type":"next-occurrence","id":"PngGmwPCxu1n87MOhve7SBesEXI="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"NSvGG4hZ2sqzeLj8Ka/k+oKyKHY=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"PngGmwPCxu1n87MOhve7SBesEXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GywKB1NELheVqG4pT54tIfJT9Cw="},{"type":"next-occurrence","id":"iPRb+5D/aCughVb6F2lJFwFqYjo="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"PngGmwPCxu1n87MOhve7SBesEXI=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"iPRb+5D/aCughVb6F2lJFwFqYjo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GywKB1NELheVqG4pT54tIfJT9Cw="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"iPRb+5D/aCughVb6F2lJFwFqYjo=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"5OKHyyDnZAgWTkerIfyPK6LVCiw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-86 both directions Exit 7 - CR 33 Panama-Stedman Road (North Harmony) to Strunk Road (Ellicott), Tuesday February 27th, 2024 thru Monday November 30th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-10T11:04:59Z"},"road_event_id":"5OKHyyDnZAgWTkerIfyPK6LVCiw=","beginning_cross_street":"Exit 7 - CR 33 Panama-Stedman Road","ending_cross_street":"Strunk Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.475119,42.157516]]}},{"id":"VGcW9pHu7Jpuw/GTqW0ZO2w4AAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation and longterm construction on NY 31 ramp to I-490 Eastbound (Rochester) RAMP CLOSED, Continuous Thursday August 15th, 2024 12:00 AM thru Thursday December 31st, 2026 11:59 PM All lanes closed and detoured","update_date":"2026-01-27T12:14:30Z"},"road_event_id":"VGcW9pHu7Jpuw/GTqW0ZO2w4AAE=","beginning_cross_street":"I-490 Eastbound","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.607298,43.151186]]}},{"id":"ORC300451805","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 126"],"direction":"unknown","description":"Construction on NY 126 both directions Town of New Bremen; Village of Croghan (New Bremen) to Town of New Bremen; Village of Croghan (New Bremen) Route 126 now open to two way traffic. Not currently Scheduled","update_date":"2026-05-01T03:59:00Z"},"road_event_id":"ORC300451805","beginning_cross_street":"Town of New Bremen; Village of Croghan","ending_cross_street":"Town of New Bremen; Village of Croghan","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-25T18:11:57Z","end_date":"2026-05-01T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-75.402784,43.889413]]}},{"id":"ORC300488454","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bruckner Boulevard"],"direction":"unknown","description":"Construction on Bruckner Boulevard eastbound between Cypress Avenue (New York) and East 138th Street (New York) Subject to change without notice. Bridge Washing. Not currently Scheduled","update_date":"2025-10-02T07:00:01Z"},"road_event_id":"ORC300488454","beginning_cross_street":"Cypress Avenue","ending_cross_street":"East 138th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-09-30T14:50:51Z","end_date":"2025-10-03T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.91664,40.803178]]}},{"id":"VH3evuxn4TxtL8WnvBSg5YXDM24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[],"description":"Construction on VAN WYCK EXPY northbound from 107TH AVE (New York) to LIBERTY AVE (New York) Subject to change without notice., Continuous Wednesday October 1st, 2025 12:00 AM thru Tuesday June 30th, 2026 11:59 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-02-27T18:35:06Z"},"road_event_id":"VH3evuxn4TxtL8WnvBSg5YXDM24=","beginning_cross_street":"107TH AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.808397,40.688858]]}},{"id":"MlyWit1AknI/jch02lMkA7oMxIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[],"description":"Construction on VAN WYCK EXPY northbound from 130TH AVE (New York) to ROCKAWAY BLVD (New York) Subject to change without notice., Continuous Wednesday October 1st, 2025 12:00 AM thru Tuesday June 30th, 2026 11:59 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-02-27T18:35:54Z"},"road_event_id":"MlyWit1AknI/jch02lMkA7oMxIk=","beginning_cross_street":"130TH AVE","ending_cross_street":"ROCKAWAY BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.800682,40.671532]]}},{"id":"G1O8qj3//+KCQwlgY/fYf+XK5LI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[],"description":"Construction on I-678 southbound ramp to Exit 1B-2 - North Conduit Avenue; NY 27 (New York) Subject to change without notice., Continuous Wednesday October 1st, 2025 12:00 AM thru Tuesday June 30th, 2026 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-02-27T18:44:40Z"},"road_event_id":"G1O8qj3//+KCQwlgY/fYf+XK5LI=","beginning_cross_street":"Exit 1B-2 - North Conduit Avenue; NY 27","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801971,40.667921]]}},{"id":"c4aI7y2X9qobxi6oW4GeqWkWoXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[],"description":"Bridge work on CT 9 northbound Exit ramp Exit 28 - CT 72 (New Britain) There will be a lane closure for the duration of the project on the Route 9 northbound off-ramp to Route 72 westbound, from April 28, 2025, to Fall/Winter of 2025, Continuous Monday April 28th, 2025 12:00 AM thru Thursday August 27th, 2026 11:59 PM All lanes open","update_date":"2025-10-15T16:00:31Z"},"road_event_id":"c4aI7y2X9qobxi6oW4GeqWkWoXo=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 28 - CT 72","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773132,41.66795]]}},{"id":"meKDXraxnBroF+VM7bpggxEZcTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["13 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, 13 Bus Clinton Ave At Bergen St (Newark) The following bus stop will be temporarily deactivated until April 2027: Deactivated Bus Stop: Route 99 Only: Bergen Street, northbound, at Clinton Avenue, Far Side (MyBus #18263) Route 13 Only: Clinton Avenue, westbound, at Bergen Street, Near Side (MyBus #18474) Alternate Bus Stop: Route 99 Only: Bergen Street, northbound, at West Bigelow Street, Near Side (MyBus #18261) Route 13 Only: Clinton Avenue, westbound at Peshine Avenue, Near Side (MyBus #18475), Continuous Thursday October 9th, 2025 12:00 AM thru Thursday April 1st, 2027 11:59 PM","update_date":"2025-10-24T18:25:02Z"},"road_event_id":"meKDXraxnBroF+VM7bpggxEZcTM=","beginning_cross_street":"Clinton Ave At Bergen St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.20033,40.721459]]}},{"id":"+IKFPp27m21/bYFjYC9bfVx/TsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["99 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction westbound, 99 Bus at Bergen St At Clinton Ave (Newark) The following bus stop will be temporarily deactivated until April 2027: Deactivated Bus Stop: Route 99 Only: Bergen Street, northbound, at Clinton Avenue, Far Side (MyBus #18263) Route 13 Only: Clinton Avenue, westbound, at Bergen Street, Near Side (MyBus #18474) Alternate Bus Stop: Route 99 Only: Bergen Street, northbound, at West Bigelow Street, Near Side (MyBus #18261) Route 13 Only: Clinton Avenue, westbound at Peshine Avenue, Near Side (MyBus #18475), Continuous Sunday November 9th, 2025 12:00 AM thru Thursday April 1st, 2027 11:59 PM","update_date":"2025-10-24T18:26:15Z"},"road_event_id":"+IKFPp27m21/bYFjYC9bfVx/TsU=","beginning_cross_street":"Bergen St At Clinton Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.200231,40.721588]]}},{"id":"PROSRkgYbuhUVjAiHOBQOjwk5vU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"R4af0eC/by80IK/85o8u+qnBjmI="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"PROSRkgYbuhUVjAiHOBQOjwk5vU=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"R4af0eC/by80IK/85o8u+qnBjmI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PROSRkgYbuhUVjAiHOBQOjwk5vU="},{"type":"next-occurrence","id":"QL+YxVTynVr7fM1wQBdZnpD0YAI="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"R4af0eC/by80IK/85o8u+qnBjmI=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"QL+YxVTynVr7fM1wQBdZnpD0YAI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PROSRkgYbuhUVjAiHOBQOjwk5vU="},{"type":"next-occurrence","id":"tpQCaRlONlT9awYkOgUO6f1FOuc="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"QL+YxVTynVr7fM1wQBdZnpD0YAI=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"tpQCaRlONlT9awYkOgUO6f1FOuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PROSRkgYbuhUVjAiHOBQOjwk5vU="},{"type":"next-occurrence","id":"yJdWiAlNF3x+BHQHX/lXcrPHioA="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"tpQCaRlONlT9awYkOgUO6f1FOuc=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"yJdWiAlNF3x+BHQHX/lXcrPHioA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PROSRkgYbuhUVjAiHOBQOjwk5vU="},{"type":"next-occurrence","id":"BYHms6qBELFjPnB2GvTsxmQr4og="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"yJdWiAlNF3x+BHQHX/lXcrPHioA=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"BYHms6qBELFjPnB2GvTsxmQr4og=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PROSRkgYbuhUVjAiHOBQOjwk5vU="},{"type":"next-occurrence","id":"mmzXytpWGBr5cxEwStElVC7t7cQ="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"BYHms6qBELFjPnB2GvTsxmQr4og=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"mmzXytpWGBr5cxEwStElVC7t7cQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PROSRkgYbuhUVjAiHOBQOjwk5vU="},{"type":"next-occurrence","id":"5y5+qedlCPrCRPVHS4/G8cgXjgg="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"mmzXytpWGBr5cxEwStElVC7t7cQ=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"5y5+qedlCPrCRPVHS4/G8cgXjgg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PROSRkgYbuhUVjAiHOBQOjwk5vU="},{"type":"next-occurrence","id":"tJmCe2u6FUXRRnkZNzERC26TSBU="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"5y5+qedlCPrCRPVHS4/G8cgXjgg=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"tJmCe2u6FUXRRnkZNzERC26TSBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PROSRkgYbuhUVjAiHOBQOjwk5vU="},{"type":"next-occurrence","id":"Q67SdnvWRykdy4eXW7pMhEaUG20="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"tJmCe2u6FUXRRnkZNzERC26TSBU=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"Q67SdnvWRykdy4eXW7pMhEaUG20=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PROSRkgYbuhUVjAiHOBQOjwk5vU="},{"type":"next-occurrence","id":"1DtxAKdWlkgbP1WXdcfavm5HTKc="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"Q67SdnvWRykdy4eXW7pMhEaUG20=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"1DtxAKdWlkgbP1WXdcfavm5HTKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PROSRkgYbuhUVjAiHOBQOjwk5vU="},{"type":"next-occurrence","id":"lSwOABPUpI9W4dK/wzW97uS6uFw="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"1DtxAKdWlkgbP1WXdcfavm5HTKc=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"lSwOABPUpI9W4dK/wzW97uS6uFw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PROSRkgYbuhUVjAiHOBQOjwk5vU="},{"type":"next-occurrence","id":"nVcLTIdxGFe5ykKi0HVsg0xv2/U="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"lSwOABPUpI9W4dK/wzW97uS6uFw=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"nVcLTIdxGFe5ykKi0HVsg0xv2/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PROSRkgYbuhUVjAiHOBQOjwk5vU="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"nVcLTIdxGFe5ykKi0HVsg0xv2/U=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"VETtJ7SK/j+ssRinmPOsG/+voGI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements and safety improvements on CT 2 westbound between Exit 20 - CT 354/Parum Road (Colchester) and Exit 21 - CT 11 (Colchester), Continuous Monday October 27th, 2025 12:00 AM thru Monday November 30th, 2026 11:59 PM 1 Right lane of 2 lanes closed","update_date":"2025-11-07T20:51:45Z"},"road_event_id":"VETtJ7SK/j+ssRinmPOsG/+voGI=","beginning_cross_street":"Exit 20 - CT 354/Parum Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.311926,41.56519]]}},{"id":"254/c1BsGt+m/wdl9kFVOUoCygs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GCVgNL8E38rWKnUJhCvwqUC6uCU="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-26T19:00:09Z"},"road_event_id":"254/c1BsGt+m/wdl9kFVOUoCygs=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"GCVgNL8E38rWKnUJhCvwqUC6uCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"254/c1BsGt+m/wdl9kFVOUoCygs="},{"type":"next-occurrence","id":"qcG7KsrRvc99i+ruJtaaSRBhnXc="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-26T19:00:09Z"},"road_event_id":"GCVgNL8E38rWKnUJhCvwqUC6uCU=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"qcG7KsrRvc99i+ruJtaaSRBhnXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"254/c1BsGt+m/wdl9kFVOUoCygs="},{"type":"next-occurrence","id":"6PRZsmhVAJvS/Pq35DdRB96Vwmo="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-26T19:00:09Z"},"road_event_id":"qcG7KsrRvc99i+ruJtaaSRBhnXc=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"6PRZsmhVAJvS/Pq35DdRB96Vwmo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"254/c1BsGt+m/wdl9kFVOUoCygs="},{"type":"next-occurrence","id":"4Qm0MCTTG3Enq4pWtjjMUSFgWAE="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-26T19:00:09Z"},"road_event_id":"6PRZsmhVAJvS/Pq35DdRB96Vwmo=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"4Qm0MCTTG3Enq4pWtjjMUSFgWAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"254/c1BsGt+m/wdl9kFVOUoCygs="},{"type":"next-occurrence","id":"v9++8hFYBoKiVC8eyDbsgDIG9+Q="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-26T19:00:09Z"},"road_event_id":"4Qm0MCTTG3Enq4pWtjjMUSFgWAE=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"v9++8hFYBoKiVC8eyDbsgDIG9+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"254/c1BsGt+m/wdl9kFVOUoCygs="},{"type":"next-occurrence","id":"UsJskM0XLBocta3WjnQf+VaV4xI="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-26T19:00:09Z"},"road_event_id":"v9++8hFYBoKiVC8eyDbsgDIG9+Q=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"UsJskM0XLBocta3WjnQf+VaV4xI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"254/c1BsGt+m/wdl9kFVOUoCygs="},{"type":"next-occurrence","id":"vXJ/m0kWbqW0DqC7BopPP+z/6cs="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-26T19:00:09Z"},"road_event_id":"UsJskM0XLBocta3WjnQf+VaV4xI=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"vXJ/m0kWbqW0DqC7BopPP+z/6cs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"254/c1BsGt+m/wdl9kFVOUoCygs="},{"type":"next-occurrence","id":"PQ0sdxoq4CUV26j8ZhRGrKeeQ3A="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-26T19:00:09Z"},"road_event_id":"vXJ/m0kWbqW0DqC7BopPP+z/6cs=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"PQ0sdxoq4CUV26j8ZhRGrKeeQ3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"254/c1BsGt+m/wdl9kFVOUoCygs="},{"type":"next-occurrence","id":"q7korZf1ZWGov7YPOYH3KWcqKv8="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-26T19:00:09Z"},"road_event_id":"PQ0sdxoq4CUV26j8ZhRGrKeeQ3A=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"q7korZf1ZWGov7YPOYH3KWcqKv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"254/c1BsGt+m/wdl9kFVOUoCygs="},{"type":"next-occurrence","id":"MgaSCA3cHwmxxjsdS2hvKFsHHWg="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-26T19:00:09Z"},"road_event_id":"q7korZf1ZWGov7YPOYH3KWcqKv8=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"MgaSCA3cHwmxxjsdS2hvKFsHHWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"254/c1BsGt+m/wdl9kFVOUoCygs="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-26T19:00:09Z"},"road_event_id":"MgaSCA3cHwmxxjsdS2hvKFsHHWg=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"h2HdF89OnanChNXM/3ZUCrtXYC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on NY 304 northbound between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/32646509 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Continuous Monday November 17th, 2025 12:00 AM thru Saturday June 20th, 2026 12:00 AM left lane closed to traffic","update_date":"2026-05-20T17:05:10Z"},"road_event_id":"h2HdF89OnanChNXM/3ZUCrtXYC8=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99742,41.102213]]}},{"id":"8Ugqhd1Xp76f63Cck2ux1ehO68g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ExLUEd21CsSAndr4iDjPjZ41+u4="}],"description":"Bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Monday November 17th, 2025 thru Saturday June 20th, 2026, Sunday thru Saturday, 12:00 AM thru 12:00 AM, right lane closure","update_date":"2026-05-22T04:00:42Z"},"road_event_id":"8Ugqhd1Xp76f63Cck2ux1ehO68g=","beginning_cross_street":"Village Green","ending_cross_street":"Demarest Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-05T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997537,41.102252]]}},{"id":"ExLUEd21CsSAndr4iDjPjZ41+u4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ugqhd1Xp76f63Cck2ux1ehO68g="},{"type":"next-occurrence","id":"OU71ErfsnMYxpwQvc65FM7d3+us="}],"description":"Bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Monday November 17th, 2025 thru Saturday June 20th, 2026, Sunday thru Saturday, 12:00 AM thru 12:00 AM, right lane closure","update_date":"2026-05-22T04:00:42Z"},"road_event_id":"ExLUEd21CsSAndr4iDjPjZ41+u4=","beginning_cross_street":"Village Green","ending_cross_street":"Demarest Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T04:00:00Z","end_date":"2026-06-06T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997537,41.102252]]}},{"id":"OU71ErfsnMYxpwQvc65FM7d3+us=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ugqhd1Xp76f63Cck2ux1ehO68g="},{"type":"next-occurrence","id":"33ILwt4riueR8xyYisvuTawSi/o="}],"description":"Bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Monday November 17th, 2025 thru Saturday June 20th, 2026, Sunday thru Saturday, 12:00 AM thru 12:00 AM, right lane closure","update_date":"2026-05-22T04:00:42Z"},"road_event_id":"OU71ErfsnMYxpwQvc65FM7d3+us=","beginning_cross_street":"Village Green","ending_cross_street":"Demarest Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T04:00:00Z","end_date":"2026-06-07T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997537,41.102252]]}},{"id":"33ILwt4riueR8xyYisvuTawSi/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ugqhd1Xp76f63Cck2ux1ehO68g="},{"type":"next-occurrence","id":"W/NnQ3G6RY4Jr9pyVJ0p0MCj2KI="}],"description":"Bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Monday November 17th, 2025 thru Saturday June 20th, 2026, Sunday thru Saturday, 12:00 AM thru 12:00 AM, right lane closure","update_date":"2026-05-22T04:00:42Z"},"road_event_id":"33ILwt4riueR8xyYisvuTawSi/o=","beginning_cross_street":"Village Green","ending_cross_street":"Demarest Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T04:00:00Z","end_date":"2026-06-08T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997537,41.102252]]}},{"id":"W/NnQ3G6RY4Jr9pyVJ0p0MCj2KI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ugqhd1Xp76f63Cck2ux1ehO68g="},{"type":"next-occurrence","id":"Mfql6Ue4PVn5k6tyZ/LXzFGMXmc="}],"description":"Bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Monday November 17th, 2025 thru Saturday June 20th, 2026, Sunday thru Saturday, 12:00 AM thru 12:00 AM, right lane closure","update_date":"2026-05-22T04:00:42Z"},"road_event_id":"W/NnQ3G6RY4Jr9pyVJ0p0MCj2KI=","beginning_cross_street":"Village Green","ending_cross_street":"Demarest Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T04:00:00Z","end_date":"2026-06-09T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997537,41.102252]]}},{"id":"Mfql6Ue4PVn5k6tyZ/LXzFGMXmc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ugqhd1Xp76f63Cck2ux1ehO68g="},{"type":"next-occurrence","id":"WMmXMAWJnYMwN5E4cciD3om+n9o="}],"description":"Bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Monday November 17th, 2025 thru Saturday June 20th, 2026, Sunday thru Saturday, 12:00 AM thru 12:00 AM, right lane closure","update_date":"2026-05-22T04:00:42Z"},"road_event_id":"Mfql6Ue4PVn5k6tyZ/LXzFGMXmc=","beginning_cross_street":"Village Green","ending_cross_street":"Demarest Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T04:00:00Z","end_date":"2026-06-10T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997537,41.102252]]}},{"id":"WMmXMAWJnYMwN5E4cciD3om+n9o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ugqhd1Xp76f63Cck2ux1ehO68g="},{"type":"next-occurrence","id":"/gQO5TM9s4Eqo5XUhiv2Qnqor18="}],"description":"Bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Monday November 17th, 2025 thru Saturday June 20th, 2026, Sunday thru Saturday, 12:00 AM thru 12:00 AM, right lane closure","update_date":"2026-05-22T04:00:42Z"},"road_event_id":"WMmXMAWJnYMwN5E4cciD3om+n9o=","beginning_cross_street":"Village Green","ending_cross_street":"Demarest Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T04:00:00Z","end_date":"2026-06-11T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997537,41.102252]]}},{"id":"/gQO5TM9s4Eqo5XUhiv2Qnqor18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ugqhd1Xp76f63Cck2ux1ehO68g="},{"type":"next-occurrence","id":"ZluR9Fopjf89vGMg3qyM6G+2PyU="}],"description":"Bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Monday November 17th, 2025 thru Saturday June 20th, 2026, Sunday thru Saturday, 12:00 AM thru 12:00 AM, right lane closure","update_date":"2026-05-22T04:00:42Z"},"road_event_id":"/gQO5TM9s4Eqo5XUhiv2Qnqor18=","beginning_cross_street":"Village Green","ending_cross_street":"Demarest Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T04:00:00Z","end_date":"2026-06-12T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997537,41.102252]]}},{"id":"ZluR9Fopjf89vGMg3qyM6G+2PyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ugqhd1Xp76f63Cck2ux1ehO68g="},{"type":"next-occurrence","id":"DeciBpadd0HUaVgHp0TRT32nx1Q="}],"description":"Bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Monday November 17th, 2025 thru Saturday June 20th, 2026, Sunday thru Saturday, 12:00 AM thru 12:00 AM, right lane closure","update_date":"2026-05-22T04:00:42Z"},"road_event_id":"ZluR9Fopjf89vGMg3qyM6G+2PyU=","beginning_cross_street":"Village Green","ending_cross_street":"Demarest Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T04:00:00Z","end_date":"2026-06-13T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997537,41.102252]]}},{"id":"DeciBpadd0HUaVgHp0TRT32nx1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ugqhd1Xp76f63Cck2ux1ehO68g="},{"type":"next-occurrence","id":"dX3HQ/QQUoaEmapjO0rHpPnFNlU="}],"description":"Bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Monday November 17th, 2025 thru Saturday June 20th, 2026, Sunday thru Saturday, 12:00 AM thru 12:00 AM, right lane closure","update_date":"2026-05-22T04:00:42Z"},"road_event_id":"DeciBpadd0HUaVgHp0TRT32nx1Q=","beginning_cross_street":"Village Green","ending_cross_street":"Demarest Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T04:00:00Z","end_date":"2026-06-14T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997537,41.102252]]}},{"id":"dX3HQ/QQUoaEmapjO0rHpPnFNlU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ugqhd1Xp76f63Cck2ux1ehO68g="},{"type":"next-occurrence","id":"Ih0nhbfTTKynWaNm1bL4WUcproo="}],"description":"Bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Monday November 17th, 2025 thru Saturday June 20th, 2026, Sunday thru Saturday, 12:00 AM thru 12:00 AM, right lane closure","update_date":"2026-05-22T04:00:42Z"},"road_event_id":"dX3HQ/QQUoaEmapjO0rHpPnFNlU=","beginning_cross_street":"Village Green","ending_cross_street":"Demarest Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T04:00:00Z","end_date":"2026-06-15T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997537,41.102252]]}},{"id":"Ih0nhbfTTKynWaNm1bL4WUcproo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ugqhd1Xp76f63Cck2ux1ehO68g="},{"type":"next-occurrence","id":"0yG1c6Hoyx+7iUOcIdqBHQk4Qqg="}],"description":"Bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Monday November 17th, 2025 thru Saturday June 20th, 2026, Sunday thru Saturday, 12:00 AM thru 12:00 AM, right lane closure","update_date":"2026-05-22T04:00:42Z"},"road_event_id":"Ih0nhbfTTKynWaNm1bL4WUcproo=","beginning_cross_street":"Village Green","ending_cross_street":"Demarest Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T04:00:00Z","end_date":"2026-06-16T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997537,41.102252]]}},{"id":"0yG1c6Hoyx+7iUOcIdqBHQk4Qqg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ugqhd1Xp76f63Cck2ux1ehO68g="},{"type":"next-occurrence","id":"tIoMyy8cCq5VVOkLxn42kdnWXBE="}],"description":"Bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Monday November 17th, 2025 thru Saturday June 20th, 2026, Sunday thru Saturday, 12:00 AM thru 12:00 AM, right lane closure","update_date":"2026-05-22T04:00:42Z"},"road_event_id":"0yG1c6Hoyx+7iUOcIdqBHQk4Qqg=","beginning_cross_street":"Village Green","ending_cross_street":"Demarest Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T04:00:00Z","end_date":"2026-06-17T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997537,41.102252]]}},{"id":"tIoMyy8cCq5VVOkLxn42kdnWXBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ugqhd1Xp76f63Cck2ux1ehO68g="},{"type":"next-occurrence","id":"ZST8v3JEWmmtYL74duiA3phXvrk="}],"description":"Bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Monday November 17th, 2025 thru Saturday June 20th, 2026, Sunday thru Saturday, 12:00 AM thru 12:00 AM, right lane closure","update_date":"2026-05-22T04:00:42Z"},"road_event_id":"tIoMyy8cCq5VVOkLxn42kdnWXBE=","beginning_cross_street":"Village Green","ending_cross_street":"Demarest Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T04:00:00Z","end_date":"2026-06-18T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997537,41.102252]]}},{"id":"ZST8v3JEWmmtYL74duiA3phXvrk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ugqhd1Xp76f63Cck2ux1ehO68g="}],"description":"Bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Monday November 17th, 2025 thru Saturday June 20th, 2026, Sunday thru Saturday, 12:00 AM thru 12:00 AM, right lane closure","update_date":"2026-05-22T04:00:42Z"},"road_event_id":"ZST8v3JEWmmtYL74duiA3phXvrk=","beginning_cross_street":"Village Green","ending_cross_street":"Demarest Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T04:00:00Z","end_date":"2026-06-19T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997537,41.102252]]}},{"id":"ORC300499900","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-636"],"direction":"unknown","description":"Construction on CR-636 northbound between JACKSON AVE (Woodland Park) and CR-636 (Woodland Park) Not currently Scheduled","update_date":"2026-06-01T19:00:02Z"},"road_event_id":"ORC300499900","beginning_cross_street":"JACKSON AVE","ending_cross_street":"CR-636","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-11-24T15:49:59Z","end_date":"2026-06-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.192236,40.902586]]}},{"id":"aKUm7UM8qk7qk69OHrcJ2Y7fPrY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bbSq2kw+paajy9ikMWDBlfoZN3Y="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"aKUm7UM8qk7qk69OHrcJ2Y7fPrY=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-06T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"bbSq2kw+paajy9ikMWDBlfoZN3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aKUm7UM8qk7qk69OHrcJ2Y7fPrY="},{"type":"next-occurrence","id":"2QgOgpts2TPipF2IX6o4tutnU+4="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"bbSq2kw+paajy9ikMWDBlfoZN3Y=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-07T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"2QgOgpts2TPipF2IX6o4tutnU+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aKUm7UM8qk7qk69OHrcJ2Y7fPrY="},{"type":"next-occurrence","id":"PdSbr/eAzqPxKvsngFxHZGWgbD8="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"2QgOgpts2TPipF2IX6o4tutnU+4=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T10:00:00Z","end_date":"2026-06-08T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"PdSbr/eAzqPxKvsngFxHZGWgbD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aKUm7UM8qk7qk69OHrcJ2Y7fPrY="},{"type":"next-occurrence","id":"kqx3PwVITU90ok41DYNg6/HxG2Y="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"PdSbr/eAzqPxKvsngFxHZGWgbD8=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-09T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"kqx3PwVITU90ok41DYNg6/HxG2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aKUm7UM8qk7qk69OHrcJ2Y7fPrY="},{"type":"next-occurrence","id":"74sFwukwTa02P9T+SJQRG9OsA3U="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"kqx3PwVITU90ok41DYNg6/HxG2Y=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-10T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"74sFwukwTa02P9T+SJQRG9OsA3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aKUm7UM8qk7qk69OHrcJ2Y7fPrY="},{"type":"next-occurrence","id":"8RAxP1Knxyd12T8iKNMf7PzetnY="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"74sFwukwTa02P9T+SJQRG9OsA3U=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-11T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"8RAxP1Knxyd12T8iKNMf7PzetnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aKUm7UM8qk7qk69OHrcJ2Y7fPrY="},{"type":"next-occurrence","id":"Bl1t8fGB6/cji0hVw+Ltqz10IEk="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"8RAxP1Knxyd12T8iKNMf7PzetnY=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-12T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"Bl1t8fGB6/cji0hVw+Ltqz10IEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aKUm7UM8qk7qk69OHrcJ2Y7fPrY="},{"type":"next-occurrence","id":"zDb1ka0ZQi+8+UATYtWf7TihFig="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"Bl1t8fGB6/cji0hVw+Ltqz10IEk=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-13T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"zDb1ka0ZQi+8+UATYtWf7TihFig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aKUm7UM8qk7qk69OHrcJ2Y7fPrY="},{"type":"next-occurrence","id":"iLBtX/6/aeC+vb5wukRBaRgl0M4="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"zDb1ka0ZQi+8+UATYtWf7TihFig=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T10:00:00Z","end_date":"2026-06-14T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"iLBtX/6/aeC+vb5wukRBaRgl0M4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aKUm7UM8qk7qk69OHrcJ2Y7fPrY="},{"type":"next-occurrence","id":"jLuksrzUTFVTBHN4n8X6M+6AtjM="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"iLBtX/6/aeC+vb5wukRBaRgl0M4=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T10:00:00Z","end_date":"2026-06-15T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"jLuksrzUTFVTBHN4n8X6M+6AtjM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aKUm7UM8qk7qk69OHrcJ2Y7fPrY="},{"type":"next-occurrence","id":"YvJLER7AqTJzoc+juJb41UOJNDU="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"jLuksrzUTFVTBHN4n8X6M+6AtjM=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-16T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"YvJLER7AqTJzoc+juJb41UOJNDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aKUm7UM8qk7qk69OHrcJ2Y7fPrY="},{"type":"next-occurrence","id":"JFTaItzfWWNH+WC0uGlNuyU+cYE="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"YvJLER7AqTJzoc+juJb41UOJNDU=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-17T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"JFTaItzfWWNH+WC0uGlNuyU+cYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aKUm7UM8qk7qk69OHrcJ2Y7fPrY="},{"type":"next-occurrence","id":"SwXZs/SEpdALVg2hzu68JT6ub7c="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"JFTaItzfWWNH+WC0uGlNuyU+cYE=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-18T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"SwXZs/SEpdALVg2hzu68JT6ub7c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aKUm7UM8qk7qk69OHrcJ2Y7fPrY="},{"type":"next-occurrence","id":"TEoqeh469vDqjLNxSEKKP2rgsKc="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"SwXZs/SEpdALVg2hzu68JT6ub7c=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-19T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"TEoqeh469vDqjLNxSEKKP2rgsKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aKUm7UM8qk7qk69OHrcJ2Y7fPrY="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"TEoqeh469vDqjLNxSEKKP2rgsKc=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-20T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"ORC300501412","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12F"],"direction":"unknown","description":"Bridge demolition on NY 12F both directions NY 971H; Paddy Hill Road (Hounsfield) to NY 971H; Paddy Hill Road (Hounsfield) Motorists may experience minor disruptions on Rte. 12F near the Bridge St. intersection due to equipment and/or material movements Not currently Scheduled","update_date":"2026-05-31T03:59:01Z"},"road_event_id":"ORC300501412","beginning_cross_street":"NY 971H; Paddy Hill Road","ending_cross_street":"NY 971H; Paddy Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-12-05T16:36:54Z","end_date":"2026-05-31T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-75.983093,43.999423]]}},{"id":"ppfahjoLSs9Gh6pqvIw59/UqHPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"i5ZGfYWZ/nGcpv3ESde6RgJnrKU="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-05-23T21:38:19Z"},"road_event_id":"ppfahjoLSs9Gh6pqvIw59/UqHPU=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"i5ZGfYWZ/nGcpv3ESde6RgJnrKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppfahjoLSs9Gh6pqvIw59/UqHPU="},{"type":"next-occurrence","id":"X4L6ew5MRdj1FvsQX8d/CPdlDT0="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-05-23T21:38:19Z"},"road_event_id":"i5ZGfYWZ/nGcpv3ESde6RgJnrKU=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T23:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"X4L6ew5MRdj1FvsQX8d/CPdlDT0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppfahjoLSs9Gh6pqvIw59/UqHPU="},{"type":"next-occurrence","id":"IftvhxhlbdFYsU+yItIdR8pIj6o="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-05-23T21:38:19Z"},"road_event_id":"X4L6ew5MRdj1FvsQX8d/CPdlDT0=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"IftvhxhlbdFYsU+yItIdR8pIj6o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppfahjoLSs9Gh6pqvIw59/UqHPU="},{"type":"next-occurrence","id":"CtAJdTpQO0imsAw1QCT8KeqTM2Q="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-05-23T21:38:19Z"},"road_event_id":"IftvhxhlbdFYsU+yItIdR8pIj6o=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"CtAJdTpQO0imsAw1QCT8KeqTM2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppfahjoLSs9Gh6pqvIw59/UqHPU="},{"type":"next-occurrence","id":"SPuUyAkf45Q5eWoIdYL0nS489S8="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-05-23T21:38:19Z"},"road_event_id":"CtAJdTpQO0imsAw1QCT8KeqTM2Q=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"SPuUyAkf45Q5eWoIdYL0nS489S8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppfahjoLSs9Gh6pqvIw59/UqHPU="},{"type":"next-occurrence","id":"Movp0aRz+chflUASXL3BZdnyAYs="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-05-23T21:38:19Z"},"road_event_id":"SPuUyAkf45Q5eWoIdYL0nS489S8=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"Movp0aRz+chflUASXL3BZdnyAYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppfahjoLSs9Gh6pqvIw59/UqHPU="},{"type":"next-occurrence","id":"BU808IIz/ahBXv4hO5QO8s0JlZg="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-05-23T21:38:19Z"},"road_event_id":"Movp0aRz+chflUASXL3BZdnyAYs=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"BU808IIz/ahBXv4hO5QO8s0JlZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppfahjoLSs9Gh6pqvIw59/UqHPU="},{"type":"next-occurrence","id":"TYZ+GDfSY4RpwNsP/4onUfvbWdE="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-05-23T21:38:19Z"},"road_event_id":"BU808IIz/ahBXv4hO5QO8s0JlZg=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T23:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"TYZ+GDfSY4RpwNsP/4onUfvbWdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppfahjoLSs9Gh6pqvIw59/UqHPU="},{"type":"next-occurrence","id":"sOBeWocKYie8BA3Pg57awC+OzH0="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-05-23T21:38:19Z"},"road_event_id":"TYZ+GDfSY4RpwNsP/4onUfvbWdE=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"sOBeWocKYie8BA3Pg57awC+OzH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppfahjoLSs9Gh6pqvIw59/UqHPU="},{"type":"next-occurrence","id":"+3sUgjH9P4zxMzZGMrRh1YDF63Y="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-05-23T21:38:19Z"},"road_event_id":"sOBeWocKYie8BA3Pg57awC+OzH0=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"+3sUgjH9P4zxMzZGMrRh1YDF63Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppfahjoLSs9Gh6pqvIw59/UqHPU="},{"type":"next-occurrence","id":"arA6HNsU9LFiOftn8Vlw6etgNrg="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-05-23T21:38:19Z"},"road_event_id":"+3sUgjH9P4zxMzZGMrRh1YDF63Y=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"arA6HNsU9LFiOftn8Vlw6etgNrg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppfahjoLSs9Gh6pqvIw59/UqHPU="},{"type":"next-occurrence","id":"Jv4/BqFHVA9DRxoA2vaAxSre6/s="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-05-23T21:38:19Z"},"road_event_id":"arA6HNsU9LFiOftn8Vlw6etgNrg=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"Jv4/BqFHVA9DRxoA2vaAxSre6/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppfahjoLSs9Gh6pqvIw59/UqHPU="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-05-23T21:38:19Z"},"road_event_id":"Jv4/BqFHVA9DRxoA2vaAxSre6/s=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"OPmttAlmr0w9wnIbsVCJRRzdDUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YxD3Sv8rsCQB26dyaaclz4Icj1o="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"OPmttAlmr0w9wnIbsVCJRRzdDUs=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"YxD3Sv8rsCQB26dyaaclz4Icj1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OPmttAlmr0w9wnIbsVCJRRzdDUs="},{"type":"next-occurrence","id":"Z5rHNqHy+EDH4YVJyTrwXsuH2RQ="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"YxD3Sv8rsCQB26dyaaclz4Icj1o=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"Z5rHNqHy+EDH4YVJyTrwXsuH2RQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OPmttAlmr0w9wnIbsVCJRRzdDUs="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"Z5rHNqHy+EDH4YVJyTrwXsuH2RQ=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"hO3lW6MeTBqIW9VMOdCukh2DhrE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 5 both directions between Almond Street (Syracuse) and University Ave (Syracuse), Continuous Thursday January 1st, 2026 07:00 AM thru Wednesday July 1st, 2026 03:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-27T17:43:45Z"},"road_event_id":"hO3lW6MeTBqIW9VMOdCukh2DhrE=","beginning_cross_street":"Almond Street","ending_cross_street":"University Ave ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.141945,43.050785]]}},{"id":"yiksGxvHlU9+50qD8TjfglVVcwI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"oFa4sDfFb6z5CS4Edo6EmgHrmCw="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T22:00:05Z"},"road_event_id":"yiksGxvHlU9+50qD8TjfglVVcwI=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"oFa4sDfFb6z5CS4Edo6EmgHrmCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yiksGxvHlU9+50qD8TjfglVVcwI="},{"type":"next-occurrence","id":"Lji3+LgxlSDY5Mkj8c+HacbCozA="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T22:00:05Z"},"road_event_id":"oFa4sDfFb6z5CS4Edo6EmgHrmCw=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:30:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"Lji3+LgxlSDY5Mkj8c+HacbCozA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yiksGxvHlU9+50qD8TjfglVVcwI="},{"type":"next-occurrence","id":"UU8jswhyiO0uVz9WamGNhCMU/48="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T22:00:05Z"},"road_event_id":"Lji3+LgxlSDY5Mkj8c+HacbCozA=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"UU8jswhyiO0uVz9WamGNhCMU/48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yiksGxvHlU9+50qD8TjfglVVcwI="},{"type":"next-occurrence","id":"5U/wL9lUiY8RpFHScz9jotnuE/k="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T22:00:05Z"},"road_event_id":"UU8jswhyiO0uVz9WamGNhCMU/48=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"5U/wL9lUiY8RpFHScz9jotnuE/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yiksGxvHlU9+50qD8TjfglVVcwI="},{"type":"next-occurrence","id":"4tOSzziIPNUKdn4PmmFDSuTQIDg="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T22:00:05Z"},"road_event_id":"5U/wL9lUiY8RpFHScz9jotnuE/k=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"4tOSzziIPNUKdn4PmmFDSuTQIDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yiksGxvHlU9+50qD8TjfglVVcwI="},{"type":"next-occurrence","id":"HLBUrD3khCzbSRlHY/OXPAcPm8Q="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T22:00:05Z"},"road_event_id":"4tOSzziIPNUKdn4PmmFDSuTQIDg=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"HLBUrD3khCzbSRlHY/OXPAcPm8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yiksGxvHlU9+50qD8TjfglVVcwI="},{"type":"next-occurrence","id":"3Tn+vCA7MNjK8q7AiC8fbjDTwYQ="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T22:00:05Z"},"road_event_id":"HLBUrD3khCzbSRlHY/OXPAcPm8Q=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"3Tn+vCA7MNjK8q7AiC8fbjDTwYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yiksGxvHlU9+50qD8TjfglVVcwI="},{"type":"next-occurrence","id":"0IljIo3yaZByqju+XwvVBGIzM9k="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T22:00:05Z"},"road_event_id":"3Tn+vCA7MNjK8q7AiC8fbjDTwYQ=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T10:30:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"0IljIo3yaZByqju+XwvVBGIzM9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yiksGxvHlU9+50qD8TjfglVVcwI="},{"type":"next-occurrence","id":"BruJDOjSjMpWItTaoq388dsVLP0="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T22:00:05Z"},"road_event_id":"0IljIo3yaZByqju+XwvVBGIzM9k=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"BruJDOjSjMpWItTaoq388dsVLP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yiksGxvHlU9+50qD8TjfglVVcwI="},{"type":"next-occurrence","id":"uLbBbN9MCU8mWT3zEZvFhGQIh8Y="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T22:00:05Z"},"road_event_id":"BruJDOjSjMpWItTaoq388dsVLP0=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"uLbBbN9MCU8mWT3zEZvFhGQIh8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yiksGxvHlU9+50qD8TjfglVVcwI="},{"type":"next-occurrence","id":"z+ISAGiCcZRzkTUGqV8m2rrxxDY="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T22:00:05Z"},"road_event_id":"uLbBbN9MCU8mWT3zEZvFhGQIh8Y=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"z+ISAGiCcZRzkTUGqV8m2rrxxDY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yiksGxvHlU9+50qD8TjfglVVcwI="},{"type":"next-occurrence","id":"wix2LdiMwNetBbFZgA5Hc+qd0bU="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T22:00:05Z"},"road_event_id":"z+ISAGiCcZRzkTUGqV8m2rrxxDY=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"wix2LdiMwNetBbFZgA5Hc+qd0bU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yiksGxvHlU9+50qD8TjfglVVcwI="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T22:00:05Z"},"road_event_id":"wix2LdiMwNetBbFZgA5Hc+qd0bU=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"afMReXvdsEwelaAzfXz2Et7v0B4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3gbHO/rsqRMaeglhnrIcA8fou44="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T22:00:03Z"},"road_event_id":"afMReXvdsEwelaAzfXz2Et7v0B4=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"3gbHO/rsqRMaeglhnrIcA8fou44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"afMReXvdsEwelaAzfXz2Et7v0B4="},{"type":"next-occurrence","id":"yznN0A6h3NhW6jtfUIQwhT4QGNo="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T22:00:03Z"},"road_event_id":"3gbHO/rsqRMaeglhnrIcA8fou44=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:30:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"yznN0A6h3NhW6jtfUIQwhT4QGNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"afMReXvdsEwelaAzfXz2Et7v0B4="},{"type":"next-occurrence","id":"UXfTtHAkuRe3yYbeUW7VLSDjdls="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T22:00:03Z"},"road_event_id":"yznN0A6h3NhW6jtfUIQwhT4QGNo=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"UXfTtHAkuRe3yYbeUW7VLSDjdls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"afMReXvdsEwelaAzfXz2Et7v0B4="},{"type":"next-occurrence","id":"ahwD03ZDRT0FNwBa/uCFk2LxTMY="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T22:00:03Z"},"road_event_id":"UXfTtHAkuRe3yYbeUW7VLSDjdls=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"ahwD03ZDRT0FNwBa/uCFk2LxTMY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"afMReXvdsEwelaAzfXz2Et7v0B4="},{"type":"next-occurrence","id":"i9WT34fma5Rni7GQ8EjECMDuy4s="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T22:00:03Z"},"road_event_id":"ahwD03ZDRT0FNwBa/uCFk2LxTMY=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"i9WT34fma5Rni7GQ8EjECMDuy4s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"afMReXvdsEwelaAzfXz2Et7v0B4="},{"type":"next-occurrence","id":"azJmgIPn0NLKB/xK+K7nh06/WX8="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T22:00:03Z"},"road_event_id":"i9WT34fma5Rni7GQ8EjECMDuy4s=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"azJmgIPn0NLKB/xK+K7nh06/WX8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"afMReXvdsEwelaAzfXz2Et7v0B4="},{"type":"next-occurrence","id":"JaMI2RnYJAqDjrWtjAdz3B2nICA="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T22:00:03Z"},"road_event_id":"azJmgIPn0NLKB/xK+K7nh06/WX8=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"JaMI2RnYJAqDjrWtjAdz3B2nICA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"afMReXvdsEwelaAzfXz2Et7v0B4="},{"type":"next-occurrence","id":"S3EJR0gkNeGFDAsoFFeZ1ZZf4Ds="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T22:00:03Z"},"road_event_id":"JaMI2RnYJAqDjrWtjAdz3B2nICA=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T10:30:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"S3EJR0gkNeGFDAsoFFeZ1ZZf4Ds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"afMReXvdsEwelaAzfXz2Et7v0B4="},{"type":"next-occurrence","id":"wzKmYxk61eQAW2PxGkSZsMIlELQ="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T22:00:03Z"},"road_event_id":"S3EJR0gkNeGFDAsoFFeZ1ZZf4Ds=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"wzKmYxk61eQAW2PxGkSZsMIlELQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"afMReXvdsEwelaAzfXz2Et7v0B4="},{"type":"next-occurrence","id":"c2nZiOny6repCti6UYLaHhnwPjA="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T22:00:03Z"},"road_event_id":"wzKmYxk61eQAW2PxGkSZsMIlELQ=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"c2nZiOny6repCti6UYLaHhnwPjA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"afMReXvdsEwelaAzfXz2Et7v0B4="},{"type":"next-occurrence","id":"+XedZD7Xtm4hk6Ci+G3/ElH6Lrs="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T22:00:03Z"},"road_event_id":"c2nZiOny6repCti6UYLaHhnwPjA=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"+XedZD7Xtm4hk6Ci+G3/ElH6Lrs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"afMReXvdsEwelaAzfXz2Et7v0B4="},{"type":"next-occurrence","id":"bmpv3cg9xbNitMPt/zYECottGyY="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T22:00:03Z"},"road_event_id":"+XedZD7Xtm4hk6Ci+G3/ElH6Lrs=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"bmpv3cg9xbNitMPt/zYECottGyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"afMReXvdsEwelaAzfXz2Et7v0B4="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T22:00:03Z"},"road_event_id":"bmpv3cg9xbNitMPt/zYECottGyY=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"IYk2jDgmN5lv3u/bhCx3ZVg9fK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RTbCDlN6BjoIDrTZRBbkgO51z1s="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"IYk2jDgmN5lv3u/bhCx3ZVg9fK4=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"RTbCDlN6BjoIDrTZRBbkgO51z1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IYk2jDgmN5lv3u/bhCx3ZVg9fK4="},{"type":"next-occurrence","id":"nulcM9DqosvQhKJ2JJH1Pl7EZP0="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"RTbCDlN6BjoIDrTZRBbkgO51z1s=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"nulcM9DqosvQhKJ2JJH1Pl7EZP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IYk2jDgmN5lv3u/bhCx3ZVg9fK4="},{"type":"next-occurrence","id":"ZgCg167bDpx89Oblvx4dzihs5Ks="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"nulcM9DqosvQhKJ2JJH1Pl7EZP0=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"ZgCg167bDpx89Oblvx4dzihs5Ks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IYk2jDgmN5lv3u/bhCx3ZVg9fK4="},{"type":"next-occurrence","id":"EaAiHsQaoYgQc2oIf81HXtYtPP0="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"ZgCg167bDpx89Oblvx4dzihs5Ks=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"EaAiHsQaoYgQc2oIf81HXtYtPP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IYk2jDgmN5lv3u/bhCx3ZVg9fK4="},{"type":"next-occurrence","id":"ZlisWX8dEClUbl+t60WjkNN3nZw="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"EaAiHsQaoYgQc2oIf81HXtYtPP0=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"ZlisWX8dEClUbl+t60WjkNN3nZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IYk2jDgmN5lv3u/bhCx3ZVg9fK4="},{"type":"next-occurrence","id":"vhUyuC7BuMUH3dljSp34jxEVYCg="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"ZlisWX8dEClUbl+t60WjkNN3nZw=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"vhUyuC7BuMUH3dljSp34jxEVYCg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IYk2jDgmN5lv3u/bhCx3ZVg9fK4="},{"type":"next-occurrence","id":"Pc5iOfSUhtRq0U0G0umA++A8o5s="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"vhUyuC7BuMUH3dljSp34jxEVYCg=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"Pc5iOfSUhtRq0U0G0umA++A8o5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IYk2jDgmN5lv3u/bhCx3ZVg9fK4="},{"type":"next-occurrence","id":"CIIR/dxDMGgIaCeaIduZzdP8shM="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"Pc5iOfSUhtRq0U0G0umA++A8o5s=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"CIIR/dxDMGgIaCeaIduZzdP8shM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IYk2jDgmN5lv3u/bhCx3ZVg9fK4="},{"type":"next-occurrence","id":"426cnH9IqfZSo1knjvC42qyo8Lc="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"CIIR/dxDMGgIaCeaIduZzdP8shM=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"426cnH9IqfZSo1knjvC42qyo8Lc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IYk2jDgmN5lv3u/bhCx3ZVg9fK4="},{"type":"next-occurrence","id":"F5K81SIA8sT3KkVGvqkMOiIObDU="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"426cnH9IqfZSo1knjvC42qyo8Lc=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"F5K81SIA8sT3KkVGvqkMOiIObDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IYk2jDgmN5lv3u/bhCx3ZVg9fK4="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"F5K81SIA8sT3KkVGvqkMOiIObDU=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"5cX0MyoE9K1XFZjh+sOl7JWVToA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xrH248EWkweyUkEpFCeLHBE09zQ="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"5cX0MyoE9K1XFZjh+sOl7JWVToA=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"xrH248EWkweyUkEpFCeLHBE09zQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5cX0MyoE9K1XFZjh+sOl7JWVToA="},{"type":"next-occurrence","id":"zlJ8LMaJTWajbkgTca9k69XvcLs="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"xrH248EWkweyUkEpFCeLHBE09zQ=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"zlJ8LMaJTWajbkgTca9k69XvcLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5cX0MyoE9K1XFZjh+sOl7JWVToA="},{"type":"next-occurrence","id":"gPOGPjrC5NnWdeHYqgA8O3sYl/E="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"zlJ8LMaJTWajbkgTca9k69XvcLs=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"gPOGPjrC5NnWdeHYqgA8O3sYl/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5cX0MyoE9K1XFZjh+sOl7JWVToA="},{"type":"next-occurrence","id":"ppbgUfF42Vm8IlCCZ2fVFne9YsA="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"gPOGPjrC5NnWdeHYqgA8O3sYl/E=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"ppbgUfF42Vm8IlCCZ2fVFne9YsA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5cX0MyoE9K1XFZjh+sOl7JWVToA="},{"type":"next-occurrence","id":"rQVuPqFG+ImjN0BhCZ6ZYt+UDyw="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"ppbgUfF42Vm8IlCCZ2fVFne9YsA=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"rQVuPqFG+ImjN0BhCZ6ZYt+UDyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5cX0MyoE9K1XFZjh+sOl7JWVToA="},{"type":"next-occurrence","id":"mTikKHysjFn7No7qnxIIHSexH70="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"rQVuPqFG+ImjN0BhCZ6ZYt+UDyw=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"mTikKHysjFn7No7qnxIIHSexH70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5cX0MyoE9K1XFZjh+sOl7JWVToA="},{"type":"next-occurrence","id":"S/cCGUpUX2qZezlKfpz2lcZ9EIs="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"mTikKHysjFn7No7qnxIIHSexH70=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"S/cCGUpUX2qZezlKfpz2lcZ9EIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5cX0MyoE9K1XFZjh+sOl7JWVToA="},{"type":"next-occurrence","id":"3ldHYxtqDKfthjAPd5DqvgSYxXQ="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"S/cCGUpUX2qZezlKfpz2lcZ9EIs=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"3ldHYxtqDKfthjAPd5DqvgSYxXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5cX0MyoE9K1XFZjh+sOl7JWVToA="},{"type":"next-occurrence","id":"TprBl5JDQOVf4e0l/w9YiSzEOTg="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"3ldHYxtqDKfthjAPd5DqvgSYxXQ=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"TprBl5JDQOVf4e0l/w9YiSzEOTg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5cX0MyoE9K1XFZjh+sOl7JWVToA="},{"type":"next-occurrence","id":"6vgJxtfvdX2GSdB0ABB7HyjcYsU="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"TprBl5JDQOVf4e0l/w9YiSzEOTg=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"6vgJxtfvdX2GSdB0ABB7HyjcYsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5cX0MyoE9K1XFZjh+sOl7JWVToA="},{"type":"next-occurrence","id":"/0hpkKTZbZXAHhaCMOYzZ7EW/yg="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"6vgJxtfvdX2GSdB0ABB7HyjcYsU=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"/0hpkKTZbZXAHhaCMOYzZ7EW/yg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5cX0MyoE9K1XFZjh+sOl7JWVToA="},{"type":"next-occurrence","id":"o6IQqvlzDs0Gcw0KfSJUNDwEZss="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"/0hpkKTZbZXAHhaCMOYzZ7EW/yg=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"o6IQqvlzDs0Gcw0KfSJUNDwEZss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5cX0MyoE9K1XFZjh+sOl7JWVToA="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"o6IQqvlzDs0Gcw0KfSJUNDwEZss=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"xn7rZCWCcupiHBIzvLkmvscyHmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Ci4e5L4SnBUpjzQ6QTAAmckwWZs="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"xn7rZCWCcupiHBIzvLkmvscyHmQ=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"Ci4e5L4SnBUpjzQ6QTAAmckwWZs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn7rZCWCcupiHBIzvLkmvscyHmQ="},{"type":"next-occurrence","id":"CuF6ydKOND0Y6QYBBSQ6DTOKbQM="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"Ci4e5L4SnBUpjzQ6QTAAmckwWZs=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"CuF6ydKOND0Y6QYBBSQ6DTOKbQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn7rZCWCcupiHBIzvLkmvscyHmQ="},{"type":"next-occurrence","id":"/No+wsfBk7lg1UY+UQAEMn/y3uI="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"CuF6ydKOND0Y6QYBBSQ6DTOKbQM=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"/No+wsfBk7lg1UY+UQAEMn/y3uI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn7rZCWCcupiHBIzvLkmvscyHmQ="},{"type":"next-occurrence","id":"rZJyTyakqIOVh/Et+SvxWDnq+6I="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"/No+wsfBk7lg1UY+UQAEMn/y3uI=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"rZJyTyakqIOVh/Et+SvxWDnq+6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn7rZCWCcupiHBIzvLkmvscyHmQ="},{"type":"next-occurrence","id":"tZSqUNHFQt5jZGK4Ri2jOWU5v1M="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"rZJyTyakqIOVh/Et+SvxWDnq+6I=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"tZSqUNHFQt5jZGK4Ri2jOWU5v1M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn7rZCWCcupiHBIzvLkmvscyHmQ="},{"type":"next-occurrence","id":"aHnn10ooYJyqb9dXCcUVjEfvL+U="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"tZSqUNHFQt5jZGK4Ri2jOWU5v1M=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"aHnn10ooYJyqb9dXCcUVjEfvL+U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn7rZCWCcupiHBIzvLkmvscyHmQ="},{"type":"next-occurrence","id":"0SZEUP3wfw47pbifEljSOb03lsE="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"aHnn10ooYJyqb9dXCcUVjEfvL+U=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"0SZEUP3wfw47pbifEljSOb03lsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn7rZCWCcupiHBIzvLkmvscyHmQ="},{"type":"next-occurrence","id":"pGhbGIGlCgVAU1d88l0r0PFt3XE="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"0SZEUP3wfw47pbifEljSOb03lsE=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"pGhbGIGlCgVAU1d88l0r0PFt3XE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn7rZCWCcupiHBIzvLkmvscyHmQ="},{"type":"next-occurrence","id":"VYAByxwJvVYgDfeko14m45ttzQk="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"pGhbGIGlCgVAU1d88l0r0PFt3XE=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"VYAByxwJvVYgDfeko14m45ttzQk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn7rZCWCcupiHBIzvLkmvscyHmQ="},{"type":"next-occurrence","id":"1pK0UfJW6PQ/mouvK2BeNUyPiY0="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"VYAByxwJvVYgDfeko14m45ttzQk=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"1pK0UfJW6PQ/mouvK2BeNUyPiY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn7rZCWCcupiHBIzvLkmvscyHmQ="},{"type":"next-occurrence","id":"NiQ5qD+QSx/RCRAU/MeW220PYr8="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"1pK0UfJW6PQ/mouvK2BeNUyPiY0=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"NiQ5qD+QSx/RCRAU/MeW220PYr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn7rZCWCcupiHBIzvLkmvscyHmQ="},{"type":"next-occurrence","id":"GxyazPr5oepxYCtl58S46W/lA8o="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"NiQ5qD+QSx/RCRAU/MeW220PYr8=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"GxyazPr5oepxYCtl58S46W/lA8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn7rZCWCcupiHBIzvLkmvscyHmQ="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"GxyazPr5oepxYCtl58S46W/lA8o=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"QQjWlfjy1dqizI/5XFb6vUR0dUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"J9dLdV6L+kOHwESjZQB6qhB29yg="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"QQjWlfjy1dqizI/5XFb6vUR0dUI=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"J9dLdV6L+kOHwESjZQB6qhB29yg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QQjWlfjy1dqizI/5XFb6vUR0dUI="},{"type":"next-occurrence","id":"lwmpbVqsbGGE4PH/ZuLqtLBPR0E="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"J9dLdV6L+kOHwESjZQB6qhB29yg=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"lwmpbVqsbGGE4PH/ZuLqtLBPR0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QQjWlfjy1dqizI/5XFb6vUR0dUI="},{"type":"next-occurrence","id":"INCEpZLgwHIftdpvkynh2PoyTUs="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"lwmpbVqsbGGE4PH/ZuLqtLBPR0E=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"INCEpZLgwHIftdpvkynh2PoyTUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QQjWlfjy1dqizI/5XFb6vUR0dUI="},{"type":"next-occurrence","id":"gH373TDi9U9+8whn/onLA6UiZzA="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"INCEpZLgwHIftdpvkynh2PoyTUs=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"gH373TDi9U9+8whn/onLA6UiZzA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QQjWlfjy1dqizI/5XFb6vUR0dUI="},{"type":"next-occurrence","id":"BNzFSxdQR3WjfHT8OMR8iSJmQ2A="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"gH373TDi9U9+8whn/onLA6UiZzA=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"BNzFSxdQR3WjfHT8OMR8iSJmQ2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QQjWlfjy1dqizI/5XFb6vUR0dUI="},{"type":"next-occurrence","id":"6tl/u72kJrJ5KYo9BzV47BEYQyE="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"BNzFSxdQR3WjfHT8OMR8iSJmQ2A=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"6tl/u72kJrJ5KYo9BzV47BEYQyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QQjWlfjy1dqizI/5XFb6vUR0dUI="},{"type":"next-occurrence","id":"YwL3yGBvmoCSJnahMQXsuMNYIIo="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"6tl/u72kJrJ5KYo9BzV47BEYQyE=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"YwL3yGBvmoCSJnahMQXsuMNYIIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QQjWlfjy1dqizI/5XFb6vUR0dUI="},{"type":"next-occurrence","id":"Kz7iX9LVXaZ+zwQAL5nHYDVd77w="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"YwL3yGBvmoCSJnahMQXsuMNYIIo=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"Kz7iX9LVXaZ+zwQAL5nHYDVd77w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QQjWlfjy1dqizI/5XFb6vUR0dUI="},{"type":"next-occurrence","id":"sekwuF87Ker2cRHEy/dpHJur4A0="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"Kz7iX9LVXaZ+zwQAL5nHYDVd77w=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"sekwuF87Ker2cRHEy/dpHJur4A0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QQjWlfjy1dqizI/5XFb6vUR0dUI="},{"type":"next-occurrence","id":"506qTVfCgOB2g1jt5UQtK59a2rM="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"sekwuF87Ker2cRHEy/dpHJur4A0=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"506qTVfCgOB2g1jt5UQtK59a2rM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QQjWlfjy1dqizI/5XFb6vUR0dUI="},{"type":"next-occurrence","id":"oFYtH7LG5oFvzvTgnwjRmTmqG9Y="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"506qTVfCgOB2g1jt5UQtK59a2rM=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"oFYtH7LG5oFvzvTgnwjRmTmqG9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QQjWlfjy1dqizI/5XFb6vUR0dUI="},{"type":"next-occurrence","id":"Wh9cp55Ha6ls4BU6vrMbpFN+r6g="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"oFYtH7LG5oFvzvTgnwjRmTmqG9Y=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"Wh9cp55Ha6ls4BU6vrMbpFN+r6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QQjWlfjy1dqizI/5XFb6vUR0dUI="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"Wh9cp55Ha6ls4BU6vrMbpFN+r6g=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"a9Dmm7kfw7+iRbUsqNo98KrFqOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HVI1ItVbHgq5Kg6LZSVTjEoQRCE="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"a9Dmm7kfw7+iRbUsqNo98KrFqOk=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"HVI1ItVbHgq5Kg6LZSVTjEoQRCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a9Dmm7kfw7+iRbUsqNo98KrFqOk="},{"type":"next-occurrence","id":"L19f7ZC4dYKBwjOff1vOH/yqMO4="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"HVI1ItVbHgq5Kg6LZSVTjEoQRCE=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"L19f7ZC4dYKBwjOff1vOH/yqMO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a9Dmm7kfw7+iRbUsqNo98KrFqOk="},{"type":"next-occurrence","id":"odCA6Hdfq9kMOi45ftzMhka7sfw="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"L19f7ZC4dYKBwjOff1vOH/yqMO4=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"odCA6Hdfq9kMOi45ftzMhka7sfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a9Dmm7kfw7+iRbUsqNo98KrFqOk="},{"type":"next-occurrence","id":"lg+5yNa9BJxoWF0gCHD2QZzRgeo="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"odCA6Hdfq9kMOi45ftzMhka7sfw=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"lg+5yNa9BJxoWF0gCHD2QZzRgeo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a9Dmm7kfw7+iRbUsqNo98KrFqOk="},{"type":"next-occurrence","id":"Jv6I+8V+U34QrkkgCsvFWsTpZ1M="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"lg+5yNa9BJxoWF0gCHD2QZzRgeo=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"Jv6I+8V+U34QrkkgCsvFWsTpZ1M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a9Dmm7kfw7+iRbUsqNo98KrFqOk="},{"type":"next-occurrence","id":"DXPksfoNxcDL28Wm+bY5DL88CkQ="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"Jv6I+8V+U34QrkkgCsvFWsTpZ1M=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"DXPksfoNxcDL28Wm+bY5DL88CkQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a9Dmm7kfw7+iRbUsqNo98KrFqOk="},{"type":"next-occurrence","id":"O734oa8Lz7XqsO/xusx2GO+eskY="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"DXPksfoNxcDL28Wm+bY5DL88CkQ=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"O734oa8Lz7XqsO/xusx2GO+eskY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a9Dmm7kfw7+iRbUsqNo98KrFqOk="},{"type":"next-occurrence","id":"k/fxKAoQ9APirISFbGHw+z4Cw+w="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"O734oa8Lz7XqsO/xusx2GO+eskY=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"k/fxKAoQ9APirISFbGHw+z4Cw+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a9Dmm7kfw7+iRbUsqNo98KrFqOk="},{"type":"next-occurrence","id":"hj3Cp1zExwTN7WonYZomXQBKNk8="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"k/fxKAoQ9APirISFbGHw+z4Cw+w=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"hj3Cp1zExwTN7WonYZomXQBKNk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a9Dmm7kfw7+iRbUsqNo98KrFqOk="},{"type":"next-occurrence","id":"WJjps9rygEGWmK9LdZzacW+ooyE="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"hj3Cp1zExwTN7WonYZomXQBKNk8=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"WJjps9rygEGWmK9LdZzacW+ooyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a9Dmm7kfw7+iRbUsqNo98KrFqOk="},{"type":"next-occurrence","id":"nOGnqUsGs8XrCynfDHkUcMuHzvs="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"WJjps9rygEGWmK9LdZzacW+ooyE=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"nOGnqUsGs8XrCynfDHkUcMuHzvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a9Dmm7kfw7+iRbUsqNo98KrFqOk="},{"type":"next-occurrence","id":"DYpHSVV2nFs6XAqbgg5yoyx5mgE="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"nOGnqUsGs8XrCynfDHkUcMuHzvs=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"DYpHSVV2nFs6XAqbgg5yoyx5mgE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a9Dmm7kfw7+iRbUsqNo98KrFqOk="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"DYpHSVV2nFs6XAqbgg5yoyx5mgE=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"R5kBpJHjLMD0Z4kHmlD6oV6mxNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-81 southbound ramp to Exit 1A (Old Exit 16A) - I-481 (Syracuse) ; follow detour, Continuous Thursday January 1st, 2026 12:00 AM thru Friday September 4th, 2026 03:00 PM All lanes closed","update_date":"2026-03-12T11:03:11Z"},"road_event_id":"R5kBpJHjLMD0Z4kHmlD6oV6mxNQ=","beginning_cross_street":"Exit 1A (Old Exit 16A) - I-481  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.135376,43.00864]]}},{"id":"DgdRPMOg6+Rv/Fd/cdyqNjxcv+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"K1AnJ6Ggb7In5J+8nWkkwEvR2nU="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"DgdRPMOg6+Rv/Fd/cdyqNjxcv+E=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"K1AnJ6Ggb7In5J+8nWkkwEvR2nU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DgdRPMOg6+Rv/Fd/cdyqNjxcv+E="},{"type":"next-occurrence","id":"jagiMajPbvPALUQUIq/95ec7hsE="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"K1AnJ6Ggb7In5J+8nWkkwEvR2nU=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"jagiMajPbvPALUQUIq/95ec7hsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DgdRPMOg6+Rv/Fd/cdyqNjxcv+E="},{"type":"next-occurrence","id":"Rd0GyCArh0GcBpeidAXrobuYbEo="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"jagiMajPbvPALUQUIq/95ec7hsE=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"Rd0GyCArh0GcBpeidAXrobuYbEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DgdRPMOg6+Rv/Fd/cdyqNjxcv+E="},{"type":"next-occurrence","id":"+4p/yN/bx+eZOfcV6Owb+vteSQw="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"Rd0GyCArh0GcBpeidAXrobuYbEo=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"+4p/yN/bx+eZOfcV6Owb+vteSQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DgdRPMOg6+Rv/Fd/cdyqNjxcv+E="},{"type":"next-occurrence","id":"IkUjb4OScyp/0LOa111BRbmVi3k="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"+4p/yN/bx+eZOfcV6Owb+vteSQw=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"IkUjb4OScyp/0LOa111BRbmVi3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DgdRPMOg6+Rv/Fd/cdyqNjxcv+E="},{"type":"next-occurrence","id":"42xII6py7GE3NG+SFWpAdLBYs3c="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"IkUjb4OScyp/0LOa111BRbmVi3k=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"42xII6py7GE3NG+SFWpAdLBYs3c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DgdRPMOg6+Rv/Fd/cdyqNjxcv+E="},{"type":"next-occurrence","id":"nqr1hQYiFryGObzabHFlH55MRwg="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"42xII6py7GE3NG+SFWpAdLBYs3c=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"nqr1hQYiFryGObzabHFlH55MRwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DgdRPMOg6+Rv/Fd/cdyqNjxcv+E="},{"type":"next-occurrence","id":"30jlJft/LDuPpYe+NWi+fIZnzBo="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"nqr1hQYiFryGObzabHFlH55MRwg=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"30jlJft/LDuPpYe+NWi+fIZnzBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DgdRPMOg6+Rv/Fd/cdyqNjxcv+E="},{"type":"next-occurrence","id":"axjTmvoeHFg1NNLVD0Ug9UQ5vgY="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"30jlJft/LDuPpYe+NWi+fIZnzBo=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"axjTmvoeHFg1NNLVD0Ug9UQ5vgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DgdRPMOg6+Rv/Fd/cdyqNjxcv+E="},{"type":"next-occurrence","id":"GtuYb5H7VHcHGUFI0ADmFCI4tN4="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"axjTmvoeHFg1NNLVD0Ug9UQ5vgY=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"GtuYb5H7VHcHGUFI0ADmFCI4tN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DgdRPMOg6+Rv/Fd/cdyqNjxcv+E="},{"type":"next-occurrence","id":"I33GBw5ZSIKYEUt6JV944pZ6trE="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"GtuYb5H7VHcHGUFI0ADmFCI4tN4=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"I33GBw5ZSIKYEUt6JV944pZ6trE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DgdRPMOg6+Rv/Fd/cdyqNjxcv+E="},{"type":"next-occurrence","id":"cohS8pr4pk8kjnsd306CUCGWQRE="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"I33GBw5ZSIKYEUt6JV944pZ6trE=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"cohS8pr4pk8kjnsd306CUCGWQRE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DgdRPMOg6+Rv/Fd/cdyqNjxcv+E="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"cohS8pr4pk8kjnsd306CUCGWQRE=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"Tcj/JExk8OVdYF4jMsCgoTIuhkU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SkLJV4biE3TfRR0gKhuXrZP/+IQ="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"Tcj/JExk8OVdYF4jMsCgoTIuhkU=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"SkLJV4biE3TfRR0gKhuXrZP/+IQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tcj/JExk8OVdYF4jMsCgoTIuhkU="},{"type":"next-occurrence","id":"DSj5KocSaFaC4DPYCJZUlatqzZg="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"SkLJV4biE3TfRR0gKhuXrZP/+IQ=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"DSj5KocSaFaC4DPYCJZUlatqzZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tcj/JExk8OVdYF4jMsCgoTIuhkU="},{"type":"next-occurrence","id":"9RK5S7HGcYM74A2YX8FWSHCUaaQ="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"DSj5KocSaFaC4DPYCJZUlatqzZg=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"9RK5S7HGcYM74A2YX8FWSHCUaaQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tcj/JExk8OVdYF4jMsCgoTIuhkU="},{"type":"next-occurrence","id":"MygDSv8tefsAF9YOmxU/bp+gZPU="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"9RK5S7HGcYM74A2YX8FWSHCUaaQ=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"MygDSv8tefsAF9YOmxU/bp+gZPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tcj/JExk8OVdYF4jMsCgoTIuhkU="},{"type":"next-occurrence","id":"ZI2Xf9wmJxTU8jnq2QXqn5WCYEc="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"MygDSv8tefsAF9YOmxU/bp+gZPU=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"ZI2Xf9wmJxTU8jnq2QXqn5WCYEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tcj/JExk8OVdYF4jMsCgoTIuhkU="},{"type":"next-occurrence","id":"eE9fzo5uE8Xc/ZCQT/kA6HcWtL8="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"ZI2Xf9wmJxTU8jnq2QXqn5WCYEc=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"eE9fzo5uE8Xc/ZCQT/kA6HcWtL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tcj/JExk8OVdYF4jMsCgoTIuhkU="},{"type":"next-occurrence","id":"KJ2VC4iDs8uy46TVO1Vu7dQ1qRk="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"eE9fzo5uE8Xc/ZCQT/kA6HcWtL8=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"KJ2VC4iDs8uy46TVO1Vu7dQ1qRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tcj/JExk8OVdYF4jMsCgoTIuhkU="},{"type":"next-occurrence","id":"50nGTDYsV7dQn5KXwPmALI/gGdw="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"KJ2VC4iDs8uy46TVO1Vu7dQ1qRk=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"50nGTDYsV7dQn5KXwPmALI/gGdw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tcj/JExk8OVdYF4jMsCgoTIuhkU="},{"type":"next-occurrence","id":"llT/S0gZ80HJlUWHlV1MhxA2XBA="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"50nGTDYsV7dQn5KXwPmALI/gGdw=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"llT/S0gZ80HJlUWHlV1MhxA2XBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tcj/JExk8OVdYF4jMsCgoTIuhkU="},{"type":"next-occurrence","id":"E1rjUiPXaZf27oUSCk9JmvIRsek="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"llT/S0gZ80HJlUWHlV1MhxA2XBA=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"E1rjUiPXaZf27oUSCk9JmvIRsek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tcj/JExk8OVdYF4jMsCgoTIuhkU="},{"type":"next-occurrence","id":"t9SOlJ6jqmTCjC4+xn/8jKPvWpY="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"E1rjUiPXaZf27oUSCk9JmvIRsek=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"t9SOlJ6jqmTCjC4+xn/8jKPvWpY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tcj/JExk8OVdYF4jMsCgoTIuhkU="},{"type":"next-occurrence","id":"4kOnaM4PtKy+z5D8KVunrW3q9uY="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"t9SOlJ6jqmTCjC4+xn/8jKPvWpY=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"4kOnaM4PtKy+z5D8KVunrW3q9uY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tcj/JExk8OVdYF4jMsCgoTIuhkU="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"4kOnaM4PtKy+z5D8KVunrW3q9uY=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"OCKbVp2zQaU9LyqWEi3PjKiQJNc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 88 (Old Exit 4) - I-690 (De Witt) ; Lane Shift, Continuous Thursday January 1st, 2026 09:00 AM thru Friday September 11th, 2026 06:00 PM All lanes open","update_date":"2026-03-16T12:59:23Z"},"road_event_id":"OCKbVp2zQaU9LyqWEi3PjKiQJNc=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 88 (Old Exit 4) - I-690     ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053712,43.083097]]}},{"id":"cfH2qjS1okapuhbStDEazq1P0Ic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; follow detour, Continuous Thursday January 1st,2026 09:00 AM thru Friday September 11th,2026 06:00 PM All lanes closed ,","update_date":"2026-04-11T21:30:01Z"},"road_event_id":"cfH2qjS1okapuhbStDEazq1P0Ic=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055974,43.076862]]}},{"id":"yJe2azh/c6uRxrIA8tFeVkW9lDI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[],"description":"Bridge work on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Continuous Wednesday December 31st, 2025 12:00 AM thru Thursday August 27th, 2026 11:59 PM All lanes closed","update_date":"2025-12-31T15:12:21Z"},"road_event_id":"yJe2azh/c6uRxrIA8tFeVkW9lDI=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855797,41.675278]]}},{"id":"e1cmMk/HZuOSvLtYkA5u8FIrmEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on US 11 both directions between Bennett St (Cicero) and River Rd (Hastings) ; Alternating one-way traffic with temporary signals, Continuous Monday January 12th, 2026 09:00 AM thru Thursday December 31st, 2026 03:30 PM All lanes open","update_date":"2026-04-09T17:20:27Z"},"road_event_id":"e1cmMk/HZuOSvLtYkA5u8FIrmEg=","beginning_cross_street":"Bennett St","ending_cross_street":"River Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140613,43.239408]]}},{"id":"YS/jXMuRALtNmjQymWtAmJ/xseA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 34 both directions between Trombley Rd (Brutus) and Emerson Rd (Cato) ; follow detour, Continuous Thursday January 1st, 2026 07:00 AM thru Sunday November 1st, 2026 06:00 AM All lanes closed","update_date":"2026-03-12T10:52:38Z"},"road_event_id":"YS/jXMuRALtNmjQymWtAmJ/xseA=","beginning_cross_street":"Trombley Rd","ending_cross_street":"Emerson Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.559128,43.06476]]}},{"id":"2No/Kg524Dq5JdmHTo6DCWKJYPk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/ij4BGd+8d8q0677oihcn1HpP9w="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"2No/Kg524Dq5JdmHTo6DCWKJYPk=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T17:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"/ij4BGd+8d8q0677oihcn1HpP9w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2No/Kg524Dq5JdmHTo6DCWKJYPk="},{"type":"next-occurrence","id":"TZjl0E6IfWupGwois7IDepqk+qg="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"/ij4BGd+8d8q0677oihcn1HpP9w=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T17:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"TZjl0E6IfWupGwois7IDepqk+qg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2No/Kg524Dq5JdmHTo6DCWKJYPk="},{"type":"next-occurrence","id":"pZbL2U9J3AnjyBlGMRNbeOMWUo8="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"TZjl0E6IfWupGwois7IDepqk+qg=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T17:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"pZbL2U9J3AnjyBlGMRNbeOMWUo8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2No/Kg524Dq5JdmHTo6DCWKJYPk="},{"type":"next-occurrence","id":"Kbv5lPoyPEqfkHLQ68v1718Ivy0="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"pZbL2U9J3AnjyBlGMRNbeOMWUo8=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T17:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"Kbv5lPoyPEqfkHLQ68v1718Ivy0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2No/Kg524Dq5JdmHTo6DCWKJYPk="},{"type":"next-occurrence","id":"HwsZ4y7GZMad2YOKwV8LZ2+0r1o="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"Kbv5lPoyPEqfkHLQ68v1718Ivy0=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T17:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"HwsZ4y7GZMad2YOKwV8LZ2+0r1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2No/Kg524Dq5JdmHTo6DCWKJYPk="},{"type":"next-occurrence","id":"yMZzZt652zF8ouKUTac8cO8UjLc="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"HwsZ4y7GZMad2YOKwV8LZ2+0r1o=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T17:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"yMZzZt652zF8ouKUTac8cO8UjLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2No/Kg524Dq5JdmHTo6DCWKJYPk="},{"type":"next-occurrence","id":"PQoV0yE4ZcC8mHGC8Wuk9LgVenk="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"yMZzZt652zF8ouKUTac8cO8UjLc=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T17:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"PQoV0yE4ZcC8mHGC8Wuk9LgVenk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2No/Kg524Dq5JdmHTo6DCWKJYPk="},{"type":"next-occurrence","id":"7DXgMHLk1vs0mKRGLl7a2/c/OUA="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"PQoV0yE4ZcC8mHGC8Wuk9LgVenk=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T17:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"7DXgMHLk1vs0mKRGLl7a2/c/OUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2No/Kg524Dq5JdmHTo6DCWKJYPk="},{"type":"next-occurrence","id":"Lyzt5eIQdJ3rZOpxbEo24q5whEg="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"7DXgMHLk1vs0mKRGLl7a2/c/OUA=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T17:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"Lyzt5eIQdJ3rZOpxbEo24q5whEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2No/Kg524Dq5JdmHTo6DCWKJYPk="},{"type":"next-occurrence","id":"eZe9Q2C8Uq8ex8KfRJPOZKWPgn4="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"Lyzt5eIQdJ3rZOpxbEo24q5whEg=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T17:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"eZe9Q2C8Uq8ex8KfRJPOZKWPgn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2No/Kg524Dq5JdmHTo6DCWKJYPk="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"eZe9Q2C8Uq8ex8KfRJPOZKWPgn4=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T17:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"WvvZ69XqXXKns/lM/mTBAzbku8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 28 both directions area of South Inlet Raquette Lake (Raquette Lake) Motorists will encounter lane closures in both directions with the use of temporary signals, Continuous Thursday January 2nd, 2025 6:00 AM thru Wednesday September 30th, 2026 6:00 PM","update_date":"2026-02-13T10:49:56Z"},"road_event_id":"WvvZ69XqXXKns/lM/mTBAzbku8I=","beginning_cross_street":"South Inlet Raquette Lake","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.609983,43.807112]]}},{"id":"r+DpYRwHk35SlYtXyInKZYRN9mg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B63 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, B63 Bus between 5 Av/64 St (New York) and 5 Av/65 St (New York) may experience delays and will wait out any temporary closures. Please allow additional travel time, Continuous Wednesday January 7th, 2026 09:15 AM thru Friday June 19th, 2026 11:59 PM","update_date":"2026-01-07T14:15:57Z"},"road_event_id":"r+DpYRwHk35SlYtXyInKZYRN9mg=","beginning_cross_street":"5 Av/64 St","ending_cross_street":"5 Av/65 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.018242,40.637578]]}},{"id":"+MIJBVTGFMMOjwtVe4yoe43p5yQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M5 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, M5 Bus at 6 Av/W 31 St (New York) stop is closed; for service, consider the southbound stop on 5th Ave at W 33rd St or the northbound stop on 6th Ave at W 31st St. Buses detour via 23rd S, Continuous Friday January 9th, 2026 08:35 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-01-09T13:35:35Z"},"road_event_id":"+MIJBVTGFMMOjwtVe4yoe43p5yQ=","beginning_cross_street":"6 Av/W 31 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988957,40.748042]]}},{"id":"gx/isr4jQHJG7xCqUlEYLnPjYwU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M8 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, M8 Bus at Av D/Loop (New York) stop is closed until further notice. The first and last stops will be made on E 10th St at Avenue D in both directions, Continuous Friday January 9th, 2026 08:51 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-03-09T12:27:19Z"},"road_event_id":"gx/isr4jQHJG7xCqUlEYLnPjYwU=","beginning_cross_street":"Av D/Loop","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974548,40.724689]]}},{"id":"yWLdjGkptXv4sNv8X57gOU6SukE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M35 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, M35 Bus at Main Roadway/ Manhattan Psyc Ctr (New York) stop is closed until further notice. For service, use the stop on Main Roadway at Manhattan Psych Center instead, Continuous Friday January 9th, 2026 08:57 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-03-09T12:27:01Z"},"road_event_id":"yWLdjGkptXv4sNv8X57gOU6SukE=","beginning_cross_street":"Main Roadway/ Manhattan Psyc Ctr","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926839,40.789168]]}},{"id":"ihUlK0H002umBhr3l6ej12OKgA0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q38 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction eastbound, Q38 Bus at 63 Dr/Austin St (New York) stop on 63rd Dr at Austin St has been temporarily relocated north between Wetherole St and Austin St through the Fall of 2027, Continuous Friday January 9th, 2026 09:33 AM thru Friday October 1st, 2027 11:59 PM","update_date":"2026-03-09T12:26:03Z"},"road_event_id":"ihUlK0H002umBhr3l6ej12OKgA0=","beginning_cross_street":"63 Dr/Austin St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.863947,40.727478]]}},{"id":"QXdOu6liBch49+5pDXNO7x3z+bE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RKJPF733TXUmOdS7SGZ3a3seFvI="}],"description":"Drainage improvements on WEST AVE both directions between N WATER ST (Norwalk) and CONNECTICUT AVE (Norwalk) West Avenue will have various daytime and nighttime lane closures Monday-Friday. Traffic control personnel and signing patterns will guide motorists through the work zone., Sunday February 8th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-01-14T16:09:13Z"},"road_event_id":"QXdOu6liBch49+5pDXNO7x3z+bE=","beginning_cross_street":"N WATER ST","ending_cross_street":"CONNECTICUT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.419777,41.104532]]}},{"id":"RKJPF733TXUmOdS7SGZ3a3seFvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QXdOu6liBch49+5pDXNO7x3z+bE="},{"type":"next-occurrence","id":"mxRc2XXvfPsAfyovuq5g8qFIf84="}],"description":"Drainage improvements on WEST AVE both directions between N WATER ST (Norwalk) and CONNECTICUT AVE (Norwalk) West Avenue will have various daytime and nighttime lane closures Monday-Friday. Traffic control personnel and signing patterns will guide motorists through the work zone., Sunday February 8th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-01-14T16:09:13Z"},"road_event_id":"RKJPF733TXUmOdS7SGZ3a3seFvI=","beginning_cross_street":"N WATER ST","ending_cross_street":"CONNECTICUT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T04:00:00Z","end_date":"2026-06-13T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.419777,41.104532]]}},{"id":"mxRc2XXvfPsAfyovuq5g8qFIf84=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QXdOu6liBch49+5pDXNO7x3z+bE="}],"description":"Drainage improvements on WEST AVE both directions between N WATER ST (Norwalk) and CONNECTICUT AVE (Norwalk) West Avenue will have various daytime and nighttime lane closures Monday-Friday. Traffic control personnel and signing patterns will guide motorists through the work zone., Sunday February 8th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-01-14T16:09:13Z"},"road_event_id":"mxRc2XXvfPsAfyovuq5g8qFIf84=","beginning_cross_street":"N WATER ST","ending_cross_street":"CONNECTICUT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T04:00:00Z","end_date":"2026-06-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.419777,41.104532]]}},{"id":"2mB7gVWORbn9oIioc7wxelWcgG4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CROOKED ST"],"direction":"unknown","related_road_events":[],"description":"Construction on CROOKED ST both directions between CT-372 (Plainville) and 34 (Plainville) Traffic on the Crooked Street bridge in Plainville will be restricted to one lane in each direction, Continuous Wednesday January 14th, 2026 12:00 AM thru Thursday July 30th, 2026 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-01-14T16:18:30Z"},"road_event_id":"2mB7gVWORbn9oIioc7wxelWcgG4=","beginning_cross_street":"CT-372","ending_cross_street":"34","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.838354,41.671495]]}},{"id":"yMitzb4gBmLkb7lKkG7K63q1ECA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3jVk52itKxN8PzM5JMqDMoKeSNg="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14, Tue, May 26, Wed, May 27 and Thu, Jun 11) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 7th,2026 thru Friday July 10th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 14th,2026 thru Friday July 17th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 21st,2026 thru Friday July 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 28th,2026 thru Friday July 31st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-06-05T19:30:20Z"},"road_event_id":"yMitzb4gBmLkb7lKkG7K63q1ECA=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:15:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"3jVk52itKxN8PzM5JMqDMoKeSNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yMitzb4gBmLkb7lKkG7K63q1ECA="},{"type":"next-occurrence","id":"WTmWHmEjzJTLdK8ett6Uee8x/Wk="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14, Tue, May 26, Wed, May 27 and Thu, Jun 11) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 7th,2026 thru Friday July 10th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 14th,2026 thru Friday July 17th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 21st,2026 thru Friday July 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 28th,2026 thru Friday July 31st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-06-05T19:30:20Z"},"road_event_id":"3jVk52itKxN8PzM5JMqDMoKeSNg=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:15:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"WTmWHmEjzJTLdK8ett6Uee8x/Wk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yMitzb4gBmLkb7lKkG7K63q1ECA="},{"type":"next-occurrence","id":"BN94RI2NEtsLO2rBI1wBuppPnwc="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14, Tue, May 26, Wed, May 27 and Thu, Jun 11) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 7th,2026 thru Friday July 10th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 14th,2026 thru Friday July 17th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 21st,2026 thru Friday July 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 28th,2026 thru Friday July 31st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-06-05T19:30:20Z"},"road_event_id":"WTmWHmEjzJTLdK8ett6Uee8x/Wk=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:15:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"BN94RI2NEtsLO2rBI1wBuppPnwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yMitzb4gBmLkb7lKkG7K63q1ECA="},{"type":"next-occurrence","id":"KWTSDTYMdcCM4LZi9sCXPi0LrCU="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14, Tue, May 26, Wed, May 27 and Thu, Jun 11) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 7th,2026 thru Friday July 10th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 14th,2026 thru Friday July 17th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 21st,2026 thru Friday July 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 28th,2026 thru Friday July 31st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-06-05T19:30:20Z"},"road_event_id":"BN94RI2NEtsLO2rBI1wBuppPnwc=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:15:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"KWTSDTYMdcCM4LZi9sCXPi0LrCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yMitzb4gBmLkb7lKkG7K63q1ECA="},{"type":"next-occurrence","id":"7hjxyw1NEA3vnBJypR6+/cK60AA="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14, Tue, May 26, Wed, May 27 and Thu, Jun 11) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 7th,2026 thru Friday July 10th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 14th,2026 thru Friday July 17th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 21st,2026 thru Friday July 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 28th,2026 thru Friday July 31st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-06-05T19:30:20Z"},"road_event_id":"KWTSDTYMdcCM4LZi9sCXPi0LrCU=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:15:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"7hjxyw1NEA3vnBJypR6+/cK60AA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yMitzb4gBmLkb7lKkG7K63q1ECA="},{"type":"next-occurrence","id":"CAXRSiUKk8rwx0WZzwKKuU+IqEo="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14, Tue, May 26, Wed, May 27 and Thu, Jun 11) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 7th,2026 thru Friday July 10th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 14th,2026 thru Friday July 17th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 21st,2026 thru Friday July 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 28th,2026 thru Friday July 31st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-06-05T19:30:20Z"},"road_event_id":"7hjxyw1NEA3vnBJypR6+/cK60AA=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:15:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"CAXRSiUKk8rwx0WZzwKKuU+IqEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yMitzb4gBmLkb7lKkG7K63q1ECA="},{"type":"next-occurrence","id":"4gDc0hBOKivRpJPaKHmxlrEtBrU="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14, Tue, May 26, Wed, May 27 and Thu, Jun 11) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 7th,2026 thru Friday July 10th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 14th,2026 thru Friday July 17th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 21st,2026 thru Friday July 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 28th,2026 thru Friday July 31st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-06-05T19:30:20Z"},"road_event_id":"CAXRSiUKk8rwx0WZzwKKuU+IqEo=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:15:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"4gDc0hBOKivRpJPaKHmxlrEtBrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yMitzb4gBmLkb7lKkG7K63q1ECA="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14, Tue, May 26, Wed, May 27 and Thu, Jun 11) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 7th,2026 thru Friday July 10th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 14th,2026 thru Friday July 17th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 21st,2026 thru Friday July 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 28th,2026 thru Friday July 31st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-06-05T19:30:20Z"},"road_event_id":"4gDc0hBOKivRpJPaKHmxlrEtBrU=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:15:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"hQBmCCPpEbZXSAfzoz7EhtmKe84=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LoJZc09ZS3/1VekZG1weNaaysFw="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14, Tue, May 26, Wed, May 27 and Thu, Jun 11) run every 10 minutes., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 7th,2026 thru Friday July 10th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 14th,2026 thru Friday July 17th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 21st,2026 thru Friday July 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 28th,2026 thru Friday July 31st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-06-05T19:30:20Z"},"road_event_id":"hQBmCCPpEbZXSAfzoz7EhtmKe84=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:15:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"LoJZc09ZS3/1VekZG1weNaaysFw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hQBmCCPpEbZXSAfzoz7EhtmKe84="},{"type":"next-occurrence","id":"LKsDt646gleNCUvhjTsfaBFDK+o="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14, Tue, May 26, Wed, May 27 and Thu, Jun 11) run every 10 minutes., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 7th,2026 thru Friday July 10th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 14th,2026 thru Friday July 17th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 21st,2026 thru Friday July 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 28th,2026 thru Friday July 31st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-06-05T19:30:20Z"},"road_event_id":"LoJZc09ZS3/1VekZG1weNaaysFw=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:15:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"LKsDt646gleNCUvhjTsfaBFDK+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hQBmCCPpEbZXSAfzoz7EhtmKe84="},{"type":"next-occurrence","id":"m8ajwarHBwzJdq1lVl+I49ufhE0="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14, Tue, May 26, Wed, May 27 and Thu, Jun 11) run every 10 minutes., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 7th,2026 thru Friday July 10th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 14th,2026 thru Friday July 17th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 21st,2026 thru Friday July 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 28th,2026 thru Friday July 31st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-06-05T19:30:20Z"},"road_event_id":"LKsDt646gleNCUvhjTsfaBFDK+o=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:15:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"m8ajwarHBwzJdq1lVl+I49ufhE0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hQBmCCPpEbZXSAfzoz7EhtmKe84="},{"type":"next-occurrence","id":"KrtEsmxyeBJ7qmJM0MWGDveoga8="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14, Tue, May 26, Wed, May 27 and Thu, Jun 11) run every 10 minutes., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 7th,2026 thru Friday July 10th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 14th,2026 thru Friday July 17th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 21st,2026 thru Friday July 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 28th,2026 thru Friday July 31st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-06-05T19:30:20Z"},"road_event_id":"m8ajwarHBwzJdq1lVl+I49ufhE0=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:15:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"KrtEsmxyeBJ7qmJM0MWGDveoga8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hQBmCCPpEbZXSAfzoz7EhtmKe84="},{"type":"next-occurrence","id":"6+ivvgh9dJja5psT9azCmZZCoZs="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14, Tue, May 26, Wed, May 27 and Thu, Jun 11) run every 10 minutes., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 7th,2026 thru Friday July 10th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 14th,2026 thru Friday July 17th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 21st,2026 thru Friday July 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 28th,2026 thru Friday July 31st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-06-05T19:30:20Z"},"road_event_id":"KrtEsmxyeBJ7qmJM0MWGDveoga8=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:15:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"6+ivvgh9dJja5psT9azCmZZCoZs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hQBmCCPpEbZXSAfzoz7EhtmKe84="},{"type":"next-occurrence","id":"3hegYazqRnDF67odquFqvox15Hs="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14, Tue, May 26, Wed, May 27 and Thu, Jun 11) run every 10 minutes., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 7th,2026 thru Friday July 10th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 14th,2026 thru Friday July 17th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 21st,2026 thru Friday July 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 28th,2026 thru Friday July 31st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-06-05T19:30:20Z"},"road_event_id":"6+ivvgh9dJja5psT9azCmZZCoZs=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:15:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"3hegYazqRnDF67odquFqvox15Hs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hQBmCCPpEbZXSAfzoz7EhtmKe84="},{"type":"next-occurrence","id":"2sMRqBpLpsKVnj9QvXt+AIE5nyI="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14, Tue, May 26, Wed, May 27 and Thu, Jun 11) run every 10 minutes., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 7th,2026 thru Friday July 10th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 14th,2026 thru Friday July 17th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 21st,2026 thru Friday July 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 28th,2026 thru Friday July 31st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-06-05T19:30:20Z"},"road_event_id":"3hegYazqRnDF67odquFqvox15Hs=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:15:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"2sMRqBpLpsKVnj9QvXt+AIE5nyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hQBmCCPpEbZXSAfzoz7EhtmKe84="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14, Tue, May 26, Wed, May 27 and Thu, Jun 11) run every 10 minutes., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 16th,2026 thru Friday June 19th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 23rd,2026 thru Friday June 26th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday June 30th,2026 thru Friday July 3rd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 7th,2026 thru Friday July 10th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 14th,2026 thru Friday July 17th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 21st,2026 thru Friday July 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday July 28th,2026 thru Friday July 31st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-06-05T19:30:20Z"},"road_event_id":"2sMRqBpLpsKVnj9QvXt+AIE5nyI=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:15:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"3OoqA2J/wTgIHEgZxMVXrVnoRds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/lAEXK0m4VraNY368vZftGFlUzE="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"3OoqA2J/wTgIHEgZxMVXrVnoRds=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"/lAEXK0m4VraNY368vZftGFlUzE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OoqA2J/wTgIHEgZxMVXrVnoRds="},{"type":"next-occurrence","id":"gs+GZFbgnufcQzCz/uqFgC9I6Y8="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"/lAEXK0m4VraNY368vZftGFlUzE=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"gs+GZFbgnufcQzCz/uqFgC9I6Y8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OoqA2J/wTgIHEgZxMVXrVnoRds="},{"type":"next-occurrence","id":"av6En26F9fEW7vfGyUVMEqfaKVI="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"gs+GZFbgnufcQzCz/uqFgC9I6Y8=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"av6En26F9fEW7vfGyUVMEqfaKVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OoqA2J/wTgIHEgZxMVXrVnoRds="},{"type":"next-occurrence","id":"zWw20O3OfUFA4np/urpuUWYtznc="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"av6En26F9fEW7vfGyUVMEqfaKVI=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"zWw20O3OfUFA4np/urpuUWYtznc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OoqA2J/wTgIHEgZxMVXrVnoRds="},{"type":"next-occurrence","id":"DkbfK/JqTdzpBUACKsPc1LMs5G8="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"zWw20O3OfUFA4np/urpuUWYtznc=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"DkbfK/JqTdzpBUACKsPc1LMs5G8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OoqA2J/wTgIHEgZxMVXrVnoRds="},{"type":"next-occurrence","id":"Vj1jrR3XdbtrElok6lp7K/pSfHk="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"DkbfK/JqTdzpBUACKsPc1LMs5G8=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"Vj1jrR3XdbtrElok6lp7K/pSfHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OoqA2J/wTgIHEgZxMVXrVnoRds="},{"type":"next-occurrence","id":"ujfo+Svjl4JlQ+dAZD/tz/0RhRg="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"Vj1jrR3XdbtrElok6lp7K/pSfHk=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"ujfo+Svjl4JlQ+dAZD/tz/0RhRg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OoqA2J/wTgIHEgZxMVXrVnoRds="},{"type":"next-occurrence","id":"rwocjoupjSjUJ3q2wuLg4ZsqulI="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"ujfo+Svjl4JlQ+dAZD/tz/0RhRg=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"rwocjoupjSjUJ3q2wuLg4ZsqulI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OoqA2J/wTgIHEgZxMVXrVnoRds="},{"type":"next-occurrence","id":"7X4ZUJdzAnheVrZv9ELnXVVYX90="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"rwocjoupjSjUJ3q2wuLg4ZsqulI=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"7X4ZUJdzAnheVrZv9ELnXVVYX90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OoqA2J/wTgIHEgZxMVXrVnoRds="},{"type":"next-occurrence","id":"e6GQJ4IeoHXqjLodlbOcu5LFBtE="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"7X4ZUJdzAnheVrZv9ELnXVVYX90=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"e6GQJ4IeoHXqjLodlbOcu5LFBtE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OoqA2J/wTgIHEgZxMVXrVnoRds="},{"type":"next-occurrence","id":"GBs/3if9H7HeUl5HsNKwKtdU8Pc="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"e6GQJ4IeoHXqjLodlbOcu5LFBtE=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"GBs/3if9H7HeUl5HsNKwKtdU8Pc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OoqA2J/wTgIHEgZxMVXrVnoRds="},{"type":"next-occurrence","id":"q00R8sg1jE/gpqRRnI6BGqvXWIM="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"GBs/3if9H7HeUl5HsNKwKtdU8Pc=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"q00R8sg1jE/gpqRRnI6BGqvXWIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3OoqA2J/wTgIHEgZxMVXrVnoRds="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"q00R8sg1jE/gpqRRnI6BGqvXWIM=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"5Bbm0r5po/eLewrTPjaE9EJ4Eyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BxM3 Bus and BxM4 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, BxM3 Bus and BxM4 Bus at Madison Av/E 46 St (New York) stop is closed. Please use the M3 bus stop on Madison Ave at E 45th St instead. Through 2028., Continuous Thursday January 22nd, 2026 12:00 AM thru Saturday December 30th, 2028 11:59 PM","update_date":"2026-01-22T18:55:38Z"},"road_event_id":"5Bbm0r5po/eLewrTPjaE9EJ4Eyk=","beginning_cross_street":"Madison Av/E 46 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97695,40.755797]]}},{"id":"AKAr2458sdHHqCCUg07Eiflb6rQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M15-SBS Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, M15-SBS Bus at Water St/Wall St (New York) The M15 and M15-SBS stop has been temporarily moved to the far side of Pine St., Continuous Thursday February 5th, 2026 07:27 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-04-17T16:54:16Z"},"road_event_id":"AKAr2458sdHHqCCUg07Eiflb6rQ=","beginning_cross_street":"Water St/Wall St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.007109,40.705287]]}},{"id":"OJgu+Lc5UMDP9zKiJ77cp7NiCFc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, 40 Bus area of Kellogg St 290' E Of Corbin St (Newark) Kellogg Street and Marlin Street will be closed between Corbin Street and Distribution Street due to construction. During this time, NJ TRANSIT Bus Route No. 40 in Newark will operate on a detour as follows: Buses traveling toward Jersey Garden Mall will travel from Doremus Avenue and Distribution Street, continue on Distribution Street, make a right on Marlin Street, left on Port Street, bear right on Corbin Street, and then continue the regular route. Pick-up and drop-off are only permitted at the bus stop on Distribution Street during the detour., Continuous Friday February 6th, 2026 12:00 AM thru Thursday August 6th, 2026 11:59 PM","update_date":"2026-02-06T22:05:15Z"},"road_event_id":"OJgu+Lc5UMDP9zKiJ77cp7NiCFc=","beginning_cross_street":"Kellogg St 290' E Of Corbin St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.15065,40.702269]]}},{"id":"n3wFfRgnTT5b0CF8rGUbhfVf19E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/qrHvfm/TnFaGtC6VaKu+NFXKZ4="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"n3wFfRgnTT5b0CF8rGUbhfVf19E=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"/qrHvfm/TnFaGtC6VaKu+NFXKZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3wFfRgnTT5b0CF8rGUbhfVf19E="},{"type":"next-occurrence","id":"8rx30LIt2QOU3JSkxXreB24If3o="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"/qrHvfm/TnFaGtC6VaKu+NFXKZ4=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T14:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"8rx30LIt2QOU3JSkxXreB24If3o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3wFfRgnTT5b0CF8rGUbhfVf19E="},{"type":"next-occurrence","id":"LDw6shh+IOxM+Lw+YsFJr7UVQDM="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"8rx30LIt2QOU3JSkxXreB24If3o=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"LDw6shh+IOxM+Lw+YsFJr7UVQDM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3wFfRgnTT5b0CF8rGUbhfVf19E="},{"type":"next-occurrence","id":"LgR4jq1SOUhHcxG0y71NgK+6S4E="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"LDw6shh+IOxM+Lw+YsFJr7UVQDM=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"LgR4jq1SOUhHcxG0y71NgK+6S4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3wFfRgnTT5b0CF8rGUbhfVf19E="},{"type":"next-occurrence","id":"d/0Rxh+JMBARXPjI6fqjjEQ86G8="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"LgR4jq1SOUhHcxG0y71NgK+6S4E=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"d/0Rxh+JMBARXPjI6fqjjEQ86G8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3wFfRgnTT5b0CF8rGUbhfVf19E="},{"type":"next-occurrence","id":"2CS5X1BXHToRilzLWHdlgIvC114="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"d/0Rxh+JMBARXPjI6fqjjEQ86G8=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"2CS5X1BXHToRilzLWHdlgIvC114=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3wFfRgnTT5b0CF8rGUbhfVf19E="},{"type":"next-occurrence","id":"9JSZ4xg4A+qEPSlcVwGEr4mU1bw="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"2CS5X1BXHToRilzLWHdlgIvC114=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"9JSZ4xg4A+qEPSlcVwGEr4mU1bw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3wFfRgnTT5b0CF8rGUbhfVf19E="},{"type":"next-occurrence","id":"rxxsIlM7n84IWNKs9JcTyEuIAHA="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"9JSZ4xg4A+qEPSlcVwGEr4mU1bw=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T14:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"rxxsIlM7n84IWNKs9JcTyEuIAHA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3wFfRgnTT5b0CF8rGUbhfVf19E="},{"type":"next-occurrence","id":"ysP/rpkUM8HmoSMvOH8dgjn197Q="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"rxxsIlM7n84IWNKs9JcTyEuIAHA=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T14:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"ysP/rpkUM8HmoSMvOH8dgjn197Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3wFfRgnTT5b0CF8rGUbhfVf19E="},{"type":"next-occurrence","id":"lsIxXZfY3mb2yWt3lXQG1qEts2g="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"ysP/rpkUM8HmoSMvOH8dgjn197Q=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T14:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"lsIxXZfY3mb2yWt3lXQG1qEts2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3wFfRgnTT5b0CF8rGUbhfVf19E="},{"type":"next-occurrence","id":"yDscDMqR6/zmohHemfwi8v9J/5M="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"lsIxXZfY3mb2yWt3lXQG1qEts2g=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T14:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"yDscDMqR6/zmohHemfwi8v9J/5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3wFfRgnTT5b0CF8rGUbhfVf19E="},{"type":"next-occurrence","id":"qWh6EmB+l+QeLjhEikXpfJpikxU="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"yDscDMqR6/zmohHemfwi8v9J/5M=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T14:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"qWh6EmB+l+QeLjhEikXpfJpikxU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3wFfRgnTT5b0CF8rGUbhfVf19E="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"qWh6EmB+l+QeLjhEikXpfJpikxU=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T14:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"NZ+CixsVZrqCK/A0gvxJhOoaqQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ozRZqD5rqjxjuGoCdbxErxJZbAE="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"NZ+CixsVZrqCK/A0gvxJhOoaqQY=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"ozRZqD5rqjxjuGoCdbxErxJZbAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZ+CixsVZrqCK/A0gvxJhOoaqQY="},{"type":"next-occurrence","id":"3eBmIlILAAQD9Rdr56wCq1AWjic="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"ozRZqD5rqjxjuGoCdbxErxJZbAE=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"3eBmIlILAAQD9Rdr56wCq1AWjic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZ+CixsVZrqCK/A0gvxJhOoaqQY="},{"type":"next-occurrence","id":"EoII2SvNikC2vWB1PPtalaNFTqs="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"3eBmIlILAAQD9Rdr56wCq1AWjic=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"EoII2SvNikC2vWB1PPtalaNFTqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZ+CixsVZrqCK/A0gvxJhOoaqQY="},{"type":"next-occurrence","id":"M9pudRwy8WWNBeU01+/V7N5R/So="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"EoII2SvNikC2vWB1PPtalaNFTqs=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"M9pudRwy8WWNBeU01+/V7N5R/So=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZ+CixsVZrqCK/A0gvxJhOoaqQY="},{"type":"next-occurrence","id":"hmjaCTw1aL0jmRQytrNqD5YTyZs="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"M9pudRwy8WWNBeU01+/V7N5R/So=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"hmjaCTw1aL0jmRQytrNqD5YTyZs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZ+CixsVZrqCK/A0gvxJhOoaqQY="},{"type":"next-occurrence","id":"3JJJnptPu+Ec9PRM9VvxWCJ4UMk="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"hmjaCTw1aL0jmRQytrNqD5YTyZs=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"3JJJnptPu+Ec9PRM9VvxWCJ4UMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZ+CixsVZrqCK/A0gvxJhOoaqQY="},{"type":"next-occurrence","id":"8L8M4Ppk9gJa56Zhrb/Ap1UPRkg="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"3JJJnptPu+Ec9PRM9VvxWCJ4UMk=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"8L8M4Ppk9gJa56Zhrb/Ap1UPRkg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZ+CixsVZrqCK/A0gvxJhOoaqQY="},{"type":"next-occurrence","id":"y4Ge+tKk3NxGYdhyoonTAXxvSTo="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"8L8M4Ppk9gJa56Zhrb/Ap1UPRkg=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"y4Ge+tKk3NxGYdhyoonTAXxvSTo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZ+CixsVZrqCK/A0gvxJhOoaqQY="},{"type":"next-occurrence","id":"WqiEXJqNPp4/lHRngEkHD9UhG5U="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"y4Ge+tKk3NxGYdhyoonTAXxvSTo=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"WqiEXJqNPp4/lHRngEkHD9UhG5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZ+CixsVZrqCK/A0gvxJhOoaqQY="},{"type":"next-occurrence","id":"5qmMV+cNe62q49KvCEnKNQDwQfA="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"WqiEXJqNPp4/lHRngEkHD9UhG5U=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"5qmMV+cNe62q49KvCEnKNQDwQfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZ+CixsVZrqCK/A0gvxJhOoaqQY="},{"type":"next-occurrence","id":"RWoabYQAiCQKunntuYiD/KDzaJw="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"5qmMV+cNe62q49KvCEnKNQDwQfA=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"RWoabYQAiCQKunntuYiD/KDzaJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZ+CixsVZrqCK/A0gvxJhOoaqQY="},{"type":"next-occurrence","id":"z7TSSpSwFFAYveqwAmIvKaWg1SY="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"RWoabYQAiCQKunntuYiD/KDzaJw=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"z7TSSpSwFFAYveqwAmIvKaWg1SY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZ+CixsVZrqCK/A0gvxJhOoaqQY="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"z7TSSpSwFFAYveqwAmIvKaWg1SY=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"uiQJOv8bshKkyw3hZ7eqAcHuPoo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RW7hn4486usk2+Ip6zTaDeVNz4g="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"uiQJOv8bshKkyw3hZ7eqAcHuPoo=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"RW7hn4486usk2+Ip6zTaDeVNz4g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uiQJOv8bshKkyw3hZ7eqAcHuPoo="},{"type":"next-occurrence","id":"J8oQ5G9EzDbaClR35Yva7wb3/7s="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"RW7hn4486usk2+Ip6zTaDeVNz4g=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T14:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"J8oQ5G9EzDbaClR35Yva7wb3/7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uiQJOv8bshKkyw3hZ7eqAcHuPoo="},{"type":"next-occurrence","id":"DZoQb/PoxgYIACp8CkX2LnxuDHs="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"J8oQ5G9EzDbaClR35Yva7wb3/7s=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"DZoQb/PoxgYIACp8CkX2LnxuDHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uiQJOv8bshKkyw3hZ7eqAcHuPoo="},{"type":"next-occurrence","id":"NBo2F9W6b1LPpO2EOBlw1pBoVmM="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"DZoQb/PoxgYIACp8CkX2LnxuDHs=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"NBo2F9W6b1LPpO2EOBlw1pBoVmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uiQJOv8bshKkyw3hZ7eqAcHuPoo="},{"type":"next-occurrence","id":"0cw4ToXthcr3/V2TERvCc0rE/mQ="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"NBo2F9W6b1LPpO2EOBlw1pBoVmM=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"0cw4ToXthcr3/V2TERvCc0rE/mQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uiQJOv8bshKkyw3hZ7eqAcHuPoo="},{"type":"next-occurrence","id":"k/EbzzD5YWhzoK+foyUc38QNqT0="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"0cw4ToXthcr3/V2TERvCc0rE/mQ=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"k/EbzzD5YWhzoK+foyUc38QNqT0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uiQJOv8bshKkyw3hZ7eqAcHuPoo="},{"type":"next-occurrence","id":"pFuLwh0/sRRTZFuMekFt910Dqas="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"k/EbzzD5YWhzoK+foyUc38QNqT0=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"pFuLwh0/sRRTZFuMekFt910Dqas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uiQJOv8bshKkyw3hZ7eqAcHuPoo="},{"type":"next-occurrence","id":"w2mrlLxFxuEp5k1I7M3jGZOoOo4="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"pFuLwh0/sRRTZFuMekFt910Dqas=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T14:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"w2mrlLxFxuEp5k1I7M3jGZOoOo4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uiQJOv8bshKkyw3hZ7eqAcHuPoo="},{"type":"next-occurrence","id":"5+agOEC2ZSZ+XIH7HUFxoC5QCcA="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"w2mrlLxFxuEp5k1I7M3jGZOoOo4=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T14:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"5+agOEC2ZSZ+XIH7HUFxoC5QCcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uiQJOv8bshKkyw3hZ7eqAcHuPoo="},{"type":"next-occurrence","id":"zcuocUInxD6H80D2y+F5s5o9TF0="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"5+agOEC2ZSZ+XIH7HUFxoC5QCcA=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T14:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"zcuocUInxD6H80D2y+F5s5o9TF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uiQJOv8bshKkyw3hZ7eqAcHuPoo="},{"type":"next-occurrence","id":"fmfamqMvz2zK/6tTQxtb3+mZcyU="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"zcuocUInxD6H80D2y+F5s5o9TF0=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T14:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"fmfamqMvz2zK/6tTQxtb3+mZcyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uiQJOv8bshKkyw3hZ7eqAcHuPoo="},{"type":"next-occurrence","id":"1nvIMPpSw3eQehWoyPhyf62W7U4="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"fmfamqMvz2zK/6tTQxtb3+mZcyU=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T14:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"1nvIMPpSw3eQehWoyPhyf62W7U4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uiQJOv8bshKkyw3hZ7eqAcHuPoo="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"1nvIMPpSw3eQehWoyPhyf62W7U4=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T14:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"RZR+rSTzNp6V6XnmKcWQDT7MT+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"A1coLYPArSPiuW/n45BVSJMJ3lA="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:02Z"},"road_event_id":"RZR+rSTzNp6V6XnmKcWQDT7MT+o=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"A1coLYPArSPiuW/n45BVSJMJ3lA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RZR+rSTzNp6V6XnmKcWQDT7MT+o="},{"type":"next-occurrence","id":"bPN+1yVzw5TUcdRF58iRmqSQ3CQ="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:02Z"},"road_event_id":"A1coLYPArSPiuW/n45BVSJMJ3lA=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"bPN+1yVzw5TUcdRF58iRmqSQ3CQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RZR+rSTzNp6V6XnmKcWQDT7MT+o="},{"type":"next-occurrence","id":"w+ehtb3nzBw1+4UlOahiDGq2Kq0="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:02Z"},"road_event_id":"bPN+1yVzw5TUcdRF58iRmqSQ3CQ=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"w+ehtb3nzBw1+4UlOahiDGq2Kq0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RZR+rSTzNp6V6XnmKcWQDT7MT+o="},{"type":"next-occurrence","id":"WMviPkUdpyQyZHDa2/T/LMbJFyw="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:02Z"},"road_event_id":"w+ehtb3nzBw1+4UlOahiDGq2Kq0=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"WMviPkUdpyQyZHDa2/T/LMbJFyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RZR+rSTzNp6V6XnmKcWQDT7MT+o="},{"type":"next-occurrence","id":"acnr5i4yP7hCu8ZZPxmVXELZB9M="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:02Z"},"road_event_id":"WMviPkUdpyQyZHDa2/T/LMbJFyw=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"acnr5i4yP7hCu8ZZPxmVXELZB9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RZR+rSTzNp6V6XnmKcWQDT7MT+o="},{"type":"next-occurrence","id":"XymYB5dY2AI7CZSsUzTT+McsyHc="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:02Z"},"road_event_id":"acnr5i4yP7hCu8ZZPxmVXELZB9M=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"XymYB5dY2AI7CZSsUzTT+McsyHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RZR+rSTzNp6V6XnmKcWQDT7MT+o="},{"type":"next-occurrence","id":"JvFJHiwX93y4Slx8QqWZL5rXDTQ="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:02Z"},"road_event_id":"XymYB5dY2AI7CZSsUzTT+McsyHc=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"JvFJHiwX93y4Slx8QqWZL5rXDTQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RZR+rSTzNp6V6XnmKcWQDT7MT+o="},{"type":"next-occurrence","id":"tRKokldN5N01E5TcVdTxGiwedKs="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:02Z"},"road_event_id":"JvFJHiwX93y4Slx8QqWZL5rXDTQ=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"tRKokldN5N01E5TcVdTxGiwedKs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RZR+rSTzNp6V6XnmKcWQDT7MT+o="},{"type":"next-occurrence","id":"5wbHY9atptv74JzTBhwmJpCRyos="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:02Z"},"road_event_id":"tRKokldN5N01E5TcVdTxGiwedKs=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"5wbHY9atptv74JzTBhwmJpCRyos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RZR+rSTzNp6V6XnmKcWQDT7MT+o="},{"type":"next-occurrence","id":"9KEM6URyAE5IzEPuA0TNTi4/WQg="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:02Z"},"road_event_id":"5wbHY9atptv74JzTBhwmJpCRyos=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"9KEM6URyAE5IzEPuA0TNTi4/WQg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RZR+rSTzNp6V6XnmKcWQDT7MT+o="},{"type":"next-occurrence","id":"tihqtthq5AI04u5vaRelqzyltG0="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:02Z"},"road_event_id":"9KEM6URyAE5IzEPuA0TNTi4/WQg=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"tihqtthq5AI04u5vaRelqzyltG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RZR+rSTzNp6V6XnmKcWQDT7MT+o="},{"type":"next-occurrence","id":"GYNuwsJCU2k/TarEl6w6y4q5q+M="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:02Z"},"road_event_id":"tihqtthq5AI04u5vaRelqzyltG0=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"GYNuwsJCU2k/TarEl6w6y4q5q+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RZR+rSTzNp6V6XnmKcWQDT7MT+o="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-05-22T10:01:02Z"},"road_event_id":"GYNuwsJCU2k/TarEl6w6y4q5q+M=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"Qd5qTMvz90sPYc//S+v3/5TfhsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7DpK1/AQBieJ+vdbu6wSecICjko="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"Qd5qTMvz90sPYc//S+v3/5TfhsE=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"7DpK1/AQBieJ+vdbu6wSecICjko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qd5qTMvz90sPYc//S+v3/5TfhsE="},{"type":"next-occurrence","id":"iWtH8BMZkbE2bhCySZoIX6z2qIs="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"7DpK1/AQBieJ+vdbu6wSecICjko=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T14:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"iWtH8BMZkbE2bhCySZoIX6z2qIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qd5qTMvz90sPYc//S+v3/5TfhsE="},{"type":"next-occurrence","id":"id60gjgN/Czu9LqbBJq3GNS3nTA="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"iWtH8BMZkbE2bhCySZoIX6z2qIs=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"id60gjgN/Czu9LqbBJq3GNS3nTA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qd5qTMvz90sPYc//S+v3/5TfhsE="},{"type":"next-occurrence","id":"Fo+kUotfRGSaNdWD9dR0U2ankQ8="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"id60gjgN/Czu9LqbBJq3GNS3nTA=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"Fo+kUotfRGSaNdWD9dR0U2ankQ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qd5qTMvz90sPYc//S+v3/5TfhsE="},{"type":"next-occurrence","id":"YAjDPNB2eKqk1IMdP9l+urhdPXc="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"Fo+kUotfRGSaNdWD9dR0U2ankQ8=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"YAjDPNB2eKqk1IMdP9l+urhdPXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qd5qTMvz90sPYc//S+v3/5TfhsE="},{"type":"next-occurrence","id":"ee5P1tJwWjz7mwrv8t3TwvjzcOs="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"YAjDPNB2eKqk1IMdP9l+urhdPXc=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"ee5P1tJwWjz7mwrv8t3TwvjzcOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qd5qTMvz90sPYc//S+v3/5TfhsE="},{"type":"next-occurrence","id":"1nKQ4B5Hu3jNUpbTs9nZw4jwdNk="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"ee5P1tJwWjz7mwrv8t3TwvjzcOs=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"1nKQ4B5Hu3jNUpbTs9nZw4jwdNk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qd5qTMvz90sPYc//S+v3/5TfhsE="},{"type":"next-occurrence","id":"6W+5SsmnC2ELQ9UP4x4PgioWYHg="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"1nKQ4B5Hu3jNUpbTs9nZw4jwdNk=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T14:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"6W+5SsmnC2ELQ9UP4x4PgioWYHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qd5qTMvz90sPYc//S+v3/5TfhsE="},{"type":"next-occurrence","id":"uUdQr71vN1CRj92fTFC6XayLwdM="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"6W+5SsmnC2ELQ9UP4x4PgioWYHg=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T14:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"uUdQr71vN1CRj92fTFC6XayLwdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qd5qTMvz90sPYc//S+v3/5TfhsE="},{"type":"next-occurrence","id":"ueYAdD5voWVjLOt6qbvvkcsQ6l4="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"uUdQr71vN1CRj92fTFC6XayLwdM=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T14:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"ueYAdD5voWVjLOt6qbvvkcsQ6l4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qd5qTMvz90sPYc//S+v3/5TfhsE="},{"type":"next-occurrence","id":"YqyaMPtGSX07ma5rxY4eUfKDwRc="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"ueYAdD5voWVjLOt6qbvvkcsQ6l4=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T14:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"YqyaMPtGSX07ma5rxY4eUfKDwRc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qd5qTMvz90sPYc//S+v3/5TfhsE="},{"type":"next-occurrence","id":"JUSVk9rakBLJB47ZnGUA0LYavJ0="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"YqyaMPtGSX07ma5rxY4eUfKDwRc=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T14:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"JUSVk9rakBLJB47ZnGUA0LYavJ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qd5qTMvz90sPYc//S+v3/5TfhsE="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:27Z"},"road_event_id":"JUSVk9rakBLJB47ZnGUA0LYavJ0=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T14:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"zd+U/wLel28QxZwSPs4c4hq84/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7gkI52+vFTgJYUllLM/5faosh1o="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"zd+U/wLel28QxZwSPs4c4hq84/g=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"7gkI52+vFTgJYUllLM/5faosh1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zd+U/wLel28QxZwSPs4c4hq84/g="},{"type":"next-occurrence","id":"Y+fIgs54HLBGXVsTOJX6zLEcrmI="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"7gkI52+vFTgJYUllLM/5faosh1o=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"Y+fIgs54HLBGXVsTOJX6zLEcrmI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zd+U/wLel28QxZwSPs4c4hq84/g="},{"type":"next-occurrence","id":"O6mXMCFdfPcg7WEhBnI217Hi5cY="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"Y+fIgs54HLBGXVsTOJX6zLEcrmI=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"O6mXMCFdfPcg7WEhBnI217Hi5cY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zd+U/wLel28QxZwSPs4c4hq84/g="},{"type":"next-occurrence","id":"vBPYZydbdXnWQDexp32Imgr50vs="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"O6mXMCFdfPcg7WEhBnI217Hi5cY=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"vBPYZydbdXnWQDexp32Imgr50vs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zd+U/wLel28QxZwSPs4c4hq84/g="},{"type":"next-occurrence","id":"Gqxwiw1x5s8otAxc7pLyc4PnylM="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"vBPYZydbdXnWQDexp32Imgr50vs=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"Gqxwiw1x5s8otAxc7pLyc4PnylM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zd+U/wLel28QxZwSPs4c4hq84/g="},{"type":"next-occurrence","id":"KOyUqPKqzca7uajUUO+2ysdEUhk="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"Gqxwiw1x5s8otAxc7pLyc4PnylM=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"KOyUqPKqzca7uajUUO+2ysdEUhk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zd+U/wLel28QxZwSPs4c4hq84/g="},{"type":"next-occurrence","id":"SueERk0veKnIbud+fS8/N/54iuI="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"KOyUqPKqzca7uajUUO+2ysdEUhk=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"SueERk0veKnIbud+fS8/N/54iuI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zd+U/wLel28QxZwSPs4c4hq84/g="},{"type":"next-occurrence","id":"1Hu1LC8FBdtncIyOsgkXP3gZ5Yk="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"SueERk0veKnIbud+fS8/N/54iuI=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"1Hu1LC8FBdtncIyOsgkXP3gZ5Yk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zd+U/wLel28QxZwSPs4c4hq84/g="},{"type":"next-occurrence","id":"m035NKAuEF021EB5AyBR4EPTNdE="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"1Hu1LC8FBdtncIyOsgkXP3gZ5Yk=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"m035NKAuEF021EB5AyBR4EPTNdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zd+U/wLel28QxZwSPs4c4hq84/g="},{"type":"next-occurrence","id":"k93Y7X5i+xOO86uA3rKqQz9OF4E="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"m035NKAuEF021EB5AyBR4EPTNdE=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"k93Y7X5i+xOO86uA3rKqQz9OF4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zd+U/wLel28QxZwSPs4c4hq84/g="},{"type":"next-occurrence","id":"V9/mB8n79AZj+zzy9+aj3sc4+vg="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"k93Y7X5i+xOO86uA3rKqQz9OF4E=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"V9/mB8n79AZj+zzy9+aj3sc4+vg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zd+U/wLel28QxZwSPs4c4hq84/g="},{"type":"next-occurrence","id":"D30ZIbA2whRfZySQAOs6AXm6HHA="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"V9/mB8n79AZj+zzy9+aj3sc4+vg=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"D30ZIbA2whRfZySQAOs6AXm6HHA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zd+U/wLel28QxZwSPs4c4hq84/g="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"D30ZIbA2whRfZySQAOs6AXm6HHA=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"FqLBjbhc9AaIken9h7ZMpZ3VwvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[],"description":"Construction on I-678 southbound ramp to Exit 1B-2 - North Conduit Avenue; NY 27 (New York) Subject to change without notice., Continuous Thursday January 1st, 2026 12:00 AM thru Tuesday June 30th, 2026 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-26T17:35:40Z"},"road_event_id":"FqLBjbhc9AaIken9h7ZMpZ3VwvU=","beginning_cross_street":"Exit 1B-2 - North Conduit Avenue; NY 27","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801918,40.667966]]}},{"id":"e3HTTRf2VdK4Bsf78l6f5pCnAGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9kuj/kLAjFEArAkj7txRnx+XF7g="}],"description":"Construction on I-87 Major Deegan Expressway both directions in the vicinity of East 138th Street; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed, Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:00 PM thru 08:00 AM 1 Center lane of 3 lanes closed, Friday June 12th, 2026 thru Saturday June 13th, 2026, 11:00 PM thru 08:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-06-03T14:26:07Z"},"road_event_id":"e3HTTRf2VdK4Bsf78l6f5pCnAGQ=","beginning_cross_street":"East 138th Street; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931203,40.813506]]}},{"id":"9kuj/kLAjFEArAkj7txRnx+XF7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e3HTTRf2VdK4Bsf78l6f5pCnAGQ="},{"type":"next-occurrence","id":"hw2xLkEX54Tznxgrl1lfhJoFxEk="}],"description":"Construction on I-87 Major Deegan Expressway both directions in the vicinity of East 138th Street; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed, Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:00 PM thru 08:00 AM 1 Center lane of 3 lanes closed, Friday June 12th, 2026 thru Saturday June 13th, 2026, 11:00 PM thru 08:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-06-03T14:26:07Z"},"road_event_id":"9kuj/kLAjFEArAkj7txRnx+XF7g=","beginning_cross_street":"East 138th Street; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T03:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931203,40.813506]]}},{"id":"hw2xLkEX54Tznxgrl1lfhJoFxEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e3HTTRf2VdK4Bsf78l6f5pCnAGQ="},{"type":"next-occurrence","id":"Ey8UBOHfkQZ2Cghfd12KuFAVYQo="}],"description":"Construction on I-87 Major Deegan Expressway both directions in the vicinity of East 138th Street; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed, Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:00 PM thru 08:00 AM 1 Center lane of 3 lanes closed, Friday June 12th, 2026 thru Saturday June 13th, 2026, 11:00 PM thru 08:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-06-03T14:26:07Z"},"road_event_id":"hw2xLkEX54Tznxgrl1lfhJoFxEk=","beginning_cross_street":"East 138th Street; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T03:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931203,40.813506]]}},{"id":"Ey8UBOHfkQZ2Cghfd12KuFAVYQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e3HTTRf2VdK4Bsf78l6f5pCnAGQ="},{"type":"next-occurrence","id":"FoFLqkY2M9Qz5swuPOlBly3LKq0="}],"description":"Construction on I-87 Major Deegan Expressway both directions in the vicinity of East 138th Street; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed, Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:00 PM thru 08:00 AM 1 Center lane of 3 lanes closed, Friday June 12th, 2026 thru Saturday June 13th, 2026, 11:00 PM thru 08:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-06-03T14:26:07Z"},"road_event_id":"Ey8UBOHfkQZ2Cghfd12KuFAVYQo=","beginning_cross_street":"East 138th Street; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T03:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931203,40.813506]]}},{"id":"FoFLqkY2M9Qz5swuPOlBly3LKq0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e3HTTRf2VdK4Bsf78l6f5pCnAGQ="},{"type":"next-occurrence","id":"iWuO29HaDOxMg4MaPIaliyD428A="}],"description":"Construction on I-87 Major Deegan Expressway both directions in the vicinity of East 138th Street; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed, Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:00 PM thru 08:00 AM 1 Center lane of 3 lanes closed, Friday June 12th, 2026 thru Saturday June 13th, 2026, 11:00 PM thru 08:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-06-03T14:26:07Z"},"road_event_id":"FoFLqkY2M9Qz5swuPOlBly3LKq0=","beginning_cross_street":"East 138th Street; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T03:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931203,40.813506]]}},{"id":"iWuO29HaDOxMg4MaPIaliyD428A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e3HTTRf2VdK4Bsf78l6f5pCnAGQ="}],"description":"Construction on I-87 Major Deegan Expressway both directions in the vicinity of East 138th Street; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed, Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:00 PM thru 08:00 AM 1 Center lane of 3 lanes closed, Friday June 12th, 2026 thru Saturday June 13th, 2026, 11:00 PM thru 08:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-06-03T14:26:07Z"},"road_event_id":"iWuO29HaDOxMg4MaPIaliyD428A=","beginning_cross_street":"East 138th Street; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T03:00:00Z","end_date":"2026-06-13T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931203,40.813506]]}},{"id":"ORC300519661","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Van Wyck Expressway"],"direction":"unknown","description":"Scheduled roadwork on Van Wyck Expressway southbound ramp to Exit C - Federal Circle (New York) Not currently Scheduled","update_date":"2026-04-09T03:59:00Z"},"road_event_id":"ORC300519661","beginning_cross_street":"Exit C - Federal Circle ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-02-20T22:57:15Z","end_date":"2026-04-09T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.805964,40.66074]]}},{"id":"iAVaWPj8HdGFTR76iRAQyj0rxs0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"z6TAOVFwaRGjGd8jTDC5YdJgbTE="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"iAVaWPj8HdGFTR76iRAQyj0rxs0=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"z6TAOVFwaRGjGd8jTDC5YdJgbTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iAVaWPj8HdGFTR76iRAQyj0rxs0="},{"type":"next-occurrence","id":"qkRL+5krSJk0FBMmm+29LLmvqsc="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"z6TAOVFwaRGjGd8jTDC5YdJgbTE=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:30:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"qkRL+5krSJk0FBMmm+29LLmvqsc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iAVaWPj8HdGFTR76iRAQyj0rxs0="},{"type":"next-occurrence","id":"fpI3+PU40NynIsVDNP/IN841ZU8="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"qkRL+5krSJk0FBMmm+29LLmvqsc=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"fpI3+PU40NynIsVDNP/IN841ZU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iAVaWPj8HdGFTR76iRAQyj0rxs0="},{"type":"next-occurrence","id":"qQHLt1arL4h0wqbiloTSS5bxhRI="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"fpI3+PU40NynIsVDNP/IN841ZU8=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"qQHLt1arL4h0wqbiloTSS5bxhRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iAVaWPj8HdGFTR76iRAQyj0rxs0="},{"type":"next-occurrence","id":"lEfVVvGdkKj4109uLx5NddPfIBg="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"qQHLt1arL4h0wqbiloTSS5bxhRI=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"lEfVVvGdkKj4109uLx5NddPfIBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iAVaWPj8HdGFTR76iRAQyj0rxs0="},{"type":"next-occurrence","id":"YnaHrUhejzzfLw6J/A90a7VczQQ="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"lEfVVvGdkKj4109uLx5NddPfIBg=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"YnaHrUhejzzfLw6J/A90a7VczQQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iAVaWPj8HdGFTR76iRAQyj0rxs0="},{"type":"next-occurrence","id":"57svbhx8kbnmdN+BqX9FoN6Cimw="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"YnaHrUhejzzfLw6J/A90a7VczQQ=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"57svbhx8kbnmdN+BqX9FoN6Cimw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iAVaWPj8HdGFTR76iRAQyj0rxs0="},{"type":"next-occurrence","id":"dxOTug677JLp9FNw7S9SwtNy4IM="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"57svbhx8kbnmdN+BqX9FoN6Cimw=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T10:30:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"dxOTug677JLp9FNw7S9SwtNy4IM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iAVaWPj8HdGFTR76iRAQyj0rxs0="},{"type":"next-occurrence","id":"3nW6a9SjXNfB/EL1ejk6088lI6k="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"dxOTug677JLp9FNw7S9SwtNy4IM=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"3nW6a9SjXNfB/EL1ejk6088lI6k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iAVaWPj8HdGFTR76iRAQyj0rxs0="},{"type":"next-occurrence","id":"ZdR2EYc1SXr3Cg2eceyu4ISChTU="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"3nW6a9SjXNfB/EL1ejk6088lI6k=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"ZdR2EYc1SXr3Cg2eceyu4ISChTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iAVaWPj8HdGFTR76iRAQyj0rxs0="},{"type":"next-occurrence","id":"mcSOyP0yz/Gp0sKKA7lBqBfvzC4="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"ZdR2EYc1SXr3Cg2eceyu4ISChTU=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"mcSOyP0yz/Gp0sKKA7lBqBfvzC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iAVaWPj8HdGFTR76iRAQyj0rxs0="},{"type":"next-occurrence","id":"P5YsFNmARPR9ZYm4ZPeNrdMM9+0="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"mcSOyP0yz/Gp0sKKA7lBqBfvzC4=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"P5YsFNmARPR9ZYm4ZPeNrdMM9+0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iAVaWPj8HdGFTR76iRAQyj0rxs0="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"P5YsFNmARPR9ZYm4ZPeNrdMM9+0=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"U1aiMM607L4foNvtZ/fUsY60bv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on NY 284 both directions between Langlitz Road (Minisink) and CR 1 - Pine Island Turnpike (Minisink) D265386/32597309 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Monday March 16th, 2026 12:00 AM thru Tuesday June 30th, 2026 12:00 AM all lanes closed and detoured","update_date":"2026-06-03T20:04:37Z"},"road_event_id":"U1aiMM607L4foNvtZ/fUsY60bv8=","beginning_cross_street":"Langlitz Road","ending_cross_street":"CR 1 - Pine Island Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552716,41.328515]]}},{"id":"w/txO/Vjdh4Jj2XPxfQA1Zo18a8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 240"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kia6OWDwqe3FXjbW+w2oyq4u2WE="}],"description":"Roadwork on NY 240 both directions NY 400; Aurora Expressway (West Seneca) to Mineral Springs Road (West Seneca), Monday March 16th, 2026 thru Friday December 4th, 2026, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-26T16:13:00Z"},"road_event_id":"w/txO/Vjdh4Jj2XPxfQA1Zo18a8=","beginning_cross_street":"NY 400; Aurora Expressway","ending_cross_street":"Mineral Springs Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.787995,42.849281]]}},{"id":"kia6OWDwqe3FXjbW+w2oyq4u2WE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 240"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/txO/Vjdh4Jj2XPxfQA1Zo18a8="}],"description":"Roadwork on NY 240 both directions NY 400; Aurora Expressway (West Seneca) to Mineral Springs Road (West Seneca), Monday March 16th, 2026 thru Friday December 4th, 2026, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-26T16:13:00Z"},"road_event_id":"kia6OWDwqe3FXjbW+w2oyq4u2WE=","beginning_cross_street":"NY 400; Aurora Expressway","ending_cross_street":"Mineral Springs Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.787995,42.849281]]}},{"id":"1sf4csYxIxD2D9/4UT8o1vs333g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FGffu2XhTWLAgHNT7vsaWw24nJc="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"1sf4csYxIxD2D9/4UT8o1vs333g=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"FGffu2XhTWLAgHNT7vsaWw24nJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1sf4csYxIxD2D9/4UT8o1vs333g="},{"type":"next-occurrence","id":"A4AyA+DuRnFEIwqIZg2ZPwgXSxY="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"FGffu2XhTWLAgHNT7vsaWw24nJc=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"A4AyA+DuRnFEIwqIZg2ZPwgXSxY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1sf4csYxIxD2D9/4UT8o1vs333g="},{"type":"next-occurrence","id":"06KdUJcog36sCaQGAj+bVmtBTdg="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"A4AyA+DuRnFEIwqIZg2ZPwgXSxY=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"06KdUJcog36sCaQGAj+bVmtBTdg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1sf4csYxIxD2D9/4UT8o1vs333g="},{"type":"next-occurrence","id":"OPW0VNKPxjiZmncIq6mM/HMV/oo="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"06KdUJcog36sCaQGAj+bVmtBTdg=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"OPW0VNKPxjiZmncIq6mM/HMV/oo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1sf4csYxIxD2D9/4UT8o1vs333g="},{"type":"next-occurrence","id":"Oh0OazSSiFrfd6wbkt6ze1TgM+Y="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"OPW0VNKPxjiZmncIq6mM/HMV/oo=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"Oh0OazSSiFrfd6wbkt6ze1TgM+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1sf4csYxIxD2D9/4UT8o1vs333g="},{"type":"next-occurrence","id":"GlasnDP1/BRdgfbUOVo1HJo4u4k="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"Oh0OazSSiFrfd6wbkt6ze1TgM+Y=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"GlasnDP1/BRdgfbUOVo1HJo4u4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1sf4csYxIxD2D9/4UT8o1vs333g="},{"type":"next-occurrence","id":"yJdzYxUZ0GusItbTxM4D69Yy970="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"GlasnDP1/BRdgfbUOVo1HJo4u4k=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"yJdzYxUZ0GusItbTxM4D69Yy970=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1sf4csYxIxD2D9/4UT8o1vs333g="},{"type":"next-occurrence","id":"NkM67fLattA5IJRVqO+RJ5OVjN4="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"yJdzYxUZ0GusItbTxM4D69Yy970=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"NkM67fLattA5IJRVqO+RJ5OVjN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1sf4csYxIxD2D9/4UT8o1vs333g="},{"type":"next-occurrence","id":"wVV3BFHfq087NsIyVHARzxcaEqQ="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"NkM67fLattA5IJRVqO+RJ5OVjN4=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"wVV3BFHfq087NsIyVHARzxcaEqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1sf4csYxIxD2D9/4UT8o1vs333g="},{"type":"next-occurrence","id":"2NT1DbDizly6WaW6oh1a810ATQs="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"wVV3BFHfq087NsIyVHARzxcaEqQ=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"2NT1DbDizly6WaW6oh1a810ATQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1sf4csYxIxD2D9/4UT8o1vs333g="},{"type":"next-occurrence","id":"/GXPXIuhKykUeocvKUeevUmDmck="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"2NT1DbDizly6WaW6oh1a810ATQs=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"/GXPXIuhKykUeocvKUeevUmDmck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1sf4csYxIxD2D9/4UT8o1vs333g="},{"type":"next-occurrence","id":"KqFwkSwta0ySyhgMtIpSkAQrwwA="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"/GXPXIuhKykUeocvKUeevUmDmck=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"KqFwkSwta0ySyhgMtIpSkAQrwwA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1sf4csYxIxD2D9/4UT8o1vs333g="},{"type":"next-occurrence","id":"XmCvcXnCHuzkeWaNkvVT++oYbgg="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"KqFwkSwta0ySyhgMtIpSkAQrwwA=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"XmCvcXnCHuzkeWaNkvVT++oYbgg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1sf4csYxIxD2D9/4UT8o1vs333g="},{"type":"next-occurrence","id":"cGa1q/EdRB1AW++2VoGn7wCfqfs="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"XmCvcXnCHuzkeWaNkvVT++oYbgg=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"cGa1q/EdRB1AW++2VoGn7wCfqfs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1sf4csYxIxD2D9/4UT8o1vs333g="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"cGa1q/EdRB1AW++2VoGn7wCfqfs=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"Parln4CPjA8hpgeA3HRhcOxgzTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5/6Fo0Kt50cD24RmVmjg3HAEy4c="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"Parln4CPjA8hpgeA3HRhcOxgzTk=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"5/6Fo0Kt50cD24RmVmjg3HAEy4c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Parln4CPjA8hpgeA3HRhcOxgzTk="},{"type":"next-occurrence","id":"BsePLz3XTrv2TAeeT7lsgtrvisk="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"5/6Fo0Kt50cD24RmVmjg3HAEy4c=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"BsePLz3XTrv2TAeeT7lsgtrvisk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Parln4CPjA8hpgeA3HRhcOxgzTk="},{"type":"next-occurrence","id":"JUBgr7fKNrjlQMewXaxApJ2EyZg="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"BsePLz3XTrv2TAeeT7lsgtrvisk=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"JUBgr7fKNrjlQMewXaxApJ2EyZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Parln4CPjA8hpgeA3HRhcOxgzTk="},{"type":"next-occurrence","id":"msc8TufUiG9veoPJBa8Ggybu3J4="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"JUBgr7fKNrjlQMewXaxApJ2EyZg=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"msc8TufUiG9veoPJBa8Ggybu3J4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Parln4CPjA8hpgeA3HRhcOxgzTk="},{"type":"next-occurrence","id":"ALVct5Oj94MqquutUB/3API4nD0="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"msc8TufUiG9veoPJBa8Ggybu3J4=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"ALVct5Oj94MqquutUB/3API4nD0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Parln4CPjA8hpgeA3HRhcOxgzTk="},{"type":"next-occurrence","id":"4oILbGB2PZTLpgKUnzy06QCLlGE="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"ALVct5Oj94MqquutUB/3API4nD0=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"4oILbGB2PZTLpgKUnzy06QCLlGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Parln4CPjA8hpgeA3HRhcOxgzTk="},{"type":"next-occurrence","id":"dvtANWB1Ru12jHjLFEAqAH2hSDs="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"4oILbGB2PZTLpgKUnzy06QCLlGE=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"dvtANWB1Ru12jHjLFEAqAH2hSDs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Parln4CPjA8hpgeA3HRhcOxgzTk="},{"type":"next-occurrence","id":"H3wb4hEPxFeRuwJVUg0VloRT8k4="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"dvtANWB1Ru12jHjLFEAqAH2hSDs=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"H3wb4hEPxFeRuwJVUg0VloRT8k4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Parln4CPjA8hpgeA3HRhcOxgzTk="},{"type":"next-occurrence","id":"FLBmOmUQl66ujstiPUMRZzZ61Wg="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"H3wb4hEPxFeRuwJVUg0VloRT8k4=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"FLBmOmUQl66ujstiPUMRZzZ61Wg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Parln4CPjA8hpgeA3HRhcOxgzTk="},{"type":"next-occurrence","id":"m4+u8g/sgy5JkUml82GPYHSfMMo="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"FLBmOmUQl66ujstiPUMRZzZ61Wg=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"m4+u8g/sgy5JkUml82GPYHSfMMo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Parln4CPjA8hpgeA3HRhcOxgzTk="},{"type":"next-occurrence","id":"ilvMZNxEt/rtsTSrRocas5vEo2U="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"m4+u8g/sgy5JkUml82GPYHSfMMo=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"ilvMZNxEt/rtsTSrRocas5vEo2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Parln4CPjA8hpgeA3HRhcOxgzTk="},{"type":"next-occurrence","id":"uGgFWflem49eFNALKy+E5EJ+IlQ="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"ilvMZNxEt/rtsTSrRocas5vEo2U=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"uGgFWflem49eFNALKy+E5EJ+IlQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Parln4CPjA8hpgeA3HRhcOxgzTk="},{"type":"next-occurrence","id":"aWl5+M3Lg+9/s3Q9Klt1YvYtnfc="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"uGgFWflem49eFNALKy+E5EJ+IlQ=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"aWl5+M3Lg+9/s3Q9Klt1YvYtnfc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Parln4CPjA8hpgeA3HRhcOxgzTk="},{"type":"next-occurrence","id":"F9AY8f8oAXwKu8j8so8DKbSiOMc="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"aWl5+M3Lg+9/s3Q9Klt1YvYtnfc=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"F9AY8f8oAXwKu8j8so8DKbSiOMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Parln4CPjA8hpgeA3HRhcOxgzTk="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"F9AY8f8oAXwKu8j8so8DKbSiOMc=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"Mb12FbSyzbN0jpeCtLEBb5E6rrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rLmTT7iErKkM0GhbayH2kXixklw="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"Mb12FbSyzbN0jpeCtLEBb5E6rrM=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"rLmTT7iErKkM0GhbayH2kXixklw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mb12FbSyzbN0jpeCtLEBb5E6rrM="},{"type":"next-occurrence","id":"l4MNkF7bmPRfX2DU1araIiSyCnY="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"rLmTT7iErKkM0GhbayH2kXixklw=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"l4MNkF7bmPRfX2DU1araIiSyCnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mb12FbSyzbN0jpeCtLEBb5E6rrM="},{"type":"next-occurrence","id":"bghv3Qo4O1rBfXw5Gz7soOyaMgc="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"l4MNkF7bmPRfX2DU1araIiSyCnY=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"bghv3Qo4O1rBfXw5Gz7soOyaMgc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mb12FbSyzbN0jpeCtLEBb5E6rrM="},{"type":"next-occurrence","id":"Q/D5qu8DREzGF0PpVLMiYUCSswo="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"bghv3Qo4O1rBfXw5Gz7soOyaMgc=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"Q/D5qu8DREzGF0PpVLMiYUCSswo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mb12FbSyzbN0jpeCtLEBb5E6rrM="},{"type":"next-occurrence","id":"Aip6cZQwKFnjStN+Jnbdd90+et8="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"Q/D5qu8DREzGF0PpVLMiYUCSswo=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"Aip6cZQwKFnjStN+Jnbdd90+et8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mb12FbSyzbN0jpeCtLEBb5E6rrM="},{"type":"next-occurrence","id":"ErpX/zZ/aHMLUSVG2nS+8v6MG/w="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"Aip6cZQwKFnjStN+Jnbdd90+et8=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"ErpX/zZ/aHMLUSVG2nS+8v6MG/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mb12FbSyzbN0jpeCtLEBb5E6rrM="},{"type":"next-occurrence","id":"d3ODPHW43p9eB8x/hvI1rRhmRW4="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"ErpX/zZ/aHMLUSVG2nS+8v6MG/w=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"d3ODPHW43p9eB8x/hvI1rRhmRW4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mb12FbSyzbN0jpeCtLEBb5E6rrM="},{"type":"next-occurrence","id":"lUvtRWJP4kRbDX63lKK8jpLxPwM="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"d3ODPHW43p9eB8x/hvI1rRhmRW4=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"lUvtRWJP4kRbDX63lKK8jpLxPwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mb12FbSyzbN0jpeCtLEBb5E6rrM="},{"type":"next-occurrence","id":"6xTY+LEnhCvJ/PRx1S9dfvIGz/Y="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"lUvtRWJP4kRbDX63lKK8jpLxPwM=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"6xTY+LEnhCvJ/PRx1S9dfvIGz/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mb12FbSyzbN0jpeCtLEBb5E6rrM="},{"type":"next-occurrence","id":"k4Vgp/TkAB/qNWzDMALZCBKhbgA="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"6xTY+LEnhCvJ/PRx1S9dfvIGz/Y=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"k4Vgp/TkAB/qNWzDMALZCBKhbgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mb12FbSyzbN0jpeCtLEBb5E6rrM="},{"type":"next-occurrence","id":"JFfJVLj/DYF4loTlUOASXYAvxLM="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"k4Vgp/TkAB/qNWzDMALZCBKhbgA=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"JFfJVLj/DYF4loTlUOASXYAvxLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mb12FbSyzbN0jpeCtLEBb5E6rrM="},{"type":"next-occurrence","id":"t01Lw8oory2+3bNuTWcftjk98As="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"JFfJVLj/DYF4loTlUOASXYAvxLM=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"t01Lw8oory2+3bNuTWcftjk98As=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mb12FbSyzbN0jpeCtLEBb5E6rrM="},{"type":"next-occurrence","id":"eFq+FCfedM9aREGj9A/94P4QjeA="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"t01Lw8oory2+3bNuTWcftjk98As=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"eFq+FCfedM9aREGj9A/94P4QjeA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mb12FbSyzbN0jpeCtLEBb5E6rrM="},{"type":"next-occurrence","id":"kAIoolDGJLFmm1aDf0v/++NKbt0="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"eFq+FCfedM9aREGj9A/94P4QjeA=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"kAIoolDGJLFmm1aDf0v/++NKbt0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mb12FbSyzbN0jpeCtLEBb5E6rrM="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"kAIoolDGJLFmm1aDf0v/++NKbt0=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"yymPZH4Qlay8OEf+CVsRKTJfEFw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SOUTH ST"],"direction":"unknown","related_road_events":[],"description":"Bridge work on SOUTH ST both directions between DWYER RD (Middlebury) and SANDY HILL RD (Middlebury), Continuous Monday March 2nd, 2026 12:00 AM thru Friday September 10th, 2027 11:59 PM All lanes closed","update_date":"2026-03-03T18:06:13Z"},"road_event_id":"yymPZH4Qlay8OEf+CVsRKTJfEFw=","beginning_cross_street":"DWYER RD","ending_cross_street":"SANDY HILL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.122891,41.516388]]}},{"id":"wU1vax8/Xi86snjOCVMOns0663w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5SoL4b1aNClMLLR4FnJ6A2kQ/yo="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"wU1vax8/Xi86snjOCVMOns0663w=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"5SoL4b1aNClMLLR4FnJ6A2kQ/yo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wU1vax8/Xi86snjOCVMOns0663w="},{"type":"next-occurrence","id":"mYcijvCytuTYp3B3yxPgaGKWVxM="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"5SoL4b1aNClMLLR4FnJ6A2kQ/yo=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"mYcijvCytuTYp3B3yxPgaGKWVxM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wU1vax8/Xi86snjOCVMOns0663w="},{"type":"next-occurrence","id":"zw4VHrV+hu8aenesX9qINh6Kvlg="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"mYcijvCytuTYp3B3yxPgaGKWVxM=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"zw4VHrV+hu8aenesX9qINh6Kvlg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wU1vax8/Xi86snjOCVMOns0663w="},{"type":"next-occurrence","id":"IXDoR366vFMbXsp41ULPCtT3qoM="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"zw4VHrV+hu8aenesX9qINh6Kvlg=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"IXDoR366vFMbXsp41ULPCtT3qoM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wU1vax8/Xi86snjOCVMOns0663w="},{"type":"next-occurrence","id":"Q0OFYb84bL+Ocmf7CD0eOguVMfo="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"IXDoR366vFMbXsp41ULPCtT3qoM=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"Q0OFYb84bL+Ocmf7CD0eOguVMfo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wU1vax8/Xi86snjOCVMOns0663w="},{"type":"next-occurrence","id":"Z53PopAAuQxBR29uOkvXNceCAmY="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"Q0OFYb84bL+Ocmf7CD0eOguVMfo=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"Z53PopAAuQxBR29uOkvXNceCAmY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wU1vax8/Xi86snjOCVMOns0663w="},{"type":"next-occurrence","id":"zGhWNgYxbXeSPPR8zpZzXs7tKHs="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"Z53PopAAuQxBR29uOkvXNceCAmY=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"zGhWNgYxbXeSPPR8zpZzXs7tKHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wU1vax8/Xi86snjOCVMOns0663w="},{"type":"next-occurrence","id":"/aga7B9zmKdT82L8Y8r0feSrXoc="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"zGhWNgYxbXeSPPR8zpZzXs7tKHs=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"/aga7B9zmKdT82L8Y8r0feSrXoc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wU1vax8/Xi86snjOCVMOns0663w="},{"type":"next-occurrence","id":"ppfv/Yi6cbJrbmvsjzJBxvLTYVs="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"/aga7B9zmKdT82L8Y8r0feSrXoc=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"ppfv/Yi6cbJrbmvsjzJBxvLTYVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wU1vax8/Xi86snjOCVMOns0663w="},{"type":"next-occurrence","id":"hwDHSbQBTymwEyn8Uj6H8KR+KRU="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"ppfv/Yi6cbJrbmvsjzJBxvLTYVs=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"hwDHSbQBTymwEyn8Uj6H8KR+KRU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wU1vax8/Xi86snjOCVMOns0663w="},{"type":"next-occurrence","id":"MzbD2sjl9GKcRXkW82/C172ZRzQ="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"hwDHSbQBTymwEyn8Uj6H8KR+KRU=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"MzbD2sjl9GKcRXkW82/C172ZRzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wU1vax8/Xi86snjOCVMOns0663w="},{"type":"next-occurrence","id":"5BUp+2Li6eEYRMQ54SunfLAZz04="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"MzbD2sjl9GKcRXkW82/C172ZRzQ=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"5BUp+2Li6eEYRMQ54SunfLAZz04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wU1vax8/Xi86snjOCVMOns0663w="},{"type":"next-occurrence","id":"nKBBex4aOmBOH6YLY0OXbwhBQ9o="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"5BUp+2Li6eEYRMQ54SunfLAZz04=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"nKBBex4aOmBOH6YLY0OXbwhBQ9o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wU1vax8/Xi86snjOCVMOns0663w="},{"type":"next-occurrence","id":"20i+VJr2W19e8zYyLzZgCDPiAUg="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"nKBBex4aOmBOH6YLY0OXbwhBQ9o=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"20i+VJr2W19e8zYyLzZgCDPiAUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wU1vax8/Xi86snjOCVMOns0663w="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"20i+VJr2W19e8zYyLzZgCDPiAUg=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"g+Qqo+5qg79c1+IfzydvjJnEj8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"97+l4ZztOlFYYsSJ7cCaG2DqFAQ="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:30:53Z"},"road_event_id":"g+Qqo+5qg79c1+IfzydvjJnEj8A=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"97+l4ZztOlFYYsSJ7cCaG2DqFAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g+Qqo+5qg79c1+IfzydvjJnEj8A="},{"type":"next-occurrence","id":"fglpoVA9qnzfvI9mPnZRHzkBngA="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:30:53Z"},"road_event_id":"97+l4ZztOlFYYsSJ7cCaG2DqFAQ=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"fglpoVA9qnzfvI9mPnZRHzkBngA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g+Qqo+5qg79c1+IfzydvjJnEj8A="},{"type":"next-occurrence","id":"yRz982Kf7jnxSZG5c/Ik6Vr9cYk="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:30:53Z"},"road_event_id":"fglpoVA9qnzfvI9mPnZRHzkBngA=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"yRz982Kf7jnxSZG5c/Ik6Vr9cYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g+Qqo+5qg79c1+IfzydvjJnEj8A="},{"type":"next-occurrence","id":"HgCnNTWLirk5+dSf6qtOgb0RrU0="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:30:53Z"},"road_event_id":"yRz982Kf7jnxSZG5c/Ik6Vr9cYk=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"HgCnNTWLirk5+dSf6qtOgb0RrU0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g+Qqo+5qg79c1+IfzydvjJnEj8A="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:30:53Z"},"road_event_id":"HgCnNTWLirk5+dSf6qtOgb0RrU0=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"ORC300521385","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","description":"Construction on George Washington Bridge Upper Level southbound ramp from Palisades Interstate Parkway (Fort Lee) to Palisades Interstate Parkway (Fort Lee) Not currently Scheduled","update_date":"2026-03-22T12:00:01Z"},"road_event_id":"ORC300521385","beginning_cross_street":"Palisades Interstate Parkway","ending_cross_street":"Palisades Interstate Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-03-08T22:41:00Z","end_date":"2026-03-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.962982,40.854543]]}},{"id":"rIzwKTJ5H1TPRcjF5tum/kErAss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GbhsMdYCti1GFJk9lZ/0oXpUWv0="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"rIzwKTJ5H1TPRcjF5tum/kErAss=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"GbhsMdYCti1GFJk9lZ/0oXpUWv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rIzwKTJ5H1TPRcjF5tum/kErAss="},{"type":"next-occurrence","id":"hfC6z6ROVpNBCpKnXN+U0paCNms="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"GbhsMdYCti1GFJk9lZ/0oXpUWv0=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"hfC6z6ROVpNBCpKnXN+U0paCNms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rIzwKTJ5H1TPRcjF5tum/kErAss="},{"type":"next-occurrence","id":"clsdh43ta9oFauDnLG1CdUI0aOc="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"hfC6z6ROVpNBCpKnXN+U0paCNms=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"clsdh43ta9oFauDnLG1CdUI0aOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rIzwKTJ5H1TPRcjF5tum/kErAss="},{"type":"next-occurrence","id":"U61D4FXNSXUbW44/DpMGlKC/7RE="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"clsdh43ta9oFauDnLG1CdUI0aOc=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"U61D4FXNSXUbW44/DpMGlKC/7RE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rIzwKTJ5H1TPRcjF5tum/kErAss="},{"type":"next-occurrence","id":"6uU7SpjXA/UruJc0e+gJREs62qo="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"U61D4FXNSXUbW44/DpMGlKC/7RE=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"6uU7SpjXA/UruJc0e+gJREs62qo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rIzwKTJ5H1TPRcjF5tum/kErAss="},{"type":"next-occurrence","id":"yygGRB5CQlbbizOtylkHlV//btI="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"6uU7SpjXA/UruJc0e+gJREs62qo=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"yygGRB5CQlbbizOtylkHlV//btI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rIzwKTJ5H1TPRcjF5tum/kErAss="},{"type":"next-occurrence","id":"xD0Jqp5Zd+Z8oZkvpxBpymlIHS4="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"yygGRB5CQlbbizOtylkHlV//btI=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"xD0Jqp5Zd+Z8oZkvpxBpymlIHS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rIzwKTJ5H1TPRcjF5tum/kErAss="},{"type":"next-occurrence","id":"UHkYc+23rdFamhWsuGC3fe7Fvts="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"xD0Jqp5Zd+Z8oZkvpxBpymlIHS4=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"UHkYc+23rdFamhWsuGC3fe7Fvts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rIzwKTJ5H1TPRcjF5tum/kErAss="},{"type":"next-occurrence","id":"IO5CETzGK5m6UYQ7jz7qN3aeL9w="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"UHkYc+23rdFamhWsuGC3fe7Fvts=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"IO5CETzGK5m6UYQ7jz7qN3aeL9w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rIzwKTJ5H1TPRcjF5tum/kErAss="},{"type":"next-occurrence","id":"Z34mlyxqNY/G1UmLa6W+TNt/auw="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"IO5CETzGK5m6UYQ7jz7qN3aeL9w=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"Z34mlyxqNY/G1UmLa6W+TNt/auw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rIzwKTJ5H1TPRcjF5tum/kErAss="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"Z34mlyxqNY/G1UmLa6W+TNt/auw=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"xyQ+PtgDqdNKzmqzn7LdCUiDXQ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"of1beADaYtMiQRQAXHOmogatbGg="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-26T12:04:31Z"},"road_event_id":"xyQ+PtgDqdNKzmqzn7LdCUiDXQ8=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"of1beADaYtMiQRQAXHOmogatbGg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xyQ+PtgDqdNKzmqzn7LdCUiDXQ8="},{"type":"next-occurrence","id":"IYFSy4Sujp6p+t/kHXSrLBn5vRk="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-26T12:04:31Z"},"road_event_id":"of1beADaYtMiQRQAXHOmogatbGg=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"IYFSy4Sujp6p+t/kHXSrLBn5vRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xyQ+PtgDqdNKzmqzn7LdCUiDXQ8="},{"type":"next-occurrence","id":"iU/Ufs8kVfSM6KC8n6uY7mFqZ4A="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-26T12:04:31Z"},"road_event_id":"IYFSy4Sujp6p+t/kHXSrLBn5vRk=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"iU/Ufs8kVfSM6KC8n6uY7mFqZ4A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xyQ+PtgDqdNKzmqzn7LdCUiDXQ8="},{"type":"next-occurrence","id":"bqiUZkzaPn5MjSzUQWm7T9YXpBo="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-26T12:04:31Z"},"road_event_id":"iU/Ufs8kVfSM6KC8n6uY7mFqZ4A=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"bqiUZkzaPn5MjSzUQWm7T9YXpBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xyQ+PtgDqdNKzmqzn7LdCUiDXQ8="},{"type":"next-occurrence","id":"DeCPuVDPDYIN8C5s7m5nrKdM0Nk="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-26T12:04:31Z"},"road_event_id":"bqiUZkzaPn5MjSzUQWm7T9YXpBo=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"DeCPuVDPDYIN8C5s7m5nrKdM0Nk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xyQ+PtgDqdNKzmqzn7LdCUiDXQ8="},{"type":"next-occurrence","id":"ApVmOZGKs49qEviRg7A1IUU5Kws="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-26T12:04:31Z"},"road_event_id":"DeCPuVDPDYIN8C5s7m5nrKdM0Nk=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"ApVmOZGKs49qEviRg7A1IUU5Kws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xyQ+PtgDqdNKzmqzn7LdCUiDXQ8="},{"type":"next-occurrence","id":"FKHWtdUJAUpzd6ZmNaRw0/JqPpU="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-26T12:04:31Z"},"road_event_id":"ApVmOZGKs49qEviRg7A1IUU5Kws=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"FKHWtdUJAUpzd6ZmNaRw0/JqPpU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xyQ+PtgDqdNKzmqzn7LdCUiDXQ8="},{"type":"next-occurrence","id":"+wgt+U51Cd2pNcKaXGXhlyyVCd0="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-26T12:04:31Z"},"road_event_id":"FKHWtdUJAUpzd6ZmNaRw0/JqPpU=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"+wgt+U51Cd2pNcKaXGXhlyyVCd0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xyQ+PtgDqdNKzmqzn7LdCUiDXQ8="},{"type":"next-occurrence","id":"mT5DqQuJHxtqkmZseKcp+icDQRg="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-26T12:04:31Z"},"road_event_id":"+wgt+U51Cd2pNcKaXGXhlyyVCd0=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"mT5DqQuJHxtqkmZseKcp+icDQRg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xyQ+PtgDqdNKzmqzn7LdCUiDXQ8="},{"type":"next-occurrence","id":"k1swuKCy1WpHlXSEgk1O5YXUdZE="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-26T12:04:31Z"},"road_event_id":"mT5DqQuJHxtqkmZseKcp+icDQRg=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"k1swuKCy1WpHlXSEgk1O5YXUdZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xyQ+PtgDqdNKzmqzn7LdCUiDXQ8="},{"type":"next-occurrence","id":"+47CwkDHnL59E/bBqXLZcxgE/IA="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-26T12:04:31Z"},"road_event_id":"k1swuKCy1WpHlXSEgk1O5YXUdZE=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"+47CwkDHnL59E/bBqXLZcxgE/IA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xyQ+PtgDqdNKzmqzn7LdCUiDXQ8="},{"type":"next-occurrence","id":"0fZUOcyK9kYi8bHMdyYqwqRGCQ0="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-26T12:04:31Z"},"road_event_id":"+47CwkDHnL59E/bBqXLZcxgE/IA=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"0fZUOcyK9kYi8bHMdyYqwqRGCQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xyQ+PtgDqdNKzmqzn7LdCUiDXQ8="},{"type":"next-occurrence","id":"wkIbWHcAUPBQwa3XxgNXhyaXVCc="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-26T12:04:31Z"},"road_event_id":"0fZUOcyK9kYi8bHMdyYqwqRGCQ0=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"wkIbWHcAUPBQwa3XxgNXhyaXVCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xyQ+PtgDqdNKzmqzn7LdCUiDXQ8="},{"type":"next-occurrence","id":"Fbo1i3EgX5qAmS/P2a9wJYQIR3I="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-26T12:04:31Z"},"road_event_id":"wkIbWHcAUPBQwa3XxgNXhyaXVCc=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"Fbo1i3EgX5qAmS/P2a9wJYQIR3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xyQ+PtgDqdNKzmqzn7LdCUiDXQ8="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-26T12:04:31Z"},"road_event_id":"Fbo1i3EgX5qAmS/P2a9wJYQIR3I=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"CTL81aWIsYIwHt/xcWujRgcZxNc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ERQzAOQ1QA5+YutYgYWlnjo+leI="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"CTL81aWIsYIwHt/xcWujRgcZxNc=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"ERQzAOQ1QA5+YutYgYWlnjo+leI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTL81aWIsYIwHt/xcWujRgcZxNc="},{"type":"next-occurrence","id":"gmKzD0laLA/TuSjimk/YfJvo8ws="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"ERQzAOQ1QA5+YutYgYWlnjo+leI=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"gmKzD0laLA/TuSjimk/YfJvo8ws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTL81aWIsYIwHt/xcWujRgcZxNc="},{"type":"next-occurrence","id":"aJCZV3CUu3MNS4cDRH1kbaeWV6A="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"gmKzD0laLA/TuSjimk/YfJvo8ws=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"aJCZV3CUu3MNS4cDRH1kbaeWV6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTL81aWIsYIwHt/xcWujRgcZxNc="},{"type":"next-occurrence","id":"l7fNuEFjMKK2fvPch1wBE4vD51g="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"aJCZV3CUu3MNS4cDRH1kbaeWV6A=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"l7fNuEFjMKK2fvPch1wBE4vD51g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTL81aWIsYIwHt/xcWujRgcZxNc="},{"type":"next-occurrence","id":"lleAvRIw0bYbxg3DHaiXeY+PS1c="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"l7fNuEFjMKK2fvPch1wBE4vD51g=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"lleAvRIw0bYbxg3DHaiXeY+PS1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTL81aWIsYIwHt/xcWujRgcZxNc="},{"type":"next-occurrence","id":"au0FkpQfoJCRd6PCM2IvJhQ4olE="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"lleAvRIw0bYbxg3DHaiXeY+PS1c=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"au0FkpQfoJCRd6PCM2IvJhQ4olE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTL81aWIsYIwHt/xcWujRgcZxNc="},{"type":"next-occurrence","id":"44Voj8W0tvqQ5LqAxuemP3em4eY="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"au0FkpQfoJCRd6PCM2IvJhQ4olE=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"44Voj8W0tvqQ5LqAxuemP3em4eY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTL81aWIsYIwHt/xcWujRgcZxNc="},{"type":"next-occurrence","id":"x9j75+WLGYo6VlBaK7sI2pPS/ks="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"44Voj8W0tvqQ5LqAxuemP3em4eY=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"x9j75+WLGYo6VlBaK7sI2pPS/ks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTL81aWIsYIwHt/xcWujRgcZxNc="},{"type":"next-occurrence","id":"zVWzvl+bx6ttpUfZgSGs0i+dfOk="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"x9j75+WLGYo6VlBaK7sI2pPS/ks=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"zVWzvl+bx6ttpUfZgSGs0i+dfOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTL81aWIsYIwHt/xcWujRgcZxNc="},{"type":"next-occurrence","id":"/XM38qlzrGkJi2SLdLefDKIBHEQ="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"zVWzvl+bx6ttpUfZgSGs0i+dfOk=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"/XM38qlzrGkJi2SLdLefDKIBHEQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTL81aWIsYIwHt/xcWujRgcZxNc="},{"type":"next-occurrence","id":"AtVYCdQqiHIaS1t0DJCfV75TWtg="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"/XM38qlzrGkJi2SLdLefDKIBHEQ=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"AtVYCdQqiHIaS1t0DJCfV75TWtg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTL81aWIsYIwHt/xcWujRgcZxNc="},{"type":"next-occurrence","id":"bJUHLFO++0k+wpF0cDI9QXeXumg="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"AtVYCdQqiHIaS1t0DJCfV75TWtg=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"bJUHLFO++0k+wpF0cDI9QXeXumg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTL81aWIsYIwHt/xcWujRgcZxNc="},{"type":"next-occurrence","id":"RWgqCPTjsKtXPBF+8gy1qJ5S7Yk="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"bJUHLFO++0k+wpF0cDI9QXeXumg=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"RWgqCPTjsKtXPBF+8gy1qJ5S7Yk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTL81aWIsYIwHt/xcWujRgcZxNc="},{"type":"next-occurrence","id":"qcJEPhveYHab3iF6gCxxiBaZWS0="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"RWgqCPTjsKtXPBF+8gy1qJ5S7Yk=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"qcJEPhveYHab3iF6gCxxiBaZWS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTL81aWIsYIwHt/xcWujRgcZxNc="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"qcJEPhveYHab3iF6gCxxiBaZWS0=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"0GKXymmDXr3U+3COobgNCYgFisw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"G0BVJbQe3y0OurIUJw27cyhZEX8="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Road (Putnam Valley) and Exit 37 - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T14:53:26Z"},"road_event_id":"0GKXymmDXr3U+3COobgNCYgFisw=","beginning_cross_street":"Exit 25 - Peekskill Hollow Road","ending_cross_street":"Exit 37 - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"G0BVJbQe3y0OurIUJw27cyhZEX8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GKXymmDXr3U+3COobgNCYgFisw="},{"type":"next-occurrence","id":"Ztv5q4wDm5vyTaRi6h3dIs06iSA="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Road (Putnam Valley) and Exit 37 - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T14:53:26Z"},"road_event_id":"G0BVJbQe3y0OurIUJw27cyhZEX8=","beginning_cross_street":"Exit 25 - Peekskill Hollow Road","ending_cross_street":"Exit 37 - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"Ztv5q4wDm5vyTaRi6h3dIs06iSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GKXymmDXr3U+3COobgNCYgFisw="},{"type":"next-occurrence","id":"EbVfimYFTx01hWBvBAuoH7Td6T0="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Road (Putnam Valley) and Exit 37 - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T14:53:26Z"},"road_event_id":"Ztv5q4wDm5vyTaRi6h3dIs06iSA=","beginning_cross_street":"Exit 25 - Peekskill Hollow Road","ending_cross_street":"Exit 37 - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"EbVfimYFTx01hWBvBAuoH7Td6T0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GKXymmDXr3U+3COobgNCYgFisw="},{"type":"next-occurrence","id":"ihJffvLiy8rp1rAxyNQa70ivKsQ="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Road (Putnam Valley) and Exit 37 - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T14:53:26Z"},"road_event_id":"EbVfimYFTx01hWBvBAuoH7Td6T0=","beginning_cross_street":"Exit 25 - Peekskill Hollow Road","ending_cross_street":"Exit 37 - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"ihJffvLiy8rp1rAxyNQa70ivKsQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GKXymmDXr3U+3COobgNCYgFisw="},{"type":"next-occurrence","id":"4D7r3A4ZRqRzO62YPMI8e9+251s="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Road (Putnam Valley) and Exit 37 - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T14:53:26Z"},"road_event_id":"ihJffvLiy8rp1rAxyNQa70ivKsQ=","beginning_cross_street":"Exit 25 - Peekskill Hollow Road","ending_cross_street":"Exit 37 - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"4D7r3A4ZRqRzO62YPMI8e9+251s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GKXymmDXr3U+3COobgNCYgFisw="},{"type":"next-occurrence","id":"hDLtdyrAWietAl4b4n4X2iLYKmU="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Road (Putnam Valley) and Exit 37 - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T14:53:26Z"},"road_event_id":"4D7r3A4ZRqRzO62YPMI8e9+251s=","beginning_cross_street":"Exit 25 - Peekskill Hollow Road","ending_cross_street":"Exit 37 - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"hDLtdyrAWietAl4b4n4X2iLYKmU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GKXymmDXr3U+3COobgNCYgFisw="},{"type":"next-occurrence","id":"WoFrfHgBhJDCZE4D2N6AWJwSt5g="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Road (Putnam Valley) and Exit 37 - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T14:53:26Z"},"road_event_id":"hDLtdyrAWietAl4b4n4X2iLYKmU=","beginning_cross_street":"Exit 25 - Peekskill Hollow Road","ending_cross_street":"Exit 37 - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"WoFrfHgBhJDCZE4D2N6AWJwSt5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GKXymmDXr3U+3COobgNCYgFisw="},{"type":"next-occurrence","id":"p/PsEXQsUHJSDPVaLWls9NvnOHY="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Road (Putnam Valley) and Exit 37 - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T14:53:26Z"},"road_event_id":"WoFrfHgBhJDCZE4D2N6AWJwSt5g=","beginning_cross_street":"Exit 25 - Peekskill Hollow Road","ending_cross_street":"Exit 37 - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"p/PsEXQsUHJSDPVaLWls9NvnOHY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GKXymmDXr3U+3COobgNCYgFisw="},{"type":"next-occurrence","id":"Jn+oD3SF2JydDgqc8hDu/70+FPY="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Road (Putnam Valley) and Exit 37 - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T14:53:26Z"},"road_event_id":"p/PsEXQsUHJSDPVaLWls9NvnOHY=","beginning_cross_street":"Exit 25 - Peekskill Hollow Road","ending_cross_street":"Exit 37 - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"Jn+oD3SF2JydDgqc8hDu/70+FPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GKXymmDXr3U+3COobgNCYgFisw="},{"type":"next-occurrence","id":"aBJFBsTiFNzy8/nWDD0o34Ii/1g="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Road (Putnam Valley) and Exit 37 - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T14:53:26Z"},"road_event_id":"Jn+oD3SF2JydDgqc8hDu/70+FPY=","beginning_cross_street":"Exit 25 - Peekskill Hollow Road","ending_cross_street":"Exit 37 - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"aBJFBsTiFNzy8/nWDD0o34Ii/1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0GKXymmDXr3U+3COobgNCYgFisw="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Road (Putnam Valley) and Exit 37 - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Monday July 6th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday September 8th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T14:53:26Z"},"road_event_id":"aBJFBsTiFNzy8/nWDD0o34Ii/1g=","beginning_cross_street":"Exit 25 - Peekskill Hollow Road","ending_cross_street":"Exit 37 - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"k+gF+Z0D4CuOKJZg0CqDa0GR/88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0wM/lWYtlyNisS5jXNihT4LTSyE="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37 - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Road (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Monday July 6th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures","update_date":"2026-06-05T14:53:06Z"},"road_event_id":"k+gF+Z0D4CuOKJZg0CqDa0GR/88=","beginning_cross_street":"Exit 37 - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"0wM/lWYtlyNisS5jXNihT4LTSyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k+gF+Z0D4CuOKJZg0CqDa0GR/88="},{"type":"next-occurrence","id":"wmya7Yf5URNCcMTmjSujjDxL0ao="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37 - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Road (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Monday July 6th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures","update_date":"2026-06-05T14:53:06Z"},"road_event_id":"0wM/lWYtlyNisS5jXNihT4LTSyE=","beginning_cross_street":"Exit 37 - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"wmya7Yf5URNCcMTmjSujjDxL0ao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k+gF+Z0D4CuOKJZg0CqDa0GR/88="},{"type":"next-occurrence","id":"XPEM5q/iwjOk5DOOUQpWHd2XAuQ="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37 - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Road (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Monday July 6th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures","update_date":"2026-06-05T14:53:06Z"},"road_event_id":"wmya7Yf5URNCcMTmjSujjDxL0ao=","beginning_cross_street":"Exit 37 - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"XPEM5q/iwjOk5DOOUQpWHd2XAuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k+gF+Z0D4CuOKJZg0CqDa0GR/88="},{"type":"next-occurrence","id":"QPoSg95tOkgCHLUKnq5RGDQWesk="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37 - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Road (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Monday July 6th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures","update_date":"2026-06-05T14:53:06Z"},"road_event_id":"XPEM5q/iwjOk5DOOUQpWHd2XAuQ=","beginning_cross_street":"Exit 37 - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"QPoSg95tOkgCHLUKnq5RGDQWesk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k+gF+Z0D4CuOKJZg0CqDa0GR/88="},{"type":"next-occurrence","id":"ix1TVDx7wk0qscoZkgw5rhWm/zE="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37 - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Road (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Monday July 6th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures","update_date":"2026-06-05T14:53:06Z"},"road_event_id":"QPoSg95tOkgCHLUKnq5RGDQWesk=","beginning_cross_street":"Exit 37 - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"ix1TVDx7wk0qscoZkgw5rhWm/zE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k+gF+Z0D4CuOKJZg0CqDa0GR/88="},{"type":"next-occurrence","id":"31/utkHQiNnM+E2UMQO7iy/nWdg="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37 - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Road (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Monday July 6th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures","update_date":"2026-06-05T14:53:06Z"},"road_event_id":"ix1TVDx7wk0qscoZkgw5rhWm/zE=","beginning_cross_street":"Exit 37 - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"31/utkHQiNnM+E2UMQO7iy/nWdg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k+gF+Z0D4CuOKJZg0CqDa0GR/88="},{"type":"next-occurrence","id":"CMaU6vU7UUM1AA/1ZjgrLdLDvt0="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37 - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Road (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Monday July 6th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures","update_date":"2026-06-05T14:53:06Z"},"road_event_id":"31/utkHQiNnM+E2UMQO7iy/nWdg=","beginning_cross_street":"Exit 37 - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T14:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"CMaU6vU7UUM1AA/1ZjgrLdLDvt0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k+gF+Z0D4CuOKJZg0CqDa0GR/88="},{"type":"next-occurrence","id":"CBvrV2xQ9j4ZtrXImfdpASl0jz8="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37 - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Road (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Monday July 6th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures","update_date":"2026-06-05T14:53:06Z"},"road_event_id":"CMaU6vU7UUM1AA/1ZjgrLdLDvt0=","beginning_cross_street":"Exit 37 - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T14:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"CBvrV2xQ9j4ZtrXImfdpASl0jz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k+gF+Z0D4CuOKJZg0CqDa0GR/88="},{"type":"next-occurrence","id":"kGd05jyS/uErGtd2/bJygVhGFBo="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37 - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Road (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Monday July 6th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures","update_date":"2026-06-05T14:53:06Z"},"road_event_id":"CBvrV2xQ9j4ZtrXImfdpASl0jz8=","beginning_cross_street":"Exit 37 - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T14:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"kGd05jyS/uErGtd2/bJygVhGFBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k+gF+Z0D4CuOKJZg0CqDa0GR/88="},{"type":"next-occurrence","id":"AYWUXy4Sn2o52C7RitEMgQICiJw="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37 - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Road (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Monday July 6th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures","update_date":"2026-06-05T14:53:06Z"},"road_event_id":"kGd05jyS/uErGtd2/bJygVhGFBo=","beginning_cross_street":"Exit 37 - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T14:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"AYWUXy4Sn2o52C7RitEMgQICiJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k+gF+Z0D4CuOKJZg0CqDa0GR/88="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37 - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Road (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Monday July 6th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures, Wednesday September 9th, 2026 thru Friday September 18th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, various lane closures","update_date":"2026-06-05T14:53:06Z"},"road_event_id":"AYWUXy4Sn2o52C7RitEMgQICiJw=","beginning_cross_street":"Exit 37 - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T14:00:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"ORC30136709","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","description":"Road maintenance operations on I-84 eastbound between Exit 41 - NY 9D (Fishkill) and Exit 68 - I-684 (Southeast) Res 8-3 RW/30136709 - This work is weather permitting. Plan travel accordingly; delays may exist Not currently scheduled","update_date":"2026-06-05T18:30:41Z"},"road_event_id":"ORC30136709","beginning_cross_street":"Exit 41 - NY 9D","ending_cross_street":"Exit 68 - I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2023-02-02T21:35:18Z","end_date":"2026-06-06T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.968373,41.518969]]}},{"id":"anMqlYXajVVI06MMwYZb5/gwvW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"b4j0qGLwhIakjoKKEa83AmHsrc4="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"anMqlYXajVVI06MMwYZb5/gwvW0=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"b4j0qGLwhIakjoKKEa83AmHsrc4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"anMqlYXajVVI06MMwYZb5/gwvW0="},{"type":"next-occurrence","id":"5sy+Yx1K0N6p+rpVAD+vcP3LqZ4="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"b4j0qGLwhIakjoKKEa83AmHsrc4=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"5sy+Yx1K0N6p+rpVAD+vcP3LqZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"anMqlYXajVVI06MMwYZb5/gwvW0="},{"type":"next-occurrence","id":"iq4q3VfEhFVim2s1/tuVcS6KZV0="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"5sy+Yx1K0N6p+rpVAD+vcP3LqZ4=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"iq4q3VfEhFVim2s1/tuVcS6KZV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"anMqlYXajVVI06MMwYZb5/gwvW0="},{"type":"next-occurrence","id":"e/4+esx0HZEoXBAO9POymEGwOFU="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"iq4q3VfEhFVim2s1/tuVcS6KZV0=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"e/4+esx0HZEoXBAO9POymEGwOFU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"anMqlYXajVVI06MMwYZb5/gwvW0="},{"type":"next-occurrence","id":"FLi7P24JYytW8r2MxZg94mfPysE="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"e/4+esx0HZEoXBAO9POymEGwOFU=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"FLi7P24JYytW8r2MxZg94mfPysE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"anMqlYXajVVI06MMwYZb5/gwvW0="},{"type":"next-occurrence","id":"expOABNSxi21pWOx0XTDuNBZdXY="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"FLi7P24JYytW8r2MxZg94mfPysE=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"expOABNSxi21pWOx0XTDuNBZdXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"anMqlYXajVVI06MMwYZb5/gwvW0="},{"type":"next-occurrence","id":"narVuGvTORZ3PdRKdoS1afq3SKA="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"expOABNSxi21pWOx0XTDuNBZdXY=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"narVuGvTORZ3PdRKdoS1afq3SKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"anMqlYXajVVI06MMwYZb5/gwvW0="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"narVuGvTORZ3PdRKdoS1afq3SKA=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"MCGnTVjSOWrlSYuoP/ZJNOT4jt0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Palisades Interstate Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on Palisades Interstate Parkway southbound ramp to Exit 9W - I-87 - I-287 (Clarkstown) D265160/32254709 - EXIT RAMP CLOSED TO TRAFFIC - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Tuesday March 25th, 2025 12:00 AM thru Monday November 16th, 2026 12:00 AM ramp closed and detoured","update_date":"2026-03-16T10:25:02Z"},"road_event_id":"MCGnTVjSOWrlSYuoP/ZJNOT4jt0=","beginning_cross_street":"Exit 9W - I-87 - I-287","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995487,41.104079]]}},{"id":"ORC300521951","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 66TH ST"],"direction":"unknown","description":"Construction on W 66TH ST westbound at 65TH ST (New York) Not currently Scheduled","update_date":"2026-03-18T07:00:01Z"},"road_event_id":"ORC300521951","beginning_cross_street":"65TH ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-03-12T16:42:46Z","end_date":"2026-03-19T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.978875,40.772473]]}},{"id":"zhNV7FhMP1lt7VxLGlSq33vOrmw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wVdQualz+MIe3tBddhkfSg1JmLE="}],"description":"Road rehabilitation on US 219 both directions Route 219; Sunnyside Drive (Carrollton) to Cattaraugus County Line (Carrollton), Friday March 13th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-13T19:33:22Z"},"road_event_id":"zhNV7FhMP1lt7VxLGlSq33vOrmw=","beginning_cross_street":"Route 219; Sunnyside Drive","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.635989,42.072287]]}},{"id":"wVdQualz+MIe3tBddhkfSg1JmLE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zhNV7FhMP1lt7VxLGlSq33vOrmw="},{"type":"next-occurrence","id":"8r8fHMnq67jsy3KtQru5B/09vqc="}],"description":"Road rehabilitation on US 219 both directions Route 219; Sunnyside Drive (Carrollton) to Cattaraugus County Line (Carrollton), Friday March 13th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-13T19:33:22Z"},"road_event_id":"wVdQualz+MIe3tBddhkfSg1JmLE=","beginning_cross_street":"Route 219; Sunnyside Drive","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T04:00:00Z","end_date":"2026-06-13T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.635989,42.072287]]}},{"id":"8r8fHMnq67jsy3KtQru5B/09vqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zhNV7FhMP1lt7VxLGlSq33vOrmw="}],"description":"Road rehabilitation on US 219 both directions Route 219; Sunnyside Drive (Carrollton) to Cattaraugus County Line (Carrollton), Friday March 13th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-13T19:33:22Z"},"road_event_id":"8r8fHMnq67jsy3KtQru5B/09vqc=","beginning_cross_street":"Route 219; Sunnyside Drive","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T04:00:00Z","end_date":"2026-06-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.635989,42.072287]]}},{"id":"ZmH2+B6COEM6hs0bkVtnKf0beqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound ramp from W/B I-287 (Greenburgh) D265281/32709309 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Sunday March 1st, 2026 12:00 AM thru Tuesday June 30th, 2026 12:00 PM ramp closed and detoured","update_date":"2026-03-16T14:26:41Z"},"road_event_id":"ZmH2+B6COEM6hs0bkVtnKf0beqk=","beginning_cross_street":"W/B I-287","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.809031,41.056626]]}},{"id":"OobnkhnEZEJnWCHtVn3NBM65G6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on US 9W both directions between NY 218 (Highlands) and Mountain Road (Cornwall) D265262/32427409 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Continuous Sunday March 30th, 2025 12:00 AM thru Friday September 4th, 2026 12:00 AM right lane closed to traffic","update_date":"2026-03-16T13:43:22Z"},"road_event_id":"OobnkhnEZEJnWCHtVn3NBM65G6c=","beginning_cross_street":"NY 218","ending_cross_street":"Mountain Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983618,41.37714]]}},{"id":"ORC300522700","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JFK Expressway"],"direction":"unknown","description":"Scheduled roadwork on JFK Expressway southbound ramp to Terminal 8 Arrivals (New York) Not currently Scheduled","update_date":"2026-03-19T12:30:00Z"},"road_event_id":"ORC300522700","beginning_cross_street":"Terminal 8 Arrivals ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-03-16T16:13:52Z","end_date":"2026-03-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.786656,40.647841]]}},{"id":"ORC300522702","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Van Wyck Expressway"],"direction":"unknown","description":"Scheduled roadwork on Van Wyck Expressway southbound ramp to Exit C - Federal Circle (New York) Not currently Scheduled","update_date":"2026-04-09T03:59:01Z"},"road_event_id":"ORC300522702","beginning_cross_street":"Exit C - Federal Circle ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-03-16T16:19:32Z","end_date":"2026-04-09T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.805984,40.660718]]}},{"id":"9Yxa7h0vj6mOcmQe/NkwfgefV2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LaiVacEDRrgItHsOhWXX2+eITFs="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"9Yxa7h0vj6mOcmQe/NkwfgefV2A=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"LaiVacEDRrgItHsOhWXX2+eITFs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Yxa7h0vj6mOcmQe/NkwfgefV2A="},{"type":"next-occurrence","id":"kC2PRV7gKVJo8jQx0udQS6r4O9E="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"LaiVacEDRrgItHsOhWXX2+eITFs=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"kC2PRV7gKVJo8jQx0udQS6r4O9E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Yxa7h0vj6mOcmQe/NkwfgefV2A="},{"type":"next-occurrence","id":"lstc6xcWtWGi7xhHrKhAFxGSMk8="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"kC2PRV7gKVJo8jQx0udQS6r4O9E=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"lstc6xcWtWGi7xhHrKhAFxGSMk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Yxa7h0vj6mOcmQe/NkwfgefV2A="},{"type":"next-occurrence","id":"I2k3v5PbC3DNy95CPI/LdzlQJOg="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"lstc6xcWtWGi7xhHrKhAFxGSMk8=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"I2k3v5PbC3DNy95CPI/LdzlQJOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Yxa7h0vj6mOcmQe/NkwfgefV2A="},{"type":"next-occurrence","id":"2A+zhtIWdmZxtTDbDvZwRVVruqU="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"I2k3v5PbC3DNy95CPI/LdzlQJOg=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"2A+zhtIWdmZxtTDbDvZwRVVruqU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Yxa7h0vj6mOcmQe/NkwfgefV2A="},{"type":"next-occurrence","id":"FUGsTJDA/xWoNTsa76Dy/3mtuyE="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"2A+zhtIWdmZxtTDbDvZwRVVruqU=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"FUGsTJDA/xWoNTsa76Dy/3mtuyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Yxa7h0vj6mOcmQe/NkwfgefV2A="},{"type":"next-occurrence","id":"8ZwWNQQaIAqmssdQjdyNl41aXA4="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"FUGsTJDA/xWoNTsa76Dy/3mtuyE=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"8ZwWNQQaIAqmssdQjdyNl41aXA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Yxa7h0vj6mOcmQe/NkwfgefV2A="},{"type":"next-occurrence","id":"vuUId86KHpK9F39S4BXKrjWg6lE="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"8ZwWNQQaIAqmssdQjdyNl41aXA4=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"vuUId86KHpK9F39S4BXKrjWg6lE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Yxa7h0vj6mOcmQe/NkwfgefV2A="},{"type":"next-occurrence","id":"tUiKJ9+L41aTSbmINDLxhBMCO7g="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"vuUId86KHpK9F39S4BXKrjWg6lE=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"tUiKJ9+L41aTSbmINDLxhBMCO7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Yxa7h0vj6mOcmQe/NkwfgefV2A="},{"type":"next-occurrence","id":"nJOHiIFv1U4a0p6EoH8aUDDSWDY="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"tUiKJ9+L41aTSbmINDLxhBMCO7g=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"nJOHiIFv1U4a0p6EoH8aUDDSWDY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9Yxa7h0vj6mOcmQe/NkwfgefV2A="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Saturday May 30th,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-29T22:00:05Z"},"road_event_id":"nJOHiIFv1U4a0p6EoH8aUDDSWDY=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"7KV6ncComMeEL83Xn91OnXhEaQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Cr2RPVRTE/eO2sCxLsqXZzd+HRk="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"7KV6ncComMeEL83Xn91OnXhEaQw=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"Cr2RPVRTE/eO2sCxLsqXZzd+HRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7KV6ncComMeEL83Xn91OnXhEaQw="},{"type":"next-occurrence","id":"AhQk6yU8S8u6Jxx31gZiLNfpOV8="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"Cr2RPVRTE/eO2sCxLsqXZzd+HRk=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"AhQk6yU8S8u6Jxx31gZiLNfpOV8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7KV6ncComMeEL83Xn91OnXhEaQw="},{"type":"next-occurrence","id":"qPSzHiPfh0M4yeQN52s0P5cv8Ys="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"AhQk6yU8S8u6Jxx31gZiLNfpOV8=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"qPSzHiPfh0M4yeQN52s0P5cv8Ys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7KV6ncComMeEL83Xn91OnXhEaQw="},{"type":"next-occurrence","id":"8vuVIkS6yrb8uqOqlLQxVW6Wtbw="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"qPSzHiPfh0M4yeQN52s0P5cv8Ys=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"8vuVIkS6yrb8uqOqlLQxVW6Wtbw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7KV6ncComMeEL83Xn91OnXhEaQw="},{"type":"next-occurrence","id":"Xoi4Z5JilLzh9fs+xnDiEJWMxak="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"8vuVIkS6yrb8uqOqlLQxVW6Wtbw=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"Xoi4Z5JilLzh9fs+xnDiEJWMxak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7KV6ncComMeEL83Xn91OnXhEaQw="},{"type":"next-occurrence","id":"SFv6QWkJII+LYU52M7RSqe4eEYQ="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"Xoi4Z5JilLzh9fs+xnDiEJWMxak=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"SFv6QWkJII+LYU52M7RSqe4eEYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7KV6ncComMeEL83Xn91OnXhEaQw="},{"type":"next-occurrence","id":"bnXPjOGqWkAJdrlZDYy1dEBjORc="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"SFv6QWkJII+LYU52M7RSqe4eEYQ=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"bnXPjOGqWkAJdrlZDYy1dEBjORc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7KV6ncComMeEL83Xn91OnXhEaQw="},{"type":"next-occurrence","id":"YbPz+oSU5pDl96NhXLrqxjGqucI="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"bnXPjOGqWkAJdrlZDYy1dEBjORc=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"YbPz+oSU5pDl96NhXLrqxjGqucI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7KV6ncComMeEL83Xn91OnXhEaQw="},{"type":"next-occurrence","id":"Wvt19Drln/0XKfjAOrOpwXOQyOY="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"YbPz+oSU5pDl96NhXLrqxjGqucI=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"Wvt19Drln/0XKfjAOrOpwXOQyOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7KV6ncComMeEL83Xn91OnXhEaQw="},{"type":"next-occurrence","id":"Rs9Rs9THGWYjsaZpiQmx/Dnebao="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"Wvt19Drln/0XKfjAOrOpwXOQyOY=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"Rs9Rs9THGWYjsaZpiQmx/Dnebao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7KV6ncComMeEL83Xn91OnXhEaQw="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"Rs9Rs9THGWYjsaZpiQmx/Dnebao=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"5IOgp8bHm6IeUWPvk5ySxBEU2R8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sn3ZiKtLdT9gEGmw6l85LpG3h4Q="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"5IOgp8bHm6IeUWPvk5ySxBEU2R8=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"sn3ZiKtLdT9gEGmw6l85LpG3h4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5IOgp8bHm6IeUWPvk5ySxBEU2R8="},{"type":"next-occurrence","id":"dJ0L2ImYOIpilWFYPzstNDUTg0k="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"sn3ZiKtLdT9gEGmw6l85LpG3h4Q=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"dJ0L2ImYOIpilWFYPzstNDUTg0k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5IOgp8bHm6IeUWPvk5ySxBEU2R8="},{"type":"next-occurrence","id":"yC/iFgabT4K0cGhiILx2d2l5yJQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"dJ0L2ImYOIpilWFYPzstNDUTg0k=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"yC/iFgabT4K0cGhiILx2d2l5yJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5IOgp8bHm6IeUWPvk5ySxBEU2R8="},{"type":"next-occurrence","id":"AHNKZId0zriw0A8jOSGO6h/fq5c="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"yC/iFgabT4K0cGhiILx2d2l5yJQ=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"AHNKZId0zriw0A8jOSGO6h/fq5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5IOgp8bHm6IeUWPvk5ySxBEU2R8="},{"type":"next-occurrence","id":"1TlLzjDt+L2nZYHXGKl3yRzdNkA="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"AHNKZId0zriw0A8jOSGO6h/fq5c=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"1TlLzjDt+L2nZYHXGKl3yRzdNkA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5IOgp8bHm6IeUWPvk5ySxBEU2R8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"1TlLzjDt+L2nZYHXGKl3yRzdNkA=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"MMdmm60qUuaJDlSgonPRVPZeTOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0Blb7QmOMty1A3uaKtel7Ec+UuQ="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"MMdmm60qUuaJDlSgonPRVPZeTOk=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"0Blb7QmOMty1A3uaKtel7Ec+UuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MMdmm60qUuaJDlSgonPRVPZeTOk="},{"type":"next-occurrence","id":"IrpEh3ffn52dgSD4yDe/qAH9Pgo="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"0Blb7QmOMty1A3uaKtel7Ec+UuQ=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"IrpEh3ffn52dgSD4yDe/qAH9Pgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MMdmm60qUuaJDlSgonPRVPZeTOk="},{"type":"next-occurrence","id":"jMekp9Nw+Ytj9U3iXXWI0mOk7hw="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"IrpEh3ffn52dgSD4yDe/qAH9Pgo=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"jMekp9Nw+Ytj9U3iXXWI0mOk7hw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MMdmm60qUuaJDlSgonPRVPZeTOk="},{"type":"next-occurrence","id":"WlvCIMaMbLw6zCYTdn6nlE/U0dQ="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"jMekp9Nw+Ytj9U3iXXWI0mOk7hw=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"WlvCIMaMbLw6zCYTdn6nlE/U0dQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MMdmm60qUuaJDlSgonPRVPZeTOk="},{"type":"next-occurrence","id":"iPPINaWGWK8EU+k/NMR9dlNzD78="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"WlvCIMaMbLw6zCYTdn6nlE/U0dQ=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"iPPINaWGWK8EU+k/NMR9dlNzD78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MMdmm60qUuaJDlSgonPRVPZeTOk="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"iPPINaWGWK8EU+k/NMR9dlNzD78=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"4fxZYSvJBee98ynQ1eAnlQn6hc4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XaRXmwkTdtJ2iFOlKyeoXy2LbZg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"4fxZYSvJBee98ynQ1eAnlQn6hc4=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"XaRXmwkTdtJ2iFOlKyeoXy2LbZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4fxZYSvJBee98ynQ1eAnlQn6hc4="},{"type":"next-occurrence","id":"bC3hYv0xUqafqzR+CNvtH04hA8I="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"XaRXmwkTdtJ2iFOlKyeoXy2LbZg=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"bC3hYv0xUqafqzR+CNvtH04hA8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4fxZYSvJBee98ynQ1eAnlQn6hc4="},{"type":"next-occurrence","id":"X6dgLmuwReUk++2QTIUyei+qFAk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"bC3hYv0xUqafqzR+CNvtH04hA8I=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"X6dgLmuwReUk++2QTIUyei+qFAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4fxZYSvJBee98ynQ1eAnlQn6hc4="},{"type":"next-occurrence","id":"U50EurJXi2eCzd3ebh8WQPS4+QM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"X6dgLmuwReUk++2QTIUyei+qFAk=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"U50EurJXi2eCzd3ebh8WQPS4+QM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4fxZYSvJBee98ynQ1eAnlQn6hc4="},{"type":"next-occurrence","id":"+BFW6/gYR6LutMCh0UFSM8GC8KY="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"U50EurJXi2eCzd3ebh8WQPS4+QM=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"+BFW6/gYR6LutMCh0UFSM8GC8KY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4fxZYSvJBee98ynQ1eAnlQn6hc4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"+BFW6/gYR6LutMCh0UFSM8GC8KY=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"GiFkQGQAjCARYCm/MHQB0S7jo88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"diV0GrdrIZP/FX9c3CiEf0Coyc0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"GiFkQGQAjCARYCm/MHQB0S7jo88=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"diV0GrdrIZP/FX9c3CiEf0Coyc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GiFkQGQAjCARYCm/MHQB0S7jo88="},{"type":"next-occurrence","id":"t8oY7/gRlHCmQAVA1uWvG3Wevh4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"diV0GrdrIZP/FX9c3CiEf0Coyc0=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"t8oY7/gRlHCmQAVA1uWvG3Wevh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GiFkQGQAjCARYCm/MHQB0S7jo88="},{"type":"next-occurrence","id":"tKweTtjp4tocrBMhkB298LyJgb4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"t8oY7/gRlHCmQAVA1uWvG3Wevh4=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"tKweTtjp4tocrBMhkB298LyJgb4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GiFkQGQAjCARYCm/MHQB0S7jo88="},{"type":"next-occurrence","id":"wLrMKyTse29jMEzE60cwLG8ZD/I="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"tKweTtjp4tocrBMhkB298LyJgb4=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"wLrMKyTse29jMEzE60cwLG8ZD/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GiFkQGQAjCARYCm/MHQB0S7jo88="},{"type":"next-occurrence","id":"0P4uuNUxX+24Vg82ycjwS15y8kI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"wLrMKyTse29jMEzE60cwLG8ZD/I=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"0P4uuNUxX+24Vg82ycjwS15y8kI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GiFkQGQAjCARYCm/MHQB0S7jo88="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"0P4uuNUxX+24Vg82ycjwS15y8kI=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"OmY6jEMkyZa7KYg1WgU0eB9wLb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aSaPCnQCUcRsAYJVUZUkrT7ouL8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"OmY6jEMkyZa7KYg1WgU0eB9wLb8=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"aSaPCnQCUcRsAYJVUZUkrT7ouL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OmY6jEMkyZa7KYg1WgU0eB9wLb8="},{"type":"next-occurrence","id":"khJqHb08jUROjYu7gTu9sJY+I6I="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"aSaPCnQCUcRsAYJVUZUkrT7ouL8=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"khJqHb08jUROjYu7gTu9sJY+I6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OmY6jEMkyZa7KYg1WgU0eB9wLb8="},{"type":"next-occurrence","id":"sVbHVHqEiBneEL73NjsE2e7ssa8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"khJqHb08jUROjYu7gTu9sJY+I6I=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"sVbHVHqEiBneEL73NjsE2e7ssa8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OmY6jEMkyZa7KYg1WgU0eB9wLb8="},{"type":"next-occurrence","id":"fGxjMN2QjZtBOpgquyrTbN/InMg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"sVbHVHqEiBneEL73NjsE2e7ssa8=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"fGxjMN2QjZtBOpgquyrTbN/InMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OmY6jEMkyZa7KYg1WgU0eB9wLb8="},{"type":"next-occurrence","id":"f4vKcbagqG5RRlZBO4KU5zSktb8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"fGxjMN2QjZtBOpgquyrTbN/InMg=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"f4vKcbagqG5RRlZBO4KU5zSktb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OmY6jEMkyZa7KYg1WgU0eB9wLb8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"f4vKcbagqG5RRlZBO4KU5zSktb8=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"ole5QP9IpGDGHtbYolA6oLyoyGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AC/ApCMxg+Fp4BSobg9Au0h9U1k="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"ole5QP9IpGDGHtbYolA6oLyoyGM=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"AC/ApCMxg+Fp4BSobg9Au0h9U1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ole5QP9IpGDGHtbYolA6oLyoyGM="},{"type":"next-occurrence","id":"1JqZhp4auqYHGi39HvbLGwF/uq8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"AC/ApCMxg+Fp4BSobg9Au0h9U1k=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"1JqZhp4auqYHGi39HvbLGwF/uq8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ole5QP9IpGDGHtbYolA6oLyoyGM="},{"type":"next-occurrence","id":"NSu2WWxYdreZ1As9egRU7CdQZ3U="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"1JqZhp4auqYHGi39HvbLGwF/uq8=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"NSu2WWxYdreZ1As9egRU7CdQZ3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ole5QP9IpGDGHtbYolA6oLyoyGM="},{"type":"next-occurrence","id":"47ahcsi+uRMgOk0M6iGv2tdLLGQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"NSu2WWxYdreZ1As9egRU7CdQZ3U=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"47ahcsi+uRMgOk0M6iGv2tdLLGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ole5QP9IpGDGHtbYolA6oLyoyGM="},{"type":"next-occurrence","id":"h4seKNkV3VJnciNJIGL2t42CA8w="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"47ahcsi+uRMgOk0M6iGv2tdLLGQ=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"h4seKNkV3VJnciNJIGL2t42CA8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ole5QP9IpGDGHtbYolA6oLyoyGM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"h4seKNkV3VJnciNJIGL2t42CA8w=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"JcPQMbcEn00sUEpsPwPJU6ibUWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Ey9iIE7p70l7/i1NRz8c1fRo768="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"JcPQMbcEn00sUEpsPwPJU6ibUWs=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"Ey9iIE7p70l7/i1NRz8c1fRo768=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JcPQMbcEn00sUEpsPwPJU6ibUWs="},{"type":"next-occurrence","id":"Xt0cnhXRAvnm2GDK86IybffEANQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"Ey9iIE7p70l7/i1NRz8c1fRo768=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"Xt0cnhXRAvnm2GDK86IybffEANQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JcPQMbcEn00sUEpsPwPJU6ibUWs="},{"type":"next-occurrence","id":"vKwAudIj5EsJuEPMgTHPuadxaB8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"Xt0cnhXRAvnm2GDK86IybffEANQ=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"vKwAudIj5EsJuEPMgTHPuadxaB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JcPQMbcEn00sUEpsPwPJU6ibUWs="},{"type":"next-occurrence","id":"JzvUEhv4Ex2UIFFH5tgZIlobLHI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"vKwAudIj5EsJuEPMgTHPuadxaB8=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"JzvUEhv4Ex2UIFFH5tgZIlobLHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JcPQMbcEn00sUEpsPwPJU6ibUWs="},{"type":"next-occurrence","id":"fIiFr/teXQz1FBaY0tTRowWpzI8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"JzvUEhv4Ex2UIFFH5tgZIlobLHI=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"fIiFr/teXQz1FBaY0tTRowWpzI8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JcPQMbcEn00sUEpsPwPJU6ibUWs="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"fIiFr/teXQz1FBaY0tTRowWpzI8=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"p+d5fv+lM1IWY3j1ChJaPx0IBUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bDbAaC7jfaGuNqD63BV9KFJyMKI="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"p+d5fv+lM1IWY3j1ChJaPx0IBUM=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"bDbAaC7jfaGuNqD63BV9KFJyMKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p+d5fv+lM1IWY3j1ChJaPx0IBUM="},{"type":"next-occurrence","id":"DSDVLAptLUujrjZB0MyeH+x8nLs="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"bDbAaC7jfaGuNqD63BV9KFJyMKI=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"DSDVLAptLUujrjZB0MyeH+x8nLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p+d5fv+lM1IWY3j1ChJaPx0IBUM="},{"type":"next-occurrence","id":"Sf/8M+JVrgZdrJIs/MrKvKa/wXI="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"DSDVLAptLUujrjZB0MyeH+x8nLs=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"Sf/8M+JVrgZdrJIs/MrKvKa/wXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p+d5fv+lM1IWY3j1ChJaPx0IBUM="},{"type":"next-occurrence","id":"ea3uvUooUTXvgvD++B+tb7INeJA="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"Sf/8M+JVrgZdrJIs/MrKvKa/wXI=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"ea3uvUooUTXvgvD++B+tb7INeJA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p+d5fv+lM1IWY3j1ChJaPx0IBUM="},{"type":"next-occurrence","id":"2L1YWCQ47ijCrjzJ1s4VYI/Qnfs="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"ea3uvUooUTXvgvD++B+tb7INeJA=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"2L1YWCQ47ijCrjzJ1s4VYI/Qnfs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p+d5fv+lM1IWY3j1ChJaPx0IBUM="},{"type":"next-occurrence","id":"7xHj8gMrtu25k1LqexocOH0e24s="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"2L1YWCQ47ijCrjzJ1s4VYI/Qnfs=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"7xHj8gMrtu25k1LqexocOH0e24s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p+d5fv+lM1IWY3j1ChJaPx0IBUM="},{"type":"next-occurrence","id":"ETcBpCJC/4bvK4Obm0zIfL126N8="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"7xHj8gMrtu25k1LqexocOH0e24s=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"ETcBpCJC/4bvK4Obm0zIfL126N8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p+d5fv+lM1IWY3j1ChJaPx0IBUM="},{"type":"next-occurrence","id":"4kZIRSqzPkGdmlTFLdHOr9H6z/U="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"ETcBpCJC/4bvK4Obm0zIfL126N8=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"4kZIRSqzPkGdmlTFLdHOr9H6z/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p+d5fv+lM1IWY3j1ChJaPx0IBUM="},{"type":"next-occurrence","id":"+fwG5AZArmAlmurHh3EA89QsJAY="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"4kZIRSqzPkGdmlTFLdHOr9H6z/U=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"+fwG5AZArmAlmurHh3EA89QsJAY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p+d5fv+lM1IWY3j1ChJaPx0IBUM="},{"type":"next-occurrence","id":"ikhLEyUovMK9hNMAyUTu6kAYf4A="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"+fwG5AZArmAlmurHh3EA89QsJAY=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"ikhLEyUovMK9hNMAyUTu6kAYf4A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p+d5fv+lM1IWY3j1ChJaPx0IBUM="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"ikhLEyUovMK9hNMAyUTu6kAYf4A=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"OncKQ2UzfxKr8eMd7k5tr/P3QFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xRp6L9PeYN820kUxbAKnwBrZ1ug="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"OncKQ2UzfxKr8eMd7k5tr/P3QFQ=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"xRp6L9PeYN820kUxbAKnwBrZ1ug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OncKQ2UzfxKr8eMd7k5tr/P3QFQ="},{"type":"next-occurrence","id":"pgW9AS8a0zfG7yWPnoc+MPf1C9g="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"xRp6L9PeYN820kUxbAKnwBrZ1ug=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"pgW9AS8a0zfG7yWPnoc+MPf1C9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OncKQ2UzfxKr8eMd7k5tr/P3QFQ="},{"type":"next-occurrence","id":"emRdaZhQV0ZjnIN5+gAYuW1zC1s="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"pgW9AS8a0zfG7yWPnoc+MPf1C9g=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"emRdaZhQV0ZjnIN5+gAYuW1zC1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OncKQ2UzfxKr8eMd7k5tr/P3QFQ="},{"type":"next-occurrence","id":"nObKHAUjnMU15iSMHDQk6Tn7Lw0="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"emRdaZhQV0ZjnIN5+gAYuW1zC1s=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"nObKHAUjnMU15iSMHDQk6Tn7Lw0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OncKQ2UzfxKr8eMd7k5tr/P3QFQ="},{"type":"next-occurrence","id":"3P28JFJo9ezrtqVzsuKUT4RugR4="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"nObKHAUjnMU15iSMHDQk6Tn7Lw0=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"3P28JFJo9ezrtqVzsuKUT4RugR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OncKQ2UzfxKr8eMd7k5tr/P3QFQ="},{"type":"next-occurrence","id":"qVXEF0fVeNJuOFLsR1ctWBaPE2U="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"3P28JFJo9ezrtqVzsuKUT4RugR4=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"qVXEF0fVeNJuOFLsR1ctWBaPE2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OncKQ2UzfxKr8eMd7k5tr/P3QFQ="},{"type":"next-occurrence","id":"3tOGgnMlBFFmP7pw3rM5u7O1gdw="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"qVXEF0fVeNJuOFLsR1ctWBaPE2U=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"3tOGgnMlBFFmP7pw3rM5u7O1gdw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OncKQ2UzfxKr8eMd7k5tr/P3QFQ="},{"type":"next-occurrence","id":"0AuzYiNoE00yVSXCBBwziEkvgbk="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"3tOGgnMlBFFmP7pw3rM5u7O1gdw=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"0AuzYiNoE00yVSXCBBwziEkvgbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OncKQ2UzfxKr8eMd7k5tr/P3QFQ="},{"type":"next-occurrence","id":"9O8gSrqqjFBe5BU7sxQcH2xZiP4="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"0AuzYiNoE00yVSXCBBwziEkvgbk=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"9O8gSrqqjFBe5BU7sxQcH2xZiP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OncKQ2UzfxKr8eMd7k5tr/P3QFQ="},{"type":"next-occurrence","id":"Rr7eoth8t05csMw/K0tSzVtEEeE="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"9O8gSrqqjFBe5BU7sxQcH2xZiP4=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"Rr7eoth8t05csMw/K0tSzVtEEeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OncKQ2UzfxKr8eMd7k5tr/P3QFQ="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"Rr7eoth8t05csMw/K0tSzVtEEeE=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"0Qd13CfZD3nMjQsNvgvfflUAgo0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Umasen5nPBUtEv8A2dsgYUUcgak="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"0Qd13CfZD3nMjQsNvgvfflUAgo0=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"Umasen5nPBUtEv8A2dsgYUUcgak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Qd13CfZD3nMjQsNvgvfflUAgo0="},{"type":"next-occurrence","id":"+KjCOrUa68nCAWtTh3GlMkcyOu4="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"Umasen5nPBUtEv8A2dsgYUUcgak=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"+KjCOrUa68nCAWtTh3GlMkcyOu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Qd13CfZD3nMjQsNvgvfflUAgo0="},{"type":"next-occurrence","id":"/1t7GgDQGTsFHiaJp5agr1QcrrU="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"+KjCOrUa68nCAWtTh3GlMkcyOu4=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"/1t7GgDQGTsFHiaJp5agr1QcrrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Qd13CfZD3nMjQsNvgvfflUAgo0="},{"type":"next-occurrence","id":"tlbT6nUZ5cGJMOA7ROQNh6eqRts="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"/1t7GgDQGTsFHiaJp5agr1QcrrU=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"tlbT6nUZ5cGJMOA7ROQNh6eqRts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Qd13CfZD3nMjQsNvgvfflUAgo0="},{"type":"next-occurrence","id":"KnqkkqMuCqWUsGa50uFjSEjqXHs="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"tlbT6nUZ5cGJMOA7ROQNh6eqRts=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"KnqkkqMuCqWUsGa50uFjSEjqXHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Qd13CfZD3nMjQsNvgvfflUAgo0="},{"type":"next-occurrence","id":"JfF2TM8tts4Jl/VRcpzAfVPZLxA="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"KnqkkqMuCqWUsGa50uFjSEjqXHs=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"JfF2TM8tts4Jl/VRcpzAfVPZLxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Qd13CfZD3nMjQsNvgvfflUAgo0="},{"type":"next-occurrence","id":"DVDwap1C4B0gNQQb6LfeKualH5o="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"JfF2TM8tts4Jl/VRcpzAfVPZLxA=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"DVDwap1C4B0gNQQb6LfeKualH5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Qd13CfZD3nMjQsNvgvfflUAgo0="},{"type":"next-occurrence","id":"21EFAljVexbhkDZZoPFnIk71tGQ="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"DVDwap1C4B0gNQQb6LfeKualH5o=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"21EFAljVexbhkDZZoPFnIk71tGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Qd13CfZD3nMjQsNvgvfflUAgo0="},{"type":"next-occurrence","id":"fL6Fs+lfMqOx6veNbS+umSfvHGU="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"21EFAljVexbhkDZZoPFnIk71tGQ=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"fL6Fs+lfMqOx6veNbS+umSfvHGU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Qd13CfZD3nMjQsNvgvfflUAgo0="},{"type":"next-occurrence","id":"lhn0Qh5w+V8iVeoSOf9OipjAtGM="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"fL6Fs+lfMqOx6veNbS+umSfvHGU=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"lhn0Qh5w+V8iVeoSOf9OipjAtGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Qd13CfZD3nMjQsNvgvfflUAgo0="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"lhn0Qh5w+V8iVeoSOf9OipjAtGM=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"WOolESgt9mJi8mxa38/H9F8ezcs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2BFX2N1vsIRTlDs9QgPMDgigMwM="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"WOolESgt9mJi8mxa38/H9F8ezcs=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"2BFX2N1vsIRTlDs9QgPMDgigMwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WOolESgt9mJi8mxa38/H9F8ezcs="},{"type":"next-occurrence","id":"XJ8G+Fua8xZes/HRTJTvkco1Hsg="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"2BFX2N1vsIRTlDs9QgPMDgigMwM=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"XJ8G+Fua8xZes/HRTJTvkco1Hsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WOolESgt9mJi8mxa38/H9F8ezcs="},{"type":"next-occurrence","id":"BjRCK3055zoQ7Gj47JPbU6SuYSE="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"XJ8G+Fua8xZes/HRTJTvkco1Hsg=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"BjRCK3055zoQ7Gj47JPbU6SuYSE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WOolESgt9mJi8mxa38/H9F8ezcs="},{"type":"next-occurrence","id":"AHpSvV2bffDFboT1GkqtiKkjg7o="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"BjRCK3055zoQ7Gj47JPbU6SuYSE=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"AHpSvV2bffDFboT1GkqtiKkjg7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WOolESgt9mJi8mxa38/H9F8ezcs="},{"type":"next-occurrence","id":"YI05F91YqdSJXHDOhnd2F/7NB6k="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"AHpSvV2bffDFboT1GkqtiKkjg7o=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"YI05F91YqdSJXHDOhnd2F/7NB6k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WOolESgt9mJi8mxa38/H9F8ezcs="},{"type":"next-occurrence","id":"GrL/RpSgwl1s44gIwaEMJa5Ve7M="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"YI05F91YqdSJXHDOhnd2F/7NB6k=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"GrL/RpSgwl1s44gIwaEMJa5Ve7M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WOolESgt9mJi8mxa38/H9F8ezcs="},{"type":"next-occurrence","id":"evMefv96I/R6qBvGv5dLeB3Ilfc="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"GrL/RpSgwl1s44gIwaEMJa5Ve7M=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"evMefv96I/R6qBvGv5dLeB3Ilfc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WOolESgt9mJi8mxa38/H9F8ezcs="},{"type":"next-occurrence","id":"YdnD0GCAvib3ZEIpduNFKrUJpug="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"evMefv96I/R6qBvGv5dLeB3Ilfc=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"YdnD0GCAvib3ZEIpduNFKrUJpug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WOolESgt9mJi8mxa38/H9F8ezcs="},{"type":"next-occurrence","id":"qk+1JPCik1AqTGF3gMMseVuoo/g="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"YdnD0GCAvib3ZEIpduNFKrUJpug=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"qk+1JPCik1AqTGF3gMMseVuoo/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WOolESgt9mJi8mxa38/H9F8ezcs="},{"type":"next-occurrence","id":"nWEqISUF9NPXKV/bg8BJOg9uJyY="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"qk+1JPCik1AqTGF3gMMseVuoo/g=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"nWEqISUF9NPXKV/bg8BJOg9uJyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WOolESgt9mJi8mxa38/H9F8ezcs="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"nWEqISUF9NPXKV/bg8BJOg9uJyY=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"0yagltg7UJEbNs5GjN0LxNZ7D1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AjRlnrZFR37ivBnbvCsA8ysXnJM="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"0yagltg7UJEbNs5GjN0LxNZ7D1o=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"AjRlnrZFR37ivBnbvCsA8ysXnJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0yagltg7UJEbNs5GjN0LxNZ7D1o="},{"type":"next-occurrence","id":"13R1MUoHDWVoLcvqazhJzNiyuBM="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"AjRlnrZFR37ivBnbvCsA8ysXnJM=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"13R1MUoHDWVoLcvqazhJzNiyuBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0yagltg7UJEbNs5GjN0LxNZ7D1o="},{"type":"next-occurrence","id":"iCCSAF9KXvsipYW7erOevGFiszk="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"13R1MUoHDWVoLcvqazhJzNiyuBM=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"iCCSAF9KXvsipYW7erOevGFiszk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0yagltg7UJEbNs5GjN0LxNZ7D1o="},{"type":"next-occurrence","id":"Nq2gdLR8V7G4dSkFicZTRo747AM="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"iCCSAF9KXvsipYW7erOevGFiszk=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"Nq2gdLR8V7G4dSkFicZTRo747AM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0yagltg7UJEbNs5GjN0LxNZ7D1o="},{"type":"next-occurrence","id":"BTaCo//BY67/n/6Jw+3QxaHM//o="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"Nq2gdLR8V7G4dSkFicZTRo747AM=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"BTaCo//BY67/n/6Jw+3QxaHM//o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0yagltg7UJEbNs5GjN0LxNZ7D1o="},{"type":"next-occurrence","id":"WXX5MblpE54FD3fNAZ/MoCjjVNg="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"BTaCo//BY67/n/6Jw+3QxaHM//o=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"WXX5MblpE54FD3fNAZ/MoCjjVNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0yagltg7UJEbNs5GjN0LxNZ7D1o="},{"type":"next-occurrence","id":"cMgZ+2r7efEbTCDZ/P3xwp56P4A="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"WXX5MblpE54FD3fNAZ/MoCjjVNg=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"cMgZ+2r7efEbTCDZ/P3xwp56P4A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0yagltg7UJEbNs5GjN0LxNZ7D1o="},{"type":"next-occurrence","id":"j9GZVsmrbxlmgdngbfOtSjslJbU="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"cMgZ+2r7efEbTCDZ/P3xwp56P4A=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"j9GZVsmrbxlmgdngbfOtSjslJbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0yagltg7UJEbNs5GjN0LxNZ7D1o="},{"type":"next-occurrence","id":"ZC7ROkAVqCeMnm6/9IQsleAXn0A="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"j9GZVsmrbxlmgdngbfOtSjslJbU=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"ZC7ROkAVqCeMnm6/9IQsleAXn0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0yagltg7UJEbNs5GjN0LxNZ7D1o="},{"type":"next-occurrence","id":"qGq2Z/qz3FaOm21eCn3jd1as3lM="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"ZC7ROkAVqCeMnm6/9IQsleAXn0A=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"qGq2Z/qz3FaOm21eCn3jd1as3lM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0yagltg7UJEbNs5GjN0LxNZ7D1o="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T20:00:06Z"},"road_event_id":"qGq2Z/qz3FaOm21eCn3jd1as3lM=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"B0kS3ikrKORt9MuuxHLrnwLWuEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"77lFYm0gM+ZzSltkjDVkFu3lK2Q="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"B0kS3ikrKORt9MuuxHLrnwLWuEg=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"77lFYm0gM+ZzSltkjDVkFu3lK2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B0kS3ikrKORt9MuuxHLrnwLWuEg="},{"type":"next-occurrence","id":"lSp2k/QYARXz9hxYcjKFKjxXVk0="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"77lFYm0gM+ZzSltkjDVkFu3lK2Q=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"lSp2k/QYARXz9hxYcjKFKjxXVk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B0kS3ikrKORt9MuuxHLrnwLWuEg="},{"type":"next-occurrence","id":"5cmQYA+Id0SbjqpwKTtChz5B884="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"lSp2k/QYARXz9hxYcjKFKjxXVk0=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"5cmQYA+Id0SbjqpwKTtChz5B884=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B0kS3ikrKORt9MuuxHLrnwLWuEg="},{"type":"next-occurrence","id":"T1dHaiu19evsq8rJB3SMk1Iifys="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"5cmQYA+Id0SbjqpwKTtChz5B884=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"T1dHaiu19evsq8rJB3SMk1Iifys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B0kS3ikrKORt9MuuxHLrnwLWuEg="},{"type":"next-occurrence","id":"F5xX7ZBYlR0LTUEJIOJZbfM7ew8="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"T1dHaiu19evsq8rJB3SMk1Iifys=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"F5xX7ZBYlR0LTUEJIOJZbfM7ew8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B0kS3ikrKORt9MuuxHLrnwLWuEg="},{"type":"next-occurrence","id":"M+KF0fn7R964GYfc7RKd2n3ZsCg="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"F5xX7ZBYlR0LTUEJIOJZbfM7ew8=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"M+KF0fn7R964GYfc7RKd2n3ZsCg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B0kS3ikrKORt9MuuxHLrnwLWuEg="},{"type":"next-occurrence","id":"ZbVPEQs4QX1X4YidJW5RFQy1O6Y="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"M+KF0fn7R964GYfc7RKd2n3ZsCg=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"ZbVPEQs4QX1X4YidJW5RFQy1O6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B0kS3ikrKORt9MuuxHLrnwLWuEg="},{"type":"next-occurrence","id":"MkLhvhsVHvFc6m8/uHPTHUQKdlM="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"ZbVPEQs4QX1X4YidJW5RFQy1O6Y=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"MkLhvhsVHvFc6m8/uHPTHUQKdlM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B0kS3ikrKORt9MuuxHLrnwLWuEg="},{"type":"next-occurrence","id":"pR+hDEoZsC9PXwqUQasLInHSWLs="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"MkLhvhsVHvFc6m8/uHPTHUQKdlM=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"pR+hDEoZsC9PXwqUQasLInHSWLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B0kS3ikrKORt9MuuxHLrnwLWuEg="},{"type":"next-occurrence","id":"Yl4Vhvka6biyyblKAc/uMUFK7sI="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"pR+hDEoZsC9PXwqUQasLInHSWLs=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"Yl4Vhvka6biyyblKAc/uMUFK7sI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B0kS3ikrKORt9MuuxHLrnwLWuEg="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"Yl4Vhvka6biyyblKAc/uMUFK7sI=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"wcjiokbl/uRIVGPdfSSl0LuLYok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 168"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 168 both directions between END ROUTE; NY 80; Hamlet of Stark (Stark) and CR 206; Lighthall Road Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 80 and Lighthall Road., Continuous Monday April 6th, 2026 7:00 AM thru Saturday June 27th, 2026 6:00 PM all lanes closed","update_date":"2026-04-24T11:13:28Z"},"road_event_id":"wcjiokbl/uRIVGPdfSSl0LuLYok=","beginning_cross_street":"END ROUTE; NY 80; Hamlet of Stark","ending_cross_street":"CR 206; Lighthall Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.793448,42.926459]]}},{"id":"5VSx5354569lxnCXeOa6AyynVeI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 69"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 69 both directions between NY 291 (Whitestown) and NY 922A; Clinton Street; CR 30 (Whitestown) Motorists will encounter lane closures in both directions for work on the I-90 bridge, Continuous Monday March 23rd, 2026 6:00 AM thru Saturday November 21st, 2026 6:00 PM","update_date":"2026-04-10T10:02:57Z"},"road_event_id":"5VSx5354569lxnCXeOa6AyynVeI=","beginning_cross_street":"NY 291","ending_cross_street":"NY 922A; Clinton Street; CR 30","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.300808,43.129911]]}},{"id":"ZMAhO7T1OiyejYO3dIr8bDO6n00=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 825"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WtreB/8hsJbYNeRr0qCRF1U2r2k="}],"description":"Construction on NY 825 both directions at Perimeter Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-06-05T13:55:30Z"},"road_event_id":"ZMAhO7T1OiyejYO3dIr8bDO6n00=","beginning_cross_street":"Perimeter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.425299999999993,43.2258]]}},{"id":"WtreB/8hsJbYNeRr0qCRF1U2r2k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 825"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZMAhO7T1OiyejYO3dIr8bDO6n00="},{"type":"next-occurrence","id":"nOr9eR7PIeYyN67Q5yUTKliW9c8="}],"description":"Construction on NY 825 both directions at Perimeter Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-06-05T13:55:30Z"},"road_event_id":"WtreB/8hsJbYNeRr0qCRF1U2r2k=","beginning_cross_street":"Perimeter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.425299999999993,43.2258]]}},{"id":"nOr9eR7PIeYyN67Q5yUTKliW9c8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 825"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZMAhO7T1OiyejYO3dIr8bDO6n00="},{"type":"next-occurrence","id":"IGG4BZg0GtE3CmOIvzuCuKwaFYw="}],"description":"Construction on NY 825 both directions at Perimeter Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-06-05T13:55:30Z"},"road_event_id":"nOr9eR7PIeYyN67Q5yUTKliW9c8=","beginning_cross_street":"Perimeter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.425299999999993,43.2258]]}},{"id":"IGG4BZg0GtE3CmOIvzuCuKwaFYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 825"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZMAhO7T1OiyejYO3dIr8bDO6n00="},{"type":"next-occurrence","id":"jW/5Chclnb1RIOYxJQsOFHEq6AI="}],"description":"Construction on NY 825 both directions at Perimeter Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-06-05T13:55:30Z"},"road_event_id":"IGG4BZg0GtE3CmOIvzuCuKwaFYw=","beginning_cross_street":"Perimeter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.425299999999993,43.2258]]}},{"id":"jW/5Chclnb1RIOYxJQsOFHEq6AI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 825"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZMAhO7T1OiyejYO3dIr8bDO6n00="},{"type":"next-occurrence","id":"PeKd7qf3lO5apRiUV5iPKAcAsRU="}],"description":"Construction on NY 825 both directions at Perimeter Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-06-05T13:55:30Z"},"road_event_id":"jW/5Chclnb1RIOYxJQsOFHEq6AI=","beginning_cross_street":"Perimeter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.425299999999993,43.2258]]}},{"id":"PeKd7qf3lO5apRiUV5iPKAcAsRU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 825"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZMAhO7T1OiyejYO3dIr8bDO6n00="}],"description":"Construction on NY 825 both directions at Perimeter Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-06-05T13:55:30Z"},"road_event_id":"PeKd7qf3lO5apRiUV5iPKAcAsRU=","beginning_cross_street":"Perimeter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.425299999999993,43.2258]]}},{"id":"jzctw8TQSbsEdVND9HCwOyKk5XQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Westbound near West of US 130/Collingswood Circle (Collingswood), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 08:00 PM, right lane closed","update_date":"2026-06-03T17:37:38Z"},"road_event_id":"jzctw8TQSbsEdVND9HCwOyKk5XQ=","beginning_cross_street":"West of US 130/Collingswood Circle","ending_cross_street":"CR 628/North Park Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.08757,39.920494]]}},{"id":"xlPeRurm/Q6+4Lsysc49MMxZM4c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-149"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on CT-149 both directions between JOHNSONVILLE RD (East Haddam) and CT-196 (East Haddam), Continuous Monday April 20th, 2026 12:00 AM thru Monday August 17th, 2026 11:59 PM All lanes closed","update_date":"2026-03-24T11:54:08Z"},"road_event_id":"xlPeRurm/Q6+4Lsysc49MMxZM4c=","beginning_cross_street":"JOHNSONVILLE RD","ending_cross_street":"CT-196","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.465625,41.489618]]}},{"id":"IJ5A3MVoL4dsYdz6Gr3I+pT5WiM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WINTHROP ST"],"direction":"unknown","related_road_events":[],"description":"Bridge work on WINTHROP ST both directions between DALTON ST (Torrington) and KINNEY ST (Torrington) a lane closure will occur switching traffic from two lane to one lane alternating traffic , Continuous Wednesday April 1st, 2026 12:00 AM thru Friday July 31st, 2026 11:59 PM All lanes open","update_date":"2026-03-24T11:57:35Z"},"road_event_id":"IJ5A3MVoL4dsYdz6Gr3I+pT5WiM=","beginning_cross_street":"DALTON ST","ending_cross_street":"KINNEY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.113072,41.812442]]}},{"id":"nudvCOwlhWHWd3UORWkOncKQuBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINNEY ST"],"direction":"unknown","related_road_events":[],"description":"Bridge work on KINNEY ST both directions between CALHOUN ST (Torrington) and JONES ST (Torrington) traffic will be detoured to Brightwood Ave., Continuous Wednesday April 1st, 2026 12:00 AM thru Friday July 31st, 2026 11:59 PM All lanes closed","update_date":"2026-03-24T12:00:55Z"},"road_event_id":"nudvCOwlhWHWd3UORWkOncKQuBE=","beginning_cross_street":"CALHOUN ST","ending_cross_street":"JONES ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.114324,41.813821]]}},{"id":"pMVfgqj5jG0yBq0GC33lwAoG7aA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZmEsrrdDopZKltRnzdpFf00G0GU="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"pMVfgqj5jG0yBq0GC33lwAoG7aA=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"ZmEsrrdDopZKltRnzdpFf00G0GU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMVfgqj5jG0yBq0GC33lwAoG7aA="},{"type":"next-occurrence","id":"T20r4nSc8z2kPGnIToJcdV0hw7Y="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"ZmEsrrdDopZKltRnzdpFf00G0GU=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T22:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"T20r4nSc8z2kPGnIToJcdV0hw7Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMVfgqj5jG0yBq0GC33lwAoG7aA="},{"type":"next-occurrence","id":"MBgX8fY+lHYsIpeTB5ZCDA7JTvU="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"T20r4nSc8z2kPGnIToJcdV0hw7Y=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T22:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"MBgX8fY+lHYsIpeTB5ZCDA7JTvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMVfgqj5jG0yBq0GC33lwAoG7aA="},{"type":"next-occurrence","id":"dMPp25ALN3dcyk6w7O2Arvpd6RM="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"MBgX8fY+lHYsIpeTB5ZCDA7JTvU=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"dMPp25ALN3dcyk6w7O2Arvpd6RM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMVfgqj5jG0yBq0GC33lwAoG7aA="},{"type":"next-occurrence","id":"0k3GrVxdFfsaAUVZwGxOL9wQFEI="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"dMPp25ALN3dcyk6w7O2Arvpd6RM=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"0k3GrVxdFfsaAUVZwGxOL9wQFEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMVfgqj5jG0yBq0GC33lwAoG7aA="},{"type":"next-occurrence","id":"9so+zBpNdqrYePAOWp8W/aWSn58="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"0k3GrVxdFfsaAUVZwGxOL9wQFEI=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"9so+zBpNdqrYePAOWp8W/aWSn58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMVfgqj5jG0yBq0GC33lwAoG7aA="},{"type":"next-occurrence","id":"/Wkg2Uk36yRVqoHKD/NvFU/pMk0="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"9so+zBpNdqrYePAOWp8W/aWSn58=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"/Wkg2Uk36yRVqoHKD/NvFU/pMk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMVfgqj5jG0yBq0GC33lwAoG7aA="},{"type":"next-occurrence","id":"EKDbwDfqoF3SxiUsdUwyzcD+FTg="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"/Wkg2Uk36yRVqoHKD/NvFU/pMk0=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"EKDbwDfqoF3SxiUsdUwyzcD+FTg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMVfgqj5jG0yBq0GC33lwAoG7aA="},{"type":"next-occurrence","id":"H8L5ccik7K072Q85fdyT0vyAN6g="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"EKDbwDfqoF3SxiUsdUwyzcD+FTg=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T22:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"H8L5ccik7K072Q85fdyT0vyAN6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMVfgqj5jG0yBq0GC33lwAoG7aA="},{"type":"next-occurrence","id":"Ldsw+GWQPYjLUzaLxkh9e2iEKzs="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"H8L5ccik7K072Q85fdyT0vyAN6g=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T22:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"Ldsw+GWQPYjLUzaLxkh9e2iEKzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMVfgqj5jG0yBq0GC33lwAoG7aA="},{"type":"next-occurrence","id":"+GHzDhQzca76dKCvV8nRtq7RE3U="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"Ldsw+GWQPYjLUzaLxkh9e2iEKzs=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"+GHzDhQzca76dKCvV8nRtq7RE3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMVfgqj5jG0yBq0GC33lwAoG7aA="},{"type":"next-occurrence","id":"UdFRKTvqO1Ea37m3SMqgZEKXZXQ="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"+GHzDhQzca76dKCvV8nRtq7RE3U=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"UdFRKTvqO1Ea37m3SMqgZEKXZXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMVfgqj5jG0yBq0GC33lwAoG7aA="},{"type":"next-occurrence","id":"BHwY+DhztsgknBzzvaGLi0XIk6w="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"UdFRKTvqO1Ea37m3SMqgZEKXZXQ=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"BHwY+DhztsgknBzzvaGLi0XIk6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMVfgqj5jG0yBq0GC33lwAoG7aA="},{"type":"next-occurrence","id":"LxmHJZx24NATrfa+2BPkl6Y3UmU="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"BHwY+DhztsgknBzzvaGLi0XIk6w=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"LxmHJZx24NATrfa+2BPkl6Y3UmU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMVfgqj5jG0yBq0GC33lwAoG7aA="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"LxmHJZx24NATrfa+2BPkl6Y3UmU=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"DWVt4IZALTVZJ195QxgFS/fHrHY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Y16hH15DU8ne8m1KH4bQeX+Eaxs="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"DWVt4IZALTVZJ195QxgFS/fHrHY=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"Y16hH15DU8ne8m1KH4bQeX+Eaxs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DWVt4IZALTVZJ195QxgFS/fHrHY="},{"type":"next-occurrence","id":"jk4guoguyVKX0qCT5UIW7mFMhH4="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"Y16hH15DU8ne8m1KH4bQeX+Eaxs=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T01:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"jk4guoguyVKX0qCT5UIW7mFMhH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DWVt4IZALTVZJ195QxgFS/fHrHY="},{"type":"next-occurrence","id":"TnUn3pbH6GZD7un83aO03ChEHio="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"jk4guoguyVKX0qCT5UIW7mFMhH4=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T01:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"TnUn3pbH6GZD7un83aO03ChEHio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DWVt4IZALTVZJ195QxgFS/fHrHY="},{"type":"next-occurrence","id":"Rl7faGzS51IUdyOXQtrRFF01080="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"TnUn3pbH6GZD7un83aO03ChEHio=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"Rl7faGzS51IUdyOXQtrRFF01080=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DWVt4IZALTVZJ195QxgFS/fHrHY="},{"type":"next-occurrence","id":"U1b61diifeAqVG3Ijgu9paCFf2k="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"Rl7faGzS51IUdyOXQtrRFF01080=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"U1b61diifeAqVG3Ijgu9paCFf2k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DWVt4IZALTVZJ195QxgFS/fHrHY="},{"type":"next-occurrence","id":"85+XC6OcNHYVmFn7Vi3JFnDvPOE="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"U1b61diifeAqVG3Ijgu9paCFf2k=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"85+XC6OcNHYVmFn7Vi3JFnDvPOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DWVt4IZALTVZJ195QxgFS/fHrHY="},{"type":"next-occurrence","id":"JUv15eZik+SJJdfZoAh9NlPHfiU="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"85+XC6OcNHYVmFn7Vi3JFnDvPOE=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"JUv15eZik+SJJdfZoAh9NlPHfiU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DWVt4IZALTVZJ195QxgFS/fHrHY="},{"type":"next-occurrence","id":"m+C2d2d7PNl5MUqCoRrZjvTGpQI="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"JUv15eZik+SJJdfZoAh9NlPHfiU=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T01:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"m+C2d2d7PNl5MUqCoRrZjvTGpQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DWVt4IZALTVZJ195QxgFS/fHrHY="},{"type":"next-occurrence","id":"xLSd9j6WqOSjLngTZR2UDOnwZBc="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"m+C2d2d7PNl5MUqCoRrZjvTGpQI=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T01:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"xLSd9j6WqOSjLngTZR2UDOnwZBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DWVt4IZALTVZJ195QxgFS/fHrHY="},{"type":"next-occurrence","id":"470q6+fR3QRyyP5gusqwrvMqqfg="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"xLSd9j6WqOSjLngTZR2UDOnwZBc=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T01:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"470q6+fR3QRyyP5gusqwrvMqqfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DWVt4IZALTVZJ195QxgFS/fHrHY="},{"type":"next-occurrence","id":"YuuQTcHwywx0gOTplBrtBjFJ/70="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"470q6+fR3QRyyP5gusqwrvMqqfg=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T01:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"YuuQTcHwywx0gOTplBrtBjFJ/70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DWVt4IZALTVZJ195QxgFS/fHrHY="},{"type":"next-occurrence","id":"AAOny/Cy/2PQPFqZsxdPLkSqt9A="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"YuuQTcHwywx0gOTplBrtBjFJ/70=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T01:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"AAOny/Cy/2PQPFqZsxdPLkSqt9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DWVt4IZALTVZJ195QxgFS/fHrHY="},{"type":"next-occurrence","id":"pqDEO+U0cGH3LVOnwbgiJMsjacU="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"AAOny/Cy/2PQPFqZsxdPLkSqt9A=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T01:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"pqDEO+U0cGH3LVOnwbgiJMsjacU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DWVt4IZALTVZJ195QxgFS/fHrHY="},{"type":"next-occurrence","id":"p72c84OSPzNSJCIkuzB2G09qc6Y="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"pqDEO+U0cGH3LVOnwbgiJMsjacU=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T01:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"p72c84OSPzNSJCIkuzB2G09qc6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DWVt4IZALTVZJ195QxgFS/fHrHY="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"p72c84OSPzNSJCIkuzB2G09qc6Y=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T01:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"W6D4tnoUbYfrxoYaj07HSTHsHrY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q/I63/hFOHboY+kRD2mhAj/zutE="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"W6D4tnoUbYfrxoYaj07HSTHsHrY=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"q/I63/hFOHboY+kRD2mhAj/zutE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W6D4tnoUbYfrxoYaj07HSTHsHrY="},{"type":"next-occurrence","id":"cW/gkDKiAio+qtvDldYPFiaH6J4="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"q/I63/hFOHboY+kRD2mhAj/zutE=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T01:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"cW/gkDKiAio+qtvDldYPFiaH6J4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W6D4tnoUbYfrxoYaj07HSTHsHrY="},{"type":"next-occurrence","id":"ReOPf9ISKwIYpLmpZskAm1otn90="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"cW/gkDKiAio+qtvDldYPFiaH6J4=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T01:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"ReOPf9ISKwIYpLmpZskAm1otn90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W6D4tnoUbYfrxoYaj07HSTHsHrY="},{"type":"next-occurrence","id":"inHijb3cBx8L/wLTjITTDndoMvQ="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"ReOPf9ISKwIYpLmpZskAm1otn90=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"inHijb3cBx8L/wLTjITTDndoMvQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W6D4tnoUbYfrxoYaj07HSTHsHrY="},{"type":"next-occurrence","id":"kQ4ewDiAydJDopQQuIHq+qYcTuM="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"inHijb3cBx8L/wLTjITTDndoMvQ=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"kQ4ewDiAydJDopQQuIHq+qYcTuM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W6D4tnoUbYfrxoYaj07HSTHsHrY="},{"type":"next-occurrence","id":"+8O2C3zoohUlleE35rshZRBKtms="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"kQ4ewDiAydJDopQQuIHq+qYcTuM=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"+8O2C3zoohUlleE35rshZRBKtms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W6D4tnoUbYfrxoYaj07HSTHsHrY="},{"type":"next-occurrence","id":"EQ93XQufBHJ/w8z9El747O2vBYQ="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"+8O2C3zoohUlleE35rshZRBKtms=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"EQ93XQufBHJ/w8z9El747O2vBYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W6D4tnoUbYfrxoYaj07HSTHsHrY="},{"type":"next-occurrence","id":"BiJYyYkEa0ukgpTfFjliFZKz0Jk="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"EQ93XQufBHJ/w8z9El747O2vBYQ=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T01:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"BiJYyYkEa0ukgpTfFjliFZKz0Jk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W6D4tnoUbYfrxoYaj07HSTHsHrY="},{"type":"next-occurrence","id":"Nywjvd6e2W2BFXC1vEu7sK5w0Fk="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"BiJYyYkEa0ukgpTfFjliFZKz0Jk=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T01:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"Nywjvd6e2W2BFXC1vEu7sK5w0Fk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W6D4tnoUbYfrxoYaj07HSTHsHrY="},{"type":"next-occurrence","id":"fmDqd5B9NCdNLXG+keu6qAJxIMQ="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"Nywjvd6e2W2BFXC1vEu7sK5w0Fk=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T01:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"fmDqd5B9NCdNLXG+keu6qAJxIMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W6D4tnoUbYfrxoYaj07HSTHsHrY="},{"type":"next-occurrence","id":"Hv5Z0c1APz26Lpa5CRyxl9OE/eM="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"fmDqd5B9NCdNLXG+keu6qAJxIMQ=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T01:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"Hv5Z0c1APz26Lpa5CRyxl9OE/eM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W6D4tnoUbYfrxoYaj07HSTHsHrY="},{"type":"next-occurrence","id":"NIDMuU5nsmCZhnKY0nDUYsVz3Bs="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"Hv5Z0c1APz26Lpa5CRyxl9OE/eM=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T01:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"NIDMuU5nsmCZhnKY0nDUYsVz3Bs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W6D4tnoUbYfrxoYaj07HSTHsHrY="},{"type":"next-occurrence","id":"yHGZwNKHEJ+2OYJJRpYb7zC6Gvs="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"NIDMuU5nsmCZhnKY0nDUYsVz3Bs=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T01:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"yHGZwNKHEJ+2OYJJRpYb7zC6Gvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W6D4tnoUbYfrxoYaj07HSTHsHrY="},{"type":"next-occurrence","id":"Rlvku5qX3LMko4U8V5aHY+M4jss="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"yHGZwNKHEJ+2OYJJRpYb7zC6Gvs=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T01:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"Rlvku5qX3LMko4U8V5aHY+M4jss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W6D4tnoUbYfrxoYaj07HSTHsHrY="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"Rlvku5qX3LMko4U8V5aHY+M4jss=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T01:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"ZkVyZM1jEZZ+i8GAqqbyccMXrSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4IAgCTRy7IgpmYpKEL0mZQE+04w="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"ZkVyZM1jEZZ+i8GAqqbyccMXrSU=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"4IAgCTRy7IgpmYpKEL0mZQE+04w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkVyZM1jEZZ+i8GAqqbyccMXrSU="},{"type":"next-occurrence","id":"4RDnO/BioAVGf8R+xzQtIX3EWak="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"4IAgCTRy7IgpmYpKEL0mZQE+04w=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"4RDnO/BioAVGf8R+xzQtIX3EWak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkVyZM1jEZZ+i8GAqqbyccMXrSU="},{"type":"next-occurrence","id":"3wQbC/ZhdrCvot3IZX+9FPNExCw="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"4RDnO/BioAVGf8R+xzQtIX3EWak=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"3wQbC/ZhdrCvot3IZX+9FPNExCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkVyZM1jEZZ+i8GAqqbyccMXrSU="},{"type":"next-occurrence","id":"SqADZ7nzT8zi4xgKCOs982f7R84="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"3wQbC/ZhdrCvot3IZX+9FPNExCw=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"SqADZ7nzT8zi4xgKCOs982f7R84=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkVyZM1jEZZ+i8GAqqbyccMXrSU="},{"type":"next-occurrence","id":"vtCk6PJ/1u3Srfo4TeEZhpiFUtM="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"SqADZ7nzT8zi4xgKCOs982f7R84=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"vtCk6PJ/1u3Srfo4TeEZhpiFUtM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkVyZM1jEZZ+i8GAqqbyccMXrSU="},{"type":"next-occurrence","id":"wLQ5Qqze7xGkCX2Bx8JNvJVhyDA="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"vtCk6PJ/1u3Srfo4TeEZhpiFUtM=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"wLQ5Qqze7xGkCX2Bx8JNvJVhyDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkVyZM1jEZZ+i8GAqqbyccMXrSU="},{"type":"next-occurrence","id":"Qwg5g0tuf4zxWTscUnU1NEjHDEY="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"wLQ5Qqze7xGkCX2Bx8JNvJVhyDA=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"Qwg5g0tuf4zxWTscUnU1NEjHDEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkVyZM1jEZZ+i8GAqqbyccMXrSU="},{"type":"next-occurrence","id":"Vr1MP279yB/cvy93R7TI5WswUCM="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"Qwg5g0tuf4zxWTscUnU1NEjHDEY=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"Vr1MP279yB/cvy93R7TI5WswUCM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkVyZM1jEZZ+i8GAqqbyccMXrSU="},{"type":"next-occurrence","id":"/vVymmi5/+/ckY8ag7JQrLdAT1A="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"Vr1MP279yB/cvy93R7TI5WswUCM=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"/vVymmi5/+/ckY8ag7JQrLdAT1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkVyZM1jEZZ+i8GAqqbyccMXrSU="},{"type":"next-occurrence","id":"UdLioYz7zT2xzQZVhVzB4PsGWVc="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"/vVymmi5/+/ckY8ag7JQrLdAT1A=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"UdLioYz7zT2xzQZVhVzB4PsGWVc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkVyZM1jEZZ+i8GAqqbyccMXrSU="},{"type":"next-occurrence","id":"iUCicy/EbfZSzCJbql6teuLbwsM="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"UdLioYz7zT2xzQZVhVzB4PsGWVc=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"iUCicy/EbfZSzCJbql6teuLbwsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkVyZM1jEZZ+i8GAqqbyccMXrSU="},{"type":"next-occurrence","id":"/FrsMfhQPj7PaRT2IGs3y+Ytbew="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"iUCicy/EbfZSzCJbql6teuLbwsM=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"/FrsMfhQPj7PaRT2IGs3y+Ytbew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkVyZM1jEZZ+i8GAqqbyccMXrSU="},{"type":"next-occurrence","id":"RTTc4KzEfXqZ8QqVopYNV5V/vck="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"/FrsMfhQPj7PaRT2IGs3y+Ytbew=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"RTTc4KzEfXqZ8QqVopYNV5V/vck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkVyZM1jEZZ+i8GAqqbyccMXrSU="},{"type":"next-occurrence","id":"Jgq2zI9nbYEnTqCyFNnVyuOc45E="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"RTTc4KzEfXqZ8QqVopYNV5V/vck=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"Jgq2zI9nbYEnTqCyFNnVyuOc45E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkVyZM1jEZZ+i8GAqqbyccMXrSU="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"Jgq2zI9nbYEnTqCyFNnVyuOc45E=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"nficDtouOqu7LklCNQa3gK4v8m8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EaA+QkHQCNVvOj+ucXYyINKxk7U="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"nficDtouOqu7LklCNQa3gK4v8m8=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"EaA+QkHQCNVvOj+ucXYyINKxk7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nficDtouOqu7LklCNQa3gK4v8m8="},{"type":"next-occurrence","id":"HWAea3Q/Mu9tMglOmLt/au+eQmA="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"EaA+QkHQCNVvOj+ucXYyINKxk7U=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"HWAea3Q/Mu9tMglOmLt/au+eQmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nficDtouOqu7LklCNQa3gK4v8m8="},{"type":"next-occurrence","id":"Ne3jJjRVazfEp81IpQJ53TN24+U="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"HWAea3Q/Mu9tMglOmLt/au+eQmA=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"Ne3jJjRVazfEp81IpQJ53TN24+U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nficDtouOqu7LklCNQa3gK4v8m8="},{"type":"next-occurrence","id":"+vGG2+9KhDONXAUdJCeHqvoslxY="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"Ne3jJjRVazfEp81IpQJ53TN24+U=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"+vGG2+9KhDONXAUdJCeHqvoslxY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nficDtouOqu7LklCNQa3gK4v8m8="},{"type":"next-occurrence","id":"l2FMfVdWqFe5zWXYORbXaYbsmPk="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"+vGG2+9KhDONXAUdJCeHqvoslxY=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"l2FMfVdWqFe5zWXYORbXaYbsmPk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nficDtouOqu7LklCNQa3gK4v8m8="},{"type":"next-occurrence","id":"vRaIBPaROnaD+RNvPYZcP5Vm38g="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"l2FMfVdWqFe5zWXYORbXaYbsmPk=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"vRaIBPaROnaD+RNvPYZcP5Vm38g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nficDtouOqu7LklCNQa3gK4v8m8="},{"type":"next-occurrence","id":"7bnRPPG8fNl3r0GKnPGvRdH9NnA="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"vRaIBPaROnaD+RNvPYZcP5Vm38g=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"7bnRPPG8fNl3r0GKnPGvRdH9NnA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nficDtouOqu7LklCNQa3gK4v8m8="},{"type":"next-occurrence","id":"STb9dkAKgOgQRqsp1/hN6R3pKWM="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"7bnRPPG8fNl3r0GKnPGvRdH9NnA=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"STb9dkAKgOgQRqsp1/hN6R3pKWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nficDtouOqu7LklCNQa3gK4v8m8="},{"type":"next-occurrence","id":"8HLm+9iC1BRDWpU5vNhkJqTX7t4="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"STb9dkAKgOgQRqsp1/hN6R3pKWM=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"8HLm+9iC1BRDWpU5vNhkJqTX7t4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nficDtouOqu7LklCNQa3gK4v8m8="},{"type":"next-occurrence","id":"NPbcLBVOUN+pmP+E1pgm3Ve+mlo="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"8HLm+9iC1BRDWpU5vNhkJqTX7t4=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"NPbcLBVOUN+pmP+E1pgm3Ve+mlo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nficDtouOqu7LklCNQa3gK4v8m8="},{"type":"next-occurrence","id":"7puW9yDbsq5vtbr76PK61vAnWAk="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"NPbcLBVOUN+pmP+E1pgm3Ve+mlo=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"7puW9yDbsq5vtbr76PK61vAnWAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nficDtouOqu7LklCNQa3gK4v8m8="},{"type":"next-occurrence","id":"SXCq7ESOpGou8+zCT+EqOnGviEU="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"7puW9yDbsq5vtbr76PK61vAnWAk=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"SXCq7ESOpGou8+zCT+EqOnGviEU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nficDtouOqu7LklCNQa3gK4v8m8="},{"type":"next-occurrence","id":"5f50Sc6Sz+8yTfXsx5vTO3kCr8E="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"SXCq7ESOpGou8+zCT+EqOnGviEU=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"5f50Sc6Sz+8yTfXsx5vTO3kCr8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nficDtouOqu7LklCNQa3gK4v8m8="},{"type":"next-occurrence","id":"lIHUwCfzXSEIsRZyhezYoriOqjQ="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"5f50Sc6Sz+8yTfXsx5vTO3kCr8E=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"lIHUwCfzXSEIsRZyhezYoriOqjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nficDtouOqu7LklCNQa3gK4v8m8="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"lIHUwCfzXSEIsRZyhezYoriOqjQ=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"u43v2P1KglM9WMChtYvYaiMST/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZGXTlqG2+rQXAl/Soo6u2Okbsms="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"u43v2P1KglM9WMChtYvYaiMST/4=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"ZGXTlqG2+rQXAl/Soo6u2Okbsms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u43v2P1KglM9WMChtYvYaiMST/4="},{"type":"next-occurrence","id":"OtmBULOMoyhEoe78PNHNgs1h1hs="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"ZGXTlqG2+rQXAl/Soo6u2Okbsms=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"OtmBULOMoyhEoe78PNHNgs1h1hs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u43v2P1KglM9WMChtYvYaiMST/4="},{"type":"next-occurrence","id":"+HzC3l0k/abG93D08aRG71mRtnE="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"OtmBULOMoyhEoe78PNHNgs1h1hs=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"+HzC3l0k/abG93D08aRG71mRtnE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u43v2P1KglM9WMChtYvYaiMST/4="},{"type":"next-occurrence","id":"Pd62MHo0g7fnw0c75HZAgmzuYr8="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"+HzC3l0k/abG93D08aRG71mRtnE=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"Pd62MHo0g7fnw0c75HZAgmzuYr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u43v2P1KglM9WMChtYvYaiMST/4="},{"type":"next-occurrence","id":"lUtlvEjjJbWkGLParJdPGu4XvDg="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"Pd62MHo0g7fnw0c75HZAgmzuYr8=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"lUtlvEjjJbWkGLParJdPGu4XvDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u43v2P1KglM9WMChtYvYaiMST/4="},{"type":"next-occurrence","id":"6tdK5RiVLpT+kf67n3+j8GXsBmY="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"lUtlvEjjJbWkGLParJdPGu4XvDg=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"6tdK5RiVLpT+kf67n3+j8GXsBmY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u43v2P1KglM9WMChtYvYaiMST/4="},{"type":"next-occurrence","id":"4bvi1yOSO1xaGc1fVBqpb25VV70="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"6tdK5RiVLpT+kf67n3+j8GXsBmY=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"4bvi1yOSO1xaGc1fVBqpb25VV70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u43v2P1KglM9WMChtYvYaiMST/4="},{"type":"next-occurrence","id":"30Eoqg39zoQh01p11apoy22+580="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"4bvi1yOSO1xaGc1fVBqpb25VV70=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"30Eoqg39zoQh01p11apoy22+580=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u43v2P1KglM9WMChtYvYaiMST/4="},{"type":"next-occurrence","id":"zDygjpSavf3RoKDCbBSI0XULUTo="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"30Eoqg39zoQh01p11apoy22+580=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"zDygjpSavf3RoKDCbBSI0XULUTo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u43v2P1KglM9WMChtYvYaiMST/4="},{"type":"next-occurrence","id":"p50mRU/o6CiU6K/ftt2oP3uSy04="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"zDygjpSavf3RoKDCbBSI0XULUTo=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"p50mRU/o6CiU6K/ftt2oP3uSy04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u43v2P1KglM9WMChtYvYaiMST/4="},{"type":"next-occurrence","id":"pIW/ee3rVgRu3c/+vwDpGMR2xnc="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"p50mRU/o6CiU6K/ftt2oP3uSy04=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"pIW/ee3rVgRu3c/+vwDpGMR2xnc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u43v2P1KglM9WMChtYvYaiMST/4="},{"type":"next-occurrence","id":"jxhepLPwLPvvz9IIJAtIdozX2mM="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"pIW/ee3rVgRu3c/+vwDpGMR2xnc=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"jxhepLPwLPvvz9IIJAtIdozX2mM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u43v2P1KglM9WMChtYvYaiMST/4="},{"type":"next-occurrence","id":"C2Fez0zqnsd1Zgm1SakRdrah0VU="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"jxhepLPwLPvvz9IIJAtIdozX2mM=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"C2Fez0zqnsd1Zgm1SakRdrah0VU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u43v2P1KglM9WMChtYvYaiMST/4="},{"type":"next-occurrence","id":"NEN6GQV0m6rV5bhLhUReBgDbLDA="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"C2Fez0zqnsd1Zgm1SakRdrah0VU=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"NEN6GQV0m6rV5bhLhUReBgDbLDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u43v2P1KglM9WMChtYvYaiMST/4="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"NEN6GQV0m6rV5bhLhUReBgDbLDA=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"6l9zvNu9wmmgd5u/FHivXwccoZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Vzn5jFMU1MVnjtmXofCt8wqazgQ="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"6l9zvNu9wmmgd5u/FHivXwccoZU=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"Vzn5jFMU1MVnjtmXofCt8wqazgQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6l9zvNu9wmmgd5u/FHivXwccoZU="},{"type":"next-occurrence","id":"fYR5q2BTTFqqA43sy7p4BHkWyuQ="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"Vzn5jFMU1MVnjtmXofCt8wqazgQ=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"fYR5q2BTTFqqA43sy7p4BHkWyuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6l9zvNu9wmmgd5u/FHivXwccoZU="},{"type":"next-occurrence","id":"cJh5Nw39UBbDmabx2p/w99WOxQ8="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"fYR5q2BTTFqqA43sy7p4BHkWyuQ=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"cJh5Nw39UBbDmabx2p/w99WOxQ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6l9zvNu9wmmgd5u/FHivXwccoZU="},{"type":"next-occurrence","id":"NgWXy78ZdyLyc+pN/9ipGsNr4bE="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"cJh5Nw39UBbDmabx2p/w99WOxQ8=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"NgWXy78ZdyLyc+pN/9ipGsNr4bE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6l9zvNu9wmmgd5u/FHivXwccoZU="},{"type":"next-occurrence","id":"n6J0LWNe+oL8di1QSW3PUsnRIgg="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"NgWXy78ZdyLyc+pN/9ipGsNr4bE=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"n6J0LWNe+oL8di1QSW3PUsnRIgg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6l9zvNu9wmmgd5u/FHivXwccoZU="},{"type":"next-occurrence","id":"RFSiisrxpYp5EuGMxwsofTUB2Wc="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"n6J0LWNe+oL8di1QSW3PUsnRIgg=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"RFSiisrxpYp5EuGMxwsofTUB2Wc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6l9zvNu9wmmgd5u/FHivXwccoZU="},{"type":"next-occurrence","id":"daR2Vl2hUmeXlULkrJ2lS+jSYy0="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"RFSiisrxpYp5EuGMxwsofTUB2Wc=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"daR2Vl2hUmeXlULkrJ2lS+jSYy0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6l9zvNu9wmmgd5u/FHivXwccoZU="},{"type":"next-occurrence","id":"AgEzsrqgPDq6LF40QAVzCGNjmPE="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"daR2Vl2hUmeXlULkrJ2lS+jSYy0=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"AgEzsrqgPDq6LF40QAVzCGNjmPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6l9zvNu9wmmgd5u/FHivXwccoZU="},{"type":"next-occurrence","id":"+DO+UtDrm5YbrK/0uYDXCs291Vg="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"AgEzsrqgPDq6LF40QAVzCGNjmPE=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"+DO+UtDrm5YbrK/0uYDXCs291Vg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6l9zvNu9wmmgd5u/FHivXwccoZU="},{"type":"next-occurrence","id":"9uuJj76nGO5tJfKfh9L9xwmdSqQ="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"+DO+UtDrm5YbrK/0uYDXCs291Vg=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"9uuJj76nGO5tJfKfh9L9xwmdSqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6l9zvNu9wmmgd5u/FHivXwccoZU="},{"type":"next-occurrence","id":"azEGUTX8fiiF72Z3LRUruxf0VCk="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"9uuJj76nGO5tJfKfh9L9xwmdSqQ=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"azEGUTX8fiiF72Z3LRUruxf0VCk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6l9zvNu9wmmgd5u/FHivXwccoZU="},{"type":"next-occurrence","id":"aY/iuGuN+WUuXhM/6eo39gSe7SY="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"azEGUTX8fiiF72Z3LRUruxf0VCk=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"aY/iuGuN+WUuXhM/6eo39gSe7SY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6l9zvNu9wmmgd5u/FHivXwccoZU="},{"type":"next-occurrence","id":"/eNz7cMfJvmf/+IzkmGyi4jxU6o="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"aY/iuGuN+WUuXhM/6eo39gSe7SY=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"/eNz7cMfJvmf/+IzkmGyi4jxU6o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6l9zvNu9wmmgd5u/FHivXwccoZU="},{"type":"next-occurrence","id":"CjinFiYCtEangHCSJER3IAxxZk8="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"/eNz7cMfJvmf/+IzkmGyi4jxU6o=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"CjinFiYCtEangHCSJER3IAxxZk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6l9zvNu9wmmgd5u/FHivXwccoZU="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"CjinFiYCtEangHCSJER3IAxxZk8=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"iEQknw7QyBdPppCQrckSgozTdyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0lcrM3kBaDBW+9znjd0waqrZMp8="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"iEQknw7QyBdPppCQrckSgozTdyg=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"0lcrM3kBaDBW+9znjd0waqrZMp8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iEQknw7QyBdPppCQrckSgozTdyg="},{"type":"next-occurrence","id":"tegK74kt4V+k81MrOk4HK/Ui5A0="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"0lcrM3kBaDBW+9znjd0waqrZMp8=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"tegK74kt4V+k81MrOk4HK/Ui5A0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iEQknw7QyBdPppCQrckSgozTdyg="},{"type":"next-occurrence","id":"niY3/hYhrgSnIVPhXYm2Ry0Ovzo="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"tegK74kt4V+k81MrOk4HK/Ui5A0=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"niY3/hYhrgSnIVPhXYm2Ry0Ovzo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iEQknw7QyBdPppCQrckSgozTdyg="},{"type":"next-occurrence","id":"EH+3HbuP+M7V2yVIX9uhBdytyh8="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"niY3/hYhrgSnIVPhXYm2Ry0Ovzo=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"EH+3HbuP+M7V2yVIX9uhBdytyh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iEQknw7QyBdPppCQrckSgozTdyg="},{"type":"next-occurrence","id":"kWYgwgaxgdpFtDx2PMCKaBBtouk="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"EH+3HbuP+M7V2yVIX9uhBdytyh8=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"kWYgwgaxgdpFtDx2PMCKaBBtouk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iEQknw7QyBdPppCQrckSgozTdyg="},{"type":"next-occurrence","id":"XP1PG7wVq5IBEXp2h0G+K3e4Wrs="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"kWYgwgaxgdpFtDx2PMCKaBBtouk=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"XP1PG7wVq5IBEXp2h0G+K3e4Wrs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iEQknw7QyBdPppCQrckSgozTdyg="},{"type":"next-occurrence","id":"wjyew9AnHNad1UrxSCe8LCXgVbI="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"XP1PG7wVq5IBEXp2h0G+K3e4Wrs=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"wjyew9AnHNad1UrxSCe8LCXgVbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iEQknw7QyBdPppCQrckSgozTdyg="},{"type":"next-occurrence","id":"xihtbue5orQ07U7FPt6FJp22/4g="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"wjyew9AnHNad1UrxSCe8LCXgVbI=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"xihtbue5orQ07U7FPt6FJp22/4g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iEQknw7QyBdPppCQrckSgozTdyg="},{"type":"next-occurrence","id":"HI/iL9nFAA5ZN8NpWRY+pT0Olf0="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"xihtbue5orQ07U7FPt6FJp22/4g=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"HI/iL9nFAA5ZN8NpWRY+pT0Olf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iEQknw7QyBdPppCQrckSgozTdyg="},{"type":"next-occurrence","id":"wB7HktZ3uSJviqhgiAaQMhGcP3I="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"HI/iL9nFAA5ZN8NpWRY+pT0Olf0=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"wB7HktZ3uSJviqhgiAaQMhGcP3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iEQknw7QyBdPppCQrckSgozTdyg="},{"type":"next-occurrence","id":"Kz7V3O+MPQuaH+47/0cX7l4JsPY="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"wB7HktZ3uSJviqhgiAaQMhGcP3I=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"Kz7V3O+MPQuaH+47/0cX7l4JsPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iEQknw7QyBdPppCQrckSgozTdyg="},{"type":"next-occurrence","id":"N2UpVDxeldwbbV8KjsPQ1DmDPh4="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"Kz7V3O+MPQuaH+47/0cX7l4JsPY=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"N2UpVDxeldwbbV8KjsPQ1DmDPh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iEQknw7QyBdPppCQrckSgozTdyg="},{"type":"next-occurrence","id":"EjJRCpnExaGa7AVSYw90Kef4lUM="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"N2UpVDxeldwbbV8KjsPQ1DmDPh4=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"EjJRCpnExaGa7AVSYw90Kef4lUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iEQknw7QyBdPppCQrckSgozTdyg="},{"type":"next-occurrence","id":"wYNeKF4+YPGEizKeFInfV08M+gQ="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"EjJRCpnExaGa7AVSYw90Kef4lUM=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"wYNeKF4+YPGEizKeFInfV08M+gQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iEQknw7QyBdPppCQrckSgozTdyg="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"wYNeKF4+YPGEizKeFInfV08M+gQ=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"v6Opl1hbBR1AVv8P1yUisZ+sLTg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hf07CPUpYNb1yDl321byiTIZQTQ="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"v6Opl1hbBR1AVv8P1yUisZ+sLTg=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"hf07CPUpYNb1yDl321byiTIZQTQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v6Opl1hbBR1AVv8P1yUisZ+sLTg="},{"type":"next-occurrence","id":"ntONlFNf94vhd0U748roGvL7gbI="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"hf07CPUpYNb1yDl321byiTIZQTQ=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"ntONlFNf94vhd0U748roGvL7gbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v6Opl1hbBR1AVv8P1yUisZ+sLTg="},{"type":"next-occurrence","id":"gWhtbUVO5hwgnRhq0XXopN1JnUI="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"ntONlFNf94vhd0U748roGvL7gbI=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"gWhtbUVO5hwgnRhq0XXopN1JnUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v6Opl1hbBR1AVv8P1yUisZ+sLTg="},{"type":"next-occurrence","id":"khH8XNzgStrAFiwdf4qlz/MUJSg="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"gWhtbUVO5hwgnRhq0XXopN1JnUI=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"khH8XNzgStrAFiwdf4qlz/MUJSg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v6Opl1hbBR1AVv8P1yUisZ+sLTg="},{"type":"next-occurrence","id":"1O+J0PQvhyBKFRyJ03eaQN2D5c4="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"khH8XNzgStrAFiwdf4qlz/MUJSg=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"1O+J0PQvhyBKFRyJ03eaQN2D5c4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v6Opl1hbBR1AVv8P1yUisZ+sLTg="},{"type":"next-occurrence","id":"dKVh2a6RmM7FKaxAOtzDKzrbZ1k="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"1O+J0PQvhyBKFRyJ03eaQN2D5c4=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"dKVh2a6RmM7FKaxAOtzDKzrbZ1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v6Opl1hbBR1AVv8P1yUisZ+sLTg="},{"type":"next-occurrence","id":"nJnaNqPgwQzOU4JRFYZk8WoHNXQ="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"dKVh2a6RmM7FKaxAOtzDKzrbZ1k=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"nJnaNqPgwQzOU4JRFYZk8WoHNXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v6Opl1hbBR1AVv8P1yUisZ+sLTg="},{"type":"next-occurrence","id":"bkXVll9VZEcmMo3QfxUXPcSDWmo="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"nJnaNqPgwQzOU4JRFYZk8WoHNXQ=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"bkXVll9VZEcmMo3QfxUXPcSDWmo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v6Opl1hbBR1AVv8P1yUisZ+sLTg="},{"type":"next-occurrence","id":"fhFAO/1Q87GZtWuUF+KcJZ1GaPY="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"bkXVll9VZEcmMo3QfxUXPcSDWmo=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"fhFAO/1Q87GZtWuUF+KcJZ1GaPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v6Opl1hbBR1AVv8P1yUisZ+sLTg="},{"type":"next-occurrence","id":"XjDnLFYOnzwrh+0g1fuZSXsNpSw="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"fhFAO/1Q87GZtWuUF+KcJZ1GaPY=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"XjDnLFYOnzwrh+0g1fuZSXsNpSw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v6Opl1hbBR1AVv8P1yUisZ+sLTg="},{"type":"next-occurrence","id":"AtCq/fjuW50y9x5k3m4C+28VEyU="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"XjDnLFYOnzwrh+0g1fuZSXsNpSw=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"AtCq/fjuW50y9x5k3m4C+28VEyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v6Opl1hbBR1AVv8P1yUisZ+sLTg="},{"type":"next-occurrence","id":"jhyiLzJibZLL9OPGXfEHW9eS3R8="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"AtCq/fjuW50y9x5k3m4C+28VEyU=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"jhyiLzJibZLL9OPGXfEHW9eS3R8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v6Opl1hbBR1AVv8P1yUisZ+sLTg="},{"type":"next-occurrence","id":"96y0yzuXRiP0lA4Pe2eaBUybIX8="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"jhyiLzJibZLL9OPGXfEHW9eS3R8=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"96y0yzuXRiP0lA4Pe2eaBUybIX8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v6Opl1hbBR1AVv8P1yUisZ+sLTg="},{"type":"next-occurrence","id":"TlN1VNW3TvCw2ZL+g5OizCYInso="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"96y0yzuXRiP0lA4Pe2eaBUybIX8=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"TlN1VNW3TvCw2ZL+g5OizCYInso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v6Opl1hbBR1AVv8P1yUisZ+sLTg="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"TlN1VNW3TvCw2ZL+g5OizCYInso=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"EaKW3iFI1VyFahWz646mYvo1gDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uqSdQc1AiZZ9dRRYZaH79HvkgpY="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"EaKW3iFI1VyFahWz646mYvo1gDA=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"uqSdQc1AiZZ9dRRYZaH79HvkgpY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"NbWkoQLIBY2cfKwiIHlj4ceua1o="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"uqSdQc1AiZZ9dRRYZaH79HvkgpY=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"NbWkoQLIBY2cfKwiIHlj4ceua1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"Ye9qE2+vv62UigWzqq3jS7ljBxg="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"NbWkoQLIBY2cfKwiIHlj4ceua1o=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"Ye9qE2+vv62UigWzqq3jS7ljBxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"u8c6KULE8JAaRg48LqvRcFK3UkM="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"Ye9qE2+vv62UigWzqq3jS7ljBxg=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T23:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"u8c6KULE8JAaRg48LqvRcFK3UkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"5We6lwGiYs7NnEYHVN6f12IS5cE="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"u8c6KULE8JAaRg48LqvRcFK3UkM=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"5We6lwGiYs7NnEYHVN6f12IS5cE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"KnYPjMmAu7icnEgSVTwn0640oV0="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"5We6lwGiYs7NnEYHVN6f12IS5cE=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"KnYPjMmAu7icnEgSVTwn0640oV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"T54sELmmpJTh+7csojSHez1Q0kA="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"KnYPjMmAu7icnEgSVTwn0640oV0=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"T54sELmmpJTh+7csojSHez1Q0kA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"60jVYS4sedsDEXkaNV1xul/zO+c="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"T54sELmmpJTh+7csojSHez1Q0kA=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"60jVYS4sedsDEXkaNV1xul/zO+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"2RwsDDAzwpNPKH9VDqzv/vVFsR8="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"60jVYS4sedsDEXkaNV1xul/zO+c=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"2RwsDDAzwpNPKH9VDqzv/vVFsR8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"f3Djnr1AVY4VfLyGWdLC6Zdby1E="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"2RwsDDAzwpNPKH9VDqzv/vVFsR8=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"f3Djnr1AVY4VfLyGWdLC6Zdby1E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"7sE+JmzhaSm6OgzbP7oSFm0vZ+E="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"f3Djnr1AVY4VfLyGWdLC6Zdby1E=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"7sE+JmzhaSm6OgzbP7oSFm0vZ+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"FEg+WQ42xfOIm1VCUAlgIXc1r1Q="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"7sE+JmzhaSm6OgzbP7oSFm0vZ+E=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"FEg+WQ42xfOIm1VCUAlgIXc1r1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"DEyhmozWk8L3OryPLCWlF9wnWLs="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"FEg+WQ42xfOIm1VCUAlgIXc1r1Q=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"DEyhmozWk8L3OryPLCWlF9wnWLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"w/N5Kai0ZcbUtEhuUI29qtWeKuI="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"DEyhmozWk8L3OryPLCWlF9wnWLs=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"w/N5Kai0ZcbUtEhuUI29qtWeKuI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"S4oixsMeqwmntpyNUXjVGc0ApXc="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"w/N5Kai0ZcbUtEhuUI29qtWeKuI=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"S4oixsMeqwmntpyNUXjVGc0ApXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"8l87BMLxgK8SeS8epqzXuT62v0A="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"S4oixsMeqwmntpyNUXjVGc0ApXc=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"8l87BMLxgK8SeS8epqzXuT62v0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"tlS0E0Yo3CeDAnlWWA277w487y4="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"8l87BMLxgK8SeS8epqzXuT62v0A=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"tlS0E0Yo3CeDAnlWWA277w487y4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"F+0x4gBiZm73dC/0TCQch45zck4="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"tlS0E0Yo3CeDAnlWWA277w487y4=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T23:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"F+0x4gBiZm73dC/0TCQch45zck4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"87FEgDES5ZdijJzj5Qadvi3IWFg="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"F+0x4gBiZm73dC/0TCQch45zck4=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"87FEgDES5ZdijJzj5Qadvi3IWFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"l4ytyz9v5xlpjFiLOs/rm/T4eJQ="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"87FEgDES5ZdijJzj5Qadvi3IWFg=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"l4ytyz9v5xlpjFiLOs/rm/T4eJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"2UNU1c15X8VxQ1FNI80oVF3hHtI="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"l4ytyz9v5xlpjFiLOs/rm/T4eJQ=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"2UNU1c15X8VxQ1FNI80oVF3hHtI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"M3XDuvyx+oHYTvVQoPP9PhCo2tQ="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"2UNU1c15X8VxQ1FNI80oVF3hHtI=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"M3XDuvyx+oHYTvVQoPP9PhCo2tQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"gDj/p23Zt3GCGxhvDpled+mf7ew="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"M3XDuvyx+oHYTvVQoPP9PhCo2tQ=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"gDj/p23Zt3GCGxhvDpled+mf7ew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"u91q+trObZP6zI+ybutMsAGeHow="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"gDj/p23Zt3GCGxhvDpled+mf7ew=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"u91q+trObZP6zI+ybutMsAGeHow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"xuypczcWGoAWlu9krwYzXIM0LTA="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"u91q+trObZP6zI+ybutMsAGeHow=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"xuypczcWGoAWlu9krwYzXIM0LTA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"r8jasW4/ffwhDrNmcLFKkaBUwyM="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"xuypczcWGoAWlu9krwYzXIM0LTA=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"r8jasW4/ffwhDrNmcLFKkaBUwyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"fFvKcuJCdjEdr1ZDZPjRFoeupc4="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"r8jasW4/ffwhDrNmcLFKkaBUwyM=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"fFvKcuJCdjEdr1ZDZPjRFoeupc4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"hTpUZG2kOA/dKqtGhfoUgSVwggI="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"fFvKcuJCdjEdr1ZDZPjRFoeupc4=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"hTpUZG2kOA/dKqtGhfoUgSVwggI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="},{"type":"next-occurrence","id":"VSVliPm/drD6m2OfYx6XyqT+t1E="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"hTpUZG2kOA/dKqtGhfoUgSVwggI=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"VSVliPm/drD6m2OfYx6XyqT+t1E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EaKW3iFI1VyFahWz646mYvo1gDA="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"VSVliPm/drD6m2OfYx6XyqT+t1E=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"sNXCXvDSUijC4o5i67MUswifTpg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8HnK5sGmRIt3/LOsQ9YLVDkESPc="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"sNXCXvDSUijC4o5i67MUswifTpg=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"8HnK5sGmRIt3/LOsQ9YLVDkESPc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"Xv+O4KZQGBvZOJ56srKuvNo/ffA="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"8HnK5sGmRIt3/LOsQ9YLVDkESPc=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"Xv+O4KZQGBvZOJ56srKuvNo/ffA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"sowCUV2UhvXMpjV6RTwK3Ec6H/I="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"Xv+O4KZQGBvZOJ56srKuvNo/ffA=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"sowCUV2UhvXMpjV6RTwK3Ec6H/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"dTQfJWEOfznjjgLuI7wqx3aKdNE="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"sowCUV2UhvXMpjV6RTwK3Ec6H/I=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T23:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"dTQfJWEOfznjjgLuI7wqx3aKdNE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"s2gCmDBcoQHdeH1FDjTvm257CDQ="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"dTQfJWEOfznjjgLuI7wqx3aKdNE=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"s2gCmDBcoQHdeH1FDjTvm257CDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"5nRx1n5aDGI4qozx1lrO7aXG+Lk="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"s2gCmDBcoQHdeH1FDjTvm257CDQ=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"5nRx1n5aDGI4qozx1lrO7aXG+Lk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"/OD84VUYOJLPpYDmHW0Ftwzz1LM="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"5nRx1n5aDGI4qozx1lrO7aXG+Lk=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"/OD84VUYOJLPpYDmHW0Ftwzz1LM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"vA62mqs0cwZCxTKBDcR0R2W81y0="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"/OD84VUYOJLPpYDmHW0Ftwzz1LM=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"vA62mqs0cwZCxTKBDcR0R2W81y0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"E+GkMelezbegh9Coj5Ej6VT7aMk="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"vA62mqs0cwZCxTKBDcR0R2W81y0=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"E+GkMelezbegh9Coj5Ej6VT7aMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"F7XHvI8UrUCyNkt7AXb/hEk6vyU="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"E+GkMelezbegh9Coj5Ej6VT7aMk=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"F7XHvI8UrUCyNkt7AXb/hEk6vyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"mOBNFOtS9XN5sbktDGbFyjc2Lm8="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"F7XHvI8UrUCyNkt7AXb/hEk6vyU=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"mOBNFOtS9XN5sbktDGbFyjc2Lm8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"P24Mak58h6Fe4O3e4hAzkhMX/HA="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"mOBNFOtS9XN5sbktDGbFyjc2Lm8=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"P24Mak58h6Fe4O3e4hAzkhMX/HA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"NJaSS54RavDG5gpZzwppxF72ijM="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"P24Mak58h6Fe4O3e4hAzkhMX/HA=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"NJaSS54RavDG5gpZzwppxF72ijM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"oPOOed00l/2GfNAMa5FUQRhoToI="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"NJaSS54RavDG5gpZzwppxF72ijM=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"oPOOed00l/2GfNAMa5FUQRhoToI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"BJo8jJYCeTduefZ669WLwRWusXY="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"oPOOed00l/2GfNAMa5FUQRhoToI=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"BJo8jJYCeTduefZ669WLwRWusXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"Zj7iaDLGoKxSQOs8jZ1KCb2I/PA="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"BJo8jJYCeTduefZ669WLwRWusXY=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"Zj7iaDLGoKxSQOs8jZ1KCb2I/PA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"3UA/nxUwYjn4oSbmdIWIeodlCnY="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"Zj7iaDLGoKxSQOs8jZ1KCb2I/PA=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"3UA/nxUwYjn4oSbmdIWIeodlCnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"VbjDGg3wJfTEQ2T3I7g3W8efKJk="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"3UA/nxUwYjn4oSbmdIWIeodlCnY=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T23:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"VbjDGg3wJfTEQ2T3I7g3W8efKJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"ZQvNBZJAM5mimGBbM4cpYslTCF0="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"VbjDGg3wJfTEQ2T3I7g3W8efKJk=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"ZQvNBZJAM5mimGBbM4cpYslTCF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"/BKbUN3szvMpJHuT3SHwF0uqdwQ="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"ZQvNBZJAM5mimGBbM4cpYslTCF0=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"/BKbUN3szvMpJHuT3SHwF0uqdwQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"1fmxIHHC3RRqy4/8nlUMnugkxoM="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"/BKbUN3szvMpJHuT3SHwF0uqdwQ=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"1fmxIHHC3RRqy4/8nlUMnugkxoM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"0TK7HiSma7Em25qI8f+CA3LcHVM="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"1fmxIHHC3RRqy4/8nlUMnugkxoM=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"0TK7HiSma7Em25qI8f+CA3LcHVM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"fSo2MxaJcPHoKRd9k1/kMgs7tRw="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"0TK7HiSma7Em25qI8f+CA3LcHVM=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"fSo2MxaJcPHoKRd9k1/kMgs7tRw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"dIzVmab2ZoOqkMtAe1TYAQ0MoJU="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"fSo2MxaJcPHoKRd9k1/kMgs7tRw=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"dIzVmab2ZoOqkMtAe1TYAQ0MoJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"ot2sUoAcdKQEFUWjy2CdGDDe5gM="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"dIzVmab2ZoOqkMtAe1TYAQ0MoJU=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"ot2sUoAcdKQEFUWjy2CdGDDe5gM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"3v0xVdYwBkVOv+Rksw67Hkl32n4="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"ot2sUoAcdKQEFUWjy2CdGDDe5gM=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"3v0xVdYwBkVOv+Rksw67Hkl32n4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"KPFccszqd4ZYCgZVetJ+KT6vr5s="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"3v0xVdYwBkVOv+Rksw67Hkl32n4=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"KPFccszqd4ZYCgZVetJ+KT6vr5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"4bdiQ2MlRhN8J3prhrggVS/9BzI="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"KPFccszqd4ZYCgZVetJ+KT6vr5s=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"4bdiQ2MlRhN8J3prhrggVS/9BzI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="},{"type":"next-occurrence","id":"qwyx8A2P0uKAfxa5w8eczaqQSX4="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"4bdiQ2MlRhN8J3prhrggVS/9BzI=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"qwyx8A2P0uKAfxa5w8eczaqQSX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNXCXvDSUijC4o5i67MUswifTpg="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"qwyx8A2P0uKAfxa5w8eczaqQSX4=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"fYgEanThQ3qEkmEjPiI18GzFODQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"r48Id/6ajJPGXDzNekQUIwJhjsc="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"fYgEanThQ3qEkmEjPiI18GzFODQ=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"r48Id/6ajJPGXDzNekQUIwJhjsc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fYgEanThQ3qEkmEjPiI18GzFODQ="},{"type":"next-occurrence","id":"kOAHglu4jVLjkBC4UE44G7OgZ58="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"r48Id/6ajJPGXDzNekQUIwJhjsc=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T01:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"kOAHglu4jVLjkBC4UE44G7OgZ58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fYgEanThQ3qEkmEjPiI18GzFODQ="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"kOAHglu4jVLjkBC4UE44G7OgZ58=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T01:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"lpOgQTg6nxLGQXziYw7tqOGqufg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q2crpJhEdH/ZIW7g/zzHxctccSA="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"lpOgQTg6nxLGQXziYw7tqOGqufg=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"q2crpJhEdH/ZIW7g/zzHxctccSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lpOgQTg6nxLGQXziYw7tqOGqufg="},{"type":"next-occurrence","id":"LEGUy1T+qyhjqkgeb06uwKzkD44="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"q2crpJhEdH/ZIW7g/zzHxctccSA=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T01:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"LEGUy1T+qyhjqkgeb06uwKzkD44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lpOgQTg6nxLGQXziYw7tqOGqufg="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"LEGUy1T+qyhjqkgeb06uwKzkD44=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T01:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"qAzyRqhZrtSJ9RGnKwx7zUR+C3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q2xdC36euPVRknGLsUIqpzkg8mg="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"qAzyRqhZrtSJ9RGnKwx7zUR+C3k=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"q2xdC36euPVRknGLsUIqpzkg8mg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qAzyRqhZrtSJ9RGnKwx7zUR+C3k="},{"type":"next-occurrence","id":"dkrXK3EkVN0IpW8eTqtOL0dM2cY="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"q2xdC36euPVRknGLsUIqpzkg8mg=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T01:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"dkrXK3EkVN0IpW8eTqtOL0dM2cY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qAzyRqhZrtSJ9RGnKwx7zUR+C3k="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"dkrXK3EkVN0IpW8eTqtOL0dM2cY=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T01:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"ofKAjqZldA9CoNbehqcEckw1sY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on I-490 westbound at Bushnells Basin on ramp (Perinton) Exit 27 - I490 WB on ramp will be closed to all traffic beginning Monday March 30th. Detour will be posted Closure scheduled to be in place for the 2026 construction season. , Continuous Monday March 30th, 2026 07:00 AM thru Friday December 18th, 2026 05:00 PM All lanes closed ramp","update_date":"2026-04-13T14:42:36Z"},"road_event_id":"ofKAjqZldA9CoNbehqcEckw1sY0=","beginning_cross_street":"Bushnells Basin on ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.47116,43.057699]]}},{"id":"EvwoYl9TlzuESrPS99Yib905cOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on I-490 eastbound from Pittsford Palmyra Road; NY 31 (Perinton) to Bushnells Basin (Perinton) The I490 EB between Exit 26 to Exit 27. Both the EB lanes will be shifted to the right but staying in the EB travel direction beginning Monday March 30th. Lanes Shifts scheduled to be in place for the 2026 construction season., Continuous Monday March 30th, 2026 07:00 AM thru Friday December 18th, 2026 05:00 PM All lanes","update_date":"2026-04-13T14:40:48Z"},"road_event_id":"EvwoYl9TlzuESrPS99Yib905cOI=","beginning_cross_street":"Pittsford Palmyra Road; NY 31","ending_cross_street":"Bushnells Basin ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.485802,43.079325]]}},{"id":"97vKfIzZZggS/UX+CfYXakUisGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[],"description":"Construction on PARK AVE northbound between E 128TH ST (New York) and E 129TH ST (New York) to erect the gantries for the Park Avenue Viaduct-northbound., Continuous Tuesday March 24th, 2026 12:00 AM thru Sunday June 21st, 2026 11:59 PM All lanes closed","update_date":"2026-03-24T19:40:05Z"},"road_event_id":"97vKfIzZZggS/UX+CfYXakUisGY=","beginning_cross_street":"E 128TH ST","ending_cross_street":"E 129TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937448,40.807004]]}},{"id":"smCi25WisIbVbjQP633tfGWSGgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[],"description":"Construction on PARK AVE northbound between E 129TH ST (New York) and E 130TH ST (New York) to erect the gantries for the Park Avenue Viaduct-northbound., Continuous Tuesday March 24th, 2026 12:00 AM thru Sunday June 21st, 2026 11:59 PM All lanes closed","update_date":"2026-03-24T19:42:48Z"},"road_event_id":"smCi25WisIbVbjQP633tfGWSGgo=","beginning_cross_street":"E 129TH ST","ending_cross_street":"E 130TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937017,40.807596]]}},{"id":"0SCjhzxCqPq0EeYTAIjpsetVN7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[],"description":"Construction on PARK AVE northbound between E 130TH ST (New York) and E 131ST ST (New York) to erect the gantries for the Park Avenue Viaduct-northbound., Continuous Tuesday March 24th, 2026 12:00 AM thru Sunday June 21st, 2026 11:59 PM All lanes closed","update_date":"2026-03-24T19:44:22Z"},"road_event_id":"0SCjhzxCqPq0EeYTAIjpsetVN7A=","beginning_cross_street":"E 130TH ST","ending_cross_street":"E 131ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936571,40.808209]]}},{"id":"4QmwUfsxqwoY6ZXOVHmt/IzN9qk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on WATER ST southbound between COLONIE ST (Albany) and ORANGE ST (Albany) left lane closure with temporary concrete barrier, Continuous Tuesday March 31st, 2026 12:00 AM thru Wednesday September 30th, 2026 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-22T19:17:53Z"},"road_event_id":"4QmwUfsxqwoY6ZXOVHmt/IzN9qk=","beginning_cross_street":"COLONIE ST","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.744117,42.656052]]}},{"id":"n2lkhUssrfsUETuXxw7DcjsGtHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bIicyZ/Bods4hwF0+GiMxe7Rczk="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:34Z"},"road_event_id":"n2lkhUssrfsUETuXxw7DcjsGtHs=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"bIicyZ/Bods4hwF0+GiMxe7Rczk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2lkhUssrfsUETuXxw7DcjsGtHs="},{"type":"next-occurrence","id":"kv9/UGJ8a6R0PyXcM9b9tIJVfp0="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:34Z"},"road_event_id":"bIicyZ/Bods4hwF0+GiMxe7Rczk=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"kv9/UGJ8a6R0PyXcM9b9tIJVfp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2lkhUssrfsUETuXxw7DcjsGtHs="},{"type":"next-occurrence","id":"IdMjIsw06FAo1qG/kmSEpz1jL5g="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:34Z"},"road_event_id":"kv9/UGJ8a6R0PyXcM9b9tIJVfp0=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"IdMjIsw06FAo1qG/kmSEpz1jL5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2lkhUssrfsUETuXxw7DcjsGtHs="},{"type":"next-occurrence","id":"7ViU1deIfhQzxayr+6Nf5zdmW/w="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:34Z"},"road_event_id":"IdMjIsw06FAo1qG/kmSEpz1jL5g=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"7ViU1deIfhQzxayr+6Nf5zdmW/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2lkhUssrfsUETuXxw7DcjsGtHs="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:34Z"},"road_event_id":"7ViU1deIfhQzxayr+6Nf5zdmW/w=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"Ts6vmHEr1VANA/9Gjjr5/HNZonc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Mid Hudson Bridge"],"direction":"unknown","related_road_events":[],"description":"Overnight roadwork on Mid Hudson Bridge both directions area of Dutchess County Side (Poughkeepsie) 6PM-6AM, Thursday March 26th, 2026 thru Monday August 31st, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-06T19:30:36Z"},"road_event_id":"Ts6vmHEr1VANA/9Gjjr5/HNZonc=","beginning_cross_street":"Dutchess County Side","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.941247,41.702365]]}},{"id":"qzYlp8xNjGh3DruZCFnb1PP8Glw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12B"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"z7BxXZkhj9aAzxdWeM42XJRf6v4="}],"description":"Construction on NY 12B both directions between Harding Road; NY 233; Hamlet of Franklin Springs (Kirkland) and CR 15; Brimfield Street (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place between Furnace Street and Taylor Ave., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:37:42Z"},"road_event_id":"qzYlp8xNjGh3DruZCFnb1PP8Glw=","beginning_cross_street":"Harding Road; NY 233; Hamlet of Franklin Springs","ending_cross_street":"CR 15; Brimfield Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.404403,43.032398]]}},{"id":"z7BxXZkhj9aAzxdWeM42XJRf6v4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qzYlp8xNjGh3DruZCFnb1PP8Glw="},{"type":"next-occurrence","id":"/sNCVUu3x5p7+TBCtrGT8VzuhP8="}],"description":"Construction on NY 12B both directions between Harding Road; NY 233; Hamlet of Franklin Springs (Kirkland) and CR 15; Brimfield Street (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place between Furnace Street and Taylor Ave., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:37:42Z"},"road_event_id":"z7BxXZkhj9aAzxdWeM42XJRf6v4=","beginning_cross_street":"Harding Road; NY 233; Hamlet of Franklin Springs","ending_cross_street":"CR 15; Brimfield Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.404403,43.032398]]}},{"id":"/sNCVUu3x5p7+TBCtrGT8VzuhP8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qzYlp8xNjGh3DruZCFnb1PP8Glw="},{"type":"next-occurrence","id":"0eifA/sb76EH+cC+nHRTm3F1QVU="}],"description":"Construction on NY 12B both directions between Harding Road; NY 233; Hamlet of Franklin Springs (Kirkland) and CR 15; Brimfield Street (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place between Furnace Street and Taylor Ave., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:37:42Z"},"road_event_id":"/sNCVUu3x5p7+TBCtrGT8VzuhP8=","beginning_cross_street":"Harding Road; NY 233; Hamlet of Franklin Springs","ending_cross_street":"CR 15; Brimfield Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.404403,43.032398]]}},{"id":"0eifA/sb76EH+cC+nHRTm3F1QVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qzYlp8xNjGh3DruZCFnb1PP8Glw="},{"type":"next-occurrence","id":"HWsH49CZcw5XjLfMNlfMq5R1qzk="}],"description":"Construction on NY 12B both directions between Harding Road; NY 233; Hamlet of Franklin Springs (Kirkland) and CR 15; Brimfield Street (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place between Furnace Street and Taylor Ave., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:37:42Z"},"road_event_id":"0eifA/sb76EH+cC+nHRTm3F1QVU=","beginning_cross_street":"Harding Road; NY 233; Hamlet of Franklin Springs","ending_cross_street":"CR 15; Brimfield Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.404403,43.032398]]}},{"id":"HWsH49CZcw5XjLfMNlfMq5R1qzk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qzYlp8xNjGh3DruZCFnb1PP8Glw="},{"type":"next-occurrence","id":"jWI/R58jD91jAzmeuPpfIdIgLSc="}],"description":"Construction on NY 12B both directions between Harding Road; NY 233; Hamlet of Franklin Springs (Kirkland) and CR 15; Brimfield Street (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place between Furnace Street and Taylor Ave., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:37:42Z"},"road_event_id":"HWsH49CZcw5XjLfMNlfMq5R1qzk=","beginning_cross_street":"Harding Road; NY 233; Hamlet of Franklin Springs","ending_cross_street":"CR 15; Brimfield Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.404403,43.032398]]}},{"id":"jWI/R58jD91jAzmeuPpfIdIgLSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qzYlp8xNjGh3DruZCFnb1PP8Glw="}],"description":"Construction on NY 12B both directions between Harding Road; NY 233; Hamlet of Franklin Springs (Kirkland) and CR 15; Brimfield Street (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place between Furnace Street and Taylor Ave., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:37:42Z"},"road_event_id":"jWI/R58jD91jAzmeuPpfIdIgLSc=","beginning_cross_street":"Harding Road; NY 233; Hamlet of Franklin Springs","ending_cross_street":"CR 15; Brimfield Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.404403,43.032398]]}},{"id":"FBwIoOFbYLk6NxKR9NhGD0rZ4AE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 46 both directions between Center Street (Oneida) and Cobb Street Motorists will encounter a full road closure with a signed detour in place for the replacement of the bridge over I-90. The detour will utilize Route 365A, Route 365 and Route31, Continuous Monday March 30th, 2026 6:00 AM thru Wednesday November 25th, 2026 6:00 PM all lanes closed","update_date":"2026-03-30T15:41:21Z"},"road_event_id":"FBwIoOFbYLk6NxKR9NhGD0rZ4AE=","beginning_cross_street":"Center Street","ending_cross_street":"Cobb Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.664703,43.110298]]}},{"id":"uUpeoLz64INF/HypTu6LVDNi3zw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bvjQVPUtafaQkmsyZzTp1EuzSvE="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"uUpeoLz64INF/HypTu6LVDNi3zw=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"bvjQVPUtafaQkmsyZzTp1EuzSvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uUpeoLz64INF/HypTu6LVDNi3zw="},{"type":"next-occurrence","id":"RWJiTW+KXreT8xnCo9MpZhnUZ3o="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"bvjQVPUtafaQkmsyZzTp1EuzSvE=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"RWJiTW+KXreT8xnCo9MpZhnUZ3o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uUpeoLz64INF/HypTu6LVDNi3zw="},{"type":"next-occurrence","id":"9G5CM4zWxX+W98WwBELf6C26nLY="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"RWJiTW+KXreT8xnCo9MpZhnUZ3o=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"9G5CM4zWxX+W98WwBELf6C26nLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uUpeoLz64INF/HypTu6LVDNi3zw="},{"type":"next-occurrence","id":"hLm5UOR7tAutW0X56r6SdE6p+Ro="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"9G5CM4zWxX+W98WwBELf6C26nLY=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"hLm5UOR7tAutW0X56r6SdE6p+Ro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uUpeoLz64INF/HypTu6LVDNi3zw="},{"type":"next-occurrence","id":"SBkP3KjMU06mvQ2x5vYTeuW2yOU="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"hLm5UOR7tAutW0X56r6SdE6p+Ro=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"SBkP3KjMU06mvQ2x5vYTeuW2yOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uUpeoLz64INF/HypTu6LVDNi3zw="},{"type":"next-occurrence","id":"6lMkIVK7wPyf1Yw6yiny9GIQBa8="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"SBkP3KjMU06mvQ2x5vYTeuW2yOU=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"6lMkIVK7wPyf1Yw6yiny9GIQBa8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uUpeoLz64INF/HypTu6LVDNi3zw="},{"type":"next-occurrence","id":"LRZ99ce31WjFB+kZqH1FJvyv0zM="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"6lMkIVK7wPyf1Yw6yiny9GIQBa8=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"LRZ99ce31WjFB+kZqH1FJvyv0zM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uUpeoLz64INF/HypTu6LVDNi3zw="},{"type":"next-occurrence","id":"pQYuDAW+5PdIIrXbO3xHScKXMnM="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"LRZ99ce31WjFB+kZqH1FJvyv0zM=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"pQYuDAW+5PdIIrXbO3xHScKXMnM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uUpeoLz64INF/HypTu6LVDNi3zw="},{"type":"next-occurrence","id":"8BUF0hh2zc9d/P2VxcOHsGGpoAg="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"pQYuDAW+5PdIIrXbO3xHScKXMnM=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"8BUF0hh2zc9d/P2VxcOHsGGpoAg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uUpeoLz64INF/HypTu6LVDNi3zw="},{"type":"next-occurrence","id":"1QlGpo3R0HQOJvCW4UQXlwuSqik="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"8BUF0hh2zc9d/P2VxcOHsGGpoAg=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"1QlGpo3R0HQOJvCW4UQXlwuSqik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uUpeoLz64INF/HypTu6LVDNi3zw="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"1QlGpo3R0HQOJvCW4UQXlwuSqik=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"NDVdCsRqEmbg92Fvpc+Juf/Vqv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs on NY 22 both directions between Bedford Center Road (Bedford) and Maple Avenue (White Plains) D265557/32720109 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Monday April 6th, 2026 7:00 AM thru Friday June 19th, 2026 4:30 PM all lanes closed and detoured","update_date":"2026-05-26T19:47:10Z"},"road_event_id":"NDVdCsRqEmbg92Fvpc+Juf/Vqv8=","beginning_cross_street":"Bedford Center Road","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-19T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.656147,41.23112]]}},{"id":"JVwnY7ITMRAeUv/3vuNE7O+t16w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"JVwnY7ITMRAeUv/3vuNE7O+t16w=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"kLNGk6dCmAJ2jfwI9wSy1dhbKjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Cqsfd2S6fvC+4FdBOHx/zc8JxgI="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"kLNGk6dCmAJ2jfwI9wSy1dhbKjU=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:30:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"Cqsfd2S6fvC+4FdBOHx/zc8JxgI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLNGk6dCmAJ2jfwI9wSy1dhbKjU="},{"type":"next-occurrence","id":"HUpjfkbVbHqkIppaVaNEWw+wwyA="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"Cqsfd2S6fvC+4FdBOHx/zc8JxgI=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"HUpjfkbVbHqkIppaVaNEWw+wwyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLNGk6dCmAJ2jfwI9wSy1dhbKjU="},{"type":"next-occurrence","id":"0qLowuKunqobWznVR0np1UlZTXo="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"HUpjfkbVbHqkIppaVaNEWw+wwyA=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"0qLowuKunqobWznVR0np1UlZTXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLNGk6dCmAJ2jfwI9wSy1dhbKjU="},{"type":"next-occurrence","id":"PFBL7zWzXaHjEfwqnirtKb6uM+w="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"0qLowuKunqobWznVR0np1UlZTXo=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"PFBL7zWzXaHjEfwqnirtKb6uM+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLNGk6dCmAJ2jfwI9wSy1dhbKjU="},{"type":"next-occurrence","id":"NFbBAiT17yg/jvbBXdP4o5VPUHg="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"PFBL7zWzXaHjEfwqnirtKb6uM+w=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"NFbBAiT17yg/jvbBXdP4o5VPUHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLNGk6dCmAJ2jfwI9wSy1dhbKjU="},{"type":"next-occurrence","id":"8XpjGsAY40eAl4oi8OMVB6OAa4s="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"NFbBAiT17yg/jvbBXdP4o5VPUHg=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"8XpjGsAY40eAl4oi8OMVB6OAa4s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLNGk6dCmAJ2jfwI9wSy1dhbKjU="},{"type":"next-occurrence","id":"l9vPAMBpy/opd2YalM7z/ku0XDI="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"8XpjGsAY40eAl4oi8OMVB6OAa4s=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:30:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"l9vPAMBpy/opd2YalM7z/ku0XDI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLNGk6dCmAJ2jfwI9wSy1dhbKjU="},{"type":"next-occurrence","id":"gs0HZPIZz6OQUR/LeeoQHWe9Vlw="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"l9vPAMBpy/opd2YalM7z/ku0XDI=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:30:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"gs0HZPIZz6OQUR/LeeoQHWe9Vlw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLNGk6dCmAJ2jfwI9wSy1dhbKjU="},{"type":"next-occurrence","id":"DkKqfikIQLC3k2hf7C3wxsAUrQA="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"gs0HZPIZz6OQUR/LeeoQHWe9Vlw=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:30:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"DkKqfikIQLC3k2hf7C3wxsAUrQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLNGk6dCmAJ2jfwI9wSy1dhbKjU="},{"type":"next-occurrence","id":"qZYzY3icNdaHcgj/5G268p066SA="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"DkKqfikIQLC3k2hf7C3wxsAUrQA=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:30:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"qZYzY3icNdaHcgj/5G268p066SA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLNGk6dCmAJ2jfwI9wSy1dhbKjU="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"qZYzY3icNdaHcgj/5G268p066SA=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:30:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"M//895q9XWfxvb64dl4oZaJ01gc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 84TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bcpi5QDx3CYyNkTSnB/1zJ2Jcg4="}],"description":"Construction on W 84TH ST eastbound between AMSTERDAM AVE (New York) and COLUMBUS AVE (New York) for system upgrade., Saturday April 4th, 2026 thru Saturday August 29th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday August 30th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:30:31Z"},"road_event_id":"M//895q9XWfxvb64dl4oZaJ01gc=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97584,40.78631]]}},{"id":"bcpi5QDx3CYyNkTSnB/1zJ2Jcg4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M//895q9XWfxvb64dl4oZaJ01gc="},{"type":"next-occurrence","id":"DcU+tkVpKOHst9h3WMGP6Ab2OFI="}],"description":"Construction on W 84TH ST eastbound between AMSTERDAM AVE (New York) and COLUMBUS AVE (New York) for system upgrade., Saturday April 4th, 2026 thru Saturday August 29th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday August 30th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:30:31Z"},"road_event_id":"bcpi5QDx3CYyNkTSnB/1zJ2Jcg4=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97584,40.78631]]}},{"id":"DcU+tkVpKOHst9h3WMGP6Ab2OFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M//895q9XWfxvb64dl4oZaJ01gc="},{"type":"next-occurrence","id":"B0x3+EoNnO6vyjX9TwtHzfWOaOo="}],"description":"Construction on W 84TH ST eastbound between AMSTERDAM AVE (New York) and COLUMBUS AVE (New York) for system upgrade., Saturday April 4th, 2026 thru Saturday August 29th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday August 30th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:30:31Z"},"road_event_id":"DcU+tkVpKOHst9h3WMGP6Ab2OFI=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97584,40.78631]]}},{"id":"B0x3+EoNnO6vyjX9TwtHzfWOaOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M//895q9XWfxvb64dl4oZaJ01gc="}],"description":"Construction on W 84TH ST eastbound between AMSTERDAM AVE (New York) and COLUMBUS AVE (New York) for system upgrade., Saturday April 4th, 2026 thru Saturday August 29th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday August 30th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:30:31Z"},"road_event_id":"B0x3+EoNnO6vyjX9TwtHzfWOaOo=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97584,40.78631]]}},{"id":"9epEk4ymgxltEYZiiB+uSk2h2VU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Longterm construction on I-490 westbound between Exit 27 - NY 96 (Perinton) and Exit 26 - NY 31 (Pittsford), Continuous Saturday April 4th, 2026 07:00 AM thru Friday December 18th, 2026 05:00 PM All lanes shift","update_date":"2026-03-31T17:42:31Z"},"road_event_id":"9epEk4ymgxltEYZiiB+uSk2h2VU=","beginning_cross_street":"Exit 27 - NY 96","ending_cross_street":"Exit 26 - NY 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.471156,43.057095]]}},{"id":"3xlVX7TdO4Yj3j72fEv22etFfMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CcF11kG1Yp7cdkuzRRK9S4tLtnY="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"3xlVX7TdO4Yj3j72fEv22etFfMM=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"CcF11kG1Yp7cdkuzRRK9S4tLtnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3xlVX7TdO4Yj3j72fEv22etFfMM="},{"type":"next-occurrence","id":"AC5d0YhECIYmHAYfA0LlYU47jVs="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"CcF11kG1Yp7cdkuzRRK9S4tLtnY=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"AC5d0YhECIYmHAYfA0LlYU47jVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3xlVX7TdO4Yj3j72fEv22etFfMM="},{"type":"next-occurrence","id":"vwcbqVVLoZzGX2/YsogkoT0ZDt8="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"AC5d0YhECIYmHAYfA0LlYU47jVs=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"vwcbqVVLoZzGX2/YsogkoT0ZDt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3xlVX7TdO4Yj3j72fEv22etFfMM="},{"type":"next-occurrence","id":"HWAk8uUbvXWxNOFHLAufRvJlyS8="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"vwcbqVVLoZzGX2/YsogkoT0ZDt8=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"HWAk8uUbvXWxNOFHLAufRvJlyS8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3xlVX7TdO4Yj3j72fEv22etFfMM="},{"type":"next-occurrence","id":"Yc/sEReBAqz5dervfAEgPsyo49Y="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"HWAk8uUbvXWxNOFHLAufRvJlyS8=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"Yc/sEReBAqz5dervfAEgPsyo49Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3xlVX7TdO4Yj3j72fEv22etFfMM="},{"type":"next-occurrence","id":"gaCYFrhiLVsM6kQUVs/uqQMqpDw="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"Yc/sEReBAqz5dervfAEgPsyo49Y=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"gaCYFrhiLVsM6kQUVs/uqQMqpDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3xlVX7TdO4Yj3j72fEv22etFfMM="},{"type":"next-occurrence","id":"wkGl8eLlsusu4lq4zmeVyG0CtX4="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"gaCYFrhiLVsM6kQUVs/uqQMqpDw=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"wkGl8eLlsusu4lq4zmeVyG0CtX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3xlVX7TdO4Yj3j72fEv22etFfMM="},{"type":"next-occurrence","id":"qb2OGgTNOzxHGtcg6xHg7euDTbs="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"wkGl8eLlsusu4lq4zmeVyG0CtX4=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"qb2OGgTNOzxHGtcg6xHg7euDTbs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3xlVX7TdO4Yj3j72fEv22etFfMM="},{"type":"next-occurrence","id":"b9sWYHieFEaVBp+XC72yp/z37x0="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"qb2OGgTNOzxHGtcg6xHg7euDTbs=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"b9sWYHieFEaVBp+XC72yp/z37x0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3xlVX7TdO4Yj3j72fEv22etFfMM="},{"type":"next-occurrence","id":"LEhf9OVza9c8Z3Vkt9+iIzsLVk0="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"b9sWYHieFEaVBp+XC72yp/z37x0=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"LEhf9OVza9c8Z3Vkt9+iIzsLVk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3xlVX7TdO4Yj3j72fEv22etFfMM="},{"type":"next-occurrence","id":"fLbyz3iP4Pn0NeXqBaupVEnSR3M="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"LEhf9OVza9c8Z3Vkt9+iIzsLVk0=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"fLbyz3iP4Pn0NeXqBaupVEnSR3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3xlVX7TdO4Yj3j72fEv22etFfMM="},{"type":"next-occurrence","id":"nptfraieO3pzbbSjpHwsp7YPspw="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"fLbyz3iP4Pn0NeXqBaupVEnSR3M=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"nptfraieO3pzbbSjpHwsp7YPspw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3xlVX7TdO4Yj3j72fEv22etFfMM="},{"type":"next-occurrence","id":"C+JPWyDPESFRmO3ShewhGSPCD9Q="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"nptfraieO3pzbbSjpHwsp7YPspw=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"C+JPWyDPESFRmO3ShewhGSPCD9Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3xlVX7TdO4Yj3j72fEv22etFfMM="},{"type":"next-occurrence","id":"VaoupGcaijQllcfOqWJz8B9udXc="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"C+JPWyDPESFRmO3ShewhGSPCD9Q=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"VaoupGcaijQllcfOqWJz8B9udXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3xlVX7TdO4Yj3j72fEv22etFfMM="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"VaoupGcaijQllcfOqWJz8B9udXc=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"fiBBJEax7tXnZQmygjf+lrszCRM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"V/uLFmIAbehdKsLbZkA6jQrwNhc="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"fiBBJEax7tXnZQmygjf+lrszCRM=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"V/uLFmIAbehdKsLbZkA6jQrwNhc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fiBBJEax7tXnZQmygjf+lrszCRM="},{"type":"next-occurrence","id":"yqHprdMz/GJ1WJM5rRp9RFvvqd4="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"V/uLFmIAbehdKsLbZkA6jQrwNhc=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"yqHprdMz/GJ1WJM5rRp9RFvvqd4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fiBBJEax7tXnZQmygjf+lrszCRM="},{"type":"next-occurrence","id":"CoA45MlZJa9t/yjP5nQqJgi/moY="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"yqHprdMz/GJ1WJM5rRp9RFvvqd4=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"CoA45MlZJa9t/yjP5nQqJgi/moY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fiBBJEax7tXnZQmygjf+lrszCRM="},{"type":"next-occurrence","id":"cEb84UA8tBeAgvvBFYV3I9qf27w="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"CoA45MlZJa9t/yjP5nQqJgi/moY=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"cEb84UA8tBeAgvvBFYV3I9qf27w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fiBBJEax7tXnZQmygjf+lrszCRM="},{"type":"next-occurrence","id":"S7mUkmqm/p2gZWl3mcJjXD/OLQA="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"cEb84UA8tBeAgvvBFYV3I9qf27w=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"S7mUkmqm/p2gZWl3mcJjXD/OLQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fiBBJEax7tXnZQmygjf+lrszCRM="},{"type":"next-occurrence","id":"nJW+Zo5RA8zek94Muow/gOggO5U="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"S7mUkmqm/p2gZWl3mcJjXD/OLQA=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"nJW+Zo5RA8zek94Muow/gOggO5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fiBBJEax7tXnZQmygjf+lrszCRM="},{"type":"next-occurrence","id":"r8W0FXsvzDTW35V6k7QWylA9VRs="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"nJW+Zo5RA8zek94Muow/gOggO5U=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"r8W0FXsvzDTW35V6k7QWylA9VRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fiBBJEax7tXnZQmygjf+lrszCRM="},{"type":"next-occurrence","id":"Klx019hskBAKgmclPHdIvKbghdM="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"r8W0FXsvzDTW35V6k7QWylA9VRs=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"Klx019hskBAKgmclPHdIvKbghdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fiBBJEax7tXnZQmygjf+lrszCRM="},{"type":"next-occurrence","id":"NBs3qQz0QfXQXf2n+s+x5fydYjo="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"Klx019hskBAKgmclPHdIvKbghdM=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"NBs3qQz0QfXQXf2n+s+x5fydYjo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fiBBJEax7tXnZQmygjf+lrszCRM="},{"type":"next-occurrence","id":"7JvIdDlXOEWnDRhHug9Ws3v4YgQ="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"NBs3qQz0QfXQXf2n+s+x5fydYjo=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"7JvIdDlXOEWnDRhHug9Ws3v4YgQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fiBBJEax7tXnZQmygjf+lrszCRM="},{"type":"next-occurrence","id":"2bA00ljXB1p0g0wA1FNB2Y/V5Zw="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"7JvIdDlXOEWnDRhHug9Ws3v4YgQ=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"2bA00ljXB1p0g0wA1FNB2Y/V5Zw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fiBBJEax7tXnZQmygjf+lrszCRM="},{"type":"next-occurrence","id":"3U5hNrz8EyJnQ5gyFwJ3tK9RTb4="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"2bA00ljXB1p0g0wA1FNB2Y/V5Zw=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"3U5hNrz8EyJnQ5gyFwJ3tK9RTb4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fiBBJEax7tXnZQmygjf+lrszCRM="},{"type":"next-occurrence","id":"pkJrAqNwnLD9t9J03MThQgoJfFo="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"3U5hNrz8EyJnQ5gyFwJ3tK9RTb4=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"pkJrAqNwnLD9t9J03MThQgoJfFo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fiBBJEax7tXnZQmygjf+lrszCRM="},{"type":"next-occurrence","id":"3mhVhpo18CAd+l6PzdEgMpCSTVc="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"pkJrAqNwnLD9t9J03MThQgoJfFo=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"3mhVhpo18CAd+l6PzdEgMpCSTVc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fiBBJEax7tXnZQmygjf+lrszCRM="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"3mhVhpo18CAd+l6PzdEgMpCSTVc=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"fECrQ8/HrC9KkEHpEVgAGthfGoM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+0Fs/+z8v+xU+vcXEBMW2dEgZKo="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"fECrQ8/HrC9KkEHpEVgAGthfGoM=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"+0Fs/+z8v+xU+vcXEBMW2dEgZKo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fECrQ8/HrC9KkEHpEVgAGthfGoM="},{"type":"next-occurrence","id":"YGhQlYMDY4uzcbyii88R19ahEgE="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"+0Fs/+z8v+xU+vcXEBMW2dEgZKo=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"YGhQlYMDY4uzcbyii88R19ahEgE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fECrQ8/HrC9KkEHpEVgAGthfGoM="},{"type":"next-occurrence","id":"qzXDCGvxwRzJDtoxxe7tze/IIgI="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"YGhQlYMDY4uzcbyii88R19ahEgE=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"qzXDCGvxwRzJDtoxxe7tze/IIgI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fECrQ8/HrC9KkEHpEVgAGthfGoM="},{"type":"next-occurrence","id":"rtAQrOugvLJnJajOnjo7xpSLusY="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"qzXDCGvxwRzJDtoxxe7tze/IIgI=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"rtAQrOugvLJnJajOnjo7xpSLusY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fECrQ8/HrC9KkEHpEVgAGthfGoM="},{"type":"next-occurrence","id":"R5nqeztTzS2aqMMz8YIZ1t2FjUs="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"rtAQrOugvLJnJajOnjo7xpSLusY=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"R5nqeztTzS2aqMMz8YIZ1t2FjUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fECrQ8/HrC9KkEHpEVgAGthfGoM="},{"type":"next-occurrence","id":"kct0SJK8FpZ5YjwevuPlLBUPEaQ="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"R5nqeztTzS2aqMMz8YIZ1t2FjUs=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"kct0SJK8FpZ5YjwevuPlLBUPEaQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fECrQ8/HrC9KkEHpEVgAGthfGoM="},{"type":"next-occurrence","id":"Fx7r1YugdIobpNMlksXFgxsrfdw="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"kct0SJK8FpZ5YjwevuPlLBUPEaQ=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"Fx7r1YugdIobpNMlksXFgxsrfdw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fECrQ8/HrC9KkEHpEVgAGthfGoM="},{"type":"next-occurrence","id":"Qi7OSKGEq2jNIX5ioYGLR+3IxtY="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"Fx7r1YugdIobpNMlksXFgxsrfdw=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"Qi7OSKGEq2jNIX5ioYGLR+3IxtY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fECrQ8/HrC9KkEHpEVgAGthfGoM="},{"type":"next-occurrence","id":"7TzZZzIMCjOFVC67COMidrUo9Go="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"Qi7OSKGEq2jNIX5ioYGLR+3IxtY=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"7TzZZzIMCjOFVC67COMidrUo9Go=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fECrQ8/HrC9KkEHpEVgAGthfGoM="},{"type":"next-occurrence","id":"nsAJxQD6AfBrzPpsAbvBm1r5oNQ="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"7TzZZzIMCjOFVC67COMidrUo9Go=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"nsAJxQD6AfBrzPpsAbvBm1r5oNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fECrQ8/HrC9KkEHpEVgAGthfGoM="},{"type":"next-occurrence","id":"q5apau1NhGcFhcwaoMpdSnQ2/O4="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"nsAJxQD6AfBrzPpsAbvBm1r5oNQ=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"q5apau1NhGcFhcwaoMpdSnQ2/O4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fECrQ8/HrC9KkEHpEVgAGthfGoM="},{"type":"next-occurrence","id":"UuZNXCIu44daIo4wRUCEtPTvxM4="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"q5apau1NhGcFhcwaoMpdSnQ2/O4=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"UuZNXCIu44daIo4wRUCEtPTvxM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fECrQ8/HrC9KkEHpEVgAGthfGoM="},{"type":"next-occurrence","id":"GtYMGkzRx3+8hjILMW0Z+/W4iz4="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"UuZNXCIu44daIo4wRUCEtPTvxM4=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"GtYMGkzRx3+8hjILMW0Z+/W4iz4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fECrQ8/HrC9KkEHpEVgAGthfGoM="},{"type":"next-occurrence","id":"j03l16o1XJ5Ms2hEm4IzgI+w4AI="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"GtYMGkzRx3+8hjILMW0Z+/W4iz4=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"j03l16o1XJ5Ms2hEm4IzgI+w4AI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fECrQ8/HrC9KkEHpEVgAGthfGoM="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"j03l16o1XJ5Ms2hEm4IzgI+w4AI=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"nMqXLOsFtThEFykSc6zNM9HRM/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0puZm2q6BVDFKqXj8Bdx79ptjNo="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"nMqXLOsFtThEFykSc6zNM9HRM/0=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"0puZm2q6BVDFKqXj8Bdx79ptjNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMqXLOsFtThEFykSc6zNM9HRM/0="},{"type":"next-occurrence","id":"JqQ9gARigotrBZYaydSDkU4q7Q4="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"0puZm2q6BVDFKqXj8Bdx79ptjNo=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"JqQ9gARigotrBZYaydSDkU4q7Q4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMqXLOsFtThEFykSc6zNM9HRM/0="},{"type":"next-occurrence","id":"rBv8dftE+ZemnvSxRFg8ImGIyro="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"JqQ9gARigotrBZYaydSDkU4q7Q4=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"rBv8dftE+ZemnvSxRFg8ImGIyro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMqXLOsFtThEFykSc6zNM9HRM/0="},{"type":"next-occurrence","id":"ySZMm4cFtcJTFbHbCw1txL8qNcM="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"rBv8dftE+ZemnvSxRFg8ImGIyro=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"ySZMm4cFtcJTFbHbCw1txL8qNcM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMqXLOsFtThEFykSc6zNM9HRM/0="},{"type":"next-occurrence","id":"/1sisbQm8slj64LewI7mW7mJM+s="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"ySZMm4cFtcJTFbHbCw1txL8qNcM=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"/1sisbQm8slj64LewI7mW7mJM+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMqXLOsFtThEFykSc6zNM9HRM/0="},{"type":"next-occurrence","id":"OVd+9iQvsEJ7QMjAxSawvxoEjuY="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"/1sisbQm8slj64LewI7mW7mJM+s=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"OVd+9iQvsEJ7QMjAxSawvxoEjuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMqXLOsFtThEFykSc6zNM9HRM/0="},{"type":"next-occurrence","id":"573WHkix51qJtedPrwTzXpHMm40="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"OVd+9iQvsEJ7QMjAxSawvxoEjuY=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"573WHkix51qJtedPrwTzXpHMm40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMqXLOsFtThEFykSc6zNM9HRM/0="},{"type":"next-occurrence","id":"kZsHb67XtZ/GM+gI5LBEv5k8qC8="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"573WHkix51qJtedPrwTzXpHMm40=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"kZsHb67XtZ/GM+gI5LBEv5k8qC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMqXLOsFtThEFykSc6zNM9HRM/0="},{"type":"next-occurrence","id":"/ziV3kkOGIJKIOzVoD+973oPU+Y="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"kZsHb67XtZ/GM+gI5LBEv5k8qC8=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"/ziV3kkOGIJKIOzVoD+973oPU+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMqXLOsFtThEFykSc6zNM9HRM/0="},{"type":"next-occurrence","id":"FnoS1U6qBkbBnjYqzpTCIek0RYc="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"/ziV3kkOGIJKIOzVoD+973oPU+Y=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"FnoS1U6qBkbBnjYqzpTCIek0RYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nMqXLOsFtThEFykSc6zNM9HRM/0="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"FnoS1U6qBkbBnjYqzpTCIek0RYc=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"nwQQvZz3XmEeIwZfQvjpDmzVycE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"A4ztLabsOMpWEQhb77qIE56/jOQ="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"nwQQvZz3XmEeIwZfQvjpDmzVycE=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T12:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"A4ztLabsOMpWEQhb77qIE56/jOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nwQQvZz3XmEeIwZfQvjpDmzVycE="},{"type":"next-occurrence","id":"5uKS8MP1Vxuu2SI88Z9RojHf4Ro="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"A4ztLabsOMpWEQhb77qIE56/jOQ=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"5uKS8MP1Vxuu2SI88Z9RojHf4Ro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nwQQvZz3XmEeIwZfQvjpDmzVycE="},{"type":"next-occurrence","id":"qaAxf4md83ii2qMD4PoxXPjTPkQ="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"5uKS8MP1Vxuu2SI88Z9RojHf4Ro=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"qaAxf4md83ii2qMD4PoxXPjTPkQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nwQQvZz3XmEeIwZfQvjpDmzVycE="},{"type":"next-occurrence","id":"2mJCQIns3OSQztjMscVMpB9RPSk="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"qaAxf4md83ii2qMD4PoxXPjTPkQ=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"2mJCQIns3OSQztjMscVMpB9RPSk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nwQQvZz3XmEeIwZfQvjpDmzVycE="},{"type":"next-occurrence","id":"LWc/amGqH4cXFMzFZNXDQhPoRKg="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"2mJCQIns3OSQztjMscVMpB9RPSk=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"LWc/amGqH4cXFMzFZNXDQhPoRKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nwQQvZz3XmEeIwZfQvjpDmzVycE="},{"type":"next-occurrence","id":"CmlGCKQTXnco/YbiOWE9MVRQVjA="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"LWc/amGqH4cXFMzFZNXDQhPoRKg=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"CmlGCKQTXnco/YbiOWE9MVRQVjA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nwQQvZz3XmEeIwZfQvjpDmzVycE="},{"type":"next-occurrence","id":"Rf+XjN6ZsMN3yV3goM6Q8/I5vBc="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"CmlGCKQTXnco/YbiOWE9MVRQVjA=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T12:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"Rf+XjN6ZsMN3yV3goM6Q8/I5vBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nwQQvZz3XmEeIwZfQvjpDmzVycE="},{"type":"next-occurrence","id":"XFHeuNIapyALWRHUlASyNtXp7iY="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"Rf+XjN6ZsMN3yV3goM6Q8/I5vBc=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T12:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"XFHeuNIapyALWRHUlASyNtXp7iY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nwQQvZz3XmEeIwZfQvjpDmzVycE="},{"type":"next-occurrence","id":"LSJKlfea8h5D363u6cYRmyRRZKg="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"XFHeuNIapyALWRHUlASyNtXp7iY=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T12:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"LSJKlfea8h5D363u6cYRmyRRZKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nwQQvZz3XmEeIwZfQvjpDmzVycE="},{"type":"next-occurrence","id":"MRf5Bl8+XiivzOsprGLpu7FdgqA="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"LSJKlfea8h5D363u6cYRmyRRZKg=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T12:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"MRf5Bl8+XiivzOsprGLpu7FdgqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nwQQvZz3XmEeIwZfQvjpDmzVycE="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"MRf5Bl8+XiivzOsprGLpu7FdgqA=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T12:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"iS2YIUY6tIScGXTs8j/YK/0CZTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Wqvo9JJ9gs+2khaKKOThEXhCwK0="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"iS2YIUY6tIScGXTs8j/YK/0CZTk=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"Wqvo9JJ9gs+2khaKKOThEXhCwK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iS2YIUY6tIScGXTs8j/YK/0CZTk="},{"type":"next-occurrence","id":"c6YQN/ihdTc9SM7+nNVl9HaHATo="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"Wqvo9JJ9gs+2khaKKOThEXhCwK0=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"c6YQN/ihdTc9SM7+nNVl9HaHATo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iS2YIUY6tIScGXTs8j/YK/0CZTk="},{"type":"next-occurrence","id":"QSpuPCom28XtahuJYuj0WAfESwY="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"c6YQN/ihdTc9SM7+nNVl9HaHATo=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"QSpuPCom28XtahuJYuj0WAfESwY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iS2YIUY6tIScGXTs8j/YK/0CZTk="},{"type":"next-occurrence","id":"TTEqubMjlMPf/vNMSBI6Xz58MO0="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"QSpuPCom28XtahuJYuj0WAfESwY=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"TTEqubMjlMPf/vNMSBI6Xz58MO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iS2YIUY6tIScGXTs8j/YK/0CZTk="},{"type":"next-occurrence","id":"SE0vKsHsV10z1isH4KwJmCRWg/I="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"TTEqubMjlMPf/vNMSBI6Xz58MO0=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"SE0vKsHsV10z1isH4KwJmCRWg/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iS2YIUY6tIScGXTs8j/YK/0CZTk="},{"type":"next-occurrence","id":"smiBMto/wTPpc99JzgeY2k2b0kI="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"SE0vKsHsV10z1isH4KwJmCRWg/I=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"smiBMto/wTPpc99JzgeY2k2b0kI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iS2YIUY6tIScGXTs8j/YK/0CZTk="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"smiBMto/wTPpc99JzgeY2k2b0kI=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"7RvIFYD2sYKnLU+Tr00/3aTNg7M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lNNe49NIG+NUmA641KPm+EKVDOw="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"7RvIFYD2sYKnLU+Tr00/3aTNg7M=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"lNNe49NIG+NUmA641KPm+EKVDOw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7RvIFYD2sYKnLU+Tr00/3aTNg7M="},{"type":"next-occurrence","id":"QKpUyTcc26Eq692Pjb6Q0KBDG2o="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"lNNe49NIG+NUmA641KPm+EKVDOw=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"QKpUyTcc26Eq692Pjb6Q0KBDG2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7RvIFYD2sYKnLU+Tr00/3aTNg7M="},{"type":"next-occurrence","id":"EckTupB6uUJp4JipjQq6LALVMiQ="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"QKpUyTcc26Eq692Pjb6Q0KBDG2o=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"EckTupB6uUJp4JipjQq6LALVMiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7RvIFYD2sYKnLU+Tr00/3aTNg7M="},{"type":"next-occurrence","id":"3kluITXsEtCTP+Y9ZWC5UFNDZRA="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"EckTupB6uUJp4JipjQq6LALVMiQ=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"3kluITXsEtCTP+Y9ZWC5UFNDZRA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7RvIFYD2sYKnLU+Tr00/3aTNg7M="},{"type":"next-occurrence","id":"mIgWkR+rw2E6bhme3e0mfujO2B4="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"3kluITXsEtCTP+Y9ZWC5UFNDZRA=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"mIgWkR+rw2E6bhme3e0mfujO2B4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7RvIFYD2sYKnLU+Tr00/3aTNg7M="},{"type":"next-occurrence","id":"iBgwk7wcYtRQ+Cm0R9pDzNUGQk0="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"mIgWkR+rw2E6bhme3e0mfujO2B4=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"iBgwk7wcYtRQ+Cm0R9pDzNUGQk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7RvIFYD2sYKnLU+Tr00/3aTNg7M="},{"type":"next-occurrence","id":"Skrr1VjdnEFUwILsXSxZJSzZLzA="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"iBgwk7wcYtRQ+Cm0R9pDzNUGQk0=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"Skrr1VjdnEFUwILsXSxZJSzZLzA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7RvIFYD2sYKnLU+Tr00/3aTNg7M="},{"type":"next-occurrence","id":"7LbbB4L2UcouB7ohbSExlGMvLvA="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"Skrr1VjdnEFUwILsXSxZJSzZLzA=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"7LbbB4L2UcouB7ohbSExlGMvLvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7RvIFYD2sYKnLU+Tr00/3aTNg7M="},{"type":"next-occurrence","id":"5ssEceh0QzE9foXDxW5JTQ5kHn0="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"7LbbB4L2UcouB7ohbSExlGMvLvA=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"5ssEceh0QzE9foXDxW5JTQ5kHn0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7RvIFYD2sYKnLU+Tr00/3aTNg7M="},{"type":"next-occurrence","id":"tQ7EylTjCYjOOmehL7qjW/3ytrE="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"5ssEceh0QzE9foXDxW5JTQ5kHn0=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"tQ7EylTjCYjOOmehL7qjW/3ytrE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7RvIFYD2sYKnLU+Tr00/3aTNg7M="},{"type":"next-occurrence","id":"ZqGdOSkMUMo7Fij2z02Bak5P+Iw="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"tQ7EylTjCYjOOmehL7qjW/3ytrE=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"ZqGdOSkMUMo7Fij2z02Bak5P+Iw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7RvIFYD2sYKnLU+Tr00/3aTNg7M="},{"type":"next-occurrence","id":"YDULBTywVdkQUEU85427e7s94ww="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"ZqGdOSkMUMo7Fij2z02Bak5P+Iw=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"YDULBTywVdkQUEU85427e7s94ww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7RvIFYD2sYKnLU+Tr00/3aTNg7M="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"YDULBTywVdkQUEU85427e7s94ww=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"efM2mIBCuGnTtZJCFiOpD+83pOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dgODtFIAQhEvIqxCn2IJ3Lsbx7g="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"efM2mIBCuGnTtZJCFiOpD+83pOE=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"dgODtFIAQhEvIqxCn2IJ3Lsbx7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efM2mIBCuGnTtZJCFiOpD+83pOE="},{"type":"next-occurrence","id":"r/1qxRBcd0OqwC6LtOd0XRgIN74="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"dgODtFIAQhEvIqxCn2IJ3Lsbx7g=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"r/1qxRBcd0OqwC6LtOd0XRgIN74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efM2mIBCuGnTtZJCFiOpD+83pOE="},{"type":"next-occurrence","id":"EY/GvWsob2vLacVPxmnUAMAZZXg="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"r/1qxRBcd0OqwC6LtOd0XRgIN74=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"EY/GvWsob2vLacVPxmnUAMAZZXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efM2mIBCuGnTtZJCFiOpD+83pOE="},{"type":"next-occurrence","id":"FMlP5CiURcvaCgDH6YFc/uSQQeY="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"EY/GvWsob2vLacVPxmnUAMAZZXg=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"FMlP5CiURcvaCgDH6YFc/uSQQeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efM2mIBCuGnTtZJCFiOpD+83pOE="},{"type":"next-occurrence","id":"rHbIflIlkwM+HvfV6vrfjZIgA9s="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"FMlP5CiURcvaCgDH6YFc/uSQQeY=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"rHbIflIlkwM+HvfV6vrfjZIgA9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efM2mIBCuGnTtZJCFiOpD+83pOE="},{"type":"next-occurrence","id":"ZhC76WR9AGZNTe8IZYbCX6RsPyA="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"rHbIflIlkwM+HvfV6vrfjZIgA9s=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"ZhC76WR9AGZNTe8IZYbCX6RsPyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efM2mIBCuGnTtZJCFiOpD+83pOE="},{"type":"next-occurrence","id":"0s3jqweR9PV1TJdoxVjdx3tpmV0="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"ZhC76WR9AGZNTe8IZYbCX6RsPyA=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"0s3jqweR9PV1TJdoxVjdx3tpmV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efM2mIBCuGnTtZJCFiOpD+83pOE="},{"type":"next-occurrence","id":"d6qKquVIST06SzCpNQraA79WwOI="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"0s3jqweR9PV1TJdoxVjdx3tpmV0=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"d6qKquVIST06SzCpNQraA79WwOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efM2mIBCuGnTtZJCFiOpD+83pOE="},{"type":"next-occurrence","id":"+O3rq62ZsdmWUBB0BZlExFDWrmA="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"d6qKquVIST06SzCpNQraA79WwOI=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"+O3rq62ZsdmWUBB0BZlExFDWrmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efM2mIBCuGnTtZJCFiOpD+83pOE="},{"type":"next-occurrence","id":"FonMiY8mODF/CNqITiU5PzO57TM="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"+O3rq62ZsdmWUBB0BZlExFDWrmA=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"FonMiY8mODF/CNqITiU5PzO57TM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efM2mIBCuGnTtZJCFiOpD+83pOE="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"FonMiY8mODF/CNqITiU5PzO57TM=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"sNDDr6ILmkp94iENYYQzj/C6QeQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wR+g3wWzXp4Do2WkyVU78pw3Pn8="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"sNDDr6ILmkp94iENYYQzj/C6QeQ=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"wR+g3wWzXp4Do2WkyVU78pw3Pn8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNDDr6ILmkp94iENYYQzj/C6QeQ="},{"type":"next-occurrence","id":"u34VEBD4mZHJxAOGjCK7em3j3BA="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"wR+g3wWzXp4Do2WkyVU78pw3Pn8=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"u34VEBD4mZHJxAOGjCK7em3j3BA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNDDr6ILmkp94iENYYQzj/C6QeQ="},{"type":"next-occurrence","id":"ATap+BpP//KssMi+jVCgmwpFYSs="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"u34VEBD4mZHJxAOGjCK7em3j3BA=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"ATap+BpP//KssMi+jVCgmwpFYSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNDDr6ILmkp94iENYYQzj/C6QeQ="},{"type":"next-occurrence","id":"m/+OyHg1eJGiQgzgYV9+yNPCzmw="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"ATap+BpP//KssMi+jVCgmwpFYSs=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"m/+OyHg1eJGiQgzgYV9+yNPCzmw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNDDr6ILmkp94iENYYQzj/C6QeQ="},{"type":"next-occurrence","id":"lUX05uEWYrPz7/La7+rd94w1nJI="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"m/+OyHg1eJGiQgzgYV9+yNPCzmw=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"lUX05uEWYrPz7/La7+rd94w1nJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNDDr6ILmkp94iENYYQzj/C6QeQ="},{"type":"next-occurrence","id":"Zq0LkPVSBB5OTm+KaT3v1iB7Azs="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"lUX05uEWYrPz7/La7+rd94w1nJI=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"Zq0LkPVSBB5OTm+KaT3v1iB7Azs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNDDr6ILmkp94iENYYQzj/C6QeQ="},{"type":"next-occurrence","id":"TXRsoE0JzudAEeOzCEHbngW3Efk="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"Zq0LkPVSBB5OTm+KaT3v1iB7Azs=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"TXRsoE0JzudAEeOzCEHbngW3Efk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNDDr6ILmkp94iENYYQzj/C6QeQ="},{"type":"next-occurrence","id":"Gf8BXXgYluJ9EDg187zYGSF67fM="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"TXRsoE0JzudAEeOzCEHbngW3Efk=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"Gf8BXXgYluJ9EDg187zYGSF67fM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNDDr6ILmkp94iENYYQzj/C6QeQ="},{"type":"next-occurrence","id":"SmbIJPkmDck9y3mO1fMFEMBe8+Y="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"Gf8BXXgYluJ9EDg187zYGSF67fM=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"SmbIJPkmDck9y3mO1fMFEMBe8+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNDDr6ILmkp94iENYYQzj/C6QeQ="},{"type":"next-occurrence","id":"SuqyfO2Z5XulRWe2uk1yUBUgPSI="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"SmbIJPkmDck9y3mO1fMFEMBe8+Y=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"SuqyfO2Z5XulRWe2uk1yUBUgPSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNDDr6ILmkp94iENYYQzj/C6QeQ="},{"type":"next-occurrence","id":"Dw8+NjX1M0vyNBmotCUjHaWmavE="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"SuqyfO2Z5XulRWe2uk1yUBUgPSI=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"Dw8+NjX1M0vyNBmotCUjHaWmavE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNDDr6ILmkp94iENYYQzj/C6QeQ="},{"type":"next-occurrence","id":"H7CX1N3C7UKB8iB7V9IInZU9lDg="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"Dw8+NjX1M0vyNBmotCUjHaWmavE=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"H7CX1N3C7UKB8iB7V9IInZU9lDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNDDr6ILmkp94iENYYQzj/C6QeQ="},{"type":"next-occurrence","id":"MLpNMb/FhkCFdj+mNeL7qpMvCeo="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"H7CX1N3C7UKB8iB7V9IInZU9lDg=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"MLpNMb/FhkCFdj+mNeL7qpMvCeo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNDDr6ILmkp94iENYYQzj/C6QeQ="},{"type":"next-occurrence","id":"9lL2CvBHjQGaFIx4XYzcI5PtuxE="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"MLpNMb/FhkCFdj+mNeL7qpMvCeo=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"9lL2CvBHjQGaFIx4XYzcI5PtuxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sNDDr6ILmkp94iENYYQzj/C6QeQ="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"9lL2CvBHjQGaFIx4XYzcI5PtuxE=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"58TF+sUhAvGPXME6fw+wTbhebwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6nsxw1kekyLfvqE6A1i2isrmWlc="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"58TF+sUhAvGPXME6fw+wTbhebwc=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"6nsxw1kekyLfvqE6A1i2isrmWlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"58TF+sUhAvGPXME6fw+wTbhebwc="},{"type":"next-occurrence","id":"lIula/uzHysmRAHKHN7LYk6T+OU="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"6nsxw1kekyLfvqE6A1i2isrmWlc=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"lIula/uzHysmRAHKHN7LYk6T+OU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"58TF+sUhAvGPXME6fw+wTbhebwc="},{"type":"next-occurrence","id":"pFms+ZcKWz39eLsbIzhEFYzV4ps="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"lIula/uzHysmRAHKHN7LYk6T+OU=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"pFms+ZcKWz39eLsbIzhEFYzV4ps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"58TF+sUhAvGPXME6fw+wTbhebwc="},{"type":"next-occurrence","id":"WQ75WHE18FRHdmGSsZhg3Y7CmOE="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"pFms+ZcKWz39eLsbIzhEFYzV4ps=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"WQ75WHE18FRHdmGSsZhg3Y7CmOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"58TF+sUhAvGPXME6fw+wTbhebwc="},{"type":"next-occurrence","id":"cLz8ULhmAAUKopelioilpGJumh0="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"WQ75WHE18FRHdmGSsZhg3Y7CmOE=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"cLz8ULhmAAUKopelioilpGJumh0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"58TF+sUhAvGPXME6fw+wTbhebwc="},{"type":"next-occurrence","id":"DUkhBpDOdadQs93vRnJntRIH4cQ="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"cLz8ULhmAAUKopelioilpGJumh0=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"DUkhBpDOdadQs93vRnJntRIH4cQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"58TF+sUhAvGPXME6fw+wTbhebwc="},{"type":"next-occurrence","id":"x/mE4wvuIkWjFmiSTm3EZy4iYM4="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"DUkhBpDOdadQs93vRnJntRIH4cQ=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"x/mE4wvuIkWjFmiSTm3EZy4iYM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"58TF+sUhAvGPXME6fw+wTbhebwc="},{"type":"next-occurrence","id":"zl8dOVJ57BzovtrmDUXXe1FlFoY="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"x/mE4wvuIkWjFmiSTm3EZy4iYM4=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"zl8dOVJ57BzovtrmDUXXe1FlFoY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"58TF+sUhAvGPXME6fw+wTbhebwc="},{"type":"next-occurrence","id":"atVwZ4mUEvHhChU+IKC9CRqmlkc="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"zl8dOVJ57BzovtrmDUXXe1FlFoY=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"atVwZ4mUEvHhChU+IKC9CRqmlkc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"58TF+sUhAvGPXME6fw+wTbhebwc="},{"type":"next-occurrence","id":"F2zy8ziabeRe6gHlSqSHh0uTnMs="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"atVwZ4mUEvHhChU+IKC9CRqmlkc=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"F2zy8ziabeRe6gHlSqSHh0uTnMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"58TF+sUhAvGPXME6fw+wTbhebwc="},{"type":"next-occurrence","id":"BHIySClACRmpqJCVbiWLrFTfdeU="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"F2zy8ziabeRe6gHlSqSHh0uTnMs=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"BHIySClACRmpqJCVbiWLrFTfdeU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"58TF+sUhAvGPXME6fw+wTbhebwc="},{"type":"next-occurrence","id":"9gpmvVmIbNn9eT6OWEB5oUUlYVo="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"BHIySClACRmpqJCVbiWLrFTfdeU=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"9gpmvVmIbNn9eT6OWEB5oUUlYVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"58TF+sUhAvGPXME6fw+wTbhebwc="},{"type":"next-occurrence","id":"MkJCQMdwrLssEhjb0XS0LY9hAfo="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"9gpmvVmIbNn9eT6OWEB5oUUlYVo=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"MkJCQMdwrLssEhjb0XS0LY9hAfo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"58TF+sUhAvGPXME6fw+wTbhebwc="},{"type":"next-occurrence","id":"Pfe+eUZWlrc3jW9yrG5ywaC9Yx8="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"MkJCQMdwrLssEhjb0XS0LY9hAfo=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"Pfe+eUZWlrc3jW9yrG5ywaC9Yx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"58TF+sUhAvGPXME6fw+wTbhebwc="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"Pfe+eUZWlrc3jW9yrG5ywaC9Yx8=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"7l8xDiBLeBbougQy2nfHa5ymRLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/pFCFMcw8uaV6SN4f50iHoYM80w="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"7l8xDiBLeBbougQy2nfHa5ymRLc=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"/pFCFMcw8uaV6SN4f50iHoYM80w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7l8xDiBLeBbougQy2nfHa5ymRLc="},{"type":"next-occurrence","id":"6orGtWJC363WpQjjjrmNiX8jYI0="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"/pFCFMcw8uaV6SN4f50iHoYM80w=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"6orGtWJC363WpQjjjrmNiX8jYI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7l8xDiBLeBbougQy2nfHa5ymRLc="},{"type":"next-occurrence","id":"RISd8C2B4RbRtIEtpWDVDd9P480="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"6orGtWJC363WpQjjjrmNiX8jYI0=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"RISd8C2B4RbRtIEtpWDVDd9P480=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7l8xDiBLeBbougQy2nfHa5ymRLc="},{"type":"next-occurrence","id":"tx/021FZIKxRmzH6wE4mZTg77iA="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"RISd8C2B4RbRtIEtpWDVDd9P480=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"tx/021FZIKxRmzH6wE4mZTg77iA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7l8xDiBLeBbougQy2nfHa5ymRLc="},{"type":"next-occurrence","id":"Nt+O/nBVvoRVWJtSQumWNk63k1k="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"tx/021FZIKxRmzH6wE4mZTg77iA=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"Nt+O/nBVvoRVWJtSQumWNk63k1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7l8xDiBLeBbougQy2nfHa5ymRLc="},{"type":"next-occurrence","id":"vNO+lXqVHwgUKYE3rRLa2f8iAks="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"Nt+O/nBVvoRVWJtSQumWNk63k1k=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"vNO+lXqVHwgUKYE3rRLa2f8iAks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7l8xDiBLeBbougQy2nfHa5ymRLc="},{"type":"next-occurrence","id":"pw5nfOqm4eD+dTR7g7SZ8vkfPUI="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"vNO+lXqVHwgUKYE3rRLa2f8iAks=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"pw5nfOqm4eD+dTR7g7SZ8vkfPUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7l8xDiBLeBbougQy2nfHa5ymRLc="},{"type":"next-occurrence","id":"ERXlMIKeg0IMN4BoovlDIRf/QiI="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"pw5nfOqm4eD+dTR7g7SZ8vkfPUI=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"ERXlMIKeg0IMN4BoovlDIRf/QiI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7l8xDiBLeBbougQy2nfHa5ymRLc="},{"type":"next-occurrence","id":"L8xJ1ZETl32kLStEaycS8DJ1rtA="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"ERXlMIKeg0IMN4BoovlDIRf/QiI=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"L8xJ1ZETl32kLStEaycS8DJ1rtA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7l8xDiBLeBbougQy2nfHa5ymRLc="},{"type":"next-occurrence","id":"Wu1Xqq3Hh7N/k44UrPbstDQt5Ws="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"L8xJ1ZETl32kLStEaycS8DJ1rtA=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"Wu1Xqq3Hh7N/k44UrPbstDQt5Ws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7l8xDiBLeBbougQy2nfHa5ymRLc="},{"type":"next-occurrence","id":"m7yeqikAVyYZmCupcKb6dWog8JQ="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"Wu1Xqq3Hh7N/k44UrPbstDQt5Ws=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"m7yeqikAVyYZmCupcKb6dWog8JQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7l8xDiBLeBbougQy2nfHa5ymRLc="},{"type":"next-occurrence","id":"ciUU2IsmchHqi46PjpgnYxmKy38="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"m7yeqikAVyYZmCupcKb6dWog8JQ=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"ciUU2IsmchHqi46PjpgnYxmKy38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7l8xDiBLeBbougQy2nfHa5ymRLc="},{"type":"next-occurrence","id":"YVT1sKymYkFHW91ukpgdkegBQVk="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"ciUU2IsmchHqi46PjpgnYxmKy38=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"YVT1sKymYkFHW91ukpgdkegBQVk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7l8xDiBLeBbougQy2nfHa5ymRLc="},{"type":"next-occurrence","id":"V3U1N7uROis0d6Td6XL2OJ6+SAw="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"YVT1sKymYkFHW91ukpgdkegBQVk=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"V3U1N7uROis0d6Td6XL2OJ6+SAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7l8xDiBLeBbougQy2nfHa5ymRLc="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"V3U1N7uROis0d6Td6XL2OJ6+SAw=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"O23gonUXPMxOT2yi9dgXuRiIiPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/4iVS2jPETaglnBL7F/pNAjwNuQ="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"O23gonUXPMxOT2yi9dgXuRiIiPY=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"/4iVS2jPETaglnBL7F/pNAjwNuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O23gonUXPMxOT2yi9dgXuRiIiPY="},{"type":"next-occurrence","id":"7z0liuIVNYSRT5+0Pdm3WOpf9DI="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"/4iVS2jPETaglnBL7F/pNAjwNuQ=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"7z0liuIVNYSRT5+0Pdm3WOpf9DI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O23gonUXPMxOT2yi9dgXuRiIiPY="},{"type":"next-occurrence","id":"3MyblynKOjF3K7H1rVWsYCMDZ3E="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"7z0liuIVNYSRT5+0Pdm3WOpf9DI=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"3MyblynKOjF3K7H1rVWsYCMDZ3E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O23gonUXPMxOT2yi9dgXuRiIiPY="},{"type":"next-occurrence","id":"Q1P5GPTKw4pmCD8Lf1Kpel7MQOk="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"3MyblynKOjF3K7H1rVWsYCMDZ3E=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"Q1P5GPTKw4pmCD8Lf1Kpel7MQOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O23gonUXPMxOT2yi9dgXuRiIiPY="},{"type":"next-occurrence","id":"P8ryp8gVv5jSfPs2YSMt2TxjpOQ="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"Q1P5GPTKw4pmCD8Lf1Kpel7MQOk=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"P8ryp8gVv5jSfPs2YSMt2TxjpOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O23gonUXPMxOT2yi9dgXuRiIiPY="},{"type":"next-occurrence","id":"FheL8MxcAFqI9ISxx1YcxfNe7kk="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"P8ryp8gVv5jSfPs2YSMt2TxjpOQ=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"FheL8MxcAFqI9ISxx1YcxfNe7kk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O23gonUXPMxOT2yi9dgXuRiIiPY="},{"type":"next-occurrence","id":"IxIX9lbHznR1kMFG+UTdBn7LFIY="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"FheL8MxcAFqI9ISxx1YcxfNe7kk=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"IxIX9lbHznR1kMFG+UTdBn7LFIY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O23gonUXPMxOT2yi9dgXuRiIiPY="},{"type":"next-occurrence","id":"itMcRE5BXonZ1/kzXBggeTaxqQU="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"IxIX9lbHznR1kMFG+UTdBn7LFIY=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"itMcRE5BXonZ1/kzXBggeTaxqQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O23gonUXPMxOT2yi9dgXuRiIiPY="},{"type":"next-occurrence","id":"uKsUUpcRjR/U8rCa8xZJvts9Jhs="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"itMcRE5BXonZ1/kzXBggeTaxqQU=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"uKsUUpcRjR/U8rCa8xZJvts9Jhs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O23gonUXPMxOT2yi9dgXuRiIiPY="},{"type":"next-occurrence","id":"L+c4YBPd7nMo1GkYN1RvjIjwVYQ="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"uKsUUpcRjR/U8rCa8xZJvts9Jhs=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"L+c4YBPd7nMo1GkYN1RvjIjwVYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O23gonUXPMxOT2yi9dgXuRiIiPY="},{"type":"next-occurrence","id":"foI47ex5nJAUs9Zn88sI3xSrJrs="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"L+c4YBPd7nMo1GkYN1RvjIjwVYQ=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"foI47ex5nJAUs9Zn88sI3xSrJrs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O23gonUXPMxOT2yi9dgXuRiIiPY="},{"type":"next-occurrence","id":"uWUZEyZOhmYWSj7/4jAdeaWYNbU="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"foI47ex5nJAUs9Zn88sI3xSrJrs=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"uWUZEyZOhmYWSj7/4jAdeaWYNbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O23gonUXPMxOT2yi9dgXuRiIiPY="},{"type":"next-occurrence","id":"hJxaZP1OyWcIDNC0yXMO25nd+9Q="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"uWUZEyZOhmYWSj7/4jAdeaWYNbU=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"hJxaZP1OyWcIDNC0yXMO25nd+9Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O23gonUXPMxOT2yi9dgXuRiIiPY="},{"type":"next-occurrence","id":"vQ9qNXNT3f1Tv71FO+wqSQRg9nM="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"hJxaZP1OyWcIDNC0yXMO25nd+9Q=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"vQ9qNXNT3f1Tv71FO+wqSQRg9nM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O23gonUXPMxOT2yi9dgXuRiIiPY="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"vQ9qNXNT3f1Tv71FO+wqSQRg9nM=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"hhC6g3aPT9R3QE14c3FZcNA9wA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cccXri3rAFc319n5pOX+QGBvlBA="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"hhC6g3aPT9R3QE14c3FZcNA9wA8=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"cccXri3rAFc319n5pOX+QGBvlBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hhC6g3aPT9R3QE14c3FZcNA9wA8="},{"type":"next-occurrence","id":"7Hcz/ZRqhyjYuVs/hUSI2bweJcA="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"cccXri3rAFc319n5pOX+QGBvlBA=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"7Hcz/ZRqhyjYuVs/hUSI2bweJcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hhC6g3aPT9R3QE14c3FZcNA9wA8="},{"type":"next-occurrence","id":"WqRdOYtqNq6VLWyy8Fljy0/bW3k="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"7Hcz/ZRqhyjYuVs/hUSI2bweJcA=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"WqRdOYtqNq6VLWyy8Fljy0/bW3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hhC6g3aPT9R3QE14c3FZcNA9wA8="},{"type":"next-occurrence","id":"1fzO2HdCvYRe5RRjMPxxo2dnYXg="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"WqRdOYtqNq6VLWyy8Fljy0/bW3k=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"1fzO2HdCvYRe5RRjMPxxo2dnYXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hhC6g3aPT9R3QE14c3FZcNA9wA8="},{"type":"next-occurrence","id":"6/IqrwMzMZUq1ecvHn/c/9S5nQ4="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"1fzO2HdCvYRe5RRjMPxxo2dnYXg=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"6/IqrwMzMZUq1ecvHn/c/9S5nQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hhC6g3aPT9R3QE14c3FZcNA9wA8="},{"type":"next-occurrence","id":"nuxD8O1YTHOZ0OCTHqp+WZXIeAc="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"6/IqrwMzMZUq1ecvHn/c/9S5nQ4=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"nuxD8O1YTHOZ0OCTHqp+WZXIeAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hhC6g3aPT9R3QE14c3FZcNA9wA8="},{"type":"next-occurrence","id":"O6SPpy8DN6JBnkHRdbaeayplmaw="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"nuxD8O1YTHOZ0OCTHqp+WZXIeAc=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"O6SPpy8DN6JBnkHRdbaeayplmaw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hhC6g3aPT9R3QE14c3FZcNA9wA8="},{"type":"next-occurrence","id":"7KcO8TmTxQuKNSYDXr4s4BaCkew="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"O6SPpy8DN6JBnkHRdbaeayplmaw=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"7KcO8TmTxQuKNSYDXr4s4BaCkew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hhC6g3aPT9R3QE14c3FZcNA9wA8="},{"type":"next-occurrence","id":"Gx3GC0fwxuAEmVsoYSy+bSCIebg="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"7KcO8TmTxQuKNSYDXr4s4BaCkew=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"Gx3GC0fwxuAEmVsoYSy+bSCIebg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hhC6g3aPT9R3QE14c3FZcNA9wA8="},{"type":"next-occurrence","id":"+6lTSNZXYPwZK4npcQ1jnWZ2t3A="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"Gx3GC0fwxuAEmVsoYSy+bSCIebg=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"+6lTSNZXYPwZK4npcQ1jnWZ2t3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hhC6g3aPT9R3QE14c3FZcNA9wA8="},{"type":"next-occurrence","id":"vEMDypm180vzcdy5eU4LaoLes/s="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"+6lTSNZXYPwZK4npcQ1jnWZ2t3A=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"vEMDypm180vzcdy5eU4LaoLes/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hhC6g3aPT9R3QE14c3FZcNA9wA8="},{"type":"next-occurrence","id":"R624Ym13aJXxXol9K7W8KOJLA6A="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"vEMDypm180vzcdy5eU4LaoLes/s=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"R624Ym13aJXxXol9K7W8KOJLA6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hhC6g3aPT9R3QE14c3FZcNA9wA8="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"R624Ym13aJXxXol9K7W8KOJLA6A=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"x7AsHZR3r2kMaB3KZDC34ZqUSoE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NSRPMqgWAGvyUGgZuL9pDBy5ISA="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Thursday May 28th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-28T10:00:10Z"},"road_event_id":"x7AsHZR3r2kMaB3KZDC34ZqUSoE=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"NSRPMqgWAGvyUGgZuL9pDBy5ISA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x7AsHZR3r2kMaB3KZDC34ZqUSoE="},{"type":"next-occurrence","id":"+/7pSrcfb0jhwCLXDxDZ0M03LAk="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Thursday May 28th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-28T10:00:10Z"},"road_event_id":"NSRPMqgWAGvyUGgZuL9pDBy5ISA=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"+/7pSrcfb0jhwCLXDxDZ0M03LAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x7AsHZR3r2kMaB3KZDC34ZqUSoE="},{"type":"next-occurrence","id":"eJpJYdYApcFdFTterexBIuMcoUc="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Thursday May 28th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-28T10:00:10Z"},"road_event_id":"+/7pSrcfb0jhwCLXDxDZ0M03LAk=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"eJpJYdYApcFdFTterexBIuMcoUc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x7AsHZR3r2kMaB3KZDC34ZqUSoE="},{"type":"next-occurrence","id":"xBsXRIYH7+NGhKYGja5eBwjLmf0="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Thursday May 28th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-28T10:00:10Z"},"road_event_id":"eJpJYdYApcFdFTterexBIuMcoUc=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"xBsXRIYH7+NGhKYGja5eBwjLmf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x7AsHZR3r2kMaB3KZDC34ZqUSoE="},{"type":"next-occurrence","id":"dnL41DyxyvBI0o+SohkcUEjvkA4="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Thursday May 28th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-28T10:00:10Z"},"road_event_id":"xBsXRIYH7+NGhKYGja5eBwjLmf0=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"dnL41DyxyvBI0o+SohkcUEjvkA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x7AsHZR3r2kMaB3KZDC34ZqUSoE="},{"type":"next-occurrence","id":"mFoO1dCa8IuL4APq7iisOmypqyQ="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Thursday May 28th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-28T10:00:10Z"},"road_event_id":"dnL41DyxyvBI0o+SohkcUEjvkA4=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"mFoO1dCa8IuL4APq7iisOmypqyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x7AsHZR3r2kMaB3KZDC34ZqUSoE="},{"type":"next-occurrence","id":"rY1jdrSrLhzYoBfhECPUlbJqoxQ="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Thursday May 28th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-28T10:00:10Z"},"road_event_id":"mFoO1dCa8IuL4APq7iisOmypqyQ=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"rY1jdrSrLhzYoBfhECPUlbJqoxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x7AsHZR3r2kMaB3KZDC34ZqUSoE="},{"type":"next-occurrence","id":"pm2QJGh/J7iNqlPMeX3FDAHuXEA="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Thursday May 28th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-28T10:00:10Z"},"road_event_id":"rY1jdrSrLhzYoBfhECPUlbJqoxQ=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"pm2QJGh/J7iNqlPMeX3FDAHuXEA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x7AsHZR3r2kMaB3KZDC34ZqUSoE="},{"type":"next-occurrence","id":"APcmn9v5Gcnglkdpll71ckDO6RM="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Thursday May 28th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-28T10:00:10Z"},"road_event_id":"pm2QJGh/J7iNqlPMeX3FDAHuXEA=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"APcmn9v5Gcnglkdpll71ckDO6RM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x7AsHZR3r2kMaB3KZDC34ZqUSoE="},{"type":"next-occurrence","id":"Mov8pAH+K0gc3uJ56WlHTvxMNyE="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Thursday May 28th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-28T10:00:10Z"},"road_event_id":"APcmn9v5Gcnglkdpll71ckDO6RM=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"Mov8pAH+K0gc3uJ56WlHTvxMNyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x7AsHZR3r2kMaB3KZDC34ZqUSoE="},{"type":"next-occurrence","id":"rfw4EUSwWcaX3yhloV0h/yCggqE="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Thursday May 28th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-28T10:00:10Z"},"road_event_id":"Mov8pAH+K0gc3uJ56WlHTvxMNyE=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"rfw4EUSwWcaX3yhloV0h/yCggqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x7AsHZR3r2kMaB3KZDC34ZqUSoE="},{"type":"next-occurrence","id":"253LEh2MUPiamnjovi7KYaslTqU="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Thursday May 28th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-28T10:00:10Z"},"road_event_id":"rfw4EUSwWcaX3yhloV0h/yCggqE=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"253LEh2MUPiamnjovi7KYaslTqU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x7AsHZR3r2kMaB3KZDC34ZqUSoE="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Thursday May 28th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 2 lanes open northbound, southbound","update_date":"2026-05-28T10:00:10Z"},"road_event_id":"253LEh2MUPiamnjovi7KYaslTqU=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"t6+c5KC4uTyEHu6u2B6ZxRteOCk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KrUuEeWDKvjO2Q5w/ZYQ5sKMoUk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"t6+c5KC4uTyEHu6u2B6ZxRteOCk=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"KrUuEeWDKvjO2Q5w/ZYQ5sKMoUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t6+c5KC4uTyEHu6u2B6ZxRteOCk="},{"type":"next-occurrence","id":"OSS0/Ywd07xYatWkCYQeETn3hC8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"KrUuEeWDKvjO2Q5w/ZYQ5sKMoUk=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"OSS0/Ywd07xYatWkCYQeETn3hC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t6+c5KC4uTyEHu6u2B6ZxRteOCk="},{"type":"next-occurrence","id":"F0G1G+fSv9TVvIoa2vFSsbQloyQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"OSS0/Ywd07xYatWkCYQeETn3hC8=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"F0G1G+fSv9TVvIoa2vFSsbQloyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t6+c5KC4uTyEHu6u2B6ZxRteOCk="},{"type":"next-occurrence","id":"utbFs0NE1ZjXz5vAiqw97CkzTR4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"F0G1G+fSv9TVvIoa2vFSsbQloyQ=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"utbFs0NE1ZjXz5vAiqw97CkzTR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t6+c5KC4uTyEHu6u2B6ZxRteOCk="},{"type":"next-occurrence","id":"smpTd/Vdq5q/FJNf9/LRZImoHLo="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"utbFs0NE1ZjXz5vAiqw97CkzTR4=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"smpTd/Vdq5q/FJNf9/LRZImoHLo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t6+c5KC4uTyEHu6u2B6ZxRteOCk="},{"type":"next-occurrence","id":"Sb3jr5N1p05o19iRla0rtDcnxQ4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"smpTd/Vdq5q/FJNf9/LRZImoHLo=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"Sb3jr5N1p05o19iRla0rtDcnxQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t6+c5KC4uTyEHu6u2B6ZxRteOCk="},{"type":"next-occurrence","id":"wiXHTLllO21NjmkKgbe/FZlJ+5I="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"Sb3jr5N1p05o19iRla0rtDcnxQ4=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"wiXHTLllO21NjmkKgbe/FZlJ+5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t6+c5KC4uTyEHu6u2B6ZxRteOCk="},{"type":"next-occurrence","id":"oNzk6l3Bu/+gPWqS3lzVUieeqag="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"wiXHTLllO21NjmkKgbe/FZlJ+5I=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"oNzk6l3Bu/+gPWqS3lzVUieeqag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t6+c5KC4uTyEHu6u2B6ZxRteOCk="},{"type":"next-occurrence","id":"Uzxp720Kf4srjc73v8BfGTwo94M="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"oNzk6l3Bu/+gPWqS3lzVUieeqag=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"Uzxp720Kf4srjc73v8BfGTwo94M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t6+c5KC4uTyEHu6u2B6ZxRteOCk="},{"type":"next-occurrence","id":"yo6pYy5ZIWS+I16p8uAIqGb8nD4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"Uzxp720Kf4srjc73v8BfGTwo94M=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"yo6pYy5ZIWS+I16p8uAIqGb8nD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t6+c5KC4uTyEHu6u2B6ZxRteOCk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"yo6pYy5ZIWS+I16p8uAIqGb8nD4=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"qtXnfoBJS4MaSZFQ4nqmXBtNcK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AcG235I0ctN5dVHJtWtqSnKuV8A="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday September 8th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-27T10:00:15Z"},"road_event_id":"qtXnfoBJS4MaSZFQ4nqmXBtNcK4=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"AcG235I0ctN5dVHJtWtqSnKuV8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qtXnfoBJS4MaSZFQ4nqmXBtNcK4="},{"type":"next-occurrence","id":"+DiUcEUS/iA1npyET+KLFS8r5MA="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday September 8th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-27T10:00:15Z"},"road_event_id":"AcG235I0ctN5dVHJtWtqSnKuV8A=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"+DiUcEUS/iA1npyET+KLFS8r5MA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qtXnfoBJS4MaSZFQ4nqmXBtNcK4="},{"type":"next-occurrence","id":"GkDXcXWIwqb10GxTiql9KEdUvhM="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday September 8th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-27T10:00:15Z"},"road_event_id":"+DiUcEUS/iA1npyET+KLFS8r5MA=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"GkDXcXWIwqb10GxTiql9KEdUvhM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qtXnfoBJS4MaSZFQ4nqmXBtNcK4="},{"type":"next-occurrence","id":"9kGBxOSNqK+H5tNZRC0Sshelheo="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday September 8th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-27T10:00:15Z"},"road_event_id":"GkDXcXWIwqb10GxTiql9KEdUvhM=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"9kGBxOSNqK+H5tNZRC0Sshelheo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qtXnfoBJS4MaSZFQ4nqmXBtNcK4="},{"type":"next-occurrence","id":"b6XMiafMNkX76/Hgzy0B/9LAgbk="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday September 8th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-27T10:00:15Z"},"road_event_id":"9kGBxOSNqK+H5tNZRC0Sshelheo=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"b6XMiafMNkX76/Hgzy0B/9LAgbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qtXnfoBJS4MaSZFQ4nqmXBtNcK4="},{"type":"next-occurrence","id":"ffnZn0YAJhhZCvW0UctJfmEp1MY="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday September 8th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-27T10:00:15Z"},"road_event_id":"b6XMiafMNkX76/Hgzy0B/9LAgbk=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"ffnZn0YAJhhZCvW0UctJfmEp1MY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qtXnfoBJS4MaSZFQ4nqmXBtNcK4="},{"type":"next-occurrence","id":"wdlMN3V2QkOXSiELp1TS0uRC3mo="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday September 8th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-27T10:00:15Z"},"road_event_id":"ffnZn0YAJhhZCvW0UctJfmEp1MY=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"wdlMN3V2QkOXSiELp1TS0uRC3mo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qtXnfoBJS4MaSZFQ4nqmXBtNcK4="},{"type":"next-occurrence","id":"LHIOyGdFNI54wFU3WKT0iMkxLaE="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday September 8th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-27T10:00:15Z"},"road_event_id":"wdlMN3V2QkOXSiELp1TS0uRC3mo=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"LHIOyGdFNI54wFU3WKT0iMkxLaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qtXnfoBJS4MaSZFQ4nqmXBtNcK4="},{"type":"next-occurrence","id":"cAjzfwIE2AJXcCH1REPIBfBD1bs="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday September 8th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-27T10:00:15Z"},"road_event_id":"LHIOyGdFNI54wFU3WKT0iMkxLaE=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"cAjzfwIE2AJXcCH1REPIBfBD1bs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qtXnfoBJS4MaSZFQ4nqmXBtNcK4="},{"type":"next-occurrence","id":"LvJuoGNnGEe+H1Fs57b23U9z/b0="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday September 8th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-27T10:00:15Z"},"road_event_id":"cAjzfwIE2AJXcCH1REPIBfBD1bs=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"LvJuoGNnGEe+H1Fs57b23U9z/b0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qtXnfoBJS4MaSZFQ4nqmXBtNcK4="},{"type":"next-occurrence","id":"r76AgRgxdaDq3wR96aBx+MPyXRg="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday September 8th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-27T10:00:15Z"},"road_event_id":"LvJuoGNnGEe+H1Fs57b23U9z/b0=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"r76AgRgxdaDq3wR96aBx+MPyXRg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qtXnfoBJS4MaSZFQ4nqmXBtNcK4="},{"type":"next-occurrence","id":"ftCk8Ph7cUYNomqO+Wp0zxmBx28="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday September 8th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-27T10:00:15Z"},"road_event_id":"r76AgRgxdaDq3wR96aBx+MPyXRg=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"ftCk8Ph7cUYNomqO+Wp0zxmBx28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qtXnfoBJS4MaSZFQ4nqmXBtNcK4="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound, Tuesday September 8th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-27T10:00:15Z"},"road_event_id":"ftCk8Ph7cUYNomqO+Wp0zxmBx28=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"zRYr+rblrg756K1RcjWqdWi8QyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FbolD5ejmGo/SHKlFdaqsleuOsI="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"zRYr+rblrg756K1RcjWqdWi8QyU=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"FbolD5ejmGo/SHKlFdaqsleuOsI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zRYr+rblrg756K1RcjWqdWi8QyU="},{"type":"next-occurrence","id":"8NhCz37OojxAMXRLa4IzBsNEh9k="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"FbolD5ejmGo/SHKlFdaqsleuOsI=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"8NhCz37OojxAMXRLa4IzBsNEh9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zRYr+rblrg756K1RcjWqdWi8QyU="},{"type":"next-occurrence","id":"oWNO8LkUASsQEaguPeQe/XepoGk="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"8NhCz37OojxAMXRLa4IzBsNEh9k=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"oWNO8LkUASsQEaguPeQe/XepoGk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zRYr+rblrg756K1RcjWqdWi8QyU="},{"type":"next-occurrence","id":"XcXhpPN4JoT0cHlP/GGv6P9fOWQ="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"oWNO8LkUASsQEaguPeQe/XepoGk=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"XcXhpPN4JoT0cHlP/GGv6P9fOWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zRYr+rblrg756K1RcjWqdWi8QyU="},{"type":"next-occurrence","id":"BN1HRfkH1xiloqQJ88/Ya/S1NbM="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"XcXhpPN4JoT0cHlP/GGv6P9fOWQ=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"BN1HRfkH1xiloqQJ88/Ya/S1NbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zRYr+rblrg756K1RcjWqdWi8QyU="},{"type":"next-occurrence","id":"g48CVHvP0n9BvCfHWW/5xpXHz4s="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"BN1HRfkH1xiloqQJ88/Ya/S1NbM=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"g48CVHvP0n9BvCfHWW/5xpXHz4s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zRYr+rblrg756K1RcjWqdWi8QyU="},{"type":"next-occurrence","id":"d2ezPQk96B9BEB8pP8QtU4ii4tY="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"g48CVHvP0n9BvCfHWW/5xpXHz4s=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"d2ezPQk96B9BEB8pP8QtU4ii4tY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zRYr+rblrg756K1RcjWqdWi8QyU="},{"type":"next-occurrence","id":"/De2w+HLE7rnFMKuTGosECgp7xQ="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"d2ezPQk96B9BEB8pP8QtU4ii4tY=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"/De2w+HLE7rnFMKuTGosECgp7xQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zRYr+rblrg756K1RcjWqdWi8QyU="},{"type":"next-occurrence","id":"LmU8/Q/paLc8bVbK993vc9pndFQ="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"/De2w+HLE7rnFMKuTGosECgp7xQ=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"LmU8/Q/paLc8bVbK993vc9pndFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zRYr+rblrg756K1RcjWqdWi8QyU="},{"type":"next-occurrence","id":"kKLRgLiQifQDUNO0UOS2uL1wUjI="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"LmU8/Q/paLc8bVbK993vc9pndFQ=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"kKLRgLiQifQDUNO0UOS2uL1wUjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zRYr+rblrg756K1RcjWqdWi8QyU="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"kKLRgLiQifQDUNO0UOS2uL1wUjI=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"oZ3VPQB+HqrfVaaARr/kzhKlHBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KEBCaewvRKP+ythqHCxucf3vIag="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"oZ3VPQB+HqrfVaaARr/kzhKlHBg=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"KEBCaewvRKP+ythqHCxucf3vIag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZ3VPQB+HqrfVaaARr/kzhKlHBg="},{"type":"next-occurrence","id":"eAKmoPGvjEUFazH6kG3zhrXuRuo="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"KEBCaewvRKP+ythqHCxucf3vIag=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"eAKmoPGvjEUFazH6kG3zhrXuRuo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZ3VPQB+HqrfVaaARr/kzhKlHBg="},{"type":"next-occurrence","id":"BlxlR9Y5ZxE60Z0cgSIPqotrPXk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"eAKmoPGvjEUFazH6kG3zhrXuRuo=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"BlxlR9Y5ZxE60Z0cgSIPqotrPXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZ3VPQB+HqrfVaaARr/kzhKlHBg="},{"type":"next-occurrence","id":"St/W7t+AV8VKrlObZUiZyi9U1PA="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"BlxlR9Y5ZxE60Z0cgSIPqotrPXk=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"St/W7t+AV8VKrlObZUiZyi9U1PA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZ3VPQB+HqrfVaaARr/kzhKlHBg="},{"type":"next-occurrence","id":"MqvUFW5MO7OEWEsAhzltlzVBxG8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"St/W7t+AV8VKrlObZUiZyi9U1PA=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"MqvUFW5MO7OEWEsAhzltlzVBxG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZ3VPQB+HqrfVaaARr/kzhKlHBg="},{"type":"next-occurrence","id":"v4RBYNfUIRdHGE9AGkxc2sTP+Vw="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"MqvUFW5MO7OEWEsAhzltlzVBxG8=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"v4RBYNfUIRdHGE9AGkxc2sTP+Vw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZ3VPQB+HqrfVaaARr/kzhKlHBg="},{"type":"next-occurrence","id":"sQrPdU+yp3O1Nbebsaw4EeZhuS0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"v4RBYNfUIRdHGE9AGkxc2sTP+Vw=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"sQrPdU+yp3O1Nbebsaw4EeZhuS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZ3VPQB+HqrfVaaARr/kzhKlHBg="},{"type":"next-occurrence","id":"OSXmXh5IRRE2RUeZGvGK3tpX5mg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"sQrPdU+yp3O1Nbebsaw4EeZhuS0=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"OSXmXh5IRRE2RUeZGvGK3tpX5mg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZ3VPQB+HqrfVaaARr/kzhKlHBg="},{"type":"next-occurrence","id":"nkes6CP8/1dR/l0An/CFRmA/6BQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"OSXmXh5IRRE2RUeZGvGK3tpX5mg=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"nkes6CP8/1dR/l0An/CFRmA/6BQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZ3VPQB+HqrfVaaARr/kzhKlHBg="},{"type":"next-occurrence","id":"AgV9/DQJHzh+t/N6Oh2w/MbMHsc="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"nkes6CP8/1dR/l0An/CFRmA/6BQ=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"AgV9/DQJHzh+t/N6Oh2w/MbMHsc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZ3VPQB+HqrfVaaARr/kzhKlHBg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"AgV9/DQJHzh+t/N6Oh2w/MbMHsc=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"5JpLq8KKJ5DpPaUQN+rvOSW+EtU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NjFk+X0M8yZBJa6hgEA4CpdXLfU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"5JpLq8KKJ5DpPaUQN+rvOSW+EtU=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"NjFk+X0M8yZBJa6hgEA4CpdXLfU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5JpLq8KKJ5DpPaUQN+rvOSW+EtU="},{"type":"next-occurrence","id":"XGeAy7QPDO3xjREcBBEadvVq5Dc="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"NjFk+X0M8yZBJa6hgEA4CpdXLfU=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"XGeAy7QPDO3xjREcBBEadvVq5Dc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5JpLq8KKJ5DpPaUQN+rvOSW+EtU="},{"type":"next-occurrence","id":"WZtQtV1jygvWYn7QpGXUh3SOu9Y="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"XGeAy7QPDO3xjREcBBEadvVq5Dc=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"WZtQtV1jygvWYn7QpGXUh3SOu9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5JpLq8KKJ5DpPaUQN+rvOSW+EtU="},{"type":"next-occurrence","id":"XZG06jr7cOcps1kxjppFcbZdZMs="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"WZtQtV1jygvWYn7QpGXUh3SOu9Y=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"XZG06jr7cOcps1kxjppFcbZdZMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5JpLq8KKJ5DpPaUQN+rvOSW+EtU="},{"type":"next-occurrence","id":"eWQcmxIQDlOVKKTbd8adswSUGdk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"XZG06jr7cOcps1kxjppFcbZdZMs=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"eWQcmxIQDlOVKKTbd8adswSUGdk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5JpLq8KKJ5DpPaUQN+rvOSW+EtU="},{"type":"next-occurrence","id":"rJzfrevYoAOHxQuoZMmariqXsDo="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"eWQcmxIQDlOVKKTbd8adswSUGdk=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"rJzfrevYoAOHxQuoZMmariqXsDo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5JpLq8KKJ5DpPaUQN+rvOSW+EtU="},{"type":"next-occurrence","id":"21hpmJbpljc2qwSsPN8TM57PU5w="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"rJzfrevYoAOHxQuoZMmariqXsDo=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"21hpmJbpljc2qwSsPN8TM57PU5w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5JpLq8KKJ5DpPaUQN+rvOSW+EtU="},{"type":"next-occurrence","id":"9umBNhp3kKU02Vj+huV30BZM+fU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"21hpmJbpljc2qwSsPN8TM57PU5w=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"9umBNhp3kKU02Vj+huV30BZM+fU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5JpLq8KKJ5DpPaUQN+rvOSW+EtU="},{"type":"next-occurrence","id":"oGTxbZVARgU6aQ6usIbhF7pmSKs="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"9umBNhp3kKU02Vj+huV30BZM+fU=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"oGTxbZVARgU6aQ6usIbhF7pmSKs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5JpLq8KKJ5DpPaUQN+rvOSW+EtU="},{"type":"next-occurrence","id":"+C55TpC/e9SXKQ6ix7KjjCk+ejI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"oGTxbZVARgU6aQ6usIbhF7pmSKs=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"+C55TpC/e9SXKQ6ix7KjjCk+ejI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5JpLq8KKJ5DpPaUQN+rvOSW+EtU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"+C55TpC/e9SXKQ6ix7KjjCk+ejI=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"rifTz96Q/WCpa9eA/7GUrvGjEXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3QlC4X6sMxwUNlpw+OManSWh6ik="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"rifTz96Q/WCpa9eA/7GUrvGjEXI=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"3QlC4X6sMxwUNlpw+OManSWh6ik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rifTz96Q/WCpa9eA/7GUrvGjEXI="},{"type":"next-occurrence","id":"Gy29VWJLQhWIvN+rwxLd2vyOsjw="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"3QlC4X6sMxwUNlpw+OManSWh6ik=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"Gy29VWJLQhWIvN+rwxLd2vyOsjw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rifTz96Q/WCpa9eA/7GUrvGjEXI="},{"type":"next-occurrence","id":"AnqeEe+qwsN9CjKbWlyx86/WQ6I="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"Gy29VWJLQhWIvN+rwxLd2vyOsjw=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"AnqeEe+qwsN9CjKbWlyx86/WQ6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rifTz96Q/WCpa9eA/7GUrvGjEXI="},{"type":"next-occurrence","id":"E/K7Y+2e101KHNFPL74xVowBabQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"AnqeEe+qwsN9CjKbWlyx86/WQ6I=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"E/K7Y+2e101KHNFPL74xVowBabQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rifTz96Q/WCpa9eA/7GUrvGjEXI="},{"type":"next-occurrence","id":"HLD+1BCrhxNSU7ETo4TQZU6LlKo="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"E/K7Y+2e101KHNFPL74xVowBabQ=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"HLD+1BCrhxNSU7ETo4TQZU6LlKo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rifTz96Q/WCpa9eA/7GUrvGjEXI="},{"type":"next-occurrence","id":"Hb99DSh9uiExoc4xSbUkDVP1leo="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"HLD+1BCrhxNSU7ETo4TQZU6LlKo=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"Hb99DSh9uiExoc4xSbUkDVP1leo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rifTz96Q/WCpa9eA/7GUrvGjEXI="},{"type":"next-occurrence","id":"LFEv+7g642WY4a4GGqf2WO2BEzk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"Hb99DSh9uiExoc4xSbUkDVP1leo=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"LFEv+7g642WY4a4GGqf2WO2BEzk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rifTz96Q/WCpa9eA/7GUrvGjEXI="},{"type":"next-occurrence","id":"9Vi3qVYlXYw94UQjHo+9h6oUyAQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"LFEv+7g642WY4a4GGqf2WO2BEzk=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"9Vi3qVYlXYw94UQjHo+9h6oUyAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rifTz96Q/WCpa9eA/7GUrvGjEXI="},{"type":"next-occurrence","id":"HmHX8Ph6w7ATAcW7Fbn5Pz95wSg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"9Vi3qVYlXYw94UQjHo+9h6oUyAQ=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"HmHX8Ph6w7ATAcW7Fbn5Pz95wSg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rifTz96Q/WCpa9eA/7GUrvGjEXI="},{"type":"next-occurrence","id":"iNbZJSoy3cNs2orntbHvLRiHBJ8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"HmHX8Ph6w7ATAcW7Fbn5Pz95wSg=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"iNbZJSoy3cNs2orntbHvLRiHBJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rifTz96Q/WCpa9eA/7GUrvGjEXI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"iNbZJSoy3cNs2orntbHvLRiHBJ8=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"jHvaoLqdSOmkT7To3nAmbKjq5z0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uqJyCioUDaSR3zbuX97jUnjCTio="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"jHvaoLqdSOmkT7To3nAmbKjq5z0=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"uqJyCioUDaSR3zbuX97jUnjCTio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jHvaoLqdSOmkT7To3nAmbKjq5z0="},{"type":"next-occurrence","id":"zQZI/NC3or48PNM6eR5V46pAeVE="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"uqJyCioUDaSR3zbuX97jUnjCTio=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"zQZI/NC3or48PNM6eR5V46pAeVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jHvaoLqdSOmkT7To3nAmbKjq5z0="},{"type":"next-occurrence","id":"NP9c8NzAj7shWOaSuC+daKbVe0c="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"zQZI/NC3or48PNM6eR5V46pAeVE=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"NP9c8NzAj7shWOaSuC+daKbVe0c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jHvaoLqdSOmkT7To3nAmbKjq5z0="},{"type":"next-occurrence","id":"IEXdXRQIml0+7muZRzhoBKr+FXc="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"NP9c8NzAj7shWOaSuC+daKbVe0c=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"IEXdXRQIml0+7muZRzhoBKr+FXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jHvaoLqdSOmkT7To3nAmbKjq5z0="},{"type":"next-occurrence","id":"/lb+f09d6+8kbXu/hfHipIYHTmE="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"IEXdXRQIml0+7muZRzhoBKr+FXc=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"/lb+f09d6+8kbXu/hfHipIYHTmE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jHvaoLqdSOmkT7To3nAmbKjq5z0="},{"type":"next-occurrence","id":"jqrjelDF3sYe/a34F/VKUxDWNDA="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"/lb+f09d6+8kbXu/hfHipIYHTmE=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"jqrjelDF3sYe/a34F/VKUxDWNDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jHvaoLqdSOmkT7To3nAmbKjq5z0="},{"type":"next-occurrence","id":"q46kRoJ74CsR+LbRcgR49yEItms="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"jqrjelDF3sYe/a34F/VKUxDWNDA=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"q46kRoJ74CsR+LbRcgR49yEItms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jHvaoLqdSOmkT7To3nAmbKjq5z0="},{"type":"next-occurrence","id":"wedOwUpFLXIwn7xL7KYMA9p7cls="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"q46kRoJ74CsR+LbRcgR49yEItms=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"wedOwUpFLXIwn7xL7KYMA9p7cls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jHvaoLqdSOmkT7To3nAmbKjq5z0="},{"type":"next-occurrence","id":"xZ3WFtD3Pqf3gSRaE9TaqEMyRU4="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"wedOwUpFLXIwn7xL7KYMA9p7cls=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"xZ3WFtD3Pqf3gSRaE9TaqEMyRU4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jHvaoLqdSOmkT7To3nAmbKjq5z0="},{"type":"next-occurrence","id":"PhzJo2UC2lXPQBKiw2RePbY9qHw="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"xZ3WFtD3Pqf3gSRaE9TaqEMyRU4=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"PhzJo2UC2lXPQBKiw2RePbY9qHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jHvaoLqdSOmkT7To3nAmbKjq5z0="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"PhzJo2UC2lXPQBKiw2RePbY9qHw=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"jQa6e94frUkGxergqDPybiCAJ4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/WVFiet20CvAiix0iWgSOyq8k0Y="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 PM All lanes of 1 lane open southbound, , Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound,","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"jQa6e94frUkGxergqDPybiCAJ4k=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"/WVFiet20CvAiix0iWgSOyq8k0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jQa6e94frUkGxergqDPybiCAJ4k="},{"type":"next-occurrence","id":"vnKUJ+I5KudruG1JwEHwJoIZko0="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 PM All lanes of 1 lane open southbound, , Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound,","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"/WVFiet20CvAiix0iWgSOyq8k0Y=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"vnKUJ+I5KudruG1JwEHwJoIZko0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jQa6e94frUkGxergqDPybiCAJ4k="},{"type":"next-occurrence","id":"1UBvRCzfZp7QS9JzV2eRfv51EN8="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 PM All lanes of 1 lane open southbound, , Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound,","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"vnKUJ+I5KudruG1JwEHwJoIZko0=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"1UBvRCzfZp7QS9JzV2eRfv51EN8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jQa6e94frUkGxergqDPybiCAJ4k="},{"type":"next-occurrence","id":"dBk4BGFVcKtTQIQkJbsK9PMLVUA="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 PM All lanes of 1 lane open southbound, , Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound,","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"1UBvRCzfZp7QS9JzV2eRfv51EN8=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"dBk4BGFVcKtTQIQkJbsK9PMLVUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jQa6e94frUkGxergqDPybiCAJ4k="},{"type":"next-occurrence","id":"J28YLB0bgvjE8Cgy/v3VuICISF8="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 PM All lanes of 1 lane open southbound, , Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound,","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"dBk4BGFVcKtTQIQkJbsK9PMLVUA=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"J28YLB0bgvjE8Cgy/v3VuICISF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jQa6e94frUkGxergqDPybiCAJ4k="},{"type":"next-occurrence","id":"pdD2KlE4zL8WYFgX1E4j+5WrQ20="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 PM All lanes of 1 lane open southbound, , Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound,","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"J28YLB0bgvjE8Cgy/v3VuICISF8=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"pdD2KlE4zL8WYFgX1E4j+5WrQ20=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jQa6e94frUkGxergqDPybiCAJ4k="},{"type":"next-occurrence","id":"EC0Ho0wyABodfD59SqaoCI7caO8="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 PM All lanes of 1 lane open southbound, , Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound,","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"pdD2KlE4zL8WYFgX1E4j+5WrQ20=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"EC0Ho0wyABodfD59SqaoCI7caO8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jQa6e94frUkGxergqDPybiCAJ4k="},{"type":"next-occurrence","id":"ZKflJuAIGhITsDPmxI7hHYLrqNo="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 PM All lanes of 1 lane open southbound, , Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound,","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"EC0Ho0wyABodfD59SqaoCI7caO8=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"ZKflJuAIGhITsDPmxI7hHYLrqNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jQa6e94frUkGxergqDPybiCAJ4k="},{"type":"next-occurrence","id":"8DlA9I/HI/7gI89uwg9Y5KhTI2w="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 PM All lanes of 1 lane open southbound, , Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound,","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"ZKflJuAIGhITsDPmxI7hHYLrqNo=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"8DlA9I/HI/7gI89uwg9Y5KhTI2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jQa6e94frUkGxergqDPybiCAJ4k="},{"type":"next-occurrence","id":"4HXEtSjiqmXMD1TnjKmzrO2QU+0="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 PM All lanes of 1 lane open southbound, , Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound,","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"8DlA9I/HI/7gI89uwg9Y5KhTI2w=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"4HXEtSjiqmXMD1TnjKmzrO2QU+0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jQa6e94frUkGxergqDPybiCAJ4k="},{"type":"next-occurrence","id":"gDJOYvFrF8BnunuRFBtFmzt3Nf0="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 PM All lanes of 1 lane open southbound, , Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound,","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"4HXEtSjiqmXMD1TnjKmzrO2QU+0=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"gDJOYvFrF8BnunuRFBtFmzt3Nf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jQa6e94frUkGxergqDPybiCAJ4k="},{"type":"next-occurrence","id":"NFam7wSnpUNG5ThIHWbyZLDHGq0="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 PM All lanes of 1 lane open southbound, , Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound,","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"gDJOYvFrF8BnunuRFBtFmzt3Nf0=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"NFam7wSnpUNG5ThIHWbyZLDHGq0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jQa6e94frUkGxergqDPybiCAJ4k="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 PM All lanes of 1 lane open southbound, , Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open southbound, , Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open southbound,","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"NFam7wSnpUNG5ThIHWbyZLDHGq0=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"NteBEDQh43lVaTjzHnR7ZmhBTtk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AiN2KVJyfWRPIfT6m3JlzHMiTtw="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"NteBEDQh43lVaTjzHnR7ZmhBTtk=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"AiN2KVJyfWRPIfT6m3JlzHMiTtw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NteBEDQh43lVaTjzHnR7ZmhBTtk="},{"type":"next-occurrence","id":"O+zuR46ZsjDnRQ+/ZDdN/n3Lx14="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"AiN2KVJyfWRPIfT6m3JlzHMiTtw=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"O+zuR46ZsjDnRQ+/ZDdN/n3Lx14=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NteBEDQh43lVaTjzHnR7ZmhBTtk="},{"type":"next-occurrence","id":"w097e0o3HJqnQb2p7c85i/ecacY="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"O+zuR46ZsjDnRQ+/ZDdN/n3Lx14=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"w097e0o3HJqnQb2p7c85i/ecacY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NteBEDQh43lVaTjzHnR7ZmhBTtk="},{"type":"next-occurrence","id":"C1k0hKRUugitYOJKpCwt8ABYyJk="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"w097e0o3HJqnQb2p7c85i/ecacY=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"C1k0hKRUugitYOJKpCwt8ABYyJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NteBEDQh43lVaTjzHnR7ZmhBTtk="},{"type":"next-occurrence","id":"RGInAMkG8zSIsvviNXXDCL2vzuE="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"C1k0hKRUugitYOJKpCwt8ABYyJk=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"RGInAMkG8zSIsvviNXXDCL2vzuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NteBEDQh43lVaTjzHnR7ZmhBTtk="},{"type":"next-occurrence","id":"POriZHEvyZf3a99RBY1jv1VLVjE="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"RGInAMkG8zSIsvviNXXDCL2vzuE=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"POriZHEvyZf3a99RBY1jv1VLVjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NteBEDQh43lVaTjzHnR7ZmhBTtk="},{"type":"next-occurrence","id":"yNdkI0LOhoTXcd2pN03K1LaCwa4="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"POriZHEvyZf3a99RBY1jv1VLVjE=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"yNdkI0LOhoTXcd2pN03K1LaCwa4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NteBEDQh43lVaTjzHnR7ZmhBTtk="},{"type":"next-occurrence","id":"2XBfIo57TcLbmuHmbdfA+a4NaIY="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"yNdkI0LOhoTXcd2pN03K1LaCwa4=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"2XBfIo57TcLbmuHmbdfA+a4NaIY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NteBEDQh43lVaTjzHnR7ZmhBTtk="},{"type":"next-occurrence","id":"Qm45lmd7OmqeuoHiugrRj2ycRHo="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"2XBfIo57TcLbmuHmbdfA+a4NaIY=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"Qm45lmd7OmqeuoHiugrRj2ycRHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NteBEDQh43lVaTjzHnR7ZmhBTtk="},{"type":"next-occurrence","id":"I9mfB6mAN+o0Z0Xg+7VTAtcI5EA="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"Qm45lmd7OmqeuoHiugrRj2ycRHo=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"I9mfB6mAN+o0Z0Xg+7VTAtcI5EA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NteBEDQh43lVaTjzHnR7ZmhBTtk="},{"type":"next-occurrence","id":"2vJHyU3gHFxliyV6ettN3e0FPWs="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"I9mfB6mAN+o0Z0Xg+7VTAtcI5EA=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"2vJHyU3gHFxliyV6ettN3e0FPWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NteBEDQh43lVaTjzHnR7ZmhBTtk="},{"type":"next-occurrence","id":"sf3UWlwHK01UhlpWItwU54Qzv7c="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"2vJHyU3gHFxliyV6ettN3e0FPWs=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"sf3UWlwHK01UhlpWItwU54Qzv7c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NteBEDQh43lVaTjzHnR7ZmhBTtk="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-27T10:00:13Z"},"road_event_id":"sf3UWlwHK01UhlpWItwU54Qzv7c=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"I64m0UI908V12DheBU/9aniZFt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LNoZe5xQcwPcNbMlUOZ7nMi6VOg="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"I64m0UI908V12DheBU/9aniZFt8=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"LNoZe5xQcwPcNbMlUOZ7nMi6VOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I64m0UI908V12DheBU/9aniZFt8="},{"type":"next-occurrence","id":"RBDyP2Rv9u6d8ILPdO6fAJ9miBs="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"LNoZe5xQcwPcNbMlUOZ7nMi6VOg=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"RBDyP2Rv9u6d8ILPdO6fAJ9miBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I64m0UI908V12DheBU/9aniZFt8="},{"type":"next-occurrence","id":"JTGVW9rK4pikM+74+R+D3YFFgis="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"RBDyP2Rv9u6d8ILPdO6fAJ9miBs=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"JTGVW9rK4pikM+74+R+D3YFFgis=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I64m0UI908V12DheBU/9aniZFt8="},{"type":"next-occurrence","id":"ZEtGQeEsVgr2MT09ee+JZ4i5h68="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"JTGVW9rK4pikM+74+R+D3YFFgis=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"ZEtGQeEsVgr2MT09ee+JZ4i5h68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I64m0UI908V12DheBU/9aniZFt8="},{"type":"next-occurrence","id":"p7XMW7lJ99Qm2COx+k6KlUuCDzM="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"ZEtGQeEsVgr2MT09ee+JZ4i5h68=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"p7XMW7lJ99Qm2COx+k6KlUuCDzM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I64m0UI908V12DheBU/9aniZFt8="},{"type":"next-occurrence","id":"GFpHBOjPvFVX5C33m2JGEuz66qM="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"p7XMW7lJ99Qm2COx+k6KlUuCDzM=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"GFpHBOjPvFVX5C33m2JGEuz66qM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I64m0UI908V12DheBU/9aniZFt8="},{"type":"next-occurrence","id":"Ibxjl5Kw4sj1+iWt4Sad/Hr2Zzs="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"GFpHBOjPvFVX5C33m2JGEuz66qM=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"Ibxjl5Kw4sj1+iWt4Sad/Hr2Zzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I64m0UI908V12DheBU/9aniZFt8="},{"type":"next-occurrence","id":"etlL4vNEyWKN7dSqqjVXNhPqrRI="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"Ibxjl5Kw4sj1+iWt4Sad/Hr2Zzs=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"etlL4vNEyWKN7dSqqjVXNhPqrRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I64m0UI908V12DheBU/9aniZFt8="},{"type":"next-occurrence","id":"dUdrflq+nYADYIzUJPRipa2ScmQ="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"etlL4vNEyWKN7dSqqjVXNhPqrRI=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"dUdrflq+nYADYIzUJPRipa2ScmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I64m0UI908V12DheBU/9aniZFt8="},{"type":"next-occurrence","id":"3ZQE0ZHr5SJxdrU4S2wsVpnjyiw="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"dUdrflq+nYADYIzUJPRipa2ScmQ=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"3ZQE0ZHr5SJxdrU4S2wsVpnjyiw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I64m0UI908V12DheBU/9aniZFt8="},{"type":"next-occurrence","id":"e3TKiPqFTV/ZAhe/qDfAF89fIxw="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"3ZQE0ZHr5SJxdrU4S2wsVpnjyiw=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"e3TKiPqFTV/ZAhe/qDfAF89fIxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I64m0UI908V12DheBU/9aniZFt8="},{"type":"next-occurrence","id":"/1s9SoMhVwNepn/BO3+Gn6pTsHk="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"e3TKiPqFTV/ZAhe/qDfAF89fIxw=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"/1s9SoMhVwNepn/BO3+Gn6pTsHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I64m0UI908V12DheBU/9aniZFt8="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 4 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:12Z"},"road_event_id":"/1s9SoMhVwNepn/BO3+Gn6pTsHk=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"5D+bPmhlAYzpYPI70ph+r/m2w3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"e+pf1pT/OvE5HkqEmXxQw4LvNuQ="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:14Z"},"road_event_id":"5D+bPmhlAYzpYPI70ph+r/m2w3U=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"e+pf1pT/OvE5HkqEmXxQw4LvNuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5D+bPmhlAYzpYPI70ph+r/m2w3U="},{"type":"next-occurrence","id":"+635LjX5Ckltmo/hc2di1q6WCtE="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:14Z"},"road_event_id":"e+pf1pT/OvE5HkqEmXxQw4LvNuQ=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"+635LjX5Ckltmo/hc2di1q6WCtE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5D+bPmhlAYzpYPI70ph+r/m2w3U="},{"type":"next-occurrence","id":"YiefgcCcqQ4ZNXRneAbB3lXJ090="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:14Z"},"road_event_id":"+635LjX5Ckltmo/hc2di1q6WCtE=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"YiefgcCcqQ4ZNXRneAbB3lXJ090=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5D+bPmhlAYzpYPI70ph+r/m2w3U="},{"type":"next-occurrence","id":"8NVwJtIfPF4nxggam8y+Zjvp7wQ="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:14Z"},"road_event_id":"YiefgcCcqQ4ZNXRneAbB3lXJ090=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"8NVwJtIfPF4nxggam8y+Zjvp7wQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5D+bPmhlAYzpYPI70ph+r/m2w3U="},{"type":"next-occurrence","id":"6NtFPTnGHdDSMqFTCwROvcVc+kE="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:14Z"},"road_event_id":"8NVwJtIfPF4nxggam8y+Zjvp7wQ=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"6NtFPTnGHdDSMqFTCwROvcVc+kE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5D+bPmhlAYzpYPI70ph+r/m2w3U="},{"type":"next-occurrence","id":"MIFq/YtKsuMvH9vDRfISjorbX+Q="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:14Z"},"road_event_id":"6NtFPTnGHdDSMqFTCwROvcVc+kE=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"MIFq/YtKsuMvH9vDRfISjorbX+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5D+bPmhlAYzpYPI70ph+r/m2w3U="},{"type":"next-occurrence","id":"AHJ+Wn7fxKrhhZ4UdXM+zbjFzvY="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:14Z"},"road_event_id":"MIFq/YtKsuMvH9vDRfISjorbX+Q=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"AHJ+Wn7fxKrhhZ4UdXM+zbjFzvY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5D+bPmhlAYzpYPI70ph+r/m2w3U="},{"type":"next-occurrence","id":"gUqB8IqGctsawz4tUllFbwswXCk="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:14Z"},"road_event_id":"AHJ+Wn7fxKrhhZ4UdXM+zbjFzvY=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"gUqB8IqGctsawz4tUllFbwswXCk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5D+bPmhlAYzpYPI70ph+r/m2w3U="},{"type":"next-occurrence","id":"wBcnPp3i5/gUDeTRKISKC6w5WVk="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:14Z"},"road_event_id":"gUqB8IqGctsawz4tUllFbwswXCk=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"wBcnPp3i5/gUDeTRKISKC6w5WVk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5D+bPmhlAYzpYPI70ph+r/m2w3U="},{"type":"next-occurrence","id":"MgBgKQ6nq2cUekXCxAAgSql808U="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:14Z"},"road_event_id":"wBcnPp3i5/gUDeTRKISKC6w5WVk=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"MgBgKQ6nq2cUekXCxAAgSql808U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5D+bPmhlAYzpYPI70ph+r/m2w3U="},{"type":"next-occurrence","id":"aW3lpF9xZhGeTQ7fk0JlBNwZSHY="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:14Z"},"road_event_id":"MgBgKQ6nq2cUekXCxAAgSql808U=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"aW3lpF9xZhGeTQ7fk0JlBNwZSHY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5D+bPmhlAYzpYPI70ph+r/m2w3U="},{"type":"next-occurrence","id":"pG4/gBHgc/AxSNT9+KfdQ1hlckU="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:14Z"},"road_event_id":"aW3lpF9xZhGeTQ7fk0JlBNwZSHY=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"pG4/gBHgc/AxSNT9+KfdQ1hlckU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5D+bPmhlAYzpYPI70ph+r/m2w3U="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed., Wednesday May 27th,2026 thru Thursday July 2nd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Monday July 6th,2026 thru Tuesday July 7th,2026, Monday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday July 7th,2026 thru Thursday September 3rd,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Tuesday September 8th,2026 thru Wednesday September 9th,2026, Tuesday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound, Wednesday September 9th,2026 thru Friday October 30th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes of 3 lanes open eastbound, westbound","update_date":"2026-05-27T10:00:14Z"},"road_event_id":"pG4/gBHgc/AxSNT9+KfdQ1hlckU=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"F0iwoS8dyQEhy9gzAfA5P+/BABg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on I-84 HOV Lane eastbound Exit 60 - US 44/Middle Turnpike West (Manchester), Continuous Monday April 6th, 2026 12:00 AM thru Monday November 30th, 2026 11:59 PM All lanes closed","update_date":"2026-03-31T20:03:23Z"},"road_event_id":"F0iwoS8dyQEhy9gzAfA5P+/BABg=","beginning_cross_street":"Exit 60 - US 44/Middle Turnpike West","ending_cross_street":"Exit 60 - US 44/Middle Turnpike West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.589968,41.773015]]}},{"id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zGxfhQsISgQpNNkm+RHNZQ+bQgY="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"zGxfhQsISgQpNNkm+RHNZQ+bQgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"teqjww10Ai8PIx4+cFOHi7C49ys="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"zGxfhQsISgQpNNkm+RHNZQ+bQgY=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"teqjww10Ai8PIx4+cFOHi7C49ys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"cDIx6Xta296OUDZzEyEPlwd9rNI="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"teqjww10Ai8PIx4+cFOHi7C49ys=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T22:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"cDIx6Xta296OUDZzEyEPlwd9rNI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"R3ideYfG9RR0eug2fMBxvQf4Cls="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"cDIx6Xta296OUDZzEyEPlwd9rNI=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"R3ideYfG9RR0eug2fMBxvQf4Cls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"OTfVNCWQvTNf9b4EI94DZF3W8tk="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"R3ideYfG9RR0eug2fMBxvQf4Cls=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"OTfVNCWQvTNf9b4EI94DZF3W8tk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"RAlk6cFloB48IFYRIZmFC/dCaJs="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"OTfVNCWQvTNf9b4EI94DZF3W8tk=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"RAlk6cFloB48IFYRIZmFC/dCaJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"PzcTOAO0QUpPQBO2ZsPiRjEY0+Y="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"RAlk6cFloB48IFYRIZmFC/dCaJs=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"PzcTOAO0QUpPQBO2ZsPiRjEY0+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"KC0w+cwG0OIvR/QkCzlTI2tmG1o="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"PzcTOAO0QUpPQBO2ZsPiRjEY0+Y=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"KC0w+cwG0OIvR/QkCzlTI2tmG1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"bcSC/stcd0TOW9wAmJRnuFi35Ig="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"KC0w+cwG0OIvR/QkCzlTI2tmG1o=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"bcSC/stcd0TOW9wAmJRnuFi35Ig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"u3cS8i4lgjtU5eeY78x8WqAZERs="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"bcSC/stcd0TOW9wAmJRnuFi35Ig=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"u3cS8i4lgjtU5eeY78x8WqAZERs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"55cCsAsLk13HFcdmaL8ZNe19mz4="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"u3cS8i4lgjtU5eeY78x8WqAZERs=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"55cCsAsLk13HFcdmaL8ZNe19mz4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"Av+JVBWH6GeXqbS8zAYOsfdh1qE="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"55cCsAsLk13HFcdmaL8ZNe19mz4=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"Av+JVBWH6GeXqbS8zAYOsfdh1qE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"298VRtkWoLqwDCND+QTCzPaqwwg="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"Av+JVBWH6GeXqbS8zAYOsfdh1qE=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"298VRtkWoLqwDCND+QTCzPaqwwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"EngaI/1x1Xtx78gvQawhl5f0Mrk="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"298VRtkWoLqwDCND+QTCzPaqwwg=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T22:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"EngaI/1x1Xtx78gvQawhl5f0Mrk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"MDF2QMlIG4NMOMv9DkutrvAqp1g="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"EngaI/1x1Xtx78gvQawhl5f0Mrk=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"MDF2QMlIG4NMOMv9DkutrvAqp1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"3qQsKYm66DY8wS9GCa3UAMSKodg="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"MDF2QMlIG4NMOMv9DkutrvAqp1g=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"3qQsKYm66DY8wS9GCa3UAMSKodg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"dAGjLVbbbopz2KxrU6h3/PZTUdU="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"3qQsKYm66DY8wS9GCa3UAMSKodg=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"dAGjLVbbbopz2KxrU6h3/PZTUdU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"KU8ogk32Ytqafpjm0tSHvhhO9cc="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"dAGjLVbbbopz2KxrU6h3/PZTUdU=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"KU8ogk32Ytqafpjm0tSHvhhO9cc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"OUn/QHMtsCGczwN/0TxwADtnH6I="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"KU8ogk32Ytqafpjm0tSHvhhO9cc=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"OUn/QHMtsCGczwN/0TxwADtnH6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"pPCr9NZ/rLq8I0xnzhaIOu3kpEg="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"OUn/QHMtsCGczwN/0TxwADtnH6I=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"pPCr9NZ/rLq8I0xnzhaIOu3kpEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"2XNo0z88wqTBOxJ8FIK29qTX9TM="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"pPCr9NZ/rLq8I0xnzhaIOu3kpEg=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"2XNo0z88wqTBOxJ8FIK29qTX9TM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="},{"type":"next-occurrence","id":"GZsclysgwBl3e4iNlrgiWULiYo4="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"2XNo0z88wqTBOxJ8FIK29qTX9TM=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"GZsclysgwBl3e4iNlrgiWULiYo4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MyZYJB2Lt2Sqr8BMnOS6xg0NMEs="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"GZsclysgwBl3e4iNlrgiWULiYo4=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"pH0SBogFml7BZw5amyMKEBgCVlI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"u2jk5SVWGFAZp2hjBfDztVqwrZw="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"pH0SBogFml7BZw5amyMKEBgCVlI=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"u2jk5SVWGFAZp2hjBfDztVqwrZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pH0SBogFml7BZw5amyMKEBgCVlI="},{"type":"next-occurrence","id":"1tDqrhoAleyBV9bYCsfOY6WqWUQ="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"u2jk5SVWGFAZp2hjBfDztVqwrZw=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"1tDqrhoAleyBV9bYCsfOY6WqWUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pH0SBogFml7BZw5amyMKEBgCVlI="},{"type":"next-occurrence","id":"+7pdKMQ0kGASwTEn+an2avrNzl8="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"1tDqrhoAleyBV9bYCsfOY6WqWUQ=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"+7pdKMQ0kGASwTEn+an2avrNzl8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pH0SBogFml7BZw5amyMKEBgCVlI="},{"type":"next-occurrence","id":"kqJXvxOkK81k8RuiiXzqxH3D2t4="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"+7pdKMQ0kGASwTEn+an2avrNzl8=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"kqJXvxOkK81k8RuiiXzqxH3D2t4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pH0SBogFml7BZw5amyMKEBgCVlI="},{"type":"next-occurrence","id":"A+Cucnt9lrGgYT/hQsAoVmllRX4="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"kqJXvxOkK81k8RuiiXzqxH3D2t4=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"A+Cucnt9lrGgYT/hQsAoVmllRX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pH0SBogFml7BZw5amyMKEBgCVlI="},{"type":"next-occurrence","id":"DgoUpdIcEx/cm8+ZQH1GcIqCuCs="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"A+Cucnt9lrGgYT/hQsAoVmllRX4=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"DgoUpdIcEx/cm8+ZQH1GcIqCuCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pH0SBogFml7BZw5amyMKEBgCVlI="},{"type":"next-occurrence","id":"zfRgfUKFNyJcEnVikr1CBc+XCTo="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"DgoUpdIcEx/cm8+ZQH1GcIqCuCs=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"zfRgfUKFNyJcEnVikr1CBc+XCTo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pH0SBogFml7BZw5amyMKEBgCVlI="},{"type":"next-occurrence","id":"H1NMqnvkNmL5QLzQpPVj9uOe0R0="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"zfRgfUKFNyJcEnVikr1CBc+XCTo=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"H1NMqnvkNmL5QLzQpPVj9uOe0R0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pH0SBogFml7BZw5amyMKEBgCVlI="},{"type":"next-occurrence","id":"nHvCWom3kTN88Mu2gvMFsI7KXZo="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"H1NMqnvkNmL5QLzQpPVj9uOe0R0=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"nHvCWom3kTN88Mu2gvMFsI7KXZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pH0SBogFml7BZw5amyMKEBgCVlI="},{"type":"next-occurrence","id":"VuMU+zFkGLbxItkHes35sHBca9I="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"nHvCWom3kTN88Mu2gvMFsI7KXZo=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"VuMU+zFkGLbxItkHes35sHBca9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pH0SBogFml7BZw5amyMKEBgCVlI="},{"type":"next-occurrence","id":"P3+hgrvCk3Ozfzt8lzwjS4GJCiU="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"VuMU+zFkGLbxItkHes35sHBca9I=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"P3+hgrvCk3Ozfzt8lzwjS4GJCiU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pH0SBogFml7BZw5amyMKEBgCVlI="},{"type":"next-occurrence","id":"6EGGOnFfRFuJ08IzQfk1AEyX+34="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"P3+hgrvCk3Ozfzt8lzwjS4GJCiU=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"6EGGOnFfRFuJ08IzQfk1AEyX+34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pH0SBogFml7BZw5amyMKEBgCVlI="},{"type":"next-occurrence","id":"LLJYAFUFHQBVahAgVjL686ZC0VE="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"6EGGOnFfRFuJ08IzQfk1AEyX+34=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"LLJYAFUFHQBVahAgVjL686ZC0VE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pH0SBogFml7BZw5amyMKEBgCVlI="},{"type":"next-occurrence","id":"Zr/i4Kp2acGm6QegptSgG2zRiMo="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"LLJYAFUFHQBVahAgVjL686ZC0VE=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"Zr/i4Kp2acGm6QegptSgG2zRiMo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pH0SBogFml7BZw5amyMKEBgCVlI="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"Zr/i4Kp2acGm6QegptSgG2zRiMo=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"76oF5kcTsxGTVEe7Gv338iSgKDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/J61OQf5xo9F5x2W3b2CNgCCS9I="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"76oF5kcTsxGTVEe7Gv338iSgKDA=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"/J61OQf5xo9F5x2W3b2CNgCCS9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76oF5kcTsxGTVEe7Gv338iSgKDA="},{"type":"next-occurrence","id":"D4QNxhJok4UlcGGA7w3p/be10OQ="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"/J61OQf5xo9F5x2W3b2CNgCCS9I=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"D4QNxhJok4UlcGGA7w3p/be10OQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76oF5kcTsxGTVEe7Gv338iSgKDA="},{"type":"next-occurrence","id":"BpZOt0I5MN6eZNOuNAKYOLiYgKk="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"D4QNxhJok4UlcGGA7w3p/be10OQ=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"BpZOt0I5MN6eZNOuNAKYOLiYgKk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76oF5kcTsxGTVEe7Gv338iSgKDA="},{"type":"next-occurrence","id":"qqWGsplEwiDx7sYiPHEBaoY5fsM="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"BpZOt0I5MN6eZNOuNAKYOLiYgKk=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"qqWGsplEwiDx7sYiPHEBaoY5fsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76oF5kcTsxGTVEe7Gv338iSgKDA="},{"type":"next-occurrence","id":"JREsnzPbws0mqn56uzb2wDfMIVk="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"qqWGsplEwiDx7sYiPHEBaoY5fsM=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"JREsnzPbws0mqn56uzb2wDfMIVk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76oF5kcTsxGTVEe7Gv338iSgKDA="},{"type":"next-occurrence","id":"f8vABrkhvkRvLG7sM6YykxvWzII="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"JREsnzPbws0mqn56uzb2wDfMIVk=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"f8vABrkhvkRvLG7sM6YykxvWzII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76oF5kcTsxGTVEe7Gv338iSgKDA="},{"type":"next-occurrence","id":"Gs1aI0FJg6bmnetpfe/Cw/g7GAI="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"f8vABrkhvkRvLG7sM6YykxvWzII=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"Gs1aI0FJg6bmnetpfe/Cw/g7GAI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76oF5kcTsxGTVEe7Gv338iSgKDA="},{"type":"next-occurrence","id":"zOuAcrBlkCwONmHe7iRQK9fEf/g="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"Gs1aI0FJg6bmnetpfe/Cw/g7GAI=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"zOuAcrBlkCwONmHe7iRQK9fEf/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76oF5kcTsxGTVEe7Gv338iSgKDA="},{"type":"next-occurrence","id":"PMoAc72BJBAyeHM6Iw7X4Fpf3tM="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"zOuAcrBlkCwONmHe7iRQK9fEf/g=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"PMoAc72BJBAyeHM6Iw7X4Fpf3tM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76oF5kcTsxGTVEe7Gv338iSgKDA="},{"type":"next-occurrence","id":"tOC5rvC79O718F9//yU3qED38HE="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"PMoAc72BJBAyeHM6Iw7X4Fpf3tM=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"tOC5rvC79O718F9//yU3qED38HE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"76oF5kcTsxGTVEe7Gv338iSgKDA="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"tOC5rvC79O718F9//yU3qED38HE=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"BGOM0oiAXAG8Ww+cPHr3p5OIp+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAHAM VILLAGE RD"],"direction":"unknown","related_road_events":[],"description":"Bridge work on GRAHAM VILLAGE RD both directions between NORTHSIDE DR (Torrington) and TERRACE DR (Torrington) Motorist can expect a lane closure with switching traffic from two lanes to one lane alternating traffic, Continuous Wednesday April 8th, 2026 12:00 AM thru Friday July 31st, 2026 11:59 PM All lanes open","update_date":"2026-03-31T20:19:26Z"},"road_event_id":"BGOM0oiAXAG8Ww+cPHr3p5OIp+g=","beginning_cross_street":"NORTHSIDE DR","ending_cross_street":"TERRACE DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.112597,41.821571]]}},{"id":"2WWELzACkxbfNlkR+AaFyPVr1LU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xZOk8ZS+Zq3a4FtkLSUcTKMQZBE="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Thursday August 6th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:36Z"},"road_event_id":"2WWELzACkxbfNlkR+AaFyPVr1LU=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"xZOk8ZS+Zq3a4FtkLSUcTKMQZBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2WWELzACkxbfNlkR+AaFyPVr1LU="},{"type":"next-occurrence","id":"ePyinCdoyjT1W9QqvM3Y5HESNLw="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Thursday August 6th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:36Z"},"road_event_id":"xZOk8ZS+Zq3a4FtkLSUcTKMQZBE=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"ePyinCdoyjT1W9QqvM3Y5HESNLw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2WWELzACkxbfNlkR+AaFyPVr1LU="},{"type":"next-occurrence","id":"6fbRJgTz3F9roeBJ4OuHrHU9YNQ="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Thursday August 6th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:36Z"},"road_event_id":"ePyinCdoyjT1W9QqvM3Y5HESNLw=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"6fbRJgTz3F9roeBJ4OuHrHU9YNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2WWELzACkxbfNlkR+AaFyPVr1LU="},{"type":"next-occurrence","id":"2xqz9xELNyCVo5yxzAi6Oh5Df4I="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Thursday August 6th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:36Z"},"road_event_id":"6fbRJgTz3F9roeBJ4OuHrHU9YNQ=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"2xqz9xELNyCVo5yxzAi6Oh5Df4I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2WWELzACkxbfNlkR+AaFyPVr1LU="},{"type":"next-occurrence","id":"N+jUeER58nXqGLc92hu2GL9eaUs="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Thursday August 6th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:36Z"},"road_event_id":"2xqz9xELNyCVo5yxzAi6Oh5Df4I=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"N+jUeER58nXqGLc92hu2GL9eaUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2WWELzACkxbfNlkR+AaFyPVr1LU="},{"type":"next-occurrence","id":"c+qSukqPmxkBY39YMf1FhqJ4p9c="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Thursday August 6th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:36Z"},"road_event_id":"N+jUeER58nXqGLc92hu2GL9eaUs=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"c+qSukqPmxkBY39YMf1FhqJ4p9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2WWELzACkxbfNlkR+AaFyPVr1LU="},{"type":"next-occurrence","id":"GlrITr0PWM+bWbSGj6Cuo904XAo="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Thursday August 6th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:36Z"},"road_event_id":"c+qSukqPmxkBY39YMf1FhqJ4p9c=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"GlrITr0PWM+bWbSGj6Cuo904XAo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2WWELzACkxbfNlkR+AaFyPVr1LU="},{"type":"next-occurrence","id":"xqDHdjcYfdpkI/xknRIJBhL62H4="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Thursday August 6th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:36Z"},"road_event_id":"GlrITr0PWM+bWbSGj6Cuo904XAo=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"xqDHdjcYfdpkI/xknRIJBhL62H4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2WWELzACkxbfNlkR+AaFyPVr1LU="},{"type":"next-occurrence","id":"FbFP1Vjx1L7ECx/Tb5t5Fv7CeW0="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Thursday August 6th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:36Z"},"road_event_id":"xqDHdjcYfdpkI/xknRIJBhL62H4=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"FbFP1Vjx1L7ECx/Tb5t5Fv7CeW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2WWELzACkxbfNlkR+AaFyPVr1LU="},{"type":"next-occurrence","id":"8LIF5IjsYh608Nms6xmpUupmb5Q="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Thursday August 6th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:36Z"},"road_event_id":"FbFP1Vjx1L7ECx/Tb5t5Fv7CeW0=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"8LIF5IjsYh608Nms6xmpUupmb5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2WWELzACkxbfNlkR+AaFyPVr1LU="},{"type":"next-occurrence","id":"bsK96QuJweFzril9enAv6lwHrII="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Thursday August 6th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:36Z"},"road_event_id":"8LIF5IjsYh608Nms6xmpUupmb5Q=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"bsK96QuJweFzril9enAv6lwHrII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2WWELzACkxbfNlkR+AaFyPVr1LU="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Thursday August 6th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:36Z"},"road_event_id":"bsK96QuJweFzril9enAv6lwHrII=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"LzTbesSbr7yhG2eaL683zEKaPi8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-95 southbound between Exit 85 - CT 184/US 1N (Groton) and Exit 84 - CT 32 (New London), Continuous Monday April 6th, 2026 08:00 PM thru Thursday October 31st, 2030 06:00 AM 2 Left lanes of 6 lanes closed","update_date":"2026-04-01T17:31:56Z"},"road_event_id":"LzTbesSbr7yhG2eaL683zEKaPi8=","beginning_cross_street":"Exit 85 - CT 184/US 1N","ending_cross_street":"Exit 84 - CT 32","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.080515,41.364692]]}},{"id":"D7IDwNIBTnDhtnMesMsy9t+zyA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Bridge work and traffic shift on I-95 northbound between Exit 84 - CT 32 (New London) and Exit 85 - CT 184/US 1N (Groton) Only two (2) lanes of traffic will be allowed on the northbound bridge. All other northbound traffic will be required to use the crossover onto the southbound bridge to travel north., Continuous Saturday May 9th, 2026 08:00 PM thru Thursday October 31st, 2030 06:00 AM 3 Left lanes of 5 lanes closed","update_date":"2026-04-01T17:36:33Z"},"road_event_id":"D7IDwNIBTnDhtnMesMsy9t+zyA8=","beginning_cross_street":"Exit 84 - CT 32","ending_cross_street":"Exit 85 - CT 184/US 1N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.094974,41.363528]]}},{"id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HanRIPPz4jRnq5SZsnafL+Vi8/U="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"HanRIPPz4jRnq5SZsnafL+Vi8/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"JMWjeaSt6mm6LOgCqppFv8APHSA="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"HanRIPPz4jRnq5SZsnafL+Vi8/U=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"JMWjeaSt6mm6LOgCqppFv8APHSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"cHIcNPhX4nz97j5kYJvVM1lcDQA="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"JMWjeaSt6mm6LOgCqppFv8APHSA=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T14:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"cHIcNPhX4nz97j5kYJvVM1lcDQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"MfSKEOfA7IN7OuF9Y10srCzFgCc="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"cHIcNPhX4nz97j5kYJvVM1lcDQA=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T14:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"MfSKEOfA7IN7OuF9Y10srCzFgCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"yfks2RRy/xZ9N08dc4frjFBtm1w="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"MfSKEOfA7IN7OuF9Y10srCzFgCc=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"yfks2RRy/xZ9N08dc4frjFBtm1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"OT9IBvJt0N38b6/tL7QVxo4KiP8="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"yfks2RRy/xZ9N08dc4frjFBtm1w=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"OT9IBvJt0N38b6/tL7QVxo4KiP8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"yCkT28/dRkq4Xk2ogxk/uz+t5lg="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"OT9IBvJt0N38b6/tL7QVxo4KiP8=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"yCkT28/dRkq4Xk2ogxk/uz+t5lg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"3elFvJp8icpiCmAi8QDVLKHMk3E="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"yCkT28/dRkq4Xk2ogxk/uz+t5lg=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"3elFvJp8icpiCmAi8QDVLKHMk3E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"snEt28XBxmv5FePeK9SERrDtu6s="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"3elFvJp8icpiCmAi8QDVLKHMk3E=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"snEt28XBxmv5FePeK9SERrDtu6s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"Oljy/NjlCdTlLHHAvVUC/IHen1A="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"snEt28XBxmv5FePeK9SERrDtu6s=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"Oljy/NjlCdTlLHHAvVUC/IHen1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"D3Koris08woJPmzrSsmi3sULAe0="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"Oljy/NjlCdTlLHHAvVUC/IHen1A=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"D3Koris08woJPmzrSsmi3sULAe0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"WXYWIjmnihlHRn6gbRUzwb97Wto="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"D3Koris08woJPmzrSsmi3sULAe0=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"WXYWIjmnihlHRn6gbRUzwb97Wto=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"aKJV7RxZdlCxLxeIzsFBLyGrncQ="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"WXYWIjmnihlHRn6gbRUzwb97Wto=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"aKJV7RxZdlCxLxeIzsFBLyGrncQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"ZzH3LWyjNAP1sUdfCFmjbVy0SzI="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"aKJV7RxZdlCxLxeIzsFBLyGrncQ=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"ZzH3LWyjNAP1sUdfCFmjbVy0SzI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"b+bKUa5cANJYwtim83kY1e2h46I="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"ZzH3LWyjNAP1sUdfCFmjbVy0SzI=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T14:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"b+bKUa5cANJYwtim83kY1e2h46I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"rYx8GNDgDQM96ThBLU5Px1xLTSI="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"b+bKUa5cANJYwtim83kY1e2h46I=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T14:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"rYx8GNDgDQM96ThBLU5Px1xLTSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"dI1R+Lj/yv+oZCbUUv7HvS57jGs="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"rYx8GNDgDQM96ThBLU5Px1xLTSI=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"dI1R+Lj/yv+oZCbUUv7HvS57jGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"d97ihnqqhtuuCIpa9NrdthU9/CY="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"dI1R+Lj/yv+oZCbUUv7HvS57jGs=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"d97ihnqqhtuuCIpa9NrdthU9/CY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"z8XtBOwY1JsTvHlMMoQc/Xmdjsw="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"d97ihnqqhtuuCIpa9NrdthU9/CY=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"z8XtBOwY1JsTvHlMMoQc/Xmdjsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"DUGola1yZr5ebrM/FcTNbuPaYB4="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"z8XtBOwY1JsTvHlMMoQc/Xmdjsw=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"DUGola1yZr5ebrM/FcTNbuPaYB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"bASCfRKT3EwDQ2ECLkYkjcSYM8U="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"DUGola1yZr5ebrM/FcTNbuPaYB4=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"bASCfRKT3EwDQ2ECLkYkjcSYM8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"jQgtG5z4RJemga6uS1jxghjRv5M="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"bASCfRKT3EwDQ2ECLkYkjcSYM8U=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"jQgtG5z4RJemga6uS1jxghjRv5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"7UDIk0phxSuhhlJxozXqGYaCnco="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"jQgtG5z4RJemga6uS1jxghjRv5M=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"7UDIk0phxSuhhlJxozXqGYaCnco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"XdGLC0AXxAK49evEntP3mGKsalM="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"7UDIk0phxSuhhlJxozXqGYaCnco=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"XdGLC0AXxAK49evEntP3mGKsalM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="},{"type":"next-occurrence","id":"bDHSqNnf5ruiDzCF/qjGHe/IooY="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"XdGLC0AXxAK49evEntP3mGKsalM=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"bDHSqNnf5ruiDzCF/qjGHe/IooY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCrg3tB2RAUnlBWYIWu5d7jzJo="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"bDHSqNnf5ruiDzCF/qjGHe/IooY=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"aQXHi8szPKaOysR/p0T+hhlcdMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YKQbejMa5198G0wAUPZta4ClE18="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"aQXHi8szPKaOysR/p0T+hhlcdMM=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"YKQbejMa5198G0wAUPZta4ClE18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"v5X3PWWDy+f/B7S2Tvn+eBw9sS4="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"YKQbejMa5198G0wAUPZta4ClE18=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"v5X3PWWDy+f/B7S2Tvn+eBw9sS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"OvBMKiyBOGxQMOwIAEdFGt/bdJU="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"v5X3PWWDy+f/B7S2Tvn+eBw9sS4=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T14:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"OvBMKiyBOGxQMOwIAEdFGt/bdJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"9YxZOGyp4/KQrZMFxH48aqmfxek="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"OvBMKiyBOGxQMOwIAEdFGt/bdJU=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T14:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"9YxZOGyp4/KQrZMFxH48aqmfxek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"4xFoQL1UCWdhJ6yP7KyFjDlrUPw="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"9YxZOGyp4/KQrZMFxH48aqmfxek=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"4xFoQL1UCWdhJ6yP7KyFjDlrUPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"TfXj068h6iWWu6OQLsoY4mMg98o="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"4xFoQL1UCWdhJ6yP7KyFjDlrUPw=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"TfXj068h6iWWu6OQLsoY4mMg98o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"puCJAQbb1bUe2KlCD1+cprqAfBw="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"TfXj068h6iWWu6OQLsoY4mMg98o=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"puCJAQbb1bUe2KlCD1+cprqAfBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"BprvcZRMQk8uufJnhnCH3AyNw5s="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"puCJAQbb1bUe2KlCD1+cprqAfBw=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"BprvcZRMQk8uufJnhnCH3AyNw5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"YkkYp4746CeVTi1CdZ5xS1t2IS8="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"BprvcZRMQk8uufJnhnCH3AyNw5s=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"YkkYp4746CeVTi1CdZ5xS1t2IS8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"MNDiyhI89AeV2oGBYncQf+X7Ti4="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"YkkYp4746CeVTi1CdZ5xS1t2IS8=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"MNDiyhI89AeV2oGBYncQf+X7Ti4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"JRYP7VyTnXxfXBavHO78hTM3/X8="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"MNDiyhI89AeV2oGBYncQf+X7Ti4=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"JRYP7VyTnXxfXBavHO78hTM3/X8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"4k5q5fPiD9k+VxvWEvDCGhigogk="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"JRYP7VyTnXxfXBavHO78hTM3/X8=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"4k5q5fPiD9k+VxvWEvDCGhigogk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"BqEWCLl/fKKgiPbfhpS9oHm+6Tg="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"4k5q5fPiD9k+VxvWEvDCGhigogk=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"BqEWCLl/fKKgiPbfhpS9oHm+6Tg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"dFD+oL1eMrkSbYX5qQ76M/ZIK+8="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"BqEWCLl/fKKgiPbfhpS9oHm+6Tg=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"dFD+oL1eMrkSbYX5qQ76M/ZIK+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"MoBBGr8CCNkgDYMu63WCHhSzbWk="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"dFD+oL1eMrkSbYX5qQ76M/ZIK+8=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T14:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"MoBBGr8CCNkgDYMu63WCHhSzbWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"K87NhpbNd9p/fS9tSlgboOoHuMU="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"MoBBGr8CCNkgDYMu63WCHhSzbWk=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T14:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"K87NhpbNd9p/fS9tSlgboOoHuMU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"7dLL3EO0obIDc7yq/Je0adZuBIw="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"K87NhpbNd9p/fS9tSlgboOoHuMU=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"7dLL3EO0obIDc7yq/Je0adZuBIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"X6B32PJzok+mfYYXQ/ahoY2kP44="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"7dLL3EO0obIDc7yq/Je0adZuBIw=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"X6B32PJzok+mfYYXQ/ahoY2kP44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"snsKXlQWYjfwEkgx8SlNxV+PJHk="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"X6B32PJzok+mfYYXQ/ahoY2kP44=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"snsKXlQWYjfwEkgx8SlNxV+PJHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"9LEPGa9zY1HxI3eX7/Z6q928PJQ="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"snsKXlQWYjfwEkgx8SlNxV+PJHk=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"9LEPGa9zY1HxI3eX7/Z6q928PJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"dNAEgcAXYK550bN/Uwnb89epu+Y="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"9LEPGa9zY1HxI3eX7/Z6q928PJQ=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"dNAEgcAXYK550bN/Uwnb89epu+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"x+8tofoF/GDNcTww25pPWHT9VYY="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"dNAEgcAXYK550bN/Uwnb89epu+Y=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"x+8tofoF/GDNcTww25pPWHT9VYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"t8f7ks3zRm5daM8TFZyUyVwPpBM="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"x+8tofoF/GDNcTww25pPWHT9VYY=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"t8f7ks3zRm5daM8TFZyUyVwPpBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"AiI+gtRSR3R9MHhv+BZZzeFYvTc="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"t8f7ks3zRm5daM8TFZyUyVwPpBM=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"AiI+gtRSR3R9MHhv+BZZzeFYvTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="},{"type":"next-occurrence","id":"ncFeWNSnkkak2joqz+G0qzw77qQ="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"AiI+gtRSR3R9MHhv+BZZzeFYvTc=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"ncFeWNSnkkak2joqz+G0qzw77qQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aQXHi8szPKaOysR/p0T+hhlcdMM="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"ncFeWNSnkkak2joqz+G0qzw77qQ=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"jJXueZY1OzXfV8aAFLjAhBxnPmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pNQ1R8/bVXlq38/w0JzIBFW8iKo="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"jJXueZY1OzXfV8aAFLjAhBxnPmA=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"pNQ1R8/bVXlq38/w0JzIBFW8iKo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"gERxI/vGv9trx/HTyXmmHk6zsvw="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"pNQ1R8/bVXlq38/w0JzIBFW8iKo=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"gERxI/vGv9trx/HTyXmmHk6zsvw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"VybqqIzXN14CGceKO9vNkjFHuK0="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"gERxI/vGv9trx/HTyXmmHk6zsvw=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T14:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"VybqqIzXN14CGceKO9vNkjFHuK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"uH/2OlpP68KGL+4jNAdFAl10wfc="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"VybqqIzXN14CGceKO9vNkjFHuK0=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T14:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"uH/2OlpP68KGL+4jNAdFAl10wfc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"kNJr40ohaGlfeG9JsEHhDXr8H/Q="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"uH/2OlpP68KGL+4jNAdFAl10wfc=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"kNJr40ohaGlfeG9JsEHhDXr8H/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"hMIiY97QTPVR1L8KKsFEAPI2FWU="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"kNJr40ohaGlfeG9JsEHhDXr8H/Q=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"hMIiY97QTPVR1L8KKsFEAPI2FWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"MKjefxzpS13EOhydEDguhADi72k="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"hMIiY97QTPVR1L8KKsFEAPI2FWU=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"MKjefxzpS13EOhydEDguhADi72k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"GL/TBgLTRsAHNXCvZA4Zo2ZFmqw="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"MKjefxzpS13EOhydEDguhADi72k=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"GL/TBgLTRsAHNXCvZA4Zo2ZFmqw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"6zVpnueIGOgRrBI8ZRWf2LJH6UQ="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"GL/TBgLTRsAHNXCvZA4Zo2ZFmqw=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"6zVpnueIGOgRrBI8ZRWf2LJH6UQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"I10lzo0IbE6OjOKMDPcY5aUUhp0="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"6zVpnueIGOgRrBI8ZRWf2LJH6UQ=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"I10lzo0IbE6OjOKMDPcY5aUUhp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"V2klcjWYbp5B7XQQcIJBbBWVrVE="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"I10lzo0IbE6OjOKMDPcY5aUUhp0=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"V2klcjWYbp5B7XQQcIJBbBWVrVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"kR4FLnSgXPZBKk8galcOFWtp/rs="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"V2klcjWYbp5B7XQQcIJBbBWVrVE=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"kR4FLnSgXPZBKk8galcOFWtp/rs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"Fi2fzdJh8SNrJphU5mNS1b//e5k="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"kR4FLnSgXPZBKk8galcOFWtp/rs=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"Fi2fzdJh8SNrJphU5mNS1b//e5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"vEYFHTFJ9m92cf1tv1juxk7/uys="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"Fi2fzdJh8SNrJphU5mNS1b//e5k=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"vEYFHTFJ9m92cf1tv1juxk7/uys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"jvyQ96KQpijvRsDoKKBA6hfbKNA="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"vEYFHTFJ9m92cf1tv1juxk7/uys=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T14:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"jvyQ96KQpijvRsDoKKBA6hfbKNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"T5Ps5exlog0jfyFgBAgADqna/EE="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"jvyQ96KQpijvRsDoKKBA6hfbKNA=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T14:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"T5Ps5exlog0jfyFgBAgADqna/EE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"yQBz9kKpQGoBDBEXwcYmZ818cK8="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"T5Ps5exlog0jfyFgBAgADqna/EE=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"yQBz9kKpQGoBDBEXwcYmZ818cK8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"aPmwIDrQtQqdMvdiKBKkhCKXBfM="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"yQBz9kKpQGoBDBEXwcYmZ818cK8=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"aPmwIDrQtQqdMvdiKBKkhCKXBfM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"7NUsc/1ez0qQJPqYrdo2U4SeiiQ="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"aPmwIDrQtQqdMvdiKBKkhCKXBfM=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"7NUsc/1ez0qQJPqYrdo2U4SeiiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"NfLHluQgupSkVGvTv+mrU6FRzKM="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"7NUsc/1ez0qQJPqYrdo2U4SeiiQ=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"NfLHluQgupSkVGvTv+mrU6FRzKM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"Lj4U4+FMbMC6rrdZgQ39B4FDjdg="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"NfLHluQgupSkVGvTv+mrU6FRzKM=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"Lj4U4+FMbMC6rrdZgQ39B4FDjdg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"XWiHbh5tI6qkRiABejwFEqOTDEY="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"Lj4U4+FMbMC6rrdZgQ39B4FDjdg=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"XWiHbh5tI6qkRiABejwFEqOTDEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"N9jYUjafw6Iow8Yexh1/Zif4aOc="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"XWiHbh5tI6qkRiABejwFEqOTDEY=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"N9jYUjafw6Iow8Yexh1/Zif4aOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"7MiMUrd006uJAANxZQBwRNdyKok="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"N9jYUjafw6Iow8Yexh1/Zif4aOc=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"7MiMUrd006uJAANxZQBwRNdyKok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="},{"type":"next-occurrence","id":"gSJKoomlOBlGVYjwMazMu9AYLE0="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"7MiMUrd006uJAANxZQBwRNdyKok=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"gSJKoomlOBlGVYjwMazMu9AYLE0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJXueZY1OzXfV8aAFLjAhBxnPmA="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"gSJKoomlOBlGVYjwMazMu9AYLE0=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"wuuP9m+ToRL/+4gyzAT5u05BuRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BFJImlvQe9yZrMq3B4Uia7SInk8="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"wuuP9m+ToRL/+4gyzAT5u05BuRk=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"BFJImlvQe9yZrMq3B4Uia7SInk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"TuSKBC40o5xrvZPX5Ea6v2kwRXQ="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"BFJImlvQe9yZrMq3B4Uia7SInk8=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"TuSKBC40o5xrvZPX5Ea6v2kwRXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"xuyB8RctK04DZqUMibKI2bZ6kr4="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"TuSKBC40o5xrvZPX5Ea6v2kwRXQ=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T14:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"xuyB8RctK04DZqUMibKI2bZ6kr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"l4eopCn11R4uSKq0OMFWKm9omBQ="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"xuyB8RctK04DZqUMibKI2bZ6kr4=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T14:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"l4eopCn11R4uSKq0OMFWKm9omBQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"xvniihVWoLMm3JCAslpl0sQmsRk="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"l4eopCn11R4uSKq0OMFWKm9omBQ=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"xvniihVWoLMm3JCAslpl0sQmsRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"j8KJs05a6hfQj4tOanpB6KEJvgs="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"xvniihVWoLMm3JCAslpl0sQmsRk=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"j8KJs05a6hfQj4tOanpB6KEJvgs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"bzk47BJ7//9kkVx18NqYYlZT3p0="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"j8KJs05a6hfQj4tOanpB6KEJvgs=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"bzk47BJ7//9kkVx18NqYYlZT3p0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"j+v7jXl1mK1vhjPdkxGVTVIa/m0="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"bzk47BJ7//9kkVx18NqYYlZT3p0=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"j+v7jXl1mK1vhjPdkxGVTVIa/m0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"iqigfgUQsCCN+eDa4AhtbZfIRqs="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"j+v7jXl1mK1vhjPdkxGVTVIa/m0=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"iqigfgUQsCCN+eDa4AhtbZfIRqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"9wq+WsTZyW26VGDlrd/7B15ULe8="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"iqigfgUQsCCN+eDa4AhtbZfIRqs=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"9wq+WsTZyW26VGDlrd/7B15ULe8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"xW1Km2v+QSDdJoqIZYVJqdjDTd8="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"9wq+WsTZyW26VGDlrd/7B15ULe8=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"xW1Km2v+QSDdJoqIZYVJqdjDTd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"96fSXnK6dktChWDhNrS5whZ5r4g="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"xW1Km2v+QSDdJoqIZYVJqdjDTd8=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"96fSXnK6dktChWDhNrS5whZ5r4g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"8VSwJwlO3gl8I+U6bxtQIoalyfk="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"96fSXnK6dktChWDhNrS5whZ5r4g=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"8VSwJwlO3gl8I+U6bxtQIoalyfk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"I9g2GGWPHcuIqvXBDSI7HjcErOo="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"8VSwJwlO3gl8I+U6bxtQIoalyfk=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"I9g2GGWPHcuIqvXBDSI7HjcErOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"WD47fxyrIk38UwCrU5JfAiN+2WM="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"I9g2GGWPHcuIqvXBDSI7HjcErOo=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T14:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"WD47fxyrIk38UwCrU5JfAiN+2WM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"a0ZsPZssVFgZCU05qI9plH2Zcyw="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"WD47fxyrIk38UwCrU5JfAiN+2WM=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T14:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"a0ZsPZssVFgZCU05qI9plH2Zcyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"qbCVblYw75j7vx2JdruPunFmz6g="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"a0ZsPZssVFgZCU05qI9plH2Zcyw=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"qbCVblYw75j7vx2JdruPunFmz6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"jWA0U93dG2YAKQ9airPxGWlBIVw="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"qbCVblYw75j7vx2JdruPunFmz6g=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"jWA0U93dG2YAKQ9airPxGWlBIVw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"p5+0dl0K5rg1Om0FMHlzh2U0koA="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"jWA0U93dG2YAKQ9airPxGWlBIVw=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"p5+0dl0K5rg1Om0FMHlzh2U0koA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"qBLK1ZKqWNeHgrjiONvxkkILRt0="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"p5+0dl0K5rg1Om0FMHlzh2U0koA=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"qBLK1ZKqWNeHgrjiONvxkkILRt0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"cdaZcMScRLKPEqGGAzDpa/vEycY="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"qBLK1ZKqWNeHgrjiONvxkkILRt0=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"cdaZcMScRLKPEqGGAzDpa/vEycY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"KR+EVOraYXhvl4KF14oBtEw/z68="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"cdaZcMScRLKPEqGGAzDpa/vEycY=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"KR+EVOraYXhvl4KF14oBtEw/z68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"WHo6VcDwRbOJKEi1U753Obls6OM="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"KR+EVOraYXhvl4KF14oBtEw/z68=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"WHo6VcDwRbOJKEi1U753Obls6OM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"RsqiCpn6S/TIVIynhloT6n8BDVA="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"WHo6VcDwRbOJKEi1U753Obls6OM=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"RsqiCpn6S/TIVIynhloT6n8BDVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="},{"type":"next-occurrence","id":"ozonB42hE3qNm2A3wMWwTR4iOoA="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"RsqiCpn6S/TIVIynhloT6n8BDVA=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"ozonB42hE3qNm2A3wMWwTR4iOoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wuuP9m+ToRL/+4gyzAT5u05BuRk="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"ozonB42hE3qNm2A3wMWwTR4iOoA=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"m5MR7L64ZDChbx5drZ2tCCsnQ9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near West of Exit 53 - NJ 23/US 46 (Wayne Twp), Continuous Tuesday April 7, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-02T12:49:28Z"},"road_event_id":"m5MR7L64ZDChbx5drZ2tCCsnQ9g=","beginning_cross_street":"West of Exit 53 - NJ 23/US 46","ending_cross_street":"East of Exit 52 - CR 613/Passaic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.263801,40.894535]]}},{"id":"LE/YcdiGiT15i7xptIKVigRP8NQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near East of Exit 53 - NJ 23/US 46 (Wayne Twp), Continuous Monday April 6, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-02T12:49:41Z"},"road_event_id":"LE/YcdiGiT15i7xptIKVigRP8NQ=","beginning_cross_street":"East of Exit 53 - NJ 23/US 46","ending_cross_street":"West of Exit 54 - Minnisink Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.243606,40.898761]]}},{"id":"OcsM3rnzSYkpGmv+16Gje4Gy34Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AQCKSQ6fWAZJF/JNfvNMezZUfsQ="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121 - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closures","update_date":"2026-06-05T19:30:52Z"},"road_event_id":"OcsM3rnzSYkpGmv+16Gje4Gy34Q=","beginning_cross_street":"","ending_cross_street":"Exit 121 - I 84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"AQCKSQ6fWAZJF/JNfvNMezZUfsQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OcsM3rnzSYkpGmv+16Gje4Gy34Q="},{"type":"next-occurrence","id":"+6EBs5Z8EWDjk+EwETRXqVV2YXg="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121 - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closures","update_date":"2026-06-05T19:30:52Z"},"road_event_id":"AQCKSQ6fWAZJF/JNfvNMezZUfsQ=","beginning_cross_street":"","ending_cross_street":"Exit 121 - I 84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"+6EBs5Z8EWDjk+EwETRXqVV2YXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OcsM3rnzSYkpGmv+16Gje4Gy34Q="},{"type":"next-occurrence","id":"IW3SqFIi94+B0gPE11d0pjpn4ig="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121 - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closures","update_date":"2026-06-05T19:30:52Z"},"road_event_id":"+6EBs5Z8EWDjk+EwETRXqVV2YXg=","beginning_cross_street":"","ending_cross_street":"Exit 121 - I 84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"IW3SqFIi94+B0gPE11d0pjpn4ig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OcsM3rnzSYkpGmv+16Gje4Gy34Q="},{"type":"next-occurrence","id":"FbJLuwW3DOO0H+l0nb0zHePHmnw="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121 - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closures","update_date":"2026-06-05T19:30:52Z"},"road_event_id":"IW3SqFIi94+B0gPE11d0pjpn4ig=","beginning_cross_street":"","ending_cross_street":"Exit 121 - I 84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"FbJLuwW3DOO0H+l0nb0zHePHmnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OcsM3rnzSYkpGmv+16Gje4Gy34Q="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121 - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closures","update_date":"2026-06-05T19:30:52Z"},"road_event_id":"FbJLuwW3DOO0H+l0nb0zHePHmnw=","beginning_cross_street":"","ending_cross_street":"Exit 121 - I 84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"etkpU/CKPZazoB5LC6nBC6H7b2k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tzdOOC80pOmq+6SCZPQymtBMJvE="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy northbound between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/DAY/B5501670/32494609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:07:03Z"},"road_event_id":"etkpU/CKPZazoB5LC6nBC6H7b2k=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831593,40.999401]]}},{"id":"tzdOOC80pOmq+6SCZPQymtBMJvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"etkpU/CKPZazoB5LC6nBC6H7b2k="},{"type":"next-occurrence","id":"OQeskBCzzgmhqUdNtVLuQGzJF48="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy northbound between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/DAY/B5501670/32494609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:07:03Z"},"road_event_id":"tzdOOC80pOmq+6SCZPQymtBMJvE=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831593,40.999401]]}},{"id":"OQeskBCzzgmhqUdNtVLuQGzJF48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"etkpU/CKPZazoB5LC6nBC6H7b2k="},{"type":"next-occurrence","id":"m4NvHcNnwFd6xf0LrXiz8RRgMMo="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy northbound between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/DAY/B5501670/32494609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:07:03Z"},"road_event_id":"OQeskBCzzgmhqUdNtVLuQGzJF48=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831593,40.999401]]}},{"id":"m4NvHcNnwFd6xf0LrXiz8RRgMMo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"etkpU/CKPZazoB5LC6nBC6H7b2k="},{"type":"next-occurrence","id":"TWXYWQcu51b3yniJXJQy02sXufw="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy northbound between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/DAY/B5501670/32494609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:07:03Z"},"road_event_id":"m4NvHcNnwFd6xf0LrXiz8RRgMMo=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831593,40.999401]]}},{"id":"TWXYWQcu51b3yniJXJQy02sXufw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"etkpU/CKPZazoB5LC6nBC6H7b2k="},{"type":"next-occurrence","id":"Wf1k6TNhMtT3l750TVOiAa2rxBw="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy northbound between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/DAY/B5501670/32494609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:07:03Z"},"road_event_id":"TWXYWQcu51b3yniJXJQy02sXufw=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831593,40.999401]]}},{"id":"Wf1k6TNhMtT3l750TVOiAa2rxBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"etkpU/CKPZazoB5LC6nBC6H7b2k="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy northbound between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/DAY/B5501670/32494609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:07:03Z"},"road_event_id":"Wf1k6TNhMtT3l750TVOiAa2rxBw=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831593,40.999401]]}},{"id":"pMRNwWYAGhq8YOXVRVLR1cToN+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bLhZSqevFchBUzhkP7dLi/KBri8="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Dobbs Ferry Road - NY 100B (Greenburgh) and Jackson Avenue (Greenburgh) D264324/DAY/B5501670/32483909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:06:56Z"},"road_event_id":"pMRNwWYAGhq8YOXVRVLR1cToN+A=","beginning_cross_street":"Dobbs Ferry Road - NY 100B","ending_cross_street":"Jackson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831735,40.999721]]}},{"id":"bLhZSqevFchBUzhkP7dLi/KBri8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMRNwWYAGhq8YOXVRVLR1cToN+A="},{"type":"next-occurrence","id":"ypBFGXv9VgQ2gukFskZgnobdEyk="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Dobbs Ferry Road - NY 100B (Greenburgh) and Jackson Avenue (Greenburgh) D264324/DAY/B5501670/32483909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:06:56Z"},"road_event_id":"bLhZSqevFchBUzhkP7dLi/KBri8=","beginning_cross_street":"Dobbs Ferry Road - NY 100B","ending_cross_street":"Jackson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831735,40.999721]]}},{"id":"ypBFGXv9VgQ2gukFskZgnobdEyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMRNwWYAGhq8YOXVRVLR1cToN+A="},{"type":"next-occurrence","id":"G9Ur72kCS5TzQNwll2UAREEzi70="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Dobbs Ferry Road - NY 100B (Greenburgh) and Jackson Avenue (Greenburgh) D264324/DAY/B5501670/32483909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:06:56Z"},"road_event_id":"ypBFGXv9VgQ2gukFskZgnobdEyk=","beginning_cross_street":"Dobbs Ferry Road - NY 100B","ending_cross_street":"Jackson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831735,40.999721]]}},{"id":"G9Ur72kCS5TzQNwll2UAREEzi70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMRNwWYAGhq8YOXVRVLR1cToN+A="},{"type":"next-occurrence","id":"0wemT4EjQwB57spf1UstJQg18Ug="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Dobbs Ferry Road - NY 100B (Greenburgh) and Jackson Avenue (Greenburgh) D264324/DAY/B5501670/32483909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:06:56Z"},"road_event_id":"G9Ur72kCS5TzQNwll2UAREEzi70=","beginning_cross_street":"Dobbs Ferry Road - NY 100B","ending_cross_street":"Jackson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831735,40.999721]]}},{"id":"0wemT4EjQwB57spf1UstJQg18Ug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMRNwWYAGhq8YOXVRVLR1cToN+A="},{"type":"next-occurrence","id":"EJjO1ZiwUB+8qmndrtPEqxfdSwY="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Dobbs Ferry Road - NY 100B (Greenburgh) and Jackson Avenue (Greenburgh) D264324/DAY/B5501670/32483909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:06:56Z"},"road_event_id":"0wemT4EjQwB57spf1UstJQg18Ug=","beginning_cross_street":"Dobbs Ferry Road - NY 100B","ending_cross_street":"Jackson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831735,40.999721]]}},{"id":"EJjO1ZiwUB+8qmndrtPEqxfdSwY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMRNwWYAGhq8YOXVRVLR1cToN+A="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Dobbs Ferry Road - NY 100B (Greenburgh) and Jackson Avenue (Greenburgh) D264324/DAY/B5501670/32483909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:06:56Z"},"road_event_id":"EJjO1ZiwUB+8qmndrtPEqxfdSwY=","beginning_cross_street":"Dobbs Ferry Road - NY 100B","ending_cross_street":"Jackson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831735,40.999721]]}},{"id":"N9349T5TfolXt56F9EcgePV1+u0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near West of Exit 45 - CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp), Continuous Thursday April 9, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed local lane","update_date":"2026-04-03T11:14:08Z"},"road_event_id":"N9349T5TfolXt56F9EcgePV1+u0=","beginning_cross_street":"West of Exit 45 - CR 637/Beverwyck Rd","ending_cross_street":"East of Exit 43 - I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.39772,40.860549]]}},{"id":"XCKjQ+yk27lh3bbgX8Ao1Dwi61k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near East of Exit 47A - I-280 (Fairfield Twp), Continuous Wednesday April 8, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-03T11:14:03Z"},"road_event_id":"XCKjQ+yk27lh3bbgX8Ao1Dwi61k=","beginning_cross_street":"East of Exit 47A - I-280","ending_cross_street":"East of Exit 47A - I-280","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.330825,40.868228]]}},{"id":"czA7gyR1rSnknKMFLGvxapXRZek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"T3luH7RAupXMfha+tBRy1JC/Xz0="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"czA7gyR1rSnknKMFLGvxapXRZek=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"T3luH7RAupXMfha+tBRy1JC/Xz0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"czA7gyR1rSnknKMFLGvxapXRZek="},{"type":"next-occurrence","id":"JoZ7l2pLMQIyyTtjcTEFmeej8yg="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"T3luH7RAupXMfha+tBRy1JC/Xz0=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"JoZ7l2pLMQIyyTtjcTEFmeej8yg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"czA7gyR1rSnknKMFLGvxapXRZek="},{"type":"next-occurrence","id":"Y345mCThO2G7laJwdI1nZrJomrk="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"JoZ7l2pLMQIyyTtjcTEFmeej8yg=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"Y345mCThO2G7laJwdI1nZrJomrk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"czA7gyR1rSnknKMFLGvxapXRZek="},{"type":"next-occurrence","id":"pSP6qVAptnqRj84jG2FH3CwlDeU="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"Y345mCThO2G7laJwdI1nZrJomrk=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"pSP6qVAptnqRj84jG2FH3CwlDeU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"czA7gyR1rSnknKMFLGvxapXRZek="},{"type":"next-occurrence","id":"UTHcyrFDdnxIi7BK2PjsQPagqC8="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"pSP6qVAptnqRj84jG2FH3CwlDeU=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"UTHcyrFDdnxIi7BK2PjsQPagqC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"czA7gyR1rSnknKMFLGvxapXRZek="},{"type":"next-occurrence","id":"7aLiAdyw4EcH/IkiexrO/RLOnXY="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"UTHcyrFDdnxIi7BK2PjsQPagqC8=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"7aLiAdyw4EcH/IkiexrO/RLOnXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"czA7gyR1rSnknKMFLGvxapXRZek="},{"type":"next-occurrence","id":"zm2M0I7nvCFlo579gSuaCM6wlnQ="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"7aLiAdyw4EcH/IkiexrO/RLOnXY=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"zm2M0I7nvCFlo579gSuaCM6wlnQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"czA7gyR1rSnknKMFLGvxapXRZek="},{"type":"next-occurrence","id":"gcFzC8MwQ+mohtjELZx48i5BZ4w="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"zm2M0I7nvCFlo579gSuaCM6wlnQ=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"gcFzC8MwQ+mohtjELZx48i5BZ4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"czA7gyR1rSnknKMFLGvxapXRZek="},{"type":"next-occurrence","id":"F1yzeRgERlFOSeYq9wRJI/PK59k="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"gcFzC8MwQ+mohtjELZx48i5BZ4w=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"F1yzeRgERlFOSeYq9wRJI/PK59k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"czA7gyR1rSnknKMFLGvxapXRZek="},{"type":"next-occurrence","id":"Qk7or5EBykGa/ljFBlOrqUITGKk="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"F1yzeRgERlFOSeYq9wRJI/PK59k=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"Qk7or5EBykGa/ljFBlOrqUITGKk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"czA7gyR1rSnknKMFLGvxapXRZek="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"Qk7or5EBykGa/ljFBlOrqUITGKk=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"R58lw4/m8ZQs87VdgpbEy4nLO+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLD RT-17"],"direction":"unknown","related_road_events":[],"description":"Bridge demolition on OLD RT-17 both directions RT-394 (Coldspring), Monday April 6th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes closed","update_date":"2026-04-03T14:11:55Z"},"road_event_id":"R58lw4/m8ZQs87VdgpbEy4nLO+8=","beginning_cross_street":"RT-394","ending_cross_street":"RT-394","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.879125,42.106334]]}},{"id":"uZkhqNNTrQ2Ba7vLv8WMKhc1XI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28"],"direction":"unknown","related_road_events":[],"description":"Tree trimming on NY 28 both directions between ONeil Flowage (Indian Lake) and Durant Road (Indian Lake) Motorists will encounter lane closures in both directions with temporary signals in place, Continuous Wednesday April 8th, 2026 7:00 AM thru Monday November 30th, 2026 5:00 PM","update_date":"2026-05-21T15:20:04Z"},"road_event_id":"uZkhqNNTrQ2Ba7vLv8WMKhc1XI0=","beginning_cross_street":"ONeil Flowage","ending_cross_street":"Durant Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.346154,43.820343]]}},{"id":"ORC300526495","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","description":"Roadwork on NY 9N both directions CR 36 (Greenfield) to Saratoga; Warren County Line (Lake Luzerne) Various Short Term Closures Not currently Scheduled","update_date":"2026-04-10T21:30:01Z"},"road_event_id":"ORC300526495","beginning_cross_street":"CR 36","ending_cross_street":"Saratoga; Warren County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-03T16:31:23Z","end_date":"2026-04-11T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.846611,43.128423]]}},{"id":"LmFnhaA3kvB53U4Tk/n7cV2xRq8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 3"],"direction":"unknown","related_road_events":[],"description":"Bridge work on CT 3 both directions between I-91 (Wetherfield) a 20-ton weight restriction for Bridge No. 00417 (Putnam Memorial Bridge) over the Connecticut River, located in the towns of Wethersfield and Glastonbury, effective April 6, 2026. This restriction will remain in place until specific work under the associated project is completed,, Continuous Monday April 6th, 2026 12:00 AM thru Friday November 3rd, 2028 11:59 PM All lanes open","update_date":"2026-04-03T19:30:45Z"},"road_event_id":"LmFnhaA3kvB53U4Tk/n7cV2xRq8=","beginning_cross_street":"I-91","ending_cross_street":"I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.641876,41.712963]]}},{"id":"1BVWQ5Oi4Ylb4U/buQniweWeMH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TNltEEohP4EexL5xrHntbMIuQCE="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"1BVWQ5Oi4Ylb4U/buQniweWeMH0=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"TNltEEohP4EexL5xrHntbMIuQCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BVWQ5Oi4Ylb4U/buQniweWeMH0="},{"type":"next-occurrence","id":"He6uYM0CtUeENvHZmHWLU/Md/YM="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"TNltEEohP4EexL5xrHntbMIuQCE=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"He6uYM0CtUeENvHZmHWLU/Md/YM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BVWQ5Oi4Ylb4U/buQniweWeMH0="},{"type":"next-occurrence","id":"1u7dLpTuZMl1CJ5nCbo6fmkIgIQ="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"He6uYM0CtUeENvHZmHWLU/Md/YM=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"1u7dLpTuZMl1CJ5nCbo6fmkIgIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BVWQ5Oi4Ylb4U/buQniweWeMH0="},{"type":"next-occurrence","id":"FxD0qGJqt2OdrAIPsk3fTjUgZBg="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"1u7dLpTuZMl1CJ5nCbo6fmkIgIQ=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"FxD0qGJqt2OdrAIPsk3fTjUgZBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BVWQ5Oi4Ylb4U/buQniweWeMH0="},{"type":"next-occurrence","id":"28hX6g6RhPYGdZUekjDxifA3tYM="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"FxD0qGJqt2OdrAIPsk3fTjUgZBg=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"28hX6g6RhPYGdZUekjDxifA3tYM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BVWQ5Oi4Ylb4U/buQniweWeMH0="},{"type":"next-occurrence","id":"qOcrtwUEqlCnTNocn1Z0UgEyA2I="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"28hX6g6RhPYGdZUekjDxifA3tYM=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"qOcrtwUEqlCnTNocn1Z0UgEyA2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BVWQ5Oi4Ylb4U/buQniweWeMH0="},{"type":"next-occurrence","id":"oJBSHm0wMGCgcg3PR2iRWR4+OYg="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"qOcrtwUEqlCnTNocn1Z0UgEyA2I=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"oJBSHm0wMGCgcg3PR2iRWR4+OYg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BVWQ5Oi4Ylb4U/buQniweWeMH0="},{"type":"next-occurrence","id":"Y48pxQlL7YON487n18iaNfHvMsg="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"oJBSHm0wMGCgcg3PR2iRWR4+OYg=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"Y48pxQlL7YON487n18iaNfHvMsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BVWQ5Oi4Ylb4U/buQniweWeMH0="},{"type":"next-occurrence","id":"uBrtPw7zEke7W8C6s6qz4u/yB64="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"Y48pxQlL7YON487n18iaNfHvMsg=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"uBrtPw7zEke7W8C6s6qz4u/yB64=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BVWQ5Oi4Ylb4U/buQniweWeMH0="},{"type":"next-occurrence","id":"X09DGjwJOTXLUt2NSY8lrA+S1d8="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"uBrtPw7zEke7W8C6s6qz4u/yB64=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"X09DGjwJOTXLUt2NSY8lrA+S1d8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BVWQ5Oi4Ylb4U/buQniweWeMH0="},{"type":"next-occurrence","id":"HLuVo0CM1Qc2FQyFE/EYS/WLw4o="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"X09DGjwJOTXLUt2NSY8lrA+S1d8=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"HLuVo0CM1Qc2FQyFE/EYS/WLw4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BVWQ5Oi4Ylb4U/buQniweWeMH0="},{"type":"next-occurrence","id":"TG57KMi8vpM2PDIMgvuq5qYyhHk="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"HLuVo0CM1Qc2FQyFE/EYS/WLw4o=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"TG57KMi8vpM2PDIMgvuq5qYyhHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BVWQ5Oi4Ylb4U/buQniweWeMH0="},{"type":"next-occurrence","id":"zJl4J4TOxyv4LttOqwX3pt68mBw="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"TG57KMi8vpM2PDIMgvuq5qYyhHk=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"zJl4J4TOxyv4LttOqwX3pt68mBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BVWQ5Oi4Ylb4U/buQniweWeMH0="},{"type":"next-occurrence","id":"MGWGybrQ4Xa55SjvVKUEzNYr6eg="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"zJl4J4TOxyv4LttOqwX3pt68mBw=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"MGWGybrQ4Xa55SjvVKUEzNYr6eg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BVWQ5Oi4Ylb4U/buQniweWeMH0="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"MGWGybrQ4Xa55SjvVKUEzNYr6eg=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"PXppeNkpMuBQYSqp58StImh4tpM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/vPy79WVJ5UXnyU3BMiCUZT26GE="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"PXppeNkpMuBQYSqp58StImh4tpM=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"/vPy79WVJ5UXnyU3BMiCUZT26GE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PXppeNkpMuBQYSqp58StImh4tpM="},{"type":"next-occurrence","id":"dypxI0qJb8W7Nl13/rpo9usG790="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"/vPy79WVJ5UXnyU3BMiCUZT26GE=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"dypxI0qJb8W7Nl13/rpo9usG790=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PXppeNkpMuBQYSqp58StImh4tpM="},{"type":"next-occurrence","id":"/wMxLdXLr1IlZ+l+D7QNge7omGA="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"dypxI0qJb8W7Nl13/rpo9usG790=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"/wMxLdXLr1IlZ+l+D7QNge7omGA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PXppeNkpMuBQYSqp58StImh4tpM="},{"type":"next-occurrence","id":"4oHsTAMG5D6n26WaFAlGeub9BOA="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"/wMxLdXLr1IlZ+l+D7QNge7omGA=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"4oHsTAMG5D6n26WaFAlGeub9BOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PXppeNkpMuBQYSqp58StImh4tpM="},{"type":"next-occurrence","id":"rJbvNrAwXkgzOUPx+u2wJPpxYuI="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"4oHsTAMG5D6n26WaFAlGeub9BOA=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"rJbvNrAwXkgzOUPx+u2wJPpxYuI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PXppeNkpMuBQYSqp58StImh4tpM="},{"type":"next-occurrence","id":"hB25pTzCU+uUkcCuo9Fi0DpBNXE="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"rJbvNrAwXkgzOUPx+u2wJPpxYuI=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"hB25pTzCU+uUkcCuo9Fi0DpBNXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PXppeNkpMuBQYSqp58StImh4tpM="},{"type":"next-occurrence","id":"7SN/ndMtlhjm+B+nohcEPkLbYDA="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"hB25pTzCU+uUkcCuo9Fi0DpBNXE=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"7SN/ndMtlhjm+B+nohcEPkLbYDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PXppeNkpMuBQYSqp58StImh4tpM="},{"type":"next-occurrence","id":"f3OLI+JMfHiSSbppEqjc54OiJ+8="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"7SN/ndMtlhjm+B+nohcEPkLbYDA=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"f3OLI+JMfHiSSbppEqjc54OiJ+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PXppeNkpMuBQYSqp58StImh4tpM="},{"type":"next-occurrence","id":"FadKOUzMjhUX5BDTHpz2PEWX7kg="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"f3OLI+JMfHiSSbppEqjc54OiJ+8=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"FadKOUzMjhUX5BDTHpz2PEWX7kg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PXppeNkpMuBQYSqp58StImh4tpM="},{"type":"next-occurrence","id":"wvtBumAa3yUmN4+1SSDwo1S7v1s="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"FadKOUzMjhUX5BDTHpz2PEWX7kg=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"wvtBumAa3yUmN4+1SSDwo1S7v1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PXppeNkpMuBQYSqp58StImh4tpM="},{"type":"next-occurrence","id":"qbJ3TQKzmHjZi1FAVcqiA5iJnqQ="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"wvtBumAa3yUmN4+1SSDwo1S7v1s=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"qbJ3TQKzmHjZi1FAVcqiA5iJnqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PXppeNkpMuBQYSqp58StImh4tpM="},{"type":"next-occurrence","id":"OXU4R8YkdJWXtJJxr9gztxaUmmQ="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"qbJ3TQKzmHjZi1FAVcqiA5iJnqQ=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"OXU4R8YkdJWXtJJxr9gztxaUmmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PXppeNkpMuBQYSqp58StImh4tpM="},{"type":"next-occurrence","id":"dGCuk3fCVhfRFSGMduATcvKnzhY="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"OXU4R8YkdJWXtJJxr9gztxaUmmQ=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"dGCuk3fCVhfRFSGMduATcvKnzhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PXppeNkpMuBQYSqp58StImh4tpM="},{"type":"next-occurrence","id":"TnxKBM/G01J+uta6uQbqW2+Skm8="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"dGCuk3fCVhfRFSGMduATcvKnzhY=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"TnxKBM/G01J+uta6uQbqW2+Skm8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PXppeNkpMuBQYSqp58StImh4tpM="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"TnxKBM/G01J+uta6uQbqW2+Skm8=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"XZ68bPWLQd16N+Q2bvKfrmpgx6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"elEmQvuknuPelWOtf2y8aCicyfM="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"XZ68bPWLQd16N+Q2bvKfrmpgx6U=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"elEmQvuknuPelWOtf2y8aCicyfM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZ68bPWLQd16N+Q2bvKfrmpgx6U="},{"type":"next-occurrence","id":"qxrqvks4f9xmEUKpQUZbSnGR7Tc="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"elEmQvuknuPelWOtf2y8aCicyfM=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"qxrqvks4f9xmEUKpQUZbSnGR7Tc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZ68bPWLQd16N+Q2bvKfrmpgx6U="},{"type":"next-occurrence","id":"UXgbXDiPRJto8X3F1MeO8RvApZg="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"qxrqvks4f9xmEUKpQUZbSnGR7Tc=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"UXgbXDiPRJto8X3F1MeO8RvApZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZ68bPWLQd16N+Q2bvKfrmpgx6U="},{"type":"next-occurrence","id":"jkyRJAXGPKm+WN/Zyvfd5770y8w="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"UXgbXDiPRJto8X3F1MeO8RvApZg=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"jkyRJAXGPKm+WN/Zyvfd5770y8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZ68bPWLQd16N+Q2bvKfrmpgx6U="},{"type":"next-occurrence","id":"Dv1zyw90DOyv4sGAFR3lsND4Kjc="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"jkyRJAXGPKm+WN/Zyvfd5770y8w=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"Dv1zyw90DOyv4sGAFR3lsND4Kjc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZ68bPWLQd16N+Q2bvKfrmpgx6U="},{"type":"next-occurrence","id":"KRi2+nbt3oW1BK0opMzb5kgOkhY="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"Dv1zyw90DOyv4sGAFR3lsND4Kjc=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"KRi2+nbt3oW1BK0opMzb5kgOkhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZ68bPWLQd16N+Q2bvKfrmpgx6U="},{"type":"next-occurrence","id":"n7z4e3ODGdKTbUBwifE2Mlx9QQo="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"KRi2+nbt3oW1BK0opMzb5kgOkhY=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"n7z4e3ODGdKTbUBwifE2Mlx9QQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZ68bPWLQd16N+Q2bvKfrmpgx6U="},{"type":"next-occurrence","id":"V5ONy9zu/gJiI87oyYtMbcnI89I="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"n7z4e3ODGdKTbUBwifE2Mlx9QQo=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"V5ONy9zu/gJiI87oyYtMbcnI89I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZ68bPWLQd16N+Q2bvKfrmpgx6U="},{"type":"next-occurrence","id":"BIMmbchcb36Ea6MtaqVxOHzc7DY="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"V5ONy9zu/gJiI87oyYtMbcnI89I=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"BIMmbchcb36Ea6MtaqVxOHzc7DY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZ68bPWLQd16N+Q2bvKfrmpgx6U="},{"type":"next-occurrence","id":"6/+L7ZDdfcj7pOMav8r+XbKhL28="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"BIMmbchcb36Ea6MtaqVxOHzc7DY=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"6/+L7ZDdfcj7pOMav8r+XbKhL28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZ68bPWLQd16N+Q2bvKfrmpgx6U="},{"type":"next-occurrence","id":"JGx1QGlaVZxViukOQFF9cr2OJ5Y="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"6/+L7ZDdfcj7pOMav8r+XbKhL28=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"JGx1QGlaVZxViukOQFF9cr2OJ5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZ68bPWLQd16N+Q2bvKfrmpgx6U="},{"type":"next-occurrence","id":"m8r2h/ePH4hJhAHiYc99+KBUNx0="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"JGx1QGlaVZxViukOQFF9cr2OJ5Y=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"m8r2h/ePH4hJhAHiYc99+KBUNx0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZ68bPWLQd16N+Q2bvKfrmpgx6U="},{"type":"next-occurrence","id":"SHIbYdLnrFMq/qr+SbYVejm+seI="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"m8r2h/ePH4hJhAHiYc99+KBUNx0=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"SHIbYdLnrFMq/qr+SbYVejm+seI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZ68bPWLQd16N+Q2bvKfrmpgx6U="},{"type":"next-occurrence","id":"sn/oXmgbjOrAugvD38fa2AldLCs="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"SHIbYdLnrFMq/qr+SbYVejm+seI=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"sn/oXmgbjOrAugvD38fa2AldLCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZ68bPWLQd16N+Q2bvKfrmpgx6U="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"sn/oXmgbjOrAugvD38fa2AldLCs=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"FYJRq3F8fk2+mRYdAOCOr/9CopU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"baBH6QRhQ3KLjNzQePVxL5zxwJU="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"FYJRq3F8fk2+mRYdAOCOr/9CopU=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"baBH6QRhQ3KLjNzQePVxL5zxwJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYJRq3F8fk2+mRYdAOCOr/9CopU="},{"type":"next-occurrence","id":"oRVeW0nCOpXS14ve1yLgTKmQXoY="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"baBH6QRhQ3KLjNzQePVxL5zxwJU=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"oRVeW0nCOpXS14ve1yLgTKmQXoY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYJRq3F8fk2+mRYdAOCOr/9CopU="},{"type":"next-occurrence","id":"2AwHJHysP1IARZMNY2EJCST3ofk="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"oRVeW0nCOpXS14ve1yLgTKmQXoY=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"2AwHJHysP1IARZMNY2EJCST3ofk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYJRq3F8fk2+mRYdAOCOr/9CopU="},{"type":"next-occurrence","id":"+eH/bknB2FjfIP569/Fl3weJzQ4="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"2AwHJHysP1IARZMNY2EJCST3ofk=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"+eH/bknB2FjfIP569/Fl3weJzQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYJRq3F8fk2+mRYdAOCOr/9CopU="},{"type":"next-occurrence","id":"ipUE5jr7HbCUGUctUBzUhUX54ec="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"+eH/bknB2FjfIP569/Fl3weJzQ4=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"ipUE5jr7HbCUGUctUBzUhUX54ec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYJRq3F8fk2+mRYdAOCOr/9CopU="},{"type":"next-occurrence","id":"+2YIU40i831ledzTsNx5SIXdvCo="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"ipUE5jr7HbCUGUctUBzUhUX54ec=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"+2YIU40i831ledzTsNx5SIXdvCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYJRq3F8fk2+mRYdAOCOr/9CopU="},{"type":"next-occurrence","id":"2Nrk9Z4eL6TmZTbEEXqGW8oCnDg="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"+2YIU40i831ledzTsNx5SIXdvCo=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"2Nrk9Z4eL6TmZTbEEXqGW8oCnDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYJRq3F8fk2+mRYdAOCOr/9CopU="},{"type":"next-occurrence","id":"kF4hJA200wSmGr1uxWhRJM4nNvs="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"2Nrk9Z4eL6TmZTbEEXqGW8oCnDg=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"kF4hJA200wSmGr1uxWhRJM4nNvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYJRq3F8fk2+mRYdAOCOr/9CopU="},{"type":"next-occurrence","id":"W5JvukMpfAmvunsIjxa4vJc1kJU="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"kF4hJA200wSmGr1uxWhRJM4nNvs=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"W5JvukMpfAmvunsIjxa4vJc1kJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYJRq3F8fk2+mRYdAOCOr/9CopU="},{"type":"next-occurrence","id":"er8cnNBa5ofvhzgzDJv8jWxnCQE="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"W5JvukMpfAmvunsIjxa4vJc1kJU=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"er8cnNBa5ofvhzgzDJv8jWxnCQE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYJRq3F8fk2+mRYdAOCOr/9CopU="},{"type":"next-occurrence","id":"vF3frhqu12NH6uJyM+nGjWp3x7A="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"er8cnNBa5ofvhzgzDJv8jWxnCQE=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"vF3frhqu12NH6uJyM+nGjWp3x7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYJRq3F8fk2+mRYdAOCOr/9CopU="},{"type":"next-occurrence","id":"Zaj9wwLqwvP5MQ1ygBTEiZK078I="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"vF3frhqu12NH6uJyM+nGjWp3x7A=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"Zaj9wwLqwvP5MQ1ygBTEiZK078I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYJRq3F8fk2+mRYdAOCOr/9CopU="},{"type":"next-occurrence","id":"Fh9rB05wmUkUFpTxfekL/dsUh9w="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"Zaj9wwLqwvP5MQ1ygBTEiZK078I=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"Fh9rB05wmUkUFpTxfekL/dsUh9w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYJRq3F8fk2+mRYdAOCOr/9CopU="},{"type":"next-occurrence","id":"8S+/XtNNZXQoAm67D39dFm7tXh0="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"Fh9rB05wmUkUFpTxfekL/dsUh9w=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"8S+/XtNNZXQoAm67D39dFm7tXh0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYJRq3F8fk2+mRYdAOCOr/9CopU="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"8S+/XtNNZXQoAm67D39dFm7tXh0=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"HrNEwmd0m2EcaJ7HdSozdusJ9RA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FFVawfyw0d4fljq+jLm7ycNJplo="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"HrNEwmd0m2EcaJ7HdSozdusJ9RA=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"FFVawfyw0d4fljq+jLm7ycNJplo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrNEwmd0m2EcaJ7HdSozdusJ9RA="},{"type":"next-occurrence","id":"akPPF2gJ+4uzctSkVZ+aXt1gzEE="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"FFVawfyw0d4fljq+jLm7ycNJplo=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"akPPF2gJ+4uzctSkVZ+aXt1gzEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrNEwmd0m2EcaJ7HdSozdusJ9RA="},{"type":"next-occurrence","id":"BzW17tOzcPXTHES23BlmwE2bCAk="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"akPPF2gJ+4uzctSkVZ+aXt1gzEE=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"BzW17tOzcPXTHES23BlmwE2bCAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrNEwmd0m2EcaJ7HdSozdusJ9RA="},{"type":"next-occurrence","id":"d8d7iC4LrN5afw3DOahWLHjl+Yo="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"BzW17tOzcPXTHES23BlmwE2bCAk=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"d8d7iC4LrN5afw3DOahWLHjl+Yo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrNEwmd0m2EcaJ7HdSozdusJ9RA="},{"type":"next-occurrence","id":"4hYNOYeS3NgBFg4niSoBJLA+22c="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"d8d7iC4LrN5afw3DOahWLHjl+Yo=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"4hYNOYeS3NgBFg4niSoBJLA+22c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrNEwmd0m2EcaJ7HdSozdusJ9RA="},{"type":"next-occurrence","id":"V0ixXsh1BxorJ+5BT0KfzqxeG/Q="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"4hYNOYeS3NgBFg4niSoBJLA+22c=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"V0ixXsh1BxorJ+5BT0KfzqxeG/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrNEwmd0m2EcaJ7HdSozdusJ9RA="},{"type":"next-occurrence","id":"QgN1Ipg19AmbHBx1yjhtF5X469A="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"V0ixXsh1BxorJ+5BT0KfzqxeG/Q=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"QgN1Ipg19AmbHBx1yjhtF5X469A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrNEwmd0m2EcaJ7HdSozdusJ9RA="},{"type":"next-occurrence","id":"4oJaj5UQH2rAaINf5Rfi1QE6CyU="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"QgN1Ipg19AmbHBx1yjhtF5X469A=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"4oJaj5UQH2rAaINf5Rfi1QE6CyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrNEwmd0m2EcaJ7HdSozdusJ9RA="},{"type":"next-occurrence","id":"M0SdLVk0hhyy2tMEK4pr1/5Y0UE="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"4oJaj5UQH2rAaINf5Rfi1QE6CyU=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"M0SdLVk0hhyy2tMEK4pr1/5Y0UE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrNEwmd0m2EcaJ7HdSozdusJ9RA="},{"type":"next-occurrence","id":"xpSWq3ABqMgdpvt1K2PxvgmQQd8="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"M0SdLVk0hhyy2tMEK4pr1/5Y0UE=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"xpSWq3ABqMgdpvt1K2PxvgmQQd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrNEwmd0m2EcaJ7HdSozdusJ9RA="},{"type":"next-occurrence","id":"byv+MWwO17ZrqcIvDzDRxHUZaiM="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"xpSWq3ABqMgdpvt1K2PxvgmQQd8=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"byv+MWwO17ZrqcIvDzDRxHUZaiM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrNEwmd0m2EcaJ7HdSozdusJ9RA="},{"type":"next-occurrence","id":"SKPjN3eCcVKklcq0Zz+E/awscR8="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"byv+MWwO17ZrqcIvDzDRxHUZaiM=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"SKPjN3eCcVKklcq0Zz+E/awscR8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrNEwmd0m2EcaJ7HdSozdusJ9RA="},{"type":"next-occurrence","id":"HSBB8qIy2r/egagUYtxK33wsla8="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"SKPjN3eCcVKklcq0Zz+E/awscR8=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"HSBB8qIy2r/egagUYtxK33wsla8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrNEwmd0m2EcaJ7HdSozdusJ9RA="},{"type":"next-occurrence","id":"EB70ltMHHaXKLxttBCMPXrCLE5Y="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"HSBB8qIy2r/egagUYtxK33wsla8=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"EB70ltMHHaXKLxttBCMPXrCLE5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrNEwmd0m2EcaJ7HdSozdusJ9RA="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"EB70ltMHHaXKLxttBCMPXrCLE5Y=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"1BXcW7OqDIzvZC2iGqG+JVg/nvQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2LqTMvQ9EFdymiwmT1vCQHCGkBc="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"1BXcW7OqDIzvZC2iGqG+JVg/nvQ=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"2LqTMvQ9EFdymiwmT1vCQHCGkBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BXcW7OqDIzvZC2iGqG+JVg/nvQ="},{"type":"next-occurrence","id":"Fk4BGJZd3YWoWsL0BMFBypofgzY="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"2LqTMvQ9EFdymiwmT1vCQHCGkBc=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"Fk4BGJZd3YWoWsL0BMFBypofgzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BXcW7OqDIzvZC2iGqG+JVg/nvQ="},{"type":"next-occurrence","id":"TUnONqsoQaimgQDMTSygWWQuG8E="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"Fk4BGJZd3YWoWsL0BMFBypofgzY=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"TUnONqsoQaimgQDMTSygWWQuG8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BXcW7OqDIzvZC2iGqG+JVg/nvQ="},{"type":"next-occurrence","id":"lDNyyXrxtLHbwmeoNd6BNIdY8EQ="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"TUnONqsoQaimgQDMTSygWWQuG8E=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"lDNyyXrxtLHbwmeoNd6BNIdY8EQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BXcW7OqDIzvZC2iGqG+JVg/nvQ="},{"type":"next-occurrence","id":"9pKl2IxWcWi0hNryAPF181a5t5E="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"lDNyyXrxtLHbwmeoNd6BNIdY8EQ=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"9pKl2IxWcWi0hNryAPF181a5t5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BXcW7OqDIzvZC2iGqG+JVg/nvQ="},{"type":"next-occurrence","id":"CgUvxAdAddOKK6N3TfZmxd31yjE="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"9pKl2IxWcWi0hNryAPF181a5t5E=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"CgUvxAdAddOKK6N3TfZmxd31yjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BXcW7OqDIzvZC2iGqG+JVg/nvQ="},{"type":"next-occurrence","id":"WBY5pm7WHjVIAxyfmi7kf3sDFR4="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"CgUvxAdAddOKK6N3TfZmxd31yjE=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"WBY5pm7WHjVIAxyfmi7kf3sDFR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BXcW7OqDIzvZC2iGqG+JVg/nvQ="},{"type":"next-occurrence","id":"7qip+wBUtlDOWrV60ySzZ8rLNkk="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"WBY5pm7WHjVIAxyfmi7kf3sDFR4=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"7qip+wBUtlDOWrV60ySzZ8rLNkk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BXcW7OqDIzvZC2iGqG+JVg/nvQ="},{"type":"next-occurrence","id":"zfDutzlIxmS1aCNhWS2ZEhbGw1w="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"7qip+wBUtlDOWrV60ySzZ8rLNkk=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"zfDutzlIxmS1aCNhWS2ZEhbGw1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BXcW7OqDIzvZC2iGqG+JVg/nvQ="},{"type":"next-occurrence","id":"zjyO92wlvFvSsIrN/jvDUzUOsm8="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"zfDutzlIxmS1aCNhWS2ZEhbGw1w=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"zjyO92wlvFvSsIrN/jvDUzUOsm8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BXcW7OqDIzvZC2iGqG+JVg/nvQ="},{"type":"next-occurrence","id":"h6POAK42w2Qk4y8BNkr6GwEPMD0="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"zjyO92wlvFvSsIrN/jvDUzUOsm8=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"h6POAK42w2Qk4y8BNkr6GwEPMD0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BXcW7OqDIzvZC2iGqG+JVg/nvQ="},{"type":"next-occurrence","id":"WLBkfeH8mdQZSTl2P/2gDllqpAI="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"h6POAK42w2Qk4y8BNkr6GwEPMD0=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"WLBkfeH8mdQZSTl2P/2gDllqpAI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BXcW7OqDIzvZC2iGqG+JVg/nvQ="},{"type":"next-occurrence","id":"8c7Fe2ygq9xfDiSLA5ZqfTU3yc0="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"WLBkfeH8mdQZSTl2P/2gDllqpAI=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"8c7Fe2ygq9xfDiSLA5ZqfTU3yc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BXcW7OqDIzvZC2iGqG+JVg/nvQ="},{"type":"next-occurrence","id":"U9qt2WpNi88tWNjBZaPyHeiiNuI="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"8c7Fe2ygq9xfDiSLA5ZqfTU3yc0=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"U9qt2WpNi88tWNjBZaPyHeiiNuI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BXcW7OqDIzvZC2iGqG+JVg/nvQ="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"U9qt2WpNi88tWNjBZaPyHeiiNuI=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"FFcGoB8qNeBEi4487SEYjtY8kJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VCZplqOKh1yCRSBgZxcmkgyfEG8="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"FFcGoB8qNeBEi4487SEYjtY8kJc=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"VCZplqOKh1yCRSBgZxcmkgyfEG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FFcGoB8qNeBEi4487SEYjtY8kJc="},{"type":"next-occurrence","id":"ChVC4WW7CEEmCUOaJ/nYUD4ckMo="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"VCZplqOKh1yCRSBgZxcmkgyfEG8=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"ChVC4WW7CEEmCUOaJ/nYUD4ckMo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FFcGoB8qNeBEi4487SEYjtY8kJc="},{"type":"next-occurrence","id":"iCOgA7hlkwuBj+Sh5e6VByvj8ww="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"ChVC4WW7CEEmCUOaJ/nYUD4ckMo=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"iCOgA7hlkwuBj+Sh5e6VByvj8ww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FFcGoB8qNeBEi4487SEYjtY8kJc="},{"type":"next-occurrence","id":"l4TEL/diWUc8z3dUseHl+e3Fh3Q="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"iCOgA7hlkwuBj+Sh5e6VByvj8ww=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"l4TEL/diWUc8z3dUseHl+e3Fh3Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FFcGoB8qNeBEi4487SEYjtY8kJc="},{"type":"next-occurrence","id":"Vsp7WEdS5jsi1Ys98R0gqMhTiOE="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"l4TEL/diWUc8z3dUseHl+e3Fh3Q=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"Vsp7WEdS5jsi1Ys98R0gqMhTiOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FFcGoB8qNeBEi4487SEYjtY8kJc="},{"type":"next-occurrence","id":"56ycChhk/ny8U8bzU4aPbukcOMQ="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"Vsp7WEdS5jsi1Ys98R0gqMhTiOE=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"56ycChhk/ny8U8bzU4aPbukcOMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FFcGoB8qNeBEi4487SEYjtY8kJc="},{"type":"next-occurrence","id":"SryaCjz8Z2KpeowTTj2y9uaVsqs="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"56ycChhk/ny8U8bzU4aPbukcOMQ=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"SryaCjz8Z2KpeowTTj2y9uaVsqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FFcGoB8qNeBEi4487SEYjtY8kJc="},{"type":"next-occurrence","id":"0ApRtvPNI5I3IWbNWs1M2CClXl4="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"SryaCjz8Z2KpeowTTj2y9uaVsqs=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"0ApRtvPNI5I3IWbNWs1M2CClXl4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FFcGoB8qNeBEi4487SEYjtY8kJc="},{"type":"next-occurrence","id":"pEnibF8yFqb6qN3iqLXVSR+mw5U="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"0ApRtvPNI5I3IWbNWs1M2CClXl4=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"pEnibF8yFqb6qN3iqLXVSR+mw5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FFcGoB8qNeBEi4487SEYjtY8kJc="},{"type":"next-occurrence","id":"sj8qVK+WwOgLfhCvwY5d2DGXIJE="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"pEnibF8yFqb6qN3iqLXVSR+mw5U=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"sj8qVK+WwOgLfhCvwY5d2DGXIJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FFcGoB8qNeBEi4487SEYjtY8kJc="},{"type":"next-occurrence","id":"lKjIkSltzXx/UBZgA+bKc6NKYSA="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"sj8qVK+WwOgLfhCvwY5d2DGXIJE=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"lKjIkSltzXx/UBZgA+bKc6NKYSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FFcGoB8qNeBEi4487SEYjtY8kJc="},{"type":"next-occurrence","id":"NRHMNBxW5Pjgxfld8Id4idi6TIY="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"lKjIkSltzXx/UBZgA+bKc6NKYSA=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"NRHMNBxW5Pjgxfld8Id4idi6TIY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FFcGoB8qNeBEi4487SEYjtY8kJc="},{"type":"next-occurrence","id":"c4ER+HfcGqqEnpnByH+XMWG2zbw="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"NRHMNBxW5Pjgxfld8Id4idi6TIY=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"c4ER+HfcGqqEnpnByH+XMWG2zbw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FFcGoB8qNeBEi4487SEYjtY8kJc="},{"type":"next-occurrence","id":"FdFRMkAPrL65JAdjooJwmJXEOtc="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"c4ER+HfcGqqEnpnByH+XMWG2zbw=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"FdFRMkAPrL65JAdjooJwmJXEOtc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FFcGoB8qNeBEi4487SEYjtY8kJc="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"FdFRMkAPrL65JAdjooJwmJXEOtc=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"C2yWvXV1RGGDPzxgqb8aR9MNnNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Vld+aJvF/91yG7DgsZwr5+WpHvU="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"C2yWvXV1RGGDPzxgqb8aR9MNnNU=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"Vld+aJvF/91yG7DgsZwr5+WpHvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C2yWvXV1RGGDPzxgqb8aR9MNnNU="},{"type":"next-occurrence","id":"7Sb9vcm39ZNcHzHpqmlLEb28ZVw="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"Vld+aJvF/91yG7DgsZwr5+WpHvU=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"7Sb9vcm39ZNcHzHpqmlLEb28ZVw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C2yWvXV1RGGDPzxgqb8aR9MNnNU="},{"type":"next-occurrence","id":"iqnPI5oZNJdTAg0EHQ8bT9Mij5g="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"7Sb9vcm39ZNcHzHpqmlLEb28ZVw=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"iqnPI5oZNJdTAg0EHQ8bT9Mij5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C2yWvXV1RGGDPzxgqb8aR9MNnNU="},{"type":"next-occurrence","id":"vghDO/+kAJadTKi0du6biEp5QkY="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"iqnPI5oZNJdTAg0EHQ8bT9Mij5g=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"vghDO/+kAJadTKi0du6biEp5QkY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C2yWvXV1RGGDPzxgqb8aR9MNnNU="},{"type":"next-occurrence","id":"mx88idwTpFfe2OGdNkK16p7RmYg="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"vghDO/+kAJadTKi0du6biEp5QkY=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"mx88idwTpFfe2OGdNkK16p7RmYg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C2yWvXV1RGGDPzxgqb8aR9MNnNU="},{"type":"next-occurrence","id":"E40HuJKY+wVJHwzu1J2QXbxWq6k="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"mx88idwTpFfe2OGdNkK16p7RmYg=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"E40HuJKY+wVJHwzu1J2QXbxWq6k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C2yWvXV1RGGDPzxgqb8aR9MNnNU="},{"type":"next-occurrence","id":"AK7S1HSMj7c+5WPu5MOp+FmlKAA="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"E40HuJKY+wVJHwzu1J2QXbxWq6k=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"AK7S1HSMj7c+5WPu5MOp+FmlKAA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C2yWvXV1RGGDPzxgqb8aR9MNnNU="},{"type":"next-occurrence","id":"tdcWyRLuopx2LKZaouMSWHqUUJ8="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"AK7S1HSMj7c+5WPu5MOp+FmlKAA=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"tdcWyRLuopx2LKZaouMSWHqUUJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C2yWvXV1RGGDPzxgqb8aR9MNnNU="},{"type":"next-occurrence","id":"qz/LWqGGz/kr4Av8oAxUCIZZbII="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"tdcWyRLuopx2LKZaouMSWHqUUJ8=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"qz/LWqGGz/kr4Av8oAxUCIZZbII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C2yWvXV1RGGDPzxgqb8aR9MNnNU="},{"type":"next-occurrence","id":"NDR98O5Kx1xmcuDJQ/B2uSCupSQ="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"qz/LWqGGz/kr4Av8oAxUCIZZbII=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"NDR98O5Kx1xmcuDJQ/B2uSCupSQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C2yWvXV1RGGDPzxgqb8aR9MNnNU="},{"type":"next-occurrence","id":"+f2DfaWHak+ep5IzICZ1ZOSgn/o="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"NDR98O5Kx1xmcuDJQ/B2uSCupSQ=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"+f2DfaWHak+ep5IzICZ1ZOSgn/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C2yWvXV1RGGDPzxgqb8aR9MNnNU="},{"type":"next-occurrence","id":"WsZRQQcCZTbJvHokxledwz8ykLI="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"+f2DfaWHak+ep5IzICZ1ZOSgn/o=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"WsZRQQcCZTbJvHokxledwz8ykLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C2yWvXV1RGGDPzxgqb8aR9MNnNU="},{"type":"next-occurrence","id":"1o3SYyOvJLebEmRISFmEL5WUXfc="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"WsZRQQcCZTbJvHokxledwz8ykLI=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"1o3SYyOvJLebEmRISFmEL5WUXfc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C2yWvXV1RGGDPzxgqb8aR9MNnNU="},{"type":"next-occurrence","id":"fh/N6lUKSoUCtcr6s3hSzidFodA="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"1o3SYyOvJLebEmRISFmEL5WUXfc=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"fh/N6lUKSoUCtcr6s3hSzidFodA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C2yWvXV1RGGDPzxgqb8aR9MNnNU="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"fh/N6lUKSoUCtcr6s3hSzidFodA=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"SaqgD1t5J27NVAEgEbWgBqHjUsk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wI55efTaknRCZIVoa0jrjVM7cac="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"SaqgD1t5J27NVAEgEbWgBqHjUsk=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"wI55efTaknRCZIVoa0jrjVM7cac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SaqgD1t5J27NVAEgEbWgBqHjUsk="},{"type":"next-occurrence","id":"CNxvbquJzhKyXVMzgLmyEhCty3E="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"wI55efTaknRCZIVoa0jrjVM7cac=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"CNxvbquJzhKyXVMzgLmyEhCty3E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SaqgD1t5J27NVAEgEbWgBqHjUsk="},{"type":"next-occurrence","id":"ALf/rVcO2ZK45O6Kjzd6Gjxvfsw="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"CNxvbquJzhKyXVMzgLmyEhCty3E=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"ALf/rVcO2ZK45O6Kjzd6Gjxvfsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SaqgD1t5J27NVAEgEbWgBqHjUsk="},{"type":"next-occurrence","id":"4uLYKAFOIAPm+aeSfhiXx/Wh8ks="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"ALf/rVcO2ZK45O6Kjzd6Gjxvfsw=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"4uLYKAFOIAPm+aeSfhiXx/Wh8ks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SaqgD1t5J27NVAEgEbWgBqHjUsk="},{"type":"next-occurrence","id":"JkwKAneO/p0d3o2D/5V88NevHA4="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"4uLYKAFOIAPm+aeSfhiXx/Wh8ks=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"JkwKAneO/p0d3o2D/5V88NevHA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SaqgD1t5J27NVAEgEbWgBqHjUsk="},{"type":"next-occurrence","id":"eXjWUaBUg08NzPnvUk446TpivCU="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"JkwKAneO/p0d3o2D/5V88NevHA4=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"eXjWUaBUg08NzPnvUk446TpivCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SaqgD1t5J27NVAEgEbWgBqHjUsk="},{"type":"next-occurrence","id":"OG+Cnb4Tm9a64Je2RnA41KKmOdI="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"eXjWUaBUg08NzPnvUk446TpivCU=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"OG+Cnb4Tm9a64Je2RnA41KKmOdI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SaqgD1t5J27NVAEgEbWgBqHjUsk="},{"type":"next-occurrence","id":"mF77EbjZwH0DRe4mwTwQwq7x53c="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"OG+Cnb4Tm9a64Je2RnA41KKmOdI=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"mF77EbjZwH0DRe4mwTwQwq7x53c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SaqgD1t5J27NVAEgEbWgBqHjUsk="},{"type":"next-occurrence","id":"fDBniM0gpEmCLps5bcDtEVwek6w="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"mF77EbjZwH0DRe4mwTwQwq7x53c=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"fDBniM0gpEmCLps5bcDtEVwek6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SaqgD1t5J27NVAEgEbWgBqHjUsk="},{"type":"next-occurrence","id":"H3iROLdc+37Mlg9f6kRGwFghQ/0="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"fDBniM0gpEmCLps5bcDtEVwek6w=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"H3iROLdc+37Mlg9f6kRGwFghQ/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SaqgD1t5J27NVAEgEbWgBqHjUsk="},{"type":"next-occurrence","id":"xFJ5Yea2D9PUqmmLPaq8zzLOhwg="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"H3iROLdc+37Mlg9f6kRGwFghQ/0=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"xFJ5Yea2D9PUqmmLPaq8zzLOhwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SaqgD1t5J27NVAEgEbWgBqHjUsk="},{"type":"next-occurrence","id":"kmS/AGyFvFw9E2+SIcnJ/4mQ1aU="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"xFJ5Yea2D9PUqmmLPaq8zzLOhwg=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"kmS/AGyFvFw9E2+SIcnJ/4mQ1aU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SaqgD1t5J27NVAEgEbWgBqHjUsk="},{"type":"next-occurrence","id":"9/QDnyL3rGduTtN91owxwL0rK1o="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"kmS/AGyFvFw9E2+SIcnJ/4mQ1aU=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"9/QDnyL3rGduTtN91owxwL0rK1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SaqgD1t5J27NVAEgEbWgBqHjUsk="},{"type":"next-occurrence","id":"iz/dfAlZ3KJHInYENn8wiAJfM28="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"9/QDnyL3rGduTtN91owxwL0rK1o=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"iz/dfAlZ3KJHInYENn8wiAJfM28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SaqgD1t5J27NVAEgEbWgBqHjUsk="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"iz/dfAlZ3KJHInYENn8wiAJfM28=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"n20gIoAtVDpKqj5tDCCw1sE86go=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near West of Exit 38 - US 46 (Denville Twp), Continuous Friday April 10, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-05T08:13:49Z"},"road_event_id":"n20gIoAtVDpKqj5tDCCw1sE86go=","beginning_cross_street":"West of Exit 38 - US 46","ending_cross_street":"East of Exit 37 - CR 513/Hibernia Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.496742,40.90538]]}},{"id":"cvCGCwu+84xdT0qOC4HMDSPsqTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iV3+Foi2DT1VLtpR03p+XHfVdXQ="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"cvCGCwu+84xdT0qOC4HMDSPsqTc=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"iV3+Foi2DT1VLtpR03p+XHfVdXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cvCGCwu+84xdT0qOC4HMDSPsqTc="},{"type":"next-occurrence","id":"IXCVbLxZJ9TEryIClmcHvKadKQQ="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"iV3+Foi2DT1VLtpR03p+XHfVdXQ=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"IXCVbLxZJ9TEryIClmcHvKadKQQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cvCGCwu+84xdT0qOC4HMDSPsqTc="},{"type":"next-occurrence","id":"5GOzc/dHz1BoJtLGmvzrIIE+XGs="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"IXCVbLxZJ9TEryIClmcHvKadKQQ=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"5GOzc/dHz1BoJtLGmvzrIIE+XGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cvCGCwu+84xdT0qOC4HMDSPsqTc="},{"type":"next-occurrence","id":"tMYjitYfsLbFl13eLZJ2K+h25gI="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"5GOzc/dHz1BoJtLGmvzrIIE+XGs=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"tMYjitYfsLbFl13eLZJ2K+h25gI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cvCGCwu+84xdT0qOC4HMDSPsqTc="},{"type":"next-occurrence","id":"ainqZdbqFfUVA35eLVrWlD5T11Q="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"tMYjitYfsLbFl13eLZJ2K+h25gI=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"ainqZdbqFfUVA35eLVrWlD5T11Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cvCGCwu+84xdT0qOC4HMDSPsqTc="},{"type":"next-occurrence","id":"4GLXYUzeae2kJjjH5/n8I/Iaawg="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"ainqZdbqFfUVA35eLVrWlD5T11Q=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"4GLXYUzeae2kJjjH5/n8I/Iaawg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cvCGCwu+84xdT0qOC4HMDSPsqTc="},{"type":"next-occurrence","id":"vSp1dBrCNWOSnHTdWejKLUpRj9k="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"4GLXYUzeae2kJjjH5/n8I/Iaawg=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"vSp1dBrCNWOSnHTdWejKLUpRj9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cvCGCwu+84xdT0qOC4HMDSPsqTc="},{"type":"next-occurrence","id":"XanBNwRtEGY4fCW048DQuB8sq04="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"vSp1dBrCNWOSnHTdWejKLUpRj9k=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"XanBNwRtEGY4fCW048DQuB8sq04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cvCGCwu+84xdT0qOC4HMDSPsqTc="},{"type":"next-occurrence","id":"Gt3ezGJdmhFSwf7A/UqBLk0qGOY="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"XanBNwRtEGY4fCW048DQuB8sq04=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"Gt3ezGJdmhFSwf7A/UqBLk0qGOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cvCGCwu+84xdT0qOC4HMDSPsqTc="},{"type":"next-occurrence","id":"2GoTEkdOYYUth7IChdcs3tOngNE="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"Gt3ezGJdmhFSwf7A/UqBLk0qGOY=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"2GoTEkdOYYUth7IChdcs3tOngNE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cvCGCwu+84xdT0qOC4HMDSPsqTc="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"2GoTEkdOYYUth7IChdcs3tOngNE=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"ZpUb6dUC6MRO8lZzb9rEbMZsdxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"R2Qw0NAy/f0qv/dw/1jFbBlwgmk="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:02Z"},"road_event_id":"ZpUb6dUC6MRO8lZzb9rEbMZsdxI=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"R2Qw0NAy/f0qv/dw/1jFbBlwgmk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZpUb6dUC6MRO8lZzb9rEbMZsdxI="},{"type":"next-occurrence","id":"43vzHvw+GY+RirsmD1n7yA70Keo="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:02Z"},"road_event_id":"R2Qw0NAy/f0qv/dw/1jFbBlwgmk=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"43vzHvw+GY+RirsmD1n7yA70Keo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZpUb6dUC6MRO8lZzb9rEbMZsdxI="},{"type":"next-occurrence","id":"UcLcv09va0VHcIQ++x8+ZXgdZ70="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:02Z"},"road_event_id":"43vzHvw+GY+RirsmD1n7yA70Keo=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"UcLcv09va0VHcIQ++x8+ZXgdZ70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZpUb6dUC6MRO8lZzb9rEbMZsdxI="},{"type":"next-occurrence","id":"0AMMJX2Ikymy7dA23panDzlmNRo="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:02Z"},"road_event_id":"UcLcv09va0VHcIQ++x8+ZXgdZ70=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"0AMMJX2Ikymy7dA23panDzlmNRo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZpUb6dUC6MRO8lZzb9rEbMZsdxI="},{"type":"next-occurrence","id":"3rFGTOflEl047cf9574InsFkWSU="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:02Z"},"road_event_id":"0AMMJX2Ikymy7dA23panDzlmNRo=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"3rFGTOflEl047cf9574InsFkWSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZpUb6dUC6MRO8lZzb9rEbMZsdxI="},{"type":"next-occurrence","id":"4JB6egmBZ/Cs5hILz1PkKgWHxHQ="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:02Z"},"road_event_id":"3rFGTOflEl047cf9574InsFkWSU=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"4JB6egmBZ/Cs5hILz1PkKgWHxHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZpUb6dUC6MRO8lZzb9rEbMZsdxI="},{"type":"next-occurrence","id":"g0ryGOrqgqwKWmuWg5O1UxbyJ0w="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:02Z"},"road_event_id":"4JB6egmBZ/Cs5hILz1PkKgWHxHQ=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"g0ryGOrqgqwKWmuWg5O1UxbyJ0w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZpUb6dUC6MRO8lZzb9rEbMZsdxI="},{"type":"next-occurrence","id":"v8UPA2L75JyZTWvsI02Iodf+oCk="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:02Z"},"road_event_id":"g0ryGOrqgqwKWmuWg5O1UxbyJ0w=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"v8UPA2L75JyZTWvsI02Iodf+oCk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZpUb6dUC6MRO8lZzb9rEbMZsdxI="},{"type":"next-occurrence","id":"+29JaUMgV9YvoquFD2Glw9emojM="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:02Z"},"road_event_id":"v8UPA2L75JyZTWvsI02Iodf+oCk=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"+29JaUMgV9YvoquFD2Glw9emojM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZpUb6dUC6MRO8lZzb9rEbMZsdxI="},{"type":"next-occurrence","id":"WIsjt2SkpzGJa6uAA2a78eHrZts="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:02Z"},"road_event_id":"+29JaUMgV9YvoquFD2Glw9emojM=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"WIsjt2SkpzGJa6uAA2a78eHrZts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZpUb6dUC6MRO8lZzb9rEbMZsdxI="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:02Z"},"road_event_id":"WIsjt2SkpzGJa6uAA2a78eHrZts=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"S7pxouvEfOljpvLvJLsHSy6p0h8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"I1YYrpkRrnI+fbD6qF8CqJldS+w="}],"description":"Installation of sign structure and guard rail repairs and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:05Z"},"road_event_id":"S7pxouvEfOljpvLvJLsHSy6p0h8=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"I1YYrpkRrnI+fbD6qF8CqJldS+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7pxouvEfOljpvLvJLsHSy6p0h8="},{"type":"next-occurrence","id":"x0LthsutpwWMNnI3lWXIYboalDU="}],"description":"Installation of sign structure and guard rail repairs and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:05Z"},"road_event_id":"I1YYrpkRrnI+fbD6qF8CqJldS+w=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"x0LthsutpwWMNnI3lWXIYboalDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7pxouvEfOljpvLvJLsHSy6p0h8="},{"type":"next-occurrence","id":"DJ1cfT+RFj0FeUPuqY43Sjj8DYI="}],"description":"Installation of sign structure and guard rail repairs and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:05Z"},"road_event_id":"x0LthsutpwWMNnI3lWXIYboalDU=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"DJ1cfT+RFj0FeUPuqY43Sjj8DYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7pxouvEfOljpvLvJLsHSy6p0h8="},{"type":"next-occurrence","id":"ae/krxWqH021rrR7hrPSOiOHd14="}],"description":"Installation of sign structure and guard rail repairs and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:05Z"},"road_event_id":"DJ1cfT+RFj0FeUPuqY43Sjj8DYI=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"ae/krxWqH021rrR7hrPSOiOHd14=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7pxouvEfOljpvLvJLsHSy6p0h8="},{"type":"next-occurrence","id":"M16ErUjW3Wmz9s9qHHTI+d1gkS0="}],"description":"Installation of sign structure and guard rail repairs and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:05Z"},"road_event_id":"ae/krxWqH021rrR7hrPSOiOHd14=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"M16ErUjW3Wmz9s9qHHTI+d1gkS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7pxouvEfOljpvLvJLsHSy6p0h8="},{"type":"next-occurrence","id":"7/azs3C5rugzPw/4jlxGjIlxcCQ="}],"description":"Installation of sign structure and guard rail repairs and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:05Z"},"road_event_id":"M16ErUjW3Wmz9s9qHHTI+d1gkS0=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"7/azs3C5rugzPw/4jlxGjIlxcCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7pxouvEfOljpvLvJLsHSy6p0h8="},{"type":"next-occurrence","id":"g7sswWZaStF1k1s2NOe5y4xvrCQ="}],"description":"Installation of sign structure and guard rail repairs and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:05Z"},"road_event_id":"7/azs3C5rugzPw/4jlxGjIlxcCQ=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"g7sswWZaStF1k1s2NOe5y4xvrCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7pxouvEfOljpvLvJLsHSy6p0h8="},{"type":"next-occurrence","id":"0GQ576RIbaR1YC8HsDhuADQrva4="}],"description":"Installation of sign structure and guard rail repairs and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:05Z"},"road_event_id":"g7sswWZaStF1k1s2NOe5y4xvrCQ=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"0GQ576RIbaR1YC8HsDhuADQrva4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7pxouvEfOljpvLvJLsHSy6p0h8="},{"type":"next-occurrence","id":"Kd88YDWUiX/vd/4ckJbrIQtMGzA="}],"description":"Installation of sign structure and guard rail repairs and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:05Z"},"road_event_id":"0GQ576RIbaR1YC8HsDhuADQrva4=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"Kd88YDWUiX/vd/4ckJbrIQtMGzA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7pxouvEfOljpvLvJLsHSy6p0h8="},{"type":"next-occurrence","id":"TjqUWzDsZ9b9odTD4Sf5Y1oY+NM="}],"description":"Installation of sign structure and guard rail repairs and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:05Z"},"road_event_id":"Kd88YDWUiX/vd/4ckJbrIQtMGzA=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"TjqUWzDsZ9b9odTD4Sf5Y1oY+NM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S7pxouvEfOljpvLvJLsHSy6p0h8="}],"description":"Installation of sign structure and guard rail repairs and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:05Z"},"road_event_id":"TjqUWzDsZ9b9odTD4Sf5Y1oY+NM=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"IX5/kig6mtubVigiXRQiDs97YrI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rpyORo8ptUgILbFEpKsV9LvtziU="}],"description":"Line striping and guard rail repairs and installation of sign structure on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"IX5/kig6mtubVigiXRQiDs97YrI=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"rpyORo8ptUgILbFEpKsV9LvtziU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IX5/kig6mtubVigiXRQiDs97YrI="},{"type":"next-occurrence","id":"v1XqqQ7LKJfFygpSOdiV3i9fImM="}],"description":"Line striping and guard rail repairs and installation of sign structure on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"rpyORo8ptUgILbFEpKsV9LvtziU=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"v1XqqQ7LKJfFygpSOdiV3i9fImM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IX5/kig6mtubVigiXRQiDs97YrI="},{"type":"next-occurrence","id":"nyCBQcWMNxYeCraUN63X/F2IPR0="}],"description":"Line striping and guard rail repairs and installation of sign structure on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"v1XqqQ7LKJfFygpSOdiV3i9fImM=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"nyCBQcWMNxYeCraUN63X/F2IPR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IX5/kig6mtubVigiXRQiDs97YrI="},{"type":"next-occurrence","id":"7J21CKkjNJPv/4WQ8zipTTZDE+g="}],"description":"Line striping and guard rail repairs and installation of sign structure on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"nyCBQcWMNxYeCraUN63X/F2IPR0=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"7J21CKkjNJPv/4WQ8zipTTZDE+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IX5/kig6mtubVigiXRQiDs97YrI="},{"type":"next-occurrence","id":"2MjzIu3QKQ5dKGG+BkfadK+igIs="}],"description":"Line striping and guard rail repairs and installation of sign structure on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"7J21CKkjNJPv/4WQ8zipTTZDE+g=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"2MjzIu3QKQ5dKGG+BkfadK+igIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IX5/kig6mtubVigiXRQiDs97YrI="},{"type":"next-occurrence","id":"IyA9c3VwCbt855cZNNHt133KsLA="}],"description":"Line striping and guard rail repairs and installation of sign structure on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"2MjzIu3QKQ5dKGG+BkfadK+igIs=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"IyA9c3VwCbt855cZNNHt133KsLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IX5/kig6mtubVigiXRQiDs97YrI="},{"type":"next-occurrence","id":"j5QA6iezKbixw16okB3eB4kkQp0="}],"description":"Line striping and guard rail repairs and installation of sign structure on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"IyA9c3VwCbt855cZNNHt133KsLA=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"j5QA6iezKbixw16okB3eB4kkQp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IX5/kig6mtubVigiXRQiDs97YrI="},{"type":"next-occurrence","id":"6K/ZC4T32Z5XjMRrPqGl1DeKGR8="}],"description":"Line striping and guard rail repairs and installation of sign structure on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"j5QA6iezKbixw16okB3eB4kkQp0=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"6K/ZC4T32Z5XjMRrPqGl1DeKGR8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IX5/kig6mtubVigiXRQiDs97YrI="},{"type":"next-occurrence","id":"yUQCqoMFU4yPIRk6Xo264EN4G6Y="}],"description":"Line striping and guard rail repairs and installation of sign structure on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"6K/ZC4T32Z5XjMRrPqGl1DeKGR8=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"yUQCqoMFU4yPIRk6Xo264EN4G6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IX5/kig6mtubVigiXRQiDs97YrI="},{"type":"next-occurrence","id":"MD+hefdNK1GJ2gWznr+CoG1NNT4="}],"description":"Line striping and guard rail repairs and installation of sign structure on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"yUQCqoMFU4yPIRk6Xo264EN4G6Y=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"MD+hefdNK1GJ2gWznr+CoG1NNT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IX5/kig6mtubVigiXRQiDs97YrI="}],"description":"Line striping and guard rail repairs and installation of sign structure on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T20:00:08Z"},"road_event_id":"MD+hefdNK1GJ2gWznr+CoG1NNT4=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"exrBWcutRfJxkQe8S3b6ieu0qnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q07sY89qiSn4EAuYLUC48QgNLVo="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:01Z"},"road_event_id":"exrBWcutRfJxkQe8S3b6ieu0qnw=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"q07sY89qiSn4EAuYLUC48QgNLVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"exrBWcutRfJxkQe8S3b6ieu0qnw="},{"type":"next-occurrence","id":"qUw39UcDHfs3cAHUFwRRxk72Iow="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:01Z"},"road_event_id":"q07sY89qiSn4EAuYLUC48QgNLVo=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"qUw39UcDHfs3cAHUFwRRxk72Iow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"exrBWcutRfJxkQe8S3b6ieu0qnw="},{"type":"next-occurrence","id":"GnZEtD47z0+0CdUGFBLhY5FrqJ4="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:01Z"},"road_event_id":"qUw39UcDHfs3cAHUFwRRxk72Iow=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"GnZEtD47z0+0CdUGFBLhY5FrqJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"exrBWcutRfJxkQe8S3b6ieu0qnw="},{"type":"next-occurrence","id":"SdE+ndMrmZKihH6Kgdg1sYzbMps="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:01Z"},"road_event_id":"GnZEtD47z0+0CdUGFBLhY5FrqJ4=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"SdE+ndMrmZKihH6Kgdg1sYzbMps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"exrBWcutRfJxkQe8S3b6ieu0qnw="},{"type":"next-occurrence","id":"7yhrs/zqNHW/Ulp1+7oGO8Crvlo="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:01Z"},"road_event_id":"SdE+ndMrmZKihH6Kgdg1sYzbMps=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"7yhrs/zqNHW/Ulp1+7oGO8Crvlo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"exrBWcutRfJxkQe8S3b6ieu0qnw="},{"type":"next-occurrence","id":"F5xzF49SSmukTWspuffhobrYgsM="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:01Z"},"road_event_id":"7yhrs/zqNHW/Ulp1+7oGO8Crvlo=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"F5xzF49SSmukTWspuffhobrYgsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"exrBWcutRfJxkQe8S3b6ieu0qnw="},{"type":"next-occurrence","id":"a5hhfs0PEnI7SixU9iiKV5uN1XA="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:01Z"},"road_event_id":"F5xzF49SSmukTWspuffhobrYgsM=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"a5hhfs0PEnI7SixU9iiKV5uN1XA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"exrBWcutRfJxkQe8S3b6ieu0qnw="},{"type":"next-occurrence","id":"s0t024h8itTMIMpHNc1OY4Dr+dE="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:01Z"},"road_event_id":"a5hhfs0PEnI7SixU9iiKV5uN1XA=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"s0t024h8itTMIMpHNc1OY4Dr+dE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"exrBWcutRfJxkQe8S3b6ieu0qnw="},{"type":"next-occurrence","id":"qrXJ2xbt1Czo+AGHOEiiEWHKjus="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:01Z"},"road_event_id":"s0t024h8itTMIMpHNc1OY4Dr+dE=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"qrXJ2xbt1Czo+AGHOEiiEWHKjus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"exrBWcutRfJxkQe8S3b6ieu0qnw="},{"type":"next-occurrence","id":"CuIZq0EG3pa981ZtB1Q/G0WXL54="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:01Z"},"road_event_id":"qrXJ2xbt1Czo+AGHOEiiEWHKjus=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"CuIZq0EG3pa981ZtB1Q/G0WXL54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"exrBWcutRfJxkQe8S3b6ieu0qnw="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T19:00:01Z"},"road_event_id":"CuIZq0EG3pa981ZtB1Q/G0WXL54=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"UXH/59+soaBjKcM/BwKpah0PEJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1wFCb12XFjRAJQwm2TSd7tnANK4="}],"description":"Guard rail repairs and line striping and installation of sign structure on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"UXH/59+soaBjKcM/BwKpah0PEJ4=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"1wFCb12XFjRAJQwm2TSd7tnANK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UXH/59+soaBjKcM/BwKpah0PEJ4="},{"type":"next-occurrence","id":"hcUJ4CuZlzlEuGBeqQeiZrmLi88="}],"description":"Guard rail repairs and line striping and installation of sign structure on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"1wFCb12XFjRAJQwm2TSd7tnANK4=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"hcUJ4CuZlzlEuGBeqQeiZrmLi88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UXH/59+soaBjKcM/BwKpah0PEJ4="},{"type":"next-occurrence","id":"bYGrLu2d9cley/305QldmhNKssE="}],"description":"Guard rail repairs and line striping and installation of sign structure on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"hcUJ4CuZlzlEuGBeqQeiZrmLi88=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"bYGrLu2d9cley/305QldmhNKssE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UXH/59+soaBjKcM/BwKpah0PEJ4="},{"type":"next-occurrence","id":"t2ZHYX4xAkf1InwOQ5IlB0W8Vco="}],"description":"Guard rail repairs and line striping and installation of sign structure on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"bYGrLu2d9cley/305QldmhNKssE=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"t2ZHYX4xAkf1InwOQ5IlB0W8Vco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UXH/59+soaBjKcM/BwKpah0PEJ4="},{"type":"next-occurrence","id":"Wp+gSv5QXZ5IlYzWSddX5mfz6m0="}],"description":"Guard rail repairs and line striping and installation of sign structure on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"t2ZHYX4xAkf1InwOQ5IlB0W8Vco=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"Wp+gSv5QXZ5IlYzWSddX5mfz6m0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UXH/59+soaBjKcM/BwKpah0PEJ4="},{"type":"next-occurrence","id":"u+hgwpH+S5g9rlp1fvmIy0X6Geo="}],"description":"Guard rail repairs and line striping and installation of sign structure on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"Wp+gSv5QXZ5IlYzWSddX5mfz6m0=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"u+hgwpH+S5g9rlp1fvmIy0X6Geo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UXH/59+soaBjKcM/BwKpah0PEJ4="},{"type":"next-occurrence","id":"hvqWHbLJ43hopijcPDTjBNZ7jHg="}],"description":"Guard rail repairs and line striping and installation of sign structure on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"u+hgwpH+S5g9rlp1fvmIy0X6Geo=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"hvqWHbLJ43hopijcPDTjBNZ7jHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UXH/59+soaBjKcM/BwKpah0PEJ4="},{"type":"next-occurrence","id":"6lokF1NzgJrmdODjS+3y33DllrA="}],"description":"Guard rail repairs and line striping and installation of sign structure on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"hvqWHbLJ43hopijcPDTjBNZ7jHg=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"6lokF1NzgJrmdODjS+3y33DllrA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UXH/59+soaBjKcM/BwKpah0PEJ4="},{"type":"next-occurrence","id":"lbOgBGpL+iMoNTThXE/M+D1lb94="}],"description":"Guard rail repairs and line striping and installation of sign structure on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"6lokF1NzgJrmdODjS+3y33DllrA=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"lbOgBGpL+iMoNTThXE/M+D1lb94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UXH/59+soaBjKcM/BwKpah0PEJ4="},{"type":"next-occurrence","id":"AuVKm9JD8sSbDAFUOT5zJih0VGs="}],"description":"Guard rail repairs and line striping and installation of sign structure on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"lbOgBGpL+iMoNTThXE/M+D1lb94=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"AuVKm9JD8sSbDAFUOT5zJih0VGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UXH/59+soaBjKcM/BwKpah0PEJ4="}],"description":"Guard rail repairs and line striping and installation of sign structure on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"AuVKm9JD8sSbDAFUOT5zJih0VGs=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"AqLvNcpKtdH+wpKeoEd3tYVvETk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+QG9bS5m64nTZVPsFRv5+/tTi8M="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"AqLvNcpKtdH+wpKeoEd3tYVvETk=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"+QG9bS5m64nTZVPsFRv5+/tTi8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqLvNcpKtdH+wpKeoEd3tYVvETk="},{"type":"next-occurrence","id":"va3MMB9FGXbQFu2h+5kfG0dbDf0="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"+QG9bS5m64nTZVPsFRv5+/tTi8M=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"va3MMB9FGXbQFu2h+5kfG0dbDf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqLvNcpKtdH+wpKeoEd3tYVvETk="},{"type":"next-occurrence","id":"Fth61OYlfLss6Hu793VDL05/fvw="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"va3MMB9FGXbQFu2h+5kfG0dbDf0=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"Fth61OYlfLss6Hu793VDL05/fvw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqLvNcpKtdH+wpKeoEd3tYVvETk="},{"type":"next-occurrence","id":"lutJ/iqhmLmK+GzfMBusMHMMk9M="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"Fth61OYlfLss6Hu793VDL05/fvw=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"lutJ/iqhmLmK+GzfMBusMHMMk9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqLvNcpKtdH+wpKeoEd3tYVvETk="},{"type":"next-occurrence","id":"S5GoGGVLhXSG02J2CzVAvAzuzeI="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"lutJ/iqhmLmK+GzfMBusMHMMk9M=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"S5GoGGVLhXSG02J2CzVAvAzuzeI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqLvNcpKtdH+wpKeoEd3tYVvETk="},{"type":"next-occurrence","id":"6iaABJicoa84hD2wmDAA/HexZaQ="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"S5GoGGVLhXSG02J2CzVAvAzuzeI=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"6iaABJicoa84hD2wmDAA/HexZaQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqLvNcpKtdH+wpKeoEd3tYVvETk="},{"type":"next-occurrence","id":"v8UrjTM7mVa6WkKD0kzrVqjamaY="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"6iaABJicoa84hD2wmDAA/HexZaQ=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"v8UrjTM7mVa6WkKD0kzrVqjamaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqLvNcpKtdH+wpKeoEd3tYVvETk="},{"type":"next-occurrence","id":"QsxLj0yDSH5Xsx6Gg4oi4e54+s0="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"v8UrjTM7mVa6WkKD0kzrVqjamaY=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"QsxLj0yDSH5Xsx6Gg4oi4e54+s0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqLvNcpKtdH+wpKeoEd3tYVvETk="},{"type":"next-occurrence","id":"DG/WkLSqmoxzPytM503eNcEjVy0="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"QsxLj0yDSH5Xsx6Gg4oi4e54+s0=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"DG/WkLSqmoxzPytM503eNcEjVy0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqLvNcpKtdH+wpKeoEd3tYVvETk="},{"type":"next-occurrence","id":"APV60Y28MUFdXxng53gWltvnvSs="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"DG/WkLSqmoxzPytM503eNcEjVy0=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"APV60Y28MUFdXxng53gWltvnvSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqLvNcpKtdH+wpKeoEd3tYVvETk="}],"description":"Installation of sign structure and line striping and guard rail repairs on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"APV60Y28MUFdXxng53gWltvnvSs=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"iDBCeZnZ/D2mfu6VPrIE7yYqq/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0IPkOM33xiwCvX/SVQqb6YfFdG4="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"iDBCeZnZ/D2mfu6VPrIE7yYqq/A=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"0IPkOM33xiwCvX/SVQqb6YfFdG4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iDBCeZnZ/D2mfu6VPrIE7yYqq/A="},{"type":"next-occurrence","id":"1rWFIaaQmQtGoryXO+adLzwxsPI="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"0IPkOM33xiwCvX/SVQqb6YfFdG4=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"1rWFIaaQmQtGoryXO+adLzwxsPI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iDBCeZnZ/D2mfu6VPrIE7yYqq/A="},{"type":"next-occurrence","id":"WB7708sORQT2/MvO5tkhPR38Mks="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"1rWFIaaQmQtGoryXO+adLzwxsPI=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"WB7708sORQT2/MvO5tkhPR38Mks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iDBCeZnZ/D2mfu6VPrIE7yYqq/A="},{"type":"next-occurrence","id":"jvSyqicjlpnWW/yM13j03r6ZB18="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"WB7708sORQT2/MvO5tkhPR38Mks=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"jvSyqicjlpnWW/yM13j03r6ZB18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iDBCeZnZ/D2mfu6VPrIE7yYqq/A="},{"type":"next-occurrence","id":"GYGZIjN16RX8djna2mtcwK/OFa4="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"jvSyqicjlpnWW/yM13j03r6ZB18=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"GYGZIjN16RX8djna2mtcwK/OFa4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iDBCeZnZ/D2mfu6VPrIE7yYqq/A="},{"type":"next-occurrence","id":"BMPSlLZeCUwPchD2zdW5y/RNRVA="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"GYGZIjN16RX8djna2mtcwK/OFa4=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"BMPSlLZeCUwPchD2zdW5y/RNRVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iDBCeZnZ/D2mfu6VPrIE7yYqq/A="},{"type":"next-occurrence","id":"waKoyx+3m6s+yDNQwuoII57BDB8="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"BMPSlLZeCUwPchD2zdW5y/RNRVA=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"waKoyx+3m6s+yDNQwuoII57BDB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iDBCeZnZ/D2mfu6VPrIE7yYqq/A="},{"type":"next-occurrence","id":"zSbvHkZm6c2AybrdjPmxh+MJhoU="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"waKoyx+3m6s+yDNQwuoII57BDB8=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"zSbvHkZm6c2AybrdjPmxh+MJhoU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iDBCeZnZ/D2mfu6VPrIE7yYqq/A="},{"type":"next-occurrence","id":"8HyBz6BJxznOZ95CgEeMFGJdAzg="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"zSbvHkZm6c2AybrdjPmxh+MJhoU=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"8HyBz6BJxznOZ95CgEeMFGJdAzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iDBCeZnZ/D2mfu6VPrIE7yYqq/A="},{"type":"next-occurrence","id":"vvKe4pl+UDYhjv1xZ4y8HoKSnl0="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"8HyBz6BJxznOZ95CgEeMFGJdAzg=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"vvKe4pl+UDYhjv1xZ4y8HoKSnl0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iDBCeZnZ/D2mfu6VPrIE7yYqq/A="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T20:00:02Z"},"road_event_id":"vvKe4pl+UDYhjv1xZ4y8HoKSnl0=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"ECfJwAADA4ZS8Smb0W1yFF7E1g8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 3 both directions NY 178 (Henderson) NYS Rte. 3 closed in both directions at the bridge over Stoney Creek. Traffic is directed to follow the signed detour, Continuous Monday April 6th, 2026 12:00 AM thru Sunday November 15th, 2026 11:59 PM All lanes closed","update_date":"2026-04-07T18:21:51Z"},"road_event_id":"ECfJwAADA4ZS8Smb0W1yFF7E1g8=","beginning_cross_street":"NY 178","ending_cross_street":"NY 178","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.199127,43.841085]]}},{"id":"drfkjtnjXjyzwy8XTzPf9Lq9Csg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on I-87 Northway both directions E. Schroon River Rd just north of Exit 23 (Bolton) 11' lane width restriction, Continuous Wednesday April 8th, 2026 12:00 AM thru Wednesday September 30th, 2026 11:59 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-04-10T18:40:16Z"},"road_event_id":"drfkjtnjXjyzwy8XTzPf9Lq9Csg=","beginning_cross_street":"E. Schroon River Rd just north of Exit 23","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.746835,43.499729]]}},{"id":"jPjCfJ0m9rpUyzHbTlMASa8hL9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"jPjCfJ0m9rpUyzHbTlMASa8hL9U=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"rgYAjW5CmndfGPJfNu5x14NOHnk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OBRpk2HXOSCCXm3mi8EXgPSsSDY="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"rgYAjW5CmndfGPJfNu5x14NOHnk=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"OBRpk2HXOSCCXm3mi8EXgPSsSDY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rgYAjW5CmndfGPJfNu5x14NOHnk="},{"type":"next-occurrence","id":"iODw91xC+tK87D3rzz1QRBo55jc="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"OBRpk2HXOSCCXm3mi8EXgPSsSDY=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"iODw91xC+tK87D3rzz1QRBo55jc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rgYAjW5CmndfGPJfNu5x14NOHnk="},{"type":"next-occurrence","id":"Cj77oetcDn5Tm42N0IBq3bo8Lq8="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"iODw91xC+tK87D3rzz1QRBo55jc=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"Cj77oetcDn5Tm42N0IBq3bo8Lq8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rgYAjW5CmndfGPJfNu5x14NOHnk="},{"type":"next-occurrence","id":"CFDwJ599lBevkip5o7BOhRq61rA="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"Cj77oetcDn5Tm42N0IBq3bo8Lq8=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"CFDwJ599lBevkip5o7BOhRq61rA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rgYAjW5CmndfGPJfNu5x14NOHnk="},{"type":"next-occurrence","id":"b50+lpDB8uDGkMRRsephR66PVHU="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"CFDwJ599lBevkip5o7BOhRq61rA=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"b50+lpDB8uDGkMRRsephR66PVHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rgYAjW5CmndfGPJfNu5x14NOHnk="},{"type":"next-occurrence","id":"QtNrUrhqK/5EwCZdcXtNaOwF3GY="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"b50+lpDB8uDGkMRRsephR66PVHU=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"QtNrUrhqK/5EwCZdcXtNaOwF3GY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rgYAjW5CmndfGPJfNu5x14NOHnk="},{"type":"next-occurrence","id":"NOIFOkupWz5IGsCmUoqUKDe8Tlc="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"QtNrUrhqK/5EwCZdcXtNaOwF3GY=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"NOIFOkupWz5IGsCmUoqUKDe8Tlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rgYAjW5CmndfGPJfNu5x14NOHnk="},{"type":"next-occurrence","id":"MPZhQ/7uIFdwXPRnHvCnWQE5s5o="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"NOIFOkupWz5IGsCmUoqUKDe8Tlc=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"MPZhQ/7uIFdwXPRnHvCnWQE5s5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rgYAjW5CmndfGPJfNu5x14NOHnk="},{"type":"next-occurrence","id":"rtyy24ok1a79bnivovU+xbV/fYs="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"MPZhQ/7uIFdwXPRnHvCnWQE5s5o=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"rtyy24ok1a79bnivovU+xbV/fYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rgYAjW5CmndfGPJfNu5x14NOHnk="},{"type":"next-occurrence","id":"gKEGzsLCy4Uoew8mWS7AB5xsweQ="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"rtyy24ok1a79bnivovU+xbV/fYs=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"gKEGzsLCy4Uoew8mWS7AB5xsweQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rgYAjW5CmndfGPJfNu5x14NOHnk="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"gKEGzsLCy4Uoew8mWS7AB5xsweQ=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"oFJA/hmrpFYXFA7N3TGLeLLR58E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HHSQkww4Jy77V4fOk3uSEfNaheM="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"oFJA/hmrpFYXFA7N3TGLeLLR58E=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"HHSQkww4Jy77V4fOk3uSEfNaheM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oFJA/hmrpFYXFA7N3TGLeLLR58E="},{"type":"next-occurrence","id":"FovY6YXNr2Lm4XJX9I8m0Jzr7IU="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"HHSQkww4Jy77V4fOk3uSEfNaheM=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"FovY6YXNr2Lm4XJX9I8m0Jzr7IU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oFJA/hmrpFYXFA7N3TGLeLLR58E="},{"type":"next-occurrence","id":"JyaRgwZPvxvi0Esg/w4hPyz289I="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"FovY6YXNr2Lm4XJX9I8m0Jzr7IU=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"JyaRgwZPvxvi0Esg/w4hPyz289I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oFJA/hmrpFYXFA7N3TGLeLLR58E="},{"type":"next-occurrence","id":"TokV4xQ7z24tFmxk7Xjb5XwWRtY="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"JyaRgwZPvxvi0Esg/w4hPyz289I=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"TokV4xQ7z24tFmxk7Xjb5XwWRtY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oFJA/hmrpFYXFA7N3TGLeLLR58E="},{"type":"next-occurrence","id":"qckxJJUVCfmE8dWAybIForry+sE="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"TokV4xQ7z24tFmxk7Xjb5XwWRtY=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"qckxJJUVCfmE8dWAybIForry+sE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oFJA/hmrpFYXFA7N3TGLeLLR58E="},{"type":"next-occurrence","id":"dmtmfJeBU/pWFmxiUjNS5GiZiFE="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"qckxJJUVCfmE8dWAybIForry+sE=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"dmtmfJeBU/pWFmxiUjNS5GiZiFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oFJA/hmrpFYXFA7N3TGLeLLR58E="},{"type":"next-occurrence","id":"pQBPrGieq+RWnE/EUGMKMAUrktU="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"dmtmfJeBU/pWFmxiUjNS5GiZiFE=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"pQBPrGieq+RWnE/EUGMKMAUrktU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oFJA/hmrpFYXFA7N3TGLeLLR58E="},{"type":"next-occurrence","id":"CjUYaXtC/tmEg2+YRXnVqzjuHpY="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"pQBPrGieq+RWnE/EUGMKMAUrktU=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"CjUYaXtC/tmEg2+YRXnVqzjuHpY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oFJA/hmrpFYXFA7N3TGLeLLR58E="},{"type":"next-occurrence","id":"RgQ4aU+BF1uNoGGdWFKCLRDoXXY="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"CjUYaXtC/tmEg2+YRXnVqzjuHpY=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"RgQ4aU+BF1uNoGGdWFKCLRDoXXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oFJA/hmrpFYXFA7N3TGLeLLR58E="},{"type":"next-occurrence","id":"ToKFuIQq0eI2SEr1IGYxM56hXEk="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"RgQ4aU+BF1uNoGGdWFKCLRDoXXY=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"ToKFuIQq0eI2SEr1IGYxM56hXEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oFJA/hmrpFYXFA7N3TGLeLLR58E="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"ToKFuIQq0eI2SEr1IGYxM56hXEk=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"MYvTziVoV9Mp/WPmgEJTEHVm86k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"obOdqz8NRtWwFTW+jHQf1leCZuU="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"MYvTziVoV9Mp/WPmgEJTEHVm86k=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"obOdqz8NRtWwFTW+jHQf1leCZuU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MYvTziVoV9Mp/WPmgEJTEHVm86k="},{"type":"next-occurrence","id":"64pDXczqXOp+7XYUW0qqPRfdQuA="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"obOdqz8NRtWwFTW+jHQf1leCZuU=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"64pDXczqXOp+7XYUW0qqPRfdQuA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MYvTziVoV9Mp/WPmgEJTEHVm86k="},{"type":"next-occurrence","id":"4gaUcdprM4pnI4lIK+azl0OzUUc="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"64pDXczqXOp+7XYUW0qqPRfdQuA=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"4gaUcdprM4pnI4lIK+azl0OzUUc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MYvTziVoV9Mp/WPmgEJTEHVm86k="},{"type":"next-occurrence","id":"BrOqVntZSEcXkEe4ORAo7T7u6Rg="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"4gaUcdprM4pnI4lIK+azl0OzUUc=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"BrOqVntZSEcXkEe4ORAo7T7u6Rg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MYvTziVoV9Mp/WPmgEJTEHVm86k="},{"type":"next-occurrence","id":"uVpY3dGLsn6CV919PjYebKfMY/4="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"BrOqVntZSEcXkEe4ORAo7T7u6Rg=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"uVpY3dGLsn6CV919PjYebKfMY/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MYvTziVoV9Mp/WPmgEJTEHVm86k="},{"type":"next-occurrence","id":"mgedmMOmApCI9DJ9occ+pSgHCKY="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"uVpY3dGLsn6CV919PjYebKfMY/4=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"mgedmMOmApCI9DJ9occ+pSgHCKY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MYvTziVoV9Mp/WPmgEJTEHVm86k="},{"type":"next-occurrence","id":"SN8WrgBoCDmgiqP7qZqCM+sKS94="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"mgedmMOmApCI9DJ9occ+pSgHCKY=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"SN8WrgBoCDmgiqP7qZqCM+sKS94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MYvTziVoV9Mp/WPmgEJTEHVm86k="},{"type":"next-occurrence","id":"60SwH0EZcpjaHiv61C9GzhbsTbI="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"SN8WrgBoCDmgiqP7qZqCM+sKS94=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"60SwH0EZcpjaHiv61C9GzhbsTbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MYvTziVoV9Mp/WPmgEJTEHVm86k="},{"type":"next-occurrence","id":"lgQ4e8ahKOiP5FtIwTM65J3Erxc="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"60SwH0EZcpjaHiv61C9GzhbsTbI=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"lgQ4e8ahKOiP5FtIwTM65J3Erxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MYvTziVoV9Mp/WPmgEJTEHVm86k="},{"type":"next-occurrence","id":"gs5i05DQXpKYv06XsvyL42cQ0xY="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"lgQ4e8ahKOiP5FtIwTM65J3Erxc=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"gs5i05DQXpKYv06XsvyL42cQ0xY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MYvTziVoV9Mp/WPmgEJTEHVm86k="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:06:54Z"},"road_event_id":"gs5i05DQXpKYv06XsvyL42cQ0xY=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"DHb0hrMN8iXLzyMYw0FXroEWc40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVERVIEW RD"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on RIVERVIEW RD both directions over I-87 (Halfmoon), Continuous Monday May 18th, 2026 12:00 AM thru Wednesday March 31st, 2027 11:59 PM All lanes closed","update_date":"2026-05-18T20:06:53Z"},"road_event_id":"DHb0hrMN8iXLzyMYw0FXroEWc40=","beginning_cross_street":"over I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764915,42.800434]]}},{"id":"X9kiYyPmJ4Q9BlrtoG5c0C9N8dk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KBoLCNHUedK1Jop+dSX/PgbkXts="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"X9kiYyPmJ4Q9BlrtoG5c0C9N8dk=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"KBoLCNHUedK1Jop+dSX/PgbkXts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X9kiYyPmJ4Q9BlrtoG5c0C9N8dk="},{"type":"next-occurrence","id":"2RfTwg0AV+dVZj9b4/CJt+zfaeo="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"KBoLCNHUedK1Jop+dSX/PgbkXts=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"2RfTwg0AV+dVZj9b4/CJt+zfaeo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X9kiYyPmJ4Q9BlrtoG5c0C9N8dk="},{"type":"next-occurrence","id":"aHJoXn3vU9VAIpXoTYAitQihQew="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"2RfTwg0AV+dVZj9b4/CJt+zfaeo=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"aHJoXn3vU9VAIpXoTYAitQihQew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X9kiYyPmJ4Q9BlrtoG5c0C9N8dk="},{"type":"next-occurrence","id":"Kmjbl8Ghu+7t/TuopDWvD8Vdiiw="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"aHJoXn3vU9VAIpXoTYAitQihQew=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"Kmjbl8Ghu+7t/TuopDWvD8Vdiiw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X9kiYyPmJ4Q9BlrtoG5c0C9N8dk="},{"type":"next-occurrence","id":"DNXC+GnxSd617bpcMv/170LzIQs="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"Kmjbl8Ghu+7t/TuopDWvD8Vdiiw=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"DNXC+GnxSd617bpcMv/170LzIQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X9kiYyPmJ4Q9BlrtoG5c0C9N8dk="},{"type":"next-occurrence","id":"l0C3JJ9leuSIzsz5aldmfPhPPY4="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"DNXC+GnxSd617bpcMv/170LzIQs=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"l0C3JJ9leuSIzsz5aldmfPhPPY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X9kiYyPmJ4Q9BlrtoG5c0C9N8dk="},{"type":"next-occurrence","id":"BUN68AWlAK6IVQ/ZFn1+qcwddgc="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"l0C3JJ9leuSIzsz5aldmfPhPPY4=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"BUN68AWlAK6IVQ/ZFn1+qcwddgc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X9kiYyPmJ4Q9BlrtoG5c0C9N8dk="},{"type":"next-occurrence","id":"nqNy54NaJcK7Ec8D/qxvGJ5b7AI="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"BUN68AWlAK6IVQ/ZFn1+qcwddgc=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"nqNy54NaJcK7Ec8D/qxvGJ5b7AI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X9kiYyPmJ4Q9BlrtoG5c0C9N8dk="},{"type":"next-occurrence","id":"v4r8X+DTSFh7Migm/Afovr9gN6o="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"nqNy54NaJcK7Ec8D/qxvGJ5b7AI=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"v4r8X+DTSFh7Migm/Afovr9gN6o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X9kiYyPmJ4Q9BlrtoG5c0C9N8dk="},{"type":"next-occurrence","id":"ckaHBnKQKuKoJNhaTf+pNvcOO20="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"v4r8X+DTSFh7Migm/Afovr9gN6o=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"ckaHBnKQKuKoJNhaTf+pNvcOO20=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X9kiYyPmJ4Q9BlrtoG5c0C9N8dk="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:07:44Z"},"road_event_id":"ckaHBnKQKuKoJNhaTf+pNvcOO20=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"sIr9wcHZ92UWkWNPP+11PZ+Ftb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kAOMti48hLPZj4EFV//MK8YZKX8="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"sIr9wcHZ92UWkWNPP+11PZ+Ftb0=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"kAOMti48hLPZj4EFV//MK8YZKX8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sIr9wcHZ92UWkWNPP+11PZ+Ftb0="},{"type":"next-occurrence","id":"zBSEdV4jwJ0EUp1Ufl8wK/zq6RY="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"kAOMti48hLPZj4EFV//MK8YZKX8=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"zBSEdV4jwJ0EUp1Ufl8wK/zq6RY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sIr9wcHZ92UWkWNPP+11PZ+Ftb0="},{"type":"next-occurrence","id":"km7J3SDX/DhMRw7o4pEyJho57+g="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"zBSEdV4jwJ0EUp1Ufl8wK/zq6RY=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"km7J3SDX/DhMRw7o4pEyJho57+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sIr9wcHZ92UWkWNPP+11PZ+Ftb0="},{"type":"next-occurrence","id":"TTpABH0hEn+GOSWNvKeV4Osqqd8="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"km7J3SDX/DhMRw7o4pEyJho57+g=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"TTpABH0hEn+GOSWNvKeV4Osqqd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sIr9wcHZ92UWkWNPP+11PZ+Ftb0="},{"type":"next-occurrence","id":"CylgfpwKDXQh/LRxUeNgmpfUPRo="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"TTpABH0hEn+GOSWNvKeV4Osqqd8=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"CylgfpwKDXQh/LRxUeNgmpfUPRo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sIr9wcHZ92UWkWNPP+11PZ+Ftb0="},{"type":"next-occurrence","id":"6ECrjQKUZIGNSVKihDxXQorZ7Bk="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"CylgfpwKDXQh/LRxUeNgmpfUPRo=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"6ECrjQKUZIGNSVKihDxXQorZ7Bk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sIr9wcHZ92UWkWNPP+11PZ+Ftb0="},{"type":"next-occurrence","id":"Fc6rR2seztXgrdxhPmjcpryV75E="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"6ECrjQKUZIGNSVKihDxXQorZ7Bk=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"Fc6rR2seztXgrdxhPmjcpryV75E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sIr9wcHZ92UWkWNPP+11PZ+Ftb0="},{"type":"next-occurrence","id":"RWgG0X9u7LDn70gUK8XCgE4pErU="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"Fc6rR2seztXgrdxhPmjcpryV75E=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"RWgG0X9u7LDn70gUK8XCgE4pErU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sIr9wcHZ92UWkWNPP+11PZ+Ftb0="},{"type":"next-occurrence","id":"WcKKjHn5BW1WoLRW68nxp2l20uo="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"RWgG0X9u7LDn70gUK8XCgE4pErU=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"WcKKjHn5BW1WoLRW68nxp2l20uo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sIr9wcHZ92UWkWNPP+11PZ+Ftb0="},{"type":"next-occurrence","id":"Q1JerDgA9INkJTfONRKwBaDKlco="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"WcKKjHn5BW1WoLRW68nxp2l20uo=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"Q1JerDgA9INkJTfONRKwBaDKlco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sIr9wcHZ92UWkWNPP+11PZ+Ftb0="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:15:12Z"},"road_event_id":"Q1JerDgA9INkJTfONRKwBaDKlco=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"3d+ctqO2Ki/4ZuW5VYXAohNtSK8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MZh6P2rGFNnA9fsAK6FUee15pUQ="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"3d+ctqO2Ki/4ZuW5VYXAohNtSK8=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"MZh6P2rGFNnA9fsAK6FUee15pUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3d+ctqO2Ki/4ZuW5VYXAohNtSK8="},{"type":"next-occurrence","id":"jOyR8aQsQY0+bPPjq9vgjMQ2O3g="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"MZh6P2rGFNnA9fsAK6FUee15pUQ=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"jOyR8aQsQY0+bPPjq9vgjMQ2O3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3d+ctqO2Ki/4ZuW5VYXAohNtSK8="},{"type":"next-occurrence","id":"IwBVyUSgOV6hSI5DTD5C0/falak="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"jOyR8aQsQY0+bPPjq9vgjMQ2O3g=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"IwBVyUSgOV6hSI5DTD5C0/falak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3d+ctqO2Ki/4ZuW5VYXAohNtSK8="},{"type":"next-occurrence","id":"ANPManBIRlQkL+Ogi9Va+w+vs3g="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"IwBVyUSgOV6hSI5DTD5C0/falak=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"ANPManBIRlQkL+Ogi9Va+w+vs3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3d+ctqO2Ki/4ZuW5VYXAohNtSK8="},{"type":"next-occurrence","id":"yj5Y7NNfuVAD8VI1lWp/1jrcQA8="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"ANPManBIRlQkL+Ogi9Va+w+vs3g=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"yj5Y7NNfuVAD8VI1lWp/1jrcQA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3d+ctqO2Ki/4ZuW5VYXAohNtSK8="},{"type":"next-occurrence","id":"rXbE3PFwyIKqMim5M1kz7QPqBno="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"yj5Y7NNfuVAD8VI1lWp/1jrcQA8=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"rXbE3PFwyIKqMim5M1kz7QPqBno=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3d+ctqO2Ki/4ZuW5VYXAohNtSK8="},{"type":"next-occurrence","id":"fSrUxc2HTpn3NI70nF2PJ0XxQq4="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"rXbE3PFwyIKqMim5M1kz7QPqBno=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"fSrUxc2HTpn3NI70nF2PJ0XxQq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3d+ctqO2Ki/4ZuW5VYXAohNtSK8="},{"type":"next-occurrence","id":"E/3EYgvRG3vJidBO8bvFvsfixS0="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"fSrUxc2HTpn3NI70nF2PJ0XxQq4=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"E/3EYgvRG3vJidBO8bvFvsfixS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3d+ctqO2Ki/4ZuW5VYXAohNtSK8="},{"type":"next-occurrence","id":"ZlD3eprEP7F9WcZb/hQ0tjuru1w="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"E/3EYgvRG3vJidBO8bvFvsfixS0=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"ZlD3eprEP7F9WcZb/hQ0tjuru1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3d+ctqO2Ki/4ZuW5VYXAohNtSK8="},{"type":"next-occurrence","id":"wb3l4J0UcfVGaFbtS891LymcQ3Y="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"ZlD3eprEP7F9WcZb/hQ0tjuru1w=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"wb3l4J0UcfVGaFbtS891LymcQ3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3d+ctqO2Ki/4ZuW5VYXAohNtSK8="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:14:24Z"},"road_event_id":"wb3l4J0UcfVGaFbtS891LymcQ3Y=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"WqyOb+EoIlc18xT++TUdGX4C+a0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"O/+O4K4WHsTl0Tat71y5KwluWTA="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"WqyOb+EoIlc18xT++TUdGX4C+a0=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"O/+O4K4WHsTl0Tat71y5KwluWTA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WqyOb+EoIlc18xT++TUdGX4C+a0="},{"type":"next-occurrence","id":"kg8qEz74e8bM6uNpWmXU0QCvnuE="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"O/+O4K4WHsTl0Tat71y5KwluWTA=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"kg8qEz74e8bM6uNpWmXU0QCvnuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WqyOb+EoIlc18xT++TUdGX4C+a0="},{"type":"next-occurrence","id":"wVCpotOO+Sp/VLBAfWbmP4ccJUg="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"kg8qEz74e8bM6uNpWmXU0QCvnuE=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"wVCpotOO+Sp/VLBAfWbmP4ccJUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WqyOb+EoIlc18xT++TUdGX4C+a0="},{"type":"next-occurrence","id":"5fqNGvyRrr+V/fVtHIKFG3mLOsk="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"wVCpotOO+Sp/VLBAfWbmP4ccJUg=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"5fqNGvyRrr+V/fVtHIKFG3mLOsk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WqyOb+EoIlc18xT++TUdGX4C+a0="},{"type":"next-occurrence","id":"7804g44bExpfPsDTt2gxcTR+Knk="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"5fqNGvyRrr+V/fVtHIKFG3mLOsk=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"7804g44bExpfPsDTt2gxcTR+Knk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WqyOb+EoIlc18xT++TUdGX4C+a0="},{"type":"next-occurrence","id":"zIEjC5y16rApEc/nzyMKV779LZs="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"7804g44bExpfPsDTt2gxcTR+Knk=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"zIEjC5y16rApEc/nzyMKV779LZs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WqyOb+EoIlc18xT++TUdGX4C+a0="},{"type":"next-occurrence","id":"zQ1QiucBhQV6hB6NenHTgjbJHy4="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"zIEjC5y16rApEc/nzyMKV779LZs=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"zQ1QiucBhQV6hB6NenHTgjbJHy4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WqyOb+EoIlc18xT++TUdGX4C+a0="},{"type":"next-occurrence","id":"fCPQz2CU9qyv9qrDIkOh7suNi5A="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"zQ1QiucBhQV6hB6NenHTgjbJHy4=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"fCPQz2CU9qyv9qrDIkOh7suNi5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WqyOb+EoIlc18xT++TUdGX4C+a0="},{"type":"next-occurrence","id":"oRD6mG7JlmmPzTTA112IvkKVijw="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"fCPQz2CU9qyv9qrDIkOh7suNi5A=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"oRD6mG7JlmmPzTTA112IvkKVijw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WqyOb+EoIlc18xT++TUdGX4C+a0="},{"type":"next-occurrence","id":"hYrP4rqWEQWJUPe4uHThBCVj7jc="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"oRD6mG7JlmmPzTTA112IvkKVijw=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"hYrP4rqWEQWJUPe4uHThBCVj7jc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WqyOb+EoIlc18xT++TUdGX4C+a0="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:19:09Z"},"road_event_id":"hYrP4rqWEQWJUPe4uHThBCVj7jc=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"3TBmJO1eN3uXwHVA5IrVnsH07WQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aWmrx8kPgQqi1PNwcU2OxvN7PRc="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"3TBmJO1eN3uXwHVA5IrVnsH07WQ=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"aWmrx8kPgQqi1PNwcU2OxvN7PRc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3TBmJO1eN3uXwHVA5IrVnsH07WQ="},{"type":"next-occurrence","id":"XHj/Z36fUvYq/0NBqS/Wz7tTVuQ="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"aWmrx8kPgQqi1PNwcU2OxvN7PRc=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"XHj/Z36fUvYq/0NBqS/Wz7tTVuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3TBmJO1eN3uXwHVA5IrVnsH07WQ="},{"type":"next-occurrence","id":"APqWBl05wshLRNZrQBq3RSYLltU="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"XHj/Z36fUvYq/0NBqS/Wz7tTVuQ=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"APqWBl05wshLRNZrQBq3RSYLltU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3TBmJO1eN3uXwHVA5IrVnsH07WQ="},{"type":"next-occurrence","id":"IwL9N58QdUczeq8xhP9m7HhGQiA="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"APqWBl05wshLRNZrQBq3RSYLltU=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"IwL9N58QdUczeq8xhP9m7HhGQiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3TBmJO1eN3uXwHVA5IrVnsH07WQ="},{"type":"next-occurrence","id":"33r9Pdf1KSwhpUCWGImBbmHj4AE="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"IwL9N58QdUczeq8xhP9m7HhGQiA=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"33r9Pdf1KSwhpUCWGImBbmHj4AE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3TBmJO1eN3uXwHVA5IrVnsH07WQ="},{"type":"next-occurrence","id":"WM2TMazTunFnEDUitRKlZNm1brM="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"33r9Pdf1KSwhpUCWGImBbmHj4AE=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"WM2TMazTunFnEDUitRKlZNm1brM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3TBmJO1eN3uXwHVA5IrVnsH07WQ="},{"type":"next-occurrence","id":"3pc6Hi/4L8mP1hX2B+JW4eNanA0="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"WM2TMazTunFnEDUitRKlZNm1brM=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"3pc6Hi/4L8mP1hX2B+JW4eNanA0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3TBmJO1eN3uXwHVA5IrVnsH07WQ="},{"type":"next-occurrence","id":"rcDN/aKTRt3WVxkzNJDrIbI5pq8="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"3pc6Hi/4L8mP1hX2B+JW4eNanA0=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"rcDN/aKTRt3WVxkzNJDrIbI5pq8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3TBmJO1eN3uXwHVA5IrVnsH07WQ="},{"type":"next-occurrence","id":"X+Rf40TH4seuW7KBIJq/+aSTxb0="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"rcDN/aKTRt3WVxkzNJDrIbI5pq8=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"X+Rf40TH4seuW7KBIJq/+aSTxb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3TBmJO1eN3uXwHVA5IrVnsH07WQ="},{"type":"next-occurrence","id":"zVC5Vl0oqxJEGqftbmc0Ss4VitI="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"X+Rf40TH4seuW7KBIJq/+aSTxb0=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"zVC5Vl0oqxJEGqftbmc0Ss4VitI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3TBmJO1eN3uXwHVA5IrVnsH07WQ="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-12T23:20:04Z"},"road_event_id":"zVC5Vl0oqxJEGqftbmc0Ss4VitI=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"iGSUlnM+RqyGuhTghrUG9hGm5UI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 54A"],"direction":"unknown","related_road_events":[],"description":"Safety improvements on NY 54A northbound Town of Pulteney; Town of Urbana Line (Pulteney) 2 lanes reduced to 1, Continuous Wednesday April 8th, 2026 12:00 AM thru Tuesday September 29th, 2026 11:59 PM All lanes closed","update_date":"2026-05-28T13:39:14Z"},"road_event_id":"iGSUlnM+RqyGuhTghrUG9hGm5UI=","beginning_cross_street":"Town of Pulteney; Town of Urbana Line","ending_cross_street":"Town of Pulteney; Town of Urbana Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.172096,42.475378]]}},{"id":"PcCCpIiwcmmZCBa/yJYpRi/e6rA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["North Avenue Bridge"],"direction":"unknown","related_road_events":[],"description":"Scheduled roadwork on North Avenue Bridge eastbound east of Earhart Drive (Elizabeth), Continuous Friday April 10th, 2026 08:00 PM thru Saturday June 6th, 2026 08:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-12T12:21:30Z"},"road_event_id":"PcCCpIiwcmmZCBa/yJYpRi/e6rA=","beginning_cross_street":"Earhart Drive","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-07T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.178241,40.669786]]}},{"id":"IyRftZ+UubLySvVE92k/olUKeBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0/dF/7Ba6JS5wxFunDgpxms9UB8="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"IyRftZ+UubLySvVE92k/olUKeBg=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"0/dF/7Ba6JS5wxFunDgpxms9UB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IyRftZ+UubLySvVE92k/olUKeBg="},{"type":"next-occurrence","id":"hXwmSzWmcgwlIWJt7MM4h6A2Cb8="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"0/dF/7Ba6JS5wxFunDgpxms9UB8=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"hXwmSzWmcgwlIWJt7MM4h6A2Cb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IyRftZ+UubLySvVE92k/olUKeBg="},{"type":"next-occurrence","id":"NPgMEC+8BkLeyHa3XaIgBzLG7VI="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"hXwmSzWmcgwlIWJt7MM4h6A2Cb8=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"NPgMEC+8BkLeyHa3XaIgBzLG7VI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IyRftZ+UubLySvVE92k/olUKeBg="},{"type":"next-occurrence","id":"7JNOF/b62L8yE9r9Jz1VaOiYS5A="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"NPgMEC+8BkLeyHa3XaIgBzLG7VI=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"7JNOF/b62L8yE9r9Jz1VaOiYS5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IyRftZ+UubLySvVE92k/olUKeBg="},{"type":"next-occurrence","id":"L+5p2F7iv8yXeBgr4iEg3TnTAaA="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"7JNOF/b62L8yE9r9Jz1VaOiYS5A=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"L+5p2F7iv8yXeBgr4iEg3TnTAaA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IyRftZ+UubLySvVE92k/olUKeBg="},{"type":"next-occurrence","id":"rMNmQvHc/Gh+G1M9UYUGFV+Qq9k="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"L+5p2F7iv8yXeBgr4iEg3TnTAaA=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"rMNmQvHc/Gh+G1M9UYUGFV+Qq9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IyRftZ+UubLySvVE92k/olUKeBg="},{"type":"next-occurrence","id":"HMSM5Dv1ohNrQ4VNmsv20Bq1PvY="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"rMNmQvHc/Gh+G1M9UYUGFV+Qq9k=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"HMSM5Dv1ohNrQ4VNmsv20Bq1PvY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IyRftZ+UubLySvVE92k/olUKeBg="},{"type":"next-occurrence","id":"TyQ2O+tNDd2WdX8m7NMbT+ucO0Y="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"HMSM5Dv1ohNrQ4VNmsv20Bq1PvY=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"TyQ2O+tNDd2WdX8m7NMbT+ucO0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IyRftZ+UubLySvVE92k/olUKeBg="},{"type":"next-occurrence","id":"qAX4KvnP8WGH4DN+5/8XiilK9kM="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"TyQ2O+tNDd2WdX8m7NMbT+ucO0Y=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"qAX4KvnP8WGH4DN+5/8XiilK9kM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IyRftZ+UubLySvVE92k/olUKeBg="},{"type":"next-occurrence","id":"vWxAgjpkfR60+Je+/ocDZO+9reM="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"qAX4KvnP8WGH4DN+5/8XiilK9kM=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"vWxAgjpkfR60+Je+/ocDZO+9reM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IyRftZ+UubLySvVE92k/olUKeBg="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"vWxAgjpkfR60+Je+/ocDZO+9reM=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"g6UMx+UHhxCW18/cQtMiVOS9GyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"I0R5gVjWgA9W0HHtmtuxlN8fh5c="}],"description":"Construction on NY 46 both directions between Center Street (Durhamville) and NY 49 (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:07:29Z"},"road_event_id":"g6UMx+UHhxCW18/cQtMiVOS9GyY=","beginning_cross_street":"Center Street","ending_cross_street":"NY 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.659386,43.164185]]}},{"id":"I0R5gVjWgA9W0HHtmtuxlN8fh5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g6UMx+UHhxCW18/cQtMiVOS9GyY="},{"type":"next-occurrence","id":"2QBvay3KU2aUCCn4XClPpgo/uMY="}],"description":"Construction on NY 46 both directions between Center Street (Durhamville) and NY 49 (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:07:29Z"},"road_event_id":"I0R5gVjWgA9W0HHtmtuxlN8fh5c=","beginning_cross_street":"Center Street","ending_cross_street":"NY 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.659386,43.164185]]}},{"id":"2QBvay3KU2aUCCn4XClPpgo/uMY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g6UMx+UHhxCW18/cQtMiVOS9GyY="},{"type":"next-occurrence","id":"NG6a1QU0RBzxu3kPKWXHnHDhcuU="}],"description":"Construction on NY 46 both directions between Center Street (Durhamville) and NY 49 (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:07:29Z"},"road_event_id":"2QBvay3KU2aUCCn4XClPpgo/uMY=","beginning_cross_street":"Center Street","ending_cross_street":"NY 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.659386,43.164185]]}},{"id":"NG6a1QU0RBzxu3kPKWXHnHDhcuU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g6UMx+UHhxCW18/cQtMiVOS9GyY="},{"type":"next-occurrence","id":"VQY8H/lLsdN5FW5y0tOqkoGjCwE="}],"description":"Construction on NY 46 both directions between Center Street (Durhamville) and NY 49 (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:07:29Z"},"road_event_id":"NG6a1QU0RBzxu3kPKWXHnHDhcuU=","beginning_cross_street":"Center Street","ending_cross_street":"NY 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.659386,43.164185]]}},{"id":"VQY8H/lLsdN5FW5y0tOqkoGjCwE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g6UMx+UHhxCW18/cQtMiVOS9GyY="},{"type":"next-occurrence","id":"xNjQ+gxhhedU/OE0CqZbYDycVgY="}],"description":"Construction on NY 46 both directions between Center Street (Durhamville) and NY 49 (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:07:29Z"},"road_event_id":"VQY8H/lLsdN5FW5y0tOqkoGjCwE=","beginning_cross_street":"Center Street","ending_cross_street":"NY 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.659386,43.164185]]}},{"id":"xNjQ+gxhhedU/OE0CqZbYDycVgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g6UMx+UHhxCW18/cQtMiVOS9GyY="}],"description":"Construction on NY 46 both directions between Center Street (Durhamville) and NY 49 (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:07:29Z"},"road_event_id":"xNjQ+gxhhedU/OE0CqZbYDycVgY=","beginning_cross_street":"Center Street","ending_cross_street":"NY 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.659386,43.164185]]}},{"id":"TPTVb2Eb/Hy8t3ID1crfcfq16hQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2Zm6lQI1UPu98V69Ut8bZNFLlBA="}],"description":"Construction on NY 46 both directions between Hillside Road (Boonville) and Holmes Road (Boonville) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 26th, 2025 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 05:30 PM,","update_date":"2026-06-05T13:58:53Z"},"road_event_id":"TPTVb2Eb/Hy8t3ID1crfcfq16hQ=","beginning_cross_street":"Hillside Road","ending_cross_street":"Holmes Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.341465,43.41094]]}},{"id":"2Zm6lQI1UPu98V69Ut8bZNFLlBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TPTVb2Eb/Hy8t3ID1crfcfq16hQ="},{"type":"next-occurrence","id":"UXFoieotethHxYYmuDz7ze85cH8="}],"description":"Construction on NY 46 both directions between Hillside Road (Boonville) and Holmes Road (Boonville) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 26th, 2025 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 05:30 PM,","update_date":"2026-06-05T13:58:53Z"},"road_event_id":"2Zm6lQI1UPu98V69Ut8bZNFLlBA=","beginning_cross_street":"Hillside Road","ending_cross_street":"Holmes Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.341465,43.41094]]}},{"id":"UXFoieotethHxYYmuDz7ze85cH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TPTVb2Eb/Hy8t3ID1crfcfq16hQ="},{"type":"next-occurrence","id":"9FssVuGIMlVdU0SUiKtZyBF6Iy0="}],"description":"Construction on NY 46 both directions between Hillside Road (Boonville) and Holmes Road (Boonville) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 26th, 2025 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 05:30 PM,","update_date":"2026-06-05T13:58:53Z"},"road_event_id":"UXFoieotethHxYYmuDz7ze85cH8=","beginning_cross_street":"Hillside Road","ending_cross_street":"Holmes Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.341465,43.41094]]}},{"id":"9FssVuGIMlVdU0SUiKtZyBF6Iy0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TPTVb2Eb/Hy8t3ID1crfcfq16hQ="},{"type":"next-occurrence","id":"ukSzSTKrjGPHR31f90PIadB66Ik="}],"description":"Construction on NY 46 both directions between Hillside Road (Boonville) and Holmes Road (Boonville) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 26th, 2025 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 05:30 PM,","update_date":"2026-06-05T13:58:53Z"},"road_event_id":"9FssVuGIMlVdU0SUiKtZyBF6Iy0=","beginning_cross_street":"Hillside Road","ending_cross_street":"Holmes Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.341465,43.41094]]}},{"id":"ukSzSTKrjGPHR31f90PIadB66Ik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TPTVb2Eb/Hy8t3ID1crfcfq16hQ="},{"type":"next-occurrence","id":"Oul4ilFgDPa63kmSm7OWHdyrli0="}],"description":"Construction on NY 46 both directions between Hillside Road (Boonville) and Holmes Road (Boonville) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 26th, 2025 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 05:30 PM,","update_date":"2026-06-05T13:58:53Z"},"road_event_id":"ukSzSTKrjGPHR31f90PIadB66Ik=","beginning_cross_street":"Hillside Road","ending_cross_street":"Holmes Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.341465,43.41094]]}},{"id":"Oul4ilFgDPa63kmSm7OWHdyrli0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TPTVb2Eb/Hy8t3ID1crfcfq16hQ="}],"description":"Construction on NY 46 both directions between Hillside Road (Boonville) and Holmes Road (Boonville) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 26th, 2025 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 05:30 PM,","update_date":"2026-06-05T13:58:53Z"},"road_event_id":"Oul4ilFgDPa63kmSm7OWHdyrli0=","beginning_cross_street":"Hillside Road","ending_cross_street":"Holmes Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.341465,43.41094]]}},{"id":"Iqdbn6afJ11ESjrCGna2bilNO3E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 28 both directions between Exit - Mohawk Street; I-90; Steele Street (Herkimer) and Marginal Road (Herkimer) All work will be on I-90.Motorists will encounter daily road closures with flaggers in place, Continuous Monday April 13th, 2026 6:00 AM thru Monday November 30th, 2026 6:00 PM","update_date":"2026-06-05T12:49:58Z"},"road_event_id":"Iqdbn6afJ11ESjrCGna2bilNO3E=","beginning_cross_street":"Exit   - Mohawk Street; I-90; Steele Street","ending_cross_street":"Marginal Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.993552,43.017647]]}},{"id":"6fK9tsb5JxOEvZsB8grXIsjSIoY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp), Continuous Friday April 10, 2026 09:00 PM thru Saturday September 26, 2026 05:00 AM, right shoulder closed","update_date":"2026-04-09T19:22:43Z"},"road_event_id":"6fK9tsb5JxOEvZsB8grXIsjSIoY=","beginning_cross_street":"West of Exit 42 - US 202/Littleton Rd","ending_cross_street":"West of Exit 42 - US 202/Littleton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.452018,40.8679]]}},{"id":"aoyrpi30+0F3fricx+IWGHUYDY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"L2YUnTtvJUlor8m+s5w2MFi+blY="}],"description":"Construction on NY 80 both directions between Muller Hill Road (Georgetown) and Chapin Road (Georgetown) Motorists will encounter lane closures in both directions with temporary signals in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 12:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:10:17Z"},"road_event_id":"aoyrpi30+0F3fricx+IWGHUYDY0=","beginning_cross_street":"Muller Hill Road","ending_cross_street":"Chapin Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.753676,42.784731]]}},{"id":"L2YUnTtvJUlor8m+s5w2MFi+blY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aoyrpi30+0F3fricx+IWGHUYDY0="},{"type":"next-occurrence","id":"zqlOOdqdLZRYX9eFGN8Mc1vQ3/U="}],"description":"Construction on NY 80 both directions between Muller Hill Road (Georgetown) and Chapin Road (Georgetown) Motorists will encounter lane closures in both directions with temporary signals in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 12:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:10:17Z"},"road_event_id":"L2YUnTtvJUlor8m+s5w2MFi+blY=","beginning_cross_street":"Muller Hill Road","ending_cross_street":"Chapin Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T04:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.753676,42.784731]]}},{"id":"zqlOOdqdLZRYX9eFGN8Mc1vQ3/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aoyrpi30+0F3fricx+IWGHUYDY0="},{"type":"next-occurrence","id":"bwj4a0HLS92eQiv/oUcN5gXGFdM="}],"description":"Construction on NY 80 both directions between Muller Hill Road (Georgetown) and Chapin Road (Georgetown) Motorists will encounter lane closures in both directions with temporary signals in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 12:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:10:17Z"},"road_event_id":"zqlOOdqdLZRYX9eFGN8Mc1vQ3/U=","beginning_cross_street":"Muller Hill Road","ending_cross_street":"Chapin Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T04:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.753676,42.784731]]}},{"id":"bwj4a0HLS92eQiv/oUcN5gXGFdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aoyrpi30+0F3fricx+IWGHUYDY0="},{"type":"next-occurrence","id":"gjGt81WAP3ByKzYPB4dtlpFv3rM="}],"description":"Construction on NY 80 both directions between Muller Hill Road (Georgetown) and Chapin Road (Georgetown) Motorists will encounter lane closures in both directions with temporary signals in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 12:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:10:17Z"},"road_event_id":"bwj4a0HLS92eQiv/oUcN5gXGFdM=","beginning_cross_street":"Muller Hill Road","ending_cross_street":"Chapin Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T04:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.753676,42.784731]]}},{"id":"gjGt81WAP3ByKzYPB4dtlpFv3rM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aoyrpi30+0F3fricx+IWGHUYDY0="},{"type":"next-occurrence","id":"WQqfEbxyTyTaJh6R3akIRzhO62g="}],"description":"Construction on NY 80 both directions between Muller Hill Road (Georgetown) and Chapin Road (Georgetown) Motorists will encounter lane closures in both directions with temporary signals in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 12:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:10:17Z"},"road_event_id":"gjGt81WAP3ByKzYPB4dtlpFv3rM=","beginning_cross_street":"Muller Hill Road","ending_cross_street":"Chapin Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T04:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.753676,42.784731]]}},{"id":"WQqfEbxyTyTaJh6R3akIRzhO62g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aoyrpi30+0F3fricx+IWGHUYDY0="}],"description":"Construction on NY 80 both directions between Muller Hill Road (Georgetown) and Chapin Road (Georgetown) Motorists will encounter lane closures in both directions with temporary signals in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 12:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:10:17Z"},"road_event_id":"WQqfEbxyTyTaJh6R3akIRzhO62g=","beginning_cross_street":"Muller Hill Road","ending_cross_street":"Chapin Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T04:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.753676,42.784731]]}},{"id":"XkB+MLQeU3AymeyK7MSzaesnJeQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3O8zYcnmznHtUGy0/HmW2RUMIAQ="}],"description":"Bridge maintenance operations on NY 119 both directions between Vreeland Avenue (Elmsford) and Undercliff Avenue (Elmsford) D264324/B5500749/32337809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:59 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T15:00:59Z"},"road_event_id":"XkB+MLQeU3AymeyK7MSzaesnJeQ=","beginning_cross_street":"Vreeland Avenue","ending_cross_street":"Undercliff Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:59:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.8214,41.055573]]}},{"id":"3O8zYcnmznHtUGy0/HmW2RUMIAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XkB+MLQeU3AymeyK7MSzaesnJeQ="},{"type":"next-occurrence","id":"wE+YkVs1d/pWE/0KFK9q0LqiyWc="}],"description":"Bridge maintenance operations on NY 119 both directions between Vreeland Avenue (Elmsford) and Undercliff Avenue (Elmsford) D264324/B5500749/32337809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:59 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T15:00:59Z"},"road_event_id":"3O8zYcnmznHtUGy0/HmW2RUMIAQ=","beginning_cross_street":"Vreeland Avenue","ending_cross_street":"Undercliff Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:59:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.8214,41.055573]]}},{"id":"wE+YkVs1d/pWE/0KFK9q0LqiyWc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XkB+MLQeU3AymeyK7MSzaesnJeQ="},{"type":"next-occurrence","id":"t0YRSG/ocGiGisegF+YM36Osg3c="}],"description":"Bridge maintenance operations on NY 119 both directions between Vreeland Avenue (Elmsford) and Undercliff Avenue (Elmsford) D264324/B5500749/32337809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:59 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T15:00:59Z"},"road_event_id":"wE+YkVs1d/pWE/0KFK9q0LqiyWc=","beginning_cross_street":"Vreeland Avenue","ending_cross_street":"Undercliff Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:59:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.8214,41.055573]]}},{"id":"t0YRSG/ocGiGisegF+YM36Osg3c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XkB+MLQeU3AymeyK7MSzaesnJeQ="},{"type":"next-occurrence","id":"X1Hzly38oDao1znEuMm2WlyAqyw="}],"description":"Bridge maintenance operations on NY 119 both directions between Vreeland Avenue (Elmsford) and Undercliff Avenue (Elmsford) D264324/B5500749/32337809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:59 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T15:00:59Z"},"road_event_id":"t0YRSG/ocGiGisegF+YM36Osg3c=","beginning_cross_street":"Vreeland Avenue","ending_cross_street":"Undercliff Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:59:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.8214,41.055573]]}},{"id":"X1Hzly38oDao1znEuMm2WlyAqyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XkB+MLQeU3AymeyK7MSzaesnJeQ="},{"type":"next-occurrence","id":"OF9F9PvG20wsz693tsGfL7XSMRI="}],"description":"Bridge maintenance operations on NY 119 both directions between Vreeland Avenue (Elmsford) and Undercliff Avenue (Elmsford) D264324/B5500749/32337809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:59 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T15:00:59Z"},"road_event_id":"X1Hzly38oDao1znEuMm2WlyAqyw=","beginning_cross_street":"Vreeland Avenue","ending_cross_street":"Undercliff Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:59:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.8214,41.055573]]}},{"id":"OF9F9PvG20wsz693tsGfL7XSMRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XkB+MLQeU3AymeyK7MSzaesnJeQ="}],"description":"Bridge maintenance operations on NY 119 both directions between Vreeland Avenue (Elmsford) and Undercliff Avenue (Elmsford) D264324/B5500749/32337809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:59 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T15:00:59Z"},"road_event_id":"OF9F9PvG20wsz693tsGfL7XSMRI=","beginning_cross_street":"Vreeland Avenue","ending_cross_street":"Undercliff Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:59:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.8214,41.055573]]}},{"id":"cv/zJ6LG3g7F9EnUtIx6DSQcjjw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LcUFCMh9NQcSdh6uBN0mWOSlsFQ="}],"description":"Bridge maintenance operations on Saw Mill River Parkway northbound between Exit 20 - I-87 (Greenburgh) and Exit 23 - Old Saw Mill Road - CR 303 (Greenburgh) D264324/DAY/B5500749/32387409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T14:59:05Z"},"road_event_id":"cv/zJ6LG3g7F9EnUtIx6DSQcjjw=","beginning_cross_street":"Exit 20 - I-87","ending_cross_street":"Exit 23 - Old Saw Mill Road - CR 303","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821132,41.055486]]}},{"id":"LcUFCMh9NQcSdh6uBN0mWOSlsFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cv/zJ6LG3g7F9EnUtIx6DSQcjjw="},{"type":"next-occurrence","id":"5XMnzEz5vMJWLBU0kFcML6CXWYM="}],"description":"Bridge maintenance operations on Saw Mill River Parkway northbound between Exit 20 - I-87 (Greenburgh) and Exit 23 - Old Saw Mill Road - CR 303 (Greenburgh) D264324/DAY/B5500749/32387409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T14:59:05Z"},"road_event_id":"LcUFCMh9NQcSdh6uBN0mWOSlsFQ=","beginning_cross_street":"Exit 20 - I-87","ending_cross_street":"Exit 23 - Old Saw Mill Road - CR 303","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821132,41.055486]]}},{"id":"5XMnzEz5vMJWLBU0kFcML6CXWYM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cv/zJ6LG3g7F9EnUtIx6DSQcjjw="},{"type":"next-occurrence","id":"3HYN+RqYKiVW5KWvC/xvAyXOfhI="}],"description":"Bridge maintenance operations on Saw Mill River Parkway northbound between Exit 20 - I-87 (Greenburgh) and Exit 23 - Old Saw Mill Road - CR 303 (Greenburgh) D264324/DAY/B5500749/32387409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T14:59:05Z"},"road_event_id":"5XMnzEz5vMJWLBU0kFcML6CXWYM=","beginning_cross_street":"Exit 20 - I-87","ending_cross_street":"Exit 23 - Old Saw Mill Road - CR 303","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821132,41.055486]]}},{"id":"3HYN+RqYKiVW5KWvC/xvAyXOfhI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cv/zJ6LG3g7F9EnUtIx6DSQcjjw="},{"type":"next-occurrence","id":"C3qdD54Vca3jCoozEqsgX8tcLE0="}],"description":"Bridge maintenance operations on Saw Mill River Parkway northbound between Exit 20 - I-87 (Greenburgh) and Exit 23 - Old Saw Mill Road - CR 303 (Greenburgh) D264324/DAY/B5500749/32387409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T14:59:05Z"},"road_event_id":"3HYN+RqYKiVW5KWvC/xvAyXOfhI=","beginning_cross_street":"Exit 20 - I-87","ending_cross_street":"Exit 23 - Old Saw Mill Road - CR 303","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821132,41.055486]]}},{"id":"C3qdD54Vca3jCoozEqsgX8tcLE0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cv/zJ6LG3g7F9EnUtIx6DSQcjjw="},{"type":"next-occurrence","id":"0bnhl2Jr0mlwbdLLT/O8LnF0V7U="}],"description":"Bridge maintenance operations on Saw Mill River Parkway northbound between Exit 20 - I-87 (Greenburgh) and Exit 23 - Old Saw Mill Road - CR 303 (Greenburgh) D264324/DAY/B5500749/32387409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T14:59:05Z"},"road_event_id":"C3qdD54Vca3jCoozEqsgX8tcLE0=","beginning_cross_street":"Exit 20 - I-87","ending_cross_street":"Exit 23 - Old Saw Mill Road - CR 303","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821132,41.055486]]}},{"id":"0bnhl2Jr0mlwbdLLT/O8LnF0V7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cv/zJ6LG3g7F9EnUtIx6DSQcjjw="}],"description":"Bridge maintenance operations on Saw Mill River Parkway northbound between Exit 20 - I-87 (Greenburgh) and Exit 23 - Old Saw Mill Road - CR 303 (Greenburgh) D264324/DAY/B5500749/32387409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T14:59:05Z"},"road_event_id":"0bnhl2Jr0mlwbdLLT/O8LnF0V7U=","beginning_cross_street":"Exit 20 - I-87","ending_cross_street":"Exit 23 - Old Saw Mill Road - CR 303","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821132,41.055486]]}},{"id":"ZXuZhfEvArDpKfnwREL0GQ1nlTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement and longterm construction on I-590 both directions between Edgewood Ave (Brighton) and Elmwood Avenue; CR 87 (Brighton), Continuous Saturday March 28th, 2026 09:00 AM thru Wednesday September 30th, 2026 05:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-10T15:33:15Z"},"road_event_id":"ZXuZhfEvArDpKfnwREL0GQ1nlTc=","beginning_cross_street":"Edgewood Ave","ending_cross_street":"Elmwood Avenue; CR 87","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.560936,43.108454]]}},{"id":"bmM1GMTH4Hjvnz4oQotwl3JFXXU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LaSalle Expressway"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on LaSalle Expressway both directions START ROUTE LaSalle Expressway; I-190 (Niagara Falls) to Exit - Williams Road; Ramp (Wheatfield), Continuous Friday April 10th, 2026 12:00 AM thru Friday July 31st, 2026 11:59 PM 1 Right lane of 4 lanes closed","update_date":"2026-06-05T01:27:28Z"},"road_event_id":"bmM1GMTH4Hjvnz4oQotwl3JFXXU=","beginning_cross_street":"START ROUTE  LaSalle Expressway; I-190","ending_cross_street":"Exit   - Williams Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.981487,43.079962]]}},{"id":"xU0xChyLC0Z5XIF8WVk4HTj6tZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation and longterm construction on I-590 southbound Exit ramp Exit 2B to NY 31; Monroe Ave. (Brighton) RAMP CLOSED, Continuous Saturday April 11th, 2026 05:00 AM thru Monday November 30th, 2026 12:00 PM All lanes closed and detoured ramp","update_date":"2026-04-10T17:42:08Z"},"road_event_id":"xU0xChyLC0Z5XIF8WVk4HTj6tZk=","beginning_cross_street":"Exit 2B to NY 31; Monroe Ave.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.552248,43.11434]]}},{"id":"OzsWqwxFi2Ut3e6lVeyPVIVZmqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement and longterm construction on NY 31 westbound Entrance ramp I-590 SB (Brighton) RAMP CLOSED, Continuous Saturday April 11th, 2026 05:00 AM thru Monday November 30th, 2026 12:00 PM All lanes closed and detoured ramp","update_date":"2026-04-10T17:46:35Z"},"road_event_id":"OzsWqwxFi2Ut3e6lVeyPVIVZmqQ=","beginning_cross_street":"I-590 SB","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.553968,43.117]]}},{"id":"lkXXLeB/ETbbSg++DFB8EuM46/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation and longterm construction on I-590 southbound Elmwood Avenue; CR 87 (Brighton) to EXIT 2A to NY 31; Monroe Ave (Brighton) RIGHT LANE IS EXIT ONLY AT EXIT 2A, Continuous Saturday April 11th, 2026 05:00 AM thru Monday November 30th, 2026 12:00 PM 1 Right lane of 3 lanes diverted","update_date":"2026-04-10T17:54:37Z"},"road_event_id":"lkXXLeB/ETbbSg++DFB8EuM46/w=","beginning_cross_street":"Elmwood Avenue; CR 87","ending_cross_street":"EXIT 2A to NY 31; Monroe Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.553512,43.126751]]}},{"id":"ViL0d10MW9pyFPSrRGupaTIDcjg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 253"],"direction":"unknown","related_road_events":[],"description":"Structure repairs on NY 253 eastbound at I-390 (Henrietta), Continuous Monday April 13th, 2026 07:00 AM thru Monday August 31st, 2026 04:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-10T18:05:35Z"},"road_event_id":"ViL0d10MW9pyFPSrRGupaTIDcjg=","beginning_cross_street":"I-390","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.641599,43.058834]]}},{"id":"Ap9z4u1tJ8GiuuMblBR5vHjBAlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2bo/Ek6zFGz1LV0rDwvXAMv1p1M="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"Ap9z4u1tJ8GiuuMblBR5vHjBAlc=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"2bo/Ek6zFGz1LV0rDwvXAMv1p1M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ap9z4u1tJ8GiuuMblBR5vHjBAlc="},{"type":"next-occurrence","id":"3CG8Uv6SyJVEjhqcg4Ntcqv4vyo="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"2bo/Ek6zFGz1LV0rDwvXAMv1p1M=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"3CG8Uv6SyJVEjhqcg4Ntcqv4vyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ap9z4u1tJ8GiuuMblBR5vHjBAlc="},{"type":"next-occurrence","id":"mTGwo2abZURZK84miv7oFlCjRaI="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"3CG8Uv6SyJVEjhqcg4Ntcqv4vyo=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"mTGwo2abZURZK84miv7oFlCjRaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ap9z4u1tJ8GiuuMblBR5vHjBAlc="},{"type":"next-occurrence","id":"GiuOs+cFfnGWgSaWjB2lCNS23XY="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"mTGwo2abZURZK84miv7oFlCjRaI=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"GiuOs+cFfnGWgSaWjB2lCNS23XY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ap9z4u1tJ8GiuuMblBR5vHjBAlc="},{"type":"next-occurrence","id":"ntt/DpoyVIdCcjy/MUedzpFt27Y="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"GiuOs+cFfnGWgSaWjB2lCNS23XY=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"ntt/DpoyVIdCcjy/MUedzpFt27Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ap9z4u1tJ8GiuuMblBR5vHjBAlc="},{"type":"next-occurrence","id":"aNFUR7al/xkG/tFbG60o77OGVv8="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"ntt/DpoyVIdCcjy/MUedzpFt27Y=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"aNFUR7al/xkG/tFbG60o77OGVv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ap9z4u1tJ8GiuuMblBR5vHjBAlc="},{"type":"next-occurrence","id":"FWepHPD9t5q88+FSJNmWrt9NcTM="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"aNFUR7al/xkG/tFbG60o77OGVv8=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"FWepHPD9t5q88+FSJNmWrt9NcTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ap9z4u1tJ8GiuuMblBR5vHjBAlc="},{"type":"next-occurrence","id":"B2WctQWpmpQa1Mlrl3GUeTb4/7I="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"FWepHPD9t5q88+FSJNmWrt9NcTM=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"B2WctQWpmpQa1Mlrl3GUeTb4/7I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ap9z4u1tJ8GiuuMblBR5vHjBAlc="},{"type":"next-occurrence","id":"iSCw+j+mpwD0PWHPESFt6cuW+wA="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"B2WctQWpmpQa1Mlrl3GUeTb4/7I=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"iSCw+j+mpwD0PWHPESFt6cuW+wA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ap9z4u1tJ8GiuuMblBR5vHjBAlc="},{"type":"next-occurrence","id":"rCllLL7WMu3ww9qUf3oFkf2+GGc="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"iSCw+j+mpwD0PWHPESFt6cuW+wA=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"rCllLL7WMu3ww9qUf3oFkf2+GGc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ap9z4u1tJ8GiuuMblBR5vHjBAlc="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"rCllLL7WMu3ww9qUf3oFkf2+GGc=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"HonjzRSt/2mVG6sexyrKeYExi8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[],"description":"Construction on I-495 both directions between Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only (New York) and Exit 29 - Springfield Boulevard (New York) Subject to change without notice., Monday June 1st,2026 thru Saturday June 6th,2026, Monday thru Friday, 11:00 PM thru 05:00 AM 2 Right lanes of 4 lanes closed eastbound, westbound","update_date":"2026-06-05T18:00:02Z"},"road_event_id":"HonjzRSt/2mVG6sexyrKeYExi8Y=","beginning_cross_street":"Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only","ending_cross_street":"Exit 29 - Springfield Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.771162,40.744269]]}},{"id":"3X+sVZFqczx9u+Kwx5na+aetvus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"guMT+NbvrxI/5qMg721R0lymuF0="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"3X+sVZFqczx9u+Kwx5na+aetvus=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"guMT+NbvrxI/5qMg721R0lymuF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3X+sVZFqczx9u+Kwx5na+aetvus="},{"type":"next-occurrence","id":"kMgQlaOqB5kvSOgWrfpZP3N7Rts="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"guMT+NbvrxI/5qMg721R0lymuF0=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"kMgQlaOqB5kvSOgWrfpZP3N7Rts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3X+sVZFqczx9u+Kwx5na+aetvus="},{"type":"next-occurrence","id":"Xi/Oz4rOqlF0OHADdEKuS63lzJs="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"kMgQlaOqB5kvSOgWrfpZP3N7Rts=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"Xi/Oz4rOqlF0OHADdEKuS63lzJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3X+sVZFqczx9u+Kwx5na+aetvus="},{"type":"next-occurrence","id":"O5soP1X1YapG7M1DjLCOdSAqlnY="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"Xi/Oz4rOqlF0OHADdEKuS63lzJs=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"O5soP1X1YapG7M1DjLCOdSAqlnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3X+sVZFqczx9u+Kwx5na+aetvus="},{"type":"next-occurrence","id":"BKHFq70zoEXlvqlZ5mthmMDHWns="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"O5soP1X1YapG7M1DjLCOdSAqlnY=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"BKHFq70zoEXlvqlZ5mthmMDHWns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3X+sVZFqczx9u+Kwx5na+aetvus="},{"type":"next-occurrence","id":"12S1PWbicloDaR8fQ/6a68JUJ5A="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"BKHFq70zoEXlvqlZ5mthmMDHWns=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"12S1PWbicloDaR8fQ/6a68JUJ5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3X+sVZFqczx9u+Kwx5na+aetvus="},{"type":"next-occurrence","id":"wMdQFcht0jBLqyYuCDqD20AG++8="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"12S1PWbicloDaR8fQ/6a68JUJ5A=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"wMdQFcht0jBLqyYuCDqD20AG++8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3X+sVZFqczx9u+Kwx5na+aetvus="},{"type":"next-occurrence","id":"C/FbSLn0lGdqu4J9lZvSX8mxG00="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"wMdQFcht0jBLqyYuCDqD20AG++8=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"C/FbSLn0lGdqu4J9lZvSX8mxG00=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3X+sVZFqczx9u+Kwx5na+aetvus="},{"type":"next-occurrence","id":"dF0qGf0CWT9cRiuevwCV9UtpNec="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"C/FbSLn0lGdqu4J9lZvSX8mxG00=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"dF0qGf0CWT9cRiuevwCV9UtpNec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3X+sVZFqczx9u+Kwx5na+aetvus="},{"type":"next-occurrence","id":"dm45JVFTn/o/W+qvs1HVUirM7CE="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"dF0qGf0CWT9cRiuevwCV9UtpNec=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"dm45JVFTn/o/W+qvs1HVUirM7CE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3X+sVZFqczx9u+Kwx5na+aetvus="},{"type":"next-occurrence","id":"DPN9/d5VUzUFviws75aN9s98rKU="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"dm45JVFTn/o/W+qvs1HVUirM7CE=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"DPN9/d5VUzUFviws75aN9s98rKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3X+sVZFqczx9u+Kwx5na+aetvus="},{"type":"next-occurrence","id":"/QLN05OWZHD7XAPzeOaD0el8oV0="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"DPN9/d5VUzUFviws75aN9s98rKU=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"/QLN05OWZHD7XAPzeOaD0el8oV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3X+sVZFqczx9u+Kwx5na+aetvus="},{"type":"next-occurrence","id":"PieiC8b1iuN3VpmX6xY8oiGk9+Y="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"/QLN05OWZHD7XAPzeOaD0el8oV0=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"PieiC8b1iuN3VpmX6xY8oiGk9+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3X+sVZFqczx9u+Kwx5na+aetvus="},{"type":"next-occurrence","id":"lobhvF0N005yuPws0Z3pMHMONws="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"PieiC8b1iuN3VpmX6xY8oiGk9+Y=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"lobhvF0N005yuPws0Z3pMHMONws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3X+sVZFqczx9u+Kwx5na+aetvus="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"lobhvF0N005yuPws0Z3pMHMONws=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"2+6ZJ7MuyoXFrFeKQV16W0onPQk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fj1gqo8dlXdvdoMsPZIFQeCS0pY="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"2+6ZJ7MuyoXFrFeKQV16W0onPQk=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"fj1gqo8dlXdvdoMsPZIFQeCS0pY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2+6ZJ7MuyoXFrFeKQV16W0onPQk="},{"type":"next-occurrence","id":"bHb9DMdMe0PJlNi5IHIdTJwAQ6A="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"fj1gqo8dlXdvdoMsPZIFQeCS0pY=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"bHb9DMdMe0PJlNi5IHIdTJwAQ6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2+6ZJ7MuyoXFrFeKQV16W0onPQk="},{"type":"next-occurrence","id":"cruWKU2FGECa0uawupL/HWVjzdc="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"bHb9DMdMe0PJlNi5IHIdTJwAQ6A=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"cruWKU2FGECa0uawupL/HWVjzdc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2+6ZJ7MuyoXFrFeKQV16W0onPQk="},{"type":"next-occurrence","id":"U4zVpsOWNIcxhjHQ7zOcMu7qHP8="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"cruWKU2FGECa0uawupL/HWVjzdc=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"U4zVpsOWNIcxhjHQ7zOcMu7qHP8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2+6ZJ7MuyoXFrFeKQV16W0onPQk="},{"type":"next-occurrence","id":"osd+hjrWSQE8CdqYUAPBopgT3IY="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"U4zVpsOWNIcxhjHQ7zOcMu7qHP8=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"osd+hjrWSQE8CdqYUAPBopgT3IY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2+6ZJ7MuyoXFrFeKQV16W0onPQk="},{"type":"next-occurrence","id":"eYVBnmuwZKliJouiHhcrtdvPzcQ="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"osd+hjrWSQE8CdqYUAPBopgT3IY=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"eYVBnmuwZKliJouiHhcrtdvPzcQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2+6ZJ7MuyoXFrFeKQV16W0onPQk="},{"type":"next-occurrence","id":"KdYarc5fw1NckaS6yBNFgKycoAs="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"eYVBnmuwZKliJouiHhcrtdvPzcQ=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"KdYarc5fw1NckaS6yBNFgKycoAs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2+6ZJ7MuyoXFrFeKQV16W0onPQk="},{"type":"next-occurrence","id":"FIjtBsepnQsmEJgRvLQLVb5yaQ0="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"KdYarc5fw1NckaS6yBNFgKycoAs=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"FIjtBsepnQsmEJgRvLQLVb5yaQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2+6ZJ7MuyoXFrFeKQV16W0onPQk="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"FIjtBsepnQsmEJgRvLQLVb5yaQ0=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"OExpbsuvetREBt5F2jJbxK2eVYU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qxRm1yeiARdFwTOmmfC/3ImzS1Q="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"OExpbsuvetREBt5F2jJbxK2eVYU=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"qxRm1yeiARdFwTOmmfC/3ImzS1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OExpbsuvetREBt5F2jJbxK2eVYU="},{"type":"next-occurrence","id":"TDugG7D5iPaN7QBujNFyZcRcHpw="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"qxRm1yeiARdFwTOmmfC/3ImzS1Q=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"TDugG7D5iPaN7QBujNFyZcRcHpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OExpbsuvetREBt5F2jJbxK2eVYU="},{"type":"next-occurrence","id":"kvZNqioHlZSf8s9ZJKOCi198agE="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"TDugG7D5iPaN7QBujNFyZcRcHpw=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"kvZNqioHlZSf8s9ZJKOCi198agE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OExpbsuvetREBt5F2jJbxK2eVYU="},{"type":"next-occurrence","id":"IcZOK9zndDUizPShKHArtIXUL6o="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"kvZNqioHlZSf8s9ZJKOCi198agE=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"IcZOK9zndDUizPShKHArtIXUL6o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OExpbsuvetREBt5F2jJbxK2eVYU="},{"type":"next-occurrence","id":"HzZqoCIRYkOR8g42mJRrsk7idko="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"IcZOK9zndDUizPShKHArtIXUL6o=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"HzZqoCIRYkOR8g42mJRrsk7idko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OExpbsuvetREBt5F2jJbxK2eVYU="},{"type":"next-occurrence","id":"MvuFhShgQeWW5XkAX7xnmjvOnMg="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"HzZqoCIRYkOR8g42mJRrsk7idko=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"MvuFhShgQeWW5XkAX7xnmjvOnMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OExpbsuvetREBt5F2jJbxK2eVYU="},{"type":"next-occurrence","id":"68JU3ktPi0Ob4EV5AOnXyB9mXlQ="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"MvuFhShgQeWW5XkAX7xnmjvOnMg=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"68JU3ktPi0Ob4EV5AOnXyB9mXlQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OExpbsuvetREBt5F2jJbxK2eVYU="},{"type":"next-occurrence","id":"5av45S43NVLsFSweX3BV6bjLw/A="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"68JU3ktPi0Ob4EV5AOnXyB9mXlQ=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"5av45S43NVLsFSweX3BV6bjLw/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OExpbsuvetREBt5F2jJbxK2eVYU="},{"type":"next-occurrence","id":"NsqJrr7Eumg7uH3EPOp/+Ooi9dg="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"5av45S43NVLsFSweX3BV6bjLw/A=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"NsqJrr7Eumg7uH3EPOp/+Ooi9dg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OExpbsuvetREBt5F2jJbxK2eVYU="},{"type":"next-occurrence","id":"Wzhe3nyjol2y2LlfwW0crM5GIyk="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"NsqJrr7Eumg7uH3EPOp/+Ooi9dg=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"Wzhe3nyjol2y2LlfwW0crM5GIyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OExpbsuvetREBt5F2jJbxK2eVYU="},{"type":"next-occurrence","id":"+g3bnEs3o3GQRkWKiBV9o0tyaho="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"Wzhe3nyjol2y2LlfwW0crM5GIyk=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"+g3bnEs3o3GQRkWKiBV9o0tyaho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OExpbsuvetREBt5F2jJbxK2eVYU="},{"type":"next-occurrence","id":"dCkO/q/dIXZC+vZ1mv3/BDu3Vhk="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"+g3bnEs3o3GQRkWKiBV9o0tyaho=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"dCkO/q/dIXZC+vZ1mv3/BDu3Vhk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OExpbsuvetREBt5F2jJbxK2eVYU="},{"type":"next-occurrence","id":"k+MSDam8eneaIojvuIJ9TRGXHg4="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"dCkO/q/dIXZC+vZ1mv3/BDu3Vhk=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"k+MSDam8eneaIojvuIJ9TRGXHg4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OExpbsuvetREBt5F2jJbxK2eVYU="},{"type":"next-occurrence","id":"yZYK2DxCRpplhL8IVlV17dwbHe0="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"k+MSDam8eneaIojvuIJ9TRGXHg4=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"yZYK2DxCRpplhL8IVlV17dwbHe0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OExpbsuvetREBt5F2jJbxK2eVYU="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"yZYK2DxCRpplhL8IVlV17dwbHe0=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"FiSfnfNQ0dZVZdRsk74SEOHbVko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PiyLgvun4LGR+lzWqtqwytdtxYc="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Tuesday April 14th,2026 thru Friday June 19th,2026, Monday thru Friday, 08:00 AM thru 03:00 PM right shoulder of 2 lanes closed northbound,","update_date":"2026-05-29T19:00:25Z"},"road_event_id":"FiSfnfNQ0dZVZdRsk74SEOHbVko=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T12:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"PiyLgvun4LGR+lzWqtqwytdtxYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FiSfnfNQ0dZVZdRsk74SEOHbVko="},{"type":"next-occurrence","id":"AFtqbeZGf0/1bulL2bvxyQiZUfI="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Tuesday April 14th,2026 thru Friday June 19th,2026, Monday thru Friday, 08:00 AM thru 03:00 PM right shoulder of 2 lanes closed northbound,","update_date":"2026-05-29T19:00:25Z"},"road_event_id":"PiyLgvun4LGR+lzWqtqwytdtxYc=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"AFtqbeZGf0/1bulL2bvxyQiZUfI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FiSfnfNQ0dZVZdRsk74SEOHbVko="},{"type":"next-occurrence","id":"WRknqcqVL/pBRNl+4Hj0/ncRgag="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Tuesday April 14th,2026 thru Friday June 19th,2026, Monday thru Friday, 08:00 AM thru 03:00 PM right shoulder of 2 lanes closed northbound,","update_date":"2026-05-29T19:00:25Z"},"road_event_id":"AFtqbeZGf0/1bulL2bvxyQiZUfI=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"WRknqcqVL/pBRNl+4Hj0/ncRgag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FiSfnfNQ0dZVZdRsk74SEOHbVko="},{"type":"next-occurrence","id":"1iFc9gkiYXUHB7tbi3Pcw+fqtsk="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Tuesday April 14th,2026 thru Friday June 19th,2026, Monday thru Friday, 08:00 AM thru 03:00 PM right shoulder of 2 lanes closed northbound,","update_date":"2026-05-29T19:00:25Z"},"road_event_id":"WRknqcqVL/pBRNl+4Hj0/ncRgag=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"1iFc9gkiYXUHB7tbi3Pcw+fqtsk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FiSfnfNQ0dZVZdRsk74SEOHbVko="},{"type":"next-occurrence","id":"Jp6s+UdQS5ZhmUvucPzvXcAUyrI="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Tuesday April 14th,2026 thru Friday June 19th,2026, Monday thru Friday, 08:00 AM thru 03:00 PM right shoulder of 2 lanes closed northbound,","update_date":"2026-05-29T19:00:25Z"},"road_event_id":"1iFc9gkiYXUHB7tbi3Pcw+fqtsk=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"Jp6s+UdQS5ZhmUvucPzvXcAUyrI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FiSfnfNQ0dZVZdRsk74SEOHbVko="},{"type":"next-occurrence","id":"IrWA2yzVxYGD9lFawFZ4yk57C98="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Tuesday April 14th,2026 thru Friday June 19th,2026, Monday thru Friday, 08:00 AM thru 03:00 PM right shoulder of 2 lanes closed northbound,","update_date":"2026-05-29T19:00:25Z"},"road_event_id":"Jp6s+UdQS5ZhmUvucPzvXcAUyrI=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"IrWA2yzVxYGD9lFawFZ4yk57C98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FiSfnfNQ0dZVZdRsk74SEOHbVko="},{"type":"next-occurrence","id":"ACVT713c5J43E8jL8MhLpVb9Vbw="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Tuesday April 14th,2026 thru Friday June 19th,2026, Monday thru Friday, 08:00 AM thru 03:00 PM right shoulder of 2 lanes closed northbound,","update_date":"2026-05-29T19:00:25Z"},"road_event_id":"IrWA2yzVxYGD9lFawFZ4yk57C98=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T12:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"ACVT713c5J43E8jL8MhLpVb9Vbw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FiSfnfNQ0dZVZdRsk74SEOHbVko="},{"type":"next-occurrence","id":"v1NACADk3Xbf4klWxPK74hMF2g8="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Tuesday April 14th,2026 thru Friday June 19th,2026, Monday thru Friday, 08:00 AM thru 03:00 PM right shoulder of 2 lanes closed northbound,","update_date":"2026-05-29T19:00:25Z"},"road_event_id":"ACVT713c5J43E8jL8MhLpVb9Vbw=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T12:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"v1NACADk3Xbf4klWxPK74hMF2g8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FiSfnfNQ0dZVZdRsk74SEOHbVko="},{"type":"next-occurrence","id":"mWRlqqXzhwGBdx/oElYjhGunICY="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Tuesday April 14th,2026 thru Friday June 19th,2026, Monday thru Friday, 08:00 AM thru 03:00 PM right shoulder of 2 lanes closed northbound,","update_date":"2026-05-29T19:00:25Z"},"road_event_id":"v1NACADk3Xbf4klWxPK74hMF2g8=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T12:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"mWRlqqXzhwGBdx/oElYjhGunICY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FiSfnfNQ0dZVZdRsk74SEOHbVko="},{"type":"next-occurrence","id":"J8hTIp+otNVcqPy28okeZZwsvN0="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Tuesday April 14th,2026 thru Friday June 19th,2026, Monday thru Friday, 08:00 AM thru 03:00 PM right shoulder of 2 lanes closed northbound,","update_date":"2026-05-29T19:00:25Z"},"road_event_id":"mWRlqqXzhwGBdx/oElYjhGunICY=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T12:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"J8hTIp+otNVcqPy28okeZZwsvN0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FiSfnfNQ0dZVZdRsk74SEOHbVko="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Tuesday April 14th,2026 thru Friday June 19th,2026, Monday thru Friday, 08:00 AM thru 03:00 PM right shoulder of 2 lanes closed northbound,","update_date":"2026-05-29T19:00:25Z"},"road_event_id":"J8hTIp+otNVcqPy28okeZZwsvN0=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T12:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"LwmFF1Z5LYLqzKIGNWh4w1dp9QU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on NY 52 both directions between Brookside Farms Road (Newburgh) and 5th Avenue (Newburgh) D265160/B1026780/32112309 - 24/7 RIGHT LANE CLOSURE - Plan travel accordingly; delays may exist, Continuous Tuesday May 26th, 2026 12:00 AM thru Saturday June 20th, 2026 12:00 AM right lane and shoulder closed to traffic","update_date":"2026-05-22T04:00:42Z"},"road_event_id":"LwmFF1Z5LYLqzKIGNWh4w1dp9QU=","beginning_cross_street":"Brookside Farms Road","ending_cross_street":"5th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049278,41.513025]]}},{"id":"06bBDR4FdNFvtzCs85IUCnKaTxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-190"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on I-190 southbound US 62; Niagara Falls Boulevard (Niagara Falls) to Buffalo Avenue; NY 384 (Niagara Falls), Thursday April 16th, 2026 thru Wednesday March 31st, 2027, Sunday thru Saturday, 12:00 AM thru 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-28T13:56:03Z"},"road_event_id":"06bBDR4FdNFvtzCs85IUCnKaTxo=","beginning_cross_street":"US 62; Niagara Falls Boulevard","ending_cross_street":"Buffalo Avenue; NY 384","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.990228,43.090367]]}},{"id":"+43SDaZGksz4+y7VN60etHCelU0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 62"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 62 southbound Builders Way (Niagara Falls) to I-190 Niagara Expressway (Niagara Falls), Monday April 20th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-28T13:56:31Z"},"road_event_id":"+43SDaZGksz4+y7VN60etHCelU0=","beginning_cross_street":"Builders Way","ending_cross_street":"I-190 Niagara Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.991402,43.089752]]}},{"id":"cBaKpevbDXhLU8OlP/wQIZBwTzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 20 westbound between Pine Ridge Rd (Sennett) and Walker Rd (Sennett), Continuous Monday April 20th, 2026 07:00 AM thru Tuesday July 21st, 2026 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T16:21:27Z"},"road_event_id":"cBaKpevbDXhLU8OlP/wQIZBwTzc=","beginning_cross_street":"Pine Ridge Rd ","ending_cross_street":"Walker Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.506805,42.938441]]}},{"id":"O+L+3KwTG1vCZUuZg5kcvR8GcOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HbicbMxkU3hdMKGblQBdy1YxpyE="}],"description":"Road rehabilitation on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/NIGHT/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 12th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, various lane closures","update_date":"2026-06-05T10:00:17Z"},"road_event_id":"O+L+3KwTG1vCZUuZg5kcvR8GcOc=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T01:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027755]]}},{"id":"HbicbMxkU3hdMKGblQBdy1YxpyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O+L+3KwTG1vCZUuZg5kcvR8GcOc="},{"type":"next-occurrence","id":"tRRhE5hLYr+fyS3FdKy8FvON5j4="}],"description":"Road rehabilitation on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/NIGHT/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 12th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, various lane closures","update_date":"2026-06-05T10:00:17Z"},"road_event_id":"HbicbMxkU3hdMKGblQBdy1YxpyE=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027755]]}},{"id":"tRRhE5hLYr+fyS3FdKy8FvON5j4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O+L+3KwTG1vCZUuZg5kcvR8GcOc="},{"type":"next-occurrence","id":"w55CH4S8lbFEySC5oeBKC0B/KVo="}],"description":"Road rehabilitation on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/NIGHT/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 12th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, various lane closures","update_date":"2026-06-05T10:00:17Z"},"road_event_id":"tRRhE5hLYr+fyS3FdKy8FvON5j4=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027755]]}},{"id":"w55CH4S8lbFEySC5oeBKC0B/KVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O+L+3KwTG1vCZUuZg5kcvR8GcOc="},{"type":"next-occurrence","id":"33NegxR8XghJ5E/SY8cRB3DA9mA="}],"description":"Road rehabilitation on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/NIGHT/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 12th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, various lane closures","update_date":"2026-06-05T10:00:17Z"},"road_event_id":"w55CH4S8lbFEySC5oeBKC0B/KVo=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027755]]}},{"id":"33NegxR8XghJ5E/SY8cRB3DA9mA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O+L+3KwTG1vCZUuZg5kcvR8GcOc="}],"description":"Road rehabilitation on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/NIGHT/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 12th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, various lane closures","update_date":"2026-06-05T10:00:17Z"},"road_event_id":"33NegxR8XghJ5E/SY8cRB3DA9mA=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027755]]}},{"id":"81fwUWlUCo97ZOcUvv2ix8jUWwA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M20 Bus and M7 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction southbound, M20 Bus and M7 Bus bypassing 7 Av/W 28 St (New York) Use the stop on 7th Ave at W 25th St due to Water Main Replacement., Continuous Saturday April 18th, 2026 12:00 AM thru Friday July 10th, 2026 11:59 PM","update_date":"2026-04-17T16:59:33Z"},"road_event_id":"81fwUWlUCo97ZOcUvv2ix8jUWwA=","beginning_cross_street":"7 Av/W 28 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.993637,40.747035]]}},{"id":"sk345x+DQNShXC+dMQBltr4gyEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M15 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, M15 Bus bypassing South St/Whitehall St (New York) The first and last stops will be made on Water St at Whitehall St. , Continuous Saturday April 18th, 2026 12:00 AM thru Friday July 31st, 2026 11:59 PM","update_date":"2026-04-17T16:57:57Z"},"road_event_id":"sk345x+DQNShXC+dMQBltr4gyEk=","beginning_cross_street":"South St/Whitehall St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.012226,40.701609]]}},{"id":"iL9HBQi7Vo+Mo5dROIXdhtrdsIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zJYalQqtEDJYeFXpQRl04qNUBuo="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Bradhurst Avenue - NY 100 (Mount Pleasant) and Grasslands Road - NY 100C (Greenburgh) D264324/DAY/B1070500/32429709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane","update_date":"2026-06-05T16:00:35Z"},"road_event_id":"iL9HBQi7Vo+Mo5dROIXdhtrdsIk=","beginning_cross_street":"Bradhurst Avenue - NY 100","ending_cross_street":"Grasslands Road - NY 100C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80348,41.090234]]}},{"id":"zJYalQqtEDJYeFXpQRl04qNUBuo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iL9HBQi7Vo+Mo5dROIXdhtrdsIk="},{"type":"next-occurrence","id":"ju73bTxBCehioHJmN5Ghaw9S2bg="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Bradhurst Avenue - NY 100 (Mount Pleasant) and Grasslands Road - NY 100C (Greenburgh) D264324/DAY/B1070500/32429709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane","update_date":"2026-06-05T16:00:35Z"},"road_event_id":"zJYalQqtEDJYeFXpQRl04qNUBuo=","beginning_cross_street":"Bradhurst Avenue - NY 100","ending_cross_street":"Grasslands Road - NY 100C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80348,41.090234]]}},{"id":"ju73bTxBCehioHJmN5Ghaw9S2bg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iL9HBQi7Vo+Mo5dROIXdhtrdsIk="},{"type":"next-occurrence","id":"k2NiDulGjFWCLzfq30RnMXItHq8="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Bradhurst Avenue - NY 100 (Mount Pleasant) and Grasslands Road - NY 100C (Greenburgh) D264324/DAY/B1070500/32429709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane","update_date":"2026-06-05T16:00:35Z"},"road_event_id":"ju73bTxBCehioHJmN5Ghaw9S2bg=","beginning_cross_street":"Bradhurst Avenue - NY 100","ending_cross_street":"Grasslands Road - NY 100C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80348,41.090234]]}},{"id":"k2NiDulGjFWCLzfq30RnMXItHq8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iL9HBQi7Vo+Mo5dROIXdhtrdsIk="},{"type":"next-occurrence","id":"ZWHdFzNYpUtU539eks7QW5wgTV4="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Bradhurst Avenue - NY 100 (Mount Pleasant) and Grasslands Road - NY 100C (Greenburgh) D264324/DAY/B1070500/32429709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane","update_date":"2026-06-05T16:00:35Z"},"road_event_id":"k2NiDulGjFWCLzfq30RnMXItHq8=","beginning_cross_street":"Bradhurst Avenue - NY 100","ending_cross_street":"Grasslands Road - NY 100C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80348,41.090234]]}},{"id":"ZWHdFzNYpUtU539eks7QW5wgTV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iL9HBQi7Vo+Mo5dROIXdhtrdsIk="},{"type":"next-occurrence","id":"7sKd2NzslrjrnMKR+XtWzv6QsD0="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Bradhurst Avenue - NY 100 (Mount Pleasant) and Grasslands Road - NY 100C (Greenburgh) D264324/DAY/B1070500/32429709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane","update_date":"2026-06-05T16:00:35Z"},"road_event_id":"ZWHdFzNYpUtU539eks7QW5wgTV4=","beginning_cross_street":"Bradhurst Avenue - NY 100","ending_cross_street":"Grasslands Road - NY 100C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80348,41.090234]]}},{"id":"7sKd2NzslrjrnMKR+XtWzv6QsD0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iL9HBQi7Vo+Mo5dROIXdhtrdsIk="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Bradhurst Avenue - NY 100 (Mount Pleasant) and Grasslands Road - NY 100C (Greenburgh) D264324/DAY/B1070500/32429709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane","update_date":"2026-06-05T16:00:35Z"},"road_event_id":"7sKd2NzslrjrnMKR+XtWzv6QsD0=","beginning_cross_street":"Bradhurst Avenue - NY 100","ending_cross_street":"Grasslands Road - NY 100C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80348,41.090234]]}},{"id":"plRXI5gMxlUm907bN4NWJP02JuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MJJX+i5KgX0SFlOFyl4b3VPGDzs="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy northbound between Grasslands Road - NY 100C (Greenburgh) and Taconic State Parkway (Mount Pleasant) D264324/DAY/B1070500/32429809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T16:01:17Z"},"road_event_id":"plRXI5gMxlUm907bN4NWJP02JuQ=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803218,41.09032]]}},{"id":"MJJX+i5KgX0SFlOFyl4b3VPGDzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"plRXI5gMxlUm907bN4NWJP02JuQ="},{"type":"next-occurrence","id":"vwB9nPL0u0ZufOzFYPeHnc2xGgk="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy northbound between Grasslands Road - NY 100C (Greenburgh) and Taconic State Parkway (Mount Pleasant) D264324/DAY/B1070500/32429809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T16:01:17Z"},"road_event_id":"MJJX+i5KgX0SFlOFyl4b3VPGDzs=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803218,41.09032]]}},{"id":"vwB9nPL0u0ZufOzFYPeHnc2xGgk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"plRXI5gMxlUm907bN4NWJP02JuQ="},{"type":"next-occurrence","id":"6xteH9hUO8kjbBLFeBKJ91U3SlQ="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy northbound between Grasslands Road - NY 100C (Greenburgh) and Taconic State Parkway (Mount Pleasant) D264324/DAY/B1070500/32429809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T16:01:17Z"},"road_event_id":"vwB9nPL0u0ZufOzFYPeHnc2xGgk=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803218,41.09032]]}},{"id":"6xteH9hUO8kjbBLFeBKJ91U3SlQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"plRXI5gMxlUm907bN4NWJP02JuQ="},{"type":"next-occurrence","id":"3SsCIA9eKSWjvkcoNr5I4HPbcbE="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy northbound between Grasslands Road - NY 100C (Greenburgh) and Taconic State Parkway (Mount Pleasant) D264324/DAY/B1070500/32429809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T16:01:17Z"},"road_event_id":"6xteH9hUO8kjbBLFeBKJ91U3SlQ=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803218,41.09032]]}},{"id":"3SsCIA9eKSWjvkcoNr5I4HPbcbE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"plRXI5gMxlUm907bN4NWJP02JuQ="},{"type":"next-occurrence","id":"3cRfD/FK2YRt7svZIA3SCCActsE="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy northbound between Grasslands Road - NY 100C (Greenburgh) and Taconic State Parkway (Mount Pleasant) D264324/DAY/B1070500/32429809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T16:01:17Z"},"road_event_id":"3SsCIA9eKSWjvkcoNr5I4HPbcbE=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803218,41.09032]]}},{"id":"3cRfD/FK2YRt7svZIA3SCCActsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"plRXI5gMxlUm907bN4NWJP02JuQ="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy northbound between Grasslands Road - NY 100C (Greenburgh) and Taconic State Parkway (Mount Pleasant) D264324/DAY/B1070500/32429809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T16:01:17Z"},"road_event_id":"3cRfD/FK2YRt7svZIA3SCCActsE=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803218,41.09032]]}},{"id":"jg/a6QMhJf69whBTCoXZFUwFJTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["107 Bus and 37 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, 107 Bus and 37 Bus at Frelinghuysen Ave At Noble St (Newark) relinghuysen Avenue, northbound, at Noble Street, Far Side (MyBus #18611), Continuous Monday April 27th, 2026 12:00 AM thru Tuesday June 16th, 2026 11:59 PM","update_date":"2026-04-17T18:16:22Z"},"road_event_id":"jg/a6QMhJf69whBTCoXZFUwFJTM=","beginning_cross_street":"Frelinghuysen Ave At Noble St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-17T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.193813,40.704979]]}},{"id":"2cyL2ZruH+84lF/99gCPG23AZB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OJ82rzVRcqVElHb+jcEDdpEFbGc="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"2cyL2ZruH+84lF/99gCPG23AZB8=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"OJ82rzVRcqVElHb+jcEDdpEFbGc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2cyL2ZruH+84lF/99gCPG23AZB8="},{"type":"next-occurrence","id":"Xq6jSruqS5aUbPu0X/QMT0oEGfE="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"OJ82rzVRcqVElHb+jcEDdpEFbGc=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"Xq6jSruqS5aUbPu0X/QMT0oEGfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2cyL2ZruH+84lF/99gCPG23AZB8="},{"type":"next-occurrence","id":"IcDyvBAWEGIz0LCobD4co34ww+k="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"Xq6jSruqS5aUbPu0X/QMT0oEGfE=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"IcDyvBAWEGIz0LCobD4co34ww+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2cyL2ZruH+84lF/99gCPG23AZB8="},{"type":"next-occurrence","id":"GzHmUOGxvyX2TWvCeuSj9xcTl3g="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"IcDyvBAWEGIz0LCobD4co34ww+k=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"GzHmUOGxvyX2TWvCeuSj9xcTl3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2cyL2ZruH+84lF/99gCPG23AZB8="},{"type":"next-occurrence","id":"G02SI1gNoGk8+dprNJ1GzIoKjCo="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"GzHmUOGxvyX2TWvCeuSj9xcTl3g=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"G02SI1gNoGk8+dprNJ1GzIoKjCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2cyL2ZruH+84lF/99gCPG23AZB8="},{"type":"next-occurrence","id":"jb+NkcFDRwRHEoo+ObK/bqtUQNM="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"G02SI1gNoGk8+dprNJ1GzIoKjCo=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"jb+NkcFDRwRHEoo+ObK/bqtUQNM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2cyL2ZruH+84lF/99gCPG23AZB8="},{"type":"next-occurrence","id":"GVOlMNhEcvsTjVSwgtE7NAFmH/M="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"jb+NkcFDRwRHEoo+ObK/bqtUQNM=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"GVOlMNhEcvsTjVSwgtE7NAFmH/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2cyL2ZruH+84lF/99gCPG23AZB8="},{"type":"next-occurrence","id":"6vpWuXdH4n/Zp1aEu73A+qgi36w="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"GVOlMNhEcvsTjVSwgtE7NAFmH/M=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"6vpWuXdH4n/Zp1aEu73A+qgi36w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2cyL2ZruH+84lF/99gCPG23AZB8="},{"type":"next-occurrence","id":"mwnskl40Sxn7PkKt1cMA4chW1Hg="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"6vpWuXdH4n/Zp1aEu73A+qgi36w=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"mwnskl40Sxn7PkKt1cMA4chW1Hg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2cyL2ZruH+84lF/99gCPG23AZB8="},{"type":"next-occurrence","id":"ffoKOvzBMQq01eZNOi6sRy+3Y+g="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"mwnskl40Sxn7PkKt1cMA4chW1Hg=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"ffoKOvzBMQq01eZNOi6sRy+3Y+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2cyL2ZruH+84lF/99gCPG23AZB8="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"ffoKOvzBMQq01eZNOi6sRy+3Y+g=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"2m33GQpI5G2Mvax/eH7EdawXZX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CRvnur7nzNgrOEKalbsV3yAmZiA="}],"description":"Escalator Work on E Line and F line both directions at 5 Av/53 St (New York) Enter at 5 Av only. Madison Av entrance will be exit only. Also, 5 Av/53 St E line and F line is exit only during weekday AM rush hours Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only. The Madison Av side will remain closed at all times., Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 15th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 22nd,2026 thru Friday June 26th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 29th,2026 thru Friday July 3rd,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 13th,2026 thru Friday July 17th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-06-05T14:30:20Z"},"road_event_id":"2m33GQpI5G2Mvax/eH7EdawXZX0=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T14:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"CRvnur7nzNgrOEKalbsV3yAmZiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2m33GQpI5G2Mvax/eH7EdawXZX0="},{"type":"next-occurrence","id":"gqYvOQkjzpm4EQmVoasbHfHvAdU="}],"description":"Escalator Work on E Line and F line both directions at 5 Av/53 St (New York) Enter at 5 Av only. Madison Av entrance will be exit only. Also, 5 Av/53 St E line and F line is exit only during weekday AM rush hours Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only. The Madison Av side will remain closed at all times., Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 15th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 22nd,2026 thru Friday June 26th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 29th,2026 thru Friday July 3rd,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 13th,2026 thru Friday July 17th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-06-05T14:30:20Z"},"road_event_id":"CRvnur7nzNgrOEKalbsV3yAmZiA=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T14:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"gqYvOQkjzpm4EQmVoasbHfHvAdU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2m33GQpI5G2Mvax/eH7EdawXZX0="},{"type":"next-occurrence","id":"OOHlq/Af+IKVwHdJvYvfZ7xFy8g="}],"description":"Escalator Work on E Line and F line both directions at 5 Av/53 St (New York) Enter at 5 Av only. Madison Av entrance will be exit only. Also, 5 Av/53 St E line and F line is exit only during weekday AM rush hours Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only. The Madison Av side will remain closed at all times., Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 15th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 22nd,2026 thru Friday June 26th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 29th,2026 thru Friday July 3rd,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 13th,2026 thru Friday July 17th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-06-05T14:30:20Z"},"road_event_id":"gqYvOQkjzpm4EQmVoasbHfHvAdU=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T14:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"OOHlq/Af+IKVwHdJvYvfZ7xFy8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2m33GQpI5G2Mvax/eH7EdawXZX0="},{"type":"next-occurrence","id":"jPlTmLEe6ui1rqeWDbT+b+pkuB8="}],"description":"Escalator Work on E Line and F line both directions at 5 Av/53 St (New York) Enter at 5 Av only. Madison Av entrance will be exit only. Also, 5 Av/53 St E line and F line is exit only during weekday AM rush hours Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only. The Madison Av side will remain closed at all times., Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 15th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 22nd,2026 thru Friday June 26th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 29th,2026 thru Friday July 3rd,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 13th,2026 thru Friday July 17th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-06-05T14:30:20Z"},"road_event_id":"OOHlq/Af+IKVwHdJvYvfZ7xFy8g=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T14:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"jPlTmLEe6ui1rqeWDbT+b+pkuB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2m33GQpI5G2Mvax/eH7EdawXZX0="},{"type":"next-occurrence","id":"f4hq4OFlgOB2Wsl4/xgQcwnVGBI="}],"description":"Escalator Work on E Line and F line both directions at 5 Av/53 St (New York) Enter at 5 Av only. Madison Av entrance will be exit only. Also, 5 Av/53 St E line and F line is exit only during weekday AM rush hours Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only. The Madison Av side will remain closed at all times., Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 15th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 22nd,2026 thru Friday June 26th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 29th,2026 thru Friday July 3rd,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 13th,2026 thru Friday July 17th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-06-05T14:30:20Z"},"road_event_id":"jPlTmLEe6ui1rqeWDbT+b+pkuB8=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T14:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"f4hq4OFlgOB2Wsl4/xgQcwnVGBI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2m33GQpI5G2Mvax/eH7EdawXZX0="},{"type":"next-occurrence","id":"gSnYhVjBAkh2j0j70WMDMsWc+AU="}],"description":"Escalator Work on E Line and F line both directions at 5 Av/53 St (New York) Enter at 5 Av only. Madison Av entrance will be exit only. Also, 5 Av/53 St E line and F line is exit only during weekday AM rush hours Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only. The Madison Av side will remain closed at all times., Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 15th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 22nd,2026 thru Friday June 26th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 29th,2026 thru Friday July 3rd,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 13th,2026 thru Friday July 17th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-06-05T14:30:20Z"},"road_event_id":"f4hq4OFlgOB2Wsl4/xgQcwnVGBI=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T14:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"gSnYhVjBAkh2j0j70WMDMsWc+AU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2m33GQpI5G2Mvax/eH7EdawXZX0="},{"type":"next-occurrence","id":"0ZXuOP1GbarCpV4+DDnqRMElH94="}],"description":"Escalator Work on E Line and F line both directions at 5 Av/53 St (New York) Enter at 5 Av only. Madison Av entrance will be exit only. Also, 5 Av/53 St E line and F line is exit only during weekday AM rush hours Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only. The Madison Av side will remain closed at all times., Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 15th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 22nd,2026 thru Friday June 26th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 29th,2026 thru Friday July 3rd,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 13th,2026 thru Friday July 17th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-06-05T14:30:20Z"},"road_event_id":"gSnYhVjBAkh2j0j70WMDMsWc+AU=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T14:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"0ZXuOP1GbarCpV4+DDnqRMElH94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2m33GQpI5G2Mvax/eH7EdawXZX0="},{"type":"next-occurrence","id":"Ku/eH9toIvYcEHlfjD/9zGG7hnY="}],"description":"Escalator Work on E Line and F line both directions at 5 Av/53 St (New York) Enter at 5 Av only. Madison Av entrance will be exit only. Also, 5 Av/53 St E line and F line is exit only during weekday AM rush hours Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only. The Madison Av side will remain closed at all times., Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 15th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 22nd,2026 thru Friday June 26th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 29th,2026 thru Friday July 3rd,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 13th,2026 thru Friday July 17th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-06-05T14:30:20Z"},"road_event_id":"0ZXuOP1GbarCpV4+DDnqRMElH94=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T14:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"Ku/eH9toIvYcEHlfjD/9zGG7hnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2m33GQpI5G2Mvax/eH7EdawXZX0="},{"type":"next-occurrence","id":"LZjdZtzbp4mCm32TOyAXHRMUC84="}],"description":"Escalator Work on E Line and F line both directions at 5 Av/53 St (New York) Enter at 5 Av only. Madison Av entrance will be exit only. Also, 5 Av/53 St E line and F line is exit only during weekday AM rush hours Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only. The Madison Av side will remain closed at all times., Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 15th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 22nd,2026 thru Friday June 26th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 29th,2026 thru Friday July 3rd,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 13th,2026 thru Friday July 17th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-06-05T14:30:20Z"},"road_event_id":"Ku/eH9toIvYcEHlfjD/9zGG7hnY=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T14:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"LZjdZtzbp4mCm32TOyAXHRMUC84=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2m33GQpI5G2Mvax/eH7EdawXZX0="}],"description":"Escalator Work on E Line and F line both directions at 5 Av/53 St (New York) Enter at 5 Av only. Madison Av entrance will be exit only. Also, 5 Av/53 St E line and F line is exit only during weekday AM rush hours Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only. The Madison Av side will remain closed at all times., Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 15th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 22nd,2026 thru Friday June 26th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday June 29th,2026 thru Friday July 3rd,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday July 13th,2026 thru Friday July 17th,2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-06-05T14:30:20Z"},"road_event_id":"LZjdZtzbp4mCm32TOyAXHRMUC84=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T14:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"JsG321W5eoXxvTDA9A2Ndo9Eda4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Installation of sign structure on I-690 westbound between Exit 19N-19A; NY 635;Thompson Rd. (De Witt) and NY 635; Thompson Rd. overpass (Syracuse), Continuous Tuesday April 21st, 2026 09:00 AM thru Wednesday July 1st, 2026 03:00 PM right shoulder closed","update_date":"2026-05-12T13:10:10Z"},"road_event_id":"JsG321W5eoXxvTDA9A2Ndo9Eda4=","beginning_cross_street":"Exit 19N-19A; NY 635;Thompson Rd. ","ending_cross_street":"NY 635; Thompson Rd. overpass","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.073934,43.05783]]}},{"id":"bA5RnSygeMnM62tBXQEcbhLfXS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0/hBmwDnl8TEDhePuviFpK5TkLs="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"bA5RnSygeMnM62tBXQEcbhLfXS4=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"0/hBmwDnl8TEDhePuviFpK5TkLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bA5RnSygeMnM62tBXQEcbhLfXS4="},{"type":"next-occurrence","id":"Iqn4gSmgSS4CT/4wdpOaEnGgHcQ="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"0/hBmwDnl8TEDhePuviFpK5TkLs=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"Iqn4gSmgSS4CT/4wdpOaEnGgHcQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bA5RnSygeMnM62tBXQEcbhLfXS4="},{"type":"next-occurrence","id":"QSTMsoyqA1q8umZgtMfgUCTbhn4="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"Iqn4gSmgSS4CT/4wdpOaEnGgHcQ=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"QSTMsoyqA1q8umZgtMfgUCTbhn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bA5RnSygeMnM62tBXQEcbhLfXS4="},{"type":"next-occurrence","id":"aONnIm/KejAf/TN0ZS17HMKyNxo="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"QSTMsoyqA1q8umZgtMfgUCTbhn4=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"aONnIm/KejAf/TN0ZS17HMKyNxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bA5RnSygeMnM62tBXQEcbhLfXS4="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"aONnIm/KejAf/TN0ZS17HMKyNxo=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"bQiJN18OQuJYuJLBAf0SmPMw0Js=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1we90hThYBcmVc7MYVmM1YFrMf0="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"bQiJN18OQuJYuJLBAf0SmPMw0Js=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:30:00Z","end_date":"2026-06-06T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"1we90hThYBcmVc7MYVmM1YFrMf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQiJN18OQuJYuJLBAf0SmPMw0Js="},{"type":"next-occurrence","id":"tCejkojMet+QrQ2Na3i1ymy+S60="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"1we90hThYBcmVc7MYVmM1YFrMf0=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T03:30:00Z","end_date":"2026-06-07T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"tCejkojMet+QrQ2Na3i1ymy+S60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQiJN18OQuJYuJLBAf0SmPMw0Js="},{"type":"next-occurrence","id":"sALonGfsdp/opbs+72B9Ih+/VIQ="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"tCejkojMet+QrQ2Na3i1ymy+S60=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T03:30:00Z","end_date":"2026-06-08T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"sALonGfsdp/opbs+72B9Ih+/VIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQiJN18OQuJYuJLBAf0SmPMw0Js="},{"type":"next-occurrence","id":"So6GWFkiTxBbhKjTCNjkegPJFow="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"sALonGfsdp/opbs+72B9Ih+/VIQ=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T03:30:00Z","end_date":"2026-06-09T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"So6GWFkiTxBbhKjTCNjkegPJFow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQiJN18OQuJYuJLBAf0SmPMw0Js="},{"type":"next-occurrence","id":"VqMdmRnxdg7S2hIkVAbJm7TeddQ="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"So6GWFkiTxBbhKjTCNjkegPJFow=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T03:30:00Z","end_date":"2026-06-10T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"VqMdmRnxdg7S2hIkVAbJm7TeddQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQiJN18OQuJYuJLBAf0SmPMw0Js="},{"type":"next-occurrence","id":"edbQvHR6U727axjNe7Nl4yAk+tw="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"VqMdmRnxdg7S2hIkVAbJm7TeddQ=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T03:30:00Z","end_date":"2026-06-11T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"edbQvHR6U727axjNe7Nl4yAk+tw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQiJN18OQuJYuJLBAf0SmPMw0Js="},{"type":"next-occurrence","id":"kD/tFITlpHfplTyje3vwivxNHrY="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"edbQvHR6U727axjNe7Nl4yAk+tw=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T03:30:00Z","end_date":"2026-06-12T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"kD/tFITlpHfplTyje3vwivxNHrY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQiJN18OQuJYuJLBAf0SmPMw0Js="},{"type":"next-occurrence","id":"vv13N4jsQ4CyorNR00N17R3OOTg="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"kD/tFITlpHfplTyje3vwivxNHrY=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T03:30:00Z","end_date":"2026-06-13T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"vv13N4jsQ4CyorNR00N17R3OOTg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQiJN18OQuJYuJLBAf0SmPMw0Js="},{"type":"next-occurrence","id":"+v7wl6SIxjp8JgLfPYm6tO5HfYA="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"vv13N4jsQ4CyorNR00N17R3OOTg=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T03:30:00Z","end_date":"2026-06-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"+v7wl6SIxjp8JgLfPYm6tO5HfYA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQiJN18OQuJYuJLBAf0SmPMw0Js="},{"type":"next-occurrence","id":"qG9w8+HN/gr1nwznr3RZwEm67o0="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"+v7wl6SIxjp8JgLfPYm6tO5HfYA=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T03:30:00Z","end_date":"2026-06-15T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"qG9w8+HN/gr1nwznr3RZwEm67o0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQiJN18OQuJYuJLBAf0SmPMw0Js="},{"type":"next-occurrence","id":"3Gcu49m5o6ONOEw8AO3Ba5Z8O6Q="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"qG9w8+HN/gr1nwznr3RZwEm67o0=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T03:30:00Z","end_date":"2026-06-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"3Gcu49m5o6ONOEw8AO3Ba5Z8O6Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQiJN18OQuJYuJLBAf0SmPMw0Js="},{"type":"next-occurrence","id":"alvIVZ0N2jTsb+DRRdYLVY1v3rM="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"3Gcu49m5o6ONOEw8AO3Ba5Z8O6Q=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T03:30:00Z","end_date":"2026-06-17T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"alvIVZ0N2jTsb+DRRdYLVY1v3rM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQiJN18OQuJYuJLBAf0SmPMw0Js="},{"type":"next-occurrence","id":"Spmtkxho/B/8rlfkvBEhpwowRwc="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"alvIVZ0N2jTsb+DRRdYLVY1v3rM=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T03:30:00Z","end_date":"2026-06-18T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"Spmtkxho/B/8rlfkvBEhpwowRwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQiJN18OQuJYuJLBAf0SmPMw0Js="},{"type":"next-occurrence","id":"eZWSLIG3uRkhW0LnfU+XKNFoKk0="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"Spmtkxho/B/8rlfkvBEhpwowRwc=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T03:30:00Z","end_date":"2026-06-19T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"eZWSLIG3uRkhW0LnfU+XKNFoKk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQiJN18OQuJYuJLBAf0SmPMw0Js="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"eZWSLIG3uRkhW0LnfU+XKNFoKk0=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T03:30:00Z","end_date":"2026-06-20T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"yDC/byqxHmqJNSAmh4UE6y91e1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on US-202 both directions between ANTOLINI RD (New Hartford) and CT-179 (Canton) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:39:41Z"},"road_event_id":"yDC/byqxHmqJNSAmh4UE6y91e1I=","beginning_cross_street":"ANTOLINI RD","ending_cross_street":"CT-179","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.016571,41.830107]]}},{"id":"qGNBEeo8xqJax5dj5lmtpRh9Ksc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COGWHEEL LN"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on COGWHEEL LN both directions CT-67 (Seymour) to SILVERMINE RD (Seymour) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:32:50Z"},"road_event_id":"qGNBEeo8xqJax5dj5lmtpRh9Ksc=","beginning_cross_street":"CT-67","ending_cross_street":"SILVERMINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.04822,41.396269]]}},{"id":"KovFIYZ0MViHV+buZbtYuxSWoDc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"R8/T57fd+RfEEVpZbqfM6DZKlF0="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"KovFIYZ0MViHV+buZbtYuxSWoDc=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-06T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"R8/T57fd+RfEEVpZbqfM6DZKlF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KovFIYZ0MViHV+buZbtYuxSWoDc="},{"type":"next-occurrence","id":"w4pIwimOML6s5mVyJs1z0qkTNUE="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"R8/T57fd+RfEEVpZbqfM6DZKlF0=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-09T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"w4pIwimOML6s5mVyJs1z0qkTNUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KovFIYZ0MViHV+buZbtYuxSWoDc="},{"type":"next-occurrence","id":"bH7JLlmBwZgLElxDDLM4b6EVuTQ="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"w4pIwimOML6s5mVyJs1z0qkTNUE=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-10T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"bH7JLlmBwZgLElxDDLM4b6EVuTQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KovFIYZ0MViHV+buZbtYuxSWoDc="},{"type":"next-occurrence","id":"atMF/YoxB4FHjiD0bed+RDIGqfM="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"bH7JLlmBwZgLElxDDLM4b6EVuTQ=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-11T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"atMF/YoxB4FHjiD0bed+RDIGqfM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KovFIYZ0MViHV+buZbtYuxSWoDc="},{"type":"next-occurrence","id":"07SIkaWYMs1X10x8YOyvMacTFfQ="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"atMF/YoxB4FHjiD0bed+RDIGqfM=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-12T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"07SIkaWYMs1X10x8YOyvMacTFfQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KovFIYZ0MViHV+buZbtYuxSWoDc="},{"type":"next-occurrence","id":"Vm+Rg7K9h5rHMQrvn4OsZzp0hbM="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"07SIkaWYMs1X10x8YOyvMacTFfQ=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-13T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"Vm+Rg7K9h5rHMQrvn4OsZzp0hbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KovFIYZ0MViHV+buZbtYuxSWoDc="},{"type":"next-occurrence","id":"tR0k0c7g61rVZEy1jB9xXhrT34s="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"Vm+Rg7K9h5rHMQrvn4OsZzp0hbM=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-16T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"tR0k0c7g61rVZEy1jB9xXhrT34s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KovFIYZ0MViHV+buZbtYuxSWoDc="},{"type":"next-occurrence","id":"ncoDsfsM7fnKN9j07yJKo4NF6Co="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"tR0k0c7g61rVZEy1jB9xXhrT34s=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-17T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"ncoDsfsM7fnKN9j07yJKo4NF6Co=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KovFIYZ0MViHV+buZbtYuxSWoDc="},{"type":"next-occurrence","id":"8ihbtwPCCcZpeRqb2tcnHXQ68Ao="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"ncoDsfsM7fnKN9j07yJKo4NF6Co=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-18T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"8ihbtwPCCcZpeRqb2tcnHXQ68Ao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KovFIYZ0MViHV+buZbtYuxSWoDc="},{"type":"next-occurrence","id":"tBzUksZaGAg4R4NBFkYXyTLwefc="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"8ihbtwPCCcZpeRqb2tcnHXQ68Ao=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-19T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"tBzUksZaGAg4R4NBFkYXyTLwefc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KovFIYZ0MViHV+buZbtYuxSWoDc="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"tBzUksZaGAg4R4NBFkYXyTLwefc=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-20T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"aHc0n7fvx0S0pd/5Kcn9M8gNBr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, 4 Line bypassing Burnside Av (New York) through September 2026. Use nearby 176 St or 183 St stations, Continuous Wednesday March 4th, 2026 12:00 AM thru Friday September 4th, 2026 11:59 PM","update_date":"2026-03-04T15:00:05Z"},"road_event_id":"aHc0n7fvx0S0pd/5Kcn9M8gNBr8=","beginning_cross_street":"Burnside Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907684,40.853453]]}},{"id":"R+pxQmazNJaXJ8UPm+H5z41VIS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"R+pxQmazNJaXJ8UPm+H5z41VIS0=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"qSiwZ4B86sJkcPQ2yeHcQ4eC60k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hUsfiZ3EsI2shgrbNOH6IXF17FM="}],"description":"Crane operations on MASPETH AVE both directions between GRANDPARENTS AVE (New York) and OLIVE ST (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:16:43Z"},"road_event_id":"qSiwZ4B86sJkcPQ2yeHcQ4eC60k=","beginning_cross_street":"GRANDPARENTS AVE","ending_cross_street":"OLIVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93997,40.715814]]}},{"id":"hUsfiZ3EsI2shgrbNOH6IXF17FM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qSiwZ4B86sJkcPQ2yeHcQ4eC60k="},{"type":"next-occurrence","id":"TqutpFP7y/wHt+4G8ATm7sDLacw="}],"description":"Crane operations on MASPETH AVE both directions between GRANDPARENTS AVE (New York) and OLIVE ST (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:16:43Z"},"road_event_id":"hUsfiZ3EsI2shgrbNOH6IXF17FM=","beginning_cross_street":"GRANDPARENTS AVE","ending_cross_street":"OLIVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93997,40.715814]]}},{"id":"TqutpFP7y/wHt+4G8ATm7sDLacw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qSiwZ4B86sJkcPQ2yeHcQ4eC60k="},{"type":"next-occurrence","id":"zTcIKLT4Q2ud5xQXKNx1Um4x564="}],"description":"Crane operations on MASPETH AVE both directions between GRANDPARENTS AVE (New York) and OLIVE ST (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:16:43Z"},"road_event_id":"TqutpFP7y/wHt+4G8ATm7sDLacw=","beginning_cross_street":"GRANDPARENTS AVE","ending_cross_street":"OLIVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93997,40.715814]]}},{"id":"zTcIKLT4Q2ud5xQXKNx1Um4x564=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qSiwZ4B86sJkcPQ2yeHcQ4eC60k="}],"description":"Crane operations on MASPETH AVE both directions between GRANDPARENTS AVE (New York) and OLIVE ST (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:16:43Z"},"road_event_id":"zTcIKLT4Q2ud5xQXKNx1Um4x564=","beginning_cross_street":"GRANDPARENTS AVE","ending_cross_street":"OLIVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93997,40.715814]]}},{"id":"x0EJejtwOLniBCHmnvlG6ohyHk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLIVE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"x2Br2ztBfQxIC7ZEa1F9CGdOTS0="}],"description":"Crane operations on OLIVE ST northbound between ORIENT AVE (New York) and MASPETH AVE (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:21:21Z"},"road_event_id":"x0EJejtwOLniBCHmnvlG6ohyHk8=","beginning_cross_street":"ORIENT AVE","ending_cross_street":"MASPETH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938727,40.715382]]}},{"id":"x2Br2ztBfQxIC7ZEa1F9CGdOTS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLIVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x0EJejtwOLniBCHmnvlG6ohyHk8="},{"type":"next-occurrence","id":"0+RGLhhTi97f3IoCEWzeXAw8RoQ="}],"description":"Crane operations on OLIVE ST northbound between ORIENT AVE (New York) and MASPETH AVE (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:21:21Z"},"road_event_id":"x2Br2ztBfQxIC7ZEa1F9CGdOTS0=","beginning_cross_street":"ORIENT AVE","ending_cross_street":"MASPETH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938727,40.715382]]}},{"id":"0+RGLhhTi97f3IoCEWzeXAw8RoQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLIVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x0EJejtwOLniBCHmnvlG6ohyHk8="},{"type":"next-occurrence","id":"ti9Qzn8StQTPXxLaAZfVZ1jSZIA="}],"description":"Crane operations on OLIVE ST northbound between ORIENT AVE (New York) and MASPETH AVE (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:21:21Z"},"road_event_id":"0+RGLhhTi97f3IoCEWzeXAw8RoQ=","beginning_cross_street":"ORIENT AVE","ending_cross_street":"MASPETH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938727,40.715382]]}},{"id":"ti9Qzn8StQTPXxLaAZfVZ1jSZIA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLIVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x0EJejtwOLniBCHmnvlG6ohyHk8="}],"description":"Crane operations on OLIVE ST northbound between ORIENT AVE (New York) and MASPETH AVE (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:21:21Z"},"road_event_id":"ti9Qzn8StQTPXxLaAZfVZ1jSZIA=","beginning_cross_street":"ORIENT AVE","ending_cross_street":"MASPETH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938727,40.715382]]}},{"id":"736/QNKZEAGvyqzP3gpz2/PtQVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"I6VUStAHyAE2eJ2EGrXC6xT5hGw="}],"description":"Crane operations on MASPETH AVE both directions between OLIVE ST (New York) and DEBEVOISE AVE (New York), Saturday March 21st, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 22nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:19:02Z"},"road_event_id":"736/QNKZEAGvyqzP3gpz2/PtQVs=","beginning_cross_street":"OLIVE ST","ending_cross_street":"DEBEVOISE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938928,40.716071]]}},{"id":"I6VUStAHyAE2eJ2EGrXC6xT5hGw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"736/QNKZEAGvyqzP3gpz2/PtQVs="},{"type":"next-occurrence","id":"mbIcLKStkiV2Is8pueo7dmSZ1NI="}],"description":"Crane operations on MASPETH AVE both directions between OLIVE ST (New York) and DEBEVOISE AVE (New York), Saturday March 21st, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 22nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:19:02Z"},"road_event_id":"I6VUStAHyAE2eJ2EGrXC6xT5hGw=","beginning_cross_street":"OLIVE ST","ending_cross_street":"DEBEVOISE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938928,40.716071]]}},{"id":"mbIcLKStkiV2Is8pueo7dmSZ1NI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"736/QNKZEAGvyqzP3gpz2/PtQVs="},{"type":"next-occurrence","id":"Tt8W+WRAPZcQdlNkkgKHE5YBpvM="}],"description":"Crane operations on MASPETH AVE both directions between OLIVE ST (New York) and DEBEVOISE AVE (New York), Saturday March 21st, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 22nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:19:02Z"},"road_event_id":"mbIcLKStkiV2Is8pueo7dmSZ1NI=","beginning_cross_street":"OLIVE ST","ending_cross_street":"DEBEVOISE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938928,40.716071]]}},{"id":"Tt8W+WRAPZcQdlNkkgKHE5YBpvM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"736/QNKZEAGvyqzP3gpz2/PtQVs="}],"description":"Crane operations on MASPETH AVE both directions between OLIVE ST (New York) and DEBEVOISE AVE (New York), Saturday March 21st, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 22nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:19:02Z"},"road_event_id":"Tt8W+WRAPZcQdlNkkgKHE5YBpvM=","beginning_cross_street":"OLIVE ST","ending_cross_street":"DEBEVOISE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938928,40.716071]]}},{"id":"1UwxioZgs+yyJztyTaDV+8bz2Hw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEVINS RD"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation and deck work on BEVINS RD both directions FRENCH CREEK RD (Clayton) Bevins Road Bridge over French Creek is closed to all traffic until further notice, Continuous Wednesday November 19th, 2025 04:48 PM thru Monday November 30th, 2026 05:00 PM All lanes closed","update_date":"2025-11-19T21:53:47Z"},"road_event_id":"1UwxioZgs+yyJztyTaDV+8bz2Hw=","beginning_cross_street":"FRENCH CREEK RD","ending_cross_street":"FRENCH CREEK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.134837,44.188614]]}},{"id":"N21+9go1Si7/ISeWtT6HhtWknFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"04wY0oiTUpCn+YvHDVI5FzMqI6c="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:26Z"},"road_event_id":"N21+9go1Si7/ISeWtT6HhtWknFA=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"04wY0oiTUpCn+YvHDVI5FzMqI6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N21+9go1Si7/ISeWtT6HhtWknFA="},{"type":"next-occurrence","id":"B9Yi6Z/lFLvbnEtfomvL95A6LFA="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:26Z"},"road_event_id":"04wY0oiTUpCn+YvHDVI5FzMqI6c=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T14:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"B9Yi6Z/lFLvbnEtfomvL95A6LFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N21+9go1Si7/ISeWtT6HhtWknFA="},{"type":"next-occurrence","id":"vYnC9G2gBbWRYu7lZAyqzTAwB+Y="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:26Z"},"road_event_id":"B9Yi6Z/lFLvbnEtfomvL95A6LFA=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"vYnC9G2gBbWRYu7lZAyqzTAwB+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N21+9go1Si7/ISeWtT6HhtWknFA="},{"type":"next-occurrence","id":"4qpNX2ZWTemOYQj+RIpNA7b6vSA="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:26Z"},"road_event_id":"vYnC9G2gBbWRYu7lZAyqzTAwB+Y=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"4qpNX2ZWTemOYQj+RIpNA7b6vSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N21+9go1Si7/ISeWtT6HhtWknFA="},{"type":"next-occurrence","id":"Qk0sPpIB6izdj1P+RbQ4su5QNGg="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:26Z"},"road_event_id":"4qpNX2ZWTemOYQj+RIpNA7b6vSA=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"Qk0sPpIB6izdj1P+RbQ4su5QNGg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N21+9go1Si7/ISeWtT6HhtWknFA="},{"type":"next-occurrence","id":"82jzDwSsNOm5NeFFIwuZY9hJA7g="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:26Z"},"road_event_id":"Qk0sPpIB6izdj1P+RbQ4su5QNGg=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"82jzDwSsNOm5NeFFIwuZY9hJA7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N21+9go1Si7/ISeWtT6HhtWknFA="},{"type":"next-occurrence","id":"unxbS8WOSt/fXVSZIWzDgR8aJCw="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:26Z"},"road_event_id":"82jzDwSsNOm5NeFFIwuZY9hJA7g=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"unxbS8WOSt/fXVSZIWzDgR8aJCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N21+9go1Si7/ISeWtT6HhtWknFA="},{"type":"next-occurrence","id":"PPQbrvTzwPbN/OKETIbwQFPK7Cg="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:26Z"},"road_event_id":"unxbS8WOSt/fXVSZIWzDgR8aJCw=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T14:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"PPQbrvTzwPbN/OKETIbwQFPK7Cg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N21+9go1Si7/ISeWtT6HhtWknFA="},{"type":"next-occurrence","id":"56DI5/SoDMgI26MW5rFoiBRQcsw="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:26Z"},"road_event_id":"PPQbrvTzwPbN/OKETIbwQFPK7Cg=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T14:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"56DI5/SoDMgI26MW5rFoiBRQcsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N21+9go1Si7/ISeWtT6HhtWknFA="},{"type":"next-occurrence","id":"jbO3hQfHhcYc+uhTg97LGx0Cu6Y="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:26Z"},"road_event_id":"56DI5/SoDMgI26MW5rFoiBRQcsw=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T14:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"jbO3hQfHhcYc+uhTg97LGx0Cu6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N21+9go1Si7/ISeWtT6HhtWknFA="},{"type":"next-occurrence","id":"yZJVnMLUh+/1htdFbLG1qzLFFJg="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:26Z"},"road_event_id":"jbO3hQfHhcYc+uhTg97LGx0Cu6Y=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T14:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"yZJVnMLUh+/1htdFbLG1qzLFFJg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N21+9go1Si7/ISeWtT6HhtWknFA="},{"type":"next-occurrence","id":"+kMRgdfjygFtb6cUOl8J6D8vI8g="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:26Z"},"road_event_id":"yZJVnMLUh+/1htdFbLG1qzLFFJg=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T14:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"+kMRgdfjygFtb6cUOl8J6D8vI8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N21+9go1Si7/ISeWtT6HhtWknFA="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Friday June 19th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-05-21T19:00:26Z"},"road_event_id":"+kMRgdfjygFtb6cUOl8J6D8vI8g=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T14:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"awwoTtEutR6aj1dw5lg7oBSTu30=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRATFORD AVE"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on STRATFORD AVE both directions between FAIRFIELD AVE (Bridgeport) and KOSSUTH ST (Bridgeport) There will be lane shifts , Continuous Tuesday April 1st, 2025 09:00 AM thru Wednesday November 11th, 2026 11:59 PM All lanes open","update_date":"2025-01-23T15:49:57Z"},"road_event_id":"awwoTtEutR6aj1dw5lg7oBSTu30=","beginning_cross_street":"FAIRFIELD AVE","ending_cross_street":"KOSSUTH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.187204,41.179664]]}},{"id":"tM7xYCXLaUurowNhugdW5E+etkk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KiPrY4Q2RlZ6NEbLdD8trB/puIM="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"tM7xYCXLaUurowNhugdW5E+etkk=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"KiPrY4Q2RlZ6NEbLdD8trB/puIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tM7xYCXLaUurowNhugdW5E+etkk="},{"type":"next-occurrence","id":"R6i5lTosmRglc636ZuOFXJVeFNk="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"KiPrY4Q2RlZ6NEbLdD8trB/puIM=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T01:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"R6i5lTosmRglc636ZuOFXJVeFNk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tM7xYCXLaUurowNhugdW5E+etkk="},{"type":"next-occurrence","id":"LWO24KUG8sKc7c9v7sNSinYwrDU="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"R6i5lTosmRglc636ZuOFXJVeFNk=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T01:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"LWO24KUG8sKc7c9v7sNSinYwrDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tM7xYCXLaUurowNhugdW5E+etkk="},{"type":"next-occurrence","id":"ZEU2rBmCsoBpyTfuXrl4lPAX/As="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"LWO24KUG8sKc7c9v7sNSinYwrDU=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"ZEU2rBmCsoBpyTfuXrl4lPAX/As=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tM7xYCXLaUurowNhugdW5E+etkk="},{"type":"next-occurrence","id":"DpLFB1+Ubw2/F6SeXRBwFfeHo6Y="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"ZEU2rBmCsoBpyTfuXrl4lPAX/As=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"DpLFB1+Ubw2/F6SeXRBwFfeHo6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tM7xYCXLaUurowNhugdW5E+etkk="},{"type":"next-occurrence","id":"OMzQND6+CK/6+ioyaieeuG6igM4="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"DpLFB1+Ubw2/F6SeXRBwFfeHo6Y=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"OMzQND6+CK/6+ioyaieeuG6igM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tM7xYCXLaUurowNhugdW5E+etkk="},{"type":"next-occurrence","id":"tSxpMpcLqB1AFBaPhxzqD6yk3/c="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"OMzQND6+CK/6+ioyaieeuG6igM4=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"tSxpMpcLqB1AFBaPhxzqD6yk3/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tM7xYCXLaUurowNhugdW5E+etkk="},{"type":"next-occurrence","id":"+85PRwpvJcj2qBqEIXtt3jFYRRA="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"tSxpMpcLqB1AFBaPhxzqD6yk3/c=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T01:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"+85PRwpvJcj2qBqEIXtt3jFYRRA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tM7xYCXLaUurowNhugdW5E+etkk="},{"type":"next-occurrence","id":"B6W0Yk+ekvaOA/OvbcQsS7wiYt0="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"+85PRwpvJcj2qBqEIXtt3jFYRRA=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T01:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"B6W0Yk+ekvaOA/OvbcQsS7wiYt0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tM7xYCXLaUurowNhugdW5E+etkk="},{"type":"next-occurrence","id":"0cn0l4zAbZSZ7VVqj178uXJ/dNw="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"B6W0Yk+ekvaOA/OvbcQsS7wiYt0=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T01:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"0cn0l4zAbZSZ7VVqj178uXJ/dNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tM7xYCXLaUurowNhugdW5E+etkk="},{"type":"next-occurrence","id":"Rx/XBvyR/n9F2ASeICbI5qa+rL4="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"0cn0l4zAbZSZ7VVqj178uXJ/dNw=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T01:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"Rx/XBvyR/n9F2ASeICbI5qa+rL4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tM7xYCXLaUurowNhugdW5E+etkk="},{"type":"next-occurrence","id":"OReaPjCRvpwAlDCmC3gYwByiMPk="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"Rx/XBvyR/n9F2ASeICbI5qa+rL4=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T01:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"OReaPjCRvpwAlDCmC3gYwByiMPk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tM7xYCXLaUurowNhugdW5E+etkk="},{"type":"next-occurrence","id":"FDlS+tR8hZDgxBg//5T2Dh3H0P0="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"OReaPjCRvpwAlDCmC3gYwByiMPk=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T01:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"FDlS+tR8hZDgxBg//5T2Dh3H0P0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tM7xYCXLaUurowNhugdW5E+etkk="},{"type":"next-occurrence","id":"9ciyshwOeqCo/c3yNrNqzxodnV8="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"FDlS+tR8hZDgxBg//5T2Dh3H0P0=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T01:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"9ciyshwOeqCo/c3yNrNqzxodnV8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tM7xYCXLaUurowNhugdW5E+etkk="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"9ciyshwOeqCo/c3yNrNqzxodnV8=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T01:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"woYRawsWwjV/96LNdvI2iiZ0R0s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+yJbYCe/DN7sTskIhznGmsBIQrQ="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"woYRawsWwjV/96LNdvI2iiZ0R0s=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"+yJbYCe/DN7sTskIhznGmsBIQrQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"HMtpOANPewAmwx3YfAscWy2uOcA="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"+yJbYCe/DN7sTskIhznGmsBIQrQ=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"HMtpOANPewAmwx3YfAscWy2uOcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"FSCSYcx3/o797jKjZAwKmx2TGYI="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"HMtpOANPewAmwx3YfAscWy2uOcA=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"FSCSYcx3/o797jKjZAwKmx2TGYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"/NoaXGK+qfUI441y+5axHhrmxL4="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"FSCSYcx3/o797jKjZAwKmx2TGYI=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"/NoaXGK+qfUI441y+5axHhrmxL4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"lEcN/5eTtox0ePRACy5wtOaBBLo="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"/NoaXGK+qfUI441y+5axHhrmxL4=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"lEcN/5eTtox0ePRACy5wtOaBBLo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"TBo+PEeCGjSM0IZ+hTpsjy9T6wE="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"lEcN/5eTtox0ePRACy5wtOaBBLo=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"TBo+PEeCGjSM0IZ+hTpsjy9T6wE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"j1kPK6/5j1ekyp21/El6rm3vt7s="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"TBo+PEeCGjSM0IZ+hTpsjy9T6wE=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"j1kPK6/5j1ekyp21/El6rm3vt7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"asfjMJxBNxRINpOU8if1tZpfEKk="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"j1kPK6/5j1ekyp21/El6rm3vt7s=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"asfjMJxBNxRINpOU8if1tZpfEKk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"tD3Z08wXnELAa/WCuBV7wkoxZGg="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"asfjMJxBNxRINpOU8if1tZpfEKk=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"tD3Z08wXnELAa/WCuBV7wkoxZGg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"v5mCW+XIJPZtsT+mZ0JJW6DaMZs="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"tD3Z08wXnELAa/WCuBV7wkoxZGg=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"v5mCW+XIJPZtsT+mZ0JJW6DaMZs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"xXGTv3sFJyp+d2a7J6tJ+R+vlWg="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"v5mCW+XIJPZtsT+mZ0JJW6DaMZs=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"xXGTv3sFJyp+d2a7J6tJ+R+vlWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"PXE+LmcN0Q7NaMrJ8kK6Jb77gJg="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"xXGTv3sFJyp+d2a7J6tJ+R+vlWg=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"PXE+LmcN0Q7NaMrJ8kK6Jb77gJg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"rM6HL62iuNW0tSoQDmYhW4xDl14="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"PXE+LmcN0Q7NaMrJ8kK6Jb77gJg=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"rM6HL62iuNW0tSoQDmYhW4xDl14=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"kE0k2Y+f+pfeX9TAmFMoei4avXI="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"rM6HL62iuNW0tSoQDmYhW4xDl14=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"kE0k2Y+f+pfeX9TAmFMoei4avXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"NJR+kfwndvABYKt3ysgvFBpsDXY="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"kE0k2Y+f+pfeX9TAmFMoei4avXI=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"NJR+kfwndvABYKt3ysgvFBpsDXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"VaEXvGeuUur9/LmVHyoL4FBI418="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"NJR+kfwndvABYKt3ysgvFBpsDXY=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"VaEXvGeuUur9/LmVHyoL4FBI418=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"jaPldprIQ+YzQ75VCf4lP7lOzsE="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"VaEXvGeuUur9/LmVHyoL4FBI418=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"jaPldprIQ+YzQ75VCf4lP7lOzsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"AZFLro87ShZtI6rlEdLUZr5Fg78="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"jaPldprIQ+YzQ75VCf4lP7lOzsE=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"AZFLro87ShZtI6rlEdLUZr5Fg78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"SZLFN6JTziFhe7YmtP1qNAEDMAA="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"AZFLro87ShZtI6rlEdLUZr5Fg78=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"SZLFN6JTziFhe7YmtP1qNAEDMAA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"D0thcGWyc0YdsRZnJgDwbJCn5k4="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"SZLFN6JTziFhe7YmtP1qNAEDMAA=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"D0thcGWyc0YdsRZnJgDwbJCn5k4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="},{"type":"next-occurrence","id":"Y5Wjm+CgQ8+K6OVtjTdvl1Db8Qc="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"D0thcGWyc0YdsRZnJgDwbJCn5k4=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"Y5Wjm+CgQ8+K6OVtjTdvl1Db8Qc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"woYRawsWwjV/96LNdvI2iiZ0R0s="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"Y5Wjm+CgQ8+K6OVtjTdvl1Db8Qc=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"QTBWysyxvI6gvMBofcBUN1Ljazo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VAJuW5Hg0nGL0PYrtSQcydAxsIU="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"QTBWysyxvI6gvMBofcBUN1Ljazo=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"VAJuW5Hg0nGL0PYrtSQcydAxsIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"r3fTMyMRyS5xrYY77shVXWBb3h4="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"VAJuW5Hg0nGL0PYrtSQcydAxsIU=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"r3fTMyMRyS5xrYY77shVXWBb3h4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"X8eYePYnVLOhHMPO2JC8ykz/i7c="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"r3fTMyMRyS5xrYY77shVXWBb3h4=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"X8eYePYnVLOhHMPO2JC8ykz/i7c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"zzNdbC9v6yJadB2+K5U3WOPqDWo="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"X8eYePYnVLOhHMPO2JC8ykz/i7c=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"zzNdbC9v6yJadB2+K5U3WOPqDWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"wSkj/TEcnRZHR2/31ahnRIiHBDQ="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"zzNdbC9v6yJadB2+K5U3WOPqDWo=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"wSkj/TEcnRZHR2/31ahnRIiHBDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"mD+O9ddwBtc/z+i4+iLz34xPebM="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"wSkj/TEcnRZHR2/31ahnRIiHBDQ=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"mD+O9ddwBtc/z+i4+iLz34xPebM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"8Mj/c6UNbGAvsmGWgt8V8cXdZTs="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"mD+O9ddwBtc/z+i4+iLz34xPebM=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"8Mj/c6UNbGAvsmGWgt8V8cXdZTs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"2Fv8Ac2JN/VOb/GX18DXh8wOB2Q="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"8Mj/c6UNbGAvsmGWgt8V8cXdZTs=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"2Fv8Ac2JN/VOb/GX18DXh8wOB2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"AK35fn4hF7cpZ2jvBBZZ1qxbdT8="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"2Fv8Ac2JN/VOb/GX18DXh8wOB2Q=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"AK35fn4hF7cpZ2jvBBZZ1qxbdT8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"HiabN4snvpP1z1odORRJfkAx90Q="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"AK35fn4hF7cpZ2jvBBZZ1qxbdT8=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"HiabN4snvpP1z1odORRJfkAx90Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"CsnTIiQEwu53Q9irfgL28hhUzQU="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"HiabN4snvpP1z1odORRJfkAx90Q=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"CsnTIiQEwu53Q9irfgL28hhUzQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"uqx94kRLAy1/6pGNeZKpLWETcvE="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"CsnTIiQEwu53Q9irfgL28hhUzQU=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"uqx94kRLAy1/6pGNeZKpLWETcvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"fCmAGB+qpMHkE1nTerdGQDC7p80="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"uqx94kRLAy1/6pGNeZKpLWETcvE=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"fCmAGB+qpMHkE1nTerdGQDC7p80=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"PQkdArZfGq/9S+OL85YOA01D5UI="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"fCmAGB+qpMHkE1nTerdGQDC7p80=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"PQkdArZfGq/9S+OL85YOA01D5UI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"x/qKNeP1Kpv8HUsZvMShJCelN8c="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"PQkdArZfGq/9S+OL85YOA01D5UI=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"x/qKNeP1Kpv8HUsZvMShJCelN8c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"PbSP4x4eLmM+QkZ5Z8Ej09IuGto="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"x/qKNeP1Kpv8HUsZvMShJCelN8c=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"PbSP4x4eLmM+QkZ5Z8Ej09IuGto=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"rLzRhln09sf9M8edNoJdlB/kiRs="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"PbSP4x4eLmM+QkZ5Z8Ej09IuGto=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"rLzRhln09sf9M8edNoJdlB/kiRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"i9WnV9YQyr7vP9dklEVbNnsnI5I="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"rLzRhln09sf9M8edNoJdlB/kiRs=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"i9WnV9YQyr7vP9dklEVbNnsnI5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"lP7fVjg90BvjpKDjWqLHqPKfdiU="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"i9WnV9YQyr7vP9dklEVbNnsnI5I=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"lP7fVjg90BvjpKDjWqLHqPKfdiU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"OhKOnk0PKX82/Pj+PIy6W45W3bs="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"lP7fVjg90BvjpKDjWqLHqPKfdiU=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"OhKOnk0PKX82/Pj+PIy6W45W3bs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="},{"type":"next-occurrence","id":"oeRlQ2gjsuMj6VlBK9nNHG+rsr8="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"OhKOnk0PKX82/Pj+PIy6W45W3bs=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"oeRlQ2gjsuMj6VlBK9nNHG+rsr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QTBWysyxvI6gvMBofcBUN1Ljazo="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"oeRlQ2gjsuMj6VlBK9nNHG+rsr8=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"ovZac0uH+J8Zw73tmIVxVwxO9wk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VzjQiWt3Q/xKWGqBSNsntpkl9KM="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"ovZac0uH+J8Zw73tmIVxVwxO9wk=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"VzjQiWt3Q/xKWGqBSNsntpkl9KM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"LxayAjwI+t7+AU2JkCAezk/7quA="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"VzjQiWt3Q/xKWGqBSNsntpkl9KM=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"LxayAjwI+t7+AU2JkCAezk/7quA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"jnQo80aiRsaQVQygnfFEM5Nf2gw="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"LxayAjwI+t7+AU2JkCAezk/7quA=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"jnQo80aiRsaQVQygnfFEM5Nf2gw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"2sq59l1SIpVmEkXxYKrQaDdyY6o="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"jnQo80aiRsaQVQygnfFEM5Nf2gw=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"2sq59l1SIpVmEkXxYKrQaDdyY6o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"8vEGgl5MKenuAB5W9o8KiKEdwsU="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"2sq59l1SIpVmEkXxYKrQaDdyY6o=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"8vEGgl5MKenuAB5W9o8KiKEdwsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"XIKIkgi5dGzApa3Amk8FME5cMZk="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"8vEGgl5MKenuAB5W9o8KiKEdwsU=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"XIKIkgi5dGzApa3Amk8FME5cMZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"e6VHS7FPk2YiEh5r6PSWyVLxxv4="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"XIKIkgi5dGzApa3Amk8FME5cMZk=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"e6VHS7FPk2YiEh5r6PSWyVLxxv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"bnknLIeerjTGMbSXfjY1e5QYAY4="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"e6VHS7FPk2YiEh5r6PSWyVLxxv4=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"bnknLIeerjTGMbSXfjY1e5QYAY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"1bFtfVGEx1xDjlUgSKLezGZstXY="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"bnknLIeerjTGMbSXfjY1e5QYAY4=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"1bFtfVGEx1xDjlUgSKLezGZstXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"EHkU03f/0VjkO5/oXM8xjFqWq04="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"1bFtfVGEx1xDjlUgSKLezGZstXY=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"EHkU03f/0VjkO5/oXM8xjFqWq04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"bH4n4yD48F7Dq5Mq3/5oOb/i5u4="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"EHkU03f/0VjkO5/oXM8xjFqWq04=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"bH4n4yD48F7Dq5Mq3/5oOb/i5u4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"/hzDTL8LuFXZ/KqNUOLSQnnhn38="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"bH4n4yD48F7Dq5Mq3/5oOb/i5u4=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"/hzDTL8LuFXZ/KqNUOLSQnnhn38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"tzJemlO9e51J3ITtkN3KFqdJJvc="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"/hzDTL8LuFXZ/KqNUOLSQnnhn38=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"tzJemlO9e51J3ITtkN3KFqdJJvc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"eACEV+Afnyrx7FZzcdmwRsiSk4Q="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"tzJemlO9e51J3ITtkN3KFqdJJvc=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"eACEV+Afnyrx7FZzcdmwRsiSk4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"Rchj6Mg/RosiwbwK5+KC/0igePk="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"eACEV+Afnyrx7FZzcdmwRsiSk4Q=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"Rchj6Mg/RosiwbwK5+KC/0igePk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"z2Km1cJujLP3XuI5Jx0YsAJMbvY="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"Rchj6Mg/RosiwbwK5+KC/0igePk=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"z2Km1cJujLP3XuI5Jx0YsAJMbvY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"he+5EUU1mJDrF5V6fZzYvSPQtgg="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"z2Km1cJujLP3XuI5Jx0YsAJMbvY=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"he+5EUU1mJDrF5V6fZzYvSPQtgg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"aRQJ8Hg0ki4Hty3cVGnizREmzQ0="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"he+5EUU1mJDrF5V6fZzYvSPQtgg=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"aRQJ8Hg0ki4Hty3cVGnizREmzQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"DKBBrNKgRJlTlMI70WTtIM5WNQI="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"aRQJ8Hg0ki4Hty3cVGnizREmzQ0=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"DKBBrNKgRJlTlMI70WTtIM5WNQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"33tgTY1l5PqM4Pk2SLTB0FvGl30="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"DKBBrNKgRJlTlMI70WTtIM5WNQI=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"33tgTY1l5PqM4Pk2SLTB0FvGl30=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="},{"type":"next-occurrence","id":"/OqooI618tW8Q7pWpLnrR3QAxTQ="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"33tgTY1l5PqM4Pk2SLTB0FvGl30=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"/OqooI618tW8Q7pWpLnrR3QAxTQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ovZac0uH+J8Zw73tmIVxVwxO9wk="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"/OqooI618tW8Q7pWpLnrR3QAxTQ=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"9bAfkbo/7HOH75EFQbIVUXXfRzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"i9t278O96rCt/CNhW5bgO5tq3cU="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"9bAfkbo/7HOH75EFQbIVUXXfRzc=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"i9t278O96rCt/CNhW5bgO5tq3cU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9bAfkbo/7HOH75EFQbIVUXXfRzc="},{"type":"next-occurrence","id":"Hx7zwyfrX+Xli7+bkrvuyOwDNYM="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"i9t278O96rCt/CNhW5bgO5tq3cU=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T01:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"Hx7zwyfrX+Xli7+bkrvuyOwDNYM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9bAfkbo/7HOH75EFQbIVUXXfRzc="},{"type":"next-occurrence","id":"7wGItYEuGTF7gvXdlxkQd9+tGvI="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"Hx7zwyfrX+Xli7+bkrvuyOwDNYM=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T01:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"7wGItYEuGTF7gvXdlxkQd9+tGvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9bAfkbo/7HOH75EFQbIVUXXfRzc="},{"type":"next-occurrence","id":"bh+ugIM+82GIQtNiMjKnYgMQTc8="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"7wGItYEuGTF7gvXdlxkQd9+tGvI=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"bh+ugIM+82GIQtNiMjKnYgMQTc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9bAfkbo/7HOH75EFQbIVUXXfRzc="},{"type":"next-occurrence","id":"FeHG++80gwbcYVEdAMii2lt5tZs="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"bh+ugIM+82GIQtNiMjKnYgMQTc8=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"FeHG++80gwbcYVEdAMii2lt5tZs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9bAfkbo/7HOH75EFQbIVUXXfRzc="},{"type":"next-occurrence","id":"wnmXBsxqEk2vuNoVVAOsvFkYai4="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"FeHG++80gwbcYVEdAMii2lt5tZs=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"wnmXBsxqEk2vuNoVVAOsvFkYai4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9bAfkbo/7HOH75EFQbIVUXXfRzc="},{"type":"next-occurrence","id":"0PWP1FlgeQD3YNnwC2CLGieuyLg="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"wnmXBsxqEk2vuNoVVAOsvFkYai4=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"0PWP1FlgeQD3YNnwC2CLGieuyLg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9bAfkbo/7HOH75EFQbIVUXXfRzc="},{"type":"next-occurrence","id":"bvXERfmjC7WCDuwZD5uxHb4cdX0="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"0PWP1FlgeQD3YNnwC2CLGieuyLg=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T01:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"bvXERfmjC7WCDuwZD5uxHb4cdX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9bAfkbo/7HOH75EFQbIVUXXfRzc="},{"type":"next-occurrence","id":"Pi1097As8fBOXBVInnhT8CVjuCc="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"bvXERfmjC7WCDuwZD5uxHb4cdX0=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T01:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"Pi1097As8fBOXBVInnhT8CVjuCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9bAfkbo/7HOH75EFQbIVUXXfRzc="},{"type":"next-occurrence","id":"/n+ZpIfGdCZULhi9OnRhZCXVQNQ="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"Pi1097As8fBOXBVInnhT8CVjuCc=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T01:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"/n+ZpIfGdCZULhi9OnRhZCXVQNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9bAfkbo/7HOH75EFQbIVUXXfRzc="},{"type":"next-occurrence","id":"xUzHQ7I0Rtp0+CAkLeA/fAHtCNE="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"/n+ZpIfGdCZULhi9OnRhZCXVQNQ=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T01:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"xUzHQ7I0Rtp0+CAkLeA/fAHtCNE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9bAfkbo/7HOH75EFQbIVUXXfRzc="},{"type":"next-occurrence","id":"97hrjwjYAgY3QyyiIZOEIiZoKQA="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"xUzHQ7I0Rtp0+CAkLeA/fAHtCNE=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T01:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"97hrjwjYAgY3QyyiIZOEIiZoKQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9bAfkbo/7HOH75EFQbIVUXXfRzc="},{"type":"next-occurrence","id":"OEUswJOATPbYW02aWMuKWo5LvKk="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"97hrjwjYAgY3QyyiIZOEIiZoKQA=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T01:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"OEUswJOATPbYW02aWMuKWo5LvKk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9bAfkbo/7HOH75EFQbIVUXXfRzc="},{"type":"next-occurrence","id":"IZ6tD+VNeFewO47ZlVsB+iK9J60="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"OEUswJOATPbYW02aWMuKWo5LvKk=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T01:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"IZ6tD+VNeFewO47ZlVsB+iK9J60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9bAfkbo/7HOH75EFQbIVUXXfRzc="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"IZ6tD+VNeFewO47ZlVsB+iK9J60=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T01:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"hCvLsoN1J94WVdSFtx22CqDBlj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uYHAqFX5UsEoZ9w8KNhS5y0Jq00="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"hCvLsoN1J94WVdSFtx22CqDBlj8=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"uYHAqFX5UsEoZ9w8KNhS5y0Jq00=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hCvLsoN1J94WVdSFtx22CqDBlj8="},{"type":"next-occurrence","id":"ZUYHHDVlIng/MOD+J3s9YXUEfx4="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"uYHAqFX5UsEoZ9w8KNhS5y0Jq00=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T01:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"ZUYHHDVlIng/MOD+J3s9YXUEfx4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hCvLsoN1J94WVdSFtx22CqDBlj8="},{"type":"next-occurrence","id":"NTpWonizWZBDGk9i9KHYddCWtA4="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"ZUYHHDVlIng/MOD+J3s9YXUEfx4=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T01:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"NTpWonizWZBDGk9i9KHYddCWtA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hCvLsoN1J94WVdSFtx22CqDBlj8="},{"type":"next-occurrence","id":"z8p+lSqDswdcxwgHjnNuw853pVI="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"NTpWonizWZBDGk9i9KHYddCWtA4=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"z8p+lSqDswdcxwgHjnNuw853pVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hCvLsoN1J94WVdSFtx22CqDBlj8="},{"type":"next-occurrence","id":"140muvNHa1TdDXdYjdC4xKAmALs="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"z8p+lSqDswdcxwgHjnNuw853pVI=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"140muvNHa1TdDXdYjdC4xKAmALs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hCvLsoN1J94WVdSFtx22CqDBlj8="},{"type":"next-occurrence","id":"f1s+/L8FPUsx7S6ChsGSiLiORJ4="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"140muvNHa1TdDXdYjdC4xKAmALs=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"f1s+/L8FPUsx7S6ChsGSiLiORJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hCvLsoN1J94WVdSFtx22CqDBlj8="},{"type":"next-occurrence","id":"1hGY/Zl5GCeODMBJzkUFf6wV0yo="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"f1s+/L8FPUsx7S6ChsGSiLiORJ4=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"1hGY/Zl5GCeODMBJzkUFf6wV0yo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hCvLsoN1J94WVdSFtx22CqDBlj8="},{"type":"next-occurrence","id":"1yph/5YZrACxYVWLIOOmD46vBf8="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"1hGY/Zl5GCeODMBJzkUFf6wV0yo=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T01:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"1yph/5YZrACxYVWLIOOmD46vBf8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hCvLsoN1J94WVdSFtx22CqDBlj8="},{"type":"next-occurrence","id":"rplRw0jWpqLSnRxM1UdM80gv024="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"1yph/5YZrACxYVWLIOOmD46vBf8=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T01:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"rplRw0jWpqLSnRxM1UdM80gv024=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hCvLsoN1J94WVdSFtx22CqDBlj8="},{"type":"next-occurrence","id":"NEpLewr7OfKxoHTU7nq+l2KbiOo="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"rplRw0jWpqLSnRxM1UdM80gv024=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T01:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"NEpLewr7OfKxoHTU7nq+l2KbiOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hCvLsoN1J94WVdSFtx22CqDBlj8="},{"type":"next-occurrence","id":"w6f2EqJMZc3RUvBVtlPnsXlvR+w="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"NEpLewr7OfKxoHTU7nq+l2KbiOo=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T01:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"w6f2EqJMZc3RUvBVtlPnsXlvR+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hCvLsoN1J94WVdSFtx22CqDBlj8="},{"type":"next-occurrence","id":"dC5yFrM1xg5QfbYAIQdm+ttkWRg="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"w6f2EqJMZc3RUvBVtlPnsXlvR+w=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T01:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"dC5yFrM1xg5QfbYAIQdm+ttkWRg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hCvLsoN1J94WVdSFtx22CqDBlj8="},{"type":"next-occurrence","id":"jrbJQsNgmB/xPRmoUcYSTypnZd4="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"dC5yFrM1xg5QfbYAIQdm+ttkWRg=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T01:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"jrbJQsNgmB/xPRmoUcYSTypnZd4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hCvLsoN1J94WVdSFtx22CqDBlj8="},{"type":"next-occurrence","id":"ko06kN3EsVbt0cJDUqQuX41UqYE="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"jrbJQsNgmB/xPRmoUcYSTypnZd4=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T01:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"ko06kN3EsVbt0cJDUqQuX41UqYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hCvLsoN1J94WVdSFtx22CqDBlj8="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"ko06kN3EsVbt0cJDUqQuX41UqYE=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T01:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"32nUUDR2zBVHABjH+NX19GXoixU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ORW23mhtgPyHO2oaMl/VODbv71k="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"32nUUDR2zBVHABjH+NX19GXoixU=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"ORW23mhtgPyHO2oaMl/VODbv71k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32nUUDR2zBVHABjH+NX19GXoixU="},{"type":"next-occurrence","id":"jv1Bc533ATC+JosqBwc1vSEcey4="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"ORW23mhtgPyHO2oaMl/VODbv71k=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T01:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"jv1Bc533ATC+JosqBwc1vSEcey4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32nUUDR2zBVHABjH+NX19GXoixU="},{"type":"next-occurrence","id":"rdUEw7osR7Z7BhQR6T5ZuF9nyMA="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"jv1Bc533ATC+JosqBwc1vSEcey4=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T01:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"rdUEw7osR7Z7BhQR6T5ZuF9nyMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32nUUDR2zBVHABjH+NX19GXoixU="},{"type":"next-occurrence","id":"5z/HO9yf09F3zwPiP3dKkkmJ89E="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"rdUEw7osR7Z7BhQR6T5ZuF9nyMA=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"5z/HO9yf09F3zwPiP3dKkkmJ89E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32nUUDR2zBVHABjH+NX19GXoixU="},{"type":"next-occurrence","id":"EwK+2v6nCkmHNXm0AlzrdIxuy38="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"5z/HO9yf09F3zwPiP3dKkkmJ89E=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"EwK+2v6nCkmHNXm0AlzrdIxuy38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32nUUDR2zBVHABjH+NX19GXoixU="},{"type":"next-occurrence","id":"WhrU4+f2HoZNA9C0kRfe3FQB2T0="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"EwK+2v6nCkmHNXm0AlzrdIxuy38=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"WhrU4+f2HoZNA9C0kRfe3FQB2T0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32nUUDR2zBVHABjH+NX19GXoixU="},{"type":"next-occurrence","id":"ez8YYKdQKbbL4aF8ORLu/s/FRnM="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"WhrU4+f2HoZNA9C0kRfe3FQB2T0=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"ez8YYKdQKbbL4aF8ORLu/s/FRnM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32nUUDR2zBVHABjH+NX19GXoixU="},{"type":"next-occurrence","id":"NcTxCPdL+d2tjiNSLqOvFaSTcGA="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"ez8YYKdQKbbL4aF8ORLu/s/FRnM=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T01:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"NcTxCPdL+d2tjiNSLqOvFaSTcGA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32nUUDR2zBVHABjH+NX19GXoixU="},{"type":"next-occurrence","id":"CeQxDYv/KLJ036LIWW/7U5fDKEs="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"NcTxCPdL+d2tjiNSLqOvFaSTcGA=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T01:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"CeQxDYv/KLJ036LIWW/7U5fDKEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32nUUDR2zBVHABjH+NX19GXoixU="},{"type":"next-occurrence","id":"wxJJYSpecNq/ZlPfeD2mAzC6XYk="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"CeQxDYv/KLJ036LIWW/7U5fDKEs=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T01:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"wxJJYSpecNq/ZlPfeD2mAzC6XYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32nUUDR2zBVHABjH+NX19GXoixU="},{"type":"next-occurrence","id":"58e/mwbEr+i1wxdBRD6+1oVw3f0="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"wxJJYSpecNq/ZlPfeD2mAzC6XYk=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T01:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"58e/mwbEr+i1wxdBRD6+1oVw3f0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32nUUDR2zBVHABjH+NX19GXoixU="},{"type":"next-occurrence","id":"cOBi8jGOZcmdXzSNx2YqmYkfCH4="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"58e/mwbEr+i1wxdBRD6+1oVw3f0=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T01:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"cOBi8jGOZcmdXzSNx2YqmYkfCH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32nUUDR2zBVHABjH+NX19GXoixU="},{"type":"next-occurrence","id":"GioKcoEWtoJRKTsvrzSZXOFGe+M="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"cOBi8jGOZcmdXzSNx2YqmYkfCH4=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T01:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"GioKcoEWtoJRKTsvrzSZXOFGe+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32nUUDR2zBVHABjH+NX19GXoixU="},{"type":"next-occurrence","id":"Bm6hMyW0esUwvzJj07cbskCLcmU="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"GioKcoEWtoJRKTsvrzSZXOFGe+M=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T01:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"Bm6hMyW0esUwvzJj07cbskCLcmU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"32nUUDR2zBVHABjH+NX19GXoixU="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"Bm6hMyW0esUwvzJj07cbskCLcmU=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T01:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"TleJaI5xLnqfgouRFcTnEC0uRs8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0rCrjxPt2/sugmgyaObUD+95CGA="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"TleJaI5xLnqfgouRFcTnEC0uRs8=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"0rCrjxPt2/sugmgyaObUD+95CGA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TleJaI5xLnqfgouRFcTnEC0uRs8="},{"type":"next-occurrence","id":"PjYVyY+6KmiEv7WTj+lPv4jAukE="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"0rCrjxPt2/sugmgyaObUD+95CGA=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T22:00:00Z","end_date":"2026-06-07T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"PjYVyY+6KmiEv7WTj+lPv4jAukE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TleJaI5xLnqfgouRFcTnEC0uRs8="},{"type":"next-occurrence","id":"IQbjKZBTG56ocp6GJ4E2PKtY0Mw="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"PjYVyY+6KmiEv7WTj+lPv4jAukE=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"IQbjKZBTG56ocp6GJ4E2PKtY0Mw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TleJaI5xLnqfgouRFcTnEC0uRs8="},{"type":"next-occurrence","id":"5ic3L81FedgrDVVEowP7WvkwHS4="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"IQbjKZBTG56ocp6GJ4E2PKtY0Mw=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"5ic3L81FedgrDVVEowP7WvkwHS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TleJaI5xLnqfgouRFcTnEC0uRs8="},{"type":"next-occurrence","id":"zETf6Ec/KiOSk0hDPoayjXczWnA="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"5ic3L81FedgrDVVEowP7WvkwHS4=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"zETf6Ec/KiOSk0hDPoayjXczWnA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TleJaI5xLnqfgouRFcTnEC0uRs8="},{"type":"next-occurrence","id":"R/ohfBpChf6mWCcwl6qk6Y9W09g="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"zETf6Ec/KiOSk0hDPoayjXczWnA=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"R/ohfBpChf6mWCcwl6qk6Y9W09g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TleJaI5xLnqfgouRFcTnEC0uRs8="},{"type":"next-occurrence","id":"SC+fwH9zhx3Jug4Afimb11Be4uY="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"R/ohfBpChf6mWCcwl6qk6Y9W09g=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"SC+fwH9zhx3Jug4Afimb11Be4uY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TleJaI5xLnqfgouRFcTnEC0uRs8="},{"type":"next-occurrence","id":"BI51b2eTkJ/OEbxnA5Zb712T/pk="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"SC+fwH9zhx3Jug4Afimb11Be4uY=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T22:00:00Z","end_date":"2026-06-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"BI51b2eTkJ/OEbxnA5Zb712T/pk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TleJaI5xLnqfgouRFcTnEC0uRs8="},{"type":"next-occurrence","id":"0vmgWUKqxOpimXtSBR9MnGBjYK0="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"BI51b2eTkJ/OEbxnA5Zb712T/pk=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"0vmgWUKqxOpimXtSBR9MnGBjYK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TleJaI5xLnqfgouRFcTnEC0uRs8="},{"type":"next-occurrence","id":"p7XwBC1DiefBhcwB7DxoAh6vr6w="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"0vmgWUKqxOpimXtSBR9MnGBjYK0=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"p7XwBC1DiefBhcwB7DxoAh6vr6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TleJaI5xLnqfgouRFcTnEC0uRs8="},{"type":"next-occurrence","id":"EF+sBM6o9xTV1aKv0AY/xYo4LZg="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"p7XwBC1DiefBhcwB7DxoAh6vr6w=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"EF+sBM6o9xTV1aKv0AY/xYo4LZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TleJaI5xLnqfgouRFcTnEC0uRs8="},{"type":"next-occurrence","id":"uibTjsH66Itz0QFwuEZlRtFSUeo="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"EF+sBM6o9xTV1aKv0AY/xYo4LZg=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"uibTjsH66Itz0QFwuEZlRtFSUeo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TleJaI5xLnqfgouRFcTnEC0uRs8="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"uibTjsH66Itz0QFwuEZlRtFSUeo=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hYGJ/0WDoMxU7hfODNUqGfigRpk="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"hYGJ/0WDoMxU7hfODNUqGfigRpk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"hFIhtLMtVd8ti0aW3biCf2oCxmg="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"hYGJ/0WDoMxU7hfODNUqGfigRpk=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"hFIhtLMtVd8ti0aW3biCf2oCxmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"lkrKiCfKgRgP3PLOMvQhJ5w1nDc="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"hFIhtLMtVd8ti0aW3biCf2oCxmg=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T22:00:00Z","end_date":"2026-06-07T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"lkrKiCfKgRgP3PLOMvQhJ5w1nDc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"9NMx9mHv0wSzLDRgDcc/9F4ea2w="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"lkrKiCfKgRgP3PLOMvQhJ5w1nDc=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"9NMx9mHv0wSzLDRgDcc/9F4ea2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"cVDpp69NcDy/OcAb48ZYsLlASD8="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"9NMx9mHv0wSzLDRgDcc/9F4ea2w=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"cVDpp69NcDy/OcAb48ZYsLlASD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"LD/UHBaHPzE9/nlhlfrrqTQ4lHU="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"cVDpp69NcDy/OcAb48ZYsLlASD8=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"LD/UHBaHPzE9/nlhlfrrqTQ4lHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"8/IDQbFpZZb5Rc5QxxVf+u/syW4="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"LD/UHBaHPzE9/nlhlfrrqTQ4lHU=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"8/IDQbFpZZb5Rc5QxxVf+u/syW4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"ftYxfQB4pHy1jdLzydKvbpfT5kU="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"8/IDQbFpZZb5Rc5QxxVf+u/syW4=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"ftYxfQB4pHy1jdLzydKvbpfT5kU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"6OezXoONPQZb/b1WMzIwESDG8Us="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"ftYxfQB4pHy1jdLzydKvbpfT5kU=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"6OezXoONPQZb/b1WMzIwESDG8Us=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"bSOVhcwzOam5qiJk3/fhvLh0NuM="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"6OezXoONPQZb/b1WMzIwESDG8Us=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"bSOVhcwzOam5qiJk3/fhvLh0NuM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"B4bzyuoKgGwV+suLrMeO6T+SJO4="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"bSOVhcwzOam5qiJk3/fhvLh0NuM=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"B4bzyuoKgGwV+suLrMeO6T+SJO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"X2foWTsu7IBKTMydFZn7v9kvUWA="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"B4bzyuoKgGwV+suLrMeO6T+SJO4=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"X2foWTsu7IBKTMydFZn7v9kvUWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"CAl3Xr3VbNsocILtQGSeadkDwIA="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"X2foWTsu7IBKTMydFZn7v9kvUWA=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"CAl3Xr3VbNsocILtQGSeadkDwIA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"2f+YiHkqPDsa5e0fTAhsnaPzxHw="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"CAl3Xr3VbNsocILtQGSeadkDwIA=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T22:00:00Z","end_date":"2026-06-14T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"2f+YiHkqPDsa5e0fTAhsnaPzxHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"vhSbD4fhjdHT/0iS03R01+QjmtY="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"2f+YiHkqPDsa5e0fTAhsnaPzxHw=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"vhSbD4fhjdHT/0iS03R01+QjmtY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"uAeT77Vv6d6EoswOihLfsP41LqM="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"vhSbD4fhjdHT/0iS03R01+QjmtY=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"uAeT77Vv6d6EoswOihLfsP41LqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"WCDQnGQlLgz0I8j/Klr12cuUMIc="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"uAeT77Vv6d6EoswOihLfsP41LqM=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"WCDQnGQlLgz0I8j/Klr12cuUMIc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"xXlpSD7c89ec9ZRmJAQngD+9gMg="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"WCDQnGQlLgz0I8j/Klr12cuUMIc=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"xXlpSD7c89ec9ZRmJAQngD+9gMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"ht+L45VwUid7b14FGy6LQbWNNo4="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"xXlpSD7c89ec9ZRmJAQngD+9gMg=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"ht+L45VwUid7b14FGy6LQbWNNo4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"Cq6/t9MEL7eMng/kGsOGGEaJSa8="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"ht+L45VwUid7b14FGy6LQbWNNo4=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"Cq6/t9MEL7eMng/kGsOGGEaJSa8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"tcTWr8yA5jg0PGcZkvpJWlujxQU="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"Cq6/t9MEL7eMng/kGsOGGEaJSa8=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"tcTWr8yA5jg0PGcZkvpJWlujxQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"+rKGAhL3RrBW7ykmVl/NnCvFWTc="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"tcTWr8yA5jg0PGcZkvpJWlujxQU=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"+rKGAhL3RrBW7ykmVl/NnCvFWTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="},{"type":"next-occurrence","id":"g33yoRV4+8xuRJWLlPAdhtN+mNA="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"+rKGAhL3RrBW7ykmVl/NnCvFWTc=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"g33yoRV4+8xuRJWLlPAdhtN+mNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ip90WuEKkWQvvgI1Q5OLakFSdP4="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"g33yoRV4+8xuRJWLlPAdhtN+mNA=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iAJfAWj5qGvUMC3iiSe3aCKrpns="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"iAJfAWj5qGvUMC3iiSe3aCKrpns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"oN7HrfRHTJwJr0tBE+HOy37ZhpM="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"iAJfAWj5qGvUMC3iiSe3aCKrpns=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"oN7HrfRHTJwJr0tBE+HOy37ZhpM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"XV6Gsv4vkbPczPtBH39cJ6noRc0="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"oN7HrfRHTJwJr0tBE+HOy37ZhpM=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T23:00:00Z","end_date":"2026-06-07T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"XV6Gsv4vkbPczPtBH39cJ6noRc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"kCcp1WGSXpZr7dcIArbEam4cgQU="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"XV6Gsv4vkbPczPtBH39cJ6noRc0=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"kCcp1WGSXpZr7dcIArbEam4cgQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"J1fFiAlnOl7a9GPT2z+h5XaU4do="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"kCcp1WGSXpZr7dcIArbEam4cgQU=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"J1fFiAlnOl7a9GPT2z+h5XaU4do=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"lVZm9ehIiilnnmulNbI0jQGLeAM="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"J1fFiAlnOl7a9GPT2z+h5XaU4do=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"lVZm9ehIiilnnmulNbI0jQGLeAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"V3/ngT3Pep29qLAnrw0m919TC4c="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"lVZm9ehIiilnnmulNbI0jQGLeAM=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"V3/ngT3Pep29qLAnrw0m919TC4c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"y1cHVkmvKMxmaBToSIKfOixYCbM="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"V3/ngT3Pep29qLAnrw0m919TC4c=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"y1cHVkmvKMxmaBToSIKfOixYCbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"h/whg5XFbD719osJ8mlwUMQqtpE="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"y1cHVkmvKMxmaBToSIKfOixYCbM=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"h/whg5XFbD719osJ8mlwUMQqtpE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"zhTUh/pxrc/rj9geTwERK+YId6g="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"h/whg5XFbD719osJ8mlwUMQqtpE=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"zhTUh/pxrc/rj9geTwERK+YId6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"JsVlBn0l3m2U8Lt7Wuk/yrf0dp0="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"zhTUh/pxrc/rj9geTwERK+YId6g=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"JsVlBn0l3m2U8Lt7Wuk/yrf0dp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"3TyzCs6wD9+lsP87yBDyd1XYcIA="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"JsVlBn0l3m2U8Lt7Wuk/yrf0dp0=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"3TyzCs6wD9+lsP87yBDyd1XYcIA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"q2ip7yDv+58GkZT0e8WeW+hYJ6U="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"3TyzCs6wD9+lsP87yBDyd1XYcIA=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"q2ip7yDv+58GkZT0e8WeW+hYJ6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"3hpgpMxPdPWBUEztaL9F6EjKhJg="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"q2ip7yDv+58GkZT0e8WeW+hYJ6U=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T23:00:00Z","end_date":"2026-06-14T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"3hpgpMxPdPWBUEztaL9F6EjKhJg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"Jfju2Va2gED++90pVSRSQGYNU3I="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"3hpgpMxPdPWBUEztaL9F6EjKhJg=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"Jfju2Va2gED++90pVSRSQGYNU3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"f58SYYZY288fEdLqQ/w3y67uUdE="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"Jfju2Va2gED++90pVSRSQGYNU3I=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"f58SYYZY288fEdLqQ/w3y67uUdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"VUGSIbriVWJBcRK9daRwmDeyi9E="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"f58SYYZY288fEdLqQ/w3y67uUdE=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"VUGSIbriVWJBcRK9daRwmDeyi9E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"sm2Kzck/ZVvvgcL0VyvJv9CVZFU="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"VUGSIbriVWJBcRK9daRwmDeyi9E=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"sm2Kzck/ZVvvgcL0VyvJv9CVZFU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"mbS5mQygOgjCFfr3xi7UlqEri0E="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"sm2Kzck/ZVvvgcL0VyvJv9CVZFU=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"mbS5mQygOgjCFfr3xi7UlqEri0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"i3Oj/ZtgkpFeBLRNm2XcV9Qnnyo="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"mbS5mQygOgjCFfr3xi7UlqEri0E=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"i3Oj/ZtgkpFeBLRNm2XcV9Qnnyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"1VQiraB5spENcZAHoZXM+E0ftLQ="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"i3Oj/ZtgkpFeBLRNm2XcV9Qnnyo=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"1VQiraB5spENcZAHoZXM+E0ftLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"mvkrJ3BWuRnujHdB0yfWiTeZJZw="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"1VQiraB5spENcZAHoZXM+E0ftLQ=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"mvkrJ3BWuRnujHdB0yfWiTeZJZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="},{"type":"next-occurrence","id":"Or3nY5hczZZscBKhm2X7YrAJU+Q="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"mvkrJ3BWuRnujHdB0yfWiTeZJZw=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"Or3nY5hczZZscBKhm2X7YrAJU+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qp1iV/XJjXnXiTXBHYwdr2/JCr8="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"Or3nY5hczZZscBKhm2X7YrAJU+Q=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kPrUQ/0bDLWsSEeoKT7YgBRP16w="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"kPrUQ/0bDLWsSEeoKT7YgBRP16w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"3mrnquJQE9qNtC6yaOb4i9JDmj0="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"kPrUQ/0bDLWsSEeoKT7YgBRP16w=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"3mrnquJQE9qNtC6yaOb4i9JDmj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"27FUEjOpOFBtQH03xQ4S+UPXSZw="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"3mrnquJQE9qNtC6yaOb4i9JDmj0=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"27FUEjOpOFBtQH03xQ4S+UPXSZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"5JpVoVvydeCXqr/l4nML+DZ9CYI="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"27FUEjOpOFBtQH03xQ4S+UPXSZw=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"5JpVoVvydeCXqr/l4nML+DZ9CYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"7Wxp65cd8+iaWUxOGs/ECeXA6+M="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"5JpVoVvydeCXqr/l4nML+DZ9CYI=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"7Wxp65cd8+iaWUxOGs/ECeXA6+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"cQbpAKeCl0mxReFL8EA3xHW7q/g="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"7Wxp65cd8+iaWUxOGs/ECeXA6+M=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"cQbpAKeCl0mxReFL8EA3xHW7q/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"K2k4wTFzCHuUS5yU83J5twsPQCc="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"cQbpAKeCl0mxReFL8EA3xHW7q/g=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"K2k4wTFzCHuUS5yU83J5twsPQCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"tWFw8wkU3Mw848Fqi80+thZ97wQ="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"K2k4wTFzCHuUS5yU83J5twsPQCc=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"tWFw8wkU3Mw848Fqi80+thZ97wQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"pyKI21WvwwWbT32hLusJBJef9ko="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"tWFw8wkU3Mw848Fqi80+thZ97wQ=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"pyKI21WvwwWbT32hLusJBJef9ko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"V9qoUSk2hvSjYJtJpfsyU5m3GB8="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"pyKI21WvwwWbT32hLusJBJef9ko=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"V9qoUSk2hvSjYJtJpfsyU5m3GB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"DqYBvkDjLSd66Y1P1S+KMWcxABk="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"V9qoUSk2hvSjYJtJpfsyU5m3GB8=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"DqYBvkDjLSd66Y1P1S+KMWcxABk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"uW5lf12gg0OjmPZVYHKQ3JWKo64="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"DqYBvkDjLSd66Y1P1S+KMWcxABk=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"uW5lf12gg0OjmPZVYHKQ3JWKo64=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"qWfptcQ4Gk7i+SKgVnk+BTe6jc8="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"uW5lf12gg0OjmPZVYHKQ3JWKo64=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"qWfptcQ4Gk7i+SKgVnk+BTe6jc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"vJZCCAA2hI7Jf8aHlPdOdV08FGg="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"qWfptcQ4Gk7i+SKgVnk+BTe6jc8=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"vJZCCAA2hI7Jf8aHlPdOdV08FGg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"n/H2PRlpnXl1qV00SSR9RyPaNSQ="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"vJZCCAA2hI7Jf8aHlPdOdV08FGg=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"n/H2PRlpnXl1qV00SSR9RyPaNSQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"OaqghBQptj5hBWt1Q6KV4dbDsHw="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"n/H2PRlpnXl1qV00SSR9RyPaNSQ=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"OaqghBQptj5hBWt1Q6KV4dbDsHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"qAdNiIK9pVSFRiEF9jPvn33RJdY="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"OaqghBQptj5hBWt1Q6KV4dbDsHw=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"qAdNiIK9pVSFRiEF9jPvn33RJdY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"6iKqQHfkyaBKNIGH4AwflnSFcv8="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"qAdNiIK9pVSFRiEF9jPvn33RJdY=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"6iKqQHfkyaBKNIGH4AwflnSFcv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"yD1kmOlqrbwmj3jD9FuSswRJs6w="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"6iKqQHfkyaBKNIGH4AwflnSFcv8=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"yD1kmOlqrbwmj3jD9FuSswRJs6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"1JXam4h8U833y0WMdI4BIX/kV/A="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"yD1kmOlqrbwmj3jD9FuSswRJs6w=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"1JXam4h8U833y0WMdI4BIX/kV/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="},{"type":"next-occurrence","id":"5QmwM2Sy7Qq4IJPEfUW21voqm4k="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"1JXam4h8U833y0WMdI4BIX/kV/A=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"5QmwM2Sy7Qq4IJPEfUW21voqm4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2Wo+mmK8uhuyswaLBGSSXzQuIuk="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"5QmwM2Sy7Qq4IJPEfUW21voqm4k=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"tSPUPks3ok5uAnX46PJR/vbSQhg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xjLeVgO0pqxvMQe1p/F8MEE+TVA="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"tSPUPks3ok5uAnX46PJR/vbSQhg=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"xjLeVgO0pqxvMQe1p/F8MEE+TVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"V2RCtFSdet2NZRzyqNhRfWuFCsI="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"xjLeVgO0pqxvMQe1p/F8MEE+TVA=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"V2RCtFSdet2NZRzyqNhRfWuFCsI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"Zt0hkt7Ag+owtZlLMnnbO0AXfCA="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"V2RCtFSdet2NZRzyqNhRfWuFCsI=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"Zt0hkt7Ag+owtZlLMnnbO0AXfCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"QcEwP4a+bxCw+k89D3uUS4el3hE="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"Zt0hkt7Ag+owtZlLMnnbO0AXfCA=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"QcEwP4a+bxCw+k89D3uUS4el3hE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"F+K5+EfM5EkvicgyxRQWIgX2Xb8="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"QcEwP4a+bxCw+k89D3uUS4el3hE=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"F+K5+EfM5EkvicgyxRQWIgX2Xb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"S02zhUaG2qvPnUuoRM/xVg6vk1o="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"F+K5+EfM5EkvicgyxRQWIgX2Xb8=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"S02zhUaG2qvPnUuoRM/xVg6vk1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"Y9a6gD6lzI5ZtslR2Xj2+SgxyfY="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"S02zhUaG2qvPnUuoRM/xVg6vk1o=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"Y9a6gD6lzI5ZtslR2Xj2+SgxyfY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"vzQfxPDHpBwDYuCgz84l0yt0aLY="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"Y9a6gD6lzI5ZtslR2Xj2+SgxyfY=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"vzQfxPDHpBwDYuCgz84l0yt0aLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"+qt0DdNVNrywnw3O5j1YTH/zXVo="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"vzQfxPDHpBwDYuCgz84l0yt0aLY=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"+qt0DdNVNrywnw3O5j1YTH/zXVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"u8MZ71Ww8ukmX67tnPcb8Kqwza8="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"+qt0DdNVNrywnw3O5j1YTH/zXVo=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"u8MZ71Ww8ukmX67tnPcb8Kqwza8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"e+bj2KCaYQwcMPzlyv7mWYxpckI="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"u8MZ71Ww8ukmX67tnPcb8Kqwza8=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"e+bj2KCaYQwcMPzlyv7mWYxpckI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"HFYWwKbuO7CfsCMAid+Z0LL5Wvg="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"e+bj2KCaYQwcMPzlyv7mWYxpckI=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"HFYWwKbuO7CfsCMAid+Z0LL5Wvg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"1dF/6sy+tn934bJlE/pLjpXqjIA="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"HFYWwKbuO7CfsCMAid+Z0LL5Wvg=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"1dF/6sy+tn934bJlE/pLjpXqjIA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"33lhJp08HgqyR2KafER60PmGloI="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"1dF/6sy+tn934bJlE/pLjpXqjIA=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"33lhJp08HgqyR2KafER60PmGloI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"1xs6xHtAmQaBT/RZ52Isujr/InY="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"33lhJp08HgqyR2KafER60PmGloI=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"1xs6xHtAmQaBT/RZ52Isujr/InY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"Eji94h/igjVxRJE2I5hwiuKFZlk="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"1xs6xHtAmQaBT/RZ52Isujr/InY=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"Eji94h/igjVxRJE2I5hwiuKFZlk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"Czvg1LsfaCegA23ZSEiFVwIQyVo="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"Eji94h/igjVxRJE2I5hwiuKFZlk=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"Czvg1LsfaCegA23ZSEiFVwIQyVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"wjUycSaQ6FDqozhKqx64uTo/Olo="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"Czvg1LsfaCegA23ZSEiFVwIQyVo=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"wjUycSaQ6FDqozhKqx64uTo/Olo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"gy6/rPfKO8sZKsD9V3RHeLgiX28="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"wjUycSaQ6FDqozhKqx64uTo/Olo=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"gy6/rPfKO8sZKsD9V3RHeLgiX28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"8xh86EQK1UcxXOUntBqlSiUqEeE="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"gy6/rPfKO8sZKsD9V3RHeLgiX28=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"8xh86EQK1UcxXOUntBqlSiUqEeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="},{"type":"next-occurrence","id":"dilYmJLIsYc8U4ahK14TVQG47xs="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"8xh86EQK1UcxXOUntBqlSiUqEeE=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"dilYmJLIsYc8U4ahK14TVQG47xs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSPUPks3ok5uAnX46PJR/vbSQhg="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"dilYmJLIsYc8U4ahK14TVQG47xs=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"kXcI95Gq1GMU9DRYrUBqFLn+ZH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Q0kpdcQQbbs/PY/xPe4aEOLB8sI="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) all trains at 3 Av and 1 Av board from the 8 Av-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line. , Tuesday March 10th, 2026 thru Thursday June 25th, 2026, Tuesday/Thursday, 01:30 AM thru 05:00 AM","update_date":"2026-05-14T15:18:23Z"},"road_event_id":"kXcI95Gq1GMU9DRYrUBqFLn+ZH0=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T05:30:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"Q0kpdcQQbbs/PY/xPe4aEOLB8sI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kXcI95Gq1GMU9DRYrUBqFLn+ZH0="},{"type":"next-occurrence","id":"UxblPr34WCagxAcRADBGCZWBhC4="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) all trains at 3 Av and 1 Av board from the 8 Av-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line. , Tuesday March 10th, 2026 thru Thursday June 25th, 2026, Tuesday/Thursday, 01:30 AM thru 05:00 AM","update_date":"2026-05-14T15:18:23Z"},"road_event_id":"Q0kpdcQQbbs/PY/xPe4aEOLB8sI=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T05:30:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"UxblPr34WCagxAcRADBGCZWBhC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kXcI95Gq1GMU9DRYrUBqFLn+ZH0="},{"type":"next-occurrence","id":"4M3I/OTVSWa8nsPDV83SyfgfKYA="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) all trains at 3 Av and 1 Av board from the 8 Av-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line. , Tuesday March 10th, 2026 thru Thursday June 25th, 2026, Tuesday/Thursday, 01:30 AM thru 05:00 AM","update_date":"2026-05-14T15:18:23Z"},"road_event_id":"UxblPr34WCagxAcRADBGCZWBhC4=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T05:30:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"4M3I/OTVSWa8nsPDV83SyfgfKYA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kXcI95Gq1GMU9DRYrUBqFLn+ZH0="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) all trains at 3 Av and 1 Av board from the 8 Av-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line. , Tuesday March 10th, 2026 thru Thursday June 25th, 2026, Tuesday/Thursday, 01:30 AM thru 05:00 AM","update_date":"2026-05-14T15:18:23Z"},"road_event_id":"4M3I/OTVSWa8nsPDV83SyfgfKYA=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T05:30:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"HSABIeO+3TE/uyZB0uQvGh+3lRo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M11 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, M11 Bus at Amsterdam Av/W 62 St (New York) stop is being bypassed until 2028, use the stops on Amsterdam Ave at W 59th St or W 65th St, Continuous Thursday March 12th, 2026 07:43 AM thru Monday January 3rd, 2028 11:59 PM","update_date":"2026-03-12T11:43:37Z"},"road_event_id":"HSABIeO+3TE/uyZB0uQvGh+3lRo=","beginning_cross_street":"Amsterdam Av/W 62 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985836,40.772642]]}},{"id":"3+jfWxPvCtCABQua6NvU//oQvps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GARDEN RD"],"direction":"unknown","related_road_events":[],"description":"Bridge work on GARDEN RD both directions RT-26 (Philadelphia) to Sophia Street (Philadelphia) Garden Rd over Indian River Bridge #P021Closed to Traffic until further notice, Continuous Thursday November 2nd, 2023 12:00 AM thru Thursday December 31st, 2026 11:59 PM All lanes closed westbound; All lanes of 1 lanes closed eastbound, Continuous Thursday November 2nd, 2023 12:00 AM thru Thursday December 31st, 2026 11:59 PM All lanes closed","update_date":"2026-01-02T21:30:19Z"},"road_event_id":"3+jfWxPvCtCABQua6NvU//oQvps=","beginning_cross_street":" RT-26","ending_cross_street":"Sophia Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.708586,44.158968]]}},{"id":"ZDOVXIXrCVBa1t6oSzz0JYR1IhQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Ouo2kwrChRLTClEbmPacdHq4oCg="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Sunday thru Saturday, 06:30 AM thru 06:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T22:00:01Z"},"road_event_id":"ZDOVXIXrCVBa1t6oSzz0JYR1IhQ=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"Ouo2kwrChRLTClEbmPacdHq4oCg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZDOVXIXrCVBa1t6oSzz0JYR1IhQ="},{"type":"next-occurrence","id":"8sfNKMl/MCpQf8TeFc+DSvaRCMg="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Sunday thru Saturday, 06:30 AM thru 06:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T22:00:01Z"},"road_event_id":"Ouo2kwrChRLTClEbmPacdHq4oCg=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:30:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"8sfNKMl/MCpQf8TeFc+DSvaRCMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZDOVXIXrCVBa1t6oSzz0JYR1IhQ="},{"type":"next-occurrence","id":"PZWNbiAMnMVBp22PYAmrfHfJvJg="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Sunday thru Saturday, 06:30 AM thru 06:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T22:00:01Z"},"road_event_id":"8sfNKMl/MCpQf8TeFc+DSvaRCMg=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T10:30:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"PZWNbiAMnMVBp22PYAmrfHfJvJg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZDOVXIXrCVBa1t6oSzz0JYR1IhQ="},{"type":"next-occurrence","id":"C2NIw1iz+7xLAX1nMBFOZFdOE50="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Sunday thru Saturday, 06:30 AM thru 06:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T22:00:01Z"},"road_event_id":"PZWNbiAMnMVBp22PYAmrfHfJvJg=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"C2NIw1iz+7xLAX1nMBFOZFdOE50=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZDOVXIXrCVBa1t6oSzz0JYR1IhQ="},{"type":"next-occurrence","id":"gM/a1v3fLpBpfx5va9Y5Furdvgk="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Sunday thru Saturday, 06:30 AM thru 06:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T22:00:01Z"},"road_event_id":"C2NIw1iz+7xLAX1nMBFOZFdOE50=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"gM/a1v3fLpBpfx5va9Y5Furdvgk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZDOVXIXrCVBa1t6oSzz0JYR1IhQ="},{"type":"next-occurrence","id":"W5idxi4JvppJj2IK/jScFAJU3Jo="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Sunday thru Saturday, 06:30 AM thru 06:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T22:00:01Z"},"road_event_id":"gM/a1v3fLpBpfx5va9Y5Furdvgk=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"W5idxi4JvppJj2IK/jScFAJU3Jo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZDOVXIXrCVBa1t6oSzz0JYR1IhQ="},{"type":"next-occurrence","id":"xu6qK0KDfSAVKQ78Uny7y8ODM/I="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Sunday thru Saturday, 06:30 AM thru 06:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T22:00:01Z"},"road_event_id":"W5idxi4JvppJj2IK/jScFAJU3Jo=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"xu6qK0KDfSAVKQ78Uny7y8ODM/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZDOVXIXrCVBa1t6oSzz0JYR1IhQ="},{"type":"next-occurrence","id":"sE5D2yjbOR5uE7yUmreP6crOg1s="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Sunday thru Saturday, 06:30 AM thru 06:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T22:00:01Z"},"road_event_id":"xu6qK0KDfSAVKQ78Uny7y8ODM/I=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"sE5D2yjbOR5uE7yUmreP6crOg1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZDOVXIXrCVBa1t6oSzz0JYR1IhQ="},{"type":"next-occurrence","id":"yC7d5g6cYwLkQWJsLoUyo+iHPr8="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Sunday thru Saturday, 06:30 AM thru 06:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T22:00:01Z"},"road_event_id":"sE5D2yjbOR5uE7yUmreP6crOg1s=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T10:30:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"yC7d5g6cYwLkQWJsLoUyo+iHPr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZDOVXIXrCVBa1t6oSzz0JYR1IhQ="},{"type":"next-occurrence","id":"ObW1kzKFMOMia8vfGDJgtBdL/Eg="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Sunday thru Saturday, 06:30 AM thru 06:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T22:00:01Z"},"road_event_id":"yC7d5g6cYwLkQWJsLoUyo+iHPr8=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T10:30:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"ObW1kzKFMOMia8vfGDJgtBdL/Eg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZDOVXIXrCVBa1t6oSzz0JYR1IhQ="},{"type":"next-occurrence","id":"XcINQ5y8Bs/tZ4g3eX9gDPzfu/w="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Sunday thru Saturday, 06:30 AM thru 06:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T22:00:01Z"},"road_event_id":"ObW1kzKFMOMia8vfGDJgtBdL/Eg=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"XcINQ5y8Bs/tZ4g3eX9gDPzfu/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZDOVXIXrCVBa1t6oSzz0JYR1IhQ="},{"type":"next-occurrence","id":"vI5mo1I08myB2OKZi8DObgSOlK8="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Sunday thru Saturday, 06:30 AM thru 06:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T22:00:01Z"},"road_event_id":"XcINQ5y8Bs/tZ4g3eX9gDPzfu/w=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"vI5mo1I08myB2OKZi8DObgSOlK8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZDOVXIXrCVBa1t6oSzz0JYR1IhQ="},{"type":"next-occurrence","id":"SOxZKrEqk5nNPtq41TVC/JTfyKI="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Sunday thru Saturday, 06:30 AM thru 06:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T22:00:01Z"},"road_event_id":"vI5mo1I08myB2OKZi8DObgSOlK8=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"SOxZKrEqk5nNPtq41TVC/JTfyKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZDOVXIXrCVBa1t6oSzz0JYR1IhQ="},{"type":"next-occurrence","id":"HROw7Scja7MMidPHszxMk59Y07A="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Sunday thru Saturday, 06:30 AM thru 06:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T22:00:01Z"},"road_event_id":"SOxZKrEqk5nNPtq41TVC/JTfyKI=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"HROw7Scja7MMidPHszxMk59Y07A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZDOVXIXrCVBa1t6oSzz0JYR1IhQ="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Sunday thru Saturday, 06:30 AM thru 06:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T22:00:01Z"},"road_event_id":"HROw7Scja7MMidPHszxMk59Y07A=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"VhLj4ChbIDf/FZBpXZJcsdqeTrs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"R4c88iMQguLY+09me2ADiC79vgk="}],"description":"Substructure repairs on NY 117 northbound between King Street; NY 120 (New Castle) and Memorial Drive (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday July 16th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:53:36Z"},"road_event_id":"VhLj4ChbIDf/FZBpXZJcsdqeTrs=","beginning_cross_street":"King Street - NY 120","ending_cross_street":"Memorial Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.765006,41.15867]]}},{"id":"R4c88iMQguLY+09me2ADiC79vgk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VhLj4ChbIDf/FZBpXZJcsdqeTrs="},{"type":"next-occurrence","id":"bRKTOi+K0+hM3QMHmwzdX2x1k3I="}],"description":"Substructure repairs on NY 117 northbound between King Street; NY 120 (New Castle) and Memorial Drive (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday July 16th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:53:36Z"},"road_event_id":"R4c88iMQguLY+09me2ADiC79vgk=","beginning_cross_street":"King Street - NY 120","ending_cross_street":"Memorial Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.765006,41.15867]]}},{"id":"bRKTOi+K0+hM3QMHmwzdX2x1k3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VhLj4ChbIDf/FZBpXZJcsdqeTrs="},{"type":"next-occurrence","id":"wnt/92vI44YODc3Xn6udbFJYm5c="}],"description":"Substructure repairs on NY 117 northbound between King Street; NY 120 (New Castle) and Memorial Drive (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday July 16th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:53:36Z"},"road_event_id":"bRKTOi+K0+hM3QMHmwzdX2x1k3I=","beginning_cross_street":"King Street - NY 120","ending_cross_street":"Memorial Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.765006,41.15867]]}},{"id":"wnt/92vI44YODc3Xn6udbFJYm5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VhLj4ChbIDf/FZBpXZJcsdqeTrs="},{"type":"next-occurrence","id":"gGLeM3DqKpaCHcRmrevCRXdQmF8="}],"description":"Substructure repairs on NY 117 northbound between King Street; NY 120 (New Castle) and Memorial Drive (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday July 16th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:53:36Z"},"road_event_id":"wnt/92vI44YODc3Xn6udbFJYm5c=","beginning_cross_street":"King Street - NY 120","ending_cross_street":"Memorial Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.765006,41.15867]]}},{"id":"gGLeM3DqKpaCHcRmrevCRXdQmF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VhLj4ChbIDf/FZBpXZJcsdqeTrs="},{"type":"next-occurrence","id":"hu2UOim4hWvw/30zalIC2a5I7t0="}],"description":"Substructure repairs on NY 117 northbound between King Street; NY 120 (New Castle) and Memorial Drive (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday July 16th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:53:36Z"},"road_event_id":"gGLeM3DqKpaCHcRmrevCRXdQmF8=","beginning_cross_street":"King Street - NY 120","ending_cross_street":"Memorial Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.765006,41.15867]]}},{"id":"hu2UOim4hWvw/30zalIC2a5I7t0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VhLj4ChbIDf/FZBpXZJcsdqeTrs="},{"type":"next-occurrence","id":"Dg1oZ+58RFa96yqkP8koTp7DfXc="}],"description":"Substructure repairs on NY 117 northbound between King Street; NY 120 (New Castle) and Memorial Drive (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday July 16th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:53:36Z"},"road_event_id":"hu2UOim4hWvw/30zalIC2a5I7t0=","beginning_cross_street":"King Street - NY 120","ending_cross_street":"Memorial Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.765006,41.15867]]}},{"id":"Dg1oZ+58RFa96yqkP8koTp7DfXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VhLj4ChbIDf/FZBpXZJcsdqeTrs="},{"type":"next-occurrence","id":"sAfqySXuDzLFBPi9grMJ80CsbWI="}],"description":"Substructure repairs on NY 117 northbound between King Street; NY 120 (New Castle) and Memorial Drive (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday July 16th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:53:36Z"},"road_event_id":"Dg1oZ+58RFa96yqkP8koTp7DfXc=","beginning_cross_street":"King Street - NY 120","ending_cross_street":"Memorial Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.765006,41.15867]]}},{"id":"sAfqySXuDzLFBPi9grMJ80CsbWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VhLj4ChbIDf/FZBpXZJcsdqeTrs="},{"type":"next-occurrence","id":"QtSSCrnE7KdAHBeI6OOkRzMNzOY="}],"description":"Substructure repairs on NY 117 northbound between King Street; NY 120 (New Castle) and Memorial Drive (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday July 16th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:53:36Z"},"road_event_id":"sAfqySXuDzLFBPi9grMJ80CsbWI=","beginning_cross_street":"King Street - NY 120","ending_cross_street":"Memorial Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.765006,41.15867]]}},{"id":"QtSSCrnE7KdAHBeI6OOkRzMNzOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VhLj4ChbIDf/FZBpXZJcsdqeTrs="},{"type":"next-occurrence","id":"+Wd7GcI8tpppPl3/udCtkpNLAGI="}],"description":"Substructure repairs on NY 117 northbound between King Street; NY 120 (New Castle) and Memorial Drive (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday July 16th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:53:36Z"},"road_event_id":"QtSSCrnE7KdAHBeI6OOkRzMNzOY=","beginning_cross_street":"King Street - NY 120","ending_cross_street":"Memorial Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.765006,41.15867]]}},{"id":"+Wd7GcI8tpppPl3/udCtkpNLAGI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VhLj4ChbIDf/FZBpXZJcsdqeTrs="},{"type":"next-occurrence","id":"YCXnexZcCI0bgVIQBgjSLzhiHP0="}],"description":"Substructure repairs on NY 117 northbound between King Street; NY 120 (New Castle) and Memorial Drive (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday July 16th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:53:36Z"},"road_event_id":"+Wd7GcI8tpppPl3/udCtkpNLAGI=","beginning_cross_street":"King Street - NY 120","ending_cross_street":"Memorial Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.765006,41.15867]]}},{"id":"YCXnexZcCI0bgVIQBgjSLzhiHP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VhLj4ChbIDf/FZBpXZJcsdqeTrs="}],"description":"Substructure repairs on NY 117 northbound between King Street; NY 120 (New Castle) and Memorial Drive (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday July 16th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:53:36Z"},"road_event_id":"YCXnexZcCI0bgVIQBgjSLzhiHP0=","beginning_cross_street":"King Street - NY 120","ending_cross_street":"Memorial Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.765006,41.15867]]}},{"id":"esuRqrUlTbbvLkyDlf+GSTXgxmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"luZh8paS8syAiXl6jTkJdGaTa4Y="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"esuRqrUlTbbvLkyDlf+GSTXgxmQ=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"luZh8paS8syAiXl6jTkJdGaTa4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"esuRqrUlTbbvLkyDlf+GSTXgxmQ="},{"type":"next-occurrence","id":"AkUqTsjhCYN2xhYxa85HS2uJhyc="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"luZh8paS8syAiXl6jTkJdGaTa4Y=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T03:00:00Z","end_date":"2026-06-07T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"AkUqTsjhCYN2xhYxa85HS2uJhyc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"esuRqrUlTbbvLkyDlf+GSTXgxmQ="},{"type":"next-occurrence","id":"WmygimYWIwqWbT24FVFqOpOFpLc="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"AkUqTsjhCYN2xhYxa85HS2uJhyc=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T03:00:00Z","end_date":"2026-06-08T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"WmygimYWIwqWbT24FVFqOpOFpLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"esuRqrUlTbbvLkyDlf+GSTXgxmQ="},{"type":"next-occurrence","id":"XHoY7t7XpKS98GtzXwwP6jND7ZY="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"WmygimYWIwqWbT24FVFqOpOFpLc=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"XHoY7t7XpKS98GtzXwwP6jND7ZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"esuRqrUlTbbvLkyDlf+GSTXgxmQ="},{"type":"next-occurrence","id":"Sb1//g9mj/iLQuPrbZu7mRXacgc="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"XHoY7t7XpKS98GtzXwwP6jND7ZY=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"Sb1//g9mj/iLQuPrbZu7mRXacgc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"esuRqrUlTbbvLkyDlf+GSTXgxmQ="},{"type":"next-occurrence","id":"aIRq/lRd3MPrdoCX2NvcmLytN98="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"Sb1//g9mj/iLQuPrbZu7mRXacgc=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"aIRq/lRd3MPrdoCX2NvcmLytN98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"esuRqrUlTbbvLkyDlf+GSTXgxmQ="},{"type":"next-occurrence","id":"1qznxVSGhstH9Sy66EvzqqeELBw="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"aIRq/lRd3MPrdoCX2NvcmLytN98=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"1qznxVSGhstH9Sy66EvzqqeELBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"esuRqrUlTbbvLkyDlf+GSTXgxmQ="},{"type":"next-occurrence","id":"nB5A0TYYYCi7XeFKpwWZgHb8UXg="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"1qznxVSGhstH9Sy66EvzqqeELBw=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"nB5A0TYYYCi7XeFKpwWZgHb8UXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"esuRqrUlTbbvLkyDlf+GSTXgxmQ="},{"type":"next-occurrence","id":"LxX02795Lmw+jdse20+tRMIIOL0="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"nB5A0TYYYCi7XeFKpwWZgHb8UXg=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T03:00:00Z","end_date":"2026-06-14T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"LxX02795Lmw+jdse20+tRMIIOL0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"esuRqrUlTbbvLkyDlf+GSTXgxmQ="},{"type":"next-occurrence","id":"KQ/VMbCR5lw6E3OrE9Wvl0Pno78="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"LxX02795Lmw+jdse20+tRMIIOL0=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T03:00:00Z","end_date":"2026-06-15T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"KQ/VMbCR5lw6E3OrE9Wvl0Pno78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"esuRqrUlTbbvLkyDlf+GSTXgxmQ="},{"type":"next-occurrence","id":"3g6J0XegQ3VOlh9wMCt+EDbSfBg="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"KQ/VMbCR5lw6E3OrE9Wvl0Pno78=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T02:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"3g6J0XegQ3VOlh9wMCt+EDbSfBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"esuRqrUlTbbvLkyDlf+GSTXgxmQ="},{"type":"next-occurrence","id":"VzQ7o5Z9BBOH4TsbKY3OpUDKlzw="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"3g6J0XegQ3VOlh9wMCt+EDbSfBg=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T02:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"VzQ7o5Z9BBOH4TsbKY3OpUDKlzw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"esuRqrUlTbbvLkyDlf+GSTXgxmQ="},{"type":"next-occurrence","id":"Z/2SRqBLecPChXPtNUX9h41txss="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"VzQ7o5Z9BBOH4TsbKY3OpUDKlzw=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T02:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"Z/2SRqBLecPChXPtNUX9h41txss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"esuRqrUlTbbvLkyDlf+GSTXgxmQ="},{"type":"next-occurrence","id":"9/4MXoUakUBDGZ8YUYPbZikz9Q4="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"Z/2SRqBLecPChXPtNUX9h41txss=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T02:00:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"9/4MXoUakUBDGZ8YUYPbZikz9Q4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"esuRqrUlTbbvLkyDlf+GSTXgxmQ="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"9/4MXoUakUBDGZ8YUYPbZikz9Q4=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T02:00:00Z","end_date":"2026-06-20T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"66v13BmH1eukgxzrgVIMgB/AmuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Cja0nQidS8kla2LfZKUFxAlz7Ao="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"66v13BmH1eukgxzrgVIMgB/AmuE=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"Cja0nQidS8kla2LfZKUFxAlz7Ao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"66v13BmH1eukgxzrgVIMgB/AmuE="},{"type":"next-occurrence","id":"Y8yUdxtgTx5VxguQ+VWX778rXAM="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"Cja0nQidS8kla2LfZKUFxAlz7Ao=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T01:00:00Z","end_date":"2026-06-07T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"Y8yUdxtgTx5VxguQ+VWX778rXAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"66v13BmH1eukgxzrgVIMgB/AmuE="},{"type":"next-occurrence","id":"/dUh5FOh+I8tgFBSxOun6EH3EAY="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"Y8yUdxtgTx5VxguQ+VWX778rXAM=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T01:00:00Z","end_date":"2026-06-08T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"/dUh5FOh+I8tgFBSxOun6EH3EAY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"66v13BmH1eukgxzrgVIMgB/AmuE="},{"type":"next-occurrence","id":"FFzPyI7m6/dcECNkyBQfuknH+Ro="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"/dUh5FOh+I8tgFBSxOun6EH3EAY=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"FFzPyI7m6/dcECNkyBQfuknH+Ro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"66v13BmH1eukgxzrgVIMgB/AmuE="},{"type":"next-occurrence","id":"LO8dz1RQ7/42dWPC7SxA7KqEtfo="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"FFzPyI7m6/dcECNkyBQfuknH+Ro=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"LO8dz1RQ7/42dWPC7SxA7KqEtfo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"66v13BmH1eukgxzrgVIMgB/AmuE="},{"type":"next-occurrence","id":"Z3gd7TCO+aamWA0UbT4FH192JOw="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"LO8dz1RQ7/42dWPC7SxA7KqEtfo=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"Z3gd7TCO+aamWA0UbT4FH192JOw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"66v13BmH1eukgxzrgVIMgB/AmuE="},{"type":"next-occurrence","id":"iTZcxhl3ZZ5jodltjkGy62Nye2M="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"Z3gd7TCO+aamWA0UbT4FH192JOw=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"iTZcxhl3ZZ5jodltjkGy62Nye2M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"66v13BmH1eukgxzrgVIMgB/AmuE="},{"type":"next-occurrence","id":"t2UamIjhXXEPl9ZRrFXFeYR1ojE="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"iTZcxhl3ZZ5jodltjkGy62Nye2M=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T01:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"t2UamIjhXXEPl9ZRrFXFeYR1ojE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"66v13BmH1eukgxzrgVIMgB/AmuE="},{"type":"next-occurrence","id":"wvwNET6zrKdtRhfZp1yppVixjgA="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"t2UamIjhXXEPl9ZRrFXFeYR1ojE=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T01:00:00Z","end_date":"2026-06-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"wvwNET6zrKdtRhfZp1yppVixjgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"66v13BmH1eukgxzrgVIMgB/AmuE="},{"type":"next-occurrence","id":"/haMPFSVd/E0B/UldzCY8jGhcgA="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"wvwNET6zrKdtRhfZp1yppVixjgA=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T01:00:00Z","end_date":"2026-06-15T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"/haMPFSVd/E0B/UldzCY8jGhcgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"66v13BmH1eukgxzrgVIMgB/AmuE="},{"type":"next-occurrence","id":"w2TIJy6IwbUmKE0U6Dw+Jb5++J4="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"/haMPFSVd/E0B/UldzCY8jGhcgA=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T01:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"w2TIJy6IwbUmKE0U6Dw+Jb5++J4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"66v13BmH1eukgxzrgVIMgB/AmuE="},{"type":"next-occurrence","id":"NVf62X0TWHr3Ujq4maa3eWXYlpY="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"w2TIJy6IwbUmKE0U6Dw+Jb5++J4=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T01:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"NVf62X0TWHr3Ujq4maa3eWXYlpY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"66v13BmH1eukgxzrgVIMgB/AmuE="},{"type":"next-occurrence","id":"JMUJbUDNJZkO3tjN8+m80FtpKrY="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"NVf62X0TWHr3Ujq4maa3eWXYlpY=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T01:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"JMUJbUDNJZkO3tjN8+m80FtpKrY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"66v13BmH1eukgxzrgVIMgB/AmuE="},{"type":"next-occurrence","id":"yhgWyVSue4+FgoUMQtQTrKje6C8="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"JMUJbUDNJZkO3tjN8+m80FtpKrY=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T01:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"yhgWyVSue4+FgoUMQtQTrKje6C8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"66v13BmH1eukgxzrgVIMgB/AmuE="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"yhgWyVSue4+FgoUMQtQTrKje6C8=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T01:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"Ul0Kmn1HHNPcMfzBWcx/m5ekgWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 221"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 221 both directions between Jennings Creek Rd (Lapeer) and Cooper Hill Rd (Lapeer) ; follow detour, Continuous Monday February 2nd, 2026 07:00 AM thru Monday September 21st, 2026 04:00 PM All lanes closed","update_date":"2026-03-12T11:08:21Z"},"road_event_id":"Ul0Kmn1HHNPcMfzBWcx/m5ekgWw=","beginning_cross_street":"Jennings Creek Rd","ending_cross_street":"Cooper Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.083494,42.425507]]}},{"id":"UbIFhPLcnVeU+gcnEQ8WXePDFow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Roadwork and toll plaza repairs on I-87 Northway northbound at END ROUTE I-87; US-Canadian Line (Champlain) Starting on 4/21/25, border crossing will be restricted to trailers over 16'4\" in height, 8'5\" in width and over 53' in length. , Monday April 21st, 2025 thru Sunday December 31st, 2028, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2025-04-15T16:28:14Z"},"road_event_id":"UbIFhPLcnVeU+gcnEQ8WXePDFow=","beginning_cross_street":"END ROUTE I-87; US-Canadian Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.452066,45.008807]]}},{"id":"0FTFksqZbSWvRiaXIERzJL90Ckw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UjMwHGBxnmD1J2ESHAG0mzwG84s="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"0FTFksqZbSWvRiaXIERzJL90Ckw=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"UjMwHGBxnmD1J2ESHAG0mzwG84s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0FTFksqZbSWvRiaXIERzJL90Ckw="},{"type":"next-occurrence","id":"3gxSHIN/Y7gjraUsJKbWceNdV7I="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"UjMwHGBxnmD1J2ESHAG0mzwG84s=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"3gxSHIN/Y7gjraUsJKbWceNdV7I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0FTFksqZbSWvRiaXIERzJL90Ckw="},{"type":"next-occurrence","id":"85VHR7QzbkM+BAZhzMmfPtVoo2Y="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"3gxSHIN/Y7gjraUsJKbWceNdV7I=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"85VHR7QzbkM+BAZhzMmfPtVoo2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0FTFksqZbSWvRiaXIERzJL90Ckw="},{"type":"next-occurrence","id":"O18N476cxLElL5Ycy178Q2iiZ/Q="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"85VHR7QzbkM+BAZhzMmfPtVoo2Y=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"O18N476cxLElL5Ycy178Q2iiZ/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0FTFksqZbSWvRiaXIERzJL90Ckw="},{"type":"next-occurrence","id":"CcJ56RrOciGF+eGe2p1rcgrikeU="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"O18N476cxLElL5Ycy178Q2iiZ/Q=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"CcJ56RrOciGF+eGe2p1rcgrikeU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0FTFksqZbSWvRiaXIERzJL90Ckw="},{"type":"next-occurrence","id":"kdEfgTbEn11HmpZJRrvg/m0ofPc="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"CcJ56RrOciGF+eGe2p1rcgrikeU=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"kdEfgTbEn11HmpZJRrvg/m0ofPc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0FTFksqZbSWvRiaXIERzJL90Ckw="},{"type":"next-occurrence","id":"VCDNmhqGe3cEzQYPei5R3c42wZg="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"kdEfgTbEn11HmpZJRrvg/m0ofPc=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"VCDNmhqGe3cEzQYPei5R3c42wZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0FTFksqZbSWvRiaXIERzJL90Ckw="},{"type":"next-occurrence","id":"2JJJgKLFX+plBgNwVrW50z2YEws="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"VCDNmhqGe3cEzQYPei5R3c42wZg=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"2JJJgKLFX+plBgNwVrW50z2YEws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0FTFksqZbSWvRiaXIERzJL90Ckw="},{"type":"next-occurrence","id":"NxzVehU4Q+xK/8fSvg2CbBnr5lA="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"2JJJgKLFX+plBgNwVrW50z2YEws=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"NxzVehU4Q+xK/8fSvg2CbBnr5lA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0FTFksqZbSWvRiaXIERzJL90Ckw="},{"type":"next-occurrence","id":"x1WD/dxfO8orcv0opqMl9jQvLBE="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"NxzVehU4Q+xK/8fSvg2CbBnr5lA=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"x1WD/dxfO8orcv0opqMl9jQvLBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0FTFksqZbSWvRiaXIERzJL90Ckw="},{"type":"next-occurrence","id":"hqvnGpdEjI4VydnXujSpdk/NTT8="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"x1WD/dxfO8orcv0opqMl9jQvLBE=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"hqvnGpdEjI4VydnXujSpdk/NTT8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0FTFksqZbSWvRiaXIERzJL90Ckw="},{"type":"next-occurrence","id":"+KWTxdgjOJSu6vU7SXCAG68W0jw="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"hqvnGpdEjI4VydnXujSpdk/NTT8=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"+KWTxdgjOJSu6vU7SXCAG68W0jw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0FTFksqZbSWvRiaXIERzJL90Ckw="},{"type":"next-occurrence","id":"Bcjfqoutf4thlCFey7jeuz+LtKg="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"+KWTxdgjOJSu6vU7SXCAG68W0jw=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"Bcjfqoutf4thlCFey7jeuz+LtKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0FTFksqZbSWvRiaXIERzJL90Ckw="},{"type":"next-occurrence","id":"CQCnjj0vPuK2P9ycgI4bjPKgBiA="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"Bcjfqoutf4thlCFey7jeuz+LtKg=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"CQCnjj0vPuK2P9ycgI4bjPKgBiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0FTFksqZbSWvRiaXIERzJL90Ckw="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"CQCnjj0vPuK2P9ycgI4bjPKgBiA=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"NDPXyDOY17TS8j+h4UGNqUeycr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"H9Wj7/wxtreT29qu6zx/RxpYeqo="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-06-02T19:03:53Z"},"road_event_id":"NDPXyDOY17TS8j+h4UGNqUeycr8=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"H9Wj7/wxtreT29qu6zx/RxpYeqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NDPXyDOY17TS8j+h4UGNqUeycr8="},{"type":"next-occurrence","id":"igG39WPvl/Zewt1xdCb191WuQCA="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-06-02T19:03:53Z"},"road_event_id":"H9Wj7/wxtreT29qu6zx/RxpYeqo=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"igG39WPvl/Zewt1xdCb191WuQCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NDPXyDOY17TS8j+h4UGNqUeycr8="},{"type":"next-occurrence","id":"4VVpTkrwdV5/i7hyOIpgq+CAuM4="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-06-02T19:03:53Z"},"road_event_id":"igG39WPvl/Zewt1xdCb191WuQCA=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"4VVpTkrwdV5/i7hyOIpgq+CAuM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NDPXyDOY17TS8j+h4UGNqUeycr8="},{"type":"next-occurrence","id":"P+ogeIK2JRTELLBze5kJx+SpRwg="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-06-02T19:03:53Z"},"road_event_id":"4VVpTkrwdV5/i7hyOIpgq+CAuM4=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"P+ogeIK2JRTELLBze5kJx+SpRwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NDPXyDOY17TS8j+h4UGNqUeycr8="},{"type":"next-occurrence","id":"JydnVovfIJZQVZ0bGQYb+runGRo="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-06-02T19:03:53Z"},"road_event_id":"P+ogeIK2JRTELLBze5kJx+SpRwg=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"JydnVovfIJZQVZ0bGQYb+runGRo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NDPXyDOY17TS8j+h4UGNqUeycr8="},{"type":"next-occurrence","id":"slMM1JLNrGjniLzY2ps2LkOclBw="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-06-02T19:03:53Z"},"road_event_id":"JydnVovfIJZQVZ0bGQYb+runGRo=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"slMM1JLNrGjniLzY2ps2LkOclBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NDPXyDOY17TS8j+h4UGNqUeycr8="},{"type":"next-occurrence","id":"c+QOaeMnh2ByRWixvZ0Qe0KKeOQ="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-06-02T19:03:53Z"},"road_event_id":"slMM1JLNrGjniLzY2ps2LkOclBw=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"c+QOaeMnh2ByRWixvZ0Qe0KKeOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NDPXyDOY17TS8j+h4UGNqUeycr8="},{"type":"next-occurrence","id":"z69jvcth+lfA3WcurdPgsy+6rnA="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-06-02T19:03:53Z"},"road_event_id":"c+QOaeMnh2ByRWixvZ0Qe0KKeOQ=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"z69jvcth+lfA3WcurdPgsy+6rnA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NDPXyDOY17TS8j+h4UGNqUeycr8="},{"type":"next-occurrence","id":"x9sM3Ftg9MvbQNimc+H97uSD/rQ="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-06-02T19:03:53Z"},"road_event_id":"z69jvcth+lfA3WcurdPgsy+6rnA=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"x9sM3Ftg9MvbQNimc+H97uSD/rQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NDPXyDOY17TS8j+h4UGNqUeycr8="},{"type":"next-occurrence","id":"88Gkrm0aXIX3Mdy5Rvbrfugn/sM="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-06-02T19:03:53Z"},"road_event_id":"x9sM3Ftg9MvbQNimc+H97uSD/rQ=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"88Gkrm0aXIX3Mdy5Rvbrfugn/sM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NDPXyDOY17TS8j+h4UGNqUeycr8="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-06-02T19:03:53Z"},"road_event_id":"88Gkrm0aXIX3Mdy5Rvbrfugn/sM=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"86/bOaxdyQLBvKBC9NIGp/tSrgI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"l25B4YkUN1SU1TpTHT2NTz+9N6Y="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"86/bOaxdyQLBvKBC9NIGp/tSrgI=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"l25B4YkUN1SU1TpTHT2NTz+9N6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"86/bOaxdyQLBvKBC9NIGp/tSrgI="},{"type":"next-occurrence","id":"mexKraoj/X1fTVlBWYV9WryMUWs="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"l25B4YkUN1SU1TpTHT2NTz+9N6Y=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"mexKraoj/X1fTVlBWYV9WryMUWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"86/bOaxdyQLBvKBC9NIGp/tSrgI="},{"type":"next-occurrence","id":"vZH2sBlmfpbi7BjxXPO1+YG4OHo="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"mexKraoj/X1fTVlBWYV9WryMUWs=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"vZH2sBlmfpbi7BjxXPO1+YG4OHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"86/bOaxdyQLBvKBC9NIGp/tSrgI="},{"type":"next-occurrence","id":"p1aBVcB028huoG1EmctnbEWlXjw="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"vZH2sBlmfpbi7BjxXPO1+YG4OHo=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"p1aBVcB028huoG1EmctnbEWlXjw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"86/bOaxdyQLBvKBC9NIGp/tSrgI="},{"type":"next-occurrence","id":"da6sq0fi96pQjDXc2qysGTQiGt4="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"p1aBVcB028huoG1EmctnbEWlXjw=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"da6sq0fi96pQjDXc2qysGTQiGt4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"86/bOaxdyQLBvKBC9NIGp/tSrgI="},{"type":"next-occurrence","id":"BS6lG8EbP5M3RtwE/FVudQubMQo="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"da6sq0fi96pQjDXc2qysGTQiGt4=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"BS6lG8EbP5M3RtwE/FVudQubMQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"86/bOaxdyQLBvKBC9NIGp/tSrgI="},{"type":"next-occurrence","id":"0Ljdb/2zTYoFS1ucTj7mDaoejpc="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"BS6lG8EbP5M3RtwE/FVudQubMQo=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"0Ljdb/2zTYoFS1ucTj7mDaoejpc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"86/bOaxdyQLBvKBC9NIGp/tSrgI="},{"type":"next-occurrence","id":"PN5vMLW5AoOOnyNfktqD2QlYySY="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"0Ljdb/2zTYoFS1ucTj7mDaoejpc=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"PN5vMLW5AoOOnyNfktqD2QlYySY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"86/bOaxdyQLBvKBC9NIGp/tSrgI="},{"type":"next-occurrence","id":"3mw95C9SvoDE5W6xlpixmWWNfxM="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"PN5vMLW5AoOOnyNfktqD2QlYySY=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"3mw95C9SvoDE5W6xlpixmWWNfxM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"86/bOaxdyQLBvKBC9NIGp/tSrgI="},{"type":"next-occurrence","id":"EtMYJ5m+WzzIKIo6yUZ9Ynqv9xI="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"3mw95C9SvoDE5W6xlpixmWWNfxM=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"EtMYJ5m+WzzIKIo6yUZ9Ynqv9xI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"86/bOaxdyQLBvKBC9NIGp/tSrgI="},{"type":"next-occurrence","id":"jIRre4/PKRGXHncb4x7zmMU9dAc="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"EtMYJ5m+WzzIKIo6yUZ9Ynqv9xI=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"jIRre4/PKRGXHncb4x7zmMU9dAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"86/bOaxdyQLBvKBC9NIGp/tSrgI="},{"type":"next-occurrence","id":"Xwm0IBbeYzeKNDRfMpr7ZNpe3bg="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"jIRre4/PKRGXHncb4x7zmMU9dAc=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"Xwm0IBbeYzeKNDRfMpr7ZNpe3bg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"86/bOaxdyQLBvKBC9NIGp/tSrgI="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday May 26th, 2026 thru Saturday June 20th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-05-22T10:01:01Z"},"road_event_id":"Xwm0IBbeYzeKNDRfMpr7ZNpe3bg=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"Q6/ASIA7d3LegPGLLPTWThvqkgg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 26TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FsX4vZ93VqUP5U78Cu4cWqOLOPY="}],"description":"Construction on E 26TH ST eastbound between 3RD AVE (New York) and 2ND AVE (New York) for system enhancement-gas., Saturday April 11th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-04-07T17:22:12Z"},"road_event_id":"Q6/ASIA7d3LegPGLLPTWThvqkgg=","beginning_cross_street":"3RD AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981521,40.740629]]}},{"id":"FsX4vZ93VqUP5U78Cu4cWqOLOPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 26TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q6/ASIA7d3LegPGLLPTWThvqkgg="}],"description":"Construction on E 26TH ST eastbound between 3RD AVE (New York) and 2ND AVE (New York) for system enhancement-gas., Saturday April 11th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-04-07T17:22:12Z"},"road_event_id":"FsX4vZ93VqUP5U78Cu4cWqOLOPY=","beginning_cross_street":"3RD AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981521,40.740629]]}},{"id":"ORC300367575","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","description":"Bridge replacement on NJ 47 both directions CR 551/Broadway Av (Westville) to US 130 (Westville) Not currently Scheduled","update_date":"2026-01-01T04:59:00Z"},"road_event_id":"ORC300367575","beginning_cross_street":"CR 551/Broadway Av","ending_cross_street":"US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2024-05-10T17:48:01Z","end_date":"2026-01-01T04:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-75.125527,39.870341]]}},{"id":"YDjfCR+jvUNGBOjfALGPYBoZefM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ua8jDwqsp85Gg6ZCojpSy5yl/Ew="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"YDjfCR+jvUNGBOjfALGPYBoZefM=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"ua8jDwqsp85Gg6ZCojpSy5yl/Ew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDjfCR+jvUNGBOjfALGPYBoZefM="},{"type":"next-occurrence","id":"q+uQMdGigzS6VBIupwxLER2SVvk="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"ua8jDwqsp85Gg6ZCojpSy5yl/Ew=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"q+uQMdGigzS6VBIupwxLER2SVvk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDjfCR+jvUNGBOjfALGPYBoZefM="},{"type":"next-occurrence","id":"xW9JHarqiyhEgkS0nwXYfsIx2uc="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"q+uQMdGigzS6VBIupwxLER2SVvk=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"xW9JHarqiyhEgkS0nwXYfsIx2uc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDjfCR+jvUNGBOjfALGPYBoZefM="},{"type":"next-occurrence","id":"PBE8K5ZGjoUz7gFMoPrLhV0KJJU="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"xW9JHarqiyhEgkS0nwXYfsIx2uc=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"PBE8K5ZGjoUz7gFMoPrLhV0KJJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDjfCR+jvUNGBOjfALGPYBoZefM="},{"type":"next-occurrence","id":"e6Q+2Gg43yWbw8IvRU6Zqc1X6oc="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"PBE8K5ZGjoUz7gFMoPrLhV0KJJU=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"e6Q+2Gg43yWbw8IvRU6Zqc1X6oc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDjfCR+jvUNGBOjfALGPYBoZefM="},{"type":"next-occurrence","id":"X3Vu3vv8qyxHfJ7HPrSHM6ce/zU="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"e6Q+2Gg43yWbw8IvRU6Zqc1X6oc=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"X3Vu3vv8qyxHfJ7HPrSHM6ce/zU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDjfCR+jvUNGBOjfALGPYBoZefM="},{"type":"next-occurrence","id":"mAGME+rFbRmV4IVK0o/nYiz/HoI="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"X3Vu3vv8qyxHfJ7HPrSHM6ce/zU=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"mAGME+rFbRmV4IVK0o/nYiz/HoI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDjfCR+jvUNGBOjfALGPYBoZefM="},{"type":"next-occurrence","id":"Xzwu5wCDzbX3tV5AkMb6a88mGBk="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"mAGME+rFbRmV4IVK0o/nYiz/HoI=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"Xzwu5wCDzbX3tV5AkMb6a88mGBk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDjfCR+jvUNGBOjfALGPYBoZefM="},{"type":"next-occurrence","id":"D6pyQe/K6wxD8uqb2UjI8pc1DwA="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"Xzwu5wCDzbX3tV5AkMb6a88mGBk=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"D6pyQe/K6wxD8uqb2UjI8pc1DwA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDjfCR+jvUNGBOjfALGPYBoZefM="},{"type":"next-occurrence","id":"B7hMNRX9Rj2uejVlMSuVueqFhME="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"D6pyQe/K6wxD8uqb2UjI8pc1DwA=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"B7hMNRX9Rj2uejVlMSuVueqFhME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDjfCR+jvUNGBOjfALGPYBoZefM="},{"type":"next-occurrence","id":"qgyade3nlTqWezpWCd0P/bxWKtE="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"B7hMNRX9Rj2uejVlMSuVueqFhME=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"qgyade3nlTqWezpWCd0P/bxWKtE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDjfCR+jvUNGBOjfALGPYBoZefM="},{"type":"next-occurrence","id":"/mGh4/NTMkuLJtEiZ7Z+Ml2aNik="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"qgyade3nlTqWezpWCd0P/bxWKtE=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"/mGh4/NTMkuLJtEiZ7Z+Ml2aNik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDjfCR+jvUNGBOjfALGPYBoZefM="},{"type":"next-occurrence","id":"zlebipv5NnQNHtDZOr/J9C1G/5s="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"/mGh4/NTMkuLJtEiZ7Z+Ml2aNik=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"zlebipv5NnQNHtDZOr/J9C1G/5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDjfCR+jvUNGBOjfALGPYBoZefM="},{"type":"next-occurrence","id":"GVPddFGWgaUtg0P4N3CS9Ecbfqw="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"zlebipv5NnQNHtDZOr/J9C1G/5s=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"GVPddFGWgaUtg0P4N3CS9Ecbfqw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YDjfCR+jvUNGBOjfALGPYBoZefM="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"GVPddFGWgaUtg0P4N3CS9Ecbfqw=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"G4vlzRHbwtyDwTqIyG67wEZYMmc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1qTnnY3tKY3gBuoGA44nx/POmto="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"G4vlzRHbwtyDwTqIyG67wEZYMmc=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"1qTnnY3tKY3gBuoGA44nx/POmto=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G4vlzRHbwtyDwTqIyG67wEZYMmc="},{"type":"next-occurrence","id":"2giIA1+LFkEcLUxMMBhkFFLCCT4="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"1qTnnY3tKY3gBuoGA44nx/POmto=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"2giIA1+LFkEcLUxMMBhkFFLCCT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G4vlzRHbwtyDwTqIyG67wEZYMmc="},{"type":"next-occurrence","id":"qg67RQh+trY87SUU7AtGqYRcXhY="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"2giIA1+LFkEcLUxMMBhkFFLCCT4=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"qg67RQh+trY87SUU7AtGqYRcXhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G4vlzRHbwtyDwTqIyG67wEZYMmc="},{"type":"next-occurrence","id":"YOa2gZTUC1dCzSwDW1PhbOwVyk4="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"qg67RQh+trY87SUU7AtGqYRcXhY=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"YOa2gZTUC1dCzSwDW1PhbOwVyk4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G4vlzRHbwtyDwTqIyG67wEZYMmc="},{"type":"next-occurrence","id":"B9bKf0Bdl7UrKYdseYsnek7OOq4="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"YOa2gZTUC1dCzSwDW1PhbOwVyk4=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"B9bKf0Bdl7UrKYdseYsnek7OOq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G4vlzRHbwtyDwTqIyG67wEZYMmc="},{"type":"next-occurrence","id":"Fzba6tmHiMzh/ViZ24rzX2PqlYI="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"B9bKf0Bdl7UrKYdseYsnek7OOq4=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"Fzba6tmHiMzh/ViZ24rzX2PqlYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G4vlzRHbwtyDwTqIyG67wEZYMmc="},{"type":"next-occurrence","id":"LHytGwrs3YVwjcXkqxkflTIMKwA="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"Fzba6tmHiMzh/ViZ24rzX2PqlYI=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"LHytGwrs3YVwjcXkqxkflTIMKwA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G4vlzRHbwtyDwTqIyG67wEZYMmc="},{"type":"next-occurrence","id":"EJ0SaJSo1AcZzpexNFDsNfdH2LM="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"LHytGwrs3YVwjcXkqxkflTIMKwA=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"EJ0SaJSo1AcZzpexNFDsNfdH2LM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G4vlzRHbwtyDwTqIyG67wEZYMmc="},{"type":"next-occurrence","id":"ab8+/MPD6Y7IVLczceHmzyBxFU4="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"EJ0SaJSo1AcZzpexNFDsNfdH2LM=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"ab8+/MPD6Y7IVLczceHmzyBxFU4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G4vlzRHbwtyDwTqIyG67wEZYMmc="},{"type":"next-occurrence","id":"NL2qAq9qC0K0TkaEAPG4WgiNrd4="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"ab8+/MPD6Y7IVLczceHmzyBxFU4=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"NL2qAq9qC0K0TkaEAPG4WgiNrd4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G4vlzRHbwtyDwTqIyG67wEZYMmc="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"NL2qAq9qC0K0TkaEAPG4WgiNrd4=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"hUjcaKPyVJPdKgZB/3pCX2+3UF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ori28f98jqBo7Q6FnUha/JoHOBU="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"hUjcaKPyVJPdKgZB/3pCX2+3UF4=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"ori28f98jqBo7Q6FnUha/JoHOBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUjcaKPyVJPdKgZB/3pCX2+3UF4="},{"type":"next-occurrence","id":"2CCn/o//zpNgIN+E1Fw2Lu+7VaI="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"ori28f98jqBo7Q6FnUha/JoHOBU=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"2CCn/o//zpNgIN+E1Fw2Lu+7VaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUjcaKPyVJPdKgZB/3pCX2+3UF4="},{"type":"next-occurrence","id":"IRyhh9Svx5cmSGlrX+uDXvyb+Mo="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"2CCn/o//zpNgIN+E1Fw2Lu+7VaI=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"IRyhh9Svx5cmSGlrX+uDXvyb+Mo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUjcaKPyVJPdKgZB/3pCX2+3UF4="},{"type":"next-occurrence","id":"J6QDrMICJwtpMM/U0b33zEv5JPA="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"IRyhh9Svx5cmSGlrX+uDXvyb+Mo=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"J6QDrMICJwtpMM/U0b33zEv5JPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUjcaKPyVJPdKgZB/3pCX2+3UF4="},{"type":"next-occurrence","id":"L4svBCYjp0PBfIvDYN1dJS5DoYI="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"J6QDrMICJwtpMM/U0b33zEv5JPA=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"L4svBCYjp0PBfIvDYN1dJS5DoYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUjcaKPyVJPdKgZB/3pCX2+3UF4="},{"type":"next-occurrence","id":"xXR1wIC+vh7TELpEwzU+CSl1qKw="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"L4svBCYjp0PBfIvDYN1dJS5DoYI=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"xXR1wIC+vh7TELpEwzU+CSl1qKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUjcaKPyVJPdKgZB/3pCX2+3UF4="},{"type":"next-occurrence","id":"2THifLBlUW5Sdl4ydp7mBiA03CE="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"xXR1wIC+vh7TELpEwzU+CSl1qKw=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"2THifLBlUW5Sdl4ydp7mBiA03CE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUjcaKPyVJPdKgZB/3pCX2+3UF4="},{"type":"next-occurrence","id":"6oyYcvAl6y7O8NiQHMe/IAuw7qM="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"2THifLBlUW5Sdl4ydp7mBiA03CE=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"6oyYcvAl6y7O8NiQHMe/IAuw7qM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUjcaKPyVJPdKgZB/3pCX2+3UF4="},{"type":"next-occurrence","id":"LXMd23GlFfRikoPgK7ISaRKmDO4="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"6oyYcvAl6y7O8NiQHMe/IAuw7qM=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"LXMd23GlFfRikoPgK7ISaRKmDO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUjcaKPyVJPdKgZB/3pCX2+3UF4="},{"type":"next-occurrence","id":"YkRPFLRz6zC+kDXRiGJzmHVwwhw="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"LXMd23GlFfRikoPgK7ISaRKmDO4=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"YkRPFLRz6zC+kDXRiGJzmHVwwhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUjcaKPyVJPdKgZB/3pCX2+3UF4="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"YkRPFLRz6zC+kDXRiGJzmHVwwhw=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"NgkveqXFTxIwBJBdhHMD76y776w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2s+jahURfFvnILzcL/EmZRnA/qc="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"NgkveqXFTxIwBJBdhHMD76y776w=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"2s+jahURfFvnILzcL/EmZRnA/qc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NgkveqXFTxIwBJBdhHMD76y776w="},{"type":"next-occurrence","id":"fP7xVcqNRLrslQnBA4d1gOYeLtc="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"2s+jahURfFvnILzcL/EmZRnA/qc=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"fP7xVcqNRLrslQnBA4d1gOYeLtc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NgkveqXFTxIwBJBdhHMD76y776w="},{"type":"next-occurrence","id":"muj1WPH68ER99IDsSq3+MZo/4M8="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"fP7xVcqNRLrslQnBA4d1gOYeLtc=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"muj1WPH68ER99IDsSq3+MZo/4M8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NgkveqXFTxIwBJBdhHMD76y776w="},{"type":"next-occurrence","id":"86tpTwL6aQqoDNb5U1rEixiKROk="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"muj1WPH68ER99IDsSq3+MZo/4M8=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"86tpTwL6aQqoDNb5U1rEixiKROk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NgkveqXFTxIwBJBdhHMD76y776w="},{"type":"next-occurrence","id":"ZD/4h42Ft7ummnR3rc7dM2V+vnI="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"86tpTwL6aQqoDNb5U1rEixiKROk=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"ZD/4h42Ft7ummnR3rc7dM2V+vnI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NgkveqXFTxIwBJBdhHMD76y776w="},{"type":"next-occurrence","id":"2N5ti3RZ97HlP87zqZmJo5hgnAM="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"ZD/4h42Ft7ummnR3rc7dM2V+vnI=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"2N5ti3RZ97HlP87zqZmJo5hgnAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NgkveqXFTxIwBJBdhHMD76y776w="},{"type":"next-occurrence","id":"tnDbLm622Owe3wGZKuRMGhGd82E="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"2N5ti3RZ97HlP87zqZmJo5hgnAM=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"tnDbLm622Owe3wGZKuRMGhGd82E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NgkveqXFTxIwBJBdhHMD76y776w="},{"type":"next-occurrence","id":"gW75UfAXTNT+FKbJHkopPzFjAm8="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"tnDbLm622Owe3wGZKuRMGhGd82E=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"gW75UfAXTNT+FKbJHkopPzFjAm8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NgkveqXFTxIwBJBdhHMD76y776w="},{"type":"next-occurrence","id":"OyGqN/sA/B+V5vkcl8ZLx1D9y3s="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"gW75UfAXTNT+FKbJHkopPzFjAm8=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"OyGqN/sA/B+V5vkcl8ZLx1D9y3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NgkveqXFTxIwBJBdhHMD76y776w="},{"type":"next-occurrence","id":"+LDT6pZpiQv0hyHp8ctwQX5JMjs="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"OyGqN/sA/B+V5vkcl8ZLx1D9y3s=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"+LDT6pZpiQv0hyHp8ctwQX5JMjs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NgkveqXFTxIwBJBdhHMD76y776w="},{"type":"next-occurrence","id":"210VDKgKX/kGzA4pP30Y8VXl86A="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"+LDT6pZpiQv0hyHp8ctwQX5JMjs=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"210VDKgKX/kGzA4pP30Y8VXl86A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NgkveqXFTxIwBJBdhHMD76y776w="},{"type":"next-occurrence","id":"v4kwE7SSw3IT0XAV83uR5UCXOVw="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"210VDKgKX/kGzA4pP30Y8VXl86A=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"v4kwE7SSw3IT0XAV83uR5UCXOVw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NgkveqXFTxIwBJBdhHMD76y776w="},{"type":"next-occurrence","id":"cjupbLa2vlhLniFA1Pd87IqH/9Y="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"v4kwE7SSw3IT0XAV83uR5UCXOVw=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"cjupbLa2vlhLniFA1Pd87IqH/9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NgkveqXFTxIwBJBdhHMD76y776w="},{"type":"next-occurrence","id":"wgLpueVp3L3GdE7h8mdV19EYpPM="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"cjupbLa2vlhLniFA1Pd87IqH/9Y=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"wgLpueVp3L3GdE7h8mdV19EYpPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NgkveqXFTxIwBJBdhHMD76y776w="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"wgLpueVp3L3GdE7h8mdV19EYpPM=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"gvnmZa2Gpt7b3uBJM2O0bgvaayE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YWvyaNFczeC8BtlSJF6TJLtN3jY="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"gvnmZa2Gpt7b3uBJM2O0bgvaayE=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"YWvyaNFczeC8BtlSJF6TJLtN3jY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gvnmZa2Gpt7b3uBJM2O0bgvaayE="},{"type":"next-occurrence","id":"9YUJxAamVnHgYOLIzW/aoBzEcHk="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"YWvyaNFczeC8BtlSJF6TJLtN3jY=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"9YUJxAamVnHgYOLIzW/aoBzEcHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gvnmZa2Gpt7b3uBJM2O0bgvaayE="},{"type":"next-occurrence","id":"SYM8gYNftViu9fwlDFqE9RfBLfs="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"9YUJxAamVnHgYOLIzW/aoBzEcHk=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"SYM8gYNftViu9fwlDFqE9RfBLfs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gvnmZa2Gpt7b3uBJM2O0bgvaayE="},{"type":"next-occurrence","id":"pVB6yYiDpmEqHKwLtDnNdyzdopM="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"SYM8gYNftViu9fwlDFqE9RfBLfs=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"pVB6yYiDpmEqHKwLtDnNdyzdopM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gvnmZa2Gpt7b3uBJM2O0bgvaayE="},{"type":"next-occurrence","id":"s8UWSIxU+rHR3rYSMvacxiC+8pw="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"pVB6yYiDpmEqHKwLtDnNdyzdopM=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"s8UWSIxU+rHR3rYSMvacxiC+8pw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gvnmZa2Gpt7b3uBJM2O0bgvaayE="},{"type":"next-occurrence","id":"qrutm/TKcfgNuEyj1shhUG2/wmY="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"s8UWSIxU+rHR3rYSMvacxiC+8pw=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"qrutm/TKcfgNuEyj1shhUG2/wmY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gvnmZa2Gpt7b3uBJM2O0bgvaayE="},{"type":"next-occurrence","id":"gzhYj8ai4oNDkiRf98VvP/xxB28="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"qrutm/TKcfgNuEyj1shhUG2/wmY=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"gzhYj8ai4oNDkiRf98VvP/xxB28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gvnmZa2Gpt7b3uBJM2O0bgvaayE="},{"type":"next-occurrence","id":"FckNZePa6hA350W6GSIcO2b/weA="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"gzhYj8ai4oNDkiRf98VvP/xxB28=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"FckNZePa6hA350W6GSIcO2b/weA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gvnmZa2Gpt7b3uBJM2O0bgvaayE="},{"type":"next-occurrence","id":"qBBW61UHgWNzw1ZUO1/6p9F31JA="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"FckNZePa6hA350W6GSIcO2b/weA=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"qBBW61UHgWNzw1ZUO1/6p9F31JA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gvnmZa2Gpt7b3uBJM2O0bgvaayE="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Sunday June 14th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:38:17Z"},"road_event_id":"qBBW61UHgWNzw1ZUO1/6p9F31JA=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"ORC300435275","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for Sandrespc-East side coastal resiliency. Not currently Scheduled","update_date":"2025-05-30T20:00:02Z"},"road_event_id":"ORC300435275","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-04-01T20:13:26Z","end_date":"2025-05-31T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.977725,40.733945]]}},{"id":"ho+zqKtQf8bKDtbtK9dOYfeG7wI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bT6fHvnDF3yXLXItKWRhLXpbIWU="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"ho+zqKtQf8bKDtbtK9dOYfeG7wI=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"bT6fHvnDF3yXLXItKWRhLXpbIWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ho+zqKtQf8bKDtbtK9dOYfeG7wI="},{"type":"next-occurrence","id":"MjMG+2oULDyytKwMQUEkyNNs8AY="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"bT6fHvnDF3yXLXItKWRhLXpbIWU=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"MjMG+2oULDyytKwMQUEkyNNs8AY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ho+zqKtQf8bKDtbtK9dOYfeG7wI="},{"type":"next-occurrence","id":"Kc1IXh23+cASzdH9f1wehRBssc8="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"MjMG+2oULDyytKwMQUEkyNNs8AY=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"Kc1IXh23+cASzdH9f1wehRBssc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ho+zqKtQf8bKDtbtK9dOYfeG7wI="},{"type":"next-occurrence","id":"0vLduKXx3aOLiFXLBahQZw4l7Zo="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"Kc1IXh23+cASzdH9f1wehRBssc8=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"0vLduKXx3aOLiFXLBahQZw4l7Zo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ho+zqKtQf8bKDtbtK9dOYfeG7wI="},{"type":"next-occurrence","id":"ZMTIldCuIaLzkf7AJkLKztQ69KI="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"0vLduKXx3aOLiFXLBahQZw4l7Zo=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"ZMTIldCuIaLzkf7AJkLKztQ69KI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ho+zqKtQf8bKDtbtK9dOYfeG7wI="},{"type":"next-occurrence","id":"CxAzbSkOJGouFjsDscr5XyzCw1Q="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"ZMTIldCuIaLzkf7AJkLKztQ69KI=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"CxAzbSkOJGouFjsDscr5XyzCw1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ho+zqKtQf8bKDtbtK9dOYfeG7wI="},{"type":"next-occurrence","id":"y/nI1VM2QXR3r1J6rPVQdmkCXaU="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"CxAzbSkOJGouFjsDscr5XyzCw1Q=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"y/nI1VM2QXR3r1J6rPVQdmkCXaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ho+zqKtQf8bKDtbtK9dOYfeG7wI="},{"type":"next-occurrence","id":"TVJYEZzgXoQAHZjCFOEiwfl1Wis="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"y/nI1VM2QXR3r1J6rPVQdmkCXaU=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"TVJYEZzgXoQAHZjCFOEiwfl1Wis=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ho+zqKtQf8bKDtbtK9dOYfeG7wI="},{"type":"next-occurrence","id":"Hb9RtnvusbQawBZyTRKV8YEWvTY="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"TVJYEZzgXoQAHZjCFOEiwfl1Wis=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"Hb9RtnvusbQawBZyTRKV8YEWvTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ho+zqKtQf8bKDtbtK9dOYfeG7wI="},{"type":"next-occurrence","id":"cVQA6e4RBAyEjf5ZWPOLkvDZWnM="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"Hb9RtnvusbQawBZyTRKV8YEWvTY=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"cVQA6e4RBAyEjf5ZWPOLkvDZWnM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ho+zqKtQf8bKDtbtK9dOYfeG7wI="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-12T20:36:57Z"},"road_event_id":"cVQA6e4RBAyEjf5ZWPOLkvDZWnM=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"kzGh0D5+Qs5iS2gtGY3paS220i8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WiwMTQ9O/Vw4Rd+r5TzZ9Fd6nus="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"kzGh0D5+Qs5iS2gtGY3paS220i8=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T12:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"WiwMTQ9O/Vw4Rd+r5TzZ9Fd6nus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kzGh0D5+Qs5iS2gtGY3paS220i8="},{"type":"next-occurrence","id":"NJ/HEdjpcHSH0fqR5eLtaI9MCEE="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"WiwMTQ9O/Vw4Rd+r5TzZ9Fd6nus=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"NJ/HEdjpcHSH0fqR5eLtaI9MCEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kzGh0D5+Qs5iS2gtGY3paS220i8="},{"type":"next-occurrence","id":"Ux4graNIZoEByCaB9Ex8lAihD5E="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"NJ/HEdjpcHSH0fqR5eLtaI9MCEE=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"Ux4graNIZoEByCaB9Ex8lAihD5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kzGh0D5+Qs5iS2gtGY3paS220i8="},{"type":"next-occurrence","id":"JYh3dhViCRZk8DJBYjus/CPEz8g="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"Ux4graNIZoEByCaB9Ex8lAihD5E=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"JYh3dhViCRZk8DJBYjus/CPEz8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kzGh0D5+Qs5iS2gtGY3paS220i8="},{"type":"next-occurrence","id":"gzgT6ZHmKWFprEPxWpwuef+0YMo="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"JYh3dhViCRZk8DJBYjus/CPEz8g=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"gzgT6ZHmKWFprEPxWpwuef+0YMo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kzGh0D5+Qs5iS2gtGY3paS220i8="},{"type":"next-occurrence","id":"zn5Wq/b8Zz3ObC1rZMc2Qn+sZoI="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"gzgT6ZHmKWFprEPxWpwuef+0YMo=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"zn5Wq/b8Zz3ObC1rZMc2Qn+sZoI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kzGh0D5+Qs5iS2gtGY3paS220i8="},{"type":"next-occurrence","id":"u65jatXUvx5BGao/V8evQ2EQ5qE="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"zn5Wq/b8Zz3ObC1rZMc2Qn+sZoI=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T12:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"u65jatXUvx5BGao/V8evQ2EQ5qE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kzGh0D5+Qs5iS2gtGY3paS220i8="},{"type":"next-occurrence","id":"dnApTRdU66JvyRBxOoKGM9oTF4Y="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"u65jatXUvx5BGao/V8evQ2EQ5qE=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T12:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"dnApTRdU66JvyRBxOoKGM9oTF4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kzGh0D5+Qs5iS2gtGY3paS220i8="},{"type":"next-occurrence","id":"qQ5klvlnPtvkY4G9Fq0hBRAUrrw="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"dnApTRdU66JvyRBxOoKGM9oTF4Y=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T12:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"qQ5klvlnPtvkY4G9Fq0hBRAUrrw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kzGh0D5+Qs5iS2gtGY3paS220i8="},{"type":"next-occurrence","id":"WSq+JfpMbG2P76fEyUzmhg3imgw="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"qQ5klvlnPtvkY4G9Fq0hBRAUrrw=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T12:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"WSq+JfpMbG2P76fEyUzmhg3imgw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kzGh0D5+Qs5iS2gtGY3paS220i8="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"WSq+JfpMbG2P76fEyUzmhg3imgw=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T12:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"mHhMxEWIWpgu8tPfTrOxPgJWj9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VZ1O+ilr9B8eaOxX3C3+pVzdqEU="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"mHhMxEWIWpgu8tPfTrOxPgJWj9g=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"VZ1O+ilr9B8eaOxX3C3+pVzdqEU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mHhMxEWIWpgu8tPfTrOxPgJWj9g="},{"type":"next-occurrence","id":"vYUrpUiVihnep3cxUt3/w3nWx04="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"VZ1O+ilr9B8eaOxX3C3+pVzdqEU=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"vYUrpUiVihnep3cxUt3/w3nWx04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mHhMxEWIWpgu8tPfTrOxPgJWj9g="},{"type":"next-occurrence","id":"D1Jh9TgdW67JiZKhjs2jrqec9/M="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"vYUrpUiVihnep3cxUt3/w3nWx04=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"D1Jh9TgdW67JiZKhjs2jrqec9/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mHhMxEWIWpgu8tPfTrOxPgJWj9g="},{"type":"next-occurrence","id":"xlkHfsVunV24D3Ra//DrF2ONBes="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"D1Jh9TgdW67JiZKhjs2jrqec9/M=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"xlkHfsVunV24D3Ra//DrF2ONBes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mHhMxEWIWpgu8tPfTrOxPgJWj9g="},{"type":"next-occurrence","id":"M9IPyfFPhTe7b4zVLaB/I+7u/u4="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"xlkHfsVunV24D3Ra//DrF2ONBes=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"M9IPyfFPhTe7b4zVLaB/I+7u/u4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mHhMxEWIWpgu8tPfTrOxPgJWj9g="},{"type":"next-occurrence","id":"4YEPnyn5vdDhaM9Qq0wLTFTPQr4="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"M9IPyfFPhTe7b4zVLaB/I+7u/u4=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"4YEPnyn5vdDhaM9Qq0wLTFTPQr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mHhMxEWIWpgu8tPfTrOxPgJWj9g="},{"type":"next-occurrence","id":"WGo5kQEcr6MVbfXSfjww5wVNV5E="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"4YEPnyn5vdDhaM9Qq0wLTFTPQr4=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"WGo5kQEcr6MVbfXSfjww5wVNV5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mHhMxEWIWpgu8tPfTrOxPgJWj9g="},{"type":"next-occurrence","id":"YszlkjPm7uDSz5b7un1CUC1SML0="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"WGo5kQEcr6MVbfXSfjww5wVNV5E=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"YszlkjPm7uDSz5b7un1CUC1SML0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mHhMxEWIWpgu8tPfTrOxPgJWj9g="},{"type":"next-occurrence","id":"kXJhh2tDDNGY8/hKHpp7btMLsxs="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"YszlkjPm7uDSz5b7un1CUC1SML0=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"kXJhh2tDDNGY8/hKHpp7btMLsxs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mHhMxEWIWpgu8tPfTrOxPgJWj9g="},{"type":"next-occurrence","id":"KAZy7Ka2NW3hhF5biwl9IxiE8lI="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"kXJhh2tDDNGY8/hKHpp7btMLsxs=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"KAZy7Ka2NW3hhF5biwl9IxiE8lI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mHhMxEWIWpgu8tPfTrOxPgJWj9g="},{"type":"next-occurrence","id":"Zu2kxh4LoQX1inrwGySlLyaHX5w="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"KAZy7Ka2NW3hhF5biwl9IxiE8lI=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"Zu2kxh4LoQX1inrwGySlLyaHX5w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mHhMxEWIWpgu8tPfTrOxPgJWj9g="},{"type":"next-occurrence","id":"zvtvfbSYsuUpLOYuQjKj6/6oDf8="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"Zu2kxh4LoQX1inrwGySlLyaHX5w=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"zvtvfbSYsuUpLOYuQjKj6/6oDf8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mHhMxEWIWpgu8tPfTrOxPgJWj9g="},{"type":"next-occurrence","id":"jdphsSRTTF1XgHDyHRXDHbRioXM="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"zvtvfbSYsuUpLOYuQjKj6/6oDf8=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"jdphsSRTTF1XgHDyHRXDHbRioXM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mHhMxEWIWpgu8tPfTrOxPgJWj9g="},{"type":"next-occurrence","id":"6ifiRcY9EjpglT/xE2axtnBoqPo="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"jdphsSRTTF1XgHDyHRXDHbRioXM=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"6ifiRcY9EjpglT/xE2axtnBoqPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mHhMxEWIWpgu8tPfTrOxPgJWj9g="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"6ifiRcY9EjpglT/xE2axtnBoqPo=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"qNp7JZpRVlRE9KAJgrrRWTTk9Dk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"s0NvHA2ICRmTBcpmge55G2jJ0O4="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"qNp7JZpRVlRE9KAJgrrRWTTk9Dk=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"s0NvHA2ICRmTBcpmge55G2jJ0O4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qNp7JZpRVlRE9KAJgrrRWTTk9Dk="},{"type":"next-occurrence","id":"T56o/3jTV/n4B9IMwZ7UuxU8YWQ="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"s0NvHA2ICRmTBcpmge55G2jJ0O4=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"T56o/3jTV/n4B9IMwZ7UuxU8YWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qNp7JZpRVlRE9KAJgrrRWTTk9Dk="},{"type":"next-occurrence","id":"a7uyLhcdcKOlo3o/XCeq/P4Dkxw="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"T56o/3jTV/n4B9IMwZ7UuxU8YWQ=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"a7uyLhcdcKOlo3o/XCeq/P4Dkxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qNp7JZpRVlRE9KAJgrrRWTTk9Dk="},{"type":"next-occurrence","id":"4VatVW1cLBcdvUBKYFWCckvnKbo="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"a7uyLhcdcKOlo3o/XCeq/P4Dkxw=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"4VatVW1cLBcdvUBKYFWCckvnKbo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qNp7JZpRVlRE9KAJgrrRWTTk9Dk="},{"type":"next-occurrence","id":"6Cc5D3tSDQlI++HhiWL9+LeCd+g="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"4VatVW1cLBcdvUBKYFWCckvnKbo=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"6Cc5D3tSDQlI++HhiWL9+LeCd+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qNp7JZpRVlRE9KAJgrrRWTTk9Dk="},{"type":"next-occurrence","id":"IXBFji70RtF8EQbelMMJEvVvnGQ="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"6Cc5D3tSDQlI++HhiWL9+LeCd+g=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"IXBFji70RtF8EQbelMMJEvVvnGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qNp7JZpRVlRE9KAJgrrRWTTk9Dk="},{"type":"next-occurrence","id":"ExVD20j2kS15iMiiHGN0YBZs/So="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"IXBFji70RtF8EQbelMMJEvVvnGQ=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"ExVD20j2kS15iMiiHGN0YBZs/So=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qNp7JZpRVlRE9KAJgrrRWTTk9Dk="},{"type":"next-occurrence","id":"mzDfFfbha8cy6Y9JbUvQ2mm8XeU="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"ExVD20j2kS15iMiiHGN0YBZs/So=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"mzDfFfbha8cy6Y9JbUvQ2mm8XeU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qNp7JZpRVlRE9KAJgrrRWTTk9Dk="},{"type":"next-occurrence","id":"Uk13lKxXqf4+qqwM5ng+Q+jYL/w="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"mzDfFfbha8cy6Y9JbUvQ2mm8XeU=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"Uk13lKxXqf4+qqwM5ng+Q+jYL/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qNp7JZpRVlRE9KAJgrrRWTTk9Dk="},{"type":"next-occurrence","id":"moMYSx4ywtv3Sb2K0Sxa5XE6RWk="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"Uk13lKxXqf4+qqwM5ng+Q+jYL/w=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"moMYSx4ywtv3Sb2K0Sxa5XE6RWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qNp7JZpRVlRE9KAJgrrRWTTk9Dk="},{"type":"next-occurrence","id":"UOJBdVaIDE8av89JqtRMXbsiIxQ="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"moMYSx4ywtv3Sb2K0Sxa5XE6RWk=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"UOJBdVaIDE8av89JqtRMXbsiIxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qNp7JZpRVlRE9KAJgrrRWTTk9Dk="},{"type":"next-occurrence","id":"2uWGy+7roaQ4nWbORTFAZE82yc4="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"UOJBdVaIDE8av89JqtRMXbsiIxQ=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"2uWGy+7roaQ4nWbORTFAZE82yc4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qNp7JZpRVlRE9KAJgrrRWTTk9Dk="},{"type":"next-occurrence","id":"48Eerkmn/8EIhAwVXhRvauuN9ZA="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"2uWGy+7roaQ4nWbORTFAZE82yc4=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"48Eerkmn/8EIhAwVXhRvauuN9ZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qNp7JZpRVlRE9KAJgrrRWTTk9Dk="},{"type":"next-occurrence","id":"VBxfHfeWJtCIDfSR4k+7gMcxZZ4="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"48Eerkmn/8EIhAwVXhRvauuN9ZA=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"VBxfHfeWJtCIDfSR4k+7gMcxZZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qNp7JZpRVlRE9KAJgrrRWTTk9Dk="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"VBxfHfeWJtCIDfSR4k+7gMcxZZ4=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"RSA+UC4HsSiJxazJzsZDIOrhAa8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VUSeXBFZE2ICMJKNUNZSnSOj9jc="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"RSA+UC4HsSiJxazJzsZDIOrhAa8=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"VUSeXBFZE2ICMJKNUNZSnSOj9jc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSA+UC4HsSiJxazJzsZDIOrhAa8="},{"type":"next-occurrence","id":"VIhJ/0zz/a6liAioc+0JrbJAoZY="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"VUSeXBFZE2ICMJKNUNZSnSOj9jc=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"VIhJ/0zz/a6liAioc+0JrbJAoZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSA+UC4HsSiJxazJzsZDIOrhAa8="},{"type":"next-occurrence","id":"J7eJY4nteTJ0A/AeLuM8qS6JLc8="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"VIhJ/0zz/a6liAioc+0JrbJAoZY=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"J7eJY4nteTJ0A/AeLuM8qS6JLc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSA+UC4HsSiJxazJzsZDIOrhAa8="},{"type":"next-occurrence","id":"08BcYIUd47EqDbxCptzPdh2CvFU="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"J7eJY4nteTJ0A/AeLuM8qS6JLc8=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"08BcYIUd47EqDbxCptzPdh2CvFU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RSA+UC4HsSiJxazJzsZDIOrhAa8="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"08BcYIUd47EqDbxCptzPdh2CvFU=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"DI4D+EUwN1A1wvy22ehr7WoEaFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WUCjnKOLlSvSF00uwSUWw2spPp4="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"DI4D+EUwN1A1wvy22ehr7WoEaFI=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"WUCjnKOLlSvSF00uwSUWw2spPp4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DI4D+EUwN1A1wvy22ehr7WoEaFI="},{"type":"next-occurrence","id":"wPsR34XQDD6iCwk4C0ydedmMXgg="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"WUCjnKOLlSvSF00uwSUWw2spPp4=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"wPsR34XQDD6iCwk4C0ydedmMXgg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DI4D+EUwN1A1wvy22ehr7WoEaFI="},{"type":"next-occurrence","id":"sxigsd5rvmJ0vzovyqVPpccR1IE="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"wPsR34XQDD6iCwk4C0ydedmMXgg=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"sxigsd5rvmJ0vzovyqVPpccR1IE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DI4D+EUwN1A1wvy22ehr7WoEaFI="},{"type":"next-occurrence","id":"5Adna6/+YkzIjw/FNBHW/k3hqoc="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"sxigsd5rvmJ0vzovyqVPpccR1IE=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"5Adna6/+YkzIjw/FNBHW/k3hqoc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DI4D+EUwN1A1wvy22ehr7WoEaFI="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"5Adna6/+YkzIjw/FNBHW/k3hqoc=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"nbeMoam2JHvVgxloHeQnIE2+2jo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"w4MKmpXJFmv0ecrLJJzNoJMPblc="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:49Z"},"road_event_id":"nbeMoam2JHvVgxloHeQnIE2+2jo=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T03:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"w4MKmpXJFmv0ecrLJJzNoJMPblc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nbeMoam2JHvVgxloHeQnIE2+2jo="},{"type":"next-occurrence","id":"01Wtb5xKrQq76a2tQCeqtHl7duY="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:49Z"},"road_event_id":"w4MKmpXJFmv0ecrLJJzNoJMPblc=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T03:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"01Wtb5xKrQq76a2tQCeqtHl7duY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nbeMoam2JHvVgxloHeQnIE2+2jo="},{"type":"next-occurrence","id":"RB8dkOopDwittH8lWLTUXjy2dTE="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:49Z"},"road_event_id":"01Wtb5xKrQq76a2tQCeqtHl7duY=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T03:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"RB8dkOopDwittH8lWLTUXjy2dTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nbeMoam2JHvVgxloHeQnIE2+2jo="},{"type":"next-occurrence","id":"5H71ujzc5j0KN26zRpIaHLZHmAY="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:49Z"},"road_event_id":"RB8dkOopDwittH8lWLTUXjy2dTE=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T03:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"5H71ujzc5j0KN26zRpIaHLZHmAY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nbeMoam2JHvVgxloHeQnIE2+2jo="},{"type":"next-occurrence","id":"scaZxyUaVJ5mbejcMHQfqAbndfM="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:49Z"},"road_event_id":"5H71ujzc5j0KN26zRpIaHLZHmAY=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T03:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"scaZxyUaVJ5mbejcMHQfqAbndfM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nbeMoam2JHvVgxloHeQnIE2+2jo="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-07T02:32:49Z"},"road_event_id":"scaZxyUaVJ5mbejcMHQfqAbndfM=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T03:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"oZrK9gSM4rT1G0mMzOwWm2b7JIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FD9S86VNM1CxHtH+EXuWjYa6HQE="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"oZrK9gSM4rT1G0mMzOwWm2b7JIw=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"FD9S86VNM1CxHtH+EXuWjYa6HQE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZrK9gSM4rT1G0mMzOwWm2b7JIw="},{"type":"next-occurrence","id":"aDHZIVlHaUpMtVFL/60K3P7I7x4="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"FD9S86VNM1CxHtH+EXuWjYa6HQE=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"aDHZIVlHaUpMtVFL/60K3P7I7x4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZrK9gSM4rT1G0mMzOwWm2b7JIw="},{"type":"next-occurrence","id":"v9RJ5UnxR5YhejHUt/RQnjKVCtU="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"aDHZIVlHaUpMtVFL/60K3P7I7x4=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"v9RJ5UnxR5YhejHUt/RQnjKVCtU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZrK9gSM4rT1G0mMzOwWm2b7JIw="},{"type":"next-occurrence","id":"c5I65Bf/Hq70FNWAma9M9yRBP4w="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"v9RJ5UnxR5YhejHUt/RQnjKVCtU=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"c5I65Bf/Hq70FNWAma9M9yRBP4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZrK9gSM4rT1G0mMzOwWm2b7JIw="},{"type":"next-occurrence","id":"Fd54uh3akMclHRDAcdDaZ6pJhvY="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"c5I65Bf/Hq70FNWAma9M9yRBP4w=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"Fd54uh3akMclHRDAcdDaZ6pJhvY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZrK9gSM4rT1G0mMzOwWm2b7JIw="},{"type":"next-occurrence","id":"JEoDEApNICJTX+HHhHciq1zwSO4="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"Fd54uh3akMclHRDAcdDaZ6pJhvY=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"JEoDEApNICJTX+HHhHciq1zwSO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZrK9gSM4rT1G0mMzOwWm2b7JIw="},{"type":"next-occurrence","id":"G0zXdx3BD3UCPCI9jsTMreVEQYI="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"JEoDEApNICJTX+HHhHciq1zwSO4=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"G0zXdx3BD3UCPCI9jsTMreVEQYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZrK9gSM4rT1G0mMzOwWm2b7JIw="},{"type":"next-occurrence","id":"J9d1nbdZXoDHoXgTj/W7HAU9BYE="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"G0zXdx3BD3UCPCI9jsTMreVEQYI=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"J9d1nbdZXoDHoXgTj/W7HAU9BYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZrK9gSM4rT1G0mMzOwWm2b7JIw="},{"type":"next-occurrence","id":"AUBhXmqoUqD8IL1HgUdLbatrUwI="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"J9d1nbdZXoDHoXgTj/W7HAU9BYE=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"AUBhXmqoUqD8IL1HgUdLbatrUwI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZrK9gSM4rT1G0mMzOwWm2b7JIw="},{"type":"next-occurrence","id":"/ao7Amg/A+j++JJm3w+H+rzfKn4="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"AUBhXmqoUqD8IL1HgUdLbatrUwI=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"/ao7Amg/A+j++JJm3w+H+rzfKn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZrK9gSM4rT1G0mMzOwWm2b7JIw="},{"type":"next-occurrence","id":"Q758cSpFsy9G0yToU3945iWDTj0="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"/ao7Amg/A+j++JJm3w+H+rzfKn4=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"Q758cSpFsy9G0yToU3945iWDTj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZrK9gSM4rT1G0mMzOwWm2b7JIw="},{"type":"next-occurrence","id":"Cy6/kPrQnWMhGdNbds/51o7UI7o="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"Q758cSpFsy9G0yToU3945iWDTj0=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"Cy6/kPrQnWMhGdNbds/51o7UI7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZrK9gSM4rT1G0mMzOwWm2b7JIw="},{"type":"next-occurrence","id":"KlsquRp0aHMHsyyBFJoBNZq2p/0="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"Cy6/kPrQnWMhGdNbds/51o7UI7o=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"KlsquRp0aHMHsyyBFJoBNZq2p/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZrK9gSM4rT1G0mMzOwWm2b7JIw="},{"type":"next-occurrence","id":"nHMcdxdEMpFLKEAUUd5aDZDPEP0="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"KlsquRp0aHMHsyyBFJoBNZq2p/0=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"nHMcdxdEMpFLKEAUUd5aDZDPEP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oZrK9gSM4rT1G0mMzOwWm2b7JIw="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"nHMcdxdEMpFLKEAUUd5aDZDPEP0=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"ORC300540115","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9L"],"direction":"unknown","description":"Installation of fiber optics on NY 9L both directions Quaker Road; NY 254 (Queensbury) to Meadowbrook Rd (Glens Falls) Alternating Not currently Scheduled","update_date":"2026-04-20T23:00:01Z"},"road_event_id":"ORC300540115","beginning_cross_street":"Quaker Road; NY 254","ending_cross_street":"Meadowbrook Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-17T17:21:27Z","end_date":"2026-04-21T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.636806,43.330989]]}},{"id":"yL5heS6ySiFJm9HJBTQnfdlq47s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TMpJjXqCGn9+8zFXvTrajaLQP8I="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T02:55:11Z"},"road_event_id":"yL5heS6ySiFJm9HJBTQnfdlq47s=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T03:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"TMpJjXqCGn9+8zFXvTrajaLQP8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yL5heS6ySiFJm9HJBTQnfdlq47s="},{"type":"next-occurrence","id":"mt2ARE7xAmKkucZ6aBYQHy/hUog="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T02:55:11Z"},"road_event_id":"TMpJjXqCGn9+8zFXvTrajaLQP8I=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T03:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"mt2ARE7xAmKkucZ6aBYQHy/hUog=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yL5heS6ySiFJm9HJBTQnfdlq47s="},{"type":"next-occurrence","id":"KnLWIbRpY33Yhi2bZSblzZCmqP4="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T02:55:11Z"},"road_event_id":"mt2ARE7xAmKkucZ6aBYQHy/hUog=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T03:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"KnLWIbRpY33Yhi2bZSblzZCmqP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yL5heS6ySiFJm9HJBTQnfdlq47s="},{"type":"next-occurrence","id":"jqsz/4ULNp6HJ1gJKf/P2NHbrxE="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T02:55:11Z"},"road_event_id":"KnLWIbRpY33Yhi2bZSblzZCmqP4=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T03:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"jqsz/4ULNp6HJ1gJKf/P2NHbrxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yL5heS6ySiFJm9HJBTQnfdlq47s="},{"type":"next-occurrence","id":"GBDSx8Xww75yV+TFOLDpZinkNMI="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T02:55:11Z"},"road_event_id":"jqsz/4ULNp6HJ1gJKf/P2NHbrxE=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T03:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"GBDSx8Xww75yV+TFOLDpZinkNMI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yL5heS6ySiFJm9HJBTQnfdlq47s="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T02:55:11Z"},"road_event_id":"GBDSx8Xww75yV+TFOLDpZinkNMI=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T03:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"AnGiTH14zH6t/1njR53LN3ng43g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Du8V08Bu+W5T1O+xjg6MhzyeUzI="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"AnGiTH14zH6t/1njR53LN3ng43g=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"Du8V08Bu+W5T1O+xjg6MhzyeUzI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AnGiTH14zH6t/1njR53LN3ng43g="},{"type":"next-occurrence","id":"xI674uRJpwiYyvkwUJXg3fTV8E0="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"Du8V08Bu+W5T1O+xjg6MhzyeUzI=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"xI674uRJpwiYyvkwUJXg3fTV8E0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AnGiTH14zH6t/1njR53LN3ng43g="},{"type":"next-occurrence","id":"D+biF7N0MdhzAmeV+9ceXV8zrXE="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"xI674uRJpwiYyvkwUJXg3fTV8E0=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"D+biF7N0MdhzAmeV+9ceXV8zrXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AnGiTH14zH6t/1njR53LN3ng43g="},{"type":"next-occurrence","id":"Qa+mlcuEUH6elrAB2rrml9BHzhE="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"D+biF7N0MdhzAmeV+9ceXV8zrXE=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"Qa+mlcuEUH6elrAB2rrml9BHzhE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AnGiTH14zH6t/1njR53LN3ng43g="},{"type":"next-occurrence","id":"OUFYL1aQPb+bq2n1i+1ueDERy7k="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"Qa+mlcuEUH6elrAB2rrml9BHzhE=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"OUFYL1aQPb+bq2n1i+1ueDERy7k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AnGiTH14zH6t/1njR53LN3ng43g="},{"type":"next-occurrence","id":"bi270gHeUW9ma8eAsrcsuODNHwU="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"OUFYL1aQPb+bq2n1i+1ueDERy7k=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"bi270gHeUW9ma8eAsrcsuODNHwU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AnGiTH14zH6t/1njR53LN3ng43g="},{"type":"next-occurrence","id":"ujHqc96i/vZRA7Kzx3p32cUAH8U="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"bi270gHeUW9ma8eAsrcsuODNHwU=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"ujHqc96i/vZRA7Kzx3p32cUAH8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AnGiTH14zH6t/1njR53LN3ng43g="},{"type":"next-occurrence","id":"db1oqhpMR3PPCaUK9uXtCXhIxrg="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"ujHqc96i/vZRA7Kzx3p32cUAH8U=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"db1oqhpMR3PPCaUK9uXtCXhIxrg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AnGiTH14zH6t/1njR53LN3ng43g="},{"type":"next-occurrence","id":"f3FOlo7xm9f+GraZKw6OzvPxeyQ="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"db1oqhpMR3PPCaUK9uXtCXhIxrg=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"f3FOlo7xm9f+GraZKw6OzvPxeyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AnGiTH14zH6t/1njR53LN3ng43g="},{"type":"next-occurrence","id":"GvckJvNpLhp3GmwdWkhvC33EeG4="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"f3FOlo7xm9f+GraZKw6OzvPxeyQ=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"GvckJvNpLhp3GmwdWkhvC33EeG4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AnGiTH14zH6t/1njR53LN3ng43g="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Monday July 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-12T20:34:32Z"},"road_event_id":"GvckJvNpLhp3GmwdWkhvC33EeG4=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"CTq+a/66iNtB/+jv+sNN0NL7POo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"80tsW1DJYYONfULJ4AEWdfH2DKA="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-05-19T19:05:23Z"},"road_event_id":"CTq+a/66iNtB/+jv+sNN0NL7POo=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:30:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"80tsW1DJYYONfULJ4AEWdfH2DKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTq+a/66iNtB/+jv+sNN0NL7POo="},{"type":"next-occurrence","id":"WybI99Qq63DsxrgeYtsnX4dkqSE="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-05-19T19:05:23Z"},"road_event_id":"80tsW1DJYYONfULJ4AEWdfH2DKA=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T03:30:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"WybI99Qq63DsxrgeYtsnX4dkqSE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTq+a/66iNtB/+jv+sNN0NL7POo="},{"type":"next-occurrence","id":"mSgA3QZiTFZojeo8JxhSkcT9Vbw="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-05-19T19:05:23Z"},"road_event_id":"WybI99Qq63DsxrgeYtsnX4dkqSE=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T03:30:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"mSgA3QZiTFZojeo8JxhSkcT9Vbw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTq+a/66iNtB/+jv+sNN0NL7POo="},{"type":"next-occurrence","id":"i03EVlcqUmSi/1UcxlO3h0o6ISo="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-05-19T19:05:23Z"},"road_event_id":"mSgA3QZiTFZojeo8JxhSkcT9Vbw=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T03:30:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"i03EVlcqUmSi/1UcxlO3h0o6ISo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTq+a/66iNtB/+jv+sNN0NL7POo="},{"type":"next-occurrence","id":"VVax3z34tkk2HNyQXMB9fQka8vQ="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-05-19T19:05:23Z"},"road_event_id":"i03EVlcqUmSi/1UcxlO3h0o6ISo=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T03:30:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"VVax3z34tkk2HNyQXMB9fQka8vQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTq+a/66iNtB/+jv+sNN0NL7POo="},{"type":"next-occurrence","id":"Xn6mpqvLQrYLYjlX4rS6QcWLOqg="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-05-19T19:05:23Z"},"road_event_id":"VVax3z34tkk2HNyQXMB9fQka8vQ=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T03:30:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"Xn6mpqvLQrYLYjlX4rS6QcWLOqg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTq+a/66iNtB/+jv+sNN0NL7POo="},{"type":"next-occurrence","id":"gUH9IOm3o2k0vVpVuCTB4FIavvo="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-05-19T19:05:23Z"},"road_event_id":"Xn6mpqvLQrYLYjlX4rS6QcWLOqg=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T03:30:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"gUH9IOm3o2k0vVpVuCTB4FIavvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTq+a/66iNtB/+jv+sNN0NL7POo="},{"type":"next-occurrence","id":"tZAll97F+V8hl533PXC0LiUJ3eM="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-05-19T19:05:23Z"},"road_event_id":"gUH9IOm3o2k0vVpVuCTB4FIavvo=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T03:30:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"tZAll97F+V8hl533PXC0LiUJ3eM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTq+a/66iNtB/+jv+sNN0NL7POo="},{"type":"next-occurrence","id":"WoW8ONaFiFcouBWgnVj3bYce9/Y="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-05-19T19:05:23Z"},"road_event_id":"tZAll97F+V8hl533PXC0LiUJ3eM=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T03:30:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"WoW8ONaFiFcouBWgnVj3bYce9/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTq+a/66iNtB/+jv+sNN0NL7POo="},{"type":"next-occurrence","id":"EHrBX5HkIL2iY/8ahCiGnvsr3sI="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-05-19T19:05:23Z"},"road_event_id":"WoW8ONaFiFcouBWgnVj3bYce9/Y=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T03:30:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"EHrBX5HkIL2iY/8ahCiGnvsr3sI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTq+a/66iNtB/+jv+sNN0NL7POo="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-05-19T19:05:23Z"},"road_event_id":"EHrBX5HkIL2iY/8ahCiGnvsr3sI=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T03:30:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"4favXtf67Q5HDRVJfTPQVlk9PuA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/cuPVoRHU0766ZWUa8RagGNO98w="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-29T12:12:18Z"},"road_event_id":"4favXtf67Q5HDRVJfTPQVlk9PuA=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"/cuPVoRHU0766ZWUa8RagGNO98w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4favXtf67Q5HDRVJfTPQVlk9PuA="},{"type":"next-occurrence","id":"9jH6CtdfIIff1E1wKvg0WJpTuRY="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-29T12:12:18Z"},"road_event_id":"/cuPVoRHU0766ZWUa8RagGNO98w=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T22:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"9jH6CtdfIIff1E1wKvg0WJpTuRY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4favXtf67Q5HDRVJfTPQVlk9PuA="},{"type":"next-occurrence","id":"Blv2q9UkME7OZxcbqAi+LXtiS7g="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-29T12:12:18Z"},"road_event_id":"9jH6CtdfIIff1E1wKvg0WJpTuRY=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T22:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"Blv2q9UkME7OZxcbqAi+LXtiS7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4favXtf67Q5HDRVJfTPQVlk9PuA="},{"type":"next-occurrence","id":"OnUNc0AuvaQbgQLB+lzVyeXZXbg="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-29T12:12:18Z"},"road_event_id":"Blv2q9UkME7OZxcbqAi+LXtiS7g=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"OnUNc0AuvaQbgQLB+lzVyeXZXbg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4favXtf67Q5HDRVJfTPQVlk9PuA="},{"type":"next-occurrence","id":"90C/dCPOqo8CNMt79Wdzhlv8cg8="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-29T12:12:18Z"},"road_event_id":"OnUNc0AuvaQbgQLB+lzVyeXZXbg=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"90C/dCPOqo8CNMt79Wdzhlv8cg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4favXtf67Q5HDRVJfTPQVlk9PuA="},{"type":"next-occurrence","id":"M8U6JKmpdV5P/ORBgxpWsONaq0g="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-29T12:12:18Z"},"road_event_id":"90C/dCPOqo8CNMt79Wdzhlv8cg8=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"M8U6JKmpdV5P/ORBgxpWsONaq0g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4favXtf67Q5HDRVJfTPQVlk9PuA="},{"type":"next-occurrence","id":"Rlz04EvJqND7rxNH0CNRnsHpPRQ="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-29T12:12:18Z"},"road_event_id":"M8U6JKmpdV5P/ORBgxpWsONaq0g=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"Rlz04EvJqND7rxNH0CNRnsHpPRQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4favXtf67Q5HDRVJfTPQVlk9PuA="},{"type":"next-occurrence","id":"Pqw1m/FAEaTtydtFKKfHtLjN8uo="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-29T12:12:18Z"},"road_event_id":"Rlz04EvJqND7rxNH0CNRnsHpPRQ=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"Pqw1m/FAEaTtydtFKKfHtLjN8uo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4favXtf67Q5HDRVJfTPQVlk9PuA="},{"type":"next-occurrence","id":"Rr/n0jTDyvtm5ieV3OxEJZ6/xks="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-29T12:12:18Z"},"road_event_id":"Pqw1m/FAEaTtydtFKKfHtLjN8uo=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T22:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"Rr/n0jTDyvtm5ieV3OxEJZ6/xks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4favXtf67Q5HDRVJfTPQVlk9PuA="},{"type":"next-occurrence","id":"cNrIg0aFQnFIOAKW4WfTaq6sWHM="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-29T12:12:18Z"},"road_event_id":"Rr/n0jTDyvtm5ieV3OxEJZ6/xks=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T22:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"cNrIg0aFQnFIOAKW4WfTaq6sWHM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4favXtf67Q5HDRVJfTPQVlk9PuA="},{"type":"next-occurrence","id":"JEMjwT+JzMCyH3BhsRJh9L4EFx8="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-29T12:12:18Z"},"road_event_id":"cNrIg0aFQnFIOAKW4WfTaq6sWHM=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"JEMjwT+JzMCyH3BhsRJh9L4EFx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4favXtf67Q5HDRVJfTPQVlk9PuA="},{"type":"next-occurrence","id":"7sYicnH1zPhmnTlDLWyKOa0kVBc="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-29T12:12:18Z"},"road_event_id":"JEMjwT+JzMCyH3BhsRJh9L4EFx8=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"7sYicnH1zPhmnTlDLWyKOa0kVBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4favXtf67Q5HDRVJfTPQVlk9PuA="},{"type":"next-occurrence","id":"j8BReq1w6nYZnN3/GKrUFW7e8YI="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-29T12:12:18Z"},"road_event_id":"7sYicnH1zPhmnTlDLWyKOa0kVBc=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"j8BReq1w6nYZnN3/GKrUFW7e8YI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4favXtf67Q5HDRVJfTPQVlk9PuA="},{"type":"next-occurrence","id":"lzGwQeOKZkdUEKhlK2fQVeYKZaY="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-29T12:12:18Z"},"road_event_id":"j8BReq1w6nYZnN3/GKrUFW7e8YI=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"lzGwQeOKZkdUEKhlK2fQVeYKZaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4favXtf67Q5HDRVJfTPQVlk9PuA="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-29T12:12:18Z"},"road_event_id":"lzGwQeOKZkdUEKhlK2fQVeYKZaY=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"1uiSBXRRAQQeQ6fra3+c8Z2oHrI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs on NY 21 both directions between Bristol Spring Rd; CR 12 (Naples) and NY 64 (South Bristol) Road closed , local traffic only, Follow posted detour, Continuous Monday April 27th, 2026 06:00 AM thru Thursday June 25th, 2026 05:00 PM All lanes closed and detoured","update_date":"2026-04-14T13:12:58Z"},"road_event_id":"1uiSBXRRAQQeQ6fra3+c8Z2oHrI=","beginning_cross_street":"Bristol Spring Rd; CR 12","ending_cross_street":"NY 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.391818,42.63093]]}},{"id":"ORC300539117","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","description":"Guard rail repairs on I-86 eastbound east of Exit 14 - NY 62 Frewsburg Road (Poland) Not currently Scheduled","update_date":"2026-04-16T19:00:15Z"},"road_event_id":"ORC300539117","beginning_cross_street":"Exit 14 - NY 62 Frewsburg Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-14T14:20:10Z","end_date":"2026-04-17T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-79.068253,42.149227]]}},{"id":"xAD0cpEZEFCzkqJdnE1jb9b5FTg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WIjl8gZFERpyOnFvR5DtHehnLww="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"xAD0cpEZEFCzkqJdnE1jb9b5FTg=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"WIjl8gZFERpyOnFvR5DtHehnLww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xAD0cpEZEFCzkqJdnE1jb9b5FTg="},{"type":"next-occurrence","id":"5CcJirpnPc64vJedKkFCsXEcAIM="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"WIjl8gZFERpyOnFvR5DtHehnLww=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T22:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"5CcJirpnPc64vJedKkFCsXEcAIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xAD0cpEZEFCzkqJdnE1jb9b5FTg="},{"type":"next-occurrence","id":"BJ7EcnSOu7/pye/v4Ugr+gCd2Zs="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"5CcJirpnPc64vJedKkFCsXEcAIM=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"BJ7EcnSOu7/pye/v4Ugr+gCd2Zs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xAD0cpEZEFCzkqJdnE1jb9b5FTg="},{"type":"next-occurrence","id":"6KmRPURIKO2RHtrl3DYT2tGMc2Q="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"BJ7EcnSOu7/pye/v4Ugr+gCd2Zs=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"6KmRPURIKO2RHtrl3DYT2tGMc2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xAD0cpEZEFCzkqJdnE1jb9b5FTg="},{"type":"next-occurrence","id":"AhjY3wqNHAbksq7V9xXafRVVBfg="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"6KmRPURIKO2RHtrl3DYT2tGMc2Q=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"AhjY3wqNHAbksq7V9xXafRVVBfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xAD0cpEZEFCzkqJdnE1jb9b5FTg="},{"type":"next-occurrence","id":"xpV+D+lkww2Y/9ZCO7lBfJUDE+I="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"AhjY3wqNHAbksq7V9xXafRVVBfg=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"xpV+D+lkww2Y/9ZCO7lBfJUDE+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xAD0cpEZEFCzkqJdnE1jb9b5FTg="},{"type":"next-occurrence","id":"tIDLVgaEA9AYR8tMzCF6UcTRQLQ="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"xpV+D+lkww2Y/9ZCO7lBfJUDE+I=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"tIDLVgaEA9AYR8tMzCF6UcTRQLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xAD0cpEZEFCzkqJdnE1jb9b5FTg="},{"type":"next-occurrence","id":"pd39euaC2mpa7F/nkqgSkQ6o7jg="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"tIDLVgaEA9AYR8tMzCF6UcTRQLQ=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T22:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"pd39euaC2mpa7F/nkqgSkQ6o7jg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xAD0cpEZEFCzkqJdnE1jb9b5FTg="},{"type":"next-occurrence","id":"4dRPFqd0j/GtTRmw3A5o+dpsqUI="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"pd39euaC2mpa7F/nkqgSkQ6o7jg=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"4dRPFqd0j/GtTRmw3A5o+dpsqUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xAD0cpEZEFCzkqJdnE1jb9b5FTg="},{"type":"next-occurrence","id":"KPAm8aNHN3/Gm1dGPCR5FiT6+X4="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"4dRPFqd0j/GtTRmw3A5o+dpsqUI=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"KPAm8aNHN3/Gm1dGPCR5FiT6+X4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xAD0cpEZEFCzkqJdnE1jb9b5FTg="},{"type":"next-occurrence","id":"NWtAX0m6r9n4ZT1LoStoVgeHCUg="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"KPAm8aNHN3/Gm1dGPCR5FiT6+X4=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"NWtAX0m6r9n4ZT1LoStoVgeHCUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xAD0cpEZEFCzkqJdnE1jb9b5FTg="},{"type":"next-occurrence","id":"EcmgAOUgfukdFGRiODzNrXjqYD4="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"NWtAX0m6r9n4ZT1LoStoVgeHCUg=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"EcmgAOUgfukdFGRiODzNrXjqYD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xAD0cpEZEFCzkqJdnE1jb9b5FTg="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"EcmgAOUgfukdFGRiODzNrXjqYD4=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"ORC300448529","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 71"],"direction":"unknown","description":"Roadwork on NJ 71 Southbound At South of Shark River Bridge (Belmar) Thursday June 12, 2025 09:30 PM thru Friday June 13, 2025 05:00 AM, 2 left lanes of 3 lanes closed","update_date":"2025-06-13T09:00:03Z"},"road_event_id":"ORC300448529","beginning_cross_street":"South of Shark River Bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-10T14:52:30Z","end_date":"2025-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.023712,40.184688]]}},{"id":"T4fcrdabJYsBC0VdM6e3cLeHWCg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qqacN9oM8HRTLcXh9B492ks9ys8="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"T4fcrdabJYsBC0VdM6e3cLeHWCg=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"qqacN9oM8HRTLcXh9B492ks9ys8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T4fcrdabJYsBC0VdM6e3cLeHWCg="},{"type":"next-occurrence","id":"3XX5n0XQucsS2vHf10NNS1/hnPY="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"qqacN9oM8HRTLcXh9B492ks9ys8=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"3XX5n0XQucsS2vHf10NNS1/hnPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T4fcrdabJYsBC0VdM6e3cLeHWCg="},{"type":"next-occurrence","id":"FGpmgDTyUbQn/uHn6XlKd92R1zU="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"3XX5n0XQucsS2vHf10NNS1/hnPY=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"FGpmgDTyUbQn/uHn6XlKd92R1zU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T4fcrdabJYsBC0VdM6e3cLeHWCg="},{"type":"next-occurrence","id":"N7FQfwl0Uus+8UANr/uOvYTQlLY="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"FGpmgDTyUbQn/uHn6XlKd92R1zU=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"N7FQfwl0Uus+8UANr/uOvYTQlLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T4fcrdabJYsBC0VdM6e3cLeHWCg="},{"type":"next-occurrence","id":"V2Pv3f6N4tnX9Y8Y/U4T9RPdOwQ="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"N7FQfwl0Uus+8UANr/uOvYTQlLY=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"V2Pv3f6N4tnX9Y8Y/U4T9RPdOwQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T4fcrdabJYsBC0VdM6e3cLeHWCg="},{"type":"next-occurrence","id":"tAvy5qIt0riuzWZuH4rCI1LWBik="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"V2Pv3f6N4tnX9Y8Y/U4T9RPdOwQ=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"tAvy5qIt0riuzWZuH4rCI1LWBik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T4fcrdabJYsBC0VdM6e3cLeHWCg="},{"type":"next-occurrence","id":"U38SSDyuJt7RiYUwEXN6n32N8vU="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"tAvy5qIt0riuzWZuH4rCI1LWBik=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"U38SSDyuJt7RiYUwEXN6n32N8vU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T4fcrdabJYsBC0VdM6e3cLeHWCg="},{"type":"next-occurrence","id":"ftn0TgxXIMUE+zUX3rgeFasaOrM="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"U38SSDyuJt7RiYUwEXN6n32N8vU=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"ftn0TgxXIMUE+zUX3rgeFasaOrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T4fcrdabJYsBC0VdM6e3cLeHWCg="},{"type":"next-occurrence","id":"22NoENZwuho4bJhVrDjk24YYqqo="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"ftn0TgxXIMUE+zUX3rgeFasaOrM=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"22NoENZwuho4bJhVrDjk24YYqqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T4fcrdabJYsBC0VdM6e3cLeHWCg="},{"type":"next-occurrence","id":"RnR9azr1uJPQgy8DvVCEuZcx8W0="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"22NoENZwuho4bJhVrDjk24YYqqo=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"RnR9azr1uJPQgy8DvVCEuZcx8W0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T4fcrdabJYsBC0VdM6e3cLeHWCg="},{"type":"next-occurrence","id":"1gJb77PB1xW3XF2xWgDnvaIRgpg="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"RnR9azr1uJPQgy8DvVCEuZcx8W0=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"1gJb77PB1xW3XF2xWgDnvaIRgpg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T4fcrdabJYsBC0VdM6e3cLeHWCg="},{"type":"next-occurrence","id":"KzapOLvCJuns5Df8xS1d7AJ5nXw="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"1gJb77PB1xW3XF2xWgDnvaIRgpg=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"KzapOLvCJuns5Df8xS1d7AJ5nXw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T4fcrdabJYsBC0VdM6e3cLeHWCg="},{"type":"next-occurrence","id":"S3znuSGNTrwZ4lgnEJWvYwLx4lE="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"KzapOLvCJuns5Df8xS1d7AJ5nXw=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"S3znuSGNTrwZ4lgnEJWvYwLx4lE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T4fcrdabJYsBC0VdM6e3cLeHWCg="},{"type":"next-occurrence","id":"14pHntX4AkPJnPR4nDPokPfNjcQ="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"S3znuSGNTrwZ4lgnEJWvYwLx4lE=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"14pHntX4AkPJnPR4nDPokPfNjcQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T4fcrdabJYsBC0VdM6e3cLeHWCg="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"14pHntX4AkPJnPR4nDPokPfNjcQ=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"XPY1jmH1IJrinlGDLtnqlabbBIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"74u4WAiXBdQHGPmfWgQ+Q5uERBE="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"XPY1jmH1IJrinlGDLtnqlabbBIE=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-06T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"74u4WAiXBdQHGPmfWgQ+Q5uERBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XPY1jmH1IJrinlGDLtnqlabbBIE="},{"type":"next-occurrence","id":"uCWzM82H0bbjmpIVXc4B3gXWVH0="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"74u4WAiXBdQHGPmfWgQ+Q5uERBE=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-07T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"uCWzM82H0bbjmpIVXc4B3gXWVH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XPY1jmH1IJrinlGDLtnqlabbBIE="},{"type":"next-occurrence","id":"1FsGZPexr5KuRO2W23AJVb+oiK4="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"uCWzM82H0bbjmpIVXc4B3gXWVH0=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-08T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"1FsGZPexr5KuRO2W23AJVb+oiK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XPY1jmH1IJrinlGDLtnqlabbBIE="},{"type":"next-occurrence","id":"Uqby2bdDNOtfdvEWMOTj/AblI1k="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"1FsGZPexr5KuRO2W23AJVb+oiK4=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-09T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"Uqby2bdDNOtfdvEWMOTj/AblI1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XPY1jmH1IJrinlGDLtnqlabbBIE="},{"type":"next-occurrence","id":"hXYBPr4zFENdE+/H5dfntZ5VUMk="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"Uqby2bdDNOtfdvEWMOTj/AblI1k=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-10T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"hXYBPr4zFENdE+/H5dfntZ5VUMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XPY1jmH1IJrinlGDLtnqlabbBIE="},{"type":"next-occurrence","id":"3puaIAh5/mOetOLMTH2fJPZTRIw="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"hXYBPr4zFENdE+/H5dfntZ5VUMk=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-11T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"3puaIAh5/mOetOLMTH2fJPZTRIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XPY1jmH1IJrinlGDLtnqlabbBIE="},{"type":"next-occurrence","id":"NU2zBcq6j2flRJnCufLgGjB+xsE="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"3puaIAh5/mOetOLMTH2fJPZTRIw=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-12T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"NU2zBcq6j2flRJnCufLgGjB+xsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XPY1jmH1IJrinlGDLtnqlabbBIE="},{"type":"next-occurrence","id":"LdAdaasmpBcl3gvboQaZddHkX5o="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"NU2zBcq6j2flRJnCufLgGjB+xsE=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-13T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"LdAdaasmpBcl3gvboQaZddHkX5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XPY1jmH1IJrinlGDLtnqlabbBIE="},{"type":"next-occurrence","id":"+k7AOI6Z7jvRXcKZHiqmHFL6bro="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"LdAdaasmpBcl3gvboQaZddHkX5o=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-14T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"+k7AOI6Z7jvRXcKZHiqmHFL6bro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XPY1jmH1IJrinlGDLtnqlabbBIE="},{"type":"next-occurrence","id":"XCP3TLfqIeuMa4yVFdqaKz6spN0="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"+k7AOI6Z7jvRXcKZHiqmHFL6bro=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-15T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"XCP3TLfqIeuMa4yVFdqaKz6spN0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XPY1jmH1IJrinlGDLtnqlabbBIE="},{"type":"next-occurrence","id":"L+/s8ekaCYfGjZ9IWIYVMkfcqKI="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"XCP3TLfqIeuMa4yVFdqaKz6spN0=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-16T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"L+/s8ekaCYfGjZ9IWIYVMkfcqKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XPY1jmH1IJrinlGDLtnqlabbBIE="},{"type":"next-occurrence","id":"iDaJ4Tq9L3nm1WsPctaUPSn2S80="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"L+/s8ekaCYfGjZ9IWIYVMkfcqKI=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-17T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"iDaJ4Tq9L3nm1WsPctaUPSn2S80=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XPY1jmH1IJrinlGDLtnqlabbBIE="},{"type":"next-occurrence","id":"ie2v6CxsptomPsJeH6cyzJZ/X/A="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"iDaJ4Tq9L3nm1WsPctaUPSn2S80=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-18T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"ie2v6CxsptomPsJeH6cyzJZ/X/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XPY1jmH1IJrinlGDLtnqlabbBIE="},{"type":"next-occurrence","id":"VLj+Ut1CJ9B3gP0RomFiOtwljGA="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"ie2v6CxsptomPsJeH6cyzJZ/X/A=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-19T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"VLj+Ut1CJ9B3gP0RomFiOtwljGA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XPY1jmH1IJrinlGDLtnqlabbBIE="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"VLj+Ut1CJ9B3gP0RomFiOtwljGA=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-20T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"ZlS1KlTVIjJwT4uAKk+tT2QW7SU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tXVQjuyqY7JcyjFVJ1usDenUViE="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"ZlS1KlTVIjJwT4uAKk+tT2QW7SU=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"tXVQjuyqY7JcyjFVJ1usDenUViE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZlS1KlTVIjJwT4uAKk+tT2QW7SU="},{"type":"next-occurrence","id":"pqpKrJriDrqU8mYoDQTPZHnXSbE="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"tXVQjuyqY7JcyjFVJ1usDenUViE=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"pqpKrJriDrqU8mYoDQTPZHnXSbE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZlS1KlTVIjJwT4uAKk+tT2QW7SU="},{"type":"next-occurrence","id":"nxUa72Yh9yJCXI3ZjlQ9N0OgBBE="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"pqpKrJriDrqU8mYoDQTPZHnXSbE=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"nxUa72Yh9yJCXI3ZjlQ9N0OgBBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZlS1KlTVIjJwT4uAKk+tT2QW7SU="},{"type":"next-occurrence","id":"Yjsn+xLFDGT7j3VnPb+Ryl7Wln0="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"nxUa72Yh9yJCXI3ZjlQ9N0OgBBE=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"Yjsn+xLFDGT7j3VnPb+Ryl7Wln0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZlS1KlTVIjJwT4uAKk+tT2QW7SU="},{"type":"next-occurrence","id":"yvRkg+q1JY6tMJdqAF8ZM6AWFTc="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"Yjsn+xLFDGT7j3VnPb+Ryl7Wln0=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"yvRkg+q1JY6tMJdqAF8ZM6AWFTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZlS1KlTVIjJwT4uAKk+tT2QW7SU="},{"type":"next-occurrence","id":"kiY3yAnOjcmORCAScInchCquUd0="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"yvRkg+q1JY6tMJdqAF8ZM6AWFTc=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"kiY3yAnOjcmORCAScInchCquUd0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZlS1KlTVIjJwT4uAKk+tT2QW7SU="},{"type":"next-occurrence","id":"XLvFU0i2Z4mTzffDSAjuW5ZDQh8="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"kiY3yAnOjcmORCAScInchCquUd0=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"XLvFU0i2Z4mTzffDSAjuW5ZDQh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZlS1KlTVIjJwT4uAKk+tT2QW7SU="},{"type":"next-occurrence","id":"1XZnWXe7MDleNE6CItWZmeB26tw="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"XLvFU0i2Z4mTzffDSAjuW5ZDQh8=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"1XZnWXe7MDleNE6CItWZmeB26tw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZlS1KlTVIjJwT4uAKk+tT2QW7SU="},{"type":"next-occurrence","id":"cX8GFp9P3OeGpkVY6xwzi5gxjzQ="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"1XZnWXe7MDleNE6CItWZmeB26tw=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"cX8GFp9P3OeGpkVY6xwzi5gxjzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZlS1KlTVIjJwT4uAKk+tT2QW7SU="},{"type":"next-occurrence","id":"sKzVnHaDJ1G0uF6rHepElLJO9S4="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"cX8GFp9P3OeGpkVY6xwzi5gxjzQ=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"sKzVnHaDJ1G0uF6rHepElLJO9S4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZlS1KlTVIjJwT4uAKk+tT2QW7SU="},{"type":"next-occurrence","id":"w4vUBnIDA6qYPL3NapjXHfhjRXQ="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"sKzVnHaDJ1G0uF6rHepElLJO9S4=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"w4vUBnIDA6qYPL3NapjXHfhjRXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZlS1KlTVIjJwT4uAKk+tT2QW7SU="},{"type":"next-occurrence","id":"KyFKrsjr4mikwtjzVz2Js22CoBo="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"w4vUBnIDA6qYPL3NapjXHfhjRXQ=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"KyFKrsjr4mikwtjzVz2Js22CoBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZlS1KlTVIjJwT4uAKk+tT2QW7SU="},{"type":"next-occurrence","id":"duPzYKJ5UTQ55CUuefkHt+xRm+k="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"KyFKrsjr4mikwtjzVz2Js22CoBo=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"duPzYKJ5UTQ55CUuefkHt+xRm+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZlS1KlTVIjJwT4uAKk+tT2QW7SU="},{"type":"next-occurrence","id":"NyOlKajEVY88DtGa0ujBYuwHqPc="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"duPzYKJ5UTQ55CUuefkHt+xRm+k=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"NyOlKajEVY88DtGa0ujBYuwHqPc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZlS1KlTVIjJwT4uAKk+tT2QW7SU="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"NyOlKajEVY88DtGa0ujBYuwHqPc=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"nw/HxeMk618Isg/M35pN+Wh9dmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UJSkPhNUCv3gFTDLP4tPOV0sZPY="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday November 26th, 2025 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-22T09:00:01Z"},"road_event_id":"nw/HxeMk618Isg/M35pN+Wh9dmA=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"UJSkPhNUCv3gFTDLP4tPOV0sZPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nw/HxeMk618Isg/M35pN+Wh9dmA="},{"type":"next-occurrence","id":"cgaIXAW8wiy/PEmZg6g8R+TnU/Q="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday November 26th, 2025 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-22T09:00:01Z"},"road_event_id":"UJSkPhNUCv3gFTDLP4tPOV0sZPY=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"cgaIXAW8wiy/PEmZg6g8R+TnU/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nw/HxeMk618Isg/M35pN+Wh9dmA="},{"type":"next-occurrence","id":"IGm6pJHxq6a6EjpM4YXMc0BIfqQ="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday November 26th, 2025 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-22T09:00:01Z"},"road_event_id":"cgaIXAW8wiy/PEmZg6g8R+TnU/Q=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"IGm6pJHxq6a6EjpM4YXMc0BIfqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nw/HxeMk618Isg/M35pN+Wh9dmA="},{"type":"next-occurrence","id":"/yIjn109upPa1cITi8xJ3xY1JPQ="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday November 26th, 2025 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-22T09:00:01Z"},"road_event_id":"IGm6pJHxq6a6EjpM4YXMc0BIfqQ=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"/yIjn109upPa1cITi8xJ3xY1JPQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nw/HxeMk618Isg/M35pN+Wh9dmA="},{"type":"next-occurrence","id":"sVm92F8VKkWgZGtu2CWC/a18EmU="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday November 26th, 2025 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-22T09:00:01Z"},"road_event_id":"/yIjn109upPa1cITi8xJ3xY1JPQ=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"sVm92F8VKkWgZGtu2CWC/a18EmU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nw/HxeMk618Isg/M35pN+Wh9dmA="},{"type":"next-occurrence","id":"wAtNyWUMKOkx4GCDoy/3pnHbo8Q="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday November 26th, 2025 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-22T09:00:01Z"},"road_event_id":"sVm92F8VKkWgZGtu2CWC/a18EmU=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"wAtNyWUMKOkx4GCDoy/3pnHbo8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nw/HxeMk618Isg/M35pN+Wh9dmA="},{"type":"next-occurrence","id":"g/orxpW5pWTHI+X+X/aP6XPeK0U="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday November 26th, 2025 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-22T09:00:01Z"},"road_event_id":"wAtNyWUMKOkx4GCDoy/3pnHbo8Q=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"g/orxpW5pWTHI+X+X/aP6XPeK0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nw/HxeMk618Isg/M35pN+Wh9dmA="},{"type":"next-occurrence","id":"bxS47TOJypZVA9eBKYSpQGIPLLo="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday November 26th, 2025 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-22T09:00:01Z"},"road_event_id":"g/orxpW5pWTHI+X+X/aP6XPeK0U=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"bxS47TOJypZVA9eBKYSpQGIPLLo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nw/HxeMk618Isg/M35pN+Wh9dmA="},{"type":"next-occurrence","id":"/XYqOBh4fFE7RhrOW9gGMpo7kTQ="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday November 26th, 2025 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-22T09:00:01Z"},"road_event_id":"bxS47TOJypZVA9eBKYSpQGIPLLo=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"/XYqOBh4fFE7RhrOW9gGMpo7kTQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nw/HxeMk618Isg/M35pN+Wh9dmA="},{"type":"next-occurrence","id":"S+xMoBAE1aS1WuSMore60dRLZBo="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday November 26th, 2025 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-22T09:00:01Z"},"road_event_id":"/XYqOBh4fFE7RhrOW9gGMpo7kTQ=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"S+xMoBAE1aS1WuSMore60dRLZBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nw/HxeMk618Isg/M35pN+Wh9dmA="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday November 26th, 2025 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-05-22T09:00:01Z"},"road_event_id":"S+xMoBAE1aS1WuSMore60dRLZBo=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"D0M/G7XQC1SJrOK21jBc6ffytkY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[],"description":"Construction on I-678 northbound ramp from Exit 4 - Liberty Avenue (New York) Subject to change without notice., Friday June 5th,2026 thru Saturday June 6th,2026, Friday, 11:59 PM thru 08:00 AM All lanes closed ,","update_date":"2026-06-05T10:00:10Z"},"road_event_id":"D0M/G7XQC1SJrOK21jBc6ffytkY=","beginning_cross_street":"Exit 4 -  Liberty Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:59:00Z","end_date":"2026-06-06T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810731,40.692675]]}},{"id":"xeqOuhmkFYe7xL2wnldfxrGQPvY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on US-6 eastbound between MANSFIELD AVE (Mansfield) and CT-633 (Mansfield) Route 6 eastbound will be reduced from 2 lanes of travel to 1 lane , Continuous Wednesday September 10th, 2025 09:00 AM thru Thursday August 6th, 2026 11:59 PM All lanes open","update_date":"2025-08-28T20:45:01Z"},"road_event_id":"xeqOuhmkFYe7xL2wnldfxrGQPvY=","beginning_cross_street":"MANSFIELD AVE","ending_cross_street":"CT-633","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.227656,41.729046]]}},{"id":"ORC300536734","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JFK Expressway"],"direction":"unknown","description":"Scheduled roadwork on JFK Expressway southbound ramp to Terminal 8 Departures (New York) Not currently Scheduled","update_date":"2026-05-21T18:00:11Z"},"road_event_id":"ORC300536734","beginning_cross_street":"Terminal 8 Departures","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-05T17:18:19Z","end_date":"2026-05-22T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.786734,40.647794]]}},{"id":"ORC300536735","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Terminal 7 Arrivals"],"direction":"unknown","description":"Scheduled roadwork on Terminal 7 Arrivals eastbound at (New York) Not currently Scheduled","update_date":"2026-04-25T09:00:01Z"},"road_event_id":"ORC300536735","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-05T17:22:05Z","end_date":"2026-04-26T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.783261,40.648078]]}},{"id":"ORC300536736","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","description":"Scheduled roadwork on I-678 southbound Exit B - 130th Place (New York) to Exit A - South Service Road; North Service Road (New York) Not currently Scheduled","update_date":"2026-04-08T07:00:01Z"},"road_event_id":"ORC300536736","beginning_cross_street":"Exit B  - 130th Place","ending_cross_street":"Exit A - South Service Road; North Service Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-05T17:26:24Z","end_date":"2026-04-09T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.807534,40.655213]]}},{"id":"H+QgC2IjTSlfXJJhGayri5MCirE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["QM11 Bus, QM25 Bus, QM7 Bus and QM8 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, QM11 Bus, QM25 Bus, QM7 Bus and QM8 Bus at State St/Battery Pl (New York) stop is closed. Use the temporary stop on State St at Bridge St instead. Through November 2026. , Continuous Saturday August 23rd, 2025 12:00 AM thru Sunday November 1st, 2026 11:59 PM","update_date":"2025-08-22T18:38:39Z"},"road_event_id":"H+QgC2IjTSlfXJJhGayri5MCirE=","beginning_cross_street":"State St/Battery Pl","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.014174,40.704386]]}},{"id":"kgB5d+wX9BTnEl8x1Uo5fUMWwWY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"siKgCIeH8Up4mZvMU82Ps0Zm7vY="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"kgB5d+wX9BTnEl8x1Uo5fUMWwWY=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"siKgCIeH8Up4mZvMU82Ps0Zm7vY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kgB5d+wX9BTnEl8x1Uo5fUMWwWY="},{"type":"next-occurrence","id":"rykCPw+T6MNkP5ilTKGOuZtmu5E="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"siKgCIeH8Up4mZvMU82Ps0Zm7vY=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"rykCPw+T6MNkP5ilTKGOuZtmu5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kgB5d+wX9BTnEl8x1Uo5fUMWwWY="},{"type":"next-occurrence","id":"QP7xhuvmIrLiG0GJzmW1EHu5vAA="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"rykCPw+T6MNkP5ilTKGOuZtmu5E=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"QP7xhuvmIrLiG0GJzmW1EHu5vAA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kgB5d+wX9BTnEl8x1Uo5fUMWwWY="},{"type":"next-occurrence","id":"JFWOeQ3bd7tk53XZWj58qksXBbQ="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"QP7xhuvmIrLiG0GJzmW1EHu5vAA=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"JFWOeQ3bd7tk53XZWj58qksXBbQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kgB5d+wX9BTnEl8x1Uo5fUMWwWY="},{"type":"next-occurrence","id":"I/EHoofXJggxH36Tuz9ANtswO4M="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"JFWOeQ3bd7tk53XZWj58qksXBbQ=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"I/EHoofXJggxH36Tuz9ANtswO4M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kgB5d+wX9BTnEl8x1Uo5fUMWwWY="},{"type":"next-occurrence","id":"cEBoMxjTP83KavO04qfaw++0CvI="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"I/EHoofXJggxH36Tuz9ANtswO4M=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"cEBoMxjTP83KavO04qfaw++0CvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kgB5d+wX9BTnEl8x1Uo5fUMWwWY="},{"type":"next-occurrence","id":"0KvgLjym32Y27cVhTXtk6GvgHNk="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"cEBoMxjTP83KavO04qfaw++0CvI=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"0KvgLjym32Y27cVhTXtk6GvgHNk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kgB5d+wX9BTnEl8x1Uo5fUMWwWY="},{"type":"next-occurrence","id":"zKZmOuTIh+QfJSKJ6N+czoTzfeo="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"0KvgLjym32Y27cVhTXtk6GvgHNk=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"zKZmOuTIh+QfJSKJ6N+czoTzfeo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kgB5d+wX9BTnEl8x1Uo5fUMWwWY="},{"type":"next-occurrence","id":"P6TdbmDaxvcR4sLpBpvimAUhyP8="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"zKZmOuTIh+QfJSKJ6N+czoTzfeo=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"P6TdbmDaxvcR4sLpBpvimAUhyP8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kgB5d+wX9BTnEl8x1Uo5fUMWwWY="},{"type":"next-occurrence","id":"aigRGZQrjm/vM2eT1O6QRSwTRAE="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"P6TdbmDaxvcR4sLpBpvimAUhyP8=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"aigRGZQrjm/vM2eT1O6QRSwTRAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kgB5d+wX9BTnEl8x1Uo5fUMWwWY="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T20:00:09Z"},"road_event_id":"aigRGZQrjm/vM2eT1O6QRSwTRAE=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"eGjJL2T0N5GbszXtOifzHop62+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wLbfcxCpX9cErhmL8+0ifJdfEm8="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-21T20:01:30Z"},"road_event_id":"eGjJL2T0N5GbszXtOifzHop62+I=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"wLbfcxCpX9cErhmL8+0ifJdfEm8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eGjJL2T0N5GbszXtOifzHop62+I="},{"type":"next-occurrence","id":"kO6FfX2lCB54ozfwQoRDAD6AnyM="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-21T20:01:30Z"},"road_event_id":"wLbfcxCpX9cErhmL8+0ifJdfEm8=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"kO6FfX2lCB54ozfwQoRDAD6AnyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eGjJL2T0N5GbszXtOifzHop62+I="},{"type":"next-occurrence","id":"PRDv9JSFtUJbdcXM12QU0RgFOQs="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-21T20:01:30Z"},"road_event_id":"kO6FfX2lCB54ozfwQoRDAD6AnyM=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"PRDv9JSFtUJbdcXM12QU0RgFOQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eGjJL2T0N5GbszXtOifzHop62+I="},{"type":"next-occurrence","id":"jGIPw9laxI2barPEI1+qE2CwN38="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-21T20:01:30Z"},"road_event_id":"PRDv9JSFtUJbdcXM12QU0RgFOQs=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"jGIPw9laxI2barPEI1+qE2CwN38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eGjJL2T0N5GbszXtOifzHop62+I="},{"type":"next-occurrence","id":"AiomZmAVCgMmMvcGH+rIBNoH9Uo="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-21T20:01:30Z"},"road_event_id":"jGIPw9laxI2barPEI1+qE2CwN38=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"AiomZmAVCgMmMvcGH+rIBNoH9Uo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eGjJL2T0N5GbszXtOifzHop62+I="},{"type":"next-occurrence","id":"bDwqla3f8BVK/TKn+cIkNFagrUA="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-21T20:01:30Z"},"road_event_id":"AiomZmAVCgMmMvcGH+rIBNoH9Uo=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"bDwqla3f8BVK/TKn+cIkNFagrUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eGjJL2T0N5GbszXtOifzHop62+I="},{"type":"next-occurrence","id":"XgF6A0CvDko/suz1UAZB3Omh0JQ="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-21T20:01:30Z"},"road_event_id":"bDwqla3f8BVK/TKn+cIkNFagrUA=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"XgF6A0CvDko/suz1UAZB3Omh0JQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eGjJL2T0N5GbszXtOifzHop62+I="},{"type":"next-occurrence","id":"vv4rEiOcOrGb06ZnUs2/rcnmIa0="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-21T20:01:30Z"},"road_event_id":"XgF6A0CvDko/suz1UAZB3Omh0JQ=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"vv4rEiOcOrGb06ZnUs2/rcnmIa0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eGjJL2T0N5GbszXtOifzHop62+I="},{"type":"next-occurrence","id":"5mhtcuHNqotDKxy8q+sPly1BYdA="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-21T20:01:30Z"},"road_event_id":"vv4rEiOcOrGb06ZnUs2/rcnmIa0=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"5mhtcuHNqotDKxy8q+sPly1BYdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eGjJL2T0N5GbszXtOifzHop62+I="},{"type":"next-occurrence","id":"Xs7hoWAdlArCabhrwpW7oBp+q0M="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-21T20:01:30Z"},"road_event_id":"5mhtcuHNqotDKxy8q+sPly1BYdA=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"Xs7hoWAdlArCabhrwpW7oBp+q0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eGjJL2T0N5GbszXtOifzHop62+I="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Tuesday May 26th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-05-21T20:01:30Z"},"road_event_id":"Xs7hoWAdlArCabhrwpW7oBp+q0M=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"sap8W9Mxj85P8djGA6bcNHz4ptw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINDEN BLVD"],"direction":"unknown","related_road_events":[],"description":"Construction on LINDEN BLVD eastbound between LINCOLN AVE (New York) and ELDERT LN (New York), Tuesday March 10th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday March 10th, 2026 thru Saturday June 6th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-10T18:35:39Z"},"road_event_id":"sap8W9Mxj85P8djGA6bcNHz4ptw=","beginning_cross_street":"LINCOLN AVE","ending_cross_street":"ELDERT LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.865708,40.668891]]}},{"id":"0VW7RAW3uGb+GvcbYdl++FWiPrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iwWeWGLejEyn0y7ZIv4onXgjOqY="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"0VW7RAW3uGb+GvcbYdl++FWiPrU=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"iwWeWGLejEyn0y7ZIv4onXgjOqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0VW7RAW3uGb+GvcbYdl++FWiPrU="},{"type":"next-occurrence","id":"kltYHfuzCMbaxOsed0atGadGpF8="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"iwWeWGLejEyn0y7ZIv4onXgjOqY=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"kltYHfuzCMbaxOsed0atGadGpF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0VW7RAW3uGb+GvcbYdl++FWiPrU="},{"type":"next-occurrence","id":"J59RVf8ysolk7ezmH7T95kCC/2w="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"kltYHfuzCMbaxOsed0atGadGpF8=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"J59RVf8ysolk7ezmH7T95kCC/2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0VW7RAW3uGb+GvcbYdl++FWiPrU="},{"type":"next-occurrence","id":"6bYtBfACvWUxOJptlGhKDKN7JQs="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"J59RVf8ysolk7ezmH7T95kCC/2w=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"6bYtBfACvWUxOJptlGhKDKN7JQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0VW7RAW3uGb+GvcbYdl++FWiPrU="},{"type":"next-occurrence","id":"3TyiyTemdgIBcr7GRseVFZvl/lk="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"6bYtBfACvWUxOJptlGhKDKN7JQs=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"3TyiyTemdgIBcr7GRseVFZvl/lk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0VW7RAW3uGb+GvcbYdl++FWiPrU="},{"type":"next-occurrence","id":"htMAyxaHLOqbcA5BWd938Y9muGo="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"3TyiyTemdgIBcr7GRseVFZvl/lk=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"htMAyxaHLOqbcA5BWd938Y9muGo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0VW7RAW3uGb+GvcbYdl++FWiPrU="},{"type":"next-occurrence","id":"FYx/n12IOZX6O9sP1XQyi0YqvJs="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"htMAyxaHLOqbcA5BWd938Y9muGo=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"FYx/n12IOZX6O9sP1XQyi0YqvJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0VW7RAW3uGb+GvcbYdl++FWiPrU="},{"type":"next-occurrence","id":"6eYO4wg8+0uqjxuJE3g1uKxhQ/4="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"FYx/n12IOZX6O9sP1XQyi0YqvJs=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"6eYO4wg8+0uqjxuJE3g1uKxhQ/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0VW7RAW3uGb+GvcbYdl++FWiPrU="},{"type":"next-occurrence","id":"GrvsZGTrnfrQTNEP9LXD1/23wzA="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"6eYO4wg8+0uqjxuJE3g1uKxhQ/4=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"GrvsZGTrnfrQTNEP9LXD1/23wzA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0VW7RAW3uGb+GvcbYdl++FWiPrU="},{"type":"next-occurrence","id":"Fr4aZVBMK/flx7jj5S/aDVYgHOg="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"GrvsZGTrnfrQTNEP9LXD1/23wzA=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"Fr4aZVBMK/flx7jj5S/aDVYgHOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0VW7RAW3uGb+GvcbYdl++FWiPrU="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:01Z"},"road_event_id":"Fr4aZVBMK/flx7jj5S/aDVYgHOg=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"IG+ZEDMCjqrq4T9vEWTvBVcCbEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3GFVD9iS97Ks4Lmq1jIfIgIdEpk="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:07Z"},"road_event_id":"IG+ZEDMCjqrq4T9vEWTvBVcCbEo=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"3GFVD9iS97Ks4Lmq1jIfIgIdEpk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IG+ZEDMCjqrq4T9vEWTvBVcCbEo="},{"type":"next-occurrence","id":"lyi5TphQ6a86CHYsjSm/4nnndOQ="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:07Z"},"road_event_id":"3GFVD9iS97Ks4Lmq1jIfIgIdEpk=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"lyi5TphQ6a86CHYsjSm/4nnndOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IG+ZEDMCjqrq4T9vEWTvBVcCbEo="},{"type":"next-occurrence","id":"WRKxXrmNGrtxMpPbDwAkTPomQWc="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:07Z"},"road_event_id":"lyi5TphQ6a86CHYsjSm/4nnndOQ=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"WRKxXrmNGrtxMpPbDwAkTPomQWc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IG+ZEDMCjqrq4T9vEWTvBVcCbEo="},{"type":"next-occurrence","id":"NqXSh81mU45yXzqQ90N5kosxRvU="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:07Z"},"road_event_id":"WRKxXrmNGrtxMpPbDwAkTPomQWc=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"NqXSh81mU45yXzqQ90N5kosxRvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IG+ZEDMCjqrq4T9vEWTvBVcCbEo="},{"type":"next-occurrence","id":"/KbqbTtSeHx6LysI18rcdPKrKjc="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:07Z"},"road_event_id":"NqXSh81mU45yXzqQ90N5kosxRvU=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"/KbqbTtSeHx6LysI18rcdPKrKjc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IG+ZEDMCjqrq4T9vEWTvBVcCbEo="},{"type":"next-occurrence","id":"qw78lZ0M6WRDQNgLwLl+s+A4tUs="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:07Z"},"road_event_id":"/KbqbTtSeHx6LysI18rcdPKrKjc=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"qw78lZ0M6WRDQNgLwLl+s+A4tUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IG+ZEDMCjqrq4T9vEWTvBVcCbEo="},{"type":"next-occurrence","id":"Wff6ZibGbF6c9Bo45RCrSRrGuDc="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:07Z"},"road_event_id":"qw78lZ0M6WRDQNgLwLl+s+A4tUs=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"Wff6ZibGbF6c9Bo45RCrSRrGuDc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IG+ZEDMCjqrq4T9vEWTvBVcCbEo="},{"type":"next-occurrence","id":"eppi1pzYdeR2dx6H666tyo3EwEc="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:07Z"},"road_event_id":"Wff6ZibGbF6c9Bo45RCrSRrGuDc=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"eppi1pzYdeR2dx6H666tyo3EwEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IG+ZEDMCjqrq4T9vEWTvBVcCbEo="},{"type":"next-occurrence","id":"jPOJqJ9PHd/xQRsCTWiZto6FlOw="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:07Z"},"road_event_id":"eppi1pzYdeR2dx6H666tyo3EwEc=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"jPOJqJ9PHd/xQRsCTWiZto6FlOw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IG+ZEDMCjqrq4T9vEWTvBVcCbEo="},{"type":"next-occurrence","id":"axlmPuICpi8R1dB5hcbp8SHr1a8="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:07Z"},"road_event_id":"jPOJqJ9PHd/xQRsCTWiZto6FlOw=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"axlmPuICpi8R1dB5hcbp8SHr1a8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IG+ZEDMCjqrq4T9vEWTvBVcCbEo="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T20:00:07Z"},"road_event_id":"axlmPuICpi8R1dB5hcbp8SHr1a8=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"XmbdQ6dieVyggQdIQGAk4nvDWGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Eastbound between East of I-676/Ben Franklin Bridge (Camden) and West of CR 608/Baird Blvd (Camden), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 06:00 AM, right shoulder closed","update_date":"2026-06-03T17:37:39Z"},"road_event_id":"XmbdQ6dieVyggQdIQGAk4nvDWGQ=","beginning_cross_street":"East of I-676/Ben Franklin Bridge","ending_cross_street":"West of CR 608/Baird Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.117393,39.947628]]}},{"id":"zhBDW8HxD19c2cre74Dwo4E1wWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Westbound between West of CR 608/Baird Blvd (Camden) and East of I-676/Ben Franklin Bridge (Camden), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 06:00 AM, right lane closed","update_date":"2026-06-03T17:37:40Z"},"road_event_id":"zhBDW8HxD19c2cre74Dwo4E1wWs=","beginning_cross_street":"West of CR 608/Baird Blvd","ending_cross_street":"East of I-676/Ben Franklin Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.099777,39.940704]]}},{"id":"oEmiIViyEtPPYuMlUgLer8onwcE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"REX3zQD8n9gEsHTYYOJhhwWxluc="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open southbound,","update_date":"2026-05-31T20:00:03Z"},"road_event_id":"oEmiIViyEtPPYuMlUgLer8onwcE=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"REX3zQD8n9gEsHTYYOJhhwWxluc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oEmiIViyEtPPYuMlUgLer8onwcE="},{"type":"next-occurrence","id":"YX8BzMeRLYzCqFSE3Qu3krZBO3U="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open southbound,","update_date":"2026-05-31T20:00:03Z"},"road_event_id":"REX3zQD8n9gEsHTYYOJhhwWxluc=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"YX8BzMeRLYzCqFSE3Qu3krZBO3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oEmiIViyEtPPYuMlUgLer8onwcE="},{"type":"next-occurrence","id":"JP9Zm8BG0UmW8bwEhvibwEDclbk="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open southbound,","update_date":"2026-05-31T20:00:03Z"},"road_event_id":"YX8BzMeRLYzCqFSE3Qu3krZBO3U=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"JP9Zm8BG0UmW8bwEhvibwEDclbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oEmiIViyEtPPYuMlUgLer8onwcE="},{"type":"next-occurrence","id":"QtD6KUmXpxYbWrCns0zgFNMjzU4="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open southbound,","update_date":"2026-05-31T20:00:03Z"},"road_event_id":"JP9Zm8BG0UmW8bwEhvibwEDclbk=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"QtD6KUmXpxYbWrCns0zgFNMjzU4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oEmiIViyEtPPYuMlUgLer8onwcE="},{"type":"next-occurrence","id":"yQ6z+ygpE177MMdQGO3kJX3+Vgk="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open southbound,","update_date":"2026-05-31T20:00:03Z"},"road_event_id":"QtD6KUmXpxYbWrCns0zgFNMjzU4=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"yQ6z+ygpE177MMdQGO3kJX3+Vgk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oEmiIViyEtPPYuMlUgLer8onwcE="},{"type":"next-occurrence","id":"8Dv2J75Y8iXyggXwM5/K/8HJ/bw="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open southbound,","update_date":"2026-05-31T20:00:03Z"},"road_event_id":"yQ6z+ygpE177MMdQGO3kJX3+Vgk=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"8Dv2J75Y8iXyggXwM5/K/8HJ/bw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oEmiIViyEtPPYuMlUgLer8onwcE="},{"type":"next-occurrence","id":"Fiy8yTSks0HFoAUyZkei6hKAfIk="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open southbound,","update_date":"2026-05-31T20:00:03Z"},"road_event_id":"8Dv2J75Y8iXyggXwM5/K/8HJ/bw=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"Fiy8yTSks0HFoAUyZkei6hKAfIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oEmiIViyEtPPYuMlUgLer8onwcE="},{"type":"next-occurrence","id":"eP2rVVoS0wFBg9VYtLRKK15I3ys="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open southbound,","update_date":"2026-05-31T20:00:03Z"},"road_event_id":"Fiy8yTSks0HFoAUyZkei6hKAfIk=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"eP2rVVoS0wFBg9VYtLRKK15I3ys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oEmiIViyEtPPYuMlUgLer8onwcE="},{"type":"next-occurrence","id":"oAf6htIMYiGje5TYbleYw+9FG/c="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open southbound,","update_date":"2026-05-31T20:00:03Z"},"road_event_id":"eP2rVVoS0wFBg9VYtLRKK15I3ys=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"oAf6htIMYiGje5TYbleYw+9FG/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oEmiIViyEtPPYuMlUgLer8onwcE="},{"type":"next-occurrence","id":"TidU2BYDtstxGXAK93hYMbKOag0="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open southbound,","update_date":"2026-05-31T20:00:03Z"},"road_event_id":"oAf6htIMYiGje5TYbleYw+9FG/c=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"TidU2BYDtstxGXAK93hYMbKOag0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oEmiIViyEtPPYuMlUgLer8onwcE="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes of 4 lanes open southbound,","update_date":"2026-05-31T20:00:03Z"},"road_event_id":"TidU2BYDtstxGXAK93hYMbKOag0=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"HrzuX2I1Rlb6DBplE1a729bNadk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M66 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction eastbound, M66 Bus bypassing W 65 St/Columbus Av (New York) Use the stop on W 65th at Broadway instead. Through 2026. , Continuous Saturday August 23rd, 2025 12:00 AM thru Thursday December 31st, 2026 11:59 PM","update_date":"2026-04-17T17:48:21Z"},"road_event_id":"HrzuX2I1Rlb6DBplE1a729bNadk=","beginning_cross_street":"W 65 St/Columbus Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981874,40.772835]]}},{"id":"hjaBD0NgyNGBA6J08ABIg/XMNZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q32 Bus and Q60 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction eastbound, Q32 Bus and Q60 Bus at Queens Bl/44 St (New York) Stop is closed; please use the stops on Queens Blvd at 41st St or 46th St instead. Until September 2026. , Continuous Saturday August 23rd, 2025 12:00 AM thru Tuesday September 1st, 2026 11:59 PM","update_date":"2025-08-22T18:24:55Z"},"road_event_id":"hjaBD0NgyNGBA6J08ABIg/XMNZY=","beginning_cross_street":"Queens Bl/44 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.920408,40.743115]]}},{"id":"RjfleZHu8s3F0FmCr0yHCCDgu2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MI40BU20n2vJY3NESY3fDXw2A1o="}],"description":"Bridge maintenance operations on Saw Mill River Parkway southbound between Exit 22 - I-287 (Greenburgh) and Exit 21W - NY 119 (Greenburgh) D264324/DAY/B5500749/32234509 -This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T14:58:48Z"},"road_event_id":"RjfleZHu8s3F0FmCr0yHCCDgu2Q=","beginning_cross_street":"","ending_cross_street":"Exit 21W - Frontage Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821302,41.055569]]}},{"id":"MI40BU20n2vJY3NESY3fDXw2A1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RjfleZHu8s3F0FmCr0yHCCDgu2Q="},{"type":"next-occurrence","id":"H2vGjpjxA+PL+GzRU5IDwNdduOI="}],"description":"Bridge maintenance operations on Saw Mill River Parkway southbound between Exit 22 - I-287 (Greenburgh) and Exit 21W - NY 119 (Greenburgh) D264324/DAY/B5500749/32234509 -This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T14:58:48Z"},"road_event_id":"MI40BU20n2vJY3NESY3fDXw2A1o=","beginning_cross_street":"","ending_cross_street":"Exit 21W - Frontage Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821302,41.055569]]}},{"id":"H2vGjpjxA+PL+GzRU5IDwNdduOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RjfleZHu8s3F0FmCr0yHCCDgu2Q="},{"type":"next-occurrence","id":"lFQKga0SRgrR3lsDm6/9itYu5n8="}],"description":"Bridge maintenance operations on Saw Mill River Parkway southbound between Exit 22 - I-287 (Greenburgh) and Exit 21W - NY 119 (Greenburgh) D264324/DAY/B5500749/32234509 -This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T14:58:48Z"},"road_event_id":"H2vGjpjxA+PL+GzRU5IDwNdduOI=","beginning_cross_street":"","ending_cross_street":"Exit 21W - Frontage Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821302,41.055569]]}},{"id":"lFQKga0SRgrR3lsDm6/9itYu5n8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RjfleZHu8s3F0FmCr0yHCCDgu2Q="},{"type":"next-occurrence","id":"NrfgdTD6VhTKHw0VlKdGf6VKtwM="}],"description":"Bridge maintenance operations on Saw Mill River Parkway southbound between Exit 22 - I-287 (Greenburgh) and Exit 21W - NY 119 (Greenburgh) D264324/DAY/B5500749/32234509 -This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T14:58:48Z"},"road_event_id":"lFQKga0SRgrR3lsDm6/9itYu5n8=","beginning_cross_street":"","ending_cross_street":"Exit 21W - Frontage Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821302,41.055569]]}},{"id":"NrfgdTD6VhTKHw0VlKdGf6VKtwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RjfleZHu8s3F0FmCr0yHCCDgu2Q="},{"type":"next-occurrence","id":"M8XKgoMQMB3YrTmizxj81iOgqPU="}],"description":"Bridge maintenance operations on Saw Mill River Parkway southbound between Exit 22 - I-287 (Greenburgh) and Exit 21W - NY 119 (Greenburgh) D264324/DAY/B5500749/32234509 -This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T14:58:48Z"},"road_event_id":"NrfgdTD6VhTKHw0VlKdGf6VKtwM=","beginning_cross_street":"","ending_cross_street":"Exit 21W - Frontage Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821302,41.055569]]}},{"id":"M8XKgoMQMB3YrTmizxj81iOgqPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RjfleZHu8s3F0FmCr0yHCCDgu2Q="}],"description":"Bridge maintenance operations on Saw Mill River Parkway southbound between Exit 22 - I-287 (Greenburgh) and Exit 21W - NY 119 (Greenburgh) D264324/DAY/B5500749/32234509 -This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T14:58:48Z"},"road_event_id":"M8XKgoMQMB3YrTmizxj81iOgqPU=","beginning_cross_street":"","ending_cross_street":"Exit 21W - Frontage Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821302,41.055569]]}},{"id":"cD0r5yhFHQCk4hjByYsnnF8McmE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BxM11 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, BxM11 Bus at Madison Av/E 47 St (New York) stop is closed, please use the stop on Madison Ave at E 46th St instead., Continuous Saturday March 21st, 2026 12:00 AM thru Saturday December 30th, 2028 11:59 PM","update_date":"2026-03-20T18:57:26Z"},"road_event_id":"cD0r5yhFHQCk4hjByYsnnF8McmE=","beginning_cross_street":"Madison Av/E 47 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976941,40.755877]]}},{"id":"qpyXcaGpHHA3qxH/P4pQxNb0Kg4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction westbound, B65 Bus at Smith St/Atlantic Av (New York) is closed. Please use the stops on Smith St at Bergen St or Livingston St, Continuous Saturday March 8th, 2025 12:00 AM thru Sunday April 1st, 2029 11:59 PM","update_date":"2026-06-04T11:33:38Z"},"road_event_id":"qpyXcaGpHHA3qxH/P4pQxNb0Kg4=","beginning_cross_street":"Smith St/Atlantic Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98898,40.68878]]}},{"id":"UvP+82h51HF40qhSMNYwW4MpXe4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B61 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, B61 Bus at Smith St/Atlantic Av (New York) is closed. Please use the stops on Atlantic Ave at Court St or Smith St at Livingston St. , Continuous Tuesday October 21st, 2025 09:10 AM thru Sunday April 1st, 2029 11:59 PM","update_date":"2025-10-21T13:11:55Z"},"road_event_id":"UvP+82h51HF40qhSMNYwW4MpXe4=","beginning_cross_street":"Smith St/Atlantic Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98898,40.68878]]}},{"id":"F8c0xUEm8jq15Z5yGIsJFmR8B/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[],"description":"Scheduled roadwork on George Washington Bridge Upper Level westbound ramp to Center Avenue (Fort Lee) will be closed through July. Cars/Buses use Exit 73 for Local Streets. Trucks follow posted detours, Continuous Monday January 12th, 2026 10:00 PM thru Friday July 31st, 2026 11:59 PM All lanes closed","update_date":"2026-01-13T10:42:46Z"},"road_event_id":"F8c0xUEm8jq15Z5yGIsJFmR8B/8=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.969412,40.855231]]}},{"id":"t/N+mcjfC2o7BjFbvv1XOzxFD5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bruce Reynolds Blvd"],"direction":"unknown","related_road_events":[],"description":"Scheduled roadwork on Bruce Reynolds Blvd westbound between Lemoine Avenue (Fort Lee) and Center Avenue (Fort Lee) will be closed through September., Continuous Monday January 12th, 2026 10:00 PM thru Wednesday September 30th, 2026 11:59 PM All lanes closed","update_date":"2026-01-13T10:43:29Z"},"road_event_id":"t/N+mcjfC2o7BjFbvv1XOzxFD5Y=","beginning_cross_street":"Lemoine Avenue ","ending_cross_street":"Center Avenue ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968544,40.853674]]}},{"id":"lFtVXhAMj/FzFNoHjylwWcg04wQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Tv3a1Jtn/HI6A/mpBhaK9DpskQM="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"lFtVXhAMj/FzFNoHjylwWcg04wQ=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"Tv3a1Jtn/HI6A/mpBhaK9DpskQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lFtVXhAMj/FzFNoHjylwWcg04wQ="},{"type":"next-occurrence","id":"A6ksPKCF5wgcB1qGyEHX1aEKYGA="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"Tv3a1Jtn/HI6A/mpBhaK9DpskQM=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T02:00:00Z","end_date":"2026-06-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"A6ksPKCF5wgcB1qGyEHX1aEKYGA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lFtVXhAMj/FzFNoHjylwWcg04wQ="},{"type":"next-occurrence","id":"wyrVIEPDQv942miGZHX9G1STv+Q="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"A6ksPKCF5wgcB1qGyEHX1aEKYGA=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T02:00:00Z","end_date":"2026-06-08T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"wyrVIEPDQv942miGZHX9G1STv+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lFtVXhAMj/FzFNoHjylwWcg04wQ="},{"type":"next-occurrence","id":"WJEkeUsgjdoJdyBdWJbehGY90UI="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"wyrVIEPDQv942miGZHX9G1STv+Q=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"WJEkeUsgjdoJdyBdWJbehGY90UI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lFtVXhAMj/FzFNoHjylwWcg04wQ="},{"type":"next-occurrence","id":"v4Fs+o7Su+1wXuJ5UsKBZEzJwS0="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"WJEkeUsgjdoJdyBdWJbehGY90UI=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"v4Fs+o7Su+1wXuJ5UsKBZEzJwS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lFtVXhAMj/FzFNoHjylwWcg04wQ="},{"type":"next-occurrence","id":"mdR8/eg1cqdL+L8iQhALqExb1dQ="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"v4Fs+o7Su+1wXuJ5UsKBZEzJwS0=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"mdR8/eg1cqdL+L8iQhALqExb1dQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lFtVXhAMj/FzFNoHjylwWcg04wQ="},{"type":"next-occurrence","id":"er2gFTgo2BlMxDZE3CX9vMVCYqo="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"mdR8/eg1cqdL+L8iQhALqExb1dQ=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"er2gFTgo2BlMxDZE3CX9vMVCYqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lFtVXhAMj/FzFNoHjylwWcg04wQ="},{"type":"next-occurrence","id":"m/5WKZgRQmyr4Cr6Htqaw5epcrQ="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"er2gFTgo2BlMxDZE3CX9vMVCYqo=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"m/5WKZgRQmyr4Cr6Htqaw5epcrQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lFtVXhAMj/FzFNoHjylwWcg04wQ="},{"type":"next-occurrence","id":"VcIFwmjfVMfwnLZJQK2RuTEKlI0="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"m/5WKZgRQmyr4Cr6Htqaw5epcrQ=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T02:00:00Z","end_date":"2026-06-14T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"VcIFwmjfVMfwnLZJQK2RuTEKlI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lFtVXhAMj/FzFNoHjylwWcg04wQ="},{"type":"next-occurrence","id":"ExjcHo5ehyOvIvEQQBEwrxuDSEc="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"VcIFwmjfVMfwnLZJQK2RuTEKlI0=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T02:00:00Z","end_date":"2026-06-15T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"ExjcHo5ehyOvIvEQQBEwrxuDSEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lFtVXhAMj/FzFNoHjylwWcg04wQ="},{"type":"next-occurrence","id":"UjmEn/vhM2VZ8dQfdtW9SkNDPnk="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"ExjcHo5ehyOvIvEQQBEwrxuDSEc=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T02:00:00Z","end_date":"2026-06-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"UjmEn/vhM2VZ8dQfdtW9SkNDPnk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lFtVXhAMj/FzFNoHjylwWcg04wQ="},{"type":"next-occurrence","id":"0hXeylLR9ib/YoCBuQney5oDig0="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"UjmEn/vhM2VZ8dQfdtW9SkNDPnk=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T02:00:00Z","end_date":"2026-06-17T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"0hXeylLR9ib/YoCBuQney5oDig0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lFtVXhAMj/FzFNoHjylwWcg04wQ="},{"type":"next-occurrence","id":"UzIKFKAH9pGkFjhvASXmc/hZPOs="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"0hXeylLR9ib/YoCBuQney5oDig0=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T02:00:00Z","end_date":"2026-06-18T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"UzIKFKAH9pGkFjhvASXmc/hZPOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lFtVXhAMj/FzFNoHjylwWcg04wQ="},{"type":"next-occurrence","id":"dqN+EelShUXwTOHp9THkeaqs8Iw="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"UzIKFKAH9pGkFjhvASXmc/hZPOs=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T02:00:00Z","end_date":"2026-06-19T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"dqN+EelShUXwTOHp9THkeaqs8Iw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lFtVXhAMj/FzFNoHjylwWcg04wQ="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"dqN+EelShUXwTOHp9THkeaqs8Iw=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T02:00:00Z","end_date":"2026-06-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"pXYduHpdVTKAnjfZQcbbTg4CUZc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"irQCHXgtYb6MWMJIB/5lRey/njo="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"pXYduHpdVTKAnjfZQcbbTg4CUZc=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"irQCHXgtYb6MWMJIB/5lRey/njo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pXYduHpdVTKAnjfZQcbbTg4CUZc="},{"type":"next-occurrence","id":"c/tmq5mD3yUTxXtWbqkJi+yYOqs="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"irQCHXgtYb6MWMJIB/5lRey/njo=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"c/tmq5mD3yUTxXtWbqkJi+yYOqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pXYduHpdVTKAnjfZQcbbTg4CUZc="},{"type":"next-occurrence","id":"mzwFf69eefCc/fFar/gmPvNwzMk="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"c/tmq5mD3yUTxXtWbqkJi+yYOqs=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"mzwFf69eefCc/fFar/gmPvNwzMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pXYduHpdVTKAnjfZQcbbTg4CUZc="},{"type":"next-occurrence","id":"1jMnae+Tx50tmF3x36otuzhplFE="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"mzwFf69eefCc/fFar/gmPvNwzMk=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"1jMnae+Tx50tmF3x36otuzhplFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pXYduHpdVTKAnjfZQcbbTg4CUZc="},{"type":"next-occurrence","id":"bQR3uTMZ/vHXe1EA8vxowIq9wH0="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"1jMnae+Tx50tmF3x36otuzhplFE=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"bQR3uTMZ/vHXe1EA8vxowIq9wH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pXYduHpdVTKAnjfZQcbbTg4CUZc="},{"type":"next-occurrence","id":"JtGDxOdIIELsGbizODtNJPDye+M="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"bQR3uTMZ/vHXe1EA8vxowIq9wH0=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"JtGDxOdIIELsGbizODtNJPDye+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pXYduHpdVTKAnjfZQcbbTg4CUZc="},{"type":"next-occurrence","id":"5UojW7fa+pxw83+pWfNa1hWrUE4="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"JtGDxOdIIELsGbizODtNJPDye+M=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"5UojW7fa+pxw83+pWfNa1hWrUE4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pXYduHpdVTKAnjfZQcbbTg4CUZc="},{"type":"next-occurrence","id":"O1lhFKqwPX3bE1KMwOukjrCucbQ="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"5UojW7fa+pxw83+pWfNa1hWrUE4=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"O1lhFKqwPX3bE1KMwOukjrCucbQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pXYduHpdVTKAnjfZQcbbTg4CUZc="},{"type":"next-occurrence","id":"RDAdLQ22Z6VTgEscfgWFq/BRXag="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"O1lhFKqwPX3bE1KMwOukjrCucbQ=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"RDAdLQ22Z6VTgEscfgWFq/BRXag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pXYduHpdVTKAnjfZQcbbTg4CUZc="},{"type":"next-occurrence","id":"hDMjh4KOU7o0hmUUHltJGCHqE84="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"RDAdLQ22Z6VTgEscfgWFq/BRXag=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"hDMjh4KOU7o0hmUUHltJGCHqE84=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pXYduHpdVTKAnjfZQcbbTg4CUZc="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open southbound,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"hDMjh4KOU7o0hmUUHltJGCHqE84=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"9p6qsI4Z3nC9TsmPfm2X9HHOjgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pCiuEGlQDLxJguLo2OOTc3qKGJU="}],"description":"Overnight roadwork and line striping on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"9p6qsI4Z3nC9TsmPfm2X9HHOjgY=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"pCiuEGlQDLxJguLo2OOTc3qKGJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9p6qsI4Z3nC9TsmPfm2X9HHOjgY="},{"type":"next-occurrence","id":"At5hVXNAh6uEgTW6N96Z624o7R8="}],"description":"Overnight roadwork and line striping on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"pCiuEGlQDLxJguLo2OOTc3qKGJU=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"At5hVXNAh6uEgTW6N96Z624o7R8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9p6qsI4Z3nC9TsmPfm2X9HHOjgY="},{"type":"next-occurrence","id":"tQWiAHAr1XqqFJYwnuvsjmh95Eg="}],"description":"Overnight roadwork and line striping on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"At5hVXNAh6uEgTW6N96Z624o7R8=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"tQWiAHAr1XqqFJYwnuvsjmh95Eg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9p6qsI4Z3nC9TsmPfm2X9HHOjgY="},{"type":"next-occurrence","id":"AlAk1xM0SByq8nIWOJG1osXIS3s="}],"description":"Overnight roadwork and line striping on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"tQWiAHAr1XqqFJYwnuvsjmh95Eg=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"AlAk1xM0SByq8nIWOJG1osXIS3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9p6qsI4Z3nC9TsmPfm2X9HHOjgY="},{"type":"next-occurrence","id":"VpZSUcMJNCz6jRDdZjXWyEveQIM="}],"description":"Overnight roadwork and line striping on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"AlAk1xM0SByq8nIWOJG1osXIS3s=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"VpZSUcMJNCz6jRDdZjXWyEveQIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9p6qsI4Z3nC9TsmPfm2X9HHOjgY="},{"type":"next-occurrence","id":"2s0aRDkVmql14ibYPi/qV0tAdWQ="}],"description":"Overnight roadwork and line striping on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"VpZSUcMJNCz6jRDdZjXWyEveQIM=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"2s0aRDkVmql14ibYPi/qV0tAdWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9p6qsI4Z3nC9TsmPfm2X9HHOjgY="},{"type":"next-occurrence","id":"iAZtEDh2WULcC/neK3xPxqRrWZU="}],"description":"Overnight roadwork and line striping on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"2s0aRDkVmql14ibYPi/qV0tAdWQ=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"iAZtEDh2WULcC/neK3xPxqRrWZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9p6qsI4Z3nC9TsmPfm2X9HHOjgY="},{"type":"next-occurrence","id":"mVUl0F4LusXPWJkaFOKs7xclY48="}],"description":"Overnight roadwork and line striping on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"iAZtEDh2WULcC/neK3xPxqRrWZU=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"mVUl0F4LusXPWJkaFOKs7xclY48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9p6qsI4Z3nC9TsmPfm2X9HHOjgY="},{"type":"next-occurrence","id":"+ieIL1xJ5BRU5B90eYev3mEGCyk="}],"description":"Overnight roadwork and line striping on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"mVUl0F4LusXPWJkaFOKs7xclY48=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"+ieIL1xJ5BRU5B90eYev3mEGCyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9p6qsI4Z3nC9TsmPfm2X9HHOjgY="},{"type":"next-occurrence","id":"qajsAyaDnU9MgSmqpmm6nrrtvpo="}],"description":"Overnight roadwork and line striping on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"+ieIL1xJ5BRU5B90eYev3mEGCyk=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"qajsAyaDnU9MgSmqpmm6nrrtvpo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9p6qsI4Z3nC9TsmPfm2X9HHOjgY="}],"description":"Overnight roadwork and line striping on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"qajsAyaDnU9MgSmqpmm6nrrtvpo=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"4BRo0d2BNeqe+0dmL/4hDWd66z4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"N8BN8ItcsqeX9hsS+jNqScHfMWU="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"4BRo0d2BNeqe+0dmL/4hDWd66z4=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"N8BN8ItcsqeX9hsS+jNqScHfMWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4BRo0d2BNeqe+0dmL/4hDWd66z4="},{"type":"next-occurrence","id":"vhovkQwv6v3QsWIaoHDIEvmZ4v0="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"N8BN8ItcsqeX9hsS+jNqScHfMWU=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"vhovkQwv6v3QsWIaoHDIEvmZ4v0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4BRo0d2BNeqe+0dmL/4hDWd66z4="},{"type":"next-occurrence","id":"ndfbALJhbyNrbn1igMjqKKQ4ZKQ="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"vhovkQwv6v3QsWIaoHDIEvmZ4v0=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"ndfbALJhbyNrbn1igMjqKKQ4ZKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4BRo0d2BNeqe+0dmL/4hDWd66z4="},{"type":"next-occurrence","id":"goFq60Pjuj8YPmb8Qde4PADZooo="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"ndfbALJhbyNrbn1igMjqKKQ4ZKQ=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"goFq60Pjuj8YPmb8Qde4PADZooo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4BRo0d2BNeqe+0dmL/4hDWd66z4="},{"type":"next-occurrence","id":"C7c6ekpIAxMAaVgZiQZ7BOm4YN8="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"goFq60Pjuj8YPmb8Qde4PADZooo=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"C7c6ekpIAxMAaVgZiQZ7BOm4YN8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4BRo0d2BNeqe+0dmL/4hDWd66z4="},{"type":"next-occurrence","id":"VXIJu+/yX/JE8XLIp/JfOclV/SI="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"C7c6ekpIAxMAaVgZiQZ7BOm4YN8=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"VXIJu+/yX/JE8XLIp/JfOclV/SI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4BRo0d2BNeqe+0dmL/4hDWd66z4="},{"type":"next-occurrence","id":"PPBkP2Yo4oXKrs8DuG8GbTL2yZU="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"VXIJu+/yX/JE8XLIp/JfOclV/SI=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"PPBkP2Yo4oXKrs8DuG8GbTL2yZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4BRo0d2BNeqe+0dmL/4hDWd66z4="},{"type":"next-occurrence","id":"7doKLVvllq5cuX1DWtTmAbanBr4="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"PPBkP2Yo4oXKrs8DuG8GbTL2yZU=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"7doKLVvllq5cuX1DWtTmAbanBr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4BRo0d2BNeqe+0dmL/4hDWd66z4="},{"type":"next-occurrence","id":"MwBO9BxYjqcv9cxIj5dufGE43qg="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"7doKLVvllq5cuX1DWtTmAbanBr4=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"MwBO9BxYjqcv9cxIj5dufGE43qg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4BRo0d2BNeqe+0dmL/4hDWd66z4="},{"type":"next-occurrence","id":"qSSgiPqWOhPNqVL/s/xAGV/Pi1g="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"MwBO9BxYjqcv9cxIj5dufGE43qg=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"qSSgiPqWOhPNqVL/s/xAGV/Pi1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4BRo0d2BNeqe+0dmL/4hDWd66z4="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open northbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"qSSgiPqWOhPNqVL/s/xAGV/Pi1g=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"X6Q4vSCn0Hz5rMC4W3JgFz6Bhp4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dYF4aHLCNG1MkSe3wRES8O00caY="}],"description":"Overnight roadwork and line striping on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"X6Q4vSCn0Hz5rMC4W3JgFz6Bhp4=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"dYF4aHLCNG1MkSe3wRES8O00caY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Q4vSCn0Hz5rMC4W3JgFz6Bhp4="},{"type":"next-occurrence","id":"UHMoOWT5A10ka/sNm/oe2narf/8="}],"description":"Overnight roadwork and line striping on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"dYF4aHLCNG1MkSe3wRES8O00caY=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"UHMoOWT5A10ka/sNm/oe2narf/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Q4vSCn0Hz5rMC4W3JgFz6Bhp4="},{"type":"next-occurrence","id":"gh7zlgs5LaIOKok71JByWni+1B0="}],"description":"Overnight roadwork and line striping on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"UHMoOWT5A10ka/sNm/oe2narf/8=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"gh7zlgs5LaIOKok71JByWni+1B0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Q4vSCn0Hz5rMC4W3JgFz6Bhp4="},{"type":"next-occurrence","id":"LF7nYofAOMEO1My3X0ZpSk3vz6g="}],"description":"Overnight roadwork and line striping on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"gh7zlgs5LaIOKok71JByWni+1B0=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"LF7nYofAOMEO1My3X0ZpSk3vz6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Q4vSCn0Hz5rMC4W3JgFz6Bhp4="},{"type":"next-occurrence","id":"QzWC6EObJY27zAsnCPc1n7WAWls="}],"description":"Overnight roadwork and line striping on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"LF7nYofAOMEO1My3X0ZpSk3vz6g=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"QzWC6EObJY27zAsnCPc1n7WAWls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Q4vSCn0Hz5rMC4W3JgFz6Bhp4="},{"type":"next-occurrence","id":"H6cY3Fa8Ix8Bnbf26qlumANbNH8="}],"description":"Overnight roadwork and line striping on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"QzWC6EObJY27zAsnCPc1n7WAWls=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"H6cY3Fa8Ix8Bnbf26qlumANbNH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Q4vSCn0Hz5rMC4W3JgFz6Bhp4="},{"type":"next-occurrence","id":"x1k/+w7zgjBWIbVypcjBM/XO/0I="}],"description":"Overnight roadwork and line striping on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"H6cY3Fa8Ix8Bnbf26qlumANbNH8=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"x1k/+w7zgjBWIbVypcjBM/XO/0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Q4vSCn0Hz5rMC4W3JgFz6Bhp4="},{"type":"next-occurrence","id":"7FfcnQBjDrvRhyr+cFCM7ltFHpA="}],"description":"Overnight roadwork and line striping on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"x1k/+w7zgjBWIbVypcjBM/XO/0I=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"7FfcnQBjDrvRhyr+cFCM7ltFHpA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Q4vSCn0Hz5rMC4W3JgFz6Bhp4="},{"type":"next-occurrence","id":"HmxcbhWYkUEiGQ63N4LixPszzhw="}],"description":"Overnight roadwork and line striping on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"7FfcnQBjDrvRhyr+cFCM7ltFHpA=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"HmxcbhWYkUEiGQ63N4LixPszzhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Q4vSCn0Hz5rMC4W3JgFz6Bhp4="},{"type":"next-occurrence","id":"Wnul3YgQbwoFCIom8dpdbNsVTaU="}],"description":"Overnight roadwork and line striping on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"HmxcbhWYkUEiGQ63N4LixPszzhw=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"Wnul3YgQbwoFCIom8dpdbNsVTaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6Q4vSCn0Hz5rMC4W3JgFz6Bhp4="}],"description":"Overnight roadwork and line striping on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 5 lanes open northbound,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"Wnul3YgQbwoFCIom8dpdbNsVTaU=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"5Ben5hTBLeXeEM5s82eqo8C+oPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LnCJYGKfGErjttH95wNii+ZyHQc="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"5Ben5hTBLeXeEM5s82eqo8C+oPM=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"LnCJYGKfGErjttH95wNii+ZyHQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Ben5hTBLeXeEM5s82eqo8C+oPM="},{"type":"next-occurrence","id":"EevjsUD1wDDbsCgnMqcr6dr0k+k="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"LnCJYGKfGErjttH95wNii+ZyHQc=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"EevjsUD1wDDbsCgnMqcr6dr0k+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Ben5hTBLeXeEM5s82eqo8C+oPM="},{"type":"next-occurrence","id":"SPYD7bOb3aQLQNO+X9xbvAdwXys="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"EevjsUD1wDDbsCgnMqcr6dr0k+k=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"SPYD7bOb3aQLQNO+X9xbvAdwXys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Ben5hTBLeXeEM5s82eqo8C+oPM="},{"type":"next-occurrence","id":"wMnwr+DtN/69pWp2oNH4uAjef+E="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"SPYD7bOb3aQLQNO+X9xbvAdwXys=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"wMnwr+DtN/69pWp2oNH4uAjef+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Ben5hTBLeXeEM5s82eqo8C+oPM="},{"type":"next-occurrence","id":"SIvVhIKA7yioJz4T4sBHeOvOfdQ="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"wMnwr+DtN/69pWp2oNH4uAjef+E=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"SIvVhIKA7yioJz4T4sBHeOvOfdQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Ben5hTBLeXeEM5s82eqo8C+oPM="},{"type":"next-occurrence","id":"5JoGBSRRPTJdZtPzXVYlKYg9fxI="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"SIvVhIKA7yioJz4T4sBHeOvOfdQ=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"5JoGBSRRPTJdZtPzXVYlKYg9fxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Ben5hTBLeXeEM5s82eqo8C+oPM="},{"type":"next-occurrence","id":"nHmNWVpQ8oo6D3ZcP3Da1WNy8es="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"5JoGBSRRPTJdZtPzXVYlKYg9fxI=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"nHmNWVpQ8oo6D3ZcP3Da1WNy8es=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Ben5hTBLeXeEM5s82eqo8C+oPM="},{"type":"next-occurrence","id":"CXLhF1dLBIOUzLjM2ulsFojjnjU="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"nHmNWVpQ8oo6D3ZcP3Da1WNy8es=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"CXLhF1dLBIOUzLjM2ulsFojjnjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Ben5hTBLeXeEM5s82eqo8C+oPM="},{"type":"next-occurrence","id":"vkd1QNUJStvsubtgWvqQicBbfyc="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"CXLhF1dLBIOUzLjM2ulsFojjnjU=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"vkd1QNUJStvsubtgWvqQicBbfyc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Ben5hTBLeXeEM5s82eqo8C+oPM="},{"type":"next-occurrence","id":"2Xo1Djgg6Wv4j8ULGaKvxT4YRk8="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"vkd1QNUJStvsubtgWvqQicBbfyc=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"2Xo1Djgg6Wv4j8ULGaKvxT4YRk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5Ben5hTBLeXeEM5s82eqo8C+oPM="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 11th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-12T14:11:47Z"},"road_event_id":"2Xo1Djgg6Wv4j8ULGaKvxT4YRk8=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"FBwEtHbQ8FyHA6Anorj/X2T0CcQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MKMZkLnJtPOHbmJlvm23LvtxM/Q="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"FBwEtHbQ8FyHA6Anorj/X2T0CcQ=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"MKMZkLnJtPOHbmJlvm23LvtxM/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FBwEtHbQ8FyHA6Anorj/X2T0CcQ="},{"type":"next-occurrence","id":"/d3RawL3xjVPln6Nsd2iD6Mrcaw="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"MKMZkLnJtPOHbmJlvm23LvtxM/Q=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"/d3RawL3xjVPln6Nsd2iD6Mrcaw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FBwEtHbQ8FyHA6Anorj/X2T0CcQ="},{"type":"next-occurrence","id":"euv04a8ZudtUkiBRSCRq2uUks/M="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"/d3RawL3xjVPln6Nsd2iD6Mrcaw=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"euv04a8ZudtUkiBRSCRq2uUks/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FBwEtHbQ8FyHA6Anorj/X2T0CcQ="},{"type":"next-occurrence","id":"WlsgiieGALHyjdb3tuGakeNMBmc="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"euv04a8ZudtUkiBRSCRq2uUks/M=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"WlsgiieGALHyjdb3tuGakeNMBmc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FBwEtHbQ8FyHA6Anorj/X2T0CcQ="},{"type":"next-occurrence","id":"0Iq1c5Tyc4ScjFCdM2hJZePGELU="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"WlsgiieGALHyjdb3tuGakeNMBmc=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"0Iq1c5Tyc4ScjFCdM2hJZePGELU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FBwEtHbQ8FyHA6Anorj/X2T0CcQ="},{"type":"next-occurrence","id":"t8ERwDCCvtqYbzXucFnwOoxLtsM="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"0Iq1c5Tyc4ScjFCdM2hJZePGELU=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"t8ERwDCCvtqYbzXucFnwOoxLtsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FBwEtHbQ8FyHA6Anorj/X2T0CcQ="},{"type":"next-occurrence","id":"NIAH9GCYHnUzPArXFz3xM1/L/9I="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"t8ERwDCCvtqYbzXucFnwOoxLtsM=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"NIAH9GCYHnUzPArXFz3xM1/L/9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FBwEtHbQ8FyHA6Anorj/X2T0CcQ="},{"type":"next-occurrence","id":"yGFEj2YmP2lJCOb/Vhi1IDqovvE="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"NIAH9GCYHnUzPArXFz3xM1/L/9I=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"yGFEj2YmP2lJCOb/Vhi1IDqovvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FBwEtHbQ8FyHA6Anorj/X2T0CcQ="},{"type":"next-occurrence","id":"F34WHR81smpOJldnB6olt9Ops/E="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"yGFEj2YmP2lJCOb/Vhi1IDqovvE=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"F34WHR81smpOJldnB6olt9Ops/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FBwEtHbQ8FyHA6Anorj/X2T0CcQ="},{"type":"next-occurrence","id":"dLlOQzu+15CT4ev/X8JUN/BAV9M="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"F34WHR81smpOJldnB6olt9Ops/E=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"dLlOQzu+15CT4ev/X8JUN/BAV9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FBwEtHbQ8FyHA6Anorj/X2T0CcQ="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"dLlOQzu+15CT4ev/X8JUN/BAV9M=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"US8tyDKx2GJ7W5YwkFG1nGghABw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+53cFfEWZhJg7xnVYyWjut/JneU="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:00Z"},"road_event_id":"US8tyDKx2GJ7W5YwkFG1nGghABw=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"+53cFfEWZhJg7xnVYyWjut/JneU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"US8tyDKx2GJ7W5YwkFG1nGghABw="},{"type":"next-occurrence","id":"H0fcqeskw/a1gPwqxo6aoJ3LGJE="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:00Z"},"road_event_id":"+53cFfEWZhJg7xnVYyWjut/JneU=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"H0fcqeskw/a1gPwqxo6aoJ3LGJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"US8tyDKx2GJ7W5YwkFG1nGghABw="},{"type":"next-occurrence","id":"j+gw/PeMdzlcbK23lyYPPvsoq9U="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:00Z"},"road_event_id":"H0fcqeskw/a1gPwqxo6aoJ3LGJE=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"j+gw/PeMdzlcbK23lyYPPvsoq9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"US8tyDKx2GJ7W5YwkFG1nGghABw="},{"type":"next-occurrence","id":"1I0zSjIvBY8T4A1sxML29hn4sVg="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:00Z"},"road_event_id":"j+gw/PeMdzlcbK23lyYPPvsoq9U=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"1I0zSjIvBY8T4A1sxML29hn4sVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"US8tyDKx2GJ7W5YwkFG1nGghABw="},{"type":"next-occurrence","id":"vU7YYb1NQyKcL01EJ9GWi3eQuUc="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:00Z"},"road_event_id":"1I0zSjIvBY8T4A1sxML29hn4sVg=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"vU7YYb1NQyKcL01EJ9GWi3eQuUc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"US8tyDKx2GJ7W5YwkFG1nGghABw="},{"type":"next-occurrence","id":"Po+as96zt1+i5yeELdWGZZhKgz8="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:00Z"},"road_event_id":"vU7YYb1NQyKcL01EJ9GWi3eQuUc=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"Po+as96zt1+i5yeELdWGZZhKgz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"US8tyDKx2GJ7W5YwkFG1nGghABw="},{"type":"next-occurrence","id":"g3FW1BtQaE3hhGZ9k2FDLxn85Rk="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:00Z"},"road_event_id":"Po+as96zt1+i5yeELdWGZZhKgz8=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"g3FW1BtQaE3hhGZ9k2FDLxn85Rk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"US8tyDKx2GJ7W5YwkFG1nGghABw="},{"type":"next-occurrence","id":"YSoumOHzZliHB3Ptm2tWPjSG4Kc="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:00Z"},"road_event_id":"g3FW1BtQaE3hhGZ9k2FDLxn85Rk=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"YSoumOHzZliHB3Ptm2tWPjSG4Kc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"US8tyDKx2GJ7W5YwkFG1nGghABw="},{"type":"next-occurrence","id":"Lr04LG4cZjJLpmMVjwp4bnkFY/E="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:00Z"},"road_event_id":"YSoumOHzZliHB3Ptm2tWPjSG4Kc=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"Lr04LG4cZjJLpmMVjwp4bnkFY/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"US8tyDKx2GJ7W5YwkFG1nGghABw="},{"type":"next-occurrence","id":"3DIjm6xxWWUWPLV/bI+WutnhNnw="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:00Z"},"road_event_id":"Lr04LG4cZjJLpmMVjwp4bnkFY/E=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"3DIjm6xxWWUWPLV/bI+WutnhNnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"US8tyDKx2GJ7W5YwkFG1nGghABw="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:00Z"},"road_event_id":"3DIjm6xxWWUWPLV/bI+WutnhNnw=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"A3kf04b2IM1Ss0lJ/yALWLnKtTo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qdR5F93OIkCRxKWmOySB/0u5YiA="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"A3kf04b2IM1Ss0lJ/yALWLnKtTo=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"qdR5F93OIkCRxKWmOySB/0u5YiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A3kf04b2IM1Ss0lJ/yALWLnKtTo="},{"type":"next-occurrence","id":"82ilPjsq0/h+E85nhyT9Z6huMEk="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"qdR5F93OIkCRxKWmOySB/0u5YiA=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"82ilPjsq0/h+E85nhyT9Z6huMEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A3kf04b2IM1Ss0lJ/yALWLnKtTo="},{"type":"next-occurrence","id":"JBSTrvSO5yhqNumdp1JSfRiwBhw="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"82ilPjsq0/h+E85nhyT9Z6huMEk=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"JBSTrvSO5yhqNumdp1JSfRiwBhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A3kf04b2IM1Ss0lJ/yALWLnKtTo="},{"type":"next-occurrence","id":"/TL2FcivS5dIQUsA9/neBT5QLos="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"JBSTrvSO5yhqNumdp1JSfRiwBhw=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"/TL2FcivS5dIQUsA9/neBT5QLos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A3kf04b2IM1Ss0lJ/yALWLnKtTo="},{"type":"next-occurrence","id":"0LrnU2w7opCS42JiODO8F9Up6gg="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"/TL2FcivS5dIQUsA9/neBT5QLos=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"0LrnU2w7opCS42JiODO8F9Up6gg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A3kf04b2IM1Ss0lJ/yALWLnKtTo="},{"type":"next-occurrence","id":"d8FdNZM0+2ntRkKxs1BLHU+sAwM="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"0LrnU2w7opCS42JiODO8F9Up6gg=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"d8FdNZM0+2ntRkKxs1BLHU+sAwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A3kf04b2IM1Ss0lJ/yALWLnKtTo="},{"type":"next-occurrence","id":"hDXQkgs4UgF+WvXNO6WpFqzHIFA="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"d8FdNZM0+2ntRkKxs1BLHU+sAwM=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"hDXQkgs4UgF+WvXNO6WpFqzHIFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A3kf04b2IM1Ss0lJ/yALWLnKtTo="},{"type":"next-occurrence","id":"Caz3HbVMuXUgZrViq6mrlHH/6VU="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"hDXQkgs4UgF+WvXNO6WpFqzHIFA=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"Caz3HbVMuXUgZrViq6mrlHH/6VU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A3kf04b2IM1Ss0lJ/yALWLnKtTo="},{"type":"next-occurrence","id":"WmfJTFh2ET9iYLis8dep3/2YLIs="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"Caz3HbVMuXUgZrViq6mrlHH/6VU=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"WmfJTFh2ET9iYLis8dep3/2YLIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A3kf04b2IM1Ss0lJ/yALWLnKtTo="},{"type":"next-occurrence","id":"O0Uz/gYXPePMjx3Sf0x7G/fUMsU="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"WmfJTFh2ET9iYLis8dep3/2YLIs=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"O0Uz/gYXPePMjx3Sf0x7G/fUMsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A3kf04b2IM1Ss0lJ/yALWLnKtTo="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"O0Uz/gYXPePMjx3Sf0x7G/fUMsU=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"XWM5rLRS65j+PfbJ4sSsFBGvwTg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1St2GQOTCALvETSuzjKD684QRPc="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"XWM5rLRS65j+PfbJ4sSsFBGvwTg=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"1St2GQOTCALvETSuzjKD684QRPc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XWM5rLRS65j+PfbJ4sSsFBGvwTg="},{"type":"next-occurrence","id":"cqmPXO8efv4rHqDehc8GJDY2Umk="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"1St2GQOTCALvETSuzjKD684QRPc=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"cqmPXO8efv4rHqDehc8GJDY2Umk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XWM5rLRS65j+PfbJ4sSsFBGvwTg="},{"type":"next-occurrence","id":"Le6bc9ygIMNYeQ2NyxUxrM6s/EA="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"cqmPXO8efv4rHqDehc8GJDY2Umk=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"Le6bc9ygIMNYeQ2NyxUxrM6s/EA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XWM5rLRS65j+PfbJ4sSsFBGvwTg="},{"type":"next-occurrence","id":"0afqh8Q6BQc09a9N94IMbz1um4s="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"Le6bc9ygIMNYeQ2NyxUxrM6s/EA=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"0afqh8Q6BQc09a9N94IMbz1um4s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XWM5rLRS65j+PfbJ4sSsFBGvwTg="},{"type":"next-occurrence","id":"ihoVLsq95zKw2hUVAODCCCKF6ng="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"0afqh8Q6BQc09a9N94IMbz1um4s=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"ihoVLsq95zKw2hUVAODCCCKF6ng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XWM5rLRS65j+PfbJ4sSsFBGvwTg="},{"type":"next-occurrence","id":"DCJcUU3S0IGtel/mtH2uIm8mYHQ="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"ihoVLsq95zKw2hUVAODCCCKF6ng=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"DCJcUU3S0IGtel/mtH2uIm8mYHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XWM5rLRS65j+PfbJ4sSsFBGvwTg="},{"type":"next-occurrence","id":"D4yJFP/z7H9Ze7l1NMSUsf51t04="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"DCJcUU3S0IGtel/mtH2uIm8mYHQ=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"D4yJFP/z7H9Ze7l1NMSUsf51t04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XWM5rLRS65j+PfbJ4sSsFBGvwTg="},{"type":"next-occurrence","id":"WYQpg3Jexan44JGa6lX1YgZrvIw="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"D4yJFP/z7H9Ze7l1NMSUsf51t04=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"WYQpg3Jexan44JGa6lX1YgZrvIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XWM5rLRS65j+PfbJ4sSsFBGvwTg="},{"type":"next-occurrence","id":"RUso77W7Lg6oghcSqUAdkFBsfO0="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"WYQpg3Jexan44JGa6lX1YgZrvIw=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"RUso77W7Lg6oghcSqUAdkFBsfO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XWM5rLRS65j+PfbJ4sSsFBGvwTg="},{"type":"next-occurrence","id":"JSdRJ+Um5U7lYzZytimbMSZ9U7Q="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"RUso77W7Lg6oghcSqUAdkFBsfO0=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"JSdRJ+Um5U7lYzZytimbMSZ9U7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XWM5rLRS65j+PfbJ4sSsFBGvwTg="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"JSdRJ+Um5U7lYzZytimbMSZ9U7Q=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"Jqj4SQDT4wbXSA+l1aJK8+85daE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"U0Kcw+8Yhb6iOrDnfMvLxKYV6h4="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"Jqj4SQDT4wbXSA+l1aJK8+85daE=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"U0Kcw+8Yhb6iOrDnfMvLxKYV6h4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Jqj4SQDT4wbXSA+l1aJK8+85daE="},{"type":"next-occurrence","id":"M4/U5ByP0oXaw0X3EniSD0UYNCE="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"U0Kcw+8Yhb6iOrDnfMvLxKYV6h4=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"M4/U5ByP0oXaw0X3EniSD0UYNCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Jqj4SQDT4wbXSA+l1aJK8+85daE="},{"type":"next-occurrence","id":"6TMLQbF1gu77TMLMDW21dLeIIUA="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"M4/U5ByP0oXaw0X3EniSD0UYNCE=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"6TMLQbF1gu77TMLMDW21dLeIIUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Jqj4SQDT4wbXSA+l1aJK8+85daE="},{"type":"next-occurrence","id":"9i4ckU9D8aH21Ee/geBCUMxEdFE="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"6TMLQbF1gu77TMLMDW21dLeIIUA=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"9i4ckU9D8aH21Ee/geBCUMxEdFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Jqj4SQDT4wbXSA+l1aJK8+85daE="},{"type":"next-occurrence","id":"eMq1Dd+p/I1FFCqNBr7+mUi3egM="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"9i4ckU9D8aH21Ee/geBCUMxEdFE=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"eMq1Dd+p/I1FFCqNBr7+mUi3egM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Jqj4SQDT4wbXSA+l1aJK8+85daE="},{"type":"next-occurrence","id":"KGtSbvWvZZDqz8K6qTFLZlrL0fU="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"eMq1Dd+p/I1FFCqNBr7+mUi3egM=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"KGtSbvWvZZDqz8K6qTFLZlrL0fU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Jqj4SQDT4wbXSA+l1aJK8+85daE="},{"type":"next-occurrence","id":"u6BGdpxKKAQ3cQRtD+/qhAS0n3M="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"KGtSbvWvZZDqz8K6qTFLZlrL0fU=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"u6BGdpxKKAQ3cQRtD+/qhAS0n3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Jqj4SQDT4wbXSA+l1aJK8+85daE="},{"type":"next-occurrence","id":"UCNKKGFiVG+b0yK3pPPQUC5pkAc="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"u6BGdpxKKAQ3cQRtD+/qhAS0n3M=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"UCNKKGFiVG+b0yK3pPPQUC5pkAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Jqj4SQDT4wbXSA+l1aJK8+85daE="},{"type":"next-occurrence","id":"Ykv7GUi0G8GoyXh1Tf7+QTVied4="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"UCNKKGFiVG+b0yK3pPPQUC5pkAc=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"Ykv7GUi0G8GoyXh1Tf7+QTVied4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Jqj4SQDT4wbXSA+l1aJK8+85daE="},{"type":"next-occurrence","id":"bVZn9SGkLbbGC3k4vgYCqvpgh4k="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"Ykv7GUi0G8GoyXh1Tf7+QTVied4=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"bVZn9SGkLbbGC3k4vgYCqvpgh4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Jqj4SQDT4wbXSA+l1aJK8+85daE="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:10Z"},"road_event_id":"bVZn9SGkLbbGC3k4vgYCqvpgh4k=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"hsTGZKYfulb46VMfdmI6N4ocG1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NQKX4VYWGliQOQkaWMb70u0P7Ag="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"hsTGZKYfulb46VMfdmI6N4ocG1U=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"NQKX4VYWGliQOQkaWMb70u0P7Ag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hsTGZKYfulb46VMfdmI6N4ocG1U="},{"type":"next-occurrence","id":"A/8VH/b4Q3gcn0EVB8WrmQjHijc="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"NQKX4VYWGliQOQkaWMb70u0P7Ag=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"A/8VH/b4Q3gcn0EVB8WrmQjHijc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hsTGZKYfulb46VMfdmI6N4ocG1U="},{"type":"next-occurrence","id":"JjJPeTQR9HUn7fHCa5ht9Go1Xzk="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"A/8VH/b4Q3gcn0EVB8WrmQjHijc=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"JjJPeTQR9HUn7fHCa5ht9Go1Xzk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hsTGZKYfulb46VMfdmI6N4ocG1U="},{"type":"next-occurrence","id":"WfW94/fsdJKh5PpbF6nGaBvwz/8="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"JjJPeTQR9HUn7fHCa5ht9Go1Xzk=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"WfW94/fsdJKh5PpbF6nGaBvwz/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hsTGZKYfulb46VMfdmI6N4ocG1U="},{"type":"next-occurrence","id":"BZ70dLSEkRb5surkcxqmQI1pT3k="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"WfW94/fsdJKh5PpbF6nGaBvwz/8=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"BZ70dLSEkRb5surkcxqmQI1pT3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hsTGZKYfulb46VMfdmI6N4ocG1U="},{"type":"next-occurrence","id":"4117lAde3TNlCGO+f25lFnuFM3A="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"BZ70dLSEkRb5surkcxqmQI1pT3k=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"4117lAde3TNlCGO+f25lFnuFM3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hsTGZKYfulb46VMfdmI6N4ocG1U="},{"type":"next-occurrence","id":"HeZQAI3bfuIvTulE2gQ3RHxdHH0="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"4117lAde3TNlCGO+f25lFnuFM3A=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"HeZQAI3bfuIvTulE2gQ3RHxdHH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hsTGZKYfulb46VMfdmI6N4ocG1U="},{"type":"next-occurrence","id":"zNOU94nmIX/8a7JYY/ujXBcXCps="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"HeZQAI3bfuIvTulE2gQ3RHxdHH0=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"zNOU94nmIX/8a7JYY/ujXBcXCps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hsTGZKYfulb46VMfdmI6N4ocG1U="},{"type":"next-occurrence","id":"tL9IV5W0ls6SseFDc6yxr7erqm4="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"zNOU94nmIX/8a7JYY/ujXBcXCps=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"tL9IV5W0ls6SseFDc6yxr7erqm4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hsTGZKYfulb46VMfdmI6N4ocG1U="},{"type":"next-occurrence","id":"nmq2X4eIbK5pT1wZPhR+M3rehEI="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"tL9IV5W0ls6SseFDc6yxr7erqm4=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"nmq2X4eIbK5pT1wZPhR+M3rehEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hsTGZKYfulb46VMfdmI6N4ocG1U="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"nmq2X4eIbK5pT1wZPhR+M3rehEI=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"Mxg4mmbJEjSrFT4tOnRm8uT2ZfM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q6ZJlPibNaQY9URt88bjW9xsFCI="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"Mxg4mmbJEjSrFT4tOnRm8uT2ZfM=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"q6ZJlPibNaQY9URt88bjW9xsFCI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mxg4mmbJEjSrFT4tOnRm8uT2ZfM="},{"type":"next-occurrence","id":"QrkgX2YQ/Gsn740Tro8xVaTzfMY="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"q6ZJlPibNaQY9URt88bjW9xsFCI=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"QrkgX2YQ/Gsn740Tro8xVaTzfMY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mxg4mmbJEjSrFT4tOnRm8uT2ZfM="},{"type":"next-occurrence","id":"69R+yEJh9EntoxeTjBYAP8cIlEA="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"QrkgX2YQ/Gsn740Tro8xVaTzfMY=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"69R+yEJh9EntoxeTjBYAP8cIlEA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mxg4mmbJEjSrFT4tOnRm8uT2ZfM="},{"type":"next-occurrence","id":"zlGNvBOvQEdoIqMuN0+G3auwgNY="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"69R+yEJh9EntoxeTjBYAP8cIlEA=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"zlGNvBOvQEdoIqMuN0+G3auwgNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mxg4mmbJEjSrFT4tOnRm8uT2ZfM="},{"type":"next-occurrence","id":"5mCAszcXIanC0I6jx3UD1YTMREU="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"zlGNvBOvQEdoIqMuN0+G3auwgNY=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"5mCAszcXIanC0I6jx3UD1YTMREU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mxg4mmbJEjSrFT4tOnRm8uT2ZfM="},{"type":"next-occurrence","id":"53U74wzHp/dp40RrnGb+T7eqKX0="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"5mCAszcXIanC0I6jx3UD1YTMREU=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"53U74wzHp/dp40RrnGb+T7eqKX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mxg4mmbJEjSrFT4tOnRm8uT2ZfM="},{"type":"next-occurrence","id":"JOe4dpzs6ytpa6uZcmN60vbrT8o="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"53U74wzHp/dp40RrnGb+T7eqKX0=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"JOe4dpzs6ytpa6uZcmN60vbrT8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mxg4mmbJEjSrFT4tOnRm8uT2ZfM="},{"type":"next-occurrence","id":"uYQ0G+bzGNimvinnLlxio0st0Q4="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"JOe4dpzs6ytpa6uZcmN60vbrT8o=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"uYQ0G+bzGNimvinnLlxio0st0Q4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mxg4mmbJEjSrFT4tOnRm8uT2ZfM="},{"type":"next-occurrence","id":"/U5SU5j7bcq3ZssNlUEJhlmfwKc="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"uYQ0G+bzGNimvinnLlxio0st0Q4=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"/U5SU5j7bcq3ZssNlUEJhlmfwKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mxg4mmbJEjSrFT4tOnRm8uT2ZfM="},{"type":"next-occurrence","id":"z40036/nT7B2XuAN5CFyfNQtVFw="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"/U5SU5j7bcq3ZssNlUEJhlmfwKc=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"z40036/nT7B2XuAN5CFyfNQtVFw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mxg4mmbJEjSrFT4tOnRm8uT2ZfM="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"z40036/nT7B2XuAN5CFyfNQtVFw=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"c7KPnRfDvXPcDEyHSTszzD53KtE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aiDjNQfeJLMtysRrdyu4K4ppYro="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"c7KPnRfDvXPcDEyHSTszzD53KtE=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"aiDjNQfeJLMtysRrdyu4K4ppYro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7KPnRfDvXPcDEyHSTszzD53KtE="},{"type":"next-occurrence","id":"d9c/HLso8n9qIv+dREpe1He5DC8="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"aiDjNQfeJLMtysRrdyu4K4ppYro=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"d9c/HLso8n9qIv+dREpe1He5DC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7KPnRfDvXPcDEyHSTszzD53KtE="},{"type":"next-occurrence","id":"4BKfNYirMAOZNER1QjdLLxzgizs="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"d9c/HLso8n9qIv+dREpe1He5DC8=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"4BKfNYirMAOZNER1QjdLLxzgizs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7KPnRfDvXPcDEyHSTszzD53KtE="},{"type":"next-occurrence","id":"UrJ926b8pyEk+F9fRyAtRCrvHRs="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"4BKfNYirMAOZNER1QjdLLxzgizs=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"UrJ926b8pyEk+F9fRyAtRCrvHRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7KPnRfDvXPcDEyHSTszzD53KtE="},{"type":"next-occurrence","id":"HCJAm2L3+J/Km13BDPv/D3hNppo="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"UrJ926b8pyEk+F9fRyAtRCrvHRs=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"HCJAm2L3+J/Km13BDPv/D3hNppo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7KPnRfDvXPcDEyHSTszzD53KtE="},{"type":"next-occurrence","id":"xc10qvfBb9OJQaDs4LixVNzK9hE="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"HCJAm2L3+J/Km13BDPv/D3hNppo=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"xc10qvfBb9OJQaDs4LixVNzK9hE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7KPnRfDvXPcDEyHSTszzD53KtE="},{"type":"next-occurrence","id":"HwAmcroVrJQQIz4bv7rlR7bKkck="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"xc10qvfBb9OJQaDs4LixVNzK9hE=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"HwAmcroVrJQQIz4bv7rlR7bKkck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7KPnRfDvXPcDEyHSTszzD53KtE="},{"type":"next-occurrence","id":"afIn38EszTIAXq8CHnF0LnqebKg="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"HwAmcroVrJQQIz4bv7rlR7bKkck=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"afIn38EszTIAXq8CHnF0LnqebKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7KPnRfDvXPcDEyHSTszzD53KtE="},{"type":"next-occurrence","id":"Z0rOZ/Rl1qRTst2NU0nYNBkV5X4="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"afIn38EszTIAXq8CHnF0LnqebKg=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"Z0rOZ/Rl1qRTst2NU0nYNBkV5X4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7KPnRfDvXPcDEyHSTszzD53KtE="},{"type":"next-occurrence","id":"bml+J8EVqIp37Z6p7D+N7Y5i714="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"Z0rOZ/Rl1qRTst2NU0nYNBkV5X4=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"bml+J8EVqIp37Z6p7D+N7Y5i714=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7KPnRfDvXPcDEyHSTszzD53KtE="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"bml+J8EVqIp37Z6p7D+N7Y5i714=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"3KF9pEWl44pWTr7HtDELQKgaws0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3IiFwLj23c5CL+6dDvx38YyOuZ4="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"3KF9pEWl44pWTr7HtDELQKgaws0=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"3IiFwLj23c5CL+6dDvx38YyOuZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3KF9pEWl44pWTr7HtDELQKgaws0="},{"type":"next-occurrence","id":"JDy5yXTs+KplABPvD3D8IYZUgvE="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"3IiFwLj23c5CL+6dDvx38YyOuZ4=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"JDy5yXTs+KplABPvD3D8IYZUgvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3KF9pEWl44pWTr7HtDELQKgaws0="},{"type":"next-occurrence","id":"vkoiywF+k1ipZntldIxGqRvRFp8="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"JDy5yXTs+KplABPvD3D8IYZUgvE=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"vkoiywF+k1ipZntldIxGqRvRFp8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3KF9pEWl44pWTr7HtDELQKgaws0="},{"type":"next-occurrence","id":"NOY/tL/wkQ2dpw06uKfjLG+xzvo="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"vkoiywF+k1ipZntldIxGqRvRFp8=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"NOY/tL/wkQ2dpw06uKfjLG+xzvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3KF9pEWl44pWTr7HtDELQKgaws0="},{"type":"next-occurrence","id":"t02wAb9Xe2NJTfU8FA2jGBIASKs="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"NOY/tL/wkQ2dpw06uKfjLG+xzvo=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"t02wAb9Xe2NJTfU8FA2jGBIASKs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3KF9pEWl44pWTr7HtDELQKgaws0="},{"type":"next-occurrence","id":"7sOOH/wqM90SD1y+VX/wq2Bj7nI="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"t02wAb9Xe2NJTfU8FA2jGBIASKs=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"7sOOH/wqM90SD1y+VX/wq2Bj7nI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3KF9pEWl44pWTr7HtDELQKgaws0="},{"type":"next-occurrence","id":"pSKDoGq9UJkQjjb27Lk6R8OyVd0="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"7sOOH/wqM90SD1y+VX/wq2Bj7nI=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"pSKDoGq9UJkQjjb27Lk6R8OyVd0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3KF9pEWl44pWTr7HtDELQKgaws0="},{"type":"next-occurrence","id":"Ujf405rIjzO+ILlh+C7BVkm4icE="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"pSKDoGq9UJkQjjb27Lk6R8OyVd0=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"Ujf405rIjzO+ILlh+C7BVkm4icE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3KF9pEWl44pWTr7HtDELQKgaws0="},{"type":"next-occurrence","id":"uY2EPXkbhnmQEUmJwosC7n+0ZNQ="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"Ujf405rIjzO+ILlh+C7BVkm4icE=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"uY2EPXkbhnmQEUmJwosC7n+0ZNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3KF9pEWl44pWTr7HtDELQKgaws0="},{"type":"next-occurrence","id":"qTsaglcdMGrLn/HmOGNLn4tBy28="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"uY2EPXkbhnmQEUmJwosC7n+0ZNQ=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"qTsaglcdMGrLn/HmOGNLn4tBy28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3KF9pEWl44pWTr7HtDELQKgaws0="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 2 lanes open southbound,","update_date":"2026-05-31T10:00:01Z"},"road_event_id":"qTsaglcdMGrLn/HmOGNLn4tBy28=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"fMxxoxomINl0VFKkL6qUSXaujTA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DMieFp5XA7hOVtPFFHo6n0q4l2g="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"fMxxoxomINl0VFKkL6qUSXaujTA=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"DMieFp5XA7hOVtPFFHo6n0q4l2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fMxxoxomINl0VFKkL6qUSXaujTA="},{"type":"next-occurrence","id":"xpqtU38iT7lbRaQgYXXpAMTQpj4="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"DMieFp5XA7hOVtPFFHo6n0q4l2g=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"xpqtU38iT7lbRaQgYXXpAMTQpj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fMxxoxomINl0VFKkL6qUSXaujTA="},{"type":"next-occurrence","id":"HTdv9jSys680VEm9bwWtz5ElkHc="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"xpqtU38iT7lbRaQgYXXpAMTQpj4=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"HTdv9jSys680VEm9bwWtz5ElkHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fMxxoxomINl0VFKkL6qUSXaujTA="},{"type":"next-occurrence","id":"hFPHg3w0NgiWg1YaV/oDvxF+iF8="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"HTdv9jSys680VEm9bwWtz5ElkHc=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"hFPHg3w0NgiWg1YaV/oDvxF+iF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fMxxoxomINl0VFKkL6qUSXaujTA="},{"type":"next-occurrence","id":"R2HcPiAc54a70MCKqRAJ/jJN1es="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"hFPHg3w0NgiWg1YaV/oDvxF+iF8=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"R2HcPiAc54a70MCKqRAJ/jJN1es=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fMxxoxomINl0VFKkL6qUSXaujTA="},{"type":"next-occurrence","id":"Miews+pMBVHoKw9sXgsU+6z6El8="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"R2HcPiAc54a70MCKqRAJ/jJN1es=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"Miews+pMBVHoKw9sXgsU+6z6El8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fMxxoxomINl0VFKkL6qUSXaujTA="},{"type":"next-occurrence","id":"imKP/kZ62xgG5gqG3k8LMU5gdOY="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"Miews+pMBVHoKw9sXgsU+6z6El8=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"imKP/kZ62xgG5gqG3k8LMU5gdOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fMxxoxomINl0VFKkL6qUSXaujTA="},{"type":"next-occurrence","id":"0WSFA310NA5OeUsGCaAiezm5Z48="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"imKP/kZ62xgG5gqG3k8LMU5gdOY=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"0WSFA310NA5OeUsGCaAiezm5Z48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fMxxoxomINl0VFKkL6qUSXaujTA="},{"type":"next-occurrence","id":"qV3lYz8GNXbN2Ml8JEtYcW2efGE="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"0WSFA310NA5OeUsGCaAiezm5Z48=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"qV3lYz8GNXbN2Ml8JEtYcW2efGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fMxxoxomINl0VFKkL6qUSXaujTA="},{"type":"next-occurrence","id":"EY4snLhiXBcG3Wcwl/67wK8fU7s="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"qV3lYz8GNXbN2Ml8JEtYcW2efGE=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"EY4snLhiXBcG3Wcwl/67wK8fU7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fMxxoxomINl0VFKkL6qUSXaujTA="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"EY4snLhiXBcG3Wcwl/67wK8fU7s=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"spKXoiLNN4lsV9aAJBe6ba3LS7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GR01W589as6Ahx6W6E9w0gEnGXc="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"spKXoiLNN4lsV9aAJBe6ba3LS7A=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"GR01W589as6Ahx6W6E9w0gEnGXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"spKXoiLNN4lsV9aAJBe6ba3LS7A="},{"type":"next-occurrence","id":"IwPHnoF4lTU4nGLWjyzzAC19XMg="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"GR01W589as6Ahx6W6E9w0gEnGXc=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"IwPHnoF4lTU4nGLWjyzzAC19XMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"spKXoiLNN4lsV9aAJBe6ba3LS7A="},{"type":"next-occurrence","id":"HooNnjfvzL5ugRK5MYq+sm6vVV4="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"IwPHnoF4lTU4nGLWjyzzAC19XMg=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"HooNnjfvzL5ugRK5MYq+sm6vVV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"spKXoiLNN4lsV9aAJBe6ba3LS7A="},{"type":"next-occurrence","id":"+ZekajXxuebhVegtkehMduCqFzI="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"HooNnjfvzL5ugRK5MYq+sm6vVV4=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"+ZekajXxuebhVegtkehMduCqFzI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"spKXoiLNN4lsV9aAJBe6ba3LS7A="},{"type":"next-occurrence","id":"kLSmDBA/b09sJOwzRxInPQrqzx8="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"+ZekajXxuebhVegtkehMduCqFzI=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"kLSmDBA/b09sJOwzRxInPQrqzx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"spKXoiLNN4lsV9aAJBe6ba3LS7A="},{"type":"next-occurrence","id":"AAjV0/0YKvHU6ekzjP7+vSYff+Y="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"kLSmDBA/b09sJOwzRxInPQrqzx8=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"AAjV0/0YKvHU6ekzjP7+vSYff+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"spKXoiLNN4lsV9aAJBe6ba3LS7A="},{"type":"next-occurrence","id":"iS78xhL2r9XQt9yEipSKUxMFfV0="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"AAjV0/0YKvHU6ekzjP7+vSYff+Y=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"iS78xhL2r9XQt9yEipSKUxMFfV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"spKXoiLNN4lsV9aAJBe6ba3LS7A="},{"type":"next-occurrence","id":"WSdk6wWthqemcnASCd+i1dELqjs="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"iS78xhL2r9XQt9yEipSKUxMFfV0=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"WSdk6wWthqemcnASCd+i1dELqjs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"spKXoiLNN4lsV9aAJBe6ba3LS7A="},{"type":"next-occurrence","id":"lVOjabFw8sRllfhMJlAT3QP6UB4="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"WSdk6wWthqemcnASCd+i1dELqjs=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"lVOjabFw8sRllfhMJlAT3QP6UB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"spKXoiLNN4lsV9aAJBe6ba3LS7A="},{"type":"next-occurrence","id":"S6oJpKZ1swIoMfp8MIZxU23Gxts="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"lVOjabFw8sRllfhMJlAT3QP6UB4=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"S6oJpKZ1swIoMfp8MIZxU23Gxts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"spKXoiLNN4lsV9aAJBe6ba3LS7A="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"S6oJpKZ1swIoMfp8MIZxU23Gxts=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"8Ic45aQTmqZFBauU4kMIFII6q08=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WhR04iXukLfWbJbd2uNB5ECHfxE="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"8Ic45aQTmqZFBauU4kMIFII6q08=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"WhR04iXukLfWbJbd2uNB5ECHfxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ic45aQTmqZFBauU4kMIFII6q08="},{"type":"next-occurrence","id":"74FyoGeZi13JnXxgfyadsrt8fQ4="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"WhR04iXukLfWbJbd2uNB5ECHfxE=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"74FyoGeZi13JnXxgfyadsrt8fQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ic45aQTmqZFBauU4kMIFII6q08="},{"type":"next-occurrence","id":"ozRV4pWVGGt3AfkoCvwpk4tH1K0="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"74FyoGeZi13JnXxgfyadsrt8fQ4=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"ozRV4pWVGGt3AfkoCvwpk4tH1K0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ic45aQTmqZFBauU4kMIFII6q08="},{"type":"next-occurrence","id":"Tbp+Wcw6j8JlMTycAgdVeoAvB58="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"ozRV4pWVGGt3AfkoCvwpk4tH1K0=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"Tbp+Wcw6j8JlMTycAgdVeoAvB58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ic45aQTmqZFBauU4kMIFII6q08="},{"type":"next-occurrence","id":"FULLr313d/PSEhaQ3QljfTO7Xlo="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"Tbp+Wcw6j8JlMTycAgdVeoAvB58=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"FULLr313d/PSEhaQ3QljfTO7Xlo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ic45aQTmqZFBauU4kMIFII6q08="},{"type":"next-occurrence","id":"Hm+dggJv49cxNoFyUg8kI62Fj6I="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"FULLr313d/PSEhaQ3QljfTO7Xlo=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"Hm+dggJv49cxNoFyUg8kI62Fj6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ic45aQTmqZFBauU4kMIFII6q08="},{"type":"next-occurrence","id":"z0SsaR1gmhUgEF9vskADOz9sG0A="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"Hm+dggJv49cxNoFyUg8kI62Fj6I=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"z0SsaR1gmhUgEF9vskADOz9sG0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ic45aQTmqZFBauU4kMIFII6q08="},{"type":"next-occurrence","id":"z6ExMNoukMmxBOMt/40/rs1ZM2A="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"z0SsaR1gmhUgEF9vskADOz9sG0A=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"z6ExMNoukMmxBOMt/40/rs1ZM2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ic45aQTmqZFBauU4kMIFII6q08="},{"type":"next-occurrence","id":"MSg6yppJwxnTYaMDAMEyN6dJW0U="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"z6ExMNoukMmxBOMt/40/rs1ZM2A=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"MSg6yppJwxnTYaMDAMEyN6dJW0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ic45aQTmqZFBauU4kMIFII6q08="},{"type":"next-occurrence","id":"62FPLsmoCLbRKgrORoKSAv3Eb14="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"MSg6yppJwxnTYaMDAMEyN6dJW0U=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"62FPLsmoCLbRKgrORoKSAv3Eb14=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Ic45aQTmqZFBauU4kMIFII6q08="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"62FPLsmoCLbRKgrORoKSAv3Eb14=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"9UYfbElQRDqj7EV/Ib1C9MG4E/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[],"description":"Construction on US 11 both directions in the vicinity of HALLAHAN RD (Lawrence) Narrow Bridge, Continuous Sunday December 15th, 2024 08:59 PM thru Friday December 31st, 2027 11:59 PM All lanes open","update_date":"2024-12-16T01:59:41Z"},"road_event_id":"9UYfbElQRDqj7EV/Ib1C9MG4E/Q=","beginning_cross_street":"HALLAHAN RD","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.713616,44.772081]]}},{"id":"LFsy2h4woahnoBjHGHZuGPznCsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bea6EC9HmpeWwMrjE3j341w+yEA="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"LFsy2h4woahnoBjHGHZuGPznCsM=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"bea6EC9HmpeWwMrjE3j341w+yEA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LFsy2h4woahnoBjHGHZuGPznCsM="},{"type":"next-occurrence","id":"nFopcix0NgGlas1DByG6jjuQB/c="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"bea6EC9HmpeWwMrjE3j341w+yEA=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"nFopcix0NgGlas1DByG6jjuQB/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LFsy2h4woahnoBjHGHZuGPznCsM="},{"type":"next-occurrence","id":"S8gPl2DfR38zv+WzflH38++ZT/4="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"nFopcix0NgGlas1DByG6jjuQB/c=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"S8gPl2DfR38zv+WzflH38++ZT/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LFsy2h4woahnoBjHGHZuGPznCsM="},{"type":"next-occurrence","id":"0gsCeDdoETNA1UZF4V4bCUW+WIw="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"S8gPl2DfR38zv+WzflH38++ZT/4=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"0gsCeDdoETNA1UZF4V4bCUW+WIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LFsy2h4woahnoBjHGHZuGPznCsM="},{"type":"next-occurrence","id":"dfJ51kW34plcT9mG5AE4sv7G1+g="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"0gsCeDdoETNA1UZF4V4bCUW+WIw=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"dfJ51kW34plcT9mG5AE4sv7G1+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LFsy2h4woahnoBjHGHZuGPznCsM="},{"type":"next-occurrence","id":"1soUjiZiByaBQf2uf46yIdo2DFY="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"dfJ51kW34plcT9mG5AE4sv7G1+g=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"1soUjiZiByaBQf2uf46yIdo2DFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LFsy2h4woahnoBjHGHZuGPznCsM="},{"type":"next-occurrence","id":"JYiTZweh35oGD1fWsQeUmbtlIbg="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"1soUjiZiByaBQf2uf46yIdo2DFY=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"JYiTZweh35oGD1fWsQeUmbtlIbg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LFsy2h4woahnoBjHGHZuGPznCsM="},{"type":"next-occurrence","id":"6ngi0A40p/8+WPo4W6kbU/RlZQ0="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"JYiTZweh35oGD1fWsQeUmbtlIbg=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"6ngi0A40p/8+WPo4W6kbU/RlZQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LFsy2h4woahnoBjHGHZuGPznCsM="},{"type":"next-occurrence","id":"Sl5l7axoYcdI8HZND60Lu+991Cs="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"6ngi0A40p/8+WPo4W6kbU/RlZQ0=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"Sl5l7axoYcdI8HZND60Lu+991Cs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LFsy2h4woahnoBjHGHZuGPznCsM="},{"type":"next-occurrence","id":"O5UpR5FTF8OjAICiTaJz5kSqrvE="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"Sl5l7axoYcdI8HZND60Lu+991Cs=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"O5UpR5FTF8OjAICiTaJz5kSqrvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LFsy2h4woahnoBjHGHZuGPznCsM="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:03Z"},"road_event_id":"O5UpR5FTF8OjAICiTaJz5kSqrvE=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"p0nmePx/GSOKtV7p9MslBYJLoDE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9j+Jb1JjhfQV2Bz4nbVymOTCmHI="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"p0nmePx/GSOKtV7p9MslBYJLoDE=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"9j+Jb1JjhfQV2Bz4nbVymOTCmHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p0nmePx/GSOKtV7p9MslBYJLoDE="},{"type":"next-occurrence","id":"xwuqlzOF3IlYi7wY/YtYn52iPOw="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"9j+Jb1JjhfQV2Bz4nbVymOTCmHI=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"xwuqlzOF3IlYi7wY/YtYn52iPOw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p0nmePx/GSOKtV7p9MslBYJLoDE="},{"type":"next-occurrence","id":"uU1j+MXuVMB1LnYv/0leqbu/9jU="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"xwuqlzOF3IlYi7wY/YtYn52iPOw=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"uU1j+MXuVMB1LnYv/0leqbu/9jU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p0nmePx/GSOKtV7p9MslBYJLoDE="},{"type":"next-occurrence","id":"XL3atHfXhRbM5IdModQF77ZSUkc="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"uU1j+MXuVMB1LnYv/0leqbu/9jU=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"XL3atHfXhRbM5IdModQF77ZSUkc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p0nmePx/GSOKtV7p9MslBYJLoDE="},{"type":"next-occurrence","id":"YFxrGh901y0djFo7W6tRIlalXR4="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"XL3atHfXhRbM5IdModQF77ZSUkc=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"YFxrGh901y0djFo7W6tRIlalXR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p0nmePx/GSOKtV7p9MslBYJLoDE="},{"type":"next-occurrence","id":"v7rRzRfMJwiqPvtU1dm7T1nB/Ss="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"YFxrGh901y0djFo7W6tRIlalXR4=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"v7rRzRfMJwiqPvtU1dm7T1nB/Ss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p0nmePx/GSOKtV7p9MslBYJLoDE="},{"type":"next-occurrence","id":"RU8IF2CbyL2TWxSmW8zMcXlk51k="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"v7rRzRfMJwiqPvtU1dm7T1nB/Ss=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"RU8IF2CbyL2TWxSmW8zMcXlk51k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p0nmePx/GSOKtV7p9MslBYJLoDE="},{"type":"next-occurrence","id":"fFM94J9nAJsVNOoYXiMb7NOU5Ro="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"RU8IF2CbyL2TWxSmW8zMcXlk51k=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"fFM94J9nAJsVNOoYXiMb7NOU5Ro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p0nmePx/GSOKtV7p9MslBYJLoDE="},{"type":"next-occurrence","id":"9/bxTwreh10l8sYZTtNM9nU4OMk="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"fFM94J9nAJsVNOoYXiMb7NOU5Ro=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"9/bxTwreh10l8sYZTtNM9nU4OMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p0nmePx/GSOKtV7p9MslBYJLoDE="},{"type":"next-occurrence","id":"FeIwm/oFaTqYtfhACwLDWrUOEdc="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"9/bxTwreh10l8sYZTtNM9nU4OMk=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"FeIwm/oFaTqYtfhACwLDWrUOEdc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p0nmePx/GSOKtV7p9MslBYJLoDE="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:07Z"},"road_event_id":"FeIwm/oFaTqYtfhACwLDWrUOEdc=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"TASrImxsfzXyUnyFAkY/nrJsABg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xNnBxiD4jvQ3FLSq40KRxZY/Hok="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"TASrImxsfzXyUnyFAkY/nrJsABg=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"xNnBxiD4jvQ3FLSq40KRxZY/Hok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TASrImxsfzXyUnyFAkY/nrJsABg="},{"type":"next-occurrence","id":"7JNvSLDbiRxm7tlYKZjBO39PkLo="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"xNnBxiD4jvQ3FLSq40KRxZY/Hok=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"7JNvSLDbiRxm7tlYKZjBO39PkLo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TASrImxsfzXyUnyFAkY/nrJsABg="},{"type":"next-occurrence","id":"UbimltS7JmTgc3Y8bwcvPWxYrEA="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"7JNvSLDbiRxm7tlYKZjBO39PkLo=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"UbimltS7JmTgc3Y8bwcvPWxYrEA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TASrImxsfzXyUnyFAkY/nrJsABg="},{"type":"next-occurrence","id":"Rsdvl5HvxcYsaB0Zr/LtBoAvz9I="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"UbimltS7JmTgc3Y8bwcvPWxYrEA=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"Rsdvl5HvxcYsaB0Zr/LtBoAvz9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TASrImxsfzXyUnyFAkY/nrJsABg="},{"type":"next-occurrence","id":"KgbGSc+i4STPdlw62rxYFNJz9Ck="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"Rsdvl5HvxcYsaB0Zr/LtBoAvz9I=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"KgbGSc+i4STPdlw62rxYFNJz9Ck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TASrImxsfzXyUnyFAkY/nrJsABg="},{"type":"next-occurrence","id":"WnJfxpsGoAkk+E/74vBfeJpGWnU="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"KgbGSc+i4STPdlw62rxYFNJz9Ck=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"WnJfxpsGoAkk+E/74vBfeJpGWnU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TASrImxsfzXyUnyFAkY/nrJsABg="},{"type":"next-occurrence","id":"FQcp+cyEvTxWfK50RaPcHfH9QEc="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"WnJfxpsGoAkk+E/74vBfeJpGWnU=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"FQcp+cyEvTxWfK50RaPcHfH9QEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TASrImxsfzXyUnyFAkY/nrJsABg="},{"type":"next-occurrence","id":"VGgM5X5lsyG194MYod8FMcP8/Es="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"FQcp+cyEvTxWfK50RaPcHfH9QEc=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"VGgM5X5lsyG194MYod8FMcP8/Es=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TASrImxsfzXyUnyFAkY/nrJsABg="},{"type":"next-occurrence","id":"zGeCDIg6TZ5MRfz9UL2hpGRIOcs="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"VGgM5X5lsyG194MYod8FMcP8/Es=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"zGeCDIg6TZ5MRfz9UL2hpGRIOcs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TASrImxsfzXyUnyFAkY/nrJsABg="},{"type":"next-occurrence","id":"aIcuYrZBadK6gmFNkiaw64OAMNg="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"zGeCDIg6TZ5MRfz9UL2hpGRIOcs=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"aIcuYrZBadK6gmFNkiaw64OAMNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TASrImxsfzXyUnyFAkY/nrJsABg="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 3 lanes open northbound,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"aIcuYrZBadK6gmFNkiaw64OAMNg=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"m7h7BOHQZ98xc9Nkg5GPvDIDvE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VJU5NaCKKsZPC6Zzc7xhwVOHhh8="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"m7h7BOHQZ98xc9Nkg5GPvDIDvE8=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"VJU5NaCKKsZPC6Zzc7xhwVOHhh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m7h7BOHQZ98xc9Nkg5GPvDIDvE8="},{"type":"next-occurrence","id":"GAbDCMRPELtZmL4cMHkdZXtSGXk="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"VJU5NaCKKsZPC6Zzc7xhwVOHhh8=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"GAbDCMRPELtZmL4cMHkdZXtSGXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m7h7BOHQZ98xc9Nkg5GPvDIDvE8="},{"type":"next-occurrence","id":"pUFmQT0FBrx4lGBKvZ1mMHOpD6s="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"GAbDCMRPELtZmL4cMHkdZXtSGXk=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"pUFmQT0FBrx4lGBKvZ1mMHOpD6s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m7h7BOHQZ98xc9Nkg5GPvDIDvE8="},{"type":"next-occurrence","id":"aWybPpC64qaJPKJaolb1MCFy1y8="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"pUFmQT0FBrx4lGBKvZ1mMHOpD6s=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"aWybPpC64qaJPKJaolb1MCFy1y8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m7h7BOHQZ98xc9Nkg5GPvDIDvE8="},{"type":"next-occurrence","id":"duT0NQaTxSgY4mKAgx3612iOsp4="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"aWybPpC64qaJPKJaolb1MCFy1y8=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"duT0NQaTxSgY4mKAgx3612iOsp4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m7h7BOHQZ98xc9Nkg5GPvDIDvE8="},{"type":"next-occurrence","id":"NLdzYwDUwod9JItX9u8FNVcqUCM="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"duT0NQaTxSgY4mKAgx3612iOsp4=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"NLdzYwDUwod9JItX9u8FNVcqUCM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m7h7BOHQZ98xc9Nkg5GPvDIDvE8="},{"type":"next-occurrence","id":"X6F2cgmEhCzXirF0SSQvRUzZxSE="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"NLdzYwDUwod9JItX9u8FNVcqUCM=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"X6F2cgmEhCzXirF0SSQvRUzZxSE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m7h7BOHQZ98xc9Nkg5GPvDIDvE8="},{"type":"next-occurrence","id":"z5TylvbGmOGujcleZBPyyoi0K10="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"X6F2cgmEhCzXirF0SSQvRUzZxSE=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"z5TylvbGmOGujcleZBPyyoi0K10=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m7h7BOHQZ98xc9Nkg5GPvDIDvE8="},{"type":"next-occurrence","id":"9KVFNxPds3ostKZ0eA/0n9iNM7Y="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"z5TylvbGmOGujcleZBPyyoi0K10=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"9KVFNxPds3ostKZ0eA/0n9iNM7Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m7h7BOHQZ98xc9Nkg5GPvDIDvE8="},{"type":"next-occurrence","id":"BiKLTMr7rhHymChRLbunJJdDWd0="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"9KVFNxPds3ostKZ0eA/0n9iNM7Y=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"BiKLTMr7rhHymChRLbunJJdDWd0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m7h7BOHQZ98xc9Nkg5GPvDIDvE8="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:04Z"},"road_event_id":"BiKLTMr7rhHymChRLbunJJdDWd0=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"QYcbWHqLEI95bFd2+mHjF6h/pow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2npbKFMfc+gaCvjRpBCZr4p3qcc="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"QYcbWHqLEI95bFd2+mHjF6h/pow=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"2npbKFMfc+gaCvjRpBCZr4p3qcc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QYcbWHqLEI95bFd2+mHjF6h/pow="},{"type":"next-occurrence","id":"9+MWF8Gkx3+cZHZnpbg4Dll2/aM="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"2npbKFMfc+gaCvjRpBCZr4p3qcc=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"9+MWF8Gkx3+cZHZnpbg4Dll2/aM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QYcbWHqLEI95bFd2+mHjF6h/pow="},{"type":"next-occurrence","id":"x9m7/cYkYZmo4NwqMDSLdguqEhs="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"9+MWF8Gkx3+cZHZnpbg4Dll2/aM=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"x9m7/cYkYZmo4NwqMDSLdguqEhs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QYcbWHqLEI95bFd2+mHjF6h/pow="},{"type":"next-occurrence","id":"wmjvoVu6egsXnNrqaw0ls1uGX68="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"x9m7/cYkYZmo4NwqMDSLdguqEhs=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"wmjvoVu6egsXnNrqaw0ls1uGX68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QYcbWHqLEI95bFd2+mHjF6h/pow="},{"type":"next-occurrence","id":"XcuyearF095Y9240XZAk+mEAasI="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"wmjvoVu6egsXnNrqaw0ls1uGX68=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"XcuyearF095Y9240XZAk+mEAasI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QYcbWHqLEI95bFd2+mHjF6h/pow="},{"type":"next-occurrence","id":"TRWbWtnuIGS8TSVDKPZo4YS4vQY="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"XcuyearF095Y9240XZAk+mEAasI=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"TRWbWtnuIGS8TSVDKPZo4YS4vQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QYcbWHqLEI95bFd2+mHjF6h/pow="},{"type":"next-occurrence","id":"0mjJesDFDleFfm9U/XW4C0nu0oo="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"TRWbWtnuIGS8TSVDKPZo4YS4vQY=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"0mjJesDFDleFfm9U/XW4C0nu0oo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QYcbWHqLEI95bFd2+mHjF6h/pow="},{"type":"next-occurrence","id":"G3G9JTPPfNfy6d3kEAGq+Zz3yyA="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"0mjJesDFDleFfm9U/XW4C0nu0oo=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"G3G9JTPPfNfy6d3kEAGq+Zz3yyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QYcbWHqLEI95bFd2+mHjF6h/pow="},{"type":"next-occurrence","id":"AlIIg78ydmUaFXvkq5q0E5DKA+E="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"G3G9JTPPfNfy6d3kEAGq+Zz3yyA=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"AlIIg78ydmUaFXvkq5q0E5DKA+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QYcbWHqLEI95bFd2+mHjF6h/pow="},{"type":"next-occurrence","id":"Iu7Zm76HFJELC7/hjKXDiW04Et8="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"AlIIg78ydmUaFXvkq5q0E5DKA+E=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"Iu7Zm76HFJELC7/hjKXDiW04Et8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QYcbWHqLEI95bFd2+mHjF6h/pow="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:02Z"},"road_event_id":"Iu7Zm76HFJELC7/hjKXDiW04Et8=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"7B7wXxaP7oEoVyA38eAlGC+EsDY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vZSOpDd0OOdgwwkeFky/CpOuHqs="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"7B7wXxaP7oEoVyA38eAlGC+EsDY=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"vZSOpDd0OOdgwwkeFky/CpOuHqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7B7wXxaP7oEoVyA38eAlGC+EsDY="},{"type":"next-occurrence","id":"68BFewWIeMeN4vQuQgf9x168E9g="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"vZSOpDd0OOdgwwkeFky/CpOuHqs=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"68BFewWIeMeN4vQuQgf9x168E9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7B7wXxaP7oEoVyA38eAlGC+EsDY="},{"type":"next-occurrence","id":"583yNeOvyFTd0OFoqdN6KfQXk+c="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"68BFewWIeMeN4vQuQgf9x168E9g=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"583yNeOvyFTd0OFoqdN6KfQXk+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7B7wXxaP7oEoVyA38eAlGC+EsDY="},{"type":"next-occurrence","id":"Pk7MoR4wESnS4DtqSG9yP3cjGQk="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"583yNeOvyFTd0OFoqdN6KfQXk+c=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"Pk7MoR4wESnS4DtqSG9yP3cjGQk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7B7wXxaP7oEoVyA38eAlGC+EsDY="},{"type":"next-occurrence","id":"m3doleWqz3uFlEEN9Y6sqjTyShI="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"Pk7MoR4wESnS4DtqSG9yP3cjGQk=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"m3doleWqz3uFlEEN9Y6sqjTyShI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7B7wXxaP7oEoVyA38eAlGC+EsDY="},{"type":"next-occurrence","id":"k8zjv8a1Ym/gGFQdcvgjGQhlR2Y="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"m3doleWqz3uFlEEN9Y6sqjTyShI=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"k8zjv8a1Ym/gGFQdcvgjGQhlR2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7B7wXxaP7oEoVyA38eAlGC+EsDY="},{"type":"next-occurrence","id":"I0YcENc1JvHUuns7242VE5yKXUg="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"k8zjv8a1Ym/gGFQdcvgjGQhlR2Y=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"I0YcENc1JvHUuns7242VE5yKXUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7B7wXxaP7oEoVyA38eAlGC+EsDY="},{"type":"next-occurrence","id":"ZRZ/5kumOHnoSF9aTT+TTpVUf7k="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"I0YcENc1JvHUuns7242VE5yKXUg=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"ZRZ/5kumOHnoSF9aTT+TTpVUf7k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7B7wXxaP7oEoVyA38eAlGC+EsDY="},{"type":"next-occurrence","id":"k3X6iigY3bvFTbKSLz5HKVQlG+Y="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"ZRZ/5kumOHnoSF9aTT+TTpVUf7k=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"k3X6iigY3bvFTbKSLz5HKVQlG+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7B7wXxaP7oEoVyA38eAlGC+EsDY="},{"type":"next-occurrence","id":"Xk8S8b6Mc3VRa/foe2bbzhdUeHo="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"k3X6iigY3bvFTbKSLz5HKVQlG+Y=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"Xk8S8b6Mc3VRa/foe2bbzhdUeHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7B7wXxaP7oEoVyA38eAlGC+EsDY="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:09Z"},"road_event_id":"Xk8S8b6Mc3VRa/foe2bbzhdUeHo=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"yJVioI6x7Gg/jNNIKbGAidvi2NA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SlkhhIVkU0H0i5kSzZE4lF/krTo="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"yJVioI6x7Gg/jNNIKbGAidvi2NA=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"SlkhhIVkU0H0i5kSzZE4lF/krTo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yJVioI6x7Gg/jNNIKbGAidvi2NA="},{"type":"next-occurrence","id":"3jF3/TiqKIgbumkzakWzr/4Fv/Y="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"SlkhhIVkU0H0i5kSzZE4lF/krTo=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"3jF3/TiqKIgbumkzakWzr/4Fv/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yJVioI6x7Gg/jNNIKbGAidvi2NA="},{"type":"next-occurrence","id":"D+UXyaqtVnfXuGJ0hlgIac2b5uU="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"3jF3/TiqKIgbumkzakWzr/4Fv/Y=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"D+UXyaqtVnfXuGJ0hlgIac2b5uU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yJVioI6x7Gg/jNNIKbGAidvi2NA="},{"type":"next-occurrence","id":"GKmynyrevKPqDidwf2Fs7782eKk="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"D+UXyaqtVnfXuGJ0hlgIac2b5uU=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"GKmynyrevKPqDidwf2Fs7782eKk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yJVioI6x7Gg/jNNIKbGAidvi2NA="},{"type":"next-occurrence","id":"ldTTzrKibdu/SlbRxVTpF0CzeX0="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"GKmynyrevKPqDidwf2Fs7782eKk=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"ldTTzrKibdu/SlbRxVTpF0CzeX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yJVioI6x7Gg/jNNIKbGAidvi2NA="},{"type":"next-occurrence","id":"Y5vRID3+zj/DBrL4yWmyNM3POn0="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"ldTTzrKibdu/SlbRxVTpF0CzeX0=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"Y5vRID3+zj/DBrL4yWmyNM3POn0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yJVioI6x7Gg/jNNIKbGAidvi2NA="},{"type":"next-occurrence","id":"ZkxV81f2bJyiHq9v6bMk4SxYTVg="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"Y5vRID3+zj/DBrL4yWmyNM3POn0=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"ZkxV81f2bJyiHq9v6bMk4SxYTVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yJVioI6x7Gg/jNNIKbGAidvi2NA="},{"type":"next-occurrence","id":"PzMJ6pzcFebRjAqth0JaNKHEMmU="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"ZkxV81f2bJyiHq9v6bMk4SxYTVg=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"PzMJ6pzcFebRjAqth0JaNKHEMmU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yJVioI6x7Gg/jNNIKbGAidvi2NA="},{"type":"next-occurrence","id":"XpblGRy9uFAmLkaPDgSG+TbitWk="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"PzMJ6pzcFebRjAqth0JaNKHEMmU=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"XpblGRy9uFAmLkaPDgSG+TbitWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yJVioI6x7Gg/jNNIKbGAidvi2NA="},{"type":"next-occurrence","id":"+UYTQsK3cut7nWmwOXBbHaGc9LE="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"XpblGRy9uFAmLkaPDgSG+TbitWk=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"+UYTQsK3cut7nWmwOXBbHaGc9LE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yJVioI6x7Gg/jNNIKbGAidvi2NA="}],"description":"Overnight roadwork and line striping on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 PM All lanes of 2 lanes open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"+UYTQsK3cut7nWmwOXBbHaGc9LE=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"ZBU662iQE6SbO+JmugfUzJKLpak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HK+5yEC+uEpWqbeBkpajamvRLLg="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"ZBU662iQE6SbO+JmugfUzJKLpak=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"HK+5yEC+uEpWqbeBkpajamvRLLg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZBU662iQE6SbO+JmugfUzJKLpak="},{"type":"next-occurrence","id":"OxF+dl0BQksqNt6Vl2VajhCIIoA="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"HK+5yEC+uEpWqbeBkpajamvRLLg=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"OxF+dl0BQksqNt6Vl2VajhCIIoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZBU662iQE6SbO+JmugfUzJKLpak="},{"type":"next-occurrence","id":"+neSNDMhB247NJAcIGEeSthWW7I="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"OxF+dl0BQksqNt6Vl2VajhCIIoA=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"+neSNDMhB247NJAcIGEeSthWW7I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZBU662iQE6SbO+JmugfUzJKLpak="},{"type":"next-occurrence","id":"INJt5PLSR94zQ+UktYR/krrxvpg="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"+neSNDMhB247NJAcIGEeSthWW7I=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"INJt5PLSR94zQ+UktYR/krrxvpg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZBU662iQE6SbO+JmugfUzJKLpak="},{"type":"next-occurrence","id":"k54fGXJVU3yYVPUFG7pjWk7GL9s="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"INJt5PLSR94zQ+UktYR/krrxvpg=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"k54fGXJVU3yYVPUFG7pjWk7GL9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZBU662iQE6SbO+JmugfUzJKLpak="},{"type":"next-occurrence","id":"hRPJJyD6kce9rPrGWtG3T9ZDrWs="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"k54fGXJVU3yYVPUFG7pjWk7GL9s=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"hRPJJyD6kce9rPrGWtG3T9ZDrWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZBU662iQE6SbO+JmugfUzJKLpak="},{"type":"next-occurrence","id":"J5OqxsSMVgpLtpR19YHzm4P2Uao="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"hRPJJyD6kce9rPrGWtG3T9ZDrWs=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"J5OqxsSMVgpLtpR19YHzm4P2Uao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZBU662iQE6SbO+JmugfUzJKLpak="},{"type":"next-occurrence","id":"fDtKNxNi4v5363KpHVABYF62h/U="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"J5OqxsSMVgpLtpR19YHzm4P2Uao=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"fDtKNxNi4v5363KpHVABYF62h/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZBU662iQE6SbO+JmugfUzJKLpak="},{"type":"next-occurrence","id":"e0tZjierfhjLf2hw9KHyVWcORQk="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"fDtKNxNi4v5363KpHVABYF62h/U=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"e0tZjierfhjLf2hw9KHyVWcORQk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZBU662iQE6SbO+JmugfUzJKLpak="},{"type":"next-occurrence","id":"+ftxU+GXwv2PqHhOAfAWcxN8UMQ="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"e0tZjierfhjLf2hw9KHyVWcORQk=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"+ftxU+GXwv2PqHhOAfAWcxN8UMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZBU662iQE6SbO+JmugfUzJKLpak="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:08Z"},"road_event_id":"+ftxU+GXwv2PqHhOAfAWcxN8UMQ=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"NbLD/+sjdA45p8ppvHfR4Zj9d5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"suPeC2IWau17/VXdzshfLTgwyKM="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"NbLD/+sjdA45p8ppvHfR4Zj9d5o=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"suPeC2IWau17/VXdzshfLTgwyKM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbLD/+sjdA45p8ppvHfR4Zj9d5o="},{"type":"next-occurrence","id":"h6Dlx6aYRr6IOrz2tB+jFkz6e3Y="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"suPeC2IWau17/VXdzshfLTgwyKM=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"h6Dlx6aYRr6IOrz2tB+jFkz6e3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbLD/+sjdA45p8ppvHfR4Zj9d5o="},{"type":"next-occurrence","id":"iAMqET+4TXbwCcbV+td1zprC0G8="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"h6Dlx6aYRr6IOrz2tB+jFkz6e3Y=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"iAMqET+4TXbwCcbV+td1zprC0G8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbLD/+sjdA45p8ppvHfR4Zj9d5o="},{"type":"next-occurrence","id":"cImjEBDL+cUPk3wDII7IXQHeRjQ="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"iAMqET+4TXbwCcbV+td1zprC0G8=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"cImjEBDL+cUPk3wDII7IXQHeRjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbLD/+sjdA45p8ppvHfR4Zj9d5o="},{"type":"next-occurrence","id":"xKqvT1uyiqQgbceD4ypyJyQFCI8="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"cImjEBDL+cUPk3wDII7IXQHeRjQ=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"xKqvT1uyiqQgbceD4ypyJyQFCI8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbLD/+sjdA45p8ppvHfR4Zj9d5o="},{"type":"next-occurrence","id":"YxkWIFWC6jUkP6vdqM8Tq5c30OU="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"xKqvT1uyiqQgbceD4ypyJyQFCI8=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"YxkWIFWC6jUkP6vdqM8Tq5c30OU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbLD/+sjdA45p8ppvHfR4Zj9d5o="},{"type":"next-occurrence","id":"tZqvrdjjoQObiXsAovJ1aQnTQ5E="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"YxkWIFWC6jUkP6vdqM8Tq5c30OU=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"tZqvrdjjoQObiXsAovJ1aQnTQ5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbLD/+sjdA45p8ppvHfR4Zj9d5o="},{"type":"next-occurrence","id":"0AQLOHfqQ9555A8lJa4ZNzPWfC0="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"tZqvrdjjoQObiXsAovJ1aQnTQ5E=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"0AQLOHfqQ9555A8lJa4ZNzPWfC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbLD/+sjdA45p8ppvHfR4Zj9d5o="},{"type":"next-occurrence","id":"MkdknvDMHGaHX7zAYEjIXH5QKGg="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"0AQLOHfqQ9555A8lJa4ZNzPWfC0=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"MkdknvDMHGaHX7zAYEjIXH5QKGg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbLD/+sjdA45p8ppvHfR4Zj9d5o="},{"type":"next-occurrence","id":"zY+yG5WB3OcijvPbV2odxFJ3I7E="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"MkdknvDMHGaHX7zAYEjIXH5QKGg=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"zY+yG5WB3OcijvPbV2odxFJ3I7E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NbLD/+sjdA45p8ppvHfR4Zj9d5o="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"zY+yG5WB3OcijvPbV2odxFJ3I7E=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"DJN8U2nPWz5nJkrmsB7egld4wCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VI/Fng+qJpv/pne2piGFASj6Qww="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"DJN8U2nPWz5nJkrmsB7egld4wCs=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"VI/Fng+qJpv/pne2piGFASj6Qww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DJN8U2nPWz5nJkrmsB7egld4wCs="},{"type":"next-occurrence","id":"TAi2VNSvqlyoSjYYtowpEWsLSBg="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"VI/Fng+qJpv/pne2piGFASj6Qww=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"TAi2VNSvqlyoSjYYtowpEWsLSBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DJN8U2nPWz5nJkrmsB7egld4wCs="},{"type":"next-occurrence","id":"cqqSYhaQqvh6fre08zve9fCLSfU="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"TAi2VNSvqlyoSjYYtowpEWsLSBg=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"cqqSYhaQqvh6fre08zve9fCLSfU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DJN8U2nPWz5nJkrmsB7egld4wCs="},{"type":"next-occurrence","id":"rQBStUKsonNKi4oIrdz2bJ75tE0="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"cqqSYhaQqvh6fre08zve9fCLSfU=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"rQBStUKsonNKi4oIrdz2bJ75tE0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DJN8U2nPWz5nJkrmsB7egld4wCs="},{"type":"next-occurrence","id":"k/81I28WfH79AlifUIkYOw9Akew="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"rQBStUKsonNKi4oIrdz2bJ75tE0=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"k/81I28WfH79AlifUIkYOw9Akew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DJN8U2nPWz5nJkrmsB7egld4wCs="},{"type":"next-occurrence","id":"xLRNTLwBY+yikw42kPf3d/LYLEA="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"k/81I28WfH79AlifUIkYOw9Akew=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"xLRNTLwBY+yikw42kPf3d/LYLEA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DJN8U2nPWz5nJkrmsB7egld4wCs="},{"type":"next-occurrence","id":"jeFZzJCwDUrzytVdQpDleYYe1qI="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"xLRNTLwBY+yikw42kPf3d/LYLEA=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"jeFZzJCwDUrzytVdQpDleYYe1qI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DJN8U2nPWz5nJkrmsB7egld4wCs="},{"type":"next-occurrence","id":"olBGXlqgIsrmsyau2Kloj/2yWF0="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"jeFZzJCwDUrzytVdQpDleYYe1qI=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"olBGXlqgIsrmsyau2Kloj/2yWF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DJN8U2nPWz5nJkrmsB7egld4wCs="},{"type":"next-occurrence","id":"pCPqnjqwCrfBmSEpGBo90N84mn4="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"olBGXlqgIsrmsyau2Kloj/2yWF0=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"pCPqnjqwCrfBmSEpGBo90N84mn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DJN8U2nPWz5nJkrmsB7egld4wCs="},{"type":"next-occurrence","id":"GiM1wGHesQ4jVL3hCyh/0ELR/aM="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"pCPqnjqwCrfBmSEpGBo90N84mn4=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"GiM1wGHesQ4jVL3hCyh/0ELR/aM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DJN8U2nPWz5nJkrmsB7egld4wCs="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:05Z"},"road_event_id":"GiM1wGHesQ4jVL3hCyh/0ELR/aM=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"QW5Sechurd6L6HWeK2VqQZoH+lE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"efrcshH6Eyy4W8gGfDDi02SUubk="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"QW5Sechurd6L6HWeK2VqQZoH+lE=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"efrcshH6Eyy4W8gGfDDi02SUubk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QW5Sechurd6L6HWeK2VqQZoH+lE="},{"type":"next-occurrence","id":"9JR6vXnu3j7gqsl7xlAdcvpe47I="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"efrcshH6Eyy4W8gGfDDi02SUubk=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"9JR6vXnu3j7gqsl7xlAdcvpe47I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QW5Sechurd6L6HWeK2VqQZoH+lE="},{"type":"next-occurrence","id":"Ik6WySgUNchFschi4TJteMD9LXs="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"9JR6vXnu3j7gqsl7xlAdcvpe47I=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"Ik6WySgUNchFschi4TJteMD9LXs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QW5Sechurd6L6HWeK2VqQZoH+lE="},{"type":"next-occurrence","id":"FpM9pVPeqQM1cWXUwZ92smbFZXY="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"Ik6WySgUNchFschi4TJteMD9LXs=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"FpM9pVPeqQM1cWXUwZ92smbFZXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QW5Sechurd6L6HWeK2VqQZoH+lE="},{"type":"next-occurrence","id":"PLk11ZnaayeF8ODJUms2Gv2qqgk="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"FpM9pVPeqQM1cWXUwZ92smbFZXY=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"PLk11ZnaayeF8ODJUms2Gv2qqgk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QW5Sechurd6L6HWeK2VqQZoH+lE="},{"type":"next-occurrence","id":"mPr44NFYBxrqLV1ud2HWBaKoLMk="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"PLk11ZnaayeF8ODJUms2Gv2qqgk=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"mPr44NFYBxrqLV1ud2HWBaKoLMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QW5Sechurd6L6HWeK2VqQZoH+lE="},{"type":"next-occurrence","id":"hXxPRp5iqS18GqIluJjDfmDeJUU="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"mPr44NFYBxrqLV1ud2HWBaKoLMk=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"hXxPRp5iqS18GqIluJjDfmDeJUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QW5Sechurd6L6HWeK2VqQZoH+lE="},{"type":"next-occurrence","id":"EqFLkedJAW/0MziXysgG4yHZ7pE="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"hXxPRp5iqS18GqIluJjDfmDeJUU=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"EqFLkedJAW/0MziXysgG4yHZ7pE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QW5Sechurd6L6HWeK2VqQZoH+lE="},{"type":"next-occurrence","id":"4X71glBMPSVTVUHDJN4Xo5ilm/0="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"EqFLkedJAW/0MziXysgG4yHZ7pE=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"4X71glBMPSVTVUHDJN4Xo5ilm/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QW5Sechurd6L6HWeK2VqQZoH+lE="},{"type":"next-occurrence","id":"j+vcDmq6MNMftfCMlIv8oPFsdsg="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"4X71glBMPSVTVUHDJN4Xo5ilm/0=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"j+vcDmq6MNMftfCMlIv8oPFsdsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QW5Sechurd6L6HWeK2VqQZoH+lE="}],"description":"Overnight roadwork and line striping on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:06Z"},"road_event_id":"j+vcDmq6MNMftfCMlIv8oPFsdsg=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"7NuRA9sb6lttZy5JHBUjtSqkoLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WswVFXAde//otPOzf7ZzxXDkbtM="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"7NuRA9sb6lttZy5JHBUjtSqkoLY=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"WswVFXAde//otPOzf7ZzxXDkbtM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7NuRA9sb6lttZy5JHBUjtSqkoLY="},{"type":"next-occurrence","id":"IQrpxupfR7qsSlVl7+b+0SXr8MU="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"WswVFXAde//otPOzf7ZzxXDkbtM=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"IQrpxupfR7qsSlVl7+b+0SXr8MU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7NuRA9sb6lttZy5JHBUjtSqkoLY="},{"type":"next-occurrence","id":"+cGJ9mzWqu/rDrgYyZtWdqdkPEg="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"IQrpxupfR7qsSlVl7+b+0SXr8MU=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"+cGJ9mzWqu/rDrgYyZtWdqdkPEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7NuRA9sb6lttZy5JHBUjtSqkoLY="},{"type":"next-occurrence","id":"KfXMgCng/O5/Y66MfsZC1MUeFv4="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"+cGJ9mzWqu/rDrgYyZtWdqdkPEg=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"KfXMgCng/O5/Y66MfsZC1MUeFv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7NuRA9sb6lttZy5JHBUjtSqkoLY="},{"type":"next-occurrence","id":"dYBjT++WkphVIsYGvkKhyLKxTzI="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"KfXMgCng/O5/Y66MfsZC1MUeFv4=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"dYBjT++WkphVIsYGvkKhyLKxTzI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7NuRA9sb6lttZy5JHBUjtSqkoLY="},{"type":"next-occurrence","id":"QbYViPIoLI6h9JIlI37OO9gZG0E="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"dYBjT++WkphVIsYGvkKhyLKxTzI=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"QbYViPIoLI6h9JIlI37OO9gZG0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7NuRA9sb6lttZy5JHBUjtSqkoLY="},{"type":"next-occurrence","id":"2xxceqn8XNYkPL1m8pusVbbd+iU="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"QbYViPIoLI6h9JIlI37OO9gZG0E=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"2xxceqn8XNYkPL1m8pusVbbd+iU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7NuRA9sb6lttZy5JHBUjtSqkoLY="},{"type":"next-occurrence","id":"+nnjS7fMWLGQwIl53ACWcq2SlE8="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"2xxceqn8XNYkPL1m8pusVbbd+iU=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"+nnjS7fMWLGQwIl53ACWcq2SlE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7NuRA9sb6lttZy5JHBUjtSqkoLY="},{"type":"next-occurrence","id":"+JRM299hOpOeGXdWApETC/9LEuY="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"+nnjS7fMWLGQwIl53ACWcq2SlE8=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"+JRM299hOpOeGXdWApETC/9LEuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7NuRA9sb6lttZy5JHBUjtSqkoLY="},{"type":"next-occurrence","id":"EOR7IJ7RrMAtQuU2svocxA1Vuzg="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"+JRM299hOpOeGXdWApETC/9LEuY=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"EOR7IJ7RrMAtQuU2svocxA1Vuzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7NuRA9sb6lttZy5JHBUjtSqkoLY="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday June 1st,2026 thru Wednesday September 30th,2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes of 1 lane open ,","update_date":"2026-05-31T10:00:11Z"},"road_event_id":"EOR7IJ7RrMAtQuU2svocxA1Vuzg=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T00:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"qAh8argqiw6vul7o+GIKxenU5+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q4lHrwxjyDF2XEndKZ2l1UKvi8Q="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:24Z"},"road_event_id":"qAh8argqiw6vul7o+GIKxenU5+M=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"q4lHrwxjyDF2XEndKZ2l1UKvi8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qAh8argqiw6vul7o+GIKxenU5+M="},{"type":"next-occurrence","id":"EkU3ngyVxJu2U/j73CKkg9TSppk="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:24Z"},"road_event_id":"q4lHrwxjyDF2XEndKZ2l1UKvi8Q=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"EkU3ngyVxJu2U/j73CKkg9TSppk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qAh8argqiw6vul7o+GIKxenU5+M="},{"type":"next-occurrence","id":"3bGvu9NHRgLVsQ9ZSOxauPXBQ3Q="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:24Z"},"road_event_id":"EkU3ngyVxJu2U/j73CKkg9TSppk=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"3bGvu9NHRgLVsQ9ZSOxauPXBQ3Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qAh8argqiw6vul7o+GIKxenU5+M="},{"type":"next-occurrence","id":"7vzh25n1kZTEN7rhZVcdcqMeUew="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:24Z"},"road_event_id":"3bGvu9NHRgLVsQ9ZSOxauPXBQ3Q=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"7vzh25n1kZTEN7rhZVcdcqMeUew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qAh8argqiw6vul7o+GIKxenU5+M="},{"type":"next-occurrence","id":"vzCKhx9junU4W9YqpjAXt2o+CUo="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:24Z"},"road_event_id":"7vzh25n1kZTEN7rhZVcdcqMeUew=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"vzCKhx9junU4W9YqpjAXt2o+CUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qAh8argqiw6vul7o+GIKxenU5+M="},{"type":"next-occurrence","id":"T11FlAj/wVUiB3xH4/L6HO/vEH8="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:24Z"},"road_event_id":"vzCKhx9junU4W9YqpjAXt2o+CUo=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"T11FlAj/wVUiB3xH4/L6HO/vEH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qAh8argqiw6vul7o+GIKxenU5+M="},{"type":"next-occurrence","id":"PSm/2/7MXGkMV163MgS6uALo2eA="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:24Z"},"road_event_id":"T11FlAj/wVUiB3xH4/L6HO/vEH8=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"PSm/2/7MXGkMV163MgS6uALo2eA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qAh8argqiw6vul7o+GIKxenU5+M="},{"type":"next-occurrence","id":"UYkNyvnfOxEhp42u2pSfVu1Unpw="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:24Z"},"road_event_id":"PSm/2/7MXGkMV163MgS6uALo2eA=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"UYkNyvnfOxEhp42u2pSfVu1Unpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qAh8argqiw6vul7o+GIKxenU5+M="},{"type":"next-occurrence","id":"yK2Oswqts5bu0fteS4hZkPSinXM="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:24Z"},"road_event_id":"UYkNyvnfOxEhp42u2pSfVu1Unpw=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"yK2Oswqts5bu0fteS4hZkPSinXM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qAh8argqiw6vul7o+GIKxenU5+M="},{"type":"next-occurrence","id":"tFen4sjVUkSJ2MD8b3wcj/k820M="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:24Z"},"road_event_id":"yK2Oswqts5bu0fteS4hZkPSinXM=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"tFen4sjVUkSJ2MD8b3wcj/k820M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qAh8argqiw6vul7o+GIKxenU5+M="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-05-26T19:30:24Z"},"road_event_id":"tFen4sjVUkSJ2MD8b3wcj/k820M=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"oWgfiJ5YrTUWxQYmd7HpSu3GXXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5S"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 5S both directions between CR 122; Auriesville Road (Glen) and CR 27; Main Street; Hamlet of Fort Hunter (Montgomery) Motorists will encounter lane closures in both directions with temporary signals in place, Continuous Monday March 16th, 2026 6:00 AM thru Saturday November 21st, 2026 6:00 PM","update_date":"2026-03-13T14:11:32Z"},"road_event_id":"oWgfiJ5YrTUWxQYmd7HpSu3GXXg=","beginning_cross_street":"CR 122; Auriesville Road","ending_cross_street":"CR 27; Main Street; Hamlet of Fort Hunter","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.315,42.9299]]}},{"id":"rPIbWSy6UW9lwnjXSsEexbwcIhI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8BKgmnGJrDL3fiBIGcox6Zvz9Nk="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121 - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closures","update_date":"2026-06-05T18:30:42Z"},"road_event_id":"rPIbWSy6UW9lwnjXSsEexbwcIhI=","beginning_cross_street":"Exit 121 - I 84","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"8BKgmnGJrDL3fiBIGcox6Zvz9Nk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rPIbWSy6UW9lwnjXSsEexbwcIhI="},{"type":"next-occurrence","id":"iA0TgeR3Y5u4pCSSpJ6oAbGMsWQ="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121 - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closures","update_date":"2026-06-05T18:30:42Z"},"road_event_id":"8BKgmnGJrDL3fiBIGcox6Zvz9Nk=","beginning_cross_street":"Exit 121 - I 84","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"iA0TgeR3Y5u4pCSSpJ6oAbGMsWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rPIbWSy6UW9lwnjXSsEexbwcIhI="},{"type":"next-occurrence","id":"1mM24pqZ3I/ry11FcySkuyxqcaY="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121 - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closures","update_date":"2026-06-05T18:30:42Z"},"road_event_id":"iA0TgeR3Y5u4pCSSpJ6oAbGMsWQ=","beginning_cross_street":"Exit 121 - I 84","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"1mM24pqZ3I/ry11FcySkuyxqcaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rPIbWSy6UW9lwnjXSsEexbwcIhI="},{"type":"next-occurrence","id":"MSAPVQP6zWj8cLb+RrsE/dgzgcY="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121 - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closures","update_date":"2026-06-05T18:30:42Z"},"road_event_id":"1mM24pqZ3I/ry11FcySkuyxqcaY=","beginning_cross_street":"Exit 121 - I 84","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"MSAPVQP6zWj8cLb+RrsE/dgzgcY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rPIbWSy6UW9lwnjXSsEexbwcIhI="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121 - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closures","update_date":"2026-06-05T18:30:42Z"},"road_event_id":"MSAPVQP6zWj8cLb+RrsE/dgzgcY=","beginning_cross_street":"Exit 121 - I 84","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"zv8nMf/UOMZYXaS3rIMdDP12mhs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[],"description":"Intersection improvements on US-6 both directions between AGNEY AVE (Plymouth) and N MAIN ST (Plymouth) Motorists can expect alternating one-way traffic will occur during off-peak hours on Route 6. Police Officers and traffic control signing patterns will guide motorists through the work zone during construction., Continuous Monday October 13th, 2025 12:00 AM thru Monday November 30th, 2026 11:59 PM All lanes open","update_date":"2025-10-21T15:38:30Z"},"road_event_id":"zv8nMf/UOMZYXaS3rIMdDP12mhs=","beginning_cross_street":"AGNEY AVE","ending_cross_street":"N MAIN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.009439,41.678378]]}},{"id":"ORC300517613","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials. Not currently Scheduled","update_date":"2026-02-28T21:00:02Z"},"road_event_id":"ORC300517613","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-02-03T19:17:48Z","end_date":"2026-03-01T04:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694603]]}},{"id":"gQIA0odE9XZC1UoZ0S4/TejU5WM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qgMpdJEziKOnL8x/MxI7vAUJu8o="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"gQIA0odE9XZC1UoZ0S4/TejU5WM=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"qgMpdJEziKOnL8x/MxI7vAUJu8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gQIA0odE9XZC1UoZ0S4/TejU5WM="},{"type":"next-occurrence","id":"Ob5PXT6VEjVqzKuUWNz+YDxswCE="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"qgMpdJEziKOnL8x/MxI7vAUJu8o=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T22:00:00Z","end_date":"2026-06-07T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"Ob5PXT6VEjVqzKuUWNz+YDxswCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gQIA0odE9XZC1UoZ0S4/TejU5WM="},{"type":"next-occurrence","id":"CUnvzXxXOF9b9LtAtarp9Qb9leA="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"Ob5PXT6VEjVqzKuUWNz+YDxswCE=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"CUnvzXxXOF9b9LtAtarp9Qb9leA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gQIA0odE9XZC1UoZ0S4/TejU5WM="},{"type":"next-occurrence","id":"whZ6GauprTqlVk2EOfYTJDEQcbc="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"CUnvzXxXOF9b9LtAtarp9Qb9leA=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"whZ6GauprTqlVk2EOfYTJDEQcbc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gQIA0odE9XZC1UoZ0S4/TejU5WM="},{"type":"next-occurrence","id":"f/Qab/+0CYc7oagVwud9VjbYn8Q="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"whZ6GauprTqlVk2EOfYTJDEQcbc=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"f/Qab/+0CYc7oagVwud9VjbYn8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gQIA0odE9XZC1UoZ0S4/TejU5WM="},{"type":"next-occurrence","id":"LjGpaYD2lZ6ZzAo0PUsRlUs/btM="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"f/Qab/+0CYc7oagVwud9VjbYn8Q=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"LjGpaYD2lZ6ZzAo0PUsRlUs/btM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gQIA0odE9XZC1UoZ0S4/TejU5WM="},{"type":"next-occurrence","id":"TlaSY4olMgkHE+DyPneti4z0Yzc="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"LjGpaYD2lZ6ZzAo0PUsRlUs/btM=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"TlaSY4olMgkHE+DyPneti4z0Yzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gQIA0odE9XZC1UoZ0S4/TejU5WM="},{"type":"next-occurrence","id":"dSBAVpmPym6KgPSOzKel8zcsKEE="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"TlaSY4olMgkHE+DyPneti4z0Yzc=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T22:00:00Z","end_date":"2026-06-14T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"dSBAVpmPym6KgPSOzKel8zcsKEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gQIA0odE9XZC1UoZ0S4/TejU5WM="},{"type":"next-occurrence","id":"PA6jcHkgLrulNe2W8guONndUpys="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"dSBAVpmPym6KgPSOzKel8zcsKEE=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"PA6jcHkgLrulNe2W8guONndUpys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gQIA0odE9XZC1UoZ0S4/TejU5WM="},{"type":"next-occurrence","id":"V2shKyGVtEdZ4whdIvx8Bb7k0sA="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"PA6jcHkgLrulNe2W8guONndUpys=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"V2shKyGVtEdZ4whdIvx8Bb7k0sA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gQIA0odE9XZC1UoZ0S4/TejU5WM="},{"type":"next-occurrence","id":"7Fr1atTP38QJA8np4fwUrFzXPhQ="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"V2shKyGVtEdZ4whdIvx8Bb7k0sA=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"7Fr1atTP38QJA8np4fwUrFzXPhQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gQIA0odE9XZC1UoZ0S4/TejU5WM="},{"type":"next-occurrence","id":"6fBQtXFQgnErdpwa6HAxGFRioQo="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"7Fr1atTP38QJA8np4fwUrFzXPhQ=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"6fBQtXFQgnErdpwa6HAxGFRioQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gQIA0odE9XZC1UoZ0S4/TejU5WM="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"6fBQtXFQgnErdpwa6HAxGFRioQo=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"/AkrudrnBaaUnuIHikKEAKe9jWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILER RD"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on WILER RD both directions between CR-203; Brick Schoolhouse Rd (Hamlin) and CR-207; Hamlin Center Rd. (Hamlin) Road closed, follow posted detour., Continuous Thursday April 30th, 2026 09:00 AM thru Sunday November 1st, 2026 05:00 PM All lanes closed and detoured","update_date":"2026-04-13T20:09:51Z"},"road_event_id":"/AkrudrnBaaUnuIHikKEAKe9jWQ=","beginning_cross_street":" CR-203; Brick Schoolhouse Rd","ending_cross_street":"CR-207; Hamlin Center Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.891045,43.312773]]}},{"id":"e+ho6pqBh30ki0x2OPPrMmwA2hE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"l70zpsZKtF/6p/zAhUP2ivwPHSs="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from, Thursday April 23rd,2026 thru Wednesday July 1st,2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed westbound,","update_date":"2026-05-22T19:00:06Z"},"road_event_id":"e+ho6pqBh30ki0x2OPPrMmwA2hE=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"l70zpsZKtF/6p/zAhUP2ivwPHSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+ho6pqBh30ki0x2OPPrMmwA2hE="},{"type":"next-occurrence","id":"mnGa2HKFJDVtsPcx+6sLCXalIAs="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from, Thursday April 23rd,2026 thru Wednesday July 1st,2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed westbound,","update_date":"2026-05-22T19:00:06Z"},"road_event_id":"l70zpsZKtF/6p/zAhUP2ivwPHSs=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"mnGa2HKFJDVtsPcx+6sLCXalIAs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+ho6pqBh30ki0x2OPPrMmwA2hE="},{"type":"next-occurrence","id":"0xltQiqij7AW8KYeF1wbXDCYgiY="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from, Thursday April 23rd,2026 thru Wednesday July 1st,2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed westbound,","update_date":"2026-05-22T19:00:06Z"},"road_event_id":"mnGa2HKFJDVtsPcx+6sLCXalIAs=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"0xltQiqij7AW8KYeF1wbXDCYgiY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+ho6pqBh30ki0x2OPPrMmwA2hE="},{"type":"next-occurrence","id":"idC5t50xKkOWsf6wZGD32DOaSeo="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from, Thursday April 23rd,2026 thru Wednesday July 1st,2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed westbound,","update_date":"2026-05-22T19:00:06Z"},"road_event_id":"0xltQiqij7AW8KYeF1wbXDCYgiY=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"idC5t50xKkOWsf6wZGD32DOaSeo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+ho6pqBh30ki0x2OPPrMmwA2hE="},{"type":"next-occurrence","id":"PlANLZ1Jka7qA3IPb6sNMmvEmZE="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from, Thursday April 23rd,2026 thru Wednesday July 1st,2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed westbound,","update_date":"2026-05-22T19:00:06Z"},"road_event_id":"idC5t50xKkOWsf6wZGD32DOaSeo=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"PlANLZ1Jka7qA3IPb6sNMmvEmZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+ho6pqBh30ki0x2OPPrMmwA2hE="},{"type":"next-occurrence","id":"3G3Mluk6ELRjwGM1ncfRt7dtWZ0="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from, Thursday April 23rd,2026 thru Wednesday July 1st,2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed westbound,","update_date":"2026-05-22T19:00:06Z"},"road_event_id":"PlANLZ1Jka7qA3IPb6sNMmvEmZE=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"3G3Mluk6ELRjwGM1ncfRt7dtWZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+ho6pqBh30ki0x2OPPrMmwA2hE="},{"type":"next-occurrence","id":"OedyET1KkFpUkkH1pphcUiPj25M="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from, Thursday April 23rd,2026 thru Wednesday July 1st,2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed westbound,","update_date":"2026-05-22T19:00:06Z"},"road_event_id":"3G3Mluk6ELRjwGM1ncfRt7dtWZ0=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"OedyET1KkFpUkkH1pphcUiPj25M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+ho6pqBh30ki0x2OPPrMmwA2hE="},{"type":"next-occurrence","id":"bpzSj5KJwWB4wmY/2qLYrpZwHkQ="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from, Thursday April 23rd,2026 thru Wednesday July 1st,2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed westbound,","update_date":"2026-05-22T19:00:06Z"},"road_event_id":"OedyET1KkFpUkkH1pphcUiPj25M=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"bpzSj5KJwWB4wmY/2qLYrpZwHkQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+ho6pqBh30ki0x2OPPrMmwA2hE="},{"type":"next-occurrence","id":"ilzHaTf1ceDiCAo4MkM1VVhh7So="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from, Thursday April 23rd,2026 thru Wednesday July 1st,2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed westbound,","update_date":"2026-05-22T19:00:06Z"},"road_event_id":"bpzSj5KJwWB4wmY/2qLYrpZwHkQ=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"ilzHaTf1ceDiCAo4MkM1VVhh7So=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+ho6pqBh30ki0x2OPPrMmwA2hE="},{"type":"next-occurrence","id":"uJTFrVwhuGHAvvYFX0m+xiglzo8="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from, Thursday April 23rd,2026 thru Wednesday July 1st,2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed westbound,","update_date":"2026-05-22T19:00:06Z"},"road_event_id":"ilzHaTf1ceDiCAo4MkM1VVhh7So=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"uJTFrVwhuGHAvvYFX0m+xiglzo8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+ho6pqBh30ki0x2OPPrMmwA2hE="},{"type":"next-occurrence","id":"nSAWtnbnJ+d1AKNLSEz3/fXqPIE="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from, Thursday April 23rd,2026 thru Wednesday July 1st,2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed westbound,","update_date":"2026-05-22T19:00:06Z"},"road_event_id":"uJTFrVwhuGHAvvYFX0m+xiglzo8=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"nSAWtnbnJ+d1AKNLSEz3/fXqPIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+ho6pqBh30ki0x2OPPrMmwA2hE="},{"type":"next-occurrence","id":"A2EeErOqroi0moAOiLEpbSl7y9U="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from, Thursday April 23rd,2026 thru Wednesday July 1st,2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed westbound,","update_date":"2026-05-22T19:00:06Z"},"road_event_id":"nSAWtnbnJ+d1AKNLSEz3/fXqPIE=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"A2EeErOqroi0moAOiLEpbSl7y9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+ho6pqBh30ki0x2OPPrMmwA2hE="},{"type":"next-occurrence","id":"sCSFQhVh8zd+oF/YqBsMFgVPj98="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from, Thursday April 23rd,2026 thru Wednesday July 1st,2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed westbound,","update_date":"2026-05-22T19:00:06Z"},"road_event_id":"A2EeErOqroi0moAOiLEpbSl7y9U=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"sCSFQhVh8zd+oF/YqBsMFgVPj98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+ho6pqBh30ki0x2OPPrMmwA2hE="},{"type":"next-occurrence","id":"Z8VfFWQuwV9y3iym3IDVi5Ofw9c="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from, Thursday April 23rd,2026 thru Wednesday July 1st,2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed westbound,","update_date":"2026-05-22T19:00:06Z"},"road_event_id":"sCSFQhVh8zd+oF/YqBsMFgVPj98=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"Z8VfFWQuwV9y3iym3IDVi5Ofw9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e+ho6pqBh30ki0x2OPPrMmwA2hE="}],"description":"Noise wall construction on I-690 westbound Exit 15 - Midler Avenue (Syracuse) between the ramp to/ramp from, Thursday April 23rd,2026 thru Wednesday July 1st,2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed westbound,","update_date":"2026-05-22T19:00:06Z"},"road_event_id":"Z8VfFWQuwV9y3iym3IDVi5Ofw9c=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098587,43.058922]]}},{"id":"XlYeewHmILGJ4nfyo0GnFBt8VZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9s4V7ILLA9ZP7s1C7qbrCHA4mzs="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"XlYeewHmILGJ4nfyo0GnFBt8VZk=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"9s4V7ILLA9ZP7s1C7qbrCHA4mzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XlYeewHmILGJ4nfyo0GnFBt8VZk="},{"type":"next-occurrence","id":"UQy10n+i6RLtm8ZHZvFQIibpBTU="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"9s4V7ILLA9ZP7s1C7qbrCHA4mzs=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"UQy10n+i6RLtm8ZHZvFQIibpBTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XlYeewHmILGJ4nfyo0GnFBt8VZk="},{"type":"next-occurrence","id":"+jWQlX/KfzVwvHs3ZNPvbYEVfUI="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"UQy10n+i6RLtm8ZHZvFQIibpBTU=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"+jWQlX/KfzVwvHs3ZNPvbYEVfUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XlYeewHmILGJ4nfyo0GnFBt8VZk="},{"type":"next-occurrence","id":"Y0vsnQKtC8R+QX0ifzn1Kur4HTI="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"+jWQlX/KfzVwvHs3ZNPvbYEVfUI=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"Y0vsnQKtC8R+QX0ifzn1Kur4HTI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XlYeewHmILGJ4nfyo0GnFBt8VZk="},{"type":"next-occurrence","id":"sL/rUrTJjbxhF/TNtnnJGghQbw0="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"Y0vsnQKtC8R+QX0ifzn1Kur4HTI=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"sL/rUrTJjbxhF/TNtnnJGghQbw0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XlYeewHmILGJ4nfyo0GnFBt8VZk="},{"type":"next-occurrence","id":"Fsj1eIJ7aADzxnl7Cruawkh0i6c="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"sL/rUrTJjbxhF/TNtnnJGghQbw0=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"Fsj1eIJ7aADzxnl7Cruawkh0i6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XlYeewHmILGJ4nfyo0GnFBt8VZk="},{"type":"next-occurrence","id":"VykW0PiBZDfDTXfhbuyUlgtvyYI="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"Fsj1eIJ7aADzxnl7Cruawkh0i6c=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"VykW0PiBZDfDTXfhbuyUlgtvyYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XlYeewHmILGJ4nfyo0GnFBt8VZk="},{"type":"next-occurrence","id":"e0PFTWfr/Ne6acFReMKTW3S3D+Y="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"VykW0PiBZDfDTXfhbuyUlgtvyYI=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"e0PFTWfr/Ne6acFReMKTW3S3D+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XlYeewHmILGJ4nfyo0GnFBt8VZk="},{"type":"next-occurrence","id":"qIqdsOD/hTlwqJ9x6DeeuduePLA="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"e0PFTWfr/Ne6acFReMKTW3S3D+Y=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"qIqdsOD/hTlwqJ9x6DeeuduePLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XlYeewHmILGJ4nfyo0GnFBt8VZk="},{"type":"next-occurrence","id":"gNvfv8Y9U/KTYa0AD8VmCoqmgH0="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"qIqdsOD/hTlwqJ9x6DeeuduePLA=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"gNvfv8Y9U/KTYa0AD8VmCoqmgH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XlYeewHmILGJ4nfyo0GnFBt8VZk="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"gNvfv8Y9U/KTYa0AD8VmCoqmgH0=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"c4MRkeUNJtLbUo32sXjlmGp2xUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QuI+c3/kbSTAyQm6G1dPCW5OWFw="}],"description":"Construction on NY 26 both directions between Tuffy Road (Ava) and River Road (Ava) Motorists will encounter shoulder closures in both directions with most work performed off the roadway, Tuesday February 24th, 2026 thru Saturday June 13th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T14:12:21Z"},"road_event_id":"c4MRkeUNJtLbUo32sXjlmGp2xUg=","beginning_cross_street":"Tuffy Road","ending_cross_street":"River Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.486969,43.381366]]}},{"id":"QuI+c3/kbSTAyQm6G1dPCW5OWFw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c4MRkeUNJtLbUo32sXjlmGp2xUg="},{"type":"next-occurrence","id":"n392Fb9PHY2JzOTcBV/ljFVNu6g="}],"description":"Construction on NY 26 both directions between Tuffy Road (Ava) and River Road (Ava) Motorists will encounter shoulder closures in both directions with most work performed off the roadway, Tuesday February 24th, 2026 thru Saturday June 13th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T14:12:21Z"},"road_event_id":"QuI+c3/kbSTAyQm6G1dPCW5OWFw=","beginning_cross_street":"Tuffy Road","ending_cross_street":"River Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.486969,43.381366]]}},{"id":"n392Fb9PHY2JzOTcBV/ljFVNu6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c4MRkeUNJtLbUo32sXjlmGp2xUg="},{"type":"next-occurrence","id":"gJlbB1J8wU6J48HPxDk1cDYy/5k="}],"description":"Construction on NY 26 both directions between Tuffy Road (Ava) and River Road (Ava) Motorists will encounter shoulder closures in both directions with most work performed off the roadway, Tuesday February 24th, 2026 thru Saturday June 13th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T14:12:21Z"},"road_event_id":"n392Fb9PHY2JzOTcBV/ljFVNu6g=","beginning_cross_street":"Tuffy Road","ending_cross_street":"River Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.486969,43.381366]]}},{"id":"gJlbB1J8wU6J48HPxDk1cDYy/5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c4MRkeUNJtLbUo32sXjlmGp2xUg="},{"type":"next-occurrence","id":"DisEGoN7aQxpUUObY+LzcwxJcoQ="}],"description":"Construction on NY 26 both directions between Tuffy Road (Ava) and River Road (Ava) Motorists will encounter shoulder closures in both directions with most work performed off the roadway, Tuesday February 24th, 2026 thru Saturday June 13th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T14:12:21Z"},"road_event_id":"gJlbB1J8wU6J48HPxDk1cDYy/5k=","beginning_cross_street":"Tuffy Road","ending_cross_street":"River Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.486969,43.381366]]}},{"id":"DisEGoN7aQxpUUObY+LzcwxJcoQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c4MRkeUNJtLbUo32sXjlmGp2xUg="},{"type":"next-occurrence","id":"sQXTdaY6JkAoSMSs5Sq/gFIRLvo="}],"description":"Construction on NY 26 both directions between Tuffy Road (Ava) and River Road (Ava) Motorists will encounter shoulder closures in both directions with most work performed off the roadway, Tuesday February 24th, 2026 thru Saturday June 13th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T14:12:21Z"},"road_event_id":"DisEGoN7aQxpUUObY+LzcwxJcoQ=","beginning_cross_street":"Tuffy Road","ending_cross_street":"River Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.486969,43.381366]]}},{"id":"sQXTdaY6JkAoSMSs5Sq/gFIRLvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c4MRkeUNJtLbUo32sXjlmGp2xUg="},{"type":"next-occurrence","id":"EFIOABxxDnYQqE5/GQf2rQ7wVHs="}],"description":"Construction on NY 26 both directions between Tuffy Road (Ava) and River Road (Ava) Motorists will encounter shoulder closures in both directions with most work performed off the roadway, Tuesday February 24th, 2026 thru Saturday June 13th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T14:12:21Z"},"road_event_id":"sQXTdaY6JkAoSMSs5Sq/gFIRLvo=","beginning_cross_street":"Tuffy Road","ending_cross_street":"River Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.486969,43.381366]]}},{"id":"EFIOABxxDnYQqE5/GQf2rQ7wVHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c4MRkeUNJtLbUo32sXjlmGp2xUg="},{"type":"next-occurrence","id":"okZM8yxv8vvNwFPX0QgmXJ2qWck="}],"description":"Construction on NY 26 both directions between Tuffy Road (Ava) and River Road (Ava) Motorists will encounter shoulder closures in both directions with most work performed off the roadway, Tuesday February 24th, 2026 thru Saturday June 13th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T14:12:21Z"},"road_event_id":"EFIOABxxDnYQqE5/GQf2rQ7wVHs=","beginning_cross_street":"Tuffy Road","ending_cross_street":"River Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.486969,43.381366]]}},{"id":"okZM8yxv8vvNwFPX0QgmXJ2qWck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c4MRkeUNJtLbUo32sXjlmGp2xUg="}],"description":"Construction on NY 26 both directions between Tuffy Road (Ava) and River Road (Ava) Motorists will encounter shoulder closures in both directions with most work performed off the roadway, Tuesday February 24th, 2026 thru Saturday June 13th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T14:12:21Z"},"road_event_id":"okZM8yxv8vvNwFPX0QgmXJ2qWck=","beginning_cross_street":"Tuffy Road","ending_cross_street":"River Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.486969,43.381366]]}},{"id":"5NDNdsg2ACDypVfS9eYvJdszSUc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bx39 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction southbound, Bx39 Bus on White Plains Rd/E 215 St (New York) is closed; please use the new stop on White Plains Rd at E 216th St instead., Continuous Friday January 17th, 2025 12:00 AM thru Monday November 30th, 2026 11:59 PM","update_date":"2026-03-09T12:28:03Z"},"road_event_id":"5NDNdsg2ACDypVfS9eYvJdszSUc=","beginning_cross_street":"White Plains Rd/E 215 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.864544,40.880382]]}},{"id":"BIA/pVAwKFsd01OFeRpmTsfcXXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EvBkx5mLrarJv1MyL7mUtkfRoJk="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"BIA/pVAwKFsd01OFeRpmTsfcXXQ=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"EvBkx5mLrarJv1MyL7mUtkfRoJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIA/pVAwKFsd01OFeRpmTsfcXXQ="},{"type":"next-occurrence","id":"CPZMWOXEvPKFCjcojz5RzVu8sZY="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"EvBkx5mLrarJv1MyL7mUtkfRoJk=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T23:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"CPZMWOXEvPKFCjcojz5RzVu8sZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIA/pVAwKFsd01OFeRpmTsfcXXQ="},{"type":"next-occurrence","id":"qOf8cDTb6/L1OmwvaBrHPlmUKIQ="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"CPZMWOXEvPKFCjcojz5RzVu8sZY=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"qOf8cDTb6/L1OmwvaBrHPlmUKIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIA/pVAwKFsd01OFeRpmTsfcXXQ="},{"type":"next-occurrence","id":"NLfJN4h8rZejOceOc9Tk0lB1r7E="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"qOf8cDTb6/L1OmwvaBrHPlmUKIQ=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"NLfJN4h8rZejOceOc9Tk0lB1r7E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIA/pVAwKFsd01OFeRpmTsfcXXQ="},{"type":"next-occurrence","id":"A0xuHMCjWycmgjkqY9C356snluE="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"NLfJN4h8rZejOceOc9Tk0lB1r7E=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"A0xuHMCjWycmgjkqY9C356snluE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIA/pVAwKFsd01OFeRpmTsfcXXQ="},{"type":"next-occurrence","id":"5ZCL2e4+7c19Ap1ptHXNoNaM8rg="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"A0xuHMCjWycmgjkqY9C356snluE=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"5ZCL2e4+7c19Ap1ptHXNoNaM8rg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIA/pVAwKFsd01OFeRpmTsfcXXQ="},{"type":"next-occurrence","id":"nt1X7ogXu26yY/dNJkkvEP5rZrE="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"5ZCL2e4+7c19Ap1ptHXNoNaM8rg=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"nt1X7ogXu26yY/dNJkkvEP5rZrE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIA/pVAwKFsd01OFeRpmTsfcXXQ="},{"type":"next-occurrence","id":"83P17p5GToXoPS7gfpYEEINkcQ0="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"nt1X7ogXu26yY/dNJkkvEP5rZrE=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"83P17p5GToXoPS7gfpYEEINkcQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIA/pVAwKFsd01OFeRpmTsfcXXQ="},{"type":"next-occurrence","id":"OdD611Gjd7gw/Yi5vE0/1i5OJHM="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"83P17p5GToXoPS7gfpYEEINkcQ0=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T23:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"OdD611Gjd7gw/Yi5vE0/1i5OJHM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIA/pVAwKFsd01OFeRpmTsfcXXQ="},{"type":"next-occurrence","id":"vwTnShNV8Dr2oMnL8CWIqxmjG7U="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"OdD611Gjd7gw/Yi5vE0/1i5OJHM=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"vwTnShNV8Dr2oMnL8CWIqxmjG7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIA/pVAwKFsd01OFeRpmTsfcXXQ="},{"type":"next-occurrence","id":"iPXwh0UW9Lif0/7spVJcW7/174g="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"vwTnShNV8Dr2oMnL8CWIqxmjG7U=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"iPXwh0UW9Lif0/7spVJcW7/174g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIA/pVAwKFsd01OFeRpmTsfcXXQ="},{"type":"next-occurrence","id":"fYP2i3FSJPqTpc32SOWH8+SowTM="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"iPXwh0UW9Lif0/7spVJcW7/174g=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"fYP2i3FSJPqTpc32SOWH8+SowTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIA/pVAwKFsd01OFeRpmTsfcXXQ="},{"type":"next-occurrence","id":"d8giJ1xwqQW7Ey6auKI9DQmWcsM="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"fYP2i3FSJPqTpc32SOWH8+SowTM=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"d8giJ1xwqQW7Ey6auKI9DQmWcsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIA/pVAwKFsd01OFeRpmTsfcXXQ="},{"type":"next-occurrence","id":"sqUyFUqg27aCLPidhb5VDtd55uQ="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"d8giJ1xwqQW7Ey6auKI9DQmWcsM=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"sqUyFUqg27aCLPidhb5VDtd55uQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIA/pVAwKFsd01OFeRpmTsfcXXQ="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"sqUyFUqg27aCLPidhb5VDtd55uQ=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"qhkbjEuQKytJDiu98xbZXvGlhEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Reconstruction on I-87 Northway northbound END ROUTE I-87; US-Canadian Line (Champlain) 8 car lanes NB reduced to 3 (max) lanes , Continuous Thursday September 25th, 2025 12:00 AM thru Sunday February 28th, 2027 11:59 PM 5 lanes of 8 lanes closed","update_date":"2025-10-20T15:28:45Z"},"road_event_id":"qhkbjEuQKytJDiu98xbZXvGlhEc=","beginning_cross_street":"END ROUTE I-87; US-Canadian Line","ending_cross_street":"END ROUTE I-87; US-Canadian Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.452063,45.008751]]}},{"id":"gmeG29OmmypT6z0cGy0TMP7QGsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VPzSOFYRp5i24CfBbAABlE+eVh0="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"gmeG29OmmypT6z0cGy0TMP7QGsE=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"VPzSOFYRp5i24CfBbAABlE+eVh0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmeG29OmmypT6z0cGy0TMP7QGsE="},{"type":"next-occurrence","id":"eL31DdLCyTcPiiA35EUfoOAdtE4="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"VPzSOFYRp5i24CfBbAABlE+eVh0=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"eL31DdLCyTcPiiA35EUfoOAdtE4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmeG29OmmypT6z0cGy0TMP7QGsE="},{"type":"next-occurrence","id":"7QmI6VZ7JdnOrrM3TLKHamfImIM="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"eL31DdLCyTcPiiA35EUfoOAdtE4=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"7QmI6VZ7JdnOrrM3TLKHamfImIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmeG29OmmypT6z0cGy0TMP7QGsE="},{"type":"next-occurrence","id":"Lcprynrfke1BXTBf7+wVTIFOVvM="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"7QmI6VZ7JdnOrrM3TLKHamfImIM=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"Lcprynrfke1BXTBf7+wVTIFOVvM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmeG29OmmypT6z0cGy0TMP7QGsE="},{"type":"next-occurrence","id":"xbQB20hvfRGD+nuXgjNDjniIxLk="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"Lcprynrfke1BXTBf7+wVTIFOVvM=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"xbQB20hvfRGD+nuXgjNDjniIxLk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmeG29OmmypT6z0cGy0TMP7QGsE="},{"type":"next-occurrence","id":"BtZ0MigkP+sMcA0RTAYW7FCbKDI="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"xbQB20hvfRGD+nuXgjNDjniIxLk=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"BtZ0MigkP+sMcA0RTAYW7FCbKDI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmeG29OmmypT6z0cGy0TMP7QGsE="},{"type":"next-occurrence","id":"w05wMuSzm7o4vIG9Q8avQ+cpht0="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"BtZ0MigkP+sMcA0RTAYW7FCbKDI=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"w05wMuSzm7o4vIG9Q8avQ+cpht0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmeG29OmmypT6z0cGy0TMP7QGsE="},{"type":"next-occurrence","id":"s93b8ehRGgUi87hkH33yMIL7T2U="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"w05wMuSzm7o4vIG9Q8avQ+cpht0=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"s93b8ehRGgUi87hkH33yMIL7T2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmeG29OmmypT6z0cGy0TMP7QGsE="},{"type":"next-occurrence","id":"+xRe3xee/ThIWjwgEg7QEFXrBlI="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"s93b8ehRGgUi87hkH33yMIL7T2U=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"+xRe3xee/ThIWjwgEg7QEFXrBlI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmeG29OmmypT6z0cGy0TMP7QGsE="},{"type":"next-occurrence","id":"kVbFJoJnIt+aXfszfgQpsevKxpE="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"+xRe3xee/ThIWjwgEg7QEFXrBlI=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"kVbFJoJnIt+aXfszfgQpsevKxpE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmeG29OmmypT6z0cGy0TMP7QGsE="},{"type":"next-occurrence","id":"q8Y7nwHnHOn9rsWScjw6UVWGDPw="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"kVbFJoJnIt+aXfszfgQpsevKxpE=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"q8Y7nwHnHOn9rsWScjw6UVWGDPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmeG29OmmypT6z0cGy0TMP7QGsE="},{"type":"next-occurrence","id":"DIdLvPlCY+ZL717UsxHBD30mlfI="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"q8Y7nwHnHOn9rsWScjw6UVWGDPw=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"DIdLvPlCY+ZL717UsxHBD30mlfI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmeG29OmmypT6z0cGy0TMP7QGsE="},{"type":"next-occurrence","id":"+itkI3NQSXmF9OBHlz8NgzrS9RY="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"DIdLvPlCY+ZL717UsxHBD30mlfI=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"+itkI3NQSXmF9OBHlz8NgzrS9RY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmeG29OmmypT6z0cGy0TMP7QGsE="},{"type":"next-occurrence","id":"c0+QY7USYXhQXzUpdNlpZdXKUOA="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"+itkI3NQSXmF9OBHlz8NgzrS9RY=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"c0+QY7USYXhQXzUpdNlpZdXKUOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gmeG29OmmypT6z0cGy0TMP7QGsE="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"c0+QY7USYXhQXzUpdNlpZdXKUOA=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"3cHTRr1RpCQxf75KI0nC5ZrQuVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RcVwEIDLmbFuoe1ybHDB2jTXtcc="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"3cHTRr1RpCQxf75KI0nC5ZrQuVQ=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"RcVwEIDLmbFuoe1ybHDB2jTXtcc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3cHTRr1RpCQxf75KI0nC5ZrQuVQ="},{"type":"next-occurrence","id":"LB9KiT+bblugRej+7NaTtgItIHQ="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"RcVwEIDLmbFuoe1ybHDB2jTXtcc=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"LB9KiT+bblugRej+7NaTtgItIHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3cHTRr1RpCQxf75KI0nC5ZrQuVQ="},{"type":"next-occurrence","id":"HJTeiEOHmb4CFxm+S1qHcufy1ic="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"LB9KiT+bblugRej+7NaTtgItIHQ=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"HJTeiEOHmb4CFxm+S1qHcufy1ic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3cHTRr1RpCQxf75KI0nC5ZrQuVQ="},{"type":"next-occurrence","id":"Vr6DHBEgkanF3Sku2uZLQ3ydIr0="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"HJTeiEOHmb4CFxm+S1qHcufy1ic=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"Vr6DHBEgkanF3Sku2uZLQ3ydIr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3cHTRr1RpCQxf75KI0nC5ZrQuVQ="},{"type":"next-occurrence","id":"MMcRszCta56MbBTojq1teHgwEW0="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"Vr6DHBEgkanF3Sku2uZLQ3ydIr0=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"MMcRszCta56MbBTojq1teHgwEW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3cHTRr1RpCQxf75KI0nC5ZrQuVQ="},{"type":"next-occurrence","id":"eAqBhqmCEQmL0N7Rxdsu4Yyxda0="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"MMcRszCta56MbBTojq1teHgwEW0=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"eAqBhqmCEQmL0N7Rxdsu4Yyxda0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3cHTRr1RpCQxf75KI0nC5ZrQuVQ="},{"type":"next-occurrence","id":"4tBzrJL5H1mLQF/U15v2+l8f8pk="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"eAqBhqmCEQmL0N7Rxdsu4Yyxda0=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"4tBzrJL5H1mLQF/U15v2+l8f8pk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3cHTRr1RpCQxf75KI0nC5ZrQuVQ="},{"type":"next-occurrence","id":"bUPGGJoX0SflR/nE7PT73XhpczA="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"4tBzrJL5H1mLQF/U15v2+l8f8pk=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"bUPGGJoX0SflR/nE7PT73XhpczA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3cHTRr1RpCQxf75KI0nC5ZrQuVQ="},{"type":"next-occurrence","id":"OK+NJVExeyI0KPEAtPT0g7EBmJc="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"bUPGGJoX0SflR/nE7PT73XhpczA=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"OK+NJVExeyI0KPEAtPT0g7EBmJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3cHTRr1RpCQxf75KI0nC5ZrQuVQ="},{"type":"next-occurrence","id":"F/JyJJMw+rJTBv6vyxJcupJs1xo="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"OK+NJVExeyI0KPEAtPT0g7EBmJc=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"F/JyJJMw+rJTBv6vyxJcupJs1xo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3cHTRr1RpCQxf75KI0nC5ZrQuVQ="},{"type":"next-occurrence","id":"VYnBrNiw3wydhqQJQqpnRiYMJwM="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"F/JyJJMw+rJTBv6vyxJcupJs1xo=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"VYnBrNiw3wydhqQJQqpnRiYMJwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3cHTRr1RpCQxf75KI0nC5ZrQuVQ="},{"type":"next-occurrence","id":"lVaqjRdGRTwd+YH0mc3cVi5mFVs="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"VYnBrNiw3wydhqQJQqpnRiYMJwM=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"lVaqjRdGRTwd+YH0mc3cVi5mFVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3cHTRr1RpCQxf75KI0nC5ZrQuVQ="},{"type":"next-occurrence","id":"bGNKCJNsUb8Bb+U5IwA0hLQEx+4="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"lVaqjRdGRTwd+YH0mc3cVi5mFVs=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"bGNKCJNsUb8Bb+U5IwA0hLQEx+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3cHTRr1RpCQxf75KI0nC5ZrQuVQ="},{"type":"next-occurrence","id":"afafTa4VD/Zd9pGsn3ACMLKhXpM="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"bGNKCJNsUb8Bb+U5IwA0hLQEx+4=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"afafTa4VD/Zd9pGsn3ACMLKhXpM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3cHTRr1RpCQxf75KI0nC5ZrQuVQ="}],"description":"Bridge rehabilitation on WATER ST eastbound between Colonie Street (Albany) and ORANGE ST (Albany) alternating lanes , Monday April 27th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T19:25:58Z"},"road_event_id":"afafTa4VD/Zd9pGsn3ACMLKhXpM=","beginning_cross_street":"Colonie Street ","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.745788,42.654506]]}},{"id":"VEtDEAq2i/e58hKdMWIdhPyN91E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JN5YWF7M6eN3c2bMgGwTnOWzsvE="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"VEtDEAq2i/e58hKdMWIdhPyN91E=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"JN5YWF7M6eN3c2bMgGwTnOWzsvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VEtDEAq2i/e58hKdMWIdhPyN91E="},{"type":"next-occurrence","id":"/pc5qWrJIhd+LBjfevtmIx4Gr6Y="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"JN5YWF7M6eN3c2bMgGwTnOWzsvE=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T23:00:00Z","end_date":"2026-06-07T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"/pc5qWrJIhd+LBjfevtmIx4Gr6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VEtDEAq2i/e58hKdMWIdhPyN91E="},{"type":"next-occurrence","id":"eeEdctyMgGsLJREvWqOvM8TjxSI="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"/pc5qWrJIhd+LBjfevtmIx4Gr6Y=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"eeEdctyMgGsLJREvWqOvM8TjxSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VEtDEAq2i/e58hKdMWIdhPyN91E="},{"type":"next-occurrence","id":"Edj5yRnnGb87Io/zsshdADP4dYs="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"eeEdctyMgGsLJREvWqOvM8TjxSI=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"Edj5yRnnGb87Io/zsshdADP4dYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VEtDEAq2i/e58hKdMWIdhPyN91E="},{"type":"next-occurrence","id":"Nj1fpWQBI5mrl/L3ZTKwK3jMZ8I="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"Edj5yRnnGb87Io/zsshdADP4dYs=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"Nj1fpWQBI5mrl/L3ZTKwK3jMZ8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VEtDEAq2i/e58hKdMWIdhPyN91E="},{"type":"next-occurrence","id":"sNmDiJ3JWYJrC7NeLRFLuwiXfNY="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"Nj1fpWQBI5mrl/L3ZTKwK3jMZ8I=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"sNmDiJ3JWYJrC7NeLRFLuwiXfNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VEtDEAq2i/e58hKdMWIdhPyN91E="},{"type":"next-occurrence","id":"c7bMox3kyZS6lnc8x8BVlBqc6J8="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"sNmDiJ3JWYJrC7NeLRFLuwiXfNY=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"c7bMox3kyZS6lnc8x8BVlBqc6J8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VEtDEAq2i/e58hKdMWIdhPyN91E="},{"type":"next-occurrence","id":"8ma8nSXNM/Wf+nS0huYAbFpBVPU="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"c7bMox3kyZS6lnc8x8BVlBqc6J8=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"8ma8nSXNM/Wf+nS0huYAbFpBVPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VEtDEAq2i/e58hKdMWIdhPyN91E="},{"type":"next-occurrence","id":"1nfsaqEv3A4FJTFI7Lltcq99x7Q="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"8ma8nSXNM/Wf+nS0huYAbFpBVPU=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T23:00:00Z","end_date":"2026-06-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"1nfsaqEv3A4FJTFI7Lltcq99x7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VEtDEAq2i/e58hKdMWIdhPyN91E="},{"type":"next-occurrence","id":"Lm3lgSGHO2sqmuKUN2fB69TQSr4="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"1nfsaqEv3A4FJTFI7Lltcq99x7Q=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"Lm3lgSGHO2sqmuKUN2fB69TQSr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 50"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VEtDEAq2i/e58hKdMWIdhPyN91E="}],"description":"Roadwork on NY 50 both directions between I-87 Exit 15 (Saratoga Springs) and Perry Road (Wilton) (Pavement Corrective Maintenance) alternating lanes , Monday May 18th, 2026 thru Monday June 15th, 2026, Sunday thru Saturday, 07:00 PM thru 07:00 AM All lanes open","update_date":"2026-05-01T19:18:12Z"},"road_event_id":"Lm3lgSGHO2sqmuKUN2fB69TQSr4=","beginning_cross_street":"I-87 Exit 15","ending_cross_street":"Perry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753086,43.096243]]}},{"id":"X1szGchvym7TP6RGxLuQKuoz2SI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAUREL HILL RD"],"direction":"unknown","related_road_events":[],"description":"Bridge work on LAUREL HILL RD both directions between 43 (Torrington) and HILLSIDE AVE (Torrington), Continuous Wednesday April 22nd, 2026 12:00 AM thru Monday June 22nd, 2026 11:59 PM All lanes closed","update_date":"2026-04-22T20:54:45Z"},"road_event_id":"X1szGchvym7TP6RGxLuQKuoz2SI=","beginning_cross_street":"43","ending_cross_street":"HILLSIDE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.113637,41.798303]]}},{"id":"Fyi+vbpSwJWLzs4x33ItXIxK4Gk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FLq1pozWymNLS7j/ATAsiyG8j8Q="}],"description":"Milling and paving operations on US-6 both directions between US-44 (Bolton) and CT-316 (Andover) Motorists can expect lane closures, Sunday May 17th,2026 thru Monday June 29th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-12T09:00:11Z"},"road_event_id":"Fyi+vbpSwJWLzs4x33ItXIxK4Gk=","beginning_cross_street":"US-44","ending_cross_street":"CT-316","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.445255,41.789658]]}},{"id":"FLq1pozWymNLS7j/ATAsiyG8j8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fyi+vbpSwJWLzs4x33ItXIxK4Gk="},{"type":"next-occurrence","id":"pAlOvXPhKtrxA0i65JdixaWgvWU="}],"description":"Milling and paving operations on US-6 both directions between US-44 (Bolton) and CT-316 (Andover) Motorists can expect lane closures, Sunday May 17th,2026 thru Monday June 29th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-12T09:00:11Z"},"road_event_id":"FLq1pozWymNLS7j/ATAsiyG8j8Q=","beginning_cross_street":"US-44","ending_cross_street":"CT-316","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.445255,41.789658]]}},{"id":"pAlOvXPhKtrxA0i65JdixaWgvWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fyi+vbpSwJWLzs4x33ItXIxK4Gk="},{"type":"next-occurrence","id":"U6uiVY+05OG99LVDRdO2q74it5I="}],"description":"Milling and paving operations on US-6 both directions between US-44 (Bolton) and CT-316 (Andover) Motorists can expect lane closures, Sunday May 17th,2026 thru Monday June 29th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-12T09:00:11Z"},"road_event_id":"pAlOvXPhKtrxA0i65JdixaWgvWU=","beginning_cross_street":"US-44","ending_cross_street":"CT-316","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.445255,41.789658]]}},{"id":"U6uiVY+05OG99LVDRdO2q74it5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fyi+vbpSwJWLzs4x33ItXIxK4Gk="},{"type":"next-occurrence","id":"2CbsSX5a0jaE1xl8DNGo8rQe0dg="}],"description":"Milling and paving operations on US-6 both directions between US-44 (Bolton) and CT-316 (Andover) Motorists can expect lane closures, Sunday May 17th,2026 thru Monday June 29th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-12T09:00:11Z"},"road_event_id":"U6uiVY+05OG99LVDRdO2q74it5I=","beginning_cross_street":"US-44","ending_cross_street":"CT-316","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.445255,41.789658]]}},{"id":"2CbsSX5a0jaE1xl8DNGo8rQe0dg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fyi+vbpSwJWLzs4x33ItXIxK4Gk="},{"type":"next-occurrence","id":"tmPDQISUGMcM16i/xQJGSjqKWZ0="}],"description":"Milling and paving operations on US-6 both directions between US-44 (Bolton) and CT-316 (Andover) Motorists can expect lane closures, Sunday May 17th,2026 thru Monday June 29th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-12T09:00:11Z"},"road_event_id":"2CbsSX5a0jaE1xl8DNGo8rQe0dg=","beginning_cross_street":"US-44","ending_cross_street":"CT-316","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.445255,41.789658]]}},{"id":"tmPDQISUGMcM16i/xQJGSjqKWZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fyi+vbpSwJWLzs4x33ItXIxK4Gk="},{"type":"next-occurrence","id":"1r+Mytpa5MUnDVKRRmGch13in1g="}],"description":"Milling and paving operations on US-6 both directions between US-44 (Bolton) and CT-316 (Andover) Motorists can expect lane closures, Sunday May 17th,2026 thru Monday June 29th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-12T09:00:11Z"},"road_event_id":"tmPDQISUGMcM16i/xQJGSjqKWZ0=","beginning_cross_street":"US-44","ending_cross_street":"CT-316","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.445255,41.789658]]}},{"id":"1r+Mytpa5MUnDVKRRmGch13in1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fyi+vbpSwJWLzs4x33ItXIxK4Gk="},{"type":"next-occurrence","id":"1fci4BSE2S3X4MwGTe3ScucLMvU="}],"description":"Milling and paving operations on US-6 both directions between US-44 (Bolton) and CT-316 (Andover) Motorists can expect lane closures, Sunday May 17th,2026 thru Monday June 29th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-12T09:00:11Z"},"road_event_id":"1r+Mytpa5MUnDVKRRmGch13in1g=","beginning_cross_street":"US-44","ending_cross_street":"CT-316","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.445255,41.789658]]}},{"id":"1fci4BSE2S3X4MwGTe3ScucLMvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fyi+vbpSwJWLzs4x33ItXIxK4Gk="},{"type":"next-occurrence","id":"6wQPxZ+RHZS6Kj9YLv3FPhhbSgk="}],"description":"Milling and paving operations on US-6 both directions between US-44 (Bolton) and CT-316 (Andover) Motorists can expect lane closures, Sunday May 17th,2026 thru Monday June 29th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-12T09:00:11Z"},"road_event_id":"1fci4BSE2S3X4MwGTe3ScucLMvU=","beginning_cross_street":"US-44","ending_cross_street":"CT-316","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.445255,41.789658]]}},{"id":"6wQPxZ+RHZS6Kj9YLv3FPhhbSgk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fyi+vbpSwJWLzs4x33ItXIxK4Gk="},{"type":"next-occurrence","id":"Ad2cnKeKAyim5GfK1TQUJ4Y7Cng="}],"description":"Milling and paving operations on US-6 both directions between US-44 (Bolton) and CT-316 (Andover) Motorists can expect lane closures, Sunday May 17th,2026 thru Monday June 29th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-12T09:00:11Z"},"road_event_id":"6wQPxZ+RHZS6Kj9YLv3FPhhbSgk=","beginning_cross_street":"US-44","ending_cross_street":"CT-316","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.445255,41.789658]]}},{"id":"Ad2cnKeKAyim5GfK1TQUJ4Y7Cng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fyi+vbpSwJWLzs4x33ItXIxK4Gk="}],"description":"Milling and paving operations on US-6 both directions between US-44 (Bolton) and CT-316 (Andover) Motorists can expect lane closures, Sunday May 17th,2026 thru Monday June 29th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-12T09:00:11Z"},"road_event_id":"Ad2cnKeKAyim5GfK1TQUJ4Y7Cng=","beginning_cross_street":"US-44","ending_cross_street":"CT-316","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.445255,41.789658]]}},{"id":"VrE8HnGo6Jx504XOtWH7232bwPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wVEnaNmOWBhfmuSEOWWoUWx+eag="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"VrE8HnGo6Jx504XOtWH7232bwPE=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T12:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"wVEnaNmOWBhfmuSEOWWoUWx+eag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VrE8HnGo6Jx504XOtWH7232bwPE="},{"type":"next-occurrence","id":"+TKXuHNfUqHcFgX83AZVeDxNTnI="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"wVEnaNmOWBhfmuSEOWWoUWx+eag=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"+TKXuHNfUqHcFgX83AZVeDxNTnI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VrE8HnGo6Jx504XOtWH7232bwPE="},{"type":"next-occurrence","id":"tdCnnGSdOE0n8lh04hSs7+2I6z8="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"+TKXuHNfUqHcFgX83AZVeDxNTnI=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T12:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"tdCnnGSdOE0n8lh04hSs7+2I6z8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VrE8HnGo6Jx504XOtWH7232bwPE="},{"type":"next-occurrence","id":"a2MTTAU4zjy3M8+giMIgBxAG8wg="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"tdCnnGSdOE0n8lh04hSs7+2I6z8=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"a2MTTAU4zjy3M8+giMIgBxAG8wg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VrE8HnGo6Jx504XOtWH7232bwPE="},{"type":"next-occurrence","id":"+m4YsaNtwQZozSiE6UBvFcWTT3s="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"a2MTTAU4zjy3M8+giMIgBxAG8wg=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"+m4YsaNtwQZozSiE6UBvFcWTT3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VrE8HnGo6Jx504XOtWH7232bwPE="},{"type":"next-occurrence","id":"r6x1K8zT+cgqSFYBn0Zn55PVHnk="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"+m4YsaNtwQZozSiE6UBvFcWTT3s=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"r6x1K8zT+cgqSFYBn0Zn55PVHnk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VrE8HnGo6Jx504XOtWH7232bwPE="},{"type":"next-occurrence","id":"r/iw7lXGpJeWJKWwbf+WAQcjL5s="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"r6x1K8zT+cgqSFYBn0Zn55PVHnk=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"r/iw7lXGpJeWJKWwbf+WAQcjL5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VrE8HnGo6Jx504XOtWH7232bwPE="},{"type":"next-occurrence","id":"EuLui6Tk8FI1ueNJP+ViAEwFbAA="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"r/iw7lXGpJeWJKWwbf+WAQcjL5s=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"EuLui6Tk8FI1ueNJP+ViAEwFbAA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VrE8HnGo6Jx504XOtWH7232bwPE="},{"type":"next-occurrence","id":"7mcFmAKR0HBjbDnV0Xfgv3mS8zs="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"EuLui6Tk8FI1ueNJP+ViAEwFbAA=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"7mcFmAKR0HBjbDnV0Xfgv3mS8zs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VrE8HnGo6Jx504XOtWH7232bwPE="},{"type":"next-occurrence","id":"PQpb/Golay4VNc4sWEPtTNhZmK8="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"7mcFmAKR0HBjbDnV0Xfgv3mS8zs=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T12:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"PQpb/Golay4VNc4sWEPtTNhZmK8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VrE8HnGo6Jx504XOtWH7232bwPE="},{"type":"next-occurrence","id":"vB25hIQq60Jl8x9KQG170zDGdLI="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"PQpb/Golay4VNc4sWEPtTNhZmK8=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T12:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"vB25hIQq60Jl8x9KQG170zDGdLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VrE8HnGo6Jx504XOtWH7232bwPE="},{"type":"next-occurrence","id":"kLppGv5Zy6lw2qcqKD3YDIw2wF8="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"vB25hIQq60Jl8x9KQG170zDGdLI=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T12:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"kLppGv5Zy6lw2qcqKD3YDIw2wF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VrE8HnGo6Jx504XOtWH7232bwPE="},{"type":"next-occurrence","id":"ZEdcugNWPpplUuhtQ5LvNEh9UUM="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"kLppGv5Zy6lw2qcqKD3YDIw2wF8=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T12:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"ZEdcugNWPpplUuhtQ5LvNEh9UUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VrE8HnGo6Jx504XOtWH7232bwPE="},{"type":"next-occurrence","id":"zVvdkYxWwgb94GVAbKpyl8pxlks="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"ZEdcugNWPpplUuhtQ5LvNEh9UUM=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T12:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"zVvdkYxWwgb94GVAbKpyl8pxlks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VrE8HnGo6Jx504XOtWH7232bwPE="}],"description":"Guard rail repairs on MILL ST both directions between CT-20 (Hartland) and HOGBACK RD (Hartland) There will be lane closures , Monday May 4th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T21:10:10Z"},"road_event_id":"zVvdkYxWwgb94GVAbKpyl8pxlks=","beginning_cross_street":"CT-20","ending_cross_street":"HOGBACK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T12:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.997369,41.991235]]}},{"id":"Ki6d9VODJam5jifC+9v3Wlh5wsY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 72"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QRIvuxN9V58izX4NO8LX1D2L3Qk="}],"description":"Milling and paving operations on CT 72 both directions between Exit 1 - CT 177/Unionville Avenue (Plainville) and BLAKESLEE ST (Bristol) Motorists can expect lane closures, Tuesday May 26th,2026 thru Friday June 12th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 2 lanes open westbound, eastbound","update_date":"2026-05-21T09:00:11Z"},"road_event_id":"Ki6d9VODJam5jifC+9v3Wlh5wsY=","beginning_cross_street":"Exit 1 - CT 177/Unionville Avenue","ending_cross_street":"BLAKESLEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.886183,41.672587]]}},{"id":"QRIvuxN9V58izX4NO8LX1D2L3Qk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 72"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ki6d9VODJam5jifC+9v3Wlh5wsY="},{"type":"next-occurrence","id":"1hQigk3m+kpfZTk6U+o5qGy39SQ="}],"description":"Milling and paving operations on CT 72 both directions between Exit 1 - CT 177/Unionville Avenue (Plainville) and BLAKESLEE ST (Bristol) Motorists can expect lane closures, Tuesday May 26th,2026 thru Friday June 12th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 2 lanes open westbound, eastbound","update_date":"2026-05-21T09:00:11Z"},"road_event_id":"QRIvuxN9V58izX4NO8LX1D2L3Qk=","beginning_cross_street":"Exit 1 - CT 177/Unionville Avenue","ending_cross_street":"BLAKESLEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.886183,41.672587]]}},{"id":"1hQigk3m+kpfZTk6U+o5qGy39SQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 72"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ki6d9VODJam5jifC+9v3Wlh5wsY="},{"type":"next-occurrence","id":"EtNyv6hM3CvuijwmxGyRWdfEmU4="}],"description":"Milling and paving operations on CT 72 both directions between Exit 1 - CT 177/Unionville Avenue (Plainville) and BLAKESLEE ST (Bristol) Motorists can expect lane closures, Tuesday May 26th,2026 thru Friday June 12th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 2 lanes open westbound, eastbound","update_date":"2026-05-21T09:00:11Z"},"road_event_id":"1hQigk3m+kpfZTk6U+o5qGy39SQ=","beginning_cross_street":"Exit 1 - CT 177/Unionville Avenue","ending_cross_street":"BLAKESLEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.886183,41.672587]]}},{"id":"EtNyv6hM3CvuijwmxGyRWdfEmU4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 72"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ki6d9VODJam5jifC+9v3Wlh5wsY="},{"type":"next-occurrence","id":"CSKtjPwDujzdfU0gzHaDQt6Mpc4="}],"description":"Milling and paving operations on CT 72 both directions between Exit 1 - CT 177/Unionville Avenue (Plainville) and BLAKESLEE ST (Bristol) Motorists can expect lane closures, Tuesday May 26th,2026 thru Friday June 12th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 2 lanes open westbound, eastbound","update_date":"2026-05-21T09:00:11Z"},"road_event_id":"EtNyv6hM3CvuijwmxGyRWdfEmU4=","beginning_cross_street":"Exit 1 - CT 177/Unionville Avenue","ending_cross_street":"BLAKESLEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.886183,41.672587]]}},{"id":"CSKtjPwDujzdfU0gzHaDQt6Mpc4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 72"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ki6d9VODJam5jifC+9v3Wlh5wsY="}],"description":"Milling and paving operations on CT 72 both directions between Exit 1 - CT 177/Unionville Avenue (Plainville) and BLAKESLEE ST (Bristol) Motorists can expect lane closures, Tuesday May 26th,2026 thru Friday June 12th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes of 2 lanes open westbound, eastbound","update_date":"2026-05-21T09:00:11Z"},"road_event_id":"CSKtjPwDujzdfU0gzHaDQt6Mpc4=","beginning_cross_street":"Exit 1 - CT 177/Unionville Avenue","ending_cross_street":"BLAKESLEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.886183,41.672587]]}},{"id":"j2YU9ZCC4QaxiFry3r2w6GKoFUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yKpPeu55JinkC9TcrHxkuqXcxZk="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) The last stop for alternate Bronx-bound trains is 3 Av-138 St (days/evenings). Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday June 1st,2026 thru Saturday June 6th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 15th,2026 thru Saturday June 20th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday June 5th,2026 09:45 PM thru Monday June 8th,2026 05:00 AM express only","update_date":"2026-06-01T09:00:21Z"},"road_event_id":"j2YU9ZCC4QaxiFry3r2w6GKoFUM=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"yKpPeu55JinkC9TcrHxkuqXcxZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j2YU9ZCC4QaxiFry3r2w6GKoFUM="},{"type":"next-occurrence","id":"SfXpgYd2bkJAxI6I7WqMTZHkQbs="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) The last stop for alternate Bronx-bound trains is 3 Av-138 St (days/evenings). Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday June 1st,2026 thru Saturday June 6th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 15th,2026 thru Saturday June 20th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday June 5th,2026 09:45 PM thru Monday June 8th,2026 05:00 AM express only","update_date":"2026-06-01T09:00:21Z"},"road_event_id":"yKpPeu55JinkC9TcrHxkuqXcxZk=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:45:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"SfXpgYd2bkJAxI6I7WqMTZHkQbs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j2YU9ZCC4QaxiFry3r2w6GKoFUM="},{"type":"next-occurrence","id":"CM2lRZHbEhzbUy8yDUjES4LfzxA="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) The last stop for alternate Bronx-bound trains is 3 Av-138 St (days/evenings). Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday June 1st,2026 thru Saturday June 6th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 15th,2026 thru Saturday June 20th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday June 5th,2026 09:45 PM thru Monday June 8th,2026 05:00 AM express only","update_date":"2026-06-01T09:00:21Z"},"road_event_id":"SfXpgYd2bkJAxI6I7WqMTZHkQbs=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:45:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"CM2lRZHbEhzbUy8yDUjES4LfzxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j2YU9ZCC4QaxiFry3r2w6GKoFUM="},{"type":"next-occurrence","id":"HRMfWbiTSwQlzgDcr8iWdoCRsPg="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) The last stop for alternate Bronx-bound trains is 3 Av-138 St (days/evenings). Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday June 1st,2026 thru Saturday June 6th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 15th,2026 thru Saturday June 20th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday June 5th,2026 09:45 PM thru Monday June 8th,2026 05:00 AM express only","update_date":"2026-06-01T09:00:21Z"},"road_event_id":"CM2lRZHbEhzbUy8yDUjES4LfzxA=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:45:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"HRMfWbiTSwQlzgDcr8iWdoCRsPg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j2YU9ZCC4QaxiFry3r2w6GKoFUM="},{"type":"next-occurrence","id":"P1x3H3j1ZnPQWKUQ9FS9YJbDAtc="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) The last stop for alternate Bronx-bound trains is 3 Av-138 St (days/evenings). Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday June 1st,2026 thru Saturday June 6th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 15th,2026 thru Saturday June 20th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday June 5th,2026 09:45 PM thru Monday June 8th,2026 05:00 AM express only","update_date":"2026-06-01T09:00:21Z"},"road_event_id":"HRMfWbiTSwQlzgDcr8iWdoCRsPg=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:45:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"P1x3H3j1ZnPQWKUQ9FS9YJbDAtc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j2YU9ZCC4QaxiFry3r2w6GKoFUM="},{"type":"next-occurrence","id":"7s0khI3QepZqmo+0vWbxQkeqByg="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) The last stop for alternate Bronx-bound trains is 3 Av-138 St (days/evenings). Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday June 1st,2026 thru Saturday June 6th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 15th,2026 thru Saturday June 20th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday June 5th,2026 09:45 PM thru Monday June 8th,2026 05:00 AM express only","update_date":"2026-06-01T09:00:21Z"},"road_event_id":"P1x3H3j1ZnPQWKUQ9FS9YJbDAtc=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T01:45:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"7s0khI3QepZqmo+0vWbxQkeqByg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j2YU9ZCC4QaxiFry3r2w6GKoFUM="},{"type":"next-occurrence","id":"PCMf7wqY8l3yU3tSGli/6vuwbsg="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) The last stop for alternate Bronx-bound trains is 3 Av-138 St (days/evenings). Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday June 1st,2026 thru Saturday June 6th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 15th,2026 thru Saturday June 20th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday June 5th,2026 09:45 PM thru Monday June 8th,2026 05:00 AM express only","update_date":"2026-06-01T09:00:21Z"},"road_event_id":"7s0khI3QepZqmo+0vWbxQkeqByg=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T01:45:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"PCMf7wqY8l3yU3tSGli/6vuwbsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j2YU9ZCC4QaxiFry3r2w6GKoFUM="},{"type":"next-occurrence","id":"iGYx3hxyeeI2F4Z6jstVQtYsRM8="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) The last stop for alternate Bronx-bound trains is 3 Av-138 St (days/evenings). Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday June 1st,2026 thru Saturday June 6th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 15th,2026 thru Saturday June 20th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday June 5th,2026 09:45 PM thru Monday June 8th,2026 05:00 AM express only","update_date":"2026-06-01T09:00:21Z"},"road_event_id":"PCMf7wqY8l3yU3tSGli/6vuwbsg=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T01:45:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"iGYx3hxyeeI2F4Z6jstVQtYsRM8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j2YU9ZCC4QaxiFry3r2w6GKoFUM="},{"type":"next-occurrence","id":"tm1Sjkb96MKK7tkJ5ugCuVxBBWY="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) The last stop for alternate Bronx-bound trains is 3 Av-138 St (days/evenings). Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday June 1st,2026 thru Saturday June 6th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 15th,2026 thru Saturday June 20th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday June 5th,2026 09:45 PM thru Monday June 8th,2026 05:00 AM express only","update_date":"2026-06-01T09:00:21Z"},"road_event_id":"iGYx3hxyeeI2F4Z6jstVQtYsRM8=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T01:45:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"tm1Sjkb96MKK7tkJ5ugCuVxBBWY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j2YU9ZCC4QaxiFry3r2w6GKoFUM="},{"type":"next-occurrence","id":"AT4+tGrV/6j+UoTmj7u4VZpQfvE="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) The last stop for alternate Bronx-bound trains is 3 Av-138 St (days/evenings). Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday June 1st,2026 thru Saturday June 6th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 15th,2026 thru Saturday June 20th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday June 5th,2026 09:45 PM thru Monday June 8th,2026 05:00 AM express only","update_date":"2026-06-01T09:00:21Z"},"road_event_id":"tm1Sjkb96MKK7tkJ5ugCuVxBBWY=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T01:45:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"AT4+tGrV/6j+UoTmj7u4VZpQfvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j2YU9ZCC4QaxiFry3r2w6GKoFUM="}],"description":"Track replacement on 6 Line southbound from Parkchester (New York) to 3 Av - 138 St (New York) The last stop for alternate Bronx-bound trains is 3 Av-138 St (days/evenings). Trains stop at Hunts Point Av. For service to St Lawrence Av, Morrison Av-Soundview, Elder Av and Whitlock Av, take the 6 line to Hunts Point Av and transfer to a Pelham Bay Park-bound 6 line. For service to Longwood Av, E 149 St, E 143 St-St Mary's St, Cypress Av and Brook Av, take the 6 line to 3 Av-138 St and transfer to a Pelham Bay Park-bound 6 line. For service from these stations, take the 6 line to Hunts Point Av or Parkchester and transfer to a Manhattan-bound 6 line., Monday June 1st,2026 thru Saturday June 6th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Monday June 15th,2026 thru Saturday June 20th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM express only, Continuous Friday June 5th,2026 09:45 PM thru Monday June 8th,2026 05:00 AM express only","update_date":"2026-06-01T09:00:21Z"},"road_event_id":"AT4+tGrV/6j+UoTmj7u4VZpQfvE=","beginning_cross_street":"Parkchester","ending_cross_street":"3 Av - 138 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T01:45:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860816,40.833226]]}},{"id":"CJTQe+Q0JznJx6hKoZeC5nNPrxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-110"],"direction":"unknown","related_road_events":[],"description":"Utility work on CT-110 both directions between MAIN ST (Stratford), Continuous Monday May 4th, 2026 06:00 AM thru Friday June 12th, 2026 08:00 PM All lanes closed","update_date":"2026-04-22T21:26:36Z"},"road_event_id":"CJTQe+Q0JznJx6hKoZeC5nNPrxw=","beginning_cross_street":"MAIN ST","ending_cross_street":"MAIN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-13T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107162,41.236501]]}},{"id":"HLUta+rc0QxdDQB5sFaIywhl3gU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BADGZ5BXqom1BIwxO2prQrgpzYQ="}],"description":"Road rehabilitation on Sprain Brook State Pkwy both directions between Tuckahoe Road (Yonkers) and Taconic State Parkway (Mount Pleasant) D265686/NIGHT/32732509 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 19th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T18:51:25Z"},"road_event_id":"HLUta+rc0QxdDQB5sFaIywhl3gU=","beginning_cross_street":"Tuckahoe Road","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T01:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852547,40.954335]]}},{"id":"BADGZ5BXqom1BIwxO2prQrgpzYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HLUta+rc0QxdDQB5sFaIywhl3gU="},{"type":"next-occurrence","id":"kMPKfDE9l8oUCQ2EBrcWf8jeZ3s="}],"description":"Road rehabilitation on Sprain Brook State Pkwy both directions between Tuckahoe Road (Yonkers) and Taconic State Parkway (Mount Pleasant) D265686/NIGHT/32732509 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 19th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T18:51:25Z"},"road_event_id":"BADGZ5BXqom1BIwxO2prQrgpzYQ=","beginning_cross_street":"Tuckahoe Road","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852547,40.954335]]}},{"id":"kMPKfDE9l8oUCQ2EBrcWf8jeZ3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HLUta+rc0QxdDQB5sFaIywhl3gU="},{"type":"next-occurrence","id":"RwJ1ybOw+37o8Zd2qlXfb2llty4="}],"description":"Road rehabilitation on Sprain Brook State Pkwy both directions between Tuckahoe Road (Yonkers) and Taconic State Parkway (Mount Pleasant) D265686/NIGHT/32732509 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 19th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T18:51:25Z"},"road_event_id":"kMPKfDE9l8oUCQ2EBrcWf8jeZ3s=","beginning_cross_street":"Tuckahoe Road","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852547,40.954335]]}},{"id":"RwJ1ybOw+37o8Zd2qlXfb2llty4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HLUta+rc0QxdDQB5sFaIywhl3gU="},{"type":"next-occurrence","id":"p830DIyyylkhiAp7mXxGcfuRTEI="}],"description":"Road rehabilitation on Sprain Brook State Pkwy both directions between Tuckahoe Road (Yonkers) and Taconic State Parkway (Mount Pleasant) D265686/NIGHT/32732509 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 19th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T18:51:25Z"},"road_event_id":"RwJ1ybOw+37o8Zd2qlXfb2llty4=","beginning_cross_street":"Tuckahoe Road","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852547,40.954335]]}},{"id":"p830DIyyylkhiAp7mXxGcfuRTEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HLUta+rc0QxdDQB5sFaIywhl3gU="},{"type":"next-occurrence","id":"A34ZTPOcZ7/kDbq7Fk3sxmpu4Jg="}],"description":"Road rehabilitation on Sprain Brook State Pkwy both directions between Tuckahoe Road (Yonkers) and Taconic State Parkway (Mount Pleasant) D265686/NIGHT/32732509 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 19th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T18:51:25Z"},"road_event_id":"p830DIyyylkhiAp7mXxGcfuRTEI=","beginning_cross_street":"Tuckahoe Road","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852547,40.954335]]}},{"id":"A34ZTPOcZ7/kDbq7Fk3sxmpu4Jg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HLUta+rc0QxdDQB5sFaIywhl3gU="},{"type":"next-occurrence","id":"SSclwfkulSVuioBgdkHlnnU87cY="}],"description":"Road rehabilitation on Sprain Brook State Pkwy both directions between Tuckahoe Road (Yonkers) and Taconic State Parkway (Mount Pleasant) D265686/NIGHT/32732509 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 19th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T18:51:25Z"},"road_event_id":"A34ZTPOcZ7/kDbq7Fk3sxmpu4Jg=","beginning_cross_street":"Tuckahoe Road","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T01:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852547,40.954335]]}},{"id":"SSclwfkulSVuioBgdkHlnnU87cY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HLUta+rc0QxdDQB5sFaIywhl3gU="},{"type":"next-occurrence","id":"EM0oGtWiaK9xR82z7LOsddfXqDc="}],"description":"Road rehabilitation on Sprain Brook State Pkwy both directions between Tuckahoe Road (Yonkers) and Taconic State Parkway (Mount Pleasant) D265686/NIGHT/32732509 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 19th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T18:51:25Z"},"road_event_id":"SSclwfkulSVuioBgdkHlnnU87cY=","beginning_cross_street":"Tuckahoe Road","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T01:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852547,40.954335]]}},{"id":"EM0oGtWiaK9xR82z7LOsddfXqDc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HLUta+rc0QxdDQB5sFaIywhl3gU="},{"type":"next-occurrence","id":"AW+hmyTt4YGG5DeAV24wBiDiaOA="}],"description":"Road rehabilitation on Sprain Brook State Pkwy both directions between Tuckahoe Road (Yonkers) and Taconic State Parkway (Mount Pleasant) D265686/NIGHT/32732509 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 19th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T18:51:25Z"},"road_event_id":"EM0oGtWiaK9xR82z7LOsddfXqDc=","beginning_cross_street":"Tuckahoe Road","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T01:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852547,40.954335]]}},{"id":"AW+hmyTt4YGG5DeAV24wBiDiaOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HLUta+rc0QxdDQB5sFaIywhl3gU="},{"type":"next-occurrence","id":"vED886UnMlQ/fY3C0O2W09eyAK8="}],"description":"Road rehabilitation on Sprain Brook State Pkwy both directions between Tuckahoe Road (Yonkers) and Taconic State Parkway (Mount Pleasant) D265686/NIGHT/32732509 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 19th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T18:51:25Z"},"road_event_id":"AW+hmyTt4YGG5DeAV24wBiDiaOA=","beginning_cross_street":"Tuckahoe Road","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T01:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852547,40.954335]]}},{"id":"vED886UnMlQ/fY3C0O2W09eyAK8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HLUta+rc0QxdDQB5sFaIywhl3gU="}],"description":"Road rehabilitation on Sprain Brook State Pkwy both directions between Tuckahoe Road (Yonkers) and Taconic State Parkway (Mount Pleasant) D265686/NIGHT/32732509 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 19th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T18:51:25Z"},"road_event_id":"vED886UnMlQ/fY3C0O2W09eyAK8=","beginning_cross_street":"Tuckahoe Road","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T01:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852547,40.954335]]}},{"id":"WfgfG8UCk2RwkV+EeZouJBWIeCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on NY 208 both directions between Salzburg Road (Blooming Grove) and Twin Arch Road (Blooming Grove) D265386/32732609 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Monday May 11th, 2026 12:00 AM thru Tuesday August 11th, 2026 12:00 AM all lanes closed and detoured","update_date":"2026-04-23T11:50:47Z"},"road_event_id":"WfgfG8UCk2RwkV+EeZouJBWIeCo=","beginning_cross_street":"Salzburg Road","ending_cross_street":"Twin Arch Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.184067,41.431177]]}},{"id":"Atz9XKJHS/SP7mjDOS+zeN+9Ktg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 9D southbound between Coris Lane (Cold Spring) and Fair Street (Cold Spring) 2026084697290/30372609 - 24/7 S/B LANE CLOSURE - This work is weather permitting. Plan travel accordingly; delays may exist, Continuous Thursday April 30th, 2026 8:30 AM thru Tuesday September 29th, 2026 7:00 AM alternating traffic","update_date":"2026-04-23T14:50:59Z"},"road_event_id":"Atz9XKJHS/SP7mjDOS+zeN+9Ktg=","beginning_cross_street":"Coris Lane","ending_cross_street":"Fair Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977608,41.443102]]}},{"id":"ORC300541662","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","description":"Utility work on US 20A both directions between Pennimite Rd (Livonia) and Longview Blvd (Livonia) Alternating lane closures with flaggers as needed Not currently Scheduled","update_date":"2026-06-05T19:00:20Z"},"road_event_id":"ORC300541662","beginning_cross_street":"Pennimite Rd","ending_cross_street":"Longview Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:30:42Z","end_date":"2026-06-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-77.686821,42.826285]]}},{"id":"Od6LOu2CVxg66NefWmRQcsCzw/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[],"description":"Utility work on VAN BUREN ST both directions between ALMOND ST (Syracuse) and HENRY ST (Syracuse) ; follow detour, Continuous Thursday April 23rd, 2026 06:00 AM thru Thursday October 15th, 2026 05:00 PM All lanes closed","update_date":"2026-05-21T11:52:43Z"},"road_event_id":"Od6LOu2CVxg66NefWmRQcsCzw/A=","beginning_cross_street":"ALMOND ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142081,43.038465]]}},{"id":"H3mdsnT7tSJMVjMQQXm5migSBNs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ALMOND ST"],"direction":"unknown","related_road_events":[],"description":"Longterm construction on ALMOND ST both directions between E TAYLOR ST (Syracuse) and VAN BUREN ST (Syracuse) ; Alternating one-way traffic with flaggers, Continuous Wednesday April 15th, 2026 06:00 AM thru Thursday October 15th, 2026 05:00 PM All lanes open","update_date":"2026-05-21T11:52:04Z"},"road_event_id":"H3mdsnT7tSJMVjMQQXm5migSBNs=","beginning_cross_street":"E TAYLOR ST","ending_cross_street":"VAN BUREN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142204,43.039399]]}},{"id":"/T5vtLm/+MQY90oBSSnAvnPIE6k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 51"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 51 both directions area of Remington Road (Ilion) Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Elizabethtown Road and Spinnerville Gulf Road, Continuous Monday June 8th, 2026 12:00 AM thru Saturday August 15th, 2026 6:00 PM all lanes closed","update_date":"2026-06-05T21:01:08Z"},"road_event_id":"/T5vtLm/+MQY90oBSSnAvnPIE6k=","beginning_cross_street":"Remington Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.077996,42.985683]]}},{"id":"7mrZQpQ5AOlPMYhnFQ21JmeVugQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 30 both directions over Hatchery Brook (Lake Pleasant) Motorists will encounter lane closures in both directions with temporary signals in place., Continuous Monday April 13th, 2026 7:00 AM thru Friday June 12th, 2026 5:30 PM","update_date":"2026-06-05T12:04:49Z"},"road_event_id":"7mrZQpQ5AOlPMYhnFQ21JmeVugQ=","beginning_cross_street":"Hatchery Brook","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-12T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.386687,43.526934]]}},{"id":"9EYrUt28mKTiyafqVcAYupys9EQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TTejygR5qD8R7j7tHQ3ggfApFkg="}],"description":"Gas main work on NY 32 southbound between S Manor Avenue (Kingston) and St James Court (Kingston) 2026084710447/32731609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-02T20:23:01Z"},"road_event_id":"9EYrUt28mKTiyafqVcAYupys9EQ=","beginning_cross_street":"S Manor Avenue","ending_cross_street":"St James Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003805,41.937816]]}},{"id":"TTejygR5qD8R7j7tHQ3ggfApFkg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EYrUt28mKTiyafqVcAYupys9EQ="},{"type":"next-occurrence","id":"x0xa3Bw/AaVur35LXNrpSUGZrm8="}],"description":"Gas main work on NY 32 southbound between S Manor Avenue (Kingston) and St James Court (Kingston) 2026084710447/32731609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-02T20:23:01Z"},"road_event_id":"TTejygR5qD8R7j7tHQ3ggfApFkg=","beginning_cross_street":"S Manor Avenue","ending_cross_street":"St James Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003805,41.937816]]}},{"id":"x0xa3Bw/AaVur35LXNrpSUGZrm8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EYrUt28mKTiyafqVcAYupys9EQ="},{"type":"next-occurrence","id":"H1naPpcTsa8iG7aGXJpSBLAbzFA="}],"description":"Gas main work on NY 32 southbound between S Manor Avenue (Kingston) and St James Court (Kingston) 2026084710447/32731609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-02T20:23:01Z"},"road_event_id":"x0xa3Bw/AaVur35LXNrpSUGZrm8=","beginning_cross_street":"S Manor Avenue","ending_cross_street":"St James Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003805,41.937816]]}},{"id":"H1naPpcTsa8iG7aGXJpSBLAbzFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EYrUt28mKTiyafqVcAYupys9EQ="},{"type":"next-occurrence","id":"/sWP9rJTt4XDTGt/H3Q+X4ioGbM="}],"description":"Gas main work on NY 32 southbound between S Manor Avenue (Kingston) and St James Court (Kingston) 2026084710447/32731609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-02T20:23:01Z"},"road_event_id":"H1naPpcTsa8iG7aGXJpSBLAbzFA=","beginning_cross_street":"S Manor Avenue","ending_cross_street":"St James Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003805,41.937816]]}},{"id":"/sWP9rJTt4XDTGt/H3Q+X4ioGbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EYrUt28mKTiyafqVcAYupys9EQ="},{"type":"next-occurrence","id":"4Nj4l7289WF5v/NuONZLrqyVmm8="}],"description":"Gas main work on NY 32 southbound between S Manor Avenue (Kingston) and St James Court (Kingston) 2026084710447/32731609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-02T20:23:01Z"},"road_event_id":"/sWP9rJTt4XDTGt/H3Q+X4ioGbM=","beginning_cross_street":"S Manor Avenue","ending_cross_street":"St James Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003805,41.937816]]}},{"id":"4Nj4l7289WF5v/NuONZLrqyVmm8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9EYrUt28mKTiyafqVcAYupys9EQ="}],"description":"Gas main work on NY 32 southbound between S Manor Avenue (Kingston) and St James Court (Kingston) 2026084710447/32731609 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-02T20:23:01Z"},"road_event_id":"4Nj4l7289WF5v/NuONZLrqyVmm8=","beginning_cross_street":"S Manor Avenue","ending_cross_street":"St James Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003805,41.937816]]}},{"id":"iLlrs3RDodptNNygZln8ethbUXs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lzFqVU3vTwtTdeBUnHfmtBSGtwM="}],"description":"Road rehabilitation on Hutchinson River Parkway [Westchester] both directions between Exit 4 - Boston Post Road - US 1 (Pelham) and Exit 13 - Mamaroneck Avenue (White Plains) D265463/NIGHT/32714709 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 12th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T09:00:14Z"},"road_event_id":"iLlrs3RDodptNNygZln8ethbUXs=","beginning_cross_street":"Exit 4 - Boston Post Road - US 1","ending_cross_street":"Exit 13 - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T03:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815902,40.891899]]}},{"id":"lzFqVU3vTwtTdeBUnHfmtBSGtwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iLlrs3RDodptNNygZln8ethbUXs="},{"type":"next-occurrence","id":"xlSv73lf+MqjEuUGubl9wLPUs68="}],"description":"Road rehabilitation on Hutchinson River Parkway [Westchester] both directions between Exit 4 - Boston Post Road - US 1 (Pelham) and Exit 13 - Mamaroneck Avenue (White Plains) D265463/NIGHT/32714709 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 12th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T09:00:14Z"},"road_event_id":"lzFqVU3vTwtTdeBUnHfmtBSGtwM=","beginning_cross_street":"Exit 4 - Boston Post Road - US 1","ending_cross_street":"Exit 13 - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T03:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815902,40.891899]]}},{"id":"xlSv73lf+MqjEuUGubl9wLPUs68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iLlrs3RDodptNNygZln8ethbUXs="},{"type":"next-occurrence","id":"eaAy9iFj1Tnh6ypXSjTv+62QBjg="}],"description":"Road rehabilitation on Hutchinson River Parkway [Westchester] both directions between Exit 4 - Boston Post Road - US 1 (Pelham) and Exit 13 - Mamaroneck Avenue (White Plains) D265463/NIGHT/32714709 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 12th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T09:00:14Z"},"road_event_id":"xlSv73lf+MqjEuUGubl9wLPUs68=","beginning_cross_street":"Exit 4 - Boston Post Road - US 1","ending_cross_street":"Exit 13 - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T03:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815902,40.891899]]}},{"id":"eaAy9iFj1Tnh6ypXSjTv+62QBjg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iLlrs3RDodptNNygZln8ethbUXs="},{"type":"next-occurrence","id":"QkD/o3di1Tuk9p5SRNR0JZyuOFw="}],"description":"Road rehabilitation on Hutchinson River Parkway [Westchester] both directions between Exit 4 - Boston Post Road - US 1 (Pelham) and Exit 13 - Mamaroneck Avenue (White Plains) D265463/NIGHT/32714709 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 12th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T09:00:14Z"},"road_event_id":"eaAy9iFj1Tnh6ypXSjTv+62QBjg=","beginning_cross_street":"Exit 4 - Boston Post Road - US 1","ending_cross_street":"Exit 13 - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T03:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815902,40.891899]]}},{"id":"QkD/o3di1Tuk9p5SRNR0JZyuOFw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iLlrs3RDodptNNygZln8ethbUXs="}],"description":"Road rehabilitation on Hutchinson River Parkway [Westchester] both directions between Exit 4 - Boston Post Road - US 1 (Pelham) and Exit 13 - Mamaroneck Avenue (White Plains) D265463/NIGHT/32714709 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 12th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T09:00:14Z"},"road_event_id":"QkD/o3di1Tuk9p5SRNR0JZyuOFw=","beginning_cross_street":"Exit 4 - Boston Post Road - US 1","ending_cross_street":"Exit 13 - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T03:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815902,40.891899]]}},{"id":"2KoBKGkZPgD4j2rZeXfv5ik2Vok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"eLipA0hs1KPkzFm4C10O0jt6ovY="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-19T19:08:25Z"},"road_event_id":"2KoBKGkZPgD4j2rZeXfv5ik2Vok=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"eLipA0hs1KPkzFm4C10O0jt6ovY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2KoBKGkZPgD4j2rZeXfv5ik2Vok="},{"type":"next-occurrence","id":"d2m1n3VcQtTYl6kVBlxs/WI2A98="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-19T19:08:25Z"},"road_event_id":"eLipA0hs1KPkzFm4C10O0jt6ovY=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"d2m1n3VcQtTYl6kVBlxs/WI2A98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2KoBKGkZPgD4j2rZeXfv5ik2Vok="},{"type":"next-occurrence","id":"PXsWa4NTV0sTs5qX+mzDxLFcBr4="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-19T19:08:25Z"},"road_event_id":"d2m1n3VcQtTYl6kVBlxs/WI2A98=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"PXsWa4NTV0sTs5qX+mzDxLFcBr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2KoBKGkZPgD4j2rZeXfv5ik2Vok="},{"type":"next-occurrence","id":"abni37rEO5+yocCaxY2TxkS3wGk="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-19T19:08:25Z"},"road_event_id":"PXsWa4NTV0sTs5qX+mzDxLFcBr4=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"abni37rEO5+yocCaxY2TxkS3wGk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2KoBKGkZPgD4j2rZeXfv5ik2Vok="},{"type":"next-occurrence","id":"Phd8KPuFkxMtK6EloHMunZ3kU5Q="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-19T19:08:25Z"},"road_event_id":"abni37rEO5+yocCaxY2TxkS3wGk=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"Phd8KPuFkxMtK6EloHMunZ3kU5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2KoBKGkZPgD4j2rZeXfv5ik2Vok="},{"type":"next-occurrence","id":"kp9W330of1bm41bxAcYEbPP8Cs8="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-19T19:08:25Z"},"road_event_id":"Phd8KPuFkxMtK6EloHMunZ3kU5Q=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"kp9W330of1bm41bxAcYEbPP8Cs8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2KoBKGkZPgD4j2rZeXfv5ik2Vok="},{"type":"next-occurrence","id":"ZLGtyfUXeQpCiU1iXsL8Jm+kmHU="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-19T19:08:25Z"},"road_event_id":"kp9W330of1bm41bxAcYEbPP8Cs8=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"ZLGtyfUXeQpCiU1iXsL8Jm+kmHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2KoBKGkZPgD4j2rZeXfv5ik2Vok="},{"type":"next-occurrence","id":"vp+10TCKWRSrh1+HEokCu7XRBXs="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-19T19:08:25Z"},"road_event_id":"ZLGtyfUXeQpCiU1iXsL8Jm+kmHU=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"vp+10TCKWRSrh1+HEokCu7XRBXs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2KoBKGkZPgD4j2rZeXfv5ik2Vok="},{"type":"next-occurrence","id":"Gl1ACYSpsNiXklnAJ/vfGvdVLhc="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-19T19:08:25Z"},"road_event_id":"vp+10TCKWRSrh1+HEokCu7XRBXs=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"Gl1ACYSpsNiXklnAJ/vfGvdVLhc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2KoBKGkZPgD4j2rZeXfv5ik2Vok="},{"type":"next-occurrence","id":"RZ8JXKUR7X7akM2R/60ced+u8Lc="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-19T19:08:25Z"},"road_event_id":"Gl1ACYSpsNiXklnAJ/vfGvdVLhc=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"RZ8JXKUR7X7akM2R/60ced+u8Lc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2KoBKGkZPgD4j2rZeXfv5ik2Vok="},{"type":"next-occurrence","id":"GQEYAkIGsIiOitvzBRdwrHLd73k="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-19T19:08:25Z"},"road_event_id":"RZ8JXKUR7X7akM2R/60ced+u8Lc=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"GQEYAkIGsIiOitvzBRdwrHLd73k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2KoBKGkZPgD4j2rZeXfv5ik2Vok="},{"type":"next-occurrence","id":"vrCL+8JdGQuB6uokgzVoq8UAma4="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-19T19:08:25Z"},"road_event_id":"GQEYAkIGsIiOitvzBRdwrHLd73k=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"vrCL+8JdGQuB6uokgzVoq8UAma4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2KoBKGkZPgD4j2rZeXfv5ik2Vok="},{"type":"next-occurrence","id":"ECBLBS3oRRmNJsM6OxDoIHzlEGk="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-19T19:08:25Z"},"road_event_id":"vrCL+8JdGQuB6uokgzVoq8UAma4=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"ECBLBS3oRRmNJsM6OxDoIHzlEGk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2KoBKGkZPgD4j2rZeXfv5ik2Vok="},{"type":"next-occurrence","id":"S7Eibbx7n9MQTcnn7vxDNtrSq8c="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-19T19:08:25Z"},"road_event_id":"ECBLBS3oRRmNJsM6OxDoIHzlEGk=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"S7Eibbx7n9MQTcnn7vxDNtrSq8c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEDFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2KoBKGkZPgD4j2rZeXfv5ik2Vok="}],"description":"Construction on BEDFORD ST northbound between BARROW ST (New York) and GROVE ST (New York) for use of knuckle boom to hoist wood/steel/building materials., Friday April 24th, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-19T19:08:25Z"},"road_event_id":"S7Eibbx7n9MQTcnn7vxDNtrSq8c=","beginning_cross_street":"BARROW ST","ending_cross_street":"GROVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005131,40.731869]]}},{"id":"WCzIIkquxwW3xpYPDRrhB+YFSL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on US 11 both directions Delancy Avenue (Moira) The bridge on Rte. 11 over Little Salmon River is reduced to one lane alternating traffic under control of a temporary signal, Continuous Friday April 24th, 2026 12:00 AM thru Monday November 30th, 2026 11:59 PM All lanes diverted","update_date":"2026-04-24T18:34:17Z"},"road_event_id":"WCzIIkquxwW3xpYPDRrhB+YFSL8=","beginning_cross_street":"Delancy Avenue","ending_cross_street":"Delancy Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.509729,44.830738]]}},{"id":"xmXtvE/d/JoEG2Ggqqi38H4bem0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5Df2CUEWqiFk6PNxT3zEYpJJhps="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-19T19:12:33Z"},"road_event_id":"xmXtvE/d/JoEG2Ggqqi38H4bem0=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"5Df2CUEWqiFk6PNxT3zEYpJJhps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xmXtvE/d/JoEG2Ggqqi38H4bem0="},{"type":"next-occurrence","id":"GdtB2qCuRFu1moXuP7Jzl8UnALg="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-19T19:12:33Z"},"road_event_id":"5Df2CUEWqiFk6PNxT3zEYpJJhps=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"GdtB2qCuRFu1moXuP7Jzl8UnALg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xmXtvE/d/JoEG2Ggqqi38H4bem0="},{"type":"next-occurrence","id":"DJC31vTROV81xzYzFqq1PwxI1lY="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-19T19:12:33Z"},"road_event_id":"GdtB2qCuRFu1moXuP7Jzl8UnALg=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"DJC31vTROV81xzYzFqq1PwxI1lY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xmXtvE/d/JoEG2Ggqqi38H4bem0="},{"type":"next-occurrence","id":"pPjHOLh+o4Zyo8qDbg25QBT07RM="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-19T19:12:33Z"},"road_event_id":"DJC31vTROV81xzYzFqq1PwxI1lY=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"pPjHOLh+o4Zyo8qDbg25QBT07RM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xmXtvE/d/JoEG2Ggqqi38H4bem0="},{"type":"next-occurrence","id":"JX8iJy0vzgAIGl8dIVXYdiGVz+8="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-19T19:12:33Z"},"road_event_id":"pPjHOLh+o4Zyo8qDbg25QBT07RM=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"JX8iJy0vzgAIGl8dIVXYdiGVz+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xmXtvE/d/JoEG2Ggqqi38H4bem0="},{"type":"next-occurrence","id":"7CTVx1A+qLlrku3eN988zuFwuxA="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-19T19:12:33Z"},"road_event_id":"JX8iJy0vzgAIGl8dIVXYdiGVz+8=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"7CTVx1A+qLlrku3eN988zuFwuxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xmXtvE/d/JoEG2Ggqqi38H4bem0="},{"type":"next-occurrence","id":"RfJJeR2T9gwSReD2D+mjbT12jsU="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-19T19:12:33Z"},"road_event_id":"7CTVx1A+qLlrku3eN988zuFwuxA=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"RfJJeR2T9gwSReD2D+mjbT12jsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xmXtvE/d/JoEG2Ggqqi38H4bem0="},{"type":"next-occurrence","id":"ijoU4TJjNihhN1vd4wLuizwVSV0="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-19T19:12:33Z"},"road_event_id":"RfJJeR2T9gwSReD2D+mjbT12jsU=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"ijoU4TJjNihhN1vd4wLuizwVSV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xmXtvE/d/JoEG2Ggqqi38H4bem0="},{"type":"next-occurrence","id":"rp7UP9DwhIN2/lZnGC76EynoECk="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-19T19:12:33Z"},"road_event_id":"ijoU4TJjNihhN1vd4wLuizwVSV0=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"rp7UP9DwhIN2/lZnGC76EynoECk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xmXtvE/d/JoEG2Ggqqi38H4bem0="},{"type":"next-occurrence","id":"Z+S2zTE3KTTDCw11qxiiy+VOBoA="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-19T19:12:33Z"},"road_event_id":"rp7UP9DwhIN2/lZnGC76EynoECk=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"Z+S2zTE3KTTDCw11qxiiy+VOBoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xmXtvE/d/JoEG2Ggqqi38H4bem0="}],"description":"Construction on INWOOD AVE northbound between W CLARKE PL (New York) and W 170TH ST (New York) for use of concrete pumps, boom trucks and knuckle booms., Friday April 24th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-19T19:12:33Z"},"road_event_id":"Z+S2zTE3KTTDCw11qxiiy+VOBoA=","beginning_cross_street":"W CLARKE PL","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919928,40.838794]]}},{"id":"0WOxGqiZi3Xr4zNrkbIL8lHE4vU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"klpZ2+xqUwYlzLlMBtwAamCVeSI="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"0WOxGqiZi3Xr4zNrkbIL8lHE4vU=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"klpZ2+xqUwYlzLlMBtwAamCVeSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0WOxGqiZi3Xr4zNrkbIL8lHE4vU="},{"type":"next-occurrence","id":"v6ocIV6gJxc+Bdrc+1dYTv6ZDrM="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"klpZ2+xqUwYlzLlMBtwAamCVeSI=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"v6ocIV6gJxc+Bdrc+1dYTv6ZDrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0WOxGqiZi3Xr4zNrkbIL8lHE4vU="},{"type":"next-occurrence","id":"FAr1vTlbnR9/6hu/QGpbTqiabm0="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"v6ocIV6gJxc+Bdrc+1dYTv6ZDrM=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"FAr1vTlbnR9/6hu/QGpbTqiabm0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0WOxGqiZi3Xr4zNrkbIL8lHE4vU="},{"type":"next-occurrence","id":"ECQxhEsfeyStZ8JfieF3rrIbe38="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"FAr1vTlbnR9/6hu/QGpbTqiabm0=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"ECQxhEsfeyStZ8JfieF3rrIbe38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0WOxGqiZi3Xr4zNrkbIL8lHE4vU="},{"type":"next-occurrence","id":"XHREQ7m5PhInsEqgiMG1qe8wOo8="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"ECQxhEsfeyStZ8JfieF3rrIbe38=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"XHREQ7m5PhInsEqgiMG1qe8wOo8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0WOxGqiZi3Xr4zNrkbIL8lHE4vU="},{"type":"next-occurrence","id":"J3ati8yfOTV+H5NrOORkp4cBgbQ="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"XHREQ7m5PhInsEqgiMG1qe8wOo8=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"J3ati8yfOTV+H5NrOORkp4cBgbQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0WOxGqiZi3Xr4zNrkbIL8lHE4vU="},{"type":"next-occurrence","id":"opPxyZdJbYt/vtu/1uTn4fTaFKM="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"J3ati8yfOTV+H5NrOORkp4cBgbQ=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"opPxyZdJbYt/vtu/1uTn4fTaFKM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0WOxGqiZi3Xr4zNrkbIL8lHE4vU="},{"type":"next-occurrence","id":"E0CWskeBLWmt0Rk7nQZNsiW9APQ="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"opPxyZdJbYt/vtu/1uTn4fTaFKM=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"E0CWskeBLWmt0Rk7nQZNsiW9APQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0WOxGqiZi3Xr4zNrkbIL8lHE4vU="},{"type":"next-occurrence","id":"GQivTTM8Z8a2qxEz6BbYhSxCAM4="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"E0CWskeBLWmt0Rk7nQZNsiW9APQ=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"GQivTTM8Z8a2qxEz6BbYhSxCAM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0WOxGqiZi3Xr4zNrkbIL8lHE4vU="},{"type":"next-occurrence","id":"NV5CpsxMcl9mBVAnuGbFU9USr+M="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"GQivTTM8Z8a2qxEz6BbYhSxCAM4=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"NV5CpsxMcl9mBVAnuGbFU9USr+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["19TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0WOxGqiZi3Xr4zNrkbIL8lHE4vU="}],"description":"Crane operations on 19TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York), Friday April 24th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-24T18:57:58Z"},"road_event_id":"NV5CpsxMcl9mBVAnuGbFU9USr+M=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992108,40.662395]]}},{"id":"9d8JzOoOPFUBGVWNSzkhsjttgOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-86 both directions Exit 8 - NY 394 West Lake Road (North Harmony) to Exit 10 9 - I-86 (Ellery), Continuous Friday April 24th, 2026 12:00 AM thru Tuesday November 30th, 2027 11:59 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-24T19:20:50Z"},"road_event_id":"9d8JzOoOPFUBGVWNSzkhsjttgOU=","beginning_cross_street":"Exit 8 - NY 394 West Lake Road","ending_cross_street":"Exit 10 9 - I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.411908,42.15157]]}},{"id":"2GWER0IhaOV1XM7ycpyBuNHC9bA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1c4jNP8mPPp22BBAznRRddwsg9w="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"2GWER0IhaOV1XM7ycpyBuNHC9bA=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"1c4jNP8mPPp22BBAznRRddwsg9w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2GWER0IhaOV1XM7ycpyBuNHC9bA="},{"type":"next-occurrence","id":"8jV+QhxfOn+QBGt+ZvCmNo4Mp60="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"1c4jNP8mPPp22BBAznRRddwsg9w=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"8jV+QhxfOn+QBGt+ZvCmNo4Mp60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2GWER0IhaOV1XM7ycpyBuNHC9bA="},{"type":"next-occurrence","id":"d109673DtKonX9/RwD0Ny8hFPvk="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"8jV+QhxfOn+QBGt+ZvCmNo4Mp60=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"d109673DtKonX9/RwD0Ny8hFPvk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2GWER0IhaOV1XM7ycpyBuNHC9bA="},{"type":"next-occurrence","id":"4kHc4fVIqV8eHGYozxidflzMv18="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"d109673DtKonX9/RwD0Ny8hFPvk=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"4kHc4fVIqV8eHGYozxidflzMv18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2GWER0IhaOV1XM7ycpyBuNHC9bA="},{"type":"next-occurrence","id":"xaAOyoEHuYiHxtvMQ8FFcpQXsvs="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"4kHc4fVIqV8eHGYozxidflzMv18=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"xaAOyoEHuYiHxtvMQ8FFcpQXsvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2GWER0IhaOV1XM7ycpyBuNHC9bA="},{"type":"next-occurrence","id":"jAwOU8EEjkPqFaUvRqp2+8DYKog="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"xaAOyoEHuYiHxtvMQ8FFcpQXsvs=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"jAwOU8EEjkPqFaUvRqp2+8DYKog=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2GWER0IhaOV1XM7ycpyBuNHC9bA="},{"type":"next-occurrence","id":"MuAkDgnHwf+fEo65Zs/fsdJNax8="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"jAwOU8EEjkPqFaUvRqp2+8DYKog=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"MuAkDgnHwf+fEo65Zs/fsdJNax8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2GWER0IhaOV1XM7ycpyBuNHC9bA="},{"type":"next-occurrence","id":"Zcff8FCHv+y0a7MmppAwWkgnqSs="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"MuAkDgnHwf+fEo65Zs/fsdJNax8=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"Zcff8FCHv+y0a7MmppAwWkgnqSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2GWER0IhaOV1XM7ycpyBuNHC9bA="},{"type":"next-occurrence","id":"ps3/m7JkFAQ8mzGkRtQpUjrWuvA="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"Zcff8FCHv+y0a7MmppAwWkgnqSs=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"ps3/m7JkFAQ8mzGkRtQpUjrWuvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2GWER0IhaOV1XM7ycpyBuNHC9bA="},{"type":"next-occurrence","id":"dFqK0EH3jXpTtkQ/O6e611WF+/Q="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"ps3/m7JkFAQ8mzGkRtQpUjrWuvA=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"dFqK0EH3jXpTtkQ/O6e611WF+/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2GWER0IhaOV1XM7ycpyBuNHC9bA="}],"description":"Gas main work on NY 218 northbound between Stonihurts Drive (Highlands) and Regina Road (Highlands) 2025083062852/32734409 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-28T11:07:31Z"},"road_event_id":"dFqK0EH3jXpTtkQ/O6e611WF+/Q=","beginning_cross_street":"Stonihurts Drive","ending_cross_street":"Regina Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968737,41.358587]]}},{"id":"ORC32597209","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","description":"Road rehabilitation on NY 100 both directions between Moseman Avenue (Somers) and Muscoot Lane (Somers) D265424/32597209 - This work is weather permitting, Plan travel accordingly; delays may exist Not currently scheduled","update_date":"2026-06-05T20:00:32Z"},"road_event_id":"ORC32597209","beginning_cross_street":"Moseman Avenue","ending_cross_street":"Muscoot Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-10-08T13:26:22Z","end_date":"2026-06-06T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.740831,41.249997]]}},{"id":"HM77h/meIb1tFuQBuPIV8xpWtpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Mc5pq0NTbVobYJfWabquscrWZIY="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"HM77h/meIb1tFuQBuPIV8xpWtpw=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"Mc5pq0NTbVobYJfWabquscrWZIY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HM77h/meIb1tFuQBuPIV8xpWtpw="},{"type":"next-occurrence","id":"g7l86p1dJlKuEX6f+rDr8LtLBEM="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"Mc5pq0NTbVobYJfWabquscrWZIY=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"g7l86p1dJlKuEX6f+rDr8LtLBEM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HM77h/meIb1tFuQBuPIV8xpWtpw="},{"type":"next-occurrence","id":"bk4YtiVt44m8rw7Hl/1oRi29wfA="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"g7l86p1dJlKuEX6f+rDr8LtLBEM=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"bk4YtiVt44m8rw7Hl/1oRi29wfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HM77h/meIb1tFuQBuPIV8xpWtpw="},{"type":"next-occurrence","id":"/056lezU2wKV+0cRqu8zf1Ed8o4="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"bk4YtiVt44m8rw7Hl/1oRi29wfA=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"/056lezU2wKV+0cRqu8zf1Ed8o4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HM77h/meIb1tFuQBuPIV8xpWtpw="},{"type":"next-occurrence","id":"x4c2DgTNVytmVmml7odyHt2VwsI="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"/056lezU2wKV+0cRqu8zf1Ed8o4=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"x4c2DgTNVytmVmml7odyHt2VwsI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HM77h/meIb1tFuQBuPIV8xpWtpw="},{"type":"next-occurrence","id":"XdVq0vz5Lod3/HgLtq8XzmEi614="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"x4c2DgTNVytmVmml7odyHt2VwsI=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"XdVq0vz5Lod3/HgLtq8XzmEi614=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HM77h/meIb1tFuQBuPIV8xpWtpw="},{"type":"next-occurrence","id":"/xCrdj47PzKkzRwlanM8+KpH/yE="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"XdVq0vz5Lod3/HgLtq8XzmEi614=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"/xCrdj47PzKkzRwlanM8+KpH/yE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HM77h/meIb1tFuQBuPIV8xpWtpw="},{"type":"next-occurrence","id":"j0wEeiUZZRL8FdOzs9I0E+uc5uk="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"/xCrdj47PzKkzRwlanM8+KpH/yE=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"j0wEeiUZZRL8FdOzs9I0E+uc5uk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HM77h/meIb1tFuQBuPIV8xpWtpw="},{"type":"next-occurrence","id":"ZSOhHrkP11oALPtdAghdeE7lyl4="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"j0wEeiUZZRL8FdOzs9I0E+uc5uk=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"ZSOhHrkP11oALPtdAghdeE7lyl4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HM77h/meIb1tFuQBuPIV8xpWtpw="},{"type":"next-occurrence","id":"6n/BPW1PvsMHEO+DgssnsCjEDzo="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"ZSOhHrkP11oALPtdAghdeE7lyl4=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"6n/BPW1PvsMHEO+DgssnsCjEDzo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HM77h/meIb1tFuQBuPIV8xpWtpw="}],"description":"Roadwork on I-86 both directions Exit 20 - NY 417 (Salamanca) to Exit 23 - US 219 (Carrollton), Monday April 27th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-27T20:23:13Z"},"road_event_id":"6n/BPW1PvsMHEO+DgssnsCjEDzo=","beginning_cross_street":"Exit 20 - NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756792,42.152376]]}},{"id":"ILj/95ZA3Uoc6yjutrrjUTXqBqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"a+NargrPYUyDTbbDe0MvCWJ5xHM="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-05-26T19:30:26Z"},"road_event_id":"ILj/95ZA3Uoc6yjutrrjUTXqBqc=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:30:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"a+NargrPYUyDTbbDe0MvCWJ5xHM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ILj/95ZA3Uoc6yjutrrjUTXqBqc="},{"type":"next-occurrence","id":"FrtYlY+P3vQweYNjokLGiJneLlU="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-05-26T19:30:26Z"},"road_event_id":"a+NargrPYUyDTbbDe0MvCWJ5xHM=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"FrtYlY+P3vQweYNjokLGiJneLlU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ILj/95ZA3Uoc6yjutrrjUTXqBqc="},{"type":"next-occurrence","id":"d7kRTBt6i831xm/4iGhgSTT4xbw="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-05-26T19:30:26Z"},"road_event_id":"FrtYlY+P3vQweYNjokLGiJneLlU=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"d7kRTBt6i831xm/4iGhgSTT4xbw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ILj/95ZA3Uoc6yjutrrjUTXqBqc="},{"type":"next-occurrence","id":"NvuGuTnEm4iCGQvzyQ7DZoQ9nWA="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-05-26T19:30:26Z"},"road_event_id":"d7kRTBt6i831xm/4iGhgSTT4xbw=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"NvuGuTnEm4iCGQvzyQ7DZoQ9nWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ILj/95ZA3Uoc6yjutrrjUTXqBqc="},{"type":"next-occurrence","id":"kGEd2uGFQQ2jGZSq+wPq+RX5dCw="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-05-26T19:30:26Z"},"road_event_id":"NvuGuTnEm4iCGQvzyQ7DZoQ9nWA=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"kGEd2uGFQQ2jGZSq+wPq+RX5dCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ILj/95ZA3Uoc6yjutrrjUTXqBqc="},{"type":"next-occurrence","id":"hxg44zMqXvbwtGgb5uLJ63bhXHo="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-05-26T19:30:26Z"},"road_event_id":"kGEd2uGFQQ2jGZSq+wPq+RX5dCw=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"hxg44zMqXvbwtGgb5uLJ63bhXHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ILj/95ZA3Uoc6yjutrrjUTXqBqc="},{"type":"next-occurrence","id":"wbx3PMrTLWUW0PHBPhJaac+SkkY="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-05-26T19:30:26Z"},"road_event_id":"hxg44zMqXvbwtGgb5uLJ63bhXHo=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:30:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"wbx3PMrTLWUW0PHBPhJaac+SkkY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ILj/95ZA3Uoc6yjutrrjUTXqBqc="},{"type":"next-occurrence","id":"x6gXsTUlrAbB7P3Me1cot9cIy3Y="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-05-26T19:30:26Z"},"road_event_id":"wbx3PMrTLWUW0PHBPhJaac+SkkY=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:30:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"x6gXsTUlrAbB7P3Me1cot9cIy3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ILj/95ZA3Uoc6yjutrrjUTXqBqc="},{"type":"next-occurrence","id":"7E8yVnNzrx7BIRvZpxSnK7yyOmk="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-05-26T19:30:26Z"},"road_event_id":"x6gXsTUlrAbB7P3Me1cot9cIy3Y=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:30:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"7E8yVnNzrx7BIRvZpxSnK7yyOmk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ILj/95ZA3Uoc6yjutrrjUTXqBqc="},{"type":"next-occurrence","id":"c4ldva9HvRelCLwe3XY/7MVSfwk="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-05-26T19:30:26Z"},"road_event_id":"7E8yVnNzrx7BIRvZpxSnK7yyOmk=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:30:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"c4ldva9HvRelCLwe3XY/7MVSfwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ILj/95ZA3Uoc6yjutrrjUTXqBqc="}],"description":"Construction on US 1 northbound between Westchester Avenue (Port Chester) and Adee Street (Port Chester) 2025082848040/32735109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure, Tuesday September 8th, 2026, 10:00 AM thru 03:30 PM, shoulder closure, Wednesday September 9th, 2026 thru Monday October 5th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-05-26T19:30:26Z"},"road_event_id":"c4ldva9HvRelCLwe3XY/7MVSfwk=","beginning_cross_street":"Westchester Avenue","ending_cross_street":"Adee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:30:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.663471,41.000559]]}},{"id":"sre38dhmafXbdCVEB/4kFABYMSQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"44p2bv6nxc32y0DrrxlI8ohJZ3M="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday August 3rd, 2026 thru Tuesday August 4th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-06-05T19:30:56Z"},"road_event_id":"sre38dhmafXbdCVEB/4kFABYMSQ=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"44p2bv6nxc32y0DrrxlI8ohJZ3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sre38dhmafXbdCVEB/4kFABYMSQ="},{"type":"next-occurrence","id":"pqz2d1MOV+NbHb0VW/Oga1JC5mY="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday August 3rd, 2026 thru Tuesday August 4th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-06-05T19:30:56Z"},"road_event_id":"44p2bv6nxc32y0DrrxlI8ohJZ3M=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"pqz2d1MOV+NbHb0VW/Oga1JC5mY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sre38dhmafXbdCVEB/4kFABYMSQ="},{"type":"next-occurrence","id":"xK4w/qBAHG4uobZhua2yuFrTf1A="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday August 3rd, 2026 thru Tuesday August 4th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-06-05T19:30:56Z"},"road_event_id":"pqz2d1MOV+NbHb0VW/Oga1JC5mY=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"xK4w/qBAHG4uobZhua2yuFrTf1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sre38dhmafXbdCVEB/4kFABYMSQ="},{"type":"next-occurrence","id":"mN2QlbObHvNGYuyiZjUzy4eA0Pw="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday August 3rd, 2026 thru Tuesday August 4th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-06-05T19:30:56Z"},"road_event_id":"xK4w/qBAHG4uobZhua2yuFrTf1A=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"mN2QlbObHvNGYuyiZjUzy4eA0Pw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sre38dhmafXbdCVEB/4kFABYMSQ="},{"type":"next-occurrence","id":"7azYuPd/nTiGQw/KQIVoxAHJ0mI="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday August 3rd, 2026 thru Tuesday August 4th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-06-05T19:30:56Z"},"road_event_id":"mN2QlbObHvNGYuyiZjUzy4eA0Pw=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"7azYuPd/nTiGQw/KQIVoxAHJ0mI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sre38dhmafXbdCVEB/4kFABYMSQ="},{"type":"next-occurrence","id":"2Pv4DhlUHF23aQWVkueN3lWA4k8="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday August 3rd, 2026 thru Tuesday August 4th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-06-05T19:30:56Z"},"road_event_id":"7azYuPd/nTiGQw/KQIVoxAHJ0mI=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"2Pv4DhlUHF23aQWVkueN3lWA4k8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sre38dhmafXbdCVEB/4kFABYMSQ="},{"type":"next-occurrence","id":"nzpsMfXRIf84RJ8MIMoUtT/4DNU="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday August 3rd, 2026 thru Tuesday August 4th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-06-05T19:30:56Z"},"road_event_id":"2Pv4DhlUHF23aQWVkueN3lWA4k8=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"nzpsMfXRIf84RJ8MIMoUtT/4DNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sre38dhmafXbdCVEB/4kFABYMSQ="},{"type":"next-occurrence","id":"YWZiR7BUUZ0DUIvR6+KkJ1Ay82Q="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday August 3rd, 2026 thru Tuesday August 4th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-06-05T19:30:56Z"},"road_event_id":"nzpsMfXRIf84RJ8MIMoUtT/4DNU=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:30:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"YWZiR7BUUZ0DUIvR6+KkJ1Ay82Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sre38dhmafXbdCVEB/4kFABYMSQ="},{"type":"next-occurrence","id":"et5CbrPNngWNijm/m572siWV1S4="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday August 3rd, 2026 thru Tuesday August 4th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-06-05T19:30:56Z"},"road_event_id":"YWZiR7BUUZ0DUIvR6+KkJ1Ay82Q=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:30:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"et5CbrPNngWNijm/m572siWV1S4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sre38dhmafXbdCVEB/4kFABYMSQ="},{"type":"next-occurrence","id":"Xr5tM7HORzNr76I6O8u0uk1dUhg="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday August 3rd, 2026 thru Tuesday August 4th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-06-05T19:30:56Z"},"road_event_id":"et5CbrPNngWNijm/m572siWV1S4=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:30:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"Xr5tM7HORzNr76I6O8u0uk1dUhg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sre38dhmafXbdCVEB/4kFABYMSQ="},{"type":"next-occurrence","id":"k/H0rvVuTLDWhufB5ZWfvtF36XY="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday August 3rd, 2026 thru Tuesday August 4th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-06-05T19:30:56Z"},"road_event_id":"Xr5tM7HORzNr76I6O8u0uk1dUhg=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:30:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"k/H0rvVuTLDWhufB5ZWfvtF36XY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sre38dhmafXbdCVEB/4kFABYMSQ="}],"description":"Utility work on NY 22 both directions between Wayside Lane (Scarsdale) and Fenimore Road (Scarsdale) 2026084511213/32735209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, right lane closure, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, right lane closure, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday August 3rd, 2026 thru Tuesday August 4th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-06-05T19:30:56Z"},"road_event_id":"k/H0rvVuTLDWhufB5ZWfvtF36XY=","beginning_cross_street":"Wayside Lane","ending_cross_street":"Fenimore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:30:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793756,40.99213]]}},{"id":"g5raBiFoqtUQr/zXJ7ayZ9UqGdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"J/k58LbnBxW4nln5rdxBOBc4cmk="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-06-03T13:02:44Z"},"road_event_id":"g5raBiFoqtUQr/zXJ7ayZ9UqGdA=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"J/k58LbnBxW4nln5rdxBOBc4cmk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g5raBiFoqtUQr/zXJ7ayZ9UqGdA="},{"type":"next-occurrence","id":"3LFMptatG/ZFjJV2IcnA6f92B80="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-06-03T13:02:44Z"},"road_event_id":"J/k58LbnBxW4nln5rdxBOBc4cmk=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"3LFMptatG/ZFjJV2IcnA6f92B80=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g5raBiFoqtUQr/zXJ7ayZ9UqGdA="},{"type":"next-occurrence","id":"w0YzzA4qLUzXC+A7H+0mMwpzO9I="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-06-03T13:02:44Z"},"road_event_id":"3LFMptatG/ZFjJV2IcnA6f92B80=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"w0YzzA4qLUzXC+A7H+0mMwpzO9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g5raBiFoqtUQr/zXJ7ayZ9UqGdA="},{"type":"next-occurrence","id":"7a6mDbCo1I1QzDYZNx+ChRf/2dE="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-06-03T13:02:44Z"},"road_event_id":"w0YzzA4qLUzXC+A7H+0mMwpzO9I=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"7a6mDbCo1I1QzDYZNx+ChRf/2dE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g5raBiFoqtUQr/zXJ7ayZ9UqGdA="},{"type":"next-occurrence","id":"9kbmode6q6OqJYcU0i0BPv5zihI="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-06-03T13:02:44Z"},"road_event_id":"7a6mDbCo1I1QzDYZNx+ChRf/2dE=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"9kbmode6q6OqJYcU0i0BPv5zihI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g5raBiFoqtUQr/zXJ7ayZ9UqGdA="},{"type":"next-occurrence","id":"3yEnyecDOqBJ1NYZLQjHo4hXrTo="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-06-03T13:02:44Z"},"road_event_id":"9kbmode6q6OqJYcU0i0BPv5zihI=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"3yEnyecDOqBJ1NYZLQjHo4hXrTo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g5raBiFoqtUQr/zXJ7ayZ9UqGdA="},{"type":"next-occurrence","id":"6G7K7IUlcnKUW9O9JZlrviNR5bU="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-06-03T13:02:44Z"},"road_event_id":"3yEnyecDOqBJ1NYZLQjHo4hXrTo=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"6G7K7IUlcnKUW9O9JZlrviNR5bU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g5raBiFoqtUQr/zXJ7ayZ9UqGdA="},{"type":"next-occurrence","id":"HJMSg8rvc4zhFtUBMiD+jCBZ1h8="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-06-03T13:02:44Z"},"road_event_id":"6G7K7IUlcnKUW9O9JZlrviNR5bU=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"HJMSg8rvc4zhFtUBMiD+jCBZ1h8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g5raBiFoqtUQr/zXJ7ayZ9UqGdA="},{"type":"next-occurrence","id":"boDHbKR5V+Uqco1AeoAmUkCaCxI="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-06-03T13:02:44Z"},"road_event_id":"HJMSg8rvc4zhFtUBMiD+jCBZ1h8=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"boDHbKR5V+Uqco1AeoAmUkCaCxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g5raBiFoqtUQr/zXJ7ayZ9UqGdA="},{"type":"next-occurrence","id":"VLWUSvRbbURZ7xBlNcO2h3A+KIM="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-06-03T13:02:44Z"},"road_event_id":"boDHbKR5V+Uqco1AeoAmUkCaCxI=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"VLWUSvRbbURZ7xBlNcO2h3A+KIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Waterfront Place/Don Bosco Place"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g5raBiFoqtUQr/zXJ7ayZ9UqGdA="}],"description":"Drainage improvements on NY 982B - Waterfront Place/Don Bosco Place westbound between Beech Street (Port Chester) and Westchester Avenue (Port Chester) 202508114073/32547209 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-06-03T13:02:44Z"},"road_event_id":"VLWUSvRbbURZ7xBlNcO2h3A+KIM=","beginning_cross_street":"Beech Street","ending_cross_street":"Westchester Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664651,40.996553]]}},{"id":"z4HmqDs0zy8kQqoDW+xWboZh0iI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LW1svZJISebbbvPR3nBwDpUeLC4="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"z4HmqDs0zy8kQqoDW+xWboZh0iI=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"LW1svZJISebbbvPR3nBwDpUeLC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z4HmqDs0zy8kQqoDW+xWboZh0iI="},{"type":"next-occurrence","id":"9l846yTTCiLyo0lJPMZ6IG4Z6sc="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"LW1svZJISebbbvPR3nBwDpUeLC4=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"9l846yTTCiLyo0lJPMZ6IG4Z6sc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z4HmqDs0zy8kQqoDW+xWboZh0iI="},{"type":"next-occurrence","id":"Jbgy93tYtEpp1VD0yyFoSe3iGXQ="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"9l846yTTCiLyo0lJPMZ6IG4Z6sc=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"Jbgy93tYtEpp1VD0yyFoSe3iGXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z4HmqDs0zy8kQqoDW+xWboZh0iI="},{"type":"next-occurrence","id":"UcHrKcG4CC+dlRMV/I1h3lsGx64="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"Jbgy93tYtEpp1VD0yyFoSe3iGXQ=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"UcHrKcG4CC+dlRMV/I1h3lsGx64=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z4HmqDs0zy8kQqoDW+xWboZh0iI="},{"type":"next-occurrence","id":"GlQT2jTe0khzX/N6jm70GYZc4mQ="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"UcHrKcG4CC+dlRMV/I1h3lsGx64=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"GlQT2jTe0khzX/N6jm70GYZc4mQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z4HmqDs0zy8kQqoDW+xWboZh0iI="},{"type":"next-occurrence","id":"r1sszOB3BnL4zNn+AJQq4oebdzQ="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"GlQT2jTe0khzX/N6jm70GYZc4mQ=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"r1sszOB3BnL4zNn+AJQq4oebdzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z4HmqDs0zy8kQqoDW+xWboZh0iI="},{"type":"next-occurrence","id":"MtiQKNmeSGB4VFRvx2H59OO1h7g="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"r1sszOB3BnL4zNn+AJQq4oebdzQ=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"MtiQKNmeSGB4VFRvx2H59OO1h7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z4HmqDs0zy8kQqoDW+xWboZh0iI="},{"type":"next-occurrence","id":"0DNI60qBV+YzejMR+3qcdoUNhsA="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"MtiQKNmeSGB4VFRvx2H59OO1h7g=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"0DNI60qBV+YzejMR+3qcdoUNhsA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z4HmqDs0zy8kQqoDW+xWboZh0iI="},{"type":"next-occurrence","id":"F/q+zY3FrHCalsGKjeIsdODaDFI="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"0DNI60qBV+YzejMR+3qcdoUNhsA=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"F/q+zY3FrHCalsGKjeIsdODaDFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z4HmqDs0zy8kQqoDW+xWboZh0iI="},{"type":"next-occurrence","id":"p/eAT5ozIHCNvaMjQydbe9kXrM0="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"F/q+zY3FrHCalsGKjeIsdODaDFI=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"p/eAT5ozIHCNvaMjQydbe9kXrM0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z4HmqDs0zy8kQqoDW+xWboZh0iI="},{"type":"next-occurrence","id":"eXckP61fST8P5f3Y+Y+kb5AYrMM="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"p/eAT5ozIHCNvaMjQydbe9kXrM0=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"eXckP61fST8P5f3Y+Y+kb5AYrMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z4HmqDs0zy8kQqoDW+xWboZh0iI="},{"type":"next-occurrence","id":"sf4/PMJooVeV2xfduuAnFsZzsiM="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"eXckP61fST8P5f3Y+Y+kb5AYrMM=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"sf4/PMJooVeV2xfduuAnFsZzsiM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z4HmqDs0zy8kQqoDW+xWboZh0iI="},{"type":"next-occurrence","id":"XqkHmQd3t+oAzzMSgPUFt6FJ5QI="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"sf4/PMJooVeV2xfduuAnFsZzsiM=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"XqkHmQd3t+oAzzMSgPUFt6FJ5QI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z4HmqDs0zy8kQqoDW+xWboZh0iI="},{"type":"next-occurrence","id":"4t75HIXlmNxVaAUEM5lB8VMyh6U="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"XqkHmQd3t+oAzzMSgPUFt6FJ5QI=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"4t75HIXlmNxVaAUEM5lB8VMyh6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 3RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z4HmqDs0zy8kQqoDW+xWboZh0iI="}],"description":"Construction on N 3RD ST eastbound between WYTHE AVE (New York) and BERRY ST (New York) for boom and knuckle boom to work on major alteration., Friday May 1st, 2026 thru Saturday August 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T19:55:17Z"},"road_event_id":"4t75HIXlmNxVaAUEM5lB8VMyh6U=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"BERRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962778,40.717213]]}},{"id":"ZbU5WbOK3gwI8HjiUgzTpeLY8kc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VMwZQOk027CiQhZtA+A1Qdy+I0U="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"ZbU5WbOK3gwI8HjiUgzTpeLY8kc=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"VMwZQOk027CiQhZtA+A1Qdy+I0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZbU5WbOK3gwI8HjiUgzTpeLY8kc="},{"type":"next-occurrence","id":"sFdQPBmkX4I1c+RS1TmhiF1Uy4E="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"VMwZQOk027CiQhZtA+A1Qdy+I0U=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"sFdQPBmkX4I1c+RS1TmhiF1Uy4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZbU5WbOK3gwI8HjiUgzTpeLY8kc="},{"type":"next-occurrence","id":"ngo9wQfXHrlGBaery5G75hnoRQ0="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"sFdQPBmkX4I1c+RS1TmhiF1Uy4E=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"ngo9wQfXHrlGBaery5G75hnoRQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZbU5WbOK3gwI8HjiUgzTpeLY8kc="},{"type":"next-occurrence","id":"gI7KctqhT5DXsb5dMHa41LA9+qE="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"ngo9wQfXHrlGBaery5G75hnoRQ0=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"gI7KctqhT5DXsb5dMHa41LA9+qE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZbU5WbOK3gwI8HjiUgzTpeLY8kc="},{"type":"next-occurrence","id":"xS5I3/lo/7jOvz1dOiKTmRzNCcw="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"gI7KctqhT5DXsb5dMHa41LA9+qE=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"xS5I3/lo/7jOvz1dOiKTmRzNCcw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZbU5WbOK3gwI8HjiUgzTpeLY8kc="},{"type":"next-occurrence","id":"q+dDT4eohjTGquKJaPuF5Y/21G4="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"xS5I3/lo/7jOvz1dOiKTmRzNCcw=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"q+dDT4eohjTGquKJaPuF5Y/21G4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZbU5WbOK3gwI8HjiUgzTpeLY8kc="},{"type":"next-occurrence","id":"Q0iLz9VEOxajC/vviN3YtTekS7A="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"q+dDT4eohjTGquKJaPuF5Y/21G4=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"Q0iLz9VEOxajC/vviN3YtTekS7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 12TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZbU5WbOK3gwI8HjiUgzTpeLY8kc="}],"description":"Construction on E 12TH ST southbound between ELM AVE (New York) and AVENUE N (New York) for gas main installation, Sunday May 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-29T19:57:42Z"},"road_event_id":"Q0iLz9VEOxajC/vviN3YtTekS7A=","beginning_cross_street":"ELM AVE","ending_cross_street":"AVENUE N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.61681]]}},{"id":"wDGf3iD66rJll9C4QklLw7sulG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 47TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"D6oDEWb6mVkw2uL3E0ZFqFEiE2g="}],"description":"Construction on W 47TH ST westbound between BROADWAY (New York) and 8TH AVE (New York), Wednesday April 29th, 2026 thru Saturday August 29th, 2026, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-29T19:58:52Z"},"road_event_id":"wDGf3iD66rJll9C4QklLw7sulG8=","beginning_cross_street":"BROADWAY","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T03:30:00Z","end_date":"2026-06-08T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985163,40.759439]]}},{"id":"D6oDEWb6mVkw2uL3E0ZFqFEiE2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wDGf3iD66rJll9C4QklLw7sulG8="}],"description":"Construction on W 47TH ST westbound between BROADWAY (New York) and 8TH AVE (New York), Wednesday April 29th, 2026 thru Saturday August 29th, 2026, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-29T19:58:52Z"},"road_event_id":"D6oDEWb6mVkw2uL3E0ZFqFEiE2g=","beginning_cross_street":"BROADWAY","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T03:30:00Z","end_date":"2026-06-15T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985163,40.759439]]}},{"id":"tn17+LxOMIw4uboiMJYdDGeluEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 77TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"czvfAt3TmqG7/hc1/j84buNetdo="}],"description":"Construction and crane operations on E 77TH ST westbound between 2ND AVE (New York) and 3RD AVE (New York), Sunday May 31st,2026 thru Saturday June 13th,2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes closed westbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"tn17+LxOMIw4uboiMJYdDGeluEE=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956067,40.772044]]}},{"id":"czvfAt3TmqG7/hc1/j84buNetdo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 77TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tn17+LxOMIw4uboiMJYdDGeluEE="},{"type":"next-occurrence","id":"tlO2+DKSQzIK5QSffw4rnIEATVo="}],"description":"Construction and crane operations on E 77TH ST westbound between 2ND AVE (New York) and 3RD AVE (New York), Sunday May 31st,2026 thru Saturday June 13th,2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes closed westbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"czvfAt3TmqG7/hc1/j84buNetdo=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956067,40.772044]]}},{"id":"tlO2+DKSQzIK5QSffw4rnIEATVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 77TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tn17+LxOMIw4uboiMJYdDGeluEE="},{"type":"next-occurrence","id":"mldvIhbFp45WmVhg7eiz3cw6Q3k="}],"description":"Construction and crane operations on E 77TH ST westbound between 2ND AVE (New York) and 3RD AVE (New York), Sunday May 31st,2026 thru Saturday June 13th,2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes closed westbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"tlO2+DKSQzIK5QSffw4rnIEATVo=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956067,40.772044]]}},{"id":"mldvIhbFp45WmVhg7eiz3cw6Q3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 77TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tn17+LxOMIw4uboiMJYdDGeluEE="},{"type":"next-occurrence","id":"7HR3kuOECtgf6alRXlYd4/BcqC0="}],"description":"Construction and crane operations on E 77TH ST westbound between 2ND AVE (New York) and 3RD AVE (New York), Sunday May 31st,2026 thru Saturday June 13th,2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes closed westbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"mldvIhbFp45WmVhg7eiz3cw6Q3k=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956067,40.772044]]}},{"id":"7HR3kuOECtgf6alRXlYd4/BcqC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 77TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tn17+LxOMIw4uboiMJYdDGeluEE="},{"type":"next-occurrence","id":"9PNb9bwx5qSewJ4I06SIZ+8BSgE="}],"description":"Construction and crane operations on E 77TH ST westbound between 2ND AVE (New York) and 3RD AVE (New York), Sunday May 31st,2026 thru Saturday June 13th,2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes closed westbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"7HR3kuOECtgf6alRXlYd4/BcqC0=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956067,40.772044]]}},{"id":"9PNb9bwx5qSewJ4I06SIZ+8BSgE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 77TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tn17+LxOMIw4uboiMJYdDGeluEE="},{"type":"next-occurrence","id":"h+5kcbeMVNY4xbVqd4EyH0jgHC4="}],"description":"Construction and crane operations on E 77TH ST westbound between 2ND AVE (New York) and 3RD AVE (New York), Sunday May 31st,2026 thru Saturday June 13th,2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes closed westbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"9PNb9bwx5qSewJ4I06SIZ+8BSgE=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956067,40.772044]]}},{"id":"h+5kcbeMVNY4xbVqd4EyH0jgHC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 77TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tn17+LxOMIw4uboiMJYdDGeluEE="},{"type":"next-occurrence","id":"0eypEgJhCrXLBfGMkMMEzgLUcbg="}],"description":"Construction and crane operations on E 77TH ST westbound between 2ND AVE (New York) and 3RD AVE (New York), Sunday May 31st,2026 thru Saturday June 13th,2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes closed westbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"h+5kcbeMVNY4xbVqd4EyH0jgHC4=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956067,40.772044]]}},{"id":"0eypEgJhCrXLBfGMkMMEzgLUcbg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 77TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tn17+LxOMIw4uboiMJYdDGeluEE="},{"type":"next-occurrence","id":"uQt/1Z5DKCWW//uCBB0Y9uW5jmQ="}],"description":"Construction and crane operations on E 77TH ST westbound between 2ND AVE (New York) and 3RD AVE (New York), Sunday May 31st,2026 thru Saturday June 13th,2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes closed westbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"0eypEgJhCrXLBfGMkMMEzgLUcbg=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956067,40.772044]]}},{"id":"uQt/1Z5DKCWW//uCBB0Y9uW5jmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 77TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tn17+LxOMIw4uboiMJYdDGeluEE="}],"description":"Construction and crane operations on E 77TH ST westbound between 2ND AVE (New York) and 3RD AVE (New York), Sunday May 31st,2026 thru Saturday June 13th,2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes closed westbound,","update_date":"2026-05-31T22:00:02Z"},"road_event_id":"uQt/1Z5DKCWW//uCBB0Y9uW5jmQ=","beginning_cross_street":"2ND AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956067,40.772044]]}},{"id":"lxlMDU70ED7R6ozcWia6xRB7jWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BROADWAY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GZdQ9pYxySfrIsRwuHaWb8rRxZ8="}],"description":"Construction on BROADWAY southbound between W 47TH ST (New York) and W 48TH ST (New York), Wednesday April 29th, 2026 thru Saturday August 29th, 2026, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-29T20:20:20Z"},"road_event_id":"lxlMDU70ED7R6ozcWia6xRB7jWQ=","beginning_cross_street":"W 47TH ST","ending_cross_street":"W 48TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T03:30:00Z","end_date":"2026-06-08T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985057,40.759434]]}},{"id":"GZdQ9pYxySfrIsRwuHaWb8rRxZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BROADWAY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lxlMDU70ED7R6ozcWia6xRB7jWQ="}],"description":"Construction on BROADWAY southbound between W 47TH ST (New York) and W 48TH ST (New York), Wednesday April 29th, 2026 thru Saturday August 29th, 2026, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-29T20:20:20Z"},"road_event_id":"GZdQ9pYxySfrIsRwuHaWb8rRxZ8=","beginning_cross_street":"W 47TH ST","ending_cross_street":"W 48TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T03:30:00Z","end_date":"2026-06-15T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985057,40.759434]]}},{"id":"8TDclzTJbJD8eT4pU8rLJmVcHmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"m7brhNALLVaTySp5Tk+0IiJuQm8="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"8TDclzTJbJD8eT4pU8rLJmVcHmQ=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"m7brhNALLVaTySp5Tk+0IiJuQm8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8TDclzTJbJD8eT4pU8rLJmVcHmQ="},{"type":"next-occurrence","id":"qSnklX73n02Gy6dClyrFY6S+3iM="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"m7brhNALLVaTySp5Tk+0IiJuQm8=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"qSnklX73n02Gy6dClyrFY6S+3iM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8TDclzTJbJD8eT4pU8rLJmVcHmQ="},{"type":"next-occurrence","id":"26iV3zZSuR/7Uu2Xibw9vOt2sjQ="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"qSnklX73n02Gy6dClyrFY6S+3iM=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"26iV3zZSuR/7Uu2Xibw9vOt2sjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8TDclzTJbJD8eT4pU8rLJmVcHmQ="},{"type":"next-occurrence","id":"TT6/jeacQol77prZ/yM3AnNKg1M="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"26iV3zZSuR/7Uu2Xibw9vOt2sjQ=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"TT6/jeacQol77prZ/yM3AnNKg1M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8TDclzTJbJD8eT4pU8rLJmVcHmQ="},{"type":"next-occurrence","id":"4zJSTCQwMOJj+reKHBfsrKXBgrM="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"TT6/jeacQol77prZ/yM3AnNKg1M=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"4zJSTCQwMOJj+reKHBfsrKXBgrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8TDclzTJbJD8eT4pU8rLJmVcHmQ="},{"type":"next-occurrence","id":"pmTfoAnMrJJS3G2pKm+FOxPlTno="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"4zJSTCQwMOJj+reKHBfsrKXBgrM=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"pmTfoAnMrJJS3G2pKm+FOxPlTno=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8TDclzTJbJD8eT4pU8rLJmVcHmQ="},{"type":"next-occurrence","id":"YrhgL0ng3cnD9blrrOkRm/ZVxts="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"pmTfoAnMrJJS3G2pKm+FOxPlTno=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"YrhgL0ng3cnD9blrrOkRm/ZVxts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8TDclzTJbJD8eT4pU8rLJmVcHmQ="},{"type":"next-occurrence","id":"7hYH5fQs5tTqYKzjohEVcJ/7k64="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"YrhgL0ng3cnD9blrrOkRm/ZVxts=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"7hYH5fQs5tTqYKzjohEVcJ/7k64=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8TDclzTJbJD8eT4pU8rLJmVcHmQ="},{"type":"next-occurrence","id":"GeoW8uDnnOShmPW7/JvZJRa91js="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"7hYH5fQs5tTqYKzjohEVcJ/7k64=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"GeoW8uDnnOShmPW7/JvZJRa91js=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8TDclzTJbJD8eT4pU8rLJmVcHmQ="},{"type":"next-occurrence","id":"Y5BDWqKObLzWbnz8pFgC4aX8Chg="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"GeoW8uDnnOShmPW7/JvZJRa91js=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"Y5BDWqKObLzWbnz8pFgC4aX8Chg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8TDclzTJbJD8eT4pU8rLJmVcHmQ="},{"type":"next-occurrence","id":"ZbaEU8glFQp5IEo2Hp+F1qclW18="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"Y5BDWqKObLzWbnz8pFgC4aX8Chg=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"ZbaEU8glFQp5IEo2Hp+F1qclW18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8TDclzTJbJD8eT4pU8rLJmVcHmQ="},{"type":"next-occurrence","id":"F95IzoizXJISRrIQ0YVGelat+WM="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"ZbaEU8glFQp5IEo2Hp+F1qclW18=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"F95IzoizXJISRrIQ0YVGelat+WM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8TDclzTJbJD8eT4pU8rLJmVcHmQ="},{"type":"next-occurrence","id":"q36jKNY5S+fU6b3i0Gkg+WhEeFg="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"F95IzoizXJISRrIQ0YVGelat+WM=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"q36jKNY5S+fU6b3i0Gkg+WhEeFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8TDclzTJbJD8eT4pU8rLJmVcHmQ="},{"type":"next-occurrence","id":"P1wnDSW85D78rfU10B1ibF/6nZ4="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"q36jKNY5S+fU6b3i0Gkg+WhEeFg=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"P1wnDSW85D78rfU10B1ibF/6nZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PACIFIC ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8TDclzTJbJD8eT4pU8rLJmVcHmQ="}],"description":"Construction on PACIFIC ST westbound between FRANKLIN AVE (New York) and CLASSON AVE (New York) for use of concrete pump, boom and knuckle boom to work on new building., Friday May 1st, 2026 thru Monday July 27th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-29T20:36:17Z"},"road_event_id":"P1wnDSW85D78rfU10B1ibF/6nZ4=","beginning_cross_street":"FRANKLIN AVE","ending_cross_street":"CLASSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.955294,40.678359]]}},{"id":"8RnigQlrqrn6St61IL8iAof697c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pUEJJZHiY6O41UsS+knz2KR30Dk="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"8RnigQlrqrn6St61IL8iAof697c=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"pUEJJZHiY6O41UsS+knz2KR30Dk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8RnigQlrqrn6St61IL8iAof697c="},{"type":"next-occurrence","id":"sKTuhFRI2dbAOMPovH7xKOc7JWk="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"pUEJJZHiY6O41UsS+knz2KR30Dk=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"sKTuhFRI2dbAOMPovH7xKOc7JWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8RnigQlrqrn6St61IL8iAof697c="},{"type":"next-occurrence","id":"Px9cvU0yg4SZh1CNNWxi6SfjUBE="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"sKTuhFRI2dbAOMPovH7xKOc7JWk=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"Px9cvU0yg4SZh1CNNWxi6SfjUBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8RnigQlrqrn6St61IL8iAof697c="},{"type":"next-occurrence","id":"rZcqIKKSnDvamAJ2KIGOnSxmbIc="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"Px9cvU0yg4SZh1CNNWxi6SfjUBE=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"rZcqIKKSnDvamAJ2KIGOnSxmbIc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8RnigQlrqrn6St61IL8iAof697c="},{"type":"next-occurrence","id":"kqxbkgxojHws23nQoqL3Lhfsom8="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"rZcqIKKSnDvamAJ2KIGOnSxmbIc=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"kqxbkgxojHws23nQoqL3Lhfsom8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8RnigQlrqrn6St61IL8iAof697c="},{"type":"next-occurrence","id":"hdD6rvY0ONCIZDF1SUO/XGV7cj8="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"kqxbkgxojHws23nQoqL3Lhfsom8=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"hdD6rvY0ONCIZDF1SUO/XGV7cj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8RnigQlrqrn6St61IL8iAof697c="},{"type":"next-occurrence","id":"PlLZxrrK1zKIs7zTrtpI3N6lOE4="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"hdD6rvY0ONCIZDF1SUO/XGV7cj8=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"PlLZxrrK1zKIs7zTrtpI3N6lOE4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8RnigQlrqrn6St61IL8iAof697c="},{"type":"next-occurrence","id":"xyk/wwFL0ydCsgY6h7kjj+c7wck="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"PlLZxrrK1zKIs7zTrtpI3N6lOE4=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"xyk/wwFL0ydCsgY6h7kjj+c7wck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8RnigQlrqrn6St61IL8iAof697c="},{"type":"next-occurrence","id":"ggT9ryuioc7Gx1Jc2Mz6wJBJc8M="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"xyk/wwFL0ydCsgY6h7kjj+c7wck=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"ggT9ryuioc7Gx1Jc2Mz6wJBJc8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8RnigQlrqrn6St61IL8iAof697c="},{"type":"next-occurrence","id":"bWNRlfbpkK+xacUJRe8EyvHk6UQ="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"ggT9ryuioc7Gx1Jc2Mz6wJBJc8M=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"bWNRlfbpkK+xacUJRe8EyvHk6UQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8RnigQlrqrn6St61IL8iAof697c="},{"type":"next-occurrence","id":"rRBIj0625F5F1A6mH9+nfV4Q9SU="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"bWNRlfbpkK+xacUJRe8EyvHk6UQ=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"rRBIj0625F5F1A6mH9+nfV4Q9SU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8RnigQlrqrn6St61IL8iAof697c="},{"type":"next-occurrence","id":"/bx7CyEV13HueurEtKfAXQ+UXyw="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"rRBIj0625F5F1A6mH9+nfV4Q9SU=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"/bx7CyEV13HueurEtKfAXQ+UXyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8RnigQlrqrn6St61IL8iAof697c="},{"type":"next-occurrence","id":"FxFDhOSrdTNstYfo3l72jG4b7OY="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"/bx7CyEV13HueurEtKfAXQ+UXyw=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"FxFDhOSrdTNstYfo3l72jG4b7OY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8RnigQlrqrn6St61IL8iAof697c="},{"type":"next-occurrence","id":"6giWKkCicDcGClKbTNTstkHyFrA="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"FxFDhOSrdTNstYfo3l72jG4b7OY=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"6giWKkCicDcGClKbTNTstkHyFrA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 224"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8RnigQlrqrn6St61IL8iAof697c="}],"description":"Bridge work on NY 224 northbound North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) 1 Lane closure, Friday May 1st, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-30T14:05:54Z"},"road_event_id":"6giWKkCicDcGClKbTNTstkHyFrA=","beginning_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","ending_cross_street":"North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.827223,42.343178]]}},{"id":"ORC300543366","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 40"],"direction":"unknown","description":"Repaving on NY 40 both directions Irish Road (Schaghticoke) to City of Troy; Town of Brunswick Line (Troy) Alternating Lanes Not currently Scheduled","update_date":"2026-05-01T19:30:01Z"},"road_event_id":"ORC300543366","beginning_cross_street":"Irish Road","ending_cross_street":"City of Troy; Town of Brunswick Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T15:04:46Z","end_date":"2026-05-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.634261,42.804627]]}},{"id":"xn8PBlb02fpptgup3XpqKKsr44g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qXI31YjQ5gjPKF2Q9uGkCW28d5Y="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"xn8PBlb02fpptgup3XpqKKsr44g=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"qXI31YjQ5gjPKF2Q9uGkCW28d5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn8PBlb02fpptgup3XpqKKsr44g="},{"type":"next-occurrence","id":"h3p+u19d8X0/YrHLobPMaiNoREo="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"qXI31YjQ5gjPKF2Q9uGkCW28d5Y=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"h3p+u19d8X0/YrHLobPMaiNoREo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn8PBlb02fpptgup3XpqKKsr44g="},{"type":"next-occurrence","id":"bu5v0xlwW0zWjsivLeQjRqjchOU="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"h3p+u19d8X0/YrHLobPMaiNoREo=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"bu5v0xlwW0zWjsivLeQjRqjchOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn8PBlb02fpptgup3XpqKKsr44g="},{"type":"next-occurrence","id":"3liy6k67p0ztRFUJWQjXUgd+WHc="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"bu5v0xlwW0zWjsivLeQjRqjchOU=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"3liy6k67p0ztRFUJWQjXUgd+WHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn8PBlb02fpptgup3XpqKKsr44g="},{"type":"next-occurrence","id":"Ziw0W0Zy25A4MYeAIviCwRgj8rM="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"3liy6k67p0ztRFUJWQjXUgd+WHc=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"Ziw0W0Zy25A4MYeAIviCwRgj8rM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn8PBlb02fpptgup3XpqKKsr44g="},{"type":"next-occurrence","id":"/S6HaN5yEi8IrhmTaB3lx8bKOqs="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"Ziw0W0Zy25A4MYeAIviCwRgj8rM=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"/S6HaN5yEi8IrhmTaB3lx8bKOqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn8PBlb02fpptgup3XpqKKsr44g="},{"type":"next-occurrence","id":"ou3Ie7GsK/VI+s8AiN1fQjjD/Ik="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"/S6HaN5yEi8IrhmTaB3lx8bKOqs=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"ou3Ie7GsK/VI+s8AiN1fQjjD/Ik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn8PBlb02fpptgup3XpqKKsr44g="},{"type":"next-occurrence","id":"7NzpEqy7qajuwKW9cdd2yu4WXqs="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"ou3Ie7GsK/VI+s8AiN1fQjjD/Ik=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"7NzpEqy7qajuwKW9cdd2yu4WXqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn8PBlb02fpptgup3XpqKKsr44g="},{"type":"next-occurrence","id":"RwkRGE0jD8ZNFVds6FplzHOpHls="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"7NzpEqy7qajuwKW9cdd2yu4WXqs=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"RwkRGE0jD8ZNFVds6FplzHOpHls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn8PBlb02fpptgup3XpqKKsr44g="},{"type":"next-occurrence","id":"dgAZV/pPCKh2RK7VZspAFiRDfX4="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"RwkRGE0jD8ZNFVds6FplzHOpHls=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"dgAZV/pPCKh2RK7VZspAFiRDfX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn8PBlb02fpptgup3XpqKKsr44g="},{"type":"next-occurrence","id":"nBTKeBDR2/1v6JEmEqsHFS94OV4="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"dgAZV/pPCKh2RK7VZspAFiRDfX4=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"nBTKeBDR2/1v6JEmEqsHFS94OV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn8PBlb02fpptgup3XpqKKsr44g="},{"type":"next-occurrence","id":"rsaspLdSxm0lH4iWrY0qQS07jho="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"nBTKeBDR2/1v6JEmEqsHFS94OV4=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"rsaspLdSxm0lH4iWrY0qQS07jho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn8PBlb02fpptgup3XpqKKsr44g="},{"type":"next-occurrence","id":"5z0N+Nj4P4+BYzrgW8shNKMG0ko="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"rsaspLdSxm0lH4iWrY0qQS07jho=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"5z0N+Nj4P4+BYzrgW8shNKMG0ko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn8PBlb02fpptgup3XpqKKsr44g="},{"type":"next-occurrence","id":"+XqIzfDgz9eU+8Dxn5ORwv6LfUk="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"5z0N+Nj4P4+BYzrgW8shNKMG0ko=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"+XqIzfDgz9eU+8Dxn5ORwv6LfUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xn8PBlb02fpptgup3XpqKKsr44g="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"+XqIzfDgz9eU+8Dxn5ORwv6LfUk=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"EUSRrpe+G7uWhA9B1vhZm8B6fh0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WK4R/lysSJR3jvjhaq9Xhgd+7W8="}],"description":"Construction on NY 46 both directions between Elmer Hill Road (Rome) and Pennystreet Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place.Beginning May 27th motorists will encounter a 3-color temp signal, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:29:41Z"},"road_event_id":"EUSRrpe+G7uWhA9B1vhZm8B6fh0=","beginning_cross_street":"Elmer Hill Road","ending_cross_street":"Pennystreet Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.437474,43.262245]]}},{"id":"WK4R/lysSJR3jvjhaq9Xhgd+7W8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EUSRrpe+G7uWhA9B1vhZm8B6fh0="},{"type":"next-occurrence","id":"8JdZjxDMD6PgZjC10c4rF3hOpeI="}],"description":"Construction on NY 46 both directions between Elmer Hill Road (Rome) and Pennystreet Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place.Beginning May 27th motorists will encounter a 3-color temp signal, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:29:41Z"},"road_event_id":"WK4R/lysSJR3jvjhaq9Xhgd+7W8=","beginning_cross_street":"Elmer Hill Road","ending_cross_street":"Pennystreet Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.437474,43.262245]]}},{"id":"8JdZjxDMD6PgZjC10c4rF3hOpeI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EUSRrpe+G7uWhA9B1vhZm8B6fh0="},{"type":"next-occurrence","id":"SyQXBmFe2OG4bhFyIUI95F021UY="}],"description":"Construction on NY 46 both directions between Elmer Hill Road (Rome) and Pennystreet Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place.Beginning May 27th motorists will encounter a 3-color temp signal, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:29:41Z"},"road_event_id":"8JdZjxDMD6PgZjC10c4rF3hOpeI=","beginning_cross_street":"Elmer Hill Road","ending_cross_street":"Pennystreet Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.437474,43.262245]]}},{"id":"SyQXBmFe2OG4bhFyIUI95F021UY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EUSRrpe+G7uWhA9B1vhZm8B6fh0="},{"type":"next-occurrence","id":"AnVnoD3U8c53oLkCdgsdxaf69fg="}],"description":"Construction on NY 46 both directions between Elmer Hill Road (Rome) and Pennystreet Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place.Beginning May 27th motorists will encounter a 3-color temp signal, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:29:41Z"},"road_event_id":"SyQXBmFe2OG4bhFyIUI95F021UY=","beginning_cross_street":"Elmer Hill Road","ending_cross_street":"Pennystreet Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.437474,43.262245]]}},{"id":"AnVnoD3U8c53oLkCdgsdxaf69fg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EUSRrpe+G7uWhA9B1vhZm8B6fh0="},{"type":"next-occurrence","id":"4sSBVYHmjodvuDPwNfNiJm/VIKQ="}],"description":"Construction on NY 46 both directions between Elmer Hill Road (Rome) and Pennystreet Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place.Beginning May 27th motorists will encounter a 3-color temp signal, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:29:41Z"},"road_event_id":"AnVnoD3U8c53oLkCdgsdxaf69fg=","beginning_cross_street":"Elmer Hill Road","ending_cross_street":"Pennystreet Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.437474,43.262245]]}},{"id":"4sSBVYHmjodvuDPwNfNiJm/VIKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EUSRrpe+G7uWhA9B1vhZm8B6fh0="}],"description":"Construction on NY 46 both directions between Elmer Hill Road (Rome) and Pennystreet Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place.Beginning May 27th motorists will encounter a 3-color temp signal, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:29:41Z"},"road_event_id":"4sSBVYHmjodvuDPwNfNiJm/VIKQ=","beginning_cross_street":"Elmer Hill Road","ending_cross_street":"Pennystreet Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.437474,43.262245]]}},{"id":"NggecBHmJe3Ar5Bi44/zebDLb14=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5S"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 5S both directions between Currytown Road (Root) and Sprakers Hill Road (Root) Motorists will encounter lane closures in both directions with temp signals in place, Continuous Monday May 11th, 2026 7:00 AM thru Monday June 15th, 2026 4:00 PM","update_date":"2026-05-21T15:54:07Z"},"road_event_id":"NggecBHmJe3Ar5Bi44/zebDLb14=","beginning_cross_street":"Currytown Road","ending_cross_street":"Sprakers Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.470783,42.895207]]}},{"id":"7nwaa8OH2eE70KS6yXJT3MnbkEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hr2ywEb7U2sdWNkMJu2FRwZXNfU="}],"description":"Culvert repairs on NY 46 both directions between Townline Road (Western) and Delta Lake State Park Entrance (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:30 PM,","update_date":"2026-06-05T11:36:27Z"},"road_event_id":"7nwaa8OH2eE70KS6yXJT3MnbkEI=","beginning_cross_street":"Townline Road","ending_cross_street":"Delta Lake State Park Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.418571,43.283511]]}},{"id":"hr2ywEb7U2sdWNkMJu2FRwZXNfU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7nwaa8OH2eE70KS6yXJT3MnbkEI="},{"type":"next-occurrence","id":"qRdpA3gYBPDkNiGBORTxVd4IuzI="}],"description":"Culvert repairs on NY 46 both directions between Townline Road (Western) and Delta Lake State Park Entrance (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:30 PM,","update_date":"2026-06-05T11:36:27Z"},"road_event_id":"hr2ywEb7U2sdWNkMJu2FRwZXNfU=","beginning_cross_street":"Townline Road","ending_cross_street":"Delta Lake State Park Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.418571,43.283511]]}},{"id":"qRdpA3gYBPDkNiGBORTxVd4IuzI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7nwaa8OH2eE70KS6yXJT3MnbkEI="},{"type":"next-occurrence","id":"KQIr6O8mik2yPFKmvbjA95Lrqt0="}],"description":"Culvert repairs on NY 46 both directions between Townline Road (Western) and Delta Lake State Park Entrance (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:30 PM,","update_date":"2026-06-05T11:36:27Z"},"road_event_id":"qRdpA3gYBPDkNiGBORTxVd4IuzI=","beginning_cross_street":"Townline Road","ending_cross_street":"Delta Lake State Park Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.418571,43.283511]]}},{"id":"KQIr6O8mik2yPFKmvbjA95Lrqt0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7nwaa8OH2eE70KS6yXJT3MnbkEI="},{"type":"next-occurrence","id":"phqRVzztxUmwvtL/JdtpJowQXbU="}],"description":"Culvert repairs on NY 46 both directions between Townline Road (Western) and Delta Lake State Park Entrance (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:30 PM,","update_date":"2026-06-05T11:36:27Z"},"road_event_id":"KQIr6O8mik2yPFKmvbjA95Lrqt0=","beginning_cross_street":"Townline Road","ending_cross_street":"Delta Lake State Park Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.418571,43.283511]]}},{"id":"phqRVzztxUmwvtL/JdtpJowQXbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7nwaa8OH2eE70KS6yXJT3MnbkEI="},{"type":"next-occurrence","id":"8ZpmncHeFdhaHtCCV/bhxX4ukkg="}],"description":"Culvert repairs on NY 46 both directions between Townline Road (Western) and Delta Lake State Park Entrance (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:30 PM,","update_date":"2026-06-05T11:36:27Z"},"road_event_id":"phqRVzztxUmwvtL/JdtpJowQXbU=","beginning_cross_street":"Townline Road","ending_cross_street":"Delta Lake State Park Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.418571,43.283511]]}},{"id":"8ZpmncHeFdhaHtCCV/bhxX4ukkg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7nwaa8OH2eE70KS6yXJT3MnbkEI="}],"description":"Culvert repairs on NY 46 both directions between Townline Road (Western) and Delta Lake State Park Entrance (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:30 PM,","update_date":"2026-06-05T11:36:27Z"},"road_event_id":"8ZpmncHeFdhaHtCCV/bhxX4ukkg=","beginning_cross_street":"Townline Road","ending_cross_street":"Delta Lake State Park Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.418571,43.283511]]}},{"id":"ewObWtwXy4ULtkXtM5/upG+nhpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ogxfYdenCB9HsZ4WiElGP4+1cEw="}],"description":"Construction on NY 46 both directions between Potter Road (Rome) and North James Street (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 05:00 PM,","update_date":"2026-06-05T14:10:23Z"},"road_event_id":"ewObWtwXy4ULtkXtM5/upG+nhpw=","beginning_cross_street":"Potter Road","ending_cross_street":"North James Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.438394,43.242289]]}},{"id":"ogxfYdenCB9HsZ4WiElGP4+1cEw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ewObWtwXy4ULtkXtM5/upG+nhpw="},{"type":"next-occurrence","id":"iQnbUkCcDFEkOJocv06dyxb+ALs="}],"description":"Construction on NY 46 both directions between Potter Road (Rome) and North James Street (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 05:00 PM,","update_date":"2026-06-05T14:10:23Z"},"road_event_id":"ogxfYdenCB9HsZ4WiElGP4+1cEw=","beginning_cross_street":"Potter Road","ending_cross_street":"North James Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.438394,43.242289]]}},{"id":"iQnbUkCcDFEkOJocv06dyxb+ALs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ewObWtwXy4ULtkXtM5/upG+nhpw="},{"type":"next-occurrence","id":"tHAhM81gbnqYhMYSQt59ow/OFGM="}],"description":"Construction on NY 46 both directions between Potter Road (Rome) and North James Street (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 05:00 PM,","update_date":"2026-06-05T14:10:23Z"},"road_event_id":"iQnbUkCcDFEkOJocv06dyxb+ALs=","beginning_cross_street":"Potter Road","ending_cross_street":"North James Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.438394,43.242289]]}},{"id":"tHAhM81gbnqYhMYSQt59ow/OFGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ewObWtwXy4ULtkXtM5/upG+nhpw="},{"type":"next-occurrence","id":"l1lHU99eEeh0n6ZlqdH60j8fU2I="}],"description":"Construction on NY 46 both directions between Potter Road (Rome) and North James Street (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 05:00 PM,","update_date":"2026-06-05T14:10:23Z"},"road_event_id":"tHAhM81gbnqYhMYSQt59ow/OFGM=","beginning_cross_street":"Potter Road","ending_cross_street":"North James Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.438394,43.242289]]}},{"id":"l1lHU99eEeh0n6ZlqdH60j8fU2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ewObWtwXy4ULtkXtM5/upG+nhpw="},{"type":"next-occurrence","id":"r2pbwOnGCxVRaBcCZD3nIxMNpPM="}],"description":"Construction on NY 46 both directions between Potter Road (Rome) and North James Street (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 05:00 PM,","update_date":"2026-06-05T14:10:23Z"},"road_event_id":"l1lHU99eEeh0n6ZlqdH60j8fU2I=","beginning_cross_street":"Potter Road","ending_cross_street":"North James Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.438394,43.242289]]}},{"id":"r2pbwOnGCxVRaBcCZD3nIxMNpPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ewObWtwXy4ULtkXtM5/upG+nhpw="}],"description":"Construction on NY 46 both directions between Potter Road (Rome) and North James Street (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 05:00 PM,","update_date":"2026-06-05T14:10:23Z"},"road_event_id":"r2pbwOnGCxVRaBcCZD3nIxMNpPM=","beginning_cross_street":"Potter Road","ending_cross_street":"North James Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.438394,43.242289]]}},{"id":"cgiwKll/CaEjwlfNijGMp56TkZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[],"description":"Bridge painting on NY 30 both directions between Dock Road (Long Lake) and Rice Road (Long Lake) Motorists will encounter lane closures in both directions with temporary signals in place, Continuous Monday May 4th, 2026 7:00 AM thru Friday June 12th, 2026 5:00 PM","update_date":"2026-06-05T12:12:06Z"},"road_event_id":"cgiwKll/CaEjwlfNijGMp56TkZk=","beginning_cross_street":"Dock Road","ending_cross_street":"Rice Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425992,43.974566]]}},{"id":"nXJxv43LKwWI71kKJKx09eTJFmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"P4S9iz+Wv9mZtyFJGIWmxjtFW/Q="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-21T14:22:43Z"},"road_event_id":"nXJxv43LKwWI71kKJKx09eTJFmA=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"P4S9iz+Wv9mZtyFJGIWmxjtFW/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nXJxv43LKwWI71kKJKx09eTJFmA="},{"type":"next-occurrence","id":"qTBWczaUgD6JslySDuHLX4ouEzk="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-21T14:22:43Z"},"road_event_id":"P4S9iz+Wv9mZtyFJGIWmxjtFW/Q=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"qTBWczaUgD6JslySDuHLX4ouEzk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nXJxv43LKwWI71kKJKx09eTJFmA="},{"type":"next-occurrence","id":"bOEtuGLEAW+jn60XPbetV3JKs9s="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-21T14:22:43Z"},"road_event_id":"qTBWczaUgD6JslySDuHLX4ouEzk=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"bOEtuGLEAW+jn60XPbetV3JKs9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nXJxv43LKwWI71kKJKx09eTJFmA="},{"type":"next-occurrence","id":"Ve5aDhNK2VHqN8b42kkxFd0eI4U="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-21T14:22:43Z"},"road_event_id":"bOEtuGLEAW+jn60XPbetV3JKs9s=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"Ve5aDhNK2VHqN8b42kkxFd0eI4U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nXJxv43LKwWI71kKJKx09eTJFmA="},{"type":"next-occurrence","id":"8T+rDeIlRUkCoKJ+OsZIP94qYHk="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-21T14:22:43Z"},"road_event_id":"Ve5aDhNK2VHqN8b42kkxFd0eI4U=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"8T+rDeIlRUkCoKJ+OsZIP94qYHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nXJxv43LKwWI71kKJKx09eTJFmA="},{"type":"next-occurrence","id":"zGk1XNjBnnnLHZYaganl2WEKZbQ="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-21T14:22:43Z"},"road_event_id":"8T+rDeIlRUkCoKJ+OsZIP94qYHk=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"zGk1XNjBnnnLHZYaganl2WEKZbQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nXJxv43LKwWI71kKJKx09eTJFmA="},{"type":"next-occurrence","id":"eV2PpAJi8my0y+sJcm185WgE46I="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-21T14:22:43Z"},"road_event_id":"zGk1XNjBnnnLHZYaganl2WEKZbQ=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"eV2PpAJi8my0y+sJcm185WgE46I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nXJxv43LKwWI71kKJKx09eTJFmA="},{"type":"next-occurrence","id":"YJH4mPEm8bppeLXBxf3Quaurth0="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-21T14:22:43Z"},"road_event_id":"eV2PpAJi8my0y+sJcm185WgE46I=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"YJH4mPEm8bppeLXBxf3Quaurth0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nXJxv43LKwWI71kKJKx09eTJFmA="},{"type":"next-occurrence","id":"Zwq/K7Inamg0J1768cFK6/ZZPe4="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-21T14:22:43Z"},"road_event_id":"YJH4mPEm8bppeLXBxf3Quaurth0=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"Zwq/K7Inamg0J1768cFK6/ZZPe4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nXJxv43LKwWI71kKJKx09eTJFmA="},{"type":"next-occurrence","id":"snwVU87GCR1hWAtfdYjQVhIl9SA="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-21T14:22:43Z"},"road_event_id":"Zwq/K7Inamg0J1768cFK6/ZZPe4=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"snwVU87GCR1hWAtfdYjQVhIl9SA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nXJxv43LKwWI71kKJKx09eTJFmA="},{"type":"next-occurrence","id":"KcnePgGc+QDKktcJH6q8xIWoA/Q="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-21T14:22:43Z"},"road_event_id":"snwVU87GCR1hWAtfdYjQVhIl9SA=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"KcnePgGc+QDKktcJH6q8xIWoA/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nXJxv43LKwWI71kKJKx09eTJFmA="},{"type":"next-occurrence","id":"alTo/k00li9Ub6R/4ow7Q5DAhkw="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-21T14:22:43Z"},"road_event_id":"KcnePgGc+QDKktcJH6q8xIWoA/Q=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"alTo/k00li9Ub6R/4ow7Q5DAhkw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nXJxv43LKwWI71kKJKx09eTJFmA="},{"type":"next-occurrence","id":"mF1UDcp6aexMT+iocMxmW2yZTb4="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-21T14:22:43Z"},"road_event_id":"alTo/k00li9Ub6R/4ow7Q5DAhkw=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"mF1UDcp6aexMT+iocMxmW2yZTb4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nXJxv43LKwWI71kKJKx09eTJFmA="},{"type":"next-occurrence","id":"/pdKmy1tNJoSL6gSJKhk7aXm02M="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-21T14:22:43Z"},"road_event_id":"mF1UDcp6aexMT+iocMxmW2yZTb4=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"/pdKmy1tNJoSL6gSJKhk7aXm02M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nXJxv43LKwWI71kKJKx09eTJFmA="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 2 lane reduced to 1 with flaggers, Monday May 4th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-05-21T14:22:43Z"},"road_event_id":"/pdKmy1tNJoSL6gSJKhk7aXm02M=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.328852,42.654633]]}},{"id":"cWzbcrQ6LOquIUAlEvFYsBadIJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["150TH ST"],"direction":"unknown","related_road_events":[],"description":"Construction on 150TH ST southbound from 133RD AVE (New York) to 148TH ST at 150TH AVE (New York) Subject to change without notice., Friday June 5th,2026 thru Saturday June 6th,2026, Friday, 10:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed southbound,","update_date":"2026-05-30T10:00:19Z"},"road_event_id":"cWzbcrQ6LOquIUAlEvFYsBadIJY=","beginning_cross_street":"133RD AVE","ending_cross_street":"150TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789192,40.668262]]}},{"id":"PhNfnlEvUuDvcNkHYUdBtXbl/do=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Southbound near South of US 206/NJ 28 (Raritan Boro), Continuous Friday May 15, 2026 07:00 AM thru Saturday February 27, 2027 07:00 PM,","update_date":"2026-05-03T11:45:52Z"},"road_event_id":"PhNfnlEvUuDvcNkHYUdBtXbl/do=","beginning_cross_street":"South of US 206/NJ 28","ending_cross_street":"North of Ortho Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.635749,40.574195]]}},{"id":"ORC300544467","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JFK Expressway"],"direction":"unknown","description":"Scheduled roadwork on JFK Expressway southbound ramp to Terminals 5 & 7 (New York) Terminal 5 and Terminal 7 will be redirected to the Van Wyck Expressway.. Not currently Scheduled","update_date":"2026-05-19T07:00:05Z"},"road_event_id":"ORC300544467","beginning_cross_street":"Terminals 5 & 7","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T12:12:49Z","end_date":"2026-05-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.785709,40.649232]]}},{"id":"WteKL3TKojueoKvI5Vd5rxqHtxs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28N"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs on NY 28N both directions between OWENS RD (Chester) and COBBLE CREEK RD (Chester) **Lane width restriction of 11 ft** - alternating traffic controlled by signal, Continuous Wednesday May 6th, 2026 12:00 AM thru Friday July 31st, 2026 11:59 PM All lanes open","update_date":"2026-05-19T15:51:36Z"},"road_event_id":"WteKL3TKojueoKvI5Vd5rxqHtxs=","beginning_cross_street":"OWENS RD","ending_cross_street":"COBBLE CREEK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968034,43.728092]]}},{"id":"MlVOwpxhsYJQX0JDuE7FpaWH/A8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"R1+QJ+5S0n0f5P6f5USZ4258Tls="}],"description":"Utility work on NY 370 both directions between Hayes Road (Lysander) and Colington Pointe Way (Lysander) ; Alternating one-way traffic with flaggers, Tuesday May 26th,2026 thru Monday June 15th,2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes of 1 lane open westbound, eastbound","update_date":"2026-05-21T19:00:50Z"},"road_event_id":"MlVOwpxhsYJQX0JDuE7FpaWH/A8=","beginning_cross_street":"Hayes Road ","ending_cross_street":"Colington Pointe Way ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T12:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.254531,43.131502]]}},{"id":"R1+QJ+5S0n0f5P6f5USZ4258Tls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MlVOwpxhsYJQX0JDuE7FpaWH/A8="},{"type":"next-occurrence","id":"rGfrpOI2P1vsiWs9NNeCrb7K95A="}],"description":"Utility work on NY 370 both directions between Hayes Road (Lysander) and Colington Pointe Way (Lysander) ; Alternating one-way traffic with flaggers, Tuesday May 26th,2026 thru Monday June 15th,2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes of 1 lane open westbound, eastbound","update_date":"2026-05-21T19:00:50Z"},"road_event_id":"R1+QJ+5S0n0f5P6f5USZ4258Tls=","beginning_cross_street":"Hayes Road ","ending_cross_street":"Colington Pointe Way ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.254531,43.131502]]}},{"id":"rGfrpOI2P1vsiWs9NNeCrb7K95A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MlVOwpxhsYJQX0JDuE7FpaWH/A8="},{"type":"next-occurrence","id":"p0plBeQLxnyaUe5RVZTYdti4zJI="}],"description":"Utility work on NY 370 both directions between Hayes Road (Lysander) and Colington Pointe Way (Lysander) ; Alternating one-way traffic with flaggers, Tuesday May 26th,2026 thru Monday June 15th,2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes of 1 lane open westbound, eastbound","update_date":"2026-05-21T19:00:50Z"},"road_event_id":"rGfrpOI2P1vsiWs9NNeCrb7K95A=","beginning_cross_street":"Hayes Road ","ending_cross_street":"Colington Pointe Way ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.254531,43.131502]]}},{"id":"p0plBeQLxnyaUe5RVZTYdti4zJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MlVOwpxhsYJQX0JDuE7FpaWH/A8="},{"type":"next-occurrence","id":"l4hvvotAlTZEgSg0IX5GfoxW3VA="}],"description":"Utility work on NY 370 both directions between Hayes Road (Lysander) and Colington Pointe Way (Lysander) ; Alternating one-way traffic with flaggers, Tuesday May 26th,2026 thru Monday June 15th,2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes of 1 lane open westbound, eastbound","update_date":"2026-05-21T19:00:50Z"},"road_event_id":"p0plBeQLxnyaUe5RVZTYdti4zJI=","beginning_cross_street":"Hayes Road ","ending_cross_street":"Colington Pointe Way ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.254531,43.131502]]}},{"id":"l4hvvotAlTZEgSg0IX5GfoxW3VA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MlVOwpxhsYJQX0JDuE7FpaWH/A8="},{"type":"next-occurrence","id":"lwStnojLpXA7qsFUWm9HR2J91DA="}],"description":"Utility work on NY 370 both directions between Hayes Road (Lysander) and Colington Pointe Way (Lysander) ; Alternating one-way traffic with flaggers, Tuesday May 26th,2026 thru Monday June 15th,2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes of 1 lane open westbound, eastbound","update_date":"2026-05-21T19:00:50Z"},"road_event_id":"l4hvvotAlTZEgSg0IX5GfoxW3VA=","beginning_cross_street":"Hayes Road ","ending_cross_street":"Colington Pointe Way ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.254531,43.131502]]}},{"id":"lwStnojLpXA7qsFUWm9HR2J91DA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MlVOwpxhsYJQX0JDuE7FpaWH/A8="},{"type":"next-occurrence","id":"O0p4qWSYObpAPA8sKnqckz9O0Do="}],"description":"Utility work on NY 370 both directions between Hayes Road (Lysander) and Colington Pointe Way (Lysander) ; Alternating one-way traffic with flaggers, Tuesday May 26th,2026 thru Monday June 15th,2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes of 1 lane open westbound, eastbound","update_date":"2026-05-21T19:00:50Z"},"road_event_id":"lwStnojLpXA7qsFUWm9HR2J91DA=","beginning_cross_street":"Hayes Road ","ending_cross_street":"Colington Pointe Way ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.254531,43.131502]]}},{"id":"O0p4qWSYObpAPA8sKnqckz9O0Do=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MlVOwpxhsYJQX0JDuE7FpaWH/A8="}],"description":"Utility work on NY 370 both directions between Hayes Road (Lysander) and Colington Pointe Way (Lysander) ; Alternating one-way traffic with flaggers, Tuesday May 26th,2026 thru Monday June 15th,2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes of 1 lane open westbound, eastbound","update_date":"2026-05-21T19:00:50Z"},"road_event_id":"O0p4qWSYObpAPA8sKnqckz9O0Do=","beginning_cross_street":"Hayes Road ","ending_cross_street":"Colington Pointe Way ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T12:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.254531,43.131502]]}},{"id":"dVXUQZvXVPwS1ZIA0tVowDYENUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2PJcozazcY97KXPLwivHMDSv2XA="}],"description":"Road rehabilitation on NY 22 both directions between Maple Street (Hillsdale) and Shepard Hill Circulo (Hillsdale) D265717/32739009 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 15th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-18T19:21:16Z"},"road_event_id":"dVXUQZvXVPwS1ZIA0tVowDYENUE=","beginning_cross_street":"Maple Street","ending_cross_street":"Shepard Hill Circulo","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.521315,42.180219]]}},{"id":"2PJcozazcY97KXPLwivHMDSv2XA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dVXUQZvXVPwS1ZIA0tVowDYENUE="},{"type":"next-occurrence","id":"ehM6QRXsgqxYan046Ie/WsdUS9w="}],"description":"Road rehabilitation on NY 22 both directions between Maple Street (Hillsdale) and Shepard Hill Circulo (Hillsdale) D265717/32739009 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 15th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-18T19:21:16Z"},"road_event_id":"2PJcozazcY97KXPLwivHMDSv2XA=","beginning_cross_street":"Maple Street","ending_cross_street":"Shepard Hill Circulo","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.521315,42.180219]]}},{"id":"ehM6QRXsgqxYan046Ie/WsdUS9w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dVXUQZvXVPwS1ZIA0tVowDYENUE="},{"type":"next-occurrence","id":"ZbrKrYkwD5hKO/HQQhfytEFsvJI="}],"description":"Road rehabilitation on NY 22 both directions between Maple Street (Hillsdale) and Shepard Hill Circulo (Hillsdale) D265717/32739009 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 15th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-18T19:21:16Z"},"road_event_id":"ehM6QRXsgqxYan046Ie/WsdUS9w=","beginning_cross_street":"Maple Street","ending_cross_street":"Shepard Hill Circulo","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.521315,42.180219]]}},{"id":"ZbrKrYkwD5hKO/HQQhfytEFsvJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dVXUQZvXVPwS1ZIA0tVowDYENUE="},{"type":"next-occurrence","id":"iIzvmMWccsP/pDWkHKdtp3mBz1E="}],"description":"Road rehabilitation on NY 22 both directions between Maple Street (Hillsdale) and Shepard Hill Circulo (Hillsdale) D265717/32739009 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 15th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-18T19:21:16Z"},"road_event_id":"ZbrKrYkwD5hKO/HQQhfytEFsvJI=","beginning_cross_street":"Maple Street","ending_cross_street":"Shepard Hill Circulo","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.521315,42.180219]]}},{"id":"iIzvmMWccsP/pDWkHKdtp3mBz1E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dVXUQZvXVPwS1ZIA0tVowDYENUE="}],"description":"Road rehabilitation on NY 22 both directions between Maple Street (Hillsdale) and Shepard Hill Circulo (Hillsdale) D265717/32739009 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 15th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-18T19:21:16Z"},"road_event_id":"iIzvmMWccsP/pDWkHKdtp3mBz1E=","beginning_cross_street":"Maple Street","ending_cross_street":"Shepard Hill Circulo","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.521315,42.180219]]}},{"id":"AkPRsjy9EkQKJcJIQhbSAdQL1aU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JFO5sXh5GcP5+ExEs4cT9rFpwUU="}],"description":"Road rehabilitation on NY 22 both directions between US 20 (New Lebanon) and Columbia-Rensselaer County Line (New Lebanon) D265717/32739109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 15th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-18T19:21:48Z"},"road_event_id":"AkPRsjy9EkQKJcJIQhbSAdQL1aU=","beginning_cross_street":"US 20","ending_cross_street":"Columbia-Rensselaer County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.38527,42.4719]]}},{"id":"JFO5sXh5GcP5+ExEs4cT9rFpwUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AkPRsjy9EkQKJcJIQhbSAdQL1aU="},{"type":"next-occurrence","id":"vuKLAZ4dbfPlBmTwNRbNtVQpLlI="}],"description":"Road rehabilitation on NY 22 both directions between US 20 (New Lebanon) and Columbia-Rensselaer County Line (New Lebanon) D265717/32739109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 15th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-18T19:21:48Z"},"road_event_id":"JFO5sXh5GcP5+ExEs4cT9rFpwUU=","beginning_cross_street":"US 20","ending_cross_street":"Columbia-Rensselaer County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.38527,42.4719]]}},{"id":"vuKLAZ4dbfPlBmTwNRbNtVQpLlI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AkPRsjy9EkQKJcJIQhbSAdQL1aU="},{"type":"next-occurrence","id":"hBQmrfBD686XbD4Fex/Cix1yotk="}],"description":"Road rehabilitation on NY 22 both directions between US 20 (New Lebanon) and Columbia-Rensselaer County Line (New Lebanon) D265717/32739109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 15th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-18T19:21:48Z"},"road_event_id":"vuKLAZ4dbfPlBmTwNRbNtVQpLlI=","beginning_cross_street":"US 20","ending_cross_street":"Columbia-Rensselaer County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.38527,42.4719]]}},{"id":"hBQmrfBD686XbD4Fex/Cix1yotk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AkPRsjy9EkQKJcJIQhbSAdQL1aU="},{"type":"next-occurrence","id":"DxzFsW9LLmDnqn+lzT0egWa1zu0="}],"description":"Road rehabilitation on NY 22 both directions between US 20 (New Lebanon) and Columbia-Rensselaer County Line (New Lebanon) D265717/32739109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 15th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-18T19:21:48Z"},"road_event_id":"hBQmrfBD686XbD4Fex/Cix1yotk=","beginning_cross_street":"US 20","ending_cross_street":"Columbia-Rensselaer County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.38527,42.4719]]}},{"id":"DxzFsW9LLmDnqn+lzT0egWa1zu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AkPRsjy9EkQKJcJIQhbSAdQL1aU="}],"description":"Road rehabilitation on NY 22 both directions between US 20 (New Lebanon) and Columbia-Rensselaer County Line (New Lebanon) D265717/32739109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 15th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday August 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-18T19:21:48Z"},"road_event_id":"DxzFsW9LLmDnqn+lzT0egWa1zu0=","beginning_cross_street":"US 20","ending_cross_street":"Columbia-Rensselaer County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.38527,42.4719]]}},{"id":"jK9nSwwfA/d0fowCgev0Au/Vm80=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+SGMmwLLYcWixZ7K8kIDv264yso="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 09:30 AM thru 02:00 PM, alternating traf","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"jK9nSwwfA/d0fowCgev0Au/Vm80=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"+SGMmwLLYcWixZ7K8kIDv264yso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jK9nSwwfA/d0fowCgev0Au/Vm80="},{"type":"next-occurrence","id":"4sPxrkGUik8ediSzUDO5rAy+8wE="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 09:30 AM thru 02:00 PM, alternating traf","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"+SGMmwLLYcWixZ7K8kIDv264yso=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"4sPxrkGUik8ediSzUDO5rAy+8wE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jK9nSwwfA/d0fowCgev0Au/Vm80="},{"type":"next-occurrence","id":"o/7Zhhq2iLhfAvB17VUJzFk8oN4="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 09:30 AM thru 02:00 PM, alternating traf","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"4sPxrkGUik8ediSzUDO5rAy+8wE=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"o/7Zhhq2iLhfAvB17VUJzFk8oN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jK9nSwwfA/d0fowCgev0Au/Vm80="},{"type":"next-occurrence","id":"Znx7xQmw4RPz+OoxbfS9zLE/rKw="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 09:30 AM thru 02:00 PM, alternating traf","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"o/7Zhhq2iLhfAvB17VUJzFk8oN4=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"Znx7xQmw4RPz+OoxbfS9zLE/rKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jK9nSwwfA/d0fowCgev0Au/Vm80="},{"type":"next-occurrence","id":"NarGyFhAF1DQiujATfOByzmNzk0="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 09:30 AM thru 02:00 PM, alternating traf","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"Znx7xQmw4RPz+OoxbfS9zLE/rKw=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"NarGyFhAF1DQiujATfOByzmNzk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jK9nSwwfA/d0fowCgev0Au/Vm80="},{"type":"next-occurrence","id":"K9LnLL+UsrhyUT92yqTyXtNK+T4="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 09:30 AM thru 02:00 PM, alternating traf","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"NarGyFhAF1DQiujATfOByzmNzk0=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"K9LnLL+UsrhyUT92yqTyXtNK+T4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jK9nSwwfA/d0fowCgev0Au/Vm80="},{"type":"next-occurrence","id":"wB8VqQ7tB2zlGoLFl/OWOZmbS4k="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 09:30 AM thru 02:00 PM, alternating traf","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"K9LnLL+UsrhyUT92yqTyXtNK+T4=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"wB8VqQ7tB2zlGoLFl/OWOZmbS4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jK9nSwwfA/d0fowCgev0Au/Vm80="},{"type":"next-occurrence","id":"DKuIsA9r+DyQ8a1O7O7lnQxl/po="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 09:30 AM thru 02:00 PM, alternating traf","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"wB8VqQ7tB2zlGoLFl/OWOZmbS4k=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:30:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"DKuIsA9r+DyQ8a1O7O7lnQxl/po=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jK9nSwwfA/d0fowCgev0Au/Vm80="},{"type":"next-occurrence","id":"y1Ef1Uq66A6wzV3rqYF1RogvaoE="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 09:30 AM thru 02:00 PM, alternating traf","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"DKuIsA9r+DyQ8a1O7O7lnQxl/po=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:30:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"y1Ef1Uq66A6wzV3rqYF1RogvaoE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jK9nSwwfA/d0fowCgev0Au/Vm80="},{"type":"next-occurrence","id":"KEb3Z8e9+pa8X8MHVkW0uiebEwM="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 09:30 AM thru 02:00 PM, alternating traf","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"y1Ef1Uq66A6wzV3rqYF1RogvaoE=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:30:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"KEb3Z8e9+pa8X8MHVkW0uiebEwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jK9nSwwfA/d0fowCgev0Au/Vm80="},{"type":"next-occurrence","id":"qXrHwfLL0MGaXDRwHwRX3AbuD0I="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 09:30 AM thru 02:00 PM, alternating traf","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"KEb3Z8e9+pa8X8MHVkW0uiebEwM=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:30:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"qXrHwfLL0MGaXDRwHwRX3AbuD0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jK9nSwwfA/d0fowCgev0Au/Vm80="}],"description":"Gas main repairs on NY 22 southbound between Hobart Street (Eastchester) and Concordia Place (Eastchester) 2026082178225/32740109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 09:30 AM thru 02:00 PM, alternating traf","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"qXrHwfLL0MGaXDRwHwRX3AbuD0I=","beginning_cross_street":"Hobart Street","ending_cross_street":"Concordia Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:30:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820837,40.944143]]}},{"id":"HmK8OeBIDLCEGBY8gosDoxv6CLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sPU1osDJUJzvO2uXAyXuCXNrGIQ="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternati","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"HmK8OeBIDLCEGBY8gosDoxv6CLI=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"sPU1osDJUJzvO2uXAyXuCXNrGIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HmK8OeBIDLCEGBY8gosDoxv6CLI="},{"type":"next-occurrence","id":"txwoVcG7PgYro96KirWkrFYIy8c="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternati","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"sPU1osDJUJzvO2uXAyXuCXNrGIQ=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"txwoVcG7PgYro96KirWkrFYIy8c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HmK8OeBIDLCEGBY8gosDoxv6CLI="},{"type":"next-occurrence","id":"gxWJUfpujzpVMprGc6FC1pOotTM="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternati","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"txwoVcG7PgYro96KirWkrFYIy8c=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"gxWJUfpujzpVMprGc6FC1pOotTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HmK8OeBIDLCEGBY8gosDoxv6CLI="},{"type":"next-occurrence","id":"MCc3VrVo7+ypaE6Qwhyto8GY/Is="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternati","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"gxWJUfpujzpVMprGc6FC1pOotTM=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"MCc3VrVo7+ypaE6Qwhyto8GY/Is=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HmK8OeBIDLCEGBY8gosDoxv6CLI="},{"type":"next-occurrence","id":"HCc3f9tIqsmryjdPgTTabJ6vfDM="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternati","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"MCc3VrVo7+ypaE6Qwhyto8GY/Is=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"HCc3f9tIqsmryjdPgTTabJ6vfDM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HmK8OeBIDLCEGBY8gosDoxv6CLI="},{"type":"next-occurrence","id":"7Mb/s1AYaNZkZPliQZ7JAXjRZug="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternati","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"HCc3f9tIqsmryjdPgTTabJ6vfDM=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"7Mb/s1AYaNZkZPliQZ7JAXjRZug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HmK8OeBIDLCEGBY8gosDoxv6CLI="},{"type":"next-occurrence","id":"/6wafByUo7LW0l4SqlDp7iFmEAU="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternati","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"7Mb/s1AYaNZkZPliQZ7JAXjRZug=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"/6wafByUo7LW0l4SqlDp7iFmEAU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HmK8OeBIDLCEGBY8gosDoxv6CLI="},{"type":"next-occurrence","id":"HSLpYA1293JIr3C1LpdZYYPXxC0="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternati","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"/6wafByUo7LW0l4SqlDp7iFmEAU=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:30:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"HSLpYA1293JIr3C1LpdZYYPXxC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HmK8OeBIDLCEGBY8gosDoxv6CLI="},{"type":"next-occurrence","id":"bZVEpn/nI8aHKeiHrXdqXi+amik="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternati","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"HSLpYA1293JIr3C1LpdZYYPXxC0=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:30:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"bZVEpn/nI8aHKeiHrXdqXi+amik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HmK8OeBIDLCEGBY8gosDoxv6CLI="},{"type":"next-occurrence","id":"Z/oQ14yEuw2sQfiIa75Ru4I+S2s="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternati","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"bZVEpn/nI8aHKeiHrXdqXi+amik=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:30:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"Z/oQ14yEuw2sQfiIa75Ru4I+S2s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HmK8OeBIDLCEGBY8gosDoxv6CLI="},{"type":"next-occurrence","id":"kDQneaToA1cmMdY1r4/R3KyOzY8="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternati","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"Z/oQ14yEuw2sQfiIa75Ru4I+S2s=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:30:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"kDQneaToA1cmMdY1r4/R3KyOzY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HmK8OeBIDLCEGBY8gosDoxv6CLI="}],"description":"Gas main repairs on NY 100 northbound between Lakeview Avenue (Mount Pleasant) and Hospital Road (Mount Pleasant) 2026084775484/32740209 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternati","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"kDQneaToA1cmMdY1r4/R3KyOzY8=","beginning_cross_street":"Lakeview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:30:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796456,41.080121]]}},{"id":"AZ9D35N0UzphVxLwlT0i5kww1tI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rQLCMY/5/fTqYogwiYiyzWDckIc="}],"description":"Crane operations on E 47TH ST westbound between 3RD AVE (New York) and LEXINGTON AVE (New York), Saturday May 9th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:02:20Z"},"road_event_id":"AZ9D35N0UzphVxLwlT0i5kww1tI=","beginning_cross_street":"3RD AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.972189,40.75396]]}},{"id":"rQLCMY/5/fTqYogwiYiyzWDckIc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AZ9D35N0UzphVxLwlT0i5kww1tI="},{"type":"next-occurrence","id":"LCvpPHBJVzPWiYOyaytF9qF4Tr8="}],"description":"Crane operations on E 47TH ST westbound between 3RD AVE (New York) and LEXINGTON AVE (New York), Saturday May 9th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:02:20Z"},"road_event_id":"rQLCMY/5/fTqYogwiYiyzWDckIc=","beginning_cross_street":"3RD AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.972189,40.75396]]}},{"id":"LCvpPHBJVzPWiYOyaytF9qF4Tr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AZ9D35N0UzphVxLwlT0i5kww1tI="},{"type":"next-occurrence","id":"AmzGbfAeV6RPfgnVpIfPWNzrk+I="}],"description":"Crane operations on E 47TH ST westbound between 3RD AVE (New York) and LEXINGTON AVE (New York), Saturday May 9th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:02:20Z"},"road_event_id":"LCvpPHBJVzPWiYOyaytF9qF4Tr8=","beginning_cross_street":"3RD AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.972189,40.75396]]}},{"id":"AmzGbfAeV6RPfgnVpIfPWNzrk+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AZ9D35N0UzphVxLwlT0i5kww1tI="}],"description":"Crane operations on E 47TH ST westbound between 3RD AVE (New York) and LEXINGTON AVE (New York), Saturday May 9th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:02:20Z"},"road_event_id":"AmzGbfAeV6RPfgnVpIfPWNzrk+I=","beginning_cross_street":"3RD AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.972189,40.75396]]}},{"id":"78NJjFn/GNmudOVciUHbfQMqWwI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/NX3BbiHYvL7dRxCScL1aUPSr9A="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) All trains at 1 Av and 3 Av board from the Brooklyn-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line., Thursday May 7th, 2026 thru Friday June 26th, 2026, Wednesday/Friday, 01:30 AM thru 05:00 AM","update_date":"2026-05-14T15:07:40Z"},"road_event_id":"78NJjFn/GNmudOVciUHbfQMqWwI=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T05:30:00Z","end_date":"2026-06-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"/NX3BbiHYvL7dRxCScL1aUPSr9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"78NJjFn/GNmudOVciUHbfQMqWwI="},{"type":"next-occurrence","id":"GuF5yjIyQJlYpTaJQoumnQaQvYQ="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) All trains at 1 Av and 3 Av board from the Brooklyn-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line., Thursday May 7th, 2026 thru Friday June 26th, 2026, Wednesday/Friday, 01:30 AM thru 05:00 AM","update_date":"2026-05-14T15:07:40Z"},"road_event_id":"/NX3BbiHYvL7dRxCScL1aUPSr9A=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T05:30:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"GuF5yjIyQJlYpTaJQoumnQaQvYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"78NJjFn/GNmudOVciUHbfQMqWwI="},{"type":"next-occurrence","id":"bOpMG8w3XUFtpt+BQUYEwWkWzI0="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) All trains at 1 Av and 3 Av board from the Brooklyn-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line., Thursday May 7th, 2026 thru Friday June 26th, 2026, Wednesday/Friday, 01:30 AM thru 05:00 AM","update_date":"2026-05-14T15:07:40Z"},"road_event_id":"GuF5yjIyQJlYpTaJQoumnQaQvYQ=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T05:30:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"bOpMG8w3XUFtpt+BQUYEwWkWzI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"78NJjFn/GNmudOVciUHbfQMqWwI="},{"type":"next-occurrence","id":"/fq0xV4RZoe5UdarHEM4QfHksdE="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) All trains at 1 Av and 3 Av board from the Brooklyn-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line., Thursday May 7th, 2026 thru Friday June 26th, 2026, Wednesday/Friday, 01:30 AM thru 05:00 AM","update_date":"2026-05-14T15:07:40Z"},"road_event_id":"bOpMG8w3XUFtpt+BQUYEwWkWzI0=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T05:30:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"/fq0xV4RZoe5UdarHEM4QfHksdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"78NJjFn/GNmudOVciUHbfQMqWwI="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) All trains at 1 Av and 3 Av board from the Brooklyn-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line., Thursday May 7th, 2026 thru Friday June 26th, 2026, Wednesday/Friday, 01:30 AM thru 05:00 AM","update_date":"2026-05-14T15:07:40Z"},"road_event_id":"/fq0xV4RZoe5UdarHEM4QfHksdE=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T05:30:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"9uU3adAW4le/zvH28rQn9kARYCY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"B/k7MoB08Rm3hgnr7ebGQWs0NEg="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"9uU3adAW4le/zvH28rQn9kARYCY=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"B/k7MoB08Rm3hgnr7ebGQWs0NEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9uU3adAW4le/zvH28rQn9kARYCY="},{"type":"next-occurrence","id":"rWaeUZFCKs17NlHlTh9U4DEuqlc="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"B/k7MoB08Rm3hgnr7ebGQWs0NEg=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"rWaeUZFCKs17NlHlTh9U4DEuqlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9uU3adAW4le/zvH28rQn9kARYCY="},{"type":"next-occurrence","id":"1Ow+OjuD1r0jduRNcqdXeHO0iQs="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"rWaeUZFCKs17NlHlTh9U4DEuqlc=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"1Ow+OjuD1r0jduRNcqdXeHO0iQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9uU3adAW4le/zvH28rQn9kARYCY="},{"type":"next-occurrence","id":"YeEI5+pxfsijrURCNlOVOZ8ksYQ="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"1Ow+OjuD1r0jduRNcqdXeHO0iQs=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"YeEI5+pxfsijrURCNlOVOZ8ksYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9uU3adAW4le/zvH28rQn9kARYCY="},{"type":"next-occurrence","id":"8gioy5G0NNf0ED2TFLufDq/fAos="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"YeEI5+pxfsijrURCNlOVOZ8ksYQ=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"8gioy5G0NNf0ED2TFLufDq/fAos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9uU3adAW4le/zvH28rQn9kARYCY="},{"type":"next-occurrence","id":"JwrCOgZ7aKJNwMZl3L5z3rDfyJo="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"8gioy5G0NNf0ED2TFLufDq/fAos=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"JwrCOgZ7aKJNwMZl3L5z3rDfyJo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9uU3adAW4le/zvH28rQn9kARYCY="},{"type":"next-occurrence","id":"dxsfhxxcLSkn0j+/eWIZOoE9HWI="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"JwrCOgZ7aKJNwMZl3L5z3rDfyJo=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"dxsfhxxcLSkn0j+/eWIZOoE9HWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9uU3adAW4le/zvH28rQn9kARYCY="},{"type":"next-occurrence","id":"b5QnF65KksHjKiRX237lW8D/LZ4="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"dxsfhxxcLSkn0j+/eWIZOoE9HWI=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"b5QnF65KksHjKiRX237lW8D/LZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9uU3adAW4le/zvH28rQn9kARYCY="},{"type":"next-occurrence","id":"uh03cYvcH81S8hrnXRA3E9S2mZ0="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"b5QnF65KksHjKiRX237lW8D/LZ4=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"uh03cYvcH81S8hrnXRA3E9S2mZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9uU3adAW4le/zvH28rQn9kARYCY="},{"type":"next-occurrence","id":"SkkUOiO0cKlFAPFq8D7+eDERwWI="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"uh03cYvcH81S8hrnXRA3E9S2mZ0=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"SkkUOiO0cKlFAPFq8D7+eDERwWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9uU3adAW4le/zvH28rQn9kARYCY="},{"type":"next-occurrence","id":"tf2s4fwW9eMoD+NZA8yZ6z2qf5s="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"SkkUOiO0cKlFAPFq8D7+eDERwWI=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"tf2s4fwW9eMoD+NZA8yZ6z2qf5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9uU3adAW4le/zvH28rQn9kARYCY="},{"type":"next-occurrence","id":"fd/u/CiZzFF8yV3NI5v5pZ/9qtY="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"tf2s4fwW9eMoD+NZA8yZ6z2qf5s=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"fd/u/CiZzFF8yV3NI5v5pZ/9qtY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9uU3adAW4le/zvH28rQn9kARYCY="},{"type":"next-occurrence","id":"zNPIPqW6SkphNEwk3RwVmNg0hXI="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"fd/u/CiZzFF8yV3NI5v5pZ/9qtY=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"zNPIPqW6SkphNEwk3RwVmNg0hXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9uU3adAW4le/zvH28rQn9kARYCY="},{"type":"next-occurrence","id":"ktE35inUWpJ/JWVGxEIf2dbP3RI="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"zNPIPqW6SkphNEwk3RwVmNg0hXI=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"ktE35inUWpJ/JWVGxEIf2dbP3RI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9uU3adAW4le/zvH28rQn9kARYCY="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York) for system enhancement-gas., Friday May 8th, 2026 thru Sunday August 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T18:13:28Z"},"road_event_id":"ktE35inUWpJ/JWVGxEIf2dbP3RI=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003222,40.73488]]}},{"id":"Tt3QRcQ2R8pquVXmZ53va+WGuC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CCv8W9xhxVdXrXYdzKRHNI6mlLo="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"Tt3QRcQ2R8pquVXmZ53va+WGuC8=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"CCv8W9xhxVdXrXYdzKRHNI6mlLo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tt3QRcQ2R8pquVXmZ53va+WGuC8="},{"type":"next-occurrence","id":"20EMaetM58/QFQ+dSudd53fpgf4="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"CCv8W9xhxVdXrXYdzKRHNI6mlLo=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"20EMaetM58/QFQ+dSudd53fpgf4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tt3QRcQ2R8pquVXmZ53va+WGuC8="},{"type":"next-occurrence","id":"AtiZ+cjXTiu4wIPhpZXZm/ZCM1Y="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"20EMaetM58/QFQ+dSudd53fpgf4=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"AtiZ+cjXTiu4wIPhpZXZm/ZCM1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tt3QRcQ2R8pquVXmZ53va+WGuC8="},{"type":"next-occurrence","id":"T45pTDkcdBXu8m/ly7888++3yQk="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"AtiZ+cjXTiu4wIPhpZXZm/ZCM1Y=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"T45pTDkcdBXu8m/ly7888++3yQk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tt3QRcQ2R8pquVXmZ53va+WGuC8="},{"type":"next-occurrence","id":"Hb4DNPVsaDmPOpqnJGGoDtdvUG8="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"T45pTDkcdBXu8m/ly7888++3yQk=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"Hb4DNPVsaDmPOpqnJGGoDtdvUG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tt3QRcQ2R8pquVXmZ53va+WGuC8="},{"type":"next-occurrence","id":"qiSB1G2m07GGE7iSDws3P2zp8nQ="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"Hb4DNPVsaDmPOpqnJGGoDtdvUG8=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"qiSB1G2m07GGE7iSDws3P2zp8nQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tt3QRcQ2R8pquVXmZ53va+WGuC8="},{"type":"next-occurrence","id":"IIQp5ooUdbO0dHT7xDDehZlUGhM="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"qiSB1G2m07GGE7iSDws3P2zp8nQ=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"IIQp5ooUdbO0dHT7xDDehZlUGhM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tt3QRcQ2R8pquVXmZ53va+WGuC8="},{"type":"next-occurrence","id":"+NssHfLrdP8JlWAnA6rhVV8Ncsc="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"IIQp5ooUdbO0dHT7xDDehZlUGhM=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"+NssHfLrdP8JlWAnA6rhVV8Ncsc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tt3QRcQ2R8pquVXmZ53va+WGuC8="},{"type":"next-occurrence","id":"gEtbGeIa1PgkvSi8psT3lIK7Dqk="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"+NssHfLrdP8JlWAnA6rhVV8Ncsc=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"gEtbGeIa1PgkvSi8psT3lIK7Dqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tt3QRcQ2R8pquVXmZ53va+WGuC8="},{"type":"next-occurrence","id":"9kcJ6OX+zDRgWtyC4xUTWDeQPeE="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"gEtbGeIa1PgkvSi8psT3lIK7Dqk=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"9kcJ6OX+zDRgWtyC4xUTWDeQPeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tt3QRcQ2R8pquVXmZ53va+WGuC8="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for use of knuckle boom to complete (1) story vertical enlargement., Wednesday May 6th, 2026 thru Monday July 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:15:34Z"},"road_event_id":"9kcJ6OX+zDRgWtyC4xUTWDeQPeE=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008365,40.7348]]}},{"id":"P69qUv64Mxv718I/ey6Zb2Ppj40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uFYqN4WkpuOXp6/QbUgeF+twPM8="}],"description":"Construction on WHITE ST westbound between FRANKLIN PL (New York) and CHURCH ST (New York) for new gas service., Saturday May 9th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 08:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:24:58Z"},"road_event_id":"P69qUv64Mxv718I/ey6Zb2Ppj40=","beginning_cross_street":"FRANKLIN PL","ending_cross_street":"CHURCH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-07T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003752,40.71835]]}},{"id":"uFYqN4WkpuOXp6/QbUgeF+twPM8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"P69qUv64Mxv718I/ey6Zb2Ppj40="}],"description":"Construction on WHITE ST westbound between FRANKLIN PL (New York) and CHURCH ST (New York) for new gas service., Saturday May 9th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 08:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:24:58Z"},"road_event_id":"uFYqN4WkpuOXp6/QbUgeF+twPM8=","beginning_cross_street":"FRANKLIN PL","ending_cross_street":"CHURCH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003752,40.71835]]}},{"id":"i+vj47kkciz5J5j9+UpnioWHfQ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRANKLIN ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5zOe5wXsq46THhJSgtAWal9knTA="}],"description":"Construction on FRANKLIN ST eastbound between W BROADWAY (New York) and 6TH AVE (New York) for system upgrade., Saturday May 9th, 2026 thru Sunday July 5th, 2026, Saturday/ Sunday, 10:00 AM thru 10:00 PM All lanes closed","update_date":"2026-05-06T18:29:27Z"},"road_event_id":"i+vj47kkciz5J5j9+UpnioWHfQ8=","beginning_cross_street":"W BROADWAY","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T14:00:00Z","end_date":"2026-06-07T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006551,40.718837]]}},{"id":"5zOe5wXsq46THhJSgtAWal9knTA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRANKLIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i+vj47kkciz5J5j9+UpnioWHfQ8="},{"type":"next-occurrence","id":"L1GYJ4XkOcYYY1z2cVVBWkSfwUs="}],"description":"Construction on FRANKLIN ST eastbound between W BROADWAY (New York) and 6TH AVE (New York) for system upgrade., Saturday May 9th, 2026 thru Sunday July 5th, 2026, Saturday/ Sunday, 10:00 AM thru 10:00 PM All lanes closed","update_date":"2026-05-06T18:29:27Z"},"road_event_id":"5zOe5wXsq46THhJSgtAWal9knTA=","beginning_cross_street":"W BROADWAY","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T14:00:00Z","end_date":"2026-06-08T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006551,40.718837]]}},{"id":"L1GYJ4XkOcYYY1z2cVVBWkSfwUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRANKLIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i+vj47kkciz5J5j9+UpnioWHfQ8="},{"type":"next-occurrence","id":"NnsjEe7kFIGFlDkp+Q1nvFqHI4A="}],"description":"Construction on FRANKLIN ST eastbound between W BROADWAY (New York) and 6TH AVE (New York) for system upgrade., Saturday May 9th, 2026 thru Sunday July 5th, 2026, Saturday/ Sunday, 10:00 AM thru 10:00 PM All lanes closed","update_date":"2026-05-06T18:29:27Z"},"road_event_id":"L1GYJ4XkOcYYY1z2cVVBWkSfwUs=","beginning_cross_street":"W BROADWAY","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T14:00:00Z","end_date":"2026-06-14T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006551,40.718837]]}},{"id":"NnsjEe7kFIGFlDkp+Q1nvFqHI4A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRANKLIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i+vj47kkciz5J5j9+UpnioWHfQ8="}],"description":"Construction on FRANKLIN ST eastbound between W BROADWAY (New York) and 6TH AVE (New York) for system upgrade., Saturday May 9th, 2026 thru Sunday July 5th, 2026, Saturday/ Sunday, 10:00 AM thru 10:00 PM All lanes closed","update_date":"2026-05-06T18:29:27Z"},"road_event_id":"NnsjEe7kFIGFlDkp+Q1nvFqHI4A=","beginning_cross_street":"W BROADWAY","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T14:00:00Z","end_date":"2026-06-15T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006551,40.718837]]}},{"id":"c1o4c0zECud3S9R7IjzX5e7gy1E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLINTON ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1nTqiyUyivLE/j89TdnW+qwaznk="}],"description":"Construction on CLINTON ST northbound between GRAND ST (New York) and BROOME ST (New York) for installation of conduit for system reinforcement., Saturday May 9th, 2026 thru Saturday July 4th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday July 5th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:36:31Z"},"road_event_id":"c1o4c0zECud3S9R7IjzX5e7gy1E=","beginning_cross_street":"GRAND ST","ending_cross_street":"BROOME ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986671,40.715998]]}},{"id":"1nTqiyUyivLE/j89TdnW+qwaznk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLINTON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c1o4c0zECud3S9R7IjzX5e7gy1E="},{"type":"next-occurrence","id":"Uyf9dox07WZPo8LMGczZa4HYAb4="}],"description":"Construction on CLINTON ST northbound between GRAND ST (New York) and BROOME ST (New York) for installation of conduit for system reinforcement., Saturday May 9th, 2026 thru Saturday July 4th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday July 5th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:36:31Z"},"road_event_id":"1nTqiyUyivLE/j89TdnW+qwaznk=","beginning_cross_street":"GRAND ST","ending_cross_street":"BROOME ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986671,40.715998]]}},{"id":"Uyf9dox07WZPo8LMGczZa4HYAb4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLINTON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c1o4c0zECud3S9R7IjzX5e7gy1E="},{"type":"next-occurrence","id":"T79M8fe/+kz++C8BJKIUkSdY9zA="}],"description":"Construction on CLINTON ST northbound between GRAND ST (New York) and BROOME ST (New York) for installation of conduit for system reinforcement., Saturday May 9th, 2026 thru Saturday July 4th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday July 5th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:36:31Z"},"road_event_id":"Uyf9dox07WZPo8LMGczZa4HYAb4=","beginning_cross_street":"GRAND ST","ending_cross_street":"BROOME ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986671,40.715998]]}},{"id":"T79M8fe/+kz++C8BJKIUkSdY9zA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLINTON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c1o4c0zECud3S9R7IjzX5e7gy1E="}],"description":"Construction on CLINTON ST northbound between GRAND ST (New York) and BROOME ST (New York) for installation of conduit for system reinforcement., Saturday May 9th, 2026 thru Saturday July 4th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 10th, 2026 thru Sunday July 5th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T18:36:31Z"},"road_event_id":"T79M8fe/+kz++C8BJKIUkSdY9zA=","beginning_cross_street":"GRAND ST","ending_cross_street":"BROOME ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986671,40.715998]]}},{"id":"ta3AfdR7orkamCThqVkp9n09ojU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4EOe95Aqrg16CsRqzoB4Futif6w="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Wednesday May 6th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T18:53:13Z"},"road_event_id":"ta3AfdR7orkamCThqVkp9n09ojU=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883459,40.875754]]}},{"id":"4EOe95Aqrg16CsRqzoB4Futif6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ta3AfdR7orkamCThqVkp9n09ojU="},{"type":"next-occurrence","id":"1Mq7gHcoNeCRXa13Vqbs9ZSn6lU="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Wednesday May 6th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T18:53:13Z"},"road_event_id":"4EOe95Aqrg16CsRqzoB4Futif6w=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883459,40.875754]]}},{"id":"1Mq7gHcoNeCRXa13Vqbs9ZSn6lU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ta3AfdR7orkamCThqVkp9n09ojU="},{"type":"next-occurrence","id":"0btuETncjlLno711AZxbck8Gq/Y="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Wednesday May 6th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T18:53:13Z"},"road_event_id":"1Mq7gHcoNeCRXa13Vqbs9ZSn6lU=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883459,40.875754]]}},{"id":"0btuETncjlLno711AZxbck8Gq/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ta3AfdR7orkamCThqVkp9n09ojU="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Wednesday May 6th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-06T18:53:13Z"},"road_event_id":"0btuETncjlLno711AZxbck8Gq/Y=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883459,40.875754]]}},{"id":"sOsMGOCqm+1JnpZ7T/F4sRjPmQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"80xUrVfWNt0w9fEUX4dag/BCALw="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"sOsMGOCqm+1JnpZ7T/F4sRjPmQU=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"80xUrVfWNt0w9fEUX4dag/BCALw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sOsMGOCqm+1JnpZ7T/F4sRjPmQU="},{"type":"next-occurrence","id":"hnapHYXvdACEl+B37aZzFZX3i68="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"80xUrVfWNt0w9fEUX4dag/BCALw=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"hnapHYXvdACEl+B37aZzFZX3i68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sOsMGOCqm+1JnpZ7T/F4sRjPmQU="},{"type":"next-occurrence","id":"MQhQau6W5PGg5XyLQsEhlHh0i9A="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"hnapHYXvdACEl+B37aZzFZX3i68=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"MQhQau6W5PGg5XyLQsEhlHh0i9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sOsMGOCqm+1JnpZ7T/F4sRjPmQU="},{"type":"next-occurrence","id":"Hwnj27RcGvVV3b4IjZvCBon5U3Q="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"MQhQau6W5PGg5XyLQsEhlHh0i9A=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"Hwnj27RcGvVV3b4IjZvCBon5U3Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sOsMGOCqm+1JnpZ7T/F4sRjPmQU="},{"type":"next-occurrence","id":"IvxJy5Zz0GVNNPzZ4h+3Z8H84uk="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"Hwnj27RcGvVV3b4IjZvCBon5U3Q=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"IvxJy5Zz0GVNNPzZ4h+3Z8H84uk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sOsMGOCqm+1JnpZ7T/F4sRjPmQU="},{"type":"next-occurrence","id":"BfNG3DzDV29VDNsT08CX/b+fcc8="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"IvxJy5Zz0GVNNPzZ4h+3Z8H84uk=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"BfNG3DzDV29VDNsT08CX/b+fcc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sOsMGOCqm+1JnpZ7T/F4sRjPmQU="},{"type":"next-occurrence","id":"mQDEicdwqpqkLYRrrIYVISkWg9g="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"BfNG3DzDV29VDNsT08CX/b+fcc8=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"mQDEicdwqpqkLYRrrIYVISkWg9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sOsMGOCqm+1JnpZ7T/F4sRjPmQU="},{"type":"next-occurrence","id":"4q21QbB9M4XXxoVX2K7XioPF6YM="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"mQDEicdwqpqkLYRrrIYVISkWg9g=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"4q21QbB9M4XXxoVX2K7XioPF6YM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sOsMGOCqm+1JnpZ7T/F4sRjPmQU="},{"type":"next-occurrence","id":"pomY/655zDyah1U0n9vKz+T5JD4="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"4q21QbB9M4XXxoVX2K7XioPF6YM=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"pomY/655zDyah1U0n9vKz+T5JD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sOsMGOCqm+1JnpZ7T/F4sRjPmQU="},{"type":"next-occurrence","id":"e8dVSg49yachhACo97FWeDzT9ds="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"pomY/655zDyah1U0n9vKz+T5JD4=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"e8dVSg49yachhACo97FWeDzT9ds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sOsMGOCqm+1JnpZ7T/F4sRjPmQU="},{"type":"next-occurrence","id":"fk4IhsFpPdeSEKjnvrV4XjHaoEo="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"e8dVSg49yachhACo97FWeDzT9ds=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"fk4IhsFpPdeSEKjnvrV4XjHaoEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sOsMGOCqm+1JnpZ7T/F4sRjPmQU="},{"type":"next-occurrence","id":"yt7xC92zhTbIrL2czDqc8uyn7Hk="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"fk4IhsFpPdeSEKjnvrV4XjHaoEo=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"yt7xC92zhTbIrL2czDqc8uyn7Hk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sOsMGOCqm+1JnpZ7T/F4sRjPmQU="},{"type":"next-occurrence","id":"nIdjrYf8ksWddh7UTNxw5jDEDwU="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"yt7xC92zhTbIrL2czDqc8uyn7Hk=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"nIdjrYf8ksWddh7UTNxw5jDEDwU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sOsMGOCqm+1JnpZ7T/F4sRjPmQU="},{"type":"next-occurrence","id":"K1PxnJOM5V0jCLMT47joZR2Jg44="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"nIdjrYf8ksWddh7UTNxw5jDEDwU=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"K1PxnJOM5V0jCLMT47joZR2Jg44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DITMARS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sOsMGOCqm+1JnpZ7T/F4sRjPmQU="}],"description":"Construction on DITMARS ST southbound between MYRTLE AVE (New York) and BROADWAY (New York) for major service., Friday May 8th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:40:14Z"},"road_event_id":"K1PxnJOM5V0jCLMT47joZR2Jg44=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932888,40.697191]]}},{"id":"K7SfkelZp39npDKIlomU6vycJ+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8DVQZU+5FyWx56Ujxf6k0t30Zjo="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"K7SfkelZp39npDKIlomU6vycJ+A=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"8DVQZU+5FyWx56Ujxf6k0t30Zjo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K7SfkelZp39npDKIlomU6vycJ+A="},{"type":"next-occurrence","id":"c62kVZ4oG+B7RBQkwB/SobPQSBQ="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"8DVQZU+5FyWx56Ujxf6k0t30Zjo=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"c62kVZ4oG+B7RBQkwB/SobPQSBQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K7SfkelZp39npDKIlomU6vycJ+A="},{"type":"next-occurrence","id":"v04XTiaB3WQtwpi5eVud7L8tRaE="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"c62kVZ4oG+B7RBQkwB/SobPQSBQ=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"v04XTiaB3WQtwpi5eVud7L8tRaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K7SfkelZp39npDKIlomU6vycJ+A="},{"type":"next-occurrence","id":"pLYpJNu2uqdb+VZy0VHdK25djJk="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"v04XTiaB3WQtwpi5eVud7L8tRaE=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"pLYpJNu2uqdb+VZy0VHdK25djJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K7SfkelZp39npDKIlomU6vycJ+A="},{"type":"next-occurrence","id":"ECV5UtACNEVDv+eWcNUdJhCzPOQ="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"pLYpJNu2uqdb+VZy0VHdK25djJk=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"ECV5UtACNEVDv+eWcNUdJhCzPOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K7SfkelZp39npDKIlomU6vycJ+A="},{"type":"next-occurrence","id":"iTnEmhvSijsQ5KSE5IK+MDmkMRk="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"ECV5UtACNEVDv+eWcNUdJhCzPOQ=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"iTnEmhvSijsQ5KSE5IK+MDmkMRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K7SfkelZp39npDKIlomU6vycJ+A="},{"type":"next-occurrence","id":"Nzuv24y8ZlNyTbKZLdApXW3tdN4="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"iTnEmhvSijsQ5KSE5IK+MDmkMRk=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"Nzuv24y8ZlNyTbKZLdApXW3tdN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K7SfkelZp39npDKIlomU6vycJ+A="},{"type":"next-occurrence","id":"kFn+nzejp49BImni/8GgLOXOYIs="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"Nzuv24y8ZlNyTbKZLdApXW3tdN4=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"kFn+nzejp49BImni/8GgLOXOYIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K7SfkelZp39npDKIlomU6vycJ+A="},{"type":"next-occurrence","id":"eDXPLgvEcIegNUsr1IP/0xs0G0U="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"kFn+nzejp49BImni/8GgLOXOYIs=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"eDXPLgvEcIegNUsr1IP/0xs0G0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K7SfkelZp39npDKIlomU6vycJ+A="},{"type":"next-occurrence","id":"lkjS6co5hDw4j16trg0eMZDMCdY="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"eDXPLgvEcIegNUsr1IP/0xs0G0U=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"lkjS6co5hDw4j16trg0eMZDMCdY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K7SfkelZp39npDKIlomU6vycJ+A="}],"description":"Construction on GROVE ST southbound between GOODWIN PL (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:42:35Z"},"road_event_id":"lkjS6co5hDw4j16trg0eMZDMCdY=","beginning_cross_street":"GOODWIN PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922985,40.691064]]}},{"id":"1oxDnAVAReJD4fktS5Hucp4cfdw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lAQfBk6Nj1oFo2Fk/6Gsnzcl+Uw="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"1oxDnAVAReJD4fktS5Hucp4cfdw=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"lAQfBk6Nj1oFo2Fk/6Gsnzcl+Uw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1oxDnAVAReJD4fktS5Hucp4cfdw="},{"type":"next-occurrence","id":"NCeWEXZgJduYAQFL+M3YGrfvQ40="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"lAQfBk6Nj1oFo2Fk/6Gsnzcl+Uw=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"NCeWEXZgJduYAQFL+M3YGrfvQ40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1oxDnAVAReJD4fktS5Hucp4cfdw="},{"type":"next-occurrence","id":"xj9PRNi2dLk/dN3ShVNIdBTyOjI="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"NCeWEXZgJduYAQFL+M3YGrfvQ40=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"xj9PRNi2dLk/dN3ShVNIdBTyOjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1oxDnAVAReJD4fktS5Hucp4cfdw="},{"type":"next-occurrence","id":"yi3vz0itOo08dffh6rTrWtoT2/0="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"xj9PRNi2dLk/dN3ShVNIdBTyOjI=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"yi3vz0itOo08dffh6rTrWtoT2/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1oxDnAVAReJD4fktS5Hucp4cfdw="},{"type":"next-occurrence","id":"lCr4QvWdbv9LY8KSSts0+IlzVQg="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"yi3vz0itOo08dffh6rTrWtoT2/0=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"lCr4QvWdbv9LY8KSSts0+IlzVQg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1oxDnAVAReJD4fktS5Hucp4cfdw="},{"type":"next-occurrence","id":"ySA8NZ3KDZ6S5nV+Bh4nYEfs6L4="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"lCr4QvWdbv9LY8KSSts0+IlzVQg=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"ySA8NZ3KDZ6S5nV+Bh4nYEfs6L4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1oxDnAVAReJD4fktS5Hucp4cfdw="},{"type":"next-occurrence","id":"urxXrcykGK1A3Gi5V7z4Jy1AHk4="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"ySA8NZ3KDZ6S5nV+Bh4nYEfs6L4=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"urxXrcykGK1A3Gi5V7z4Jy1AHk4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1oxDnAVAReJD4fktS5Hucp4cfdw="},{"type":"next-occurrence","id":"34hAVWQVx8LlE0dcvly2Vrmz5Pw="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"urxXrcykGK1A3Gi5V7z4Jy1AHk4=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"34hAVWQVx8LlE0dcvly2Vrmz5Pw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1oxDnAVAReJD4fktS5Hucp4cfdw="},{"type":"next-occurrence","id":"b0BsJ2JEVI/0ZChz2oSWRQ9JSeg="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"34hAVWQVx8LlE0dcvly2Vrmz5Pw=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"b0BsJ2JEVI/0ZChz2oSWRQ9JSeg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1oxDnAVAReJD4fktS5Hucp4cfdw="},{"type":"next-occurrence","id":"LkhTx2S1VmRR0xH1I7Lb5QqY60Q="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"b0BsJ2JEVI/0ZChz2oSWRQ9JSeg=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"LkhTx2S1VmRR0xH1I7Lb5QqY60Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GREENE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1oxDnAVAReJD4fktS5Hucp4cfdw="}],"description":"Construction on GREENE AVE northbound between BROADWAY (New York) and GOODWIN PL (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:45:05Z"},"road_event_id":"LkhTx2S1VmRR0xH1I7Lb5QqY60Q=","beginning_cross_street":"BROADWAY","ending_cross_street":"GOODWIN PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92551,40.691521]]}},{"id":"4WZeZH9D2Hj5WOB8VkA0840ypQQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2tn2nJvSBZByThHGuDUtpCtiiZU="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"4WZeZH9D2Hj5WOB8VkA0840ypQQ=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"2tn2nJvSBZByThHGuDUtpCtiiZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4WZeZH9D2Hj5WOB8VkA0840ypQQ="},{"type":"next-occurrence","id":"qSuAUm500HtkIuvVR0f9Fc/UNPo="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"2tn2nJvSBZByThHGuDUtpCtiiZU=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"qSuAUm500HtkIuvVR0f9Fc/UNPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4WZeZH9D2Hj5WOB8VkA0840ypQQ="},{"type":"next-occurrence","id":"KfRlObgQhmirGWB66nV98WdZhaE="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"qSuAUm500HtkIuvVR0f9Fc/UNPo=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"KfRlObgQhmirGWB66nV98WdZhaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4WZeZH9D2Hj5WOB8VkA0840ypQQ="},{"type":"next-occurrence","id":"Nw9ABimkttW64ZUfjvAPO8NG3so="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"KfRlObgQhmirGWB66nV98WdZhaE=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"Nw9ABimkttW64ZUfjvAPO8NG3so=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4WZeZH9D2Hj5WOB8VkA0840ypQQ="},{"type":"next-occurrence","id":"irMqnBRKtSJqzXeVdoKl7eIdPT4="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"Nw9ABimkttW64ZUfjvAPO8NG3so=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"irMqnBRKtSJqzXeVdoKl7eIdPT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4WZeZH9D2Hj5WOB8VkA0840ypQQ="},{"type":"next-occurrence","id":"JN//ea+/59f939mu93IUdBIPksU="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"irMqnBRKtSJqzXeVdoKl7eIdPT4=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"JN//ea+/59f939mu93IUdBIPksU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4WZeZH9D2Hj5WOB8VkA0840ypQQ="},{"type":"next-occurrence","id":"O1SMHEM12hahACNqBcEc+E0aiG8="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"JN//ea+/59f939mu93IUdBIPksU=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"O1SMHEM12hahACNqBcEc+E0aiG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4WZeZH9D2Hj5WOB8VkA0840ypQQ="},{"type":"next-occurrence","id":"wlVeXTlBZLwCJplNRgYAWT9EYow="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"O1SMHEM12hahACNqBcEc+E0aiG8=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"wlVeXTlBZLwCJplNRgYAWT9EYow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4WZeZH9D2Hj5WOB8VkA0840ypQQ="},{"type":"next-occurrence","id":"/MlraL77Ekln78lBFeaLNIz8Vc8="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"wlVeXTlBZLwCJplNRgYAWT9EYow=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"/MlraL77Ekln78lBFeaLNIz8Vc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4WZeZH9D2Hj5WOB8VkA0840ypQQ="},{"type":"next-occurrence","id":"1Sri5iTMU4VVLbuNZaokZSa+jOI="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"/MlraL77Ekln78lBFeaLNIz8Vc8=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"1Sri5iTMU4VVLbuNZaokZSa+jOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN BUREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4WZeZH9D2Hj5WOB8VkA0840ypQQ="}],"description":"Construction on VAN BUREN ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:47:02Z"},"road_event_id":"1Sri5iTMU4VVLbuNZaokZSa+jOI=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925015,40.693271]]}},{"id":"iQfK0TD9PBBIMJZwoJs9jJgLX9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"h2Q2/Epd9rWy9LprttRrkIpXumE="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"iQfK0TD9PBBIMJZwoJs9jJgLX9g=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"h2Q2/Epd9rWy9LprttRrkIpXumE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iQfK0TD9PBBIMJZwoJs9jJgLX9g="},{"type":"next-occurrence","id":"8/4y7MlTrJe2sVr7w0X8x/3lqKg="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"h2Q2/Epd9rWy9LprttRrkIpXumE=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"8/4y7MlTrJe2sVr7w0X8x/3lqKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iQfK0TD9PBBIMJZwoJs9jJgLX9g="},{"type":"next-occurrence","id":"pztBMUhL4hTKZZexd/rPBV6U5TM="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"8/4y7MlTrJe2sVr7w0X8x/3lqKg=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"pztBMUhL4hTKZZexd/rPBV6U5TM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iQfK0TD9PBBIMJZwoJs9jJgLX9g="},{"type":"next-occurrence","id":"4KlEd4JCKfCv5uDZavtoCCXM3Fs="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"pztBMUhL4hTKZZexd/rPBV6U5TM=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"4KlEd4JCKfCv5uDZavtoCCXM3Fs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iQfK0TD9PBBIMJZwoJs9jJgLX9g="},{"type":"next-occurrence","id":"GUP2j/rl6gHVMYs4NEl/eqLBwgA="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"4KlEd4JCKfCv5uDZavtoCCXM3Fs=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"GUP2j/rl6gHVMYs4NEl/eqLBwgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iQfK0TD9PBBIMJZwoJs9jJgLX9g="},{"type":"next-occurrence","id":"GDE1nlrib6EPBq5pN4gv763GWC4="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"GUP2j/rl6gHVMYs4NEl/eqLBwgA=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"GDE1nlrib6EPBq5pN4gv763GWC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iQfK0TD9PBBIMJZwoJs9jJgLX9g="},{"type":"next-occurrence","id":"14KoEMG1h2uqap2Js1vDMGME5fM="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"GDE1nlrib6EPBq5pN4gv763GWC4=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"14KoEMG1h2uqap2Js1vDMGME5fM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iQfK0TD9PBBIMJZwoJs9jJgLX9g="},{"type":"next-occurrence","id":"kgEiC22WLY982a4QoGTp+Sg2qjs="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"14KoEMG1h2uqap2Js1vDMGME5fM=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"kgEiC22WLY982a4QoGTp+Sg2qjs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iQfK0TD9PBBIMJZwoJs9jJgLX9g="},{"type":"next-occurrence","id":"pKGIqRDAIfWlJhOFbqC1vb4qtII="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"kgEiC22WLY982a4QoGTp+Sg2qjs=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"pKGIqRDAIfWlJhOFbqC1vb4qtII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iQfK0TD9PBBIMJZwoJs9jJgLX9g="},{"type":"next-occurrence","id":"JqcvbZG6zYeOYbE50RGpPi1B6fo="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"pKGIqRDAIfWlJhOFbqC1vb4qtII=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"JqcvbZG6zYeOYbE50RGpPi1B6fo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAFAYETTE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iQfK0TD9PBBIMJZwoJs9jJgLX9g="}],"description":"Construction on LAFAYETTE AVE eastbound between PATCHEN AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:49:43Z"},"road_event_id":"JqcvbZG6zYeOYbE50RGpPi1B6fo=","beginning_cross_street":"PATCHEN AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927929,40.692566]]}},{"id":"V6rodgc0gadCQqysOT5atpQ7+bI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XUC+YHZakwYNR5BVIwd5iNEfcQI="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"V6rodgc0gadCQqysOT5atpQ7+bI=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"XUC+YHZakwYNR5BVIwd5iNEfcQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V6rodgc0gadCQqysOT5atpQ7+bI="},{"type":"next-occurrence","id":"pfT520NaFzpaFyYud46GqEDZxWY="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"XUC+YHZakwYNR5BVIwd5iNEfcQI=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"pfT520NaFzpaFyYud46GqEDZxWY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V6rodgc0gadCQqysOT5atpQ7+bI="},{"type":"next-occurrence","id":"zA7cccU46qdjhut3Kc3/BGnwneg="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"pfT520NaFzpaFyYud46GqEDZxWY=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"zA7cccU46qdjhut3Kc3/BGnwneg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V6rodgc0gadCQqysOT5atpQ7+bI="},{"type":"next-occurrence","id":"XKSoZlFL//52PLTm868lQAOg4xQ="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"zA7cccU46qdjhut3Kc3/BGnwneg=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"XKSoZlFL//52PLTm868lQAOg4xQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V6rodgc0gadCQqysOT5atpQ7+bI="},{"type":"next-occurrence","id":"gMLHh+XaVcM5FDH9rgH55k2aVTg="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"XKSoZlFL//52PLTm868lQAOg4xQ=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"gMLHh+XaVcM5FDH9rgH55k2aVTg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V6rodgc0gadCQqysOT5atpQ7+bI="},{"type":"next-occurrence","id":"jLUfsme78zJPl44rmfMTNPMwu38="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"gMLHh+XaVcM5FDH9rgH55k2aVTg=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"jLUfsme78zJPl44rmfMTNPMwu38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V6rodgc0gadCQqysOT5atpQ7+bI="},{"type":"next-occurrence","id":"gTWTcpHjNCNI5q4sg57Yw99Qe70="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"jLUfsme78zJPl44rmfMTNPMwu38=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"gTWTcpHjNCNI5q4sg57Yw99Qe70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V6rodgc0gadCQqysOT5atpQ7+bI="},{"type":"next-occurrence","id":"F0263V7DyPYLriBftb46GKZUetg="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"gTWTcpHjNCNI5q4sg57Yw99Qe70=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"F0263V7DyPYLriBftb46GKZUetg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V6rodgc0gadCQqysOT5atpQ7+bI="},{"type":"next-occurrence","id":"KnS8bnsY9O0O/UikXfA16diaYBI="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"F0263V7DyPYLriBftb46GKZUetg=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"KnS8bnsY9O0O/UikXfA16diaYBI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V6rodgc0gadCQqysOT5atpQ7+bI="},{"type":"next-occurrence","id":"9TKVXngjYTVq/GSUpSmC/TCurek="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"KnS8bnsY9O0O/UikXfA16diaYBI=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"9TKVXngjYTVq/GSUpSmC/TCurek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HALSEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V6rodgc0gadCQqysOT5atpQ7+bI="}],"description":"Construction on HALSEY ST eastbound between SARATOGA AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:51:27Z"},"road_event_id":"9TKVXngjYTVq/GSUpSmC/TCurek=","beginning_cross_street":"SARATOGA AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917658,40.685515]]}},{"id":"Yd4VDFWhxqeDAOcSYKL+o8wnD+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"eCkcYeW7hPTfsPT+W1DCXStd2XY="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"Yd4VDFWhxqeDAOcSYKL+o8wnD+c=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"eCkcYeW7hPTfsPT+W1DCXStd2XY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Yd4VDFWhxqeDAOcSYKL+o8wnD+c="},{"type":"next-occurrence","id":"b5CgTkPdbnHzt6VSE2Lhk0yGw08="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"eCkcYeW7hPTfsPT+W1DCXStd2XY=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"b5CgTkPdbnHzt6VSE2Lhk0yGw08=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Yd4VDFWhxqeDAOcSYKL+o8wnD+c="},{"type":"next-occurrence","id":"kxVSg5g3ktaRQQLxLjwIyeWfbXY="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"b5CgTkPdbnHzt6VSE2Lhk0yGw08=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"kxVSg5g3ktaRQQLxLjwIyeWfbXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Yd4VDFWhxqeDAOcSYKL+o8wnD+c="},{"type":"next-occurrence","id":"Ro22tRFWj+OESva2WbAYDtzjZmc="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"kxVSg5g3ktaRQQLxLjwIyeWfbXY=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"Ro22tRFWj+OESva2WbAYDtzjZmc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Yd4VDFWhxqeDAOcSYKL+o8wnD+c="},{"type":"next-occurrence","id":"YzMhlVN1+Yc5RcWcK7oF9gwFsNg="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"Ro22tRFWj+OESva2WbAYDtzjZmc=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"YzMhlVN1+Yc5RcWcK7oF9gwFsNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Yd4VDFWhxqeDAOcSYKL+o8wnD+c="},{"type":"next-occurrence","id":"qXWayY3p9QnDXNvemA2hQHIeOsk="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"YzMhlVN1+Yc5RcWcK7oF9gwFsNg=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"qXWayY3p9QnDXNvemA2hQHIeOsk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Yd4VDFWhxqeDAOcSYKL+o8wnD+c="},{"type":"next-occurrence","id":"u/zu9OEsAhjUqOrFn+t4bnsVObY="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"qXWayY3p9QnDXNvemA2hQHIeOsk=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"u/zu9OEsAhjUqOrFn+t4bnsVObY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Yd4VDFWhxqeDAOcSYKL+o8wnD+c="},{"type":"next-occurrence","id":"QNpifAu0z7OJViq2NQoORT6Zwpk="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"u/zu9OEsAhjUqOrFn+t4bnsVObY=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"QNpifAu0z7OJViq2NQoORT6Zwpk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Yd4VDFWhxqeDAOcSYKL+o8wnD+c="},{"type":"next-occurrence","id":"5h52t5zEBxpJY9+k5qSI6PVNsQc="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"QNpifAu0z7OJViq2NQoORT6Zwpk=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"5h52t5zEBxpJY9+k5qSI6PVNsQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Yd4VDFWhxqeDAOcSYKL+o8wnD+c="},{"type":"next-occurrence","id":"3HxKA+MewT6QFcW9bsw/WO/TZE0="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"5h52t5zEBxpJY9+k5qSI6PVNsQc=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"3HxKA+MewT6QFcW9bsw/WO/TZE0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEIRFIELD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Yd4VDFWhxqeDAOcSYKL+o8wnD+c="}],"description":"Construction on WEIRFIELD ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:53:36Z"},"road_event_id":"3HxKA+MewT6QFcW9bsw/WO/TZE0=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915986,40.686134]]}},{"id":"iZQ8co+RoRKNB2tO9J+ROBHzTSQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZfWWAw6o4/WxBw5ou6++p6me8IM="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"iZQ8co+RoRKNB2tO9J+ROBHzTSQ=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"ZfWWAw6o4/WxBw5ou6++p6me8IM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iZQ8co+RoRKNB2tO9J+ROBHzTSQ="},{"type":"next-occurrence","id":"umuWQfGMTohltplnWRIWV9knUqI="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"ZfWWAw6o4/WxBw5ou6++p6me8IM=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"umuWQfGMTohltplnWRIWV9knUqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iZQ8co+RoRKNB2tO9J+ROBHzTSQ="},{"type":"next-occurrence","id":"j0fDcnfnoPaaNQID6C3g9JqGVDU="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"umuWQfGMTohltplnWRIWV9knUqI=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"j0fDcnfnoPaaNQID6C3g9JqGVDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iZQ8co+RoRKNB2tO9J+ROBHzTSQ="},{"type":"next-occurrence","id":"utbFB93SpXGuYd6I6V/qHY/L7f8="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"j0fDcnfnoPaaNQID6C3g9JqGVDU=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"utbFB93SpXGuYd6I6V/qHY/L7f8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iZQ8co+RoRKNB2tO9J+ROBHzTSQ="},{"type":"next-occurrence","id":"t7MDRU3OXgm8irESzbld4EoucDs="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"utbFB93SpXGuYd6I6V/qHY/L7f8=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"t7MDRU3OXgm8irESzbld4EoucDs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iZQ8co+RoRKNB2tO9J+ROBHzTSQ="},{"type":"next-occurrence","id":"Mrmu2U4ox5km7hflHXFoUkux0rg="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"t7MDRU3OXgm8irESzbld4EoucDs=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"Mrmu2U4ox5km7hflHXFoUkux0rg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iZQ8co+RoRKNB2tO9J+ROBHzTSQ="},{"type":"next-occurrence","id":"ddVUpkICil/JEBX5tNEOndd3ync="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"Mrmu2U4ox5km7hflHXFoUkux0rg=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"ddVUpkICil/JEBX5tNEOndd3ync=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iZQ8co+RoRKNB2tO9J+ROBHzTSQ="},{"type":"next-occurrence","id":"P8nVLiiw/wBSp/DVGy3uH8e/kwg="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"ddVUpkICil/JEBX5tNEOndd3ync=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"P8nVLiiw/wBSp/DVGy3uH8e/kwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iZQ8co+RoRKNB2tO9J+ROBHzTSQ="},{"type":"next-occurrence","id":"bUyjmQBM2jc9SUm5YRUVIWNnrvw="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"P8nVLiiw/wBSp/DVGy3uH8e/kwg=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"bUyjmQBM2jc9SUm5YRUVIWNnrvw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iZQ8co+RoRKNB2tO9J+ROBHzTSQ="},{"type":"next-occurrence","id":"ZO3WI6684zIp9ZbpZA5ySQuR7HQ="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"bUyjmQBM2jc9SUm5YRUVIWNnrvw=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"ZO3WI6684zIp9ZbpZA5ySQuR7HQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANCOCK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iZQ8co+RoRKNB2tO9J+ROBHzTSQ="}],"description":"Construction on HANCOCK ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:55:20Z"},"road_event_id":"ZO3WI6684zIp9ZbpZA5ySQuR7HQ=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.915447,40.68789]]}},{"id":"FOMhBiWNioEUuwakQQtL2Tx9dSo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qY+ZAbXhH7posFY3H8Ej0ynLjQ4="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"FOMhBiWNioEUuwakQQtL2Tx9dSo=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"qY+ZAbXhH7posFY3H8Ej0ynLjQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FOMhBiWNioEUuwakQQtL2Tx9dSo="},{"type":"next-occurrence","id":"yv+aNZTtETW+xCrOu6l1qTAn/Fc="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"qY+ZAbXhH7posFY3H8Ej0ynLjQ4=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"yv+aNZTtETW+xCrOu6l1qTAn/Fc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FOMhBiWNioEUuwakQQtL2Tx9dSo="},{"type":"next-occurrence","id":"QKkUTJSv9tGWAWol8Pq6pqiG2S4="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"yv+aNZTtETW+xCrOu6l1qTAn/Fc=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"QKkUTJSv9tGWAWol8Pq6pqiG2S4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FOMhBiWNioEUuwakQQtL2Tx9dSo="},{"type":"next-occurrence","id":"hkJ5R/kf7kjf4tQjD4RZNJ1UsbU="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"QKkUTJSv9tGWAWol8Pq6pqiG2S4=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"hkJ5R/kf7kjf4tQjD4RZNJ1UsbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FOMhBiWNioEUuwakQQtL2Tx9dSo="},{"type":"next-occurrence","id":"rX26R+RvCOBDeeVs4iap6qYbPVI="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"hkJ5R/kf7kjf4tQjD4RZNJ1UsbU=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"rX26R+RvCOBDeeVs4iap6qYbPVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FOMhBiWNioEUuwakQQtL2Tx9dSo="},{"type":"next-occurrence","id":"J9ud3VLFuj7eRNufz+OPp5W96b4="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"rX26R+RvCOBDeeVs4iap6qYbPVI=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"J9ud3VLFuj7eRNufz+OPp5W96b4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FOMhBiWNioEUuwakQQtL2Tx9dSo="},{"type":"next-occurrence","id":"zeRuLetzSCfSCxTOQbAAQPX89Q0="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"J9ud3VLFuj7eRNufz+OPp5W96b4=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"zeRuLetzSCfSCxTOQbAAQPX89Q0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FOMhBiWNioEUuwakQQtL2Tx9dSo="},{"type":"next-occurrence","id":"xdId1twUuZ07UhH93bHtSekDLJ0="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"zeRuLetzSCfSCxTOQbAAQPX89Q0=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"xdId1twUuZ07UhH93bHtSekDLJ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FOMhBiWNioEUuwakQQtL2Tx9dSo="},{"type":"next-occurrence","id":"Ai49TdSSQSmEh5vbhgJ0c+fspWI="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"xdId1twUuZ07UhH93bHtSekDLJ0=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"Ai49TdSSQSmEh5vbhgJ0c+fspWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FOMhBiWNioEUuwakQQtL2Tx9dSo="},{"type":"next-occurrence","id":"yX3sZF4pB9cQo8aZU4eYPFpHn0M="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"Ai49TdSSQSmEh5vbhgJ0c+fspWI=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"yX3sZF4pB9cQo8aZU4eYPFpHn0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JEFFERSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FOMhBiWNioEUuwakQQtL2Tx9dSo="}],"description":"Construction on JEFFERSON AVE eastbound between BROADWAY (New York) and BUSHWICK AVE (New York) for mainline track repairs., Wednesday May 6th, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-06T19:56:41Z"},"road_event_id":"yX3sZF4pB9cQo8aZU4eYPFpHn0M=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91751,40.687017]]}},{"id":"0afibAxTrjqhLxCWG4WHaqkq36s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XqEID0PumZBBiHRNFft0LbXYPmY="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"0afibAxTrjqhLxCWG4WHaqkq36s=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"XqEID0PumZBBiHRNFft0LbXYPmY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0afibAxTrjqhLxCWG4WHaqkq36s="},{"type":"next-occurrence","id":"fdfCJQFS+D9pvIF8ga3i0kP6esc="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"XqEID0PumZBBiHRNFft0LbXYPmY=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"fdfCJQFS+D9pvIF8ga3i0kP6esc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0afibAxTrjqhLxCWG4WHaqkq36s="},{"type":"next-occurrence","id":"VKFOA+EaOE19TOXoMTHjLIaiNNM="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"fdfCJQFS+D9pvIF8ga3i0kP6esc=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"VKFOA+EaOE19TOXoMTHjLIaiNNM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0afibAxTrjqhLxCWG4WHaqkq36s="},{"type":"next-occurrence","id":"VgJre1Zjb8sivYnVx3gvB3HzXEw="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"VKFOA+EaOE19TOXoMTHjLIaiNNM=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"VgJre1Zjb8sivYnVx3gvB3HzXEw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0afibAxTrjqhLxCWG4WHaqkq36s="},{"type":"next-occurrence","id":"Vv1RcKYoYS1/Jz1DTWe/NARdaRY="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"VgJre1Zjb8sivYnVx3gvB3HzXEw=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"Vv1RcKYoYS1/Jz1DTWe/NARdaRY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0afibAxTrjqhLxCWG4WHaqkq36s="},{"type":"next-occurrence","id":"hcuMe2WqCdoabcM/Ha2kBqyiPgw="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"Vv1RcKYoYS1/Jz1DTWe/NARdaRY=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"hcuMe2WqCdoabcM/Ha2kBqyiPgw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0afibAxTrjqhLxCWG4WHaqkq36s="},{"type":"next-occurrence","id":"VUoFoOHqY9Eg7GwyTAZQ8cgf750="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"hcuMe2WqCdoabcM/Ha2kBqyiPgw=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"VUoFoOHqY9Eg7GwyTAZQ8cgf750=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0afibAxTrjqhLxCWG4WHaqkq36s="},{"type":"next-occurrence","id":"eY7/kHsqICRe01cm30EgOomEgtE="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"VUoFoOHqY9Eg7GwyTAZQ8cgf750=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"eY7/kHsqICRe01cm30EgOomEgtE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0afibAxTrjqhLxCWG4WHaqkq36s="},{"type":"next-occurrence","id":"BuXY//zv970nn7G2vkDlthKGRl8="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"eY7/kHsqICRe01cm30EgOomEgtE=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"BuXY//zv970nn7G2vkDlthKGRl8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0afibAxTrjqhLxCWG4WHaqkq36s="},{"type":"next-occurrence","id":"1fquPXCbS1oGJ4tudrU1aRVmGuE="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"BuXY//zv970nn7G2vkDlthKGRl8=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"1fquPXCbS1oGJ4tudrU1aRVmGuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0afibAxTrjqhLxCWG4WHaqkq36s="}],"description":"Construction on JUNIUS ST southbound between DUMONT AVE (New York) and RIVERDALE AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:05:37Z"},"road_event_id":"1fquPXCbS1oGJ4tudrU1aRVmGuE=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"RIVERDALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90182,40.665184]]}},{"id":"9NbpIToVT3+rChRh0v+dCSU+63E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vYHjTPeTwc+5SOEr7ohmQbXLREQ="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"9NbpIToVT3+rChRh0v+dCSU+63E=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"vYHjTPeTwc+5SOEr7ohmQbXLREQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9NbpIToVT3+rChRh0v+dCSU+63E="},{"type":"next-occurrence","id":"CONlYatuunZu3TZMDA1fD8+Fe4g="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"vYHjTPeTwc+5SOEr7ohmQbXLREQ=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"CONlYatuunZu3TZMDA1fD8+Fe4g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9NbpIToVT3+rChRh0v+dCSU+63E="},{"type":"next-occurrence","id":"d+H5IGjfG3g3wRUrHBNcM+o4RJc="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"CONlYatuunZu3TZMDA1fD8+Fe4g=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"d+H5IGjfG3g3wRUrHBNcM+o4RJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9NbpIToVT3+rChRh0v+dCSU+63E="},{"type":"next-occurrence","id":"i01p0EYAQ8zx0v6qXh4SeeDY2XI="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"d+H5IGjfG3g3wRUrHBNcM+o4RJc=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"i01p0EYAQ8zx0v6qXh4SeeDY2XI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9NbpIToVT3+rChRh0v+dCSU+63E="},{"type":"next-occurrence","id":"T2XiUMGssnwdkRBSkSiVEtDsZu4="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"i01p0EYAQ8zx0v6qXh4SeeDY2XI=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"T2XiUMGssnwdkRBSkSiVEtDsZu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9NbpIToVT3+rChRh0v+dCSU+63E="},{"type":"next-occurrence","id":"d0ZQu1b1Z9aebBjur/9gn8zvrpY="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"T2XiUMGssnwdkRBSkSiVEtDsZu4=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"d0ZQu1b1Z9aebBjur/9gn8zvrpY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9NbpIToVT3+rChRh0v+dCSU+63E="},{"type":"next-occurrence","id":"Zhx1NfDVs/+G5KtSJzLeZ2vOKac="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"d0ZQu1b1Z9aebBjur/9gn8zvrpY=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"Zhx1NfDVs/+G5KtSJzLeZ2vOKac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9NbpIToVT3+rChRh0v+dCSU+63E="},{"type":"next-occurrence","id":"/gACV2ralHsKaLFFYllOyy/5C3w="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"Zhx1NfDVs/+G5KtSJzLeZ2vOKac=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"/gACV2ralHsKaLFFYllOyy/5C3w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9NbpIToVT3+rChRh0v+dCSU+63E="},{"type":"next-occurrence","id":"5SSiJYoNBetKRT2QAaUp6nqP65A="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"/gACV2ralHsKaLFFYllOyy/5C3w=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"5SSiJYoNBetKRT2QAaUp6nqP65A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9NbpIToVT3+rChRh0v+dCSU+63E="},{"type":"next-occurrence","id":"MDMAXSZ7AT6DL2E6dyL3eXumJoA="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"5SSiJYoNBetKRT2QAaUp6nqP65A=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"MDMAXSZ7AT6DL2E6dyL3eXumJoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JUNIUS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9NbpIToVT3+rChRh0v+dCSU+63E="}],"description":"Construction on JUNIUS ST southbound between LIVONIA AVE (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:08:04Z"},"road_event_id":"MDMAXSZ7AT6DL2E6dyL3eXumJoA=","beginning_cross_street":"LIVONIA AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901454,40.663766]]}},{"id":"7Pn2DDlycextyHibYXuqK7B9Pto=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sLU36zn7SeMmw5dHW6ouOnPFj2I="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"7Pn2DDlycextyHibYXuqK7B9Pto=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"sLU36zn7SeMmw5dHW6ouOnPFj2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Pn2DDlycextyHibYXuqK7B9Pto="},{"type":"next-occurrence","id":"rXcnKzvLTHP5DfFd+oPBV+pk/Ws="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"sLU36zn7SeMmw5dHW6ouOnPFj2I=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"rXcnKzvLTHP5DfFd+oPBV+pk/Ws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Pn2DDlycextyHibYXuqK7B9Pto="},{"type":"next-occurrence","id":"wIUsqT2rirrcKPOHfhUwLBSku1o="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"rXcnKzvLTHP5DfFd+oPBV+pk/Ws=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"wIUsqT2rirrcKPOHfhUwLBSku1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Pn2DDlycextyHibYXuqK7B9Pto="},{"type":"next-occurrence","id":"y8Osc7kFAW6pfDDwBV5aelpogy8="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"wIUsqT2rirrcKPOHfhUwLBSku1o=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"y8Osc7kFAW6pfDDwBV5aelpogy8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Pn2DDlycextyHibYXuqK7B9Pto="},{"type":"next-occurrence","id":"A5VT9euPDKoBa5SLbrfViyz1qtg="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"y8Osc7kFAW6pfDDwBV5aelpogy8=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"A5VT9euPDKoBa5SLbrfViyz1qtg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Pn2DDlycextyHibYXuqK7B9Pto="},{"type":"next-occurrence","id":"7pTrTs2PanHjEgbJhVBZ39H/WDA="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"A5VT9euPDKoBa5SLbrfViyz1qtg=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"7pTrTs2PanHjEgbJhVBZ39H/WDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Pn2DDlycextyHibYXuqK7B9Pto="},{"type":"next-occurrence","id":"pXldKhTqogtNX2ybwtIjyMzWf0A="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"7pTrTs2PanHjEgbJhVBZ39H/WDA=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"pXldKhTqogtNX2ybwtIjyMzWf0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Pn2DDlycextyHibYXuqK7B9Pto="},{"type":"next-occurrence","id":"RK8gQUxdqLfaMki2tRElZmW75cM="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"pXldKhTqogtNX2ybwtIjyMzWf0A=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"RK8gQUxdqLfaMki2tRElZmW75cM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Pn2DDlycextyHibYXuqK7B9Pto="},{"type":"next-occurrence","id":"1u1Pxq/1QnkgDiP7utHAPHNEnwY="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"RK8gQUxdqLfaMki2tRElZmW75cM=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"1u1Pxq/1QnkgDiP7utHAPHNEnwY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Pn2DDlycextyHibYXuqK7B9Pto="},{"type":"next-occurrence","id":"78cYrJjrXeSuFUzR46S+zajgBOo="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"1u1Pxq/1QnkgDiP7utHAPHNEnwY=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"78cYrJjrXeSuFUzR46S+zajgBOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Pn2DDlycextyHibYXuqK7B9Pto="}],"description":"Construction on LIVONIA AVE both directions between POWELL ST (New York) and JUNIUS ST (New York) for steel erection and mezzanine construction for MTA contract A-37140., Wednesday May 6th, 2026 thru Tuesday August 4th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-06T20:10:04Z"},"road_event_id":"78cYrJjrXeSuFUzR46S+zajgBOo=","beginning_cross_street":"POWELL ST","ending_cross_street":"JUNIUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.902346,40.663535]]}},{"id":"Ha70Vm4HvgbiKc8sHyq4e6khir8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations eastbound, 7 Line bypassing 103 St - Corona Plaza (New York) Use nearby Junction Blvd or 111 St stations. For service to this station, take the 7 line to 111 St and transfer to a Manhattan-bound train. For service from this station, take the 7 line to Junction Blvd and transfer to a Flushing-bound train., Continuous Thursday May 7th, 2026 12:00 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-06-04T11:40:10Z"},"road_event_id":"Ha70Vm4HvgbiKc8sHyq4e6khir8=","beginning_cross_street":"103 St - Corona Plaza","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.8627,40.749865]]}},{"id":"iH1BL/CnprojbmnMGRX6bfvm9q8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KKukAWl8YOL7C/OBZoYu7pxuTXg="}],"description":"Utility work on NY 133 eastbound between Marion Avenue (Mount Kisco) and Maple Avenue (Mount Kisco) 2026081845714/32740309 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Mo","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"iH1BL/CnprojbmnMGRX6bfvm9q8=","beginning_cross_street":"Marion Avenue","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732779,41.209233]]}},{"id":"KKukAWl8YOL7C/OBZoYu7pxuTXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iH1BL/CnprojbmnMGRX6bfvm9q8="},{"type":"next-occurrence","id":"IuHveeeMc40WX2NoP901lXslQuw="}],"description":"Utility work on NY 133 eastbound between Marion Avenue (Mount Kisco) and Maple Avenue (Mount Kisco) 2026081845714/32740309 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Mo","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"KKukAWl8YOL7C/OBZoYu7pxuTXg=","beginning_cross_street":"Marion Avenue","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732779,41.209233]]}},{"id":"IuHveeeMc40WX2NoP901lXslQuw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iH1BL/CnprojbmnMGRX6bfvm9q8="},{"type":"next-occurrence","id":"QZ/NJNogXe+aW4dxiAqwGtgG8tA="}],"description":"Utility work on NY 133 eastbound between Marion Avenue (Mount Kisco) and Maple Avenue (Mount Kisco) 2026081845714/32740309 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Mo","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"IuHveeeMc40WX2NoP901lXslQuw=","beginning_cross_street":"Marion Avenue","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732779,41.209233]]}},{"id":"QZ/NJNogXe+aW4dxiAqwGtgG8tA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iH1BL/CnprojbmnMGRX6bfvm9q8="},{"type":"next-occurrence","id":"fHJbA7fppx4xnNQQxar3yPIustk="}],"description":"Utility work on NY 133 eastbound between Marion Avenue (Mount Kisco) and Maple Avenue (Mount Kisco) 2026081845714/32740309 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Mo","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"QZ/NJNogXe+aW4dxiAqwGtgG8tA=","beginning_cross_street":"Marion Avenue","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732779,41.209233]]}},{"id":"fHJbA7fppx4xnNQQxar3yPIustk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iH1BL/CnprojbmnMGRX6bfvm9q8="},{"type":"next-occurrence","id":"DjIPl5jvPIoC1HAfwTI3uQwjzBU="}],"description":"Utility work on NY 133 eastbound between Marion Avenue (Mount Kisco) and Maple Avenue (Mount Kisco) 2026081845714/32740309 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Mo","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"fHJbA7fppx4xnNQQxar3yPIustk=","beginning_cross_street":"Marion Avenue","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732779,41.209233]]}},{"id":"DjIPl5jvPIoC1HAfwTI3uQwjzBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iH1BL/CnprojbmnMGRX6bfvm9q8="},{"type":"next-occurrence","id":"3dN//H9Nq59BaMqnHNl+mrRStW4="}],"description":"Utility work on NY 133 eastbound between Marion Avenue (Mount Kisco) and Maple Avenue (Mount Kisco) 2026081845714/32740309 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Mo","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"DjIPl5jvPIoC1HAfwTI3uQwjzBU=","beginning_cross_street":"Marion Avenue","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732779,41.209233]]}},{"id":"3dN//H9Nq59BaMqnHNl+mrRStW4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iH1BL/CnprojbmnMGRX6bfvm9q8="},{"type":"next-occurrence","id":"c2Av5aOmRqUNiKge+ATF1tX3hms="}],"description":"Utility work on NY 133 eastbound between Marion Avenue (Mount Kisco) and Maple Avenue (Mount Kisco) 2026081845714/32740309 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Mo","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"3dN//H9Nq59BaMqnHNl+mrRStW4=","beginning_cross_street":"Marion Avenue","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732779,41.209233]]}},{"id":"c2Av5aOmRqUNiKge+ATF1tX3hms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iH1BL/CnprojbmnMGRX6bfvm9q8="},{"type":"next-occurrence","id":"RRfD8MEbsG+h7ZR8lA3ht8NnWFI="}],"description":"Utility work on NY 133 eastbound between Marion Avenue (Mount Kisco) and Maple Avenue (Mount Kisco) 2026081845714/32740309 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Mo","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"c2Av5aOmRqUNiKge+ATF1tX3hms=","beginning_cross_street":"Marion Avenue","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732779,41.209233]]}},{"id":"RRfD8MEbsG+h7ZR8lA3ht8NnWFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iH1BL/CnprojbmnMGRX6bfvm9q8="},{"type":"next-occurrence","id":"8tqE+5Q8qHV7ImPmq4+PMxi7cec="}],"description":"Utility work on NY 133 eastbound between Marion Avenue (Mount Kisco) and Maple Avenue (Mount Kisco) 2026081845714/32740309 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Mo","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"RRfD8MEbsG+h7ZR8lA3ht8NnWFI=","beginning_cross_street":"Marion Avenue","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732779,41.209233]]}},{"id":"8tqE+5Q8qHV7ImPmq4+PMxi7cec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iH1BL/CnprojbmnMGRX6bfvm9q8="},{"type":"next-occurrence","id":"qce6icbR2X0JZpwqyxXHHMeW5Eo="}],"description":"Utility work on NY 133 eastbound between Marion Avenue (Mount Kisco) and Maple Avenue (Mount Kisco) 2026081845714/32740309 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Mo","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"8tqE+5Q8qHV7ImPmq4+PMxi7cec=","beginning_cross_street":"Marion Avenue","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732779,41.209233]]}},{"id":"qce6icbR2X0JZpwqyxXHHMeW5Eo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iH1BL/CnprojbmnMGRX6bfvm9q8="},{"type":"next-occurrence","id":"7MUnhUAdtm398N0ODI+YyB6IQIU="}],"description":"Utility work on NY 133 eastbound between Marion Avenue (Mount Kisco) and Maple Avenue (Mount Kisco) 2026081845714/32740309 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Mo","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"qce6icbR2X0JZpwqyxXHHMeW5Eo=","beginning_cross_street":"Marion Avenue","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732779,41.209233]]}},{"id":"7MUnhUAdtm398N0ODI+YyB6IQIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iH1BL/CnprojbmnMGRX6bfvm9q8="}],"description":"Utility work on NY 133 eastbound between Marion Avenue (Mount Kisco) and Maple Avenue (Mount Kisco) 2026081845714/32740309 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 8th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Mo","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"7MUnhUAdtm398N0ODI+YyB6IQIU=","beginning_cross_street":"Marion Avenue","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732779,41.209233]]}},{"id":"e1vGnvXZVEPw0s4ZoD4Z3dpyozQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mdIeJ1IMF5OeANrkFFQgL2M8Iqo="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"e1vGnvXZVEPw0s4ZoD4Z3dpyozQ=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"mdIeJ1IMF5OeANrkFFQgL2M8Iqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e1vGnvXZVEPw0s4ZoD4Z3dpyozQ="},{"type":"next-occurrence","id":"Y06JX/4jZSv7NyAVBuLTbYT1Gvs="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"mdIeJ1IMF5OeANrkFFQgL2M8Iqo=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"Y06JX/4jZSv7NyAVBuLTbYT1Gvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e1vGnvXZVEPw0s4ZoD4Z3dpyozQ="},{"type":"next-occurrence","id":"IkE0QdEkkuhi42yt/c9wOwpkJ0Y="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"Y06JX/4jZSv7NyAVBuLTbYT1Gvs=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"IkE0QdEkkuhi42yt/c9wOwpkJ0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e1vGnvXZVEPw0s4ZoD4Z3dpyozQ="},{"type":"next-occurrence","id":"Qw4HRLJqSPPMJLy1oYMXQLnqgzI="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"IkE0QdEkkuhi42yt/c9wOwpkJ0Y=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"Qw4HRLJqSPPMJLy1oYMXQLnqgzI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e1vGnvXZVEPw0s4ZoD4Z3dpyozQ="},{"type":"next-occurrence","id":"SzjFEE54UAGUJeIl7BLf7VeN/aw="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"Qw4HRLJqSPPMJLy1oYMXQLnqgzI=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"SzjFEE54UAGUJeIl7BLf7VeN/aw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e1vGnvXZVEPw0s4ZoD4Z3dpyozQ="},{"type":"next-occurrence","id":"73uNnXGAtGHvOkrGGyvAMAFzZeQ="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"SzjFEE54UAGUJeIl7BLf7VeN/aw=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"73uNnXGAtGHvOkrGGyvAMAFzZeQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e1vGnvXZVEPw0s4ZoD4Z3dpyozQ="},{"type":"next-occurrence","id":"PUk/Bl0lxWm9imAy7ePJmab7ILc="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"73uNnXGAtGHvOkrGGyvAMAFzZeQ=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"PUk/Bl0lxWm9imAy7ePJmab7ILc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e1vGnvXZVEPw0s4ZoD4Z3dpyozQ="},{"type":"next-occurrence","id":"OWb1pjX3fjNpQuqFI8uYGjPnB90="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"PUk/Bl0lxWm9imAy7ePJmab7ILc=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"OWb1pjX3fjNpQuqFI8uYGjPnB90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e1vGnvXZVEPw0s4ZoD4Z3dpyozQ="},{"type":"next-occurrence","id":"0TAcQa2rnArWnJX3yfke/kzPNhU="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"OWb1pjX3fjNpQuqFI8uYGjPnB90=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"0TAcQa2rnArWnJX3yfke/kzPNhU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e1vGnvXZVEPw0s4ZoD4Z3dpyozQ="},{"type":"next-occurrence","id":"9JNauIw+wAbsOA0lxe3rLDE7ekM="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"0TAcQa2rnArWnJX3yfke/kzPNhU=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"9JNauIw+wAbsOA0lxe3rLDE7ekM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e1vGnvXZVEPw0s4ZoD4Z3dpyozQ="},{"type":"next-occurrence","id":"BxLvTe6IFIN2INT2mtsoipE5byA="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"9JNauIw+wAbsOA0lxe3rLDE7ekM=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"BxLvTe6IFIN2INT2mtsoipE5byA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e1vGnvXZVEPw0s4ZoD4Z3dpyozQ="}],"description":"Gas main work on NY 117 northbound between Setters Lane (Mount Pleasant) and Woodland Drive (Mount Pleasant) 2026085056335/32740409 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Friday July 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 18th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 20th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 27th, 2026 thru Friday July 31st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday August 1st, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday August 3rd, 2026 thru Friday August 7th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:37Z"},"road_event_id":"BxLvTe6IFIN2INT2mtsoipE5byA=","beginning_cross_street":"Setters Lane","ending_cross_street":"Woodland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802879,41.127269]]}},{"id":"s9nWuvIuYy7a2m5XPz3yB0vY8Vg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tQbNvfFyBtzg9U40zJGw+v6Rsso="}],"description":"Gas main work on NY 52 both directions between Jackson Street (Fishkill) and Robinson Street (Fishkill) 2026084636715/NIGHT/32727809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-30T10:00:31Z"},"road_event_id":"s9nWuvIuYy7a2m5XPz3yB0vY8Vg=","beginning_cross_street":"","ending_cross_street":"Robinson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904742,41.534007]]}},{"id":"tQbNvfFyBtzg9U40zJGw+v6Rsso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9nWuvIuYy7a2m5XPz3yB0vY8Vg="},{"type":"next-occurrence","id":"aj5J02YJEyq38G4r1IYzTQTb4PU="}],"description":"Gas main work on NY 52 both directions between Jackson Street (Fishkill) and Robinson Street (Fishkill) 2026084636715/NIGHT/32727809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-30T10:00:31Z"},"road_event_id":"tQbNvfFyBtzg9U40zJGw+v6Rsso=","beginning_cross_street":"","ending_cross_street":"Robinson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904742,41.534007]]}},{"id":"aj5J02YJEyq38G4r1IYzTQTb4PU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9nWuvIuYy7a2m5XPz3yB0vY8Vg="},{"type":"next-occurrence","id":"gVSBm1oE9lu2lUv45V9pxzv5GZU="}],"description":"Gas main work on NY 52 both directions between Jackson Street (Fishkill) and Robinson Street (Fishkill) 2026084636715/NIGHT/32727809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-30T10:00:31Z"},"road_event_id":"aj5J02YJEyq38G4r1IYzTQTb4PU=","beginning_cross_street":"","ending_cross_street":"Robinson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904742,41.534007]]}},{"id":"gVSBm1oE9lu2lUv45V9pxzv5GZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9nWuvIuYy7a2m5XPz3yB0vY8Vg="},{"type":"next-occurrence","id":"wyN1NUvCjM84ZHuz32+S2KxPG4o="}],"description":"Gas main work on NY 52 both directions between Jackson Street (Fishkill) and Robinson Street (Fishkill) 2026084636715/NIGHT/32727809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-30T10:00:31Z"},"road_event_id":"gVSBm1oE9lu2lUv45V9pxzv5GZU=","beginning_cross_street":"","ending_cross_street":"Robinson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904742,41.534007]]}},{"id":"wyN1NUvCjM84ZHuz32+S2KxPG4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9nWuvIuYy7a2m5XPz3yB0vY8Vg="},{"type":"next-occurrence","id":"s+65NNES3WzWpwvPRvcmkwkAXDg="}],"description":"Gas main work on NY 52 both directions between Jackson Street (Fishkill) and Robinson Street (Fishkill) 2026084636715/NIGHT/32727809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-30T10:00:31Z"},"road_event_id":"wyN1NUvCjM84ZHuz32+S2KxPG4o=","beginning_cross_street":"","ending_cross_street":"Robinson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904742,41.534007]]}},{"id":"s+65NNES3WzWpwvPRvcmkwkAXDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9nWuvIuYy7a2m5XPz3yB0vY8Vg="}],"description":"Gas main work on NY 52 both directions between Jackson Street (Fishkill) and Robinson Street (Fishkill) 2026084636715/NIGHT/32727809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-05-30T10:00:31Z"},"road_event_id":"s+65NNES3WzWpwvPRvcmkwkAXDg=","beginning_cross_street":"","ending_cross_street":"Robinson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904742,41.534007]]}},{"id":"PgU59fjRA7LScp0oCn3vBm5dD6k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 116"],"direction":"unknown","related_road_events":[],"description":"Bridge maintenance operations on NY 116 both directions between Hunts Lane (North Salem) and Peach Lake Road - NY 121 (North Salem) D265445/32700709 - 24/7 LANE CLOSURE - This work is weather permitting, Plan travel accordingly; delays may exist, Continuous Thursday May 7th, 2026 12:00 AM thru Thursday December 31st, 2026 12:00 AM alternating traffic","update_date":"2026-05-07T12:44:47Z"},"road_event_id":"PgU59fjRA7LScp0oCn3vBm5dD6k=","beginning_cross_street":"Hunts Lane","ending_cross_street":"Peach Lake Road - NY 121","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.549337,41.330566]]}},{"id":"1M93utsYJ4FQH5PHxEid84eXJzM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sGdH1dxvoqTgLnrC29+NFfglPOQ="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon Blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Friday May 8th, 2026 thru Saturday June 27th, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-05-07T21:48:01Z"},"road_event_id":"1M93utsYJ4FQH5PHxEid84eXJzM=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T05:30:00Z","end_date":"2026-06-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"sGdH1dxvoqTgLnrC29+NFfglPOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1M93utsYJ4FQH5PHxEid84eXJzM="},{"type":"next-occurrence","id":"3ClkNN3uvRvXDWadIbQcPaUgoS8="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon Blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Friday May 8th, 2026 thru Saturday June 27th, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-05-07T21:48:01Z"},"road_event_id":"sGdH1dxvoqTgLnrC29+NFfglPOQ=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T05:30:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"3ClkNN3uvRvXDWadIbQcPaUgoS8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1M93utsYJ4FQH5PHxEid84eXJzM="},{"type":"next-occurrence","id":"tBnGTQEdriqF5yyc25g2UApBLu4="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon Blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Friday May 8th, 2026 thru Saturday June 27th, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-05-07T21:48:01Z"},"road_event_id":"3ClkNN3uvRvXDWadIbQcPaUgoS8=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T05:30:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"tBnGTQEdriqF5yyc25g2UApBLu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1M93utsYJ4FQH5PHxEid84eXJzM="},{"type":"next-occurrence","id":"b4ON4sR+7l4/4Kca6lKCleu1H20="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon Blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Friday May 8th, 2026 thru Saturday June 27th, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-05-07T21:48:01Z"},"road_event_id":"tBnGTQEdriqF5yyc25g2UApBLu4=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T05:30:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"b4ON4sR+7l4/4Kca6lKCleu1H20=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1M93utsYJ4FQH5PHxEid84eXJzM="},{"type":"next-occurrence","id":"eD0kCAdPksr7GJ2tzEQg/u2CBH4="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon Blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Friday May 8th, 2026 thru Saturday June 27th, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-05-07T21:48:01Z"},"road_event_id":"b4ON4sR+7l4/4Kca6lKCleu1H20=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T05:30:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"eD0kCAdPksr7GJ2tzEQg/u2CBH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1M93utsYJ4FQH5PHxEid84eXJzM="},{"type":"next-occurrence","id":"3xYbfDNF6lc3ULUzX1nk6v1ViMs="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon Blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Friday May 8th, 2026 thru Saturday June 27th, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-05-07T21:48:01Z"},"road_event_id":"eD0kCAdPksr7GJ2tzEQg/u2CBH4=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T05:30:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"3xYbfDNF6lc3ULUzX1nk6v1ViMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1M93utsYJ4FQH5PHxEid84eXJzM="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon Blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Friday May 8th, 2026 thru Saturday June 27th, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-05-07T21:48:01Z"},"road_event_id":"3xYbfDNF6lc3ULUzX1nk6v1ViMs=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T05:30:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"VIlH0VZjfDJfIxoyDyfcdsnKfHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DEqMLzpEI1KXnSb1Hl+rvADUCI0="}],"description":"Construction on NY 46 both directions between Erie Boulevard; NY 49; South James Street; NY 46; NY 26 (Rome) and South George Street (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 03:30 PM,","update_date":"2026-06-05T11:41:56Z"},"road_event_id":"VIlH0VZjfDJfIxoyDyfcdsnKfHw=","beginning_cross_street":"Erie Boulevard; NY 49; South James Street; NY 46; NY 26","ending_cross_street":"South George Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.458396,43.2098]]}},{"id":"DEqMLzpEI1KXnSb1Hl+rvADUCI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VIlH0VZjfDJfIxoyDyfcdsnKfHw="},{"type":"next-occurrence","id":"fY9ASlfcJbGRXo3U/figAKymbCY="}],"description":"Construction on NY 46 both directions between Erie Boulevard; NY 49; South James Street; NY 46; NY 26 (Rome) and South George Street (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 03:30 PM,","update_date":"2026-06-05T11:41:56Z"},"road_event_id":"DEqMLzpEI1KXnSb1Hl+rvADUCI0=","beginning_cross_street":"Erie Boulevard; NY 49; South James Street; NY 46; NY 26","ending_cross_street":"South George Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.458396,43.2098]]}},{"id":"fY9ASlfcJbGRXo3U/figAKymbCY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VIlH0VZjfDJfIxoyDyfcdsnKfHw="},{"type":"next-occurrence","id":"OulcWAG2yP9woCpaRtA4StqrHUw="}],"description":"Construction on NY 46 both directions between Erie Boulevard; NY 49; South James Street; NY 46; NY 26 (Rome) and South George Street (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 03:30 PM,","update_date":"2026-06-05T11:41:56Z"},"road_event_id":"fY9ASlfcJbGRXo3U/figAKymbCY=","beginning_cross_street":"Erie Boulevard; NY 49; South James Street; NY 46; NY 26","ending_cross_street":"South George Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.458396,43.2098]]}},{"id":"OulcWAG2yP9woCpaRtA4StqrHUw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VIlH0VZjfDJfIxoyDyfcdsnKfHw="},{"type":"next-occurrence","id":"t1561zJdZsGLmL19J2y6jikekuU="}],"description":"Construction on NY 46 both directions between Erie Boulevard; NY 49; South James Street; NY 46; NY 26 (Rome) and South George Street (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 03:30 PM,","update_date":"2026-06-05T11:41:56Z"},"road_event_id":"OulcWAG2yP9woCpaRtA4StqrHUw=","beginning_cross_street":"Erie Boulevard; NY 49; South James Street; NY 46; NY 26","ending_cross_street":"South George Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.458396,43.2098]]}},{"id":"t1561zJdZsGLmL19J2y6jikekuU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VIlH0VZjfDJfIxoyDyfcdsnKfHw="},{"type":"next-occurrence","id":"+uTVvZYNWPUKgosIbfclkSJTn9k="}],"description":"Construction on NY 46 both directions between Erie Boulevard; NY 49; South James Street; NY 46; NY 26 (Rome) and South George Street (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 03:30 PM,","update_date":"2026-06-05T11:41:56Z"},"road_event_id":"t1561zJdZsGLmL19J2y6jikekuU=","beginning_cross_street":"Erie Boulevard; NY 49; South James Street; NY 46; NY 26","ending_cross_street":"South George Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.458396,43.2098]]}},{"id":"+uTVvZYNWPUKgosIbfclkSJTn9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VIlH0VZjfDJfIxoyDyfcdsnKfHw="}],"description":"Construction on NY 46 both directions between Erie Boulevard; NY 49; South James Street; NY 46; NY 26 (Rome) and South George Street (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 03:30 PM,","update_date":"2026-06-05T11:41:56Z"},"road_event_id":"+uTVvZYNWPUKgosIbfclkSJTn9k=","beginning_cross_street":"Erie Boulevard; NY 49; South James Street; NY 46; NY 26","ending_cross_street":"South George Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.458396,43.2098]]}},{"id":"xUyFK/VV+ylM8EM+DFBBcGdWAl4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5S"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 5S eastbound over Reese Road (Frankfort) Motorists will encounter an eastbound lane closure, Continuous Friday June 5th, 2026 4:00 PM thru Wednesday June 17th, 2026 4:00 PM","update_date":"2026-06-05T11:22:30Z"},"road_event_id":"xUyFK/VV+ylM8EM+DFBBcGdWAl4=","beginning_cross_street":"Reese Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.071306,43.02514]]}},{"id":"ORC300545554","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 155"],"direction":"unknown","description":"Safety improvements on NY 155 eastbound at Loudon Road; US 9 (Colonie) Not currently Scheduled","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"ORC300545554","beginning_cross_street":"Loudon Road; US 9","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-08T12:24:22Z","end_date":"2026-05-30T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.762214,42.736815]]}},{"id":"bAVKfiy+AiXDRJuDMX1+qGGV/U8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[],"description":"Construction on Franklin D. Roosevelt Drive both directions between Brooklyn Bridge (New York) and Harlem River Drive at Exit 19 - East 127th Street (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 11:00 PM thru 05:30 AM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-05-28T20:44:19Z"},"road_event_id":"bAVKfiy+AiXDRJuDMX1+qGGV/U8=","beginning_cross_street":"Brooklyn Bridge","ending_cross_street":"Exit 19 - East 127th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999156,40.708192]]}},{"id":"0YGs/jVJh7fuvBMg9/FaS9SmOTQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12E"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 12E both directions NY 180 (Brownville) NY Rte. 12E closed to ALL traffic at bridge crossing Perch River in Limerick. Traffic shall follow signed detour, Continuous Tuesday May 12th, 2026 12:00 AM thru Sunday November 15th, 2026 11:59 PM All lanes closed","update_date":"2026-05-26T18:33:18Z"},"road_event_id":"0YGs/jVJh7fuvBMg9/FaS9SmOTQ=","beginning_cross_street":"NY 180","ending_cross_street":"NY 180","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.047167,44.029041]]}},{"id":"+/wHPcoEoR2t6rsKadJOyOtAn8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PiOes+48W6liPKRwpN6Rs5zV//A="}],"description":"Milling and repaving on I-490 both directions Exit 2 - NY 33A (Riga) to Exit 6 - NY 204 (Gates) Mobile operation, Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 05:00 AM thru 07:00 PM All lanes","update_date":"2026-06-03T12:03:42Z"},"road_event_id":"+/wHPcoEoR2t6rsKadJOyOtAn8A=","beginning_cross_street":"Exit 2 - NY 33A","ending_cross_street":"Exit 6 - NY 204","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T09:00:00Z","end_date":"2026-06-05T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.934343,43.072824]]}},{"id":"PiOes+48W6liPKRwpN6Rs5zV//A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+/wHPcoEoR2t6rsKadJOyOtAn8A="},{"type":"next-occurrence","id":"b6GMUBGXE4fGbx5Z4+ZJZzJ0xco="}],"description":"Milling and repaving on I-490 both directions Exit 2 - NY 33A (Riga) to Exit 6 - NY 204 (Gates) Mobile operation, Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 05:00 AM thru 07:00 PM All lanes","update_date":"2026-06-03T12:03:42Z"},"road_event_id":"PiOes+48W6liPKRwpN6Rs5zV//A=","beginning_cross_street":"Exit 2 - NY 33A","ending_cross_street":"Exit 6 - NY 204","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T09:00:00Z","end_date":"2026-06-08T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.934343,43.072824]]}},{"id":"b6GMUBGXE4fGbx5Z4+ZJZzJ0xco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+/wHPcoEoR2t6rsKadJOyOtAn8A="},{"type":"next-occurrence","id":"t5Sx1U2U/GnXJ2mSlN2/JUJEbzA="}],"description":"Milling and repaving on I-490 both directions Exit 2 - NY 33A (Riga) to Exit 6 - NY 204 (Gates) Mobile operation, Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 05:00 AM thru 07:00 PM All lanes","update_date":"2026-06-03T12:03:42Z"},"road_event_id":"b6GMUBGXE4fGbx5Z4+ZJZzJ0xco=","beginning_cross_street":"Exit 2 - NY 33A","ending_cross_street":"Exit 6 - NY 204","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T09:00:00Z","end_date":"2026-06-09T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.934343,43.072824]]}},{"id":"t5Sx1U2U/GnXJ2mSlN2/JUJEbzA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+/wHPcoEoR2t6rsKadJOyOtAn8A="},{"type":"next-occurrence","id":"aOKqTDlCYNO5ztsbNYeL61jZ0Bg="}],"description":"Milling and repaving on I-490 both directions Exit 2 - NY 33A (Riga) to Exit 6 - NY 204 (Gates) Mobile operation, Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 05:00 AM thru 07:00 PM All lanes","update_date":"2026-06-03T12:03:42Z"},"road_event_id":"t5Sx1U2U/GnXJ2mSlN2/JUJEbzA=","beginning_cross_street":"Exit 2 - NY 33A","ending_cross_street":"Exit 6 - NY 204","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T09:00:00Z","end_date":"2026-06-10T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.934343,43.072824]]}},{"id":"aOKqTDlCYNO5ztsbNYeL61jZ0Bg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+/wHPcoEoR2t6rsKadJOyOtAn8A="},{"type":"next-occurrence","id":"FAiSAiz0HLKe0P3BBQVCIBk1OOY="}],"description":"Milling and repaving on I-490 both directions Exit 2 - NY 33A (Riga) to Exit 6 - NY 204 (Gates) Mobile operation, Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 05:00 AM thru 07:00 PM All lanes","update_date":"2026-06-03T12:03:42Z"},"road_event_id":"aOKqTDlCYNO5ztsbNYeL61jZ0Bg=","beginning_cross_street":"Exit 2 - NY 33A","ending_cross_street":"Exit 6 - NY 204","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T09:00:00Z","end_date":"2026-06-11T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.934343,43.072824]]}},{"id":"FAiSAiz0HLKe0P3BBQVCIBk1OOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+/wHPcoEoR2t6rsKadJOyOtAn8A="},{"type":"next-occurrence","id":"vqjQUxDK+dC0GnsyQwbUneomf0I="}],"description":"Milling and repaving on I-490 both directions Exit 2 - NY 33A (Riga) to Exit 6 - NY 204 (Gates) Mobile operation, Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 05:00 AM thru 07:00 PM All lanes","update_date":"2026-06-03T12:03:42Z"},"road_event_id":"FAiSAiz0HLKe0P3BBQVCIBk1OOY=","beginning_cross_street":"Exit 2 - NY 33A","ending_cross_street":"Exit 6 - NY 204","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T09:00:00Z","end_date":"2026-06-12T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.934343,43.072824]]}},{"id":"vqjQUxDK+dC0GnsyQwbUneomf0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+/wHPcoEoR2t6rsKadJOyOtAn8A="},{"type":"next-occurrence","id":"gUWnq7LD6TN0i95gY/9PxK9ZX2c="}],"description":"Milling and repaving on I-490 both directions Exit 2 - NY 33A (Riga) to Exit 6 - NY 204 (Gates) Mobile operation, Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 05:00 AM thru 07:00 PM All lanes","update_date":"2026-06-03T12:03:42Z"},"road_event_id":"vqjQUxDK+dC0GnsyQwbUneomf0I=","beginning_cross_street":"Exit 2 - NY 33A","ending_cross_street":"Exit 6 - NY 204","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T09:00:00Z","end_date":"2026-06-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.934343,43.072824]]}},{"id":"gUWnq7LD6TN0i95gY/9PxK9ZX2c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+/wHPcoEoR2t6rsKadJOyOtAn8A="},{"type":"next-occurrence","id":"0W8l2dK7ELfkFbFJaclEjSse7bc="}],"description":"Milling and repaving on I-490 both directions Exit 2 - NY 33A (Riga) to Exit 6 - NY 204 (Gates) Mobile operation, Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 05:00 AM thru 07:00 PM All lanes","update_date":"2026-06-03T12:03:42Z"},"road_event_id":"gUWnq7LD6TN0i95gY/9PxK9ZX2c=","beginning_cross_street":"Exit 2 - NY 33A","ending_cross_street":"Exit 6 - NY 204","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T09:00:00Z","end_date":"2026-06-16T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.934343,43.072824]]}},{"id":"0W8l2dK7ELfkFbFJaclEjSse7bc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+/wHPcoEoR2t6rsKadJOyOtAn8A="},{"type":"next-occurrence","id":"U0xHV47b6TcXZ84H31w4nWsk3kY="}],"description":"Milling and repaving on I-490 both directions Exit 2 - NY 33A (Riga) to Exit 6 - NY 204 (Gates) Mobile operation, Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 05:00 AM thru 07:00 PM All lanes","update_date":"2026-06-03T12:03:42Z"},"road_event_id":"0W8l2dK7ELfkFbFJaclEjSse7bc=","beginning_cross_street":"Exit 2 - NY 33A","ending_cross_street":"Exit 6 - NY 204","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T09:00:00Z","end_date":"2026-06-17T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.934343,43.072824]]}},{"id":"U0xHV47b6TcXZ84H31w4nWsk3kY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+/wHPcoEoR2t6rsKadJOyOtAn8A="},{"type":"next-occurrence","id":"iXM4A++VkarKJi9zOf67pxmOVds="}],"description":"Milling and repaving on I-490 both directions Exit 2 - NY 33A (Riga) to Exit 6 - NY 204 (Gates) Mobile operation, Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 05:00 AM thru 07:00 PM All lanes","update_date":"2026-06-03T12:03:42Z"},"road_event_id":"U0xHV47b6TcXZ84H31w4nWsk3kY=","beginning_cross_street":"Exit 2 - NY 33A","ending_cross_street":"Exit 6 - NY 204","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T09:00:00Z","end_date":"2026-06-18T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.934343,43.072824]]}},{"id":"iXM4A++VkarKJi9zOf67pxmOVds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+/wHPcoEoR2t6rsKadJOyOtAn8A="}],"description":"Milling and repaving on I-490 both directions Exit 2 - NY 33A (Riga) to Exit 6 - NY 204 (Gates) Mobile operation, Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 05:00 AM thru 07:00 PM All lanes","update_date":"2026-06-03T12:03:42Z"},"road_event_id":"iXM4A++VkarKJi9zOf67pxmOVds=","beginning_cross_street":"Exit 2 - NY 33A","ending_cross_street":"Exit 6 - NY 204","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T09:00:00Z","end_date":"2026-06-19T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.934343,43.072824]]}},{"id":"ORC300546197","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Lincoln Tunnel"],"direction":"unknown","description":"Construction on Lincoln Tunnel Center Tube both directions New Jersey Side (Weehawken Twp) to New York Side (New York) Not currently Scheduled","update_date":"2026-05-30T04:14:21Z"},"road_event_id":"ORC300546197","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-10T03:11:30Z","end_date":"2026-05-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.016823,40.765934]]}},{"id":"PDz6qPrqJYlfML1R7c5JslamSkQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kkeKqXUv5Z4uPNYpWasFbW6zyNM="}],"description":"Utility work on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"PDz6qPrqJYlfML1R7c5JslamSkQ=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"kkeKqXUv5Z4uPNYpWasFbW6zyNM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PDz6qPrqJYlfML1R7c5JslamSkQ="},{"type":"next-occurrence","id":"NW0LYQdQggO/EJjIlB1tV9Z/pXE="}],"description":"Utility work on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"kkeKqXUv5Z4uPNYpWasFbW6zyNM=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"NW0LYQdQggO/EJjIlB1tV9Z/pXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PDz6qPrqJYlfML1R7c5JslamSkQ="},{"type":"next-occurrence","id":"3SRCnlQBbIlqauHlgfbd7MbZnt8="}],"description":"Utility work on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"NW0LYQdQggO/EJjIlB1tV9Z/pXE=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"3SRCnlQBbIlqauHlgfbd7MbZnt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PDz6qPrqJYlfML1R7c5JslamSkQ="},{"type":"next-occurrence","id":"DZoVsgBOFMre52yQS8HPCoQQyCE="}],"description":"Utility work on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"3SRCnlQBbIlqauHlgfbd7MbZnt8=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"DZoVsgBOFMre52yQS8HPCoQQyCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PDz6qPrqJYlfML1R7c5JslamSkQ="},{"type":"next-occurrence","id":"uGDpfTxr3yrV5QFuMsIYNLxCV8M="}],"description":"Utility work on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"DZoVsgBOFMre52yQS8HPCoQQyCE=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"uGDpfTxr3yrV5QFuMsIYNLxCV8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PDz6qPrqJYlfML1R7c5JslamSkQ="},{"type":"next-occurrence","id":"gOcC8LUA66xIs5q3TgZ4ldmfgSc="}],"description":"Utility work on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"uGDpfTxr3yrV5QFuMsIYNLxCV8M=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"gOcC8LUA66xIs5q3TgZ4ldmfgSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PDz6qPrqJYlfML1R7c5JslamSkQ="},{"type":"next-occurrence","id":"Z9XMthFvkJEXm+rXHfQJATHKQ7c="}],"description":"Utility work on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"gOcC8LUA66xIs5q3TgZ4ldmfgSc=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"Z9XMthFvkJEXm+rXHfQJATHKQ7c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PDz6qPrqJYlfML1R7c5JslamSkQ="},{"type":"next-occurrence","id":"ZJzVk/idGizIlwYzALzBB+oqIqk="}],"description":"Utility work on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"Z9XMthFvkJEXm+rXHfQJATHKQ7c=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:30:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"ZJzVk/idGizIlwYzALzBB+oqIqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PDz6qPrqJYlfML1R7c5JslamSkQ="},{"type":"next-occurrence","id":"Dqgz56Cg27ZYFj1cyRGY8d3cPWs="}],"description":"Utility work on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"ZJzVk/idGizIlwYzALzBB+oqIqk=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:30:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"Dqgz56Cg27ZYFj1cyRGY8d3cPWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PDz6qPrqJYlfML1R7c5JslamSkQ="},{"type":"next-occurrence","id":"zs2eB/kxF64Z/uqNByfRwhwdADo="}],"description":"Utility work on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"Dqgz56Cg27ZYFj1cyRGY8d3cPWs=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:30:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"zs2eB/kxF64Z/uqNByfRwhwdADo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PDz6qPrqJYlfML1R7c5JslamSkQ="},{"type":"next-occurrence","id":"HBRIhUDB9Zm4Ycr0MyANsX51rws="}],"description":"Utility work on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"zs2eB/kxF64Z/uqNByfRwhwdADo=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:30:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"HBRIhUDB9Zm4Ycr0MyANsX51rws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PDz6qPrqJYlfML1R7c5JslamSkQ="}],"description":"Utility work on US 9 southbound between Leroy Avenue (Tarrytown) and Prospect Avenue (Tarrytown) 2026085499839/32742609 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:30 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:30:58Z"},"road_event_id":"HBRIhUDB9Zm4Ycr0MyANsX51rws=","beginning_cross_street":"Leroy Avenue","ending_cross_street":"Prospect Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:30:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861291,41.069911]]}},{"id":"BG0kIguJ8KNHpPBEb3jHt/Hqxzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Longterm construction on I-690 eastbound between I-81 Northbound (Syracuse) and Exit 17 - Teall Avenue (Syracuse), Continuous Monday May 11th, 2026 09:00 AM thru Tuesday June 30th, 2026 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-05-11T11:02:13Z"},"road_event_id":"BG0kIguJ8KNHpPBEb3jHt/Hqxzc=","beginning_cross_street":"I-81 Northbound","ending_cross_street":"Exit 17 - Teall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.139797,43.05149]]}},{"id":"zVAEQerNS5RmqzprcojA34MfZMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"neNatt/Gm5YrtPcPJtpgOAuCXMk="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:38Z"},"road_event_id":"zVAEQerNS5RmqzprcojA34MfZMk=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"neNatt/Gm5YrtPcPJtpgOAuCXMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVAEQerNS5RmqzprcojA34MfZMk="},{"type":"next-occurrence","id":"KUkyJki3ofT2aQeG/4tB19NrDRw="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:38Z"},"road_event_id":"neNatt/Gm5YrtPcPJtpgOAuCXMk=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"KUkyJki3ofT2aQeG/4tB19NrDRw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVAEQerNS5RmqzprcojA34MfZMk="},{"type":"next-occurrence","id":"JNmOBbHJ6RXY5EcY3hKKHbL3IGM="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:38Z"},"road_event_id":"KUkyJki3ofT2aQeG/4tB19NrDRw=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"JNmOBbHJ6RXY5EcY3hKKHbL3IGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVAEQerNS5RmqzprcojA34MfZMk="},{"type":"next-occurrence","id":"PV9pzIwSo6zBx1WyJPYWObMUZyI="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:38Z"},"road_event_id":"JNmOBbHJ6RXY5EcY3hKKHbL3IGM=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"PV9pzIwSo6zBx1WyJPYWObMUZyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVAEQerNS5RmqzprcojA34MfZMk="},{"type":"next-occurrence","id":"ij4xWnigcpJlrTQdfdru750SoZs="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:38Z"},"road_event_id":"PV9pzIwSo6zBx1WyJPYWObMUZyI=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"ij4xWnigcpJlrTQdfdru750SoZs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVAEQerNS5RmqzprcojA34MfZMk="},{"type":"next-occurrence","id":"zLVRF2OmtgNamABDJjXP/fI5No8="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:38Z"},"road_event_id":"ij4xWnigcpJlrTQdfdru750SoZs=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"zLVRF2OmtgNamABDJjXP/fI5No8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVAEQerNS5RmqzprcojA34MfZMk="},{"type":"next-occurrence","id":"ZnSEFW9irl7SKcqvDo952D8HG0c="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:38Z"},"road_event_id":"zLVRF2OmtgNamABDJjXP/fI5No8=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"ZnSEFW9irl7SKcqvDo952D8HG0c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVAEQerNS5RmqzprcojA34MfZMk="},{"type":"next-occurrence","id":"myfSumY2W1wzs4boZV3B6/SHUtQ="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:38Z"},"road_event_id":"ZnSEFW9irl7SKcqvDo952D8HG0c=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"myfSumY2W1wzs4boZV3B6/SHUtQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVAEQerNS5RmqzprcojA34MfZMk="},{"type":"next-occurrence","id":"nj2LZ1YG00fUrKfeVx1JCXzI+S8="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:38Z"},"road_event_id":"myfSumY2W1wzs4boZV3B6/SHUtQ=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"nj2LZ1YG00fUrKfeVx1JCXzI+S8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVAEQerNS5RmqzprcojA34MfZMk="},{"type":"next-occurrence","id":"J/FVt35g5qL1omQYth1nGvw+b3U="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:38Z"},"road_event_id":"nj2LZ1YG00fUrKfeVx1JCXzI+S8=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"J/FVt35g5qL1omQYth1nGvw+b3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVAEQerNS5RmqzprcojA34MfZMk="},{"type":"next-occurrence","id":"hDY5xzSsovRd7AaU0HXlKMF70RQ="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:38Z"},"road_event_id":"J/FVt35g5qL1omQYth1nGvw+b3U=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"hDY5xzSsovRd7AaU0HXlKMF70RQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982B - Midland Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVAEQerNS5RmqzprcojA34MfZMk="}],"description":"Gas main work on NY 982B - Midland Avenue southbound between Leonard Street (Port Chester) and Eldredge Street (Port Chester) 2026085046755/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 29th, 2026 thru Thursday July 2nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday July 11th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday July 13th, 2026 thru Tuesday July 14th, 2026 Monday/ Tuesday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T20:00:38Z"},"road_event_id":"hDY5xzSsovRd7AaU0HXlKMF70RQ=","beginning_cross_street":"Leonard Street","ending_cross_street":"Eldredge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.669669,40.991355]]}},{"id":"ORC32743109","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","description":"Mowing on Saw Mill River Parkway southbound between Exit 9 - Executive Boulevard (Yonkers) and Exit 6 - Lockwood Avenue (Yonkers) Res 8-9 RW/32743109 - This is a moving operation. Plan travel accordingly; delays may exist Not currently scheduled","update_date":"2026-06-05T18:30:42Z"},"road_event_id":"ORC32743109","beginning_cross_street":"Exit 9 - Executive Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-11T13:21:49Z","end_date":"2026-06-06T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.871905,40.959044]]}},{"id":"LZ8RE6AFH66rsjSo6pK4BWObI4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Jskh0NgvGsjI3Wg6wGj5HeVpvNQ="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"LZ8RE6AFH66rsjSo6pK4BWObI4Q=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"Jskh0NgvGsjI3Wg6wGj5HeVpvNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LZ8RE6AFH66rsjSo6pK4BWObI4Q="},{"type":"next-occurrence","id":"r/2QcWGzdgOt7owJl3TvwbljN0s="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"Jskh0NgvGsjI3Wg6wGj5HeVpvNQ=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"r/2QcWGzdgOt7owJl3TvwbljN0s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LZ8RE6AFH66rsjSo6pK4BWObI4Q="},{"type":"next-occurrence","id":"J/ZR95cQGz09U4bHajEpyXav0zQ="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"r/2QcWGzdgOt7owJl3TvwbljN0s=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"J/ZR95cQGz09U4bHajEpyXav0zQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LZ8RE6AFH66rsjSo6pK4BWObI4Q="},{"type":"next-occurrence","id":"fd2DI3kmYwFRWAXzsJ4iFKE7AY4="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"J/ZR95cQGz09U4bHajEpyXav0zQ=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"fd2DI3kmYwFRWAXzsJ4iFKE7AY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LZ8RE6AFH66rsjSo6pK4BWObI4Q="},{"type":"next-occurrence","id":"SLqjsxFkiLhVFPwZ9p/WV/BK8Hw="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"fd2DI3kmYwFRWAXzsJ4iFKE7AY4=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"SLqjsxFkiLhVFPwZ9p/WV/BK8Hw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LZ8RE6AFH66rsjSo6pK4BWObI4Q="},{"type":"next-occurrence","id":"136n9wUpM/jfNqfGmMtn9gMsKlw="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"SLqjsxFkiLhVFPwZ9p/WV/BK8Hw=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"136n9wUpM/jfNqfGmMtn9gMsKlw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LZ8RE6AFH66rsjSo6pK4BWObI4Q="},{"type":"next-occurrence","id":"/IpWbORJvun+3zzeECuNL4PQrAQ="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"136n9wUpM/jfNqfGmMtn9gMsKlw=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"/IpWbORJvun+3zzeECuNL4PQrAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LZ8RE6AFH66rsjSo6pK4BWObI4Q="},{"type":"next-occurrence","id":"siQ5PeBEJJGKGOtixpyKZqnqHZ8="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"/IpWbORJvun+3zzeECuNL4PQrAQ=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"siQ5PeBEJJGKGOtixpyKZqnqHZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LZ8RE6AFH66rsjSo6pK4BWObI4Q="},{"type":"next-occurrence","id":"rogta78mZ/+nI5V59S3spdMYGfY="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"siQ5PeBEJJGKGOtixpyKZqnqHZ8=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"rogta78mZ/+nI5V59S3spdMYGfY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LZ8RE6AFH66rsjSo6pK4BWObI4Q="},{"type":"next-occurrence","id":"QKSr0ZXG/lskd3vW+QxI5t+ssCE="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"rogta78mZ/+nI5V59S3spdMYGfY=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"QKSr0ZXG/lskd3vW+QxI5t+ssCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LZ8RE6AFH66rsjSo6pK4BWObI4Q="}],"description":"Guard rail repairs on I-81 southbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 67 - US 11; NY 80; NY 281; Tully (Tully), Wednesday May 13th, 2026 thru Wednesday June 17th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-11T13:39:48Z"},"road_event_id":"QKSr0ZXG/lskd3vW+QxI5t+ssCE=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138547,42.952584]]}},{"id":"SQscgJPl9vP8wEqr13/uSydQEuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 376"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hl4sPINn1Flxqx7Tp0alTEVZd+M="}],"description":"Utility work on NY 376 both directions between Main Street (East Fishkill) and NY 52 (East Fishkill) 2025083592928/32743509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T18:25:02Z"},"road_event_id":"SQscgJPl9vP8wEqr13/uSydQEuk=","beginning_cross_street":"Main Street","ending_cross_street":"NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806398,41.571074]]}},{"id":"hl4sPINn1Flxqx7Tp0alTEVZd+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 376"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SQscgJPl9vP8wEqr13/uSydQEuk="},{"type":"next-occurrence","id":"dryPBNS2Le61d3i1zjEl43afNvo="}],"description":"Utility work on NY 376 both directions between Main Street (East Fishkill) and NY 52 (East Fishkill) 2025083592928/32743509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T18:25:02Z"},"road_event_id":"hl4sPINn1Flxqx7Tp0alTEVZd+M=","beginning_cross_street":"Main Street","ending_cross_street":"NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806398,41.571074]]}},{"id":"dryPBNS2Le61d3i1zjEl43afNvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 376"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SQscgJPl9vP8wEqr13/uSydQEuk="},{"type":"next-occurrence","id":"94T18KXpOoFpec1UPfC44hmtMWo="}],"description":"Utility work on NY 376 both directions between Main Street (East Fishkill) and NY 52 (East Fishkill) 2025083592928/32743509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T18:25:02Z"},"road_event_id":"dryPBNS2Le61d3i1zjEl43afNvo=","beginning_cross_street":"Main Street","ending_cross_street":"NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806398,41.571074]]}},{"id":"94T18KXpOoFpec1UPfC44hmtMWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 376"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SQscgJPl9vP8wEqr13/uSydQEuk="},{"type":"next-occurrence","id":"O7y/1ZYVMdETPr5x0Fq/6ACqQoE="}],"description":"Utility work on NY 376 both directions between Main Street (East Fishkill) and NY 52 (East Fishkill) 2025083592928/32743509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T18:25:02Z"},"road_event_id":"94T18KXpOoFpec1UPfC44hmtMWo=","beginning_cross_street":"Main Street","ending_cross_street":"NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806398,41.571074]]}},{"id":"O7y/1ZYVMdETPr5x0Fq/6ACqQoE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 376"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SQscgJPl9vP8wEqr13/uSydQEuk="},{"type":"next-occurrence","id":"EmPRL6mnfIsPHzLojza4Zccn/ig="}],"description":"Utility work on NY 376 both directions between Main Street (East Fishkill) and NY 52 (East Fishkill) 2025083592928/32743509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T18:25:02Z"},"road_event_id":"O7y/1ZYVMdETPr5x0Fq/6ACqQoE=","beginning_cross_street":"Main Street","ending_cross_street":"NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806398,41.571074]]}},{"id":"EmPRL6mnfIsPHzLojza4Zccn/ig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 376"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SQscgJPl9vP8wEqr13/uSydQEuk="}],"description":"Utility work on NY 376 both directions between Main Street (East Fishkill) and NY 52 (East Fishkill) 2025083592928/32743509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T18:25:02Z"},"road_event_id":"EmPRL6mnfIsPHzLojza4Zccn/ig=","beginning_cross_street":"Main Street","ending_cross_street":"NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806398,41.571074]]}},{"id":"NmNQUlV8pIzmpz3pClIVApDs1Ws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 5 eastbound between NB NY-695 (Camillus) and West Genesee Street (Geddes), Continuous Tuesday May 12th, 2026 07:00 AM thru Friday June 12th, 2026 04:00 PM right shoulder closed","update_date":"2026-05-11T16:20:23Z"},"road_event_id":"NmNQUlV8pIzmpz3pClIVApDs1Ws=","beginning_cross_street":"NB NY-695","ending_cross_street":"West Genesee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.239736,43.054198]]}},{"id":"9iKeC4FH8GaZepwON6glyPSVLr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 213"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VobI9SY/h1PAXSDkAlRG4nCfutI="}],"description":"Utility work on NY 213 eastbound between Mountain Road (Kingston) and Maple Street (Kingston) 2025081215136/32668509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:19Z"},"road_event_id":"9iKeC4FH8GaZepwON6glyPSVLr0=","beginning_cross_street":"Mountain Road","ending_cross_street":"Maple Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:30:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.020256,41.899284]]}},{"id":"VobI9SY/h1PAXSDkAlRG4nCfutI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9iKeC4FH8GaZepwON6glyPSVLr0="},{"type":"next-occurrence","id":"HngLllByeafTwfDVl4PVgJJ1uYk="}],"description":"Utility work on NY 213 eastbound between Mountain Road (Kingston) and Maple Street (Kingston) 2025081215136/32668509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:19Z"},"road_event_id":"VobI9SY/h1PAXSDkAlRG4nCfutI=","beginning_cross_street":"Mountain Road","ending_cross_street":"Maple Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.020256,41.899284]]}},{"id":"HngLllByeafTwfDVl4PVgJJ1uYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9iKeC4FH8GaZepwON6glyPSVLr0="},{"type":"next-occurrence","id":"F0Jgnrjj4pctqOLEtH+EM2CDHhg="}],"description":"Utility work on NY 213 eastbound between Mountain Road (Kingston) and Maple Street (Kingston) 2025081215136/32668509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:19Z"},"road_event_id":"HngLllByeafTwfDVl4PVgJJ1uYk=","beginning_cross_street":"Mountain Road","ending_cross_street":"Maple Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.020256,41.899284]]}},{"id":"F0Jgnrjj4pctqOLEtH+EM2CDHhg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9iKeC4FH8GaZepwON6glyPSVLr0="},{"type":"next-occurrence","id":"N3GmDnCcj+kJES14LGC+OGpcAus="}],"description":"Utility work on NY 213 eastbound between Mountain Road (Kingston) and Maple Street (Kingston) 2025081215136/32668509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:19Z"},"road_event_id":"F0Jgnrjj4pctqOLEtH+EM2CDHhg=","beginning_cross_street":"Mountain Road","ending_cross_street":"Maple Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.020256,41.899284]]}},{"id":"N3GmDnCcj+kJES14LGC+OGpcAus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9iKeC4FH8GaZepwON6glyPSVLr0="},{"type":"next-occurrence","id":"fd95w+FV1jo/EcmAd0k9CmQjx2w="}],"description":"Utility work on NY 213 eastbound between Mountain Road (Kingston) and Maple Street (Kingston) 2025081215136/32668509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:19Z"},"road_event_id":"N3GmDnCcj+kJES14LGC+OGpcAus=","beginning_cross_street":"Mountain Road","ending_cross_street":"Maple Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.020256,41.899284]]}},{"id":"fd95w+FV1jo/EcmAd0k9CmQjx2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9iKeC4FH8GaZepwON6glyPSVLr0="}],"description":"Utility work on NY 213 eastbound between Mountain Road (Kingston) and Maple Street (Kingston) 2025081215136/32668509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:19Z"},"road_event_id":"fd95w+FV1jo/EcmAd0k9CmQjx2w=","beginning_cross_street":"Mountain Road","ending_cross_street":"Maple Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.020256,41.899284]]}},{"id":"5ZclJiHzZXVj0ZJ/M101xkRjEic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 90"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs and drainage improvements on NY 90 both directions between GULLY RD (Ledyard) and Levanna Rd (Ledyard) ; Alternating one-way traffic with temporary signals, Continuous Monday May 11th, 2026 06:00 AM thru Friday June 12th, 2026 06:00 PM All lanes open","update_date":"2026-05-11T17:41:17Z"},"road_event_id":"5ZclJiHzZXVj0ZJ/M101xkRjEic=","beginning_cross_street":"GULLY RD","ending_cross_street":"Levanna Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.710342,42.772411]]}},{"id":"1bCADuDpdc8iXJD7RTWjbmiJ+IA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"o9ze2Cx7GezXPTWyNjW5fpVCRes="}],"description":"Roadwork on NY 33A both directions area of Exit - Buell Road; CR 162 (Gates) Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-21T18:07:16Z"},"road_event_id":"1bCADuDpdc8iXJD7RTWjbmiJ+IA=","beginning_cross_street":"Exit   - Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666926,43.139907]]}},{"id":"o9ze2Cx7GezXPTWyNjW5fpVCRes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1bCADuDpdc8iXJD7RTWjbmiJ+IA="},{"type":"next-occurrence","id":"qWQhyuMW7yhsrzO2PWwePM81Cww="}],"description":"Roadwork on NY 33A both directions area of Exit - Buell Road; CR 162 (Gates) Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-21T18:07:16Z"},"road_event_id":"o9ze2Cx7GezXPTWyNjW5fpVCRes=","beginning_cross_street":"Exit   - Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666926,43.139907]]}},{"id":"qWQhyuMW7yhsrzO2PWwePM81Cww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1bCADuDpdc8iXJD7RTWjbmiJ+IA="},{"type":"next-occurrence","id":"UII3akZmjlgAkjMNnESTbRD02Z8="}],"description":"Roadwork on NY 33A both directions area of Exit - Buell Road; CR 162 (Gates) Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-21T18:07:16Z"},"road_event_id":"qWQhyuMW7yhsrzO2PWwePM81Cww=","beginning_cross_street":"Exit   - Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666926,43.139907]]}},{"id":"UII3akZmjlgAkjMNnESTbRD02Z8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1bCADuDpdc8iXJD7RTWjbmiJ+IA="},{"type":"next-occurrence","id":"gtPvAN2zFUd2HiO1iex9oiebrEE="}],"description":"Roadwork on NY 33A both directions area of Exit - Buell Road; CR 162 (Gates) Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-21T18:07:16Z"},"road_event_id":"UII3akZmjlgAkjMNnESTbRD02Z8=","beginning_cross_street":"Exit   - Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666926,43.139907]]}},{"id":"gtPvAN2zFUd2HiO1iex9oiebrEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1bCADuDpdc8iXJD7RTWjbmiJ+IA="},{"type":"next-occurrence","id":"BAjAUjE5euxvJiVCnL3DhVS4U5U="}],"description":"Roadwork on NY 33A both directions area of Exit - Buell Road; CR 162 (Gates) Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-21T18:07:16Z"},"road_event_id":"gtPvAN2zFUd2HiO1iex9oiebrEE=","beginning_cross_street":"Exit   - Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666926,43.139907]]}},{"id":"BAjAUjE5euxvJiVCnL3DhVS4U5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1bCADuDpdc8iXJD7RTWjbmiJ+IA="}],"description":"Roadwork on NY 33A both directions area of Exit - Buell Road; CR 162 (Gates) Alternating Right/Left Lane closures as needed., Tuesday May 12th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-21T18:07:16Z"},"road_event_id":"BAjAUjE5euxvJiVCnL3DhVS4U5U=","beginning_cross_street":"Exit   - Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666926,43.139907]]}},{"id":"wrpGYefgwTnOzCInO+cfLNqy8PQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DlEPZDxYlyFoP7tzMmN4MwhSugw="}],"description":"Road maintenance operations and survey work on US 209 both directions between Hamilton Street (Port Jervis) and NY 211 (Port Jervis) D265751/32743909 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:20Z"},"road_event_id":"wrpGYefgwTnOzCInO+cfLNqy8PQ=","beginning_cross_street":"Hamilton Street","ending_cross_street":"NY 211","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.672489,41.382809]]}},{"id":"DlEPZDxYlyFoP7tzMmN4MwhSugw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wrpGYefgwTnOzCInO+cfLNqy8PQ="},{"type":"next-occurrence","id":"ywD4HJPY7IhMc5ZKre8VyHC6nCg="}],"description":"Road maintenance operations and survey work on US 209 both directions between Hamilton Street (Port Jervis) and NY 211 (Port Jervis) D265751/32743909 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:20Z"},"road_event_id":"DlEPZDxYlyFoP7tzMmN4MwhSugw=","beginning_cross_street":"Hamilton Street","ending_cross_street":"NY 211","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.672489,41.382809]]}},{"id":"ywD4HJPY7IhMc5ZKre8VyHC6nCg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wrpGYefgwTnOzCInO+cfLNqy8PQ="},{"type":"next-occurrence","id":"p18gsFdiNOLMdcT7oTZaR7WBJPA="}],"description":"Road maintenance operations and survey work on US 209 both directions between Hamilton Street (Port Jervis) and NY 211 (Port Jervis) D265751/32743909 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:20Z"},"road_event_id":"ywD4HJPY7IhMc5ZKre8VyHC6nCg=","beginning_cross_street":"Hamilton Street","ending_cross_street":"NY 211","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.672489,41.382809]]}},{"id":"p18gsFdiNOLMdcT7oTZaR7WBJPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wrpGYefgwTnOzCInO+cfLNqy8PQ="},{"type":"next-occurrence","id":"ejJYmiQMh8eoDK5wjgwUb6YEbuQ="}],"description":"Road maintenance operations and survey work on US 209 both directions between Hamilton Street (Port Jervis) and NY 211 (Port Jervis) D265751/32743909 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:20Z"},"road_event_id":"p18gsFdiNOLMdcT7oTZaR7WBJPA=","beginning_cross_street":"Hamilton Street","ending_cross_street":"NY 211","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.672489,41.382809]]}},{"id":"ejJYmiQMh8eoDK5wjgwUb6YEbuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wrpGYefgwTnOzCInO+cfLNqy8PQ="},{"type":"next-occurrence","id":"29MzLy459ljU5G/UGOnDcosfLEs="}],"description":"Road maintenance operations and survey work on US 209 both directions between Hamilton Street (Port Jervis) and NY 211 (Port Jervis) D265751/32743909 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:20Z"},"road_event_id":"ejJYmiQMh8eoDK5wjgwUb6YEbuQ=","beginning_cross_street":"Hamilton Street","ending_cross_street":"NY 211","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.672489,41.382809]]}},{"id":"29MzLy459ljU5G/UGOnDcosfLEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wrpGYefgwTnOzCInO+cfLNqy8PQ="},{"type":"next-occurrence","id":"b78mDp6gxQEpUI4YB0dxDYdVu4g="}],"description":"Road maintenance operations and survey work on US 209 both directions between Hamilton Street (Port Jervis) and NY 211 (Port Jervis) D265751/32743909 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:20Z"},"road_event_id":"29MzLy459ljU5G/UGOnDcosfLEs=","beginning_cross_street":"Hamilton Street","ending_cross_street":"NY 211","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.672489,41.382809]]}},{"id":"b78mDp6gxQEpUI4YB0dxDYdVu4g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 209"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wrpGYefgwTnOzCInO+cfLNqy8PQ="}],"description":"Road maintenance operations and survey work on US 209 both directions between Hamilton Street (Port Jervis) and NY 211 (Port Jervis) D265751/32743909 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:20Z"},"road_event_id":"b78mDp6gxQEpUI4YB0dxDYdVu4g=","beginning_cross_street":"Hamilton Street","ending_cross_street":"NY 211","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.672489,41.382809]]}},{"id":"5FsPqWx1Pg/p72olVc2xZpjeIPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MNP45w8Sbn5rZZj+Iuay+EP+F8U="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 - Katonah - Cross River (Bedford) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closures","update_date":"2026-06-05T19:00:09Z"},"road_event_id":"5FsPqWx1Pg/p72olVc2xZpjeIPY=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"MNP45w8Sbn5rZZj+Iuay+EP+F8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5FsPqWx1Pg/p72olVc2xZpjeIPY="},{"type":"next-occurrence","id":"LikFDdRRcJYm+eKROwRrHgsc0vk="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 - Katonah - Cross River (Bedford) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closures","update_date":"2026-06-05T19:00:09Z"},"road_event_id":"MNP45w8Sbn5rZZj+Iuay+EP+F8U=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"LikFDdRRcJYm+eKROwRrHgsc0vk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5FsPqWx1Pg/p72olVc2xZpjeIPY="},{"type":"next-occurrence","id":"jSZxPMXuj5F2+yFHEe4t422FqZg="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 - Katonah - Cross River (Bedford) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closures","update_date":"2026-06-05T19:00:09Z"},"road_event_id":"LikFDdRRcJYm+eKROwRrHgsc0vk=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"jSZxPMXuj5F2+yFHEe4t422FqZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5FsPqWx1Pg/p72olVc2xZpjeIPY="},{"type":"next-occurrence","id":"frHj1E+5GK1OgYdLilzIPSVqrMI="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 - Katonah - Cross River (Bedford) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closures","update_date":"2026-06-05T19:00:09Z"},"road_event_id":"jSZxPMXuj5F2+yFHEe4t422FqZg=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"frHj1E+5GK1OgYdLilzIPSVqrMI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5FsPqWx1Pg/p72olVc2xZpjeIPY="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 - Katonah - Cross River (Bedford) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closures","update_date":"2026-06-05T19:00:09Z"},"road_event_id":"frHj1E+5GK1OgYdLilzIPSVqrMI=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"i8cpVDaoLPM3euYRnvPfbk202wU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 5 both directions City of Dunkirk (Dunkirk), Continuous Friday May 15th, 2026 12:00 AM thru Monday September 7th, 2026 11:59 PM All lanes closed","update_date":"2026-05-12T16:41:25Z"},"road_event_id":"i8cpVDaoLPM3euYRnvPfbk202wU=","beginning_cross_street":"City of Dunkirk","ending_cross_street":"City of Dunkirk","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.364855,42.475934]]}},{"id":"ojU4wbMM3ji1j8itIAlkHCxXSAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QCCPhHGB2Ze+PnJqaTNfNFi4h9s="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closures","update_date":"2026-06-05T19:00:09Z"},"road_event_id":"ojU4wbMM3ji1j8itIAlkHCxXSAM=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"QCCPhHGB2Ze+PnJqaTNfNFi4h9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojU4wbMM3ji1j8itIAlkHCxXSAM="},{"type":"next-occurrence","id":"9Y8UGI+zcMXJluJzQRRRUHl8hQA="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closures","update_date":"2026-06-05T19:00:09Z"},"road_event_id":"QCCPhHGB2Ze+PnJqaTNfNFi4h9s=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"9Y8UGI+zcMXJluJzQRRRUHl8hQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojU4wbMM3ji1j8itIAlkHCxXSAM="},{"type":"next-occurrence","id":"zEuPdvE9FunXLaly11wpmUgintc="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closures","update_date":"2026-06-05T19:00:09Z"},"road_event_id":"9Y8UGI+zcMXJluJzQRRRUHl8hQA=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"zEuPdvE9FunXLaly11wpmUgintc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojU4wbMM3ji1j8itIAlkHCxXSAM="},{"type":"next-occurrence","id":"yavlVz6p+XATF436B62OxO29aOw="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closures","update_date":"2026-06-05T19:00:09Z"},"road_event_id":"zEuPdvE9FunXLaly11wpmUgintc=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"yavlVz6p+XATF436B62OxO29aOw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojU4wbMM3ji1j8itIAlkHCxXSAM="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closures","update_date":"2026-06-05T19:00:09Z"},"road_event_id":"yavlVz6p+XATF436B62OxO29aOw=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"xshyNslJVOED7MrwZq0dSO8boB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[],"description":"Road rehabilitation on Bronx River Parkway both directions City of Yonkers; City of New York Line (Yonkers) to Palmer Avenue (Yonkers) There will be single lane closures within the above limits, Continuous Tuesday May 5th, 2026 12:00 AM thru Monday April 19th, 2027 11:59 PM All lanes open","update_date":"2026-05-12T19:52:49Z"},"road_event_id":"xshyNslJVOED7MrwZq0dSO8boB4=","beginning_cross_street":"City of Yonkers; City of New York Line","ending_cross_street":"Palmer Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.860711,40.900907]]}},{"id":"7Ft0L7ImEKG42O8L70mQMUiIVNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CENTRAL PARK AVE"],"direction":"unknown","related_road_events":[],"description":"Road rehabilitation on CENTRAL PARK AVE both directions between PARKWAY N (Yonkers) and NY 100 at Palmer Road (Yonkers) There will be single lane closures within the above limits, Continuous Tuesday May 5th, 2026 12:00 AM thru Monday June 14th, 2027 12:02 AM All lanes open","update_date":"2026-06-03T19:22:55Z"},"road_event_id":"7Ft0L7ImEKG42O8L70mQMUiIVNY=","beginning_cross_street":"PARKWAY N","ending_cross_street":"Palmer Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87786,40.905977]]}},{"id":"euthBw/HF9KstfkMYEqEo9Fu+cY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bwyFBy2qLwhvA0JudtUMaZNdWdM="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 26th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-21T22:00:04Z"},"road_event_id":"euthBw/HF9KstfkMYEqEo9Fu+cY=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"bwyFBy2qLwhvA0JudtUMaZNdWdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"euthBw/HF9KstfkMYEqEo9Fu+cY="},{"type":"next-occurrence","id":"UjB1nRREcxiUVjePnKRvRpBztaE="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 26th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-21T22:00:04Z"},"road_event_id":"bwyFBy2qLwhvA0JudtUMaZNdWdM=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"UjB1nRREcxiUVjePnKRvRpBztaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"euthBw/HF9KstfkMYEqEo9Fu+cY="},{"type":"next-occurrence","id":"2t6jhFN0IP1lkO2n9j17MNqhwYo="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 26th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-21T22:00:04Z"},"road_event_id":"UjB1nRREcxiUVjePnKRvRpBztaE=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"2t6jhFN0IP1lkO2n9j17MNqhwYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"euthBw/HF9KstfkMYEqEo9Fu+cY="},{"type":"next-occurrence","id":"7qAhouGHuBya57eF2QcFdfBMWAc="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 26th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-21T22:00:04Z"},"road_event_id":"2t6jhFN0IP1lkO2n9j17MNqhwYo=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"7qAhouGHuBya57eF2QcFdfBMWAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"euthBw/HF9KstfkMYEqEo9Fu+cY="},{"type":"next-occurrence","id":"yDbtgw2m0NDnBaKM98GojHVECvc="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 26th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-21T22:00:04Z"},"road_event_id":"7qAhouGHuBya57eF2QcFdfBMWAc=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"yDbtgw2m0NDnBaKM98GojHVECvc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"euthBw/HF9KstfkMYEqEo9Fu+cY="},{"type":"next-occurrence","id":"dRDK7KAPaAtrLa85v8Wdo1QRb7o="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 26th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-21T22:00:04Z"},"road_event_id":"yDbtgw2m0NDnBaKM98GojHVECvc=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"dRDK7KAPaAtrLa85v8Wdo1QRb7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"euthBw/HF9KstfkMYEqEo9Fu+cY="},{"type":"next-occurrence","id":"lX3+qo+51P3v+hxXm/JIFhMRY0A="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 26th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-21T22:00:04Z"},"road_event_id":"dRDK7KAPaAtrLa85v8Wdo1QRb7o=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"lX3+qo+51P3v+hxXm/JIFhMRY0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"euthBw/HF9KstfkMYEqEo9Fu+cY="},{"type":"next-occurrence","id":"dK4joXGJdU6MmQjE9bka3lcMeE4="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 26th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-21T22:00:04Z"},"road_event_id":"lX3+qo+51P3v+hxXm/JIFhMRY0A=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"dK4joXGJdU6MmQjE9bka3lcMeE4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"euthBw/HF9KstfkMYEqEo9Fu+cY="},{"type":"next-occurrence","id":"mmuO/r09j2s3jusH/QsV61JBGNo="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 26th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-21T22:00:04Z"},"road_event_id":"dK4joXGJdU6MmQjE9bka3lcMeE4=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"mmuO/r09j2s3jusH/QsV61JBGNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"euthBw/HF9KstfkMYEqEo9Fu+cY="},{"type":"next-occurrence","id":"2Mu/TiIvkg5qOCrZM1LTrb4N8Vs="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 26th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-21T22:00:04Z"},"road_event_id":"mmuO/r09j2s3jusH/QsV61JBGNo=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"2Mu/TiIvkg5qOCrZM1LTrb4N8Vs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"euthBw/HF9KstfkMYEqEo9Fu+cY="}],"description":"Line striping on NY 34 both directions between Maple Ave (Danby) and Locke Rd (Genoa) ; Mobile lane closure, Tuesday May 26th,2026 thru Friday June 19th,2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-21T22:00:04Z"},"road_event_id":"2Mu/TiIvkg5qOCrZM1LTrb4N8Vs=","beginning_cross_street":"Maple Ave","ending_cross_street":"Locke Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.525479,42.318905]]}},{"id":"ap788aG7XVsohfueqSq1RFcyVMw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UQk7MbYZkAZYS9PDG6j88Crfb3U="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:21:36Z"},"road_event_id":"ap788aG7XVsohfueqSq1RFcyVMw=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518985,42.281829]]}},{"id":"UQk7MbYZkAZYS9PDG6j88Crfb3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ap788aG7XVsohfueqSq1RFcyVMw="},{"type":"next-occurrence","id":"fsB+Y8vvkUhOuUuZ3vVaMhMnuUg="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:21:36Z"},"road_event_id":"UQk7MbYZkAZYS9PDG6j88Crfb3U=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518985,42.281829]]}},{"id":"fsB+Y8vvkUhOuUuZ3vVaMhMnuUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ap788aG7XVsohfueqSq1RFcyVMw="},{"type":"next-occurrence","id":"kMt5/Z5HXzS5tH2ymh1UmNQVglU="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:21:36Z"},"road_event_id":"fsB+Y8vvkUhOuUuZ3vVaMhMnuUg=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518985,42.281829]]}},{"id":"kMt5/Z5HXzS5tH2ymh1UmNQVglU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ap788aG7XVsohfueqSq1RFcyVMw="},{"type":"next-occurrence","id":"WCV+xZirXqcpAcbMfPBDctj6sfs="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:21:36Z"},"road_event_id":"kMt5/Z5HXzS5tH2ymh1UmNQVglU=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518985,42.281829]]}},{"id":"WCV+xZirXqcpAcbMfPBDctj6sfs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ap788aG7XVsohfueqSq1RFcyVMw="},{"type":"next-occurrence","id":"ULR0gbmkth/aFG5UdLfj3z2Gkfs="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:21:36Z"},"road_event_id":"WCV+xZirXqcpAcbMfPBDctj6sfs=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518985,42.281829]]}},{"id":"ULR0gbmkth/aFG5UdLfj3z2Gkfs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ap788aG7XVsohfueqSq1RFcyVMw="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-12T23:21:36Z"},"road_event_id":"ULR0gbmkth/aFG5UdLfj3z2Gkfs=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518985,42.281829]]}},{"id":"K9fW7QPBzzxhDKetJv8vROzXtZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GfQyzGsJkNk6hcsRJTLz6BZP75Q="}],"description":"Overnight roadwork on I-81 northbound between Exit 16A - I-481 (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Follow detour , Sunday June 7th, 2026 thru Tuesday June 9th, 2026, Sunday/Monday, 07:00 PM thru 06:00 AM All lanes closed, Sunday June 7th, 2026 thru Wednesday June 10th, 2026, Sunday/Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-06-03T13:51:05Z"},"road_event_id":"K9fW7QPBzzxhDKetJv8vROzXtZE=","beginning_cross_street":"Exit 16A - I-481","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T22:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13367,43.003632]]}},{"id":"GfQyzGsJkNk6hcsRJTLz6BZP75Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K9fW7QPBzzxhDKetJv8vROzXtZE="},{"type":"next-occurrence","id":"uCVm5qqxR7ble4c8CY/eAquE39U="}],"description":"Overnight roadwork on I-81 northbound between Exit 16A - I-481 (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Follow detour , Sunday June 7th, 2026 thru Tuesday June 9th, 2026, Sunday/Monday, 07:00 PM thru 06:00 AM All lanes closed, Sunday June 7th, 2026 thru Wednesday June 10th, 2026, Sunday/Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-06-03T13:51:05Z"},"road_event_id":"GfQyzGsJkNk6hcsRJTLz6BZP75Q=","beginning_cross_street":"Exit 16A - I-481","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13367,43.003632]]}},{"id":"uCVm5qqxR7ble4c8CY/eAquE39U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K9fW7QPBzzxhDKetJv8vROzXtZE="}],"description":"Overnight roadwork on I-81 northbound between Exit 16A - I-481 (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Follow detour , Sunday June 7th, 2026 thru Tuesday June 9th, 2026, Sunday/Monday, 07:00 PM thru 06:00 AM All lanes closed, Sunday June 7th, 2026 thru Wednesday June 10th, 2026, Sunday/Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-06-03T13:51:05Z"},"road_event_id":"uCVm5qqxR7ble4c8CY/eAquE39U=","beginning_cross_street":"Exit 16A - I-481","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13367,43.003632]]}},{"id":"1ZUXmV+Zp3NDtcz9lEPbgKeKxo0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"v/EOcDBusUSS3VWPURsBADXRVTY="}],"description":"Line striping on NY 13 both directions between East Main Street; NY 392; South Street; NY 38 (Dryden) and Town of Dryden; Town of Virgil Line (Virgil) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:23:22Z"},"road_event_id":"1ZUXmV+Zp3NDtcz9lEPbgKeKxo0=","beginning_cross_street":"East Main Street; NY 392; South Street; NY 38","ending_cross_street":"Town of Dryden; Town of Virgil Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.297713,42.490644]]}},{"id":"v/EOcDBusUSS3VWPURsBADXRVTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1ZUXmV+Zp3NDtcz9lEPbgKeKxo0="},{"type":"next-occurrence","id":"MCkFhOlGLWw8E3dzf+8T7bpIX6A="}],"description":"Line striping on NY 13 both directions between East Main Street; NY 392; South Street; NY 38 (Dryden) and Town of Dryden; Town of Virgil Line (Virgil) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:23:22Z"},"road_event_id":"v/EOcDBusUSS3VWPURsBADXRVTY=","beginning_cross_street":"East Main Street; NY 392; South Street; NY 38","ending_cross_street":"Town of Dryden; Town of Virgil Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.297713,42.490644]]}},{"id":"MCkFhOlGLWw8E3dzf+8T7bpIX6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1ZUXmV+Zp3NDtcz9lEPbgKeKxo0="},{"type":"next-occurrence","id":"zgSJ2/YFWyXhBjYtrBZPiJUwUww="}],"description":"Line striping on NY 13 both directions between East Main Street; NY 392; South Street; NY 38 (Dryden) and Town of Dryden; Town of Virgil Line (Virgil) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:23:22Z"},"road_event_id":"MCkFhOlGLWw8E3dzf+8T7bpIX6A=","beginning_cross_street":"East Main Street; NY 392; South Street; NY 38","ending_cross_street":"Town of Dryden; Town of Virgil Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.297713,42.490644]]}},{"id":"zgSJ2/YFWyXhBjYtrBZPiJUwUww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1ZUXmV+Zp3NDtcz9lEPbgKeKxo0="},{"type":"next-occurrence","id":"e2ReCxQsXtZ8+u/bEQ0nogmjk7Y="}],"description":"Line striping on NY 13 both directions between East Main Street; NY 392; South Street; NY 38 (Dryden) and Town of Dryden; Town of Virgil Line (Virgil) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:23:22Z"},"road_event_id":"zgSJ2/YFWyXhBjYtrBZPiJUwUww=","beginning_cross_street":"East Main Street; NY 392; South Street; NY 38","ending_cross_street":"Town of Dryden; Town of Virgil Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.297713,42.490644]]}},{"id":"e2ReCxQsXtZ8+u/bEQ0nogmjk7Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1ZUXmV+Zp3NDtcz9lEPbgKeKxo0="},{"type":"next-occurrence","id":"PbH0ErOkHRYtA9FzLoM0FjhODqk="}],"description":"Line striping on NY 13 both directions between East Main Street; NY 392; South Street; NY 38 (Dryden) and Town of Dryden; Town of Virgil Line (Virgil) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:23:22Z"},"road_event_id":"e2ReCxQsXtZ8+u/bEQ0nogmjk7Y=","beginning_cross_street":"East Main Street; NY 392; South Street; NY 38","ending_cross_street":"Town of Dryden; Town of Virgil Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.297713,42.490644]]}},{"id":"PbH0ErOkHRYtA9FzLoM0FjhODqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1ZUXmV+Zp3NDtcz9lEPbgKeKxo0="}],"description":"Line striping on NY 13 both directions between East Main Street; NY 392; South Street; NY 38 (Dryden) and Town of Dryden; Town of Virgil Line (Virgil) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:23:22Z"},"road_event_id":"PbH0ErOkHRYtA9FzLoM0FjhODqk=","beginning_cross_street":"East Main Street; NY 392; South Street; NY 38","ending_cross_street":"Town of Dryden; Town of Virgil Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.297713,42.490644]]}},{"id":"L0pcvDEFn0ps7sHKLtjrgbiqLKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CEVSc1XCAymfMP+l8zNLwCJJmGk="}],"description":"Line striping on NY 13A both directions between START ROUTE NY 13A; Elmira Road (Ithaca) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:29:11Z"},"road_event_id":"L0pcvDEFn0ps7sHKLtjrgbiqLKI=","beginning_cross_street":"START ROUTE NY 13A; Elmira Road","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.531463,42.414569]]}},{"id":"CEVSc1XCAymfMP+l8zNLwCJJmGk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L0pcvDEFn0ps7sHKLtjrgbiqLKI="},{"type":"next-occurrence","id":"nTS53tvcdPaycZsQPHQK9Dr0oS8="}],"description":"Line striping on NY 13A both directions between START ROUTE NY 13A; Elmira Road (Ithaca) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:29:11Z"},"road_event_id":"CEVSc1XCAymfMP+l8zNLwCJJmGk=","beginning_cross_street":"START ROUTE NY 13A; Elmira Road","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.531463,42.414569]]}},{"id":"nTS53tvcdPaycZsQPHQK9Dr0oS8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L0pcvDEFn0ps7sHKLtjrgbiqLKI="},{"type":"next-occurrence","id":"vo/kHughjydypj/Ia4CDCsI7x0Y="}],"description":"Line striping on NY 13A both directions between START ROUTE NY 13A; Elmira Road (Ithaca) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:29:11Z"},"road_event_id":"nTS53tvcdPaycZsQPHQK9Dr0oS8=","beginning_cross_street":"START ROUTE NY 13A; Elmira Road","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.531463,42.414569]]}},{"id":"vo/kHughjydypj/Ia4CDCsI7x0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L0pcvDEFn0ps7sHKLtjrgbiqLKI="},{"type":"next-occurrence","id":"z8VQi+ByGkgoAKK4wJeyJu9ZQqE="}],"description":"Line striping on NY 13A both directions between START ROUTE NY 13A; Elmira Road (Ithaca) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:29:11Z"},"road_event_id":"vo/kHughjydypj/Ia4CDCsI7x0Y=","beginning_cross_street":"START ROUTE NY 13A; Elmira Road","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.531463,42.414569]]}},{"id":"z8VQi+ByGkgoAKK4wJeyJu9ZQqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L0pcvDEFn0ps7sHKLtjrgbiqLKI="},{"type":"next-occurrence","id":"ABQOoTKfiPjPeQ8aWozse87jnKA="}],"description":"Line striping on NY 13A both directions between START ROUTE NY 13A; Elmira Road (Ithaca) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:29:11Z"},"road_event_id":"z8VQi+ByGkgoAKK4wJeyJu9ZQqE=","beginning_cross_street":"START ROUTE NY 13A; Elmira Road","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.531463,42.414569]]}},{"id":"ABQOoTKfiPjPeQ8aWozse87jnKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L0pcvDEFn0ps7sHKLtjrgbiqLKI="}],"description":"Line striping on NY 13A both directions between START ROUTE NY 13A; Elmira Road (Ithaca) and City of Ithaca; Town of Ithaca Line (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T01:29:11Z"},"road_event_id":"ABQOoTKfiPjPeQ8aWozse87jnKA=","beginning_cross_street":"START ROUTE NY 13A; Elmira Road","ending_cross_street":"City of Ithaca; Town of Ithaca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.531463,42.414569]]}},{"id":"Cbujxh5U+13ggDxtHu4MiduKXGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dPsqPQF680t8go0WqsRKe6S7qtg="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"Cbujxh5U+13ggDxtHu4MiduKXGM=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"dPsqPQF680t8go0WqsRKe6S7qtg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cbujxh5U+13ggDxtHu4MiduKXGM="},{"type":"next-occurrence","id":"gsZFOQFnx+/zsKycjxOoNhsHSNU="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"dPsqPQF680t8go0WqsRKe6S7qtg=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"gsZFOQFnx+/zsKycjxOoNhsHSNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cbujxh5U+13ggDxtHu4MiduKXGM="},{"type":"next-occurrence","id":"4dvFjuA0n9/CidERzsf2staC6Pc="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"gsZFOQFnx+/zsKycjxOoNhsHSNU=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T10:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"4dvFjuA0n9/CidERzsf2staC6Pc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cbujxh5U+13ggDxtHu4MiduKXGM="},{"type":"next-occurrence","id":"lRaMWlBRFx3OrAkN7JGq6NQdosI="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"4dvFjuA0n9/CidERzsf2staC6Pc=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"lRaMWlBRFx3OrAkN7JGq6NQdosI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cbujxh5U+13ggDxtHu4MiduKXGM="},{"type":"next-occurrence","id":"2hsz4Mb46nyLIf7T3XRypAZ5YSc="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"lRaMWlBRFx3OrAkN7JGq6NQdosI=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"2hsz4Mb46nyLIf7T3XRypAZ5YSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cbujxh5U+13ggDxtHu4MiduKXGM="},{"type":"next-occurrence","id":"X3GwupMS/rssJ4UZ7CAXE3QzSDk="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"2hsz4Mb46nyLIf7T3XRypAZ5YSc=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"X3GwupMS/rssJ4UZ7CAXE3QzSDk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cbujxh5U+13ggDxtHu4MiduKXGM="},{"type":"next-occurrence","id":"EO4SvHh+NkaWnJ09LU+92dEYDAk="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"X3GwupMS/rssJ4UZ7CAXE3QzSDk=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"EO4SvHh+NkaWnJ09LU+92dEYDAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cbujxh5U+13ggDxtHu4MiduKXGM="}],"description":"Line striping on NY 34 both directions between Tompkins; Tioga County Line (Danby) and Elmira Road; NY 13 (Ithaca) ; Mobile lane closure, Monday May 11th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-13T03:30:15Z"},"road_event_id":"EO4SvHh+NkaWnJ09LU+92dEYDAk=","beginning_cross_street":"Tompkins; Tioga County Line","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.518966,42.281647]]}},{"id":"OGxEqqClARHOkJ9Ao4zAZsSBXqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs on NY 17K both directions between Union School Road (Crawford) and Old NY 17K (Crawford) D265440/32744209 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Monday June 1st, 2026 9:00 AM thru Friday July 24th, 2026 9:00 AM all lanes closed and detoured","update_date":"2026-05-13T10:08:09Z"},"road_event_id":"OGxEqqClARHOkJ9Ao4zAZsSBXqc=","beginning_cross_street":"Union School Road","ending_cross_street":"Old NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.288703,41.531428]]}},{"id":"SI1GaoV5uUP1y0DDgNfrueEG8GU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COONS CROSSING RD"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on COONS CROSSING RD both directions between Cary Rd/Ushers Rd (Halfmoon) and RT-67 (Stillwater) Follow Posted Detour, Continuous Monday May 18th, 2026 09:00 AM thru Friday September 4th, 2026 04:00 PM All lanes closed","update_date":"2026-05-13T14:53:16Z"},"road_event_id":"SI1GaoV5uUP1y0DDgNfrueEG8GU=","beginning_cross_street":"Cary Rd/Ushers Rd","ending_cross_street":"RT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.746028,42.918735]]}},{"id":"lKgI1AczeGoDrBhmKsojWGjTu04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9X/o9EhcOVyUiJSOY+BiVA3g7LE="}],"description":"Construction and roadwork on NY 21 northbound City of Hornell; Town of Hornellsville Line (Hornell) to southbound NY 36 at Industrial Park Road (Hornellsville) Alternating lane closures/with detours, Wednesday May 13th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-28T17:44:06Z"},"road_event_id":"lKgI1AczeGoDrBhmKsojWGjTu04=","beginning_cross_street":"City of Hornell; Town of Hornellsville Line","ending_cross_street":"Industrial Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.665122,42.336429]]}},{"id":"9X/o9EhcOVyUiJSOY+BiVA3g7LE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lKgI1AczeGoDrBhmKsojWGjTu04="},{"type":"next-occurrence","id":"nluuYcp/9OISpDBMaXJ9LEM9TAo="}],"description":"Construction and roadwork on NY 21 northbound City of Hornell; Town of Hornellsville Line (Hornell) to southbound NY 36 at Industrial Park Road (Hornellsville) Alternating lane closures/with detours, Wednesday May 13th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-28T17:44:06Z"},"road_event_id":"9X/o9EhcOVyUiJSOY+BiVA3g7LE=","beginning_cross_street":"City of Hornell; Town of Hornellsville Line","ending_cross_street":"Industrial Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.665122,42.336429]]}},{"id":"nluuYcp/9OISpDBMaXJ9LEM9TAo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lKgI1AczeGoDrBhmKsojWGjTu04="},{"type":"next-occurrence","id":"GlSL2GIY7lTJ3j28HfR8l68Mkhs="}],"description":"Construction and roadwork on NY 21 northbound City of Hornell; Town of Hornellsville Line (Hornell) to southbound NY 36 at Industrial Park Road (Hornellsville) Alternating lane closures/with detours, Wednesday May 13th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-28T17:44:06Z"},"road_event_id":"nluuYcp/9OISpDBMaXJ9LEM9TAo=","beginning_cross_street":"City of Hornell; Town of Hornellsville Line","ending_cross_street":"Industrial Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.665122,42.336429]]}},{"id":"GlSL2GIY7lTJ3j28HfR8l68Mkhs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lKgI1AczeGoDrBhmKsojWGjTu04="},{"type":"next-occurrence","id":"u3jfbT3VEZnMecyi3rBMipCQ56E="}],"description":"Construction and roadwork on NY 21 northbound City of Hornell; Town of Hornellsville Line (Hornell) to southbound NY 36 at Industrial Park Road (Hornellsville) Alternating lane closures/with detours, Wednesday May 13th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-28T17:44:06Z"},"road_event_id":"GlSL2GIY7lTJ3j28HfR8l68Mkhs=","beginning_cross_street":"City of Hornell; Town of Hornellsville Line","ending_cross_street":"Industrial Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.665122,42.336429]]}},{"id":"u3jfbT3VEZnMecyi3rBMipCQ56E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lKgI1AczeGoDrBhmKsojWGjTu04="},{"type":"next-occurrence","id":"W2TV8asPs1LVQdNCJjWPzjpWxnA="}],"description":"Construction and roadwork on NY 21 northbound City of Hornell; Town of Hornellsville Line (Hornell) to southbound NY 36 at Industrial Park Road (Hornellsville) Alternating lane closures/with detours, Wednesday May 13th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-28T17:44:06Z"},"road_event_id":"u3jfbT3VEZnMecyi3rBMipCQ56E=","beginning_cross_street":"City of Hornell; Town of Hornellsville Line","ending_cross_street":"Industrial Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.665122,42.336429]]}},{"id":"W2TV8asPs1LVQdNCJjWPzjpWxnA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lKgI1AczeGoDrBhmKsojWGjTu04="},{"type":"next-occurrence","id":"On4ZOSowIx9KeaEMgof9BxHeJok="}],"description":"Construction and roadwork on NY 21 northbound City of Hornell; Town of Hornellsville Line (Hornell) to southbound NY 36 at Industrial Park Road (Hornellsville) Alternating lane closures/with detours, Wednesday May 13th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-28T17:44:06Z"},"road_event_id":"W2TV8asPs1LVQdNCJjWPzjpWxnA=","beginning_cross_street":"City of Hornell; Town of Hornellsville Line","ending_cross_street":"Industrial Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.665122,42.336429]]}},{"id":"On4ZOSowIx9KeaEMgof9BxHeJok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lKgI1AczeGoDrBhmKsojWGjTu04="},{"type":"next-occurrence","id":"Z4i+RLPNoyzYcbvzTgRI4XDnSO0="}],"description":"Construction and roadwork on NY 21 northbound City of Hornell; Town of Hornellsville Line (Hornell) to southbound NY 36 at Industrial Park Road (Hornellsville) Alternating lane closures/with detours, Wednesday May 13th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-28T17:44:06Z"},"road_event_id":"On4ZOSowIx9KeaEMgof9BxHeJok=","beginning_cross_street":"City of Hornell; Town of Hornellsville Line","ending_cross_street":"Industrial Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.665122,42.336429]]}},{"id":"Z4i+RLPNoyzYcbvzTgRI4XDnSO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lKgI1AczeGoDrBhmKsojWGjTu04="},{"type":"next-occurrence","id":"w22IAB1CR8XyqPTk51m+rcNKNiA="}],"description":"Construction and roadwork on NY 21 northbound City of Hornell; Town of Hornellsville Line (Hornell) to southbound NY 36 at Industrial Park Road (Hornellsville) Alternating lane closures/with detours, Wednesday May 13th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-28T17:44:06Z"},"road_event_id":"Z4i+RLPNoyzYcbvzTgRI4XDnSO0=","beginning_cross_street":"City of Hornell; Town of Hornellsville Line","ending_cross_street":"Industrial Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.665122,42.336429]]}},{"id":"w22IAB1CR8XyqPTk51m+rcNKNiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lKgI1AczeGoDrBhmKsojWGjTu04="}],"description":"Construction and roadwork on NY 21 northbound City of Hornell; Town of Hornellsville Line (Hornell) to southbound NY 36 at Industrial Park Road (Hornellsville) Alternating lane closures/with detours, Wednesday May 13th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-05-28T17:44:06Z"},"road_event_id":"w22IAB1CR8XyqPTk51m+rcNKNiA=","beginning_cross_street":"City of Hornell; Town of Hornellsville Line","ending_cross_street":"Industrial Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.665122,42.336429]]}},{"id":"+nmkaBbnYWuDNUmgQJvg2A2Df+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"l/6sDn1KGyFFu6b+sqLufpNHucs="}],"description":"Bridge painting and construction on Hutchinson River Parkway [NYC] both directions at START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Friday June 12th, 2026 thru Saturday June 13th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Saturday June 13th, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed southbound, Saturday June 13th, 2026, 06:30 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, Saturday June 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed northbound, Saturday June 6th, 2026, 07:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Tuesday May 19th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Sunday June 7th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, Friday June 5th, 2026 thru Saturday June 6th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Saturday June 6th, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed southbound, Saturday June 6th, 2026, 06:30 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Saturday June 6th, 2026 thru Sunday June 7th, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, Sunday June 7th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed northbound, Saturday June 6th, 2026 thru Sunday June 7th, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed southbound, Sunday June 7th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed southbound, Sunday June 7th, 2026, 07:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Friday June 12th, 202","update_date":"2026-06-02T18:01:42Z"},"road_event_id":"+nmkaBbnYWuDNUmgQJvg2A2Df+E=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:01:00Z","end_date":"2026-06-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.836194,40.824876]]}},{"id":"l/6sDn1KGyFFu6b+sqLufpNHucs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+nmkaBbnYWuDNUmgQJvg2A2Df+E="},{"type":"next-occurrence","id":"aTWp6VgiSG2+8Hh00Dc8PW9yseM="}],"description":"Bridge painting and construction on Hutchinson River Parkway [NYC] both directions at START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Friday June 12th, 2026 thru Saturday June 13th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Saturday June 13th, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed southbound, Saturday June 13th, 2026, 06:30 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, Saturday June 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed northbound, Saturday June 6th, 2026, 07:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Tuesday May 19th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Sunday June 7th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, Friday June 5th, 2026 thru Saturday June 6th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Saturday June 6th, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed southbound, Saturday June 6th, 2026, 06:30 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Saturday June 6th, 2026 thru Sunday June 7th, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, Sunday June 7th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed northbound, Saturday June 6th, 2026 thru Sunday June 7th, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed southbound, Sunday June 7th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed southbound, Sunday June 7th, 2026, 07:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Friday June 12th, 202","update_date":"2026-06-02T18:01:42Z"},"road_event_id":"l/6sDn1KGyFFu6b+sqLufpNHucs=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.836194,40.824876]]}},{"id":"aTWp6VgiSG2+8Hh00Dc8PW9yseM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+nmkaBbnYWuDNUmgQJvg2A2Df+E="},{"type":"next-occurrence","id":"wr+0tYyovrxO2ZfqKLT53Q9UA4w="}],"description":"Bridge painting and construction on Hutchinson River Parkway [NYC] both directions at START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Friday June 12th, 2026 thru Saturday June 13th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Saturday June 13th, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed southbound, Saturday June 13th, 2026, 06:30 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, Saturday June 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed northbound, Saturday June 6th, 2026, 07:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Tuesday May 19th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Sunday June 7th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, Friday June 5th, 2026 thru Saturday June 6th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Saturday June 6th, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed southbound, Saturday June 6th, 2026, 06:30 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Saturday June 6th, 2026 thru Sunday June 7th, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, Sunday June 7th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed northbound, Saturday June 6th, 2026 thru Sunday June 7th, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed southbound, Sunday June 7th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed southbound, Sunday June 7th, 2026, 07:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Friday June 12th, 202","update_date":"2026-06-02T18:01:42Z"},"road_event_id":"aTWp6VgiSG2+8Hh00Dc8PW9yseM=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T02:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.836194,40.824876]]}},{"id":"wr+0tYyovrxO2ZfqKLT53Q9UA4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+nmkaBbnYWuDNUmgQJvg2A2Df+E="},{"type":"next-occurrence","id":"kUMQUWTp/Lt5fWWhyyIz7a+UWtM="}],"description":"Bridge painting and construction on Hutchinson River Parkway [NYC] both directions at START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Friday June 12th, 2026 thru Saturday June 13th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Saturday June 13th, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed southbound, Saturday June 13th, 2026, 06:30 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, Saturday June 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed northbound, Saturday June 6th, 2026, 07:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Tuesday May 19th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Sunday June 7th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, Friday June 5th, 2026 thru Saturday June 6th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Saturday June 6th, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed southbound, Saturday June 6th, 2026, 06:30 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Saturday June 6th, 2026 thru Sunday June 7th, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, Sunday June 7th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed northbound, Saturday June 6th, 2026 thru Sunday June 7th, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed southbound, Sunday June 7th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed southbound, Sunday June 7th, 2026, 07:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Friday June 12th, 202","update_date":"2026-06-02T18:01:42Z"},"road_event_id":"wr+0tYyovrxO2ZfqKLT53Q9UA4w=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.836194,40.824876]]}},{"id":"kUMQUWTp/Lt5fWWhyyIz7a+UWtM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+nmkaBbnYWuDNUmgQJvg2A2Df+E="},{"type":"next-occurrence","id":"+tEd6ho7dGSccS5NfrUloo4PYCk="}],"description":"Bridge painting and construction on Hutchinson River Parkway [NYC] both directions at START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Friday June 12th, 2026 thru Saturday June 13th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Saturday June 13th, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed southbound, Saturday June 13th, 2026, 06:30 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, Saturday June 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed northbound, Saturday June 6th, 2026, 07:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Tuesday May 19th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Sunday June 7th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, Friday June 5th, 2026 thru Saturday June 6th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Saturday June 6th, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed southbound, Saturday June 6th, 2026, 06:30 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Saturday June 6th, 2026 thru Sunday June 7th, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, Sunday June 7th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed northbound, Saturday June 6th, 2026 thru Sunday June 7th, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed southbound, Sunday June 7th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed southbound, Sunday June 7th, 2026, 07:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Friday June 12th, 202","update_date":"2026-06-02T18:01:42Z"},"road_event_id":"kUMQUWTp/Lt5fWWhyyIz7a+UWtM=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.836194,40.824876]]}},{"id":"+tEd6ho7dGSccS5NfrUloo4PYCk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+nmkaBbnYWuDNUmgQJvg2A2Df+E="},{"type":"next-occurrence","id":"26fQvX6h0L93y6a6aQ+mNGC6OzY="}],"description":"Bridge painting and construction on Hutchinson River Parkway [NYC] both directions at START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Friday June 12th, 2026 thru Saturday June 13th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Saturday June 13th, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed southbound, Saturday June 13th, 2026, 06:30 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, Saturday June 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed northbound, Saturday June 6th, 2026, 07:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Tuesday May 19th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Sunday June 7th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, Friday June 5th, 2026 thru Saturday June 6th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Saturday June 6th, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed southbound, Saturday June 6th, 2026, 06:30 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Saturday June 6th, 2026 thru Sunday June 7th, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, Sunday June 7th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed northbound, Saturday June 6th, 2026 thru Sunday June 7th, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed southbound, Sunday June 7th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed southbound, Sunday June 7th, 2026, 07:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Friday June 12th, 202","update_date":"2026-06-02T18:01:42Z"},"road_event_id":"+tEd6ho7dGSccS5NfrUloo4PYCk=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.836194,40.824876]]}},{"id":"26fQvX6h0L93y6a6aQ+mNGC6OzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+nmkaBbnYWuDNUmgQJvg2A2Df+E="},{"type":"next-occurrence","id":"3ULSzl+FMuSkklfcO/vsrFq+cos="}],"description":"Bridge painting and construction on Hutchinson River Parkway [NYC] both directions at START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Friday June 12th, 2026 thru Saturday June 13th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Saturday June 13th, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed southbound, Saturday June 13th, 2026, 06:30 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, Saturday June 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed northbound, Saturday June 6th, 2026, 07:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Tuesday May 19th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Sunday June 7th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, Friday June 5th, 2026 thru Saturday June 6th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Saturday June 6th, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed southbound, Saturday June 6th, 2026, 06:30 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Saturday June 6th, 2026 thru Sunday June 7th, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, Sunday June 7th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed northbound, Saturday June 6th, 2026 thru Sunday June 7th, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed southbound, Sunday June 7th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed southbound, Sunday June 7th, 2026, 07:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Friday June 12th, 202","update_date":"2026-06-02T18:01:42Z"},"road_event_id":"26fQvX6h0L93y6a6aQ+mNGC6OzY=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.836194,40.824876]]}},{"id":"3ULSzl+FMuSkklfcO/vsrFq+cos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+nmkaBbnYWuDNUmgQJvg2A2Df+E="},{"type":"next-occurrence","id":"AUCqHI6JthtBj9L7HYquMlgOEXs="}],"description":"Bridge painting and construction on Hutchinson River Parkway [NYC] both directions at START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Friday June 12th, 2026 thru Saturday June 13th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Saturday June 13th, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed southbound, Saturday June 13th, 2026, 06:30 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, Saturday June 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed northbound, Saturday June 6th, 2026, 07:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Tuesday May 19th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Sunday June 7th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, Friday June 5th, 2026 thru Saturday June 6th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Saturday June 6th, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed southbound, Saturday June 6th, 2026, 06:30 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Saturday June 6th, 2026 thru Sunday June 7th, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, Sunday June 7th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed northbound, Saturday June 6th, 2026 thru Sunday June 7th, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed southbound, Sunday June 7th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed southbound, Sunday June 7th, 2026, 07:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Friday June 12th, 202","update_date":"2026-06-02T18:01:42Z"},"road_event_id":"3ULSzl+FMuSkklfcO/vsrFq+cos=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.836194,40.824876]]}},{"id":"AUCqHI6JthtBj9L7HYquMlgOEXs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+nmkaBbnYWuDNUmgQJvg2A2Df+E="}],"description":"Bridge painting and construction on Hutchinson River Parkway [NYC] both directions at START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Friday June 12th, 2026 thru Saturday June 13th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Saturday June 13th, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed southbound, Saturday June 13th, 2026, 06:30 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, Saturday June 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed northbound, Saturday June 6th, 2026, 07:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Tuesday May 19th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Sunday June 7th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, Friday June 5th, 2026 thru Saturday June 6th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Saturday June 6th, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed southbound, Saturday June 6th, 2026, 06:30 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Saturday June 6th, 2026 thru Sunday June 7th, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, Sunday June 7th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed northbound, Saturday June 6th, 2026 thru Sunday June 7th, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed southbound, Sunday June 7th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed southbound, Sunday June 7th, 2026, 07:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed southbound, Friday June 12th, 202","update_date":"2026-06-02T18:01:42Z"},"road_event_id":"AUCqHI6JthtBj9L7HYquMlgOEXs=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T02:00:00Z","end_date":"2026-06-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.836194,40.824876]]}},{"id":"+dp5ol6RAmSLeRm+el8wESTfKRg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 15TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0zdKh1fBUfNEvHmuX/VsmzpIUTQ="}],"description":"Crane operations on W 15TH ST westbound between 8TH AVE (New York) and 9TH AVE (New York), Saturday May 16th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 04:00 AM thru 11:59 PM All lanes closed","update_date":"2026-05-13T16:53:52Z"},"road_event_id":"+dp5ol6RAmSLeRm+el8wESTfKRg=","beginning_cross_street":"8TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T08:00:00Z","end_date":"2026-06-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002117,40.740491]]}},{"id":"0zdKh1fBUfNEvHmuX/VsmzpIUTQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 15TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+dp5ol6RAmSLeRm+el8wESTfKRg="},{"type":"next-occurrence","id":"pJDg34xK9acPO/Askeg67nzIKns="}],"description":"Crane operations on W 15TH ST westbound between 8TH AVE (New York) and 9TH AVE (New York), Saturday May 16th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 04:00 AM thru 11:59 PM All lanes closed","update_date":"2026-05-13T16:53:52Z"},"road_event_id":"0zdKh1fBUfNEvHmuX/VsmzpIUTQ=","beginning_cross_street":"8TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T08:00:00Z","end_date":"2026-06-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002117,40.740491]]}},{"id":"pJDg34xK9acPO/Askeg67nzIKns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 15TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+dp5ol6RAmSLeRm+el8wESTfKRg="}],"description":"Crane operations on W 15TH ST westbound between 8TH AVE (New York) and 9TH AVE (New York), Saturday May 16th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 04:00 AM thru 11:59 PM All lanes closed","update_date":"2026-05-13T16:53:52Z"},"road_event_id":"pJDg34xK9acPO/Askeg67nzIKns=","beginning_cross_street":"8TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T08:00:00Z","end_date":"2026-06-08T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002117,40.740491]]}},{"id":"o3F8H+4eP3T3zNtYPFB/2nNKXWY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 17TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YqcmA1FikJm78casUXJUZpaZOYw="}],"description":"Construction on E 17TH ST westbound between 3RD AVE (New York) and IRVING PL (New York) for DDC contract MED645 for inclusion area watermain and continue restoration and pipe installation., Friday May 15th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:00 PM thru 07:00 AM All lanes closed","update_date":"2026-05-13T16:57:22Z"},"road_event_id":"o3F8H+4eP3T3zNtYPFB/2nNKXWY=","beginning_cross_street":"3RD AVE","ending_cross_street":"IRVING PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985996,40.735296]]}},{"id":"YqcmA1FikJm78casUXJUZpaZOYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 17TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o3F8H+4eP3T3zNtYPFB/2nNKXWY="},{"type":"next-occurrence","id":"rAwfusJQSzSsis/nOp7hQGgF/OQ="}],"description":"Construction on E 17TH ST westbound between 3RD AVE (New York) and IRVING PL (New York) for DDC contract MED645 for inclusion area watermain and continue restoration and pipe installation., Friday May 15th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:00 PM thru 07:00 AM All lanes closed","update_date":"2026-05-13T16:57:22Z"},"road_event_id":"YqcmA1FikJm78casUXJUZpaZOYw=","beginning_cross_street":"3RD AVE","ending_cross_street":"IRVING PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985996,40.735296]]}},{"id":"rAwfusJQSzSsis/nOp7hQGgF/OQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 17TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o3F8H+4eP3T3zNtYPFB/2nNKXWY="},{"type":"next-occurrence","id":"KPYOqqQ/MdNGBFylTUUmJQkfAyI="}],"description":"Construction on E 17TH ST westbound between 3RD AVE (New York) and IRVING PL (New York) for DDC contract MED645 for inclusion area watermain and continue restoration and pipe installation., Friday May 15th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:00 PM thru 07:00 AM All lanes closed","update_date":"2026-05-13T16:57:22Z"},"road_event_id":"rAwfusJQSzSsis/nOp7hQGgF/OQ=","beginning_cross_street":"3RD AVE","ending_cross_street":"IRVING PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985996,40.735296]]}},{"id":"KPYOqqQ/MdNGBFylTUUmJQkfAyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 17TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o3F8H+4eP3T3zNtYPFB/2nNKXWY="},{"type":"next-occurrence","id":"j63tOFIrFNOQMqHpP9NH4CJcUig="}],"description":"Construction on E 17TH ST westbound between 3RD AVE (New York) and IRVING PL (New York) for DDC contract MED645 for inclusion area watermain and continue restoration and pipe installation., Friday May 15th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:00 PM thru 07:00 AM All lanes closed","update_date":"2026-05-13T16:57:22Z"},"road_event_id":"KPYOqqQ/MdNGBFylTUUmJQkfAyI=","beginning_cross_street":"3RD AVE","ending_cross_street":"IRVING PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985996,40.735296]]}},{"id":"j63tOFIrFNOQMqHpP9NH4CJcUig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 17TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o3F8H+4eP3T3zNtYPFB/2nNKXWY="},{"type":"next-occurrence","id":"bxRjjVwkqud+ZHHm4/UCsURvNe4="}],"description":"Construction on E 17TH ST westbound between 3RD AVE (New York) and IRVING PL (New York) for DDC contract MED645 for inclusion area watermain and continue restoration and pipe installation., Friday May 15th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:00 PM thru 07:00 AM All lanes closed","update_date":"2026-05-13T16:57:22Z"},"road_event_id":"j63tOFIrFNOQMqHpP9NH4CJcUig=","beginning_cross_street":"3RD AVE","ending_cross_street":"IRVING PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985996,40.735296]]}},{"id":"bxRjjVwkqud+ZHHm4/UCsURvNe4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 17TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o3F8H+4eP3T3zNtYPFB/2nNKXWY="},{"type":"next-occurrence","id":"7cdzNRywH5oPmWV1yMKUMNBdB8U="}],"description":"Construction on E 17TH ST westbound between 3RD AVE (New York) and IRVING PL (New York) for DDC contract MED645 for inclusion area watermain and continue restoration and pipe installation., Friday May 15th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:00 PM thru 07:00 AM All lanes closed","update_date":"2026-05-13T16:57:22Z"},"road_event_id":"bxRjjVwkqud+ZHHm4/UCsURvNe4=","beginning_cross_street":"3RD AVE","ending_cross_street":"IRVING PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985996,40.735296]]}},{"id":"7cdzNRywH5oPmWV1yMKUMNBdB8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 17TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o3F8H+4eP3T3zNtYPFB/2nNKXWY="},{"type":"next-occurrence","id":"x+zqo9coNzzJY76bEoy+VDxoImI="}],"description":"Construction on E 17TH ST westbound between 3RD AVE (New York) and IRVING PL (New York) for DDC contract MED645 for inclusion area watermain and continue restoration and pipe installation., Friday May 15th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:00 PM thru 07:00 AM All lanes closed","update_date":"2026-05-13T16:57:22Z"},"road_event_id":"7cdzNRywH5oPmWV1yMKUMNBdB8U=","beginning_cross_street":"3RD AVE","ending_cross_street":"IRVING PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985996,40.735296]]}},{"id":"x+zqo9coNzzJY76bEoy+VDxoImI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 17TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o3F8H+4eP3T3zNtYPFB/2nNKXWY="},{"type":"next-occurrence","id":"Idb5CfEw9G12DhJPDFlb7A5apmE="}],"description":"Construction on E 17TH ST westbound between 3RD AVE (New York) and IRVING PL (New York) for DDC contract MED645 for inclusion area watermain and continue restoration and pipe installation., Friday May 15th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:00 PM thru 07:00 AM All lanes closed","update_date":"2026-05-13T16:57:22Z"},"road_event_id":"x+zqo9coNzzJY76bEoy+VDxoImI=","beginning_cross_street":"3RD AVE","ending_cross_street":"IRVING PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985996,40.735296]]}},{"id":"Idb5CfEw9G12DhJPDFlb7A5apmE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 17TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o3F8H+4eP3T3zNtYPFB/2nNKXWY="},{"type":"next-occurrence","id":"R9Jg5qF0zd+z4gyuL4aCv9cwUCo="}],"description":"Construction on E 17TH ST westbound between 3RD AVE (New York) and IRVING PL (New York) for DDC contract MED645 for inclusion area watermain and continue restoration and pipe installation., Friday May 15th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:00 PM thru 07:00 AM All lanes closed","update_date":"2026-05-13T16:57:22Z"},"road_event_id":"Idb5CfEw9G12DhJPDFlb7A5apmE=","beginning_cross_street":"3RD AVE","ending_cross_street":"IRVING PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985996,40.735296]]}},{"id":"R9Jg5qF0zd+z4gyuL4aCv9cwUCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 17TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o3F8H+4eP3T3zNtYPFB/2nNKXWY="},{"type":"next-occurrence","id":"YYOzkTjtZ/GeDifGPB50BT9nUsk="}],"description":"Construction on E 17TH ST westbound between 3RD AVE (New York) and IRVING PL (New York) for DDC contract MED645 for inclusion area watermain and continue restoration and pipe installation., Friday May 15th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:00 PM thru 07:00 AM All lanes closed","update_date":"2026-05-13T16:57:22Z"},"road_event_id":"R9Jg5qF0zd+z4gyuL4aCv9cwUCo=","beginning_cross_street":"3RD AVE","ending_cross_street":"IRVING PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T00:00:00Z","end_date":"2026-06-15T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985996,40.735296]]}},{"id":"YYOzkTjtZ/GeDifGPB50BT9nUsk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 17TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o3F8H+4eP3T3zNtYPFB/2nNKXWY="},{"type":"next-occurrence","id":"Igmk62cD2l8YsD71vbzVOWqhHso="}],"description":"Construction on E 17TH ST westbound between 3RD AVE (New York) and IRVING PL (New York) for DDC contract MED645 for inclusion area watermain and continue restoration and pipe installation., Friday May 15th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:00 PM thru 07:00 AM All lanes closed","update_date":"2026-05-13T16:57:22Z"},"road_event_id":"YYOzkTjtZ/GeDifGPB50BT9nUsk=","beginning_cross_street":"3RD AVE","ending_cross_street":"IRVING PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T00:00:00Z","end_date":"2026-06-16T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985996,40.735296]]}},{"id":"Igmk62cD2l8YsD71vbzVOWqhHso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 17TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o3F8H+4eP3T3zNtYPFB/2nNKXWY="},{"type":"next-occurrence","id":"1+KsbWqKd9fLWCXzMEPAob5WRY4="}],"description":"Construction on E 17TH ST westbound between 3RD AVE (New York) and IRVING PL (New York) for DDC contract MED645 for inclusion area watermain and continue restoration and pipe installation., Friday May 15th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:00 PM thru 07:00 AM All lanes closed","update_date":"2026-05-13T16:57:22Z"},"road_event_id":"Igmk62cD2l8YsD71vbzVOWqhHso=","beginning_cross_street":"3RD AVE","ending_cross_street":"IRVING PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T00:00:00Z","end_date":"2026-06-17T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985996,40.735296]]}},{"id":"1+KsbWqKd9fLWCXzMEPAob5WRY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 17TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o3F8H+4eP3T3zNtYPFB/2nNKXWY="},{"type":"next-occurrence","id":"j55Sx0nTHDXHSvkm8tnQJoqaHMg="}],"description":"Construction on E 17TH ST westbound between 3RD AVE (New York) and IRVING PL (New York) for DDC contract MED645 for inclusion area watermain and continue restoration and pipe installation., Friday May 15th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:00 PM thru 07:00 AM All lanes closed","update_date":"2026-05-13T16:57:22Z"},"road_event_id":"1+KsbWqKd9fLWCXzMEPAob5WRY4=","beginning_cross_street":"3RD AVE","ending_cross_street":"IRVING PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T00:00:00Z","end_date":"2026-06-18T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985996,40.735296]]}},{"id":"j55Sx0nTHDXHSvkm8tnQJoqaHMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 17TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o3F8H+4eP3T3zNtYPFB/2nNKXWY="}],"description":"Construction on E 17TH ST westbound between 3RD AVE (New York) and IRVING PL (New York) for DDC contract MED645 for inclusion area watermain and continue restoration and pipe installation., Friday May 15th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:00 PM thru 07:00 AM All lanes closed","update_date":"2026-05-13T16:57:22Z"},"road_event_id":"j55Sx0nTHDXHSvkm8tnQJoqaHMg=","beginning_cross_street":"3RD AVE","ending_cross_street":"IRVING PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T00:00:00Z","end_date":"2026-06-19T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985996,40.735296]]}},{"id":"XZRScpMtf+DJxJHrH/xP6xfGT5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KGE8ed/8ArnjisKClOzRD5uyGYk="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for SANDRESPC-East Side Coastal Resiliency., Saturday May 16th, 2026 thru Saturday August 8th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:02:36Z"},"road_event_id":"XZRScpMtf+DJxJHrH/xP6xfGT5U=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T12:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975395,40.732961]]}},{"id":"KGE8ed/8ArnjisKClOzRD5uyGYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZRScpMtf+DJxJHrH/xP6xfGT5U="},{"type":"next-occurrence","id":"E/n053VShu9ELOmF9BZJHQN2614="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for SANDRESPC-East Side Coastal Resiliency., Saturday May 16th, 2026 thru Saturday August 8th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:02:36Z"},"road_event_id":"KGE8ed/8ArnjisKClOzRD5uyGYk=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975395,40.732961]]}},{"id":"E/n053VShu9ELOmF9BZJHQN2614=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZRScpMtf+DJxJHrH/xP6xfGT5U="},{"type":"next-occurrence","id":"YZxpOIrYBYefikK1x/r+6u0IJVE="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for SANDRESPC-East Side Coastal Resiliency., Saturday May 16th, 2026 thru Saturday August 8th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:02:36Z"},"road_event_id":"E/n053VShu9ELOmF9BZJHQN2614=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T12:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975395,40.732961]]}},{"id":"YZxpOIrYBYefikK1x/r+6u0IJVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZRScpMtf+DJxJHrH/xP6xfGT5U="},{"type":"next-occurrence","id":"lAL6cUuStWrOSKOWlQKjnAMLM9E="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for SANDRESPC-East Side Coastal Resiliency., Saturday May 16th, 2026 thru Saturday August 8th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:02:36Z"},"road_event_id":"YZxpOIrYBYefikK1x/r+6u0IJVE=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975395,40.732961]]}},{"id":"lAL6cUuStWrOSKOWlQKjnAMLM9E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZRScpMtf+DJxJHrH/xP6xfGT5U="},{"type":"next-occurrence","id":"9M5sC6+EjOB2pq4iC2d0foE54pg="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for SANDRESPC-East Side Coastal Resiliency., Saturday May 16th, 2026 thru Saturday August 8th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:02:36Z"},"road_event_id":"lAL6cUuStWrOSKOWlQKjnAMLM9E=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975395,40.732961]]}},{"id":"9M5sC6+EjOB2pq4iC2d0foE54pg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZRScpMtf+DJxJHrH/xP6xfGT5U="},{"type":"next-occurrence","id":"s9LuGkgQkipBqa3RUEjujM5eaw8="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for SANDRESPC-East Side Coastal Resiliency., Saturday May 16th, 2026 thru Saturday August 8th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:02:36Z"},"road_event_id":"9M5sC6+EjOB2pq4iC2d0foE54pg=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975395,40.732961]]}},{"id":"s9LuGkgQkipBqa3RUEjujM5eaw8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZRScpMtf+DJxJHrH/xP6xfGT5U="},{"type":"next-occurrence","id":"3wlg9bBcP2TMo/Nl8fOqawWYSvI="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for SANDRESPC-East Side Coastal Resiliency., Saturday May 16th, 2026 thru Saturday August 8th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:02:36Z"},"road_event_id":"s9LuGkgQkipBqa3RUEjujM5eaw8=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975395,40.732961]]}},{"id":"3wlg9bBcP2TMo/Nl8fOqawWYSvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZRScpMtf+DJxJHrH/xP6xfGT5U="},{"type":"next-occurrence","id":"sZcUJadJz2OhlYf5CZEIvAuqELI="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for SANDRESPC-East Side Coastal Resiliency., Saturday May 16th, 2026 thru Saturday August 8th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:02:36Z"},"road_event_id":"3wlg9bBcP2TMo/Nl8fOqawWYSvI=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975395,40.732961]]}},{"id":"sZcUJadJz2OhlYf5CZEIvAuqELI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZRScpMtf+DJxJHrH/xP6xfGT5U="},{"type":"next-occurrence","id":"5WCri8Fg5OgizV38YH85wipqc2c="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for SANDRESPC-East Side Coastal Resiliency., Saturday May 16th, 2026 thru Saturday August 8th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:02:36Z"},"road_event_id":"sZcUJadJz2OhlYf5CZEIvAuqELI=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975395,40.732961]]}},{"id":"5WCri8Fg5OgizV38YH85wipqc2c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZRScpMtf+DJxJHrH/xP6xfGT5U="},{"type":"next-occurrence","id":"+HRUTnSCKD/xEiOSaLl31+HoWWU="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for SANDRESPC-East Side Coastal Resiliency., Saturday May 16th, 2026 thru Saturday August 8th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:02:36Z"},"road_event_id":"5WCri8Fg5OgizV38YH85wipqc2c=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T12:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975395,40.732961]]}},{"id":"+HRUTnSCKD/xEiOSaLl31+HoWWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZRScpMtf+DJxJHrH/xP6xfGT5U="},{"type":"next-occurrence","id":"Y+q1tMVDfivYS4z5avHb7ujF1/c="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for SANDRESPC-East Side Coastal Resiliency., Saturday May 16th, 2026 thru Saturday August 8th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:02:36Z"},"road_event_id":"+HRUTnSCKD/xEiOSaLl31+HoWWU=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T12:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975395,40.732961]]}},{"id":"Y+q1tMVDfivYS4z5avHb7ujF1/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZRScpMtf+DJxJHrH/xP6xfGT5U="},{"type":"next-occurrence","id":"QCDqDFQ4GI8TQILhMu34NspnG8k="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for SANDRESPC-East Side Coastal Resiliency., Saturday May 16th, 2026 thru Saturday August 8th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:02:36Z"},"road_event_id":"Y+q1tMVDfivYS4z5avHb7ujF1/c=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T12:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975395,40.732961]]}},{"id":"QCDqDFQ4GI8TQILhMu34NspnG8k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZRScpMtf+DJxJHrH/xP6xfGT5U="},{"type":"next-occurrence","id":"cuD2ixIIMlHwdqO8YjfXVTNSCAw="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for SANDRESPC-East Side Coastal Resiliency., Saturday May 16th, 2026 thru Saturday August 8th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:02:36Z"},"road_event_id":"QCDqDFQ4GI8TQILhMu34NspnG8k=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T12:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975395,40.732961]]}},{"id":"cuD2ixIIMlHwdqO8YjfXVTNSCAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZRScpMtf+DJxJHrH/xP6xfGT5U="},{"type":"next-occurrence","id":"qBNY0XNrkYrt+4fUlrWCbUE+8d8="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for SANDRESPC-East Side Coastal Resiliency., Saturday May 16th, 2026 thru Saturday August 8th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:02:36Z"},"road_event_id":"cuD2ixIIMlHwdqO8YjfXVTNSCAw=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T12:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975395,40.732961]]}},{"id":"qBNY0XNrkYrt+4fUlrWCbUE+8d8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XZRScpMtf+DJxJHrH/xP6xfGT5U="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for SANDRESPC-East Side Coastal Resiliency., Saturday May 16th, 2026 thru Saturday August 8th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:02:36Z"},"road_event_id":"qBNY0XNrkYrt+4fUlrWCbUE+8d8=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T12:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975395,40.732961]]}},{"id":"U7lNWhT1gw6uTv+v95Esqnhj4qg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 54TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bDPSWPXZuBeRio5XUmqEFgesorQ="}],"description":"Crane operations on E 54TH ST eastbound between 2ND AVE (New York) and 1ST AVE (New York), Saturday May 16th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 17th, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-13T17:14:23Z"},"road_event_id":"U7lNWhT1gw6uTv+v95Esqnhj4qg=","beginning_cross_street":"2ND AVE","ending_cross_street":"1ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96654,40.757319]]}},{"id":"bDPSWPXZuBeRio5XUmqEFgesorQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 54TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7lNWhT1gw6uTv+v95Esqnhj4qg="}],"description":"Crane operations on E 54TH ST eastbound between 2ND AVE (New York) and 1ST AVE (New York), Saturday May 16th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 17th, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-13T17:14:23Z"},"road_event_id":"bDPSWPXZuBeRio5XUmqEFgesorQ=","beginning_cross_street":"2ND AVE","ending_cross_street":"1ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96654,40.757319]]}},{"id":"+IvCia2H+n+ByZ922EhXDMJKvuU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 55TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"47e+UGyvQ9NiGbBwXGSVAOkWyoI="}],"description":"Crane operations on W 55TH ST westbound between BROADWAY (New York) and 8TH AVE (New York), Wednesday May 13th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:16:43Z"},"road_event_id":"+IvCia2H+n+ByZ922EhXDMJKvuU=","beginning_cross_street":"BROADWAY","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:30:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982291,40.764769]]}},{"id":"47e+UGyvQ9NiGbBwXGSVAOkWyoI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 55TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+IvCia2H+n+ByZ922EhXDMJKvuU="},{"type":"next-occurrence","id":"OKapiDoLy72PDcjRnxEsAc1/Sfc="}],"description":"Crane operations on W 55TH ST westbound between BROADWAY (New York) and 8TH AVE (New York), Wednesday May 13th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:16:43Z"},"road_event_id":"47e+UGyvQ9NiGbBwXGSVAOkWyoI=","beginning_cross_street":"BROADWAY","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982291,40.764769]]}},{"id":"OKapiDoLy72PDcjRnxEsAc1/Sfc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 55TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+IvCia2H+n+ByZ922EhXDMJKvuU="},{"type":"next-occurrence","id":"9Gd12xAtIr4rYSXEzGG/+quPZJ4="}],"description":"Crane operations on W 55TH ST westbound between BROADWAY (New York) and 8TH AVE (New York), Wednesday May 13th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:16:43Z"},"road_event_id":"OKapiDoLy72PDcjRnxEsAc1/Sfc=","beginning_cross_street":"BROADWAY","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982291,40.764769]]}},{"id":"9Gd12xAtIr4rYSXEzGG/+quPZJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 55TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+IvCia2H+n+ByZ922EhXDMJKvuU="},{"type":"next-occurrence","id":"yVM398jtQGwKHYErf7ci/A3XD4Q="}],"description":"Crane operations on W 55TH ST westbound between BROADWAY (New York) and 8TH AVE (New York), Wednesday May 13th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:16:43Z"},"road_event_id":"9Gd12xAtIr4rYSXEzGG/+quPZJ4=","beginning_cross_street":"BROADWAY","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982291,40.764769]]}},{"id":"yVM398jtQGwKHYErf7ci/A3XD4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 55TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+IvCia2H+n+ByZ922EhXDMJKvuU="},{"type":"next-occurrence","id":"mtibZsLn/zIfaUCKNA464+sniYA="}],"description":"Crane operations on W 55TH ST westbound between BROADWAY (New York) and 8TH AVE (New York), Wednesday May 13th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:16:43Z"},"road_event_id":"yVM398jtQGwKHYErf7ci/A3XD4Q=","beginning_cross_street":"BROADWAY","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982291,40.764769]]}},{"id":"mtibZsLn/zIfaUCKNA464+sniYA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 55TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+IvCia2H+n+ByZ922EhXDMJKvuU="},{"type":"next-occurrence","id":"BOAjW+0D05skLexhChDzT4StuPY="}],"description":"Crane operations on W 55TH ST westbound between BROADWAY (New York) and 8TH AVE (New York), Wednesday May 13th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:16:43Z"},"road_event_id":"mtibZsLn/zIfaUCKNA464+sniYA=","beginning_cross_street":"BROADWAY","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982291,40.764769]]}},{"id":"BOAjW+0D05skLexhChDzT4StuPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 55TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+IvCia2H+n+ByZ922EhXDMJKvuU="}],"description":"Crane operations on W 55TH ST westbound between BROADWAY (New York) and 8TH AVE (New York), Wednesday May 13th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T17:16:43Z"},"road_event_id":"BOAjW+0D05skLexhChDzT4StuPY=","beginning_cross_street":"BROADWAY","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:30:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982291,40.764769]]}},{"id":"/zz7Tccsb6IaxGxRFoNANAcYwSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 74TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+DUeb9yHPP4p5fgcUoqOtw2wGoA="}],"description":"Construction on E 74TH ST eastbound between 3RD AVE (New York) and 2ND AVE (New York) for building inspection from boom truck., Saturday May 16th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 17th, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-13T17:34:27Z"},"road_event_id":"/zz7Tccsb6IaxGxRFoNANAcYwSc=","beginning_cross_street":"3RD AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.959492,40.771005]]}},{"id":"+DUeb9yHPP4p5fgcUoqOtw2wGoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 74TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/zz7Tccsb6IaxGxRFoNANAcYwSc="}],"description":"Construction on E 74TH ST eastbound between 3RD AVE (New York) and 2ND AVE (New York) for building inspection from boom truck., Saturday May 16th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 17th, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-13T17:34:27Z"},"road_event_id":"+DUeb9yHPP4p5fgcUoqOtw2wGoA=","beginning_cross_street":"3RD AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.959492,40.771005]]}},{"id":"XJ5VP2sRv3gljVqTHwF90kJ5nOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 113TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SkBp2XDi56DtE9rdgaW/R46Nl5w="}],"description":"Construction on W 113TH ST westbound between AMSTERDAM AVE (New York) and BROADWAY (New York) to lift materials to roof with use of knuckle boom., Saturday May 16th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 17th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-13T17:50:04Z"},"road_event_id":"XJ5VP2sRv3gljVqTHwF90kJ5nOY=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962615,40.804941]]}},{"id":"SkBp2XDi56DtE9rdgaW/R46Nl5w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 113TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJ5VP2sRv3gljVqTHwF90kJ5nOY="},{"type":"next-occurrence","id":"OtYpOyl7OE7rgn84AvzEBjSztqI="}],"description":"Construction on W 113TH ST westbound between AMSTERDAM AVE (New York) and BROADWAY (New York) to lift materials to roof with use of knuckle boom., Saturday May 16th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 17th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-13T17:50:04Z"},"road_event_id":"SkBp2XDi56DtE9rdgaW/R46Nl5w=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962615,40.804941]]}},{"id":"OtYpOyl7OE7rgn84AvzEBjSztqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 113TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJ5VP2sRv3gljVqTHwF90kJ5nOY="},{"type":"next-occurrence","id":"STLwxvMdm70TxrRDoRQ8aMENlns="}],"description":"Construction on W 113TH ST westbound between AMSTERDAM AVE (New York) and BROADWAY (New York) to lift materials to roof with use of knuckle boom., Saturday May 16th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 17th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-13T17:50:04Z"},"road_event_id":"OtYpOyl7OE7rgn84AvzEBjSztqI=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962615,40.804941]]}},{"id":"STLwxvMdm70TxrRDoRQ8aMENlns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 113TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XJ5VP2sRv3gljVqTHwF90kJ5nOY="}],"description":"Construction on W 113TH ST westbound between AMSTERDAM AVE (New York) and BROADWAY (New York) to lift materials to roof with use of knuckle boom., Saturday May 16th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 17th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-13T17:50:04Z"},"road_event_id":"STLwxvMdm70TxrRDoRQ8aMENlns=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962615,40.804941]]}},{"id":"N+uo450B87JwTY1nzMFXCuEXkQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DgIGhMFBS/HK0ch7iO5SsbVzaeI="}],"description":"Installation of traffic management systems on NY 18 both directions between Stone Road (Greece) and NORTHGATE MNR at DENISE RD (Greece) work at different intersections during project, Alternating Right/Left Lane closures as needed., Monday May 11th, 2026 thru Thursday October 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-13T18:19:18Z"},"road_event_id":"N+uo450B87JwTY1nzMFXCuEXkQ4=","beginning_cross_street":"Stone Road","ending_cross_street":"DENISE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.641446,43.22333]]}},{"id":"DgIGhMFBS/HK0ch7iO5SsbVzaeI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N+uo450B87JwTY1nzMFXCuEXkQ4="},{"type":"next-occurrence","id":"q5LjqO2V0M2d1VqswQEZS2PnsTk="}],"description":"Installation of traffic management systems on NY 18 both directions between Stone Road (Greece) and NORTHGATE MNR at DENISE RD (Greece) work at different intersections during project, Alternating Right/Left Lane closures as needed., Monday May 11th, 2026 thru Thursday October 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-13T18:19:18Z"},"road_event_id":"DgIGhMFBS/HK0ch7iO5SsbVzaeI=","beginning_cross_street":"Stone Road","ending_cross_street":"DENISE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.641446,43.22333]]}},{"id":"q5LjqO2V0M2d1VqswQEZS2PnsTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N+uo450B87JwTY1nzMFXCuEXkQ4="},{"type":"next-occurrence","id":"/NHOaVtdYqjd/XsFlMxNJr8uWEE="}],"description":"Installation of traffic management systems on NY 18 both directions between Stone Road (Greece) and NORTHGATE MNR at DENISE RD (Greece) work at different intersections during project, Alternating Right/Left Lane closures as needed., Monday May 11th, 2026 thru Thursday October 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-13T18:19:18Z"},"road_event_id":"q5LjqO2V0M2d1VqswQEZS2PnsTk=","beginning_cross_street":"Stone Road","ending_cross_street":"DENISE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.641446,43.22333]]}},{"id":"/NHOaVtdYqjd/XsFlMxNJr8uWEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N+uo450B87JwTY1nzMFXCuEXkQ4="},{"type":"next-occurrence","id":"V1M15PJR38p6BkpjSp0Bd0CiPZM="}],"description":"Installation of traffic management systems on NY 18 both directions between Stone Road (Greece) and NORTHGATE MNR at DENISE RD (Greece) work at different intersections during project, Alternating Right/Left Lane closures as needed., Monday May 11th, 2026 thru Thursday October 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-13T18:19:18Z"},"road_event_id":"/NHOaVtdYqjd/XsFlMxNJr8uWEE=","beginning_cross_street":"Stone Road","ending_cross_street":"DENISE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.641446,43.22333]]}},{"id":"V1M15PJR38p6BkpjSp0Bd0CiPZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N+uo450B87JwTY1nzMFXCuEXkQ4="},{"type":"next-occurrence","id":"58mTQhBzZRflOfOZBxahi264fI0="}],"description":"Installation of traffic management systems on NY 18 both directions between Stone Road (Greece) and NORTHGATE MNR at DENISE RD (Greece) work at different intersections during project, Alternating Right/Left Lane closures as needed., Monday May 11th, 2026 thru Thursday October 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-13T18:19:18Z"},"road_event_id":"V1M15PJR38p6BkpjSp0Bd0CiPZM=","beginning_cross_street":"Stone Road","ending_cross_street":"DENISE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.641446,43.22333]]}},{"id":"58mTQhBzZRflOfOZBxahi264fI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N+uo450B87JwTY1nzMFXCuEXkQ4="},{"type":"next-occurrence","id":"sMmQQhILdvhs5YgY9/STihWc3PU="}],"description":"Installation of traffic management systems on NY 18 both directions between Stone Road (Greece) and NORTHGATE MNR at DENISE RD (Greece) work at different intersections during project, Alternating Right/Left Lane closures as needed., Monday May 11th, 2026 thru Thursday October 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-13T18:19:18Z"},"road_event_id":"58mTQhBzZRflOfOZBxahi264fI0=","beginning_cross_street":"Stone Road","ending_cross_street":"DENISE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.641446,43.22333]]}},{"id":"sMmQQhILdvhs5YgY9/STihWc3PU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N+uo450B87JwTY1nzMFXCuEXkQ4="},{"type":"next-occurrence","id":"aakAM7zx6HgNyDkjauq98zNlyNU="}],"description":"Installation of traffic management systems on NY 18 both directions between Stone Road (Greece) and NORTHGATE MNR at DENISE RD (Greece) work at different intersections during project, Alternating Right/Left Lane closures as needed., Monday May 11th, 2026 thru Thursday October 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-13T18:19:18Z"},"road_event_id":"sMmQQhILdvhs5YgY9/STihWc3PU=","beginning_cross_street":"Stone Road","ending_cross_street":"DENISE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.641446,43.22333]]}},{"id":"aakAM7zx6HgNyDkjauq98zNlyNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N+uo450B87JwTY1nzMFXCuEXkQ4="},{"type":"next-occurrence","id":"kpVM2xeEGSsI/GNAt3g9W/+myho="}],"description":"Installation of traffic management systems on NY 18 both directions between Stone Road (Greece) and NORTHGATE MNR at DENISE RD (Greece) work at different intersections during project, Alternating Right/Left Lane closures as needed., Monday May 11th, 2026 thru Thursday October 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-13T18:19:18Z"},"road_event_id":"aakAM7zx6HgNyDkjauq98zNlyNU=","beginning_cross_street":"Stone Road","ending_cross_street":"DENISE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.641446,43.22333]]}},{"id":"kpVM2xeEGSsI/GNAt3g9W/+myho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N+uo450B87JwTY1nzMFXCuEXkQ4="},{"type":"next-occurrence","id":"Q6MEqXyGBMYAY2dGzuAq4/TrDtg="}],"description":"Installation of traffic management systems on NY 18 both directions between Stone Road (Greece) and NORTHGATE MNR at DENISE RD (Greece) work at different intersections during project, Alternating Right/Left Lane closures as needed., Monday May 11th, 2026 thru Thursday October 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-13T18:19:18Z"},"road_event_id":"kpVM2xeEGSsI/GNAt3g9W/+myho=","beginning_cross_street":"Stone Road","ending_cross_street":"DENISE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.641446,43.22333]]}},{"id":"Q6MEqXyGBMYAY2dGzuAq4/TrDtg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N+uo450B87JwTY1nzMFXCuEXkQ4="},{"type":"next-occurrence","id":"y8JNSLlyeee0MLTnLKPoriag1XY="}],"description":"Installation of traffic management systems on NY 18 both directions between Stone Road (Greece) and NORTHGATE MNR at DENISE RD (Greece) work at different intersections during project, Alternating Right/Left Lane closures as needed., Monday May 11th, 2026 thru Thursday October 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-13T18:19:18Z"},"road_event_id":"Q6MEqXyGBMYAY2dGzuAq4/TrDtg=","beginning_cross_street":"Stone Road","ending_cross_street":"DENISE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.641446,43.22333]]}},{"id":"y8JNSLlyeee0MLTnLKPoriag1XY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N+uo450B87JwTY1nzMFXCuEXkQ4="}],"description":"Installation of traffic management systems on NY 18 both directions between Stone Road (Greece) and NORTHGATE MNR at DENISE RD (Greece) work at different intersections during project, Alternating Right/Left Lane closures as needed., Monday May 11th, 2026 thru Thursday October 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes","update_date":"2026-05-13T18:19:18Z"},"road_event_id":"y8JNSLlyeee0MLTnLKPoriag1XY=","beginning_cross_street":"Stone Road","ending_cross_street":"DENISE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.641446,43.22333]]}},{"id":"tXSTz1dFKvgJ4cIya0B+jukXxwU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BARUCH DR"],"direction":"unknown","related_road_events":[],"description":"Construction on BARUCH DR southbound between DELANCEY ST (New York) and DELANCEY ST S (New York) for SANDRESPC-East Coastal Resiliency., Continuous Wednesday May 13th, 2026 12:00 AM thru Saturday August 8th, 2026 11:59 PM All lanes closed","update_date":"2026-05-13T18:21:24Z"},"road_event_id":"tXSTz1dFKvgJ4cIya0B+jukXxwU=","beginning_cross_street":"DELANCEY ST","ending_cross_street":"DELANCEY ST S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.978016,40.715637]]}},{"id":"6J++bb7kC8onYx55qCBIby+/unU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SULLIVAN ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9szbwvVMlbMp6hlnVt2W6/qWRwo="}],"description":"Construction on SULLIVAN ST northbound between PRINCE ST (New York) and W HOUSTON ST (New York) for utility and infrastructure upgrades for NYCDDC HWPR20MKL contract., Friday May 15th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-13T18:25:07Z"},"road_event_id":"6J++bb7kC8onYx55qCBIby+/unU=","beginning_cross_street":"PRINCE ST","ending_cross_street":"W HOUSTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0023,40.726548]]}},{"id":"9szbwvVMlbMp6hlnVt2W6/qWRwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SULLIVAN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6J++bb7kC8onYx55qCBIby+/unU="},{"type":"next-occurrence","id":"9WTHqSo3PfLEVgPMXVMQkirvoD0="}],"description":"Construction on SULLIVAN ST northbound between PRINCE ST (New York) and W HOUSTON ST (New York) for utility and infrastructure upgrades for NYCDDC HWPR20MKL contract., Friday May 15th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-13T18:25:07Z"},"road_event_id":"9szbwvVMlbMp6hlnVt2W6/qWRwo=","beginning_cross_street":"PRINCE ST","ending_cross_street":"W HOUSTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0023,40.726548]]}},{"id":"9WTHqSo3PfLEVgPMXVMQkirvoD0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SULLIVAN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6J++bb7kC8onYx55qCBIby+/unU="},{"type":"next-occurrence","id":"nMrJhIzcRMhNeD7o/A/Tc69iDYo="}],"description":"Construction on SULLIVAN ST northbound between PRINCE ST (New York) and W HOUSTON ST (New York) for utility and infrastructure upgrades for NYCDDC HWPR20MKL contract., Friday May 15th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-13T18:25:07Z"},"road_event_id":"9WTHqSo3PfLEVgPMXVMQkirvoD0=","beginning_cross_street":"PRINCE ST","ending_cross_street":"W HOUSTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0023,40.726548]]}},{"id":"nMrJhIzcRMhNeD7o/A/Tc69iDYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SULLIVAN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6J++bb7kC8onYx55qCBIby+/unU="},{"type":"next-occurrence","id":"tq+g0kvlO7DNilmABa5Ob0yGQ9I="}],"description":"Construction on SULLIVAN ST northbound between PRINCE ST (New York) and W HOUSTON ST (New York) for utility and infrastructure upgrades for NYCDDC HWPR20MKL contract., Friday May 15th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-13T18:25:07Z"},"road_event_id":"nMrJhIzcRMhNeD7o/A/Tc69iDYo=","beginning_cross_street":"PRINCE ST","ending_cross_street":"W HOUSTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0023,40.726548]]}},{"id":"tq+g0kvlO7DNilmABa5Ob0yGQ9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SULLIVAN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6J++bb7kC8onYx55qCBIby+/unU="},{"type":"next-occurrence","id":"0sTs1nY0DvyHvd93UMicThfK6YE="}],"description":"Construction on SULLIVAN ST northbound between PRINCE ST (New York) and W HOUSTON ST (New York) for utility and infrastructure upgrades for NYCDDC HWPR20MKL contract., Friday May 15th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-13T18:25:07Z"},"road_event_id":"tq+g0kvlO7DNilmABa5Ob0yGQ9I=","beginning_cross_street":"PRINCE ST","ending_cross_street":"W HOUSTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0023,40.726548]]}},{"id":"0sTs1nY0DvyHvd93UMicThfK6YE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SULLIVAN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6J++bb7kC8onYx55qCBIby+/unU="},{"type":"next-occurrence","id":"7hKzw+zxnJ6IqwSfwgZIxXFTyu4="}],"description":"Construction on SULLIVAN ST northbound between PRINCE ST (New York) and W HOUSTON ST (New York) for utility and infrastructure upgrades for NYCDDC HWPR20MKL contract., Friday May 15th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-13T18:25:07Z"},"road_event_id":"0sTs1nY0DvyHvd93UMicThfK6YE=","beginning_cross_street":"PRINCE ST","ending_cross_street":"W HOUSTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0023,40.726548]]}},{"id":"7hKzw+zxnJ6IqwSfwgZIxXFTyu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SULLIVAN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6J++bb7kC8onYx55qCBIby+/unU="},{"type":"next-occurrence","id":"DFVAo6TsPlSI8PZX+galRybSF+Y="}],"description":"Construction on SULLIVAN ST northbound between PRINCE ST (New York) and W HOUSTON ST (New York) for utility and infrastructure upgrades for NYCDDC HWPR20MKL contract., Friday May 15th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-13T18:25:07Z"},"road_event_id":"7hKzw+zxnJ6IqwSfwgZIxXFTyu4=","beginning_cross_street":"PRINCE ST","ending_cross_street":"W HOUSTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0023,40.726548]]}},{"id":"DFVAo6TsPlSI8PZX+galRybSF+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SULLIVAN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6J++bb7kC8onYx55qCBIby+/unU="}],"description":"Construction on SULLIVAN ST northbound between PRINCE ST (New York) and W HOUSTON ST (New York) for utility and infrastructure upgrades for NYCDDC HWPR20MKL contract., Friday May 15th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-13T18:25:07Z"},"road_event_id":"DFVAo6TsPlSI8PZX+galRybSF+Y=","beginning_cross_street":"PRINCE ST","ending_cross_street":"W HOUSTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0023,40.726548]]}},{"id":"oE+u47ltb8NrIJirQ5HRM++ltv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tnTHkXvAEKpqs4GEMUAFUHd0VRo="}],"description":"Construction on CHAMBERS ST westbound between N END AVE (New York) and RIVER TER at 6TH PL (New York) for water main work., Saturday May 16th, 2026 thru Monday July 13th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T18:40:05Z"},"road_event_id":"oE+u47ltb8NrIJirQ5HRM++ltv8=","beginning_cross_street":"N END AVE","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T12:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01413,40.717752]]}},{"id":"tnTHkXvAEKpqs4GEMUAFUHd0VRo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oE+u47ltb8NrIJirQ5HRM++ltv8="},{"type":"next-occurrence","id":"iOQJRn10uulZOp4R7Yz4hkzm/XE="}],"description":"Construction on CHAMBERS ST westbound between N END AVE (New York) and RIVER TER at 6TH PL (New York) for water main work., Saturday May 16th, 2026 thru Monday July 13th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T18:40:05Z"},"road_event_id":"tnTHkXvAEKpqs4GEMUAFUHd0VRo=","beginning_cross_street":"N END AVE","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01413,40.717752]]}},{"id":"iOQJRn10uulZOp4R7Yz4hkzm/XE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oE+u47ltb8NrIJirQ5HRM++ltv8="},{"type":"next-occurrence","id":"IKOyxkyrZv8vM+hl0dSBILDehcg="}],"description":"Construction on CHAMBERS ST westbound between N END AVE (New York) and RIVER TER at 6TH PL (New York) for water main work., Saturday May 16th, 2026 thru Monday July 13th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T18:40:05Z"},"road_event_id":"iOQJRn10uulZOp4R7Yz4hkzm/XE=","beginning_cross_street":"N END AVE","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T12:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01413,40.717752]]}},{"id":"IKOyxkyrZv8vM+hl0dSBILDehcg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oE+u47ltb8NrIJirQ5HRM++ltv8="},{"type":"next-occurrence","id":"FLSIDia+YcAN30LSXw1LqUMGQiQ="}],"description":"Construction on CHAMBERS ST westbound between N END AVE (New York) and RIVER TER at 6TH PL (New York) for water main work., Saturday May 16th, 2026 thru Monday July 13th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T18:40:05Z"},"road_event_id":"IKOyxkyrZv8vM+hl0dSBILDehcg=","beginning_cross_street":"N END AVE","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01413,40.717752]]}},{"id":"FLSIDia+YcAN30LSXw1LqUMGQiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oE+u47ltb8NrIJirQ5HRM++ltv8="},{"type":"next-occurrence","id":"wPy1Kgu7r/kJGVqWcdnbIc9Vymk="}],"description":"Construction on CHAMBERS ST westbound between N END AVE (New York) and RIVER TER at 6TH PL (New York) for water main work., Saturday May 16th, 2026 thru Monday July 13th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T18:40:05Z"},"road_event_id":"FLSIDia+YcAN30LSXw1LqUMGQiQ=","beginning_cross_street":"N END AVE","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01413,40.717752]]}},{"id":"wPy1Kgu7r/kJGVqWcdnbIc9Vymk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oE+u47ltb8NrIJirQ5HRM++ltv8="},{"type":"next-occurrence","id":"dYG4ykcA6TcU9NaNlrD2SFp+67I="}],"description":"Construction on CHAMBERS ST westbound between N END AVE (New York) and RIVER TER at 6TH PL (New York) for water main work., Saturday May 16th, 2026 thru Monday July 13th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T18:40:05Z"},"road_event_id":"wPy1Kgu7r/kJGVqWcdnbIc9Vymk=","beginning_cross_street":"N END AVE","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01413,40.717752]]}},{"id":"dYG4ykcA6TcU9NaNlrD2SFp+67I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oE+u47ltb8NrIJirQ5HRM++ltv8="},{"type":"next-occurrence","id":"Lv+QZli2dXutDsqxBsZZTEhdm8Y="}],"description":"Construction on CHAMBERS ST westbound between N END AVE (New York) and RIVER TER at 6TH PL (New York) for water main work., Saturday May 16th, 2026 thru Monday July 13th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T18:40:05Z"},"road_event_id":"dYG4ykcA6TcU9NaNlrD2SFp+67I=","beginning_cross_street":"N END AVE","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01413,40.717752]]}},{"id":"Lv+QZli2dXutDsqxBsZZTEhdm8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oE+u47ltb8NrIJirQ5HRM++ltv8="},{"type":"next-occurrence","id":"rWIEALzzMrI+HMO85aRIT4AnkKU="}],"description":"Construction on CHAMBERS ST westbound between N END AVE (New York) and RIVER TER at 6TH PL (New York) for water main work., Saturday May 16th, 2026 thru Monday July 13th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T18:40:05Z"},"road_event_id":"Lv+QZli2dXutDsqxBsZZTEhdm8Y=","beginning_cross_street":"N END AVE","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01413,40.717752]]}},{"id":"rWIEALzzMrI+HMO85aRIT4AnkKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oE+u47ltb8NrIJirQ5HRM++ltv8="},{"type":"next-occurrence","id":"H4Q3GI52gIlwq6IfZERQFvQaQns="}],"description":"Construction on CHAMBERS ST westbound between N END AVE (New York) and RIVER TER at 6TH PL (New York) for water main work., Saturday May 16th, 2026 thru Monday July 13th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T18:40:05Z"},"road_event_id":"rWIEALzzMrI+HMO85aRIT4AnkKU=","beginning_cross_street":"N END AVE","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01413,40.717752]]}},{"id":"H4Q3GI52gIlwq6IfZERQFvQaQns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oE+u47ltb8NrIJirQ5HRM++ltv8="},{"type":"next-occurrence","id":"poQIntTXV9h0vlM9UwxgNWQqCeQ="}],"description":"Construction on CHAMBERS ST westbound between N END AVE (New York) and RIVER TER at 6TH PL (New York) for water main work., Saturday May 16th, 2026 thru Monday July 13th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T18:40:05Z"},"road_event_id":"H4Q3GI52gIlwq6IfZERQFvQaQns=","beginning_cross_street":"N END AVE","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T12:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01413,40.717752]]}},{"id":"poQIntTXV9h0vlM9UwxgNWQqCeQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oE+u47ltb8NrIJirQ5HRM++ltv8="},{"type":"next-occurrence","id":"ovcZtXAhQ62MMbW/utgB6oFPgag="}],"description":"Construction on CHAMBERS ST westbound between N END AVE (New York) and RIVER TER at 6TH PL (New York) for water main work., Saturday May 16th, 2026 thru Monday July 13th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T18:40:05Z"},"road_event_id":"poQIntTXV9h0vlM9UwxgNWQqCeQ=","beginning_cross_street":"N END AVE","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T12:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01413,40.717752]]}},{"id":"ovcZtXAhQ62MMbW/utgB6oFPgag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oE+u47ltb8NrIJirQ5HRM++ltv8="},{"type":"next-occurrence","id":"I3iFp5VWf6DbyZuWm0iQzZYtO1E="}],"description":"Construction on CHAMBERS ST westbound between N END AVE (New York) and RIVER TER at 6TH PL (New York) for water main work., Saturday May 16th, 2026 thru Monday July 13th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T18:40:05Z"},"road_event_id":"ovcZtXAhQ62MMbW/utgB6oFPgag=","beginning_cross_street":"N END AVE","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T12:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01413,40.717752]]}},{"id":"I3iFp5VWf6DbyZuWm0iQzZYtO1E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oE+u47ltb8NrIJirQ5HRM++ltv8="},{"type":"next-occurrence","id":"P6TD0KEBM7Xq0YyGMu6qH2/MEjg="}],"description":"Construction on CHAMBERS ST westbound between N END AVE (New York) and RIVER TER at 6TH PL (New York) for water main work., Saturday May 16th, 2026 thru Monday July 13th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T18:40:05Z"},"road_event_id":"I3iFp5VWf6DbyZuWm0iQzZYtO1E=","beginning_cross_street":"N END AVE","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T12:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01413,40.717752]]}},{"id":"P6TD0KEBM7Xq0YyGMu6qH2/MEjg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oE+u47ltb8NrIJirQ5HRM++ltv8="},{"type":"next-occurrence","id":"sU9HoGdwu8mAvhQpID9c78YRvbk="}],"description":"Construction on CHAMBERS ST westbound between N END AVE (New York) and RIVER TER at 6TH PL (New York) for water main work., Saturday May 16th, 2026 thru Monday July 13th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T18:40:05Z"},"road_event_id":"P6TD0KEBM7Xq0YyGMu6qH2/MEjg=","beginning_cross_street":"N END AVE","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T12:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01413,40.717752]]}},{"id":"sU9HoGdwu8mAvhQpID9c78YRvbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oE+u47ltb8NrIJirQ5HRM++ltv8="}],"description":"Construction on CHAMBERS ST westbound between N END AVE (New York) and RIVER TER at 6TH PL (New York) for water main work., Saturday May 16th, 2026 thru Monday July 13th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T18:40:05Z"},"road_event_id":"sU9HoGdwu8mAvhQpID9c78YRvbk=","beginning_cross_street":"N END AVE","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T12:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01413,40.717752]]}},{"id":"fHyUsME69x2e5MW5lQHH2UTabqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/GmeBu+U66xtwTrxw3iztYuV/NM="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Wednesday May 13th, 2026 thru Monday August 10th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-05-13T19:09:23Z"},"road_event_id":"fHyUsME69x2e5MW5lQHH2UTabqA=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006796,40.705663]]}},{"id":"/GmeBu+U66xtwTrxw3iztYuV/NM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fHyUsME69x2e5MW5lQHH2UTabqA="},{"type":"next-occurrence","id":"Byvf5KFBVtiTQPyyxVQRg4b5R5s="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Wednesday May 13th, 2026 thru Monday August 10th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-05-13T19:09:23Z"},"road_event_id":"/GmeBu+U66xtwTrxw3iztYuV/NM=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006796,40.705663]]}},{"id":"Byvf5KFBVtiTQPyyxVQRg4b5R5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fHyUsME69x2e5MW5lQHH2UTabqA="},{"type":"next-occurrence","id":"sgThm/pwRaGDvyvulYoUwdqG5R4="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Wednesday May 13th, 2026 thru Monday August 10th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-05-13T19:09:23Z"},"road_event_id":"Byvf5KFBVtiTQPyyxVQRg4b5R5s=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006796,40.705663]]}},{"id":"sgThm/pwRaGDvyvulYoUwdqG5R4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fHyUsME69x2e5MW5lQHH2UTabqA="},{"type":"next-occurrence","id":"41U7zUJijb8qBXvrgQqM72SHcfM="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Wednesday May 13th, 2026 thru Monday August 10th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-05-13T19:09:23Z"},"road_event_id":"sgThm/pwRaGDvyvulYoUwdqG5R4=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006796,40.705663]]}},{"id":"41U7zUJijb8qBXvrgQqM72SHcfM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fHyUsME69x2e5MW5lQHH2UTabqA="},{"type":"next-occurrence","id":"Ql5W6xgGUWZmiO/aogHL8m1wEUw="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Wednesday May 13th, 2026 thru Monday August 10th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-05-13T19:09:23Z"},"road_event_id":"41U7zUJijb8qBXvrgQqM72SHcfM=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006796,40.705663]]}},{"id":"Ql5W6xgGUWZmiO/aogHL8m1wEUw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fHyUsME69x2e5MW5lQHH2UTabqA="},{"type":"next-occurrence","id":"FhT93pfSSak/nOhsyswAykh/nto="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Wednesday May 13th, 2026 thru Monday August 10th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-05-13T19:09:23Z"},"road_event_id":"Ql5W6xgGUWZmiO/aogHL8m1wEUw=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006796,40.705663]]}},{"id":"FhT93pfSSak/nOhsyswAykh/nto=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fHyUsME69x2e5MW5lQHH2UTabqA="},{"type":"next-occurrence","id":"mQqKgMvrLxfcH/V1uTwiZ6SGZbU="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Wednesday May 13th, 2026 thru Monday August 10th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-05-13T19:09:23Z"},"road_event_id":"FhT93pfSSak/nOhsyswAykh/nto=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006796,40.705663]]}},{"id":"mQqKgMvrLxfcH/V1uTwiZ6SGZbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fHyUsME69x2e5MW5lQHH2UTabqA="},{"type":"next-occurrence","id":"aFd8Rn/GxJrwIQ25IJlsEpRDuRU="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Wednesday May 13th, 2026 thru Monday August 10th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-05-13T19:09:23Z"},"road_event_id":"mQqKgMvrLxfcH/V1uTwiZ6SGZbU=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-16T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006796,40.705663]]}},{"id":"aFd8Rn/GxJrwIQ25IJlsEpRDuRU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fHyUsME69x2e5MW5lQHH2UTabqA="},{"type":"next-occurrence","id":"+2Nsb6EjJK3is64c4jEBmD1U10Y="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Wednesday May 13th, 2026 thru Monday August 10th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-05-13T19:09:23Z"},"road_event_id":"aFd8Rn/GxJrwIQ25IJlsEpRDuRU=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006796,40.705663]]}},{"id":"+2Nsb6EjJK3is64c4jEBmD1U10Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fHyUsME69x2e5MW5lQHH2UTabqA="},{"type":"next-occurrence","id":"UTkbgCMVtrpttTxqDr8C3zEViNw="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Wednesday May 13th, 2026 thru Monday August 10th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-05-13T19:09:23Z"},"road_event_id":"+2Nsb6EjJK3is64c4jEBmD1U10Y=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006796,40.705663]]}},{"id":"UTkbgCMVtrpttTxqDr8C3zEViNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fHyUsME69x2e5MW5lQHH2UTabqA="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Wednesday May 13th, 2026 thru Monday August 10th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-05-13T19:09:23Z"},"road_event_id":"UTkbgCMVtrpttTxqDr8C3zEViNw=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006796,40.705663]]}},{"id":"ORC300547060","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Corbin Street"],"direction":"unknown","description":"Scheduled roadwork on Corbin Street both directions between Kellogg Street (Newark) and Outer Port Street (Newark) Not currently Scheduled","update_date":"2026-05-15T08:00:03Z"},"road_event_id":"ORC300547060","beginning_cross_street":"Kellogg Street","ending_cross_street":"Outer Port Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T19:44:22Z","end_date":"2026-05-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.151809,40.702427]]}},{"id":"ORC300547063","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Port Street"],"direction":"unknown","description":"Scheduled roadwork on Port Street eastbound between Marlin Street (Newark) and Doremus Avenue (Newark) Not currently Scheduled","update_date":"2026-05-16T08:00:03Z"},"road_event_id":"ORC300547063","beginning_cross_street":"Marlin Street","ending_cross_street":"Doremus Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-13T19:50:11Z","end_date":"2026-05-17T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.144512,40.7023]]}},{"id":"uvEtCi18NEK20uBRWHeU3/FYqsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["THOMPSON ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KD05m35WIRP3FmBiYZ1TOsPZ/PE="}],"description":"Construction on THOMPSON ST southbound between BLEECKER ST (New York) and W HOUSTON ST (New York) for painting of mural., Friday May 15th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T19:59:18Z"},"road_event_id":"uvEtCi18NEK20uBRWHeU3/FYqsw=","beginning_cross_street":"BLEECKER ST","ending_cross_street":"W HOUSTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999708,40.728364]]}},{"id":"KD05m35WIRP3FmBiYZ1TOsPZ/PE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["THOMPSON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uvEtCi18NEK20uBRWHeU3/FYqsw="},{"type":"next-occurrence","id":"yfJe4zkx16gRd6HMmu4Xm5gDsxc="}],"description":"Construction on THOMPSON ST southbound between BLEECKER ST (New York) and W HOUSTON ST (New York) for painting of mural., Friday May 15th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T19:59:18Z"},"road_event_id":"KD05m35WIRP3FmBiYZ1TOsPZ/PE=","beginning_cross_street":"BLEECKER ST","ending_cross_street":"W HOUSTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999708,40.728364]]}},{"id":"yfJe4zkx16gRd6HMmu4Xm5gDsxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["THOMPSON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uvEtCi18NEK20uBRWHeU3/FYqsw="},{"type":"next-occurrence","id":"Gi1DLaznufL+3cZFb3NKjXcHKQw="}],"description":"Construction on THOMPSON ST southbound between BLEECKER ST (New York) and W HOUSTON ST (New York) for painting of mural., Friday May 15th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T19:59:18Z"},"road_event_id":"yfJe4zkx16gRd6HMmu4Xm5gDsxc=","beginning_cross_street":"BLEECKER ST","ending_cross_street":"W HOUSTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999708,40.728364]]}},{"id":"Gi1DLaznufL+3cZFb3NKjXcHKQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["THOMPSON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uvEtCi18NEK20uBRWHeU3/FYqsw="},{"type":"next-occurrence","id":"bSlF9quxNJdD2YouQ0fO2tJHwoQ="}],"description":"Construction on THOMPSON ST southbound between BLEECKER ST (New York) and W HOUSTON ST (New York) for painting of mural., Friday May 15th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T19:59:18Z"},"road_event_id":"Gi1DLaznufL+3cZFb3NKjXcHKQw=","beginning_cross_street":"BLEECKER ST","ending_cross_street":"W HOUSTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999708,40.728364]]}},{"id":"bSlF9quxNJdD2YouQ0fO2tJHwoQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["THOMPSON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uvEtCi18NEK20uBRWHeU3/FYqsw="}],"description":"Construction on THOMPSON ST southbound between BLEECKER ST (New York) and W HOUSTON ST (New York) for painting of mural., Friday May 15th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-13T19:59:18Z"},"road_event_id":"bSlF9quxNJdD2YouQ0fO2tJHwoQ=","beginning_cross_street":"BLEECKER ST","ending_cross_street":"W HOUSTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999708,40.728364]]}},{"id":"dkO3iawewsvDrglvE0CpuS0SUUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOOSTER ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZDauGVZBoFc2OfYfz4KYD9qWeUo="}],"description":"Construction on WOOSTER ST southbound between BROOME ST (New York) and GRAND ST (New York) for concrete pump, truck pump and boom., Wednesday May 13th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-13T20:06:45Z"},"road_event_id":"dkO3iawewsvDrglvE0CpuS0SUUo=","beginning_cross_street":"BROOME ST","ending_cross_street":"GRAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002176,40.722839]]}},{"id":"ZDauGVZBoFc2OfYfz4KYD9qWeUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOOSTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dkO3iawewsvDrglvE0CpuS0SUUo="},{"type":"next-occurrence","id":"Ezxt2EL6b8ikxXa/KJOVAV8ck2E="}],"description":"Construction on WOOSTER ST southbound between BROOME ST (New York) and GRAND ST (New York) for concrete pump, truck pump and boom., Wednesday May 13th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-13T20:06:45Z"},"road_event_id":"ZDauGVZBoFc2OfYfz4KYD9qWeUo=","beginning_cross_street":"BROOME ST","ending_cross_street":"GRAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002176,40.722839]]}},{"id":"Ezxt2EL6b8ikxXa/KJOVAV8ck2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOOSTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dkO3iawewsvDrglvE0CpuS0SUUo="},{"type":"next-occurrence","id":"7VusOnzebjI8YvaQECasFJ25bjQ="}],"description":"Construction on WOOSTER ST southbound between BROOME ST (New York) and GRAND ST (New York) for concrete pump, truck pump and boom., Wednesday May 13th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-13T20:06:45Z"},"road_event_id":"Ezxt2EL6b8ikxXa/KJOVAV8ck2E=","beginning_cross_street":"BROOME ST","ending_cross_street":"GRAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002176,40.722839]]}},{"id":"7VusOnzebjI8YvaQECasFJ25bjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOOSTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dkO3iawewsvDrglvE0CpuS0SUUo="}],"description":"Construction on WOOSTER ST southbound between BROOME ST (New York) and GRAND ST (New York) for concrete pump, truck pump and boom., Wednesday May 13th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-13T20:06:45Z"},"road_event_id":"7VusOnzebjI8YvaQECasFJ25bjQ=","beginning_cross_street":"BROOME ST","ending_cross_street":"GRAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002176,40.722839]]}},{"id":"2X0dP88h16R4mLwTf+TG3Bim7iM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALL ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JSX7KH8VimaHboHkt+gS94OQFpA="}],"description":"Construction on WALL ST eastbound between WILLIAM ST (New York) and HANOVER ST (New York) for use of bucket truck to work on flags. for utilizing the gantry rigging system to deliver material., Monday May 18th,2026 thru Monday June 15th,2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed eastbound,","update_date":"2026-05-24T22:00:01Z"},"road_event_id":"2X0dP88h16R4mLwTf+TG3Bim7iM=","beginning_cross_street":"WILLIAM ST","ending_cross_street":"HANOVER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009494,40.706376]]}},{"id":"JSX7KH8VimaHboHkt+gS94OQFpA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2X0dP88h16R4mLwTf+TG3Bim7iM="},{"type":"next-occurrence","id":"kgJ2MnfHujvZ85tkidPsxhBzoRo="}],"description":"Construction on WALL ST eastbound between WILLIAM ST (New York) and HANOVER ST (New York) for use of bucket truck to work on flags. for utilizing the gantry rigging system to deliver material., Monday May 18th,2026 thru Monday June 15th,2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed eastbound,","update_date":"2026-05-24T22:00:01Z"},"road_event_id":"JSX7KH8VimaHboHkt+gS94OQFpA=","beginning_cross_street":"WILLIAM ST","ending_cross_street":"HANOVER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009494,40.706376]]}},{"id":"kgJ2MnfHujvZ85tkidPsxhBzoRo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2X0dP88h16R4mLwTf+TG3Bim7iM="},{"type":"next-occurrence","id":"ADYlChU5yBMm2FyR3hmM7NdD9ek="}],"description":"Construction on WALL ST eastbound between WILLIAM ST (New York) and HANOVER ST (New York) for use of bucket truck to work on flags. for utilizing the gantry rigging system to deliver material., Monday May 18th,2026 thru Monday June 15th,2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed eastbound,","update_date":"2026-05-24T22:00:01Z"},"road_event_id":"kgJ2MnfHujvZ85tkidPsxhBzoRo=","beginning_cross_street":"WILLIAM ST","ending_cross_street":"HANOVER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009494,40.706376]]}},{"id":"ADYlChU5yBMm2FyR3hmM7NdD9ek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2X0dP88h16R4mLwTf+TG3Bim7iM="},{"type":"next-occurrence","id":"AKcVMaf/d68bm5oGvLdg5sJxiAs="}],"description":"Construction on WALL ST eastbound between WILLIAM ST (New York) and HANOVER ST (New York) for use of bucket truck to work on flags. for utilizing the gantry rigging system to deliver material., Monday May 18th,2026 thru Monday June 15th,2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed eastbound,","update_date":"2026-05-24T22:00:01Z"},"road_event_id":"ADYlChU5yBMm2FyR3hmM7NdD9ek=","beginning_cross_street":"WILLIAM ST","ending_cross_street":"HANOVER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009494,40.706376]]}},{"id":"AKcVMaf/d68bm5oGvLdg5sJxiAs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2X0dP88h16R4mLwTf+TG3Bim7iM="},{"type":"next-occurrence","id":"DWxDsEIfU7UDtuXimHGo6YL1Hfk="}],"description":"Construction on WALL ST eastbound between WILLIAM ST (New York) and HANOVER ST (New York) for use of bucket truck to work on flags. for utilizing the gantry rigging system to deliver material., Monday May 18th,2026 thru Monday June 15th,2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed eastbound,","update_date":"2026-05-24T22:00:01Z"},"road_event_id":"AKcVMaf/d68bm5oGvLdg5sJxiAs=","beginning_cross_street":"WILLIAM ST","ending_cross_street":"HANOVER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009494,40.706376]]}},{"id":"DWxDsEIfU7UDtuXimHGo6YL1Hfk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2X0dP88h16R4mLwTf+TG3Bim7iM="},{"type":"next-occurrence","id":"9/d5L6BkEzMHA7kcSnOuF3+Lf5s="}],"description":"Construction on WALL ST eastbound between WILLIAM ST (New York) and HANOVER ST (New York) for use of bucket truck to work on flags. for utilizing the gantry rigging system to deliver material., Monday May 18th,2026 thru Monday June 15th,2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed eastbound,","update_date":"2026-05-24T22:00:01Z"},"road_event_id":"DWxDsEIfU7UDtuXimHGo6YL1Hfk=","beginning_cross_street":"WILLIAM ST","ending_cross_street":"HANOVER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009494,40.706376]]}},{"id":"9/d5L6BkEzMHA7kcSnOuF3+Lf5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2X0dP88h16R4mLwTf+TG3Bim7iM="}],"description":"Construction on WALL ST eastbound between WILLIAM ST (New York) and HANOVER ST (New York) for use of bucket truck to work on flags. for utilizing the gantry rigging system to deliver material., Monday May 18th,2026 thru Monday June 15th,2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed eastbound,","update_date":"2026-05-24T22:00:01Z"},"road_event_id":"9/d5L6BkEzMHA7kcSnOuF3+Lf5s=","beginning_cross_street":"WILLIAM ST","ending_cross_street":"HANOVER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009494,40.706376]]}},{"id":"PUirJ61MUXOD25+fwOsaksaxOj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAM ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aP5dg/uw4OQ2p4U8C9h8zjF72/8="}],"description":"Construction on WILLIAM ST northbound between MAIDEN LN (New York) and PLATT ST (New York) for facade repair., Saturday May 16th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 17th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-13T20:12:18Z"},"road_event_id":"PUirJ61MUXOD25+fwOsaksaxOj4=","beginning_cross_street":"MAIDEN LN","ending_cross_street":"PLATT ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.007974,40.708005]]}},{"id":"aP5dg/uw4OQ2p4U8C9h8zjF72/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PUirJ61MUXOD25+fwOsaksaxOj4="},{"type":"next-occurrence","id":"xBhGg1yyyQkDQwsOnwfXjpjY2jc="}],"description":"Construction on WILLIAM ST northbound between MAIDEN LN (New York) and PLATT ST (New York) for facade repair., Saturday May 16th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 17th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-13T20:12:18Z"},"road_event_id":"aP5dg/uw4OQ2p4U8C9h8zjF72/8=","beginning_cross_street":"MAIDEN LN","ending_cross_street":"PLATT ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.007974,40.708005]]}},{"id":"xBhGg1yyyQkDQwsOnwfXjpjY2jc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PUirJ61MUXOD25+fwOsaksaxOj4="},{"type":"next-occurrence","id":"48RTFCHGKoNeIYRn/X4T8HvLZNA="}],"description":"Construction on WILLIAM ST northbound between MAIDEN LN (New York) and PLATT ST (New York) for facade repair., Saturday May 16th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 17th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-13T20:12:18Z"},"road_event_id":"xBhGg1yyyQkDQwsOnwfXjpjY2jc=","beginning_cross_street":"MAIDEN LN","ending_cross_street":"PLATT ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.007974,40.708005]]}},{"id":"48RTFCHGKoNeIYRn/X4T8HvLZNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PUirJ61MUXOD25+fwOsaksaxOj4="}],"description":"Construction on WILLIAM ST northbound between MAIDEN LN (New York) and PLATT ST (New York) for facade repair., Saturday May 16th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 17th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-13T20:12:18Z"},"road_event_id":"48RTFCHGKoNeIYRn/X4T8HvLZNA=","beginning_cross_street":"MAIDEN LN","ending_cross_street":"PLATT ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.007974,40.708005]]}},{"id":"Bc0ZkmNejZun9LR/RHSvMYV7j0k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAM ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WWaa0Pr34bK4/Ldhmp1kw0xQ6Xo="}],"description":"Construction on WILLIAM ST northbound between PLATT ST (New York) for facade repair., Saturday May 16th, 2026 thru Saturday July 11th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 17th, 2026 thru Sunday July 12th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-13T20:19:40Z"},"road_event_id":"Bc0ZkmNejZun9LR/RHSvMYV7j0k=","beginning_cross_street":"PLATT ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.007614,40.708375]]}},{"id":"WWaa0Pr34bK4/Ldhmp1kw0xQ6Xo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bc0ZkmNejZun9LR/RHSvMYV7j0k="},{"type":"next-occurrence","id":"kqQb6tHZ8E5vprTwMvJ8mnuXMcg="}],"description":"Construction on WILLIAM ST northbound between PLATT ST (New York) for facade repair., Saturday May 16th, 2026 thru Saturday July 11th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 17th, 2026 thru Sunday July 12th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-13T20:19:40Z"},"road_event_id":"WWaa0Pr34bK4/Ldhmp1kw0xQ6Xo=","beginning_cross_street":"PLATT ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.007614,40.708375]]}},{"id":"kqQb6tHZ8E5vprTwMvJ8mnuXMcg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bc0ZkmNejZun9LR/RHSvMYV7j0k="},{"type":"next-occurrence","id":"Hb3Ynm67NMMoTaZjCVjqYamKe6c="}],"description":"Construction on WILLIAM ST northbound between PLATT ST (New York) for facade repair., Saturday May 16th, 2026 thru Saturday July 11th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 17th, 2026 thru Sunday July 12th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-13T20:19:40Z"},"road_event_id":"kqQb6tHZ8E5vprTwMvJ8mnuXMcg=","beginning_cross_street":"PLATT ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.007614,40.708375]]}},{"id":"Hb3Ynm67NMMoTaZjCVjqYamKe6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bc0ZkmNejZun9LR/RHSvMYV7j0k="}],"description":"Construction on WILLIAM ST northbound between PLATT ST (New York) for facade repair., Saturday May 16th, 2026 thru Saturday July 11th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 17th, 2026 thru Sunday July 12th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-13T20:19:40Z"},"road_event_id":"Hb3Ynm67NMMoTaZjCVjqYamKe6c=","beginning_cross_street":"PLATT ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.007614,40.708375]]}},{"id":"yb/Vh6mH8c7InCtMmwe6Kg7Yh+U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 300"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0kV+2DEK1n/3zz0aOBTObUlAQpA="}],"description":"Road rehabilitation on NY 300 both directions between Little Brook Lane (Newburgh) and Maplewood Drive (Newburgh) D265715/32745209 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-27T15:52:05Z"},"road_event_id":"yb/Vh6mH8c7InCtMmwe6Kg7Yh+U=","beginning_cross_street":"Little Brook Lane","ending_cross_street":"Maplewood Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.062317,41.545578]]}},{"id":"0kV+2DEK1n/3zz0aOBTObUlAQpA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 300"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yb/Vh6mH8c7InCtMmwe6Kg7Yh+U="},{"type":"next-occurrence","id":"cnkYK33hJxTrUpwrReYdTpvkzpU="}],"description":"Road rehabilitation on NY 300 both directions between Little Brook Lane (Newburgh) and Maplewood Drive (Newburgh) D265715/32745209 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-27T15:52:05Z"},"road_event_id":"0kV+2DEK1n/3zz0aOBTObUlAQpA=","beginning_cross_street":"Little Brook Lane","ending_cross_street":"Maplewood Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.062317,41.545578]]}},{"id":"cnkYK33hJxTrUpwrReYdTpvkzpU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 300"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yb/Vh6mH8c7InCtMmwe6Kg7Yh+U="},{"type":"next-occurrence","id":"Q/ejQ5PITlToarSEymZYISI7FSw="}],"description":"Road rehabilitation on NY 300 both directions between Little Brook Lane (Newburgh) and Maplewood Drive (Newburgh) D265715/32745209 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-27T15:52:05Z"},"road_event_id":"cnkYK33hJxTrUpwrReYdTpvkzpU=","beginning_cross_street":"Little Brook Lane","ending_cross_street":"Maplewood Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.062317,41.545578]]}},{"id":"Q/ejQ5PITlToarSEymZYISI7FSw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 300"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yb/Vh6mH8c7InCtMmwe6Kg7Yh+U="}],"description":"Road rehabilitation on NY 300 both directions between Little Brook Lane (Newburgh) and Maplewood Drive (Newburgh) D265715/32745209 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-27T15:52:05Z"},"road_event_id":"Q/ejQ5PITlToarSEymZYISI7FSw=","beginning_cross_street":"Little Brook Lane","ending_cross_street":"Maplewood Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.062317,41.545578]]}},{"id":"F+MoXLsM9u4Af1B8JGbPq3apvsQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KpXtWEL7x0BfPcxZ0YGVE7ovDfQ="}],"description":"Road maintenance operations and survey work on NY 32 both directions between Berry Lane (Newburgh) and Old Mill Road (Newburgh) D265715/32745309 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:20Z"},"road_event_id":"F+MoXLsM9u4Af1B8JGbPq3apvsQ=","beginning_cross_street":"Berry Lane","ending_cross_street":"Old Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.059456,41.549686]]}},{"id":"KpXtWEL7x0BfPcxZ0YGVE7ovDfQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F+MoXLsM9u4Af1B8JGbPq3apvsQ="},{"type":"next-occurrence","id":"Wp7jjeMZs9wGFr76mG5l/3zE1to="}],"description":"Road maintenance operations and survey work on NY 32 both directions between Berry Lane (Newburgh) and Old Mill Road (Newburgh) D265715/32745309 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:20Z"},"road_event_id":"KpXtWEL7x0BfPcxZ0YGVE7ovDfQ=","beginning_cross_street":"Berry Lane","ending_cross_street":"Old Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.059456,41.549686]]}},{"id":"Wp7jjeMZs9wGFr76mG5l/3zE1to=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F+MoXLsM9u4Af1B8JGbPq3apvsQ="},{"type":"next-occurrence","id":"5i6zJyAmXdJ/oN/5piQXmiIpImc="}],"description":"Road maintenance operations and survey work on NY 32 both directions between Berry Lane (Newburgh) and Old Mill Road (Newburgh) D265715/32745309 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:20Z"},"road_event_id":"Wp7jjeMZs9wGFr76mG5l/3zE1to=","beginning_cross_street":"Berry Lane","ending_cross_street":"Old Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.059456,41.549686]]}},{"id":"5i6zJyAmXdJ/oN/5piQXmiIpImc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F+MoXLsM9u4Af1B8JGbPq3apvsQ="}],"description":"Road maintenance operations and survey work on NY 32 both directions between Berry Lane (Newburgh) and Old Mill Road (Newburgh) D265715/32745309 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:20Z"},"road_event_id":"5i6zJyAmXdJ/oN/5piQXmiIpImc=","beginning_cross_street":"Berry Lane","ending_cross_street":"Old Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.059456,41.549686]]}},{"id":"5JehDWc1ibdS0TPRPjSPBvICI/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PATTONWOOD DR"],"direction":"unknown","related_road_events":[],"description":"Drawbridge testing on PATTONWOOD DR both directions at O'Rorke Bridge (Rochester) Drawbridge on Pattonwood Drive to lift frequently for river dredging operations for the next 4 weeks. Expect delays or use alternate routes. , Continuous Thursday May 14th, 2026 12:00 AM thru Friday June 12th, 2026 11:00 PM All lanes","update_date":"2026-05-14T10:51:27Z"},"road_event_id":"5JehDWc1ibdS0TPRPjSPBvICI/s=","beginning_cross_street":"O'Rorke Bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-13T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.611326,43.248389]]}},{"id":"OongJNXZlkMB/cTWnl5AjAW2t/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Cuq1ihX1vaF2d6GiyauNPUkDPmg="}],"description":"Gas main work on NY 211 westbound between Boyd Street (Montgomery) and Chandler Lane (Montgomery) 2026084736704/32745509 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"OongJNXZlkMB/cTWnl5AjAW2t/8=","beginning_cross_street":"Boyd Street","ending_cross_street":"Chandler Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.240236,41.523445]]}},{"id":"Cuq1ihX1vaF2d6GiyauNPUkDPmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OongJNXZlkMB/cTWnl5AjAW2t/8="},{"type":"next-occurrence","id":"EXkH1dTJDK4DHA8flja/kdxSUD4="}],"description":"Gas main work on NY 211 westbound between Boyd Street (Montgomery) and Chandler Lane (Montgomery) 2026084736704/32745509 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"Cuq1ihX1vaF2d6GiyauNPUkDPmg=","beginning_cross_street":"Boyd Street","ending_cross_street":"Chandler Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.240236,41.523445]]}},{"id":"EXkH1dTJDK4DHA8flja/kdxSUD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OongJNXZlkMB/cTWnl5AjAW2t/8="},{"type":"next-occurrence","id":"f8IxViCHlvqx+QVgCIPIszZewEo="}],"description":"Gas main work on NY 211 westbound between Boyd Street (Montgomery) and Chandler Lane (Montgomery) 2026084736704/32745509 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"EXkH1dTJDK4DHA8flja/kdxSUD4=","beginning_cross_street":"Boyd Street","ending_cross_street":"Chandler Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.240236,41.523445]]}},{"id":"f8IxViCHlvqx+QVgCIPIszZewEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OongJNXZlkMB/cTWnl5AjAW2t/8="},{"type":"next-occurrence","id":"WFGmDiy1hwmLvyIWn792bVPdQVU="}],"description":"Gas main work on NY 211 westbound between Boyd Street (Montgomery) and Chandler Lane (Montgomery) 2026084736704/32745509 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"f8IxViCHlvqx+QVgCIPIszZewEo=","beginning_cross_street":"Boyd Street","ending_cross_street":"Chandler Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.240236,41.523445]]}},{"id":"WFGmDiy1hwmLvyIWn792bVPdQVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OongJNXZlkMB/cTWnl5AjAW2t/8="},{"type":"next-occurrence","id":"22OHFVXmELl3QgWeFUqcYh2qhA4="}],"description":"Gas main work on NY 211 westbound between Boyd Street (Montgomery) and Chandler Lane (Montgomery) 2026084736704/32745509 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"WFGmDiy1hwmLvyIWn792bVPdQVU=","beginning_cross_street":"Boyd Street","ending_cross_street":"Chandler Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.240236,41.523445]]}},{"id":"22OHFVXmELl3QgWeFUqcYh2qhA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OongJNXZlkMB/cTWnl5AjAW2t/8="},{"type":"next-occurrence","id":"79WoZwlORsmubAlIwP17JzEvtz8="}],"description":"Gas main work on NY 211 westbound between Boyd Street (Montgomery) and Chandler Lane (Montgomery) 2026084736704/32745509 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"22OHFVXmELl3QgWeFUqcYh2qhA4=","beginning_cross_street":"Boyd Street","ending_cross_street":"Chandler Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.240236,41.523445]]}},{"id":"79WoZwlORsmubAlIwP17JzEvtz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OongJNXZlkMB/cTWnl5AjAW2t/8="},{"type":"next-occurrence","id":"1cUFUCcQeV2eHUwwGvSQiMCc5Ac="}],"description":"Gas main work on NY 211 westbound between Boyd Street (Montgomery) and Chandler Lane (Montgomery) 2026084736704/32745509 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"79WoZwlORsmubAlIwP17JzEvtz8=","beginning_cross_street":"Boyd Street","ending_cross_street":"Chandler Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.240236,41.523445]]}},{"id":"1cUFUCcQeV2eHUwwGvSQiMCc5Ac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OongJNXZlkMB/cTWnl5AjAW2t/8="},{"type":"next-occurrence","id":"dFrPAjRqNC4V6Jm3vi0wlOx23GY="}],"description":"Gas main work on NY 211 westbound between Boyd Street (Montgomery) and Chandler Lane (Montgomery) 2026084736704/32745509 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"1cUFUCcQeV2eHUwwGvSQiMCc5Ac=","beginning_cross_street":"Boyd Street","ending_cross_street":"Chandler Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.240236,41.523445]]}},{"id":"dFrPAjRqNC4V6Jm3vi0wlOx23GY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OongJNXZlkMB/cTWnl5AjAW2t/8="},{"type":"next-occurrence","id":"gs7B5EHMmnOWcGbS6SlKwbqniJM="}],"description":"Gas main work on NY 211 westbound between Boyd Street (Montgomery) and Chandler Lane (Montgomery) 2026084736704/32745509 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"dFrPAjRqNC4V6Jm3vi0wlOx23GY=","beginning_cross_street":"Boyd Street","ending_cross_street":"Chandler Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.240236,41.523445]]}},{"id":"gs7B5EHMmnOWcGbS6SlKwbqniJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OongJNXZlkMB/cTWnl5AjAW2t/8="},{"type":"next-occurrence","id":"nL/oMnbLdv60KL7E14YgqSaop88="}],"description":"Gas main work on NY 211 westbound between Boyd Street (Montgomery) and Chandler Lane (Montgomery) 2026084736704/32745509 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"gs7B5EHMmnOWcGbS6SlKwbqniJM=","beginning_cross_street":"Boyd Street","ending_cross_street":"Chandler Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.240236,41.523445]]}},{"id":"nL/oMnbLdv60KL7E14YgqSaop88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OongJNXZlkMB/cTWnl5AjAW2t/8="}],"description":"Gas main work on NY 211 westbound between Boyd Street (Montgomery) and Chandler Lane (Montgomery) 2026084736704/32745509 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"nL/oMnbLdv60KL7E14YgqSaop88=","beginning_cross_street":"Boyd Street","ending_cross_street":"Chandler Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.240236,41.523445]]}},{"id":"L8D6sQWRd4lL3kWXo+aoC1h57MQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-2"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on CR-2 both directions over Fox Creek (Berne), Continuous Monday June 1st, 2026 12:00 AM thru Friday September 25th, 2026 11:59 PM All lanes closed","update_date":"2026-05-14T13:25:32Z"},"road_event_id":"L8D6sQWRd4lL3kWXo+aoC1h57MQ=","beginning_cross_street":"over Fox Creek","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.089696,42.613688]]}},{"id":"a3hOBpxbrToV6ErQeAs1fVYEiY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 82"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1ij0CugXVRi21Xvvgn6vK7g1O0I="}],"description":"Utility work on NY 82 both directions between NY 376 (East Fishkill) and Old Farm Road (East Fishkill) 2026083605659/32745609 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday June 9th, 2026 thru Friday June 12th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:31:00Z"},"road_event_id":"a3hOBpxbrToV6ErQeAs1fVYEiY8=","beginning_cross_street":"NY 376","ending_cross_street":"Old Farm Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806973,41.581572]]}},{"id":"1ij0CugXVRi21Xvvgn6vK7g1O0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 82"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a3hOBpxbrToV6ErQeAs1fVYEiY8="},{"type":"next-occurrence","id":"UY0bMXothte1cTERKGtKUBAgTq0="}],"description":"Utility work on NY 82 both directions between NY 376 (East Fishkill) and Old Farm Road (East Fishkill) 2026083605659/32745609 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday June 9th, 2026 thru Friday June 12th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:31:00Z"},"road_event_id":"1ij0CugXVRi21Xvvgn6vK7g1O0I=","beginning_cross_street":"NY 376","ending_cross_street":"Old Farm Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806973,41.581572]]}},{"id":"UY0bMXothte1cTERKGtKUBAgTq0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 82"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a3hOBpxbrToV6ErQeAs1fVYEiY8="},{"type":"next-occurrence","id":"2l5F3hDzDTwb6+p6R3nsmmKs75I="}],"description":"Utility work on NY 82 both directions between NY 376 (East Fishkill) and Old Farm Road (East Fishkill) 2026083605659/32745609 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday June 9th, 2026 thru Friday June 12th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:31:00Z"},"road_event_id":"UY0bMXothte1cTERKGtKUBAgTq0=","beginning_cross_street":"NY 376","ending_cross_street":"Old Farm Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806973,41.581572]]}},{"id":"2l5F3hDzDTwb6+p6R3nsmmKs75I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 82"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a3hOBpxbrToV6ErQeAs1fVYEiY8="}],"description":"Utility work on NY 82 both directions between NY 376 (East Fishkill) and Old Farm Road (East Fishkill) 2026083605659/32745609 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday June 9th, 2026 thru Friday June 12th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T19:31:00Z"},"road_event_id":"2l5F3hDzDTwb6+p6R3nsmmKs75I=","beginning_cross_street":"NY 376","ending_cross_street":"Old Farm Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806973,41.581572]]}},{"id":"vW0LmfsiiNcbAXgpHkNQouMTeUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 150TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/3SwahmkPp+9YlFV/Xzu4z9aZJM="}],"description":"Construction on E 150TH ST westbound between GERARD AVE (New York) for BPP roadway work., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T14:24:54Z"},"road_event_id":"vW0LmfsiiNcbAXgpHkNQouMTeUU=","beginning_cross_street":"GERARD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92891,40.820039]]}},{"id":"/3SwahmkPp+9YlFV/Xzu4z9aZJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 150TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vW0LmfsiiNcbAXgpHkNQouMTeUU="},{"type":"next-occurrence","id":"Od3cVutY4Yf4TCMr2jDAqDKSHcU="}],"description":"Construction on E 150TH ST westbound between GERARD AVE (New York) for BPP roadway work., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T14:24:54Z"},"road_event_id":"/3SwahmkPp+9YlFV/Xzu4z9aZJM=","beginning_cross_street":"GERARD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92891,40.820039]]}},{"id":"Od3cVutY4Yf4TCMr2jDAqDKSHcU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 150TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vW0LmfsiiNcbAXgpHkNQouMTeUU="},{"type":"next-occurrence","id":"ApYcGckctzHrAsqTfC1C7zTzc1o="}],"description":"Construction on E 150TH ST westbound between GERARD AVE (New York) for BPP roadway work., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T14:24:54Z"},"road_event_id":"Od3cVutY4Yf4TCMr2jDAqDKSHcU=","beginning_cross_street":"GERARD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92891,40.820039]]}},{"id":"ApYcGckctzHrAsqTfC1C7zTzc1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 150TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vW0LmfsiiNcbAXgpHkNQouMTeUU="},{"type":"next-occurrence","id":"AndYfLVpCL8ewgUqen/zCDNmTpc="}],"description":"Construction on E 150TH ST westbound between GERARD AVE (New York) for BPP roadway work., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T14:24:54Z"},"road_event_id":"ApYcGckctzHrAsqTfC1C7zTzc1o=","beginning_cross_street":"GERARD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92891,40.820039]]}},{"id":"AndYfLVpCL8ewgUqen/zCDNmTpc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 150TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vW0LmfsiiNcbAXgpHkNQouMTeUU="},{"type":"next-occurrence","id":"MpZz7RNffKRnZZJo0VAwcjfNCgc="}],"description":"Construction on E 150TH ST westbound between GERARD AVE (New York) for BPP roadway work., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T14:24:54Z"},"road_event_id":"AndYfLVpCL8ewgUqen/zCDNmTpc=","beginning_cross_street":"GERARD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92891,40.820039]]}},{"id":"MpZz7RNffKRnZZJo0VAwcjfNCgc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 150TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vW0LmfsiiNcbAXgpHkNQouMTeUU="},{"type":"next-occurrence","id":"K3f+X59mZEXkFcN9lGi1l5H93TI="}],"description":"Construction on E 150TH ST westbound between GERARD AVE (New York) for BPP roadway work., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T14:24:54Z"},"road_event_id":"MpZz7RNffKRnZZJo0VAwcjfNCgc=","beginning_cross_street":"GERARD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92891,40.820039]]}},{"id":"K3f+X59mZEXkFcN9lGi1l5H93TI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 150TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vW0LmfsiiNcbAXgpHkNQouMTeUU="},{"type":"next-occurrence","id":"Ei5Id1dVSGsAm5VoWKV3C1Ubwkc="}],"description":"Construction on E 150TH ST westbound between GERARD AVE (New York) for BPP roadway work., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T14:24:54Z"},"road_event_id":"K3f+X59mZEXkFcN9lGi1l5H93TI=","beginning_cross_street":"GERARD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T02:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92891,40.820039]]}},{"id":"Ei5Id1dVSGsAm5VoWKV3C1Ubwkc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 150TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vW0LmfsiiNcbAXgpHkNQouMTeUU="}],"description":"Construction on E 150TH ST westbound between GERARD AVE (New York) for BPP roadway work., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T14:24:54Z"},"road_event_id":"Ei5Id1dVSGsAm5VoWKV3C1Ubwkc=","beginning_cross_street":"GERARD AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T02:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.92891,40.820039]]}},{"id":"bfDYREh8afQhgrXxDgo5R9KAyUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+aIDCg3zJjpgvkI8LjAA1Ckeihg="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Thursday May 14th, 2026 thru Thursday June 11th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday May 16th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-14T14:27:33Z"},"road_event_id":"bfDYREh8afQhgrXxDgo5R9KAyUs=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886571,40.825276]]}},{"id":"+aIDCg3zJjpgvkI8LjAA1Ckeihg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bfDYREh8afQhgrXxDgo5R9KAyUs="},{"type":"next-occurrence","id":"CZakDWDZJX6ljVGH412a3I5gsyo="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Thursday May 14th, 2026 thru Thursday June 11th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday May 16th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-14T14:27:33Z"},"road_event_id":"+aIDCg3zJjpgvkI8LjAA1Ckeihg=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886571,40.825276]]}},{"id":"CZakDWDZJX6ljVGH412a3I5gsyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bfDYREh8afQhgrXxDgo5R9KAyUs="},{"type":"next-occurrence","id":"tEN4QgIBeSwo57kUwjZmkhVF0dQ="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Thursday May 14th, 2026 thru Thursday June 11th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday May 16th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-14T14:27:33Z"},"road_event_id":"CZakDWDZJX6ljVGH412a3I5gsyo=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886571,40.825276]]}},{"id":"tEN4QgIBeSwo57kUwjZmkhVF0dQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bfDYREh8afQhgrXxDgo5R9KAyUs="},{"type":"next-occurrence","id":"Rzyg5gog9v6GZg3w5IOrErZaXYY="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Thursday May 14th, 2026 thru Thursday June 11th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday May 16th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-14T14:27:33Z"},"road_event_id":"tEN4QgIBeSwo57kUwjZmkhVF0dQ=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886571,40.825276]]}},{"id":"Rzyg5gog9v6GZg3w5IOrErZaXYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bfDYREh8afQhgrXxDgo5R9KAyUs="},{"type":"next-occurrence","id":"ERFAMuNaqjo2Mt37BcuyTnpA8us="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Thursday May 14th, 2026 thru Thursday June 11th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday May 16th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-14T14:27:33Z"},"road_event_id":"Rzyg5gog9v6GZg3w5IOrErZaXYY=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886571,40.825276]]}},{"id":"ERFAMuNaqjo2Mt37BcuyTnpA8us=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bfDYREh8afQhgrXxDgo5R9KAyUs="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Thursday May 14th, 2026 thru Thursday June 11th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday May 16th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-14T14:27:33Z"},"road_event_id":"ERFAMuNaqjo2Mt37BcuyTnpA8us=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886571,40.825276]]}},{"id":"N3YUZgoO8UIOr0lFWf0SMlC+Xc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 178TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CYPNuswcL+fY0bSpOAGckH1hU2w="}],"description":"Construction on E 178TH ST eastbound between ARTHUR AVE (New York) and HUGHES AVE (New York) for use of boom truck., Friday May 15th, 2026 thru Thursday June 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:29:20Z"},"road_event_id":"N3YUZgoO8UIOr0lFWf0SMlC+Xc8=","beginning_cross_street":"ARTHUR AVE","ending_cross_street":"HUGHES AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892976,40.846948]]}},{"id":"CYPNuswcL+fY0bSpOAGckH1hU2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 178TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N3YUZgoO8UIOr0lFWf0SMlC+Xc8="},{"type":"next-occurrence","id":"hRqI9oY1gQyGRsYOnbjzkhwMvwM="}],"description":"Construction on E 178TH ST eastbound between ARTHUR AVE (New York) and HUGHES AVE (New York) for use of boom truck., Friday May 15th, 2026 thru Thursday June 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:29:20Z"},"road_event_id":"CYPNuswcL+fY0bSpOAGckH1hU2w=","beginning_cross_street":"ARTHUR AVE","ending_cross_street":"HUGHES AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892976,40.846948]]}},{"id":"hRqI9oY1gQyGRsYOnbjzkhwMvwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 178TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N3YUZgoO8UIOr0lFWf0SMlC+Xc8="},{"type":"next-occurrence","id":"1pM4RHdPzcXHGdImDQ/4Uu8iZJQ="}],"description":"Construction on E 178TH ST eastbound between ARTHUR AVE (New York) and HUGHES AVE (New York) for use of boom truck., Friday May 15th, 2026 thru Thursday June 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:29:20Z"},"road_event_id":"hRqI9oY1gQyGRsYOnbjzkhwMvwM=","beginning_cross_street":"ARTHUR AVE","ending_cross_street":"HUGHES AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892976,40.846948]]}},{"id":"1pM4RHdPzcXHGdImDQ/4Uu8iZJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 178TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N3YUZgoO8UIOr0lFWf0SMlC+Xc8="},{"type":"next-occurrence","id":"toXDOiJQArWQ0UZzW5IP4pSjo6I="}],"description":"Construction on E 178TH ST eastbound between ARTHUR AVE (New York) and HUGHES AVE (New York) for use of boom truck., Friday May 15th, 2026 thru Thursday June 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:29:20Z"},"road_event_id":"1pM4RHdPzcXHGdImDQ/4Uu8iZJQ=","beginning_cross_street":"ARTHUR AVE","ending_cross_street":"HUGHES AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892976,40.846948]]}},{"id":"toXDOiJQArWQ0UZzW5IP4pSjo6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 178TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N3YUZgoO8UIOr0lFWf0SMlC+Xc8="},{"type":"next-occurrence","id":"w9AdEMuIIVg3LscLslnjqQKbKE4="}],"description":"Construction on E 178TH ST eastbound between ARTHUR AVE (New York) and HUGHES AVE (New York) for use of boom truck., Friday May 15th, 2026 thru Thursday June 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:29:20Z"},"road_event_id":"toXDOiJQArWQ0UZzW5IP4pSjo6I=","beginning_cross_street":"ARTHUR AVE","ending_cross_street":"HUGHES AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892976,40.846948]]}},{"id":"w9AdEMuIIVg3LscLslnjqQKbKE4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 178TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N3YUZgoO8UIOr0lFWf0SMlC+Xc8="},{"type":"next-occurrence","id":"V5BD4jb85Wce3rFK+4T+lfWAMYE="}],"description":"Construction on E 178TH ST eastbound between ARTHUR AVE (New York) and HUGHES AVE (New York) for use of boom truck., Friday May 15th, 2026 thru Thursday June 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:29:20Z"},"road_event_id":"w9AdEMuIIVg3LscLslnjqQKbKE4=","beginning_cross_street":"ARTHUR AVE","ending_cross_street":"HUGHES AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892976,40.846948]]}},{"id":"V5BD4jb85Wce3rFK+4T+lfWAMYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 178TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N3YUZgoO8UIOr0lFWf0SMlC+Xc8="}],"description":"Construction on E 178TH ST eastbound between ARTHUR AVE (New York) and HUGHES AVE (New York) for use of boom truck., Friday May 15th, 2026 thru Thursday June 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:29:20Z"},"road_event_id":"V5BD4jb85Wce3rFK+4T+lfWAMYE=","beginning_cross_street":"ARTHUR AVE","ending_cross_street":"HUGHES AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892976,40.846948]]}},{"id":"DzDkglGXhbt6nopvj1ThJfq66A8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITLOCK AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yVeLZUu/l8XtPLRtlw0A+yTHW70="}],"description":"Construction on WHITLOCK AVE southbound between E 165TH ST (New York) and ALDUS ST (New York) for new construction/concrete pump operations., Thursday May 14th, 2026 thru Thursday June 11th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-14T14:31:19Z"},"road_event_id":"DzDkglGXhbt6nopvj1ThJfq66A8=","beginning_cross_street":"E 165TH ST","ending_cross_street":"ALDUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886513,40.825222]]}},{"id":"yVeLZUu/l8XtPLRtlw0A+yTHW70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITLOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DzDkglGXhbt6nopvj1ThJfq66A8="},{"type":"next-occurrence","id":"VaXInxg+Pbgc1FtKhuT3oKDRsPY="}],"description":"Construction on WHITLOCK AVE southbound between E 165TH ST (New York) and ALDUS ST (New York) for new construction/concrete pump operations., Thursday May 14th, 2026 thru Thursday June 11th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-14T14:31:19Z"},"road_event_id":"yVeLZUu/l8XtPLRtlw0A+yTHW70=","beginning_cross_street":"E 165TH ST","ending_cross_street":"ALDUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886513,40.825222]]}},{"id":"VaXInxg+Pbgc1FtKhuT3oKDRsPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITLOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DzDkglGXhbt6nopvj1ThJfq66A8="},{"type":"next-occurrence","id":"CAw6xMhVbM1+eE7TeFhIggfPLW4="}],"description":"Construction on WHITLOCK AVE southbound between E 165TH ST (New York) and ALDUS ST (New York) for new construction/concrete pump operations., Thursday May 14th, 2026 thru Thursday June 11th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-14T14:31:19Z"},"road_event_id":"VaXInxg+Pbgc1FtKhuT3oKDRsPY=","beginning_cross_street":"E 165TH ST","ending_cross_street":"ALDUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886513,40.825222]]}},{"id":"CAw6xMhVbM1+eE7TeFhIggfPLW4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITLOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DzDkglGXhbt6nopvj1ThJfq66A8="},{"type":"next-occurrence","id":"SSQdGB8RjmwCTzGNaDl2o54ugu0="}],"description":"Construction on WHITLOCK AVE southbound between E 165TH ST (New York) and ALDUS ST (New York) for new construction/concrete pump operations., Thursday May 14th, 2026 thru Thursday June 11th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-14T14:31:19Z"},"road_event_id":"CAw6xMhVbM1+eE7TeFhIggfPLW4=","beginning_cross_street":"E 165TH ST","ending_cross_street":"ALDUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886513,40.825222]]}},{"id":"SSQdGB8RjmwCTzGNaDl2o54ugu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITLOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DzDkglGXhbt6nopvj1ThJfq66A8="}],"description":"Construction on WHITLOCK AVE southbound between E 165TH ST (New York) and ALDUS ST (New York) for new construction/concrete pump operations., Thursday May 14th, 2026 thru Thursday June 11th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-14T14:31:19Z"},"road_event_id":"SSQdGB8RjmwCTzGNaDl2o54ugu0=","beginning_cross_street":"E 165TH ST","ending_cross_street":"ALDUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886513,40.825222]]}},{"id":"PFI+V+ueYFbcIPFBLczmWZzASbw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"w40q+g7qLNeCabxCDOGY4Mu4MZY="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for BPP roadway work., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T14:33:19Z"},"road_event_id":"PFI+V+ueYFbcIPFBLczmWZzASbw=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928821,40.820068]]}},{"id":"w40q+g7qLNeCabxCDOGY4Mu4MZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PFI+V+ueYFbcIPFBLczmWZzASbw="},{"type":"next-occurrence","id":"EvL1SpSIMvyKlpV8QbDrN3Whnn0="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for BPP roadway work., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T14:33:19Z"},"road_event_id":"w40q+g7qLNeCabxCDOGY4Mu4MZY=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928821,40.820068]]}},{"id":"EvL1SpSIMvyKlpV8QbDrN3Whnn0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PFI+V+ueYFbcIPFBLczmWZzASbw="},{"type":"next-occurrence","id":"/ks1e/sUzZNLx2Q/0KNYVvSfDwo="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for BPP roadway work., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T14:33:19Z"},"road_event_id":"EvL1SpSIMvyKlpV8QbDrN3Whnn0=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928821,40.820068]]}},{"id":"/ks1e/sUzZNLx2Q/0KNYVvSfDwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PFI+V+ueYFbcIPFBLczmWZzASbw="},{"type":"next-occurrence","id":"Mg7A12ewrMk6lUd/qTiC3ZkwlaY="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for BPP roadway work., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T14:33:19Z"},"road_event_id":"/ks1e/sUzZNLx2Q/0KNYVvSfDwo=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928821,40.820068]]}},{"id":"Mg7A12ewrMk6lUd/qTiC3ZkwlaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PFI+V+ueYFbcIPFBLczmWZzASbw="},{"type":"next-occurrence","id":"nJNXWdAij1ZxN/JVGUP9Qulm0jc="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for BPP roadway work., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T14:33:19Z"},"road_event_id":"Mg7A12ewrMk6lUd/qTiC3ZkwlaY=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928821,40.820068]]}},{"id":"nJNXWdAij1ZxN/JVGUP9Qulm0jc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PFI+V+ueYFbcIPFBLczmWZzASbw="},{"type":"next-occurrence","id":"nHloSTBXhUrrbSTjjg4HaFIMYAM="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for BPP roadway work., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T14:33:19Z"},"road_event_id":"nJNXWdAij1ZxN/JVGUP9Qulm0jc=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928821,40.820068]]}},{"id":"nHloSTBXhUrrbSTjjg4HaFIMYAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PFI+V+ueYFbcIPFBLczmWZzASbw="},{"type":"next-occurrence","id":"FVMTSOtzU2UepqWbDdCyGPWWXbg="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for BPP roadway work., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T14:33:19Z"},"road_event_id":"nHloSTBXhUrrbSTjjg4HaFIMYAM=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T02:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928821,40.820068]]}},{"id":"FVMTSOtzU2UepqWbDdCyGPWWXbg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PFI+V+ueYFbcIPFBLczmWZzASbw="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for BPP roadway work., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-14T14:33:19Z"},"road_event_id":"FVMTSOtzU2UepqWbDdCyGPWWXbg=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T02:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928821,40.820068]]}},{"id":"bQlDukmy7UoPE/W0mDxr3jBb/D4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALTON AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"N4WfnmtUgzttzkasWaLdT5KIM4o="}],"description":"Construction on WALTON AVE southbound between E 177TH ST (New York) and MT HOPE PL (New York) to lift and remove materials from roof top with use of knuckle boom., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:37:01Z"},"road_event_id":"bQlDukmy7UoPE/W0mDxr3jBb/D4=","beginning_cross_street":"E 177TH ST","ending_cross_street":"MT HOPE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909196,40.849849]]}},{"id":"N4WfnmtUgzttzkasWaLdT5KIM4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQlDukmy7UoPE/W0mDxr3jBb/D4="},{"type":"next-occurrence","id":"Pm574yrG5njnqgipstH89nouCOs="}],"description":"Construction on WALTON AVE southbound between E 177TH ST (New York) and MT HOPE PL (New York) to lift and remove materials from roof top with use of knuckle boom., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:37:01Z"},"road_event_id":"N4WfnmtUgzttzkasWaLdT5KIM4o=","beginning_cross_street":"E 177TH ST","ending_cross_street":"MT HOPE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909196,40.849849]]}},{"id":"Pm574yrG5njnqgipstH89nouCOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQlDukmy7UoPE/W0mDxr3jBb/D4="},{"type":"next-occurrence","id":"8A3D9WB86+Ex+kilFMRJBXfwTaM="}],"description":"Construction on WALTON AVE southbound between E 177TH ST (New York) and MT HOPE PL (New York) to lift and remove materials from roof top with use of knuckle boom., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:37:01Z"},"road_event_id":"Pm574yrG5njnqgipstH89nouCOs=","beginning_cross_street":"E 177TH ST","ending_cross_street":"MT HOPE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909196,40.849849]]}},{"id":"8A3D9WB86+Ex+kilFMRJBXfwTaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQlDukmy7UoPE/W0mDxr3jBb/D4="},{"type":"next-occurrence","id":"De1FT/zsZl1r9W3YroRKCIUAX48="}],"description":"Construction on WALTON AVE southbound between E 177TH ST (New York) and MT HOPE PL (New York) to lift and remove materials from roof top with use of knuckle boom., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:37:01Z"},"road_event_id":"8A3D9WB86+Ex+kilFMRJBXfwTaM=","beginning_cross_street":"E 177TH ST","ending_cross_street":"MT HOPE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909196,40.849849]]}},{"id":"De1FT/zsZl1r9W3YroRKCIUAX48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQlDukmy7UoPE/W0mDxr3jBb/D4="},{"type":"next-occurrence","id":"OPW6x0sYQUrQkbfMvHYD4mwQmUo="}],"description":"Construction on WALTON AVE southbound between E 177TH ST (New York) and MT HOPE PL (New York) to lift and remove materials from roof top with use of knuckle boom., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:37:01Z"},"road_event_id":"De1FT/zsZl1r9W3YroRKCIUAX48=","beginning_cross_street":"E 177TH ST","ending_cross_street":"MT HOPE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909196,40.849849]]}},{"id":"OPW6x0sYQUrQkbfMvHYD4mwQmUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQlDukmy7UoPE/W0mDxr3jBb/D4="},{"type":"next-occurrence","id":"ODdcEiIea2b9TZkhqR94s0Fvv1Y="}],"description":"Construction on WALTON AVE southbound between E 177TH ST (New York) and MT HOPE PL (New York) to lift and remove materials from roof top with use of knuckle boom., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:37:01Z"},"road_event_id":"OPW6x0sYQUrQkbfMvHYD4mwQmUo=","beginning_cross_street":"E 177TH ST","ending_cross_street":"MT HOPE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909196,40.849849]]}},{"id":"ODdcEiIea2b9TZkhqR94s0Fvv1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQlDukmy7UoPE/W0mDxr3jBb/D4="},{"type":"next-occurrence","id":"7fS9FYVwiLLMenH/XVlFvS9T9b8="}],"description":"Construction on WALTON AVE southbound between E 177TH ST (New York) and MT HOPE PL (New York) to lift and remove materials from roof top with use of knuckle boom., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:37:01Z"},"road_event_id":"ODdcEiIea2b9TZkhqR94s0Fvv1Y=","beginning_cross_street":"E 177TH ST","ending_cross_street":"MT HOPE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909196,40.849849]]}},{"id":"7fS9FYVwiLLMenH/XVlFvS9T9b8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bQlDukmy7UoPE/W0mDxr3jBb/D4="}],"description":"Construction on WALTON AVE southbound between E 177TH ST (New York) and MT HOPE PL (New York) to lift and remove materials from roof top with use of knuckle boom., Thursday May 14th, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:37:01Z"},"road_event_id":"7fS9FYVwiLLMenH/XVlFvS9T9b8=","beginning_cross_street":"E 177TH ST","ending_cross_street":"MT HOPE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909196,40.849849]]}},{"id":"cabl79TiKpb1f4KJKR4f7XdD1KA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"h7MOHSDpsrCfkY7vrLZ/jpViVMw="}],"description":"Construction on BASSETT AVE both directions between MORRIS PARK AVE (New York) and WILKINSON AVE (New York) for drainage tie-in to an existing manhole in the street-contract CBX001-Penn Station access., Thursday May 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:40:12Z"},"road_event_id":"cabl79TiKpb1f4KJKR4f7XdD1KA=","beginning_cross_street":"MORRIS PARK AVE","ending_cross_street":"WILKINSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.84338,40.850934]]}},{"id":"h7MOHSDpsrCfkY7vrLZ/jpViVMw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cabl79TiKpb1f4KJKR4f7XdD1KA="},{"type":"next-occurrence","id":"3d6mqJzmJiJP+z7dKMTg9v5plC4="}],"description":"Construction on BASSETT AVE both directions between MORRIS PARK AVE (New York) and WILKINSON AVE (New York) for drainage tie-in to an existing manhole in the street-contract CBX001-Penn Station access., Thursday May 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:40:12Z"},"road_event_id":"h7MOHSDpsrCfkY7vrLZ/jpViVMw=","beginning_cross_street":"MORRIS PARK AVE","ending_cross_street":"WILKINSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.84338,40.850934]]}},{"id":"3d6mqJzmJiJP+z7dKMTg9v5plC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cabl79TiKpb1f4KJKR4f7XdD1KA="},{"type":"next-occurrence","id":"+eyL5XUhXEPsE+l/N5B3D4OFCA4="}],"description":"Construction on BASSETT AVE both directions between MORRIS PARK AVE (New York) and WILKINSON AVE (New York) for drainage tie-in to an existing manhole in the street-contract CBX001-Penn Station access., Thursday May 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:40:12Z"},"road_event_id":"3d6mqJzmJiJP+z7dKMTg9v5plC4=","beginning_cross_street":"MORRIS PARK AVE","ending_cross_street":"WILKINSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.84338,40.850934]]}},{"id":"+eyL5XUhXEPsE+l/N5B3D4OFCA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cabl79TiKpb1f4KJKR4f7XdD1KA="},{"type":"next-occurrence","id":"YuJPS3QkfetrdhWQn3IHFSx8GdI="}],"description":"Construction on BASSETT AVE both directions between MORRIS PARK AVE (New York) and WILKINSON AVE (New York) for drainage tie-in to an existing manhole in the street-contract CBX001-Penn Station access., Thursday May 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:40:12Z"},"road_event_id":"+eyL5XUhXEPsE+l/N5B3D4OFCA4=","beginning_cross_street":"MORRIS PARK AVE","ending_cross_street":"WILKINSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.84338,40.850934]]}},{"id":"YuJPS3QkfetrdhWQn3IHFSx8GdI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cabl79TiKpb1f4KJKR4f7XdD1KA="},{"type":"next-occurrence","id":"43PA4X8SZ9iA+kXDloWPxqqaLp4="}],"description":"Construction on BASSETT AVE both directions between MORRIS PARK AVE (New York) and WILKINSON AVE (New York) for drainage tie-in to an existing manhole in the street-contract CBX001-Penn Station access., Thursday May 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:40:12Z"},"road_event_id":"YuJPS3QkfetrdhWQn3IHFSx8GdI=","beginning_cross_street":"MORRIS PARK AVE","ending_cross_street":"WILKINSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.84338,40.850934]]}},{"id":"43PA4X8SZ9iA+kXDloWPxqqaLp4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cabl79TiKpb1f4KJKR4f7XdD1KA="},{"type":"next-occurrence","id":"9aU/X95xswDc0DH09Ufixb032GU="}],"description":"Construction on BASSETT AVE both directions between MORRIS PARK AVE (New York) and WILKINSON AVE (New York) for drainage tie-in to an existing manhole in the street-contract CBX001-Penn Station access., Thursday May 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:40:12Z"},"road_event_id":"43PA4X8SZ9iA+kXDloWPxqqaLp4=","beginning_cross_street":"MORRIS PARK AVE","ending_cross_street":"WILKINSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.84338,40.850934]]}},{"id":"9aU/X95xswDc0DH09Ufixb032GU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cabl79TiKpb1f4KJKR4f7XdD1KA="},{"type":"next-occurrence","id":"OvrUuZ9f60wqMSPfpjD6fUx/suQ="}],"description":"Construction on BASSETT AVE both directions between MORRIS PARK AVE (New York) and WILKINSON AVE (New York) for drainage tie-in to an existing manhole in the street-contract CBX001-Penn Station access., Thursday May 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:40:12Z"},"road_event_id":"9aU/X95xswDc0DH09Ufixb032GU=","beginning_cross_street":"MORRIS PARK AVE","ending_cross_street":"WILKINSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.84338,40.850934]]}},{"id":"OvrUuZ9f60wqMSPfpjD6fUx/suQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cabl79TiKpb1f4KJKR4f7XdD1KA="},{"type":"next-occurrence","id":"ppe/pCxHPrnBUW1NY3788vq2K9Y="}],"description":"Construction on BASSETT AVE both directions between MORRIS PARK AVE (New York) and WILKINSON AVE (New York) for drainage tie-in to an existing manhole in the street-contract CBX001-Penn Station access., Thursday May 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:40:12Z"},"road_event_id":"OvrUuZ9f60wqMSPfpjD6fUx/suQ=","beginning_cross_street":"MORRIS PARK AVE","ending_cross_street":"WILKINSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.84338,40.850934]]}},{"id":"ppe/pCxHPrnBUW1NY3788vq2K9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cabl79TiKpb1f4KJKR4f7XdD1KA="},{"type":"next-occurrence","id":"2Vh4v3VQUR3bH3pGpmdJ48qhBvk="}],"description":"Construction on BASSETT AVE both directions between MORRIS PARK AVE (New York) and WILKINSON AVE (New York) for drainage tie-in to an existing manhole in the street-contract CBX001-Penn Station access., Thursday May 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:40:12Z"},"road_event_id":"ppe/pCxHPrnBUW1NY3788vq2K9Y=","beginning_cross_street":"MORRIS PARK AVE","ending_cross_street":"WILKINSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.84338,40.850934]]}},{"id":"2Vh4v3VQUR3bH3pGpmdJ48qhBvk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cabl79TiKpb1f4KJKR4f7XdD1KA="},{"type":"next-occurrence","id":"r2ZFCcorguDhkYho/ujkm5ez3Kk="}],"description":"Construction on BASSETT AVE both directions between MORRIS PARK AVE (New York) and WILKINSON AVE (New York) for drainage tie-in to an existing manhole in the street-contract CBX001-Penn Station access., Thursday May 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:40:12Z"},"road_event_id":"2Vh4v3VQUR3bH3pGpmdJ48qhBvk=","beginning_cross_street":"MORRIS PARK AVE","ending_cross_street":"WILKINSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.84338,40.850934]]}},{"id":"r2ZFCcorguDhkYho/ujkm5ez3Kk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cabl79TiKpb1f4KJKR4f7XdD1KA="}],"description":"Construction on BASSETT AVE both directions between MORRIS PARK AVE (New York) and WILKINSON AVE (New York) for drainage tie-in to an existing manhole in the street-contract CBX001-Penn Station access., Thursday May 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:40:12Z"},"road_event_id":"r2ZFCcorguDhkYho/ujkm5ez3Kk=","beginning_cross_street":"MORRIS PARK AVE","ending_cross_street":"WILKINSON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.84338,40.850934]]}},{"id":"u1bNBupNH15+/fk1J1gYHzp5WSw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 23RD ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QU7SUBcgrbO+m/+AXD2MLxsmYuU="}],"description":"Construction on E 23RD ST southbound between GRAVESEND NECK RD (New York) and AVENUE W (New York) for manlift on roadway for facade work., Thursday May 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:42:11Z"},"road_event_id":"u1bNBupNH15+/fk1J1gYHzp5WSw=","beginning_cross_street":"GRAVESEND NECK RD","ending_cross_street":"AVENUE W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.948128,40.597631]]}},{"id":"QU7SUBcgrbO+m/+AXD2MLxsmYuU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 23RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u1bNBupNH15+/fk1J1gYHzp5WSw="},{"type":"next-occurrence","id":"ASHHjaYF3QskamtsptvmcOq+9ck="}],"description":"Construction on E 23RD ST southbound between GRAVESEND NECK RD (New York) and AVENUE W (New York) for manlift on roadway for facade work., Thursday May 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:42:11Z"},"road_event_id":"QU7SUBcgrbO+m/+AXD2MLxsmYuU=","beginning_cross_street":"GRAVESEND NECK RD","ending_cross_street":"AVENUE W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.948128,40.597631]]}},{"id":"ASHHjaYF3QskamtsptvmcOq+9ck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 23RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u1bNBupNH15+/fk1J1gYHzp5WSw="},{"type":"next-occurrence","id":"KUs8zyZjF2Ea3leJU/z0R10pZ1o="}],"description":"Construction on E 23RD ST southbound between GRAVESEND NECK RD (New York) and AVENUE W (New York) for manlift on roadway for facade work., Thursday May 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:42:11Z"},"road_event_id":"ASHHjaYF3QskamtsptvmcOq+9ck=","beginning_cross_street":"GRAVESEND NECK RD","ending_cross_street":"AVENUE W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.948128,40.597631]]}},{"id":"KUs8zyZjF2Ea3leJU/z0R10pZ1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 23RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u1bNBupNH15+/fk1J1gYHzp5WSw="},{"type":"next-occurrence","id":"sQWi3jRdIOoBROw2ukiU3NirWmo="}],"description":"Construction on E 23RD ST southbound between GRAVESEND NECK RD (New York) and AVENUE W (New York) for manlift on roadway for facade work., Thursday May 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:42:11Z"},"road_event_id":"KUs8zyZjF2Ea3leJU/z0R10pZ1o=","beginning_cross_street":"GRAVESEND NECK RD","ending_cross_street":"AVENUE W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.948128,40.597631]]}},{"id":"sQWi3jRdIOoBROw2ukiU3NirWmo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 23RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u1bNBupNH15+/fk1J1gYHzp5WSw="},{"type":"next-occurrence","id":"50AftfT2oVlHeSn4y2P8bZUuN6I="}],"description":"Construction on E 23RD ST southbound between GRAVESEND NECK RD (New York) and AVENUE W (New York) for manlift on roadway for facade work., Thursday May 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:42:11Z"},"road_event_id":"sQWi3jRdIOoBROw2ukiU3NirWmo=","beginning_cross_street":"GRAVESEND NECK RD","ending_cross_street":"AVENUE W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.948128,40.597631]]}},{"id":"50AftfT2oVlHeSn4y2P8bZUuN6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 23RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u1bNBupNH15+/fk1J1gYHzp5WSw="},{"type":"next-occurrence","id":"9Kap+uyAPjIjzO7nutvklcq+29g="}],"description":"Construction on E 23RD ST southbound between GRAVESEND NECK RD (New York) and AVENUE W (New York) for manlift on roadway for facade work., Thursday May 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:42:11Z"},"road_event_id":"50AftfT2oVlHeSn4y2P8bZUuN6I=","beginning_cross_street":"GRAVESEND NECK RD","ending_cross_street":"AVENUE W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.948128,40.597631]]}},{"id":"9Kap+uyAPjIjzO7nutvklcq+29g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 23RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u1bNBupNH15+/fk1J1gYHzp5WSw="},{"type":"next-occurrence","id":"yZWWuesFmBI7sG4muu0LHFW0CE4="}],"description":"Construction on E 23RD ST southbound between GRAVESEND NECK RD (New York) and AVENUE W (New York) for manlift on roadway for facade work., Thursday May 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:42:11Z"},"road_event_id":"9Kap+uyAPjIjzO7nutvklcq+29g=","beginning_cross_street":"GRAVESEND NECK RD","ending_cross_street":"AVENUE W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.948128,40.597631]]}},{"id":"yZWWuesFmBI7sG4muu0LHFW0CE4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 23RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u1bNBupNH15+/fk1J1gYHzp5WSw="},{"type":"next-occurrence","id":"2FimYDxY4QSeJ4XrLXAq79ejotc="}],"description":"Construction on E 23RD ST southbound between GRAVESEND NECK RD (New York) and AVENUE W (New York) for manlift on roadway for facade work., Thursday May 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:42:11Z"},"road_event_id":"yZWWuesFmBI7sG4muu0LHFW0CE4=","beginning_cross_street":"GRAVESEND NECK RD","ending_cross_street":"AVENUE W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.948128,40.597631]]}},{"id":"2FimYDxY4QSeJ4XrLXAq79ejotc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 23RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u1bNBupNH15+/fk1J1gYHzp5WSw="},{"type":"next-occurrence","id":"VLSf4tNa0Dnk8NmYzu9IYGqZwm4="}],"description":"Construction on E 23RD ST southbound between GRAVESEND NECK RD (New York) and AVENUE W (New York) for manlift on roadway for facade work., Thursday May 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:42:11Z"},"road_event_id":"2FimYDxY4QSeJ4XrLXAq79ejotc=","beginning_cross_street":"GRAVESEND NECK RD","ending_cross_street":"AVENUE W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.948128,40.597631]]}},{"id":"VLSf4tNa0Dnk8NmYzu9IYGqZwm4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 23RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u1bNBupNH15+/fk1J1gYHzp5WSw="},{"type":"next-occurrence","id":"zhWuA8I/cVNg0PFMpqsNTOpEi98="}],"description":"Construction on E 23RD ST southbound between GRAVESEND NECK RD (New York) and AVENUE W (New York) for manlift on roadway for facade work., Thursday May 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:42:11Z"},"road_event_id":"VLSf4tNa0Dnk8NmYzu9IYGqZwm4=","beginning_cross_street":"GRAVESEND NECK RD","ending_cross_street":"AVENUE W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.948128,40.597631]]}},{"id":"zhWuA8I/cVNg0PFMpqsNTOpEi98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 23RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u1bNBupNH15+/fk1J1gYHzp5WSw="}],"description":"Construction on E 23RD ST southbound between GRAVESEND NECK RD (New York) and AVENUE W (New York) for manlift on roadway for facade work., Thursday May 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-14T14:42:11Z"},"road_event_id":"zhWuA8I/cVNg0PFMpqsNTOpEi98=","beginning_cross_street":"GRAVESEND NECK RD","ending_cross_street":"AVENUE W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.948128,40.597631]]}},{"id":"w5DVEGgqlv1bqEs0An4UuDHY39A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rjwlx3rZxIlaEZF3FRdRHA0IuaQ="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:48:18Z"},"road_event_id":"w5DVEGgqlv1bqEs0An4UuDHY39A=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913199,40.649033]]}},{"id":"rjwlx3rZxIlaEZF3FRdRHA0IuaQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5DVEGgqlv1bqEs0An4UuDHY39A="},{"type":"next-occurrence","id":"+ui0Q5ScIV+p5SZrPRjnq5Thgz4="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:48:18Z"},"road_event_id":"rjwlx3rZxIlaEZF3FRdRHA0IuaQ=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913199,40.649033]]}},{"id":"+ui0Q5ScIV+p5SZrPRjnq5Thgz4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5DVEGgqlv1bqEs0An4UuDHY39A="},{"type":"next-occurrence","id":"rn6dmSuySqGhBUQw+/K0z+3LNP0="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:48:18Z"},"road_event_id":"+ui0Q5ScIV+p5SZrPRjnq5Thgz4=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913199,40.649033]]}},{"id":"rn6dmSuySqGhBUQw+/K0z+3LNP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5DVEGgqlv1bqEs0An4UuDHY39A="},{"type":"next-occurrence","id":"Lln2MHBb0dYmAbG42xHK3UIGEEY="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:48:18Z"},"road_event_id":"rn6dmSuySqGhBUQw+/K0z+3LNP0=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913199,40.649033]]}},{"id":"Lln2MHBb0dYmAbG42xHK3UIGEEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5DVEGgqlv1bqEs0An4UuDHY39A="},{"type":"next-occurrence","id":"0cV6MJfMW0umUjvKqrpqwChC4Bc="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:48:18Z"},"road_event_id":"Lln2MHBb0dYmAbG42xHK3UIGEEY=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913199,40.649033]]}},{"id":"0cV6MJfMW0umUjvKqrpqwChC4Bc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5DVEGgqlv1bqEs0An4UuDHY39A="},{"type":"next-occurrence","id":"phblwyNVz/IHa69RrtbVU7bLTp8="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:48:18Z"},"road_event_id":"0cV6MJfMW0umUjvKqrpqwChC4Bc=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913199,40.649033]]}},{"id":"phblwyNVz/IHa69RrtbVU7bLTp8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5DVEGgqlv1bqEs0An4UuDHY39A="},{"type":"next-occurrence","id":"zUum7vVvWzlRsYoZGFexrlcfA04="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:48:18Z"},"road_event_id":"phblwyNVz/IHa69RrtbVU7bLTp8=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913199,40.649033]]}},{"id":"zUum7vVvWzlRsYoZGFexrlcfA04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5DVEGgqlv1bqEs0An4UuDHY39A="},{"type":"next-occurrence","id":"xVi3BxkGZbfjd2taTGfWp4hed8s="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:48:18Z"},"road_event_id":"zUum7vVvWzlRsYoZGFexrlcfA04=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913199,40.649033]]}},{"id":"xVi3BxkGZbfjd2taTGfWp4hed8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5DVEGgqlv1bqEs0An4UuDHY39A="},{"type":"next-occurrence","id":"YjE/d7m6Csge6ECbFE5UworZ4JM="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:48:18Z"},"road_event_id":"xVi3BxkGZbfjd2taTGfWp4hed8s=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913199,40.649033]]}},{"id":"YjE/d7m6Csge6ECbFE5UworZ4JM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5DVEGgqlv1bqEs0An4UuDHY39A="},{"type":"next-occurrence","id":"rMN0MeBG5IoeLlATqBXQp2pCaNY="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:48:18Z"},"road_event_id":"YjE/d7m6Csge6ECbFE5UworZ4JM=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913199,40.649033]]}},{"id":"rMN0MeBG5IoeLlATqBXQp2pCaNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5DVEGgqlv1bqEs0An4UuDHY39A="},{"type":"next-occurrence","id":"dUv8ksRn+eoJ3OSoAvvsILrix0g="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:48:18Z"},"road_event_id":"rMN0MeBG5IoeLlATqBXQp2pCaNY=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913199,40.649033]]}},{"id":"dUv8ksRn+eoJ3OSoAvvsILrix0g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5DVEGgqlv1bqEs0An4UuDHY39A="},{"type":"next-occurrence","id":"8JirOlsMEnGmSn9g/AZh4rsx8N4="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:48:18Z"},"road_event_id":"dUv8ksRn+eoJ3OSoAvvsILrix0g=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913199,40.649033]]}},{"id":"8JirOlsMEnGmSn9g/AZh4rsx8N4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5DVEGgqlv1bqEs0An4UuDHY39A="},{"type":"next-occurrence","id":"VJpXOsTH+9PN4V4gaXVw/WsAIMc="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:48:18Z"},"road_event_id":"8JirOlsMEnGmSn9g/AZh4rsx8N4=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913199,40.649033]]}},{"id":"VJpXOsTH+9PN4V4gaXVw/WsAIMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5DVEGgqlv1bqEs0An4UuDHY39A="},{"type":"next-occurrence","id":"IS1jqVcfajNyHxJMzXTZtTb8D1U="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:48:18Z"},"road_event_id":"VJpXOsTH+9PN4V4gaXVw/WsAIMc=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913199,40.649033]]}},{"id":"IS1jqVcfajNyHxJMzXTZtTb8D1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5DVEGgqlv1bqEs0An4UuDHY39A="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:48:18Z"},"road_event_id":"IS1jqVcfajNyHxJMzXTZtTb8D1U=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913199,40.649033]]}},{"id":"Ou5/cNghsU1TO5oVvPra2hN6wTI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1eOnE0NOvuesah9OdpUGdAOKk6w="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:50:45Z"},"road_event_id":"Ou5/cNghsU1TO5oVvPra2hN6wTI=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912201,40.648125]]}},{"id":"1eOnE0NOvuesah9OdpUGdAOKk6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ou5/cNghsU1TO5oVvPra2hN6wTI="},{"type":"next-occurrence","id":"MCYTKjrXu/JLzx6z7O4aOWnhfdI="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:50:45Z"},"road_event_id":"1eOnE0NOvuesah9OdpUGdAOKk6w=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912201,40.648125]]}},{"id":"MCYTKjrXu/JLzx6z7O4aOWnhfdI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ou5/cNghsU1TO5oVvPra2hN6wTI="},{"type":"next-occurrence","id":"4WGcLRW72hGRQK4+lD9e1rjj26c="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:50:45Z"},"road_event_id":"MCYTKjrXu/JLzx6z7O4aOWnhfdI=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912201,40.648125]]}},{"id":"4WGcLRW72hGRQK4+lD9e1rjj26c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ou5/cNghsU1TO5oVvPra2hN6wTI="},{"type":"next-occurrence","id":"AfWU6DN0xkT/uipeVW07dBjJWx8="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:50:45Z"},"road_event_id":"4WGcLRW72hGRQK4+lD9e1rjj26c=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912201,40.648125]]}},{"id":"AfWU6DN0xkT/uipeVW07dBjJWx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ou5/cNghsU1TO5oVvPra2hN6wTI="},{"type":"next-occurrence","id":"aBwLLzhTgiO5/7LwEon0WwXGttc="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:50:45Z"},"road_event_id":"AfWU6DN0xkT/uipeVW07dBjJWx8=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912201,40.648125]]}},{"id":"aBwLLzhTgiO5/7LwEon0WwXGttc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ou5/cNghsU1TO5oVvPra2hN6wTI="},{"type":"next-occurrence","id":"oF7oCbHdN8TzA1z+ZvqP7IHHOVE="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:50:45Z"},"road_event_id":"aBwLLzhTgiO5/7LwEon0WwXGttc=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912201,40.648125]]}},{"id":"oF7oCbHdN8TzA1z+ZvqP7IHHOVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ou5/cNghsU1TO5oVvPra2hN6wTI="},{"type":"next-occurrence","id":"3VHL0KhmgS3PABxwTXxyRhwTdwE="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:50:45Z"},"road_event_id":"oF7oCbHdN8TzA1z+ZvqP7IHHOVE=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912201,40.648125]]}},{"id":"3VHL0KhmgS3PABxwTXxyRhwTdwE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ou5/cNghsU1TO5oVvPra2hN6wTI="},{"type":"next-occurrence","id":"uROVrs7CfxXVBQnur0hi7le+D/0="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:50:45Z"},"road_event_id":"3VHL0KhmgS3PABxwTXxyRhwTdwE=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912201,40.648125]]}},{"id":"uROVrs7CfxXVBQnur0hi7le+D/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ou5/cNghsU1TO5oVvPra2hN6wTI="},{"type":"next-occurrence","id":"Dt3+dCh8Vo9AigxsnpCqEycDBW0="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:50:45Z"},"road_event_id":"uROVrs7CfxXVBQnur0hi7le+D/0=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912201,40.648125]]}},{"id":"Dt3+dCh8Vo9AigxsnpCqEycDBW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ou5/cNghsU1TO5oVvPra2hN6wTI="},{"type":"next-occurrence","id":"74+alWBIzV03B4KoKYPOim8fDT4="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:50:45Z"},"road_event_id":"Dt3+dCh8Vo9AigxsnpCqEycDBW0=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912201,40.648125]]}},{"id":"74+alWBIzV03B4KoKYPOim8fDT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ou5/cNghsU1TO5oVvPra2hN6wTI="},{"type":"next-occurrence","id":"KnWxyFryFBahitBo/v7S6T2q3Xw="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:50:45Z"},"road_event_id":"74+alWBIzV03B4KoKYPOim8fDT4=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912201,40.648125]]}},{"id":"KnWxyFryFBahitBo/v7S6T2q3Xw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ou5/cNghsU1TO5oVvPra2hN6wTI="},{"type":"next-occurrence","id":"Q3WvhXk0kYvf62TdHdvaZH/PkGg="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:50:45Z"},"road_event_id":"KnWxyFryFBahitBo/v7S6T2q3Xw=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912201,40.648125]]}},{"id":"Q3WvhXk0kYvf62TdHdvaZH/PkGg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ou5/cNghsU1TO5oVvPra2hN6wTI="},{"type":"next-occurrence","id":"9QgMC/p2j6of3f12298OdrgFCK4="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:50:45Z"},"road_event_id":"Q3WvhXk0kYvf62TdHdvaZH/PkGg=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912201,40.648125]]}},{"id":"9QgMC/p2j6of3f12298OdrgFCK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ou5/cNghsU1TO5oVvPra2hN6wTI="},{"type":"next-occurrence","id":"HDuMtdIP+boHWyuXICX9EZdusq0="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:50:45Z"},"road_event_id":"9QgMC/p2j6of3f12298OdrgFCK4=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912201,40.648125]]}},{"id":"HDuMtdIP+boHWyuXICX9EZdusq0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ou5/cNghsU1TO5oVvPra2hN6wTI="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday May 15th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-14T14:50:45Z"},"road_event_id":"HDuMtdIP+boHWyuXICX9EZdusq0=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912201,40.648125]]}},{"id":"DOrFtxkjyJJxvX5EX0V+MW47ciE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Battery Park Underpass"],"direction":"unknown","related_road_events":[],"description":"Construction on Battery Park Underpass both directions between FDR Drive (Manhattan) and Franklin D. Roosevelt Drive at Brooklyn Bridge (New York) Subject to change without notice., Tuesday May 26th,2026 thru Saturday June 6th,2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed northbound, 1 Left lane of 2 lanes closed southbound","update_date":"2026-06-05T19:00:29Z"},"road_event_id":"DOrFtxkjyJJxvX5EX0V+MW47ciE=","beginning_cross_street":"FDR Drive","ending_cross_street":"Brooklyn Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01391,40.70111]]}},{"id":"BfZg+Gyar7IYo4l+aZFJBk8CAqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cHx8O3SmBqCBB3E52vBtRtJRT0A="}],"description":"Milling and repaving on I-84 both directions between Exit 64 - CT 30/CT 83 (Vernon) and Exit 69 - CT 74/to US 44 (Tolland) There will be various, intermittent lane closuresIn addition, various on and off ramps for this section of I-84 (including Exits 66, 67 and 68) may be closed to support milling and paving operations. Traffic will be detoured to the nearest ramp, following clearly marked detour signs with temporary traffic control. state troopers, municipal police, and flaggers will assist in guiding motorists safely through the associated ramp detours, Tuesday May 26th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-14T15:40:57Z"},"road_event_id":"BfZg+Gyar7IYo4l+aZFJBk8CAqA=","beginning_cross_street":"Exit 64 - CT 30/CT 83","ending_cross_street":"Exit 69 - CT 74/to US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T22:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.504816,41.820895]]}},{"id":"cHx8O3SmBqCBB3E52vBtRtJRT0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BfZg+Gyar7IYo4l+aZFJBk8CAqA="},{"type":"next-occurrence","id":"SX+lqr+k6OKKDUTOFtVjT/oLe64="}],"description":"Milling and repaving on I-84 both directions between Exit 64 - CT 30/CT 83 (Vernon) and Exit 69 - CT 74/to US 44 (Tolland) There will be various, intermittent lane closuresIn addition, various on and off ramps for this section of I-84 (including Exits 66, 67 and 68) may be closed to support milling and paving operations. Traffic will be detoured to the nearest ramp, following clearly marked detour signs with temporary traffic control. state troopers, municipal police, and flaggers will assist in guiding motorists safely through the associated ramp detours, Tuesday May 26th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-14T15:40:57Z"},"road_event_id":"cHx8O3SmBqCBB3E52vBtRtJRT0A=","beginning_cross_street":"Exit 64 - CT 30/CT 83","ending_cross_street":"Exit 69 - CT 74/to US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.504816,41.820895]]}},{"id":"SX+lqr+k6OKKDUTOFtVjT/oLe64=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BfZg+Gyar7IYo4l+aZFJBk8CAqA="},{"type":"next-occurrence","id":"RsrTuCtH0FfHciZcQ2be7392SFM="}],"description":"Milling and repaving on I-84 both directions between Exit 64 - CT 30/CT 83 (Vernon) and Exit 69 - CT 74/to US 44 (Tolland) There will be various, intermittent lane closuresIn addition, various on and off ramps for this section of I-84 (including Exits 66, 67 and 68) may be closed to support milling and paving operations. Traffic will be detoured to the nearest ramp, following clearly marked detour signs with temporary traffic control. state troopers, municipal police, and flaggers will assist in guiding motorists safely through the associated ramp detours, Tuesday May 26th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-14T15:40:57Z"},"road_event_id":"SX+lqr+k6OKKDUTOFtVjT/oLe64=","beginning_cross_street":"Exit 64 - CT 30/CT 83","ending_cross_street":"Exit 69 - CT 74/to US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.504816,41.820895]]}},{"id":"RsrTuCtH0FfHciZcQ2be7392SFM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BfZg+Gyar7IYo4l+aZFJBk8CAqA="},{"type":"next-occurrence","id":"3MeybULuVkSz8klJkfnvlnGwIR0="}],"description":"Milling and repaving on I-84 both directions between Exit 64 - CT 30/CT 83 (Vernon) and Exit 69 - CT 74/to US 44 (Tolland) There will be various, intermittent lane closuresIn addition, various on and off ramps for this section of I-84 (including Exits 66, 67 and 68) may be closed to support milling and paving operations. Traffic will be detoured to the nearest ramp, following clearly marked detour signs with temporary traffic control. state troopers, municipal police, and flaggers will assist in guiding motorists safely through the associated ramp detours, Tuesday May 26th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-14T15:40:57Z"},"road_event_id":"RsrTuCtH0FfHciZcQ2be7392SFM=","beginning_cross_street":"Exit 64 - CT 30/CT 83","ending_cross_street":"Exit 69 - CT 74/to US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.504816,41.820895]]}},{"id":"3MeybULuVkSz8klJkfnvlnGwIR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BfZg+Gyar7IYo4l+aZFJBk8CAqA="},{"type":"next-occurrence","id":"6yZnmT7G4lsraoboGkL+sTc1MBo="}],"description":"Milling and repaving on I-84 both directions between Exit 64 - CT 30/CT 83 (Vernon) and Exit 69 - CT 74/to US 44 (Tolland) There will be various, intermittent lane closuresIn addition, various on and off ramps for this section of I-84 (including Exits 66, 67 and 68) may be closed to support milling and paving operations. Traffic will be detoured to the nearest ramp, following clearly marked detour signs with temporary traffic control. state troopers, municipal police, and flaggers will assist in guiding motorists safely through the associated ramp detours, Tuesday May 26th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-14T15:40:57Z"},"road_event_id":"3MeybULuVkSz8klJkfnvlnGwIR0=","beginning_cross_street":"Exit 64 - CT 30/CT 83","ending_cross_street":"Exit 69 - CT 74/to US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.504816,41.820895]]}},{"id":"6yZnmT7G4lsraoboGkL+sTc1MBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BfZg+Gyar7IYo4l+aZFJBk8CAqA="},{"type":"next-occurrence","id":"GKKk8VrXl73IYWZKRRr+G/msgHQ="}],"description":"Milling and repaving on I-84 both directions between Exit 64 - CT 30/CT 83 (Vernon) and Exit 69 - CT 74/to US 44 (Tolland) There will be various, intermittent lane closuresIn addition, various on and off ramps for this section of I-84 (including Exits 66, 67 and 68) may be closed to support milling and paving operations. Traffic will be detoured to the nearest ramp, following clearly marked detour signs with temporary traffic control. state troopers, municipal police, and flaggers will assist in guiding motorists safely through the associated ramp detours, Tuesday May 26th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-14T15:40:57Z"},"road_event_id":"6yZnmT7G4lsraoboGkL+sTc1MBo=","beginning_cross_street":"Exit 64 - CT 30/CT 83","ending_cross_street":"Exit 69 - CT 74/to US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T22:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.504816,41.820895]]}},{"id":"GKKk8VrXl73IYWZKRRr+G/msgHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BfZg+Gyar7IYo4l+aZFJBk8CAqA="},{"type":"next-occurrence","id":"E8vXQrpb7VgcbWqI1zJ6Fei0XPY="}],"description":"Milling and repaving on I-84 both directions between Exit 64 - CT 30/CT 83 (Vernon) and Exit 69 - CT 74/to US 44 (Tolland) There will be various, intermittent lane closuresIn addition, various on and off ramps for this section of I-84 (including Exits 66, 67 and 68) may be closed to support milling and paving operations. Traffic will be detoured to the nearest ramp, following clearly marked detour signs with temporary traffic control. state troopers, municipal police, and flaggers will assist in guiding motorists safely through the associated ramp detours, Tuesday May 26th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-14T15:40:57Z"},"road_event_id":"GKKk8VrXl73IYWZKRRr+G/msgHQ=","beginning_cross_street":"Exit 64 - CT 30/CT 83","ending_cross_street":"Exit 69 - CT 74/to US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.504816,41.820895]]}},{"id":"E8vXQrpb7VgcbWqI1zJ6Fei0XPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BfZg+Gyar7IYo4l+aZFJBk8CAqA="},{"type":"next-occurrence","id":"1sgDcr6F52o6l4MOgdV8QpaAt1M="}],"description":"Milling and repaving on I-84 both directions between Exit 64 - CT 30/CT 83 (Vernon) and Exit 69 - CT 74/to US 44 (Tolland) There will be various, intermittent lane closuresIn addition, various on and off ramps for this section of I-84 (including Exits 66, 67 and 68) may be closed to support milling and paving operations. Traffic will be detoured to the nearest ramp, following clearly marked detour signs with temporary traffic control. state troopers, municipal police, and flaggers will assist in guiding motorists safely through the associated ramp detours, Tuesday May 26th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-14T15:40:57Z"},"road_event_id":"E8vXQrpb7VgcbWqI1zJ6Fei0XPY=","beginning_cross_street":"Exit 64 - CT 30/CT 83","ending_cross_street":"Exit 69 - CT 74/to US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.504816,41.820895]]}},{"id":"1sgDcr6F52o6l4MOgdV8QpaAt1M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BfZg+Gyar7IYo4l+aZFJBk8CAqA="},{"type":"next-occurrence","id":"ZQ+2+xZl5+w9rUUtGO+M0WYp4Ok="}],"description":"Milling and repaving on I-84 both directions between Exit 64 - CT 30/CT 83 (Vernon) and Exit 69 - CT 74/to US 44 (Tolland) There will be various, intermittent lane closuresIn addition, various on and off ramps for this section of I-84 (including Exits 66, 67 and 68) may be closed to support milling and paving operations. Traffic will be detoured to the nearest ramp, following clearly marked detour signs with temporary traffic control. state troopers, municipal police, and flaggers will assist in guiding motorists safely through the associated ramp detours, Tuesday May 26th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-14T15:40:57Z"},"road_event_id":"1sgDcr6F52o6l4MOgdV8QpaAt1M=","beginning_cross_street":"Exit 64 - CT 30/CT 83","ending_cross_street":"Exit 69 - CT 74/to US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.504816,41.820895]]}},{"id":"ZQ+2+xZl5+w9rUUtGO+M0WYp4Ok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BfZg+Gyar7IYo4l+aZFJBk8CAqA="}],"description":"Milling and repaving on I-84 both directions between Exit 64 - CT 30/CT 83 (Vernon) and Exit 69 - CT 74/to US 44 (Tolland) There will be various, intermittent lane closuresIn addition, various on and off ramps for this section of I-84 (including Exits 66, 67 and 68) may be closed to support milling and paving operations. Traffic will be detoured to the nearest ramp, following clearly marked detour signs with temporary traffic control. state troopers, municipal police, and flaggers will assist in guiding motorists safely through the associated ramp detours, Tuesday May 26th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-14T15:40:57Z"},"road_event_id":"ZQ+2+xZl5+w9rUUtGO+M0WYp4Ok=","beginning_cross_street":"Exit 64 - CT 30/CT 83","ending_cross_street":"Exit 69 - CT 74/to US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.504816,41.820895]]}},{"id":"kvKkKRJZPI7uPBqkA2A+MFVaA6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-37"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NF+O6UJAT5LRLVT7qoj5suGTwt0="}],"description":"Guard rail repairs on CT-37 both directions between BIG TRL (Sherman) and CT-39 (Sherman) There will be lane closures, Tuesday May 26th,2026 thru Thursday July 2nd,2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-22T20:00:01Z"},"road_event_id":"kvKkKRJZPI7uPBqkA2A+MFVaA6I=","beginning_cross_street":"BIG TRL","ending_cross_street":"CT-39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T12:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.516074,41.522557]]}},{"id":"NF+O6UJAT5LRLVT7qoj5suGTwt0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-37"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvKkKRJZPI7uPBqkA2A+MFVaA6I="},{"type":"next-occurrence","id":"ANOjYoUuBja9vzRu+t1Hr4/31s4="}],"description":"Guard rail repairs on CT-37 both directions between BIG TRL (Sherman) and CT-39 (Sherman) There will be lane closures, Tuesday May 26th,2026 thru Thursday July 2nd,2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-22T20:00:01Z"},"road_event_id":"NF+O6UJAT5LRLVT7qoj5suGTwt0=","beginning_cross_street":"BIG TRL","ending_cross_street":"CT-39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.516074,41.522557]]}},{"id":"ANOjYoUuBja9vzRu+t1Hr4/31s4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-37"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvKkKRJZPI7uPBqkA2A+MFVaA6I="},{"type":"next-occurrence","id":"Q+94a7BJ2jVtDBbmf5VFnK41rpk="}],"description":"Guard rail repairs on CT-37 both directions between BIG TRL (Sherman) and CT-39 (Sherman) There will be lane closures, Tuesday May 26th,2026 thru Thursday July 2nd,2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-22T20:00:01Z"},"road_event_id":"ANOjYoUuBja9vzRu+t1Hr4/31s4=","beginning_cross_street":"BIG TRL","ending_cross_street":"CT-39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T12:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.516074,41.522557]]}},{"id":"Q+94a7BJ2jVtDBbmf5VFnK41rpk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-37"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvKkKRJZPI7uPBqkA2A+MFVaA6I="},{"type":"next-occurrence","id":"4GpRbGva/IKQn7uH8diPCPfGqyI="}],"description":"Guard rail repairs on CT-37 both directions between BIG TRL (Sherman) and CT-39 (Sherman) There will be lane closures, Tuesday May 26th,2026 thru Thursday July 2nd,2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-22T20:00:01Z"},"road_event_id":"Q+94a7BJ2jVtDBbmf5VFnK41rpk=","beginning_cross_street":"BIG TRL","ending_cross_street":"CT-39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.516074,41.522557]]}},{"id":"4GpRbGva/IKQn7uH8diPCPfGqyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-37"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvKkKRJZPI7uPBqkA2A+MFVaA6I="},{"type":"next-occurrence","id":"O8rIFZHo/bjNsKnbUrRXzeuDg/Y="}],"description":"Guard rail repairs on CT-37 both directions between BIG TRL (Sherman) and CT-39 (Sherman) There will be lane closures, Tuesday May 26th,2026 thru Thursday July 2nd,2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-22T20:00:01Z"},"road_event_id":"4GpRbGva/IKQn7uH8diPCPfGqyI=","beginning_cross_street":"BIG TRL","ending_cross_street":"CT-39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.516074,41.522557]]}},{"id":"O8rIFZHo/bjNsKnbUrRXzeuDg/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-37"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvKkKRJZPI7uPBqkA2A+MFVaA6I="},{"type":"next-occurrence","id":"oRayF7rfGCHRSk5AyfkYCEa3YnY="}],"description":"Guard rail repairs on CT-37 both directions between BIG TRL (Sherman) and CT-39 (Sherman) There will be lane closures, Tuesday May 26th,2026 thru Thursday July 2nd,2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-22T20:00:01Z"},"road_event_id":"O8rIFZHo/bjNsKnbUrRXzeuDg/Y=","beginning_cross_street":"BIG TRL","ending_cross_street":"CT-39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.516074,41.522557]]}},{"id":"oRayF7rfGCHRSk5AyfkYCEa3YnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-37"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvKkKRJZPI7uPBqkA2A+MFVaA6I="},{"type":"next-occurrence","id":"9Ob0SuY73Le0TjCF/QeBDzvy2ZE="}],"description":"Guard rail repairs on CT-37 both directions between BIG TRL (Sherman) and CT-39 (Sherman) There will be lane closures, Tuesday May 26th,2026 thru Thursday July 2nd,2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-22T20:00:01Z"},"road_event_id":"oRayF7rfGCHRSk5AyfkYCEa3YnY=","beginning_cross_street":"BIG TRL","ending_cross_street":"CT-39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.516074,41.522557]]}},{"id":"9Ob0SuY73Le0TjCF/QeBDzvy2ZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-37"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvKkKRJZPI7uPBqkA2A+MFVaA6I="},{"type":"next-occurrence","id":"RLRX1f23d04zj3DwteokzVxLShk="}],"description":"Guard rail repairs on CT-37 both directions between BIG TRL (Sherman) and CT-39 (Sherman) There will be lane closures, Tuesday May 26th,2026 thru Thursday July 2nd,2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-22T20:00:01Z"},"road_event_id":"9Ob0SuY73Le0TjCF/QeBDzvy2ZE=","beginning_cross_street":"BIG TRL","ending_cross_street":"CT-39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.516074,41.522557]]}},{"id":"RLRX1f23d04zj3DwteokzVxLShk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-37"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvKkKRJZPI7uPBqkA2A+MFVaA6I="},{"type":"next-occurrence","id":"vpL9jF5VS046QmvhyVfcEocWf58="}],"description":"Guard rail repairs on CT-37 both directions between BIG TRL (Sherman) and CT-39 (Sherman) There will be lane closures, Tuesday May 26th,2026 thru Thursday July 2nd,2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-22T20:00:01Z"},"road_event_id":"RLRX1f23d04zj3DwteokzVxLShk=","beginning_cross_street":"BIG TRL","ending_cross_street":"CT-39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.516074,41.522557]]}},{"id":"vpL9jF5VS046QmvhyVfcEocWf58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-37"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvKkKRJZPI7uPBqkA2A+MFVaA6I="},{"type":"next-occurrence","id":"+39XXEe8lsSEEqOw7XJEZbgSp1c="}],"description":"Guard rail repairs on CT-37 both directions between BIG TRL (Sherman) and CT-39 (Sherman) There will be lane closures, Tuesday May 26th,2026 thru Thursday July 2nd,2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-22T20:00:01Z"},"road_event_id":"vpL9jF5VS046QmvhyVfcEocWf58=","beginning_cross_street":"BIG TRL","ending_cross_street":"CT-39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T12:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.516074,41.522557]]}},{"id":"+39XXEe8lsSEEqOw7XJEZbgSp1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-37"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvKkKRJZPI7uPBqkA2A+MFVaA6I="},{"type":"next-occurrence","id":"OW2PvcviiaQAhR9NA9jfURPDpKQ="}],"description":"Guard rail repairs on CT-37 both directions between BIG TRL (Sherman) and CT-39 (Sherman) There will be lane closures, Tuesday May 26th,2026 thru Thursday July 2nd,2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-22T20:00:01Z"},"road_event_id":"+39XXEe8lsSEEqOw7XJEZbgSp1c=","beginning_cross_street":"BIG TRL","ending_cross_street":"CT-39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T12:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.516074,41.522557]]}},{"id":"OW2PvcviiaQAhR9NA9jfURPDpKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-37"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvKkKRJZPI7uPBqkA2A+MFVaA6I="},{"type":"next-occurrence","id":"M6KCy5nUBSfQKkHeZ1bMPttIUlU="}],"description":"Guard rail repairs on CT-37 both directions between BIG TRL (Sherman) and CT-39 (Sherman) There will be lane closures, Tuesday May 26th,2026 thru Thursday July 2nd,2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-22T20:00:01Z"},"road_event_id":"OW2PvcviiaQAhR9NA9jfURPDpKQ=","beginning_cross_street":"BIG TRL","ending_cross_street":"CT-39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T12:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.516074,41.522557]]}},{"id":"M6KCy5nUBSfQKkHeZ1bMPttIUlU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-37"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvKkKRJZPI7uPBqkA2A+MFVaA6I="},{"type":"next-occurrence","id":"Y090FsHFTtfLwPxxP/7V6j9e2Rg="}],"description":"Guard rail repairs on CT-37 both directions between BIG TRL (Sherman) and CT-39 (Sherman) There will be lane closures, Tuesday May 26th,2026 thru Thursday July 2nd,2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-22T20:00:01Z"},"road_event_id":"M6KCy5nUBSfQKkHeZ1bMPttIUlU=","beginning_cross_street":"BIG TRL","ending_cross_street":"CT-39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T12:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.516074,41.522557]]}},{"id":"Y090FsHFTtfLwPxxP/7V6j9e2Rg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-37"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvKkKRJZPI7uPBqkA2A+MFVaA6I="},{"type":"next-occurrence","id":"IFRfA9rskFHwCWDqJbM4PFfoNg8="}],"description":"Guard rail repairs on CT-37 both directions between BIG TRL (Sherman) and CT-39 (Sherman) There will be lane closures, Tuesday May 26th,2026 thru Thursday July 2nd,2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-22T20:00:01Z"},"road_event_id":"Y090FsHFTtfLwPxxP/7V6j9e2Rg=","beginning_cross_street":"BIG TRL","ending_cross_street":"CT-39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T12:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.516074,41.522557]]}},{"id":"IFRfA9rskFHwCWDqJbM4PFfoNg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-37"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvKkKRJZPI7uPBqkA2A+MFVaA6I="}],"description":"Guard rail repairs on CT-37 both directions between BIG TRL (Sherman) and CT-39 (Sherman) There will be lane closures, Tuesday May 26th,2026 thru Thursday July 2nd,2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound, Monday July 6th,2026 thru Friday July 10th,2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes of 1 lane open northbound, southbound","update_date":"2026-05-22T20:00:01Z"},"road_event_id":"IFRfA9rskFHwCWDqJbM4PFfoNg8=","beginning_cross_street":"BIG TRL","ending_cross_street":"CT-39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T12:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.516074,41.522557]]}},{"id":"0+3N69sVStrvULqZO+tuSqt/RI8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 49"],"direction":"unknown","related_road_events":[],"description":"Long Term Road Construction on NJ 49 Both Directions between CR 548/Tuckahoe Rd (Upper Twp) and NJ 50 (Upper Twp) Wednesday June 17, 2026 09:00 AM thru 03:00 PM, right shoulder closed eastbound; right shoulder closed westbound","update_date":"2026-05-14T18:09:04Z"},"road_event_id":"0+3N69sVStrvULqZO+tuSqt/RI8=","beginning_cross_street":"CR 548/Tuckahoe Rd","ending_cross_street":"NJ 50","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.814987,39.302173]]}},{"id":"5BNe1hHsir1lv/MnIOIyuTf9f0k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 49"],"direction":"unknown","related_road_events":[],"description":"Long Term Road Construction on NJ 49 Both Directions between CR 548/Tuckahoe Rd (Upper Twp) and NJ 50 (Upper Twp) Tuesday June 16, 2026 09:00 AM thru 03:00 PM, right shoulder closed eastbound; right shoulder closed westbound","update_date":"2026-05-14T18:09:14Z"},"road_event_id":"5BNe1hHsir1lv/MnIOIyuTf9f0k=","beginning_cross_street":"CR 548/Tuckahoe Rd","ending_cross_street":"NJ 50","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.814987,39.302173]]}},{"id":"5iyA6NNc6cmz/+ObVZpAhkmdxsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 49"],"direction":"unknown","related_road_events":[],"description":"Long Term Road Construction on NJ 49 Both Directions between CR 548/Tuckahoe Rd (Upper Twp) and NJ 50 (Upper Twp) Thursday June 18, 2026 09:00 AM thru 03:00 PM, right shoulder closed eastbound; right shoulder closed westbound","update_date":"2026-05-14T18:08:53Z"},"road_event_id":"5iyA6NNc6cmz/+ObVZpAhkmdxsw=","beginning_cross_street":"CR 548/Tuckahoe Rd","ending_cross_street":"NJ 50","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.814987,39.302173]]}},{"id":"MxrZDFr83/gt0y4wxLxrgZgMmn8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 49"],"direction":"unknown","related_road_events":[],"description":"Long Term Road Construction on NJ 49 Both Directions between CR 548/Tuckahoe Rd (Upper Twp) and NJ 50 (Upper Twp) Monday June 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed eastbound; right shoulder closed westbound","update_date":"2026-05-14T18:09:24Z"},"road_event_id":"MxrZDFr83/gt0y4wxLxrgZgMmn8=","beginning_cross_street":"CR 548/Tuckahoe Rd","ending_cross_street":"NJ 50","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.814987,39.302173]]}},{"id":"gMkSPURonsJAL1PLHewZSamRPwU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 49"],"direction":"unknown","related_road_events":[],"description":"Long Term Road Construction on NJ 49 Both Directions between CR 548/Tuckahoe Rd (Upper Twp) and NJ 50 (Upper Twp) Thursday June 11, 2026 09:00 AM thru 03:00 PM, right shoulder closed eastbound; right shoulder closed westbound","update_date":"2026-05-14T18:09:34Z"},"road_event_id":"gMkSPURonsJAL1PLHewZSamRPwU=","beginning_cross_street":"CR 548/Tuckahoe Rd","ending_cross_street":"NJ 50","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.814987,39.302173]]}},{"id":"XEn0Ci7kWFyPdiH6u2zTSb3M4RU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 49"],"direction":"unknown","related_road_events":[],"description":"Long Term Road Construction on NJ 49 Both Directions between CR 548/Tuckahoe Rd (Upper Twp) and NJ 50 (Upper Twp) Tuesday June 9, 2026 09:00 AM thru 03:00 PM, right shoulder closed eastbound; right shoulder closed westbound","update_date":"2026-05-14T18:09:43Z"},"road_event_id":"XEn0Ci7kWFyPdiH6u2zTSb3M4RU=","beginning_cross_street":"CR 548/Tuckahoe Rd","ending_cross_street":"NJ 50","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.814987,39.302173]]}},{"id":"jO2zZDeoEAdeLqXHy9B+QKrC47I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 49"],"direction":"unknown","related_road_events":[],"description":"Long Term Road Construction on NJ 49 Both Directions between CR 548/Tuckahoe Rd (Upper Twp) and NJ 50 (Upper Twp) Monday June 8, 2026 09:00 AM thru 03:00 PM, right shoulder closed eastbound; right shoulder closed westbound","update_date":"2026-05-14T18:09:50Z"},"road_event_id":"jO2zZDeoEAdeLqXHy9B+QKrC47I=","beginning_cross_street":"CR 548/Tuckahoe Rd","ending_cross_street":"NJ 50","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.814987,39.302173]]}},{"id":"6vfHeECrFBEIuGCNHys0Uj1vg6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"w+lCJhS7u6UcxfMMTbrxPSRarcI="}],"description":"Crack sealing and overnight roadwork on I-590 both directions between Exit 4 - Highland Avenue; Ramp (Brighton) and NY 590 at Titus Ave. (Irondequoit) Alternating Right/Left Lane closures as needed., Tuesday May 19th, 2026 thru Monday June 8th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes","update_date":"2026-05-28T18:18:02Z"},"road_event_id":"6vfHeECrFBEIuGCNHys0Uj1vg6A=","beginning_cross_street":"Exit 4 - Highland Avenue; Ramp","ending_cross_street":"Titus Ave.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.552777,43.137258]]}},{"id":"w+lCJhS7u6UcxfMMTbrxPSRarcI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6vfHeECrFBEIuGCNHys0Uj1vg6A="},{"type":"next-occurrence","id":"f3UhgOnDEh7IzCjDqpe3UkzlyfQ="}],"description":"Crack sealing and overnight roadwork on I-590 both directions between Exit 4 - Highland Avenue; Ramp (Brighton) and NY 590 at Titus Ave. (Irondequoit) Alternating Right/Left Lane closures as needed., Tuesday May 19th, 2026 thru Monday June 8th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes","update_date":"2026-05-28T18:18:02Z"},"road_event_id":"w+lCJhS7u6UcxfMMTbrxPSRarcI=","beginning_cross_street":"Exit 4 - Highland Avenue; Ramp","ending_cross_street":"Titus Ave.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.552777,43.137258]]}},{"id":"f3UhgOnDEh7IzCjDqpe3UkzlyfQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6vfHeECrFBEIuGCNHys0Uj1vg6A="},{"type":"next-occurrence","id":"jSfBi36qCbHoDw7tOPKtiL5xKug="}],"description":"Crack sealing and overnight roadwork on I-590 both directions between Exit 4 - Highland Avenue; Ramp (Brighton) and NY 590 at Titus Ave. (Irondequoit) Alternating Right/Left Lane closures as needed., Tuesday May 19th, 2026 thru Monday June 8th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes","update_date":"2026-05-28T18:18:02Z"},"road_event_id":"f3UhgOnDEh7IzCjDqpe3UkzlyfQ=","beginning_cross_street":"Exit 4 - Highland Avenue; Ramp","ending_cross_street":"Titus Ave.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.552777,43.137258]]}},{"id":"jSfBi36qCbHoDw7tOPKtiL5xKug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6vfHeECrFBEIuGCNHys0Uj1vg6A="}],"description":"Crack sealing and overnight roadwork on I-590 both directions between Exit 4 - Highland Avenue; Ramp (Brighton) and NY 590 at Titus Ave. (Irondequoit) Alternating Right/Left Lane closures as needed., Tuesday May 19th, 2026 thru Monday June 8th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes","update_date":"2026-05-28T18:18:02Z"},"road_event_id":"jSfBi36qCbHoDw7tOPKtiL5xKug=","beginning_cross_street":"Exit 4 - Highland Avenue; Ramp","ending_cross_street":"Titus Ave.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.552777,43.137258]]}},{"id":"i7oE3Fs9Dkte27Mg3ofi3DXu5MA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DKy/ugYkGOOkDWbagljAMYwoDv4="}],"description":"Bridge work on I-84 both directions Exit 17 - CT 64 (Middlebury/Waterbury) to Exit 21 - Main Street (Waterbury) There will be left or right lane closures , Monday May 4th, 2026 thru Friday October 9th, 2026, Sunday thru Saturday, 07:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-14T18:51:22Z"},"road_event_id":"i7oE3Fs9Dkte27Mg3ofi3DXu5MA=","beginning_cross_street":"Exit 17 - CT 64","ending_cross_street":"Exit 21 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:30:00Z","end_date":"2026-06-06T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.083174,41.539097]]}},{"id":"DKy/ugYkGOOkDWbagljAMYwoDv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i7oE3Fs9Dkte27Mg3ofi3DXu5MA="},{"type":"next-occurrence","id":"+X/aKFIV4QGMDhDh79o7yBDqlfY="}],"description":"Bridge work on I-84 both directions Exit 17 - CT 64 (Middlebury/Waterbury) to Exit 21 - Main Street (Waterbury) There will be left or right lane closures , Monday May 4th, 2026 thru Friday October 9th, 2026, Sunday thru Saturday, 07:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-14T18:51:22Z"},"road_event_id":"DKy/ugYkGOOkDWbagljAMYwoDv4=","beginning_cross_street":"Exit 17 - CT 64","ending_cross_street":"Exit 21 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T23:30:00Z","end_date":"2026-06-07T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.083174,41.539097]]}},{"id":"+X/aKFIV4QGMDhDh79o7yBDqlfY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i7oE3Fs9Dkte27Mg3ofi3DXu5MA="},{"type":"next-occurrence","id":"9gFEe6wI41rRtZf3v2MjQzoD9MI="}],"description":"Bridge work on I-84 both directions Exit 17 - CT 64 (Middlebury/Waterbury) to Exit 21 - Main Street (Waterbury) There will be left or right lane closures , Monday May 4th, 2026 thru Friday October 9th, 2026, Sunday thru Saturday, 07:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-14T18:51:22Z"},"road_event_id":"+X/aKFIV4QGMDhDh79o7yBDqlfY=","beginning_cross_street":"Exit 17 - CT 64","ending_cross_street":"Exit 21 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:30:00Z","end_date":"2026-06-08T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.083174,41.539097]]}},{"id":"9gFEe6wI41rRtZf3v2MjQzoD9MI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i7oE3Fs9Dkte27Mg3ofi3DXu5MA="},{"type":"next-occurrence","id":"pxLBoFzjvupd02f8CNh+2bwiXPo="}],"description":"Bridge work on I-84 both directions Exit 17 - CT 64 (Middlebury/Waterbury) to Exit 21 - Main Street (Waterbury) There will be left or right lane closures , Monday May 4th, 2026 thru Friday October 9th, 2026, Sunday thru Saturday, 07:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-14T18:51:22Z"},"road_event_id":"9gFEe6wI41rRtZf3v2MjQzoD9MI=","beginning_cross_street":"Exit 17 - CT 64","ending_cross_street":"Exit 21 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:30:00Z","end_date":"2026-06-09T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.083174,41.539097]]}},{"id":"pxLBoFzjvupd02f8CNh+2bwiXPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i7oE3Fs9Dkte27Mg3ofi3DXu5MA="},{"type":"next-occurrence","id":"EOR9Ph4ALn128j7jeEZc6WRS3OU="}],"description":"Bridge work on I-84 both directions Exit 17 - CT 64 (Middlebury/Waterbury) to Exit 21 - Main Street (Waterbury) There will be left or right lane closures , Monday May 4th, 2026 thru Friday October 9th, 2026, Sunday thru Saturday, 07:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-14T18:51:22Z"},"road_event_id":"pxLBoFzjvupd02f8CNh+2bwiXPo=","beginning_cross_street":"Exit 17 - CT 64","ending_cross_street":"Exit 21 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:30:00Z","end_date":"2026-06-10T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.083174,41.539097]]}},{"id":"EOR9Ph4ALn128j7jeEZc6WRS3OU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i7oE3Fs9Dkte27Mg3ofi3DXu5MA="},{"type":"next-occurrence","id":"A60gqGWeQ2cwJ7Q2RHCEZDJ/TFc="}],"description":"Bridge work on I-84 both directions Exit 17 - CT 64 (Middlebury/Waterbury) to Exit 21 - Main Street (Waterbury) There will be left or right lane closures , Monday May 4th, 2026 thru Friday October 9th, 2026, Sunday thru Saturday, 07:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-14T18:51:22Z"},"road_event_id":"EOR9Ph4ALn128j7jeEZc6WRS3OU=","beginning_cross_street":"Exit 17 - CT 64","ending_cross_street":"Exit 21 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:30:00Z","end_date":"2026-06-11T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.083174,41.539097]]}},{"id":"A60gqGWeQ2cwJ7Q2RHCEZDJ/TFc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i7oE3Fs9Dkte27Mg3ofi3DXu5MA="},{"type":"next-occurrence","id":"bISt2n7pmme2adNCgvTVWuXVhRM="}],"description":"Bridge work on I-84 both directions Exit 17 - CT 64 (Middlebury/Waterbury) to Exit 21 - Main Street (Waterbury) There will be left or right lane closures , Monday May 4th, 2026 thru Friday October 9th, 2026, Sunday thru Saturday, 07:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-14T18:51:22Z"},"road_event_id":"A60gqGWeQ2cwJ7Q2RHCEZDJ/TFc=","beginning_cross_street":"Exit 17 - CT 64","ending_cross_street":"Exit 21 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:30:00Z","end_date":"2026-06-12T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.083174,41.539097]]}},{"id":"bISt2n7pmme2adNCgvTVWuXVhRM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i7oE3Fs9Dkte27Mg3ofi3DXu5MA="},{"type":"next-occurrence","id":"ybEE3U7Et2IZG8lazsJBdJRke7I="}],"description":"Bridge work on I-84 both directions Exit 17 - CT 64 (Middlebury/Waterbury) to Exit 21 - Main Street (Waterbury) There will be left or right lane closures , Monday May 4th, 2026 thru Friday October 9th, 2026, Sunday thru Saturday, 07:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-14T18:51:22Z"},"road_event_id":"bISt2n7pmme2adNCgvTVWuXVhRM=","beginning_cross_street":"Exit 17 - CT 64","ending_cross_street":"Exit 21 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:30:00Z","end_date":"2026-06-13T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.083174,41.539097]]}},{"id":"ybEE3U7Et2IZG8lazsJBdJRke7I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i7oE3Fs9Dkte27Mg3ofi3DXu5MA="},{"type":"next-occurrence","id":"AjUkUvd/J/VZIxJj93D7ctVvuSU="}],"description":"Bridge work on I-84 both directions Exit 17 - CT 64 (Middlebury/Waterbury) to Exit 21 - Main Street (Waterbury) There will be left or right lane closures , Monday May 4th, 2026 thru Friday October 9th, 2026, Sunday thru Saturday, 07:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-14T18:51:22Z"},"road_event_id":"ybEE3U7Et2IZG8lazsJBdJRke7I=","beginning_cross_street":"Exit 17 - CT 64","ending_cross_street":"Exit 21 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T23:30:00Z","end_date":"2026-06-14T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.083174,41.539097]]}},{"id":"AjUkUvd/J/VZIxJj93D7ctVvuSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i7oE3Fs9Dkte27Mg3ofi3DXu5MA="},{"type":"next-occurrence","id":"f9+auRPNG+j3SpWDT0ffnnFLgG8="}],"description":"Bridge work on I-84 both directions Exit 17 - CT 64 (Middlebury/Waterbury) to Exit 21 - Main Street (Waterbury) There will be left or right lane closures , Monday May 4th, 2026 thru Friday October 9th, 2026, Sunday thru Saturday, 07:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-14T18:51:22Z"},"road_event_id":"AjUkUvd/J/VZIxJj93D7ctVvuSU=","beginning_cross_street":"Exit 17 - CT 64","ending_cross_street":"Exit 21 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:30:00Z","end_date":"2026-06-15T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.083174,41.539097]]}},{"id":"f9+auRPNG+j3SpWDT0ffnnFLgG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i7oE3Fs9Dkte27Mg3ofi3DXu5MA="},{"type":"next-occurrence","id":"sL9ITdvfFSUpKJ3TEP3EF8CRsiE="}],"description":"Bridge work on I-84 both directions Exit 17 - CT 64 (Middlebury/Waterbury) to Exit 21 - Main Street (Waterbury) There will be left or right lane closures , Monday May 4th, 2026 thru Friday October 9th, 2026, Sunday thru Saturday, 07:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-14T18:51:22Z"},"road_event_id":"f9+auRPNG+j3SpWDT0ffnnFLgG8=","beginning_cross_street":"Exit 17 - CT 64","ending_cross_street":"Exit 21 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:30:00Z","end_date":"2026-06-16T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.083174,41.539097]]}},{"id":"sL9ITdvfFSUpKJ3TEP3EF8CRsiE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i7oE3Fs9Dkte27Mg3ofi3DXu5MA="},{"type":"next-occurrence","id":"/OI12K3SGDh1rmbvdwWMoCsGyx4="}],"description":"Bridge work on I-84 both directions Exit 17 - CT 64 (Middlebury/Waterbury) to Exit 21 - Main Street (Waterbury) There will be left or right lane closures , Monday May 4th, 2026 thru Friday October 9th, 2026, Sunday thru Saturday, 07:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-14T18:51:22Z"},"road_event_id":"sL9ITdvfFSUpKJ3TEP3EF8CRsiE=","beginning_cross_street":"Exit 17 - CT 64","ending_cross_street":"Exit 21 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:30:00Z","end_date":"2026-06-17T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.083174,41.539097]]}},{"id":"/OI12K3SGDh1rmbvdwWMoCsGyx4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i7oE3Fs9Dkte27Mg3ofi3DXu5MA="},{"type":"next-occurrence","id":"EExtMYczquB6DqHzHTHkA29RlkM="}],"description":"Bridge work on I-84 both directions Exit 17 - CT 64 (Middlebury/Waterbury) to Exit 21 - Main Street (Waterbury) There will be left or right lane closures , Monday May 4th, 2026 thru Friday October 9th, 2026, Sunday thru Saturday, 07:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-14T18:51:22Z"},"road_event_id":"/OI12K3SGDh1rmbvdwWMoCsGyx4=","beginning_cross_street":"Exit 17 - CT 64","ending_cross_street":"Exit 21 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:30:00Z","end_date":"2026-06-18T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.083174,41.539097]]}},{"id":"EExtMYczquB6DqHzHTHkA29RlkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i7oE3Fs9Dkte27Mg3ofi3DXu5MA="},{"type":"next-occurrence","id":"Hz/GdOfaez7/wGpHBQ1KyH6gPZg="}],"description":"Bridge work on I-84 both directions Exit 17 - CT 64 (Middlebury/Waterbury) to Exit 21 - Main Street (Waterbury) There will be left or right lane closures , Monday May 4th, 2026 thru Friday October 9th, 2026, Sunday thru Saturday, 07:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-14T18:51:22Z"},"road_event_id":"EExtMYczquB6DqHzHTHkA29RlkM=","beginning_cross_street":"Exit 17 - CT 64","ending_cross_street":"Exit 21 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:30:00Z","end_date":"2026-06-19T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.083174,41.539097]]}},{"id":"Hz/GdOfaez7/wGpHBQ1KyH6gPZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i7oE3Fs9Dkte27Mg3ofi3DXu5MA="}],"description":"Bridge work on I-84 both directions Exit 17 - CT 64 (Middlebury/Waterbury) to Exit 21 - Main Street (Waterbury) There will be left or right lane closures , Monday May 4th, 2026 thru Friday October 9th, 2026, Sunday thru Saturday, 07:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-14T18:51:22Z"},"road_event_id":"Hz/GdOfaez7/wGpHBQ1KyH6gPZg=","beginning_cross_street":"Exit 17 - CT 64","ending_cross_street":"Exit 21 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:30:00Z","end_date":"2026-06-20T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.083174,41.539097]]}},{"id":"TZWgw57JebY+gXDo/bDZC4tkrPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-190"],"direction":"unknown","related_road_events":[],"description":"Milling and paving operations on CT-190 both directions between CT-190 (Enfield) and CT-190 (Enfield) Motorists can expect lane closures, Tuesday June 16th,2026 thru Wednesday June 17th,2026, Tuesday, 06:30 PM thru 05:30 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-06-03T09:30:01Z"},"road_event_id":"TZWgw57JebY+gXDo/bDZC4tkrPA=","beginning_cross_street":"CT-190","ending_cross_street":"CT-190","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:30:00Z","end_date":"2026-06-17T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597574,41.990465]]}},{"id":"FC38iG9qgHtpk5vNKIV/+4ZHyWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-190"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DpwpvfQG4TGWvGyxINwyI2z6A1M="}],"description":"Milling and paving operations on CT-190 both directions between OLDEFIELD FARMS (Enfield) and SUNSET DR (Somers) Motorists can expect lane closures, Sunday June 7th,2026 thru Monday June 15th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:30 PM thru 05:30 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-06-01T09:30:01Z"},"road_event_id":"FC38iG9qgHtpk5vNKIV/+4ZHyWo=","beginning_cross_street":"OLDEFIELD FARMS","ending_cross_street":"SUNSET DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T22:30:00Z","end_date":"2026-06-08T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.558034,41.987633]]}},{"id":"DpwpvfQG4TGWvGyxINwyI2z6A1M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-190"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FC38iG9qgHtpk5vNKIV/+4ZHyWo="},{"type":"next-occurrence","id":"8UA56q3zOtbuHZvhBqshnquEa1k="}],"description":"Milling and paving operations on CT-190 both directions between OLDEFIELD FARMS (Enfield) and SUNSET DR (Somers) Motorists can expect lane closures, Sunday June 7th,2026 thru Monday June 15th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:30 PM thru 05:30 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-06-01T09:30:01Z"},"road_event_id":"DpwpvfQG4TGWvGyxINwyI2z6A1M=","beginning_cross_street":"OLDEFIELD FARMS","ending_cross_street":"SUNSET DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:30:00Z","end_date":"2026-06-09T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.558034,41.987633]]}},{"id":"8UA56q3zOtbuHZvhBqshnquEa1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-190"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FC38iG9qgHtpk5vNKIV/+4ZHyWo="},{"type":"next-occurrence","id":"IoIb69jmqgM6psRnAmjIPOkJiuk="}],"description":"Milling and paving operations on CT-190 both directions between OLDEFIELD FARMS (Enfield) and SUNSET DR (Somers) Motorists can expect lane closures, Sunday June 7th,2026 thru Monday June 15th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:30 PM thru 05:30 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-06-01T09:30:01Z"},"road_event_id":"8UA56q3zOtbuHZvhBqshnquEa1k=","beginning_cross_street":"OLDEFIELD FARMS","ending_cross_street":"SUNSET DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:30:00Z","end_date":"2026-06-10T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.558034,41.987633]]}},{"id":"IoIb69jmqgM6psRnAmjIPOkJiuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-190"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FC38iG9qgHtpk5vNKIV/+4ZHyWo="},{"type":"next-occurrence","id":"WB66pcLnLywlP3qq8s1k6ZlS2XY="}],"description":"Milling and paving operations on CT-190 both directions between OLDEFIELD FARMS (Enfield) and SUNSET DR (Somers) Motorists can expect lane closures, Sunday June 7th,2026 thru Monday June 15th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:30 PM thru 05:30 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-06-01T09:30:01Z"},"road_event_id":"IoIb69jmqgM6psRnAmjIPOkJiuk=","beginning_cross_street":"OLDEFIELD FARMS","ending_cross_street":"SUNSET DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:30:00Z","end_date":"2026-06-11T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.558034,41.987633]]}},{"id":"WB66pcLnLywlP3qq8s1k6ZlS2XY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-190"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FC38iG9qgHtpk5vNKIV/+4ZHyWo="},{"type":"next-occurrence","id":"bl+OZk5jWVYPX4sETrqVCN+W+nk="}],"description":"Milling and paving operations on CT-190 both directions between OLDEFIELD FARMS (Enfield) and SUNSET DR (Somers) Motorists can expect lane closures, Sunday June 7th,2026 thru Monday June 15th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:30 PM thru 05:30 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-06-01T09:30:01Z"},"road_event_id":"WB66pcLnLywlP3qq8s1k6ZlS2XY=","beginning_cross_street":"OLDEFIELD FARMS","ending_cross_street":"SUNSET DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:30:00Z","end_date":"2026-06-12T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.558034,41.987633]]}},{"id":"bl+OZk5jWVYPX4sETrqVCN+W+nk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-190"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FC38iG9qgHtpk5vNKIV/+4ZHyWo="},{"type":"next-occurrence","id":"aYnUcd1Gg4SR9fRnq8yfMBzxlV8="}],"description":"Milling and paving operations on CT-190 both directions between OLDEFIELD FARMS (Enfield) and SUNSET DR (Somers) Motorists can expect lane closures, Sunday June 7th,2026 thru Monday June 15th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:30 PM thru 05:30 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-06-01T09:30:01Z"},"road_event_id":"bl+OZk5jWVYPX4sETrqVCN+W+nk=","beginning_cross_street":"OLDEFIELD FARMS","ending_cross_street":"SUNSET DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T22:30:00Z","end_date":"2026-06-15T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.558034,41.987633]]}},{"id":"aYnUcd1Gg4SR9fRnq8yfMBzxlV8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-190"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FC38iG9qgHtpk5vNKIV/+4ZHyWo="}],"description":"Milling and paving operations on CT-190 both directions between OLDEFIELD FARMS (Enfield) and SUNSET DR (Somers) Motorists can expect lane closures, Sunday June 7th,2026 thru Monday June 15th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:30 PM thru 05:30 AM All lanes of 1 lane open eastbound, westbound","update_date":"2026-06-01T09:30:01Z"},"road_event_id":"aYnUcd1Gg4SR9fRnq8yfMBzxlV8=","beginning_cross_street":"OLDEFIELD FARMS","ending_cross_street":"SUNSET DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:30:00Z","end_date":"2026-06-16T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.558034,41.987633]]}},{"id":"iiVN6q2xMRrwhDkYOW84n8R4jQQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-201"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"oNkABNqc8Dp4fOmNZnWBTA0jzkU="}],"description":"Milling and paving operations on CT-201 both directions between 24 (Griswold) and CT-12 (Jewett City) Motorists can expect lane closures , Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday/Thursday/Friday, 07:00 AM thru 05:00 PM All lanes open, Monday August 10th, 2026 thru Monday August 17th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-14T19:38:35Z"},"road_event_id":"iiVN6q2xMRrwhDkYOW84n8R4jQQ=","beginning_cross_street":"24","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.946932,41.61421]]}},{"id":"oNkABNqc8Dp4fOmNZnWBTA0jzkU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-201"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iiVN6q2xMRrwhDkYOW84n8R4jQQ="},{"type":"next-occurrence","id":"n8ac2E8ZR4FEsnPOoTC9FnznkpI="}],"description":"Milling and paving operations on CT-201 both directions between 24 (Griswold) and CT-12 (Jewett City) Motorists can expect lane closures , Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday/Thursday/Friday, 07:00 AM thru 05:00 PM All lanes open, Monday August 10th, 2026 thru Monday August 17th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-14T19:38:35Z"},"road_event_id":"oNkABNqc8Dp4fOmNZnWBTA0jzkU=","beginning_cross_street":"24","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.946932,41.61421]]}},{"id":"n8ac2E8ZR4FEsnPOoTC9FnznkpI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-201"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iiVN6q2xMRrwhDkYOW84n8R4jQQ="}],"description":"Milling and paving operations on CT-201 both directions between 24 (Griswold) and CT-12 (Jewett City) Motorists can expect lane closures , Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday/Thursday/Friday, 07:00 AM thru 05:00 PM All lanes open, Monday August 10th, 2026 thru Monday August 17th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-14T19:38:35Z"},"road_event_id":"n8ac2E8ZR4FEsnPOoTC9FnznkpI=","beginning_cross_street":"24","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.946932,41.61421]]}},{"id":"yhHdYPdhsGkqyo1cDCTUJW5bUbA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-207"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"twbc85qshJJt033fc7SyjhkCpPA="}],"description":"Milling and paving operations on CT-207 both directions between BALTIC RD (Franklin) and CT-97 at WALL ST (Sprague) Motorists can expect lane closures, Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-20T21:00:02Z"},"road_event_id":"yhHdYPdhsGkqyo1cDCTUJW5bUbA=","beginning_cross_street":"BALTIC RD","ending_cross_street":"WALL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.1132,41.617735]]}},{"id":"twbc85qshJJt033fc7SyjhkCpPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-207"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yhHdYPdhsGkqyo1cDCTUJW5bUbA="},{"type":"next-occurrence","id":"93Gt0bQO0Mo21jJOuapWiOAMZOc="}],"description":"Milling and paving operations on CT-207 both directions between BALTIC RD (Franklin) and CT-97 at WALL ST (Sprague) Motorists can expect lane closures, Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-20T21:00:02Z"},"road_event_id":"twbc85qshJJt033fc7SyjhkCpPA=","beginning_cross_street":"BALTIC RD","ending_cross_street":"WALL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.1132,41.617735]]}},{"id":"93Gt0bQO0Mo21jJOuapWiOAMZOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-207"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yhHdYPdhsGkqyo1cDCTUJW5bUbA="},{"type":"next-occurrence","id":"8KrsjiF5BpfsFRZNf0xT0e8UyTc="}],"description":"Milling and paving operations on CT-207 both directions between BALTIC RD (Franklin) and CT-97 at WALL ST (Sprague) Motorists can expect lane closures, Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-20T21:00:02Z"},"road_event_id":"93Gt0bQO0Mo21jJOuapWiOAMZOc=","beginning_cross_street":"BALTIC RD","ending_cross_street":"WALL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.1132,41.617735]]}},{"id":"8KrsjiF5BpfsFRZNf0xT0e8UyTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-207"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yhHdYPdhsGkqyo1cDCTUJW5bUbA="},{"type":"next-occurrence","id":"wGNXRX+6fG5KBA7Qh49UFUwvC/w="}],"description":"Milling and paving operations on CT-207 both directions between BALTIC RD (Franklin) and CT-97 at WALL ST (Sprague) Motorists can expect lane closures, Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-20T21:00:02Z"},"road_event_id":"8KrsjiF5BpfsFRZNf0xT0e8UyTc=","beginning_cross_street":"BALTIC RD","ending_cross_street":"WALL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.1132,41.617735]]}},{"id":"wGNXRX+6fG5KBA7Qh49UFUwvC/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-207"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yhHdYPdhsGkqyo1cDCTUJW5bUbA="}],"description":"Milling and paving operations on CT-207 both directions between BALTIC RD (Franklin) and CT-97 at WALL ST (Sprague) Motorists can expect lane closures, Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes of 1 lane open eastbound, westbound","update_date":"2026-05-20T21:00:02Z"},"road_event_id":"wGNXRX+6fG5KBA7Qh49UFUwvC/w=","beginning_cross_street":"BALTIC RD","ending_cross_street":"WALL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.1132,41.617735]]}},{"id":"kX094yAZAaNKJKqYYQeeozRHqn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 3"],"direction":"unknown","related_road_events":[],"description":"Bridge work on CT 3 both directions between I-91 (Wetherfield) Vehicles in excess of 20 tons will be advised to seek alternative routes or follow posted Route 3 truck detour signs , Continuous Monday May 4th, 2026 12:00 AM thru Friday November 3rd, 2028 11:59 PM All lanes open","update_date":"2026-05-14T19:47:49Z"},"road_event_id":"kX094yAZAaNKJKqYYQeeozRHqn4=","beginning_cross_street":"I-91","ending_cross_street":"I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.642706,41.711991]]}},{"id":"Yci7kfTGfZzG0/EatsWjK7Y2olI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q7 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, Q7 Bus between Pitkin Av /Euclid Av (New York) and Pitkin Av /Eldert Ln (New York) stop on Grant Ave at Etna St will be closed. For service, use the stops on Jamaica Ave at Eldert Lane or Rockaway Blvd at 75th St. Buses operate via Jamaica Ave, Crescent St and Ridgewood Ave., Continuous Friday May 15th, 2026 12:00 AM thru Friday December 31st, 2027 11:59 PM","update_date":"2026-06-04T11:32:03Z"},"road_event_id":"Yci7kfTGfZzG0/EatsWjK7Y2olI=","beginning_cross_street":"Pitkin Av /Euclid Av","ending_cross_street":"Pitkin Av /Eldert Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.871784,40.675497]]}},{"id":"pAQwjHZvDVR2fxU1h4D5hqqt4jM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 174"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"v7AAkxU2xTlQot6LhmKkhX0MbP4="}],"description":"Utility work on NY 174 both directions at West Genesee Street (Camillus) ; Alternating one-way traffic with flaggers, Wednesday May 27th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 07:00 AM thru 04:30 PM All lanes open","update_date":"2026-05-14T22:24:28Z"},"road_event_id":"pAQwjHZvDVR2fxU1h4D5hqqt4jM=","beginning_cross_street":"West Genesee Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.310713,43.038787]]}},{"id":"v7AAkxU2xTlQot6LhmKkhX0MbP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 174"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pAQwjHZvDVR2fxU1h4D5hqqt4jM="},{"type":"next-occurrence","id":"DcRPiZqKZiRi3YAmIdfhCOsWEbA="}],"description":"Utility work on NY 174 both directions at West Genesee Street (Camillus) ; Alternating one-way traffic with flaggers, Wednesday May 27th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 07:00 AM thru 04:30 PM All lanes open","update_date":"2026-05-14T22:24:28Z"},"road_event_id":"v7AAkxU2xTlQot6LhmKkhX0MbP4=","beginning_cross_street":"West Genesee Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.310713,43.038787]]}},{"id":"DcRPiZqKZiRi3YAmIdfhCOsWEbA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 174"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pAQwjHZvDVR2fxU1h4D5hqqt4jM="},{"type":"next-occurrence","id":"Pnrw0ixPJrUEC03gbojySovJv8I="}],"description":"Utility work on NY 174 both directions at West Genesee Street (Camillus) ; Alternating one-way traffic with flaggers, Wednesday May 27th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 07:00 AM thru 04:30 PM All lanes open","update_date":"2026-05-14T22:24:28Z"},"road_event_id":"DcRPiZqKZiRi3YAmIdfhCOsWEbA=","beginning_cross_street":"West Genesee Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.310713,43.038787]]}},{"id":"Pnrw0ixPJrUEC03gbojySovJv8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 174"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pAQwjHZvDVR2fxU1h4D5hqqt4jM="}],"description":"Utility work on NY 174 both directions at West Genesee Street (Camillus) ; Alternating one-way traffic with flaggers, Wednesday May 27th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 07:00 AM thru 04:30 PM All lanes open","update_date":"2026-05-14T22:24:28Z"},"road_event_id":"Pnrw0ixPJrUEC03gbojySovJv8I=","beginning_cross_street":"West Genesee Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.310713,43.038787]]}},{"id":"3Bl9c+hhm6vTqSWL3UIA26aRMs4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound near East of Exit 44 - CR 527/Glenside Ave (Berkeley Heights Twp), Continuous Monday May 18, 2026 11:00 PM thru Tuesday July 28, 2026 11:00 PM, right shoulder closed","update_date":"2026-05-15T04:59:42Z"},"road_event_id":"3Bl9c+hhm6vTqSWL3UIA26aRMs4=","beginning_cross_street":"East of Exit 44 - CR 527/Glenside Ave","ending_cross_street":"West of Exit 45 - CR 527/Glenside Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.388969,40.684009]]}},{"id":"Y9ZIsBB3aI0fnefMWC9XW5p4Ee0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9uPMxI93Ru6uNDqhBqqssY6hE8s="}],"description":"Utility work on NY 26 both directions area of NY 5 (Vernon) Work will be off the roadway with no impact to traffic, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-06-05T11:32:55Z"},"road_event_id":"Y9ZIsBB3aI0fnefMWC9XW5p4Ee0=","beginning_cross_street":"NY 5","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.502098,43.0732]]}},{"id":"9uPMxI93Ru6uNDqhBqqssY6hE8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y9ZIsBB3aI0fnefMWC9XW5p4Ee0="},{"type":"next-occurrence","id":"GftSj8Fe3NPz8U5Klwpe/jBlhoo="}],"description":"Utility work on NY 26 both directions area of NY 5 (Vernon) Work will be off the roadway with no impact to traffic, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-06-05T11:32:55Z"},"road_event_id":"9uPMxI93Ru6uNDqhBqqssY6hE8s=","beginning_cross_street":"NY 5","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.502098,43.0732]]}},{"id":"GftSj8Fe3NPz8U5Klwpe/jBlhoo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y9ZIsBB3aI0fnefMWC9XW5p4Ee0="},{"type":"next-occurrence","id":"bFseH01hETEXQMnQaiDMUygK4oI="}],"description":"Utility work on NY 26 both directions area of NY 5 (Vernon) Work will be off the roadway with no impact to traffic, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-06-05T11:32:55Z"},"road_event_id":"GftSj8Fe3NPz8U5Klwpe/jBlhoo=","beginning_cross_street":"NY 5","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.502098,43.0732]]}},{"id":"bFseH01hETEXQMnQaiDMUygK4oI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y9ZIsBB3aI0fnefMWC9XW5p4Ee0="},{"type":"next-occurrence","id":"7mqN5e2kNWBIDkA5apt0IOv3CPw="}],"description":"Utility work on NY 26 both directions area of NY 5 (Vernon) Work will be off the roadway with no impact to traffic, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-06-05T11:32:55Z"},"road_event_id":"bFseH01hETEXQMnQaiDMUygK4oI=","beginning_cross_street":"NY 5","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.502098,43.0732]]}},{"id":"7mqN5e2kNWBIDkA5apt0IOv3CPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y9ZIsBB3aI0fnefMWC9XW5p4Ee0="},{"type":"next-occurrence","id":"CuywsNzO/+QcdnhJJhqMfQSmJ28="}],"description":"Utility work on NY 26 both directions area of NY 5 (Vernon) Work will be off the roadway with no impact to traffic, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-06-05T11:32:55Z"},"road_event_id":"7mqN5e2kNWBIDkA5apt0IOv3CPw=","beginning_cross_street":"NY 5","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.502098,43.0732]]}},{"id":"CuywsNzO/+QcdnhJJhqMfQSmJ28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y9ZIsBB3aI0fnefMWC9XW5p4Ee0="},{"type":"next-occurrence","id":"qLyW4Hm+Om1tkM9HUGnth6IkbNw="}],"description":"Utility work on NY 26 both directions area of NY 5 (Vernon) Work will be off the roadway with no impact to traffic, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-06-05T11:32:55Z"},"road_event_id":"CuywsNzO/+QcdnhJJhqMfQSmJ28=","beginning_cross_street":"NY 5","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.502098,43.0732]]}},{"id":"qLyW4Hm+Om1tkM9HUGnth6IkbNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y9ZIsBB3aI0fnefMWC9XW5p4Ee0="},{"type":"next-occurrence","id":"Xi4wgP0zRPKlPZbFUXb91aZBd6g="}],"description":"Utility work on NY 26 both directions area of NY 5 (Vernon) Work will be off the roadway with no impact to traffic, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-06-05T11:32:55Z"},"road_event_id":"qLyW4Hm+Om1tkM9HUGnth6IkbNw=","beginning_cross_street":"NY 5","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.502098,43.0732]]}},{"id":"Xi4wgP0zRPKlPZbFUXb91aZBd6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y9ZIsBB3aI0fnefMWC9XW5p4Ee0="},{"type":"next-occurrence","id":"HMwsRshjbFsN84Smze2kM+4hwJk="}],"description":"Utility work on NY 26 both directions area of NY 5 (Vernon) Work will be off the roadway with no impact to traffic, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-06-05T11:32:55Z"},"road_event_id":"Xi4wgP0zRPKlPZbFUXb91aZBd6g=","beginning_cross_street":"NY 5","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.502098,43.0732]]}},{"id":"HMwsRshjbFsN84Smze2kM+4hwJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y9ZIsBB3aI0fnefMWC9XW5p4Ee0="},{"type":"next-occurrence","id":"SAVvOmI3uJvm092w74fxugNlrUY="}],"description":"Utility work on NY 26 both directions area of NY 5 (Vernon) Work will be off the roadway with no impact to traffic, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-06-05T11:32:55Z"},"road_event_id":"HMwsRshjbFsN84Smze2kM+4hwJk=","beginning_cross_street":"NY 5","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.502098,43.0732]]}},{"id":"SAVvOmI3uJvm092w74fxugNlrUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y9ZIsBB3aI0fnefMWC9XW5p4Ee0="},{"type":"next-occurrence","id":"TlJiU+VCgKom5LvzyAuB8Y59LkE="}],"description":"Utility work on NY 26 both directions area of NY 5 (Vernon) Work will be off the roadway with no impact to traffic, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-06-05T11:32:55Z"},"road_event_id":"SAVvOmI3uJvm092w74fxugNlrUY=","beginning_cross_street":"NY 5","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.502098,43.0732]]}},{"id":"TlJiU+VCgKom5LvzyAuB8Y59LkE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y9ZIsBB3aI0fnefMWC9XW5p4Ee0="}],"description":"Utility work on NY 26 both directions area of NY 5 (Vernon) Work will be off the roadway with no impact to traffic, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM,","update_date":"2026-06-05T11:32:55Z"},"road_event_id":"TlJiU+VCgKom5LvzyAuB8Y59LkE=","beginning_cross_street":"NY 5","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.502098,43.0732]]}},{"id":"A5ZfFN+l0kaOamYI+J4SsYqFI4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Fish Hatchery Road"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs on Fish Hatchery Road both directions between NY 46 (Rome) and Williams Road (Rome) Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 46, Potter Road, Turin Road, Williams Road, Continuous Monday May 18th, 2026 7:00 AM thru Tuesday December 15th, 2026 5:00 PM all lanes closed","update_date":"2026-05-15T10:57:28Z"},"road_event_id":"A5ZfFN+l0kaOamYI+J4SsYqFI4Q=","beginning_cross_street":"NY 46","ending_cross_street":"Williams Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.438786,43.261398]]}},{"id":"Od2Xa23AUR0/YYjidWU5svHny4U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 51"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Sfa/Zw7PQIcIa/9LpEGezshi86s="}],"description":"Construction on NY 51 both directions at US 20 Junction (Winfield) Motorists will encounter lane closures/lane shifts with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:38:18Z"},"road_event_id":"Od2Xa23AUR0/YYjidWU5svHny4U=","beginning_cross_street":"US 20 Junction","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.183998,42.885898]]}},{"id":"Sfa/Zw7PQIcIa/9LpEGezshi86s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 51"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Od2Xa23AUR0/YYjidWU5svHny4U="},{"type":"next-occurrence","id":"W0y9gpMVO23YsSDTTBEyQsl+mNw="}],"description":"Construction on NY 51 both directions at US 20 Junction (Winfield) Motorists will encounter lane closures/lane shifts with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:38:18Z"},"road_event_id":"Sfa/Zw7PQIcIa/9LpEGezshi86s=","beginning_cross_street":"US 20 Junction","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.183998,42.885898]]}},{"id":"W0y9gpMVO23YsSDTTBEyQsl+mNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 51"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Od2Xa23AUR0/YYjidWU5svHny4U="},{"type":"next-occurrence","id":"2L1iLvAAXIkWVt/7X0IfBn+P1c4="}],"description":"Construction on NY 51 both directions at US 20 Junction (Winfield) Motorists will encounter lane closures/lane shifts with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:38:18Z"},"road_event_id":"W0y9gpMVO23YsSDTTBEyQsl+mNw=","beginning_cross_street":"US 20 Junction","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.183998,42.885898]]}},{"id":"2L1iLvAAXIkWVt/7X0IfBn+P1c4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 51"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Od2Xa23AUR0/YYjidWU5svHny4U="},{"type":"next-occurrence","id":"arxFY+o62VEJo6Wqgo3tyc8C7a8="}],"description":"Construction on NY 51 both directions at US 20 Junction (Winfield) Motorists will encounter lane closures/lane shifts with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:38:18Z"},"road_event_id":"2L1iLvAAXIkWVt/7X0IfBn+P1c4=","beginning_cross_street":"US 20 Junction","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.183998,42.885898]]}},{"id":"arxFY+o62VEJo6Wqgo3tyc8C7a8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 51"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Od2Xa23AUR0/YYjidWU5svHny4U="},{"type":"next-occurrence","id":"Xft6I6V3YxAey3nQTmgfNsBigWA="}],"description":"Construction on NY 51 both directions at US 20 Junction (Winfield) Motorists will encounter lane closures/lane shifts with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:38:18Z"},"road_event_id":"arxFY+o62VEJo6Wqgo3tyc8C7a8=","beginning_cross_street":"US 20 Junction","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.183998,42.885898]]}},{"id":"Xft6I6V3YxAey3nQTmgfNsBigWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 51"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Od2Xa23AUR0/YYjidWU5svHny4U="}],"description":"Construction on NY 51 both directions at US 20 Junction (Winfield) Motorists will encounter lane closures/lane shifts with flaggers in place, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:38:18Z"},"road_event_id":"Xft6I6V3YxAey3nQTmgfNsBigWA=","beginning_cross_street":"US 20 Junction","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.183998,42.885898]]}},{"id":"X9WNxvzBk/a0Yk9dN3o6PkvmtLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5gV58Du92NNO3UEoV5wgCs60qwk="}],"description":"Construction on US 20 both directions between NY 12 Junction Sangerfield (Sangerfield) and South Street; NY 8 Junction Bridgewater (Bridgewater) Motorists will encounter lane and shoulder closures in both directions, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:06:19Z"},"road_event_id":"X9WNxvzBk/a0Yk9dN3o6PkvmtLM=","beginning_cross_street":"NY 12  Junction Sangerfield","ending_cross_street":"South Street; NY 8 Junction Bridgewater","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.378799,42.913799]]}},{"id":"5gV58Du92NNO3UEoV5wgCs60qwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X9WNxvzBk/a0Yk9dN3o6PkvmtLM="},{"type":"next-occurrence","id":"w/88NZPDv0WxSUS0jH6B7BhfYPY="}],"description":"Construction on US 20 both directions between NY 12 Junction Sangerfield (Sangerfield) and South Street; NY 8 Junction Bridgewater (Bridgewater) Motorists will encounter lane and shoulder closures in both directions, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:06:19Z"},"road_event_id":"5gV58Du92NNO3UEoV5wgCs60qwk=","beginning_cross_street":"NY 12  Junction Sangerfield","ending_cross_street":"South Street; NY 8 Junction Bridgewater","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.378799,42.913799]]}},{"id":"w/88NZPDv0WxSUS0jH6B7BhfYPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X9WNxvzBk/a0Yk9dN3o6PkvmtLM="},{"type":"next-occurrence","id":"9dF+mOYPE9Z2UGt2MXnGllFqTcA="}],"description":"Construction on US 20 both directions between NY 12 Junction Sangerfield (Sangerfield) and South Street; NY 8 Junction Bridgewater (Bridgewater) Motorists will encounter lane and shoulder closures in both directions, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:06:19Z"},"road_event_id":"w/88NZPDv0WxSUS0jH6B7BhfYPY=","beginning_cross_street":"NY 12  Junction Sangerfield","ending_cross_street":"South Street; NY 8 Junction Bridgewater","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.378799,42.913799]]}},{"id":"9dF+mOYPE9Z2UGt2MXnGllFqTcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X9WNxvzBk/a0Yk9dN3o6PkvmtLM="},{"type":"next-occurrence","id":"Tx50m62XeYYAZQkFWKNdvL82Gsw="}],"description":"Construction on US 20 both directions between NY 12 Junction Sangerfield (Sangerfield) and South Street; NY 8 Junction Bridgewater (Bridgewater) Motorists will encounter lane and shoulder closures in both directions, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:06:19Z"},"road_event_id":"9dF+mOYPE9Z2UGt2MXnGllFqTcA=","beginning_cross_street":"NY 12  Junction Sangerfield","ending_cross_street":"South Street; NY 8 Junction Bridgewater","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.378799,42.913799]]}},{"id":"Tx50m62XeYYAZQkFWKNdvL82Gsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X9WNxvzBk/a0Yk9dN3o6PkvmtLM="},{"type":"next-occurrence","id":"HZvSiMXD/PrArmv85FisCNFVd5E="}],"description":"Construction on US 20 both directions between NY 12 Junction Sangerfield (Sangerfield) and South Street; NY 8 Junction Bridgewater (Bridgewater) Motorists will encounter lane and shoulder closures in both directions, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:06:19Z"},"road_event_id":"Tx50m62XeYYAZQkFWKNdvL82Gsw=","beginning_cross_street":"NY 12  Junction Sangerfield","ending_cross_street":"South Street; NY 8 Junction Bridgewater","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.378799,42.913799]]}},{"id":"HZvSiMXD/PrArmv85FisCNFVd5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X9WNxvzBk/a0Yk9dN3o6PkvmtLM="}],"description":"Construction on US 20 both directions between NY 12 Junction Sangerfield (Sangerfield) and South Street; NY 8 Junction Bridgewater (Bridgewater) Motorists will encounter lane and shoulder closures in both directions, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:06:19Z"},"road_event_id":"HZvSiMXD/PrArmv85FisCNFVd5E=","beginning_cross_street":"NY 12  Junction Sangerfield","ending_cross_street":"South Street; NY 8 Junction Bridgewater","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.378799,42.913799]]}},{"id":"goddrK8pJzq0TaIcdM0EHa3F4hU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 50"],"direction":"unknown","related_road_events":[],"description":"Long Term Road Construction on NJ 50 Both Directions between North of NJ 49 (Corbin City) and Honest John Rd (Estell Manor) Monday June 8, 2026 09:00 AM thru 03:00 PM, right shoulder closed southbound; right shoulder closed northbound","update_date":"2026-05-15T13:37:20Z"},"road_event_id":"goddrK8pJzq0TaIcdM0EHa3F4hU=","beginning_cross_street":"North of NJ 49","ending_cross_street":"Honest John Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.752227,39.295284]]}},{"id":"GP1kE79yn9J5rakhiy5/awlDUaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 50"],"direction":"unknown","related_road_events":[],"description":"Long Term Road Construction on NJ 50 Both Directions between North of NJ 49 (Corbin City) and Honest John Rd (Estell Manor) Wednesday June 10, 2026 09:00 AM thru 03:00 PM, right shoulder closed southbound; right shoulder closed northbound","update_date":"2026-05-15T13:37:26Z"},"road_event_id":"GP1kE79yn9J5rakhiy5/awlDUaI=","beginning_cross_street":"North of NJ 49","ending_cross_street":"Honest John Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.752227,39.295284]]}},{"id":"Q//gxuGO58L2YxNwa3DpNuWDlHA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 49"],"direction":"unknown","related_road_events":[],"description":"Long Term Road Construction on NJ 49 Both Directions between CR 548/Tuckahoe Rd (Upper Twp) and NJ 50 (Upper Twp) Wednesday June 10, 2026 09:00 AM thru 03:00 PM, right shoulder closed eastbound; right shoulder closed westbound","update_date":"2026-05-15T13:38:09Z"},"road_event_id":"Q//gxuGO58L2YxNwa3DpNuWDlHA=","beginning_cross_street":"CR 548/Tuckahoe Rd","ending_cross_street":"NJ 50","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.814987,39.302173]]}},{"id":"5P8wUMiCYEkB7FUF1rrdXktNxVc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 50"],"direction":"unknown","related_road_events":[],"description":"Long Term Road Construction on NJ 50 Both Directions between North of NJ 49 (Corbin City) and Honest John Rd (Estell Manor) Tuesday June 9, 2026 09:00 AM thru 03:00 PM, right shoulder closed southbound; right shoulder closed northbound","update_date":"2026-05-15T13:37:30Z"},"road_event_id":"5P8wUMiCYEkB7FUF1rrdXktNxVc=","beginning_cross_street":"North of NJ 49","ending_cross_street":"Honest John Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.752227,39.295284]]}},{"id":"Ze7HvmQ5T2MgUmhqv2/Fwi//yTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 50"],"direction":"unknown","related_road_events":[],"description":"Long Term Road Construction on NJ 50 Both Directions between North of NJ 49 (Corbin City) and Honest John Rd (Estell Manor) Thursday June 11, 2026 09:00 AM thru 03:00 PM, right shoulder closed southbound; right shoulder closed northbound","update_date":"2026-05-15T13:37:37Z"},"road_event_id":"Ze7HvmQ5T2MgUmhqv2/Fwi//yTY=","beginning_cross_street":"North of NJ 49","ending_cross_street":"Honest John Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.752227,39.295284]]}},{"id":"5ksvTsmJ6e1GKhvVi62EJNUMWW4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B69 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, B69 Bus between 7 Av/Flatbush Av (New York) and Vanderbilt Av/Sterling Pl (New York) Buses will be detoured between 7th Ave at Park Pl and Vanderbilt Pl at Sterling Pl. Northbound buses operate via Park Pl. Southbound buses operate via Sterling Pl., Continuous Saturday May 16th, 2026 12:00 AM thru Saturday October 31st, 2026 11:59 PM","update_date":"2026-06-04T11:29:09Z"},"road_event_id":"5ksvTsmJ6e1GKhvVi62EJNUMWW4=","beginning_cross_street":"7 Av/Flatbush Av","ending_cross_street":"Vanderbilt Av/Sterling Pl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.973229,40.677797]]}},{"id":"ORC32653709","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 45"],"direction":"unknown","description":"Traffic signal repairs on NY 45 both directions between East-West Church Street (Ramapo) and East Eckerson Road - CR 74 - West Eckerson Road (Spring Valley) D265198/32653709 - This work is weather permitting. Plan travel accordingly; delays may exist Not currently scheduled","update_date":"2026-06-05T20:00:32Z"},"road_event_id":"ORC32653709","beginning_cross_street":"East-West Church Street","ending_cross_street":"East Eckerson Road - CR 74 - West Eckerson Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-11-25T15:04:58Z","end_date":"2026-06-06T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.044537,41.113623]]}},{"id":"ASeJvrWKPiTFaQQceeiI/cvDwXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Southbound near North of NJ 21 (Belleville Twp), Continuous Monday May 18, 2026 12:00 AM thru Friday August 28, 2026 12:00 PM, right lane closed","update_date":"2026-05-15T17:56:53Z"},"road_event_id":"ASeJvrWKPiTFaQQceeiI/cvDwXk=","beginning_cross_street":"North of NJ 21","ending_cross_street":"CR 672/Mill St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.153694,40.784175]]}},{"id":"OnX3JBJtAOBntyCGg4v3S51otv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Northbound near CR 672/Mill St (Belleville Twp), Continuous Monday May 18, 2026 12:00 AM thru Friday August 28, 2026 11:00 PM, right lane closed","update_date":"2026-05-15T17:56:46Z"},"road_event_id":"OnX3JBJtAOBntyCGg4v3S51otv8=","beginning_cross_street":"CR 672/Mill St","ending_cross_street":"North of NJ 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.154037,40.782737]]}},{"id":"ovQr5LzlQwcsyeuAZBpg9sZCQuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, Hudson at Poughkeepsie (Poughkeepsie) The stairs at Poughkeepsie between tracks 1 and 3, and Main Street are closed for infrastructure improvements, Continuous Monday May 18th, 2026 12:00 AM thru Monday June 29th, 2026 11:59 PM","update_date":"2026-05-15T20:11:15Z"},"road_event_id":"ovQr5LzlQwcsyeuAZBpg9sZCQuQ=","beginning_cross_street":"Poughkeepsie","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937946,41.705839]]}},{"id":"VDWaOYXW/M6AIcQTB2HqsUCA910=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Canaan"],"direction":"unknown","related_road_events":[],"description":"Construction on New Canaan both directions between Stamford (Stamford) and New Canaan (New Canaan) Buses replace trains between Stamford and New Canaan, Continuous Friday June 5th,2026 10:45 PM thru Monday June 8th,2026 02:00 AM bus service only","update_date":"2026-06-01T06:00:20Z"},"road_event_id":"VDWaOYXW/M6AIcQTB2HqsUCA910=","beginning_cross_street":"Stamford","ending_cross_street":"New Canaan","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:45:00Z","end_date":"2026-06-08T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542846,41.046611]]}},{"id":"M2CsbyDPdFUrA0hWIh+8ynLOyoM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 308"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"R1HzM+RfQcunpbXnm35ObRnQ9MA="}],"description":"Road maintenance operations on NY 308 both directions between Montgomery Street - US 9 - Mill Street (Rhinebeck) and NY 199 (Milan) D265650/32736209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-29T20:01:23Z"},"road_event_id":"M2CsbyDPdFUrA0hWIh+8ynLOyoM=","beginning_cross_street":"Montgomery Street - US 9 -  Mill Street","ending_cross_street":"NY 199","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911988,41.926886]]}},{"id":"R1HzM+RfQcunpbXnm35ObRnQ9MA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 308"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M2CsbyDPdFUrA0hWIh+8ynLOyoM="},{"type":"next-occurrence","id":"SAvKbzdnVlm/y2W0fJkqalvoCX0="}],"description":"Road maintenance operations on NY 308 both directions between Montgomery Street - US 9 - Mill Street (Rhinebeck) and NY 199 (Milan) D265650/32736209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-29T20:01:23Z"},"road_event_id":"R1HzM+RfQcunpbXnm35ObRnQ9MA=","beginning_cross_street":"Montgomery Street - US 9 -  Mill Street","ending_cross_street":"NY 199","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911988,41.926886]]}},{"id":"SAvKbzdnVlm/y2W0fJkqalvoCX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 308"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M2CsbyDPdFUrA0hWIh+8ynLOyoM="},{"type":"next-occurrence","id":"RVEVlW4pRvECqP0bKcE1Dqopcfg="}],"description":"Road maintenance operations on NY 308 both directions between Montgomery Street - US 9 - Mill Street (Rhinebeck) and NY 199 (Milan) D265650/32736209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-29T20:01:23Z"},"road_event_id":"SAvKbzdnVlm/y2W0fJkqalvoCX0=","beginning_cross_street":"Montgomery Street - US 9 -  Mill Street","ending_cross_street":"NY 199","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911988,41.926886]]}},{"id":"RVEVlW4pRvECqP0bKcE1Dqopcfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 308"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M2CsbyDPdFUrA0hWIh+8ynLOyoM="},{"type":"next-occurrence","id":"gaeVDhxXtgtUEw5aJZtHCVN6tsQ="}],"description":"Road maintenance operations on NY 308 both directions between Montgomery Street - US 9 - Mill Street (Rhinebeck) and NY 199 (Milan) D265650/32736209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-29T20:01:23Z"},"road_event_id":"RVEVlW4pRvECqP0bKcE1Dqopcfg=","beginning_cross_street":"Montgomery Street - US 9 -  Mill Street","ending_cross_street":"NY 199","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911988,41.926886]]}},{"id":"gaeVDhxXtgtUEw5aJZtHCVN6tsQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 308"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M2CsbyDPdFUrA0hWIh+8ynLOyoM="},{"type":"next-occurrence","id":"+KMDBld6eSlMiWf4InW6/Oo+668="}],"description":"Road maintenance operations on NY 308 both directions between Montgomery Street - US 9 - Mill Street (Rhinebeck) and NY 199 (Milan) D265650/32736209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-29T20:01:23Z"},"road_event_id":"gaeVDhxXtgtUEw5aJZtHCVN6tsQ=","beginning_cross_street":"Montgomery Street - US 9 -  Mill Street","ending_cross_street":"NY 199","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911988,41.926886]]}},{"id":"+KMDBld6eSlMiWf4InW6/Oo+668=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 308"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M2CsbyDPdFUrA0hWIh+8ynLOyoM="}],"description":"Road maintenance operations on NY 308 both directions between Montgomery Street - US 9 - Mill Street (Rhinebeck) and NY 199 (Milan) D265650/32736209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-29T20:01:23Z"},"road_event_id":"+KMDBld6eSlMiWf4InW6/Oo+668=","beginning_cross_street":"Montgomery Street - US 9 -  Mill Street","ending_cross_street":"NY 199","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911988,41.926886]]}},{"id":"eSrOCL3a7XQF7LG4nn9wcvfpdi8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 29"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 29 Northbound near North of NJ 129 (Trenton), Friday June 5, 2026 09:00 PM thru Saturday June 6, 2026 05:00 AM, right lane closed","update_date":"2026-05-18T17:52:55Z"},"road_event_id":"eSrOCL3a7XQF7LG4nn9wcvfpdi8=","beginning_cross_street":"North of NJ 129","ending_cross_street":"South of Lalor St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.753623,40.191841]]}},{"id":"XG3+OblpmzZY98rAdwH+5NTFTUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 129"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5e8P8StZCiiw1uXryW/S+/STTxs="}],"description":"Utility work on NY 129 westbound between Underhill Avenue (Yorktown) and Rustic Ridge Court (Yorktown) 2026085165349/32750709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"XG3+OblpmzZY98rAdwH+5NTFTUI=","beginning_cross_street":"Underhill Avenue","ending_cross_street":"Rustic Ridge Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819931,41.247706]]}},{"id":"5e8P8StZCiiw1uXryW/S+/STTxs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 129"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XG3+OblpmzZY98rAdwH+5NTFTUI="},{"type":"next-occurrence","id":"BmstNP4tTBFB9jGqQK2XXojIBpQ="}],"description":"Utility work on NY 129 westbound between Underhill Avenue (Yorktown) and Rustic Ridge Court (Yorktown) 2026085165349/32750709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"5e8P8StZCiiw1uXryW/S+/STTxs=","beginning_cross_street":"Underhill Avenue","ending_cross_street":"Rustic Ridge Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819931,41.247706]]}},{"id":"BmstNP4tTBFB9jGqQK2XXojIBpQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 129"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XG3+OblpmzZY98rAdwH+5NTFTUI="},{"type":"next-occurrence","id":"KGTn7x8eJxRqyeQ6hmJG2dt0qyc="}],"description":"Utility work on NY 129 westbound between Underhill Avenue (Yorktown) and Rustic Ridge Court (Yorktown) 2026085165349/32750709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"BmstNP4tTBFB9jGqQK2XXojIBpQ=","beginning_cross_street":"Underhill Avenue","ending_cross_street":"Rustic Ridge Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819931,41.247706]]}},{"id":"KGTn7x8eJxRqyeQ6hmJG2dt0qyc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 129"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XG3+OblpmzZY98rAdwH+5NTFTUI="},{"type":"next-occurrence","id":"R5nuW+H8ubJ7+Z0JumPnv6D+eWc="}],"description":"Utility work on NY 129 westbound between Underhill Avenue (Yorktown) and Rustic Ridge Court (Yorktown) 2026085165349/32750709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"KGTn7x8eJxRqyeQ6hmJG2dt0qyc=","beginning_cross_street":"Underhill Avenue","ending_cross_street":"Rustic Ridge Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819931,41.247706]]}},{"id":"R5nuW+H8ubJ7+Z0JumPnv6D+eWc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 129"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XG3+OblpmzZY98rAdwH+5NTFTUI="},{"type":"next-occurrence","id":"2x1hdsvjTnTSoWm8SW3CNab01hs="}],"description":"Utility work on NY 129 westbound between Underhill Avenue (Yorktown) and Rustic Ridge Court (Yorktown) 2026085165349/32750709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"R5nuW+H8ubJ7+Z0JumPnv6D+eWc=","beginning_cross_street":"Underhill Avenue","ending_cross_street":"Rustic Ridge Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819931,41.247706]]}},{"id":"2x1hdsvjTnTSoWm8SW3CNab01hs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 129"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XG3+OblpmzZY98rAdwH+5NTFTUI="},{"type":"next-occurrence","id":"vhnHlo1uhiHyQ+8KusJVyeEJZNg="}],"description":"Utility work on NY 129 westbound between Underhill Avenue (Yorktown) and Rustic Ridge Court (Yorktown) 2026085165349/32750709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"2x1hdsvjTnTSoWm8SW3CNab01hs=","beginning_cross_street":"Underhill Avenue","ending_cross_street":"Rustic Ridge Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819931,41.247706]]}},{"id":"vhnHlo1uhiHyQ+8KusJVyeEJZNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 129"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XG3+OblpmzZY98rAdwH+5NTFTUI="},{"type":"next-occurrence","id":"rJv8bX+1UgFtuqix7w7rzum0Wwg="}],"description":"Utility work on NY 129 westbound between Underhill Avenue (Yorktown) and Rustic Ridge Court (Yorktown) 2026085165349/32750709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"vhnHlo1uhiHyQ+8KusJVyeEJZNg=","beginning_cross_street":"Underhill Avenue","ending_cross_street":"Rustic Ridge Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819931,41.247706]]}},{"id":"rJv8bX+1UgFtuqix7w7rzum0Wwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 129"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XG3+OblpmzZY98rAdwH+5NTFTUI="},{"type":"next-occurrence","id":"qYwpKfZFlS2Uclek6RiZKxt5krI="}],"description":"Utility work on NY 129 westbound between Underhill Avenue (Yorktown) and Rustic Ridge Court (Yorktown) 2026085165349/32750709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"rJv8bX+1UgFtuqix7w7rzum0Wwg=","beginning_cross_street":"Underhill Avenue","ending_cross_street":"Rustic Ridge Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819931,41.247706]]}},{"id":"qYwpKfZFlS2Uclek6RiZKxt5krI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 129"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XG3+OblpmzZY98rAdwH+5NTFTUI="},{"type":"next-occurrence","id":"A+e1W/cCF6kSab0rfU/SBBDCYFQ="}],"description":"Utility work on NY 129 westbound between Underhill Avenue (Yorktown) and Rustic Ridge Court (Yorktown) 2026085165349/32750709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"qYwpKfZFlS2Uclek6RiZKxt5krI=","beginning_cross_street":"Underhill Avenue","ending_cross_street":"Rustic Ridge Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819931,41.247706]]}},{"id":"A+e1W/cCF6kSab0rfU/SBBDCYFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 129"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XG3+OblpmzZY98rAdwH+5NTFTUI="},{"type":"next-occurrence","id":"R2vBSsKR9Tx0HPnk+8s8ukCA8j0="}],"description":"Utility work on NY 129 westbound between Underhill Avenue (Yorktown) and Rustic Ridge Court (Yorktown) 2026085165349/32750709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"A+e1W/cCF6kSab0rfU/SBBDCYFQ=","beginning_cross_street":"Underhill Avenue","ending_cross_street":"Rustic Ridge Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819931,41.247706]]}},{"id":"R2vBSsKR9Tx0HPnk+8s8ukCA8j0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 129"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XG3+OblpmzZY98rAdwH+5NTFTUI="}],"description":"Utility work on NY 129 westbound between Underhill Avenue (Yorktown) and Rustic Ridge Court (Yorktown) 2026085165349/32750709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-26T20:00:21Z"},"road_event_id":"R2vBSsKR9Tx0HPnk+8s8ukCA8j0=","beginning_cross_street":"Underhill Avenue","ending_cross_street":"Rustic Ridge Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819931,41.247706]]}},{"id":"MUGjAUt3IIoKn9DYK9rXYmFkk8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XBsRyTNd/rzZYkao92Tatxq8XYI="}],"description":"Safety improvements on NY 17 [Rockland] both directions between Eagle Valley Road (Sloatsburg) and S Side Place (Sloatsburg) 202508113210/DAY/32577909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, various lane closures","update_date":"2026-05-28T16:46:21Z"},"road_event_id":"MUGjAUt3IIoKn9DYK9rXYmFkk8o=","beginning_cross_street":"Eagle Valley Road","ending_cross_street":"S Side Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192721,41.157409]]}},{"id":"XBsRyTNd/rzZYkao92Tatxq8XYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MUGjAUt3IIoKn9DYK9rXYmFkk8o="},{"type":"next-occurrence","id":"LvAdFK3ZhBZsyJuuhaTGYF/trdA="}],"description":"Safety improvements on NY 17 [Rockland] both directions between Eagle Valley Road (Sloatsburg) and S Side Place (Sloatsburg) 202508113210/DAY/32577909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, various lane closures","update_date":"2026-05-28T16:46:21Z"},"road_event_id":"XBsRyTNd/rzZYkao92Tatxq8XYI=","beginning_cross_street":"Eagle Valley Road","ending_cross_street":"S Side Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192721,41.157409]]}},{"id":"LvAdFK3ZhBZsyJuuhaTGYF/trdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MUGjAUt3IIoKn9DYK9rXYmFkk8o="},{"type":"next-occurrence","id":"vnMh5u/x4kSKWvAQrhHBIV6KfNY="}],"description":"Safety improvements on NY 17 [Rockland] both directions between Eagle Valley Road (Sloatsburg) and S Side Place (Sloatsburg) 202508113210/DAY/32577909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, various lane closures","update_date":"2026-05-28T16:46:21Z"},"road_event_id":"LvAdFK3ZhBZsyJuuhaTGYF/trdA=","beginning_cross_street":"Eagle Valley Road","ending_cross_street":"S Side Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192721,41.157409]]}},{"id":"vnMh5u/x4kSKWvAQrhHBIV6KfNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MUGjAUt3IIoKn9DYK9rXYmFkk8o="},{"type":"next-occurrence","id":"DLbOBX9W2cRF/LBeSqLR1e+4HOc="}],"description":"Safety improvements on NY 17 [Rockland] both directions between Eagle Valley Road (Sloatsburg) and S Side Place (Sloatsburg) 202508113210/DAY/32577909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, various lane closures","update_date":"2026-05-28T16:46:21Z"},"road_event_id":"vnMh5u/x4kSKWvAQrhHBIV6KfNY=","beginning_cross_street":"Eagle Valley Road","ending_cross_street":"S Side Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192721,41.157409]]}},{"id":"DLbOBX9W2cRF/LBeSqLR1e+4HOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MUGjAUt3IIoKn9DYK9rXYmFkk8o="},{"type":"next-occurrence","id":"8RqqsNNfX4Bron8ISA+Lwhi6JOc="}],"description":"Safety improvements on NY 17 [Rockland] both directions between Eagle Valley Road (Sloatsburg) and S Side Place (Sloatsburg) 202508113210/DAY/32577909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, various lane closures","update_date":"2026-05-28T16:46:21Z"},"road_event_id":"DLbOBX9W2cRF/LBeSqLR1e+4HOc=","beginning_cross_street":"Eagle Valley Road","ending_cross_street":"S Side Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192721,41.157409]]}},{"id":"8RqqsNNfX4Bron8ISA+Lwhi6JOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MUGjAUt3IIoKn9DYK9rXYmFkk8o="}],"description":"Safety improvements on NY 17 [Rockland] both directions between Eagle Valley Road (Sloatsburg) and S Side Place (Sloatsburg) 202508113210/DAY/32577909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, various lane closures","update_date":"2026-05-28T16:46:21Z"},"road_event_id":"8RqqsNNfX4Bron8ISA+Lwhi6JOc=","beginning_cross_street":"Eagle Valley Road","ending_cross_street":"S Side Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192721,41.157409]]}},{"id":"wnVLIJU1U//2UxcVWdf2WyaCbNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"i9PfSZN3vT/A8poKzPfnNNb6XyQ="}],"description":"Utility work on NY 5 both directions east of Keeney Rd. (Le Roy) Alternating lane closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-05-20T12:41:17Z"},"road_event_id":"wnVLIJU1U//2UxcVWdf2WyaCbNw=","beginning_cross_street":"Keeney Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.013184999999993,42.978757]]}},{"id":"i9PfSZN3vT/A8poKzPfnNNb6XyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnVLIJU1U//2UxcVWdf2WyaCbNw="},{"type":"next-occurrence","id":"v0awd/au2vvlo6oHJYmTZyMGUa4="}],"description":"Utility work on NY 5 both directions east of Keeney Rd. (Le Roy) Alternating lane closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-05-20T12:41:17Z"},"road_event_id":"i9PfSZN3vT/A8poKzPfnNNb6XyQ=","beginning_cross_street":"Keeney Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.013184999999993,42.978757]]}},{"id":"v0awd/au2vvlo6oHJYmTZyMGUa4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnVLIJU1U//2UxcVWdf2WyaCbNw="},{"type":"next-occurrence","id":"jgahGDQx3B3i5+oXqPfvL9WHDCE="}],"description":"Utility work on NY 5 both directions east of Keeney Rd. (Le Roy) Alternating lane closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-05-20T12:41:17Z"},"road_event_id":"v0awd/au2vvlo6oHJYmTZyMGUa4=","beginning_cross_street":"Keeney Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.013184999999993,42.978757]]}},{"id":"jgahGDQx3B3i5+oXqPfvL9WHDCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnVLIJU1U//2UxcVWdf2WyaCbNw="},{"type":"next-occurrence","id":"lZt0XEp0ZKWhUjwzOu80+kiOcug="}],"description":"Utility work on NY 5 both directions east of Keeney Rd. (Le Roy) Alternating lane closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-05-20T12:41:17Z"},"road_event_id":"jgahGDQx3B3i5+oXqPfvL9WHDCE=","beginning_cross_street":"Keeney Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.013184999999993,42.978757]]}},{"id":"lZt0XEp0ZKWhUjwzOu80+kiOcug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnVLIJU1U//2UxcVWdf2WyaCbNw="},{"type":"next-occurrence","id":"HcUQSphU+51SCgye4aMk09vXFZo="}],"description":"Utility work on NY 5 both directions east of Keeney Rd. (Le Roy) Alternating lane closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-05-20T12:41:17Z"},"road_event_id":"lZt0XEp0ZKWhUjwzOu80+kiOcug=","beginning_cross_street":"Keeney Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.013184999999993,42.978757]]}},{"id":"HcUQSphU+51SCgye4aMk09vXFZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnVLIJU1U//2UxcVWdf2WyaCbNw="},{"type":"next-occurrence","id":"QZyMPQANP6popw3YdLIL762SA94="}],"description":"Utility work on NY 5 both directions east of Keeney Rd. (Le Roy) Alternating lane closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-05-20T12:41:17Z"},"road_event_id":"HcUQSphU+51SCgye4aMk09vXFZo=","beginning_cross_street":"Keeney Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.013184999999993,42.978757]]}},{"id":"QZyMPQANP6popw3YdLIL762SA94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnVLIJU1U//2UxcVWdf2WyaCbNw="},{"type":"next-occurrence","id":"9x78wmkRuBqT5UTdI4opEuqw2xM="}],"description":"Utility work on NY 5 both directions east of Keeney Rd. (Le Roy) Alternating lane closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-05-20T12:41:17Z"},"road_event_id":"QZyMPQANP6popw3YdLIL762SA94=","beginning_cross_street":"Keeney Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.013184999999993,42.978757]]}},{"id":"9x78wmkRuBqT5UTdI4opEuqw2xM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnVLIJU1U//2UxcVWdf2WyaCbNw="},{"type":"next-occurrence","id":"MGEvXkGFAQOA47w7rVe09P2fFI0="}],"description":"Utility work on NY 5 both directions east of Keeney Rd. (Le Roy) Alternating lane closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-05-20T12:41:17Z"},"road_event_id":"9x78wmkRuBqT5UTdI4opEuqw2xM=","beginning_cross_street":"Keeney Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.013184999999993,42.978757]]}},{"id":"MGEvXkGFAQOA47w7rVe09P2fFI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnVLIJU1U//2UxcVWdf2WyaCbNw="},{"type":"next-occurrence","id":"QIrRkpgZ+6QJnpGVMkb9MAfPCfo="}],"description":"Utility work on NY 5 both directions east of Keeney Rd. (Le Roy) Alternating lane closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-05-20T12:41:17Z"},"road_event_id":"MGEvXkGFAQOA47w7rVe09P2fFI0=","beginning_cross_street":"Keeney Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.013184999999993,42.978757]]}},{"id":"QIrRkpgZ+6QJnpGVMkb9MAfPCfo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnVLIJU1U//2UxcVWdf2WyaCbNw="},{"type":"next-occurrence","id":"Rcbo9YhVUq9G7Mn4wrrL4Im7f3k="}],"description":"Utility work on NY 5 both directions east of Keeney Rd. (Le Roy) Alternating lane closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-05-20T12:41:17Z"},"road_event_id":"QIrRkpgZ+6QJnpGVMkb9MAfPCfo=","beginning_cross_street":"Keeney Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.013184999999993,42.978757]]}},{"id":"Rcbo9YhVUq9G7Mn4wrrL4Im7f3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnVLIJU1U//2UxcVWdf2WyaCbNw="},{"type":"next-occurrence","id":"HBzblWtbLbs29NFHkHgCe9q5V3A="}],"description":"Utility work on NY 5 both directions east of Keeney Rd. (Le Roy) Alternating lane closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-05-20T12:41:17Z"},"road_event_id":"Rcbo9YhVUq9G7Mn4wrrL4Im7f3k=","beginning_cross_street":"Keeney Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.013184999999993,42.978757]]}},{"id":"HBzblWtbLbs29NFHkHgCe9q5V3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnVLIJU1U//2UxcVWdf2WyaCbNw="},{"type":"next-occurrence","id":"GBqwadKq14dgYBJkknINXFms+Ew="}],"description":"Utility work on NY 5 both directions east of Keeney Rd. (Le Roy) Alternating lane closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-05-20T12:41:17Z"},"road_event_id":"HBzblWtbLbs29NFHkHgCe9q5V3A=","beginning_cross_street":"Keeney Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.013184999999993,42.978757]]}},{"id":"GBqwadKq14dgYBJkknINXFms+Ew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnVLIJU1U//2UxcVWdf2WyaCbNw="},{"type":"next-occurrence","id":"TrV1soJCxVP/p8mO/2qLqPwfcrQ="}],"description":"Utility work on NY 5 both directions east of Keeney Rd. (Le Roy) Alternating lane closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-05-20T12:41:17Z"},"road_event_id":"GBqwadKq14dgYBJkknINXFms+Ew=","beginning_cross_street":"Keeney Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.013184999999993,42.978757]]}},{"id":"TrV1soJCxVP/p8mO/2qLqPwfcrQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnVLIJU1U//2UxcVWdf2WyaCbNw="},{"type":"next-occurrence","id":"CzgV3sC2AjESc3mI0rZxC0rkqP0="}],"description":"Utility work on NY 5 both directions east of Keeney Rd. (Le Roy) Alternating lane closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-05-20T12:41:17Z"},"road_event_id":"TrV1soJCxVP/p8mO/2qLqPwfcrQ=","beginning_cross_street":"Keeney Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.013184999999993,42.978757]]}},{"id":"CzgV3sC2AjESc3mI0rZxC0rkqP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnVLIJU1U//2UxcVWdf2WyaCbNw="}],"description":"Utility work on NY 5 both directions east of Keeney Rd. (Le Roy) Alternating lane closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-05-20T12:41:17Z"},"road_event_id":"CzgV3sC2AjESc3mI0rZxC0rkqP0=","beginning_cross_street":"Keeney Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.013184999999993,42.978757]]}},{"id":"2BXP+72ChLrShrf1Pu85KvPvaTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FSYKCgJ2PdUY+hbzH3wg0VJAAzc="}],"description":"Construction on Franklin D. Roosevelt Drive both directions from Exit 1 - South Street (New York) to Brooklyn Bridge (New York) Subject to change without notice., Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 2 lanes closed northbound, southbound","update_date":"2026-06-05T09:00:19Z"},"road_event_id":"2BXP+72ChLrShrf1Pu85KvPvaTU=","beginning_cross_street":"Exit 1 - South Street","ending_cross_street":"Brooklyn Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.011058,40.701625]]}},{"id":"FSYKCgJ2PdUY+hbzH3wg0VJAAzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2BXP+72ChLrShrf1Pu85KvPvaTU="},{"type":"next-occurrence","id":"e5GQ2SLyQZuXk99WrMow+azYnn8="}],"description":"Construction on Franklin D. Roosevelt Drive both directions from Exit 1 - South Street (New York) to Brooklyn Bridge (New York) Subject to change without notice., Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 2 lanes closed northbound, southbound","update_date":"2026-06-05T09:00:19Z"},"road_event_id":"FSYKCgJ2PdUY+hbzH3wg0VJAAzc=","beginning_cross_street":"Exit 1 - South Street","ending_cross_street":"Brooklyn Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.011058,40.701625]]}},{"id":"e5GQ2SLyQZuXk99WrMow+azYnn8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2BXP+72ChLrShrf1Pu85KvPvaTU="},{"type":"next-occurrence","id":"NC1Ltu/ccTPIWLj26jCxzo3IiEY="}],"description":"Construction on Franklin D. Roosevelt Drive both directions from Exit 1 - South Street (New York) to Brooklyn Bridge (New York) Subject to change without notice., Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 2 lanes closed northbound, southbound","update_date":"2026-06-05T09:00:19Z"},"road_event_id":"e5GQ2SLyQZuXk99WrMow+azYnn8=","beginning_cross_street":"Exit 1 - South Street","ending_cross_street":"Brooklyn Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.011058,40.701625]]}},{"id":"NC1Ltu/ccTPIWLj26jCxzo3IiEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2BXP+72ChLrShrf1Pu85KvPvaTU="},{"type":"next-occurrence","id":"R30X/cb/Uw6uNLewODbGszcpFcM="}],"description":"Construction on Franklin D. Roosevelt Drive both directions from Exit 1 - South Street (New York) to Brooklyn Bridge (New York) Subject to change without notice., Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 2 lanes closed northbound, southbound","update_date":"2026-06-05T09:00:19Z"},"road_event_id":"NC1Ltu/ccTPIWLj26jCxzo3IiEY=","beginning_cross_street":"Exit 1 - South Street","ending_cross_street":"Brooklyn Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.011058,40.701625]]}},{"id":"R30X/cb/Uw6uNLewODbGszcpFcM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2BXP+72ChLrShrf1Pu85KvPvaTU="}],"description":"Construction on Franklin D. Roosevelt Drive both directions from Exit 1 - South Street (New York) to Brooklyn Bridge (New York) Subject to change without notice., Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 2 lanes closed northbound, southbound","update_date":"2026-06-05T09:00:19Z"},"road_event_id":"R30X/cb/Uw6uNLewODbGszcpFcM=","beginning_cross_street":"Exit 1 - South Street","ending_cross_street":"Brooklyn Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.011058,40.701625]]}},{"id":"ORC300548611","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","description":"Repaving on I-481 southbound between Exit 88 - I-690 (De Witt) and Exit 86 - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures Not currently Scheduled","update_date":"2026-05-22T10:00:02Z"},"road_event_id":"ORC300548611","beginning_cross_street":"Exit 88 - I-690  ","ending_cross_street":"Exit 86 - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-20T15:23:36Z","end_date":"2026-05-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-76.051995,43.062114]]}},{"id":"eY/m+FoLy4VuCYyvoyggRvJvEc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/oVwO9qXqZKCZUT4+ve+Bia0rP4="}],"description":"Construction on NY 27 westbound from 11th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:23:38Z"},"road_event_id":"eY/m+FoLy4VuCYyvoyggRvJvEc8=","beginning_cross_street":"11th Avenue","ending_cross_street":"11th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.9788,40.654829]]}},{"id":"/oVwO9qXqZKCZUT4+ve+Bia0rP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eY/m+FoLy4VuCYyvoyggRvJvEc8="},{"type":"next-occurrence","id":"HiFfnBO78z6zEa1RCvUO13G95x0="}],"description":"Construction on NY 27 westbound from 11th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:23:38Z"},"road_event_id":"/oVwO9qXqZKCZUT4+ve+Bia0rP4=","beginning_cross_street":"11th Avenue","ending_cross_street":"11th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T14:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.9788,40.654829]]}},{"id":"HiFfnBO78z6zEa1RCvUO13G95x0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eY/m+FoLy4VuCYyvoyggRvJvEc8="},{"type":"next-occurrence","id":"vDhPOrbj2/b099BWz0sNaGBEyV4="}],"description":"Construction on NY 27 westbound from 11th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:23:38Z"},"road_event_id":"HiFfnBO78z6zEa1RCvUO13G95x0=","beginning_cross_street":"11th Avenue","ending_cross_street":"11th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.9788,40.654829]]}},{"id":"vDhPOrbj2/b099BWz0sNaGBEyV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eY/m+FoLy4VuCYyvoyggRvJvEc8="},{"type":"next-occurrence","id":"FbwJny1Qe0G+b9A1ZFCERQaikzE="}],"description":"Construction on NY 27 westbound from 11th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:23:38Z"},"road_event_id":"vDhPOrbj2/b099BWz0sNaGBEyV4=","beginning_cross_street":"11th Avenue","ending_cross_street":"11th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.9788,40.654829]]}},{"id":"FbwJny1Qe0G+b9A1ZFCERQaikzE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eY/m+FoLy4VuCYyvoyggRvJvEc8="},{"type":"next-occurrence","id":"OadrTYTSXhItQc3JVtjNYUqTRP4="}],"description":"Construction on NY 27 westbound from 11th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:23:38Z"},"road_event_id":"FbwJny1Qe0G+b9A1ZFCERQaikzE=","beginning_cross_street":"11th Avenue","ending_cross_street":"11th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.9788,40.654829]]}},{"id":"OadrTYTSXhItQc3JVtjNYUqTRP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eY/m+FoLy4VuCYyvoyggRvJvEc8="},{"type":"next-occurrence","id":"1LSBKaoXVIJKTuE0hdlIGJoi564="}],"description":"Construction on NY 27 westbound from 11th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:23:38Z"},"road_event_id":"OadrTYTSXhItQc3JVtjNYUqTRP4=","beginning_cross_street":"11th Avenue","ending_cross_street":"11th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.9788,40.654829]]}},{"id":"1LSBKaoXVIJKTuE0hdlIGJoi564=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eY/m+FoLy4VuCYyvoyggRvJvEc8="},{"type":"next-occurrence","id":"l9sECODMf2v2YWns60L8IBXs1KE="}],"description":"Construction on NY 27 westbound from 11th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:23:38Z"},"road_event_id":"1LSBKaoXVIJKTuE0hdlIGJoi564=","beginning_cross_street":"11th Avenue","ending_cross_street":"11th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.9788,40.654829]]}},{"id":"l9sECODMf2v2YWns60L8IBXs1KE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eY/m+FoLy4VuCYyvoyggRvJvEc8="}],"description":"Construction on NY 27 westbound from 11th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:23:38Z"},"road_event_id":"l9sECODMf2v2YWns60L8IBXs1KE=","beginning_cross_street":"11th Avenue","ending_cross_street":"11th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T14:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.9788,40.654829]]}},{"id":"AIK7eDrBd/Mk76Usr6ZR/pulmPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lxY0bvT7V6BKPBKT2EfmYhdUMJE="}],"description":"Construction on NY 27 westbound from Prospect Park West (New York) to Exit 4 - John P Devaney Boulevard (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:25:59Z"},"road_event_id":"AIK7eDrBd/Mk76Usr6ZR/pulmPo=","beginning_cross_street":"Prospect Park  West","ending_cross_street":"Exit 4 - John P Devaney Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983246,40.657599]]}},{"id":"lxY0bvT7V6BKPBKT2EfmYhdUMJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AIK7eDrBd/Mk76Usr6ZR/pulmPo="},{"type":"next-occurrence","id":"Q4h9cwmtG6p1bZ4FDK95EufDfWM="}],"description":"Construction on NY 27 westbound from Prospect Park West (New York) to Exit 4 - John P Devaney Boulevard (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:25:59Z"},"road_event_id":"lxY0bvT7V6BKPBKT2EfmYhdUMJE=","beginning_cross_street":"Prospect Park  West","ending_cross_street":"Exit 4 - John P Devaney Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T14:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983246,40.657599]]}},{"id":"Q4h9cwmtG6p1bZ4FDK95EufDfWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AIK7eDrBd/Mk76Usr6ZR/pulmPo="},{"type":"next-occurrence","id":"dP+Ewt+j2h/M43Lwq4sFTVUGOu0="}],"description":"Construction on NY 27 westbound from Prospect Park West (New York) to Exit 4 - John P Devaney Boulevard (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:25:59Z"},"road_event_id":"Q4h9cwmtG6p1bZ4FDK95EufDfWM=","beginning_cross_street":"Prospect Park  West","ending_cross_street":"Exit 4 - John P Devaney Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983246,40.657599]]}},{"id":"dP+Ewt+j2h/M43Lwq4sFTVUGOu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AIK7eDrBd/Mk76Usr6ZR/pulmPo="},{"type":"next-occurrence","id":"HvfFlW5pItvS/b3IHRU9vKvIx8I="}],"description":"Construction on NY 27 westbound from Prospect Park West (New York) to Exit 4 - John P Devaney Boulevard (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:25:59Z"},"road_event_id":"dP+Ewt+j2h/M43Lwq4sFTVUGOu0=","beginning_cross_street":"Prospect Park  West","ending_cross_street":"Exit 4 - John P Devaney Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983246,40.657599]]}},{"id":"HvfFlW5pItvS/b3IHRU9vKvIx8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AIK7eDrBd/Mk76Usr6ZR/pulmPo="},{"type":"next-occurrence","id":"eEHoBJgbAhD07mOufVea7SHA8L4="}],"description":"Construction on NY 27 westbound from Prospect Park West (New York) to Exit 4 - John P Devaney Boulevard (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:25:59Z"},"road_event_id":"HvfFlW5pItvS/b3IHRU9vKvIx8I=","beginning_cross_street":"Prospect Park  West","ending_cross_street":"Exit 4 - John P Devaney Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983246,40.657599]]}},{"id":"eEHoBJgbAhD07mOufVea7SHA8L4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AIK7eDrBd/Mk76Usr6ZR/pulmPo="},{"type":"next-occurrence","id":"NOPyWWO2co3/40kgzx7F3h+KF8Q="}],"description":"Construction on NY 27 westbound from Prospect Park West (New York) to Exit 4 - John P Devaney Boulevard (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:25:59Z"},"road_event_id":"eEHoBJgbAhD07mOufVea7SHA8L4=","beginning_cross_street":"Prospect Park  West","ending_cross_street":"Exit 4 - John P Devaney Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983246,40.657599]]}},{"id":"NOPyWWO2co3/40kgzx7F3h+KF8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AIK7eDrBd/Mk76Usr6ZR/pulmPo="},{"type":"next-occurrence","id":"R9LTbVgzKzy0oiPbvmMy+rUoWac="}],"description":"Construction on NY 27 westbound from Prospect Park West (New York) to Exit 4 - John P Devaney Boulevard (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:25:59Z"},"road_event_id":"NOPyWWO2co3/40kgzx7F3h+KF8Q=","beginning_cross_street":"Prospect Park  West","ending_cross_street":"Exit 4 - John P Devaney Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983246,40.657599]]}},{"id":"R9LTbVgzKzy0oiPbvmMy+rUoWac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AIK7eDrBd/Mk76Usr6ZR/pulmPo="}],"description":"Construction on NY 27 westbound from Prospect Park West (New York) to Exit 4 - John P Devaney Boulevard (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:25:59Z"},"road_event_id":"R9LTbVgzKzy0oiPbvmMy+rUoWac=","beginning_cross_street":"Prospect Park  West","ending_cross_street":"Exit 4 - John P Devaney Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T14:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983246,40.657599]]}},{"id":"FmKt56ZvSQ6rRykl8T/RwGOpPV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17M"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6va/m+P/nvEx1KboPfet+Q8mnRQ="}],"description":"Survey work on NY 17M eastbound between Hudson Street (Chester) and Lehigh Avenue (Chester) D265617/32751309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-20T16:43:24Z"},"road_event_id":"FmKt56ZvSQ6rRykl8T/RwGOpPV0=","beginning_cross_street":"Hudson Street","ending_cross_street":"Lehigh Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.273357,41.351699]]}},{"id":"6va/m+P/nvEx1KboPfet+Q8mnRQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FmKt56ZvSQ6rRykl8T/RwGOpPV0="},{"type":"next-occurrence","id":"SawBkuUHEqFAX+Z/umuTcUDNGHw="}],"description":"Survey work on NY 17M eastbound between Hudson Street (Chester) and Lehigh Avenue (Chester) D265617/32751309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-20T16:43:24Z"},"road_event_id":"6va/m+P/nvEx1KboPfet+Q8mnRQ=","beginning_cross_street":"Hudson Street","ending_cross_street":"Lehigh Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.273357,41.351699]]}},{"id":"SawBkuUHEqFAX+Z/umuTcUDNGHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FmKt56ZvSQ6rRykl8T/RwGOpPV0="},{"type":"next-occurrence","id":"mtzEKtsK4aoeu5rd1io1ZLS8yHI="}],"description":"Survey work on NY 17M eastbound between Hudson Street (Chester) and Lehigh Avenue (Chester) D265617/32751309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-20T16:43:24Z"},"road_event_id":"SawBkuUHEqFAX+Z/umuTcUDNGHw=","beginning_cross_street":"Hudson Street","ending_cross_street":"Lehigh Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.273357,41.351699]]}},{"id":"mtzEKtsK4aoeu5rd1io1ZLS8yHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FmKt56ZvSQ6rRykl8T/RwGOpPV0="},{"type":"next-occurrence","id":"b//pWUp6M/m+99LTVKLfXFXl8oM="}],"description":"Survey work on NY 17M eastbound between Hudson Street (Chester) and Lehigh Avenue (Chester) D265617/32751309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-20T16:43:24Z"},"road_event_id":"mtzEKtsK4aoeu5rd1io1ZLS8yHI=","beginning_cross_street":"Hudson Street","ending_cross_street":"Lehigh Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.273357,41.351699]]}},{"id":"b//pWUp6M/m+99LTVKLfXFXl8oM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FmKt56ZvSQ6rRykl8T/RwGOpPV0="},{"type":"next-occurrence","id":"Cy5c45iWwhNCT7kDqSo3YzUUdx0="}],"description":"Survey work on NY 17M eastbound between Hudson Street (Chester) and Lehigh Avenue (Chester) D265617/32751309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-20T16:43:24Z"},"road_event_id":"b//pWUp6M/m+99LTVKLfXFXl8oM=","beginning_cross_street":"Hudson Street","ending_cross_street":"Lehigh Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.273357,41.351699]]}},{"id":"Cy5c45iWwhNCT7kDqSo3YzUUdx0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FmKt56ZvSQ6rRykl8T/RwGOpPV0="},{"type":"next-occurrence","id":"JwjyUSMhkp7srsON05LzwStmnmc="}],"description":"Survey work on NY 17M eastbound between Hudson Street (Chester) and Lehigh Avenue (Chester) D265617/32751309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-20T16:43:24Z"},"road_event_id":"Cy5c45iWwhNCT7kDqSo3YzUUdx0=","beginning_cross_street":"Hudson Street","ending_cross_street":"Lehigh Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.273357,41.351699]]}},{"id":"JwjyUSMhkp7srsON05LzwStmnmc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FmKt56ZvSQ6rRykl8T/RwGOpPV0="},{"type":"next-occurrence","id":"VrgpkNSAf3wEwXsQTJqlmjYz/Rg="}],"description":"Survey work on NY 17M eastbound between Hudson Street (Chester) and Lehigh Avenue (Chester) D265617/32751309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-20T16:43:24Z"},"road_event_id":"JwjyUSMhkp7srsON05LzwStmnmc=","beginning_cross_street":"Hudson Street","ending_cross_street":"Lehigh Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.273357,41.351699]]}},{"id":"VrgpkNSAf3wEwXsQTJqlmjYz/Rg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FmKt56ZvSQ6rRykl8T/RwGOpPV0="},{"type":"next-occurrence","id":"Fp3nh+ExNOhcGHnU/D6zGYluWKg="}],"description":"Survey work on NY 17M eastbound between Hudson Street (Chester) and Lehigh Avenue (Chester) D265617/32751309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-20T16:43:24Z"},"road_event_id":"VrgpkNSAf3wEwXsQTJqlmjYz/Rg=","beginning_cross_street":"Hudson Street","ending_cross_street":"Lehigh Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.273357,41.351699]]}},{"id":"Fp3nh+ExNOhcGHnU/D6zGYluWKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FmKt56ZvSQ6rRykl8T/RwGOpPV0="},{"type":"next-occurrence","id":"tQoA2dEY9rAEectvJNe3NaFHl5g="}],"description":"Survey work on NY 17M eastbound between Hudson Street (Chester) and Lehigh Avenue (Chester) D265617/32751309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-20T16:43:24Z"},"road_event_id":"Fp3nh+ExNOhcGHnU/D6zGYluWKg=","beginning_cross_street":"Hudson Street","ending_cross_street":"Lehigh Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.273357,41.351699]]}},{"id":"tQoA2dEY9rAEectvJNe3NaFHl5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FmKt56ZvSQ6rRykl8T/RwGOpPV0="}],"description":"Survey work on NY 17M eastbound between Hudson Street (Chester) and Lehigh Avenue (Chester) D265617/32751309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-05-20T16:43:24Z"},"road_event_id":"tQoA2dEY9rAEectvJNe3NaFHl5g=","beginning_cross_street":"Hudson Street","ending_cross_street":"Lehigh Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.273357,41.351699]]}},{"id":"dNblxWlsmb1zqxv8Lj7bCHxPwoM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kcq+cMGUqb8PLD5D6m+ujwxQI3o="}],"description":"Construction on I-278 eastbound from Fingerboard Road; Verrazano Narrows Bridge (New York) to Exit 15 - Lily Pond Avenue (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 4 lanes closed","update_date":"2026-06-03T19:22:24Z"},"road_event_id":"dNblxWlsmb1zqxv8Lj7bCHxPwoM=","beginning_cross_street":"Fingerboard Road; Verrazano Narrows Bridge","ending_cross_street":"Exit 15 - Lily Pond Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.068773,40.603748]]}},{"id":"kcq+cMGUqb8PLD5D6m+ujwxQI3o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dNblxWlsmb1zqxv8Lj7bCHxPwoM="},{"type":"next-occurrence","id":"b1t86VsRSpjfNXnWx93RtfzQln8="}],"description":"Construction on I-278 eastbound from Fingerboard Road; Verrazano Narrows Bridge (New York) to Exit 15 - Lily Pond Avenue (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 4 lanes closed","update_date":"2026-06-03T19:22:24Z"},"road_event_id":"kcq+cMGUqb8PLD5D6m+ujwxQI3o=","beginning_cross_street":"Fingerboard Road; Verrazano Narrows Bridge","ending_cross_street":"Exit 15 - Lily Pond Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.068773,40.603748]]}},{"id":"b1t86VsRSpjfNXnWx93RtfzQln8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dNblxWlsmb1zqxv8Lj7bCHxPwoM="},{"type":"next-occurrence","id":"4HjChWul1rHk6eokbCDF+BopyEI="}],"description":"Construction on I-278 eastbound from Fingerboard Road; Verrazano Narrows Bridge (New York) to Exit 15 - Lily Pond Avenue (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 4 lanes closed","update_date":"2026-06-03T19:22:24Z"},"road_event_id":"b1t86VsRSpjfNXnWx93RtfzQln8=","beginning_cross_street":"Fingerboard Road; Verrazano Narrows Bridge","ending_cross_street":"Exit 15 - Lily Pond Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.068773,40.603748]]}},{"id":"4HjChWul1rHk6eokbCDF+BopyEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dNblxWlsmb1zqxv8Lj7bCHxPwoM="},{"type":"next-occurrence","id":"sU3sXTW5h17PbRs8a26nPqp3Ndc="}],"description":"Construction on I-278 eastbound from Fingerboard Road; Verrazano Narrows Bridge (New York) to Exit 15 - Lily Pond Avenue (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 4 lanes closed","update_date":"2026-06-03T19:22:24Z"},"road_event_id":"4HjChWul1rHk6eokbCDF+BopyEI=","beginning_cross_street":"Fingerboard Road; Verrazano Narrows Bridge","ending_cross_street":"Exit 15 - Lily Pond Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.068773,40.603748]]}},{"id":"sU3sXTW5h17PbRs8a26nPqp3Ndc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dNblxWlsmb1zqxv8Lj7bCHxPwoM="},{"type":"next-occurrence","id":"p2vg4eHWSgMIFn2lMDquIL3nIfk="}],"description":"Construction on I-278 eastbound from Fingerboard Road; Verrazano Narrows Bridge (New York) to Exit 15 - Lily Pond Avenue (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 4 lanes closed","update_date":"2026-06-03T19:22:24Z"},"road_event_id":"sU3sXTW5h17PbRs8a26nPqp3Ndc=","beginning_cross_street":"Fingerboard Road; Verrazano Narrows Bridge","ending_cross_street":"Exit 15 - Lily Pond Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.068773,40.603748]]}},{"id":"p2vg4eHWSgMIFn2lMDquIL3nIfk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dNblxWlsmb1zqxv8Lj7bCHxPwoM="}],"description":"Construction on I-278 eastbound from Fingerboard Road; Verrazano Narrows Bridge (New York) to Exit 15 - Lily Pond Avenue (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 4 lanes closed","update_date":"2026-06-03T19:22:24Z"},"road_event_id":"p2vg4eHWSgMIFn2lMDquIL3nIfk=","beginning_cross_street":"Fingerboard Road; Verrazano Narrows Bridge","ending_cross_street":"Exit 15 - Lily Pond Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.068773,40.603748]]}},{"id":"C0stNwaRUI89qyKe2HH7nH+DBp8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"68LgSh/24kLTkrnrN3JWSZAhTbY="}],"description":"Repaving on I-81 southbound between East Cathrop Avenue; On Ramp (Syracuse) and East Seneca Turnpike; NY 173 (Syracuse) ; Alternating left and right lane closures, Tuesday June 2nd,2026 thru Saturday June 6th,2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 AM thru 03:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-06-02T19:00:21Z"},"road_event_id":"C0stNwaRUI89qyKe2HH7nH+DBp8=","beginning_cross_street":"East Cathrop Avenue; On Ramp","ending_cross_street":"East Seneca Turnpike; NY 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138844,43.013835]]}},{"id":"68LgSh/24kLTkrnrN3JWSZAhTbY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C0stNwaRUI89qyKe2HH7nH+DBp8="}],"description":"Repaving on I-81 southbound between East Cathrop Avenue; On Ramp (Syracuse) and East Seneca Turnpike; NY 173 (Syracuse) ; Alternating left and right lane closures, Tuesday June 2nd,2026 thru Saturday June 6th,2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 AM thru 03:00 PM All lanes of 2 lanes open southbound,","update_date":"2026-06-02T19:00:21Z"},"road_event_id":"68LgSh/24kLTkrnrN3JWSZAhTbY=","beginning_cross_street":"East Cathrop Avenue; On Ramp","ending_cross_street":"East Seneca Turnpike; NY 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138844,43.013835]]}},{"id":"xU3L6j8k0Iy2JeNtO4sMIq2ElvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 15TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ixYRQKjGYQm3i7/7We5N9UQCmxs="}],"description":"Construction on E 15TH ST westbound between IRVING PL (New York) and UNION SQ E (New York), Wednesday May 20th, 2026 thru Friday June 26th, 2026, Sunday thru Saturday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T17:38:23Z"},"road_event_id":"xU3L6j8k0Iy2JeNtO4sMIq2ElvE=","beginning_cross_street":"IRVING PL","ending_cross_street":"UNION SQ E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T12:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988343,40.734686]]}},{"id":"ixYRQKjGYQm3i7/7We5N9UQCmxs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 15TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xU3L6j8k0Iy2JeNtO4sMIq2ElvE="},{"type":"next-occurrence","id":"aI2KW52V/zMAMWhpDqb8mb8fYYk="}],"description":"Construction on E 15TH ST westbound between IRVING PL (New York) and UNION SQ E (New York), Wednesday May 20th, 2026 thru Friday June 26th, 2026, Sunday thru Saturday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T17:38:23Z"},"road_event_id":"ixYRQKjGYQm3i7/7We5N9UQCmxs=","beginning_cross_street":"IRVING PL","ending_cross_street":"UNION SQ E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988343,40.734686]]}},{"id":"aI2KW52V/zMAMWhpDqb8mb8fYYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 15TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xU3L6j8k0Iy2JeNtO4sMIq2ElvE="},{"type":"next-occurrence","id":"vE/OGKvXJuRbO4FDq10DI/2qEf4="}],"description":"Construction on E 15TH ST westbound between IRVING PL (New York) and UNION SQ E (New York), Wednesday May 20th, 2026 thru Friday June 26th, 2026, Sunday thru Saturday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T17:38:23Z"},"road_event_id":"aI2KW52V/zMAMWhpDqb8mb8fYYk=","beginning_cross_street":"IRVING PL","ending_cross_street":"UNION SQ E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T12:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988343,40.734686]]}},{"id":"vE/OGKvXJuRbO4FDq10DI/2qEf4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 15TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xU3L6j8k0Iy2JeNtO4sMIq2ElvE="},{"type":"next-occurrence","id":"iTQ58TRWlcUco03Rm3VgVUPgtlY="}],"description":"Construction on E 15TH ST westbound between IRVING PL (New York) and UNION SQ E (New York), Wednesday May 20th, 2026 thru Friday June 26th, 2026, Sunday thru Saturday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T17:38:23Z"},"road_event_id":"vE/OGKvXJuRbO4FDq10DI/2qEf4=","beginning_cross_street":"IRVING PL","ending_cross_street":"UNION SQ E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988343,40.734686]]}},{"id":"iTQ58TRWlcUco03Rm3VgVUPgtlY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 15TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xU3L6j8k0Iy2JeNtO4sMIq2ElvE="},{"type":"next-occurrence","id":"v4b6uf6vO/VHZt1IWFh8AVXNsQg="}],"description":"Construction on E 15TH ST westbound between IRVING PL (New York) and UNION SQ E (New York), Wednesday May 20th, 2026 thru Friday June 26th, 2026, Sunday thru Saturday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T17:38:23Z"},"road_event_id":"iTQ58TRWlcUco03Rm3VgVUPgtlY=","beginning_cross_street":"IRVING PL","ending_cross_street":"UNION SQ E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988343,40.734686]]}},{"id":"v4b6uf6vO/VHZt1IWFh8AVXNsQg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 15TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xU3L6j8k0Iy2JeNtO4sMIq2ElvE="},{"type":"next-occurrence","id":"TZL4+ydVtNnONyPVjp515ZKVpFg="}],"description":"Construction on E 15TH ST westbound between IRVING PL (New York) and UNION SQ E (New York), Wednesday May 20th, 2026 thru Friday June 26th, 2026, Sunday thru Saturday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T17:38:23Z"},"road_event_id":"v4b6uf6vO/VHZt1IWFh8AVXNsQg=","beginning_cross_street":"IRVING PL","ending_cross_street":"UNION SQ E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988343,40.734686]]}},{"id":"TZL4+ydVtNnONyPVjp515ZKVpFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 15TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xU3L6j8k0Iy2JeNtO4sMIq2ElvE="},{"type":"next-occurrence","id":"LEUDtzEuVpgFkehnSf+wT7uRJTQ="}],"description":"Construction on E 15TH ST westbound between IRVING PL (New York) and UNION SQ E (New York), Wednesday May 20th, 2026 thru Friday June 26th, 2026, Sunday thru Saturday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T17:38:23Z"},"road_event_id":"TZL4+ydVtNnONyPVjp515ZKVpFg=","beginning_cross_street":"IRVING PL","ending_cross_street":"UNION SQ E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988343,40.734686]]}},{"id":"LEUDtzEuVpgFkehnSf+wT7uRJTQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 15TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xU3L6j8k0Iy2JeNtO4sMIq2ElvE="},{"type":"next-occurrence","id":"8jz9ZRsSUTF+x2nQuhhS+ha2Qrc="}],"description":"Construction on E 15TH ST westbound between IRVING PL (New York) and UNION SQ E (New York), Wednesday May 20th, 2026 thru Friday June 26th, 2026, Sunday thru Saturday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T17:38:23Z"},"road_event_id":"LEUDtzEuVpgFkehnSf+wT7uRJTQ=","beginning_cross_street":"IRVING PL","ending_cross_street":"UNION SQ E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988343,40.734686]]}},{"id":"8jz9ZRsSUTF+x2nQuhhS+ha2Qrc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 15TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xU3L6j8k0Iy2JeNtO4sMIq2ElvE="},{"type":"next-occurrence","id":"sihcrGg3/DK8JvbZtM91KiHRmLI="}],"description":"Construction on E 15TH ST westbound between IRVING PL (New York) and UNION SQ E (New York), Wednesday May 20th, 2026 thru Friday June 26th, 2026, Sunday thru Saturday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T17:38:23Z"},"road_event_id":"8jz9ZRsSUTF+x2nQuhhS+ha2Qrc=","beginning_cross_street":"IRVING PL","ending_cross_street":"UNION SQ E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988343,40.734686]]}},{"id":"sihcrGg3/DK8JvbZtM91KiHRmLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 15TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xU3L6j8k0Iy2JeNtO4sMIq2ElvE="},{"type":"next-occurrence","id":"7M/noW9ltqsv4b2oZMCQfLOcebc="}],"description":"Construction on E 15TH ST westbound between IRVING PL (New York) and UNION SQ E (New York), Wednesday May 20th, 2026 thru Friday June 26th, 2026, Sunday thru Saturday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T17:38:23Z"},"road_event_id":"sihcrGg3/DK8JvbZtM91KiHRmLI=","beginning_cross_street":"IRVING PL","ending_cross_street":"UNION SQ E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T12:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988343,40.734686]]}},{"id":"7M/noW9ltqsv4b2oZMCQfLOcebc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 15TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xU3L6j8k0Iy2JeNtO4sMIq2ElvE="},{"type":"next-occurrence","id":"ApSd6aLGPG4DqTaS5JQWYWZPN24="}],"description":"Construction on E 15TH ST westbound between IRVING PL (New York) and UNION SQ E (New York), Wednesday May 20th, 2026 thru Friday June 26th, 2026, Sunday thru Saturday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T17:38:23Z"},"road_event_id":"7M/noW9ltqsv4b2oZMCQfLOcebc=","beginning_cross_street":"IRVING PL","ending_cross_street":"UNION SQ E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T12:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988343,40.734686]]}},{"id":"ApSd6aLGPG4DqTaS5JQWYWZPN24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 15TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xU3L6j8k0Iy2JeNtO4sMIq2ElvE="},{"type":"next-occurrence","id":"jLE0vVR9E6I2kYo3tJkU3W6fAVg="}],"description":"Construction on E 15TH ST westbound between IRVING PL (New York) and UNION SQ E (New York), Wednesday May 20th, 2026 thru Friday June 26th, 2026, Sunday thru Saturday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T17:38:23Z"},"road_event_id":"ApSd6aLGPG4DqTaS5JQWYWZPN24=","beginning_cross_street":"IRVING PL","ending_cross_street":"UNION SQ E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T12:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988343,40.734686]]}},{"id":"jLE0vVR9E6I2kYo3tJkU3W6fAVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 15TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xU3L6j8k0Iy2JeNtO4sMIq2ElvE="},{"type":"next-occurrence","id":"dBQp4qLaGST8VQvsnffPIETni3Y="}],"description":"Construction on E 15TH ST westbound between IRVING PL (New York) and UNION SQ E (New York), Wednesday May 20th, 2026 thru Friday June 26th, 2026, Sunday thru Saturday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T17:38:23Z"},"road_event_id":"jLE0vVR9E6I2kYo3tJkU3W6fAVg=","beginning_cross_street":"IRVING PL","ending_cross_street":"UNION SQ E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T12:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988343,40.734686]]}},{"id":"dBQp4qLaGST8VQvsnffPIETni3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 15TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xU3L6j8k0Iy2JeNtO4sMIq2ElvE="},{"type":"next-occurrence","id":"GBInpzBEEknH4zUojyuk1qsUZCQ="}],"description":"Construction on E 15TH ST westbound between IRVING PL (New York) and UNION SQ E (New York), Wednesday May 20th, 2026 thru Friday June 26th, 2026, Sunday thru Saturday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T17:38:23Z"},"road_event_id":"dBQp4qLaGST8VQvsnffPIETni3Y=","beginning_cross_street":"IRVING PL","ending_cross_street":"UNION SQ E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T12:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988343,40.734686]]}},{"id":"GBInpzBEEknH4zUojyuk1qsUZCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 15TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xU3L6j8k0Iy2JeNtO4sMIq2ElvE="}],"description":"Construction on E 15TH ST westbound between IRVING PL (New York) and UNION SQ E (New York), Wednesday May 20th, 2026 thru Friday June 26th, 2026, Sunday thru Saturday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T17:38:23Z"},"road_event_id":"GBInpzBEEknH4zUojyuk1qsUZCQ=","beginning_cross_street":"IRVING PL","ending_cross_street":"UNION SQ E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T12:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988343,40.734686]]}},{"id":"iGHrzUig+kqMKjlOqaKqvCsd2CQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hkn33Q1S8R7bxIQm5m3rTxcbL7k="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:43:21Z"},"road_event_id":"iGHrzUig+kqMKjlOqaKqvCsd2CQ=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998672,40.739864]]}},{"id":"hkn33Q1S8R7bxIQm5m3rTxcbL7k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGHrzUig+kqMKjlOqaKqvCsd2CQ="},{"type":"next-occurrence","id":"vOO76nVyICazIGjSMuYQw1wCUOA="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:43:21Z"},"road_event_id":"hkn33Q1S8R7bxIQm5m3rTxcbL7k=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998672,40.739864]]}},{"id":"vOO76nVyICazIGjSMuYQw1wCUOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGHrzUig+kqMKjlOqaKqvCsd2CQ="},{"type":"next-occurrence","id":"4FQDFq0PlS6Xl5ikK8W6PQgqOJ8="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:43:21Z"},"road_event_id":"vOO76nVyICazIGjSMuYQw1wCUOA=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998672,40.739864]]}},{"id":"4FQDFq0PlS6Xl5ikK8W6PQgqOJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGHrzUig+kqMKjlOqaKqvCsd2CQ="},{"type":"next-occurrence","id":"IPsoP0RqUtl5mAlyEpjMFOvbfXI="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:43:21Z"},"road_event_id":"4FQDFq0PlS6Xl5ikK8W6PQgqOJ8=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998672,40.739864]]}},{"id":"IPsoP0RqUtl5mAlyEpjMFOvbfXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGHrzUig+kqMKjlOqaKqvCsd2CQ="},{"type":"next-occurrence","id":"Wn+isIZQBWTd13hNa6n7LQ5Lero="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:43:21Z"},"road_event_id":"IPsoP0RqUtl5mAlyEpjMFOvbfXI=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998672,40.739864]]}},{"id":"Wn+isIZQBWTd13hNa6n7LQ5Lero=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGHrzUig+kqMKjlOqaKqvCsd2CQ="},{"type":"next-occurrence","id":"SZ0EdNe5qWJMYqIZmyI/L33SFwc="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:43:21Z"},"road_event_id":"Wn+isIZQBWTd13hNa6n7LQ5Lero=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998672,40.739864]]}},{"id":"SZ0EdNe5qWJMYqIZmyI/L33SFwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGHrzUig+kqMKjlOqaKqvCsd2CQ="},{"type":"next-occurrence","id":"LEKqB8d6iWc3v/1uG+g6cKNM3Kg="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:43:21Z"},"road_event_id":"SZ0EdNe5qWJMYqIZmyI/L33SFwc=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998672,40.739864]]}},{"id":"LEKqB8d6iWc3v/1uG+g6cKNM3Kg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGHrzUig+kqMKjlOqaKqvCsd2CQ="},{"type":"next-occurrence","id":"Jn0y4uyVk6ILx4eGM305/dxuYEs="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:43:21Z"},"road_event_id":"LEKqB8d6iWc3v/1uG+g6cKNM3Kg=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998672,40.739864]]}},{"id":"Jn0y4uyVk6ILx4eGM305/dxuYEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGHrzUig+kqMKjlOqaKqvCsd2CQ="},{"type":"next-occurrence","id":"Anc2nFH7FOzLYQLa7WjTJ9JKKZ0="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:43:21Z"},"road_event_id":"Jn0y4uyVk6ILx4eGM305/dxuYEs=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998672,40.739864]]}},{"id":"Anc2nFH7FOzLYQLa7WjTJ9JKKZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGHrzUig+kqMKjlOqaKqvCsd2CQ="},{"type":"next-occurrence","id":"yIiDHUjvuHYC13vQVN4e7gty9Xk="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:43:21Z"},"road_event_id":"Anc2nFH7FOzLYQLa7WjTJ9JKKZ0=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998672,40.739864]]}},{"id":"yIiDHUjvuHYC13vQVN4e7gty9Xk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGHrzUig+kqMKjlOqaKqvCsd2CQ="},{"type":"next-occurrence","id":"0JGeg0dx4uCUUgazPnAnuv8/pPo="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:43:21Z"},"road_event_id":"yIiDHUjvuHYC13vQVN4e7gty9Xk=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998672,40.739864]]}},{"id":"0JGeg0dx4uCUUgazPnAnuv8/pPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGHrzUig+kqMKjlOqaKqvCsd2CQ="},{"type":"next-occurrence","id":"FBceA1LFM4xxDb+WqnjRRVjTTpE="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:43:21Z"},"road_event_id":"0JGeg0dx4uCUUgazPnAnuv8/pPo=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998672,40.739864]]}},{"id":"FBceA1LFM4xxDb+WqnjRRVjTTpE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGHrzUig+kqMKjlOqaKqvCsd2CQ="},{"type":"next-occurrence","id":"Kl1+on1jgJWBphss6uhzHsejHSU="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:43:21Z"},"road_event_id":"FBceA1LFM4xxDb+WqnjRRVjTTpE=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998672,40.739864]]}},{"id":"Kl1+on1jgJWBphss6uhzHsejHSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iGHrzUig+kqMKjlOqaKqvCsd2CQ="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:43:21Z"},"road_event_id":"Kl1+on1jgJWBphss6uhzHsejHSU=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998672,40.739864]]}},{"id":"qOz4C9831srA+WXDXhN+Dg7caIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LDw817fyOP7vMhS+/9k5souNEjM="}],"description":"Construction on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:48:25Z"},"road_event_id":"qOz4C9831srA+WXDXhN+Dg7caIg=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005591,40.745846]]}},{"id":"LDw817fyOP7vMhS+/9k5souNEjM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qOz4C9831srA+WXDXhN+Dg7caIg="},{"type":"next-occurrence","id":"DSst7lr9b5V5er18g6B9Dfrs1vo="}],"description":"Construction on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:48:25Z"},"road_event_id":"LDw817fyOP7vMhS+/9k5souNEjM=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005591,40.745846]]}},{"id":"DSst7lr9b5V5er18g6B9Dfrs1vo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qOz4C9831srA+WXDXhN+Dg7caIg="},{"type":"next-occurrence","id":"pEnlkiHd0PaCFTfppz5Zg7Sgin4="}],"description":"Construction on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:48:25Z"},"road_event_id":"DSst7lr9b5V5er18g6B9Dfrs1vo=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005591,40.745846]]}},{"id":"pEnlkiHd0PaCFTfppz5Zg7Sgin4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qOz4C9831srA+WXDXhN+Dg7caIg="},{"type":"next-occurrence","id":"fmo1OrSmyGRSuDO0SxICNbgfzfE="}],"description":"Construction on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:48:25Z"},"road_event_id":"pEnlkiHd0PaCFTfppz5Zg7Sgin4=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005591,40.745846]]}},{"id":"fmo1OrSmyGRSuDO0SxICNbgfzfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qOz4C9831srA+WXDXhN+Dg7caIg="},{"type":"next-occurrence","id":"qeGNY0oV8DmnTVURV3iQhxL8ZFI="}],"description":"Construction on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:48:25Z"},"road_event_id":"fmo1OrSmyGRSuDO0SxICNbgfzfE=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005591,40.745846]]}},{"id":"qeGNY0oV8DmnTVURV3iQhxL8ZFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qOz4C9831srA+WXDXhN+Dg7caIg="},{"type":"next-occurrence","id":"4vr0eUPiK1hQz2X7r2kLRNDJFkY="}],"description":"Construction on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:48:25Z"},"road_event_id":"qeGNY0oV8DmnTVURV3iQhxL8ZFI=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005591,40.745846]]}},{"id":"4vr0eUPiK1hQz2X7r2kLRNDJFkY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qOz4C9831srA+WXDXhN+Dg7caIg="},{"type":"next-occurrence","id":"YetS3ur2benHQ7+O3ToktICMA40="}],"description":"Construction on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:48:25Z"},"road_event_id":"4vr0eUPiK1hQz2X7r2kLRNDJFkY=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005591,40.745846]]}},{"id":"YetS3ur2benHQ7+O3ToktICMA40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qOz4C9831srA+WXDXhN+Dg7caIg="},{"type":"next-occurrence","id":"ysGBhu+5aUvv5jcd3zkO9tWKncU="}],"description":"Construction on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:48:25Z"},"road_event_id":"YetS3ur2benHQ7+O3ToktICMA40=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005591,40.745846]]}},{"id":"ysGBhu+5aUvv5jcd3zkO9tWKncU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qOz4C9831srA+WXDXhN+Dg7caIg="},{"type":"next-occurrence","id":"GYRas0POiwGXvOb4rI35/fNmB5c="}],"description":"Construction on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:48:25Z"},"road_event_id":"ysGBhu+5aUvv5jcd3zkO9tWKncU=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005591,40.745846]]}},{"id":"GYRas0POiwGXvOb4rI35/fNmB5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qOz4C9831srA+WXDXhN+Dg7caIg="},{"type":"next-occurrence","id":"HdOk42qnySQR/qGcKIZ4IqB+w2I="}],"description":"Construction on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:48:25Z"},"road_event_id":"GYRas0POiwGXvOb4rI35/fNmB5c=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005591,40.745846]]}},{"id":"HdOk42qnySQR/qGcKIZ4IqB+w2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qOz4C9831srA+WXDXhN+Dg7caIg="},{"type":"next-occurrence","id":"S2xxMaQ8Gv0MlS4QIYI/uMW8YO0="}],"description":"Construction on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:48:25Z"},"road_event_id":"HdOk42qnySQR/qGcKIZ4IqB+w2I=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005591,40.745846]]}},{"id":"S2xxMaQ8Gv0MlS4QIYI/uMW8YO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qOz4C9831srA+WXDXhN+Dg7caIg="},{"type":"next-occurrence","id":"O3AhQd3OMEOL01/tyCsxNBH+dGQ="}],"description":"Construction on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:48:25Z"},"road_event_id":"S2xxMaQ8Gv0MlS4QIYI/uMW8YO0=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005591,40.745846]]}},{"id":"O3AhQd3OMEOL01/tyCsxNBH+dGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qOz4C9831srA+WXDXhN+Dg7caIg="},{"type":"next-occurrence","id":"phxtK2+h4aF6fY3qGmmUtk3tbE4="}],"description":"Construction on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:48:25Z"},"road_event_id":"O3AhQd3OMEOL01/tyCsxNBH+dGQ=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005591,40.745846]]}},{"id":"phxtK2+h4aF6fY3qGmmUtk3tbE4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qOz4C9831srA+WXDXhN+Dg7caIg="}],"description":"Construction on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T17:48:25Z"},"road_event_id":"phxtK2+h4aF6fY3qGmmUtk3tbE4=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005591,40.745846]]}},{"id":"YOcUV3thIqQ20hFRnUp0IDOj2ms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sxB+D0Dj5MDiDLQ4ytjTkyOmah8="}],"description":"Repaving on I-81 northbound between East Seneca Turnpike; NY 173 (Syracuse) and Exit 1A - E Glen Ave (Syracuse) ; Alternating left and right lane closures, Saturday May 30th, 2026 thru Saturday June 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 08:00 PM All lanes open","update_date":"2026-05-28T16:38:18Z"},"road_event_id":"YOcUV3thIqQ20hFRnUp0IDOj2ms=","beginning_cross_street":"East Seneca Turnpike; NY 173","ending_cross_street":"Exit 1A - E Glen Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-06T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.133947,43.002647]]}},{"id":"sxB+D0Dj5MDiDLQ4ytjTkyOmah8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YOcUV3thIqQ20hFRnUp0IDOj2ms="}],"description":"Repaving on I-81 northbound between East Seneca Turnpike; NY 173 (Syracuse) and Exit 1A - E Glen Ave (Syracuse) ; Alternating left and right lane closures, Saturday May 30th, 2026 thru Saturday June 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 08:00 PM All lanes open","update_date":"2026-05-28T16:38:18Z"},"road_event_id":"sxB+D0Dj5MDiDLQ4ytjTkyOmah8=","beginning_cross_street":"East Seneca Turnpike; NY 173","ending_cross_street":"Exit 1A - E Glen Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-07T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.133947,43.002647]]}},{"id":"NvY7UL1Xy/j1apSwbh7B4JPfW1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 27TH ST"],"direction":"unknown","related_road_events":[],"description":"Construction on E 27TH ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Wednesday May 20th, 2026 thru Saturday June 6th, 2026, Saturday/ Sunday, 07:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T17:47:41Z"},"road_event_id":"NvY7UL1Xy/j1apSwbh7B4JPfW1A=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986179,40.743402]]}},{"id":"5na/o20eYuFtGHVzi0dDXqqsNUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 35TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"oHFAl+/xEFu6f4ayXLWYphb1rKc="}],"description":"Construction on E 35TH ST westbound between PARK AVE (New York) and MADISON AVE (New York), Wednesday May 20th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 06:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T17:53:39Z"},"road_event_id":"5na/o20eYuFtGHVzi0dDXqqsNUU=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980965,40.747796]]}},{"id":"oHFAl+/xEFu6f4ayXLWYphb1rKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 35TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5na/o20eYuFtGHVzi0dDXqqsNUU="}],"description":"Construction on E 35TH ST westbound between PARK AVE (New York) and MADISON AVE (New York), Wednesday May 20th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 06:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T17:53:39Z"},"road_event_id":"oHFAl+/xEFu6f4ayXLWYphb1rKc=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T10:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980965,40.747796]]}},{"id":"tkXCYTNPqmdVYUS1JpZIpyTOF5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"U4TqQ+HzFzVXf0Lv5f44RM7/ndM="}],"description":"Construction on W 48TH ST eastbound between 6TH AVE (New York) and 5TH AVE (New York), Wednesday May 20th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-20T17:59:12Z"},"road_event_id":"tkXCYTNPqmdVYUS1JpZIpyTOF5A=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981245,40.758617]]}},{"id":"U4TqQ+HzFzVXf0Lv5f44RM7/ndM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tkXCYTNPqmdVYUS1JpZIpyTOF5A="},{"type":"next-occurrence","id":"5yXjIHucwR5zOOCp48KxFa1H0JU="}],"description":"Construction on W 48TH ST eastbound between 6TH AVE (New York) and 5TH AVE (New York), Wednesday May 20th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-20T17:59:12Z"},"road_event_id":"U4TqQ+HzFzVXf0Lv5f44RM7/ndM=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T02:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981245,40.758617]]}},{"id":"5yXjIHucwR5zOOCp48KxFa1H0JU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tkXCYTNPqmdVYUS1JpZIpyTOF5A="}],"description":"Construction on W 48TH ST eastbound between 6TH AVE (New York) and 5TH AVE (New York), Wednesday May 20th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-20T17:59:12Z"},"road_event_id":"5yXjIHucwR5zOOCp48KxFa1H0JU=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T02:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981245,40.758617]]}},{"id":"KTNRoF62m/j3AkrEGcyjZFArQHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yEbI2BTpBDs+9ZSRM+Ud8ZGG8rg="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York) for major service., Friday May 22nd, 2026 thru Saturday June 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-20T18:05:22Z"},"road_event_id":"KTNRoF62m/j3AkrEGcyjZFArQHc=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965187,40.714292]]}},{"id":"yEbI2BTpBDs+9ZSRM+Ud8ZGG8rg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KTNRoF62m/j3AkrEGcyjZFArQHc="},{"type":"next-occurrence","id":"O5i7AVJdpyhQzUKx3yOrYjJpzqA="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York) for major service., Friday May 22nd, 2026 thru Saturday June 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-20T18:05:22Z"},"road_event_id":"yEbI2BTpBDs+9ZSRM+Ud8ZGG8rg=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965187,40.714292]]}},{"id":"O5i7AVJdpyhQzUKx3yOrYjJpzqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KTNRoF62m/j3AkrEGcyjZFArQHc="},{"type":"next-occurrence","id":"LVu8r5lQGZB3QFJEZQc8/PgpdnI="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York) for major service., Friday May 22nd, 2026 thru Saturday June 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-20T18:05:22Z"},"road_event_id":"O5i7AVJdpyhQzUKx3yOrYjJpzqA=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965187,40.714292]]}},{"id":"LVu8r5lQGZB3QFJEZQc8/PgpdnI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KTNRoF62m/j3AkrEGcyjZFArQHc="},{"type":"next-occurrence","id":"GcSjG45lz32fFXZXiPtXZxYFT98="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York) for major service., Friday May 22nd, 2026 thru Saturday June 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-20T18:05:22Z"},"road_event_id":"LVu8r5lQGZB3QFJEZQc8/PgpdnI=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965187,40.714292]]}},{"id":"GcSjG45lz32fFXZXiPtXZxYFT98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KTNRoF62m/j3AkrEGcyjZFArQHc="},{"type":"next-occurrence","id":"OCFo3PsaC5bnMmIXoRuo7GIk52w="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York) for major service., Friday May 22nd, 2026 thru Saturday June 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-20T18:05:22Z"},"road_event_id":"GcSjG45lz32fFXZXiPtXZxYFT98=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965187,40.714292]]}},{"id":"OCFo3PsaC5bnMmIXoRuo7GIk52w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KTNRoF62m/j3AkrEGcyjZFArQHc="},{"type":"next-occurrence","id":"6+SjBuOwNZodbl5tSUi6whrnQwU="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York) for major service., Friday May 22nd, 2026 thru Saturday June 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-20T18:05:22Z"},"road_event_id":"OCFo3PsaC5bnMmIXoRuo7GIk52w=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965187,40.714292]]}},{"id":"6+SjBuOwNZodbl5tSUi6whrnQwU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KTNRoF62m/j3AkrEGcyjZFArQHc="},{"type":"next-occurrence","id":"VPhz2vNNwUVDCi2VKYZ+7fbCcBg="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York) for major service., Friday May 22nd, 2026 thru Saturday June 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-20T18:05:22Z"},"road_event_id":"6+SjBuOwNZodbl5tSUi6whrnQwU=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965187,40.714292]]}},{"id":"VPhz2vNNwUVDCi2VKYZ+7fbCcBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KTNRoF62m/j3AkrEGcyjZFArQHc="},{"type":"next-occurrence","id":"c803u+6BiZEhIsVyWFYqONSl3nw="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York) for major service., Friday May 22nd, 2026 thru Saturday June 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-20T18:05:22Z"},"road_event_id":"VPhz2vNNwUVDCi2VKYZ+7fbCcBg=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965187,40.714292]]}},{"id":"c803u+6BiZEhIsVyWFYqONSl3nw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KTNRoF62m/j3AkrEGcyjZFArQHc="},{"type":"next-occurrence","id":"NY8OxkWz+QaTmtO24B+wYw39al0="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York) for major service., Friday May 22nd, 2026 thru Saturday June 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-20T18:05:22Z"},"road_event_id":"c803u+6BiZEhIsVyWFYqONSl3nw=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965187,40.714292]]}},{"id":"NY8OxkWz+QaTmtO24B+wYw39al0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KTNRoF62m/j3AkrEGcyjZFArQHc="},{"type":"next-occurrence","id":"U01XLdrza9b1J5XgRLZx/EN+ssc="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York) for major service., Friday May 22nd, 2026 thru Saturday June 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-20T18:05:22Z"},"road_event_id":"NY8OxkWz+QaTmtO24B+wYw39al0=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965187,40.714292]]}},{"id":"U01XLdrza9b1J5XgRLZx/EN+ssc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KTNRoF62m/j3AkrEGcyjZFArQHc="},{"type":"next-occurrence","id":"5eS8LQEicJnUj2+s7kIoLGWOo5k="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York) for major service., Friday May 22nd, 2026 thru Saturday June 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-20T18:05:22Z"},"road_event_id":"U01XLdrza9b1J5XgRLZx/EN+ssc=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965187,40.714292]]}},{"id":"5eS8LQEicJnUj2+s7kIoLGWOo5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KTNRoF62m/j3AkrEGcyjZFArQHc="},{"type":"next-occurrence","id":"AU18gYN6q/AXjnIAMzqiKAGg/7Q="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York) for major service., Friday May 22nd, 2026 thru Saturday June 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-20T18:05:22Z"},"road_event_id":"5eS8LQEicJnUj2+s7kIoLGWOo5k=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965187,40.714292]]}},{"id":"AU18gYN6q/AXjnIAMzqiKAGg/7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KTNRoF62m/j3AkrEGcyjZFArQHc="},{"type":"next-occurrence","id":"DAt9/EvFio8M2GT7ZkfvslMrKP8="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York) for major service., Friday May 22nd, 2026 thru Saturday June 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-20T18:05:22Z"},"road_event_id":"AU18gYN6q/AXjnIAMzqiKAGg/7Q=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965187,40.714292]]}},{"id":"DAt9/EvFio8M2GT7ZkfvslMrKP8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KTNRoF62m/j3AkrEGcyjZFArQHc="},{"type":"next-occurrence","id":"52jXriOWuYfBuHZJNnPdZXrJah8="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York) for major service., Friday May 22nd, 2026 thru Saturday June 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-20T18:05:22Z"},"road_event_id":"DAt9/EvFio8M2GT7ZkfvslMrKP8=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965187,40.714292]]}},{"id":"52jXriOWuYfBuHZJNnPdZXrJah8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KTNRoF62m/j3AkrEGcyjZFArQHc="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York) for major service., Friday May 22nd, 2026 thru Saturday June 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-20T18:05:22Z"},"road_event_id":"52jXriOWuYfBuHZJNnPdZXrJah8=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965187,40.714292]]}},{"id":"tC+epfth7B2qll1lhXXmb5nCDdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xRhZj61KJI8Jt6PthrHlrpUXOVk="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York) to lift and remove materials from roof top with use of knuckle boom., Wednesday May 20th, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T18:16:39Z"},"road_event_id":"tC+epfth7B2qll1lhXXmb5nCDdE=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996272,40.690715]]}},{"id":"xRhZj61KJI8Jt6PthrHlrpUXOVk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tC+epfth7B2qll1lhXXmb5nCDdE="},{"type":"next-occurrence","id":"o1m8COACOHOJTBnzz7We+nDFiHs="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York) to lift and remove materials from roof top with use of knuckle boom., Wednesday May 20th, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T18:16:39Z"},"road_event_id":"xRhZj61KJI8Jt6PthrHlrpUXOVk=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996272,40.690715]]}},{"id":"o1m8COACOHOJTBnzz7We+nDFiHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tC+epfth7B2qll1lhXXmb5nCDdE="},{"type":"next-occurrence","id":"fBW7yFu9vt9ZwhP+eVBEudK9bok="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York) to lift and remove materials from roof top with use of knuckle boom., Wednesday May 20th, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T18:16:39Z"},"road_event_id":"o1m8COACOHOJTBnzz7We+nDFiHs=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996272,40.690715]]}},{"id":"fBW7yFu9vt9ZwhP+eVBEudK9bok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tC+epfth7B2qll1lhXXmb5nCDdE="},{"type":"next-occurrence","id":"29oKbHr8s2A3ACMPOhcnM5Pln2I="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York) to lift and remove materials from roof top with use of knuckle boom., Wednesday May 20th, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T18:16:39Z"},"road_event_id":"fBW7yFu9vt9ZwhP+eVBEudK9bok=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996272,40.690715]]}},{"id":"29oKbHr8s2A3ACMPOhcnM5Pln2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tC+epfth7B2qll1lhXXmb5nCDdE="},{"type":"next-occurrence","id":"DNpxACb+nTpVI8vcso3gcpi7wk0="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York) to lift and remove materials from roof top with use of knuckle boom., Wednesday May 20th, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T18:16:39Z"},"road_event_id":"29oKbHr8s2A3ACMPOhcnM5Pln2I=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996272,40.690715]]}},{"id":"DNpxACb+nTpVI8vcso3gcpi7wk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tC+epfth7B2qll1lhXXmb5nCDdE="},{"type":"next-occurrence","id":"abBjqu0n8S7ORvMac42lAPpRhao="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York) to lift and remove materials from roof top with use of knuckle boom., Wednesday May 20th, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T18:16:39Z"},"road_event_id":"DNpxACb+nTpVI8vcso3gcpi7wk0=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996272,40.690715]]}},{"id":"abBjqu0n8S7ORvMac42lAPpRhao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tC+epfth7B2qll1lhXXmb5nCDdE="},{"type":"next-occurrence","id":"0NXaBuKWgjOIV8H2O/quvwviYao="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York) to lift and remove materials from roof top with use of knuckle boom., Wednesday May 20th, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T18:16:39Z"},"road_event_id":"abBjqu0n8S7ORvMac42lAPpRhao=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T14:00:00Z","end_date":"2026-06-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996272,40.690715]]}},{"id":"0NXaBuKWgjOIV8H2O/quvwviYao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tC+epfth7B2qll1lhXXmb5nCDdE="},{"type":"next-occurrence","id":"zrDVN61SdMPIVdZfdECe4uA7GVw="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York) to lift and remove materials from roof top with use of knuckle boom., Wednesday May 20th, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T18:16:39Z"},"road_event_id":"0NXaBuKWgjOIV8H2O/quvwviYao=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T14:00:00Z","end_date":"2026-06-16T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996272,40.690715]]}},{"id":"zrDVN61SdMPIVdZfdECe4uA7GVw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tC+epfth7B2qll1lhXXmb5nCDdE="},{"type":"next-occurrence","id":"i27MGz42/9Z9Zk4BBslwAIJ9MfU="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York) to lift and remove materials from roof top with use of knuckle boom., Wednesday May 20th, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T18:16:39Z"},"road_event_id":"zrDVN61SdMPIVdZfdECe4uA7GVw=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T14:00:00Z","end_date":"2026-06-17T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996272,40.690715]]}},{"id":"i27MGz42/9Z9Zk4BBslwAIJ9MfU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tC+epfth7B2qll1lhXXmb5nCDdE="},{"type":"next-occurrence","id":"1gTvP0VmEeRIAW/0/NvIjlVekeE="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York) to lift and remove materials from roof top with use of knuckle boom., Wednesday May 20th, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T18:16:39Z"},"road_event_id":"i27MGz42/9Z9Zk4BBslwAIJ9MfU=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T14:00:00Z","end_date":"2026-06-18T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996272,40.690715]]}},{"id":"1gTvP0VmEeRIAW/0/NvIjlVekeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tC+epfth7B2qll1lhXXmb5nCDdE="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York) to lift and remove materials from roof top with use of knuckle boom., Wednesday May 20th, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T18:16:39Z"},"road_event_id":"1gTvP0VmEeRIAW/0/NvIjlVekeE=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T14:00:00Z","end_date":"2026-06-19T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996272,40.690715]]}},{"id":"V5j1skHMXpFfhC9kkBca3RTYOuU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HOYT ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MFtXkKNzyCZTSm+ofxCvR3D5CDQ="}],"description":"Construction on HOYT ST southbound between FULTON ST (New York) and LIVINGSTON ST (New York) for concrete pour on 10th Floor., Saturday May 23rd, 2026 thru Saturday June 6th, 2026, Sunday thru Saturday, 08:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-20T18:18:36Z"},"road_event_id":"V5j1skHMXpFfhC9kkBca3RTYOuU=","beginning_cross_street":"FULTON ST","ending_cross_street":"LIVINGSTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T12:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985152,40.69053]]}},{"id":"MFtXkKNzyCZTSm+ofxCvR3D5CDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HOYT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V5j1skHMXpFfhC9kkBca3RTYOuU="}],"description":"Construction on HOYT ST southbound between FULTON ST (New York) and LIVINGSTON ST (New York) for concrete pour on 10th Floor., Saturday May 23rd, 2026 thru Saturday June 6th, 2026, Sunday thru Saturday, 08:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-20T18:18:36Z"},"road_event_id":"MFtXkKNzyCZTSm+ofxCvR3D5CDQ=","beginning_cross_street":"FULTON ST","ending_cross_street":"LIVINGSTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985152,40.69053]]}},{"id":"KCrWKlxfC6yQXUARZjDmMnGh2LY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ljk/kP023kuylTQn4zqI2CpgOMk="}],"description":"Construction on BRIDGE ST westbound between WILLOUGHBY ST (New York) and FULTON ST (New York) for associated closure., Saturday May 23rd, 2026 thru Saturday June 6th, 2026, Sunday thru Saturday, 08:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-20T18:21:18Z"},"road_event_id":"KCrWKlxfC6yQXUARZjDmMnGh2LY=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T12:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985293,40.692105]]}},{"id":"ljk/kP023kuylTQn4zqI2CpgOMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KCrWKlxfC6yQXUARZjDmMnGh2LY="}],"description":"Construction on BRIDGE ST westbound between WILLOUGHBY ST (New York) and FULTON ST (New York) for associated closure., Saturday May 23rd, 2026 thru Saturday June 6th, 2026, Sunday thru Saturday, 08:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-20T18:21:18Z"},"road_event_id":"ljk/kP023kuylTQn4zqI2CpgOMk=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985293,40.692105]]}},{"id":"EJcapqmhiA4xBq+5IgDkYxZ/K9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 56TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/Eqs2+sDdJXUDg5zHxbfc/XAtjk="}],"description":"Construction on E 56TH ST eastbound between 2ND AVE (New York) and 1ST AVE (New York), Wednesday May 20th, 2026 thru Sunday June 28th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday May 20th, 2026 thru Sunday June 28th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:25:45Z"},"road_event_id":"EJcapqmhiA4xBq+5IgDkYxZ/K9g=","beginning_cross_street":"2ND AVE","ending_cross_street":"1ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96577,40.758627]]}},{"id":"/Eqs2+sDdJXUDg5zHxbfc/XAtjk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 56TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJcapqmhiA4xBq+5IgDkYxZ/K9g="},{"type":"next-occurrence","id":"dSFUZab/W2WokGOj2v3vog3XQ+Y="}],"description":"Construction on E 56TH ST eastbound between 2ND AVE (New York) and 1ST AVE (New York), Wednesday May 20th, 2026 thru Sunday June 28th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday May 20th, 2026 thru Sunday June 28th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:25:45Z"},"road_event_id":"/Eqs2+sDdJXUDg5zHxbfc/XAtjk=","beginning_cross_street":"2ND AVE","ending_cross_street":"1ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96577,40.758627]]}},{"id":"dSFUZab/W2WokGOj2v3vog3XQ+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 56TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJcapqmhiA4xBq+5IgDkYxZ/K9g="},{"type":"next-occurrence","id":"WHl3rVSvOE5z4ryOG6flZUGiQ0k="}],"description":"Construction on E 56TH ST eastbound between 2ND AVE (New York) and 1ST AVE (New York), Wednesday May 20th, 2026 thru Sunday June 28th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday May 20th, 2026 thru Sunday June 28th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:25:45Z"},"road_event_id":"dSFUZab/W2WokGOj2v3vog3XQ+Y=","beginning_cross_street":"2ND AVE","ending_cross_street":"1ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96577,40.758627]]}},{"id":"WHl3rVSvOE5z4ryOG6flZUGiQ0k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 56TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJcapqmhiA4xBq+5IgDkYxZ/K9g="}],"description":"Construction on E 56TH ST eastbound between 2ND AVE (New York) and 1ST AVE (New York), Wednesday May 20th, 2026 thru Sunday June 28th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday May 20th, 2026 thru Sunday June 28th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:25:45Z"},"road_event_id":"WHl3rVSvOE5z4ryOG6flZUGiQ0k=","beginning_cross_street":"2ND AVE","ending_cross_street":"1ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96577,40.758627]]}},{"id":"AIaP/pnW0GT7aj1cU79Gr5e///o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 59TH ST"],"direction":"unknown","related_road_events":[],"description":"Construction on E 59TH ST eastbound between PARK AVE (New York), Wednesday May 20th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:31:45Z"},"road_event_id":"AIaP/pnW0GT7aj1cU79Gr5e///o=","beginning_cross_street":"PARK AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.969615,40.762838]]}},{"id":"z0DCz5zp7gG6VvTzkh8/GKjQFqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 66TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rnITl89G6z4u7NM0keci2rr63Mw="}],"description":"Construction on E 66TH ST westbound between LEXINGTON AVE (New York) and PARK AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:30 AM thru 04:30 PM All lanes closed","update_date":"2026-05-20T18:35:19Z"},"road_event_id":"z0DCz5zp7gG6VvTzkh8/GKjQFqk=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T12:30:00Z","end_date":"2026-06-05T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96504,40.766635]]}},{"id":"rnITl89G6z4u7NM0keci2rr63Mw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 66TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z0DCz5zp7gG6VvTzkh8/GKjQFqk="},{"type":"next-occurrence","id":"jLIJEcU9hEeZMI9F9HqRQvlPwew="}],"description":"Construction on E 66TH ST westbound between LEXINGTON AVE (New York) and PARK AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:30 AM thru 04:30 PM All lanes closed","update_date":"2026-05-20T18:35:19Z"},"road_event_id":"rnITl89G6z4u7NM0keci2rr63Mw=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:30:00Z","end_date":"2026-06-06T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96504,40.766635]]}},{"id":"jLIJEcU9hEeZMI9F9HqRQvlPwew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 66TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z0DCz5zp7gG6VvTzkh8/GKjQFqk="},{"type":"next-occurrence","id":"uHDFZUk8/JPcUNdHCe3GZzMn5Z0="}],"description":"Construction on E 66TH ST westbound between LEXINGTON AVE (New York) and PARK AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:30 AM thru 04:30 PM All lanes closed","update_date":"2026-05-20T18:35:19Z"},"road_event_id":"jLIJEcU9hEeZMI9F9HqRQvlPwew=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T12:30:00Z","end_date":"2026-06-07T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96504,40.766635]]}},{"id":"uHDFZUk8/JPcUNdHCe3GZzMn5Z0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 66TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z0DCz5zp7gG6VvTzkh8/GKjQFqk="},{"type":"next-occurrence","id":"8xjjMHRT/nNdSfxbFZCGrepS7vI="}],"description":"Construction on E 66TH ST westbound between LEXINGTON AVE (New York) and PARK AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:30 AM thru 04:30 PM All lanes closed","update_date":"2026-05-20T18:35:19Z"},"road_event_id":"uHDFZUk8/JPcUNdHCe3GZzMn5Z0=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:30:00Z","end_date":"2026-06-08T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96504,40.766635]]}},{"id":"8xjjMHRT/nNdSfxbFZCGrepS7vI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 66TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z0DCz5zp7gG6VvTzkh8/GKjQFqk="},{"type":"next-occurrence","id":"CG4Nj2uQ6CqbFeaUDSvDeYZW+0I="}],"description":"Construction on E 66TH ST westbound between LEXINGTON AVE (New York) and PARK AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:30 AM thru 04:30 PM All lanes closed","update_date":"2026-05-20T18:35:19Z"},"road_event_id":"8xjjMHRT/nNdSfxbFZCGrepS7vI=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:30:00Z","end_date":"2026-06-09T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96504,40.766635]]}},{"id":"CG4Nj2uQ6CqbFeaUDSvDeYZW+0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 66TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z0DCz5zp7gG6VvTzkh8/GKjQFqk="},{"type":"next-occurrence","id":"oinOVzcS+npxtQw83nyYl7GjHB8="}],"description":"Construction on E 66TH ST westbound between LEXINGTON AVE (New York) and PARK AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:30 AM thru 04:30 PM All lanes closed","update_date":"2026-05-20T18:35:19Z"},"road_event_id":"CG4Nj2uQ6CqbFeaUDSvDeYZW+0I=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:30:00Z","end_date":"2026-06-10T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96504,40.766635]]}},{"id":"oinOVzcS+npxtQw83nyYl7GjHB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 66TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z0DCz5zp7gG6VvTzkh8/GKjQFqk="},{"type":"next-occurrence","id":"DKBltx82rNZFEU2jMDXJzZy7/YI="}],"description":"Construction on E 66TH ST westbound between LEXINGTON AVE (New York) and PARK AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:30 AM thru 04:30 PM All lanes closed","update_date":"2026-05-20T18:35:19Z"},"road_event_id":"oinOVzcS+npxtQw83nyYl7GjHB8=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:30:00Z","end_date":"2026-06-11T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96504,40.766635]]}},{"id":"DKBltx82rNZFEU2jMDXJzZy7/YI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 66TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z0DCz5zp7gG6VvTzkh8/GKjQFqk="},{"type":"next-occurrence","id":"MJJGGMGlzTVz2ieJ+VLI0FKsVoU="}],"description":"Construction on E 66TH ST westbound between LEXINGTON AVE (New York) and PARK AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:30 AM thru 04:30 PM All lanes closed","update_date":"2026-05-20T18:35:19Z"},"road_event_id":"DKBltx82rNZFEU2jMDXJzZy7/YI=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:30:00Z","end_date":"2026-06-12T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96504,40.766635]]}},{"id":"MJJGGMGlzTVz2ieJ+VLI0FKsVoU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 66TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z0DCz5zp7gG6VvTzkh8/GKjQFqk="},{"type":"next-occurrence","id":"GBkqIH3uFsi1VYvLwFJtqxn6F/8="}],"description":"Construction on E 66TH ST westbound between LEXINGTON AVE (New York) and PARK AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:30 AM thru 04:30 PM All lanes closed","update_date":"2026-05-20T18:35:19Z"},"road_event_id":"MJJGGMGlzTVz2ieJ+VLI0FKsVoU=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:30:00Z","end_date":"2026-06-13T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96504,40.766635]]}},{"id":"GBkqIH3uFsi1VYvLwFJtqxn6F/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 66TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z0DCz5zp7gG6VvTzkh8/GKjQFqk="},{"type":"next-occurrence","id":"kYzeT02JP2JUCnrV6GvjaHhpSOo="}],"description":"Construction on E 66TH ST westbound between LEXINGTON AVE (New York) and PARK AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:30 AM thru 04:30 PM All lanes closed","update_date":"2026-05-20T18:35:19Z"},"road_event_id":"GBkqIH3uFsi1VYvLwFJtqxn6F/8=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T12:30:00Z","end_date":"2026-06-14T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96504,40.766635]]}},{"id":"kYzeT02JP2JUCnrV6GvjaHhpSOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 66TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z0DCz5zp7gG6VvTzkh8/GKjQFqk="},{"type":"next-occurrence","id":"8ya1q1MlRv0IzCUFnBHcP1aCfZ8="}],"description":"Construction on E 66TH ST westbound between LEXINGTON AVE (New York) and PARK AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:30 AM thru 04:30 PM All lanes closed","update_date":"2026-05-20T18:35:19Z"},"road_event_id":"kYzeT02JP2JUCnrV6GvjaHhpSOo=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T12:30:00Z","end_date":"2026-06-15T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96504,40.766635]]}},{"id":"8ya1q1MlRv0IzCUFnBHcP1aCfZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 66TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z0DCz5zp7gG6VvTzkh8/GKjQFqk="},{"type":"next-occurrence","id":"p/UGAbgAQFxqn8T4bIERS+FGxOs="}],"description":"Construction on E 66TH ST westbound between LEXINGTON AVE (New York) and PARK AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:30 AM thru 04:30 PM All lanes closed","update_date":"2026-05-20T18:35:19Z"},"road_event_id":"8ya1q1MlRv0IzCUFnBHcP1aCfZ8=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T12:30:00Z","end_date":"2026-06-16T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96504,40.766635]]}},{"id":"p/UGAbgAQFxqn8T4bIERS+FGxOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 66TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z0DCz5zp7gG6VvTzkh8/GKjQFqk="},{"type":"next-occurrence","id":"QRTiW4gJ/k71avHpMpOC9dWCi90="}],"description":"Construction on E 66TH ST westbound between LEXINGTON AVE (New York) and PARK AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:30 AM thru 04:30 PM All lanes closed","update_date":"2026-05-20T18:35:19Z"},"road_event_id":"p/UGAbgAQFxqn8T4bIERS+FGxOs=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T12:30:00Z","end_date":"2026-06-17T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96504,40.766635]]}},{"id":"QRTiW4gJ/k71avHpMpOC9dWCi90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 66TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z0DCz5zp7gG6VvTzkh8/GKjQFqk="}],"description":"Construction on E 66TH ST westbound between LEXINGTON AVE (New York) and PARK AVE (New York), Wednesday May 20th, 2026 thru Thursday June 18th, 2026, Sunday thru Saturday, 08:30 AM thru 04:30 PM All lanes closed","update_date":"2026-05-20T18:35:19Z"},"road_event_id":"QRTiW4gJ/k71avHpMpOC9dWCi90=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T12:30:00Z","end_date":"2026-06-18T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96504,40.766635]]}},{"id":"Tf2tSXdST+khLN7xbgO1VnCt8Po=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54th Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HU26dEUp6sQimoobmugwu2kGSjE="}],"description":"Construction and crane operations on 54th Avenue westbound between 2nd Street (New York) and Center Boulevard (New York) for crawler crane assembly, daily operations, and disassembly to erect precast for new school., Wednesday May 20th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:30 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:38:06Z"},"road_event_id":"Tf2tSXdST+khLN7xbgO1VnCt8Po=","beginning_cross_street":"2nd Street","ending_cross_street":"Center Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T12:30:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.959395,40.740811]]}},{"id":"HU26dEUp6sQimoobmugwu2kGSjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tf2tSXdST+khLN7xbgO1VnCt8Po="},{"type":"next-occurrence","id":"rrnZLi/zZA4wnOVtDe7CeyWQn74="}],"description":"Construction and crane operations on 54th Avenue westbound between 2nd Street (New York) and Center Boulevard (New York) for crawler crane assembly, daily operations, and disassembly to erect precast for new school., Wednesday May 20th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:30 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:38:06Z"},"road_event_id":"HU26dEUp6sQimoobmugwu2kGSjE=","beginning_cross_street":"2nd Street","ending_cross_street":"Center Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:30:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.959395,40.740811]]}},{"id":"rrnZLi/zZA4wnOVtDe7CeyWQn74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tf2tSXdST+khLN7xbgO1VnCt8Po="},{"type":"next-occurrence","id":"vTPGdxaOvOyxX0OKXeR2TH+yAXY="}],"description":"Construction and crane operations on 54th Avenue westbound between 2nd Street (New York) and Center Boulevard (New York) for crawler crane assembly, daily operations, and disassembly to erect precast for new school., Wednesday May 20th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:30 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:38:06Z"},"road_event_id":"rrnZLi/zZA4wnOVtDe7CeyWQn74=","beginning_cross_street":"2nd Street","ending_cross_street":"Center Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:30:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.959395,40.740811]]}},{"id":"vTPGdxaOvOyxX0OKXeR2TH+yAXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tf2tSXdST+khLN7xbgO1VnCt8Po="},{"type":"next-occurrence","id":"WSnWik8G3qF0PVjKv9cwc1MZUio="}],"description":"Construction and crane operations on 54th Avenue westbound between 2nd Street (New York) and Center Boulevard (New York) for crawler crane assembly, daily operations, and disassembly to erect precast for new school., Wednesday May 20th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:30 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:38:06Z"},"road_event_id":"vTPGdxaOvOyxX0OKXeR2TH+yAXY=","beginning_cross_street":"2nd Street","ending_cross_street":"Center Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:30:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.959395,40.740811]]}},{"id":"WSnWik8G3qF0PVjKv9cwc1MZUio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tf2tSXdST+khLN7xbgO1VnCt8Po="},{"type":"next-occurrence","id":"gAmnUA09Vgn/z3MtOprEH4UCcHk="}],"description":"Construction and crane operations on 54th Avenue westbound between 2nd Street (New York) and Center Boulevard (New York) for crawler crane assembly, daily operations, and disassembly to erect precast for new school., Wednesday May 20th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:30 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:38:06Z"},"road_event_id":"WSnWik8G3qF0PVjKv9cwc1MZUio=","beginning_cross_street":"2nd Street","ending_cross_street":"Center Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:30:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.959395,40.740811]]}},{"id":"gAmnUA09Vgn/z3MtOprEH4UCcHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tf2tSXdST+khLN7xbgO1VnCt8Po="},{"type":"next-occurrence","id":"W0WQxD3l3NnDa+MMHo1Yw7mgqF4="}],"description":"Construction and crane operations on 54th Avenue westbound between 2nd Street (New York) and Center Boulevard (New York) for crawler crane assembly, daily operations, and disassembly to erect precast for new school., Wednesday May 20th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:30 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:38:06Z"},"road_event_id":"gAmnUA09Vgn/z3MtOprEH4UCcHk=","beginning_cross_street":"2nd Street","ending_cross_street":"Center Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:30:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.959395,40.740811]]}},{"id":"W0WQxD3l3NnDa+MMHo1Yw7mgqF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tf2tSXdST+khLN7xbgO1VnCt8Po="},{"type":"next-occurrence","id":"Dj5deWY5pUGc3Zq3xj/T6Bg6cyo="}],"description":"Construction and crane operations on 54th Avenue westbound between 2nd Street (New York) and Center Boulevard (New York) for crawler crane assembly, daily operations, and disassembly to erect precast for new school., Wednesday May 20th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:30 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:38:06Z"},"road_event_id":"W0WQxD3l3NnDa+MMHo1Yw7mgqF4=","beginning_cross_street":"2nd Street","ending_cross_street":"Center Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T12:30:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.959395,40.740811]]}},{"id":"Dj5deWY5pUGc3Zq3xj/T6Bg6cyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tf2tSXdST+khLN7xbgO1VnCt8Po="},{"type":"next-occurrence","id":"EA9fz4X3M8GXZwJ1BxH8zmh/OdQ="}],"description":"Construction and crane operations on 54th Avenue westbound between 2nd Street (New York) and Center Boulevard (New York) for crawler crane assembly, daily operations, and disassembly to erect precast for new school., Wednesday May 20th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:30 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:38:06Z"},"road_event_id":"Dj5deWY5pUGc3Zq3xj/T6Bg6cyo=","beginning_cross_street":"2nd Street","ending_cross_street":"Center Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T12:30:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.959395,40.740811]]}},{"id":"EA9fz4X3M8GXZwJ1BxH8zmh/OdQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tf2tSXdST+khLN7xbgO1VnCt8Po="},{"type":"next-occurrence","id":"DquQPETiwkwRe8uXTqu4cfwzOrM="}],"description":"Construction and crane operations on 54th Avenue westbound between 2nd Street (New York) and Center Boulevard (New York) for crawler crane assembly, daily operations, and disassembly to erect precast for new school., Wednesday May 20th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:30 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:38:06Z"},"road_event_id":"EA9fz4X3M8GXZwJ1BxH8zmh/OdQ=","beginning_cross_street":"2nd Street","ending_cross_street":"Center Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T12:30:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.959395,40.740811]]}},{"id":"DquQPETiwkwRe8uXTqu4cfwzOrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tf2tSXdST+khLN7xbgO1VnCt8Po="},{"type":"next-occurrence","id":"Rpi4DjbN5oOZUTucOgnXl83YOHg="}],"description":"Construction and crane operations on 54th Avenue westbound between 2nd Street (New York) and Center Boulevard (New York) for crawler crane assembly, daily operations, and disassembly to erect precast for new school., Wednesday May 20th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:30 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:38:06Z"},"road_event_id":"DquQPETiwkwRe8uXTqu4cfwzOrM=","beginning_cross_street":"2nd Street","ending_cross_street":"Center Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T12:30:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.959395,40.740811]]}},{"id":"Rpi4DjbN5oOZUTucOgnXl83YOHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tf2tSXdST+khLN7xbgO1VnCt8Po="}],"description":"Construction and crane operations on 54th Avenue westbound between 2nd Street (New York) and Center Boulevard (New York) for crawler crane assembly, daily operations, and disassembly to erect precast for new school., Wednesday May 20th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:30 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:38:06Z"},"road_event_id":"Rpi4DjbN5oOZUTucOgnXl83YOHg=","beginning_cross_street":"2nd Street","ending_cross_street":"Center Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T12:30:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.959395,40.740811]]}},{"id":"Fir7427qOExeQRz+UyzeE2YgrLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEACH 32ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dGRYZyeJpjbY7qkiKIU37314X4o="}],"description":"Crane operations on BEACH 32ND ST both directions between BEACH CHANNEL DR (New York) and OCEAN CREST BLVD (New York), Wednesday May 20th, 2026 thru Wednesday June 17th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:40:06Z"},"road_event_id":"Fir7427qOExeQRz+UyzeE2YgrLI=","beginning_cross_street":"BEACH CHANNEL DR","ending_cross_street":"OCEAN CREST BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766026,40.598767]]}},{"id":"dGRYZyeJpjbY7qkiKIU37314X4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEACH 32ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fir7427qOExeQRz+UyzeE2YgrLI="},{"type":"next-occurrence","id":"9wEjb55y2f8qJ3Q+weEyUyGHsOg="}],"description":"Crane operations on BEACH 32ND ST both directions between BEACH CHANNEL DR (New York) and OCEAN CREST BLVD (New York), Wednesday May 20th, 2026 thru Wednesday June 17th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:40:06Z"},"road_event_id":"dGRYZyeJpjbY7qkiKIU37314X4o=","beginning_cross_street":"BEACH CHANNEL DR","ending_cross_street":"OCEAN CREST BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766026,40.598767]]}},{"id":"9wEjb55y2f8qJ3Q+weEyUyGHsOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEACH 32ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fir7427qOExeQRz+UyzeE2YgrLI="},{"type":"next-occurrence","id":"0xNOi3d23TTpql8HqrWy4SnfByQ="}],"description":"Crane operations on BEACH 32ND ST both directions between BEACH CHANNEL DR (New York) and OCEAN CREST BLVD (New York), Wednesday May 20th, 2026 thru Wednesday June 17th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:40:06Z"},"road_event_id":"9wEjb55y2f8qJ3Q+weEyUyGHsOg=","beginning_cross_street":"BEACH CHANNEL DR","ending_cross_street":"OCEAN CREST BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766026,40.598767]]}},{"id":"0xNOi3d23TTpql8HqrWy4SnfByQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEACH 32ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fir7427qOExeQRz+UyzeE2YgrLI="},{"type":"next-occurrence","id":"wBCnBlmE8cquTnR7DTQd0Fuuhus="}],"description":"Crane operations on BEACH 32ND ST both directions between BEACH CHANNEL DR (New York) and OCEAN CREST BLVD (New York), Wednesday May 20th, 2026 thru Wednesday June 17th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:40:06Z"},"road_event_id":"0xNOi3d23TTpql8HqrWy4SnfByQ=","beginning_cross_street":"BEACH CHANNEL DR","ending_cross_street":"OCEAN CREST BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766026,40.598767]]}},{"id":"wBCnBlmE8cquTnR7DTQd0Fuuhus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEACH 32ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fir7427qOExeQRz+UyzeE2YgrLI="},{"type":"next-occurrence","id":"U5rlGkgbOzeIDQdkT84fwlidcK4="}],"description":"Crane operations on BEACH 32ND ST both directions between BEACH CHANNEL DR (New York) and OCEAN CREST BLVD (New York), Wednesday May 20th, 2026 thru Wednesday June 17th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:40:06Z"},"road_event_id":"wBCnBlmE8cquTnR7DTQd0Fuuhus=","beginning_cross_street":"BEACH CHANNEL DR","ending_cross_street":"OCEAN CREST BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766026,40.598767]]}},{"id":"U5rlGkgbOzeIDQdkT84fwlidcK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEACH 32ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fir7427qOExeQRz+UyzeE2YgrLI="},{"type":"next-occurrence","id":"XxPzcM3E3N3ITP5XxIo+bqou3bE="}],"description":"Crane operations on BEACH 32ND ST both directions between BEACH CHANNEL DR (New York) and OCEAN CREST BLVD (New York), Wednesday May 20th, 2026 thru Wednesday June 17th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:40:06Z"},"road_event_id":"U5rlGkgbOzeIDQdkT84fwlidcK4=","beginning_cross_street":"BEACH CHANNEL DR","ending_cross_street":"OCEAN CREST BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766026,40.598767]]}},{"id":"XxPzcM3E3N3ITP5XxIo+bqou3bE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEACH 32ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fir7427qOExeQRz+UyzeE2YgrLI="},{"type":"next-occurrence","id":"GvpZbKn3RIMncgioDXnJSjpDJGc="}],"description":"Crane operations on BEACH 32ND ST both directions between BEACH CHANNEL DR (New York) and OCEAN CREST BLVD (New York), Wednesday May 20th, 2026 thru Wednesday June 17th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:40:06Z"},"road_event_id":"XxPzcM3E3N3ITP5XxIo+bqou3bE=","beginning_cross_street":"BEACH CHANNEL DR","ending_cross_street":"OCEAN CREST BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766026,40.598767]]}},{"id":"GvpZbKn3RIMncgioDXnJSjpDJGc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEACH 32ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fir7427qOExeQRz+UyzeE2YgrLI="},{"type":"next-occurrence","id":"Byri2CbBYX/HMDajbHgQyP/8VcI="}],"description":"Crane operations on BEACH 32ND ST both directions between BEACH CHANNEL DR (New York) and OCEAN CREST BLVD (New York), Wednesday May 20th, 2026 thru Wednesday June 17th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:40:06Z"},"road_event_id":"GvpZbKn3RIMncgioDXnJSjpDJGc=","beginning_cross_street":"BEACH CHANNEL DR","ending_cross_street":"OCEAN CREST BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766026,40.598767]]}},{"id":"Byri2CbBYX/HMDajbHgQyP/8VcI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEACH 32ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fir7427qOExeQRz+UyzeE2YgrLI="}],"description":"Crane operations on BEACH 32ND ST both directions between BEACH CHANNEL DR (New York) and OCEAN CREST BLVD (New York), Wednesday May 20th, 2026 thru Wednesday June 17th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:40:06Z"},"road_event_id":"Byri2CbBYX/HMDajbHgQyP/8VcI=","beginning_cross_street":"BEACH CHANNEL DR","ending_cross_street":"OCEAN CREST BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766026,40.598767]]}},{"id":"ryLN1DKg2hrgD/JXRQFdydjPKHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OCEAN CREST BLVD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Y2+G0wDJzNuybrBUwqutg0xkT+4="}],"description":"Crane operations on OCEAN CREST BLVD both directions between BEACH 32ND ST (New York) and HARTMAN LN (New York), Wednesday May 20th, 2026 thru Wednesday June 17th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:42:00Z"},"road_event_id":"ryLN1DKg2hrgD/JXRQFdydjPKHo=","beginning_cross_street":"BEACH 32ND ST","ending_cross_street":"HARTMAN LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766501,40.599458]]}},{"id":"Y2+G0wDJzNuybrBUwqutg0xkT+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OCEAN CREST BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ryLN1DKg2hrgD/JXRQFdydjPKHo="},{"type":"next-occurrence","id":"bKwQcuIZnPK1Ob1Yx1pyMZgu+Qw="}],"description":"Crane operations on OCEAN CREST BLVD both directions between BEACH 32ND ST (New York) and HARTMAN LN (New York), Wednesday May 20th, 2026 thru Wednesday June 17th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:42:00Z"},"road_event_id":"Y2+G0wDJzNuybrBUwqutg0xkT+4=","beginning_cross_street":"BEACH 32ND ST","ending_cross_street":"HARTMAN LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766501,40.599458]]}},{"id":"bKwQcuIZnPK1Ob1Yx1pyMZgu+Qw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OCEAN CREST BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ryLN1DKg2hrgD/JXRQFdydjPKHo="},{"type":"next-occurrence","id":"LaidGHTkdf45IfvByoRGLOUu6eM="}],"description":"Crane operations on OCEAN CREST BLVD both directions between BEACH 32ND ST (New York) and HARTMAN LN (New York), Wednesday May 20th, 2026 thru Wednesday June 17th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:42:00Z"},"road_event_id":"bKwQcuIZnPK1Ob1Yx1pyMZgu+Qw=","beginning_cross_street":"BEACH 32ND ST","ending_cross_street":"HARTMAN LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766501,40.599458]]}},{"id":"LaidGHTkdf45IfvByoRGLOUu6eM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OCEAN CREST BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ryLN1DKg2hrgD/JXRQFdydjPKHo="},{"type":"next-occurrence","id":"J2RICtVER+5XqB2nUZInJB4Upxo="}],"description":"Crane operations on OCEAN CREST BLVD both directions between BEACH 32ND ST (New York) and HARTMAN LN (New York), Wednesday May 20th, 2026 thru Wednesday June 17th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:42:00Z"},"road_event_id":"LaidGHTkdf45IfvByoRGLOUu6eM=","beginning_cross_street":"BEACH 32ND ST","ending_cross_street":"HARTMAN LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766501,40.599458]]}},{"id":"J2RICtVER+5XqB2nUZInJB4Upxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OCEAN CREST BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ryLN1DKg2hrgD/JXRQFdydjPKHo="},{"type":"next-occurrence","id":"T4k1fS7Cdgarruq9qAlUqxMD9gk="}],"description":"Crane operations on OCEAN CREST BLVD both directions between BEACH 32ND ST (New York) and HARTMAN LN (New York), Wednesday May 20th, 2026 thru Wednesday June 17th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:42:00Z"},"road_event_id":"J2RICtVER+5XqB2nUZInJB4Upxo=","beginning_cross_street":"BEACH 32ND ST","ending_cross_street":"HARTMAN LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766501,40.599458]]}},{"id":"T4k1fS7Cdgarruq9qAlUqxMD9gk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OCEAN CREST BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ryLN1DKg2hrgD/JXRQFdydjPKHo="},{"type":"next-occurrence","id":"y7Jxt0Ct1mQvzlexDGRhIXCiEtE="}],"description":"Crane operations on OCEAN CREST BLVD both directions between BEACH 32ND ST (New York) and HARTMAN LN (New York), Wednesday May 20th, 2026 thru Wednesday June 17th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:42:00Z"},"road_event_id":"T4k1fS7Cdgarruq9qAlUqxMD9gk=","beginning_cross_street":"BEACH 32ND ST","ending_cross_street":"HARTMAN LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766501,40.599458]]}},{"id":"y7Jxt0Ct1mQvzlexDGRhIXCiEtE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OCEAN CREST BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ryLN1DKg2hrgD/JXRQFdydjPKHo="},{"type":"next-occurrence","id":"8t3XMRRmmlu+Mu299zMA883bTMs="}],"description":"Crane operations on OCEAN CREST BLVD both directions between BEACH 32ND ST (New York) and HARTMAN LN (New York), Wednesday May 20th, 2026 thru Wednesday June 17th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:42:00Z"},"road_event_id":"y7Jxt0Ct1mQvzlexDGRhIXCiEtE=","beginning_cross_street":"BEACH 32ND ST","ending_cross_street":"HARTMAN LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766501,40.599458]]}},{"id":"8t3XMRRmmlu+Mu299zMA883bTMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OCEAN CREST BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ryLN1DKg2hrgD/JXRQFdydjPKHo="},{"type":"next-occurrence","id":"o6w7C0BoCXKcn+0xJAZRLSHygXY="}],"description":"Crane operations on OCEAN CREST BLVD both directions between BEACH 32ND ST (New York) and HARTMAN LN (New York), Wednesday May 20th, 2026 thru Wednesday June 17th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:42:00Z"},"road_event_id":"8t3XMRRmmlu+Mu299zMA883bTMs=","beginning_cross_street":"BEACH 32ND ST","ending_cross_street":"HARTMAN LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766501,40.599458]]}},{"id":"o6w7C0BoCXKcn+0xJAZRLSHygXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OCEAN CREST BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ryLN1DKg2hrgD/JXRQFdydjPKHo="}],"description":"Crane operations on OCEAN CREST BLVD both directions between BEACH 32ND ST (New York) and HARTMAN LN (New York), Wednesday May 20th, 2026 thru Wednesday June 17th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T18:42:00Z"},"road_event_id":"o6w7C0BoCXKcn+0xJAZRLSHygXY=","beginning_cross_street":"BEACH 32ND ST","ending_cross_street":"HARTMAN LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766501,40.599458]]}},{"id":"/7fWj7pHakCWlQ+DFp16TlFmwDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"b8hu60tGDkPDQ+ie5QQ5+DE1gao="}],"description":"Construction on ROCKAWAY FWY eastbound between BAY 25TH ST (New York) and AZTEC PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:46:58Z"},"road_event_id":"/7fWj7pHakCWlQ+DFp16TlFmwDU=","beginning_cross_street":"BAY 25TH ST","ending_cross_street":"AZTEC PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.761581,40.599901]]}},{"id":"b8hu60tGDkPDQ+ie5QQ5+DE1gao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/7fWj7pHakCWlQ+DFp16TlFmwDU="},{"type":"next-occurrence","id":"PYVhtl7TCBUcSrEnhJKeWbRmcpI="}],"description":"Construction on ROCKAWAY FWY eastbound between BAY 25TH ST (New York) and AZTEC PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:46:58Z"},"road_event_id":"b8hu60tGDkPDQ+ie5QQ5+DE1gao=","beginning_cross_street":"BAY 25TH ST","ending_cross_street":"AZTEC PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.761581,40.599901]]}},{"id":"PYVhtl7TCBUcSrEnhJKeWbRmcpI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/7fWj7pHakCWlQ+DFp16TlFmwDU="},{"type":"next-occurrence","id":"0W9m7HFtaVy9JOzuaM0wdWJyBgk="}],"description":"Construction on ROCKAWAY FWY eastbound between BAY 25TH ST (New York) and AZTEC PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:46:58Z"},"road_event_id":"PYVhtl7TCBUcSrEnhJKeWbRmcpI=","beginning_cross_street":"BAY 25TH ST","ending_cross_street":"AZTEC PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.761581,40.599901]]}},{"id":"0W9m7HFtaVy9JOzuaM0wdWJyBgk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/7fWj7pHakCWlQ+DFp16TlFmwDU="},{"type":"next-occurrence","id":"0ZPWU+LumDMmVscje4xPm8Z7tbg="}],"description":"Construction on ROCKAWAY FWY eastbound between BAY 25TH ST (New York) and AZTEC PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:46:58Z"},"road_event_id":"0W9m7HFtaVy9JOzuaM0wdWJyBgk=","beginning_cross_street":"BAY 25TH ST","ending_cross_street":"AZTEC PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.761581,40.599901]]}},{"id":"0ZPWU+LumDMmVscje4xPm8Z7tbg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/7fWj7pHakCWlQ+DFp16TlFmwDU="},{"type":"next-occurrence","id":"OsaZUCid8n7/+Ow3FHM+MxMvIxw="}],"description":"Construction on ROCKAWAY FWY eastbound between BAY 25TH ST (New York) and AZTEC PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:46:58Z"},"road_event_id":"0ZPWU+LumDMmVscje4xPm8Z7tbg=","beginning_cross_street":"BAY 25TH ST","ending_cross_street":"AZTEC PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.761581,40.599901]]}},{"id":"OsaZUCid8n7/+Ow3FHM+MxMvIxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/7fWj7pHakCWlQ+DFp16TlFmwDU="},{"type":"next-occurrence","id":"A7iGjAMmBOkPVo1M4ts2RD/0hNI="}],"description":"Construction on ROCKAWAY FWY eastbound between BAY 25TH ST (New York) and AZTEC PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:46:58Z"},"road_event_id":"OsaZUCid8n7/+Ow3FHM+MxMvIxw=","beginning_cross_street":"BAY 25TH ST","ending_cross_street":"AZTEC PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.761581,40.599901]]}},{"id":"A7iGjAMmBOkPVo1M4ts2RD/0hNI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/7fWj7pHakCWlQ+DFp16TlFmwDU="},{"type":"next-occurrence","id":"miLCtfMB+Tx2zBDxhgHReSIjDuw="}],"description":"Construction on ROCKAWAY FWY eastbound between BAY 25TH ST (New York) and AZTEC PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:46:58Z"},"road_event_id":"A7iGjAMmBOkPVo1M4ts2RD/0hNI=","beginning_cross_street":"BAY 25TH ST","ending_cross_street":"AZTEC PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.761581,40.599901]]}},{"id":"miLCtfMB+Tx2zBDxhgHReSIjDuw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/7fWj7pHakCWlQ+DFp16TlFmwDU="},{"type":"next-occurrence","id":"PX6SYQeu/YvMBW9vvv57RNzWxLA="}],"description":"Construction on ROCKAWAY FWY eastbound between BAY 25TH ST (New York) and AZTEC PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:46:58Z"},"road_event_id":"miLCtfMB+Tx2zBDxhgHReSIjDuw=","beginning_cross_street":"BAY 25TH ST","ending_cross_street":"AZTEC PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.761581,40.599901]]}},{"id":"PX6SYQeu/YvMBW9vvv57RNzWxLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/7fWj7pHakCWlQ+DFp16TlFmwDU="},{"type":"next-occurrence","id":"uJF8ndd+8fBYSmrjC9yjJcZAiEc="}],"description":"Construction on ROCKAWAY FWY eastbound between BAY 25TH ST (New York) and AZTEC PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:46:58Z"},"road_event_id":"PX6SYQeu/YvMBW9vvv57RNzWxLA=","beginning_cross_street":"BAY 25TH ST","ending_cross_street":"AZTEC PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.761581,40.599901]]}},{"id":"uJF8ndd+8fBYSmrjC9yjJcZAiEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/7fWj7pHakCWlQ+DFp16TlFmwDU="},{"type":"next-occurrence","id":"cTCycKCHHI4IA6fC7xwh7DcQGmM="}],"description":"Construction on ROCKAWAY FWY eastbound between BAY 25TH ST (New York) and AZTEC PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:46:58Z"},"road_event_id":"uJF8ndd+8fBYSmrjC9yjJcZAiEc=","beginning_cross_street":"BAY 25TH ST","ending_cross_street":"AZTEC PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.761581,40.599901]]}},{"id":"cTCycKCHHI4IA6fC7xwh7DcQGmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/7fWj7pHakCWlQ+DFp16TlFmwDU="}],"description":"Construction on ROCKAWAY FWY eastbound between BAY 25TH ST (New York) and AZTEC PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:46:58Z"},"road_event_id":"cTCycKCHHI4IA6fC7xwh7DcQGmM=","beginning_cross_street":"BAY 25TH ST","ending_cross_street":"AZTEC PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.761581,40.599901]]}},{"id":"xs2B6SU5QldRJXCgxUbcn89Getk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3MzOWHqY6+HgiRbtgKwyhAhzcKg="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) and BAY 25TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:49:54Z"},"road_event_id":"xs2B6SU5QldRJXCgxUbcn89Getk=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"BAY 25TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766603,40.596402]]}},{"id":"3MzOWHqY6+HgiRbtgKwyhAhzcKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xs2B6SU5QldRJXCgxUbcn89Getk="},{"type":"next-occurrence","id":"/+sAb/D8Zh9az7jHkn0Azhq0GHk="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) and BAY 25TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:49:54Z"},"road_event_id":"3MzOWHqY6+HgiRbtgKwyhAhzcKg=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"BAY 25TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766603,40.596402]]}},{"id":"/+sAb/D8Zh9az7jHkn0Azhq0GHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xs2B6SU5QldRJXCgxUbcn89Getk="},{"type":"next-occurrence","id":"JFxaEb62Sr3JJKCpZCN+lZG2Mco="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) and BAY 25TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:49:54Z"},"road_event_id":"/+sAb/D8Zh9az7jHkn0Azhq0GHk=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"BAY 25TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766603,40.596402]]}},{"id":"JFxaEb62Sr3JJKCpZCN+lZG2Mco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xs2B6SU5QldRJXCgxUbcn89Getk="},{"type":"next-occurrence","id":"YHiQiYWZf5g572jf/QcbXFHduBs="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) and BAY 25TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:49:54Z"},"road_event_id":"JFxaEb62Sr3JJKCpZCN+lZG2Mco=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"BAY 25TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766603,40.596402]]}},{"id":"YHiQiYWZf5g572jf/QcbXFHduBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xs2B6SU5QldRJXCgxUbcn89Getk="},{"type":"next-occurrence","id":"xy0dXGnbYhz9J2mJsbbu4MyY3Fk="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) and BAY 25TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:49:54Z"},"road_event_id":"YHiQiYWZf5g572jf/QcbXFHduBs=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"BAY 25TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766603,40.596402]]}},{"id":"xy0dXGnbYhz9J2mJsbbu4MyY3Fk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xs2B6SU5QldRJXCgxUbcn89Getk="},{"type":"next-occurrence","id":"+CFZr6NHYiBb+vinBIS4dIMMPgQ="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) and BAY 25TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:49:54Z"},"road_event_id":"xy0dXGnbYhz9J2mJsbbu4MyY3Fk=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"BAY 25TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766603,40.596402]]}},{"id":"+CFZr6NHYiBb+vinBIS4dIMMPgQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xs2B6SU5QldRJXCgxUbcn89Getk="},{"type":"next-occurrence","id":"GOWFGG6BpJdoFABfuN/u32B9ciQ="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) and BAY 25TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:49:54Z"},"road_event_id":"+CFZr6NHYiBb+vinBIS4dIMMPgQ=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"BAY 25TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766603,40.596402]]}},{"id":"GOWFGG6BpJdoFABfuN/u32B9ciQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xs2B6SU5QldRJXCgxUbcn89Getk="},{"type":"next-occurrence","id":"MNrwKIR4EFRduWHcFvLssnuMaO0="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) and BAY 25TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:49:54Z"},"road_event_id":"GOWFGG6BpJdoFABfuN/u32B9ciQ=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"BAY 25TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766603,40.596402]]}},{"id":"MNrwKIR4EFRduWHcFvLssnuMaO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xs2B6SU5QldRJXCgxUbcn89Getk="},{"type":"next-occurrence","id":"+JU52CfG7qi0oJxGZk3+nz5DmyA="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) and BAY 25TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:49:54Z"},"road_event_id":"MNrwKIR4EFRduWHcFvLssnuMaO0=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"BAY 25TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766603,40.596402]]}},{"id":"+JU52CfG7qi0oJxGZk3+nz5DmyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xs2B6SU5QldRJXCgxUbcn89Getk="},{"type":"next-occurrence","id":"e7sN8vaPsxLaRafrrDYyrjebj3E="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) and BAY 25TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:49:54Z"},"road_event_id":"+JU52CfG7qi0oJxGZk3+nz5DmyA=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"BAY 25TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766603,40.596402]]}},{"id":"e7sN8vaPsxLaRafrrDYyrjebj3E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xs2B6SU5QldRJXCgxUbcn89Getk="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) and BAY 25TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:49:54Z"},"road_event_id":"e7sN8vaPsxLaRafrrDYyrjebj3E=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"BAY 25TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766603,40.596402]]}},{"id":"OgbpM5pqvLXYFKMEEHoHqgycZ2k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"80arODaF9CSXpR/n034gmN2y8x0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 41ST ST (New York) and BEACH 38TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:51:48Z"},"road_event_id":"OgbpM5pqvLXYFKMEEHoHqgycZ2k=","beginning_cross_street":"BEACH 41ST ST","ending_cross_street":"BEACH 38TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772658,40.593363]]}},{"id":"80arODaF9CSXpR/n034gmN2y8x0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OgbpM5pqvLXYFKMEEHoHqgycZ2k="},{"type":"next-occurrence","id":"YpYb4ubc10tOW8v/Ot2t43bMO1Q="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 41ST ST (New York) and BEACH 38TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:51:48Z"},"road_event_id":"80arODaF9CSXpR/n034gmN2y8x0=","beginning_cross_street":"BEACH 41ST ST","ending_cross_street":"BEACH 38TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772658,40.593363]]}},{"id":"YpYb4ubc10tOW8v/Ot2t43bMO1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OgbpM5pqvLXYFKMEEHoHqgycZ2k="},{"type":"next-occurrence","id":"1qNOOaVhHzx1yRMlmjz7kko+msI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 41ST ST (New York) and BEACH 38TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:51:48Z"},"road_event_id":"YpYb4ubc10tOW8v/Ot2t43bMO1Q=","beginning_cross_street":"BEACH 41ST ST","ending_cross_street":"BEACH 38TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772658,40.593363]]}},{"id":"1qNOOaVhHzx1yRMlmjz7kko+msI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OgbpM5pqvLXYFKMEEHoHqgycZ2k="},{"type":"next-occurrence","id":"uDORAfMFokir0Hx9tpXLwXsiSqE="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 41ST ST (New York) and BEACH 38TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:51:48Z"},"road_event_id":"1qNOOaVhHzx1yRMlmjz7kko+msI=","beginning_cross_street":"BEACH 41ST ST","ending_cross_street":"BEACH 38TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772658,40.593363]]}},{"id":"uDORAfMFokir0Hx9tpXLwXsiSqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OgbpM5pqvLXYFKMEEHoHqgycZ2k="},{"type":"next-occurrence","id":"8Gutk+3CfyiB/fF4aGdRdk2iNbo="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 41ST ST (New York) and BEACH 38TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:51:48Z"},"road_event_id":"uDORAfMFokir0Hx9tpXLwXsiSqE=","beginning_cross_street":"BEACH 41ST ST","ending_cross_street":"BEACH 38TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772658,40.593363]]}},{"id":"8Gutk+3CfyiB/fF4aGdRdk2iNbo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OgbpM5pqvLXYFKMEEHoHqgycZ2k="},{"type":"next-occurrence","id":"wPlYOaqxbOQVNT7LWSAuaQEDD/8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 41ST ST (New York) and BEACH 38TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:51:48Z"},"road_event_id":"8Gutk+3CfyiB/fF4aGdRdk2iNbo=","beginning_cross_street":"BEACH 41ST ST","ending_cross_street":"BEACH 38TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772658,40.593363]]}},{"id":"wPlYOaqxbOQVNT7LWSAuaQEDD/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OgbpM5pqvLXYFKMEEHoHqgycZ2k="},{"type":"next-occurrence","id":"bErNJUh9JegZ2TJtfQDTHr3kUas="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 41ST ST (New York) and BEACH 38TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:51:48Z"},"road_event_id":"wPlYOaqxbOQVNT7LWSAuaQEDD/8=","beginning_cross_street":"BEACH 41ST ST","ending_cross_street":"BEACH 38TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772658,40.593363]]}},{"id":"bErNJUh9JegZ2TJtfQDTHr3kUas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OgbpM5pqvLXYFKMEEHoHqgycZ2k="},{"type":"next-occurrence","id":"ovXWgCXpmeKQqMXr28dpWuXGIWg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 41ST ST (New York) and BEACH 38TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:51:48Z"},"road_event_id":"bErNJUh9JegZ2TJtfQDTHr3kUas=","beginning_cross_street":"BEACH 41ST ST","ending_cross_street":"BEACH 38TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772658,40.593363]]}},{"id":"ovXWgCXpmeKQqMXr28dpWuXGIWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OgbpM5pqvLXYFKMEEHoHqgycZ2k="},{"type":"next-occurrence","id":"cijKwJePUon42hin5TSev0RLWBs="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 41ST ST (New York) and BEACH 38TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:51:48Z"},"road_event_id":"ovXWgCXpmeKQqMXr28dpWuXGIWg=","beginning_cross_street":"BEACH 41ST ST","ending_cross_street":"BEACH 38TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772658,40.593363]]}},{"id":"cijKwJePUon42hin5TSev0RLWBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OgbpM5pqvLXYFKMEEHoHqgycZ2k="},{"type":"next-occurrence","id":"TFc2H2SM+xhOuWLUNWWqlPHbpBw="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 41ST ST (New York) and BEACH 38TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:51:48Z"},"road_event_id":"cijKwJePUon42hin5TSev0RLWBs=","beginning_cross_street":"BEACH 41ST ST","ending_cross_street":"BEACH 38TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772658,40.593363]]}},{"id":"TFc2H2SM+xhOuWLUNWWqlPHbpBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OgbpM5pqvLXYFKMEEHoHqgycZ2k="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 41ST ST (New York) and BEACH 38TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:51:48Z"},"road_event_id":"TFc2H2SM+xhOuWLUNWWqlPHbpBw=","beginning_cross_street":"BEACH 41ST ST","ending_cross_street":"BEACH 38TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772658,40.593363]]}},{"id":"9vaJDTfcZQzq7MURglE1pnAm3+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CGuzk5mYtGcodnqLllAeOudYjPM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 44TH ST (New York) and BEACH 41ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:53:23Z"},"road_event_id":"9vaJDTfcZQzq7MURglE1pnAm3+I=","beginning_cross_street":"BEACH 44TH ST","ending_cross_street":"BEACH 41ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.775237,40.593106]]}},{"id":"CGuzk5mYtGcodnqLllAeOudYjPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vaJDTfcZQzq7MURglE1pnAm3+I="},{"type":"next-occurrence","id":"ud+uHVzuClfFsLXktyVT6MyACxM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 44TH ST (New York) and BEACH 41ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:53:23Z"},"road_event_id":"CGuzk5mYtGcodnqLllAeOudYjPM=","beginning_cross_street":"BEACH 44TH ST","ending_cross_street":"BEACH 41ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.775237,40.593106]]}},{"id":"ud+uHVzuClfFsLXktyVT6MyACxM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vaJDTfcZQzq7MURglE1pnAm3+I="},{"type":"next-occurrence","id":"V8Ljypd3pkdPuuiW2hC4pVshKJ8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 44TH ST (New York) and BEACH 41ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:53:23Z"},"road_event_id":"ud+uHVzuClfFsLXktyVT6MyACxM=","beginning_cross_street":"BEACH 44TH ST","ending_cross_street":"BEACH 41ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.775237,40.593106]]}},{"id":"V8Ljypd3pkdPuuiW2hC4pVshKJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vaJDTfcZQzq7MURglE1pnAm3+I="},{"type":"next-occurrence","id":"pewIlpAeBD4VDV/csWV2/tbCM9g="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 44TH ST (New York) and BEACH 41ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:53:23Z"},"road_event_id":"V8Ljypd3pkdPuuiW2hC4pVshKJ8=","beginning_cross_street":"BEACH 44TH ST","ending_cross_street":"BEACH 41ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.775237,40.593106]]}},{"id":"pewIlpAeBD4VDV/csWV2/tbCM9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vaJDTfcZQzq7MURglE1pnAm3+I="},{"type":"next-occurrence","id":"miYTG1yQm8XFi4s/aIwZ8PPdlN0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 44TH ST (New York) and BEACH 41ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:53:23Z"},"road_event_id":"pewIlpAeBD4VDV/csWV2/tbCM9g=","beginning_cross_street":"BEACH 44TH ST","ending_cross_street":"BEACH 41ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.775237,40.593106]]}},{"id":"miYTG1yQm8XFi4s/aIwZ8PPdlN0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vaJDTfcZQzq7MURglE1pnAm3+I="},{"type":"next-occurrence","id":"x/1x3LblNPVn0zcaT8A33SzTYfk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 44TH ST (New York) and BEACH 41ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:53:23Z"},"road_event_id":"miYTG1yQm8XFi4s/aIwZ8PPdlN0=","beginning_cross_street":"BEACH 44TH ST","ending_cross_street":"BEACH 41ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.775237,40.593106]]}},{"id":"x/1x3LblNPVn0zcaT8A33SzTYfk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vaJDTfcZQzq7MURglE1pnAm3+I="},{"type":"next-occurrence","id":"aVGjhB27pouw+EvvHDZXevEsxFI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 44TH ST (New York) and BEACH 41ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:53:23Z"},"road_event_id":"x/1x3LblNPVn0zcaT8A33SzTYfk=","beginning_cross_street":"BEACH 44TH ST","ending_cross_street":"BEACH 41ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.775237,40.593106]]}},{"id":"aVGjhB27pouw+EvvHDZXevEsxFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vaJDTfcZQzq7MURglE1pnAm3+I="},{"type":"next-occurrence","id":"O+ULGa2UInwwtuFyFpKSybYpjyM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 44TH ST (New York) and BEACH 41ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:53:23Z"},"road_event_id":"aVGjhB27pouw+EvvHDZXevEsxFI=","beginning_cross_street":"BEACH 44TH ST","ending_cross_street":"BEACH 41ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.775237,40.593106]]}},{"id":"O+ULGa2UInwwtuFyFpKSybYpjyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vaJDTfcZQzq7MURglE1pnAm3+I="},{"type":"next-occurrence","id":"ZTmtBei+cAnp8GKob44VQ8jOsCQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 44TH ST (New York) and BEACH 41ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:53:23Z"},"road_event_id":"O+ULGa2UInwwtuFyFpKSybYpjyM=","beginning_cross_street":"BEACH 44TH ST","ending_cross_street":"BEACH 41ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.775237,40.593106]]}},{"id":"ZTmtBei+cAnp8GKob44VQ8jOsCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vaJDTfcZQzq7MURglE1pnAm3+I="},{"type":"next-occurrence","id":"fyU56fJjDvwGDkBoHaJAeUt294k="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 44TH ST (New York) and BEACH 41ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:53:23Z"},"road_event_id":"ZTmtBei+cAnp8GKob44VQ8jOsCQ=","beginning_cross_street":"BEACH 44TH ST","ending_cross_street":"BEACH 41ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.775237,40.593106]]}},{"id":"fyU56fJjDvwGDkBoHaJAeUt294k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9vaJDTfcZQzq7MURglE1pnAm3+I="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 44TH ST (New York) and BEACH 41ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:53:23Z"},"road_event_id":"fyU56fJjDvwGDkBoHaJAeUt294k=","beginning_cross_street":"BEACH 44TH ST","ending_cross_street":"BEACH 41ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.775237,40.593106]]}},{"id":"bj/0UGEuR/c+SPrzoFsOdZuShfo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KdOcGxI5p7lkUdnSAgkK4+F/HaM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 47TH ST (New York) and BEACH 44TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:56:01Z"},"road_event_id":"bj/0UGEuR/c+SPrzoFsOdZuShfo=","beginning_cross_street":"BEACH 47TH ST","ending_cross_street":"BEACH 44TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.777771,40.592839]]}},{"id":"KdOcGxI5p7lkUdnSAgkK4+F/HaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bj/0UGEuR/c+SPrzoFsOdZuShfo="},{"type":"next-occurrence","id":"66RJTz2SzE/BBGClEZGM8PqmIX8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 47TH ST (New York) and BEACH 44TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:56:01Z"},"road_event_id":"KdOcGxI5p7lkUdnSAgkK4+F/HaM=","beginning_cross_street":"BEACH 47TH ST","ending_cross_street":"BEACH 44TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.777771,40.592839]]}},{"id":"66RJTz2SzE/BBGClEZGM8PqmIX8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bj/0UGEuR/c+SPrzoFsOdZuShfo="},{"type":"next-occurrence","id":"frCQlDr+1sV9fekQg/rZB+msizU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 47TH ST (New York) and BEACH 44TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:56:01Z"},"road_event_id":"66RJTz2SzE/BBGClEZGM8PqmIX8=","beginning_cross_street":"BEACH 47TH ST","ending_cross_street":"BEACH 44TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.777771,40.592839]]}},{"id":"frCQlDr+1sV9fekQg/rZB+msizU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bj/0UGEuR/c+SPrzoFsOdZuShfo="},{"type":"next-occurrence","id":"+cScKZv+Dji5jizoqVnoWk6gVMQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 47TH ST (New York) and BEACH 44TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:56:01Z"},"road_event_id":"frCQlDr+1sV9fekQg/rZB+msizU=","beginning_cross_street":"BEACH 47TH ST","ending_cross_street":"BEACH 44TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.777771,40.592839]]}},{"id":"+cScKZv+Dji5jizoqVnoWk6gVMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bj/0UGEuR/c+SPrzoFsOdZuShfo="},{"type":"next-occurrence","id":"gjtf6yUoRD63FDgvvLMXSQgO09U="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 47TH ST (New York) and BEACH 44TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:56:01Z"},"road_event_id":"+cScKZv+Dji5jizoqVnoWk6gVMQ=","beginning_cross_street":"BEACH 47TH ST","ending_cross_street":"BEACH 44TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.777771,40.592839]]}},{"id":"gjtf6yUoRD63FDgvvLMXSQgO09U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bj/0UGEuR/c+SPrzoFsOdZuShfo="},{"type":"next-occurrence","id":"2SY8evwCnfy2EYqweY2Vjuewn4Q="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 47TH ST (New York) and BEACH 44TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:56:01Z"},"road_event_id":"gjtf6yUoRD63FDgvvLMXSQgO09U=","beginning_cross_street":"BEACH 47TH ST","ending_cross_street":"BEACH 44TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.777771,40.592839]]}},{"id":"2SY8evwCnfy2EYqweY2Vjuewn4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bj/0UGEuR/c+SPrzoFsOdZuShfo="},{"type":"next-occurrence","id":"xlUeSpT67rVmVXzixOb216cKVEw="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 47TH ST (New York) and BEACH 44TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:56:01Z"},"road_event_id":"2SY8evwCnfy2EYqweY2Vjuewn4Q=","beginning_cross_street":"BEACH 47TH ST","ending_cross_street":"BEACH 44TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.777771,40.592839]]}},{"id":"xlUeSpT67rVmVXzixOb216cKVEw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bj/0UGEuR/c+SPrzoFsOdZuShfo="},{"type":"next-occurrence","id":"xuOwa8jR01+eLaiLpWsdUHiVYpk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 47TH ST (New York) and BEACH 44TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:56:01Z"},"road_event_id":"xlUeSpT67rVmVXzixOb216cKVEw=","beginning_cross_street":"BEACH 47TH ST","ending_cross_street":"BEACH 44TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.777771,40.592839]]}},{"id":"xuOwa8jR01+eLaiLpWsdUHiVYpk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bj/0UGEuR/c+SPrzoFsOdZuShfo="},{"type":"next-occurrence","id":"FgGo2MiP3anK3nxPBVQbDl8kgsw="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 47TH ST (New York) and BEACH 44TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:56:01Z"},"road_event_id":"xuOwa8jR01+eLaiLpWsdUHiVYpk=","beginning_cross_street":"BEACH 47TH ST","ending_cross_street":"BEACH 44TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.777771,40.592839]]}},{"id":"FgGo2MiP3anK3nxPBVQbDl8kgsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bj/0UGEuR/c+SPrzoFsOdZuShfo="},{"type":"next-occurrence","id":"yg4te3FHGRk7yvIEkudIwv2eclI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 47TH ST (New York) and BEACH 44TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:56:01Z"},"road_event_id":"FgGo2MiP3anK3nxPBVQbDl8kgsw=","beginning_cross_street":"BEACH 47TH ST","ending_cross_street":"BEACH 44TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.777771,40.592839]]}},{"id":"yg4te3FHGRk7yvIEkudIwv2eclI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bj/0UGEuR/c+SPrzoFsOdZuShfo="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 47TH ST (New York) and BEACH 44TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:56:01Z"},"road_event_id":"yg4te3FHGRk7yvIEkudIwv2eclI=","beginning_cross_street":"BEACH 47TH ST","ending_cross_street":"BEACH 44TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.777771,40.592839]]}},{"id":"xNE4srPFuzVoR5FrE6PYeC6Gxwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MxFz6krETbIdioTXJk63hUknOlc="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 59TH ST (New York) and BEACH 56TH PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:58:59Z"},"road_event_id":"xNE4srPFuzVoR5FrE6PYeC6Gxwc=","beginning_cross_street":"BEACH 59TH ST","ending_cross_street":"BEACH 56TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.788917,40.59244]]}},{"id":"MxFz6krETbIdioTXJk63hUknOlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xNE4srPFuzVoR5FrE6PYeC6Gxwc="},{"type":"next-occurrence","id":"Nuc00FqdMcuHUCCAEQkTncBal8A="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 59TH ST (New York) and BEACH 56TH PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:58:59Z"},"road_event_id":"MxFz6krETbIdioTXJk63hUknOlc=","beginning_cross_street":"BEACH 59TH ST","ending_cross_street":"BEACH 56TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.788917,40.59244]]}},{"id":"Nuc00FqdMcuHUCCAEQkTncBal8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xNE4srPFuzVoR5FrE6PYeC6Gxwc="},{"type":"next-occurrence","id":"vQbJUQo3rvcXW3pRs4xkfOElWTo="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 59TH ST (New York) and BEACH 56TH PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:58:59Z"},"road_event_id":"Nuc00FqdMcuHUCCAEQkTncBal8A=","beginning_cross_street":"BEACH 59TH ST","ending_cross_street":"BEACH 56TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.788917,40.59244]]}},{"id":"vQbJUQo3rvcXW3pRs4xkfOElWTo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xNE4srPFuzVoR5FrE6PYeC6Gxwc="},{"type":"next-occurrence","id":"qi6limzGZslGdT88V7qsSfqBSUk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 59TH ST (New York) and BEACH 56TH PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:58:59Z"},"road_event_id":"vQbJUQo3rvcXW3pRs4xkfOElWTo=","beginning_cross_street":"BEACH 59TH ST","ending_cross_street":"BEACH 56TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.788917,40.59244]]}},{"id":"qi6limzGZslGdT88V7qsSfqBSUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xNE4srPFuzVoR5FrE6PYeC6Gxwc="},{"type":"next-occurrence","id":"E5iQqfM1x6g0Qe5dP6bua3J16gA="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 59TH ST (New York) and BEACH 56TH PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:58:59Z"},"road_event_id":"qi6limzGZslGdT88V7qsSfqBSUk=","beginning_cross_street":"BEACH 59TH ST","ending_cross_street":"BEACH 56TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.788917,40.59244]]}},{"id":"E5iQqfM1x6g0Qe5dP6bua3J16gA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xNE4srPFuzVoR5FrE6PYeC6Gxwc="},{"type":"next-occurrence","id":"KueyvQQLA02iEtF6y+82f1K63RM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 59TH ST (New York) and BEACH 56TH PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:58:59Z"},"road_event_id":"E5iQqfM1x6g0Qe5dP6bua3J16gA=","beginning_cross_street":"BEACH 59TH ST","ending_cross_street":"BEACH 56TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.788917,40.59244]]}},{"id":"KueyvQQLA02iEtF6y+82f1K63RM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xNE4srPFuzVoR5FrE6PYeC6Gxwc="},{"type":"next-occurrence","id":"VLCr1aMK35a3bzLixoW50BsQDc4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 59TH ST (New York) and BEACH 56TH PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:58:59Z"},"road_event_id":"KueyvQQLA02iEtF6y+82f1K63RM=","beginning_cross_street":"BEACH 59TH ST","ending_cross_street":"BEACH 56TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.788917,40.59244]]}},{"id":"VLCr1aMK35a3bzLixoW50BsQDc4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xNE4srPFuzVoR5FrE6PYeC6Gxwc="},{"type":"next-occurrence","id":"UHsPSqjyvYLIDj9HLnWt7VjvHr0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 59TH ST (New York) and BEACH 56TH PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:58:59Z"},"road_event_id":"VLCr1aMK35a3bzLixoW50BsQDc4=","beginning_cross_street":"BEACH 59TH ST","ending_cross_street":"BEACH 56TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.788917,40.59244]]}},{"id":"UHsPSqjyvYLIDj9HLnWt7VjvHr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xNE4srPFuzVoR5FrE6PYeC6Gxwc="},{"type":"next-occurrence","id":"1dJ6xO5+OFGUiMCbvXU4ucaphl8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 59TH ST (New York) and BEACH 56TH PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:58:59Z"},"road_event_id":"UHsPSqjyvYLIDj9HLnWt7VjvHr0=","beginning_cross_street":"BEACH 59TH ST","ending_cross_street":"BEACH 56TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.788917,40.59244]]}},{"id":"1dJ6xO5+OFGUiMCbvXU4ucaphl8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xNE4srPFuzVoR5FrE6PYeC6Gxwc="},{"type":"next-occurrence","id":"W05pUyTkFJJHJGW/3nBONC639Pg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 59TH ST (New York) and BEACH 56TH PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:58:59Z"},"road_event_id":"1dJ6xO5+OFGUiMCbvXU4ucaphl8=","beginning_cross_street":"BEACH 59TH ST","ending_cross_street":"BEACH 56TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.788917,40.59244]]}},{"id":"W05pUyTkFJJHJGW/3nBONC639Pg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xNE4srPFuzVoR5FrE6PYeC6Gxwc="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 59TH ST (New York) and BEACH 56TH PL (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T18:58:59Z"},"road_event_id":"W05pUyTkFJJHJGW/3nBONC639Pg=","beginning_cross_street":"BEACH 59TH ST","ending_cross_street":"BEACH 56TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.788917,40.59244]]}},{"id":"w5CvmiN/IFVKFc9d9YIhvWbh+oE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUFFOLK ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JzmJPAhF7dSLQusYfSaKWpCkUhU="}],"description":"Construction on SUFFOLK ST southbound between E HOUSTON ST (New York) and STANTON ST (New York), Wednesday May 20th, 2026 thru Sunday June 7th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday May 20th, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T19:00:25Z"},"road_event_id":"w5CvmiN/IFVKFc9d9YIhvWbh+oE=","beginning_cross_street":"E HOUSTON ST","ending_cross_street":"STANTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984724,40.721633]]}},{"id":"JzmJPAhF7dSLQusYfSaKWpCkUhU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUFFOLK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w5CvmiN/IFVKFc9d9YIhvWbh+oE="}],"description":"Construction on SUFFOLK ST southbound between E HOUSTON ST (New York) and STANTON ST (New York), Wednesday May 20th, 2026 thru Sunday June 7th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday May 20th, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-20T19:00:25Z"},"road_event_id":"JzmJPAhF7dSLQusYfSaKWpCkUhU=","beginning_cross_street":"E HOUSTON ST","ending_cross_street":"STANTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984724,40.721633]]}},{"id":"jSbAdhLcLxJNAC7snGi55p/QzGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JtncClEJ603j0FMXhPqzcHfWYgA="}],"description":"Construction on ROCKAWAY FWY eastbound between CORNAGA AVE (New York) and BEACH CHANNEL DR (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T19:01:14Z"},"road_event_id":"jSbAdhLcLxJNAC7snGi55p/QzGY=","beginning_cross_street":"CORNAGA AVE","ending_cross_street":"BEACH CHANNEL DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758552,40.602355]]}},{"id":"JtncClEJ603j0FMXhPqzcHfWYgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jSbAdhLcLxJNAC7snGi55p/QzGY="},{"type":"next-occurrence","id":"hqtzTyCigFR+QW+vI5iK2gVNttk="}],"description":"Construction on ROCKAWAY FWY eastbound between CORNAGA AVE (New York) and BEACH CHANNEL DR (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T19:01:14Z"},"road_event_id":"JtncClEJ603j0FMXhPqzcHfWYgA=","beginning_cross_street":"CORNAGA AVE","ending_cross_street":"BEACH CHANNEL DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758552,40.602355]]}},{"id":"hqtzTyCigFR+QW+vI5iK2gVNttk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jSbAdhLcLxJNAC7snGi55p/QzGY="},{"type":"next-occurrence","id":"lXxdAkwa05dVoS7k25lEbD2A9oo="}],"description":"Construction on ROCKAWAY FWY eastbound between CORNAGA AVE (New York) and BEACH CHANNEL DR (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T19:01:14Z"},"road_event_id":"hqtzTyCigFR+QW+vI5iK2gVNttk=","beginning_cross_street":"CORNAGA AVE","ending_cross_street":"BEACH CHANNEL DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758552,40.602355]]}},{"id":"lXxdAkwa05dVoS7k25lEbD2A9oo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jSbAdhLcLxJNAC7snGi55p/QzGY="},{"type":"next-occurrence","id":"wC28V/gzLmMCrPGdCtnbi+vGu+I="}],"description":"Construction on ROCKAWAY FWY eastbound between CORNAGA AVE (New York) and BEACH CHANNEL DR (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T19:01:14Z"},"road_event_id":"lXxdAkwa05dVoS7k25lEbD2A9oo=","beginning_cross_street":"CORNAGA AVE","ending_cross_street":"BEACH CHANNEL DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758552,40.602355]]}},{"id":"wC28V/gzLmMCrPGdCtnbi+vGu+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jSbAdhLcLxJNAC7snGi55p/QzGY="},{"type":"next-occurrence","id":"pteNyeZOmXmB4P/yNQ6jflDMZfc="}],"description":"Construction on ROCKAWAY FWY eastbound between CORNAGA AVE (New York) and BEACH CHANNEL DR (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T19:01:14Z"},"road_event_id":"wC28V/gzLmMCrPGdCtnbi+vGu+I=","beginning_cross_street":"CORNAGA AVE","ending_cross_street":"BEACH CHANNEL DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758552,40.602355]]}},{"id":"pteNyeZOmXmB4P/yNQ6jflDMZfc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jSbAdhLcLxJNAC7snGi55p/QzGY="},{"type":"next-occurrence","id":"oNSnXJpIsHOr4UFkFUFOaCsV4cI="}],"description":"Construction on ROCKAWAY FWY eastbound between CORNAGA AVE (New York) and BEACH CHANNEL DR (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T19:01:14Z"},"road_event_id":"pteNyeZOmXmB4P/yNQ6jflDMZfc=","beginning_cross_street":"CORNAGA AVE","ending_cross_street":"BEACH CHANNEL DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758552,40.602355]]}},{"id":"oNSnXJpIsHOr4UFkFUFOaCsV4cI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jSbAdhLcLxJNAC7snGi55p/QzGY="},{"type":"next-occurrence","id":"GOlIzDm9s8FhbWa/osFEiOLEfyE="}],"description":"Construction on ROCKAWAY FWY eastbound between CORNAGA AVE (New York) and BEACH CHANNEL DR (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T19:01:14Z"},"road_event_id":"oNSnXJpIsHOr4UFkFUFOaCsV4cI=","beginning_cross_street":"CORNAGA AVE","ending_cross_street":"BEACH CHANNEL DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758552,40.602355]]}},{"id":"GOlIzDm9s8FhbWa/osFEiOLEfyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jSbAdhLcLxJNAC7snGi55p/QzGY="},{"type":"next-occurrence","id":"GduzuogHsY9G3Ae/kwJWumF2j+Q="}],"description":"Construction on ROCKAWAY FWY eastbound between CORNAGA AVE (New York) and BEACH CHANNEL DR (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T19:01:14Z"},"road_event_id":"GOlIzDm9s8FhbWa/osFEiOLEfyE=","beginning_cross_street":"CORNAGA AVE","ending_cross_street":"BEACH CHANNEL DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758552,40.602355]]}},{"id":"GduzuogHsY9G3Ae/kwJWumF2j+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jSbAdhLcLxJNAC7snGi55p/QzGY="},{"type":"next-occurrence","id":"2Qt7pVBvHNaKOq2skd6CJGIm3Ig="}],"description":"Construction on ROCKAWAY FWY eastbound between CORNAGA AVE (New York) and BEACH CHANNEL DR (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T19:01:14Z"},"road_event_id":"GduzuogHsY9G3Ae/kwJWumF2j+Q=","beginning_cross_street":"CORNAGA AVE","ending_cross_street":"BEACH CHANNEL DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758552,40.602355]]}},{"id":"2Qt7pVBvHNaKOq2skd6CJGIm3Ig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jSbAdhLcLxJNAC7snGi55p/QzGY="},{"type":"next-occurrence","id":"nscUAJcbBpbEW03ie1CEo8nj3rQ="}],"description":"Construction on ROCKAWAY FWY eastbound between CORNAGA AVE (New York) and BEACH CHANNEL DR (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T19:01:14Z"},"road_event_id":"2Qt7pVBvHNaKOq2skd6CJGIm3Ig=","beginning_cross_street":"CORNAGA AVE","ending_cross_street":"BEACH CHANNEL DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758552,40.602355]]}},{"id":"nscUAJcbBpbEW03ie1CEo8nj3rQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jSbAdhLcLxJNAC7snGi55p/QzGY="}],"description":"Construction on ROCKAWAY FWY eastbound between CORNAGA AVE (New York) and BEACH CHANNEL DR (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-20T19:01:14Z"},"road_event_id":"nscUAJcbBpbEW03ie1CEo8nj3rQ=","beginning_cross_street":"CORNAGA AVE","ending_cross_street":"BEACH CHANNEL DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758552,40.602355]]}},{"id":"XeHJedHtwz6cQbCeNfaXoGxJ5SU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"09rLQGRvqpclqAkTy88YbUrscgM="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T19:03:26Z"},"road_event_id":"XeHJedHtwz6cQbCeNfaXoGxJ5SU=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"SEAGIRT BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766958,40.596206]]}},{"id":"09rLQGRvqpclqAkTy88YbUrscgM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeHJedHtwz6cQbCeNfaXoGxJ5SU="},{"type":"next-occurrence","id":"0hndCKKlL/292gcJzyH5rKUHilk="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T19:03:26Z"},"road_event_id":"09rLQGRvqpclqAkTy88YbUrscgM=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"SEAGIRT BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766958,40.596206]]}},{"id":"0hndCKKlL/292gcJzyH5rKUHilk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeHJedHtwz6cQbCeNfaXoGxJ5SU="},{"type":"next-occurrence","id":"0CKlACs1jlXCOPD8nlhVri2oqh0="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T19:03:26Z"},"road_event_id":"0hndCKKlL/292gcJzyH5rKUHilk=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"SEAGIRT BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766958,40.596206]]}},{"id":"0CKlACs1jlXCOPD8nlhVri2oqh0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeHJedHtwz6cQbCeNfaXoGxJ5SU="},{"type":"next-occurrence","id":"SH/acJaS+u5QjYGRvx+ZtKpHQbk="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T19:03:26Z"},"road_event_id":"0CKlACs1jlXCOPD8nlhVri2oqh0=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"SEAGIRT BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766958,40.596206]]}},{"id":"SH/acJaS+u5QjYGRvx+ZtKpHQbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeHJedHtwz6cQbCeNfaXoGxJ5SU="},{"type":"next-occurrence","id":"HOui86fUFzcQz1tv5l/qo8SesLM="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T19:03:26Z"},"road_event_id":"SH/acJaS+u5QjYGRvx+ZtKpHQbk=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"SEAGIRT BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766958,40.596206]]}},{"id":"HOui86fUFzcQz1tv5l/qo8SesLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeHJedHtwz6cQbCeNfaXoGxJ5SU="},{"type":"next-occurrence","id":"bduhnJoskPuUmCVub8ow+X27Gj8="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T19:03:26Z"},"road_event_id":"HOui86fUFzcQz1tv5l/qo8SesLM=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"SEAGIRT BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766958,40.596206]]}},{"id":"bduhnJoskPuUmCVub8ow+X27Gj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeHJedHtwz6cQbCeNfaXoGxJ5SU="},{"type":"next-occurrence","id":"YJ1jKDZbPG4lpQC+ZgaMstSSdYY="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T19:03:26Z"},"road_event_id":"bduhnJoskPuUmCVub8ow+X27Gj8=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"SEAGIRT BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766958,40.596206]]}},{"id":"YJ1jKDZbPG4lpQC+ZgaMstSSdYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeHJedHtwz6cQbCeNfaXoGxJ5SU="},{"type":"next-occurrence","id":"lI69K6+BKdWPiaP1EIby3ryvhIk="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T19:03:26Z"},"road_event_id":"YJ1jKDZbPG4lpQC+ZgaMstSSdYY=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"SEAGIRT BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766958,40.596206]]}},{"id":"lI69K6+BKdWPiaP1EIby3ryvhIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeHJedHtwz6cQbCeNfaXoGxJ5SU="},{"type":"next-occurrence","id":"DRqFXBH6kMHZEB6ak5/MImU5DrI="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T19:03:26Z"},"road_event_id":"lI69K6+BKdWPiaP1EIby3ryvhIk=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"SEAGIRT BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766958,40.596206]]}},{"id":"DRqFXBH6kMHZEB6ak5/MImU5DrI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeHJedHtwz6cQbCeNfaXoGxJ5SU="},{"type":"next-occurrence","id":"JeHQRXI5qGj8IgIMvrkK7u2D5zc="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T19:03:26Z"},"road_event_id":"DRqFXBH6kMHZEB6ak5/MImU5DrI=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"SEAGIRT BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766958,40.596206]]}},{"id":"JeHQRXI5qGj8IgIMvrkK7u2D5zc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeHJedHtwz6cQbCeNfaXoGxJ5SU="}],"description":"Construction on ROCKAWAY FWY eastbound between SEAGIRT BLVD (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 20th, 2026 thru Tuesday June 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-20T19:03:26Z"},"road_event_id":"JeHQRXI5qGj8IgIMvrkK7u2D5zc=","beginning_cross_street":"SEAGIRT BLVD","ending_cross_street":"SEAGIRT BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766958,40.596206]]}},{"id":"Vfq5KOSVtANlDz5PafZHF6qwmO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0lU9EEmvOzl3WOkawb3KrXEIaVs="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Friday May 22nd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T19:44:09Z"},"road_event_id":"Vfq5KOSVtANlDz5PafZHF6qwmO4=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99626,40.690738]]}},{"id":"0lU9EEmvOzl3WOkawb3KrXEIaVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vfq5KOSVtANlDz5PafZHF6qwmO4="},{"type":"next-occurrence","id":"wC/RtRLM8eUBNyju3Up/RiYa4do="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Friday May 22nd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T19:44:09Z"},"road_event_id":"0lU9EEmvOzl3WOkawb3KrXEIaVs=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99626,40.690738]]}},{"id":"wC/RtRLM8eUBNyju3Up/RiYa4do=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vfq5KOSVtANlDz5PafZHF6qwmO4="},{"type":"next-occurrence","id":"t1TykydIt10cZDK4u69puMWtdaA="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Friday May 22nd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T19:44:09Z"},"road_event_id":"wC/RtRLM8eUBNyju3Up/RiYa4do=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99626,40.690738]]}},{"id":"t1TykydIt10cZDK4u69puMWtdaA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vfq5KOSVtANlDz5PafZHF6qwmO4="},{"type":"next-occurrence","id":"3e8tOVVTm6FtjSBQi6Uax3uaeJI="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Friday May 22nd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T19:44:09Z"},"road_event_id":"t1TykydIt10cZDK4u69puMWtdaA=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99626,40.690738]]}},{"id":"3e8tOVVTm6FtjSBQi6Uax3uaeJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vfq5KOSVtANlDz5PafZHF6qwmO4="},{"type":"next-occurrence","id":"rLeT79x4QtokNEzVRGYO8LQNNBw="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Friday May 22nd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T19:44:09Z"},"road_event_id":"3e8tOVVTm6FtjSBQi6Uax3uaeJI=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99626,40.690738]]}},{"id":"rLeT79x4QtokNEzVRGYO8LQNNBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vfq5KOSVtANlDz5PafZHF6qwmO4="},{"type":"next-occurrence","id":"st0llAHgYLv4Ujwyo/2qCMiZcC4="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Friday May 22nd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T19:44:09Z"},"road_event_id":"rLeT79x4QtokNEzVRGYO8LQNNBw=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99626,40.690738]]}},{"id":"st0llAHgYLv4Ujwyo/2qCMiZcC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vfq5KOSVtANlDz5PafZHF6qwmO4="},{"type":"next-occurrence","id":"p1ccW26QGW0E9TiSF0ld+VbE6xc="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Friday May 22nd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T19:44:09Z"},"road_event_id":"st0llAHgYLv4Ujwyo/2qCMiZcC4=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T14:00:00Z","end_date":"2026-06-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99626,40.690738]]}},{"id":"p1ccW26QGW0E9TiSF0ld+VbE6xc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vfq5KOSVtANlDz5PafZHF6qwmO4="},{"type":"next-occurrence","id":"0KOo+JE+YzeBa0fgdUmlfpvpFDo="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Friday May 22nd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T19:44:09Z"},"road_event_id":"p1ccW26QGW0E9TiSF0ld+VbE6xc=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T14:00:00Z","end_date":"2026-06-16T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99626,40.690738]]}},{"id":"0KOo+JE+YzeBa0fgdUmlfpvpFDo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vfq5KOSVtANlDz5PafZHF6qwmO4="},{"type":"next-occurrence","id":"PgdwuxKqTkTfP5Q4rSPThiTot88="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Friday May 22nd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T19:44:09Z"},"road_event_id":"0KOo+JE+YzeBa0fgdUmlfpvpFDo=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T14:00:00Z","end_date":"2026-06-17T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99626,40.690738]]}},{"id":"PgdwuxKqTkTfP5Q4rSPThiTot88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vfq5KOSVtANlDz5PafZHF6qwmO4="},{"type":"next-occurrence","id":"vUeEiGUbqxn0nrA7vKjpBX4A1Qk="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Friday May 22nd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T19:44:09Z"},"road_event_id":"PgdwuxKqTkTfP5Q4rSPThiTot88=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T14:00:00Z","end_date":"2026-06-18T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99626,40.690738]]}},{"id":"vUeEiGUbqxn0nrA7vKjpBX4A1Qk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vfq5KOSVtANlDz5PafZHF6qwmO4="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Friday May 22nd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-05-20T19:44:09Z"},"road_event_id":"vUeEiGUbqxn0nrA7vKjpBX4A1Qk=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T14:00:00Z","end_date":"2026-06-19T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99626,40.690738]]}},{"id":"Hd5xGURc7C400kIh/+IiEOJAQv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HbfFTmE74cInU/BbQvJraABFO7M="}],"description":"Road rehabilitation on US 9 southbound between Kirchner Avenue (Hyde Park) and Harvey Street (Hyde Park) 202508114083/32601409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday June 9th, 2026 thru Wednesday June 10th, 2026 Tuesday/ Wednesday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-03T19:30:17Z"},"road_event_id":"Hd5xGURc7C400kIh/+IiEOJAQv4=","beginning_cross_street":"Kirchner Avenue","ending_cross_street":"Harvey Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933727,41.785934]]}},{"id":"HbfFTmE74cInU/BbQvJraABFO7M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hd5xGURc7C400kIh/+IiEOJAQv4="}],"description":"Road rehabilitation on US 9 southbound between Kirchner Avenue (Hyde Park) and Harvey Street (Hyde Park) 202508114083/32601409 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday June 9th, 2026 thru Wednesday June 10th, 2026 Tuesday/ Wednesday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-03T19:30:17Z"},"road_event_id":"HbfFTmE74cInU/BbQvJraABFO7M=","beginning_cross_street":"Kirchner Avenue","ending_cross_street":"Harvey Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933727,41.785934]]}},{"id":"Na4rgDd8oh93kOYNBp43OzZ9lSg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4oV0dNkR7WtoG3Q6VHv0iR11xWM="}],"description":"Culvert repairs on NY 28 both directions between Old Route 28 (Indian Lake) and John Rust Road (Indian Lake) Motorists will encounter lane closures in both directions with temporary signals in place, Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM,","update_date":"2026-06-05T14:12:58Z"},"road_event_id":"Na4rgDd8oh93kOYNBp43OzZ9lSg=","beginning_cross_street":"","ending_cross_street":"John Rust Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.350979,43.821643]]}},{"id":"4oV0dNkR7WtoG3Q6VHv0iR11xWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Na4rgDd8oh93kOYNBp43OzZ9lSg="},{"type":"next-occurrence","id":"D5w324TxdrJ80/t9qVtIel4AImA="}],"description":"Culvert repairs on NY 28 both directions between Old Route 28 (Indian Lake) and John Rust Road (Indian Lake) Motorists will encounter lane closures in both directions with temporary signals in place, Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM,","update_date":"2026-06-05T14:12:58Z"},"road_event_id":"4oV0dNkR7WtoG3Q6VHv0iR11xWM=","beginning_cross_street":"","ending_cross_street":"John Rust Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.350979,43.821643]]}},{"id":"D5w324TxdrJ80/t9qVtIel4AImA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Na4rgDd8oh93kOYNBp43OzZ9lSg="},{"type":"next-occurrence","id":"QZjrPWSddJI9V7oNmmUvblqa5Wo="}],"description":"Culvert repairs on NY 28 both directions between Old Route 28 (Indian Lake) and John Rust Road (Indian Lake) Motorists will encounter lane closures in both directions with temporary signals in place, Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM,","update_date":"2026-06-05T14:12:58Z"},"road_event_id":"D5w324TxdrJ80/t9qVtIel4AImA=","beginning_cross_street":"","ending_cross_street":"John Rust Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.350979,43.821643]]}},{"id":"QZjrPWSddJI9V7oNmmUvblqa5Wo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Na4rgDd8oh93kOYNBp43OzZ9lSg="},{"type":"next-occurrence","id":"rEmP1aiqCkgWVpPa6QBYPMrIvgg="}],"description":"Culvert repairs on NY 28 both directions between Old Route 28 (Indian Lake) and John Rust Road (Indian Lake) Motorists will encounter lane closures in both directions with temporary signals in place, Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM,","update_date":"2026-06-05T14:12:58Z"},"road_event_id":"QZjrPWSddJI9V7oNmmUvblqa5Wo=","beginning_cross_street":"","ending_cross_street":"John Rust Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.350979,43.821643]]}},{"id":"rEmP1aiqCkgWVpPa6QBYPMrIvgg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Na4rgDd8oh93kOYNBp43OzZ9lSg="},{"type":"next-occurrence","id":"AY1eFJzVvbQxSFaXVHkzlJeNMWg="}],"description":"Culvert repairs on NY 28 both directions between Old Route 28 (Indian Lake) and John Rust Road (Indian Lake) Motorists will encounter lane closures in both directions with temporary signals in place, Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM,","update_date":"2026-06-05T14:12:58Z"},"road_event_id":"rEmP1aiqCkgWVpPa6QBYPMrIvgg=","beginning_cross_street":"","ending_cross_street":"John Rust Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.350979,43.821643]]}},{"id":"AY1eFJzVvbQxSFaXVHkzlJeNMWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Na4rgDd8oh93kOYNBp43OzZ9lSg="}],"description":"Culvert repairs on NY 28 both directions between Old Route 28 (Indian Lake) and John Rust Road (Indian Lake) Motorists will encounter lane closures in both directions with temporary signals in place, Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM,","update_date":"2026-06-05T14:12:58Z"},"road_event_id":"AY1eFJzVvbQxSFaXVHkzlJeNMWg=","beginning_cross_street":"","ending_cross_street":"John Rust Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.350979,43.821643]]}},{"id":"NTzELv8DUhVjaUbxzrtRi+Nyo7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rOJBXuPrC8U9uTPqVIegB/AoWdE="}],"description":"Bridge work on I-81 southbound between Exit 9A - Syracuse Airport (Salina) and Exit 8 - On ramp from Mattydale/US-11 (Salina) ; Alternating lane closures, Tuesday June 2nd, 2026 thru Monday June 8th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-21T13:20:06Z"},"road_event_id":"NTzELv8DUhVjaUbxzrtRi+Nyo7U=","beginning_cross_street":"Exit 9A - Syracuse Airport ","ending_cross_street":"Exit 8 - On ramp from Mattydale/US-11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142253,43.113581]]}},{"id":"rOJBXuPrC8U9uTPqVIegB/AoWdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NTzELv8DUhVjaUbxzrtRi+Nyo7U="}],"description":"Bridge work on I-81 southbound between Exit 9A - Syracuse Airport (Salina) and Exit 8 - On ramp from Mattydale/US-11 (Salina) ; Alternating lane closures, Tuesday June 2nd, 2026 thru Monday June 8th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-21T13:20:06Z"},"road_event_id":"rOJBXuPrC8U9uTPqVIegB/AoWdE=","beginning_cross_street":"Exit 9A - Syracuse Airport ","ending_cross_street":"Exit 8 - On ramp from Mattydale/US-11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142253,43.113581]]}},{"id":"2zLAzbEF3dHLzRzsgmhSvQVFulk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xondm35xKlwimE7bZpd5+C2kN7E="}],"description":"Due to Track repairs eastbound, Morris & Essex Line between South Orange (South Orange Twp) and Hoboken (Hoboken) eastbound trains operating from South Orange Station through Hoboken Terminal, Secaucus Junction, and Penn Station New York are subject to delays of up to 10 minutes due to track maintenance, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-21T18:14:02Z"},"road_event_id":"2zLAzbEF3dHLzRzsgmhSvQVFulk=","beginning_cross_street":"South Orange","ending_cross_street":"Hoboken","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.260538,40.745952]]}},{"id":"xondm35xKlwimE7bZpd5+C2kN7E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2zLAzbEF3dHLzRzsgmhSvQVFulk="},{"type":"next-occurrence","id":"TlkdWSbc3i92B0kOdm0c6E/1o8Y="}],"description":"Due to Track repairs eastbound, Morris & Essex Line between South Orange (South Orange Twp) and Hoboken (Hoboken) eastbound trains operating from South Orange Station through Hoboken Terminal, Secaucus Junction, and Penn Station New York are subject to delays of up to 10 minutes due to track maintenance, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-21T18:14:02Z"},"road_event_id":"xondm35xKlwimE7bZpd5+C2kN7E=","beginning_cross_street":"South Orange","ending_cross_street":"Hoboken","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.260538,40.745952]]}},{"id":"TlkdWSbc3i92B0kOdm0c6E/1o8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2zLAzbEF3dHLzRzsgmhSvQVFulk="},{"type":"next-occurrence","id":"ICCW5AK1QHn+L9hUD29ms8FeBz8="}],"description":"Due to Track repairs eastbound, Morris & Essex Line between South Orange (South Orange Twp) and Hoboken (Hoboken) eastbound trains operating from South Orange Station through Hoboken Terminal, Secaucus Junction, and Penn Station New York are subject to delays of up to 10 minutes due to track maintenance, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-21T18:14:02Z"},"road_event_id":"TlkdWSbc3i92B0kOdm0c6E/1o8Y=","beginning_cross_street":"South Orange","ending_cross_street":"Hoboken","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.260538,40.745952]]}},{"id":"ICCW5AK1QHn+L9hUD29ms8FeBz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2zLAzbEF3dHLzRzsgmhSvQVFulk="},{"type":"next-occurrence","id":"m08YDa5ulLmFWtVgSEJSOKWqJ08="}],"description":"Due to Track repairs eastbound, Morris & Essex Line between South Orange (South Orange Twp) and Hoboken (Hoboken) eastbound trains operating from South Orange Station through Hoboken Terminal, Secaucus Junction, and Penn Station New York are subject to delays of up to 10 minutes due to track maintenance, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-21T18:14:02Z"},"road_event_id":"ICCW5AK1QHn+L9hUD29ms8FeBz8=","beginning_cross_street":"South Orange","ending_cross_street":"Hoboken","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.260538,40.745952]]}},{"id":"m08YDa5ulLmFWtVgSEJSOKWqJ08=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2zLAzbEF3dHLzRzsgmhSvQVFulk="},{"type":"next-occurrence","id":"YQAK+qHkfzYH8LUJ3fbFoJIARF0="}],"description":"Due to Track repairs eastbound, Morris & Essex Line between South Orange (South Orange Twp) and Hoboken (Hoboken) eastbound trains operating from South Orange Station through Hoboken Terminal, Secaucus Junction, and Penn Station New York are subject to delays of up to 10 minutes due to track maintenance, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-21T18:14:02Z"},"road_event_id":"m08YDa5ulLmFWtVgSEJSOKWqJ08=","beginning_cross_street":"South Orange","ending_cross_street":"Hoboken","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.260538,40.745952]]}},{"id":"YQAK+qHkfzYH8LUJ3fbFoJIARF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2zLAzbEF3dHLzRzsgmhSvQVFulk="}],"description":"Due to Track repairs eastbound, Morris & Essex Line between South Orange (South Orange Twp) and Hoboken (Hoboken) eastbound trains operating from South Orange Station through Hoboken Terminal, Secaucus Junction, and Penn Station New York are subject to delays of up to 10 minutes due to track maintenance, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-21T18:14:02Z"},"road_event_id":"YQAK+qHkfzYH8LUJ3fbFoJIARF0=","beginning_cross_street":"South Orange","ending_cross_street":"Hoboken","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.260538,40.745952]]}},{"id":"m2FiOFyTt0GvZ4StSBnQgPQJzjA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q6pGOIDDf0XXqys7hdJ5m6uPA2o="}],"description":"Utility work on NY 332 both directions between Camelot Dr (Canandaigua) and NY 21 at Chapin St (Canandaigua) Lane / Shoulder closures as needed , Thursday May 21st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T18:18:41Z"},"road_event_id":"m2FiOFyTt0GvZ4StSBnQgPQJzjA=","beginning_cross_street":"Camelot Dr","ending_cross_street":"Chapin St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.28978,42.899449]]}},{"id":"q6pGOIDDf0XXqys7hdJ5m6uPA2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m2FiOFyTt0GvZ4StSBnQgPQJzjA="},{"type":"next-occurrence","id":"M3AZZG2iZQgfSPgNdB4SRiAMZ5g="}],"description":"Utility work on NY 332 both directions between Camelot Dr (Canandaigua) and NY 21 at Chapin St (Canandaigua) Lane / Shoulder closures as needed , Thursday May 21st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T18:18:41Z"},"road_event_id":"q6pGOIDDf0XXqys7hdJ5m6uPA2o=","beginning_cross_street":"Camelot Dr","ending_cross_street":"Chapin St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.28978,42.899449]]}},{"id":"M3AZZG2iZQgfSPgNdB4SRiAMZ5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m2FiOFyTt0GvZ4StSBnQgPQJzjA="},{"type":"next-occurrence","id":"sS63T6YLz4aVXpD1d2qZfajzT7I="}],"description":"Utility work on NY 332 both directions between Camelot Dr (Canandaigua) and NY 21 at Chapin St (Canandaigua) Lane / Shoulder closures as needed , Thursday May 21st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T18:18:41Z"},"road_event_id":"M3AZZG2iZQgfSPgNdB4SRiAMZ5g=","beginning_cross_street":"Camelot Dr","ending_cross_street":"Chapin St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.28978,42.899449]]}},{"id":"sS63T6YLz4aVXpD1d2qZfajzT7I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m2FiOFyTt0GvZ4StSBnQgPQJzjA="},{"type":"next-occurrence","id":"uq8kCLMGdGCY28+IAk29LT45RJQ="}],"description":"Utility work on NY 332 both directions between Camelot Dr (Canandaigua) and NY 21 at Chapin St (Canandaigua) Lane / Shoulder closures as needed , Thursday May 21st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T18:18:41Z"},"road_event_id":"sS63T6YLz4aVXpD1d2qZfajzT7I=","beginning_cross_street":"Camelot Dr","ending_cross_street":"Chapin St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.28978,42.899449]]}},{"id":"uq8kCLMGdGCY28+IAk29LT45RJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m2FiOFyTt0GvZ4StSBnQgPQJzjA="},{"type":"next-occurrence","id":"Xr9AeXs2oP9XNMk8VDxu4hD5rNg="}],"description":"Utility work on NY 332 both directions between Camelot Dr (Canandaigua) and NY 21 at Chapin St (Canandaigua) Lane / Shoulder closures as needed , Thursday May 21st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T18:18:41Z"},"road_event_id":"uq8kCLMGdGCY28+IAk29LT45RJQ=","beginning_cross_street":"Camelot Dr","ending_cross_street":"Chapin St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.28978,42.899449]]}},{"id":"Xr9AeXs2oP9XNMk8VDxu4hD5rNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m2FiOFyTt0GvZ4StSBnQgPQJzjA="},{"type":"next-occurrence","id":"GPDT8ajf4nN7yitgrDrWGWkN8sM="}],"description":"Utility work on NY 332 both directions between Camelot Dr (Canandaigua) and NY 21 at Chapin St (Canandaigua) Lane / Shoulder closures as needed , Thursday May 21st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T18:18:41Z"},"road_event_id":"Xr9AeXs2oP9XNMk8VDxu4hD5rNg=","beginning_cross_street":"Camelot Dr","ending_cross_street":"Chapin St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.28978,42.899449]]}},{"id":"GPDT8ajf4nN7yitgrDrWGWkN8sM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m2FiOFyTt0GvZ4StSBnQgPQJzjA="},{"type":"next-occurrence","id":"BlIc1lbu1YMPKOC2EYKchyjq+e4="}],"description":"Utility work on NY 332 both directions between Camelot Dr (Canandaigua) and NY 21 at Chapin St (Canandaigua) Lane / Shoulder closures as needed , Thursday May 21st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T18:18:41Z"},"road_event_id":"GPDT8ajf4nN7yitgrDrWGWkN8sM=","beginning_cross_street":"Camelot Dr","ending_cross_street":"Chapin St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.28978,42.899449]]}},{"id":"BlIc1lbu1YMPKOC2EYKchyjq+e4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m2FiOFyTt0GvZ4StSBnQgPQJzjA="}],"description":"Utility work on NY 332 both directions between Camelot Dr (Canandaigua) and NY 21 at Chapin St (Canandaigua) Lane / Shoulder closures as needed , Thursday May 21st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T18:18:41Z"},"road_event_id":"BlIc1lbu1YMPKOC2EYKchyjq+e4=","beginning_cross_street":"Camelot Dr","ending_cross_street":"Chapin St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.28978,42.899449]]}},{"id":"0OzYum62/djc536GP1a3RClRiSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NpREVY0ebA87bdT/M/ONKS6OD0k="}],"description":"Utility work on NY 332 both directions Aroline Rd (Canandaigua) to END ROUTE (Farmington) Lane/Shoulder closures with flaggers as needed. , Thursday May 21st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T11:39:12Z"},"road_event_id":"0OzYum62/djc536GP1a3RClRiSs=","beginning_cross_street":"Aroline Rd","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.302138,42.914806]]}},{"id":"NpREVY0ebA87bdT/M/ONKS6OD0k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0OzYum62/djc536GP1a3RClRiSs="},{"type":"next-occurrence","id":"bk05V9m4vnYbvX19zvEDd6wJ23s="}],"description":"Utility work on NY 332 both directions Aroline Rd (Canandaigua) to END ROUTE (Farmington) Lane/Shoulder closures with flaggers as needed. , Thursday May 21st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T11:39:12Z"},"road_event_id":"NpREVY0ebA87bdT/M/ONKS6OD0k=","beginning_cross_street":"Aroline Rd","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.302138,42.914806]]}},{"id":"bk05V9m4vnYbvX19zvEDd6wJ23s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0OzYum62/djc536GP1a3RClRiSs="},{"type":"next-occurrence","id":"QrP5F4LQ3xM5Z6zr0LqDzCZAD0c="}],"description":"Utility work on NY 332 both directions Aroline Rd (Canandaigua) to END ROUTE (Farmington) Lane/Shoulder closures with flaggers as needed. , Thursday May 21st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T11:39:12Z"},"road_event_id":"bk05V9m4vnYbvX19zvEDd6wJ23s=","beginning_cross_street":"Aroline Rd","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.302138,42.914806]]}},{"id":"QrP5F4LQ3xM5Z6zr0LqDzCZAD0c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0OzYum62/djc536GP1a3RClRiSs="},{"type":"next-occurrence","id":"L9YzcVyRBa6viYHZH0SruUXsLiQ="}],"description":"Utility work on NY 332 both directions Aroline Rd (Canandaigua) to END ROUTE (Farmington) Lane/Shoulder closures with flaggers as needed. , Thursday May 21st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T11:39:12Z"},"road_event_id":"QrP5F4LQ3xM5Z6zr0LqDzCZAD0c=","beginning_cross_street":"Aroline Rd","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.302138,42.914806]]}},{"id":"L9YzcVyRBa6viYHZH0SruUXsLiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0OzYum62/djc536GP1a3RClRiSs="},{"type":"next-occurrence","id":"33g5PjIXq4dSsuAqRM9GNglMi20="}],"description":"Utility work on NY 332 both directions Aroline Rd (Canandaigua) to END ROUTE (Farmington) Lane/Shoulder closures with flaggers as needed. , Thursday May 21st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T11:39:12Z"},"road_event_id":"L9YzcVyRBa6viYHZH0SruUXsLiQ=","beginning_cross_street":"Aroline Rd","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.302138,42.914806]]}},{"id":"33g5PjIXq4dSsuAqRM9GNglMi20=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0OzYum62/djc536GP1a3RClRiSs="},{"type":"next-occurrence","id":"F3tV0vkKM5yhAbnyKBFoF4hoT7s="}],"description":"Utility work on NY 332 both directions Aroline Rd (Canandaigua) to END ROUTE (Farmington) Lane/Shoulder closures with flaggers as needed. , Thursday May 21st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T11:39:12Z"},"road_event_id":"33g5PjIXq4dSsuAqRM9GNglMi20=","beginning_cross_street":"Aroline Rd","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.302138,42.914806]]}},{"id":"F3tV0vkKM5yhAbnyKBFoF4hoT7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0OzYum62/djc536GP1a3RClRiSs="},{"type":"next-occurrence","id":"b5gNgXaviSMxeKi09TUaDjPPaWU="}],"description":"Utility work on NY 332 both directions Aroline Rd (Canandaigua) to END ROUTE (Farmington) Lane/Shoulder closures with flaggers as needed. , Thursday May 21st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T11:39:12Z"},"road_event_id":"F3tV0vkKM5yhAbnyKBFoF4hoT7s=","beginning_cross_street":"Aroline Rd","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.302138,42.914806]]}},{"id":"b5gNgXaviSMxeKi09TUaDjPPaWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0OzYum62/djc536GP1a3RClRiSs="}],"description":"Utility work on NY 332 both directions Aroline Rd (Canandaigua) to END ROUTE (Farmington) Lane/Shoulder closures with flaggers as needed. , Thursday May 21st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T11:39:12Z"},"road_event_id":"b5gNgXaviSMxeKi09TUaDjPPaWU=","beginning_cross_street":"Aroline Rd","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.302138,42.914806]]}},{"id":"rlWrF1nvqzZ63hSPa3jOwBVejZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VEes8KEMNOPKAd6ro+yI6elRHfs="}],"description":"Utility work on NY 250 both directions between Penfield Road; NY 441 (Penfield) and Wickham Dr (Perinton) Lane/Shoulder closures with flaggers as needed., Thursday May 21st, 2026 thru Saturday June 6th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-21T19:39:04Z"},"road_event_id":"rlWrF1nvqzZ63hSPa3jOwBVejZM=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"Wickham Dr ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441312,43.130903]]}},{"id":"VEes8KEMNOPKAd6ro+yI6elRHfs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rlWrF1nvqzZ63hSPa3jOwBVejZM="}],"description":"Utility work on NY 250 both directions between Penfield Road; NY 441 (Penfield) and Wickham Dr (Perinton) Lane/Shoulder closures with flaggers as needed., Thursday May 21st, 2026 thru Saturday June 6th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-21T19:39:04Z"},"road_event_id":"VEes8KEMNOPKAd6ro+yI6elRHfs=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"Wickham Dr ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441312,43.130903]]}},{"id":"ORC300548909","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","description":"Utility work on NY 31 eastbound between HARTSHORN DR (Sweden) and Sherry Ln (Sweden) Lane / Shoulder closures with flaggers as needed. Not currently Scheduled","update_date":"2026-06-05T19:00:18Z"},"road_event_id":"ORC300548909","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"Sherry Ln ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T19:45:08Z","end_date":"2026-06-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-77.954642,43.19835]]}},{"id":"ORC300548915","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 383"],"direction":"unknown","description":"Utility work on NY 383 both directions between Ashwood Dr (Wheatland) and Jarrett Rd (Wheatland) Lane/Shoulder closures with flaggers as needed. Not currently Scheduled","update_date":"2026-06-05T19:00:30Z"},"road_event_id":"ORC300548915","beginning_cross_street":"Ashwood Dr","ending_cross_street":"Jarrett Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T20:49:03Z","end_date":"2026-06-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-77.740412,43.032947]]}},{"id":"ORC300548917","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","description":"Utility work on NY 21 both directions between 7832 NY 21 (Naples) and 7554 NY 21. (Naples) Lane/Shoulder closures with flaggers as needed Not currently Scheduled","update_date":"2026-06-05T19:00:09Z"},"road_event_id":"ORC300548917","beginning_cross_street":"7832 NY 21","ending_cross_street":"7554 NY 21.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T20:58:54Z","end_date":"2026-06-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-77.383674,42.637805]]}},{"id":"7UAaLojG62ZyinxhfH0ZhfVjUYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"M1SXpLDCchXidnJNRyE7lOhg0Ug="}],"description":"Roadwork on CR-67 both directions between RT-15A (Rush) and RT-15 (Rush) Shoulder widening. , Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-21T21:06:21Z"},"road_event_id":"7UAaLojG62ZyinxhfH0ZhfVjUYc=","beginning_cross_street":"RT-15A","ending_cross_street":"RT-15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.635767,43.017927]]}},{"id":"M1SXpLDCchXidnJNRyE7lOhg0Ug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UAaLojG62ZyinxhfH0ZhfVjUYc="},{"type":"next-occurrence","id":"ln+Vn4VizzCM0p76hGQPJaWIyF8="}],"description":"Roadwork on CR-67 both directions between RT-15A (Rush) and RT-15 (Rush) Shoulder widening. , Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-21T21:06:21Z"},"road_event_id":"M1SXpLDCchXidnJNRyE7lOhg0Ug=","beginning_cross_street":"RT-15A","ending_cross_street":"RT-15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.635767,43.017927]]}},{"id":"ln+Vn4VizzCM0p76hGQPJaWIyF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UAaLojG62ZyinxhfH0ZhfVjUYc="},{"type":"next-occurrence","id":"7I0jcHl25797+7d6CPEYJ2UItCA="}],"description":"Roadwork on CR-67 both directions between RT-15A (Rush) and RT-15 (Rush) Shoulder widening. , Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-21T21:06:21Z"},"road_event_id":"ln+Vn4VizzCM0p76hGQPJaWIyF8=","beginning_cross_street":"RT-15A","ending_cross_street":"RT-15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.635767,43.017927]]}},{"id":"7I0jcHl25797+7d6CPEYJ2UItCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UAaLojG62ZyinxhfH0ZhfVjUYc="},{"type":"next-occurrence","id":"7LwSK+Mhj5alSi3KUSmK0qJHhgM="}],"description":"Roadwork on CR-67 both directions between RT-15A (Rush) and RT-15 (Rush) Shoulder widening. , Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-21T21:06:21Z"},"road_event_id":"7I0jcHl25797+7d6CPEYJ2UItCA=","beginning_cross_street":"RT-15A","ending_cross_street":"RT-15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.635767,43.017927]]}},{"id":"7LwSK+Mhj5alSi3KUSmK0qJHhgM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UAaLojG62ZyinxhfH0ZhfVjUYc="},{"type":"next-occurrence","id":"N+QELm9i8xR02UifJPOw2Q3TZeg="}],"description":"Roadwork on CR-67 both directions between RT-15A (Rush) and RT-15 (Rush) Shoulder widening. , Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-21T21:06:21Z"},"road_event_id":"7LwSK+Mhj5alSi3KUSmK0qJHhgM=","beginning_cross_street":"RT-15A","ending_cross_street":"RT-15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.635767,43.017927]]}},{"id":"N+QELm9i8xR02UifJPOw2Q3TZeg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UAaLojG62ZyinxhfH0ZhfVjUYc="},{"type":"next-occurrence","id":"tPK8gO5eMp5tzM1KP4ZIWOP/YLE="}],"description":"Roadwork on CR-67 both directions between RT-15A (Rush) and RT-15 (Rush) Shoulder widening. , Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-21T21:06:21Z"},"road_event_id":"N+QELm9i8xR02UifJPOw2Q3TZeg=","beginning_cross_street":"RT-15A","ending_cross_street":"RT-15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.635767,43.017927]]}},{"id":"tPK8gO5eMp5tzM1KP4ZIWOP/YLE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UAaLojG62ZyinxhfH0ZhfVjUYc="},{"type":"next-occurrence","id":"bMvfz5XpS9swzCKrKow99aujg6E="}],"description":"Roadwork on CR-67 both directions between RT-15A (Rush) and RT-15 (Rush) Shoulder widening. , Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-21T21:06:21Z"},"road_event_id":"tPK8gO5eMp5tzM1KP4ZIWOP/YLE=","beginning_cross_street":"RT-15A","ending_cross_street":"RT-15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.635767,43.017927]]}},{"id":"bMvfz5XpS9swzCKrKow99aujg6E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UAaLojG62ZyinxhfH0ZhfVjUYc="},{"type":"next-occurrence","id":"MlTlE7kh1GHD7s5Y54BYAKiquew="}],"description":"Roadwork on CR-67 both directions between RT-15A (Rush) and RT-15 (Rush) Shoulder widening. , Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-21T21:06:21Z"},"road_event_id":"bMvfz5XpS9swzCKrKow99aujg6E=","beginning_cross_street":"RT-15A","ending_cross_street":"RT-15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.635767,43.017927]]}},{"id":"MlTlE7kh1GHD7s5Y54BYAKiquew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UAaLojG62ZyinxhfH0ZhfVjUYc="},{"type":"next-occurrence","id":"/qJS8xIUshOeVWfNosv+EUHLBHQ="}],"description":"Roadwork on CR-67 both directions between RT-15A (Rush) and RT-15 (Rush) Shoulder widening. , Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-21T21:06:21Z"},"road_event_id":"MlTlE7kh1GHD7s5Y54BYAKiquew=","beginning_cross_street":"RT-15A","ending_cross_street":"RT-15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.635767,43.017927]]}},{"id":"/qJS8xIUshOeVWfNosv+EUHLBHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UAaLojG62ZyinxhfH0ZhfVjUYc="},{"type":"next-occurrence","id":"GGFMXF/X18XJcDWzqKhs/1Qp0ak="}],"description":"Roadwork on CR-67 both directions between RT-15A (Rush) and RT-15 (Rush) Shoulder widening. , Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-21T21:06:21Z"},"road_event_id":"/qJS8xIUshOeVWfNosv+EUHLBHQ=","beginning_cross_street":"RT-15A","ending_cross_street":"RT-15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.635767,43.017927]]}},{"id":"GGFMXF/X18XJcDWzqKhs/1Qp0ak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UAaLojG62ZyinxhfH0ZhfVjUYc="},{"type":"next-occurrence","id":"pB3y7ABUj9CmwkQqdWgqVssbwpQ="}],"description":"Roadwork on CR-67 both directions between RT-15A (Rush) and RT-15 (Rush) Shoulder widening. , Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-21T21:06:21Z"},"road_event_id":"GGFMXF/X18XJcDWzqKhs/1Qp0ak=","beginning_cross_street":"RT-15A","ending_cross_street":"RT-15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.635767,43.017927]]}},{"id":"pB3y7ABUj9CmwkQqdWgqVssbwpQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UAaLojG62ZyinxhfH0ZhfVjUYc="},{"type":"next-occurrence","id":"Ec7Z9cFs6CLJGbXusUfIsKbsu9Q="}],"description":"Roadwork on CR-67 both directions between RT-15A (Rush) and RT-15 (Rush) Shoulder widening. , Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-21T21:06:21Z"},"road_event_id":"pB3y7ABUj9CmwkQqdWgqVssbwpQ=","beginning_cross_street":"RT-15A","ending_cross_street":"RT-15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.635767,43.017927]]}},{"id":"Ec7Z9cFs6CLJGbXusUfIsKbsu9Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UAaLojG62ZyinxhfH0ZhfVjUYc="},{"type":"next-occurrence","id":"/7iDmMRsubFf9Io+xLGGm97Lu4w="}],"description":"Roadwork on CR-67 both directions between RT-15A (Rush) and RT-15 (Rush) Shoulder widening. , Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-21T21:06:21Z"},"road_event_id":"Ec7Z9cFs6CLJGbXusUfIsKbsu9Q=","beginning_cross_street":"RT-15A","ending_cross_street":"RT-15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.635767,43.017927]]}},{"id":"/7iDmMRsubFf9Io+xLGGm97Lu4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UAaLojG62ZyinxhfH0ZhfVjUYc="},{"type":"next-occurrence","id":"1IXAI5HM0zcNUkIb8HBhdV+DmMI="}],"description":"Roadwork on CR-67 both directions between RT-15A (Rush) and RT-15 (Rush) Shoulder widening. , Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-21T21:06:21Z"},"road_event_id":"/7iDmMRsubFf9Io+xLGGm97Lu4w=","beginning_cross_street":"RT-15A","ending_cross_street":"RT-15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.635767,43.017927]]}},{"id":"1IXAI5HM0zcNUkIb8HBhdV+DmMI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UAaLojG62ZyinxhfH0ZhfVjUYc="}],"description":"Roadwork on CR-67 both directions between RT-15A (Rush) and RT-15 (Rush) Shoulder widening. , Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-21T21:06:21Z"},"road_event_id":"1IXAI5HM0zcNUkIb8HBhdV+DmMI=","beginning_cross_street":"RT-15A","ending_cross_street":"RT-15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.635767,43.017927]]}},{"id":"ORC300548919","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","description":"Utility work on NY 441 both directions between Willow Pond Way (Penfield) and Rt 250 (Penfield) Lane/Shoulder closures with flaggers as needed Not currently Scheduled","update_date":"2026-06-05T19:00:31Z"},"road_event_id":"ORC300548919","beginning_cross_street":"Willow Pond Way","ending_cross_street":"Rt 250 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-21T21:39:56Z","end_date":"2026-06-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-77.451037,43.130924]]}},{"id":"YLML6B1GCufqg72BfmZxa9X9g6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RgtpJJVCF+8CPghmgTFPBsbKxCw="}],"description":"Bridge work on I-390 northbound NY 415 (Avoca) 2 Lanes Reduced to 1 Lane, Saturday May 23rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T18:17:14Z"},"road_event_id":"YLML6B1GCufqg72BfmZxa9X9g6A=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.460344,42.440006]]}},{"id":"RgtpJJVCF+8CPghmgTFPBsbKxCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YLML6B1GCufqg72BfmZxa9X9g6A="},{"type":"next-occurrence","id":"UUifGMBcuw+CrgpPQ767DXXsros="}],"description":"Bridge work on I-390 northbound NY 415 (Avoca) 2 Lanes Reduced to 1 Lane, Saturday May 23rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T18:17:14Z"},"road_event_id":"RgtpJJVCF+8CPghmgTFPBsbKxCw=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.460344,42.440006]]}},{"id":"UUifGMBcuw+CrgpPQ767DXXsros=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YLML6B1GCufqg72BfmZxa9X9g6A="},{"type":"next-occurrence","id":"M8oHjzjR9CmOs5XweKdkOHLrFN0="}],"description":"Bridge work on I-390 northbound NY 415 (Avoca) 2 Lanes Reduced to 1 Lane, Saturday May 23rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T18:17:14Z"},"road_event_id":"UUifGMBcuw+CrgpPQ767DXXsros=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.460344,42.440006]]}},{"id":"M8oHjzjR9CmOs5XweKdkOHLrFN0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YLML6B1GCufqg72BfmZxa9X9g6A="},{"type":"next-occurrence","id":"rTthk5RGLzwSBpTVM1/k9D/eQtk="}],"description":"Bridge work on I-390 northbound NY 415 (Avoca) 2 Lanes Reduced to 1 Lane, Saturday May 23rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T18:17:14Z"},"road_event_id":"M8oHjzjR9CmOs5XweKdkOHLrFN0=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.460344,42.440006]]}},{"id":"rTthk5RGLzwSBpTVM1/k9D/eQtk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YLML6B1GCufqg72BfmZxa9X9g6A="},{"type":"next-occurrence","id":"aZX9AI9xgedW240KU59+P5Zfltg="}],"description":"Bridge work on I-390 northbound NY 415 (Avoca) 2 Lanes Reduced to 1 Lane, Saturday May 23rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T18:17:14Z"},"road_event_id":"rTthk5RGLzwSBpTVM1/k9D/eQtk=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.460344,42.440006]]}},{"id":"aZX9AI9xgedW240KU59+P5Zfltg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YLML6B1GCufqg72BfmZxa9X9g6A="},{"type":"next-occurrence","id":"UK5QRX85PwUgAwYINBnFU45geos="}],"description":"Bridge work on I-390 northbound NY 415 (Avoca) 2 Lanes Reduced to 1 Lane, Saturday May 23rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T18:17:14Z"},"road_event_id":"aZX9AI9xgedW240KU59+P5Zfltg=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.460344,42.440006]]}},{"id":"UK5QRX85PwUgAwYINBnFU45geos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YLML6B1GCufqg72BfmZxa9X9g6A="},{"type":"next-occurrence","id":"tYFTE2MVXjo7gNwa4cG26A2mLY0="}],"description":"Bridge work on I-390 northbound NY 415 (Avoca) 2 Lanes Reduced to 1 Lane, Saturday May 23rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T18:17:14Z"},"road_event_id":"UK5QRX85PwUgAwYINBnFU45geos=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.460344,42.440006]]}},{"id":"tYFTE2MVXjo7gNwa4cG26A2mLY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YLML6B1GCufqg72BfmZxa9X9g6A="}],"description":"Bridge work on I-390 northbound NY 415 (Avoca) 2 Lanes Reduced to 1 Lane, Saturday May 23rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T18:17:14Z"},"road_event_id":"tYFTE2MVXjo7gNwa4cG26A2mLY0=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.460344,42.440006]]}},{"id":"0rhX36hWZDXM+AifHIPwfE9rn4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qx06NMG+eDQE4zf+kFMyodgqD1Y="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 lanes reduced to 1 lane, Saturday May 23rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T18:18:24Z"},"road_event_id":"0rhX36hWZDXM+AifHIPwfE9rn4w=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.463872,42.441302]]}},{"id":"qx06NMG+eDQE4zf+kFMyodgqD1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rhX36hWZDXM+AifHIPwfE9rn4w="},{"type":"next-occurrence","id":"j3IBtKFpMoVM3vwXfkn349alG8I="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 lanes reduced to 1 lane, Saturday May 23rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T18:18:24Z"},"road_event_id":"qx06NMG+eDQE4zf+kFMyodgqD1Y=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.463872,42.441302]]}},{"id":"j3IBtKFpMoVM3vwXfkn349alG8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rhX36hWZDXM+AifHIPwfE9rn4w="},{"type":"next-occurrence","id":"FtRrCDcEN7w7OXgun29mW3HdFLU="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 lanes reduced to 1 lane, Saturday May 23rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T18:18:24Z"},"road_event_id":"j3IBtKFpMoVM3vwXfkn349alG8I=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.463872,42.441302]]}},{"id":"FtRrCDcEN7w7OXgun29mW3HdFLU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rhX36hWZDXM+AifHIPwfE9rn4w="},{"type":"next-occurrence","id":"ywVfgLNQ/wWGME8Almm6GxdH54Q="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 lanes reduced to 1 lane, Saturday May 23rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T18:18:24Z"},"road_event_id":"FtRrCDcEN7w7OXgun29mW3HdFLU=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.463872,42.441302]]}},{"id":"ywVfgLNQ/wWGME8Almm6GxdH54Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rhX36hWZDXM+AifHIPwfE9rn4w="},{"type":"next-occurrence","id":"usSTQcNWJmm1AC7CHhF5/Q8Q8+8="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 lanes reduced to 1 lane, Saturday May 23rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T18:18:24Z"},"road_event_id":"ywVfgLNQ/wWGME8Almm6GxdH54Q=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.463872,42.441302]]}},{"id":"usSTQcNWJmm1AC7CHhF5/Q8Q8+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rhX36hWZDXM+AifHIPwfE9rn4w="},{"type":"next-occurrence","id":"LZIXu5N+3RS7UIX+ffhO5IwND7o="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 lanes reduced to 1 lane, Saturday May 23rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T18:18:24Z"},"road_event_id":"usSTQcNWJmm1AC7CHhF5/Q8Q8+8=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.463872,42.441302]]}},{"id":"LZIXu5N+3RS7UIX+ffhO5IwND7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rhX36hWZDXM+AifHIPwfE9rn4w="},{"type":"next-occurrence","id":"ozfRmirAnzRTwTTEY1EBq8qyun4="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 lanes reduced to 1 lane, Saturday May 23rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T18:18:24Z"},"road_event_id":"LZIXu5N+3RS7UIX+ffhO5IwND7o=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.463872,42.441302]]}},{"id":"ozfRmirAnzRTwTTEY1EBq8qyun4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0rhX36hWZDXM+AifHIPwfE9rn4w="}],"description":"Bridge work on I-390 southbound NY 415 (Avoca) 2 lanes reduced to 1 lane, Saturday May 23rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T18:18:24Z"},"road_event_id":"ozfRmirAnzRTwTTEY1EBq8qyun4=","beginning_cross_street":"NY 415","ending_cross_street":"NY 415","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.463872,42.441302]]}},{"id":"CTvYUHYp06jLSnl1TVIhjtwl3YM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"N/tMQMoQWecGiuXkrbYhdYhwgn4="}],"description":"Construction on NY 125 both directions at Mamaroneck Road (Scarsdale) D265529/32741809 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"CTvYUHYp06jLSnl1TVIhjtwl3YM=","beginning_cross_street":"Mamaroneck Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767742,40.987918]]}},{"id":"N/tMQMoQWecGiuXkrbYhdYhwgn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTvYUHYp06jLSnl1TVIhjtwl3YM="},{"type":"next-occurrence","id":"pTZnj0djTRJBsFLe8ZiA6QN1kyA="}],"description":"Construction on NY 125 both directions at Mamaroneck Road (Scarsdale) D265529/32741809 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"N/tMQMoQWecGiuXkrbYhdYhwgn4=","beginning_cross_street":"Mamaroneck Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767742,40.987918]]}},{"id":"pTZnj0djTRJBsFLe8ZiA6QN1kyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTvYUHYp06jLSnl1TVIhjtwl3YM="},{"type":"next-occurrence","id":"1tTORj05CtYoIGRfIYgx3arVtB8="}],"description":"Construction on NY 125 both directions at Mamaroneck Road (Scarsdale) D265529/32741809 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"pTZnj0djTRJBsFLe8ZiA6QN1kyA=","beginning_cross_street":"Mamaroneck Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767742,40.987918]]}},{"id":"1tTORj05CtYoIGRfIYgx3arVtB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTvYUHYp06jLSnl1TVIhjtwl3YM="},{"type":"next-occurrence","id":"BKWcf3aPMAP7iktabayIiW0/E+c="}],"description":"Construction on NY 125 both directions at Mamaroneck Road (Scarsdale) D265529/32741809 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"1tTORj05CtYoIGRfIYgx3arVtB8=","beginning_cross_street":"Mamaroneck Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767742,40.987918]]}},{"id":"BKWcf3aPMAP7iktabayIiW0/E+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTvYUHYp06jLSnl1TVIhjtwl3YM="},{"type":"next-occurrence","id":"dM2WCboY3n+BbUBVFp+e08NxCuE="}],"description":"Construction on NY 125 both directions at Mamaroneck Road (Scarsdale) D265529/32741809 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"BKWcf3aPMAP7iktabayIiW0/E+c=","beginning_cross_street":"Mamaroneck Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767742,40.987918]]}},{"id":"dM2WCboY3n+BbUBVFp+e08NxCuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CTvYUHYp06jLSnl1TVIhjtwl3YM="}],"description":"Construction on NY 125 both directions at Mamaroneck Road (Scarsdale) D265529/32741809 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"dM2WCboY3n+BbUBVFp+e08NxCuE=","beginning_cross_street":"Mamaroneck Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767742,40.987918]]}},{"id":"fdWG34xqqf7Np2bN6odXVB2nWSk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RSLJ/QpBo12KEaNBywgE5Pj2DTI="}],"description":"Construction on NY 22 both directions at Ackerman Place (Eastchester) D265529/32741709 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"fdWG34xqqf7Np2bN6odXVB2nWSk=","beginning_cross_street":"Ackerman Place","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:30:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802849,40.975466]]}},{"id":"RSLJ/QpBo12KEaNBywgE5Pj2DTI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fdWG34xqqf7Np2bN6odXVB2nWSk="},{"type":"next-occurrence","id":"UjFv3J1ODSgj3R30HJCjdoF+LTU="}],"description":"Construction on NY 22 both directions at Ackerman Place (Eastchester) D265529/32741709 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"RSLJ/QpBo12KEaNBywgE5Pj2DTI=","beginning_cross_street":"Ackerman Place","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802849,40.975466]]}},{"id":"UjFv3J1ODSgj3R30HJCjdoF+LTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fdWG34xqqf7Np2bN6odXVB2nWSk="},{"type":"next-occurrence","id":"V6Rq/W6Md9uojocvA6Wj53ccy1k="}],"description":"Construction on NY 22 both directions at Ackerman Place (Eastchester) D265529/32741709 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"UjFv3J1ODSgj3R30HJCjdoF+LTU=","beginning_cross_street":"Ackerman Place","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802849,40.975466]]}},{"id":"V6Rq/W6Md9uojocvA6Wj53ccy1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fdWG34xqqf7Np2bN6odXVB2nWSk="},{"type":"next-occurrence","id":"nP/3r8PxEwvplsGgwzmWAxzhuPA="}],"description":"Construction on NY 22 both directions at Ackerman Place (Eastchester) D265529/32741709 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"V6Rq/W6Md9uojocvA6Wj53ccy1k=","beginning_cross_street":"Ackerman Place","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802849,40.975466]]}},{"id":"nP/3r8PxEwvplsGgwzmWAxzhuPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fdWG34xqqf7Np2bN6odXVB2nWSk="},{"type":"next-occurrence","id":"CFkFo4ue52gRDexck5JfOOiiQ8Y="}],"description":"Construction on NY 22 both directions at Ackerman Place (Eastchester) D265529/32741709 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"nP/3r8PxEwvplsGgwzmWAxzhuPA=","beginning_cross_street":"Ackerman Place","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802849,40.975466]]}},{"id":"CFkFo4ue52gRDexck5JfOOiiQ8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fdWG34xqqf7Np2bN6odXVB2nWSk="}],"description":"Construction on NY 22 both directions at Ackerman Place (Eastchester) D265529/32741709 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"CFkFo4ue52gRDexck5JfOOiiQ8Y=","beginning_cross_street":"Ackerman Place","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802849,40.975466]]}},{"id":"4n4WlO1FnkG0inIz58m+CzhOIJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tbhAlRXFtosxTlEpPeX9JCGruFU="}],"description":"Construction on NY 984E - Yonkers Avenue at Kimball Avenue (Mount Pleasant) D265529/32741909 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 PM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"4n4WlO1FnkG0inIz58m+CzhOIJY=","beginning_cross_street":"Kimball Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796204,41.133014]]}},{"id":"tbhAlRXFtosxTlEpPeX9JCGruFU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4n4WlO1FnkG0inIz58m+CzhOIJY="},{"type":"next-occurrence","id":"tjelTm9CDgta50fBsdt8qyUYHQc="}],"description":"Construction on NY 984E - Yonkers Avenue at Kimball Avenue (Mount Pleasant) D265529/32741909 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 PM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"tbhAlRXFtosxTlEpPeX9JCGruFU=","beginning_cross_street":"Kimball Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796204,41.133014]]}},{"id":"tjelTm9CDgta50fBsdt8qyUYHQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4n4WlO1FnkG0inIz58m+CzhOIJY="},{"type":"next-occurrence","id":"BjPupAhPfvUv5B+Lq2FOX7KHOOU="}],"description":"Construction on NY 984E - Yonkers Avenue at Kimball Avenue (Mount Pleasant) D265529/32741909 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 PM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"tjelTm9CDgta50fBsdt8qyUYHQc=","beginning_cross_street":"Kimball Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796204,41.133014]]}},{"id":"BjPupAhPfvUv5B+Lq2FOX7KHOOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4n4WlO1FnkG0inIz58m+CzhOIJY="},{"type":"next-occurrence","id":"soNBlSZ1QI2MUmbLryUbo7nVl1k="}],"description":"Construction on NY 984E - Yonkers Avenue at Kimball Avenue (Mount Pleasant) D265529/32741909 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 PM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"BjPupAhPfvUv5B+Lq2FOX7KHOOU=","beginning_cross_street":"Kimball Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796204,41.133014]]}},{"id":"soNBlSZ1QI2MUmbLryUbo7nVl1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4n4WlO1FnkG0inIz58m+CzhOIJY="},{"type":"next-occurrence","id":"6ywQrkL5hxAOfmoQdK09XzrD2NA="}],"description":"Construction on NY 984E - Yonkers Avenue at Kimball Avenue (Mount Pleasant) D265529/32741909 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 PM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"soNBlSZ1QI2MUmbLryUbo7nVl1k=","beginning_cross_street":"Kimball Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796204,41.133014]]}},{"id":"6ywQrkL5hxAOfmoQdK09XzrD2NA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4n4WlO1FnkG0inIz58m+CzhOIJY="}],"description":"Construction on NY 984E - Yonkers Avenue at Kimball Avenue (Mount Pleasant) D265529/32741909 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 PM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"6ywQrkL5hxAOfmoQdK09XzrD2NA=","beginning_cross_street":"Kimball Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T01:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.796204,41.133014]]}},{"id":"bNIgRX5lzogrDQf6k3C25HdqpEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"b0XGqBREUWnBoJ6Lsl+XbT1W6HY="}],"description":"Construction on NY 22 both directions at Pondfield Road (Eastchester) D265529/32741909 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"bNIgRX5lzogrDQf6k3C25HdqpEI=","beginning_cross_street":"Pondfield Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:30:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.818368,40.934847]]}},{"id":"b0XGqBREUWnBoJ6Lsl+XbT1W6HY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bNIgRX5lzogrDQf6k3C25HdqpEI="},{"type":"next-occurrence","id":"LSDXxd+OGaqpfR5ZVqfKs46Yycw="}],"description":"Construction on NY 22 both directions at Pondfield Road (Eastchester) D265529/32741909 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"b0XGqBREUWnBoJ6Lsl+XbT1W6HY=","beginning_cross_street":"Pondfield Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.818368,40.934847]]}},{"id":"LSDXxd+OGaqpfR5ZVqfKs46Yycw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bNIgRX5lzogrDQf6k3C25HdqpEI="},{"type":"next-occurrence","id":"iRJYtxjy/t5gLDsgmDZoSjp/mGU="}],"description":"Construction on NY 22 both directions at Pondfield Road (Eastchester) D265529/32741909 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"LSDXxd+OGaqpfR5ZVqfKs46Yycw=","beginning_cross_street":"Pondfield Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.818368,40.934847]]}},{"id":"iRJYtxjy/t5gLDsgmDZoSjp/mGU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bNIgRX5lzogrDQf6k3C25HdqpEI="},{"type":"next-occurrence","id":"dGo+v6dL7PHMj0thIDe3vJlKQ2g="}],"description":"Construction on NY 22 both directions at Pondfield Road (Eastchester) D265529/32741909 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"iRJYtxjy/t5gLDsgmDZoSjp/mGU=","beginning_cross_street":"Pondfield Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.818368,40.934847]]}},{"id":"dGo+v6dL7PHMj0thIDe3vJlKQ2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bNIgRX5lzogrDQf6k3C25HdqpEI="},{"type":"next-occurrence","id":"hv1ptoupVWp+1267HrA3fu3tp2M="}],"description":"Construction on NY 22 both directions at Pondfield Road (Eastchester) D265529/32741909 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"dGo+v6dL7PHMj0thIDe3vJlKQ2g=","beginning_cross_street":"Pondfield Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.818368,40.934847]]}},{"id":"hv1ptoupVWp+1267HrA3fu3tp2M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bNIgRX5lzogrDQf6k3C25HdqpEI="}],"description":"Construction on NY 22 both directions at Pondfield Road (Eastchester) D265529/32741909 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday June 5th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-05-29T19:00:27Z"},"road_event_id":"hv1ptoupVWp+1267HrA3fu3tp2M=","beginning_cross_street":"Pondfield Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.818368,40.934847]]}},{"id":"Rqf638jiMGX9U7HgpLj4g4FYUC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 59"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 59 both directions between Central Avenue (Clarkstown) and New Clarkstown Road (Clarkstown) D265445/B1077330/32752409 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Wednesday June 3rd, 2026 10:30 AM thru Friday October 2nd, 2026 12:00 PM all lanes closed and detoured","update_date":"2026-06-03T19:25:45Z"},"road_event_id":"Rqf638jiMGX9U7HgpLj4g4FYUC0=","beginning_cross_street":"Central Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.031625,41.104562]]}},{"id":"1/BpwDwjRYfhrnmYFA0U6vEGgPc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OiuORBNW3YDAg2OrYRNCrJwNnyk="}],"description":"Road rehabilitation on CR-67 both directions between RT-15 (Rush) and RT-15A (Henrietta) Alternating lane/shoulder closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-22T12:28:46Z"},"road_event_id":"1/BpwDwjRYfhrnmYFA0U6vEGgPc=","beginning_cross_street":"RT-15","ending_cross_street":"RT-15A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.66748,43.017721]]}},{"id":"OiuORBNW3YDAg2OrYRNCrJwNnyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/BpwDwjRYfhrnmYFA0U6vEGgPc="},{"type":"next-occurrence","id":"ZLxo1AuesXN6ngRBwv1h1V4brUQ="}],"description":"Road rehabilitation on CR-67 both directions between RT-15 (Rush) and RT-15A (Henrietta) Alternating lane/shoulder closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-22T12:28:46Z"},"road_event_id":"OiuORBNW3YDAg2OrYRNCrJwNnyk=","beginning_cross_street":"RT-15","ending_cross_street":"RT-15A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.66748,43.017721]]}},{"id":"ZLxo1AuesXN6ngRBwv1h1V4brUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/BpwDwjRYfhrnmYFA0U6vEGgPc="},{"type":"next-occurrence","id":"cbzykFZk8yldTGdz6drHI5+qEwo="}],"description":"Road rehabilitation on CR-67 both directions between RT-15 (Rush) and RT-15A (Henrietta) Alternating lane/shoulder closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-22T12:28:46Z"},"road_event_id":"ZLxo1AuesXN6ngRBwv1h1V4brUQ=","beginning_cross_street":"RT-15","ending_cross_street":"RT-15A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.66748,43.017721]]}},{"id":"cbzykFZk8yldTGdz6drHI5+qEwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/BpwDwjRYfhrnmYFA0U6vEGgPc="},{"type":"next-occurrence","id":"49QvXausCWb3BWcbtWtEWHumu3g="}],"description":"Road rehabilitation on CR-67 both directions between RT-15 (Rush) and RT-15A (Henrietta) Alternating lane/shoulder closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-22T12:28:46Z"},"road_event_id":"cbzykFZk8yldTGdz6drHI5+qEwo=","beginning_cross_street":"RT-15","ending_cross_street":"RT-15A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.66748,43.017721]]}},{"id":"49QvXausCWb3BWcbtWtEWHumu3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/BpwDwjRYfhrnmYFA0U6vEGgPc="},{"type":"next-occurrence","id":"00tHxEiv4ufwJ01sI3oh29gRBmk="}],"description":"Road rehabilitation on CR-67 both directions between RT-15 (Rush) and RT-15A (Henrietta) Alternating lane/shoulder closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-22T12:28:46Z"},"road_event_id":"49QvXausCWb3BWcbtWtEWHumu3g=","beginning_cross_street":"RT-15","ending_cross_street":"RT-15A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.66748,43.017721]]}},{"id":"00tHxEiv4ufwJ01sI3oh29gRBmk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/BpwDwjRYfhrnmYFA0U6vEGgPc="},{"type":"next-occurrence","id":"45WZ8SHIeOdYEVmP4+fh7N9DcQY="}],"description":"Road rehabilitation on CR-67 both directions between RT-15 (Rush) and RT-15A (Henrietta) Alternating lane/shoulder closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-22T12:28:46Z"},"road_event_id":"00tHxEiv4ufwJ01sI3oh29gRBmk=","beginning_cross_street":"RT-15","ending_cross_street":"RT-15A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.66748,43.017721]]}},{"id":"45WZ8SHIeOdYEVmP4+fh7N9DcQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/BpwDwjRYfhrnmYFA0U6vEGgPc="},{"type":"next-occurrence","id":"d8eWVE8zsj5TEA7xGRmddflhsOo="}],"description":"Road rehabilitation on CR-67 both directions between RT-15 (Rush) and RT-15A (Henrietta) Alternating lane/shoulder closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-22T12:28:46Z"},"road_event_id":"45WZ8SHIeOdYEVmP4+fh7N9DcQY=","beginning_cross_street":"RT-15","ending_cross_street":"RT-15A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.66748,43.017721]]}},{"id":"d8eWVE8zsj5TEA7xGRmddflhsOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/BpwDwjRYfhrnmYFA0U6vEGgPc="},{"type":"next-occurrence","id":"urF6DbUBct3Q4MIVy4UUSbNb91g="}],"description":"Road rehabilitation on CR-67 both directions between RT-15 (Rush) and RT-15A (Henrietta) Alternating lane/shoulder closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-22T12:28:46Z"},"road_event_id":"d8eWVE8zsj5TEA7xGRmddflhsOo=","beginning_cross_street":"RT-15","ending_cross_street":"RT-15A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.66748,43.017721]]}},{"id":"urF6DbUBct3Q4MIVy4UUSbNb91g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/BpwDwjRYfhrnmYFA0U6vEGgPc="},{"type":"next-occurrence","id":"W4Wgi+9pzEjCcHD2FgO9sLSzTPo="}],"description":"Road rehabilitation on CR-67 both directions between RT-15 (Rush) and RT-15A (Henrietta) Alternating lane/shoulder closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-22T12:28:46Z"},"road_event_id":"urF6DbUBct3Q4MIVy4UUSbNb91g=","beginning_cross_street":"RT-15","ending_cross_street":"RT-15A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.66748,43.017721]]}},{"id":"W4Wgi+9pzEjCcHD2FgO9sLSzTPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/BpwDwjRYfhrnmYFA0U6vEGgPc="},{"type":"next-occurrence","id":"+IF5dGM/8UCrx+Cd+DXD2C18Atc="}],"description":"Road rehabilitation on CR-67 both directions between RT-15 (Rush) and RT-15A (Henrietta) Alternating lane/shoulder closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-22T12:28:46Z"},"road_event_id":"W4Wgi+9pzEjCcHD2FgO9sLSzTPo=","beginning_cross_street":"RT-15","ending_cross_street":"RT-15A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.66748,43.017721]]}},{"id":"+IF5dGM/8UCrx+Cd+DXD2C18Atc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/BpwDwjRYfhrnmYFA0U6vEGgPc="},{"type":"next-occurrence","id":"g7wsW3UwBbNA4GxetgHk8o/abp0="}],"description":"Road rehabilitation on CR-67 both directions between RT-15 (Rush) and RT-15A (Henrietta) Alternating lane/shoulder closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-22T12:28:46Z"},"road_event_id":"+IF5dGM/8UCrx+Cd+DXD2C18Atc=","beginning_cross_street":"RT-15","ending_cross_street":"RT-15A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.66748,43.017721]]}},{"id":"g7wsW3UwBbNA4GxetgHk8o/abp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/BpwDwjRYfhrnmYFA0U6vEGgPc="},{"type":"next-occurrence","id":"DyGr87KAwyC9NzGPmJYpoXCkYa0="}],"description":"Road rehabilitation on CR-67 both directions between RT-15 (Rush) and RT-15A (Henrietta) Alternating lane/shoulder closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-22T12:28:46Z"},"road_event_id":"g7wsW3UwBbNA4GxetgHk8o/abp0=","beginning_cross_street":"RT-15","ending_cross_street":"RT-15A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.66748,43.017721]]}},{"id":"DyGr87KAwyC9NzGPmJYpoXCkYa0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/BpwDwjRYfhrnmYFA0U6vEGgPc="},{"type":"next-occurrence","id":"lNrofDj6pWivqxB27+VijOcgygM="}],"description":"Road rehabilitation on CR-67 both directions between RT-15 (Rush) and RT-15A (Henrietta) Alternating lane/shoulder closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-22T12:28:46Z"},"road_event_id":"DyGr87KAwyC9NzGPmJYpoXCkYa0=","beginning_cross_street":"RT-15","ending_cross_street":"RT-15A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.66748,43.017721]]}},{"id":"lNrofDj6pWivqxB27+VijOcgygM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/BpwDwjRYfhrnmYFA0U6vEGgPc="},{"type":"next-occurrence","id":"LX0s2y8t2dRFXfDNluztrMxVMYI="}],"description":"Road rehabilitation on CR-67 both directions between RT-15 (Rush) and RT-15A (Henrietta) Alternating lane/shoulder closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-22T12:28:46Z"},"road_event_id":"lNrofDj6pWivqxB27+VijOcgygM=","beginning_cross_street":"RT-15","ending_cross_street":"RT-15A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.66748,43.017721]]}},{"id":"LX0s2y8t2dRFXfDNluztrMxVMYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1/BpwDwjRYfhrnmYFA0U6vEGgPc="}],"description":"Road rehabilitation on CR-67 both directions between RT-15 (Rush) and RT-15A (Henrietta) Alternating lane/shoulder closures with flaggers as needed, Tuesday May 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-05-22T12:28:46Z"},"road_event_id":"LX0s2y8t2dRFXfDNluztrMxVMYI=","beginning_cross_street":"RT-15","ending_cross_street":"RT-15A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.66748,43.017721]]}},{"id":"k++8vKo3PI2Joydlz/1IlpJe3A0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Northbound near CR 672/Mill St (Belleville Twp), Continuous Monday May 18, 2026 12:00 AM thru Friday August 28, 2026 12:00 PM, right shoulder closed","update_date":"2026-05-22T13:55:32Z"},"road_event_id":"k++8vKo3PI2Joydlz/1IlpJe3A0=","beginning_cross_street":"CR 672/Mill St","ending_cross_street":"North of NJ 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.154037,40.782737]]}},{"id":"Xn7Tf9oKNtav/BoJYCiuUtvVXu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Southbound near North of NJ 21 (Belleville Twp), Continuous Friday May 22, 2026 12:00 AM thru Friday August 28, 2026 12:00 PM, right shoulder closed","update_date":"2026-05-22T13:55:34Z"},"road_event_id":"Xn7Tf9oKNtav/BoJYCiuUtvVXu4=","beginning_cross_street":"North of NJ 21","ending_cross_street":"CR 672/Mill St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.153694,40.784175]]}},{"id":"8QLqisKBwoGArF+oPJQajZmV28Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cuaV8ucxdF73L6Xk92i3Unco/Vc="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy both directions between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/NIGHT/B5501670/32355109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T16:06:48Z"},"road_event_id":"8QLqisKBwoGArF+oPJQajZmV28Q=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831707,40.999661]]}},{"id":"cuaV8ucxdF73L6Xk92i3Unco/Vc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8QLqisKBwoGArF+oPJQajZmV28Q="},{"type":"next-occurrence","id":"GtvkCBb2Sg5n5nZ/l73GpF0Oz1Q="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy both directions between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/NIGHT/B5501670/32355109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T16:06:48Z"},"road_event_id":"cuaV8ucxdF73L6Xk92i3Unco/Vc=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831707,40.999661]]}},{"id":"GtvkCBb2Sg5n5nZ/l73GpF0Oz1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8QLqisKBwoGArF+oPJQajZmV28Q="},{"type":"next-occurrence","id":"yjxlNiWlmw41O41IRLLeQLMAOWY="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy both directions between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/NIGHT/B5501670/32355109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T16:06:48Z"},"road_event_id":"GtvkCBb2Sg5n5nZ/l73GpF0Oz1Q=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831707,40.999661]]}},{"id":"yjxlNiWlmw41O41IRLLeQLMAOWY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8QLqisKBwoGArF+oPJQajZmV28Q="},{"type":"next-occurrence","id":"07S7/Iu1kGT8i91v+Z/jKAfYHbg="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy both directions between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/NIGHT/B5501670/32355109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T16:06:48Z"},"road_event_id":"yjxlNiWlmw41O41IRLLeQLMAOWY=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831707,40.999661]]}},{"id":"07S7/Iu1kGT8i91v+Z/jKAfYHbg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8QLqisKBwoGArF+oPJQajZmV28Q="},{"type":"next-occurrence","id":"Bizacy18NVxR7w69vv47bMcX3gs="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy both directions between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/NIGHT/B5501670/32355109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T16:06:48Z"},"road_event_id":"07S7/Iu1kGT8i91v+Z/jKAfYHbg=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831707,40.999661]]}},{"id":"Bizacy18NVxR7w69vv47bMcX3gs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8QLqisKBwoGArF+oPJQajZmV28Q="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy both directions between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/NIGHT/B5501670/32355109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T16:06:48Z"},"road_event_id":"Bizacy18NVxR7w69vv47bMcX3gs=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T01:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831707,40.999661]]}},{"id":"ZNoIwgqZyomtPf3bBD9xrdfFyac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kU7zDHGrOAHPrsxnFX3pkYR3S6M="}],"description":"Milling and repaving on NY 5 eastbound between Hinsdale Rd On-Ramp (Camillus) and Route 695 (Camillus) ; Alternating lane closures, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-22T15:28:45Z"},"road_event_id":"ZNoIwgqZyomtPf3bBD9xrdfFyac=","beginning_cross_street":"Hinsdale Rd On-Ramp ","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.261268,43.05422]]}},{"id":"kU7zDHGrOAHPrsxnFX3pkYR3S6M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNoIwgqZyomtPf3bBD9xrdfFyac="},{"type":"next-occurrence","id":"ZK9o04srk1SpKVwlbaLYgKfuEEk="}],"description":"Milling and repaving on NY 5 eastbound between Hinsdale Rd On-Ramp (Camillus) and Route 695 (Camillus) ; Alternating lane closures, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-22T15:28:45Z"},"road_event_id":"kU7zDHGrOAHPrsxnFX3pkYR3S6M=","beginning_cross_street":"Hinsdale Rd On-Ramp ","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.261268,43.05422]]}},{"id":"ZK9o04srk1SpKVwlbaLYgKfuEEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNoIwgqZyomtPf3bBD9xrdfFyac="},{"type":"next-occurrence","id":"4Dks/gnns0KdO89cyuMpw6IY8So="}],"description":"Milling and repaving on NY 5 eastbound between Hinsdale Rd On-Ramp (Camillus) and Route 695 (Camillus) ; Alternating lane closures, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-22T15:28:45Z"},"road_event_id":"ZK9o04srk1SpKVwlbaLYgKfuEEk=","beginning_cross_street":"Hinsdale Rd On-Ramp ","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.261268,43.05422]]}},{"id":"4Dks/gnns0KdO89cyuMpw6IY8So=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNoIwgqZyomtPf3bBD9xrdfFyac="},{"type":"next-occurrence","id":"FluVP2ZR39Mx8Mk6pOgm4/N4nT0="}],"description":"Milling and repaving on NY 5 eastbound between Hinsdale Rd On-Ramp (Camillus) and Route 695 (Camillus) ; Alternating lane closures, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-22T15:28:45Z"},"road_event_id":"4Dks/gnns0KdO89cyuMpw6IY8So=","beginning_cross_street":"Hinsdale Rd On-Ramp ","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.261268,43.05422]]}},{"id":"FluVP2ZR39Mx8Mk6pOgm4/N4nT0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNoIwgqZyomtPf3bBD9xrdfFyac="},{"type":"next-occurrence","id":"kViDD2Def+1KuCb4IRiYmOvYw0o="}],"description":"Milling and repaving on NY 5 eastbound between Hinsdale Rd On-Ramp (Camillus) and Route 695 (Camillus) ; Alternating lane closures, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-22T15:28:45Z"},"road_event_id":"FluVP2ZR39Mx8Mk6pOgm4/N4nT0=","beginning_cross_street":"Hinsdale Rd On-Ramp ","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.261268,43.05422]]}},{"id":"kViDD2Def+1KuCb4IRiYmOvYw0o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZNoIwgqZyomtPf3bBD9xrdfFyac="}],"description":"Milling and repaving on NY 5 eastbound between Hinsdale Rd On-Ramp (Camillus) and Route 695 (Camillus) ; Alternating lane closures, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-22T15:28:45Z"},"road_event_id":"kViDD2Def+1KuCb4IRiYmOvYw0o=","beginning_cross_street":"Hinsdale Rd On-Ramp ","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.261268,43.05422]]}},{"id":"ORC300549119","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 2"],"direction":"unknown","description":"Bridge rehabilitation on NY 2 eastbound between 19th Street (Watervliet) and Front Street (Watervliet) Not currently Scheduled","update_date":"2026-05-27T21:00:01Z"},"road_event_id":"ORC300549119","beginning_cross_street":"19th Street","ending_cross_street":"Front Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-22T16:55:30Z","end_date":"2026-05-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.699591,42.729517]]}},{"id":"JgyqMwN5FucveoASOvvXc64Ox1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MEnWJekm/zaNeA0tDWeHgZLWSsw="}],"description":"Bridge replacement on Sprain Brook State Pkwy both directions between Grasslands Road - NY 100C (Mount Pleasant) and Taconic State Parkway (Greenburgh) D264324/NIGHT/B1070500/29824909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T15:59:52Z"},"road_event_id":"JgyqMwN5FucveoASOvvXc64Ox1w=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803308,41.090081]]}},{"id":"MEnWJekm/zaNeA0tDWeHgZLWSsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JgyqMwN5FucveoASOvvXc64Ox1w="},{"type":"next-occurrence","id":"chJk50ihPceWKF18mH+e5S12Cas="}],"description":"Bridge replacement on Sprain Brook State Pkwy both directions between Grasslands Road - NY 100C (Mount Pleasant) and Taconic State Parkway (Greenburgh) D264324/NIGHT/B1070500/29824909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T15:59:52Z"},"road_event_id":"MEnWJekm/zaNeA0tDWeHgZLWSsw=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803308,41.090081]]}},{"id":"chJk50ihPceWKF18mH+e5S12Cas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JgyqMwN5FucveoASOvvXc64Ox1w="},{"type":"next-occurrence","id":"S9G2OfKTCXAlcS16Z66xEb0QV/4="}],"description":"Bridge replacement on Sprain Brook State Pkwy both directions between Grasslands Road - NY 100C (Mount Pleasant) and Taconic State Parkway (Greenburgh) D264324/NIGHT/B1070500/29824909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T15:59:52Z"},"road_event_id":"chJk50ihPceWKF18mH+e5S12Cas=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803308,41.090081]]}},{"id":"S9G2OfKTCXAlcS16Z66xEb0QV/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JgyqMwN5FucveoASOvvXc64Ox1w="},{"type":"next-occurrence","id":"8SLI3ZaM2GGVVBg2MUiAwz2a0QY="}],"description":"Bridge replacement on Sprain Brook State Pkwy both directions between Grasslands Road - NY 100C (Mount Pleasant) and Taconic State Parkway (Greenburgh) D264324/NIGHT/B1070500/29824909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T15:59:52Z"},"road_event_id":"S9G2OfKTCXAlcS16Z66xEb0QV/4=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803308,41.090081]]}},{"id":"8SLI3ZaM2GGVVBg2MUiAwz2a0QY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JgyqMwN5FucveoASOvvXc64Ox1w="},{"type":"next-occurrence","id":"ay4/XEMdE2Q/BNHiZsaKwac3C6c="}],"description":"Bridge replacement on Sprain Brook State Pkwy both directions between Grasslands Road - NY 100C (Mount Pleasant) and Taconic State Parkway (Greenburgh) D264324/NIGHT/B1070500/29824909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T15:59:52Z"},"road_event_id":"8SLI3ZaM2GGVVBg2MUiAwz2a0QY=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803308,41.090081]]}},{"id":"ay4/XEMdE2Q/BNHiZsaKwac3C6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JgyqMwN5FucveoASOvvXc64Ox1w="}],"description":"Bridge replacement on Sprain Brook State Pkwy both directions between Grasslands Road - NY 100C (Mount Pleasant) and Taconic State Parkway (Greenburgh) D264324/NIGHT/B1070500/29824909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-06-05T15:59:52Z"},"road_event_id":"ay4/XEMdE2Q/BNHiZsaKwac3C6c=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T01:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803308,41.090081]]}},{"id":"oTKZmNWcf5OSXORro/9Tx/quEvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Golf Course Road"],"direction":"unknown","related_road_events":[],"description":"Roadwork on Golf Course Road both directions between Route 46 (Rome) and Fish Hatchery Road , Continuous Friday May 22nd, 2026 12:00 AM thru Wednesday July 22nd, 2026 11:59 PM","update_date":"2026-05-22T17:02:08Z"},"road_event_id":"oTKZmNWcf5OSXORro/9Tx/quEvU=","beginning_cross_street":"Route 46","ending_cross_street":"Fish Hatchery Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.429674,43.272921]]}},{"id":"82qEFzuM07W8wTVQoqJyvg7XaTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sxcU9635t6V+qDFosd2x3wp3MRs="}],"description":"Drainage improvements on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 18 - CT 136 (Westport) There will be various lane closures , Sunday May 31st, 2026 thru Saturday August 22nd, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:26:02Z"},"road_event_id":"82qEFzuM07W8wTVQoqJyvg7XaTU=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 18 - CT 136","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"sxcU9635t6V+qDFosd2x3wp3MRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"82qEFzuM07W8wTVQoqJyvg7XaTU="},{"type":"next-occurrence","id":"D4pUSeOlLOmkathBZY0BX9O6iRk="}],"description":"Drainage improvements on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 18 - CT 136 (Westport) There will be various lane closures , Sunday May 31st, 2026 thru Saturday August 22nd, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:26:02Z"},"road_event_id":"sxcU9635t6V+qDFosd2x3wp3MRs=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 18 - CT 136","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T23:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"D4pUSeOlLOmkathBZY0BX9O6iRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"82qEFzuM07W8wTVQoqJyvg7XaTU="},{"type":"next-occurrence","id":"CSPSiovSoJDsHwvRTlr4UTBH4qg="}],"description":"Drainage improvements on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 18 - CT 136 (Westport) There will be various lane closures , Sunday May 31st, 2026 thru Saturday August 22nd, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:26:02Z"},"road_event_id":"D4pUSeOlLOmkathBZY0BX9O6iRk=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 18 - CT 136","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"CSPSiovSoJDsHwvRTlr4UTBH4qg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"82qEFzuM07W8wTVQoqJyvg7XaTU="},{"type":"next-occurrence","id":"it1qhDTorF64PDgPO9TOq5tVAy4="}],"description":"Drainage improvements on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 18 - CT 136 (Westport) There will be various lane closures , Sunday May 31st, 2026 thru Saturday August 22nd, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:26:02Z"},"road_event_id":"CSPSiovSoJDsHwvRTlr4UTBH4qg=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 18 - CT 136","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"it1qhDTorF64PDgPO9TOq5tVAy4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"82qEFzuM07W8wTVQoqJyvg7XaTU="},{"type":"next-occurrence","id":"UjK0P6PCh14ZNVBNiay6ZsNoMxw="}],"description":"Drainage improvements on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 18 - CT 136 (Westport) There will be various lane closures , Sunday May 31st, 2026 thru Saturday August 22nd, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:26:02Z"},"road_event_id":"it1qhDTorF64PDgPO9TOq5tVAy4=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 18 - CT 136","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"UjK0P6PCh14ZNVBNiay6ZsNoMxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"82qEFzuM07W8wTVQoqJyvg7XaTU="},{"type":"next-occurrence","id":"8eJFZa8VaOhSAlHktFIr7naT21o="}],"description":"Drainage improvements on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 18 - CT 136 (Westport) There will be various lane closures , Sunday May 31st, 2026 thru Saturday August 22nd, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:26:02Z"},"road_event_id":"UjK0P6PCh14ZNVBNiay6ZsNoMxw=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 18 - CT 136","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"8eJFZa8VaOhSAlHktFIr7naT21o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"82qEFzuM07W8wTVQoqJyvg7XaTU="},{"type":"next-occurrence","id":"X9w1woizFIoApgipXRRlFsx3OyM="}],"description":"Drainage improvements on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 18 - CT 136 (Westport) There will be various lane closures , Sunday May 31st, 2026 thru Saturday August 22nd, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:26:02Z"},"road_event_id":"8eJFZa8VaOhSAlHktFIr7naT21o=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 18 - CT 136","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"X9w1woizFIoApgipXRRlFsx3OyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"82qEFzuM07W8wTVQoqJyvg7XaTU="},{"type":"next-occurrence","id":"QhplfuFx+aVLlJoTqz2vFuVb4yk="}],"description":"Drainage improvements on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 18 - CT 136 (Westport) There will be various lane closures , Sunday May 31st, 2026 thru Saturday August 22nd, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:26:02Z"},"road_event_id":"X9w1woizFIoApgipXRRlFsx3OyM=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 18 - CT 136","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"QhplfuFx+aVLlJoTqz2vFuVb4yk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"82qEFzuM07W8wTVQoqJyvg7XaTU="},{"type":"next-occurrence","id":"MIUUkYZIpU1/BZEcyoZ2J2eXf3w="}],"description":"Drainage improvements on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 18 - CT 136 (Westport) There will be various lane closures , Sunday May 31st, 2026 thru Saturday August 22nd, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:26:02Z"},"road_event_id":"QhplfuFx+aVLlJoTqz2vFuVb4yk=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 18 - CT 136","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T23:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"MIUUkYZIpU1/BZEcyoZ2J2eXf3w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"82qEFzuM07W8wTVQoqJyvg7XaTU="},{"type":"next-occurrence","id":"2O7MZe/xIv6sKjtaz3P4ocOFTPs="}],"description":"Drainage improvements on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 18 - CT 136 (Westport) There will be various lane closures , Sunday May 31st, 2026 thru Saturday August 22nd, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:26:02Z"},"road_event_id":"MIUUkYZIpU1/BZEcyoZ2J2eXf3w=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 18 - CT 136","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"2O7MZe/xIv6sKjtaz3P4ocOFTPs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"82qEFzuM07W8wTVQoqJyvg7XaTU="},{"type":"next-occurrence","id":"mjqMQe3CuY9VdowcT8hPpF08dIM="}],"description":"Drainage improvements on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 18 - CT 136 (Westport) There will be various lane closures , Sunday May 31st, 2026 thru Saturday August 22nd, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:26:02Z"},"road_event_id":"2O7MZe/xIv6sKjtaz3P4ocOFTPs=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 18 - CT 136","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"mjqMQe3CuY9VdowcT8hPpF08dIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"82qEFzuM07W8wTVQoqJyvg7XaTU="},{"type":"next-occurrence","id":"ErlV7yjofYtrd2pmkq6LL42iPgA="}],"description":"Drainage improvements on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 18 - CT 136 (Westport) There will be various lane closures , Sunday May 31st, 2026 thru Saturday August 22nd, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:26:02Z"},"road_event_id":"mjqMQe3CuY9VdowcT8hPpF08dIM=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 18 - CT 136","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"ErlV7yjofYtrd2pmkq6LL42iPgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"82qEFzuM07W8wTVQoqJyvg7XaTU="},{"type":"next-occurrence","id":"a+8tmXWW10/ObfRpjKDbTcfMu6g="}],"description":"Drainage improvements on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 18 - CT 136 (Westport) There will be various lane closures , Sunday May 31st, 2026 thru Saturday August 22nd, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:26:02Z"},"road_event_id":"ErlV7yjofYtrd2pmkq6LL42iPgA=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 18 - CT 136","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"a+8tmXWW10/ObfRpjKDbTcfMu6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"82qEFzuM07W8wTVQoqJyvg7XaTU="},{"type":"next-occurrence","id":"jhhj+rJgPbxeTrKBp86gXt8ITUM="}],"description":"Drainage improvements on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 18 - CT 136 (Westport) There will be various lane closures , Sunday May 31st, 2026 thru Saturday August 22nd, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:26:02Z"},"road_event_id":"a+8tmXWW10/ObfRpjKDbTcfMu6g=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 18 - CT 136","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"jhhj+rJgPbxeTrKBp86gXt8ITUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"82qEFzuM07W8wTVQoqJyvg7XaTU="}],"description":"Drainage improvements on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 18 - CT 136 (Westport) There will be various lane closures , Sunday May 31st, 2026 thru Saturday August 22nd, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:26:02Z"},"road_event_id":"jhhj+rJgPbxeTrKBp86gXt8ITUM=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 18 - CT 136","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"yypEDGDSc17fQ+kYvDf752q7BgQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zgOG0QKK8Y3k6tevBJ1cmqLEjsw="}],"description":"Guard rail repairs on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Town Line (Berlin), Monday June 1st, 2026 thru Friday August 7th, 2026, Sunday thru Saturday, 08:30 AM thru 03:30 PM 1 Right lane and shoulder of 3 lanes closed northbound; 2 Right lanes of 3 lanes closed southbound","update_date":"2026-05-22T17:31:07Z"},"road_event_id":"yypEDGDSc17fQ+kYvDf752q7BgQ=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Town Line ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T12:30:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771048,41.541995]]}},{"id":"zgOG0QKK8Y3k6tevBJ1cmqLEjsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yypEDGDSc17fQ+kYvDf752q7BgQ="},{"type":"next-occurrence","id":"nVAQjoGShlwLrJmDOcCswznPmuk="}],"description":"Guard rail repairs on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Town Line (Berlin), Monday June 1st, 2026 thru Friday August 7th, 2026, Sunday thru Saturday, 08:30 AM thru 03:30 PM 1 Right lane and shoulder of 3 lanes closed northbound; 2 Right lanes of 3 lanes closed southbound","update_date":"2026-05-22T17:31:07Z"},"road_event_id":"zgOG0QKK8Y3k6tevBJ1cmqLEjsw=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Town Line ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:30:00Z","end_date":"2026-06-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771048,41.541995]]}},{"id":"nVAQjoGShlwLrJmDOcCswznPmuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yypEDGDSc17fQ+kYvDf752q7BgQ="},{"type":"next-occurrence","id":"R0LIfN3WFa0RubWdEPqP5wqTtsI="}],"description":"Guard rail repairs on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Town Line (Berlin), Monday June 1st, 2026 thru Friday August 7th, 2026, Sunday thru Saturday, 08:30 AM thru 03:30 PM 1 Right lane and shoulder of 3 lanes closed northbound; 2 Right lanes of 3 lanes closed southbound","update_date":"2026-05-22T17:31:07Z"},"road_event_id":"nVAQjoGShlwLrJmDOcCswznPmuk=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Town Line ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T12:30:00Z","end_date":"2026-06-07T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771048,41.541995]]}},{"id":"R0LIfN3WFa0RubWdEPqP5wqTtsI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yypEDGDSc17fQ+kYvDf752q7BgQ="},{"type":"next-occurrence","id":"+dyKMlKui5aHoRTGGQAggYKAia8="}],"description":"Guard rail repairs on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Town Line (Berlin), Monday June 1st, 2026 thru Friday August 7th, 2026, Sunday thru Saturday, 08:30 AM thru 03:30 PM 1 Right lane and shoulder of 3 lanes closed northbound; 2 Right lanes of 3 lanes closed southbound","update_date":"2026-05-22T17:31:07Z"},"road_event_id":"R0LIfN3WFa0RubWdEPqP5wqTtsI=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Town Line ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:30:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771048,41.541995]]}},{"id":"+dyKMlKui5aHoRTGGQAggYKAia8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yypEDGDSc17fQ+kYvDf752q7BgQ="},{"type":"next-occurrence","id":"lCPTEhsVu0gJI/wd1lzOPPzBOA0="}],"description":"Guard rail repairs on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Town Line (Berlin), Monday June 1st, 2026 thru Friday August 7th, 2026, Sunday thru Saturday, 08:30 AM thru 03:30 PM 1 Right lane and shoulder of 3 lanes closed northbound; 2 Right lanes of 3 lanes closed southbound","update_date":"2026-05-22T17:31:07Z"},"road_event_id":"+dyKMlKui5aHoRTGGQAggYKAia8=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Town Line ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:30:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771048,41.541995]]}},{"id":"lCPTEhsVu0gJI/wd1lzOPPzBOA0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yypEDGDSc17fQ+kYvDf752q7BgQ="},{"type":"next-occurrence","id":"yORhqwdfU0kq/mkh06fqiDYKkmk="}],"description":"Guard rail repairs on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Town Line (Berlin), Monday June 1st, 2026 thru Friday August 7th, 2026, Sunday thru Saturday, 08:30 AM thru 03:30 PM 1 Right lane and shoulder of 3 lanes closed northbound; 2 Right lanes of 3 lanes closed southbound","update_date":"2026-05-22T17:31:07Z"},"road_event_id":"lCPTEhsVu0gJI/wd1lzOPPzBOA0=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Town Line ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:30:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771048,41.541995]]}},{"id":"yORhqwdfU0kq/mkh06fqiDYKkmk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yypEDGDSc17fQ+kYvDf752q7BgQ="},{"type":"next-occurrence","id":"CIEZ+1brGQcuE+3xvAxKgogvVF4="}],"description":"Guard rail repairs on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Town Line (Berlin), Monday June 1st, 2026 thru Friday August 7th, 2026, Sunday thru Saturday, 08:30 AM thru 03:30 PM 1 Right lane and shoulder of 3 lanes closed northbound; 2 Right lanes of 3 lanes closed southbound","update_date":"2026-05-22T17:31:07Z"},"road_event_id":"yORhqwdfU0kq/mkh06fqiDYKkmk=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Town Line ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:30:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771048,41.541995]]}},{"id":"CIEZ+1brGQcuE+3xvAxKgogvVF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yypEDGDSc17fQ+kYvDf752q7BgQ="},{"type":"next-occurrence","id":"qdljfKXkvoQIPWi5przjzNnYiB4="}],"description":"Guard rail repairs on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Town Line (Berlin), Monday June 1st, 2026 thru Friday August 7th, 2026, Sunday thru Saturday, 08:30 AM thru 03:30 PM 1 Right lane and shoulder of 3 lanes closed northbound; 2 Right lanes of 3 lanes closed southbound","update_date":"2026-05-22T17:31:07Z"},"road_event_id":"CIEZ+1brGQcuE+3xvAxKgogvVF4=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Town Line ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:30:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771048,41.541995]]}},{"id":"qdljfKXkvoQIPWi5przjzNnYiB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yypEDGDSc17fQ+kYvDf752q7BgQ="},{"type":"next-occurrence","id":"Tx0ztSdcyvRU2zOleoOBca7mEvE="}],"description":"Guard rail repairs on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Town Line (Berlin), Monday June 1st, 2026 thru Friday August 7th, 2026, Sunday thru Saturday, 08:30 AM thru 03:30 PM 1 Right lane and shoulder of 3 lanes closed northbound; 2 Right lanes of 3 lanes closed southbound","update_date":"2026-05-22T17:31:07Z"},"road_event_id":"qdljfKXkvoQIPWi5przjzNnYiB4=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Town Line ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:30:00Z","end_date":"2026-06-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771048,41.541995]]}},{"id":"Tx0ztSdcyvRU2zOleoOBca7mEvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yypEDGDSc17fQ+kYvDf752q7BgQ="},{"type":"next-occurrence","id":"QP5EzD+tYsTgIr9Q0EW/E17g/L4="}],"description":"Guard rail repairs on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Town Line (Berlin), Monday June 1st, 2026 thru Friday August 7th, 2026, Sunday thru Saturday, 08:30 AM thru 03:30 PM 1 Right lane and shoulder of 3 lanes closed northbound; 2 Right lanes of 3 lanes closed southbound","update_date":"2026-05-22T17:31:07Z"},"road_event_id":"Tx0ztSdcyvRU2zOleoOBca7mEvE=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Town Line ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T12:30:00Z","end_date":"2026-06-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771048,41.541995]]}},{"id":"QP5EzD+tYsTgIr9Q0EW/E17g/L4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yypEDGDSc17fQ+kYvDf752q7BgQ="},{"type":"next-occurrence","id":"Fq5rWDquDqvuXelnL5u+zQ8HNsk="}],"description":"Guard rail repairs on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Town Line (Berlin), Monday June 1st, 2026 thru Friday August 7th, 2026, Sunday thru Saturday, 08:30 AM thru 03:30 PM 1 Right lane and shoulder of 3 lanes closed northbound; 2 Right lanes of 3 lanes closed southbound","update_date":"2026-05-22T17:31:07Z"},"road_event_id":"QP5EzD+tYsTgIr9Q0EW/E17g/L4=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Town Line ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T12:30:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771048,41.541995]]}},{"id":"Fq5rWDquDqvuXelnL5u+zQ8HNsk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yypEDGDSc17fQ+kYvDf752q7BgQ="},{"type":"next-occurrence","id":"C7f5BmdQWaBKeClfCt1dAJ28dj4="}],"description":"Guard rail repairs on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Town Line (Berlin), Monday June 1st, 2026 thru Friday August 7th, 2026, Sunday thru Saturday, 08:30 AM thru 03:30 PM 1 Right lane and shoulder of 3 lanes closed northbound; 2 Right lanes of 3 lanes closed southbound","update_date":"2026-05-22T17:31:07Z"},"road_event_id":"Fq5rWDquDqvuXelnL5u+zQ8HNsk=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Town Line ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T12:30:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771048,41.541995]]}},{"id":"C7f5BmdQWaBKeClfCt1dAJ28dj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yypEDGDSc17fQ+kYvDf752q7BgQ="},{"type":"next-occurrence","id":"qHpSAEtZdpzGJj6aqGKfFLxoBlo="}],"description":"Guard rail repairs on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Town Line (Berlin), Monday June 1st, 2026 thru Friday August 7th, 2026, Sunday thru Saturday, 08:30 AM thru 03:30 PM 1 Right lane and shoulder of 3 lanes closed northbound; 2 Right lanes of 3 lanes closed southbound","update_date":"2026-05-22T17:31:07Z"},"road_event_id":"C7f5BmdQWaBKeClfCt1dAJ28dj4=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Town Line ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T12:30:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771048,41.541995]]}},{"id":"qHpSAEtZdpzGJj6aqGKfFLxoBlo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yypEDGDSc17fQ+kYvDf752q7BgQ="},{"type":"next-occurrence","id":"mejg7zHjNzoYOS5/6bMdUPi9In0="}],"description":"Guard rail repairs on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Town Line (Berlin), Monday June 1st, 2026 thru Friday August 7th, 2026, Sunday thru Saturday, 08:30 AM thru 03:30 PM 1 Right lane and shoulder of 3 lanes closed northbound; 2 Right lanes of 3 lanes closed southbound","update_date":"2026-05-22T17:31:07Z"},"road_event_id":"qHpSAEtZdpzGJj6aqGKfFLxoBlo=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Town Line ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T12:30:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771048,41.541995]]}},{"id":"mejg7zHjNzoYOS5/6bMdUPi9In0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yypEDGDSc17fQ+kYvDf752q7BgQ="}],"description":"Guard rail repairs on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Town Line (Berlin), Monday June 1st, 2026 thru Friday August 7th, 2026, Sunday thru Saturday, 08:30 AM thru 03:30 PM 1 Right lane and shoulder of 3 lanes closed northbound; 2 Right lanes of 3 lanes closed southbound","update_date":"2026-05-22T17:31:07Z"},"road_event_id":"mejg7zHjNzoYOS5/6bMdUPi9In0=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Town Line ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T12:30:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771048,41.541995]]}},{"id":"VjGFBkJPXUdnie0kaNzpyBQQuIA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GOVERNOR JOHN DAVIS LODGE TPKE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BSMCjO5IMYOJI/95rzHdjQLgUtA="}],"description":"Bridge rehabilitation on GOVERNOR JOHN DAVIS LODGE TPKE northbound between I-95 (Norwalk) and US 7 at I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:37:42Z"},"road_event_id":"VjGFBkJPXUdnie0kaNzpyBQQuIA=","beginning_cross_street":"I-95","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.414717,41.10681]]}},{"id":"BSMCjO5IMYOJI/95rzHdjQLgUtA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GOVERNOR JOHN DAVIS LODGE TPKE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VjGFBkJPXUdnie0kaNzpyBQQuIA="},{"type":"next-occurrence","id":"CmGrr2VxSX1l25fSAAp20pVdaGI="}],"description":"Bridge rehabilitation on GOVERNOR JOHN DAVIS LODGE TPKE northbound between I-95 (Norwalk) and US 7 at I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:37:42Z"},"road_event_id":"BSMCjO5IMYOJI/95rzHdjQLgUtA=","beginning_cross_street":"I-95","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.414717,41.10681]]}},{"id":"CmGrr2VxSX1l25fSAAp20pVdaGI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GOVERNOR JOHN DAVIS LODGE TPKE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VjGFBkJPXUdnie0kaNzpyBQQuIA="},{"type":"next-occurrence","id":"lcLWJCbf1V8/a1tBlKAUNogAZ5I="}],"description":"Bridge rehabilitation on GOVERNOR JOHN DAVIS LODGE TPKE northbound between I-95 (Norwalk) and US 7 at I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:37:42Z"},"road_event_id":"CmGrr2VxSX1l25fSAAp20pVdaGI=","beginning_cross_street":"I-95","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.414717,41.10681]]}},{"id":"lcLWJCbf1V8/a1tBlKAUNogAZ5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GOVERNOR JOHN DAVIS LODGE TPKE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VjGFBkJPXUdnie0kaNzpyBQQuIA="},{"type":"next-occurrence","id":"P4K5K9Nx6gbSuxIo2Rl32YS2EF0="}],"description":"Bridge rehabilitation on GOVERNOR JOHN DAVIS LODGE TPKE northbound between I-95 (Norwalk) and US 7 at I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:37:42Z"},"road_event_id":"lcLWJCbf1V8/a1tBlKAUNogAZ5I=","beginning_cross_street":"I-95","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.414717,41.10681]]}},{"id":"P4K5K9Nx6gbSuxIo2Rl32YS2EF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GOVERNOR JOHN DAVIS LODGE TPKE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VjGFBkJPXUdnie0kaNzpyBQQuIA="},{"type":"next-occurrence","id":"34Y8IkDXI4g3hO/+kamte5KDoT4="}],"description":"Bridge rehabilitation on GOVERNOR JOHN DAVIS LODGE TPKE northbound between I-95 (Norwalk) and US 7 at I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:37:42Z"},"road_event_id":"P4K5K9Nx6gbSuxIo2Rl32YS2EF0=","beginning_cross_street":"I-95","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.414717,41.10681]]}},{"id":"34Y8IkDXI4g3hO/+kamte5KDoT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GOVERNOR JOHN DAVIS LODGE TPKE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VjGFBkJPXUdnie0kaNzpyBQQuIA="},{"type":"next-occurrence","id":"Zvs7eOVcEvNOf4AeKy27TGqJ66E="}],"description":"Bridge rehabilitation on GOVERNOR JOHN DAVIS LODGE TPKE northbound between I-95 (Norwalk) and US 7 at I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:37:42Z"},"road_event_id":"34Y8IkDXI4g3hO/+kamte5KDoT4=","beginning_cross_street":"I-95","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.414717,41.10681]]}},{"id":"Zvs7eOVcEvNOf4AeKy27TGqJ66E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GOVERNOR JOHN DAVIS LODGE TPKE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VjGFBkJPXUdnie0kaNzpyBQQuIA="},{"type":"next-occurrence","id":"0O5Low/F5oxm4E9jSd8C0XEnJCY="}],"description":"Bridge rehabilitation on GOVERNOR JOHN DAVIS LODGE TPKE northbound between I-95 (Norwalk) and US 7 at I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:37:42Z"},"road_event_id":"Zvs7eOVcEvNOf4AeKy27TGqJ66E=","beginning_cross_street":"I-95","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.414717,41.10681]]}},{"id":"0O5Low/F5oxm4E9jSd8C0XEnJCY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GOVERNOR JOHN DAVIS LODGE TPKE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VjGFBkJPXUdnie0kaNzpyBQQuIA="},{"type":"next-occurrence","id":"nIubzrAbz7fPA0gEM4KGG0hItII="}],"description":"Bridge rehabilitation on GOVERNOR JOHN DAVIS LODGE TPKE northbound between I-95 (Norwalk) and US 7 at I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:37:42Z"},"road_event_id":"0O5Low/F5oxm4E9jSd8C0XEnJCY=","beginning_cross_street":"I-95","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.414717,41.10681]]}},{"id":"nIubzrAbz7fPA0gEM4KGG0hItII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GOVERNOR JOHN DAVIS LODGE TPKE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VjGFBkJPXUdnie0kaNzpyBQQuIA="},{"type":"next-occurrence","id":"FLDLb962ghlHgBr00cM6COiGxPg="}],"description":"Bridge rehabilitation on GOVERNOR JOHN DAVIS LODGE TPKE northbound between I-95 (Norwalk) and US 7 at I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:37:42Z"},"road_event_id":"nIubzrAbz7fPA0gEM4KGG0hItII=","beginning_cross_street":"I-95","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.414717,41.10681]]}},{"id":"FLDLb962ghlHgBr00cM6COiGxPg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GOVERNOR JOHN DAVIS LODGE TPKE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VjGFBkJPXUdnie0kaNzpyBQQuIA="},{"type":"next-occurrence","id":"uP6B0fepfBfbnnGAfe/eA9R+U5U="}],"description":"Bridge rehabilitation on GOVERNOR JOHN DAVIS LODGE TPKE northbound between I-95 (Norwalk) and US 7 at I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:37:42Z"},"road_event_id":"FLDLb962ghlHgBr00cM6COiGxPg=","beginning_cross_street":"I-95","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.414717,41.10681]]}},{"id":"uP6B0fepfBfbnnGAfe/eA9R+U5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GOVERNOR JOHN DAVIS LODGE TPKE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VjGFBkJPXUdnie0kaNzpyBQQuIA="}],"description":"Bridge rehabilitation on GOVERNOR JOHN DAVIS LODGE TPKE northbound between I-95 (Norwalk) and US 7 at I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:37:42Z"},"road_event_id":"uP6B0fepfBfbnnGAfe/eA9R+U5U=","beginning_cross_street":"I-95","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.414717,41.10681]]}},{"id":"q/uh7XXxGUKPQJBiohciEWN+SvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 7"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OYYQpxJGLTSyNtq/A1J28+YvJXg="}],"description":"Bridge rehabilitation on US 7 southbound between Exit 1 - North Avenue (Norwalk) and I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:39:10Z"},"road_event_id":"q/uh7XXxGUKPQJBiohciEWN+SvI=","beginning_cross_street":"Exit 1 - North Avenue","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.420633,41.119136]]}},{"id":"OYYQpxJGLTSyNtq/A1J28+YvJXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 7"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q/uh7XXxGUKPQJBiohciEWN+SvI="},{"type":"next-occurrence","id":"+QeRwc8Vi68lmrIHsBeUQDGoehE="}],"description":"Bridge rehabilitation on US 7 southbound between Exit 1 - North Avenue (Norwalk) and I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:39:10Z"},"road_event_id":"OYYQpxJGLTSyNtq/A1J28+YvJXg=","beginning_cross_street":"Exit 1 - North Avenue","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.420633,41.119136]]}},{"id":"+QeRwc8Vi68lmrIHsBeUQDGoehE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 7"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q/uh7XXxGUKPQJBiohciEWN+SvI="},{"type":"next-occurrence","id":"m1/9tLzEbExL0G3Abi4YihoEQAc="}],"description":"Bridge rehabilitation on US 7 southbound between Exit 1 - North Avenue (Norwalk) and I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:39:10Z"},"road_event_id":"+QeRwc8Vi68lmrIHsBeUQDGoehE=","beginning_cross_street":"Exit 1 - North Avenue","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.420633,41.119136]]}},{"id":"m1/9tLzEbExL0G3Abi4YihoEQAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 7"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q/uh7XXxGUKPQJBiohciEWN+SvI="},{"type":"next-occurrence","id":"lClp+x7cEHfCs9u6mzh5PLBZEr8="}],"description":"Bridge rehabilitation on US 7 southbound between Exit 1 - North Avenue (Norwalk) and I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:39:10Z"},"road_event_id":"m1/9tLzEbExL0G3Abi4YihoEQAc=","beginning_cross_street":"Exit 1 - North Avenue","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.420633,41.119136]]}},{"id":"lClp+x7cEHfCs9u6mzh5PLBZEr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 7"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q/uh7XXxGUKPQJBiohciEWN+SvI="},{"type":"next-occurrence","id":"CwWeJD16EKOxd0b2f0L6ZoDWUrU="}],"description":"Bridge rehabilitation on US 7 southbound between Exit 1 - North Avenue (Norwalk) and I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:39:10Z"},"road_event_id":"lClp+x7cEHfCs9u6mzh5PLBZEr8=","beginning_cross_street":"Exit 1 - North Avenue","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.420633,41.119136]]}},{"id":"CwWeJD16EKOxd0b2f0L6ZoDWUrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 7"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q/uh7XXxGUKPQJBiohciEWN+SvI="},{"type":"next-occurrence","id":"ZNfp59sjdWPB/S/RpFY9dESYcSk="}],"description":"Bridge rehabilitation on US 7 southbound between Exit 1 - North Avenue (Norwalk) and I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:39:10Z"},"road_event_id":"CwWeJD16EKOxd0b2f0L6ZoDWUrU=","beginning_cross_street":"Exit 1 - North Avenue","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.420633,41.119136]]}},{"id":"ZNfp59sjdWPB/S/RpFY9dESYcSk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 7"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q/uh7XXxGUKPQJBiohciEWN+SvI="},{"type":"next-occurrence","id":"cRV5RKu9n1VqvmtSH2wMf1e/pH8="}],"description":"Bridge rehabilitation on US 7 southbound between Exit 1 - North Avenue (Norwalk) and I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:39:10Z"},"road_event_id":"ZNfp59sjdWPB/S/RpFY9dESYcSk=","beginning_cross_street":"Exit 1 - North Avenue","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.420633,41.119136]]}},{"id":"cRV5RKu9n1VqvmtSH2wMf1e/pH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 7"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q/uh7XXxGUKPQJBiohciEWN+SvI="},{"type":"next-occurrence","id":"fZ5uevzYTw4Dkft/R5amOaKoA3o="}],"description":"Bridge rehabilitation on US 7 southbound between Exit 1 - North Avenue (Norwalk) and I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:39:10Z"},"road_event_id":"cRV5RKu9n1VqvmtSH2wMf1e/pH8=","beginning_cross_street":"Exit 1 - North Avenue","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.420633,41.119136]]}},{"id":"fZ5uevzYTw4Dkft/R5amOaKoA3o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 7"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q/uh7XXxGUKPQJBiohciEWN+SvI="},{"type":"next-occurrence","id":"S7m4lB9HZOHL+jeXDlw92k6soJw="}],"description":"Bridge rehabilitation on US 7 southbound between Exit 1 - North Avenue (Norwalk) and I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:39:10Z"},"road_event_id":"fZ5uevzYTw4Dkft/R5amOaKoA3o=","beginning_cross_street":"Exit 1 - North Avenue","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.420633,41.119136]]}},{"id":"S7m4lB9HZOHL+jeXDlw92k6soJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 7"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q/uh7XXxGUKPQJBiohciEWN+SvI="},{"type":"next-occurrence","id":"TWM0k9tVn9uUdFFDG4uvO9+U0Rg="}],"description":"Bridge rehabilitation on US 7 southbound between Exit 1 - North Avenue (Norwalk) and I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:39:10Z"},"road_event_id":"S7m4lB9HZOHL+jeXDlw92k6soJw=","beginning_cross_street":"Exit 1 - North Avenue","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.420633,41.119136]]}},{"id":"TWM0k9tVn9uUdFFDG4uvO9+U0Rg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 7"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q/uh7XXxGUKPQJBiohciEWN+SvI="}],"description":"Bridge rehabilitation on US 7 southbound between Exit 1 - North Avenue (Norwalk) and I-95 (Norwalk) Motorists can expect temporary lane closures on Route 7, as well as temporary Exit closures to Route 7 from I-95 North and South,, Monday May 18th, 2026 thru Sunday May 16th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-22T17:39:10Z"},"road_event_id":"TWM0k9tVn9uUdFFDG4uvO9+U0Rg=","beginning_cross_street":"Exit 1 - North Avenue","ending_cross_street":"I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T22:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.420633,41.119136]]}},{"id":"r0HeEhw5ynw3FX3COvNri4602/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"m5XTagy0p1/4TYQ9na0w7qlMGRs="}],"description":"Milling and paving operations on US-202 both directions between BUCKINGHAM RD (New Milford) and WEST ST at N LAKE ST (Litchfield) Motorists can expect lane closures , Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:51:06Z"},"road_event_id":"r0HeEhw5ynw3FX3COvNri4602/I=","beginning_cross_street":"BUCKINGHAM RD","ending_cross_street":"N LAKE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.393149,41.629582]]}},{"id":"m5XTagy0p1/4TYQ9na0w7qlMGRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r0HeEhw5ynw3FX3COvNri4602/I="},{"type":"next-occurrence","id":"75iUEDVeXwh+2CCPRcioEcXcIy4="}],"description":"Milling and paving operations on US-202 both directions between BUCKINGHAM RD (New Milford) and WEST ST at N LAKE ST (Litchfield) Motorists can expect lane closures , Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:51:06Z"},"road_event_id":"m5XTagy0p1/4TYQ9na0w7qlMGRs=","beginning_cross_street":"BUCKINGHAM RD","ending_cross_street":"N LAKE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.393149,41.629582]]}},{"id":"75iUEDVeXwh+2CCPRcioEcXcIy4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r0HeEhw5ynw3FX3COvNri4602/I="},{"type":"next-occurrence","id":"WAiIAHoDY933XNhjy5Bi5AVervQ="}],"description":"Milling and paving operations on US-202 both directions between BUCKINGHAM RD (New Milford) and WEST ST at N LAKE ST (Litchfield) Motorists can expect lane closures , Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:51:06Z"},"road_event_id":"75iUEDVeXwh+2CCPRcioEcXcIy4=","beginning_cross_street":"BUCKINGHAM RD","ending_cross_street":"N LAKE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.393149,41.629582]]}},{"id":"WAiIAHoDY933XNhjy5Bi5AVervQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r0HeEhw5ynw3FX3COvNri4602/I="},{"type":"next-occurrence","id":"kG2hJuLYzpZCzoqE6IaIK38Pock="}],"description":"Milling and paving operations on US-202 both directions between BUCKINGHAM RD (New Milford) and WEST ST at N LAKE ST (Litchfield) Motorists can expect lane closures , Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:51:06Z"},"road_event_id":"WAiIAHoDY933XNhjy5Bi5AVervQ=","beginning_cross_street":"BUCKINGHAM RD","ending_cross_street":"N LAKE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.393149,41.629582]]}},{"id":"kG2hJuLYzpZCzoqE6IaIK38Pock=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r0HeEhw5ynw3FX3COvNri4602/I="}],"description":"Milling and paving operations on US-202 both directions between BUCKINGHAM RD (New Milford) and WEST ST at N LAKE ST (Litchfield) Motorists can expect lane closures , Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-22T17:51:06Z"},"road_event_id":"kG2hJuLYzpZCzoqE6IaIK38Pock=","beginning_cross_street":"BUCKINGHAM RD","ending_cross_street":"N LAKE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.393149,41.629582]]}},{"id":"o5FAWmaFifFRbVdrjt9xppXh8DY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-89"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on CT-89 both directions between 72 (Union) and 72 (Ashford) There will be one-lane alternating traffic on Route 89 bridge over I-84 , Continuous Tuesday May 26th, 2026 12:00 AM thru Friday June 25th, 2027 11:59 PM All lanes open","update_date":"2026-05-22T17:59:38Z"},"road_event_id":"o5FAWmaFifFRbVdrjt9xppXh8DY=","beginning_cross_street":"72","ending_cross_street":"72","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.19668,41.960439]]}},{"id":"sGXJ+RrHZ8fLuvjFfYpmq7lvxLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"t+muy9+HnPuDNVEQH2Sqy+v25yw="}],"description":"Construction on I-678 southbound from Hoover Avenue (New York) to Hillside Avenue (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T16:33:25Z"},"road_event_id":"sGXJ+RrHZ8fLuvjFfYpmq7lvxLM=","beginning_cross_street":"Hoover Avenue","ending_cross_street":"Hillside Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823911,40.712719]]}},{"id":"t+muy9+HnPuDNVEQH2Sqy+v25yw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sGXJ+RrHZ8fLuvjFfYpmq7lvxLM="},{"type":"next-occurrence","id":"91vybGrA4KGoPJVwax+sQdJIUvY="}],"description":"Construction on I-678 southbound from Hoover Avenue (New York) to Hillside Avenue (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T16:33:25Z"},"road_event_id":"t+muy9+HnPuDNVEQH2Sqy+v25yw=","beginning_cross_street":"Hoover Avenue","ending_cross_street":"Hillside Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823911,40.712719]]}},{"id":"91vybGrA4KGoPJVwax+sQdJIUvY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sGXJ+RrHZ8fLuvjFfYpmq7lvxLM="},{"type":"next-occurrence","id":"g9NHfOY13GbsPh4y9OCI6Ttpbto="}],"description":"Construction on I-678 southbound from Hoover Avenue (New York) to Hillside Avenue (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T16:33:25Z"},"road_event_id":"91vybGrA4KGoPJVwax+sQdJIUvY=","beginning_cross_street":"Hoover Avenue","ending_cross_street":"Hillside Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823911,40.712719]]}},{"id":"g9NHfOY13GbsPh4y9OCI6Ttpbto=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sGXJ+RrHZ8fLuvjFfYpmq7lvxLM="},{"type":"next-occurrence","id":"VoKLSy5tFXW+VZpcfOnO9EvBXLw="}],"description":"Construction on I-678 southbound from Hoover Avenue (New York) to Hillside Avenue (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T16:33:25Z"},"road_event_id":"g9NHfOY13GbsPh4y9OCI6Ttpbto=","beginning_cross_street":"Hoover Avenue","ending_cross_street":"Hillside Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823911,40.712719]]}},{"id":"VoKLSy5tFXW+VZpcfOnO9EvBXLw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sGXJ+RrHZ8fLuvjFfYpmq7lvxLM="},{"type":"next-occurrence","id":"Yn4lWlNwNKfSKCGRqoYcFwDg8E0="}],"description":"Construction on I-678 southbound from Hoover Avenue (New York) to Hillside Avenue (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T16:33:25Z"},"road_event_id":"VoKLSy5tFXW+VZpcfOnO9EvBXLw=","beginning_cross_street":"Hoover Avenue","ending_cross_street":"Hillside Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823911,40.712719]]}},{"id":"Yn4lWlNwNKfSKCGRqoYcFwDg8E0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sGXJ+RrHZ8fLuvjFfYpmq7lvxLM="}],"description":"Construction on I-678 southbound from Hoover Avenue (New York) to Hillside Avenue (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T16:33:25Z"},"road_event_id":"Yn4lWlNwNKfSKCGRqoYcFwDg8E0=","beginning_cross_street":"Hoover Avenue","ending_cross_street":"Hillside Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823911,40.712719]]}},{"id":"ipNj0td2nQraW/oeFRCzalkWu4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1dAurliz+GyMKNX1VWYzoQ0ApSc="}],"description":"Construction on VAN WYCK EXPY southbound from ATLANTIC AVE (New York) to 133RD AVE (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-04T16:41:34Z"},"road_event_id":"ipNj0td2nQraW/oeFRCzalkWu4Y=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"133RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813879,40.697071]]}},{"id":"1dAurliz+GyMKNX1VWYzoQ0ApSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ipNj0td2nQraW/oeFRCzalkWu4Y="},{"type":"next-occurrence","id":"00NfirMmFyjCUujeCgeCop+aIO4="}],"description":"Construction on VAN WYCK EXPY southbound from ATLANTIC AVE (New York) to 133RD AVE (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-04T16:41:34Z"},"road_event_id":"1dAurliz+GyMKNX1VWYzoQ0ApSc=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"133RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813879,40.697071]]}},{"id":"00NfirMmFyjCUujeCgeCop+aIO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ipNj0td2nQraW/oeFRCzalkWu4Y="},{"type":"next-occurrence","id":"J1ACtCIx0s3DxtIQKC8OVXkBAnA="}],"description":"Construction on VAN WYCK EXPY southbound from ATLANTIC AVE (New York) to 133RD AVE (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-04T16:41:34Z"},"road_event_id":"00NfirMmFyjCUujeCgeCop+aIO4=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"133RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813879,40.697071]]}},{"id":"J1ACtCIx0s3DxtIQKC8OVXkBAnA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ipNj0td2nQraW/oeFRCzalkWu4Y="},{"type":"next-occurrence","id":"QHwsEUdLnyQ8ZkDIrY2meu1X+58="}],"description":"Construction on VAN WYCK EXPY southbound from ATLANTIC AVE (New York) to 133RD AVE (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-04T16:41:34Z"},"road_event_id":"J1ACtCIx0s3DxtIQKC8OVXkBAnA=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"133RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813879,40.697071]]}},{"id":"QHwsEUdLnyQ8ZkDIrY2meu1X+58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ipNj0td2nQraW/oeFRCzalkWu4Y="},{"type":"next-occurrence","id":"pHgz/HZjwVmmTGM/OuWniE0XOno="}],"description":"Construction on VAN WYCK EXPY southbound from ATLANTIC AVE (New York) to 133RD AVE (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-04T16:41:34Z"},"road_event_id":"QHwsEUdLnyQ8ZkDIrY2meu1X+58=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"133RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813879,40.697071]]}},{"id":"pHgz/HZjwVmmTGM/OuWniE0XOno=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ipNj0td2nQraW/oeFRCzalkWu4Y="}],"description":"Construction on VAN WYCK EXPY southbound from ATLANTIC AVE (New York) to 133RD AVE (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-04T16:41:34Z"},"road_event_id":"pHgz/HZjwVmmTGM/OuWniE0XOno=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"133RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813879,40.697071]]}},{"id":"rqYe5+OH34k5x2qmN4cZXd3JWJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IXPej5K6X6dXk9dBiO+0qlt1DEE="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road, Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-04T16:40:36Z"},"road_event_id":"rqYe5+OH34k5x2qmN4cZXd3JWJk=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810338,40.692163]]}},{"id":"IXPej5K6X6dXk9dBiO+0qlt1DEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rqYe5+OH34k5x2qmN4cZXd3JWJk="},{"type":"next-occurrence","id":"Mbh6s2d/SoQCyMdXkJvjCySf5y8="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road, Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-04T16:40:36Z"},"road_event_id":"IXPej5K6X6dXk9dBiO+0qlt1DEE=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810338,40.692163]]}},{"id":"Mbh6s2d/SoQCyMdXkJvjCySf5y8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rqYe5+OH34k5x2qmN4cZXd3JWJk="},{"type":"next-occurrence","id":"z4gmEvB06iFe27KNzb++nrKWFy4="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road, Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-04T16:40:36Z"},"road_event_id":"Mbh6s2d/SoQCyMdXkJvjCySf5y8=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810338,40.692163]]}},{"id":"z4gmEvB06iFe27KNzb++nrKWFy4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rqYe5+OH34k5x2qmN4cZXd3JWJk="},{"type":"next-occurrence","id":"gHBzW+RQk7y5N/B1rPRtLJ0NaUI="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road, Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-04T16:40:36Z"},"road_event_id":"z4gmEvB06iFe27KNzb++nrKWFy4=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810338,40.692163]]}},{"id":"gHBzW+RQk7y5N/B1rPRtLJ0NaUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rqYe5+OH34k5x2qmN4cZXd3JWJk="},{"type":"next-occurrence","id":"iIk7SkAJu/1iknr93EXM6l6jQvY="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road, Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-04T16:40:36Z"},"road_event_id":"gHBzW+RQk7y5N/B1rPRtLJ0NaUI=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810338,40.692163]]}},{"id":"iIk7SkAJu/1iknr93EXM6l6jQvY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rqYe5+OH34k5x2qmN4cZXd3JWJk="},{"type":"next-occurrence","id":"Qfv92GUks/vMTfCysELj65XMzNo="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road, Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-04T16:40:36Z"},"road_event_id":"iIk7SkAJu/1iknr93EXM6l6jQvY=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810338,40.692163]]}},{"id":"Qfv92GUks/vMTfCysELj65XMzNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rqYe5+OH34k5x2qmN4cZXd3JWJk="},{"type":"next-occurrence","id":"LWAAmJJNVsaqtqlaUyMFV1a8X50="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road, Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-04T16:40:36Z"},"road_event_id":"Qfv92GUks/vMTfCysELj65XMzNo=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810338,40.692163]]}},{"id":"LWAAmJJNVsaqtqlaUyMFV1a8X50=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rqYe5+OH34k5x2qmN4cZXd3JWJk="},{"type":"next-occurrence","id":"0FbX+3AJlVbPIm44YjqUolrPMU4="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road, Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-04T16:40:36Z"},"road_event_id":"LWAAmJJNVsaqtqlaUyMFV1a8X50=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810338,40.692163]]}},{"id":"0FbX+3AJlVbPIm44YjqUolrPMU4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rqYe5+OH34k5x2qmN4cZXd3JWJk="},{"type":"next-occurrence","id":"F/fIAkpgMDGnHfqIouILHmfnAko="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road, Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-04T16:40:36Z"},"road_event_id":"0FbX+3AJlVbPIm44YjqUolrPMU4=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810338,40.692163]]}},{"id":"F/fIAkpgMDGnHfqIouILHmfnAko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rqYe5+OH34k5x2qmN4cZXd3JWJk="},{"type":"next-occurrence","id":"lJEnaXFVzUiAVBMfndJqokXKFiM="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road, Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-04T16:40:36Z"},"road_event_id":"F/fIAkpgMDGnHfqIouILHmfnAko=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810338,40.692163]]}},{"id":"lJEnaXFVzUiAVBMfndJqokXKFiM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rqYe5+OH34k5x2qmN4cZXd3JWJk="},{"type":"next-occurrence","id":"E5GcLShU/VeJcLa7catbfscZ/xs="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road, Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-04T16:40:36Z"},"road_event_id":"lJEnaXFVzUiAVBMfndJqokXKFiM=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810338,40.692163]]}},{"id":"E5GcLShU/VeJcLa7catbfscZ/xs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rqYe5+OH34k5x2qmN4cZXd3JWJk="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road, Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-04T16:40:36Z"},"road_event_id":"E5GcLShU/VeJcLa7catbfscZ/xs=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810338,40.692163]]}},{"id":"btAkMuPhR+zMCMA4asRJAOqA8Ag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uhwyvrfvfKaDyuH5awxiGv2M6sI="}],"description":"Construction on NY 878 eastbound from Lefferts Boulevard (New York) to Exit 2S - 150th Street (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-04T16:53:09Z"},"road_event_id":"btAkMuPhR+zMCMA4asRJAOqA8Ag=","beginning_cross_street":"Lefferts Boulevard","ending_cross_street":"Exit 2S - 150th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822827,40.663836]]}},{"id":"uhwyvrfvfKaDyuH5awxiGv2M6sI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"btAkMuPhR+zMCMA4asRJAOqA8Ag="},{"type":"next-occurrence","id":"/Xo3XC1pdYLYlwBd22QcOjKgLWA="}],"description":"Construction on NY 878 eastbound from Lefferts Boulevard (New York) to Exit 2S - 150th Street (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-04T16:53:09Z"},"road_event_id":"uhwyvrfvfKaDyuH5awxiGv2M6sI=","beginning_cross_street":"Lefferts Boulevard","ending_cross_street":"Exit 2S - 150th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822827,40.663836]]}},{"id":"/Xo3XC1pdYLYlwBd22QcOjKgLWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"btAkMuPhR+zMCMA4asRJAOqA8Ag="},{"type":"next-occurrence","id":"U/48ZCHt3szRr1lGb1nFlJCdpYY="}],"description":"Construction on NY 878 eastbound from Lefferts Boulevard (New York) to Exit 2S - 150th Street (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-04T16:53:09Z"},"road_event_id":"/Xo3XC1pdYLYlwBd22QcOjKgLWA=","beginning_cross_street":"Lefferts Boulevard","ending_cross_street":"Exit 2S - 150th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822827,40.663836]]}},{"id":"U/48ZCHt3szRr1lGb1nFlJCdpYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"btAkMuPhR+zMCMA4asRJAOqA8Ag="},{"type":"next-occurrence","id":"vr4+kCE5qR7afUkGxnQRHVqMRh0="}],"description":"Construction on NY 878 eastbound from Lefferts Boulevard (New York) to Exit 2S - 150th Street (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-04T16:53:09Z"},"road_event_id":"U/48ZCHt3szRr1lGb1nFlJCdpYY=","beginning_cross_street":"Lefferts Boulevard","ending_cross_street":"Exit 2S - 150th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822827,40.663836]]}},{"id":"vr4+kCE5qR7afUkGxnQRHVqMRh0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"btAkMuPhR+zMCMA4asRJAOqA8Ag="},{"type":"next-occurrence","id":"/qHEY8uIt6bHE7Nucwxeq/JpY+0="}],"description":"Construction on NY 878 eastbound from Lefferts Boulevard (New York) to Exit 2S - 150th Street (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-04T16:53:09Z"},"road_event_id":"vr4+kCE5qR7afUkGxnQRHVqMRh0=","beginning_cross_street":"Lefferts Boulevard","ending_cross_street":"Exit 2S - 150th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822827,40.663836]]}},{"id":"/qHEY8uIt6bHE7Nucwxeq/JpY+0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"btAkMuPhR+zMCMA4asRJAOqA8Ag="}],"description":"Construction on NY 878 eastbound from Lefferts Boulevard (New York) to Exit 2S - 150th Street (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-04T16:53:09Z"},"road_event_id":"/qHEY8uIt6bHE7Nucwxeq/JpY+0=","beginning_cross_street":"Lefferts Boulevard","ending_cross_street":"Exit 2S - 150th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822827,40.663836]]}},{"id":"pX3PxAFKvegWjj+uBajpd1Tis1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LPlTEN6gMrXcf4KObiqkkbbQzuQ="}],"description":"Construction on I-278 westbound from Kane Street (New York) to Sackett Street (New York) Subject to change without notice., Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:12:55Z"},"road_event_id":"pX3PxAFKvegWjj+uBajpd1Tis1o=","beginning_cross_street":"Kane Street","ending_cross_street":"Sackett Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.000015,40.687166]]}},{"id":"LPlTEN6gMrXcf4KObiqkkbbQzuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pX3PxAFKvegWjj+uBajpd1Tis1o="},{"type":"next-occurrence","id":"OiJstEnkwYnTbjWx7NmZhJtW9lQ="}],"description":"Construction on I-278 westbound from Kane Street (New York) to Sackett Street (New York) Subject to change without notice., Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:12:55Z"},"road_event_id":"LPlTEN6gMrXcf4KObiqkkbbQzuQ=","beginning_cross_street":"Kane Street","ending_cross_street":"Sackett Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T04:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.000015,40.687166]]}},{"id":"OiJstEnkwYnTbjWx7NmZhJtW9lQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pX3PxAFKvegWjj+uBajpd1Tis1o="},{"type":"next-occurrence","id":"XuXv4hutriPC/hrJ51wVYHHn62Y="}],"description":"Construction on I-278 westbound from Kane Street (New York) to Sackett Street (New York) Subject to change without notice., Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:12:55Z"},"road_event_id":"OiJstEnkwYnTbjWx7NmZhJtW9lQ=","beginning_cross_street":"Kane Street","ending_cross_street":"Sackett Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T04:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.000015,40.687166]]}},{"id":"XuXv4hutriPC/hrJ51wVYHHn62Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pX3PxAFKvegWjj+uBajpd1Tis1o="},{"type":"next-occurrence","id":"uLYDJMgVI53LQOokDcJ76JHqbY8="}],"description":"Construction on I-278 westbound from Kane Street (New York) to Sackett Street (New York) Subject to change without notice., Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:12:55Z"},"road_event_id":"XuXv4hutriPC/hrJ51wVYHHn62Y=","beginning_cross_street":"Kane Street","ending_cross_street":"Sackett Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T04:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.000015,40.687166]]}},{"id":"uLYDJMgVI53LQOokDcJ76JHqbY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pX3PxAFKvegWjj+uBajpd1Tis1o="}],"description":"Construction on I-278 westbound from Kane Street (New York) to Sackett Street (New York) Subject to change without notice., Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:12:55Z"},"road_event_id":"uLYDJMgVI53LQOokDcJ76JHqbY8=","beginning_cross_street":"Kane Street","ending_cross_street":"Sackett Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T04:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.000015,40.687166]]}},{"id":"qzgsRSqvx514llrtxz4JlB8r2J8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zXCXyg5YnU6BwizsskjS+ngbDF8="}],"description":"Construction on I-278 westbound from Congress Street (New York) to Kane Street (New York) Subject to change without notice., Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:13:46Z"},"road_event_id":"qzgsRSqvx514llrtxz4JlB8r2J8=","beginning_cross_street":"Congress Street","ending_cross_street":"Kane Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999076,40.689018]]}},{"id":"zXCXyg5YnU6BwizsskjS+ngbDF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qzgsRSqvx514llrtxz4JlB8r2J8="},{"type":"next-occurrence","id":"0ieZW1pD4CVO/cL+BFYh6LCdHJY="}],"description":"Construction on I-278 westbound from Congress Street (New York) to Kane Street (New York) Subject to change without notice., Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:13:46Z"},"road_event_id":"zXCXyg5YnU6BwizsskjS+ngbDF8=","beginning_cross_street":"Congress Street","ending_cross_street":"Kane Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T04:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999076,40.689018]]}},{"id":"0ieZW1pD4CVO/cL+BFYh6LCdHJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qzgsRSqvx514llrtxz4JlB8r2J8="},{"type":"next-occurrence","id":"ckp1bhjkzc3AFLjT7un6nPK6584="}],"description":"Construction on I-278 westbound from Congress Street (New York) to Kane Street (New York) Subject to change without notice., Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:13:46Z"},"road_event_id":"0ieZW1pD4CVO/cL+BFYh6LCdHJY=","beginning_cross_street":"Congress Street","ending_cross_street":"Kane Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T04:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999076,40.689018]]}},{"id":"ckp1bhjkzc3AFLjT7un6nPK6584=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qzgsRSqvx514llrtxz4JlB8r2J8="},{"type":"next-occurrence","id":"/3dpe9psR4ECDOPDV9YvC3UWU40="}],"description":"Construction on I-278 westbound from Congress Street (New York) to Kane Street (New York) Subject to change without notice., Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:13:46Z"},"road_event_id":"ckp1bhjkzc3AFLjT7un6nPK6584=","beginning_cross_street":"Congress Street","ending_cross_street":"Kane Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T04:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999076,40.689018]]}},{"id":"/3dpe9psR4ECDOPDV9YvC3UWU40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qzgsRSqvx514llrtxz4JlB8r2J8="}],"description":"Construction on I-278 westbound from Congress Street (New York) to Kane Street (New York) Subject to change without notice., Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:13:46Z"},"road_event_id":"/3dpe9psR4ECDOPDV9YvC3UWU40=","beginning_cross_street":"Congress Street","ending_cross_street":"Kane Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T04:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999076,40.689018]]}},{"id":"PHED+8jh5x9IudUvlERQsWOxaC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"S84hhQowBe+edPM+4/ldlBC67NI="}],"description":"Construction on I-278 eastbound from Exit 15 - Lily Pond Avenue (New York) to Verrazzano Bridge Toll Road (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane and shoulder of 2 lanes closed","update_date":"2026-06-03T19:19:37Z"},"road_event_id":"PHED+8jh5x9IudUvlERQsWOxaC8=","beginning_cross_street":"Exit 15 - Lily Pond Avenue","ending_cross_street":"Verrazzano Bridge Toll Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.065198,40.602192]]}},{"id":"S84hhQowBe+edPM+4/ldlBC67NI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PHED+8jh5x9IudUvlERQsWOxaC8="},{"type":"next-occurrence","id":"Uw8WPOlTDLO0na0XTOunXOdZViw="}],"description":"Construction on I-278 eastbound from Exit 15 - Lily Pond Avenue (New York) to Verrazzano Bridge Toll Road (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane and shoulder of 2 lanes closed","update_date":"2026-06-03T19:19:37Z"},"road_event_id":"S84hhQowBe+edPM+4/ldlBC67NI=","beginning_cross_street":"Exit 15 - Lily Pond Avenue","ending_cross_street":"Verrazzano Bridge Toll Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.065198,40.602192]]}},{"id":"Uw8WPOlTDLO0na0XTOunXOdZViw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PHED+8jh5x9IudUvlERQsWOxaC8="},{"type":"next-occurrence","id":"o+K3Xvn2Gw3YoWnVi0+2J47Wtds="}],"description":"Construction on I-278 eastbound from Exit 15 - Lily Pond Avenue (New York) to Verrazzano Bridge Toll Road (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane and shoulder of 2 lanes closed","update_date":"2026-06-03T19:19:37Z"},"road_event_id":"Uw8WPOlTDLO0na0XTOunXOdZViw=","beginning_cross_street":"Exit 15 - Lily Pond Avenue","ending_cross_street":"Verrazzano Bridge Toll Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.065198,40.602192]]}},{"id":"o+K3Xvn2Gw3YoWnVi0+2J47Wtds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PHED+8jh5x9IudUvlERQsWOxaC8="},{"type":"next-occurrence","id":"BMKqMJXSj6/pctNX9eUUSW7TGMw="}],"description":"Construction on I-278 eastbound from Exit 15 - Lily Pond Avenue (New York) to Verrazzano Bridge Toll Road (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane and shoulder of 2 lanes closed","update_date":"2026-06-03T19:19:37Z"},"road_event_id":"o+K3Xvn2Gw3YoWnVi0+2J47Wtds=","beginning_cross_street":"Exit 15 - Lily Pond Avenue","ending_cross_street":"Verrazzano Bridge Toll Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.065198,40.602192]]}},{"id":"BMKqMJXSj6/pctNX9eUUSW7TGMw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PHED+8jh5x9IudUvlERQsWOxaC8="},{"type":"next-occurrence","id":"vNupDUEb2ZdJDbgDXSrgl23YExY="}],"description":"Construction on I-278 eastbound from Exit 15 - Lily Pond Avenue (New York) to Verrazzano Bridge Toll Road (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane and shoulder of 2 lanes closed","update_date":"2026-06-03T19:19:37Z"},"road_event_id":"BMKqMJXSj6/pctNX9eUUSW7TGMw=","beginning_cross_street":"Exit 15 - Lily Pond Avenue","ending_cross_street":"Verrazzano Bridge Toll Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.065198,40.602192]]}},{"id":"vNupDUEb2ZdJDbgDXSrgl23YExY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PHED+8jh5x9IudUvlERQsWOxaC8="}],"description":"Construction on I-278 eastbound from Exit 15 - Lily Pond Avenue (New York) to Verrazzano Bridge Toll Road (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane and shoulder of 2 lanes closed","update_date":"2026-06-03T19:19:37Z"},"road_event_id":"vNupDUEb2ZdJDbgDXSrgl23YExY=","beginning_cross_street":"Exit 15 - Lily Pond Avenue","ending_cross_street":"Verrazzano Bridge Toll Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.065198,40.602192]]}},{"id":"kMpr+FyTS75zSPuHuMqC/A6iJNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2ed0HbjLIRSAOj640TvIw6iBT9M="}],"description":"Construction on NY 27 eastbound from 7th Avenue (New York) to Exit 4 - John P Devaney Boulevard (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-06-03T19:18:20Z"},"road_event_id":"kMpr+FyTS75zSPuHuMqC/A6iJNg=","beginning_cross_street":"7th Avenue","ending_cross_street":"Exit 4 - John P Devaney Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987282,40.660263]]}},{"id":"2ed0HbjLIRSAOj640TvIw6iBT9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kMpr+FyTS75zSPuHuMqC/A6iJNg="},{"type":"next-occurrence","id":"rBtcwDr8bbRxdMGBizSIGmgJbLY="}],"description":"Construction on NY 27 eastbound from 7th Avenue (New York) to Exit 4 - John P Devaney Boulevard (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-06-03T19:18:20Z"},"road_event_id":"2ed0HbjLIRSAOj640TvIw6iBT9M=","beginning_cross_street":"7th Avenue","ending_cross_street":"Exit 4 - John P Devaney Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987282,40.660263]]}},{"id":"rBtcwDr8bbRxdMGBizSIGmgJbLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kMpr+FyTS75zSPuHuMqC/A6iJNg="},{"type":"next-occurrence","id":"VuXgWhR7Kkc6lTO1T/qWZphkQPM="}],"description":"Construction on NY 27 eastbound from 7th Avenue (New York) to Exit 4 - John P Devaney Boulevard (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-06-03T19:18:20Z"},"road_event_id":"rBtcwDr8bbRxdMGBizSIGmgJbLY=","beginning_cross_street":"7th Avenue","ending_cross_street":"Exit 4 - John P Devaney Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987282,40.660263]]}},{"id":"VuXgWhR7Kkc6lTO1T/qWZphkQPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kMpr+FyTS75zSPuHuMqC/A6iJNg="},{"type":"next-occurrence","id":"NBv5tRGDimj4NqtoOOd6hk75H8g="}],"description":"Construction on NY 27 eastbound from 7th Avenue (New York) to Exit 4 - John P Devaney Boulevard (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-06-03T19:18:20Z"},"road_event_id":"VuXgWhR7Kkc6lTO1T/qWZphkQPM=","beginning_cross_street":"7th Avenue","ending_cross_street":"Exit 4 - John P Devaney Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987282,40.660263]]}},{"id":"NBv5tRGDimj4NqtoOOd6hk75H8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kMpr+FyTS75zSPuHuMqC/A6iJNg="},{"type":"next-occurrence","id":"BYl/1VUlIMRfr1ZJ97eAM3+Hj/4="}],"description":"Construction on NY 27 eastbound from 7th Avenue (New York) to Exit 4 - John P Devaney Boulevard (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-06-03T19:18:20Z"},"road_event_id":"NBv5tRGDimj4NqtoOOd6hk75H8g=","beginning_cross_street":"7th Avenue","ending_cross_street":"Exit 4 - John P Devaney Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987282,40.660263]]}},{"id":"BYl/1VUlIMRfr1ZJ97eAM3+Hj/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kMpr+FyTS75zSPuHuMqC/A6iJNg="}],"description":"Construction on NY 27 eastbound from 7th Avenue (New York) to Exit 4 - John P Devaney Boulevard (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-06-03T19:18:20Z"},"road_event_id":"BYl/1VUlIMRfr1ZJ97eAM3+Hj/4=","beginning_cross_street":"7th Avenue","ending_cross_street":"Exit 4 - John P Devaney Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987282,40.660263]]}},{"id":"DpoEsxLLd0A2/EAOJDNrmHSBWTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3H9tND//1QvGq++hsD4kt/WU/f0="}],"description":"Construction on NY 27 eastbound from Seeley Street (New York) to Exit 5 - East 5th Street (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:20:29Z"},"road_event_id":"DpoEsxLLd0A2/EAOJDNrmHSBWTk=","beginning_cross_street":"Seeley Street","ending_cross_street":"Exit 5 - East 5th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.978015,40.653859]]}},{"id":"3H9tND//1QvGq++hsD4kt/WU/f0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DpoEsxLLd0A2/EAOJDNrmHSBWTk="},{"type":"next-occurrence","id":"QjZHBZ1bbfTgdF2uwJ+cBalpPrM="}],"description":"Construction on NY 27 eastbound from Seeley Street (New York) to Exit 5 - East 5th Street (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:20:29Z"},"road_event_id":"3H9tND//1QvGq++hsD4kt/WU/f0=","beginning_cross_street":"Seeley Street","ending_cross_street":"Exit 5 - East 5th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.978015,40.653859]]}},{"id":"QjZHBZ1bbfTgdF2uwJ+cBalpPrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DpoEsxLLd0A2/EAOJDNrmHSBWTk="},{"type":"next-occurrence","id":"4KzShb/mHi1KybWronWmWuFKfJ4="}],"description":"Construction on NY 27 eastbound from Seeley Street (New York) to Exit 5 - East 5th Street (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:20:29Z"},"road_event_id":"QjZHBZ1bbfTgdF2uwJ+cBalpPrM=","beginning_cross_street":"Seeley Street","ending_cross_street":"Exit 5 - East 5th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.978015,40.653859]]}},{"id":"4KzShb/mHi1KybWronWmWuFKfJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DpoEsxLLd0A2/EAOJDNrmHSBWTk="},{"type":"next-occurrence","id":"jZli8XQ9hF5CWPDLROdxIyyfj54="}],"description":"Construction on NY 27 eastbound from Seeley Street (New York) to Exit 5 - East 5th Street (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:20:29Z"},"road_event_id":"4KzShb/mHi1KybWronWmWuFKfJ4=","beginning_cross_street":"Seeley Street","ending_cross_street":"Exit 5 - East 5th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.978015,40.653859]]}},{"id":"jZli8XQ9hF5CWPDLROdxIyyfj54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DpoEsxLLd0A2/EAOJDNrmHSBWTk="},{"type":"next-occurrence","id":"RtABegHMxwJTG/sSHw5k7GhQ3IM="}],"description":"Construction on NY 27 eastbound from Seeley Street (New York) to Exit 5 - East 5th Street (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:20:29Z"},"road_event_id":"jZli8XQ9hF5CWPDLROdxIyyfj54=","beginning_cross_street":"Seeley Street","ending_cross_street":"Exit 5 - East 5th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.978015,40.653859]]}},{"id":"RtABegHMxwJTG/sSHw5k7GhQ3IM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DpoEsxLLd0A2/EAOJDNrmHSBWTk="}],"description":"Construction on NY 27 eastbound from Seeley Street (New York) to Exit 5 - East 5th Street (New York) Subject to change without notice., Tuesday May 26th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:20:29Z"},"road_event_id":"RtABegHMxwJTG/sSHw5k7GhQ3IM=","beginning_cross_street":"Seeley Street","ending_cross_street":"Exit 5 - East 5th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.978015,40.653859]]}},{"id":"gKAc2+65wFTtVy1UZxUxBVU79AQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[],"description":"Steel repairs and street sweeping on New Jersey Turnpike - Western Spur northbound Entrance ramp From Interchange 15W to the Eastern Spur (Kearny) to From Interchange 15W to the Eastern Spur (Kearny), Thursday June 4th,2026 thru Saturday June 6th,2026, Thursday/Friday, 08:00 PM thru 05:00 AM All lanes closed northbound,","update_date":"2026-06-03T09:00:09Z"},"road_event_id":"gKAc2+65wFTtVy1UZxUxBVU79AQ=","beginning_cross_street":"From Interchange 15W to the Eastern Spur","ending_cross_street":"From Interchange 15W to the Eastern Spur","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.120601,40.754462]]}},{"id":"Qx3s6IrpURF22hPpFCgO5vAEi4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3dzR2lNKhxQxhfu7Hqbp77wNGwY="}],"description":"Bridge demolition on N CROUSE AVE both directions between BURNET AVE (Syracuse) and CANAL ST (Syracuse) ; follow detour, Tuesday May 26th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-22T22:21:55Z"},"road_event_id":"Qx3s6IrpURF22hPpFCgO5vAEi4k=","beginning_cross_street":"BURNET AVE","ending_cross_street":"CANAL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136402,43.052123]]}},{"id":"3dzR2lNKhxQxhfu7Hqbp77wNGwY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qx3s6IrpURF22hPpFCgO5vAEi4k="},{"type":"next-occurrence","id":"6PIiUU+QBkSQFAXM9upIGDO2EdA="}],"description":"Bridge demolition on N CROUSE AVE both directions between BURNET AVE (Syracuse) and CANAL ST (Syracuse) ; follow detour, Tuesday May 26th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-22T22:21:55Z"},"road_event_id":"3dzR2lNKhxQxhfu7Hqbp77wNGwY=","beginning_cross_street":"BURNET AVE","ending_cross_street":"CANAL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136402,43.052123]]}},{"id":"6PIiUU+QBkSQFAXM9upIGDO2EdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qx3s6IrpURF22hPpFCgO5vAEi4k="},{"type":"next-occurrence","id":"1vj7HUB/2XvXUKzC9PvrBkD4bEU="}],"description":"Bridge demolition on N CROUSE AVE both directions between BURNET AVE (Syracuse) and CANAL ST (Syracuse) ; follow detour, Tuesday May 26th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-22T22:21:55Z"},"road_event_id":"6PIiUU+QBkSQFAXM9upIGDO2EdA=","beginning_cross_street":"BURNET AVE","ending_cross_street":"CANAL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136402,43.052123]]}},{"id":"1vj7HUB/2XvXUKzC9PvrBkD4bEU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qx3s6IrpURF22hPpFCgO5vAEi4k="},{"type":"next-occurrence","id":"X7IjK7axbDJ9Zonndrnsbv2Daco="}],"description":"Bridge demolition on N CROUSE AVE both directions between BURNET AVE (Syracuse) and CANAL ST (Syracuse) ; follow detour, Tuesday May 26th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-22T22:21:55Z"},"road_event_id":"1vj7HUB/2XvXUKzC9PvrBkD4bEU=","beginning_cross_street":"BURNET AVE","ending_cross_street":"CANAL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136402,43.052123]]}},{"id":"X7IjK7axbDJ9Zonndrnsbv2Daco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qx3s6IrpURF22hPpFCgO5vAEi4k="},{"type":"next-occurrence","id":"7tiskMxptmTcqlIt1h1OYrRAfQg="}],"description":"Bridge demolition on N CROUSE AVE both directions between BURNET AVE (Syracuse) and CANAL ST (Syracuse) ; follow detour, Tuesday May 26th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-22T22:21:55Z"},"road_event_id":"X7IjK7axbDJ9Zonndrnsbv2Daco=","beginning_cross_street":"BURNET AVE","ending_cross_street":"CANAL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136402,43.052123]]}},{"id":"7tiskMxptmTcqlIt1h1OYrRAfQg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qx3s6IrpURF22hPpFCgO5vAEi4k="},{"type":"next-occurrence","id":"4mNg1HyWNTNcxirvKlclGh1jX8o="}],"description":"Bridge demolition on N CROUSE AVE both directions between BURNET AVE (Syracuse) and CANAL ST (Syracuse) ; follow detour, Tuesday May 26th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-22T22:21:55Z"},"road_event_id":"7tiskMxptmTcqlIt1h1OYrRAfQg=","beginning_cross_street":"BURNET AVE","ending_cross_street":"CANAL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136402,43.052123]]}},{"id":"4mNg1HyWNTNcxirvKlclGh1jX8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qx3s6IrpURF22hPpFCgO5vAEi4k="},{"type":"next-occurrence","id":"hiZ+RfQx/cb77ZnqUXBN6KvNxT0="}],"description":"Bridge demolition on N CROUSE AVE both directions between BURNET AVE (Syracuse) and CANAL ST (Syracuse) ; follow detour, Tuesday May 26th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-22T22:21:55Z"},"road_event_id":"4mNg1HyWNTNcxirvKlclGh1jX8o=","beginning_cross_street":"BURNET AVE","ending_cross_street":"CANAL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136402,43.052123]]}},{"id":"hiZ+RfQx/cb77ZnqUXBN6KvNxT0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qx3s6IrpURF22hPpFCgO5vAEi4k="},{"type":"next-occurrence","id":"6A/iJpll/W8m5PGnTOJo31H9hSI="}],"description":"Bridge demolition on N CROUSE AVE both directions between BURNET AVE (Syracuse) and CANAL ST (Syracuse) ; follow detour, Tuesday May 26th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-22T22:21:55Z"},"road_event_id":"hiZ+RfQx/cb77ZnqUXBN6KvNxT0=","beginning_cross_street":"BURNET AVE","ending_cross_street":"CANAL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136402,43.052123]]}},{"id":"6A/iJpll/W8m5PGnTOJo31H9hSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qx3s6IrpURF22hPpFCgO5vAEi4k="},{"type":"next-occurrence","id":"HYsfGP7U+mfyhxGopqp62IzP1vU="}],"description":"Bridge demolition on N CROUSE AVE both directions between BURNET AVE (Syracuse) and CANAL ST (Syracuse) ; follow detour, Tuesday May 26th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-22T22:21:55Z"},"road_event_id":"6A/iJpll/W8m5PGnTOJo31H9hSI=","beginning_cross_street":"BURNET AVE","ending_cross_street":"CANAL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136402,43.052123]]}},{"id":"HYsfGP7U+mfyhxGopqp62IzP1vU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qx3s6IrpURF22hPpFCgO5vAEi4k="}],"description":"Bridge demolition on N CROUSE AVE both directions between BURNET AVE (Syracuse) and CANAL ST (Syracuse) ; follow detour, Tuesday May 26th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-22T22:21:55Z"},"road_event_id":"HYsfGP7U+mfyhxGopqp62IzP1vU=","beginning_cross_street":"BURNET AVE","ending_cross_street":"CANAL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136402,43.052123]]}},{"id":"Hd5keirNrWifOtzTsdADPvfSei4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"j3m7A3PI7aZxfUpnWYPqexOcb+8="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/32730309 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 12th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-06-05T10:00:18Z"},"road_event_id":"Hd5keirNrWifOtzTsdADPvfSei4=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T01:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"j3m7A3PI7aZxfUpnWYPqexOcb+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hd5keirNrWifOtzTsdADPvfSei4="},{"type":"next-occurrence","id":"8kme2Sa7x2dWwM2fMYOHIbkFqMw="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/32730309 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 12th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-06-05T10:00:18Z"},"road_event_id":"j3m7A3PI7aZxfUpnWYPqexOcb+8=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"8kme2Sa7x2dWwM2fMYOHIbkFqMw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hd5keirNrWifOtzTsdADPvfSei4="},{"type":"next-occurrence","id":"JCpF4YAzmfB+rDaiZ+lhByD+WnA="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/32730309 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 12th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-06-05T10:00:18Z"},"road_event_id":"8kme2Sa7x2dWwM2fMYOHIbkFqMw=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"JCpF4YAzmfB+rDaiZ+lhByD+WnA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hd5keirNrWifOtzTsdADPvfSei4="},{"type":"next-occurrence","id":"Cm8TbT3I47SJ1qY+gPda2fQMUao="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/32730309 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 12th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-06-05T10:00:18Z"},"road_event_id":"JCpF4YAzmfB+rDaiZ+lhByD+WnA=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"Cm8TbT3I47SJ1qY+gPda2fQMUao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hd5keirNrWifOtzTsdADPvfSei4="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/32730309 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday June 7th, 2026 thru Friday June 12th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-06-05T10:00:18Z"},"road_event_id":"Cm8TbT3I47SJ1qY+gPda2fQMUao=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"O+6iUZA5AAevG+RMgn4TNtn8Cis=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[],"description":"Longterm construction on US 9W both directions between NY 304 (Haverstraw) and Short Clove Road (Haverstraw) 202308107656/202508112934/32545509 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Monday May 26th, 2025 7:00 PM thru Saturday June 27th, 2026 5:00 AM all lanes closed and detoured","update_date":"2026-05-23T20:54:26Z"},"road_event_id":"O+6iUZA5AAevG+RMgn4TNtn8Cis=","beginning_cross_street":"NY 304","ending_cross_street":"Short Clove Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94384,41.175199]]}},{"id":"kRtS88jC8s9fntBgWjz7CqoM3pY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound at Exit 52 - CR 613/Passaic Ave (Fairfield Twp) Friday June 5, 2026 11:00 PM thru Saturday June 6, 2026 05:00 AM, ramp","update_date":"2026-05-25T10:29:05Z"},"road_event_id":"kRtS88jC8s9fntBgWjz7CqoM3pY=","beginning_cross_street":"Exit 52 - CR 613/Passaic Ave","ending_cross_street":"Exit 52 - CR 613/Passaic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.275398,40.893867]]}},{"id":"PlX2LDoxP4+pl/vfM8zT9aY3gG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line"],"direction":"unknown","related_road_events":[],"description":"Escalator Work on E Line westbound between Queens Plaza (New York) and W 4 St - Wash Sq (New York) from 21 St-Queensbridge to W 4 St-Wash Sq. For Queens Plaza, use the nearby Queensboro Plaza 7 line or N line. For Court Sq-23 St, take the 7 line. For Lexington Av/53 St, take the 4 line local or 6 line at 51 St to connect with the at Grand Central-42 St 7 line. For 5 Av/53 St, use nearby F line at 57 St or 47-50 Sts-Rockefeller Ctr. For 7 Av, take the D line instead. For 50 St, 42 St-Port Authority, 34 St-Penn Station, 23 St and 14 St, take the A line or use nearby F line along 6 Av., Monday June 1st,2026 thru Saturday June 6th,2026, Monday thru Friday, 11:45 PM thru 05:00 AM runs via F line, Continuous Friday June 5th,2026 11:45 PM thru Monday June 8th,2026 05:00 AM runs via F line","update_date":"2026-05-29T09:00:20Z"},"road_event_id":"PlX2LDoxP4+pl/vfM8zT9aY3gG8=","beginning_cross_street":"Queens Plaza","ending_cross_street":"W 4 St - Wash Sq","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:45:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937243,40.748973]]}},{"id":"+cGTk8CtjbjnagHZtoL7n25truA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"M9XCgr56LWuQ2YAaXYkI8tVPI00="}],"description":"Milling and repaving on NY 19 both directions Bolivar Road; end NY 417 overlap (Wellsville) to Genesee Street; NY 244 (Amity) 1 Lane, 2 Way, Flagger Control, Tuesday May 26th, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-26T10:57:24Z"},"road_event_id":"+cGTk8CtjbjnagHZtoL7n25truA=","beginning_cross_street":"Bolivar Road; end NY 417 overlap","ending_cross_street":"Genesee Street; NY 244","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.961385,42.132561]]}},{"id":"M9XCgr56LWuQ2YAaXYkI8tVPI00=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cGTk8CtjbjnagHZtoL7n25truA="},{"type":"next-occurrence","id":"arFIaCVlBFxcxYjheKr5k38lz64="}],"description":"Milling and repaving on NY 19 both directions Bolivar Road; end NY 417 overlap (Wellsville) to Genesee Street; NY 244 (Amity) 1 Lane, 2 Way, Flagger Control, Tuesday May 26th, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-26T10:57:24Z"},"road_event_id":"M9XCgr56LWuQ2YAaXYkI8tVPI00=","beginning_cross_street":"Bolivar Road; end NY 417 overlap","ending_cross_street":"Genesee Street; NY 244","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.961385,42.132561]]}},{"id":"arFIaCVlBFxcxYjheKr5k38lz64=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cGTk8CtjbjnagHZtoL7n25truA="},{"type":"next-occurrence","id":"6ToxHfqStNFPwHnAjwc1snGIxQc="}],"description":"Milling and repaving on NY 19 both directions Bolivar Road; end NY 417 overlap (Wellsville) to Genesee Street; NY 244 (Amity) 1 Lane, 2 Way, Flagger Control, Tuesday May 26th, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-26T10:57:24Z"},"road_event_id":"arFIaCVlBFxcxYjheKr5k38lz64=","beginning_cross_street":"Bolivar Road; end NY 417 overlap","ending_cross_street":"Genesee Street; NY 244","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T10:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.961385,42.132561]]}},{"id":"6ToxHfqStNFPwHnAjwc1snGIxQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cGTk8CtjbjnagHZtoL7n25truA="},{"type":"next-occurrence","id":"No5K3oIHAoCWuRA2NJeY5oyfWGE="}],"description":"Milling and repaving on NY 19 both directions Bolivar Road; end NY 417 overlap (Wellsville) to Genesee Street; NY 244 (Amity) 1 Lane, 2 Way, Flagger Control, Tuesday May 26th, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-26T10:57:24Z"},"road_event_id":"6ToxHfqStNFPwHnAjwc1snGIxQc=","beginning_cross_street":"Bolivar Road; end NY 417 overlap","ending_cross_street":"Genesee Street; NY 244","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.961385,42.132561]]}},{"id":"No5K3oIHAoCWuRA2NJeY5oyfWGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cGTk8CtjbjnagHZtoL7n25truA="},{"type":"next-occurrence","id":"sUcsFXHAX0YCcE4kGnoGYEbKSpc="}],"description":"Milling and repaving on NY 19 both directions Bolivar Road; end NY 417 overlap (Wellsville) to Genesee Street; NY 244 (Amity) 1 Lane, 2 Way, Flagger Control, Tuesday May 26th, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-26T10:57:24Z"},"road_event_id":"No5K3oIHAoCWuRA2NJeY5oyfWGE=","beginning_cross_street":"Bolivar Road; end NY 417 overlap","ending_cross_street":"Genesee Street; NY 244","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.961385,42.132561]]}},{"id":"sUcsFXHAX0YCcE4kGnoGYEbKSpc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+cGTk8CtjbjnagHZtoL7n25truA="}],"description":"Milling and repaving on NY 19 both directions Bolivar Road; end NY 417 overlap (Wellsville) to Genesee Street; NY 244 (Amity) 1 Lane, 2 Way, Flagger Control, Tuesday May 26th, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-26T10:57:24Z"},"road_event_id":"sUcsFXHAX0YCcE4kGnoGYEbKSpc=","beginning_cross_street":"Bolivar Road; end NY 417 overlap","ending_cross_street":"Genesee Street; NY 244","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.961385,42.132561]]}},{"id":"lBaqmee4eUDQXD9/Khc6qATaf24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"l5M5f79rvQJxOp+pCRIMbloctQg="}],"description":"Roadwork on I-81 southbound ramp to Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-05-26T13:18:28Z"},"road_event_id":"lBaqmee4eUDQXD9/Khc6qATaf24=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"l5M5f79rvQJxOp+pCRIMbloctQg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lBaqmee4eUDQXD9/Khc6qATaf24="},{"type":"next-occurrence","id":"aZfMnxwBucqCDbCKGiORmZf5S1s="}],"description":"Roadwork on I-81 southbound ramp to Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-05-26T13:18:28Z"},"road_event_id":"l5M5f79rvQJxOp+pCRIMbloctQg=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"aZfMnxwBucqCDbCKGiORmZf5S1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lBaqmee4eUDQXD9/Khc6qATaf24="},{"type":"next-occurrence","id":"QOuykuv7scGu5lExvjpkXYekOCE="}],"description":"Roadwork on I-81 southbound ramp to Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-05-26T13:18:28Z"},"road_event_id":"aZfMnxwBucqCDbCKGiORmZf5S1s=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"QOuykuv7scGu5lExvjpkXYekOCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lBaqmee4eUDQXD9/Khc6qATaf24="},{"type":"next-occurrence","id":"pUMLmC/QX7xgJ07ZaNh/KkIpDfg="}],"description":"Roadwork on I-81 southbound ramp to Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-05-26T13:18:28Z"},"road_event_id":"QOuykuv7scGu5lExvjpkXYekOCE=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"pUMLmC/QX7xgJ07ZaNh/KkIpDfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lBaqmee4eUDQXD9/Khc6qATaf24="},{"type":"next-occurrence","id":"6AJF65q8f9aXXFi89UAz6R32FV4="}],"description":"Roadwork on I-81 southbound ramp to Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-05-26T13:18:28Z"},"road_event_id":"pUMLmC/QX7xgJ07ZaNh/KkIpDfg=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"6AJF65q8f9aXXFi89UAz6R32FV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lBaqmee4eUDQXD9/Khc6qATaf24="},{"type":"next-occurrence","id":"TvnKrkSah2tTuwfZogFg8nVIjSo="}],"description":"Roadwork on I-81 southbound ramp to Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-05-26T13:18:28Z"},"road_event_id":"6AJF65q8f9aXXFi89UAz6R32FV4=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"TvnKrkSah2tTuwfZogFg8nVIjSo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lBaqmee4eUDQXD9/Khc6qATaf24="},{"type":"next-occurrence","id":"Xqe3ugV3mweMmndHI0abSKhIUmk="}],"description":"Roadwork on I-81 southbound ramp to Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-05-26T13:18:28Z"},"road_event_id":"TvnKrkSah2tTuwfZogFg8nVIjSo=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"Xqe3ugV3mweMmndHI0abSKhIUmk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lBaqmee4eUDQXD9/Khc6qATaf24="},{"type":"next-occurrence","id":"TmnGyJTfYOqPvqZ+Gu2Fnt8rJc4="}],"description":"Roadwork on I-81 southbound ramp to Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-05-26T13:18:28Z"},"road_event_id":"Xqe3ugV3mweMmndHI0abSKhIUmk=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"TmnGyJTfYOqPvqZ+Gu2Fnt8rJc4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lBaqmee4eUDQXD9/Khc6qATaf24="},{"type":"next-occurrence","id":"opUK65O4bM8utriwiLXCmOmyK9s="}],"description":"Roadwork on I-81 southbound ramp to Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-05-26T13:18:28Z"},"road_event_id":"TmnGyJTfYOqPvqZ+Gu2Fnt8rJc4=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"opUK65O4bM8utriwiLXCmOmyK9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lBaqmee4eUDQXD9/Khc6qATaf24="},{"type":"next-occurrence","id":"1+VQHWi1s5vvXSwK4ny2DnIwvQw="}],"description":"Roadwork on I-81 southbound ramp to Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-05-26T13:18:28Z"},"road_event_id":"opUK65O4bM8utriwiLXCmOmyK9s=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"1+VQHWi1s5vvXSwK4ny2DnIwvQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lBaqmee4eUDQXD9/Khc6qATaf24="}],"description":"Roadwork on I-81 southbound ramp to Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-05-26T13:18:28Z"},"road_event_id":"1+VQHWi1s5vvXSwK4ny2DnIwvQw=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"idFgjJm22uxLPX8SvN8LsBPQlco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 298; Bear St"],"direction":"unknown","related_road_events":[],"description":"Ramp widening on NY 298; Bear St westbound ramp to I-690 (Syracuse) ; follow detour, Continuous Tuesday May 26th, 2026 07:00 AM thru Thursday July 2nd, 2026 03:00 PM All lanes closed","update_date":"2026-05-26T13:22:01Z"},"road_event_id":"idFgjJm22uxLPX8SvN8LsBPQlco=","beginning_cross_street":" I-690 ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.175801,43.057397]]}},{"id":"1LEW2V18gXxpjEPBpn6KwelI0rQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WWfV0vGRJesf4Lk4IUkIy0PCaX4="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM left shoulder closed","update_date":"2026-05-26T13:29:28Z"},"road_event_id":"1LEW2V18gXxpjEPBpn6KwelI0rQ=","beginning_cross_street":"Exit 14 - NY 298; Bear Street  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.179254,43.056647]]}},{"id":"WWfV0vGRJesf4Lk4IUkIy0PCaX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1LEW2V18gXxpjEPBpn6KwelI0rQ="},{"type":"next-occurrence","id":"qjZjxqJCT1sqgaSQGr35Ox1Doa4="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM left shoulder closed","update_date":"2026-05-26T13:29:28Z"},"road_event_id":"WWfV0vGRJesf4Lk4IUkIy0PCaX4=","beginning_cross_street":"Exit 14 - NY 298; Bear Street  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.179254,43.056647]]}},{"id":"qjZjxqJCT1sqgaSQGr35Ox1Doa4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1LEW2V18gXxpjEPBpn6KwelI0rQ="},{"type":"next-occurrence","id":"sH/6hFPp8uFKknnXga4gCTQqRdQ="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM left shoulder closed","update_date":"2026-05-26T13:29:28Z"},"road_event_id":"qjZjxqJCT1sqgaSQGr35Ox1Doa4=","beginning_cross_street":"Exit 14 - NY 298; Bear Street  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.179254,43.056647]]}},{"id":"sH/6hFPp8uFKknnXga4gCTQqRdQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1LEW2V18gXxpjEPBpn6KwelI0rQ="},{"type":"next-occurrence","id":"LyE/GOgwYGBSIl2wGKKks4bURcs="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM left shoulder closed","update_date":"2026-05-26T13:29:28Z"},"road_event_id":"sH/6hFPp8uFKknnXga4gCTQqRdQ=","beginning_cross_street":"Exit 14 - NY 298; Bear Street  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.179254,43.056647]]}},{"id":"LyE/GOgwYGBSIl2wGKKks4bURcs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1LEW2V18gXxpjEPBpn6KwelI0rQ="},{"type":"next-occurrence","id":"BaIWdeTCo0K5IZe3dQJGdz5FZZc="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM left shoulder closed","update_date":"2026-05-26T13:29:28Z"},"road_event_id":"LyE/GOgwYGBSIl2wGKKks4bURcs=","beginning_cross_street":"Exit 14 - NY 298; Bear Street  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.179254,43.056647]]}},{"id":"BaIWdeTCo0K5IZe3dQJGdz5FZZc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1LEW2V18gXxpjEPBpn6KwelI0rQ="},{"type":"next-occurrence","id":"Gxe1+tYV1nB6c9ZvadLczbjeWAk="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM left shoulder closed","update_date":"2026-05-26T13:29:28Z"},"road_event_id":"BaIWdeTCo0K5IZe3dQJGdz5FZZc=","beginning_cross_street":"Exit 14 - NY 298; Bear Street  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.179254,43.056647]]}},{"id":"Gxe1+tYV1nB6c9ZvadLczbjeWAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1LEW2V18gXxpjEPBpn6KwelI0rQ="},{"type":"next-occurrence","id":"nwT+jNT0DqYITuhNrKN8GHh27fk="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM left shoulder closed","update_date":"2026-05-26T13:29:28Z"},"road_event_id":"Gxe1+tYV1nB6c9ZvadLczbjeWAk=","beginning_cross_street":"Exit 14 - NY 298; Bear Street  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.179254,43.056647]]}},{"id":"nwT+jNT0DqYITuhNrKN8GHh27fk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1LEW2V18gXxpjEPBpn6KwelI0rQ="},{"type":"next-occurrence","id":"DiZME8+2xexOk++3Tlele3RC4ZQ="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM left shoulder closed","update_date":"2026-05-26T13:29:28Z"},"road_event_id":"nwT+jNT0DqYITuhNrKN8GHh27fk=","beginning_cross_street":"Exit 14 - NY 298; Bear Street  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.179254,43.056647]]}},{"id":"DiZME8+2xexOk++3Tlele3RC4ZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1LEW2V18gXxpjEPBpn6KwelI0rQ="},{"type":"next-occurrence","id":"KXucOKAjo4PUj8R86pk9JWBSo+o="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM left shoulder closed","update_date":"2026-05-26T13:29:28Z"},"road_event_id":"DiZME8+2xexOk++3Tlele3RC4ZQ=","beginning_cross_street":"Exit 14 - NY 298; Bear Street  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.179254,43.056647]]}},{"id":"KXucOKAjo4PUj8R86pk9JWBSo+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1LEW2V18gXxpjEPBpn6KwelI0rQ="},{"type":"next-occurrence","id":"oRj2XoS3l+E2kHmBGgvtP+1FD50="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM left shoulder closed","update_date":"2026-05-26T13:29:28Z"},"road_event_id":"KXucOKAjo4PUj8R86pk9JWBSo+o=","beginning_cross_street":"Exit 14 - NY 298; Bear Street  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.179254,43.056647]]}},{"id":"oRj2XoS3l+E2kHmBGgvtP+1FD50=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1LEW2V18gXxpjEPBpn6KwelI0rQ="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM left shoulder closed","update_date":"2026-05-26T13:29:28Z"},"road_event_id":"oRj2XoS3l+E2kHmBGgvtP+1FD50=","beginning_cross_street":"Exit 14 - NY 298; Bear Street  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.179254,43.056647]]}},{"id":"CGvf1zNjmCnAw6HaPm9S7FCWUXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"R5lj9bukUouE/zm1MSfRud5dsDw="}],"description":"Roadwork on I-81 southbound between Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:31:54Z"},"road_event_id":"CGvf1zNjmCnAw6HaPm9S7FCWUXI=","beginning_cross_street":"Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"R5lj9bukUouE/zm1MSfRud5dsDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGvf1zNjmCnAw6HaPm9S7FCWUXI="},{"type":"next-occurrence","id":"pcd7BQiuFZNYqkJ2S/RTRq6lGjg="}],"description":"Roadwork on I-81 southbound between Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:31:54Z"},"road_event_id":"R5lj9bukUouE/zm1MSfRud5dsDw=","beginning_cross_street":"Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"pcd7BQiuFZNYqkJ2S/RTRq6lGjg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGvf1zNjmCnAw6HaPm9S7FCWUXI="},{"type":"next-occurrence","id":"LVNe/fBMS+8W1jMqpM8fz39tzYA="}],"description":"Roadwork on I-81 southbound between Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:31:54Z"},"road_event_id":"pcd7BQiuFZNYqkJ2S/RTRq6lGjg=","beginning_cross_street":"Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"LVNe/fBMS+8W1jMqpM8fz39tzYA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGvf1zNjmCnAw6HaPm9S7FCWUXI="},{"type":"next-occurrence","id":"JPO9NIWbqcK6jpWsObv3n9Q0BBQ="}],"description":"Roadwork on I-81 southbound between Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:31:54Z"},"road_event_id":"LVNe/fBMS+8W1jMqpM8fz39tzYA=","beginning_cross_street":"Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"JPO9NIWbqcK6jpWsObv3n9Q0BBQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGvf1zNjmCnAw6HaPm9S7FCWUXI="},{"type":"next-occurrence","id":"f/1VgK3g7xzXONh3DZmc6wFQxgk="}],"description":"Roadwork on I-81 southbound between Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:31:54Z"},"road_event_id":"JPO9NIWbqcK6jpWsObv3n9Q0BBQ=","beginning_cross_street":"Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"f/1VgK3g7xzXONh3DZmc6wFQxgk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGvf1zNjmCnAw6HaPm9S7FCWUXI="},{"type":"next-occurrence","id":"cW0uvaNJ9+csaI0HFgpEyi26Jb0="}],"description":"Roadwork on I-81 southbound between Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:31:54Z"},"road_event_id":"f/1VgK3g7xzXONh3DZmc6wFQxgk=","beginning_cross_street":"Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"cW0uvaNJ9+csaI0HFgpEyi26Jb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGvf1zNjmCnAw6HaPm9S7FCWUXI="},{"type":"next-occurrence","id":"1YlA6N0LVbbQk1YFwjt1zdRtK04="}],"description":"Roadwork on I-81 southbound between Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:31:54Z"},"road_event_id":"cW0uvaNJ9+csaI0HFgpEyi26Jb0=","beginning_cross_street":"Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"1YlA6N0LVbbQk1YFwjt1zdRtK04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGvf1zNjmCnAw6HaPm9S7FCWUXI="},{"type":"next-occurrence","id":"rjVztR9tLZGqaoFtbmB/KNgf86g="}],"description":"Roadwork on I-81 southbound between Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:31:54Z"},"road_event_id":"1YlA6N0LVbbQk1YFwjt1zdRtK04=","beginning_cross_street":"Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"rjVztR9tLZGqaoFtbmB/KNgf86g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGvf1zNjmCnAw6HaPm9S7FCWUXI="},{"type":"next-occurrence","id":"X6oFi9vSduoZ2mBmMr5KMHk6wrQ="}],"description":"Roadwork on I-81 southbound between Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:31:54Z"},"road_event_id":"rjVztR9tLZGqaoFtbmB/KNgf86g=","beginning_cross_street":"Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"X6oFi9vSduoZ2mBmMr5KMHk6wrQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGvf1zNjmCnAw6HaPm9S7FCWUXI="},{"type":"next-occurrence","id":"TFVgOAwf5Vg+bllYs3BrPQvXZbE="}],"description":"Roadwork on I-81 southbound between Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:31:54Z"},"road_event_id":"X6oFi9vSduoZ2mBmMr5KMHk6wrQ=","beginning_cross_street":"Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"TFVgOAwf5Vg+bllYs3BrPQvXZbE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CGvf1zNjmCnAw6HaPm9S7FCWUXI="}],"description":"Roadwork on I-81 southbound between Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:31:54Z"},"road_event_id":"TFVgOAwf5Vg+bllYs3BrPQvXZbE=","beginning_cross_street":"Exit 5A/5B - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166802,43.068187]]}},{"id":"E2xpNIqWW+NkgRlnTSsHzMD10AE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/6+awri829TZK+E6DYtVkGUV7fE="}],"description":"Roadwork on I-81 northbound between Exit 20 - Franklin Street; West Street (Syracuse) and Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:34:28Z"},"road_event_id":"E2xpNIqWW+NkgRlnTSsHzMD10AE=","beginning_cross_street":"Exit 20 - Franklin Street; West Street","ending_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.1533,43.055998]]}},{"id":"/6+awri829TZK+E6DYtVkGUV7fE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E2xpNIqWW+NkgRlnTSsHzMD10AE="},{"type":"next-occurrence","id":"j5b9lRiwpZBxVHdDsHJ2eCVxqyE="}],"description":"Roadwork on I-81 northbound between Exit 20 - Franklin Street; West Street (Syracuse) and Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:34:28Z"},"road_event_id":"/6+awri829TZK+E6DYtVkGUV7fE=","beginning_cross_street":"Exit 20 - Franklin Street; West Street","ending_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.1533,43.055998]]}},{"id":"j5b9lRiwpZBxVHdDsHJ2eCVxqyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E2xpNIqWW+NkgRlnTSsHzMD10AE="},{"type":"next-occurrence","id":"2ggC1u2TH9CF5Vza5abvpIBViII="}],"description":"Roadwork on I-81 northbound between Exit 20 - Franklin Street; West Street (Syracuse) and Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:34:28Z"},"road_event_id":"j5b9lRiwpZBxVHdDsHJ2eCVxqyE=","beginning_cross_street":"Exit 20 - Franklin Street; West Street","ending_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.1533,43.055998]]}},{"id":"2ggC1u2TH9CF5Vza5abvpIBViII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E2xpNIqWW+NkgRlnTSsHzMD10AE="},{"type":"next-occurrence","id":"B+oWbAQC9YdNPUEb9gSJ3jx7kwk="}],"description":"Roadwork on I-81 northbound between Exit 20 - Franklin Street; West Street (Syracuse) and Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:34:28Z"},"road_event_id":"2ggC1u2TH9CF5Vza5abvpIBViII=","beginning_cross_street":"Exit 20 - Franklin Street; West Street","ending_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.1533,43.055998]]}},{"id":"B+oWbAQC9YdNPUEb9gSJ3jx7kwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E2xpNIqWW+NkgRlnTSsHzMD10AE="},{"type":"next-occurrence","id":"MrutAFd6i/cJs9WKx0mjHHurnEQ="}],"description":"Roadwork on I-81 northbound between Exit 20 - Franklin Street; West Street (Syracuse) and Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:34:28Z"},"road_event_id":"B+oWbAQC9YdNPUEb9gSJ3jx7kwk=","beginning_cross_street":"Exit 20 - Franklin Street; West Street","ending_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.1533,43.055998]]}},{"id":"MrutAFd6i/cJs9WKx0mjHHurnEQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E2xpNIqWW+NkgRlnTSsHzMD10AE="},{"type":"next-occurrence","id":"nz94HK1PTtD2A+/0ek3F+z4vL2A="}],"description":"Roadwork on I-81 northbound between Exit 20 - Franklin Street; West Street (Syracuse) and Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:34:28Z"},"road_event_id":"MrutAFd6i/cJs9WKx0mjHHurnEQ=","beginning_cross_street":"Exit 20 - Franklin Street; West Street","ending_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.1533,43.055998]]}},{"id":"nz94HK1PTtD2A+/0ek3F+z4vL2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E2xpNIqWW+NkgRlnTSsHzMD10AE="},{"type":"next-occurrence","id":"VpXLze5uHguUDffGT8t8bECpvXQ="}],"description":"Roadwork on I-81 northbound between Exit 20 - Franklin Street; West Street (Syracuse) and Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:34:28Z"},"road_event_id":"nz94HK1PTtD2A+/0ek3F+z4vL2A=","beginning_cross_street":"Exit 20 - Franklin Street; West Street","ending_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.1533,43.055998]]}},{"id":"VpXLze5uHguUDffGT8t8bECpvXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E2xpNIqWW+NkgRlnTSsHzMD10AE="},{"type":"next-occurrence","id":"1IRL9zB5F8Zdtm4Emvrm4D8Yi4I="}],"description":"Roadwork on I-81 northbound between Exit 20 - Franklin Street; West Street (Syracuse) and Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:34:28Z"},"road_event_id":"VpXLze5uHguUDffGT8t8bECpvXQ=","beginning_cross_street":"Exit 20 - Franklin Street; West Street","ending_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.1533,43.055998]]}},{"id":"1IRL9zB5F8Zdtm4Emvrm4D8Yi4I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E2xpNIqWW+NkgRlnTSsHzMD10AE="},{"type":"next-occurrence","id":"Q9wMtL3ocHXzYvf2a3gNLjLQrSo="}],"description":"Roadwork on I-81 northbound between Exit 20 - Franklin Street; West Street (Syracuse) and Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:34:28Z"},"road_event_id":"1IRL9zB5F8Zdtm4Emvrm4D8Yi4I=","beginning_cross_street":"Exit 20 - Franklin Street; West Street","ending_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.1533,43.055998]]}},{"id":"Q9wMtL3ocHXzYvf2a3gNLjLQrSo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E2xpNIqWW+NkgRlnTSsHzMD10AE="},{"type":"next-occurrence","id":"hRCK/r+PoU7384ntlcCyXE8DBtE="}],"description":"Roadwork on I-81 northbound between Exit 20 - Franklin Street; West Street (Syracuse) and Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:34:28Z"},"road_event_id":"Q9wMtL3ocHXzYvf2a3gNLjLQrSo=","beginning_cross_street":"Exit 20 - Franklin Street; West Street","ending_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.1533,43.055998]]}},{"id":"hRCK/r+PoU7384ntlcCyXE8DBtE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E2xpNIqWW+NkgRlnTSsHzMD10AE="}],"description":"Roadwork on I-81 northbound between Exit 20 - Franklin Street; West Street (Syracuse) and Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Tuesday May 26th, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-26T13:34:28Z"},"road_event_id":"hRCK/r+PoU7384ntlcCyXE8DBtE=","beginning_cross_street":"Exit 20 - Franklin Street; West Street","ending_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.1533,43.055998]]}},{"id":"9dqF7mxjYGdB0lbTke2XhN1sBVc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 298"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on NY 298 westbound between Solar Street (Syracuse) and Pulaski Street (Syracuse), Continuous Tuesday May 26th, 2026 07:00 AM thru Thursday July 2nd, 2026 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-26T13:37:02Z"},"road_event_id":"9dqF7mxjYGdB0lbTke2XhN1sBVc=","beginning_cross_street":"Solar Street","ending_cross_street":"Pulaski Street ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166353,43.064135]]}},{"id":"vALWdBnpGJZMl6JcIhQ4GIs7+tE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"foVfqcpXJqV/xB86zNk4a44a7IM="}],"description":"Utility work on NY 64 northbound Cannon Rd (West Bloomfield) to Fox Hollow Ln (West Bloomfield) alternating lane closures, Tuesday April 14th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-26T14:11:30Z"},"road_event_id":"vALWdBnpGJZMl6JcIhQ4GIs7+tE=","beginning_cross_street":"Cannon Rd","ending_cross_street":"Fox Hollow Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468187,42.922076]]}},{"id":"foVfqcpXJqV/xB86zNk4a44a7IM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vALWdBnpGJZMl6JcIhQ4GIs7+tE="},{"type":"next-occurrence","id":"C2shlOVXJUibP78D2PygH2IHK/I="}],"description":"Utility work on NY 64 northbound Cannon Rd (West Bloomfield) to Fox Hollow Ln (West Bloomfield) alternating lane closures, Tuesday April 14th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-26T14:11:30Z"},"road_event_id":"foVfqcpXJqV/xB86zNk4a44a7IM=","beginning_cross_street":"Cannon Rd","ending_cross_street":"Fox Hollow Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468187,42.922076]]}},{"id":"C2shlOVXJUibP78D2PygH2IHK/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vALWdBnpGJZMl6JcIhQ4GIs7+tE="},{"type":"next-occurrence","id":"rNXmLCb+vbcP8EqO1eOnYvBaWEs="}],"description":"Utility work on NY 64 northbound Cannon Rd (West Bloomfield) to Fox Hollow Ln (West Bloomfield) alternating lane closures, Tuesday April 14th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-26T14:11:30Z"},"road_event_id":"C2shlOVXJUibP78D2PygH2IHK/I=","beginning_cross_street":"Cannon Rd","ending_cross_street":"Fox Hollow Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468187,42.922076]]}},{"id":"rNXmLCb+vbcP8EqO1eOnYvBaWEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vALWdBnpGJZMl6JcIhQ4GIs7+tE="},{"type":"next-occurrence","id":"8D8RrBlW/v/SSRtWziPDlwEcSQ4="}],"description":"Utility work on NY 64 northbound Cannon Rd (West Bloomfield) to Fox Hollow Ln (West Bloomfield) alternating lane closures, Tuesday April 14th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-26T14:11:30Z"},"road_event_id":"rNXmLCb+vbcP8EqO1eOnYvBaWEs=","beginning_cross_street":"Cannon Rd","ending_cross_street":"Fox Hollow Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468187,42.922076]]}},{"id":"8D8RrBlW/v/SSRtWziPDlwEcSQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vALWdBnpGJZMl6JcIhQ4GIs7+tE="},{"type":"next-occurrence","id":"AlzxNuFJAN9ou0ncaj9+9ChUdwg="}],"description":"Utility work on NY 64 northbound Cannon Rd (West Bloomfield) to Fox Hollow Ln (West Bloomfield) alternating lane closures, Tuesday April 14th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-26T14:11:30Z"},"road_event_id":"8D8RrBlW/v/SSRtWziPDlwEcSQ4=","beginning_cross_street":"Cannon Rd","ending_cross_street":"Fox Hollow Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468187,42.922076]]}},{"id":"AlzxNuFJAN9ou0ncaj9+9ChUdwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vALWdBnpGJZMl6JcIhQ4GIs7+tE="},{"type":"next-occurrence","id":"cRgqapJF5DSSMygJs50kahWiaBg="}],"description":"Utility work on NY 64 northbound Cannon Rd (West Bloomfield) to Fox Hollow Ln (West Bloomfield) alternating lane closures, Tuesday April 14th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-26T14:11:30Z"},"road_event_id":"AlzxNuFJAN9ou0ncaj9+9ChUdwg=","beginning_cross_street":"Cannon Rd","ending_cross_street":"Fox Hollow Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468187,42.922076]]}},{"id":"cRgqapJF5DSSMygJs50kahWiaBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vALWdBnpGJZMl6JcIhQ4GIs7+tE="},{"type":"next-occurrence","id":"Z8TEmA9NPPJm76f0sxsWOb0yosI="}],"description":"Utility work on NY 64 northbound Cannon Rd (West Bloomfield) to Fox Hollow Ln (West Bloomfield) alternating lane closures, Tuesday April 14th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-26T14:11:30Z"},"road_event_id":"cRgqapJF5DSSMygJs50kahWiaBg=","beginning_cross_street":"Cannon Rd","ending_cross_street":"Fox Hollow Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468187,42.922076]]}},{"id":"Z8TEmA9NPPJm76f0sxsWOb0yosI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vALWdBnpGJZMl6JcIhQ4GIs7+tE="}],"description":"Utility work on NY 64 northbound Cannon Rd (West Bloomfield) to Fox Hollow Ln (West Bloomfield) alternating lane closures, Tuesday April 14th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-26T14:11:30Z"},"road_event_id":"Z8TEmA9NPPJm76f0sxsWOb0yosI=","beginning_cross_street":"Cannon Rd","ending_cross_street":"Fox Hollow Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468187,42.922076]]}},{"id":"2pvPNMUvlPDjrYOs7VDk0HYN2po=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dmMxEoeBYh3plh6rCNFXcFwcKjI="}],"description":"Bridge rehabilitation on NY 17 [Orange] westbound between Exit 118 - Fair Oaks (Wallkill) and Exit 116 - NY 17K (Wallkill) D265594/B1013909/32703209 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T19:00:09Z"},"road_event_id":"2pvPNMUvlPDjrYOs7VDk0HYN2po=","beginning_cross_street":"Exit 118 - Fair Oaks","ending_cross_street":"Exit 116 - NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414302,41.519586]]}},{"id":"dmMxEoeBYh3plh6rCNFXcFwcKjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2pvPNMUvlPDjrYOs7VDk0HYN2po="},{"type":"next-occurrence","id":"sEnckRkYIe+eInnJ+J7TFFbL80E="}],"description":"Bridge rehabilitation on NY 17 [Orange] westbound between Exit 118 - Fair Oaks (Wallkill) and Exit 116 - NY 17K (Wallkill) D265594/B1013909/32703209 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T19:00:09Z"},"road_event_id":"dmMxEoeBYh3plh6rCNFXcFwcKjI=","beginning_cross_street":"Exit 118 - Fair Oaks","ending_cross_street":"Exit 116 - NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414302,41.519586]]}},{"id":"sEnckRkYIe+eInnJ+J7TFFbL80E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2pvPNMUvlPDjrYOs7VDk0HYN2po="},{"type":"next-occurrence","id":"WB/4vZUuoCB7fPbuBi95KqxAvos="}],"description":"Bridge rehabilitation on NY 17 [Orange] westbound between Exit 118 - Fair Oaks (Wallkill) and Exit 116 - NY 17K (Wallkill) D265594/B1013909/32703209 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T19:00:09Z"},"road_event_id":"sEnckRkYIe+eInnJ+J7TFFbL80E=","beginning_cross_street":"Exit 118 - Fair Oaks","ending_cross_street":"Exit 116 - NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414302,41.519586]]}},{"id":"WB/4vZUuoCB7fPbuBi95KqxAvos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2pvPNMUvlPDjrYOs7VDk0HYN2po="},{"type":"next-occurrence","id":"BP0H3hSjhwYOZukUEfiSsUaipSQ="}],"description":"Bridge rehabilitation on NY 17 [Orange] westbound between Exit 118 - Fair Oaks (Wallkill) and Exit 116 - NY 17K (Wallkill) D265594/B1013909/32703209 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T19:00:09Z"},"road_event_id":"WB/4vZUuoCB7fPbuBi95KqxAvos=","beginning_cross_street":"Exit 118 - Fair Oaks","ending_cross_street":"Exit 116 - NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414302,41.519586]]}},{"id":"BP0H3hSjhwYOZukUEfiSsUaipSQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2pvPNMUvlPDjrYOs7VDk0HYN2po="},{"type":"next-occurrence","id":"m+8WvECxKiL1Yx6Z7K6ULWvzXUg="}],"description":"Bridge rehabilitation on NY 17 [Orange] westbound between Exit 118 - Fair Oaks (Wallkill) and Exit 116 - NY 17K (Wallkill) D265594/B1013909/32703209 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T19:00:09Z"},"road_event_id":"BP0H3hSjhwYOZukUEfiSsUaipSQ=","beginning_cross_street":"Exit 118 - Fair Oaks","ending_cross_street":"Exit 116 - NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414302,41.519586]]}},{"id":"m+8WvECxKiL1Yx6Z7K6ULWvzXUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2pvPNMUvlPDjrYOs7VDk0HYN2po="}],"description":"Bridge rehabilitation on NY 17 [Orange] westbound between Exit 118 - Fair Oaks (Wallkill) and Exit 116 - NY 17K (Wallkill) D265594/B1013909/32703209 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-05T19:00:09Z"},"road_event_id":"m+8WvECxKiL1Yx6Z7K6ULWvzXUg=","beginning_cross_street":"Exit 118 - Fair Oaks","ending_cross_street":"Exit 116 - NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414302,41.519586]]}},{"id":"k6H7FLgdtLGfmiY/jzAas9+UCaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XhyEt0xoYrB76N96P6bMuQlgV/I="}],"description":"Bridge rehabilitation on NY 17K both directions between Bloomingburg Road (Wallkill) and Goshen Tpke (Wallkill) D265594/B1013909/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T20:19:47Z"},"road_event_id":"k6H7FLgdtLGfmiY/jzAas9+UCaM=","beginning_cross_street":"Bloomingburg Road","ending_cross_street":"Goshen Tpke","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425232,41.552543]]}},{"id":"XhyEt0xoYrB76N96P6bMuQlgV/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k6H7FLgdtLGfmiY/jzAas9+UCaM="},{"type":"next-occurrence","id":"QzmH/N4JgjZVt4intPDIUTG7OjI="}],"description":"Bridge rehabilitation on NY 17K both directions between Bloomingburg Road (Wallkill) and Goshen Tpke (Wallkill) D265594/B1013909/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T20:19:47Z"},"road_event_id":"XhyEt0xoYrB76N96P6bMuQlgV/I=","beginning_cross_street":"Bloomingburg Road","ending_cross_street":"Goshen Tpke","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425232,41.552543]]}},{"id":"QzmH/N4JgjZVt4intPDIUTG7OjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k6H7FLgdtLGfmiY/jzAas9+UCaM="},{"type":"next-occurrence","id":"hVb6CQLIGdM4BF6xZ22Uqs2apks="}],"description":"Bridge rehabilitation on NY 17K both directions between Bloomingburg Road (Wallkill) and Goshen Tpke (Wallkill) D265594/B1013909/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T20:19:47Z"},"road_event_id":"QzmH/N4JgjZVt4intPDIUTG7OjI=","beginning_cross_street":"Bloomingburg Road","ending_cross_street":"Goshen Tpke","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425232,41.552543]]}},{"id":"hVb6CQLIGdM4BF6xZ22Uqs2apks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k6H7FLgdtLGfmiY/jzAas9+UCaM="},{"type":"next-occurrence","id":"w/LnRlClBTJ0+lgOat0QPe4qr0k="}],"description":"Bridge rehabilitation on NY 17K both directions between Bloomingburg Road (Wallkill) and Goshen Tpke (Wallkill) D265594/B1013909/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T20:19:47Z"},"road_event_id":"hVb6CQLIGdM4BF6xZ22Uqs2apks=","beginning_cross_street":"Bloomingburg Road","ending_cross_street":"Goshen Tpke","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425232,41.552543]]}},{"id":"w/LnRlClBTJ0+lgOat0QPe4qr0k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k6H7FLgdtLGfmiY/jzAas9+UCaM="},{"type":"next-occurrence","id":"GTPfPA5etSZY5aldjggrV9xhlDQ="}],"description":"Bridge rehabilitation on NY 17K both directions between Bloomingburg Road (Wallkill) and Goshen Tpke (Wallkill) D265594/B1013909/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T20:19:47Z"},"road_event_id":"w/LnRlClBTJ0+lgOat0QPe4qr0k=","beginning_cross_street":"Bloomingburg Road","ending_cross_street":"Goshen Tpke","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425232,41.552543]]}},{"id":"GTPfPA5etSZY5aldjggrV9xhlDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k6H7FLgdtLGfmiY/jzAas9+UCaM="},{"type":"next-occurrence","id":"aFbAMfCaNry+t+aorOB4DzAFIBg="}],"description":"Bridge rehabilitation on NY 17K both directions between Bloomingburg Road (Wallkill) and Goshen Tpke (Wallkill) D265594/B1013909/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T20:19:47Z"},"road_event_id":"GTPfPA5etSZY5aldjggrV9xhlDQ=","beginning_cross_street":"Bloomingburg Road","ending_cross_street":"Goshen Tpke","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425232,41.552543]]}},{"id":"aFbAMfCaNry+t+aorOB4DzAFIBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k6H7FLgdtLGfmiY/jzAas9+UCaM="}],"description":"Bridge rehabilitation on NY 17K both directions between Bloomingburg Road (Wallkill) and Goshen Tpke (Wallkill) D265594/B1013909/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T20:19:47Z"},"road_event_id":"aFbAMfCaNry+t+aorOB4DzAFIBg=","beginning_cross_street":"Bloomingburg Road","ending_cross_street":"Goshen Tpke","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425232,41.552543]]}},{"id":"LoPvif2/trzkGbzkhdebI+M918U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CQKJPVgC97Xl5qeCKnOZ2XoIblM="}],"description":"Bridge inspection on I-81 southbound between South Hill Rd (Virgil) and Exit 39 - US 11; NY 221; Marathon (Marathon), Friday June 5th, 2026 thru Saturday June 6th, 2026, Friday/Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-26T16:01:00Z"},"road_event_id":"LoPvif2/trzkGbzkhdebI+M918U=","beginning_cross_street":"South Hill Rd ","ending_cross_street":"Exit 39 - US 11; NY 221; Marathon   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.09815,42.551505]]}},{"id":"CQKJPVgC97Xl5qeCKnOZ2XoIblM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LoPvif2/trzkGbzkhdebI+M918U="}],"description":"Bridge inspection on I-81 southbound between South Hill Rd (Virgil) and Exit 39 - US 11; NY 221; Marathon (Marathon), Friday June 5th, 2026 thru Saturday June 6th, 2026, Friday/Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-26T16:01:00Z"},"road_event_id":"CQKJPVgC97Xl5qeCKnOZ2XoIblM=","beginning_cross_street":"South Hill Rd ","ending_cross_street":"Exit 39 - US 11; NY 221; Marathon   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.09815,42.551505]]}},{"id":"ORC32753409","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 82"],"direction":"unknown","description":"Crack sealing on NY 82 both directions between Arrowhead Road (East Fishkill) and Taconic State Pkwy (East Fishkill) D265522/32612409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist Not currently scheduled","update_date":"2026-06-05T20:00:39Z"},"road_event_id":"ORC32753409","beginning_cross_street":"Arrowhead Road","ending_cross_street":"Taconic State Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-26T16:42:31Z","end_date":"2026-06-06T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.816323,41.576669]]}},{"id":"W0SJ5WA2+U+A9S5hswUNKFFl5uc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"w9XG41Zy8/k3QOWKWN4mXrWcNAA="}],"description":"Crack sealing on Taconic State Parkway both directions between Exit 23 - Bryant Pond Road - CR 30 (Putnam Valley) and Exit 38 - NY 52 (East Fishkill) D265522/NIGHT/32612409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, moving operation","update_date":"2026-05-29T20:02:37Z"},"road_event_id":"W0SJ5WA2+U+A9S5hswUNKFFl5uc=","beginning_cross_street":"Exit 23 - Bryant Pond Road - CR 30","ending_cross_street":"Exit 38 - NY 52   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80682,41.430162]]}},{"id":"w9XG41Zy8/k3QOWKWN4mXrWcNAA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W0SJ5WA2+U+A9S5hswUNKFFl5uc="},{"type":"next-occurrence","id":"9+YPmgaCkBDfJZDkFIjyWyWiJMc="}],"description":"Crack sealing on Taconic State Parkway both directions between Exit 23 - Bryant Pond Road - CR 30 (Putnam Valley) and Exit 38 - NY 52 (East Fishkill) D265522/NIGHT/32612409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, moving operation","update_date":"2026-05-29T20:02:37Z"},"road_event_id":"w9XG41Zy8/k3QOWKWN4mXrWcNAA=","beginning_cross_street":"Exit 23 - Bryant Pond Road - CR 30","ending_cross_street":"Exit 38 - NY 52   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80682,41.430162]]}},{"id":"9+YPmgaCkBDfJZDkFIjyWyWiJMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W0SJ5WA2+U+A9S5hswUNKFFl5uc="},{"type":"next-occurrence","id":"SBKtmqC1xA95pRnMCuL3ZFsKGYk="}],"description":"Crack sealing on Taconic State Parkway both directions between Exit 23 - Bryant Pond Road - CR 30 (Putnam Valley) and Exit 38 - NY 52 (East Fishkill) D265522/NIGHT/32612409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, moving operation","update_date":"2026-05-29T20:02:37Z"},"road_event_id":"9+YPmgaCkBDfJZDkFIjyWyWiJMc=","beginning_cross_street":"Exit 23 - Bryant Pond Road - CR 30","ending_cross_street":"Exit 38 - NY 52   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80682,41.430162]]}},{"id":"SBKtmqC1xA95pRnMCuL3ZFsKGYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W0SJ5WA2+U+A9S5hswUNKFFl5uc="},{"type":"next-occurrence","id":"BcWVOkOEbIz6rzLZvcvcsLoE/Ec="}],"description":"Crack sealing on Taconic State Parkway both directions between Exit 23 - Bryant Pond Road - CR 30 (Putnam Valley) and Exit 38 - NY 52 (East Fishkill) D265522/NIGHT/32612409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, moving operation","update_date":"2026-05-29T20:02:37Z"},"road_event_id":"SBKtmqC1xA95pRnMCuL3ZFsKGYk=","beginning_cross_street":"Exit 23 - Bryant Pond Road - CR 30","ending_cross_street":"Exit 38 - NY 52   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80682,41.430162]]}},{"id":"BcWVOkOEbIz6rzLZvcvcsLoE/Ec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W0SJ5WA2+U+A9S5hswUNKFFl5uc="},{"type":"next-occurrence","id":"OTy0XCX+6zdTyg3X40JxWIa+H78="}],"description":"Crack sealing on Taconic State Parkway both directions between Exit 23 - Bryant Pond Road - CR 30 (Putnam Valley) and Exit 38 - NY 52 (East Fishkill) D265522/NIGHT/32612409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, moving operation","update_date":"2026-05-29T20:02:37Z"},"road_event_id":"BcWVOkOEbIz6rzLZvcvcsLoE/Ec=","beginning_cross_street":"Exit 23 - Bryant Pond Road - CR 30","ending_cross_street":"Exit 38 - NY 52   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80682,41.430162]]}},{"id":"OTy0XCX+6zdTyg3X40JxWIa+H78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W0SJ5WA2+U+A9S5hswUNKFFl5uc="}],"description":"Crack sealing on Taconic State Parkway both directions between Exit 23 - Bryant Pond Road - CR 30 (Putnam Valley) and Exit 38 - NY 52 (East Fishkill) D265522/NIGHT/32612409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, moving operation","update_date":"2026-05-29T20:02:37Z"},"road_event_id":"OTy0XCX+6zdTyg3X40JxWIa+H78=","beginning_cross_street":"Exit 23 - Bryant Pond Road - CR 30","ending_cross_street":"Exit 38 - NY 52   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80682,41.430162]]}},{"id":"VM/K31YBmEbCiXjdETxDIVlXaRE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound at North of Exit 43 - CR 838/Creek Rd (Mount Laurel Twp) Saturday June 6, 2026 06:00 AM thru 03:00 PM, ramp","update_date":"2026-05-26T17:19:42Z"},"road_event_id":"VM/K31YBmEbCiXjdETxDIVlXaRE=","beginning_cross_street":"North of Exit 43 - CR 838/Creek Rd","ending_cross_street":"North of Exit 43 - CR 838/Creek Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.874244,39.99316]]}},{"id":"5d8792iJCH7nbF3AoeB9vE4vvHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 128"],"direction":"unknown","related_road_events":[],"description":"Crack sealing on NY 128 both directions between School Street (North Castle) and Wrights Mill Lane (North Castle) D265522/NIGHT/32753709 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Saturday June 6th, 2026 Thursday/ Friday, 08:00 PM thru 05:00 AM, moving operation","update_date":"2026-05-29T19:56:39Z"},"road_event_id":"5d8792iJCH7nbF3AoeB9vE4vvHs=","beginning_cross_street":"School Street","ending_cross_street":"Wrights Mill Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.711431,41.133809]]}},{"id":"TgDs4c1WABaPDnDtsHYGjioXsBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Harlem"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations northbound, Harlem between Fordham (New York) and Wakefield (New York) Temporary platforms are in place at Botanical Garden, Williams Bridge, and Woodlawn for northbound travel. Build in extra travel time to reach the platform, Continuous Thursday April 16th, 2026 12:00 AM thru Monday November 30th, 2026 11:59 PM","update_date":"2026-05-26T18:24:22Z"},"road_event_id":"TgDs4c1WABaPDnDtsHYGjioXsBM=","beginning_cross_street":"Fordham","ending_cross_street":"Wakefield","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.89058,40.8615]]}},{"id":"1Oqv5M7YHgixGPUBAjG6Y4vTROg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Canaan and New Haven"],"direction":"unknown","related_road_events":[],"description":"Due to Elevator Work both directions, New Canaan and New Haven at New Rochelle (New Rochelle) The elevator leading to the tracks 2 and 4 platform at New Rochelle is closed for upgrade work., Continuous Tuesday May 26th, 2026 12:00 AM thru Friday July 17th, 2026 11:59 PM","update_date":"2026-05-26T18:25:59Z"},"road_event_id":"1Oqv5M7YHgixGPUBAjG6Y4vTROg=","beginning_cross_street":"New Rochelle","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.783807,40.911605]]}},{"id":"bvygwCEDVtOgCcvskEYEvKMiMFk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Atlantic City Line"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, Atlantic City Line between Atco (Waterford Twp) and 30th St. Phl. (Philadelphia) Atlantic City Line trains will be replaced by NJ TRANSIT buses between Atco and 30th Street stations to support bridge maintenance near Lindenwold Station., Saturday June 6th, 2026, 04:00 AM thru 06:00 PM bus service only","update_date":"2026-05-26T18:43:29Z"},"road_event_id":"bvygwCEDVtOgCcvskEYEvKMiMFk=","beginning_cross_street":"Atco","ending_cross_street":"30th St. Phl.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T08:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.907588,39.783547]]}},{"id":"+uIyuIG6LRbywMlwmNMaxPwl4Bg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12E"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 12E both directions CR 57 (Lyme) to BAYVIEW DR (Lyme) Rte. 12 E over Shaver Creek closed to all traffic. Motorists are directed to follow the signed vehicle detour around the site. , Continuous Tuesday June 2nd, 2026 12:00 AM thru Sunday November 15th, 2026 11:59 PM All lanes closed","update_date":"2026-05-26T18:50:29Z"},"road_event_id":"+uIyuIG6LRbywMlwmNMaxPwl4Bg=","beginning_cross_street":"CR 57","ending_cross_street":"BAYVIEW DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.209784,44.080502]]}},{"id":"YlBgbVjMh1X1oK4MOwH6wsQBbwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2ICnZkcQfnsiJ8Z3MMEYrDVU9qY="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:33Z"},"road_event_id":"YlBgbVjMh1X1oK4MOwH6wsQBbwc=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"2ICnZkcQfnsiJ8Z3MMEYrDVU9qY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YlBgbVjMh1X1oK4MOwH6wsQBbwc="},{"type":"next-occurrence","id":"Ztj1aEKFfgur3BCO2n08KSRgvf8="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:33Z"},"road_event_id":"2ICnZkcQfnsiJ8Z3MMEYrDVU9qY=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"Ztj1aEKFfgur3BCO2n08KSRgvf8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YlBgbVjMh1X1oK4MOwH6wsQBbwc="},{"type":"next-occurrence","id":"gBE5mYiyDSdksIhSX9LfqTlE2t8="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:33Z"},"road_event_id":"Ztj1aEKFfgur3BCO2n08KSRgvf8=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"gBE5mYiyDSdksIhSX9LfqTlE2t8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YlBgbVjMh1X1oK4MOwH6wsQBbwc="},{"type":"next-occurrence","id":"pOOPGaCZ0Ployfr0J8D0tmfxs/o="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:33Z"},"road_event_id":"gBE5mYiyDSdksIhSX9LfqTlE2t8=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"pOOPGaCZ0Ployfr0J8D0tmfxs/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YlBgbVjMh1X1oK4MOwH6wsQBbwc="},{"type":"next-occurrence","id":"TvKQKnumbiKYHD8S3vHxdS/PXaM="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:33Z"},"road_event_id":"pOOPGaCZ0Ployfr0J8D0tmfxs/o=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"TvKQKnumbiKYHD8S3vHxdS/PXaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YlBgbVjMh1X1oK4MOwH6wsQBbwc="},{"type":"next-occurrence","id":"ioIKwmsxGeX5hCnx6VUHtKBDZMU="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:33Z"},"road_event_id":"TvKQKnumbiKYHD8S3vHxdS/PXaM=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"ioIKwmsxGeX5hCnx6VUHtKBDZMU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YlBgbVjMh1X1oK4MOwH6wsQBbwc="},{"type":"next-occurrence","id":"mPDp+M6yk/qr3oG0pTmltzrZ1WE="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:33Z"},"road_event_id":"ioIKwmsxGeX5hCnx6VUHtKBDZMU=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"mPDp+M6yk/qr3oG0pTmltzrZ1WE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YlBgbVjMh1X1oK4MOwH6wsQBbwc="},{"type":"next-occurrence","id":"RUlIRzPAWCZKHBHJCxLBRtDveTw="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:33Z"},"road_event_id":"mPDp+M6yk/qr3oG0pTmltzrZ1WE=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"RUlIRzPAWCZKHBHJCxLBRtDveTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YlBgbVjMh1X1oK4MOwH6wsQBbwc="},{"type":"next-occurrence","id":"pUZEspxCLoFhRwBXPYdRY6mVsK4="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:33Z"},"road_event_id":"RUlIRzPAWCZKHBHJCxLBRtDveTw=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"pUZEspxCLoFhRwBXPYdRY6mVsK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YlBgbVjMh1X1oK4MOwH6wsQBbwc="},{"type":"next-occurrence","id":"EPHovnzLGqVzGlsHFQYegMq6KqQ="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:33Z"},"road_event_id":"pUZEspxCLoFhRwBXPYdRY6mVsK4=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"EPHovnzLGqVzGlsHFQYegMq6KqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YlBgbVjMh1X1oK4MOwH6wsQBbwc="},{"type":"next-occurrence","id":"f02WGlW08Gk2ISKvCEjCTM3k3Bc="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:33Z"},"road_event_id":"EPHovnzLGqVzGlsHFQYegMq6KqQ=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"f02WGlW08Gk2ISKvCEjCTM3k3Bc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YlBgbVjMh1X1oK4MOwH6wsQBbwc="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 27th, 2026, 08:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-05T20:00:33Z"},"road_event_id":"f02WGlW08Gk2ISKvCEjCTM3k3Bc=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"ZdJtuk00Gj0B/9zhTkz5Ry8aUoM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 55"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vuV+ll0BMg0Uu7Eu874gnaRLbPw="}],"description":"Intersection improvements on NY 55 both directions at (Dover) 2026083565215/32754309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closures","update_date":"2026-06-05T20:00:39Z"},"road_event_id":"ZdJtuk00Gj0B/9zhTkz5Ry8aUoM=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.531283,41.652818]]}},{"id":"vuV+ll0BMg0Uu7Eu874gnaRLbPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdJtuk00Gj0B/9zhTkz5Ry8aUoM="},{"type":"next-occurrence","id":"onw6W56WNf3IwxBoDVlKfMerkQ4="}],"description":"Intersection improvements on NY 55 both directions at (Dover) 2026083565215/32754309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closures","update_date":"2026-06-05T20:00:39Z"},"road_event_id":"vuV+ll0BMg0Uu7Eu874gnaRLbPw=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.531283,41.652818]]}},{"id":"onw6W56WNf3IwxBoDVlKfMerkQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdJtuk00Gj0B/9zhTkz5Ry8aUoM="},{"type":"next-occurrence","id":"T3Ja4Lns/xJlPUbCn0BNtbXPEUo="}],"description":"Intersection improvements on NY 55 both directions at (Dover) 2026083565215/32754309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closures","update_date":"2026-06-05T20:00:39Z"},"road_event_id":"onw6W56WNf3IwxBoDVlKfMerkQ4=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.531283,41.652818]]}},{"id":"T3Ja4Lns/xJlPUbCn0BNtbXPEUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdJtuk00Gj0B/9zhTkz5Ry8aUoM="},{"type":"next-occurrence","id":"DRLy0I61cle4GE+edf9USGehZto="}],"description":"Intersection improvements on NY 55 both directions at (Dover) 2026083565215/32754309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closures","update_date":"2026-06-05T20:00:39Z"},"road_event_id":"T3Ja4Lns/xJlPUbCn0BNtbXPEUo=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.531283,41.652818]]}},{"id":"DRLy0I61cle4GE+edf9USGehZto=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZdJtuk00Gj0B/9zhTkz5Ry8aUoM="}],"description":"Intersection improvements on NY 55 both directions at (Dover) 2026083565215/32754309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closures","update_date":"2026-06-05T20:00:39Z"},"road_event_id":"DRLy0I61cle4GE+edf9USGehZto=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.531283,41.652818]]}},{"id":"G7Z9cKkUUvvWd6tTAj9G+RBV4n0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Holland Tunnel"],"direction":"unknown","related_road_events":[],"description":"Scheduled roadwork on Holland Tunnel South Tube eastbound ramp to Exit 3 - Ericson Street (New York), Continuous Tuesday May 26th, 2026 12:00 AM thru Tuesday June 9th, 2026 11:59 PM All lanes closed","update_date":"2026-05-27T01:58:22Z"},"road_event_id":"G7Z9cKkUUvvWd6tTAj9G+RBV4n0=","beginning_cross_street":"Exit 3 - Ericson Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-10T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.007229,40.720573]]}},{"id":"87HjMxgZadFSklWkDnqKmaLyKOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Z/IsK9ySK+/UnjwEKVb+pCz3p+Q="}],"description":"Safety improvements on NY 17K both directions between Young Lane (Wallkill) and Long Lane (Wallkill) 2025082766143/32653409 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 9th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-27T19:33:26Z"},"road_event_id":"87HjMxgZadFSklWkDnqKmaLyKOU=","beginning_cross_street":"Young Lane","ending_cross_street":"Long Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.389098,41.547303]]}},{"id":"Z/IsK9ySK+/UnjwEKVb+pCz3p+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"87HjMxgZadFSklWkDnqKmaLyKOU="},{"type":"next-occurrence","id":"h+yv5bq0PoFJ3se5Nue80GMPqkM="}],"description":"Safety improvements on NY 17K both directions between Young Lane (Wallkill) and Long Lane (Wallkill) 2025082766143/32653409 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 9th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-27T19:33:26Z"},"road_event_id":"Z/IsK9ySK+/UnjwEKVb+pCz3p+Q=","beginning_cross_street":"Young Lane","ending_cross_street":"Long Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.389098,41.547303]]}},{"id":"h+yv5bq0PoFJ3se5Nue80GMPqkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"87HjMxgZadFSklWkDnqKmaLyKOU="}],"description":"Safety improvements on NY 17K both directions between Young Lane (Wallkill) and Long Lane (Wallkill) 2025082766143/32653409 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 27th, 2026 thru Tuesday June 9th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-27T19:33:26Z"},"road_event_id":"h+yv5bq0PoFJ3se5Nue80GMPqkM=","beginning_cross_street":"Young Lane","ending_cross_street":"Long Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.389098,41.547303]]}},{"id":"J4SRR4dOELbLlTEG+YFuydNS8X0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on NY 414 both directions between CR-137 (Lodi) and Stowe Rd (Lodi) ; Alternating one-way traffic with temporary signals, Continuous Monday June 1st, 2026 06:30 AM thru Friday June 12th, 2026 05:00 PM All lanes and both shoulder closed southbound; both shoulder closed northbound","update_date":"2026-05-27T13:06:08Z"},"road_event_id":"J4SRR4dOELbLlTEG+YFuydNS8X0=","beginning_cross_street":"CR-137","ending_cross_street":"Stowe Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.864772,42.558483]]}},{"id":"Y3Y/mCJgZ6rqwXpp6BNt1DNLJcg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"X/BRer5WSMGqRXZEP6E3TDXkN60="}],"description":"Guard rail repairs on I-81 northbound between Exit 67 - US 11; NY 80; NY 281; Tully (Tully) and Exit 73 - US 11; US 20; LaFayette (La Fayette), Monday June 1st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed, Monday June 1st, 2026 thru Wednesday July 1st, 2026, 06:00 AM thru 12:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:38:14Z"},"road_event_id":"Y3Y/mCJgZ6rqwXpp6BNt1DNLJcg=","beginning_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","ending_cross_street":"Exit 73 - US 11; US 20; LaFayette","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.123344,42.79631]]}},{"id":"X/BRer5WSMGqRXZEP6E3TDXkN60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3Y/mCJgZ6rqwXpp6BNt1DNLJcg="},{"type":"next-occurrence","id":"cEFbDtNyWQbJ9ylX3TdS+kRk9hI="}],"description":"Guard rail repairs on I-81 northbound between Exit 67 - US 11; NY 80; NY 281; Tully (Tully) and Exit 73 - US 11; US 20; LaFayette (La Fayette), Monday June 1st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed, Monday June 1st, 2026 thru Wednesday July 1st, 2026, 06:00 AM thru 12:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:38:14Z"},"road_event_id":"X/BRer5WSMGqRXZEP6E3TDXkN60=","beginning_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","ending_cross_street":"Exit 73 - US 11; US 20; LaFayette","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.123344,42.79631]]}},{"id":"cEFbDtNyWQbJ9ylX3TdS+kRk9hI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3Y/mCJgZ6rqwXpp6BNt1DNLJcg="},{"type":"next-occurrence","id":"iF1wVLKQme2B1fsGQRWwhhDKFbY="}],"description":"Guard rail repairs on I-81 northbound between Exit 67 - US 11; NY 80; NY 281; Tully (Tully) and Exit 73 - US 11; US 20; LaFayette (La Fayette), Monday June 1st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed, Monday June 1st, 2026 thru Wednesday July 1st, 2026, 06:00 AM thru 12:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:38:14Z"},"road_event_id":"cEFbDtNyWQbJ9ylX3TdS+kRk9hI=","beginning_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","ending_cross_street":"Exit 73 - US 11; US 20; LaFayette","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.123344,42.79631]]}},{"id":"iF1wVLKQme2B1fsGQRWwhhDKFbY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3Y/mCJgZ6rqwXpp6BNt1DNLJcg="},{"type":"next-occurrence","id":"t3Fws3YJwOhzn6aOtTudQIB1XOs="}],"description":"Guard rail repairs on I-81 northbound between Exit 67 - US 11; NY 80; NY 281; Tully (Tully) and Exit 73 - US 11; US 20; LaFayette (La Fayette), Monday June 1st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed, Monday June 1st, 2026 thru Wednesday July 1st, 2026, 06:00 AM thru 12:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:38:14Z"},"road_event_id":"iF1wVLKQme2B1fsGQRWwhhDKFbY=","beginning_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","ending_cross_street":"Exit 73 - US 11; US 20; LaFayette","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.123344,42.79631]]}},{"id":"t3Fws3YJwOhzn6aOtTudQIB1XOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3Y/mCJgZ6rqwXpp6BNt1DNLJcg="},{"type":"next-occurrence","id":"x6qpS7TfWlGqaBP8q06Q+fq9g68="}],"description":"Guard rail repairs on I-81 northbound between Exit 67 - US 11; NY 80; NY 281; Tully (Tully) and Exit 73 - US 11; US 20; LaFayette (La Fayette), Monday June 1st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed, Monday June 1st, 2026 thru Wednesday July 1st, 2026, 06:00 AM thru 12:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:38:14Z"},"road_event_id":"t3Fws3YJwOhzn6aOtTudQIB1XOs=","beginning_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","ending_cross_street":"Exit 73 - US 11; US 20; LaFayette","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.123344,42.79631]]}},{"id":"x6qpS7TfWlGqaBP8q06Q+fq9g68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3Y/mCJgZ6rqwXpp6BNt1DNLJcg="},{"type":"next-occurrence","id":"QgJtn5Ex+QZQ9x8xSn3QWSUF1xw="}],"description":"Guard rail repairs on I-81 northbound between Exit 67 - US 11; NY 80; NY 281; Tully (Tully) and Exit 73 - US 11; US 20; LaFayette (La Fayette), Monday June 1st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed, Monday June 1st, 2026 thru Wednesday July 1st, 2026, 06:00 AM thru 12:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:38:14Z"},"road_event_id":"x6qpS7TfWlGqaBP8q06Q+fq9g68=","beginning_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","ending_cross_street":"Exit 73 - US 11; US 20; LaFayette","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.123344,42.79631]]}},{"id":"QgJtn5Ex+QZQ9x8xSn3QWSUF1xw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3Y/mCJgZ6rqwXpp6BNt1DNLJcg="},{"type":"next-occurrence","id":"LXX7MQm74KQ4TedIv8VPwAOSfKg="}],"description":"Guard rail repairs on I-81 northbound between Exit 67 - US 11; NY 80; NY 281; Tully (Tully) and Exit 73 - US 11; US 20; LaFayette (La Fayette), Monday June 1st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed, Monday June 1st, 2026 thru Wednesday July 1st, 2026, 06:00 AM thru 12:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:38:14Z"},"road_event_id":"QgJtn5Ex+QZQ9x8xSn3QWSUF1xw=","beginning_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","ending_cross_street":"Exit 73 - US 11; US 20; LaFayette","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.123344,42.79631]]}},{"id":"LXX7MQm74KQ4TedIv8VPwAOSfKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3Y/mCJgZ6rqwXpp6BNt1DNLJcg="},{"type":"next-occurrence","id":"kKZ9wYzPU/rRJPJvX8E9fCMi+5g="}],"description":"Guard rail repairs on I-81 northbound between Exit 67 - US 11; NY 80; NY 281; Tully (Tully) and Exit 73 - US 11; US 20; LaFayette (La Fayette), Monday June 1st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed, Monday June 1st, 2026 thru Wednesday July 1st, 2026, 06:00 AM thru 12:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:38:14Z"},"road_event_id":"LXX7MQm74KQ4TedIv8VPwAOSfKg=","beginning_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","ending_cross_street":"Exit 73 - US 11; US 20; LaFayette","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T10:00:00Z","end_date":"2026-06-13T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.123344,42.79631]]}},{"id":"kKZ9wYzPU/rRJPJvX8E9fCMi+5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3Y/mCJgZ6rqwXpp6BNt1DNLJcg="},{"type":"next-occurrence","id":"raNQmnve6esGayrk6zpe9Pjpuic="}],"description":"Guard rail repairs on I-81 northbound between Exit 67 - US 11; NY 80; NY 281; Tully (Tully) and Exit 73 - US 11; US 20; LaFayette (La Fayette), Monday June 1st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed, Monday June 1st, 2026 thru Wednesday July 1st, 2026, 06:00 AM thru 12:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:38:14Z"},"road_event_id":"kKZ9wYzPU/rRJPJvX8E9fCMi+5g=","beginning_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","ending_cross_street":"Exit 73 - US 11; US 20; LaFayette","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.123344,42.79631]]}},{"id":"raNQmnve6esGayrk6zpe9Pjpuic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3Y/mCJgZ6rqwXpp6BNt1DNLJcg="},{"type":"next-occurrence","id":"TQg+SKVBzxe2YpEz58qh7Ncn9Tg="}],"description":"Guard rail repairs on I-81 northbound between Exit 67 - US 11; NY 80; NY 281; Tully (Tully) and Exit 73 - US 11; US 20; LaFayette (La Fayette), Monday June 1st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed, Monday June 1st, 2026 thru Wednesday July 1st, 2026, 06:00 AM thru 12:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:38:14Z"},"road_event_id":"raNQmnve6esGayrk6zpe9Pjpuic=","beginning_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","ending_cross_street":"Exit 73 - US 11; US 20; LaFayette","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.123344,42.79631]]}},{"id":"TQg+SKVBzxe2YpEz58qh7Ncn9Tg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3Y/mCJgZ6rqwXpp6BNt1DNLJcg="},{"type":"next-occurrence","id":"Z2xtHRSJU9dkv2ODfBUfHOIZ95M="}],"description":"Guard rail repairs on I-81 northbound between Exit 67 - US 11; NY 80; NY 281; Tully (Tully) and Exit 73 - US 11; US 20; LaFayette (La Fayette), Monday June 1st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed, Monday June 1st, 2026 thru Wednesday July 1st, 2026, 06:00 AM thru 12:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:38:14Z"},"road_event_id":"TQg+SKVBzxe2YpEz58qh7Ncn9Tg=","beginning_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","ending_cross_street":"Exit 73 - US 11; US 20; LaFayette","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.123344,42.79631]]}},{"id":"Z2xtHRSJU9dkv2ODfBUfHOIZ95M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3Y/mCJgZ6rqwXpp6BNt1DNLJcg="},{"type":"next-occurrence","id":"BQpvDN6f1k3Xu1ce8+NJ059pJyA="}],"description":"Guard rail repairs on I-81 northbound between Exit 67 - US 11; NY 80; NY 281; Tully (Tully) and Exit 73 - US 11; US 20; LaFayette (La Fayette), Monday June 1st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed, Monday June 1st, 2026 thru Wednesday July 1st, 2026, 06:00 AM thru 12:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:38:14Z"},"road_event_id":"Z2xtHRSJU9dkv2ODfBUfHOIZ95M=","beginning_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","ending_cross_street":"Exit 73 - US 11; US 20; LaFayette","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.123344,42.79631]]}},{"id":"BQpvDN6f1k3Xu1ce8+NJ059pJyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3Y/mCJgZ6rqwXpp6BNt1DNLJcg="}],"description":"Guard rail repairs on I-81 northbound between Exit 67 - US 11; NY 80; NY 281; Tully (Tully) and Exit 73 - US 11; US 20; LaFayette (La Fayette), Monday June 1st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed, Monday June 1st, 2026 thru Wednesday July 1st, 2026, 06:00 AM thru 12:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:38:14Z"},"road_event_id":"BQpvDN6f1k3Xu1ce8+NJ059pJyA=","beginning_cross_street":"Exit 67 - US 11; NY 80; NY 281; Tully","ending_cross_street":"Exit 73 - US 11; US 20; LaFayette","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.123344,42.79631]]}},{"id":"HznTcgox89H1LutqGP9/EA1fwlw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UNF2pdrhg+/+0dJufXT+VjgTUd4="}],"description":"Bridge work on I-81 southbound between Exit 121 - US 11; Tinker Tavern Road (Richland) and Exit 118 - NY 104; Mexico (Parish), Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:43:51Z"},"road_event_id":"HznTcgox89H1LutqGP9/EA1fwlw=","beginning_cross_street":"Exit 121 - US 11; Tinker Tavern Road","ending_cross_street":"Exit 118 - NY 104; Mexico   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T12:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.121234,43.503616]]}},{"id":"UNF2pdrhg+/+0dJufXT+VjgTUd4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HznTcgox89H1LutqGP9/EA1fwlw="},{"type":"next-occurrence","id":"BC6YK747TfAHId9LM0YFpckd2+M="}],"description":"Bridge work on I-81 southbound between Exit 121 - US 11; Tinker Tavern Road (Richland) and Exit 118 - NY 104; Mexico (Parish), Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:43:51Z"},"road_event_id":"UNF2pdrhg+/+0dJufXT+VjgTUd4=","beginning_cross_street":"Exit 121 - US 11; Tinker Tavern Road","ending_cross_street":"Exit 118 - NY 104; Mexico   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.121234,43.503616]]}},{"id":"BC6YK747TfAHId9LM0YFpckd2+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HznTcgox89H1LutqGP9/EA1fwlw="},{"type":"next-occurrence","id":"gt8biHw9dFG45ZUx8d0GGdJPLfQ="}],"description":"Bridge work on I-81 southbound between Exit 121 - US 11; Tinker Tavern Road (Richland) and Exit 118 - NY 104; Mexico (Parish), Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:43:51Z"},"road_event_id":"BC6YK747TfAHId9LM0YFpckd2+M=","beginning_cross_street":"Exit 121 - US 11; Tinker Tavern Road","ending_cross_street":"Exit 118 - NY 104; Mexico   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.121234,43.503616]]}},{"id":"gt8biHw9dFG45ZUx8d0GGdJPLfQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HznTcgox89H1LutqGP9/EA1fwlw="},{"type":"next-occurrence","id":"6xDjQUWFxlvcMb+DDegBkOuw17Y="}],"description":"Bridge work on I-81 southbound between Exit 121 - US 11; Tinker Tavern Road (Richland) and Exit 118 - NY 104; Mexico (Parish), Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:43:51Z"},"road_event_id":"gt8biHw9dFG45ZUx8d0GGdJPLfQ=","beginning_cross_street":"Exit 121 - US 11; Tinker Tavern Road","ending_cross_street":"Exit 118 - NY 104; Mexico   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.121234,43.503616]]}},{"id":"6xDjQUWFxlvcMb+DDegBkOuw17Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HznTcgox89H1LutqGP9/EA1fwlw="},{"type":"next-occurrence","id":"+IVdXDOxFBmPpTfoSnEjjGolvlg="}],"description":"Bridge work on I-81 southbound between Exit 121 - US 11; Tinker Tavern Road (Richland) and Exit 118 - NY 104; Mexico (Parish), Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:43:51Z"},"road_event_id":"6xDjQUWFxlvcMb+DDegBkOuw17Y=","beginning_cross_street":"Exit 121 - US 11; Tinker Tavern Road","ending_cross_street":"Exit 118 - NY 104; Mexico   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.121234,43.503616]]}},{"id":"+IVdXDOxFBmPpTfoSnEjjGolvlg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HznTcgox89H1LutqGP9/EA1fwlw="},{"type":"next-occurrence","id":"jNcxMNJRb+J0XGwfE8cN4yLsKiQ="}],"description":"Bridge work on I-81 southbound between Exit 121 - US 11; Tinker Tavern Road (Richland) and Exit 118 - NY 104; Mexico (Parish), Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:43:51Z"},"road_event_id":"+IVdXDOxFBmPpTfoSnEjjGolvlg=","beginning_cross_street":"Exit 121 - US 11; Tinker Tavern Road","ending_cross_street":"Exit 118 - NY 104; Mexico   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.121234,43.503616]]}},{"id":"jNcxMNJRb+J0XGwfE8cN4yLsKiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HznTcgox89H1LutqGP9/EA1fwlw="},{"type":"next-occurrence","id":"SY3Ua+WrxRLCuY6XyqnDtPyhgo4="}],"description":"Bridge work on I-81 southbound between Exit 121 - US 11; Tinker Tavern Road (Richland) and Exit 118 - NY 104; Mexico (Parish), Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:43:51Z"},"road_event_id":"jNcxMNJRb+J0XGwfE8cN4yLsKiQ=","beginning_cross_street":"Exit 121 - US 11; Tinker Tavern Road","ending_cross_street":"Exit 118 - NY 104; Mexico   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T12:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.121234,43.503616]]}},{"id":"SY3Ua+WrxRLCuY6XyqnDtPyhgo4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HznTcgox89H1LutqGP9/EA1fwlw="},{"type":"next-occurrence","id":"0XWawLjeUhxB+ZsC8SPbf4mEMI0="}],"description":"Bridge work on I-81 southbound between Exit 121 - US 11; Tinker Tavern Road (Richland) and Exit 118 - NY 104; Mexico (Parish), Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:43:51Z"},"road_event_id":"SY3Ua+WrxRLCuY6XyqnDtPyhgo4=","beginning_cross_street":"Exit 121 - US 11; Tinker Tavern Road","ending_cross_street":"Exit 118 - NY 104; Mexico   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T12:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.121234,43.503616]]}},{"id":"0XWawLjeUhxB+ZsC8SPbf4mEMI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HznTcgox89H1LutqGP9/EA1fwlw="},{"type":"next-occurrence","id":"5CI4YSzoAX6NsiyB/0HbOoz/eEU="}],"description":"Bridge work on I-81 southbound between Exit 121 - US 11; Tinker Tavern Road (Richland) and Exit 118 - NY 104; Mexico (Parish), Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:43:51Z"},"road_event_id":"0XWawLjeUhxB+ZsC8SPbf4mEMI0=","beginning_cross_street":"Exit 121 - US 11; Tinker Tavern Road","ending_cross_street":"Exit 118 - NY 104; Mexico   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T12:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.121234,43.503616]]}},{"id":"5CI4YSzoAX6NsiyB/0HbOoz/eEU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HznTcgox89H1LutqGP9/EA1fwlw="},{"type":"next-occurrence","id":"YIu6PfV4NWixRxYwQzE0awRWFoQ="}],"description":"Bridge work on I-81 southbound between Exit 121 - US 11; Tinker Tavern Road (Richland) and Exit 118 - NY 104; Mexico (Parish), Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:43:51Z"},"road_event_id":"5CI4YSzoAX6NsiyB/0HbOoz/eEU=","beginning_cross_street":"Exit 121 - US 11; Tinker Tavern Road","ending_cross_street":"Exit 118 - NY 104; Mexico   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T12:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.121234,43.503616]]}},{"id":"YIu6PfV4NWixRxYwQzE0awRWFoQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HznTcgox89H1LutqGP9/EA1fwlw="}],"description":"Bridge work on I-81 southbound between Exit 121 - US 11; Tinker Tavern Road (Richland) and Exit 118 - NY 104; Mexico (Parish), Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T13:43:51Z"},"road_event_id":"YIu6PfV4NWixRxYwQzE0awRWFoQ=","beginning_cross_street":"Exit 121 - US 11; Tinker Tavern Road","ending_cross_street":"Exit 118 - NY 104; Mexico   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T12:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.121234,43.503616]]}},{"id":"5GIAaKmssmieYIQmC8okOCaciAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xqYbZmm/YkelJAsPNwYz24FKeq8="}],"description":"Construction on I-278 both directions from 37th Avenue (New York) to Broadway; I-278 (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:30 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Tuesday June 2nd, 2026 thru Saturday June 6th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed","update_date":"2026-05-27T14:12:24Z"},"road_event_id":"5GIAaKmssmieYIQmC8okOCaciAM=","beginning_cross_street":"37th Avenue","ending_cross_street":"Broadway; I-278","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:01:00Z","end_date":"2026-06-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896077,40.748573]]}},{"id":"xqYbZmm/YkelJAsPNwYz24FKeq8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5GIAaKmssmieYIQmC8okOCaciAM="}],"description":"Construction on I-278 both directions from 37th Avenue (New York) to Broadway; I-278 (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:30 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Tuesday June 2nd, 2026 thru Saturday June 6th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed","update_date":"2026-05-27T14:12:24Z"},"road_event_id":"xqYbZmm/YkelJAsPNwYz24FKeq8=","beginning_cross_street":"37th Avenue","ending_cross_street":"Broadway; I-278","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:30:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896077,40.748573]]}},{"id":"4Mbd+igvQ8ree7yiJtXiBo40DNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 474"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ccLr+UufvqBOkjWH2hlvlq9yeOg="}],"description":"Roadwork on NY 474 both directions CAFLISCH RD (Clymer) to RANDALL RD (Clymer), Wednesday May 27th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T14:48:24Z"},"road_event_id":"4Mbd+igvQ8ree7yiJtXiBo40DNA=","beginning_cross_street":"CAFLISCH RD","ending_cross_street":"RANDALL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.615666,42.02085]]}},{"id":"ccLr+UufvqBOkjWH2hlvlq9yeOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 474"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Mbd+igvQ8ree7yiJtXiBo40DNA="},{"type":"next-occurrence","id":"fIOyaUSSEUBdubJiwdg2I/L+law="}],"description":"Roadwork on NY 474 both directions CAFLISCH RD (Clymer) to RANDALL RD (Clymer), Wednesday May 27th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T14:48:24Z"},"road_event_id":"ccLr+UufvqBOkjWH2hlvlq9yeOg=","beginning_cross_street":"CAFLISCH RD","ending_cross_street":"RANDALL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.615666,42.02085]]}},{"id":"fIOyaUSSEUBdubJiwdg2I/L+law=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 474"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Mbd+igvQ8ree7yiJtXiBo40DNA="},{"type":"next-occurrence","id":"TiHeH8DWOPZhYvutu+r/MMNl29Q="}],"description":"Roadwork on NY 474 both directions CAFLISCH RD (Clymer) to RANDALL RD (Clymer), Wednesday May 27th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T14:48:24Z"},"road_event_id":"fIOyaUSSEUBdubJiwdg2I/L+law=","beginning_cross_street":"CAFLISCH RD","ending_cross_street":"RANDALL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.615666,42.02085]]}},{"id":"TiHeH8DWOPZhYvutu+r/MMNl29Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 474"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Mbd+igvQ8ree7yiJtXiBo40DNA="},{"type":"next-occurrence","id":"59TotzK4UyfrgBHzJgGaPa/ur78="}],"description":"Roadwork on NY 474 both directions CAFLISCH RD (Clymer) to RANDALL RD (Clymer), Wednesday May 27th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T14:48:24Z"},"road_event_id":"TiHeH8DWOPZhYvutu+r/MMNl29Q=","beginning_cross_street":"CAFLISCH RD","ending_cross_street":"RANDALL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.615666,42.02085]]}},{"id":"59TotzK4UyfrgBHzJgGaPa/ur78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 474"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Mbd+igvQ8ree7yiJtXiBo40DNA="},{"type":"next-occurrence","id":"vuwyMaztfD1kT3+SmGaVW4mUIJw="}],"description":"Roadwork on NY 474 both directions CAFLISCH RD (Clymer) to RANDALL RD (Clymer), Wednesday May 27th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T14:48:24Z"},"road_event_id":"59TotzK4UyfrgBHzJgGaPa/ur78=","beginning_cross_street":"CAFLISCH RD","ending_cross_street":"RANDALL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.615666,42.02085]]}},{"id":"vuwyMaztfD1kT3+SmGaVW4mUIJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 474"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Mbd+igvQ8ree7yiJtXiBo40DNA="},{"type":"next-occurrence","id":"sH6t3za8Xs9hYs96e+9wSUO7WG8="}],"description":"Roadwork on NY 474 both directions CAFLISCH RD (Clymer) to RANDALL RD (Clymer), Wednesday May 27th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T14:48:24Z"},"road_event_id":"vuwyMaztfD1kT3+SmGaVW4mUIJw=","beginning_cross_street":"CAFLISCH RD","ending_cross_street":"RANDALL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.615666,42.02085]]}},{"id":"sH6t3za8Xs9hYs96e+9wSUO7WG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 474"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Mbd+igvQ8ree7yiJtXiBo40DNA="},{"type":"next-occurrence","id":"fi4+dKxg1i7cqTcVk5jvdxtRIak="}],"description":"Roadwork on NY 474 both directions CAFLISCH RD (Clymer) to RANDALL RD (Clymer), Wednesday May 27th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T14:48:24Z"},"road_event_id":"sH6t3za8Xs9hYs96e+9wSUO7WG8=","beginning_cross_street":"CAFLISCH RD","ending_cross_street":"RANDALL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.615666,42.02085]]}},{"id":"fi4+dKxg1i7cqTcVk5jvdxtRIak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 474"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Mbd+igvQ8ree7yiJtXiBo40DNA="},{"type":"next-occurrence","id":"H4wYp40TgB6COLOoE7atr6SoqCE="}],"description":"Roadwork on NY 474 both directions CAFLISCH RD (Clymer) to RANDALL RD (Clymer), Wednesday May 27th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T14:48:24Z"},"road_event_id":"fi4+dKxg1i7cqTcVk5jvdxtRIak=","beginning_cross_street":"CAFLISCH RD","ending_cross_street":"RANDALL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.615666,42.02085]]}},{"id":"H4wYp40TgB6COLOoE7atr6SoqCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 474"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Mbd+igvQ8ree7yiJtXiBo40DNA="},{"type":"next-occurrence","id":"S/RIF1XaQb+reh92Mz9l0XH4FKw="}],"description":"Roadwork on NY 474 both directions CAFLISCH RD (Clymer) to RANDALL RD (Clymer), Wednesday May 27th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T14:48:24Z"},"road_event_id":"H4wYp40TgB6COLOoE7atr6SoqCE=","beginning_cross_street":"CAFLISCH RD","ending_cross_street":"RANDALL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.615666,42.02085]]}},{"id":"S/RIF1XaQb+reh92Mz9l0XH4FKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 474"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Mbd+igvQ8ree7yiJtXiBo40DNA="},{"type":"next-occurrence","id":"SWrW7wivSC8melK6HbaWTVdlwKU="}],"description":"Roadwork on NY 474 both directions CAFLISCH RD (Clymer) to RANDALL RD (Clymer), Wednesday May 27th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T14:48:24Z"},"road_event_id":"S/RIF1XaQb+reh92Mz9l0XH4FKw=","beginning_cross_street":"CAFLISCH RD","ending_cross_street":"RANDALL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.615666,42.02085]]}},{"id":"SWrW7wivSC8melK6HbaWTVdlwKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 474"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Mbd+igvQ8ree7yiJtXiBo40DNA="},{"type":"next-occurrence","id":"Be4s8eIxxw005T2oE9Z70DwxhoI="}],"description":"Roadwork on NY 474 both directions CAFLISCH RD (Clymer) to RANDALL RD (Clymer), Wednesday May 27th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T14:48:24Z"},"road_event_id":"SWrW7wivSC8melK6HbaWTVdlwKU=","beginning_cross_street":"CAFLISCH RD","ending_cross_street":"RANDALL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.615666,42.02085]]}},{"id":"Be4s8eIxxw005T2oE9Z70DwxhoI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 474"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Mbd+igvQ8ree7yiJtXiBo40DNA="},{"type":"next-occurrence","id":"eJifrvLPL8iRwkkjFGiI+53YKqs="}],"description":"Roadwork on NY 474 both directions CAFLISCH RD (Clymer) to RANDALL RD (Clymer), Wednesday May 27th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T14:48:24Z"},"road_event_id":"Be4s8eIxxw005T2oE9Z70DwxhoI=","beginning_cross_street":"CAFLISCH RD","ending_cross_street":"RANDALL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.615666,42.02085]]}},{"id":"eJifrvLPL8iRwkkjFGiI+53YKqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 474"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Mbd+igvQ8ree7yiJtXiBo40DNA="},{"type":"next-occurrence","id":"weSLCIGtl/VkLCsMyeMMsPc18/Q="}],"description":"Roadwork on NY 474 both directions CAFLISCH RD (Clymer) to RANDALL RD (Clymer), Wednesday May 27th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T14:48:24Z"},"road_event_id":"eJifrvLPL8iRwkkjFGiI+53YKqs=","beginning_cross_street":"CAFLISCH RD","ending_cross_street":"RANDALL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.615666,42.02085]]}},{"id":"weSLCIGtl/VkLCsMyeMMsPc18/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 474"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Mbd+igvQ8ree7yiJtXiBo40DNA="},{"type":"next-occurrence","id":"eYBJgwRFu7xMlQJuzNW8AWfjc2A="}],"description":"Roadwork on NY 474 both directions CAFLISCH RD (Clymer) to RANDALL RD (Clymer), Wednesday May 27th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T14:48:24Z"},"road_event_id":"weSLCIGtl/VkLCsMyeMMsPc18/Q=","beginning_cross_street":"CAFLISCH RD","ending_cross_street":"RANDALL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.615666,42.02085]]}},{"id":"eYBJgwRFu7xMlQJuzNW8AWfjc2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 474"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Mbd+igvQ8ree7yiJtXiBo40DNA="}],"description":"Roadwork on NY 474 both directions CAFLISCH RD (Clymer) to RANDALL RD (Clymer), Wednesday May 27th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T14:48:24Z"},"road_event_id":"eYBJgwRFu7xMlQJuzNW8AWfjc2A=","beginning_cross_street":"CAFLISCH RD","ending_cross_street":"RANDALL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.615666,42.02085]]}},{"id":"DP6ouSYXC3c9R6BEze/5UN3jJ58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Qi0JDcflS04Jp7DUO3SQ7yEGpKM="}],"description":"Bridge rehabilitation and roadwork on NY 17 westbound (Chemung) alternating lane closures, Thursday May 28th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T14:49:23Z"},"road_event_id":"DP6ouSYXC3c9R6BEze/5UN3jJ58=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.639724,42.014667]]}},{"id":"Qi0JDcflS04Jp7DUO3SQ7yEGpKM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DP6ouSYXC3c9R6BEze/5UN3jJ58="},{"type":"next-occurrence","id":"14BD5EcNIwG5z6U/rkAL5JDD1Mo="}],"description":"Bridge rehabilitation and roadwork on NY 17 westbound (Chemung) alternating lane closures, Thursday May 28th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T14:49:23Z"},"road_event_id":"Qi0JDcflS04Jp7DUO3SQ7yEGpKM=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:30:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.639724,42.014667]]}},{"id":"14BD5EcNIwG5z6U/rkAL5JDD1Mo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DP6ouSYXC3c9R6BEze/5UN3jJ58="},{"type":"next-occurrence","id":"vnvVaU25ggVhwaJ/PaFPf6Hq4ss="}],"description":"Bridge rehabilitation and roadwork on NY 17 westbound (Chemung) alternating lane closures, Thursday May 28th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T14:49:23Z"},"road_event_id":"14BD5EcNIwG5z6U/rkAL5JDD1Mo=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T10:30:00Z","end_date":"2026-06-07T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.639724,42.014667]]}},{"id":"vnvVaU25ggVhwaJ/PaFPf6Hq4ss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DP6ouSYXC3c9R6BEze/5UN3jJ58="},{"type":"next-occurrence","id":"I6RqmbrFM92Qzo27wUdbdj2URR4="}],"description":"Bridge rehabilitation and roadwork on NY 17 westbound (Chemung) alternating lane closures, Thursday May 28th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T14:49:23Z"},"road_event_id":"vnvVaU25ggVhwaJ/PaFPf6Hq4ss=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.639724,42.014667]]}},{"id":"I6RqmbrFM92Qzo27wUdbdj2URR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DP6ouSYXC3c9R6BEze/5UN3jJ58="},{"type":"next-occurrence","id":"vtuGZCaU1aUVVdA+BFikj36+Kjo="}],"description":"Bridge rehabilitation and roadwork on NY 17 westbound (Chemung) alternating lane closures, Thursday May 28th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T14:49:23Z"},"road_event_id":"I6RqmbrFM92Qzo27wUdbdj2URR4=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.639724,42.014667]]}},{"id":"vtuGZCaU1aUVVdA+BFikj36+Kjo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DP6ouSYXC3c9R6BEze/5UN3jJ58="},{"type":"next-occurrence","id":"GdCP0z3yDrSB9/sfRilF0IqKcsg="}],"description":"Bridge rehabilitation and roadwork on NY 17 westbound (Chemung) alternating lane closures, Thursday May 28th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T14:49:23Z"},"road_event_id":"vtuGZCaU1aUVVdA+BFikj36+Kjo=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.639724,42.014667]]}},{"id":"GdCP0z3yDrSB9/sfRilF0IqKcsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DP6ouSYXC3c9R6BEze/5UN3jJ58="},{"type":"next-occurrence","id":"l/f68r87iyeXyIpos0KO7+6ezMU="}],"description":"Bridge rehabilitation and roadwork on NY 17 westbound (Chemung) alternating lane closures, Thursday May 28th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T14:49:23Z"},"road_event_id":"GdCP0z3yDrSB9/sfRilF0IqKcsg=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.639724,42.014667]]}},{"id":"l/f68r87iyeXyIpos0KO7+6ezMU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DP6ouSYXC3c9R6BEze/5UN3jJ58="},{"type":"next-occurrence","id":"6oWWsacYlSI9wiMpxwz68OcX7O4="}],"description":"Bridge rehabilitation and roadwork on NY 17 westbound (Chemung) alternating lane closures, Thursday May 28th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T14:49:23Z"},"road_event_id":"l/f68r87iyeXyIpos0KO7+6ezMU=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.639724,42.014667]]}},{"id":"6oWWsacYlSI9wiMpxwz68OcX7O4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DP6ouSYXC3c9R6BEze/5UN3jJ58="},{"type":"next-occurrence","id":"6CbSfGuJNIAg7KwMM1ANjONTJrg="}],"description":"Bridge rehabilitation and roadwork on NY 17 westbound (Chemung) alternating lane closures, Thursday May 28th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T14:49:23Z"},"road_event_id":"6oWWsacYlSI9wiMpxwz68OcX7O4=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T10:30:00Z","end_date":"2026-06-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.639724,42.014667]]}},{"id":"6CbSfGuJNIAg7KwMM1ANjONTJrg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DP6ouSYXC3c9R6BEze/5UN3jJ58="},{"type":"next-occurrence","id":"qYpEu+SlNaHQkRxZUejCuYzB/Uo="}],"description":"Bridge rehabilitation and roadwork on NY 17 westbound (Chemung) alternating lane closures, Thursday May 28th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T14:49:23Z"},"road_event_id":"6CbSfGuJNIAg7KwMM1ANjONTJrg=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T10:30:00Z","end_date":"2026-06-14T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.639724,42.014667]]}},{"id":"qYpEu+SlNaHQkRxZUejCuYzB/Uo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DP6ouSYXC3c9R6BEze/5UN3jJ58="},{"type":"next-occurrence","id":"ZnpzuP3Y2AEFIaYW/H2N+gfBh3k="}],"description":"Bridge rehabilitation and roadwork on NY 17 westbound (Chemung) alternating lane closures, Thursday May 28th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T14:49:23Z"},"road_event_id":"qYpEu+SlNaHQkRxZUejCuYzB/Uo=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:30:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.639724,42.014667]]}},{"id":"ZnpzuP3Y2AEFIaYW/H2N+gfBh3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DP6ouSYXC3c9R6BEze/5UN3jJ58="},{"type":"next-occurrence","id":"6nrrKuGHaMVgvylzXtVh+HtUkRg="}],"description":"Bridge rehabilitation and roadwork on NY 17 westbound (Chemung) alternating lane closures, Thursday May 28th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T14:49:23Z"},"road_event_id":"ZnpzuP3Y2AEFIaYW/H2N+gfBh3k=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:30:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.639724,42.014667]]}},{"id":"6nrrKuGHaMVgvylzXtVh+HtUkRg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DP6ouSYXC3c9R6BEze/5UN3jJ58="},{"type":"next-occurrence","id":"QlD7wo5u82T8UEe71ZLwp/iurvY="}],"description":"Bridge rehabilitation and roadwork on NY 17 westbound (Chemung) alternating lane closures, Thursday May 28th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T14:49:23Z"},"road_event_id":"6nrrKuGHaMVgvylzXtVh+HtUkRg=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:30:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.639724,42.014667]]}},{"id":"QlD7wo5u82T8UEe71ZLwp/iurvY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DP6ouSYXC3c9R6BEze/5UN3jJ58="},{"type":"next-occurrence","id":"3+ZwKOMKFLn10p2QT1DdTh7lGJw="}],"description":"Bridge rehabilitation and roadwork on NY 17 westbound (Chemung) alternating lane closures, Thursday May 28th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T14:49:23Z"},"road_event_id":"QlD7wo5u82T8UEe71ZLwp/iurvY=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:30:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.639724,42.014667]]}},{"id":"3+ZwKOMKFLn10p2QT1DdTh7lGJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DP6ouSYXC3c9R6BEze/5UN3jJ58="}],"description":"Bridge rehabilitation and roadwork on NY 17 westbound (Chemung) alternating lane closures, Thursday May 28th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T14:49:23Z"},"road_event_id":"3+ZwKOMKFLn10p2QT1DdTh7lGJw=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:30:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.639724,42.014667]]}},{"id":"SHNO9/1HCFfQFEBDMJs7nDATZxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2t9Gn8SrNgDGELH91s6Qg+Ag8NY="}],"description":"Installation of traffic management systems on NY 9D northbound between Satterlee Place (Wappinger) and S. Messier Avenue (Wappinger) D265558/32755009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closures","update_date":"2026-05-27T14:59:33Z"},"road_event_id":"SHNO9/1HCFfQFEBDMJs7nDATZxI=","beginning_cross_street":"Satterlee Place","ending_cross_street":"S. Messier Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917628,41.597288]]}},{"id":"2t9Gn8SrNgDGELH91s6Qg+Ag8NY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SHNO9/1HCFfQFEBDMJs7nDATZxI="},{"type":"next-occurrence","id":"ykRqXI2MPDaAOSYMKi1kvPnC1NU="}],"description":"Installation of traffic management systems on NY 9D northbound between Satterlee Place (Wappinger) and S. Messier Avenue (Wappinger) D265558/32755009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closures","update_date":"2026-05-27T14:59:33Z"},"road_event_id":"2t9Gn8SrNgDGELH91s6Qg+Ag8NY=","beginning_cross_street":"Satterlee Place","ending_cross_street":"S. Messier Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917628,41.597288]]}},{"id":"ykRqXI2MPDaAOSYMKi1kvPnC1NU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SHNO9/1HCFfQFEBDMJs7nDATZxI="},{"type":"next-occurrence","id":"m0Oe6n6Z6UIM5KEb4PJfQnA/G5I="}],"description":"Installation of traffic management systems on NY 9D northbound between Satterlee Place (Wappinger) and S. Messier Avenue (Wappinger) D265558/32755009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closures","update_date":"2026-05-27T14:59:33Z"},"road_event_id":"ykRqXI2MPDaAOSYMKi1kvPnC1NU=","beginning_cross_street":"Satterlee Place","ending_cross_street":"S. Messier Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917628,41.597288]]}},{"id":"m0Oe6n6Z6UIM5KEb4PJfQnA/G5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SHNO9/1HCFfQFEBDMJs7nDATZxI="},{"type":"next-occurrence","id":"tYAbqkAXE1EGR1Fz3ZQFzALLrr4="}],"description":"Installation of traffic management systems on NY 9D northbound between Satterlee Place (Wappinger) and S. Messier Avenue (Wappinger) D265558/32755009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closures","update_date":"2026-05-27T14:59:33Z"},"road_event_id":"m0Oe6n6Z6UIM5KEb4PJfQnA/G5I=","beginning_cross_street":"Satterlee Place","ending_cross_street":"S. Messier Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917628,41.597288]]}},{"id":"tYAbqkAXE1EGR1Fz3ZQFzALLrr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SHNO9/1HCFfQFEBDMJs7nDATZxI="},{"type":"next-occurrence","id":"u4cMrdU1btvTWoWWT1mT+gsBUc8="}],"description":"Installation of traffic management systems on NY 9D northbound between Satterlee Place (Wappinger) and S. Messier Avenue (Wappinger) D265558/32755009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closures","update_date":"2026-05-27T14:59:33Z"},"road_event_id":"tYAbqkAXE1EGR1Fz3ZQFzALLrr4=","beginning_cross_street":"Satterlee Place","ending_cross_street":"S. Messier Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917628,41.597288]]}},{"id":"u4cMrdU1btvTWoWWT1mT+gsBUc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SHNO9/1HCFfQFEBDMJs7nDATZxI="}],"description":"Installation of traffic management systems on NY 9D northbound between Satterlee Place (Wappinger) and S. Messier Avenue (Wappinger) D265558/32755009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closures","update_date":"2026-05-27T14:59:33Z"},"road_event_id":"u4cMrdU1btvTWoWWT1mT+gsBUc8=","beginning_cross_street":"Satterlee Place","ending_cross_street":"S. Messier Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917628,41.597288]]}},{"id":"eFYU3uwTVsgCEMqm2DLCcINXrAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"oqBug6bgad9BpSXs9QT05nrnRv0="}],"description":"Installation of traffic management systems on US 9 both directions between Fowlerhouse Road (Wappinger) and East Main Street (Wappinger) D265558/32755109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closures","update_date":"2026-05-27T15:03:26Z"},"road_event_id":"eFYU3uwTVsgCEMqm2DLCcINXrAE=","beginning_cross_street":"Fowlerhouse Road","ending_cross_street":"East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:30:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909199,41.573339]]}},{"id":"oqBug6bgad9BpSXs9QT05nrnRv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eFYU3uwTVsgCEMqm2DLCcINXrAE="},{"type":"next-occurrence","id":"1zuRQDtAu2/mpTnkMQoMLMXKRpw="}],"description":"Installation of traffic management systems on US 9 both directions between Fowlerhouse Road (Wappinger) and East Main Street (Wappinger) D265558/32755109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closures","update_date":"2026-05-27T15:03:26Z"},"road_event_id":"oqBug6bgad9BpSXs9QT05nrnRv0=","beginning_cross_street":"Fowlerhouse Road","ending_cross_street":"East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909199,41.573339]]}},{"id":"1zuRQDtAu2/mpTnkMQoMLMXKRpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eFYU3uwTVsgCEMqm2DLCcINXrAE="},{"type":"next-occurrence","id":"GeEXzoWN9eFxyIyA+r2LN/BYHM8="}],"description":"Installation of traffic management systems on US 9 both directions between Fowlerhouse Road (Wappinger) and East Main Street (Wappinger) D265558/32755109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closures","update_date":"2026-05-27T15:03:26Z"},"road_event_id":"1zuRQDtAu2/mpTnkMQoMLMXKRpw=","beginning_cross_street":"Fowlerhouse Road","ending_cross_street":"East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909199,41.573339]]}},{"id":"GeEXzoWN9eFxyIyA+r2LN/BYHM8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eFYU3uwTVsgCEMqm2DLCcINXrAE="},{"type":"next-occurrence","id":"VNx0J3jNLMwpsY2QVxRjXuUOcmM="}],"description":"Installation of traffic management systems on US 9 both directions between Fowlerhouse Road (Wappinger) and East Main Street (Wappinger) D265558/32755109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closures","update_date":"2026-05-27T15:03:26Z"},"road_event_id":"GeEXzoWN9eFxyIyA+r2LN/BYHM8=","beginning_cross_street":"Fowlerhouse Road","ending_cross_street":"East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909199,41.573339]]}},{"id":"VNx0J3jNLMwpsY2QVxRjXuUOcmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eFYU3uwTVsgCEMqm2DLCcINXrAE="},{"type":"next-occurrence","id":"SbHxvKbxYn3OijPt3HNydg5dmdA="}],"description":"Installation of traffic management systems on US 9 both directions between Fowlerhouse Road (Wappinger) and East Main Street (Wappinger) D265558/32755109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closures","update_date":"2026-05-27T15:03:26Z"},"road_event_id":"VNx0J3jNLMwpsY2QVxRjXuUOcmM=","beginning_cross_street":"Fowlerhouse Road","ending_cross_street":"East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909199,41.573339]]}},{"id":"SbHxvKbxYn3OijPt3HNydg5dmdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eFYU3uwTVsgCEMqm2DLCcINXrAE="}],"description":"Installation of traffic management systems on US 9 both directions between Fowlerhouse Road (Wappinger) and East Main Street (Wappinger) D265558/32755109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closures","update_date":"2026-05-27T15:03:26Z"},"road_event_id":"SbHxvKbxYn3OijPt3HNydg5dmdA=","beginning_cross_street":"Fowlerhouse Road","ending_cross_street":"East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909199,41.573339]]}},{"id":"ga9dWoW4I91AS0hPrcUIEQxNXI4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+IuFDLoaTfkmCISM76EvcbD+HEc="}],"description":"Utility work on US 1 southbound between Manor Place (Larchmont) and Winans Street (Larchmont) 2026085460105/32754909 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure","update_date":"2026-06-05T19:31:02Z"},"road_event_id":"ga9dWoW4I91AS0hPrcUIEQxNXI4=","beginning_cross_street":"Manor Place","ending_cross_street":"Winans Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.7532,40.926656]]}},{"id":"+IuFDLoaTfkmCISM76EvcbD+HEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ga9dWoW4I91AS0hPrcUIEQxNXI4="},{"type":"next-occurrence","id":"MKHpPmYsD/CT4rviSLxvrGPajEs="}],"description":"Utility work on US 1 southbound between Manor Place (Larchmont) and Winans Street (Larchmont) 2026085460105/32754909 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure","update_date":"2026-06-05T19:31:02Z"},"road_event_id":"+IuFDLoaTfkmCISM76EvcbD+HEc=","beginning_cross_street":"Manor Place","ending_cross_street":"Winans Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.7532,40.926656]]}},{"id":"MKHpPmYsD/CT4rviSLxvrGPajEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ga9dWoW4I91AS0hPrcUIEQxNXI4="},{"type":"next-occurrence","id":"oe0LNyO2pXToEnaRwshhx6faJ8o="}],"description":"Utility work on US 1 southbound between Manor Place (Larchmont) and Winans Street (Larchmont) 2026085460105/32754909 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure","update_date":"2026-06-05T19:31:02Z"},"road_event_id":"MKHpPmYsD/CT4rviSLxvrGPajEs=","beginning_cross_street":"Manor Place","ending_cross_street":"Winans Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.7532,40.926656]]}},{"id":"oe0LNyO2pXToEnaRwshhx6faJ8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ga9dWoW4I91AS0hPrcUIEQxNXI4="},{"type":"next-occurrence","id":"o8egyKrKp7NwgW3n5ZMlE0n1X+c="}],"description":"Utility work on US 1 southbound between Manor Place (Larchmont) and Winans Street (Larchmont) 2026085460105/32754909 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure","update_date":"2026-06-05T19:31:02Z"},"road_event_id":"oe0LNyO2pXToEnaRwshhx6faJ8o=","beginning_cross_street":"Manor Place","ending_cross_street":"Winans Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.7532,40.926656]]}},{"id":"o8egyKrKp7NwgW3n5ZMlE0n1X+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ga9dWoW4I91AS0hPrcUIEQxNXI4="},{"type":"next-occurrence","id":"jDUveXq4SRqY2rViNE8hHpeG1LE="}],"description":"Utility work on US 1 southbound between Manor Place (Larchmont) and Winans Street (Larchmont) 2026085460105/32754909 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure","update_date":"2026-06-05T19:31:02Z"},"road_event_id":"o8egyKrKp7NwgW3n5ZMlE0n1X+c=","beginning_cross_street":"Manor Place","ending_cross_street":"Winans Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.7532,40.926656]]}},{"id":"jDUveXq4SRqY2rViNE8hHpeG1LE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ga9dWoW4I91AS0hPrcUIEQxNXI4="},{"type":"next-occurrence","id":"dIthdOd9ZhENry+KJuMexGCGFas="}],"description":"Utility work on US 1 southbound between Manor Place (Larchmont) and Winans Street (Larchmont) 2026085460105/32754909 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure","update_date":"2026-06-05T19:31:02Z"},"road_event_id":"jDUveXq4SRqY2rViNE8hHpeG1LE=","beginning_cross_street":"Manor Place","ending_cross_street":"Winans Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.7532,40.926656]]}},{"id":"dIthdOd9ZhENry+KJuMexGCGFas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ga9dWoW4I91AS0hPrcUIEQxNXI4="}],"description":"Utility work on US 1 southbound between Manor Place (Larchmont) and Winans Street (Larchmont) 2026085460105/32754909 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM, right lane closure, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Saturday June 13th, 2026, 08:00 AM thru 02:00 PM, right lane closure","update_date":"2026-06-05T19:31:02Z"},"road_event_id":"dIthdOd9ZhENry+KJuMexGCGFas=","beginning_cross_street":"Manor Place","ending_cross_street":"Winans Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.7532,40.926656]]}},{"id":"CVhv+vrzjnoUsGURIiNuKRcKNkw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 240"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0XPFgF4Fgr16i2Y5JpzHGhb5Fk8="}],"description":"Roadwork on NY 240 southbound Town of Colden; Town of Concord Line (Concord), Monday June 1st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T15:22:43Z"},"road_event_id":"CVhv+vrzjnoUsGURIiNuKRcKNkw=","beginning_cross_street":"Town of Colden; Town of Concord Line","ending_cross_street":"Town of Colden; Town of Concord Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.650605,42.595888]]}},{"id":"0XPFgF4Fgr16i2Y5JpzHGhb5Fk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 240"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CVhv+vrzjnoUsGURIiNuKRcKNkw="},{"type":"next-occurrence","id":"zIm/7Bh4eCtjOH6g++cv7YOujqc="}],"description":"Roadwork on NY 240 southbound Town of Colden; Town of Concord Line (Concord), Monday June 1st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T15:22:43Z"},"road_event_id":"0XPFgF4Fgr16i2Y5JpzHGhb5Fk8=","beginning_cross_street":"Town of Colden; Town of Concord Line","ending_cross_street":"Town of Colden; Town of Concord Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.650605,42.595888]]}},{"id":"zIm/7Bh4eCtjOH6g++cv7YOujqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 240"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CVhv+vrzjnoUsGURIiNuKRcKNkw="},{"type":"next-occurrence","id":"LJhZRVOnod/92lAV1OzpBJZBN7s="}],"description":"Roadwork on NY 240 southbound Town of Colden; Town of Concord Line (Concord), Monday June 1st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T15:22:43Z"},"road_event_id":"zIm/7Bh4eCtjOH6g++cv7YOujqc=","beginning_cross_street":"Town of Colden; Town of Concord Line","ending_cross_street":"Town of Colden; Town of Concord Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.650605,42.595888]]}},{"id":"LJhZRVOnod/92lAV1OzpBJZBN7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 240"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CVhv+vrzjnoUsGURIiNuKRcKNkw="},{"type":"next-occurrence","id":"LpAgT+B0UGp2wHyFlEB3qHckh1I="}],"description":"Roadwork on NY 240 southbound Town of Colden; Town of Concord Line (Concord), Monday June 1st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T15:22:43Z"},"road_event_id":"LJhZRVOnod/92lAV1OzpBJZBN7s=","beginning_cross_street":"Town of Colden; Town of Concord Line","ending_cross_street":"Town of Colden; Town of Concord Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.650605,42.595888]]}},{"id":"LpAgT+B0UGp2wHyFlEB3qHckh1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 240"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CVhv+vrzjnoUsGURIiNuKRcKNkw="},{"type":"next-occurrence","id":"K7CozdXdzDWmoEXvRZgvezCcs78="}],"description":"Roadwork on NY 240 southbound Town of Colden; Town of Concord Line (Concord), Monday June 1st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T15:22:43Z"},"road_event_id":"LpAgT+B0UGp2wHyFlEB3qHckh1I=","beginning_cross_street":"Town of Colden; Town of Concord Line","ending_cross_street":"Town of Colden; Town of Concord Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.650605,42.595888]]}},{"id":"K7CozdXdzDWmoEXvRZgvezCcs78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 240"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CVhv+vrzjnoUsGURIiNuKRcKNkw="},{"type":"next-occurrence","id":"V07ZZ6yjjq4l7LfLngwRMdoRlyc="}],"description":"Roadwork on NY 240 southbound Town of Colden; Town of Concord Line (Concord), Monday June 1st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T15:22:43Z"},"road_event_id":"K7CozdXdzDWmoEXvRZgvezCcs78=","beginning_cross_street":"Town of Colden; Town of Concord Line","ending_cross_street":"Town of Colden; Town of Concord Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.650605,42.595888]]}},{"id":"V07ZZ6yjjq4l7LfLngwRMdoRlyc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 240"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CVhv+vrzjnoUsGURIiNuKRcKNkw="},{"type":"next-occurrence","id":"wlknpsyj8A+jF2uMozccXR61IqI="}],"description":"Roadwork on NY 240 southbound Town of Colden; Town of Concord Line (Concord), Monday June 1st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T15:22:43Z"},"road_event_id":"V07ZZ6yjjq4l7LfLngwRMdoRlyc=","beginning_cross_street":"Town of Colden; Town of Concord Line","ending_cross_street":"Town of Colden; Town of Concord Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.650605,42.595888]]}},{"id":"wlknpsyj8A+jF2uMozccXR61IqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 240"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CVhv+vrzjnoUsGURIiNuKRcKNkw="}],"description":"Roadwork on NY 240 southbound Town of Colden; Town of Concord Line (Concord), Monday June 1st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-27T15:22:43Z"},"road_event_id":"wlknpsyj8A+jF2uMozccXR61IqI=","beginning_cross_street":"Town of Colden; Town of Concord Line","ending_cross_street":"Town of Colden; Town of Concord Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.650605,42.595888]]}},{"id":"L3sWK83J5P9tDGWl1otWyQ05lAo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 94"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 94 Northbound between South of CR 519/West End Av (Newton) and US 206 (Newton), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 04:00 AM, right shoulder closed","update_date":"2026-05-27T15:37:41Z"},"road_event_id":"L3sWK83J5P9tDGWl1otWyQ05lAo=","beginning_cross_street":"South of CR 519/West End Av","ending_cross_street":"US 206","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.768493,41.053848]]}},{"id":"lLM+MKDAKBeOLOYqMtfl1HzkoFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 300"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hmgUJQOqfd+H7sAFwrnMrlVSf4Y="}],"description":"Installation of traffic management systems on NY 300 both directions between Little Britain Road - NY 207 (New Windsor) and Stewart Avenue (New Windsor) D265558/32755409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closures","update_date":"2026-05-27T15:59:31Z"},"road_event_id":"lLM+MKDAKBeOLOYqMtfl1HzkoFI=","beginning_cross_street":"Little Britain Road - NY 207","ending_cross_street":"Stewart Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:30:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070835,41.484183]]}},{"id":"hmgUJQOqfd+H7sAFwrnMrlVSf4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 300"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lLM+MKDAKBeOLOYqMtfl1HzkoFI="},{"type":"next-occurrence","id":"yYZ1n+wJI3FD2uhSmGRAbH/cc+s="}],"description":"Installation of traffic management systems on NY 300 both directions between Little Britain Road - NY 207 (New Windsor) and Stewart Avenue (New Windsor) D265558/32755409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closures","update_date":"2026-05-27T15:59:31Z"},"road_event_id":"hmgUJQOqfd+H7sAFwrnMrlVSf4Y=","beginning_cross_street":"Little Britain Road - NY 207","ending_cross_street":"Stewart Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070835,41.484183]]}},{"id":"yYZ1n+wJI3FD2uhSmGRAbH/cc+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 300"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lLM+MKDAKBeOLOYqMtfl1HzkoFI="},{"type":"next-occurrence","id":"FxlEIOYCvbrbFLZOcblvpTr4JYM="}],"description":"Installation of traffic management systems on NY 300 both directions between Little Britain Road - NY 207 (New Windsor) and Stewart Avenue (New Windsor) D265558/32755409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closures","update_date":"2026-05-27T15:59:31Z"},"road_event_id":"yYZ1n+wJI3FD2uhSmGRAbH/cc+s=","beginning_cross_street":"Little Britain Road - NY 207","ending_cross_street":"Stewart Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070835,41.484183]]}},{"id":"FxlEIOYCvbrbFLZOcblvpTr4JYM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 300"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lLM+MKDAKBeOLOYqMtfl1HzkoFI="},{"type":"next-occurrence","id":"Twzgo99z8Gxub91Bs+uD0nLGchE="}],"description":"Installation of traffic management systems on NY 300 both directions between Little Britain Road - NY 207 (New Windsor) and Stewart Avenue (New Windsor) D265558/32755409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closures","update_date":"2026-05-27T15:59:31Z"},"road_event_id":"FxlEIOYCvbrbFLZOcblvpTr4JYM=","beginning_cross_street":"Little Britain Road - NY 207","ending_cross_street":"Stewart Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070835,41.484183]]}},{"id":"Twzgo99z8Gxub91Bs+uD0nLGchE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 300"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lLM+MKDAKBeOLOYqMtfl1HzkoFI="},{"type":"next-occurrence","id":"4SDByWtpXlkGZJOfhuwiel72qZw="}],"description":"Installation of traffic management systems on NY 300 both directions between Little Britain Road - NY 207 (New Windsor) and Stewart Avenue (New Windsor) D265558/32755409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closures","update_date":"2026-05-27T15:59:31Z"},"road_event_id":"Twzgo99z8Gxub91Bs+uD0nLGchE=","beginning_cross_street":"Little Britain Road - NY 207","ending_cross_street":"Stewart Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070835,41.484183]]}},{"id":"4SDByWtpXlkGZJOfhuwiel72qZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 300"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lLM+MKDAKBeOLOYqMtfl1HzkoFI="}],"description":"Installation of traffic management systems on NY 300 both directions between Little Britain Road - NY 207 (New Windsor) and Stewart Avenue (New Windsor) D265558/32755409 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closures","update_date":"2026-05-27T15:59:31Z"},"road_event_id":"4SDByWtpXlkGZJOfhuwiel72qZw=","beginning_cross_street":"Little Britain Road - NY 207","ending_cross_street":"Stewart Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070835,41.484183]]}},{"id":"1K+ZmTsgxgnsNlFbtFbWMMNOg/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Systemwide"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6wwigL6gmJ3AKZsBobDo/O6iza0="}],"description":"Due to Switch repairs, Systemwide Many early morning trains will operate on revised schedules between midnight and 9am,, Saturday May 30th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 12:00 AM thru 09:00 AM","update_date":"2026-05-27T16:11:40Z"},"road_event_id":"1K+ZmTsgxgnsNlFbtFbWMMNOg/o=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T04:00:00Z","end_date":"2026-06-06T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991172,40.75032]]}},{"id":"6wwigL6gmJ3AKZsBobDo/O6iza0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Systemwide"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1K+ZmTsgxgnsNlFbtFbWMMNOg/o="}],"description":"Due to Switch repairs, Systemwide Many early morning trains will operate on revised schedules between midnight and 9am,, Saturday May 30th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 12:00 AM thru 09:00 AM","update_date":"2026-05-27T16:11:40Z"},"road_event_id":"6wwigL6gmJ3AKZsBobDo/O6iza0=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T04:00:00Z","end_date":"2026-06-07T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991172,40.75032]]}},{"id":"Gfr7/fq+XvSmYQVB7TSWQhwyDSE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 390"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 390 southbound ramps to I-490 E. Bound (Gates), Continuous Thursday June 4th, 2026 10:00 AM thru Thursday June 18th, 2026 02:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-05-29T16:43:01Z"},"road_event_id":"Gfr7/fq+XvSmYQVB7TSWQhwyDSE=","beginning_cross_street":"I-490 E. Bound ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-18T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.681816,43.157298]]}},{"id":"MgJR8TdMD7AdT9KucyNPIv9pViA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 75TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mtUBjG8Ib85AgOQJ8HrTYOGdmpo="}],"description":"Construction on E 75TH ST westbound between MADISON AVE (New York) and 5TH AVE (New York) for building inspection from boom truck., Saturday May 30th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 31st, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-27T16:52:32Z"},"road_event_id":"MgJR8TdMD7AdT9KucyNPIv9pViA=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.964105,40.773771]]}},{"id":"mtUBjG8Ib85AgOQJ8HrTYOGdmpo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 75TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MgJR8TdMD7AdT9KucyNPIv9pViA="},{"type":"next-occurrence","id":"NBl+hi/v9JhMwszBVzaD1Pv3XEI="}],"description":"Construction on E 75TH ST westbound between MADISON AVE (New York) and 5TH AVE (New York) for building inspection from boom truck., Saturday May 30th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 31st, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-27T16:52:32Z"},"road_event_id":"mtUBjG8Ib85AgOQJ8HrTYOGdmpo=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.964105,40.773771]]}},{"id":"NBl+hi/v9JhMwszBVzaD1Pv3XEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 75TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MgJR8TdMD7AdT9KucyNPIv9pViA="},{"type":"next-occurrence","id":"BaafWF8pLPQooYhtygoEn5aLKvI="}],"description":"Construction on E 75TH ST westbound between MADISON AVE (New York) and 5TH AVE (New York) for building inspection from boom truck., Saturday May 30th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 31st, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-27T16:52:32Z"},"road_event_id":"NBl+hi/v9JhMwszBVzaD1Pv3XEI=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.964105,40.773771]]}},{"id":"BaafWF8pLPQooYhtygoEn5aLKvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 75TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MgJR8TdMD7AdT9KucyNPIv9pViA="}],"description":"Construction on E 75TH ST westbound between MADISON AVE (New York) and 5TH AVE (New York) for building inspection from boom truck., Saturday May 30th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday May 31st, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-27T16:52:32Z"},"road_event_id":"BaafWF8pLPQooYhtygoEn5aLKvI=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.964105,40.773771]]}},{"id":"f3Lva4RzDGc54cLgL0HAyW5KbOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 84TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2TcB0UWEgWgaHzlgeQlEMXO2HfI="}],"description":"Construction on E 84TH ST eastbound between PARK AVE (New York) and LEXINGTON AVE (New York) to lift material to window with use of knuckle boom., Friday May 29th, 2026 thru Sunday June 21st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T16:54:20Z"},"road_event_id":"f3Lva4RzDGc54cLgL0HAyW5KbOk=","beginning_cross_street":"PARK AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958053,40.77881]]}},{"id":"2TcB0UWEgWgaHzlgeQlEMXO2HfI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f3Lva4RzDGc54cLgL0HAyW5KbOk="},{"type":"next-occurrence","id":"Lliia87t692fD3waPKDAMdaOKXA="}],"description":"Construction on E 84TH ST eastbound between PARK AVE (New York) and LEXINGTON AVE (New York) to lift material to window with use of knuckle boom., Friday May 29th, 2026 thru Sunday June 21st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T16:54:20Z"},"road_event_id":"2TcB0UWEgWgaHzlgeQlEMXO2HfI=","beginning_cross_street":"PARK AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958053,40.77881]]}},{"id":"Lliia87t692fD3waPKDAMdaOKXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f3Lva4RzDGc54cLgL0HAyW5KbOk="},{"type":"next-occurrence","id":"V3A3Hjkbjn7LVUU23jsJoLs38Dw="}],"description":"Construction on E 84TH ST eastbound between PARK AVE (New York) and LEXINGTON AVE (New York) to lift material to window with use of knuckle boom., Friday May 29th, 2026 thru Sunday June 21st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T16:54:20Z"},"road_event_id":"Lliia87t692fD3waPKDAMdaOKXA=","beginning_cross_street":"PARK AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958053,40.77881]]}},{"id":"V3A3Hjkbjn7LVUU23jsJoLs38Dw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f3Lva4RzDGc54cLgL0HAyW5KbOk="},{"type":"next-occurrence","id":"6Lg8yP5GIZ4nhRnlXd1CVSCDV5o="}],"description":"Construction on E 84TH ST eastbound between PARK AVE (New York) and LEXINGTON AVE (New York) to lift material to window with use of knuckle boom., Friday May 29th, 2026 thru Sunday June 21st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T16:54:20Z"},"road_event_id":"V3A3Hjkbjn7LVUU23jsJoLs38Dw=","beginning_cross_street":"PARK AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958053,40.77881]]}},{"id":"6Lg8yP5GIZ4nhRnlXd1CVSCDV5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f3Lva4RzDGc54cLgL0HAyW5KbOk="},{"type":"next-occurrence","id":"W9KA43NU3VYUxIVh7pL0q1P5dII="}],"description":"Construction on E 84TH ST eastbound between PARK AVE (New York) and LEXINGTON AVE (New York) to lift material to window with use of knuckle boom., Friday May 29th, 2026 thru Sunday June 21st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T16:54:20Z"},"road_event_id":"6Lg8yP5GIZ4nhRnlXd1CVSCDV5o=","beginning_cross_street":"PARK AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958053,40.77881]]}},{"id":"W9KA43NU3VYUxIVh7pL0q1P5dII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f3Lva4RzDGc54cLgL0HAyW5KbOk="},{"type":"next-occurrence","id":"6eqTmkp1XNsCPdDYu0tT+xHojeY="}],"description":"Construction on E 84TH ST eastbound between PARK AVE (New York) and LEXINGTON AVE (New York) to lift material to window with use of knuckle boom., Friday May 29th, 2026 thru Sunday June 21st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T16:54:20Z"},"road_event_id":"W9KA43NU3VYUxIVh7pL0q1P5dII=","beginning_cross_street":"PARK AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958053,40.77881]]}},{"id":"6eqTmkp1XNsCPdDYu0tT+xHojeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f3Lva4RzDGc54cLgL0HAyW5KbOk="},{"type":"next-occurrence","id":"5msMqI9vVuWrcz408iZrkcDkj9g="}],"description":"Construction on E 84TH ST eastbound between PARK AVE (New York) and LEXINGTON AVE (New York) to lift material to window with use of knuckle boom., Friday May 29th, 2026 thru Sunday June 21st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T16:54:20Z"},"road_event_id":"6eqTmkp1XNsCPdDYu0tT+xHojeY=","beginning_cross_street":"PARK AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958053,40.77881]]}},{"id":"5msMqI9vVuWrcz408iZrkcDkj9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f3Lva4RzDGc54cLgL0HAyW5KbOk="},{"type":"next-occurrence","id":"lysdNIHxUYWre/jnYT3FcZ9FBLo="}],"description":"Construction on E 84TH ST eastbound between PARK AVE (New York) and LEXINGTON AVE (New York) to lift material to window with use of knuckle boom., Friday May 29th, 2026 thru Sunday June 21st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T16:54:20Z"},"road_event_id":"5msMqI9vVuWrcz408iZrkcDkj9g=","beginning_cross_street":"PARK AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958053,40.77881]]}},{"id":"lysdNIHxUYWre/jnYT3FcZ9FBLo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f3Lva4RzDGc54cLgL0HAyW5KbOk="},{"type":"next-occurrence","id":"ba1HQdUu/+6HamrLjab7q/ZoiLE="}],"description":"Construction on E 84TH ST eastbound between PARK AVE (New York) and LEXINGTON AVE (New York) to lift material to window with use of knuckle boom., Friday May 29th, 2026 thru Sunday June 21st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T16:54:20Z"},"road_event_id":"lysdNIHxUYWre/jnYT3FcZ9FBLo=","beginning_cross_street":"PARK AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958053,40.77881]]}},{"id":"ba1HQdUu/+6HamrLjab7q/ZoiLE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f3Lva4RzDGc54cLgL0HAyW5KbOk="},{"type":"next-occurrence","id":"Od6geOaYhUWuLF/PL1Nln7VKOXg="}],"description":"Construction on E 84TH ST eastbound between PARK AVE (New York) and LEXINGTON AVE (New York) to lift material to window with use of knuckle boom., Friday May 29th, 2026 thru Sunday June 21st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T16:54:20Z"},"road_event_id":"ba1HQdUu/+6HamrLjab7q/ZoiLE=","beginning_cross_street":"PARK AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958053,40.77881]]}},{"id":"Od6geOaYhUWuLF/PL1Nln7VKOXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f3Lva4RzDGc54cLgL0HAyW5KbOk="},{"type":"next-occurrence","id":"d1GhtJtvpmJPrVbfSZYT9s5ictI="}],"description":"Construction on E 84TH ST eastbound between PARK AVE (New York) and LEXINGTON AVE (New York) to lift material to window with use of knuckle boom., Friday May 29th, 2026 thru Sunday June 21st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T16:54:20Z"},"road_event_id":"Od6geOaYhUWuLF/PL1Nln7VKOXg=","beginning_cross_street":"PARK AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958053,40.77881]]}},{"id":"d1GhtJtvpmJPrVbfSZYT9s5ictI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f3Lva4RzDGc54cLgL0HAyW5KbOk="},{"type":"next-occurrence","id":"3KwjWQ3RA2GCQtHV8F3N9nKpxow="}],"description":"Construction on E 84TH ST eastbound between PARK AVE (New York) and LEXINGTON AVE (New York) to lift material to window with use of knuckle boom., Friday May 29th, 2026 thru Sunday June 21st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T16:54:20Z"},"road_event_id":"d1GhtJtvpmJPrVbfSZYT9s5ictI=","beginning_cross_street":"PARK AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958053,40.77881]]}},{"id":"3KwjWQ3RA2GCQtHV8F3N9nKpxow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f3Lva4RzDGc54cLgL0HAyW5KbOk="},{"type":"next-occurrence","id":"84StjCWzhKj1LwN/uLo8KnnEcqQ="}],"description":"Construction on E 84TH ST eastbound between PARK AVE (New York) and LEXINGTON AVE (New York) to lift material to window with use of knuckle boom., Friday May 29th, 2026 thru Sunday June 21st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T16:54:20Z"},"road_event_id":"3KwjWQ3RA2GCQtHV8F3N9nKpxow=","beginning_cross_street":"PARK AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958053,40.77881]]}},{"id":"84StjCWzhKj1LwN/uLo8KnnEcqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f3Lva4RzDGc54cLgL0HAyW5KbOk="},{"type":"next-occurrence","id":"O04kfuBqRml8O+sv7wHkhN8jtuk="}],"description":"Construction on E 84TH ST eastbound between PARK AVE (New York) and LEXINGTON AVE (New York) to lift material to window with use of knuckle boom., Friday May 29th, 2026 thru Sunday June 21st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T16:54:20Z"},"road_event_id":"84StjCWzhKj1LwN/uLo8KnnEcqQ=","beginning_cross_street":"PARK AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958053,40.77881]]}},{"id":"O04kfuBqRml8O+sv7wHkhN8jtuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f3Lva4RzDGc54cLgL0HAyW5KbOk="}],"description":"Construction on E 84TH ST eastbound between PARK AVE (New York) and LEXINGTON AVE (New York) to lift material to window with use of knuckle boom., Friday May 29th, 2026 thru Sunday June 21st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T16:54:20Z"},"road_event_id":"O04kfuBqRml8O+sv7wHkhN8jtuk=","beginning_cross_street":"PARK AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958053,40.77881]]}},{"id":"i47YiyB23fYFJLy3q5X86awVY/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 103RD ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rkQ7Yvyw8llhN8Sp9C31HX18YnQ="}],"description":"Construction on W 103RD ST westbound between BROADWAY (New York) and WEST END AVE (New York) for building inspection from boom truck., Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-27T16:56:00Z"},"road_event_id":"i47YiyB23fYFJLy3q5X86awVY/A=","beginning_cross_street":"BROADWAY","ending_cross_street":"WEST END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968736,40.799186]]}},{"id":"rkQ7Yvyw8llhN8Sp9C31HX18YnQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 103RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i47YiyB23fYFJLy3q5X86awVY/A="},{"type":"next-occurrence","id":"iaBh4EB7R0R2/xZnLQQvCpHb8PY="}],"description":"Construction on W 103RD ST westbound between BROADWAY (New York) and WEST END AVE (New York) for building inspection from boom truck., Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-27T16:56:00Z"},"road_event_id":"rkQ7Yvyw8llhN8Sp9C31HX18YnQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"WEST END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968736,40.799186]]}},{"id":"iaBh4EB7R0R2/xZnLQQvCpHb8PY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 103RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i47YiyB23fYFJLy3q5X86awVY/A="},{"type":"next-occurrence","id":"KYRSg6Bez+pdrhNfhkdRm7Oyg7k="}],"description":"Construction on W 103RD ST westbound between BROADWAY (New York) and WEST END AVE (New York) for building inspection from boom truck., Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-27T16:56:00Z"},"road_event_id":"iaBh4EB7R0R2/xZnLQQvCpHb8PY=","beginning_cross_street":"BROADWAY","ending_cross_street":"WEST END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968736,40.799186]]}},{"id":"KYRSg6Bez+pdrhNfhkdRm7Oyg7k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 103RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i47YiyB23fYFJLy3q5X86awVY/A="},{"type":"next-occurrence","id":"VaBPR/FHiOBDITxx7Sf3T5rObsM="}],"description":"Construction on W 103RD ST westbound between BROADWAY (New York) and WEST END AVE (New York) for building inspection from boom truck., Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-27T16:56:00Z"},"road_event_id":"KYRSg6Bez+pdrhNfhkdRm7Oyg7k=","beginning_cross_street":"BROADWAY","ending_cross_street":"WEST END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968736,40.799186]]}},{"id":"VaBPR/FHiOBDITxx7Sf3T5rObsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 103RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i47YiyB23fYFJLy3q5X86awVY/A="},{"type":"next-occurrence","id":"SPksXpUrrgh63GMa/kWPS6tVM5c="}],"description":"Construction on W 103RD ST westbound between BROADWAY (New York) and WEST END AVE (New York) for building inspection from boom truck., Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-27T16:56:00Z"},"road_event_id":"VaBPR/FHiOBDITxx7Sf3T5rObsM=","beginning_cross_street":"BROADWAY","ending_cross_street":"WEST END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968736,40.799186]]}},{"id":"SPksXpUrrgh63GMa/kWPS6tVM5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 103RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i47YiyB23fYFJLy3q5X86awVY/A="},{"type":"next-occurrence","id":"dlczvvYcMiWb08syBDEC7caN6nw="}],"description":"Construction on W 103RD ST westbound between BROADWAY (New York) and WEST END AVE (New York) for building inspection from boom truck., Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-27T16:56:00Z"},"road_event_id":"SPksXpUrrgh63GMa/kWPS6tVM5c=","beginning_cross_street":"BROADWAY","ending_cross_street":"WEST END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968736,40.799186]]}},{"id":"dlczvvYcMiWb08syBDEC7caN6nw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 103RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i47YiyB23fYFJLy3q5X86awVY/A="}],"description":"Construction on W 103RD ST westbound between BROADWAY (New York) and WEST END AVE (New York) for building inspection from boom truck., Wednesday May 27th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-27T16:56:00Z"},"road_event_id":"dlczvvYcMiWb08syBDEC7caN6nw=","beginning_cross_street":"BROADWAY","ending_cross_street":"WEST END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968736,40.799186]]}},{"id":"9iUj5NpUkYfJMGT2TULSpEY6HnE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MOORE ST"],"direction":"unknown","related_road_events":[],"description":"Construction on MOORE ST northbound between WATER ST (New York) and PEARL ST (New York), Continuous Wednesday May 27th, 2026 12:00 AM thru Wednesday July 22nd, 2026 11:59 PM All lanes closed","update_date":"2026-05-27T17:00:13Z"},"road_event_id":"9iUj5NpUkYfJMGT2TULSpEY6HnE=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01235,40.702781]]}},{"id":"8ahTCKGlPhDNnpxtzSicB/a9MiI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CROSBY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HtAZO0dqE66Vk/ERlrNHzC+/YUo="}],"description":"Crane operations on CROSBY ST northbound between PRINCE ST (New York) and E HOUSTON ST (New York), Saturday May 30th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 07:00 AM thru 07:00 PM All lanes closed","update_date":"2026-05-27T17:02:12Z"},"road_event_id":"8ahTCKGlPhDNnpxtzSicB/a9MiI=","beginning_cross_street":"PRINCE ST","ending_cross_street":"E HOUSTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996921,40.723913]]}},{"id":"HtAZO0dqE66Vk/ERlrNHzC+/YUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CROSBY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8ahTCKGlPhDNnpxtzSicB/a9MiI="}],"description":"Crane operations on CROSBY ST northbound between PRINCE ST (New York) and E HOUSTON ST (New York), Saturday May 30th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 07:00 AM thru 07:00 PM All lanes closed","update_date":"2026-05-27T17:02:12Z"},"road_event_id":"HtAZO0dqE66Vk/ERlrNHzC+/YUo=","beginning_cross_street":"PRINCE ST","ending_cross_street":"E HOUSTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996921,40.723913]]}},{"id":"GGqMszndR7ym+3Rp0dFnTEmpKxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ajgIg5NuBQO3iEnJSKbpHA0ZsfQ="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Friday May 29th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T17:12:19Z"},"road_event_id":"GGqMszndR7ym+3Rp0dFnTEmpKxc=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"ajgIg5NuBQO3iEnJSKbpHA0ZsfQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GGqMszndR7ym+3Rp0dFnTEmpKxc="},{"type":"next-occurrence","id":"2zBD+tPDOfL+upu3gIsnfoxj8SE="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Friday May 29th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T17:12:19Z"},"road_event_id":"ajgIg5NuBQO3iEnJSKbpHA0ZsfQ=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"2zBD+tPDOfL+upu3gIsnfoxj8SE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GGqMszndR7ym+3Rp0dFnTEmpKxc="},{"type":"next-occurrence","id":"Ik8sNMvTLQ4XZNmPt4dhY+Tc2So="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Friday May 29th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T17:12:19Z"},"road_event_id":"2zBD+tPDOfL+upu3gIsnfoxj8SE=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"Ik8sNMvTLQ4XZNmPt4dhY+Tc2So=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GGqMszndR7ym+3Rp0dFnTEmpKxc="},{"type":"next-occurrence","id":"vQacNlIh4lrMyAvJjkwUb8SWvSk="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Friday May 29th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T17:12:19Z"},"road_event_id":"Ik8sNMvTLQ4XZNmPt4dhY+Tc2So=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"vQacNlIh4lrMyAvJjkwUb8SWvSk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GGqMszndR7ym+3Rp0dFnTEmpKxc="},{"type":"next-occurrence","id":"vexgNZKB/26z9Cz1qKP+zBoUcvY="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Friday May 29th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T17:12:19Z"},"road_event_id":"vQacNlIh4lrMyAvJjkwUb8SWvSk=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"vexgNZKB/26z9Cz1qKP+zBoUcvY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GGqMszndR7ym+3Rp0dFnTEmpKxc="},{"type":"next-occurrence","id":"HnbEiZ88pDvE35117oWPITw1UXg="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Friday May 29th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T17:12:19Z"},"road_event_id":"vexgNZKB/26z9Cz1qKP+zBoUcvY=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"HnbEiZ88pDvE35117oWPITw1UXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GGqMszndR7ym+3Rp0dFnTEmpKxc="},{"type":"next-occurrence","id":"t2USfzkkl8o6RSDbmJkhUA69McU="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Friday May 29th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T17:12:19Z"},"road_event_id":"HnbEiZ88pDvE35117oWPITw1UXg=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"t2USfzkkl8o6RSDbmJkhUA69McU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GGqMszndR7ym+3Rp0dFnTEmpKxc="},{"type":"next-occurrence","id":"sDRhkjJJIjQzBQLh6jxxHYEpXoc="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Friday May 29th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T17:12:19Z"},"road_event_id":"t2USfzkkl8o6RSDbmJkhUA69McU=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"sDRhkjJJIjQzBQLh6jxxHYEpXoc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GGqMszndR7ym+3Rp0dFnTEmpKxc="},{"type":"next-occurrence","id":"KGQoef2SF5vQxXnQ9+4Q9lD4PG4="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Friday May 29th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T17:12:19Z"},"road_event_id":"sDRhkjJJIjQzBQLh6jxxHYEpXoc=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"KGQoef2SF5vQxXnQ9+4Q9lD4PG4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GGqMszndR7ym+3Rp0dFnTEmpKxc="},{"type":"next-occurrence","id":"HQRC7Lwccbnn5X+/iDXe97Fowcc="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Friday May 29th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T17:12:19Z"},"road_event_id":"KGQoef2SF5vQxXnQ9+4Q9lD4PG4=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"HQRC7Lwccbnn5X+/iDXe97Fowcc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GGqMszndR7ym+3Rp0dFnTEmpKxc="},{"type":"next-occurrence","id":"n866R9cD5V4RWPzjQVfsol1C6dI="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Friday May 29th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T17:12:19Z"},"road_event_id":"HQRC7Lwccbnn5X+/iDXe97Fowcc=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"n866R9cD5V4RWPzjQVfsol1C6dI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GGqMszndR7ym+3Rp0dFnTEmpKxc="},{"type":"next-occurrence","id":"y7nLxC13FJ5QjJyL28QR2W5BwMM="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Friday May 29th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T17:12:19Z"},"road_event_id":"n866R9cD5V4RWPzjQVfsol1C6dI=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"y7nLxC13FJ5QjJyL28QR2W5BwMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GGqMszndR7ym+3Rp0dFnTEmpKxc="},{"type":"next-occurrence","id":"l2pSyLAVlAN4bgaXN5/McaZ2FOA="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Friday May 29th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T17:12:19Z"},"road_event_id":"y7nLxC13FJ5QjJyL28QR2W5BwMM=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"l2pSyLAVlAN4bgaXN5/McaZ2FOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GGqMszndR7ym+3Rp0dFnTEmpKxc="},{"type":"next-occurrence","id":"vwWVG+QJ2QBrmrikLU2ofEKB61U="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Friday May 29th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T17:12:19Z"},"road_event_id":"l2pSyLAVlAN4bgaXN5/McaZ2FOA=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"vwWVG+QJ2QBrmrikLU2ofEKB61U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GGqMszndR7ym+3Rp0dFnTEmpKxc="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Friday May 29th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-05-27T17:12:19Z"},"road_event_id":"vwWVG+QJ2QBrmrikLU2ofEKB61U=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891321,40.851524]]}},{"id":"scepPO0Ur5vhKEabSPvqmKJZo8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iZsQgNO81z5PznCGUaV6VtUXPWw="}],"description":"Construction on KINGSBRIDGE TER both directions between HEATH AVE (New York) and W KINGSBRIDGE RD (New York) for concrete pump and booming operations., Wednesday May 27th, 2026 thru Friday August 21st, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-27T17:14:32Z"},"road_event_id":"scepPO0Ur5vhKEabSPvqmKJZo8Q=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906289,40.869595]]}},{"id":"iZsQgNO81z5PznCGUaV6VtUXPWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"scepPO0Ur5vhKEabSPvqmKJZo8Q="},{"type":"next-occurrence","id":"vYfP0Bp84NG4CFhhG9ubgPPJkMk="}],"description":"Construction on KINGSBRIDGE TER both directions between HEATH AVE (New York) and W KINGSBRIDGE RD (New York) for concrete pump and booming operations., Wednesday May 27th, 2026 thru Friday August 21st, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-27T17:14:32Z"},"road_event_id":"iZsQgNO81z5PznCGUaV6VtUXPWw=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906289,40.869595]]}},{"id":"vYfP0Bp84NG4CFhhG9ubgPPJkMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"scepPO0Ur5vhKEabSPvqmKJZo8Q="},{"type":"next-occurrence","id":"ybgOdWu5/UhbBNLSCNvR/gntolQ="}],"description":"Construction on KINGSBRIDGE TER both directions between HEATH AVE (New York) and W KINGSBRIDGE RD (New York) for concrete pump and booming operations., Wednesday May 27th, 2026 thru Friday August 21st, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-27T17:14:32Z"},"road_event_id":"vYfP0Bp84NG4CFhhG9ubgPPJkMk=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906289,40.869595]]}},{"id":"ybgOdWu5/UhbBNLSCNvR/gntolQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"scepPO0Ur5vhKEabSPvqmKJZo8Q="},{"type":"next-occurrence","id":"do7umxFZUTK4BhZvxPj6sd/MjY0="}],"description":"Construction on KINGSBRIDGE TER both directions between HEATH AVE (New York) and W KINGSBRIDGE RD (New York) for concrete pump and booming operations., Wednesday May 27th, 2026 thru Friday August 21st, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-27T17:14:32Z"},"road_event_id":"ybgOdWu5/UhbBNLSCNvR/gntolQ=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906289,40.869595]]}},{"id":"do7umxFZUTK4BhZvxPj6sd/MjY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"scepPO0Ur5vhKEabSPvqmKJZo8Q="},{"type":"next-occurrence","id":"GnlAHxXkTgd9qwSsi7N+p625VrU="}],"description":"Construction on KINGSBRIDGE TER both directions between HEATH AVE (New York) and W KINGSBRIDGE RD (New York) for concrete pump and booming operations., Wednesday May 27th, 2026 thru Friday August 21st, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-27T17:14:32Z"},"road_event_id":"do7umxFZUTK4BhZvxPj6sd/MjY0=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906289,40.869595]]}},{"id":"GnlAHxXkTgd9qwSsi7N+p625VrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"scepPO0Ur5vhKEabSPvqmKJZo8Q="},{"type":"next-occurrence","id":"N2JjJ6CzwZODZAwraLkpFleLSiE="}],"description":"Construction on KINGSBRIDGE TER both directions between HEATH AVE (New York) and W KINGSBRIDGE RD (New York) for concrete pump and booming operations., Wednesday May 27th, 2026 thru Friday August 21st, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-27T17:14:32Z"},"road_event_id":"GnlAHxXkTgd9qwSsi7N+p625VrU=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906289,40.869595]]}},{"id":"N2JjJ6CzwZODZAwraLkpFleLSiE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"scepPO0Ur5vhKEabSPvqmKJZo8Q="},{"type":"next-occurrence","id":"COdusj6gJfUbSJQXF4gS4Ym1hXA="}],"description":"Construction on KINGSBRIDGE TER both directions between HEATH AVE (New York) and W KINGSBRIDGE RD (New York) for concrete pump and booming operations., Wednesday May 27th, 2026 thru Friday August 21st, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-27T17:14:32Z"},"road_event_id":"N2JjJ6CzwZODZAwraLkpFleLSiE=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906289,40.869595]]}},{"id":"COdusj6gJfUbSJQXF4gS4Ym1hXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"scepPO0Ur5vhKEabSPvqmKJZo8Q="},{"type":"next-occurrence","id":"5QDcLXHHvkGhPgWuzqIe/F8nLVg="}],"description":"Construction on KINGSBRIDGE TER both directions between HEATH AVE (New York) and W KINGSBRIDGE RD (New York) for concrete pump and booming operations., Wednesday May 27th, 2026 thru Friday August 21st, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-27T17:14:32Z"},"road_event_id":"COdusj6gJfUbSJQXF4gS4Ym1hXA=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906289,40.869595]]}},{"id":"5QDcLXHHvkGhPgWuzqIe/F8nLVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"scepPO0Ur5vhKEabSPvqmKJZo8Q="},{"type":"next-occurrence","id":"RHTpAyN5XZqR32fn+xJgny5rGv0="}],"description":"Construction on KINGSBRIDGE TER both directions between HEATH AVE (New York) and W KINGSBRIDGE RD (New York) for concrete pump and booming operations., Wednesday May 27th, 2026 thru Friday August 21st, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-27T17:14:32Z"},"road_event_id":"5QDcLXHHvkGhPgWuzqIe/F8nLVg=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906289,40.869595]]}},{"id":"RHTpAyN5XZqR32fn+xJgny5rGv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"scepPO0Ur5vhKEabSPvqmKJZo8Q="},{"type":"next-occurrence","id":"5OXYjAT1Fjv+rORvYCBYSR2yRrs="}],"description":"Construction on KINGSBRIDGE TER both directions between HEATH AVE (New York) and W KINGSBRIDGE RD (New York) for concrete pump and booming operations., Wednesday May 27th, 2026 thru Friday August 21st, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-27T17:14:32Z"},"road_event_id":"RHTpAyN5XZqR32fn+xJgny5rGv0=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906289,40.869595]]}},{"id":"5OXYjAT1Fjv+rORvYCBYSR2yRrs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"scepPO0Ur5vhKEabSPvqmKJZo8Q="}],"description":"Construction on KINGSBRIDGE TER both directions between HEATH AVE (New York) and W KINGSBRIDGE RD (New York) for concrete pump and booming operations., Wednesday May 27th, 2026 thru Friday August 21st, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-05-27T17:14:32Z"},"road_event_id":"5OXYjAT1Fjv+rORvYCBYSR2yRrs=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906289,40.869595]]}},{"id":"HoA43rPK2O2uPkrJtNloJjFaMKY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"prMXTnSnqmQruojlBtH5Gbvo2XU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 101ST ST (New York) and BEACH 98TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:30:02Z"},"road_event_id":"HoA43rPK2O2uPkrJtNloJjFaMKY=","beginning_cross_street":"BEACH 101ST ST","ending_cross_street":"BEACH 98TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822398,40.584737]]}},{"id":"prMXTnSnqmQruojlBtH5Gbvo2XU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HoA43rPK2O2uPkrJtNloJjFaMKY="},{"type":"next-occurrence","id":"c3mW4GZmbp3VwgM1bgsijSETKLQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 101ST ST (New York) and BEACH 98TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:30:02Z"},"road_event_id":"prMXTnSnqmQruojlBtH5Gbvo2XU=","beginning_cross_street":"BEACH 101ST ST","ending_cross_street":"BEACH 98TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822398,40.584737]]}},{"id":"c3mW4GZmbp3VwgM1bgsijSETKLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HoA43rPK2O2uPkrJtNloJjFaMKY="},{"type":"next-occurrence","id":"slEzzahpzj3x6yUPfU6sGUNMy8w="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 101ST ST (New York) and BEACH 98TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:30:02Z"},"road_event_id":"c3mW4GZmbp3VwgM1bgsijSETKLQ=","beginning_cross_street":"BEACH 101ST ST","ending_cross_street":"BEACH 98TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822398,40.584737]]}},{"id":"slEzzahpzj3x6yUPfU6sGUNMy8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HoA43rPK2O2uPkrJtNloJjFaMKY="},{"type":"next-occurrence","id":"oUwUSYHcF6eVHoGubCyz7vi/6vQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 101ST ST (New York) and BEACH 98TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:30:02Z"},"road_event_id":"slEzzahpzj3x6yUPfU6sGUNMy8w=","beginning_cross_street":"BEACH 101ST ST","ending_cross_street":"BEACH 98TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822398,40.584737]]}},{"id":"oUwUSYHcF6eVHoGubCyz7vi/6vQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HoA43rPK2O2uPkrJtNloJjFaMKY="},{"type":"next-occurrence","id":"T6SIawzPmYbo7MgimWWQG+dlSog="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 101ST ST (New York) and BEACH 98TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:30:02Z"},"road_event_id":"oUwUSYHcF6eVHoGubCyz7vi/6vQ=","beginning_cross_street":"BEACH 101ST ST","ending_cross_street":"BEACH 98TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822398,40.584737]]}},{"id":"T6SIawzPmYbo7MgimWWQG+dlSog=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HoA43rPK2O2uPkrJtNloJjFaMKY="},{"type":"next-occurrence","id":"iuJ2fFl+4PKaXLjj//tbHhzRWpM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 101ST ST (New York) and BEACH 98TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:30:02Z"},"road_event_id":"T6SIawzPmYbo7MgimWWQG+dlSog=","beginning_cross_street":"BEACH 101ST ST","ending_cross_street":"BEACH 98TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822398,40.584737]]}},{"id":"iuJ2fFl+4PKaXLjj//tbHhzRWpM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HoA43rPK2O2uPkrJtNloJjFaMKY="},{"type":"next-occurrence","id":"tnVvjPT8uKM+rQRT/XT2MRRBVhA="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 101ST ST (New York) and BEACH 98TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:30:02Z"},"road_event_id":"iuJ2fFl+4PKaXLjj//tbHhzRWpM=","beginning_cross_street":"BEACH 101ST ST","ending_cross_street":"BEACH 98TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822398,40.584737]]}},{"id":"tnVvjPT8uKM+rQRT/XT2MRRBVhA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HoA43rPK2O2uPkrJtNloJjFaMKY="},{"type":"next-occurrence","id":"x7h0N+KPi/w9Te9LBclpEMXfA4I="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 101ST ST (New York) and BEACH 98TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:30:02Z"},"road_event_id":"tnVvjPT8uKM+rQRT/XT2MRRBVhA=","beginning_cross_street":"BEACH 101ST ST","ending_cross_street":"BEACH 98TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822398,40.584737]]}},{"id":"x7h0N+KPi/w9Te9LBclpEMXfA4I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HoA43rPK2O2uPkrJtNloJjFaMKY="},{"type":"next-occurrence","id":"BEdQmxb9SVDFM/COIEc6Iuy6zy8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 101ST ST (New York) and BEACH 98TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:30:02Z"},"road_event_id":"x7h0N+KPi/w9Te9LBclpEMXfA4I=","beginning_cross_street":"BEACH 101ST ST","ending_cross_street":"BEACH 98TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822398,40.584737]]}},{"id":"BEdQmxb9SVDFM/COIEc6Iuy6zy8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HoA43rPK2O2uPkrJtNloJjFaMKY="},{"type":"next-occurrence","id":"WxJbXsl/LYCJlUOahJbpsCBrpL0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 101ST ST (New York) and BEACH 98TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:30:02Z"},"road_event_id":"BEdQmxb9SVDFM/COIEc6Iuy6zy8=","beginning_cross_street":"BEACH 101ST ST","ending_cross_street":"BEACH 98TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822398,40.584737]]}},{"id":"WxJbXsl/LYCJlUOahJbpsCBrpL0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HoA43rPK2O2uPkrJtNloJjFaMKY="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 101ST ST (New York) and BEACH 98TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:30:02Z"},"road_event_id":"WxJbXsl/LYCJlUOahJbpsCBrpL0=","beginning_cross_street":"BEACH 101ST ST","ending_cross_street":"BEACH 98TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822398,40.584737]]}},{"id":"m/UQOeKj3+rBrRc0Uey4G/It2Pg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Z+rfd5c1rzvcOTUrMnXkpV+MtxI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 102ND ST (New York) and BEACH 101ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:32:15Z"},"road_event_id":"m/UQOeKj3+rBrRc0Uey4G/It2Pg=","beginning_cross_street":"BEACH 102ND ST","ending_cross_street":"BEACH 101ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823243,40.5845]]}},{"id":"Z+rfd5c1rzvcOTUrMnXkpV+MtxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m/UQOeKj3+rBrRc0Uey4G/It2Pg="},{"type":"next-occurrence","id":"eN75I9CVfAIrFnQ4KpZJmzMac3o="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 102ND ST (New York) and BEACH 101ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:32:15Z"},"road_event_id":"Z+rfd5c1rzvcOTUrMnXkpV+MtxI=","beginning_cross_street":"BEACH 102ND ST","ending_cross_street":"BEACH 101ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823243,40.5845]]}},{"id":"eN75I9CVfAIrFnQ4KpZJmzMac3o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m/UQOeKj3+rBrRc0Uey4G/It2Pg="},{"type":"next-occurrence","id":"/4wlUnN+xcM9XBDq2TSIy3NGTgE="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 102ND ST (New York) and BEACH 101ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:32:15Z"},"road_event_id":"eN75I9CVfAIrFnQ4KpZJmzMac3o=","beginning_cross_street":"BEACH 102ND ST","ending_cross_street":"BEACH 101ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823243,40.5845]]}},{"id":"/4wlUnN+xcM9XBDq2TSIy3NGTgE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m/UQOeKj3+rBrRc0Uey4G/It2Pg="},{"type":"next-occurrence","id":"0E7/ELzD3l9PD+dKcWgT54iYnD4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 102ND ST (New York) and BEACH 101ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:32:15Z"},"road_event_id":"/4wlUnN+xcM9XBDq2TSIy3NGTgE=","beginning_cross_street":"BEACH 102ND ST","ending_cross_street":"BEACH 101ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823243,40.5845]]}},{"id":"0E7/ELzD3l9PD+dKcWgT54iYnD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m/UQOeKj3+rBrRc0Uey4G/It2Pg="},{"type":"next-occurrence","id":"1mcc9j8v3PiUCQMcfwiZnIrUqE0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 102ND ST (New York) and BEACH 101ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:32:15Z"},"road_event_id":"0E7/ELzD3l9PD+dKcWgT54iYnD4=","beginning_cross_street":"BEACH 102ND ST","ending_cross_street":"BEACH 101ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823243,40.5845]]}},{"id":"1mcc9j8v3PiUCQMcfwiZnIrUqE0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m/UQOeKj3+rBrRc0Uey4G/It2Pg="},{"type":"next-occurrence","id":"KmGVrrmVhh5qumTOE2iwhjc4M3c="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 102ND ST (New York) and BEACH 101ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:32:15Z"},"road_event_id":"1mcc9j8v3PiUCQMcfwiZnIrUqE0=","beginning_cross_street":"BEACH 102ND ST","ending_cross_street":"BEACH 101ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823243,40.5845]]}},{"id":"KmGVrrmVhh5qumTOE2iwhjc4M3c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m/UQOeKj3+rBrRc0Uey4G/It2Pg="},{"type":"next-occurrence","id":"KMuRzq8iIkho5pYTSsEUfrfe4IY="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 102ND ST (New York) and BEACH 101ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:32:15Z"},"road_event_id":"KmGVrrmVhh5qumTOE2iwhjc4M3c=","beginning_cross_street":"BEACH 102ND ST","ending_cross_street":"BEACH 101ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823243,40.5845]]}},{"id":"KMuRzq8iIkho5pYTSsEUfrfe4IY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m/UQOeKj3+rBrRc0Uey4G/It2Pg="},{"type":"next-occurrence","id":"Z4KOHZZX4mapOeJhnRkheDwothE="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 102ND ST (New York) and BEACH 101ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:32:15Z"},"road_event_id":"KMuRzq8iIkho5pYTSsEUfrfe4IY=","beginning_cross_street":"BEACH 102ND ST","ending_cross_street":"BEACH 101ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823243,40.5845]]}},{"id":"Z4KOHZZX4mapOeJhnRkheDwothE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m/UQOeKj3+rBrRc0Uey4G/It2Pg="},{"type":"next-occurrence","id":"qADEiI/IfixYPHCkiKnJU8j8ClU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 102ND ST (New York) and BEACH 101ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:32:15Z"},"road_event_id":"Z4KOHZZX4mapOeJhnRkheDwothE=","beginning_cross_street":"BEACH 102ND ST","ending_cross_street":"BEACH 101ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823243,40.5845]]}},{"id":"qADEiI/IfixYPHCkiKnJU8j8ClU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m/UQOeKj3+rBrRc0Uey4G/It2Pg="},{"type":"next-occurrence","id":"0r0/q30beeVThgs8XizpWUHC57A="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 102ND ST (New York) and BEACH 101ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:32:15Z"},"road_event_id":"qADEiI/IfixYPHCkiKnJU8j8ClU=","beginning_cross_street":"BEACH 102ND ST","ending_cross_street":"BEACH 101ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823243,40.5845]]}},{"id":"0r0/q30beeVThgs8XizpWUHC57A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m/UQOeKj3+rBrRc0Uey4G/It2Pg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 102ND ST (New York) and BEACH 101ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:32:15Z"},"road_event_id":"0r0/q30beeVThgs8XizpWUHC57A=","beginning_cross_street":"BEACH 102ND ST","ending_cross_street":"BEACH 101ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.823243,40.5845]]}},{"id":"ULCpmzknXtyUC3Tgqgk0qwEJlTA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GXh6Riu7RFjFijM5nxoLcUGSt2Y="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 105TH ST (New York) and BEACH 102ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:33:48Z"},"road_event_id":"ULCpmzknXtyUC3Tgqgk0qwEJlTA=","beginning_cross_street":"BEACH 105TH ST","ending_cross_street":"BEACH 102ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826352,40.58362]]}},{"id":"GXh6Riu7RFjFijM5nxoLcUGSt2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULCpmzknXtyUC3Tgqgk0qwEJlTA="},{"type":"next-occurrence","id":"4V+2nM0h5plpwG1CDQKX6DnHY9k="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 105TH ST (New York) and BEACH 102ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:33:48Z"},"road_event_id":"GXh6Riu7RFjFijM5nxoLcUGSt2Y=","beginning_cross_street":"BEACH 105TH ST","ending_cross_street":"BEACH 102ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826352,40.58362]]}},{"id":"4V+2nM0h5plpwG1CDQKX6DnHY9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULCpmzknXtyUC3Tgqgk0qwEJlTA="},{"type":"next-occurrence","id":"oQlkAth3BBy5mXKbM4HVgX9pVNE="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 105TH ST (New York) and BEACH 102ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:33:48Z"},"road_event_id":"4V+2nM0h5plpwG1CDQKX6DnHY9k=","beginning_cross_street":"BEACH 105TH ST","ending_cross_street":"BEACH 102ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826352,40.58362]]}},{"id":"oQlkAth3BBy5mXKbM4HVgX9pVNE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULCpmzknXtyUC3Tgqgk0qwEJlTA="},{"type":"next-occurrence","id":"rPf6pDqQKkv4eKO8gYEAYkewiLk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 105TH ST (New York) and BEACH 102ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:33:48Z"},"road_event_id":"oQlkAth3BBy5mXKbM4HVgX9pVNE=","beginning_cross_street":"BEACH 105TH ST","ending_cross_street":"BEACH 102ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826352,40.58362]]}},{"id":"rPf6pDqQKkv4eKO8gYEAYkewiLk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULCpmzknXtyUC3Tgqgk0qwEJlTA="},{"type":"next-occurrence","id":"zityS1G53igGRMM3V5A+VhdQzPE="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 105TH ST (New York) and BEACH 102ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:33:48Z"},"road_event_id":"rPf6pDqQKkv4eKO8gYEAYkewiLk=","beginning_cross_street":"BEACH 105TH ST","ending_cross_street":"BEACH 102ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826352,40.58362]]}},{"id":"zityS1G53igGRMM3V5A+VhdQzPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULCpmzknXtyUC3Tgqgk0qwEJlTA="},{"type":"next-occurrence","id":"DIbGHmML3qgbphBQsRdJHqoMuVI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 105TH ST (New York) and BEACH 102ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:33:48Z"},"road_event_id":"zityS1G53igGRMM3V5A+VhdQzPE=","beginning_cross_street":"BEACH 105TH ST","ending_cross_street":"BEACH 102ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826352,40.58362]]}},{"id":"DIbGHmML3qgbphBQsRdJHqoMuVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULCpmzknXtyUC3Tgqgk0qwEJlTA="},{"type":"next-occurrence","id":"XCw46awoYSz85N1eZfDyi4snfLk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 105TH ST (New York) and BEACH 102ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:33:48Z"},"road_event_id":"DIbGHmML3qgbphBQsRdJHqoMuVI=","beginning_cross_street":"BEACH 105TH ST","ending_cross_street":"BEACH 102ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826352,40.58362]]}},{"id":"XCw46awoYSz85N1eZfDyi4snfLk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULCpmzknXtyUC3Tgqgk0qwEJlTA="},{"type":"next-occurrence","id":"wF/1P+oytw/xrZG0mq5xjpZP7Pw="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 105TH ST (New York) and BEACH 102ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:33:48Z"},"road_event_id":"XCw46awoYSz85N1eZfDyi4snfLk=","beginning_cross_street":"BEACH 105TH ST","ending_cross_street":"BEACH 102ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826352,40.58362]]}},{"id":"wF/1P+oytw/xrZG0mq5xjpZP7Pw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULCpmzknXtyUC3Tgqgk0qwEJlTA="},{"type":"next-occurrence","id":"gAlIxQLFnHBq0B4C9EGR83GMDb4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 105TH ST (New York) and BEACH 102ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:33:48Z"},"road_event_id":"wF/1P+oytw/xrZG0mq5xjpZP7Pw=","beginning_cross_street":"BEACH 105TH ST","ending_cross_street":"BEACH 102ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826352,40.58362]]}},{"id":"gAlIxQLFnHBq0B4C9EGR83GMDb4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULCpmzknXtyUC3Tgqgk0qwEJlTA="},{"type":"next-occurrence","id":"nDkUkfeZPUYlL0s32jCBvXKn+RI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 105TH ST (New York) and BEACH 102ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:33:48Z"},"road_event_id":"gAlIxQLFnHBq0B4C9EGR83GMDb4=","beginning_cross_street":"BEACH 105TH ST","ending_cross_street":"BEACH 102ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826352,40.58362]]}},{"id":"nDkUkfeZPUYlL0s32jCBvXKn+RI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULCpmzknXtyUC3Tgqgk0qwEJlTA="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 105TH ST (New York) and BEACH 102ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday May 27th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-05-27T17:33:48Z"},"road_event_id":"nDkUkfeZPUYlL0s32jCBvXKn+RI=","beginning_cross_street":"BEACH 105TH ST","ending_cross_street":"BEACH 102ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826352,40.58362]]}},{"id":"+15kMreD9o7+j5agTxRmv0ksFu8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 28"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 28 Eastbound from West of I-287 (Bridgewater Twp) to West of Mountain Ave (Middlesex) Saturday June 6, 2026 09:00 AM thru 03:00 PM, 1 right lane of 4 lanes closed","update_date":"2026-05-27T17:59:19Z"},"road_event_id":"+15kMreD9o7+j5agTxRmv0ksFu8=","beginning_cross_street":"West of I-287","ending_cross_street":"West of Mountain Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.558158,40.568019]]}},{"id":"GYgfY5+ZzsO4I41HRoNQP5lnb6s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 28"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 28 Eastbound from West of I-287 (Bridgewater Twp) to West of Mountain Ave (Middlesex) Sunday June 7, 2026 09:00 AM thru 03:00 PM, 1 right lane of 4 lanes closed","update_date":"2026-05-27T17:59:25Z"},"road_event_id":"GYgfY5+ZzsO4I41HRoNQP5lnb6s=","beginning_cross_street":"West of I-287","ending_cross_street":"West of Mountain Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.558158,40.568019]]}},{"id":"S21sAURQO64T5zDCn0JJxTxSJ2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 28"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 28 Eastbound from West of I-287 (Bridgewater Twp) to West of Mountain Ave (Middlesex) Monday June 8, 2026 09:00 AM thru 03:00 PM, 1 right lane of 4 lanes closed","update_date":"2026-05-27T17:59:32Z"},"road_event_id":"S21sAURQO64T5zDCn0JJxTxSJ2I=","beginning_cross_street":"West of I-287","ending_cross_street":"West of Mountain Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.558158,40.568019]]}},{"id":"7zIlRZJbP4/cl6LK+ZNtxFVDYww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 28"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 28 Eastbound from West of I-287 (Bridgewater Twp) to West of Mountain Ave (Middlesex) Wednesday June 10, 2026 09:00 AM thru 03:00 PM, 1 right lane of 4 lanes closed","update_date":"2026-05-27T18:02:02Z"},"road_event_id":"7zIlRZJbP4/cl6LK+ZNtxFVDYww=","beginning_cross_street":"West of I-287","ending_cross_street":"West of Mountain Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.558158,40.568019]]}},{"id":"+7y9+FFT7KrLiOtLuIMM05WG8i8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EZIFcAEVFkFDTmQVdbYH/l6hXA0="}],"description":"Construction on I-495 eastbound from 48th Street; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed upper level, Thursday June 4th, 2026 thru Saturday June 6th, 2026, Thursday/Friday, 11:59 PM thru 01:00 AM 1 Right lane of 3 lanes closed upper level, Friday June 5th, 2026 thru Saturday June 6th, 2026, Friday/Saturday, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed upper level","update_date":"2026-06-04T13:41:06Z"},"road_event_id":"+7y9+FFT7KrLiOtLuIMM05WG8i8=","beginning_cross_street":"48th Street; Ramp","ending_cross_street":"48th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T05:00:00Z","end_date":"2026-06-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918231,40.731631]]}},{"id":"EZIFcAEVFkFDTmQVdbYH/l6hXA0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+7y9+FFT7KrLiOtLuIMM05WG8i8="},{"type":"next-occurrence","id":"ztLDZ6bFdNVkzmfT6AXWaJVkNjw="}],"description":"Construction on I-495 eastbound from 48th Street; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed upper level, Thursday June 4th, 2026 thru Saturday June 6th, 2026, Thursday/Friday, 11:59 PM thru 01:00 AM 1 Right lane of 3 lanes closed upper level, Friday June 5th, 2026 thru Saturday June 6th, 2026, Friday/Saturday, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed upper level","update_date":"2026-06-04T13:41:06Z"},"road_event_id":"EZIFcAEVFkFDTmQVdbYH/l6hXA0=","beginning_cross_street":"48th Street; Ramp","ending_cross_street":"48th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918231,40.731631]]}},{"id":"ztLDZ6bFdNVkzmfT6AXWaJVkNjw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+7y9+FFT7KrLiOtLuIMM05WG8i8="},{"type":"next-occurrence","id":"jUhwKlqRzGWUOWb36nbiiGRIOZo="}],"description":"Construction on I-495 eastbound from 48th Street; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed upper level, Thursday June 4th, 2026 thru Saturday June 6th, 2026, Thursday/Friday, 11:59 PM thru 01:00 AM 1 Right lane of 3 lanes closed upper level, Friday June 5th, 2026 thru Saturday June 6th, 2026, Friday/Saturday, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed upper level","update_date":"2026-06-04T13:41:06Z"},"road_event_id":"ztLDZ6bFdNVkzmfT6AXWaJVkNjw=","beginning_cross_street":"48th Street; Ramp","ending_cross_street":"48th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:59:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918231,40.731631]]}},{"id":"jUhwKlqRzGWUOWb36nbiiGRIOZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+7y9+FFT7KrLiOtLuIMM05WG8i8="},{"type":"next-occurrence","id":"REND+lqYCEFXviFTcUJM8y9xJvs="}],"description":"Construction on I-495 eastbound from 48th Street; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed upper level, Thursday June 4th, 2026 thru Saturday June 6th, 2026, Thursday/Friday, 11:59 PM thru 01:00 AM 1 Right lane of 3 lanes closed upper level, Friday June 5th, 2026 thru Saturday June 6th, 2026, Friday/Saturday, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed upper level","update_date":"2026-06-04T13:41:06Z"},"road_event_id":"jUhwKlqRzGWUOWb36nbiiGRIOZo=","beginning_cross_street":"48th Street; Ramp","ending_cross_street":"48th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918231,40.731631]]}},{"id":"REND+lqYCEFXviFTcUJM8y9xJvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+7y9+FFT7KrLiOtLuIMM05WG8i8="},{"type":"next-occurrence","id":"gHrdgrmplKf143d2P4Sn1hnioDg="}],"description":"Construction on I-495 eastbound from 48th Street; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed upper level, Thursday June 4th, 2026 thru Saturday June 6th, 2026, Thursday/Friday, 11:59 PM thru 01:00 AM 1 Right lane of 3 lanes closed upper level, Friday June 5th, 2026 thru Saturday June 6th, 2026, Friday/Saturday, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed upper level","update_date":"2026-06-04T13:41:06Z"},"road_event_id":"REND+lqYCEFXviFTcUJM8y9xJvs=","beginning_cross_street":"48th Street; Ramp","ending_cross_street":"48th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918231,40.731631]]}},{"id":"gHrdgrmplKf143d2P4Sn1hnioDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+7y9+FFT7KrLiOtLuIMM05WG8i8="},{"type":"next-occurrence","id":"PwSnzTuAwAsdFPKYiA9csohIqmY="}],"description":"Construction on I-495 eastbound from 48th Street; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed upper level, Thursday June 4th, 2026 thru Saturday June 6th, 2026, Thursday/Friday, 11:59 PM thru 01:00 AM 1 Right lane of 3 lanes closed upper level, Friday June 5th, 2026 thru Saturday June 6th, 2026, Friday/Saturday, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed upper level","update_date":"2026-06-04T13:41:06Z"},"road_event_id":"gHrdgrmplKf143d2P4Sn1hnioDg=","beginning_cross_street":"48th Street; Ramp","ending_cross_street":"48th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918231,40.731631]]}},{"id":"PwSnzTuAwAsdFPKYiA9csohIqmY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+7y9+FFT7KrLiOtLuIMM05WG8i8="},{"type":"next-occurrence","id":"8gZI0p7OYPReJ3ix/ov9pykgboE="}],"description":"Construction on I-495 eastbound from 48th Street; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed upper level, Thursday June 4th, 2026 thru Saturday June 6th, 2026, Thursday/Friday, 11:59 PM thru 01:00 AM 1 Right lane of 3 lanes closed upper level, Friday June 5th, 2026 thru Saturday June 6th, 2026, Friday/Saturday, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed upper level","update_date":"2026-06-04T13:41:06Z"},"road_event_id":"PwSnzTuAwAsdFPKYiA9csohIqmY=","beginning_cross_street":"48th Street; Ramp","ending_cross_street":"48th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918231,40.731631]]}},{"id":"8gZI0p7OYPReJ3ix/ov9pykgboE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+7y9+FFT7KrLiOtLuIMM05WG8i8="}],"description":"Construction on I-495 eastbound from 48th Street; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed upper level, Thursday June 4th, 2026 thru Saturday June 6th, 2026, Thursday/Friday, 11:59 PM thru 01:00 AM 1 Right lane of 3 lanes closed upper level, Friday June 5th, 2026 thru Saturday June 6th, 2026, Friday/Saturday, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed upper level","update_date":"2026-06-04T13:41:06Z"},"road_event_id":"8gZI0p7OYPReJ3ix/ov9pykgboE=","beginning_cross_street":"48th Street; Ramp","ending_cross_street":"48th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918231,40.731631]]}},{"id":"UOqcIDIwOGIZk8yrvOLijOjN2Do=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"r09YeydM1jNoT1ZuIdi7lySYjLc="}],"description":"Construction on I-495 westbound from Exit 20 - Junction Boulevard / Queens Boulevard (New York) to NY 25 (New York) Subject to change without notice., Thursday June 4th, 2026 thru Saturday June 6th, 2026, Thursday/Friday, 11:59 PM thru 01:00 AM 1 Left lane of 3 lanes closed, Friday June 5th, 2026 thru Saturday June 6th, 2026, Friday/Saturday, 01:00 AM thru 06:00 AM 2 Left lanes of 3 lanes closed","update_date":"2026-05-27T18:23:05Z"},"road_event_id":"UOqcIDIwOGIZk8yrvOLijOjN2Do=","beginning_cross_street":"Exit 20 - Junction Boulevard / Queens Boulevard","ending_cross_street":"NY 25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T05:00:00Z","end_date":"2026-06-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.864621,40.734013]]}},{"id":"r09YeydM1jNoT1ZuIdi7lySYjLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UOqcIDIwOGIZk8yrvOLijOjN2Do="}],"description":"Construction on I-495 westbound from Exit 20 - Junction Boulevard / Queens Boulevard (New York) to NY 25 (New York) Subject to change without notice., Thursday June 4th, 2026 thru Saturday June 6th, 2026, Thursday/Friday, 11:59 PM thru 01:00 AM 1 Left lane of 3 lanes closed, Friday June 5th, 2026 thru Saturday June 6th, 2026, Friday/Saturday, 01:00 AM thru 06:00 AM 2 Left lanes of 3 lanes closed","update_date":"2026-05-27T18:23:05Z"},"road_event_id":"r09YeydM1jNoT1ZuIdi7lySYjLc=","beginning_cross_street":"Exit 20 - Junction Boulevard / Queens Boulevard","ending_cross_street":"NY 25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:59:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.864621,40.734013]]}},{"id":"ThRm9QGP2tgaiRAUjsZ8iTuIrNI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"W0mmiHlcxGlDQZNrK2FCX8PPYig="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 8:38am train from Grand Central to Poughkeepsie will now leave Grand Central at 8:48am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 08:38 AM thru 10:00 AM","update_date":"2026-06-03T16:47:07Z"},"road_event_id":"ThRm9QGP2tgaiRAUjsZ8iTuIrNI=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T12:38:00Z","end_date":"2026-06-05T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"W0mmiHlcxGlDQZNrK2FCX8PPYig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ThRm9QGP2tgaiRAUjsZ8iTuIrNI="},{"type":"next-occurrence","id":"xHvJIrUNvQn+vf9Ltf8ZUFM15Jo="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 8:38am train from Grand Central to Poughkeepsie will now leave Grand Central at 8:48am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 08:38 AM thru 10:00 AM","update_date":"2026-06-03T16:47:07Z"},"road_event_id":"W0mmiHlcxGlDQZNrK2FCX8PPYig=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:38:00Z","end_date":"2026-06-08T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"xHvJIrUNvQn+vf9Ltf8ZUFM15Jo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ThRm9QGP2tgaiRAUjsZ8iTuIrNI="},{"type":"next-occurrence","id":"41DuQ9iZ+xqilv6ehOnDAY1828Y="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 8:38am train from Grand Central to Poughkeepsie will now leave Grand Central at 8:48am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 08:38 AM thru 10:00 AM","update_date":"2026-06-03T16:47:07Z"},"road_event_id":"xHvJIrUNvQn+vf9Ltf8ZUFM15Jo=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:38:00Z","end_date":"2026-06-09T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"41DuQ9iZ+xqilv6ehOnDAY1828Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ThRm9QGP2tgaiRAUjsZ8iTuIrNI="},{"type":"next-occurrence","id":"oASXa2V50QiIwSupmysW5tEQUOI="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 8:38am train from Grand Central to Poughkeepsie will now leave Grand Central at 8:48am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 08:38 AM thru 10:00 AM","update_date":"2026-06-03T16:47:07Z"},"road_event_id":"41DuQ9iZ+xqilv6ehOnDAY1828Y=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:38:00Z","end_date":"2026-06-10T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"oASXa2V50QiIwSupmysW5tEQUOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ThRm9QGP2tgaiRAUjsZ8iTuIrNI="},{"type":"next-occurrence","id":"WKRxyGo0b37JNN25CyeCWWVOZEI="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 8:38am train from Grand Central to Poughkeepsie will now leave Grand Central at 8:48am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 08:38 AM thru 10:00 AM","update_date":"2026-06-03T16:47:07Z"},"road_event_id":"oASXa2V50QiIwSupmysW5tEQUOI=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:38:00Z","end_date":"2026-06-11T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"WKRxyGo0b37JNN25CyeCWWVOZEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ThRm9QGP2tgaiRAUjsZ8iTuIrNI="},{"type":"next-occurrence","id":"MjANcifkySD0/hFHFCnR3EP8k1Y="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 8:38am train from Grand Central to Poughkeepsie will now leave Grand Central at 8:48am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 08:38 AM thru 10:00 AM","update_date":"2026-06-03T16:47:07Z"},"road_event_id":"WKRxyGo0b37JNN25CyeCWWVOZEI=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:38:00Z","end_date":"2026-06-12T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"MjANcifkySD0/hFHFCnR3EP8k1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ThRm9QGP2tgaiRAUjsZ8iTuIrNI="},{"type":"next-occurrence","id":"t6IIU0XiAkXe3v2+dvEy9WMXZwo="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 8:38am train from Grand Central to Poughkeepsie will now leave Grand Central at 8:48am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 08:38 AM thru 10:00 AM","update_date":"2026-06-03T16:47:07Z"},"road_event_id":"MjANcifkySD0/hFHFCnR3EP8k1Y=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T12:38:00Z","end_date":"2026-06-15T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"t6IIU0XiAkXe3v2+dvEy9WMXZwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ThRm9QGP2tgaiRAUjsZ8iTuIrNI="},{"type":"next-occurrence","id":"AUpAhLJMf3QTrD3kE7Wo+o6zuJg="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 8:38am train from Grand Central to Poughkeepsie will now leave Grand Central at 8:48am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 08:38 AM thru 10:00 AM","update_date":"2026-06-03T16:47:07Z"},"road_event_id":"t6IIU0XiAkXe3v2+dvEy9WMXZwo=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T12:38:00Z","end_date":"2026-06-16T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"AUpAhLJMf3QTrD3kE7Wo+o6zuJg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ThRm9QGP2tgaiRAUjsZ8iTuIrNI="},{"type":"next-occurrence","id":"Hr0QzLRf4KMs9nSAYvNG+F/x4LE="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 8:38am train from Grand Central to Poughkeepsie will now leave Grand Central at 8:48am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 08:38 AM thru 10:00 AM","update_date":"2026-06-03T16:47:07Z"},"road_event_id":"AUpAhLJMf3QTrD3kE7Wo+o6zuJg=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T12:38:00Z","end_date":"2026-06-17T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"Hr0QzLRf4KMs9nSAYvNG+F/x4LE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ThRm9QGP2tgaiRAUjsZ8iTuIrNI="},{"type":"next-occurrence","id":"QcmQS+lyV8zyV3DgdPAyTTiHJ/Q="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 8:38am train from Grand Central to Poughkeepsie will now leave Grand Central at 8:48am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 08:38 AM thru 10:00 AM","update_date":"2026-06-03T16:47:07Z"},"road_event_id":"Hr0QzLRf4KMs9nSAYvNG+F/x4LE=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T12:38:00Z","end_date":"2026-06-18T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"QcmQS+lyV8zyV3DgdPAyTTiHJ/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ThRm9QGP2tgaiRAUjsZ8iTuIrNI="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 8:38am train from Grand Central to Poughkeepsie will now leave Grand Central at 8:48am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 08:38 AM thru 10:00 AM","update_date":"2026-06-03T16:47:07Z"},"road_event_id":"QcmQS+lyV8zyV3DgdPAyTTiHJ/Q=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T12:38:00Z","end_date":"2026-06-19T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"hmghuZkSnG9zp4oWrMp1nv1tk/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"02XcSGJqm3nFcQmhGA93HIgIjmU="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 10:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 10:42am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 10:35 AM thru 12:00 PM","update_date":"2026-06-03T16:45:42Z"},"road_event_id":"hmghuZkSnG9zp4oWrMp1nv1tk/A=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:35:00Z","end_date":"2026-06-05T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"02XcSGJqm3nFcQmhGA93HIgIjmU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hmghuZkSnG9zp4oWrMp1nv1tk/A="},{"type":"next-occurrence","id":"QDNTTc1tU3EU1LHsymEkB9XaIQQ="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 10:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 10:42am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 10:35 AM thru 12:00 PM","update_date":"2026-06-03T16:45:42Z"},"road_event_id":"02XcSGJqm3nFcQmhGA93HIgIjmU=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:35:00Z","end_date":"2026-06-08T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"QDNTTc1tU3EU1LHsymEkB9XaIQQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hmghuZkSnG9zp4oWrMp1nv1tk/A="},{"type":"next-occurrence","id":"Z3wsE7wL+W0UQ26OXMz3HoHYOYI="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 10:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 10:42am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 10:35 AM thru 12:00 PM","update_date":"2026-06-03T16:45:42Z"},"road_event_id":"QDNTTc1tU3EU1LHsymEkB9XaIQQ=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:35:00Z","end_date":"2026-06-09T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"Z3wsE7wL+W0UQ26OXMz3HoHYOYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hmghuZkSnG9zp4oWrMp1nv1tk/A="},{"type":"next-occurrence","id":"8y6kTVGRd+BjbqPoQ2+Tuncd2K4="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 10:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 10:42am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 10:35 AM thru 12:00 PM","update_date":"2026-06-03T16:45:42Z"},"road_event_id":"Z3wsE7wL+W0UQ26OXMz3HoHYOYI=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:35:00Z","end_date":"2026-06-10T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"8y6kTVGRd+BjbqPoQ2+Tuncd2K4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hmghuZkSnG9zp4oWrMp1nv1tk/A="},{"type":"next-occurrence","id":"Mhv+k3sQIaRAKOnqMOXEKELQwQo="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 10:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 10:42am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 10:35 AM thru 12:00 PM","update_date":"2026-06-03T16:45:42Z"},"road_event_id":"8y6kTVGRd+BjbqPoQ2+Tuncd2K4=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:35:00Z","end_date":"2026-06-11T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"Mhv+k3sQIaRAKOnqMOXEKELQwQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hmghuZkSnG9zp4oWrMp1nv1tk/A="},{"type":"next-occurrence","id":"jecfaCm4L9E4OmrsIG/g2Kh11+c="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 10:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 10:42am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 10:35 AM thru 12:00 PM","update_date":"2026-06-03T16:45:42Z"},"road_event_id":"Mhv+k3sQIaRAKOnqMOXEKELQwQo=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:35:00Z","end_date":"2026-06-12T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"jecfaCm4L9E4OmrsIG/g2Kh11+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hmghuZkSnG9zp4oWrMp1nv1tk/A="},{"type":"next-occurrence","id":"r3G0dzyVcoM5zl9R5U+U7tleuNw="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 10:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 10:42am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 10:35 AM thru 12:00 PM","update_date":"2026-06-03T16:45:42Z"},"road_event_id":"jecfaCm4L9E4OmrsIG/g2Kh11+c=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T14:35:00Z","end_date":"2026-06-15T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"r3G0dzyVcoM5zl9R5U+U7tleuNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hmghuZkSnG9zp4oWrMp1nv1tk/A="},{"type":"next-occurrence","id":"TZ4RA7ir5qnxKtv4gglXOUJP52U="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 10:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 10:42am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 10:35 AM thru 12:00 PM","update_date":"2026-06-03T16:45:42Z"},"road_event_id":"r3G0dzyVcoM5zl9R5U+U7tleuNw=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T14:35:00Z","end_date":"2026-06-16T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"TZ4RA7ir5qnxKtv4gglXOUJP52U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hmghuZkSnG9zp4oWrMp1nv1tk/A="},{"type":"next-occurrence","id":"JRTM8naid2u9WctQNXJJZSQTw8o="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 10:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 10:42am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 10:35 AM thru 12:00 PM","update_date":"2026-06-03T16:45:42Z"},"road_event_id":"TZ4RA7ir5qnxKtv4gglXOUJP52U=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T14:35:00Z","end_date":"2026-06-17T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"JRTM8naid2u9WctQNXJJZSQTw8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hmghuZkSnG9zp4oWrMp1nv1tk/A="},{"type":"next-occurrence","id":"oIozeNkw9b7/mPn4CXKBPyiGs7g="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 10:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 10:42am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 10:35 AM thru 12:00 PM","update_date":"2026-06-03T16:45:42Z"},"road_event_id":"JRTM8naid2u9WctQNXJJZSQTw8o=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T14:35:00Z","end_date":"2026-06-18T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"oIozeNkw9b7/mPn4CXKBPyiGs7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hmghuZkSnG9zp4oWrMp1nv1tk/A="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 10:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 10:42am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 10:35 AM thru 12:00 PM","update_date":"2026-06-03T16:45:42Z"},"road_event_id":"oIozeNkw9b7/mPn4CXKBPyiGs7g=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T14:35:00Z","end_date":"2026-06-19T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"VU9Q7KnJsKUOvmZ6TStL1918f5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4/mskZrWoiPiNqdtIe5AezbOq5w="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 11:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 11:47am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 11:35 AM thru 01:00 PM","update_date":"2026-06-03T16:46:10Z"},"road_event_id":"VU9Q7KnJsKUOvmZ6TStL1918f5M=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T15:35:00Z","end_date":"2026-06-05T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"4/mskZrWoiPiNqdtIe5AezbOq5w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VU9Q7KnJsKUOvmZ6TStL1918f5M="},{"type":"next-occurrence","id":"NvfVCBJVmQ3pqxPU5naGRlfRAQo="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 11:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 11:47am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 11:35 AM thru 01:00 PM","update_date":"2026-06-03T16:46:10Z"},"road_event_id":"4/mskZrWoiPiNqdtIe5AezbOq5w=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T15:35:00Z","end_date":"2026-06-08T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"NvfVCBJVmQ3pqxPU5naGRlfRAQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VU9Q7KnJsKUOvmZ6TStL1918f5M="},{"type":"next-occurrence","id":"TGfaZ7S87RQkvQOwsYp+wKVInQM="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 11:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 11:47am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 11:35 AM thru 01:00 PM","update_date":"2026-06-03T16:46:10Z"},"road_event_id":"NvfVCBJVmQ3pqxPU5naGRlfRAQo=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T15:35:00Z","end_date":"2026-06-09T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"TGfaZ7S87RQkvQOwsYp+wKVInQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VU9Q7KnJsKUOvmZ6TStL1918f5M="},{"type":"next-occurrence","id":"XFT2PP6GZorBfcKrImlIPzGV0Gs="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 11:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 11:47am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 11:35 AM thru 01:00 PM","update_date":"2026-06-03T16:46:10Z"},"road_event_id":"TGfaZ7S87RQkvQOwsYp+wKVInQM=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T15:35:00Z","end_date":"2026-06-10T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"XFT2PP6GZorBfcKrImlIPzGV0Gs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VU9Q7KnJsKUOvmZ6TStL1918f5M="},{"type":"next-occurrence","id":"hdwOp/Sp3VzJaRYqbYFK0ZtFQ1U="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 11:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 11:47am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 11:35 AM thru 01:00 PM","update_date":"2026-06-03T16:46:10Z"},"road_event_id":"XFT2PP6GZorBfcKrImlIPzGV0Gs=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T15:35:00Z","end_date":"2026-06-11T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"hdwOp/Sp3VzJaRYqbYFK0ZtFQ1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VU9Q7KnJsKUOvmZ6TStL1918f5M="},{"type":"next-occurrence","id":"LetNTiZGKwsKe7ym4tuM53HXeCc="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 11:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 11:47am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 11:35 AM thru 01:00 PM","update_date":"2026-06-03T16:46:10Z"},"road_event_id":"hdwOp/Sp3VzJaRYqbYFK0ZtFQ1U=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T15:35:00Z","end_date":"2026-06-12T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"LetNTiZGKwsKe7ym4tuM53HXeCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VU9Q7KnJsKUOvmZ6TStL1918f5M="},{"type":"next-occurrence","id":"gwB0/AKb1m2EVejrLI/uo1Bu4hw="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 11:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 11:47am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 11:35 AM thru 01:00 PM","update_date":"2026-06-03T16:46:10Z"},"road_event_id":"LetNTiZGKwsKe7ym4tuM53HXeCc=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T15:35:00Z","end_date":"2026-06-15T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"gwB0/AKb1m2EVejrLI/uo1Bu4hw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VU9Q7KnJsKUOvmZ6TStL1918f5M="},{"type":"next-occurrence","id":"ET5XELRB135FrJvJabGkHW+TT0E="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 11:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 11:47am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 11:35 AM thru 01:00 PM","update_date":"2026-06-03T16:46:10Z"},"road_event_id":"gwB0/AKb1m2EVejrLI/uo1Bu4hw=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T15:35:00Z","end_date":"2026-06-16T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"ET5XELRB135FrJvJabGkHW+TT0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VU9Q7KnJsKUOvmZ6TStL1918f5M="},{"type":"next-occurrence","id":"egP/vfAG3QPwbpM3RzY9wrQOl2Q="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 11:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 11:47am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 11:35 AM thru 01:00 PM","update_date":"2026-06-03T16:46:10Z"},"road_event_id":"ET5XELRB135FrJvJabGkHW+TT0E=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T15:35:00Z","end_date":"2026-06-17T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"egP/vfAG3QPwbpM3RzY9wrQOl2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VU9Q7KnJsKUOvmZ6TStL1918f5M="},{"type":"next-occurrence","id":"SCBAZuictYsP0NCgmswtjKwHgz8="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 11:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 11:47am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 11:35 AM thru 01:00 PM","update_date":"2026-06-03T16:46:10Z"},"road_event_id":"egP/vfAG3QPwbpM3RzY9wrQOl2Q=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T15:35:00Z","end_date":"2026-06-18T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"SCBAZuictYsP0NCgmswtjKwHgz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VU9Q7KnJsKUOvmZ6TStL1918f5M="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 11:35am train from Grand Central to Poughkeepsie will now leave Grand Central at 11:47am., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 11:35 AM thru 01:00 PM","update_date":"2026-06-03T16:46:10Z"},"road_event_id":"SCBAZuictYsP0NCgmswtjKwHgz8=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T15:35:00Z","end_date":"2026-06-19T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"Vjklpff0ej+kXS/N0zDshDZVbSM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1Hdg4sakw7djboAjHYc7Y/HGO3g="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 12:35pm train from Grand Central to Poughkeepsie will now leave Grand Central at 12:47pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 12:35 PM thru 03:00 PM","update_date":"2026-06-03T16:46:36Z"},"road_event_id":"Vjklpff0ej+kXS/N0zDshDZVbSM=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T16:35:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"1Hdg4sakw7djboAjHYc7Y/HGO3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vjklpff0ej+kXS/N0zDshDZVbSM="},{"type":"next-occurrence","id":"4hV4enKof6NcBo1abSVeNqgdsK4="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 12:35pm train from Grand Central to Poughkeepsie will now leave Grand Central at 12:47pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 12:35 PM thru 03:00 PM","update_date":"2026-06-03T16:46:36Z"},"road_event_id":"1Hdg4sakw7djboAjHYc7Y/HGO3g=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T16:35:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"4hV4enKof6NcBo1abSVeNqgdsK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vjklpff0ej+kXS/N0zDshDZVbSM="},{"type":"next-occurrence","id":"l86F2SxUf4n9KYTT+x7iyVVTV7w="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 12:35pm train from Grand Central to Poughkeepsie will now leave Grand Central at 12:47pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 12:35 PM thru 03:00 PM","update_date":"2026-06-03T16:46:36Z"},"road_event_id":"4hV4enKof6NcBo1abSVeNqgdsK4=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T16:35:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"l86F2SxUf4n9KYTT+x7iyVVTV7w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vjklpff0ej+kXS/N0zDshDZVbSM="},{"type":"next-occurrence","id":"AdeZkr+DkdlZRdrw4B/YrfqLx5g="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 12:35pm train from Grand Central to Poughkeepsie will now leave Grand Central at 12:47pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 12:35 PM thru 03:00 PM","update_date":"2026-06-03T16:46:36Z"},"road_event_id":"l86F2SxUf4n9KYTT+x7iyVVTV7w=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T16:35:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"AdeZkr+DkdlZRdrw4B/YrfqLx5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vjklpff0ej+kXS/N0zDshDZVbSM="},{"type":"next-occurrence","id":"Mm/GbpdmlmshpHs0BnZG1u6opm0="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 12:35pm train from Grand Central to Poughkeepsie will now leave Grand Central at 12:47pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 12:35 PM thru 03:00 PM","update_date":"2026-06-03T16:46:36Z"},"road_event_id":"AdeZkr+DkdlZRdrw4B/YrfqLx5g=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T16:35:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"Mm/GbpdmlmshpHs0BnZG1u6opm0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vjklpff0ej+kXS/N0zDshDZVbSM="},{"type":"next-occurrence","id":"dtu1NCxvPYo85dlr/h3lWS1gxUM="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 12:35pm train from Grand Central to Poughkeepsie will now leave Grand Central at 12:47pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 12:35 PM thru 03:00 PM","update_date":"2026-06-03T16:46:36Z"},"road_event_id":"Mm/GbpdmlmshpHs0BnZG1u6opm0=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T16:35:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"dtu1NCxvPYo85dlr/h3lWS1gxUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vjklpff0ej+kXS/N0zDshDZVbSM="},{"type":"next-occurrence","id":"wMiQCAP9QG7ws2x8lG+i/opoyqY="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 12:35pm train from Grand Central to Poughkeepsie will now leave Grand Central at 12:47pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 12:35 PM thru 03:00 PM","update_date":"2026-06-03T16:46:36Z"},"road_event_id":"dtu1NCxvPYo85dlr/h3lWS1gxUM=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T16:35:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"wMiQCAP9QG7ws2x8lG+i/opoyqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vjklpff0ej+kXS/N0zDshDZVbSM="},{"type":"next-occurrence","id":"e/MTzi8CyBdgv0HbvdwtpXSwgak="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 12:35pm train from Grand Central to Poughkeepsie will now leave Grand Central at 12:47pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 12:35 PM thru 03:00 PM","update_date":"2026-06-03T16:46:36Z"},"road_event_id":"wMiQCAP9QG7ws2x8lG+i/opoyqY=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T16:35:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"e/MTzi8CyBdgv0HbvdwtpXSwgak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vjklpff0ej+kXS/N0zDshDZVbSM="},{"type":"next-occurrence","id":"BWH6e68PKwzCIHdw8RzAH1E+xjM="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 12:35pm train from Grand Central to Poughkeepsie will now leave Grand Central at 12:47pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 12:35 PM thru 03:00 PM","update_date":"2026-06-03T16:46:36Z"},"road_event_id":"e/MTzi8CyBdgv0HbvdwtpXSwgak=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T16:35:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"BWH6e68PKwzCIHdw8RzAH1E+xjM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vjklpff0ej+kXS/N0zDshDZVbSM="},{"type":"next-occurrence","id":"/yP1qzQlWv6RCc7khT23BoMRBs4="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 12:35pm train from Grand Central to Poughkeepsie will now leave Grand Central at 12:47pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 12:35 PM thru 03:00 PM","update_date":"2026-06-03T16:46:36Z"},"road_event_id":"BWH6e68PKwzCIHdw8RzAH1E+xjM=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T16:35:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"/yP1qzQlWv6RCc7khT23BoMRBs4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vjklpff0ej+kXS/N0zDshDZVbSM="}],"description":"Due to Track repairs northbound, Hudson between Grand Central (New York) and Poughkeepsie (Poughkeepsie) The 12:35pm train from Grand Central to Poughkeepsie will now leave Grand Central at 12:47pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 12:35 PM thru 03:00 PM","update_date":"2026-06-03T16:46:36Z"},"road_event_id":"/yP1qzQlWv6RCc7khT23BoMRBs4=","beginning_cross_street":"Grand Central","ending_cross_street":"Poughkeepsie","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T16:35:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977056,40.752998]]}},{"id":"ggvxFJVuiHd98xxPJbeUFedk/dI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6Z5WQnHsRJ4vR8xZY9nRQhus2zA="}],"description":"Due to Track repairs southbound, Hudson between Poughkeepsie (Poughkeepsie) and Grand Central (New York) The 2:52pm train from Poughkeepsie to Grand Central will now leave Poughkeepsie at 2:56pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 02:52 PM thru 05:00 PM","update_date":"2026-06-03T16:45:06Z"},"road_event_id":"ggvxFJVuiHd98xxPJbeUFedk/dI=","beginning_cross_street":"Poughkeepsie","ending_cross_street":"Grand Central","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T18:52:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937946,41.705839]]}},{"id":"6Z5WQnHsRJ4vR8xZY9nRQhus2zA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ggvxFJVuiHd98xxPJbeUFedk/dI="},{"type":"next-occurrence","id":"5HLouwhV/07O++8AqyDQL3P1KoY="}],"description":"Due to Track repairs southbound, Hudson between Poughkeepsie (Poughkeepsie) and Grand Central (New York) The 2:52pm train from Poughkeepsie to Grand Central will now leave Poughkeepsie at 2:56pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 02:52 PM thru 05:00 PM","update_date":"2026-06-03T16:45:06Z"},"road_event_id":"6Z5WQnHsRJ4vR8xZY9nRQhus2zA=","beginning_cross_street":"Poughkeepsie","ending_cross_street":"Grand Central","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T18:52:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937946,41.705839]]}},{"id":"5HLouwhV/07O++8AqyDQL3P1KoY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ggvxFJVuiHd98xxPJbeUFedk/dI="},{"type":"next-occurrence","id":"U9zCpIFxqPQ9QwvGhzXi0Lqe8ew="}],"description":"Due to Track repairs southbound, Hudson between Poughkeepsie (Poughkeepsie) and Grand Central (New York) The 2:52pm train from Poughkeepsie to Grand Central will now leave Poughkeepsie at 2:56pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 02:52 PM thru 05:00 PM","update_date":"2026-06-03T16:45:06Z"},"road_event_id":"5HLouwhV/07O++8AqyDQL3P1KoY=","beginning_cross_street":"Poughkeepsie","ending_cross_street":"Grand Central","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T18:52:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937946,41.705839]]}},{"id":"U9zCpIFxqPQ9QwvGhzXi0Lqe8ew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ggvxFJVuiHd98xxPJbeUFedk/dI="},{"type":"next-occurrence","id":"kzsoo/RsskJE/XcuM3HK5ITYhdY="}],"description":"Due to Track repairs southbound, Hudson between Poughkeepsie (Poughkeepsie) and Grand Central (New York) The 2:52pm train from Poughkeepsie to Grand Central will now leave Poughkeepsie at 2:56pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 02:52 PM thru 05:00 PM","update_date":"2026-06-03T16:45:06Z"},"road_event_id":"U9zCpIFxqPQ9QwvGhzXi0Lqe8ew=","beginning_cross_street":"Poughkeepsie","ending_cross_street":"Grand Central","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T18:52:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937946,41.705839]]}},{"id":"kzsoo/RsskJE/XcuM3HK5ITYhdY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ggvxFJVuiHd98xxPJbeUFedk/dI="},{"type":"next-occurrence","id":"R3OgKXxTdkf4tqumySgA9JjPNQM="}],"description":"Due to Track repairs southbound, Hudson between Poughkeepsie (Poughkeepsie) and Grand Central (New York) The 2:52pm train from Poughkeepsie to Grand Central will now leave Poughkeepsie at 2:56pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 02:52 PM thru 05:00 PM","update_date":"2026-06-03T16:45:06Z"},"road_event_id":"kzsoo/RsskJE/XcuM3HK5ITYhdY=","beginning_cross_street":"Poughkeepsie","ending_cross_street":"Grand Central","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T18:52:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937946,41.705839]]}},{"id":"R3OgKXxTdkf4tqumySgA9JjPNQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ggvxFJVuiHd98xxPJbeUFedk/dI="},{"type":"next-occurrence","id":"yESdEajb/C6Qf3bNter9X+y7rVU="}],"description":"Due to Track repairs southbound, Hudson between Poughkeepsie (Poughkeepsie) and Grand Central (New York) The 2:52pm train from Poughkeepsie to Grand Central will now leave Poughkeepsie at 2:56pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 02:52 PM thru 05:00 PM","update_date":"2026-06-03T16:45:06Z"},"road_event_id":"R3OgKXxTdkf4tqumySgA9JjPNQM=","beginning_cross_street":"Poughkeepsie","ending_cross_street":"Grand Central","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T18:52:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937946,41.705839]]}},{"id":"yESdEajb/C6Qf3bNter9X+y7rVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ggvxFJVuiHd98xxPJbeUFedk/dI="},{"type":"next-occurrence","id":"IbuHnWz+0biiA8WuwNdyZKWgoE8="}],"description":"Due to Track repairs southbound, Hudson between Poughkeepsie (Poughkeepsie) and Grand Central (New York) The 2:52pm train from Poughkeepsie to Grand Central will now leave Poughkeepsie at 2:56pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 02:52 PM thru 05:00 PM","update_date":"2026-06-03T16:45:06Z"},"road_event_id":"yESdEajb/C6Qf3bNter9X+y7rVU=","beginning_cross_street":"Poughkeepsie","ending_cross_street":"Grand Central","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T18:52:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937946,41.705839]]}},{"id":"IbuHnWz+0biiA8WuwNdyZKWgoE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ggvxFJVuiHd98xxPJbeUFedk/dI="},{"type":"next-occurrence","id":"h0/IbDnDqeSd+dH1UbhyuWdDNeo="}],"description":"Due to Track repairs southbound, Hudson between Poughkeepsie (Poughkeepsie) and Grand Central (New York) The 2:52pm train from Poughkeepsie to Grand Central will now leave Poughkeepsie at 2:56pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 02:52 PM thru 05:00 PM","update_date":"2026-06-03T16:45:06Z"},"road_event_id":"IbuHnWz+0biiA8WuwNdyZKWgoE8=","beginning_cross_street":"Poughkeepsie","ending_cross_street":"Grand Central","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T18:52:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937946,41.705839]]}},{"id":"h0/IbDnDqeSd+dH1UbhyuWdDNeo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ggvxFJVuiHd98xxPJbeUFedk/dI="},{"type":"next-occurrence","id":"xFABa+70p5VPMAqnJmTU+cgUjSI="}],"description":"Due to Track repairs southbound, Hudson between Poughkeepsie (Poughkeepsie) and Grand Central (New York) The 2:52pm train from Poughkeepsie to Grand Central will now leave Poughkeepsie at 2:56pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 02:52 PM thru 05:00 PM","update_date":"2026-06-03T16:45:06Z"},"road_event_id":"h0/IbDnDqeSd+dH1UbhyuWdDNeo=","beginning_cross_street":"Poughkeepsie","ending_cross_street":"Grand Central","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T18:52:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937946,41.705839]]}},{"id":"xFABa+70p5VPMAqnJmTU+cgUjSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ggvxFJVuiHd98xxPJbeUFedk/dI="},{"type":"next-occurrence","id":"zZv3LUEd3F6qL+GT3Wr31DuC+nY="}],"description":"Due to Track repairs southbound, Hudson between Poughkeepsie (Poughkeepsie) and Grand Central (New York) The 2:52pm train from Poughkeepsie to Grand Central will now leave Poughkeepsie at 2:56pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 02:52 PM thru 05:00 PM","update_date":"2026-06-03T16:45:06Z"},"road_event_id":"xFABa+70p5VPMAqnJmTU+cgUjSI=","beginning_cross_street":"Poughkeepsie","ending_cross_street":"Grand Central","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T18:52:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937946,41.705839]]}},{"id":"zZv3LUEd3F6qL+GT3Wr31DuC+nY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ggvxFJVuiHd98xxPJbeUFedk/dI="}],"description":"Due to Track repairs southbound, Hudson between Poughkeepsie (Poughkeepsie) and Grand Central (New York) The 2:52pm train from Poughkeepsie to Grand Central will now leave Poughkeepsie at 2:56pm., Tuesday June 2nd, 2026 thru Wednesday August 5th, 2026, Monday thru Friday, 02:52 PM thru 05:00 PM","update_date":"2026-06-03T16:45:06Z"},"road_event_id":"zZv3LUEd3F6qL+GT3Wr31DuC+nY=","beginning_cross_street":"Poughkeepsie","ending_cross_street":"Grand Central","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T18:52:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937946,41.705839]]}},{"id":"dYtteyUn74y/QNng2ZrUSFWT158=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"W0ttZD+XKgFzWn9Iq7Bt6ft89Oo="}],"description":"Construction on NY 27 eastbound from 6th Avenue (New York) to 7th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:16:27Z"},"road_event_id":"dYtteyUn74y/QNng2ZrUSFWT158=","beginning_cross_street":"6th Avenue","ending_cross_street":"7th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988701,40.662265]]}},{"id":"W0ttZD+XKgFzWn9Iq7Bt6ft89Oo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dYtteyUn74y/QNng2ZrUSFWT158="},{"type":"next-occurrence","id":"M9VvPcR6tYj+0TUfbCKp2f/dmdA="}],"description":"Construction on NY 27 eastbound from 6th Avenue (New York) to 7th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:16:27Z"},"road_event_id":"W0ttZD+XKgFzWn9Iq7Bt6ft89Oo=","beginning_cross_street":"6th Avenue","ending_cross_street":"7th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988701,40.662265]]}},{"id":"M9VvPcR6tYj+0TUfbCKp2f/dmdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dYtteyUn74y/QNng2ZrUSFWT158="},{"type":"next-occurrence","id":"RMrFs3/kBqdIpn3bcGqnLt+BPVI="}],"description":"Construction on NY 27 eastbound from 6th Avenue (New York) to 7th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:16:27Z"},"road_event_id":"M9VvPcR6tYj+0TUfbCKp2f/dmdA=","beginning_cross_street":"6th Avenue","ending_cross_street":"7th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988701,40.662265]]}},{"id":"RMrFs3/kBqdIpn3bcGqnLt+BPVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dYtteyUn74y/QNng2ZrUSFWT158="},{"type":"next-occurrence","id":"aD2TgLt//E0ZXS/LPBt2qUHxaVU="}],"description":"Construction on NY 27 eastbound from 6th Avenue (New York) to 7th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:16:27Z"},"road_event_id":"RMrFs3/kBqdIpn3bcGqnLt+BPVI=","beginning_cross_street":"6th Avenue","ending_cross_street":"7th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988701,40.662265]]}},{"id":"aD2TgLt//E0ZXS/LPBt2qUHxaVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dYtteyUn74y/QNng2ZrUSFWT158="},{"type":"next-occurrence","id":"Hv2FAIxavkuIDOVjRg1ygQ73MsE="}],"description":"Construction on NY 27 eastbound from 6th Avenue (New York) to 7th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:16:27Z"},"road_event_id":"aD2TgLt//E0ZXS/LPBt2qUHxaVU=","beginning_cross_street":"6th Avenue","ending_cross_street":"7th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988701,40.662265]]}},{"id":"Hv2FAIxavkuIDOVjRg1ygQ73MsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dYtteyUn74y/QNng2ZrUSFWT158="}],"description":"Construction on NY 27 eastbound from 6th Avenue (New York) to 7th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:16:27Z"},"road_event_id":"Hv2FAIxavkuIDOVjRg1ygQ73MsE=","beginning_cross_street":"6th Avenue","ending_cross_street":"7th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988701,40.662265]]}},{"id":"oJTyl3oYLw/8hvcnw6mfdxhv/dk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Hvx2ZePCPgm9I/hjzO9fenkOuvs="}],"description":"Construction on NY 27 eastbound from Caton Avenue (New York) to East 7th Street (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:25:05Z"},"road_event_id":"oJTyl3oYLw/8hvcnw6mfdxhv/dk=","beginning_cross_street":"Caton Avenue","ending_cross_street":"East 7th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975018,40.647735]]}},{"id":"Hvx2ZePCPgm9I/hjzO9fenkOuvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oJTyl3oYLw/8hvcnw6mfdxhv/dk="},{"type":"next-occurrence","id":"pcxXM+Ibuv2jYF3wPvlvtQL368s="}],"description":"Construction on NY 27 eastbound from Caton Avenue (New York) to East 7th Street (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:25:05Z"},"road_event_id":"Hvx2ZePCPgm9I/hjzO9fenkOuvs=","beginning_cross_street":"Caton Avenue","ending_cross_street":"East 7th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T14:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975018,40.647735]]}},{"id":"pcxXM+Ibuv2jYF3wPvlvtQL368s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oJTyl3oYLw/8hvcnw6mfdxhv/dk="},{"type":"next-occurrence","id":"lXk4fsfFNkBnGQi87bNj3S14iuU="}],"description":"Construction on NY 27 eastbound from Caton Avenue (New York) to East 7th Street (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:25:05Z"},"road_event_id":"pcxXM+Ibuv2jYF3wPvlvtQL368s=","beginning_cross_street":"Caton Avenue","ending_cross_street":"East 7th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975018,40.647735]]}},{"id":"lXk4fsfFNkBnGQi87bNj3S14iuU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oJTyl3oYLw/8hvcnw6mfdxhv/dk="},{"type":"next-occurrence","id":"8neHjgNJsMmGXgyyMcmx1m210S4="}],"description":"Construction on NY 27 eastbound from Caton Avenue (New York) to East 7th Street (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:25:05Z"},"road_event_id":"lXk4fsfFNkBnGQi87bNj3S14iuU=","beginning_cross_street":"Caton Avenue","ending_cross_street":"East 7th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975018,40.647735]]}},{"id":"8neHjgNJsMmGXgyyMcmx1m210S4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oJTyl3oYLw/8hvcnw6mfdxhv/dk="},{"type":"next-occurrence","id":"9Zh+rn1v+RwIxN6u7InpLbEwzt8="}],"description":"Construction on NY 27 eastbound from Caton Avenue (New York) to East 7th Street (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:25:05Z"},"road_event_id":"8neHjgNJsMmGXgyyMcmx1m210S4=","beginning_cross_street":"Caton Avenue","ending_cross_street":"East 7th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975018,40.647735]]}},{"id":"9Zh+rn1v+RwIxN6u7InpLbEwzt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oJTyl3oYLw/8hvcnw6mfdxhv/dk="},{"type":"next-occurrence","id":"wR/5hKDYOT6C3WA40NarZrSwLsg="}],"description":"Construction on NY 27 eastbound from Caton Avenue (New York) to East 7th Street (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:25:05Z"},"road_event_id":"9Zh+rn1v+RwIxN6u7InpLbEwzt8=","beginning_cross_street":"Caton Avenue","ending_cross_street":"East 7th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975018,40.647735]]}},{"id":"wR/5hKDYOT6C3WA40NarZrSwLsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oJTyl3oYLw/8hvcnw6mfdxhv/dk="},{"type":"next-occurrence","id":"ManLCWPJEWJK3fwJekFBhT3ORso="}],"description":"Construction on NY 27 eastbound from Caton Avenue (New York) to East 7th Street (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:25:05Z"},"road_event_id":"wR/5hKDYOT6C3WA40NarZrSwLsg=","beginning_cross_street":"Caton Avenue","ending_cross_street":"East 7th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975018,40.647735]]}},{"id":"ManLCWPJEWJK3fwJekFBhT3ORso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oJTyl3oYLw/8hvcnw6mfdxhv/dk="}],"description":"Construction on NY 27 eastbound from Caton Avenue (New York) to East 7th Street (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:25:05Z"},"road_event_id":"ManLCWPJEWJK3fwJekFBhT3ORso=","beginning_cross_street":"Caton Avenue","ending_cross_street":"East 7th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T14:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975018,40.647735]]}},{"id":"Ml8GoFeR9VaI0d6PHXGwK31DpM8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sryeCl4vHEzIgosD2PuIN+I7KJ8="}],"description":"Construction on I-678 both directions from Exit 8 - Main Street (New York) to Queens Boulevard; NY 25 (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:09:01Z"},"road_event_id":"Ml8GoFeR9VaI0d6PHXGwK31DpM8=","beginning_cross_street":"Exit 8 - Main Street","ending_cross_street":"Queens Boulevard; NY 25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819363,40.708366]]}},{"id":"sryeCl4vHEzIgosD2PuIN+I7KJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ml8GoFeR9VaI0d6PHXGwK31DpM8="},{"type":"next-occurrence","id":"Bkw/Jl3tifhuW0UzqfVfEu+hLZ8="}],"description":"Construction on I-678 both directions from Exit 8 - Main Street (New York) to Queens Boulevard; NY 25 (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:09:01Z"},"road_event_id":"sryeCl4vHEzIgosD2PuIN+I7KJ8=","beginning_cross_street":"Exit 8 - Main Street","ending_cross_street":"Queens Boulevard; NY 25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T14:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819363,40.708366]]}},{"id":"Bkw/Jl3tifhuW0UzqfVfEu+hLZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ml8GoFeR9VaI0d6PHXGwK31DpM8="},{"type":"next-occurrence","id":"DEHK7oKPU+2V/f9e/z1lREfo9FM="}],"description":"Construction on I-678 both directions from Exit 8 - Main Street (New York) to Queens Boulevard; NY 25 (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:09:01Z"},"road_event_id":"Bkw/Jl3tifhuW0UzqfVfEu+hLZ8=","beginning_cross_street":"Exit 8 - Main Street","ending_cross_street":"Queens Boulevard; NY 25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819363,40.708366]]}},{"id":"DEHK7oKPU+2V/f9e/z1lREfo9FM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ml8GoFeR9VaI0d6PHXGwK31DpM8="},{"type":"next-occurrence","id":"8Pe7YwHt3BKKw/lNKQXIOlJhf0U="}],"description":"Construction on I-678 both directions from Exit 8 - Main Street (New York) to Queens Boulevard; NY 25 (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:09:01Z"},"road_event_id":"DEHK7oKPU+2V/f9e/z1lREfo9FM=","beginning_cross_street":"Exit 8 - Main Street","ending_cross_street":"Queens Boulevard; NY 25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819363,40.708366]]}},{"id":"8Pe7YwHt3BKKw/lNKQXIOlJhf0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ml8GoFeR9VaI0d6PHXGwK31DpM8="},{"type":"next-occurrence","id":"nNAN7tCxyU2hdcAZwSiFwMHHgUw="}],"description":"Construction on I-678 both directions from Exit 8 - Main Street (New York) to Queens Boulevard; NY 25 (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:09:01Z"},"road_event_id":"8Pe7YwHt3BKKw/lNKQXIOlJhf0U=","beginning_cross_street":"Exit 8 - Main Street","ending_cross_street":"Queens Boulevard; NY 25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819363,40.708366]]}},{"id":"nNAN7tCxyU2hdcAZwSiFwMHHgUw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ml8GoFeR9VaI0d6PHXGwK31DpM8="},{"type":"next-occurrence","id":"Q/cVk6m7GfEmLktv+bWO6IQtyd0="}],"description":"Construction on I-678 both directions from Exit 8 - Main Street (New York) to Queens Boulevard; NY 25 (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:09:01Z"},"road_event_id":"nNAN7tCxyU2hdcAZwSiFwMHHgUw=","beginning_cross_street":"Exit 8 - Main Street","ending_cross_street":"Queens Boulevard; NY 25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819363,40.708366]]}},{"id":"Q/cVk6m7GfEmLktv+bWO6IQtyd0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ml8GoFeR9VaI0d6PHXGwK31DpM8="},{"type":"next-occurrence","id":"S/Z5p9pZUxkDtJBHurc+4B5sRAA="}],"description":"Construction on I-678 both directions from Exit 8 - Main Street (New York) to Queens Boulevard; NY 25 (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:09:01Z"},"road_event_id":"Q/cVk6m7GfEmLktv+bWO6IQtyd0=","beginning_cross_street":"Exit 8 - Main Street","ending_cross_street":"Queens Boulevard; NY 25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819363,40.708366]]}},{"id":"S/Z5p9pZUxkDtJBHurc+4B5sRAA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ml8GoFeR9VaI0d6PHXGwK31DpM8="}],"description":"Construction on I-678 both directions from Exit 8 - Main Street (New York) to Queens Boulevard; NY 25 (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T19:09:01Z"},"road_event_id":"S/Z5p9pZUxkDtJBHurc+4B5sRAA=","beginning_cross_street":"Exit 8 - Main Street","ending_cross_street":"Queens Boulevard; NY 25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T14:00:00Z","end_date":"2026-06-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819363,40.708366]]}},{"id":"9cxvWY3yoe2ivlfRI7fEzevu418=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"m0oPbB2drjku2qAVkvbbxPWK+dA="}],"description":"Construction on I-678 northbound from Exit 11 - 135th Street (New York) to 69th Road; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-06-03T19:08:08Z"},"road_event_id":"9cxvWY3yoe2ivlfRI7fEzevu418=","beginning_cross_street":"Exit 11 - 135th Street","ending_cross_street":"69th Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.828789,40.724213]]}},{"id":"m0oPbB2drjku2qAVkvbbxPWK+dA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9cxvWY3yoe2ivlfRI7fEzevu418="},{"type":"next-occurrence","id":"kfDkX8djzWlh65TfT3Dk68HVvFg="}],"description":"Construction on I-678 northbound from Exit 11 - 135th Street (New York) to 69th Road; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-06-03T19:08:08Z"},"road_event_id":"m0oPbB2drjku2qAVkvbbxPWK+dA=","beginning_cross_street":"Exit 11 - 135th Street","ending_cross_street":"69th Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T14:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.828789,40.724213]]}},{"id":"kfDkX8djzWlh65TfT3Dk68HVvFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9cxvWY3yoe2ivlfRI7fEzevu418="},{"type":"next-occurrence","id":"XBESwor9r76TnM9i2dKt3bfwYPs="}],"description":"Construction on I-678 northbound from Exit 11 - 135th Street (New York) to 69th Road; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-06-03T19:08:08Z"},"road_event_id":"kfDkX8djzWlh65TfT3Dk68HVvFg=","beginning_cross_street":"Exit 11 - 135th Street","ending_cross_street":"69th Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.828789,40.724213]]}},{"id":"XBESwor9r76TnM9i2dKt3bfwYPs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9cxvWY3yoe2ivlfRI7fEzevu418="},{"type":"next-occurrence","id":"82QF3eAEVUwCBXFU+FDmJtAYzuY="}],"description":"Construction on I-678 northbound from Exit 11 - 135th Street (New York) to 69th Road; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-06-03T19:08:08Z"},"road_event_id":"XBESwor9r76TnM9i2dKt3bfwYPs=","beginning_cross_street":"Exit 11 - 135th Street","ending_cross_street":"69th Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.828789,40.724213]]}},{"id":"82QF3eAEVUwCBXFU+FDmJtAYzuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9cxvWY3yoe2ivlfRI7fEzevu418="},{"type":"next-occurrence","id":"UlPo9x6RBRKZwmlAxUWmWSG/5DE="}],"description":"Construction on I-678 northbound from Exit 11 - 135th Street (New York) to 69th Road; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-06-03T19:08:08Z"},"road_event_id":"82QF3eAEVUwCBXFU+FDmJtAYzuY=","beginning_cross_street":"Exit 11 - 135th Street","ending_cross_street":"69th Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.828789,40.724213]]}},{"id":"UlPo9x6RBRKZwmlAxUWmWSG/5DE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9cxvWY3yoe2ivlfRI7fEzevu418="},{"type":"next-occurrence","id":"6v4ir4b0C2ZXttWOG5i7Go8joVw="}],"description":"Construction on I-678 northbound from Exit 11 - 135th Street (New York) to 69th Road; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-06-03T19:08:08Z"},"road_event_id":"UlPo9x6RBRKZwmlAxUWmWSG/5DE=","beginning_cross_street":"Exit 11 - 135th Street","ending_cross_street":"69th Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.828789,40.724213]]}},{"id":"6v4ir4b0C2ZXttWOG5i7Go8joVw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9cxvWY3yoe2ivlfRI7fEzevu418="},{"type":"next-occurrence","id":"Jz7jOEHih+RVFvyK7cIyeXNlayE="}],"description":"Construction on I-678 northbound from Exit 11 - 135th Street (New York) to 69th Road; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-06-03T19:08:08Z"},"road_event_id":"6v4ir4b0C2ZXttWOG5i7Go8joVw=","beginning_cross_street":"Exit 11 - 135th Street","ending_cross_street":"69th Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.828789,40.724213]]}},{"id":"Jz7jOEHih+RVFvyK7cIyeXNlayE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9cxvWY3yoe2ivlfRI7fEzevu418="}],"description":"Construction on I-678 northbound from Exit 11 - 135th Street (New York) to 69th Road; Ramp (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-06-03T19:08:08Z"},"road_event_id":"Jz7jOEHih+RVFvyK7cIyeXNlayE=","beginning_cross_street":"Exit 11 - 135th Street","ending_cross_street":"69th Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T14:00:00Z","end_date":"2026-06-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.828789,40.724213]]}},{"id":"quseJGIbaGVObKzbNgIZ5nvzWvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hbhF86LNLZkX9u2qZoDS7N5HotA="}],"description":"Construction on VAN WYCK EXPY northbound from 101ST AVE (New York) to 95TH AVE (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-03T19:10:26Z"},"road_event_id":"quseJGIbaGVObKzbNgIZ5nvzWvI=","beginning_cross_street":"101ST AVE","ending_cross_street":"95TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811502,40.694226]]}},{"id":"hbhF86LNLZkX9u2qZoDS7N5HotA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"quseJGIbaGVObKzbNgIZ5nvzWvI="},{"type":"next-occurrence","id":"gqHkjRMWgReoMIYz0uJ8+5zjIjc="}],"description":"Construction on VAN WYCK EXPY northbound from 101ST AVE (New York) to 95TH AVE (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-03T19:10:26Z"},"road_event_id":"hbhF86LNLZkX9u2qZoDS7N5HotA=","beginning_cross_street":"101ST AVE","ending_cross_street":"95TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T14:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811502,40.694226]]}},{"id":"gqHkjRMWgReoMIYz0uJ8+5zjIjc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"quseJGIbaGVObKzbNgIZ5nvzWvI="},{"type":"next-occurrence","id":"K+UVgGMec3ZOLAcMbmc+0FSK6zI="}],"description":"Construction on VAN WYCK EXPY northbound from 101ST AVE (New York) to 95TH AVE (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-03T19:10:26Z"},"road_event_id":"gqHkjRMWgReoMIYz0uJ8+5zjIjc=","beginning_cross_street":"101ST AVE","ending_cross_street":"95TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811502,40.694226]]}},{"id":"K+UVgGMec3ZOLAcMbmc+0FSK6zI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"quseJGIbaGVObKzbNgIZ5nvzWvI="},{"type":"next-occurrence","id":"5D17iDCRezYnF46rQowjM8OvKeE="}],"description":"Construction on VAN WYCK EXPY northbound from 101ST AVE (New York) to 95TH AVE (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-03T19:10:26Z"},"road_event_id":"K+UVgGMec3ZOLAcMbmc+0FSK6zI=","beginning_cross_street":"101ST AVE","ending_cross_street":"95TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811502,40.694226]]}},{"id":"5D17iDCRezYnF46rQowjM8OvKeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"quseJGIbaGVObKzbNgIZ5nvzWvI="},{"type":"next-occurrence","id":"ElLvZhc9xGZWZEH+rmJ0eWq60Mw="}],"description":"Construction on VAN WYCK EXPY northbound from 101ST AVE (New York) to 95TH AVE (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-03T19:10:26Z"},"road_event_id":"5D17iDCRezYnF46rQowjM8OvKeE=","beginning_cross_street":"101ST AVE","ending_cross_street":"95TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811502,40.694226]]}},{"id":"ElLvZhc9xGZWZEH+rmJ0eWq60Mw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"quseJGIbaGVObKzbNgIZ5nvzWvI="},{"type":"next-occurrence","id":"4Sw/sjoiK+3yViyjl4amKOLgg6c="}],"description":"Construction on VAN WYCK EXPY northbound from 101ST AVE (New York) to 95TH AVE (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-03T19:10:26Z"},"road_event_id":"ElLvZhc9xGZWZEH+rmJ0eWq60Mw=","beginning_cross_street":"101ST AVE","ending_cross_street":"95TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811502,40.694226]]}},{"id":"4Sw/sjoiK+3yViyjl4amKOLgg6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"quseJGIbaGVObKzbNgIZ5nvzWvI="},{"type":"next-occurrence","id":"sPdYlSACW/K/l6014VveAtHxJRY="}],"description":"Construction on VAN WYCK EXPY northbound from 101ST AVE (New York) to 95TH AVE (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-03T19:10:26Z"},"road_event_id":"4Sw/sjoiK+3yViyjl4amKOLgg6c=","beginning_cross_street":"101ST AVE","ending_cross_street":"95TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811502,40.694226]]}},{"id":"sPdYlSACW/K/l6014VveAtHxJRY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"quseJGIbaGVObKzbNgIZ5nvzWvI="}],"description":"Construction on VAN WYCK EXPY northbound from 101ST AVE (New York) to 95TH AVE (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-06-03T19:10:26Z"},"road_event_id":"sPdYlSACW/K/l6014VveAtHxJRY=","beginning_cross_street":"101ST AVE","ending_cross_street":"95TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T14:00:00Z","end_date":"2026-06-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811502,40.694226]]}},{"id":"7fVkwlUlGDQpXpcUWqyKg5hzj2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CQ5c7s3BOEKGjI260jZOp73vuH4="}],"description":"Construction on I-678 northbound from Exit 5 - 101st Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-06-03T19:11:36Z"},"road_event_id":"7fVkwlUlGDQpXpcUWqyKg5hzj2A=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811743,40.694128]]}},{"id":"CQ5c7s3BOEKGjI260jZOp73vuH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7fVkwlUlGDQpXpcUWqyKg5hzj2A="},{"type":"next-occurrence","id":"LVUudj+pt3Scq4WlZxQeQ/YTzSI="}],"description":"Construction on I-678 northbound from Exit 5 - 101st Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-06-03T19:11:36Z"},"road_event_id":"CQ5c7s3BOEKGjI260jZOp73vuH4=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T14:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811743,40.694128]]}},{"id":"LVUudj+pt3Scq4WlZxQeQ/YTzSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7fVkwlUlGDQpXpcUWqyKg5hzj2A="},{"type":"next-occurrence","id":"PIhu2YfNuw8fV9t2pHkpw4IWTPg="}],"description":"Construction on I-678 northbound from Exit 5 - 101st Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-06-03T19:11:36Z"},"road_event_id":"LVUudj+pt3Scq4WlZxQeQ/YTzSI=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811743,40.694128]]}},{"id":"PIhu2YfNuw8fV9t2pHkpw4IWTPg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7fVkwlUlGDQpXpcUWqyKg5hzj2A="},{"type":"next-occurrence","id":"8sjYHM8HMeU3ivF0ATq4mO02eCk="}],"description":"Construction on I-678 northbound from Exit 5 - 101st Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-06-03T19:11:36Z"},"road_event_id":"PIhu2YfNuw8fV9t2pHkpw4IWTPg=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811743,40.694128]]}},{"id":"8sjYHM8HMeU3ivF0ATq4mO02eCk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7fVkwlUlGDQpXpcUWqyKg5hzj2A="},{"type":"next-occurrence","id":"V0JR2P2TRB7YKdF8phJ4dloCyFg="}],"description":"Construction on I-678 northbound from Exit 5 - 101st Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-06-03T19:11:36Z"},"road_event_id":"8sjYHM8HMeU3ivF0ATq4mO02eCk=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811743,40.694128]]}},{"id":"V0JR2P2TRB7YKdF8phJ4dloCyFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7fVkwlUlGDQpXpcUWqyKg5hzj2A="},{"type":"next-occurrence","id":"WDsGa8Ke1meuPuC9Wy+8tgvjwJc="}],"description":"Construction on I-678 northbound from Exit 5 - 101st Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-06-03T19:11:36Z"},"road_event_id":"V0JR2P2TRB7YKdF8phJ4dloCyFg=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811743,40.694128]]}},{"id":"WDsGa8Ke1meuPuC9Wy+8tgvjwJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7fVkwlUlGDQpXpcUWqyKg5hzj2A="},{"type":"next-occurrence","id":"NvoEhD3BDSFd26xKQzXBfzeyOeg="}],"description":"Construction on I-678 northbound from Exit 5 - 101st Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-06-03T19:11:36Z"},"road_event_id":"WDsGa8Ke1meuPuC9Wy+8tgvjwJc=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811743,40.694128]]}},{"id":"NvoEhD3BDSFd26xKQzXBfzeyOeg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7fVkwlUlGDQpXpcUWqyKg5hzj2A="}],"description":"Construction on I-678 northbound from Exit 5 - 101st Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-06-03T19:11:36Z"},"road_event_id":"NvoEhD3BDSFd26xKQzXBfzeyOeg=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T14:00:00Z","end_date":"2026-06-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811743,40.694128]]}},{"id":"Qg6Fhe6IeqOy11k8yMmOPMDfYIc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"oZmak4T389/5fha5fXZECBGkMt4="}],"description":"Milling and paving operations on CT-81 both directions between LIBRARY LN (Clinton) and CHITTENDEN RD (Killingworth) Motorists can expect lane closures, Tuesday June 9th, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open, Monday June 29th, 2026 thru Monday August 17th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T20:16:22Z"},"road_event_id":"Qg6Fhe6IeqOy11k8yMmOPMDfYIc=","beginning_cross_street":"LIBRARY LN","ending_cross_street":"CHITTENDEN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.52796,41.278776]]}},{"id":"oZmak4T389/5fha5fXZECBGkMt4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qg6Fhe6IeqOy11k8yMmOPMDfYIc="},{"type":"next-occurrence","id":"CyRZRz8f7MhXfQ8Z16PvVzG7emw="}],"description":"Milling and paving operations on CT-81 both directions between LIBRARY LN (Clinton) and CHITTENDEN RD (Killingworth) Motorists can expect lane closures, Tuesday June 9th, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open, Monday June 29th, 2026 thru Monday August 17th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T20:16:22Z"},"road_event_id":"oZmak4T389/5fha5fXZECBGkMt4=","beginning_cross_street":"LIBRARY LN","ending_cross_street":"CHITTENDEN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.52796,41.278776]]}},{"id":"CyRZRz8f7MhXfQ8Z16PvVzG7emw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qg6Fhe6IeqOy11k8yMmOPMDfYIc="},{"type":"next-occurrence","id":"AaY5GDAacilFDWwk7bDzkuv6NDA="}],"description":"Milling and paving operations on CT-81 both directions between LIBRARY LN (Clinton) and CHITTENDEN RD (Killingworth) Motorists can expect lane closures, Tuesday June 9th, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open, Monday June 29th, 2026 thru Monday August 17th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T20:16:22Z"},"road_event_id":"CyRZRz8f7MhXfQ8Z16PvVzG7emw=","beginning_cross_street":"LIBRARY LN","ending_cross_street":"CHITTENDEN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.52796,41.278776]]}},{"id":"AaY5GDAacilFDWwk7bDzkuv6NDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qg6Fhe6IeqOy11k8yMmOPMDfYIc="},{"type":"next-occurrence","id":"j/kJPqHav3962UqoD2YOElcqAe4="}],"description":"Milling and paving operations on CT-81 both directions between LIBRARY LN (Clinton) and CHITTENDEN RD (Killingworth) Motorists can expect lane closures, Tuesday June 9th, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open, Monday June 29th, 2026 thru Monday August 17th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T20:16:22Z"},"road_event_id":"AaY5GDAacilFDWwk7bDzkuv6NDA=","beginning_cross_street":"LIBRARY LN","ending_cross_street":"CHITTENDEN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.52796,41.278776]]}},{"id":"j/kJPqHav3962UqoD2YOElcqAe4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qg6Fhe6IeqOy11k8yMmOPMDfYIc="},{"type":"next-occurrence","id":"7DiffrjYhjihcrBA9ha7FPqp7B4="}],"description":"Milling and paving operations on CT-81 both directions between LIBRARY LN (Clinton) and CHITTENDEN RD (Killingworth) Motorists can expect lane closures, Tuesday June 9th, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open, Monday June 29th, 2026 thru Monday August 17th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T20:16:22Z"},"road_event_id":"j/kJPqHav3962UqoD2YOElcqAe4=","beginning_cross_street":"LIBRARY LN","ending_cross_street":"CHITTENDEN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.52796,41.278776]]}},{"id":"7DiffrjYhjihcrBA9ha7FPqp7B4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qg6Fhe6IeqOy11k8yMmOPMDfYIc="},{"type":"next-occurrence","id":"rrmfQ8DHcxCbq6syf2bVsoVd3Mg="}],"description":"Milling and paving operations on CT-81 both directions between LIBRARY LN (Clinton) and CHITTENDEN RD (Killingworth) Motorists can expect lane closures, Tuesday June 9th, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open, Monday June 29th, 2026 thru Monday August 17th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T20:16:22Z"},"road_event_id":"7DiffrjYhjihcrBA9ha7FPqp7B4=","beginning_cross_street":"LIBRARY LN","ending_cross_street":"CHITTENDEN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.52796,41.278776]]}},{"id":"rrmfQ8DHcxCbq6syf2bVsoVd3Mg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qg6Fhe6IeqOy11k8yMmOPMDfYIc="},{"type":"next-occurrence","id":"GzkmIElEbaZI/pciilNbpND8eWc="}],"description":"Milling and paving operations on CT-81 both directions between LIBRARY LN (Clinton) and CHITTENDEN RD (Killingworth) Motorists can expect lane closures, Tuesday June 9th, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open, Monday June 29th, 2026 thru Monday August 17th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T20:16:22Z"},"road_event_id":"rrmfQ8DHcxCbq6syf2bVsoVd3Mg=","beginning_cross_street":"LIBRARY LN","ending_cross_street":"CHITTENDEN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.52796,41.278776]]}},{"id":"GzkmIElEbaZI/pciilNbpND8eWc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qg6Fhe6IeqOy11k8yMmOPMDfYIc="},{"type":"next-occurrence","id":"C4RRHFnsIN+5HktZSH/6Xkec1eg="}],"description":"Milling and paving operations on CT-81 both directions between LIBRARY LN (Clinton) and CHITTENDEN RD (Killingworth) Motorists can expect lane closures, Tuesday June 9th, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open, Monday June 29th, 2026 thru Monday August 17th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T20:16:22Z"},"road_event_id":"GzkmIElEbaZI/pciilNbpND8eWc=","beginning_cross_street":"LIBRARY LN","ending_cross_street":"CHITTENDEN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.52796,41.278776]]}},{"id":"C4RRHFnsIN+5HktZSH/6Xkec1eg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qg6Fhe6IeqOy11k8yMmOPMDfYIc="}],"description":"Milling and paving operations on CT-81 both directions between LIBRARY LN (Clinton) and CHITTENDEN RD (Killingworth) Motorists can expect lane closures, Tuesday June 9th, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open, Monday June 29th, 2026 thru Monday August 17th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-05-27T20:16:22Z"},"road_event_id":"C4RRHFnsIN+5HktZSH/6Xkec1eg=","beginning_cross_street":"LIBRARY LN","ending_cross_street":"CHITTENDEN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.52796,41.278776]]}},{"id":"zVOO/k5sRfCo3+n3AFQQoKJK9dE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1Vd1la0LunIdjGgzHAJnUCRa7hU="}],"description":"Milling and paving operations on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Toiwn Line (Berlin) Motorists can expect lane closures , Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:27:01Z"},"road_event_id":"zVOO/k5sRfCo3+n3AFQQoKJK9dE=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Toiwn Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771148,41.542326]]}},{"id":"1Vd1la0LunIdjGgzHAJnUCRa7hU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVOO/k5sRfCo3+n3AFQQoKJK9dE="},{"type":"next-occurrence","id":"YOybXfFfvlkw3E7/jUzZ8g/klLs="}],"description":"Milling and paving operations on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Toiwn Line (Berlin) Motorists can expect lane closures , Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:27:01Z"},"road_event_id":"1Vd1la0LunIdjGgzHAJnUCRa7hU=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Toiwn Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771148,41.542326]]}},{"id":"YOybXfFfvlkw3E7/jUzZ8g/klLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVOO/k5sRfCo3+n3AFQQoKJK9dE="},{"type":"next-occurrence","id":"lwPHQlBiD2ldv7VOCHEd9BxWPWY="}],"description":"Milling and paving operations on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Toiwn Line (Berlin) Motorists can expect lane closures , Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:27:01Z"},"road_event_id":"YOybXfFfvlkw3E7/jUzZ8g/klLs=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Toiwn Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771148,41.542326]]}},{"id":"lwPHQlBiD2ldv7VOCHEd9BxWPWY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVOO/k5sRfCo3+n3AFQQoKJK9dE="},{"type":"next-occurrence","id":"1LjL8lZmIOC4oJedr33181Kwp8w="}],"description":"Milling and paving operations on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Toiwn Line (Berlin) Motorists can expect lane closures , Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:27:01Z"},"road_event_id":"lwPHQlBiD2ldv7VOCHEd9BxWPWY=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Toiwn Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771148,41.542326]]}},{"id":"1LjL8lZmIOC4oJedr33181Kwp8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVOO/k5sRfCo3+n3AFQQoKJK9dE="},{"type":"next-occurrence","id":"KYEmfFoi21DsohCU2Ssf4UEwSOQ="}],"description":"Milling and paving operations on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Toiwn Line (Berlin) Motorists can expect lane closures , Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:27:01Z"},"road_event_id":"1LjL8lZmIOC4oJedr33181Kwp8w=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Toiwn Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771148,41.542326]]}},{"id":"KYEmfFoi21DsohCU2Ssf4UEwSOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVOO/k5sRfCo3+n3AFQQoKJK9dE="},{"type":"next-occurrence","id":"QyZuCZThfuPH/jTm8ayTmAIHRmk="}],"description":"Milling and paving operations on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Toiwn Line (Berlin) Motorists can expect lane closures , Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:27:01Z"},"road_event_id":"KYEmfFoi21DsohCU2Ssf4UEwSOQ=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Toiwn Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771148,41.542326]]}},{"id":"QyZuCZThfuPH/jTm8ayTmAIHRmk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVOO/k5sRfCo3+n3AFQQoKJK9dE="},{"type":"next-occurrence","id":"lDfVZIDck7t/o5w+5QefRxAxXa0="}],"description":"Milling and paving operations on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Toiwn Line (Berlin) Motorists can expect lane closures , Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:27:01Z"},"road_event_id":"QyZuCZThfuPH/jTm8ayTmAIHRmk=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Toiwn Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771148,41.542326]]}},{"id":"lDfVZIDck7t/o5w+5QefRxAxXa0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVOO/k5sRfCo3+n3AFQQoKJK9dE="},{"type":"next-occurrence","id":"Q/c7PzBUcEWlM3hg8biy08TBJLw="}],"description":"Milling and paving operations on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Toiwn Line (Berlin) Motorists can expect lane closures , Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:27:01Z"},"road_event_id":"lDfVZIDck7t/o5w+5QefRxAxXa0=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Toiwn Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771148,41.542326]]}},{"id":"Q/c7PzBUcEWlM3hg8biy08TBJLw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVOO/k5sRfCo3+n3AFQQoKJK9dE="},{"type":"next-occurrence","id":"/iLuI3x+b8CpoPDl+VRrf3JgK7Q="}],"description":"Milling and paving operations on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Toiwn Line (Berlin) Motorists can expect lane closures , Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:27:01Z"},"road_event_id":"Q/c7PzBUcEWlM3hg8biy08TBJLw=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Toiwn Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771148,41.542326]]}},{"id":"/iLuI3x+b8CpoPDl+VRrf3JgK7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zVOO/k5sRfCo3+n3AFQQoKJK9dE="}],"description":"Milling and paving operations on Wilbur Cross Parkway both directions between Baldwin Avenue (Meriden) and US 5 at Meriden/Berlin Toiwn Line (Berlin) Motorists can expect lane closures , Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:27:01Z"},"road_event_id":"/iLuI3x+b8CpoPDl+VRrf3JgK7Q=","beginning_cross_street":"Baldwin Avenue","ending_cross_street":"Meriden/Berlin Toiwn Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771148,41.542326]]}},{"id":"T47+AQFvbM7uxqNO7sMQAF+vVAo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-69"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5YOd6hRuTRUJO3ZtNDkseXv2XoM="}],"description":"Milling and paving operations on CT-69 both directions between CT-63 (New Haven) and CLARK RD (Woodbridge) Motorists can expect lane closures , Sunday May 31st, 2026 thru Friday June 19th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:30:53Z"},"road_event_id":"T47+AQFvbM7uxqNO7sMQAF+vVAo=","beginning_cross_street":"CT-63","ending_cross_street":"CLARK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.97671,41.334771]]}},{"id":"5YOd6hRuTRUJO3ZtNDkseXv2XoM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-69"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T47+AQFvbM7uxqNO7sMQAF+vVAo="},{"type":"next-occurrence","id":"etlJNZlLKXtZNR4wDXMIECPzDPE="}],"description":"Milling and paving operations on CT-69 both directions between CT-63 (New Haven) and CLARK RD (Woodbridge) Motorists can expect lane closures , Sunday May 31st, 2026 thru Friday June 19th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:30:53Z"},"road_event_id":"5YOd6hRuTRUJO3ZtNDkseXv2XoM=","beginning_cross_street":"CT-63","ending_cross_street":"CLARK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.97671,41.334771]]}},{"id":"etlJNZlLKXtZNR4wDXMIECPzDPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-69"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T47+AQFvbM7uxqNO7sMQAF+vVAo="},{"type":"next-occurrence","id":"+faoZTTgfRgEIw+b6MS2C27eK0k="}],"description":"Milling and paving operations on CT-69 both directions between CT-63 (New Haven) and CLARK RD (Woodbridge) Motorists can expect lane closures , Sunday May 31st, 2026 thru Friday June 19th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:30:53Z"},"road_event_id":"etlJNZlLKXtZNR4wDXMIECPzDPE=","beginning_cross_street":"CT-63","ending_cross_street":"CLARK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.97671,41.334771]]}},{"id":"+faoZTTgfRgEIw+b6MS2C27eK0k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-69"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T47+AQFvbM7uxqNO7sMQAF+vVAo="},{"type":"next-occurrence","id":"lr48LNkTE9w5hx/aklVENemYpag="}],"description":"Milling and paving operations on CT-69 both directions between CT-63 (New Haven) and CLARK RD (Woodbridge) Motorists can expect lane closures , Sunday May 31st, 2026 thru Friday June 19th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:30:53Z"},"road_event_id":"+faoZTTgfRgEIw+b6MS2C27eK0k=","beginning_cross_street":"CT-63","ending_cross_street":"CLARK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.97671,41.334771]]}},{"id":"lr48LNkTE9w5hx/aklVENemYpag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-69"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T47+AQFvbM7uxqNO7sMQAF+vVAo="},{"type":"next-occurrence","id":"r9+6wpHrKTk65qWaBQiE0hVLZ04="}],"description":"Milling and paving operations on CT-69 both directions between CT-63 (New Haven) and CLARK RD (Woodbridge) Motorists can expect lane closures , Sunday May 31st, 2026 thru Friday June 19th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:30:53Z"},"road_event_id":"lr48LNkTE9w5hx/aklVENemYpag=","beginning_cross_street":"CT-63","ending_cross_street":"CLARK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.97671,41.334771]]}},{"id":"r9+6wpHrKTk65qWaBQiE0hVLZ04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-69"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T47+AQFvbM7uxqNO7sMQAF+vVAo="},{"type":"next-occurrence","id":"5uMwn7ni3OXKejI8bEIFt3poQYk="}],"description":"Milling and paving operations on CT-69 both directions between CT-63 (New Haven) and CLARK RD (Woodbridge) Motorists can expect lane closures , Sunday May 31st, 2026 thru Friday June 19th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:30:53Z"},"road_event_id":"r9+6wpHrKTk65qWaBQiE0hVLZ04=","beginning_cross_street":"CT-63","ending_cross_street":"CLARK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T23:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.97671,41.334771]]}},{"id":"5uMwn7ni3OXKejI8bEIFt3poQYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-69"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T47+AQFvbM7uxqNO7sMQAF+vVAo="},{"type":"next-occurrence","id":"odqsS6/OMyGbPJMivmVwKHbAVqs="}],"description":"Milling and paving operations on CT-69 both directions between CT-63 (New Haven) and CLARK RD (Woodbridge) Motorists can expect lane closures , Sunday May 31st, 2026 thru Friday June 19th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:30:53Z"},"road_event_id":"5uMwn7ni3OXKejI8bEIFt3poQYk=","beginning_cross_street":"CT-63","ending_cross_street":"CLARK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.97671,41.334771]]}},{"id":"odqsS6/OMyGbPJMivmVwKHbAVqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-69"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T47+AQFvbM7uxqNO7sMQAF+vVAo="},{"type":"next-occurrence","id":"5a9ILuIF8np6CVEqgpGM4KU91u4="}],"description":"Milling and paving operations on CT-69 both directions between CT-63 (New Haven) and CLARK RD (Woodbridge) Motorists can expect lane closures , Sunday May 31st, 2026 thru Friday June 19th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:30:53Z"},"road_event_id":"odqsS6/OMyGbPJMivmVwKHbAVqs=","beginning_cross_street":"CT-63","ending_cross_street":"CLARK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.97671,41.334771]]}},{"id":"5a9ILuIF8np6CVEqgpGM4KU91u4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-69"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T47+AQFvbM7uxqNO7sMQAF+vVAo="},{"type":"next-occurrence","id":"xvpiEq5KSuqANL39sb7pUwZhqYw="}],"description":"Milling and paving operations on CT-69 both directions between CT-63 (New Haven) and CLARK RD (Woodbridge) Motorists can expect lane closures , Sunday May 31st, 2026 thru Friday June 19th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:30:53Z"},"road_event_id":"5a9ILuIF8np6CVEqgpGM4KU91u4=","beginning_cross_street":"CT-63","ending_cross_street":"CLARK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.97671,41.334771]]}},{"id":"xvpiEq5KSuqANL39sb7pUwZhqYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-69"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T47+AQFvbM7uxqNO7sMQAF+vVAo="}],"description":"Milling and paving operations on CT-69 both directions between CT-63 (New Haven) and CLARK RD (Woodbridge) Motorists can expect lane closures , Sunday May 31st, 2026 thru Friday June 19th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-05-27T20:30:53Z"},"road_event_id":"xvpiEq5KSuqANL39sb7pUwZhqYw=","beginning_cross_street":"CT-63","ending_cross_street":"CLARK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.97671,41.334771]]}},{"id":"iS2puX9Lfuk3GVslB4/pOyUyMrw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"l2k3wt3SaE8w+TRyW2JYXUHtZM4="}],"description":"Milling and paving operations on I-291 westbound between Exit 3 - CT 159 (Windsor) and Exit 2 - I-91 (Windsor) Motorists can expect lane closures , Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Sunday/Monday/Thursday, 06:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-27T20:36:53Z"},"road_event_id":"iS2puX9Lfuk3GVslB4/pOyUyMrw=","beginning_cross_street":"Exit 3 - CT 159","ending_cross_street":"Exit 2 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T22:30:00Z","end_date":"2026-06-08T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.657268,41.818308]]}},{"id":"l2k3wt3SaE8w+TRyW2JYXUHtZM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iS2puX9Lfuk3GVslB4/pOyUyMrw="}],"description":"Milling and paving operations on I-291 westbound between Exit 3 - CT 159 (Windsor) and Exit 2 - I-91 (Windsor) Motorists can expect lane closures , Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Sunday/Monday/Thursday, 06:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-27T20:36:53Z"},"road_event_id":"l2k3wt3SaE8w+TRyW2JYXUHtZM4=","beginning_cross_street":"Exit 3 - CT 159","ending_cross_street":"Exit 2 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:30:00Z","end_date":"2026-06-09T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.657268,41.818308]]}},{"id":"Rc7tsu9aMQ5tUeSAWeoWaFJzk3Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[],"description":"Milling and paving operations on I-291 westbound Exit ramp Exit 1 - CT 218 (Windsor), Thursday June 4th, 2026 thru Monday June 8th, 2026, Sunday/Thursday, 06:30 PM thru 05:30 AM All lanes closed","update_date":"2026-05-27T20:40:58Z"},"road_event_id":"Rc7tsu9aMQ5tUeSAWeoWaFJzk3Q=","beginning_cross_street":"Exit 1 - CT 218","ending_cross_street":"Exit 1 - CT 218","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T22:30:00Z","end_date":"2026-06-08T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.65122,41.815031]]}},{"id":"R5go50tyZ9/0bX0ib3clNxbI0HI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Ct 218"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dZjhp0VMWvebESbrBMLFA8eRsHk="}],"description":"Milling and paving operations on Ct 218 westbound between Deerfield Road (Windsor) and CT 218 at Windsor Avenue (Windsor) Motorists can expect lane closures , Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Sunday/Monday/Thursday, 06:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-27T20:45:36Z"},"road_event_id":"R5go50tyZ9/0bX0ib3clNxbI0HI=","beginning_cross_street":"Deerfield Road","ending_cross_street":"Windsor Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T22:30:00Z","end_date":"2026-06-08T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.655266,41.817699]]}},{"id":"dZjhp0VMWvebESbrBMLFA8eRsHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Ct 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R5go50tyZ9/0bX0ib3clNxbI0HI="}],"description":"Milling and paving operations on Ct 218 westbound between Deerfield Road (Windsor) and CT 218 at Windsor Avenue (Windsor) Motorists can expect lane closures , Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Sunday/Monday/Thursday, 06:30 PM thru 05:30 AM All lanes open","update_date":"2026-05-27T20:45:36Z"},"road_event_id":"dZjhp0VMWvebESbrBMLFA8eRsHk=","beginning_cross_street":"Deerfield Road","ending_cross_street":"Windsor Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:30:00Z","end_date":"2026-06-09T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.655266,41.817699]]}},{"id":"A/rh04oUPvabPR+0q5s8mEPuDig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TbXdlGt1LicDemvp0qfL9xfb1tQ="}],"description":"Crack sealing on CT 8 both directions between SANDY BROOK RD (Colebrook) and BEECH HILL RD (Colebrook) Traffic control signing patterns and signs will guide motorists through the work zone. , Wednesday June 3rd, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-27T20:51:45Z"},"road_event_id":"A/rh04oUPvabPR+0q5s8mEPuDig=","beginning_cross_street":"SANDY BROOK RD","ending_cross_street":"BEECH HILL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.047037,41.988398]]}},{"id":"TbXdlGt1LicDemvp0qfL9xfb1tQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A/rh04oUPvabPR+0q5s8mEPuDig="},{"type":"next-occurrence","id":"jA9Z+ErWA3XBwjVjtl2bvGs6Lbc="}],"description":"Crack sealing on CT 8 both directions between SANDY BROOK RD (Colebrook) and BEECH HILL RD (Colebrook) Traffic control signing patterns and signs will guide motorists through the work zone. , Wednesday June 3rd, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-27T20:51:45Z"},"road_event_id":"TbXdlGt1LicDemvp0qfL9xfb1tQ=","beginning_cross_street":"SANDY BROOK RD","ending_cross_street":"BEECH HILL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.047037,41.988398]]}},{"id":"jA9Z+ErWA3XBwjVjtl2bvGs6Lbc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A/rh04oUPvabPR+0q5s8mEPuDig="},{"type":"next-occurrence","id":"VO2D1eY7T70BLY4q9Fq8VnpisEc="}],"description":"Crack sealing on CT 8 both directions between SANDY BROOK RD (Colebrook) and BEECH HILL RD (Colebrook) Traffic control signing patterns and signs will guide motorists through the work zone. , Wednesday June 3rd, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-27T20:51:45Z"},"road_event_id":"jA9Z+ErWA3XBwjVjtl2bvGs6Lbc=","beginning_cross_street":"SANDY BROOK RD","ending_cross_street":"BEECH HILL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.047037,41.988398]]}},{"id":"VO2D1eY7T70BLY4q9Fq8VnpisEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A/rh04oUPvabPR+0q5s8mEPuDig="},{"type":"next-occurrence","id":"JmC1lgSSHM62Ydn1PKR1HYXlPok="}],"description":"Crack sealing on CT 8 both directions between SANDY BROOK RD (Colebrook) and BEECH HILL RD (Colebrook) Traffic control signing patterns and signs will guide motorists through the work zone. , Wednesday June 3rd, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-27T20:51:45Z"},"road_event_id":"VO2D1eY7T70BLY4q9Fq8VnpisEc=","beginning_cross_street":"SANDY BROOK RD","ending_cross_street":"BEECH HILL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.047037,41.988398]]}},{"id":"JmC1lgSSHM62Ydn1PKR1HYXlPok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A/rh04oUPvabPR+0q5s8mEPuDig="},{"type":"next-occurrence","id":"sk1kqayZxRIxbzRQWdR7k05C+rc="}],"description":"Crack sealing on CT 8 both directions between SANDY BROOK RD (Colebrook) and BEECH HILL RD (Colebrook) Traffic control signing patterns and signs will guide motorists through the work zone. , Wednesday June 3rd, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-27T20:51:45Z"},"road_event_id":"JmC1lgSSHM62Ydn1PKR1HYXlPok=","beginning_cross_street":"SANDY BROOK RD","ending_cross_street":"BEECH HILL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.047037,41.988398]]}},{"id":"sk1kqayZxRIxbzRQWdR7k05C+rc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A/rh04oUPvabPR+0q5s8mEPuDig="}],"description":"Crack sealing on CT 8 both directions between SANDY BROOK RD (Colebrook) and BEECH HILL RD (Colebrook) Traffic control signing patterns and signs will guide motorists through the work zone. , Wednesday June 3rd, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-27T20:51:45Z"},"road_event_id":"sk1kqayZxRIxbzRQWdR7k05C+rc=","beginning_cross_street":"SANDY BROOK RD","ending_cross_street":"BEECH HILL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.047037,41.988398]]}},{"id":"0CpKiIiPSpDwhFL4l4glecN3jow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"W1XhbXix0hfnLWXDDQDc8Jhr8Dc="}],"description":"Crack sealing on US-6 both directions between CT-262 (Watertown) and 38 (Thomaston) Traffic control signing patterns and signs will guide motorists through the work zone. , Wednesday June 3rd, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-27T20:54:44Z"},"road_event_id":"0CpKiIiPSpDwhFL4l4glecN3jow=","beginning_cross_street":"CT-262","ending_cross_street":"38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107669,41.622007]]}},{"id":"W1XhbXix0hfnLWXDDQDc8Jhr8Dc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0CpKiIiPSpDwhFL4l4glecN3jow="},{"type":"next-occurrence","id":"MkC+TJcb/mqyZxwIVt6Fg3vcdLk="}],"description":"Crack sealing on US-6 both directions between CT-262 (Watertown) and 38 (Thomaston) Traffic control signing patterns and signs will guide motorists through the work zone. , Wednesday June 3rd, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-27T20:54:44Z"},"road_event_id":"W1XhbXix0hfnLWXDDQDc8Jhr8Dc=","beginning_cross_street":"CT-262","ending_cross_street":"38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107669,41.622007]]}},{"id":"MkC+TJcb/mqyZxwIVt6Fg3vcdLk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0CpKiIiPSpDwhFL4l4glecN3jow="},{"type":"next-occurrence","id":"II3C37lvANjtW/262S2Ta213nAU="}],"description":"Crack sealing on US-6 both directions between CT-262 (Watertown) and 38 (Thomaston) Traffic control signing patterns and signs will guide motorists through the work zone. , Wednesday June 3rd, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-27T20:54:44Z"},"road_event_id":"MkC+TJcb/mqyZxwIVt6Fg3vcdLk=","beginning_cross_street":"CT-262","ending_cross_street":"38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107669,41.622007]]}},{"id":"II3C37lvANjtW/262S2Ta213nAU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0CpKiIiPSpDwhFL4l4glecN3jow="},{"type":"next-occurrence","id":"WGHZaTpusXMGv15lzGY7Ds7UThU="}],"description":"Crack sealing on US-6 both directions between CT-262 (Watertown) and 38 (Thomaston) Traffic control signing patterns and signs will guide motorists through the work zone. , Wednesday June 3rd, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-27T20:54:44Z"},"road_event_id":"II3C37lvANjtW/262S2Ta213nAU=","beginning_cross_street":"CT-262","ending_cross_street":"38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107669,41.622007]]}},{"id":"WGHZaTpusXMGv15lzGY7Ds7UThU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0CpKiIiPSpDwhFL4l4glecN3jow="},{"type":"next-occurrence","id":"RhCOGT9wHeTC9lIoktLllMpqx0o="}],"description":"Crack sealing on US-6 both directions between CT-262 (Watertown) and 38 (Thomaston) Traffic control signing patterns and signs will guide motorists through the work zone. , Wednesday June 3rd, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-27T20:54:44Z"},"road_event_id":"WGHZaTpusXMGv15lzGY7Ds7UThU=","beginning_cross_street":"CT-262","ending_cross_street":"38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107669,41.622007]]}},{"id":"RhCOGT9wHeTC9lIoktLllMpqx0o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0CpKiIiPSpDwhFL4l4glecN3jow="}],"description":"Crack sealing on US-6 both directions between CT-262 (Watertown) and 38 (Thomaston) Traffic control signing patterns and signs will guide motorists through the work zone. , Wednesday June 3rd, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-27T20:54:44Z"},"road_event_id":"RhCOGT9wHeTC9lIoktLllMpqx0o=","beginning_cross_street":"CT-262","ending_cross_street":"38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107669,41.622007]]}},{"id":"J3bAaI5Wukt0IBNFE6rNTfsloZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"l4S/RfMB+dT6TFTjWiv5jLhR6h4="}],"description":"Line striping on NY 392 both directions between US-11 (Virgil) and Gee Hill Rd (Dryden) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:31:38Z"},"road_event_id":"J3bAaI5Wukt0IBNFE6rNTfsloZw=","beginning_cross_street":"US-11","ending_cross_street":"Gee Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.074174,42.492159]]}},{"id":"l4S/RfMB+dT6TFTjWiv5jLhR6h4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J3bAaI5Wukt0IBNFE6rNTfsloZw="},{"type":"next-occurrence","id":"2jmKn7xyjKU9l+JIbt0szg17KWc="}],"description":"Line striping on NY 392 both directions between US-11 (Virgil) and Gee Hill Rd (Dryden) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:31:38Z"},"road_event_id":"l4S/RfMB+dT6TFTjWiv5jLhR6h4=","beginning_cross_street":"US-11","ending_cross_street":"Gee Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.074174,42.492159]]}},{"id":"2jmKn7xyjKU9l+JIbt0szg17KWc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J3bAaI5Wukt0IBNFE6rNTfsloZw="},{"type":"next-occurrence","id":"WJ0gh0hYXnoFFzHuXca94O44sq4="}],"description":"Line striping on NY 392 both directions between US-11 (Virgil) and Gee Hill Rd (Dryden) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:31:38Z"},"road_event_id":"2jmKn7xyjKU9l+JIbt0szg17KWc=","beginning_cross_street":"US-11","ending_cross_street":"Gee Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.074174,42.492159]]}},{"id":"WJ0gh0hYXnoFFzHuXca94O44sq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J3bAaI5Wukt0IBNFE6rNTfsloZw="},{"type":"next-occurrence","id":"mP/MUn153fNTYj8UWWYTTxluKI0="}],"description":"Line striping on NY 392 both directions between US-11 (Virgil) and Gee Hill Rd (Dryden) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:31:38Z"},"road_event_id":"WJ0gh0hYXnoFFzHuXca94O44sq4=","beginning_cross_street":"US-11","ending_cross_street":"Gee Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.074174,42.492159]]}},{"id":"mP/MUn153fNTYj8UWWYTTxluKI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J3bAaI5Wukt0IBNFE6rNTfsloZw="},{"type":"next-occurrence","id":"CfWa0ZBzLHczW3aewY4neMhuBZw="}],"description":"Line striping on NY 392 both directions between US-11 (Virgil) and Gee Hill Rd (Dryden) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:31:38Z"},"road_event_id":"mP/MUn153fNTYj8UWWYTTxluKI0=","beginning_cross_street":"US-11","ending_cross_street":"Gee Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.074174,42.492159]]}},{"id":"CfWa0ZBzLHczW3aewY4neMhuBZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J3bAaI5Wukt0IBNFE6rNTfsloZw="},{"type":"next-occurrence","id":"wyxqJz8zhdefLhiCb0OqCQjOEdw="}],"description":"Line striping on NY 392 both directions between US-11 (Virgil) and Gee Hill Rd (Dryden) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:31:38Z"},"road_event_id":"CfWa0ZBzLHczW3aewY4neMhuBZw=","beginning_cross_street":"US-11","ending_cross_street":"Gee Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.074174,42.492159]]}},{"id":"wyxqJz8zhdefLhiCb0OqCQjOEdw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J3bAaI5Wukt0IBNFE6rNTfsloZw="},{"type":"next-occurrence","id":"6kx1sVlCDiQMvfpFS21RVvqpAEo="}],"description":"Line striping on NY 392 both directions between US-11 (Virgil) and Gee Hill Rd (Dryden) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:31:38Z"},"road_event_id":"wyxqJz8zhdefLhiCb0OqCQjOEdw=","beginning_cross_street":"US-11","ending_cross_street":"Gee Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.074174,42.492159]]}},{"id":"6kx1sVlCDiQMvfpFS21RVvqpAEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J3bAaI5Wukt0IBNFE6rNTfsloZw="},{"type":"next-occurrence","id":"m1pNlompnekb02XRevGw9n7SrRA="}],"description":"Line striping on NY 392 both directions between US-11 (Virgil) and Gee Hill Rd (Dryden) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:31:38Z"},"road_event_id":"6kx1sVlCDiQMvfpFS21RVvqpAEo=","beginning_cross_street":"US-11","ending_cross_street":"Gee Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.074174,42.492159]]}},{"id":"m1pNlompnekb02XRevGw9n7SrRA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J3bAaI5Wukt0IBNFE6rNTfsloZw="},{"type":"next-occurrence","id":"zrghNZu9ZjBXlfkiiZXAtGwKMrA="}],"description":"Line striping on NY 392 both directions between US-11 (Virgil) and Gee Hill Rd (Dryden) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:31:38Z"},"road_event_id":"m1pNlompnekb02XRevGw9n7SrRA=","beginning_cross_street":"US-11","ending_cross_street":"Gee Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.074174,42.492159]]}},{"id":"zrghNZu9ZjBXlfkiiZXAtGwKMrA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J3bAaI5Wukt0IBNFE6rNTfsloZw="},{"type":"next-occurrence","id":"kvw0jOxc2P9/PncU1TYZObUG0u4="}],"description":"Line striping on NY 392 both directions between US-11 (Virgil) and Gee Hill Rd (Dryden) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:31:38Z"},"road_event_id":"zrghNZu9ZjBXlfkiiZXAtGwKMrA=","beginning_cross_street":"US-11","ending_cross_street":"Gee Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.074174,42.492159]]}},{"id":"kvw0jOxc2P9/PncU1TYZObUG0u4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 392"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J3bAaI5Wukt0IBNFE6rNTfsloZw="}],"description":"Line striping on NY 392 both directions between US-11 (Virgil) and Gee Hill Rd (Dryden) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:31:38Z"},"road_event_id":"kvw0jOxc2P9/PncU1TYZObUG0u4=","beginning_cross_street":"US-11","ending_cross_street":"Gee Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.074174,42.492159]]}},{"id":"lLK9Rs497FYvyPb8bEfvpHYEGGc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["930Q; Connecting Ramps NY 281 to I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"D5Fg3o2jq37NM7qTtm5rPt9Jd6c="}],"description":"Line striping on 930Q; Connecting Ramps NY 281 to I-81 both directions between NY-281 (Cortlandville) and Exit - I-81; END ROUTE (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:34:33Z"},"road_event_id":"lLK9Rs497FYvyPb8bEfvpHYEGGc=","beginning_cross_street":"NY-281","ending_cross_street":"Exit   - I-81; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.191804,42.627762]]}},{"id":"D5Fg3o2jq37NM7qTtm5rPt9Jd6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["930Q; Connecting Ramps NY 281 to I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lLK9Rs497FYvyPb8bEfvpHYEGGc="},{"type":"next-occurrence","id":"32O184+i4aX3vJmZ1N6hBDMzXes="}],"description":"Line striping on 930Q; Connecting Ramps NY 281 to I-81 both directions between NY-281 (Cortlandville) and Exit - I-81; END ROUTE (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:34:33Z"},"road_event_id":"D5Fg3o2jq37NM7qTtm5rPt9Jd6c=","beginning_cross_street":"NY-281","ending_cross_street":"Exit   - I-81; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.191804,42.627762]]}},{"id":"32O184+i4aX3vJmZ1N6hBDMzXes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["930Q; Connecting Ramps NY 281 to I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lLK9Rs497FYvyPb8bEfvpHYEGGc="},{"type":"next-occurrence","id":"fJkbsQFIqQBIH+ndEmAmjMZKOqU="}],"description":"Line striping on 930Q; Connecting Ramps NY 281 to I-81 both directions between NY-281 (Cortlandville) and Exit - I-81; END ROUTE (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:34:33Z"},"road_event_id":"32O184+i4aX3vJmZ1N6hBDMzXes=","beginning_cross_street":"NY-281","ending_cross_street":"Exit   - I-81; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.191804,42.627762]]}},{"id":"fJkbsQFIqQBIH+ndEmAmjMZKOqU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["930Q; Connecting Ramps NY 281 to I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lLK9Rs497FYvyPb8bEfvpHYEGGc="},{"type":"next-occurrence","id":"MAGwFWMewAYS+fQWv9PJqrONJNs="}],"description":"Line striping on 930Q; Connecting Ramps NY 281 to I-81 both directions between NY-281 (Cortlandville) and Exit - I-81; END ROUTE (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:34:33Z"},"road_event_id":"fJkbsQFIqQBIH+ndEmAmjMZKOqU=","beginning_cross_street":"NY-281","ending_cross_street":"Exit   - I-81; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.191804,42.627762]]}},{"id":"MAGwFWMewAYS+fQWv9PJqrONJNs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["930Q; Connecting Ramps NY 281 to I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lLK9Rs497FYvyPb8bEfvpHYEGGc="},{"type":"next-occurrence","id":"luZgzTg5rhJt1J+/P8MkdWO6VgY="}],"description":"Line striping on 930Q; Connecting Ramps NY 281 to I-81 both directions between NY-281 (Cortlandville) and Exit - I-81; END ROUTE (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:34:33Z"},"road_event_id":"MAGwFWMewAYS+fQWv9PJqrONJNs=","beginning_cross_street":"NY-281","ending_cross_street":"Exit   - I-81; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.191804,42.627762]]}},{"id":"luZgzTg5rhJt1J+/P8MkdWO6VgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["930Q; Connecting Ramps NY 281 to I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lLK9Rs497FYvyPb8bEfvpHYEGGc="},{"type":"next-occurrence","id":"mP3dCvA02tfs3z92+mdOriXryyI="}],"description":"Line striping on 930Q; Connecting Ramps NY 281 to I-81 both directions between NY-281 (Cortlandville) and Exit - I-81; END ROUTE (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:34:33Z"},"road_event_id":"luZgzTg5rhJt1J+/P8MkdWO6VgY=","beginning_cross_street":"NY-281","ending_cross_street":"Exit   - I-81; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.191804,42.627762]]}},{"id":"mP3dCvA02tfs3z92+mdOriXryyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["930Q; Connecting Ramps NY 281 to I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lLK9Rs497FYvyPb8bEfvpHYEGGc="},{"type":"next-occurrence","id":"b8HuLzaVFYjZjL53giaFMEjpips="}],"description":"Line striping on 930Q; Connecting Ramps NY 281 to I-81 both directions between NY-281 (Cortlandville) and Exit - I-81; END ROUTE (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:34:33Z"},"road_event_id":"mP3dCvA02tfs3z92+mdOriXryyI=","beginning_cross_street":"NY-281","ending_cross_street":"Exit   - I-81; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.191804,42.627762]]}},{"id":"b8HuLzaVFYjZjL53giaFMEjpips=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["930Q; Connecting Ramps NY 281 to I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lLK9Rs497FYvyPb8bEfvpHYEGGc="},{"type":"next-occurrence","id":"lXZviQxQnE97LW09JFmYMg0Bp5s="}],"description":"Line striping on 930Q; Connecting Ramps NY 281 to I-81 both directions between NY-281 (Cortlandville) and Exit - I-81; END ROUTE (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:34:33Z"},"road_event_id":"b8HuLzaVFYjZjL53giaFMEjpips=","beginning_cross_street":"NY-281","ending_cross_street":"Exit   - I-81; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.191804,42.627762]]}},{"id":"lXZviQxQnE97LW09JFmYMg0Bp5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["930Q; Connecting Ramps NY 281 to I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lLK9Rs497FYvyPb8bEfvpHYEGGc="},{"type":"next-occurrence","id":"lYpJkIHThv2tThGtEgzkYXNZK0E="}],"description":"Line striping on 930Q; Connecting Ramps NY 281 to I-81 both directions between NY-281 (Cortlandville) and Exit - I-81; END ROUTE (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:34:33Z"},"road_event_id":"lXZviQxQnE97LW09JFmYMg0Bp5s=","beginning_cross_street":"NY-281","ending_cross_street":"Exit   - I-81; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.191804,42.627762]]}},{"id":"lYpJkIHThv2tThGtEgzkYXNZK0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["930Q; Connecting Ramps NY 281 to I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lLK9Rs497FYvyPb8bEfvpHYEGGc="},{"type":"next-occurrence","id":"ovddWgGpsSfEjMrehtOcDAC8UxY="}],"description":"Line striping on 930Q; Connecting Ramps NY 281 to I-81 both directions between NY-281 (Cortlandville) and Exit - I-81; END ROUTE (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:34:33Z"},"road_event_id":"lYpJkIHThv2tThGtEgzkYXNZK0E=","beginning_cross_street":"NY-281","ending_cross_street":"Exit   - I-81; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.191804,42.627762]]}},{"id":"ovddWgGpsSfEjMrehtOcDAC8UxY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["930Q; Connecting Ramps NY 281 to I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lLK9Rs497FYvyPb8bEfvpHYEGGc="}],"description":"Line striping on 930Q; Connecting Ramps NY 281 to I-81 both directions between NY-281 (Cortlandville) and Exit - I-81; END ROUTE (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:34:33Z"},"road_event_id":"ovddWgGpsSfEjMrehtOcDAC8UxY=","beginning_cross_street":"NY-281","ending_cross_street":"Exit   - I-81; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.191804,42.627762]]}},{"id":"X2L82Jhqp1wSbsxqrG6JhIQxghw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PbI2gbg4p6EeM1A2iekklxyWp2c="}],"description":"Line striping on I-81 northbound between Exit 38 - US 11; NY 221; Marathon (Marathon) and Exit 63 - NY 281; Preble (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:38:34Z"},"road_event_id":"X2L82Jhqp1wSbsxqrG6JhIQxghw=","beginning_cross_street":"Exit 38 - US 11; NY 221; Marathon","ending_cross_street":"Exit 63 - NY 281; Preble","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.029668,42.439973]]}},{"id":"PbI2gbg4p6EeM1A2iekklxyWp2c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2L82Jhqp1wSbsxqrG6JhIQxghw="},{"type":"next-occurrence","id":"uK6pcgWMdxGQ2/UtY0guB8jt3kA="}],"description":"Line striping on I-81 northbound between Exit 38 - US 11; NY 221; Marathon (Marathon) and Exit 63 - NY 281; Preble (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:38:34Z"},"road_event_id":"PbI2gbg4p6EeM1A2iekklxyWp2c=","beginning_cross_street":"Exit 38 - US 11; NY 221; Marathon","ending_cross_street":"Exit 63 - NY 281; Preble","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.029668,42.439973]]}},{"id":"uK6pcgWMdxGQ2/UtY0guB8jt3kA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2L82Jhqp1wSbsxqrG6JhIQxghw="},{"type":"next-occurrence","id":"AOz1EyobaxZ1jufdvqdeJC9SyMQ="}],"description":"Line striping on I-81 northbound between Exit 38 - US 11; NY 221; Marathon (Marathon) and Exit 63 - NY 281; Preble (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:38:34Z"},"road_event_id":"uK6pcgWMdxGQ2/UtY0guB8jt3kA=","beginning_cross_street":"Exit 38 - US 11; NY 221; Marathon","ending_cross_street":"Exit 63 - NY 281; Preble","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.029668,42.439973]]}},{"id":"AOz1EyobaxZ1jufdvqdeJC9SyMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2L82Jhqp1wSbsxqrG6JhIQxghw="},{"type":"next-occurrence","id":"l++eba+52xOTRGPwnoyaro3pod0="}],"description":"Line striping on I-81 northbound between Exit 38 - US 11; NY 221; Marathon (Marathon) and Exit 63 - NY 281; Preble (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:38:34Z"},"road_event_id":"AOz1EyobaxZ1jufdvqdeJC9SyMQ=","beginning_cross_street":"Exit 38 - US 11; NY 221; Marathon","ending_cross_street":"Exit 63 - NY 281; Preble","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.029668,42.439973]]}},{"id":"l++eba+52xOTRGPwnoyaro3pod0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2L82Jhqp1wSbsxqrG6JhIQxghw="},{"type":"next-occurrence","id":"G/xX1K/UrQNtlRMwpsGPH57AJwI="}],"description":"Line striping on I-81 northbound between Exit 38 - US 11; NY 221; Marathon (Marathon) and Exit 63 - NY 281; Preble (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:38:34Z"},"road_event_id":"l++eba+52xOTRGPwnoyaro3pod0=","beginning_cross_street":"Exit 38 - US 11; NY 221; Marathon","ending_cross_street":"Exit 63 - NY 281; Preble","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.029668,42.439973]]}},{"id":"G/xX1K/UrQNtlRMwpsGPH57AJwI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2L82Jhqp1wSbsxqrG6JhIQxghw="},{"type":"next-occurrence","id":"JsvCcc6hvuCOEKoD6fm8E8JqreI="}],"description":"Line striping on I-81 northbound between Exit 38 - US 11; NY 221; Marathon (Marathon) and Exit 63 - NY 281; Preble (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:38:34Z"},"road_event_id":"G/xX1K/UrQNtlRMwpsGPH57AJwI=","beginning_cross_street":"Exit 38 - US 11; NY 221; Marathon","ending_cross_street":"Exit 63 - NY 281; Preble","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.029668,42.439973]]}},{"id":"JsvCcc6hvuCOEKoD6fm8E8JqreI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2L82Jhqp1wSbsxqrG6JhIQxghw="},{"type":"next-occurrence","id":"4Fhhck0PAydS0T5UK507VYrLvOA="}],"description":"Line striping on I-81 northbound between Exit 38 - US 11; NY 221; Marathon (Marathon) and Exit 63 - NY 281; Preble (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:38:34Z"},"road_event_id":"JsvCcc6hvuCOEKoD6fm8E8JqreI=","beginning_cross_street":"Exit 38 - US 11; NY 221; Marathon","ending_cross_street":"Exit 63 - NY 281; Preble","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.029668,42.439973]]}},{"id":"4Fhhck0PAydS0T5UK507VYrLvOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2L82Jhqp1wSbsxqrG6JhIQxghw="},{"type":"next-occurrence","id":"HRyxYjRff2cP24URF6zccZKm4VE="}],"description":"Line striping on I-81 northbound between Exit 38 - US 11; NY 221; Marathon (Marathon) and Exit 63 - NY 281; Preble (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:38:34Z"},"road_event_id":"4Fhhck0PAydS0T5UK507VYrLvOA=","beginning_cross_street":"Exit 38 - US 11; NY 221; Marathon","ending_cross_street":"Exit 63 - NY 281; Preble","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.029668,42.439973]]}},{"id":"HRyxYjRff2cP24URF6zccZKm4VE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2L82Jhqp1wSbsxqrG6JhIQxghw="},{"type":"next-occurrence","id":"hHlJE/fJxF+oc99nTH9k5bdxTno="}],"description":"Line striping on I-81 northbound between Exit 38 - US 11; NY 221; Marathon (Marathon) and Exit 63 - NY 281; Preble (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:38:34Z"},"road_event_id":"HRyxYjRff2cP24URF6zccZKm4VE=","beginning_cross_street":"Exit 38 - US 11; NY 221; Marathon","ending_cross_street":"Exit 63 - NY 281; Preble","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.029668,42.439973]]}},{"id":"hHlJE/fJxF+oc99nTH9k5bdxTno=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2L82Jhqp1wSbsxqrG6JhIQxghw="},{"type":"next-occurrence","id":"pDRM5XaACiStRe/vQUIumuPz4Qg="}],"description":"Line striping on I-81 northbound between Exit 38 - US 11; NY 221; Marathon (Marathon) and Exit 63 - NY 281; Preble (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:38:34Z"},"road_event_id":"hHlJE/fJxF+oc99nTH9k5bdxTno=","beginning_cross_street":"Exit 38 - US 11; NY 221; Marathon","ending_cross_street":"Exit 63 - NY 281; Preble","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.029668,42.439973]]}},{"id":"pDRM5XaACiStRe/vQUIumuPz4Qg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2L82Jhqp1wSbsxqrG6JhIQxghw="}],"description":"Line striping on I-81 northbound between Exit 38 - US 11; NY 221; Marathon (Marathon) and Exit 63 - NY 281; Preble (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:38:34Z"},"road_event_id":"pDRM5XaACiStRe/vQUIumuPz4Qg=","beginning_cross_street":"Exit 38 - US 11; NY 221; Marathon","ending_cross_street":"Exit 63 - NY 281; Preble","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.029668,42.439973]]}},{"id":"PzD4OjsldzTGRudAksv6JNkMvwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tOjFANVgiEFWUuyuXrwc4EUAJlU="}],"description":"Line striping on I-81 southbound between Exit 63 - NY 281; Preble (Preble) and Exit 39 - US 11; NY 221; Marathon (Marathon) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:40:14Z"},"road_event_id":"PzD4OjsldzTGRudAksv6JNkMvwc=","beginning_cross_street":"Exit 63 - NY 281; Preble","ending_cross_street":"Exit 39 - US 11; NY 221; Marathon","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.137077,42.74907]]}},{"id":"tOjFANVgiEFWUuyuXrwc4EUAJlU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PzD4OjsldzTGRudAksv6JNkMvwc="},{"type":"next-occurrence","id":"Ji3IfPw4YWqwGEXlZqeCOXt79+E="}],"description":"Line striping on I-81 southbound between Exit 63 - NY 281; Preble (Preble) and Exit 39 - US 11; NY 221; Marathon (Marathon) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:40:14Z"},"road_event_id":"tOjFANVgiEFWUuyuXrwc4EUAJlU=","beginning_cross_street":"Exit 63 - NY 281; Preble","ending_cross_street":"Exit 39 - US 11; NY 221; Marathon","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.137077,42.74907]]}},{"id":"Ji3IfPw4YWqwGEXlZqeCOXt79+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PzD4OjsldzTGRudAksv6JNkMvwc="},{"type":"next-occurrence","id":"2TtsjmQKFcmWr/xDmHTH7hT2J0Q="}],"description":"Line striping on I-81 southbound between Exit 63 - NY 281; Preble (Preble) and Exit 39 - US 11; NY 221; Marathon (Marathon) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:40:14Z"},"road_event_id":"Ji3IfPw4YWqwGEXlZqeCOXt79+E=","beginning_cross_street":"Exit 63 - NY 281; Preble","ending_cross_street":"Exit 39 - US 11; NY 221; Marathon","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.137077,42.74907]]}},{"id":"2TtsjmQKFcmWr/xDmHTH7hT2J0Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PzD4OjsldzTGRudAksv6JNkMvwc="},{"type":"next-occurrence","id":"jfpKz5Vqp59gP8vtLfcR2re/yZg="}],"description":"Line striping on I-81 southbound between Exit 63 - NY 281; Preble (Preble) and Exit 39 - US 11; NY 221; Marathon (Marathon) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:40:14Z"},"road_event_id":"2TtsjmQKFcmWr/xDmHTH7hT2J0Q=","beginning_cross_street":"Exit 63 - NY 281; Preble","ending_cross_street":"Exit 39 - US 11; NY 221; Marathon","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.137077,42.74907]]}},{"id":"jfpKz5Vqp59gP8vtLfcR2re/yZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PzD4OjsldzTGRudAksv6JNkMvwc="},{"type":"next-occurrence","id":"M9jMVd1Sd1WiUOxoLVqizQ1zBLE="}],"description":"Line striping on I-81 southbound between Exit 63 - NY 281; Preble (Preble) and Exit 39 - US 11; NY 221; Marathon (Marathon) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:40:14Z"},"road_event_id":"jfpKz5Vqp59gP8vtLfcR2re/yZg=","beginning_cross_street":"Exit 63 - NY 281; Preble","ending_cross_street":"Exit 39 - US 11; NY 221; Marathon","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.137077,42.74907]]}},{"id":"M9jMVd1Sd1WiUOxoLVqizQ1zBLE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PzD4OjsldzTGRudAksv6JNkMvwc="},{"type":"next-occurrence","id":"uZuEOpvjxmECf8cGRlkKcoicB7A="}],"description":"Line striping on I-81 southbound between Exit 63 - NY 281; Preble (Preble) and Exit 39 - US 11; NY 221; Marathon (Marathon) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:40:14Z"},"road_event_id":"M9jMVd1Sd1WiUOxoLVqizQ1zBLE=","beginning_cross_street":"Exit 63 - NY 281; Preble","ending_cross_street":"Exit 39 - US 11; NY 221; Marathon","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.137077,42.74907]]}},{"id":"uZuEOpvjxmECf8cGRlkKcoicB7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PzD4OjsldzTGRudAksv6JNkMvwc="},{"type":"next-occurrence","id":"07AMkr6AdA6+fxSOtq4RGKuFyJA="}],"description":"Line striping on I-81 southbound between Exit 63 - NY 281; Preble (Preble) and Exit 39 - US 11; NY 221; Marathon (Marathon) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:40:14Z"},"road_event_id":"uZuEOpvjxmECf8cGRlkKcoicB7A=","beginning_cross_street":"Exit 63 - NY 281; Preble","ending_cross_street":"Exit 39 - US 11; NY 221; Marathon","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.137077,42.74907]]}},{"id":"07AMkr6AdA6+fxSOtq4RGKuFyJA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PzD4OjsldzTGRudAksv6JNkMvwc="},{"type":"next-occurrence","id":"Y/xs2j2bNKOBj/sw8itgHHhmIng="}],"description":"Line striping on I-81 southbound between Exit 63 - NY 281; Preble (Preble) and Exit 39 - US 11; NY 221; Marathon (Marathon) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:40:14Z"},"road_event_id":"07AMkr6AdA6+fxSOtq4RGKuFyJA=","beginning_cross_street":"Exit 63 - NY 281; Preble","ending_cross_street":"Exit 39 - US 11; NY 221; Marathon","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.137077,42.74907]]}},{"id":"Y/xs2j2bNKOBj/sw8itgHHhmIng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PzD4OjsldzTGRudAksv6JNkMvwc="},{"type":"next-occurrence","id":"6KMKqxXVHK9vcsUYHnjhP/RuBf0="}],"description":"Line striping on I-81 southbound between Exit 63 - NY 281; Preble (Preble) and Exit 39 - US 11; NY 221; Marathon (Marathon) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:40:14Z"},"road_event_id":"Y/xs2j2bNKOBj/sw8itgHHhmIng=","beginning_cross_street":"Exit 63 - NY 281; Preble","ending_cross_street":"Exit 39 - US 11; NY 221; Marathon","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.137077,42.74907]]}},{"id":"6KMKqxXVHK9vcsUYHnjhP/RuBf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PzD4OjsldzTGRudAksv6JNkMvwc="},{"type":"next-occurrence","id":"24+ZP7vW8cNMdOp80kPCyxVIEr8="}],"description":"Line striping on I-81 southbound between Exit 63 - NY 281; Preble (Preble) and Exit 39 - US 11; NY 221; Marathon (Marathon) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:40:14Z"},"road_event_id":"6KMKqxXVHK9vcsUYHnjhP/RuBf0=","beginning_cross_street":"Exit 63 - NY 281; Preble","ending_cross_street":"Exit 39 - US 11; NY 221; Marathon","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.137077,42.74907]]}},{"id":"24+ZP7vW8cNMdOp80kPCyxVIEr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PzD4OjsldzTGRudAksv6JNkMvwc="}],"description":"Line striping on I-81 southbound between Exit 63 - NY 281; Preble (Preble) and Exit 39 - US 11; NY 221; Marathon (Marathon) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:40:14Z"},"road_event_id":"24+ZP7vW8cNMdOp80kPCyxVIEr8=","beginning_cross_street":"Exit 63 - NY 281; Preble","ending_cross_street":"Exit 39 - US 11; NY 221; Marathon","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.137077,42.74907]]}},{"id":"Vc4aa3KuRZ3K1FbJ6Eiktnz9Zk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CQfq5hOBsfDyuICnl8uhVicAYIs="}],"description":"Line striping on US 11 both directions between Hoxie Gorge Rd (Virgil) and Song Lake Crossing Rd (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:44:02Z"},"road_event_id":"Vc4aa3KuRZ3K1FbJ6Eiktnz9Zk8=","beginning_cross_street":"Hoxie Gorge Rd","ending_cross_street":"Song Lake Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.09663,42.545888]]}},{"id":"CQfq5hOBsfDyuICnl8uhVicAYIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vc4aa3KuRZ3K1FbJ6Eiktnz9Zk8="},{"type":"next-occurrence","id":"WnAyTa4Gsgo9nd1+oTT8LSeznow="}],"description":"Line striping on US 11 both directions between Hoxie Gorge Rd (Virgil) and Song Lake Crossing Rd (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:44:02Z"},"road_event_id":"CQfq5hOBsfDyuICnl8uhVicAYIs=","beginning_cross_street":"Hoxie Gorge Rd","ending_cross_street":"Song Lake Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.09663,42.545888]]}},{"id":"WnAyTa4Gsgo9nd1+oTT8LSeznow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vc4aa3KuRZ3K1FbJ6Eiktnz9Zk8="},{"type":"next-occurrence","id":"CD/JFmTp50PjNetNLleMVi9yAhA="}],"description":"Line striping on US 11 both directions between Hoxie Gorge Rd (Virgil) and Song Lake Crossing Rd (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:44:02Z"},"road_event_id":"WnAyTa4Gsgo9nd1+oTT8LSeznow=","beginning_cross_street":"Hoxie Gorge Rd","ending_cross_street":"Song Lake Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.09663,42.545888]]}},{"id":"CD/JFmTp50PjNetNLleMVi9yAhA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vc4aa3KuRZ3K1FbJ6Eiktnz9Zk8="},{"type":"next-occurrence","id":"SO1aaG20FKMbVzuJUUr+2msU/KY="}],"description":"Line striping on US 11 both directions between Hoxie Gorge Rd (Virgil) and Song Lake Crossing Rd (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:44:02Z"},"road_event_id":"CD/JFmTp50PjNetNLleMVi9yAhA=","beginning_cross_street":"Hoxie Gorge Rd","ending_cross_street":"Song Lake Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.09663,42.545888]]}},{"id":"SO1aaG20FKMbVzuJUUr+2msU/KY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vc4aa3KuRZ3K1FbJ6Eiktnz9Zk8="},{"type":"next-occurrence","id":"3JuLhDsdKakTxZSl3/OuLbraNnQ="}],"description":"Line striping on US 11 both directions between Hoxie Gorge Rd (Virgil) and Song Lake Crossing Rd (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:44:02Z"},"road_event_id":"SO1aaG20FKMbVzuJUUr+2msU/KY=","beginning_cross_street":"Hoxie Gorge Rd","ending_cross_street":"Song Lake Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.09663,42.545888]]}},{"id":"3JuLhDsdKakTxZSl3/OuLbraNnQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vc4aa3KuRZ3K1FbJ6Eiktnz9Zk8="},{"type":"next-occurrence","id":"fxv6oXtCEC19R8DOi4uZ+nPh6Wo="}],"description":"Line striping on US 11 both directions between Hoxie Gorge Rd (Virgil) and Song Lake Crossing Rd (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:44:02Z"},"road_event_id":"3JuLhDsdKakTxZSl3/OuLbraNnQ=","beginning_cross_street":"Hoxie Gorge Rd","ending_cross_street":"Song Lake Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.09663,42.545888]]}},{"id":"fxv6oXtCEC19R8DOi4uZ+nPh6Wo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vc4aa3KuRZ3K1FbJ6Eiktnz9Zk8="},{"type":"next-occurrence","id":"LhbkUCpW8QkRQdlHCpKUPOr9dSA="}],"description":"Line striping on US 11 both directions between Hoxie Gorge Rd (Virgil) and Song Lake Crossing Rd (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:44:02Z"},"road_event_id":"fxv6oXtCEC19R8DOi4uZ+nPh6Wo=","beginning_cross_street":"Hoxie Gorge Rd","ending_cross_street":"Song Lake Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.09663,42.545888]]}},{"id":"LhbkUCpW8QkRQdlHCpKUPOr9dSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vc4aa3KuRZ3K1FbJ6Eiktnz9Zk8="},{"type":"next-occurrence","id":"o1u5kbHuy3NonZS6OSCGtkwMINg="}],"description":"Line striping on US 11 both directions between Hoxie Gorge Rd (Virgil) and Song Lake Crossing Rd (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:44:02Z"},"road_event_id":"LhbkUCpW8QkRQdlHCpKUPOr9dSA=","beginning_cross_street":"Hoxie Gorge Rd","ending_cross_street":"Song Lake Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.09663,42.545888]]}},{"id":"o1u5kbHuy3NonZS6OSCGtkwMINg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vc4aa3KuRZ3K1FbJ6Eiktnz9Zk8="},{"type":"next-occurrence","id":"bfcHw3e76ooARYYlbe2SXvns6o0="}],"description":"Line striping on US 11 both directions between Hoxie Gorge Rd (Virgil) and Song Lake Crossing Rd (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:44:02Z"},"road_event_id":"o1u5kbHuy3NonZS6OSCGtkwMINg=","beginning_cross_street":"Hoxie Gorge Rd","ending_cross_street":"Song Lake Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.09663,42.545888]]}},{"id":"bfcHw3e76ooARYYlbe2SXvns6o0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vc4aa3KuRZ3K1FbJ6Eiktnz9Zk8="},{"type":"next-occurrence","id":"Ww0Vn/7zkA1UOvPbHJ+dLAk/2+c="}],"description":"Line striping on US 11 both directions between Hoxie Gorge Rd (Virgil) and Song Lake Crossing Rd (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:44:02Z"},"road_event_id":"bfcHw3e76ooARYYlbe2SXvns6o0=","beginning_cross_street":"Hoxie Gorge Rd","ending_cross_street":"Song Lake Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.09663,42.545888]]}},{"id":"Ww0Vn/7zkA1UOvPbHJ+dLAk/2+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vc4aa3KuRZ3K1FbJ6Eiktnz9Zk8="}],"description":"Line striping on US 11 both directions between Hoxie Gorge Rd (Virgil) and Song Lake Crossing Rd (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:44:02Z"},"road_event_id":"Ww0Vn/7zkA1UOvPbHJ+dLAk/2+c=","beginning_cross_street":"Hoxie Gorge Rd","ending_cross_street":"Song Lake Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.09663,42.545888]]}},{"id":"IErby2R6Gei8BzF2QBprq3IAdQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gwxMKWNXRO3XlUNCHS7p+nl+s54="}],"description":"Line striping on NY 13 both directions between Old Dryden Rd (Virgil) and Lorings Crossing Rd (Homer) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:47:13Z"},"road_event_id":"IErby2R6Gei8BzF2QBprq3IAdQ4=","beginning_cross_street":"Old Dryden Rd","ending_cross_street":"Lorings Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.267309,42.535789]]}},{"id":"gwxMKWNXRO3XlUNCHS7p+nl+s54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IErby2R6Gei8BzF2QBprq3IAdQ4="},{"type":"next-occurrence","id":"TA23K63kPqs86YqJtRxwLK2uM2I="}],"description":"Line striping on NY 13 both directions between Old Dryden Rd (Virgil) and Lorings Crossing Rd (Homer) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:47:13Z"},"road_event_id":"gwxMKWNXRO3XlUNCHS7p+nl+s54=","beginning_cross_street":"Old Dryden Rd","ending_cross_street":"Lorings Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.267309,42.535789]]}},{"id":"TA23K63kPqs86YqJtRxwLK2uM2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IErby2R6Gei8BzF2QBprq3IAdQ4="},{"type":"next-occurrence","id":"b6riKFefXhGnlqkSZSP+igmzyC0="}],"description":"Line striping on NY 13 both directions between Old Dryden Rd (Virgil) and Lorings Crossing Rd (Homer) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:47:13Z"},"road_event_id":"TA23K63kPqs86YqJtRxwLK2uM2I=","beginning_cross_street":"Old Dryden Rd","ending_cross_street":"Lorings Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.267309,42.535789]]}},{"id":"b6riKFefXhGnlqkSZSP+igmzyC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IErby2R6Gei8BzF2QBprq3IAdQ4="},{"type":"next-occurrence","id":"henBoZKMcc3q7JZJ3pahJjmOywA="}],"description":"Line striping on NY 13 both directions between Old Dryden Rd (Virgil) and Lorings Crossing Rd (Homer) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:47:13Z"},"road_event_id":"b6riKFefXhGnlqkSZSP+igmzyC0=","beginning_cross_street":"Old Dryden Rd","ending_cross_street":"Lorings Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.267309,42.535789]]}},{"id":"henBoZKMcc3q7JZJ3pahJjmOywA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IErby2R6Gei8BzF2QBprq3IAdQ4="},{"type":"next-occurrence","id":"pqib6cf23J2vQkYz0vaSUYBPEZM="}],"description":"Line striping on NY 13 both directions between Old Dryden Rd (Virgil) and Lorings Crossing Rd (Homer) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:47:13Z"},"road_event_id":"henBoZKMcc3q7JZJ3pahJjmOywA=","beginning_cross_street":"Old Dryden Rd","ending_cross_street":"Lorings Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.267309,42.535789]]}},{"id":"pqib6cf23J2vQkYz0vaSUYBPEZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IErby2R6Gei8BzF2QBprq3IAdQ4="},{"type":"next-occurrence","id":"ZA9Il3xsvld2/2a67yYEUBeDR8k="}],"description":"Line striping on NY 13 both directions between Old Dryden Rd (Virgil) and Lorings Crossing Rd (Homer) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:47:13Z"},"road_event_id":"pqib6cf23J2vQkYz0vaSUYBPEZM=","beginning_cross_street":"Old Dryden Rd","ending_cross_street":"Lorings Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.267309,42.535789]]}},{"id":"ZA9Il3xsvld2/2a67yYEUBeDR8k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IErby2R6Gei8BzF2QBprq3IAdQ4="},{"type":"next-occurrence","id":"gemKm0k4ygEN9/niCzBOZlT74aU="}],"description":"Line striping on NY 13 both directions between Old Dryden Rd (Virgil) and Lorings Crossing Rd (Homer) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:47:13Z"},"road_event_id":"ZA9Il3xsvld2/2a67yYEUBeDR8k=","beginning_cross_street":"Old Dryden Rd","ending_cross_street":"Lorings Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.267309,42.535789]]}},{"id":"gemKm0k4ygEN9/niCzBOZlT74aU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IErby2R6Gei8BzF2QBprq3IAdQ4="},{"type":"next-occurrence","id":"3vnykw3CO3EzEVEUs7a5wRE8vHw="}],"description":"Line striping on NY 13 both directions between Old Dryden Rd (Virgil) and Lorings Crossing Rd (Homer) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:47:13Z"},"road_event_id":"gemKm0k4ygEN9/niCzBOZlT74aU=","beginning_cross_street":"Old Dryden Rd","ending_cross_street":"Lorings Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.267309,42.535789]]}},{"id":"3vnykw3CO3EzEVEUs7a5wRE8vHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IErby2R6Gei8BzF2QBprq3IAdQ4="},{"type":"next-occurrence","id":"k4RBdzJ7tWvUpX+DwxBDC4SZJ7o="}],"description":"Line striping on NY 13 both directions between Old Dryden Rd (Virgil) and Lorings Crossing Rd (Homer) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:47:13Z"},"road_event_id":"3vnykw3CO3EzEVEUs7a5wRE8vHw=","beginning_cross_street":"Old Dryden Rd","ending_cross_street":"Lorings Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.267309,42.535789]]}},{"id":"k4RBdzJ7tWvUpX+DwxBDC4SZJ7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IErby2R6Gei8BzF2QBprq3IAdQ4="},{"type":"next-occurrence","id":"cz+zxr9KF9x4+s8eJW6+MB8DO7c="}],"description":"Line striping on NY 13 both directions between Old Dryden Rd (Virgil) and Lorings Crossing Rd (Homer) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:47:13Z"},"road_event_id":"k4RBdzJ7tWvUpX+DwxBDC4SZJ7o=","beginning_cross_street":"Old Dryden Rd","ending_cross_street":"Lorings Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.267309,42.535789]]}},{"id":"cz+zxr9KF9x4+s8eJW6+MB8DO7c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IErby2R6Gei8BzF2QBprq3IAdQ4="}],"description":"Line striping on NY 13 both directions between Old Dryden Rd (Virgil) and Lorings Crossing Rd (Homer) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:47:13Z"},"road_event_id":"cz+zxr9KF9x4+s8eJW6+MB8DO7c=","beginning_cross_street":"Old Dryden Rd","ending_cross_street":"Lorings Crossing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.267309,42.535789]]}},{"id":"mQ/dH153E1MgduCEo7TZuJKiYBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"N26AbYxf976OfEDN7Cxq7ykfSgA="}],"description":"Line striping on NY 23 both directions between START ROUTE NY 23; NY 26 (Cincinnatus) and Lower Cincinnatus Rd (Cincinnatus) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:51:36Z"},"road_event_id":"mQ/dH153E1MgduCEo7TZuJKiYBA=","beginning_cross_street":"START ROUTE NY 23; NY 26","ending_cross_street":"Lower Cincinnatus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.904665,42.533915]]}},{"id":"N26AbYxf976OfEDN7Cxq7ykfSgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQ/dH153E1MgduCEo7TZuJKiYBA="},{"type":"next-occurrence","id":"ZpxuF9hy48E8GzW1c8HQQbYeh2U="}],"description":"Line striping on NY 23 both directions between START ROUTE NY 23; NY 26 (Cincinnatus) and Lower Cincinnatus Rd (Cincinnatus) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:51:36Z"},"road_event_id":"N26AbYxf976OfEDN7Cxq7ykfSgA=","beginning_cross_street":"START ROUTE NY 23; NY 26","ending_cross_street":"Lower Cincinnatus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.904665,42.533915]]}},{"id":"ZpxuF9hy48E8GzW1c8HQQbYeh2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQ/dH153E1MgduCEo7TZuJKiYBA="},{"type":"next-occurrence","id":"ZJYZMxktyk2j6cPE6sFe0uMmNB8="}],"description":"Line striping on NY 23 both directions between START ROUTE NY 23; NY 26 (Cincinnatus) and Lower Cincinnatus Rd (Cincinnatus) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:51:36Z"},"road_event_id":"ZpxuF9hy48E8GzW1c8HQQbYeh2U=","beginning_cross_street":"START ROUTE NY 23; NY 26","ending_cross_street":"Lower Cincinnatus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.904665,42.533915]]}},{"id":"ZJYZMxktyk2j6cPE6sFe0uMmNB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQ/dH153E1MgduCEo7TZuJKiYBA="},{"type":"next-occurrence","id":"IVYG2gMQfDFCuANTaz6uv046Zis="}],"description":"Line striping on NY 23 both directions between START ROUTE NY 23; NY 26 (Cincinnatus) and Lower Cincinnatus Rd (Cincinnatus) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:51:36Z"},"road_event_id":"ZJYZMxktyk2j6cPE6sFe0uMmNB8=","beginning_cross_street":"START ROUTE NY 23; NY 26","ending_cross_street":"Lower Cincinnatus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.904665,42.533915]]}},{"id":"IVYG2gMQfDFCuANTaz6uv046Zis=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQ/dH153E1MgduCEo7TZuJKiYBA="},{"type":"next-occurrence","id":"jN2D15nc5ADVUNjNKf/FemXgbnQ="}],"description":"Line striping on NY 23 both directions between START ROUTE NY 23; NY 26 (Cincinnatus) and Lower Cincinnatus Rd (Cincinnatus) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:51:36Z"},"road_event_id":"IVYG2gMQfDFCuANTaz6uv046Zis=","beginning_cross_street":"START ROUTE NY 23; NY 26","ending_cross_street":"Lower Cincinnatus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.904665,42.533915]]}},{"id":"jN2D15nc5ADVUNjNKf/FemXgbnQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQ/dH153E1MgduCEo7TZuJKiYBA="},{"type":"next-occurrence","id":"C6QPNGqGg5rCPgHELWzHlR60GFE="}],"description":"Line striping on NY 23 both directions between START ROUTE NY 23; NY 26 (Cincinnatus) and Lower Cincinnatus Rd (Cincinnatus) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:51:36Z"},"road_event_id":"jN2D15nc5ADVUNjNKf/FemXgbnQ=","beginning_cross_street":"START ROUTE NY 23; NY 26","ending_cross_street":"Lower Cincinnatus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.904665,42.533915]]}},{"id":"C6QPNGqGg5rCPgHELWzHlR60GFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQ/dH153E1MgduCEo7TZuJKiYBA="},{"type":"next-occurrence","id":"7Grp+uK5rkYlfrMw4stis4DGiTI="}],"description":"Line striping on NY 23 both directions between START ROUTE NY 23; NY 26 (Cincinnatus) and Lower Cincinnatus Rd (Cincinnatus) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:51:36Z"},"road_event_id":"C6QPNGqGg5rCPgHELWzHlR60GFE=","beginning_cross_street":"START ROUTE NY 23; NY 26","ending_cross_street":"Lower Cincinnatus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.904665,42.533915]]}},{"id":"7Grp+uK5rkYlfrMw4stis4DGiTI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQ/dH153E1MgduCEo7TZuJKiYBA="},{"type":"next-occurrence","id":"kDO8fjDYYXZnGD5hs1w7+b3bLLQ="}],"description":"Line striping on NY 23 both directions between START ROUTE NY 23; NY 26 (Cincinnatus) and Lower Cincinnatus Rd (Cincinnatus) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:51:36Z"},"road_event_id":"7Grp+uK5rkYlfrMw4stis4DGiTI=","beginning_cross_street":"START ROUTE NY 23; NY 26","ending_cross_street":"Lower Cincinnatus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.904665,42.533915]]}},{"id":"kDO8fjDYYXZnGD5hs1w7+b3bLLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQ/dH153E1MgduCEo7TZuJKiYBA="},{"type":"next-occurrence","id":"ejGV0i8vPjVM7wf+8n0gDSkKj2g="}],"description":"Line striping on NY 23 both directions between START ROUTE NY 23; NY 26 (Cincinnatus) and Lower Cincinnatus Rd (Cincinnatus) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:51:36Z"},"road_event_id":"kDO8fjDYYXZnGD5hs1w7+b3bLLQ=","beginning_cross_street":"START ROUTE NY 23; NY 26","ending_cross_street":"Lower Cincinnatus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.904665,42.533915]]}},{"id":"ejGV0i8vPjVM7wf+8n0gDSkKj2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQ/dH153E1MgduCEo7TZuJKiYBA="},{"type":"next-occurrence","id":"+zbSMwAiheM8vDBP14VXVsSyUaE="}],"description":"Line striping on NY 23 both directions between START ROUTE NY 23; NY 26 (Cincinnatus) and Lower Cincinnatus Rd (Cincinnatus) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:51:36Z"},"road_event_id":"ejGV0i8vPjVM7wf+8n0gDSkKj2g=","beginning_cross_street":"START ROUTE NY 23; NY 26","ending_cross_street":"Lower Cincinnatus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.904665,42.533915]]}},{"id":"+zbSMwAiheM8vDBP14VXVsSyUaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mQ/dH153E1MgduCEo7TZuJKiYBA="}],"description":"Line striping on NY 23 both directions between START ROUTE NY 23; NY 26 (Cincinnatus) and Lower Cincinnatus Rd (Cincinnatus) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:51:36Z"},"road_event_id":"+zbSMwAiheM8vDBP14VXVsSyUaE=","beginning_cross_street":"START ROUTE NY 23; NY 26","ending_cross_street":"Lower Cincinnatus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.904665,42.533915]]}},{"id":"U7EJOO647tKxOlqX03KXa6r3dUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kgOJZ/5jdxoRij2JtfQBv2ivlS4="}],"description":"Line striping on NY 26 both directions between NY 41 Junction Willet (Willet) and Cheningo Solon Pond Rd (Taylor) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:54:47Z"},"road_event_id":"U7EJOO647tKxOlqX03KXa6r3dUA=","beginning_cross_street":"NY 41 Junction Willet","ending_cross_street":"Cheningo Solon Pond Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.912013,42.469212]]}},{"id":"kgOJZ/5jdxoRij2JtfQBv2ivlS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7EJOO647tKxOlqX03KXa6r3dUA="},{"type":"next-occurrence","id":"sOw3pWjOwmaRG0D3DFxXoej3V1s="}],"description":"Line striping on NY 26 both directions between NY 41 Junction Willet (Willet) and Cheningo Solon Pond Rd (Taylor) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:54:47Z"},"road_event_id":"kgOJZ/5jdxoRij2JtfQBv2ivlS4=","beginning_cross_street":"NY 41 Junction Willet","ending_cross_street":"Cheningo Solon Pond Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.912013,42.469212]]}},{"id":"sOw3pWjOwmaRG0D3DFxXoej3V1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7EJOO647tKxOlqX03KXa6r3dUA="},{"type":"next-occurrence","id":"ixIxE/IM1+Wyth16zFjT9DTxgUQ="}],"description":"Line striping on NY 26 both directions between NY 41 Junction Willet (Willet) and Cheningo Solon Pond Rd (Taylor) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:54:47Z"},"road_event_id":"sOw3pWjOwmaRG0D3DFxXoej3V1s=","beginning_cross_street":"NY 41 Junction Willet","ending_cross_street":"Cheningo Solon Pond Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.912013,42.469212]]}},{"id":"ixIxE/IM1+Wyth16zFjT9DTxgUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7EJOO647tKxOlqX03KXa6r3dUA="},{"type":"next-occurrence","id":"EYqogs9WXXseTrK3Vp/v9l5pr9A="}],"description":"Line striping on NY 26 both directions between NY 41 Junction Willet (Willet) and Cheningo Solon Pond Rd (Taylor) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:54:47Z"},"road_event_id":"ixIxE/IM1+Wyth16zFjT9DTxgUQ=","beginning_cross_street":"NY 41 Junction Willet","ending_cross_street":"Cheningo Solon Pond Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.912013,42.469212]]}},{"id":"EYqogs9WXXseTrK3Vp/v9l5pr9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7EJOO647tKxOlqX03KXa6r3dUA="},{"type":"next-occurrence","id":"pZtx6j8nrZrJB0Gx7BYAvp52mBo="}],"description":"Line striping on NY 26 both directions between NY 41 Junction Willet (Willet) and Cheningo Solon Pond Rd (Taylor) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:54:47Z"},"road_event_id":"EYqogs9WXXseTrK3Vp/v9l5pr9A=","beginning_cross_street":"NY 41 Junction Willet","ending_cross_street":"Cheningo Solon Pond Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.912013,42.469212]]}},{"id":"pZtx6j8nrZrJB0Gx7BYAvp52mBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7EJOO647tKxOlqX03KXa6r3dUA="},{"type":"next-occurrence","id":"LdKmBlFSGl/CNqfZgKUfa1k82xo="}],"description":"Line striping on NY 26 both directions between NY 41 Junction Willet (Willet) and Cheningo Solon Pond Rd (Taylor) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:54:47Z"},"road_event_id":"pZtx6j8nrZrJB0Gx7BYAvp52mBo=","beginning_cross_street":"NY 41 Junction Willet","ending_cross_street":"Cheningo Solon Pond Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.912013,42.469212]]}},{"id":"LdKmBlFSGl/CNqfZgKUfa1k82xo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7EJOO647tKxOlqX03KXa6r3dUA="},{"type":"next-occurrence","id":"XCqTehQsVVxqvlafX6GNb/+esBE="}],"description":"Line striping on NY 26 both directions between NY 41 Junction Willet (Willet) and Cheningo Solon Pond Rd (Taylor) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:54:47Z"},"road_event_id":"LdKmBlFSGl/CNqfZgKUfa1k82xo=","beginning_cross_street":"NY 41 Junction Willet","ending_cross_street":"Cheningo Solon Pond Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.912013,42.469212]]}},{"id":"XCqTehQsVVxqvlafX6GNb/+esBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7EJOO647tKxOlqX03KXa6r3dUA="},{"type":"next-occurrence","id":"BJhGI0vyXV+HWelGshdeenvcA/g="}],"description":"Line striping on NY 26 both directions between NY 41 Junction Willet (Willet) and Cheningo Solon Pond Rd (Taylor) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:54:47Z"},"road_event_id":"XCqTehQsVVxqvlafX6GNb/+esBE=","beginning_cross_street":"NY 41 Junction Willet","ending_cross_street":"Cheningo Solon Pond Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.912013,42.469212]]}},{"id":"BJhGI0vyXV+HWelGshdeenvcA/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7EJOO647tKxOlqX03KXa6r3dUA="},{"type":"next-occurrence","id":"PO/AEmQEQs+MAiCNwvhxj3sWeiE="}],"description":"Line striping on NY 26 both directions between NY 41 Junction Willet (Willet) and Cheningo Solon Pond Rd (Taylor) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:54:47Z"},"road_event_id":"BJhGI0vyXV+HWelGshdeenvcA/g=","beginning_cross_street":"NY 41 Junction Willet","ending_cross_street":"Cheningo Solon Pond Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.912013,42.469212]]}},{"id":"PO/AEmQEQs+MAiCNwvhxj3sWeiE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7EJOO647tKxOlqX03KXa6r3dUA="},{"type":"next-occurrence","id":"bVe4Mh0UnUKdRhSj3/dl5n6Wx8U="}],"description":"Line striping on NY 26 both directions between NY 41 Junction Willet (Willet) and Cheningo Solon Pond Rd (Taylor) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:54:47Z"},"road_event_id":"PO/AEmQEQs+MAiCNwvhxj3sWeiE=","beginning_cross_street":"NY 41 Junction Willet","ending_cross_street":"Cheningo Solon Pond Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.912013,42.469212]]}},{"id":"bVe4Mh0UnUKdRhSj3/dl5n6Wx8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7EJOO647tKxOlqX03KXa6r3dUA="}],"description":"Line striping on NY 26 both directions between NY 41 Junction Willet (Willet) and Cheningo Solon Pond Rd (Taylor) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:54:47Z"},"road_event_id":"bVe4Mh0UnUKdRhSj3/dl5n6Wx8U=","beginning_cross_street":"NY 41 Junction Willet","ending_cross_street":"Cheningo Solon Pond Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.912013,42.469212]]}},{"id":"i6IPCqWQhG1mu2HUmIdafFOMITU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 38"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8Fi5lxjdkPXYII/8t1HdtxvuXv4="}],"description":"Line striping on NY 38 both directions between Daisy Hollow Rd (Harford) and Cornell Ln (Harford) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:58:07Z"},"road_event_id":"i6IPCqWQhG1mu2HUmIdafFOMITU=","beginning_cross_street":"Daisy Hollow Rd","ending_cross_street":"Cornell Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235633,42.429837]]}},{"id":"8Fi5lxjdkPXYII/8t1HdtxvuXv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 38"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i6IPCqWQhG1mu2HUmIdafFOMITU="},{"type":"next-occurrence","id":"LeXXR4KHPgQIQjyl+tpwR9/eC5Q="}],"description":"Line striping on NY 38 both directions between Daisy Hollow Rd (Harford) and Cornell Ln (Harford) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:58:07Z"},"road_event_id":"8Fi5lxjdkPXYII/8t1HdtxvuXv4=","beginning_cross_street":"Daisy Hollow Rd","ending_cross_street":"Cornell Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235633,42.429837]]}},{"id":"LeXXR4KHPgQIQjyl+tpwR9/eC5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 38"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i6IPCqWQhG1mu2HUmIdafFOMITU="},{"type":"next-occurrence","id":"xB/qCjI5Ny2DB40tALdjUrKgfEY="}],"description":"Line striping on NY 38 both directions between Daisy Hollow Rd (Harford) and Cornell Ln (Harford) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:58:07Z"},"road_event_id":"LeXXR4KHPgQIQjyl+tpwR9/eC5Q=","beginning_cross_street":"Daisy Hollow Rd","ending_cross_street":"Cornell Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235633,42.429837]]}},{"id":"xB/qCjI5Ny2DB40tALdjUrKgfEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 38"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i6IPCqWQhG1mu2HUmIdafFOMITU="},{"type":"next-occurrence","id":"RK2PuSvo/w/69oJEbV/+lllNG40="}],"description":"Line striping on NY 38 both directions between Daisy Hollow Rd (Harford) and Cornell Ln (Harford) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:58:07Z"},"road_event_id":"xB/qCjI5Ny2DB40tALdjUrKgfEY=","beginning_cross_street":"Daisy Hollow Rd","ending_cross_street":"Cornell Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235633,42.429837]]}},{"id":"RK2PuSvo/w/69oJEbV/+lllNG40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 38"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i6IPCqWQhG1mu2HUmIdafFOMITU="},{"type":"next-occurrence","id":"/br1AUe1L/qUKVT5ptfjLZ4Htlc="}],"description":"Line striping on NY 38 both directions between Daisy Hollow Rd (Harford) and Cornell Ln (Harford) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:58:07Z"},"road_event_id":"RK2PuSvo/w/69oJEbV/+lllNG40=","beginning_cross_street":"Daisy Hollow Rd","ending_cross_street":"Cornell Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235633,42.429837]]}},{"id":"/br1AUe1L/qUKVT5ptfjLZ4Htlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 38"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i6IPCqWQhG1mu2HUmIdafFOMITU="}],"description":"Line striping on NY 38 both directions between Daisy Hollow Rd (Harford) and Cornell Ln (Harford) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T22:58:07Z"},"road_event_id":"/br1AUe1L/qUKVT5ptfjLZ4Htlc=","beginning_cross_street":"Daisy Hollow Rd","ending_cross_street":"Cornell Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235633,42.429837]]}},{"id":"ne6UMT6n95Neu6b5YwhEi672Ifo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 41"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2vINJZqrqFocutbsmBPU4WARW6s="}],"description":"Line striping on NY 41 both directions between German Rd (Willet) and Long Rd (Scott) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:04:55Z"},"road_event_id":"ne6UMT6n95Neu6b5YwhEi672Ifo=","beginning_cross_street":"German Rd","ending_cross_street":"Long Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.893258,42.469279]]}},{"id":"2vINJZqrqFocutbsmBPU4WARW6s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ne6UMT6n95Neu6b5YwhEi672Ifo="},{"type":"next-occurrence","id":"iaS/oBvP/uBsc3rJl+kKgL0/HEY="}],"description":"Line striping on NY 41 both directions between German Rd (Willet) and Long Rd (Scott) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:04:55Z"},"road_event_id":"2vINJZqrqFocutbsmBPU4WARW6s=","beginning_cross_street":"German Rd","ending_cross_street":"Long Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.893258,42.469279]]}},{"id":"iaS/oBvP/uBsc3rJl+kKgL0/HEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ne6UMT6n95Neu6b5YwhEi672Ifo="},{"type":"next-occurrence","id":"Qtrq009wLASX/GScH+fja4Ychqw="}],"description":"Line striping on NY 41 both directions between German Rd (Willet) and Long Rd (Scott) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:04:55Z"},"road_event_id":"iaS/oBvP/uBsc3rJl+kKgL0/HEY=","beginning_cross_street":"German Rd","ending_cross_street":"Long Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.893258,42.469279]]}},{"id":"Qtrq009wLASX/GScH+fja4Ychqw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ne6UMT6n95Neu6b5YwhEi672Ifo="},{"type":"next-occurrence","id":"1ITFydLkD37I/frKsBd2Ft3q8+g="}],"description":"Line striping on NY 41 both directions between German Rd (Willet) and Long Rd (Scott) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:04:55Z"},"road_event_id":"Qtrq009wLASX/GScH+fja4Ychqw=","beginning_cross_street":"German Rd","ending_cross_street":"Long Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.893258,42.469279]]}},{"id":"1ITFydLkD37I/frKsBd2Ft3q8+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ne6UMT6n95Neu6b5YwhEi672Ifo="},{"type":"next-occurrence","id":"XPHhVopFzlWmrMxr8YUuW/MuUow="}],"description":"Line striping on NY 41 both directions between German Rd (Willet) and Long Rd (Scott) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:04:55Z"},"road_event_id":"1ITFydLkD37I/frKsBd2Ft3q8+g=","beginning_cross_street":"German Rd","ending_cross_street":"Long Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.893258,42.469279]]}},{"id":"XPHhVopFzlWmrMxr8YUuW/MuUow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ne6UMT6n95Neu6b5YwhEi672Ifo="}],"description":"Line striping on NY 41 both directions between German Rd (Willet) and Long Rd (Scott) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:04:55Z"},"road_event_id":"XPHhVopFzlWmrMxr8YUuW/MuUow=","beginning_cross_street":"German Rd","ending_cross_street":"Long Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.893258,42.469279]]}},{"id":"SYooAnmZ1IzgBpCVrzzhVLWjpxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 90"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RDBMrorvSCZaOPbwR5TYzNlYI/Y="}],"description":"Line striping on NY 90 both directions between South Main Street; NY 41; START ROUTE NY 90 (Homer) and South West Street; NY 281 (Homer) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:07:37Z"},"road_event_id":"SYooAnmZ1IzgBpCVrzzhVLWjpxI=","beginning_cross_street":"South Main Street; NY 41; START ROUTE NY 90","ending_cross_street":"South West Street; NY 281","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.178836,42.634689]]}},{"id":"RDBMrorvSCZaOPbwR5TYzNlYI/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 90"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SYooAnmZ1IzgBpCVrzzhVLWjpxI="},{"type":"next-occurrence","id":"wJrclijItyyuMxv/v69MSQLITOE="}],"description":"Line striping on NY 90 both directions between South Main Street; NY 41; START ROUTE NY 90 (Homer) and South West Street; NY 281 (Homer) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:07:37Z"},"road_event_id":"RDBMrorvSCZaOPbwR5TYzNlYI/Y=","beginning_cross_street":"South Main Street; NY 41; START ROUTE NY 90","ending_cross_street":"South West Street; NY 281","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.178836,42.634689]]}},{"id":"wJrclijItyyuMxv/v69MSQLITOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 90"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SYooAnmZ1IzgBpCVrzzhVLWjpxI="},{"type":"next-occurrence","id":"rK4/SG/bXhGDGRIgyx7kmk897rI="}],"description":"Line striping on NY 90 both directions between South Main Street; NY 41; START ROUTE NY 90 (Homer) and South West Street; NY 281 (Homer) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:07:37Z"},"road_event_id":"wJrclijItyyuMxv/v69MSQLITOE=","beginning_cross_street":"South Main Street; NY 41; START ROUTE NY 90","ending_cross_street":"South West Street; NY 281","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.178836,42.634689]]}},{"id":"rK4/SG/bXhGDGRIgyx7kmk897rI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 90"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SYooAnmZ1IzgBpCVrzzhVLWjpxI="},{"type":"next-occurrence","id":"a1+wW0J5WLfdl8hQ8qK7J73JQec="}],"description":"Line striping on NY 90 both directions between South Main Street; NY 41; START ROUTE NY 90 (Homer) and South West Street; NY 281 (Homer) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:07:37Z"},"road_event_id":"rK4/SG/bXhGDGRIgyx7kmk897rI=","beginning_cross_street":"South Main Street; NY 41; START ROUTE NY 90","ending_cross_street":"South West Street; NY 281","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.178836,42.634689]]}},{"id":"a1+wW0J5WLfdl8hQ8qK7J73JQec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 90"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SYooAnmZ1IzgBpCVrzzhVLWjpxI="},{"type":"next-occurrence","id":"y8DuxqpxOUXw3sm9T3gDpiMQn4Q="}],"description":"Line striping on NY 90 both directions between South Main Street; NY 41; START ROUTE NY 90 (Homer) and South West Street; NY 281 (Homer) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:07:37Z"},"road_event_id":"a1+wW0J5WLfdl8hQ8qK7J73JQec=","beginning_cross_street":"South Main Street; NY 41; START ROUTE NY 90","ending_cross_street":"South West Street; NY 281","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.178836,42.634689]]}},{"id":"y8DuxqpxOUXw3sm9T3gDpiMQn4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 90"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SYooAnmZ1IzgBpCVrzzhVLWjpxI="}],"description":"Line striping on NY 90 both directions between South Main Street; NY 41; START ROUTE NY 90 (Homer) and South West Street; NY 281 (Homer) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:07:37Z"},"road_event_id":"y8DuxqpxOUXw3sm9T3gDpiMQn4Q=","beginning_cross_street":"South Main Street; NY 41; START ROUTE NY 90","ending_cross_street":"South West Street; NY 281","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.178836,42.634689]]}},{"id":"9hYnYLtjcapCEoPx/AsTDJXUwfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YwHoEnGVVith3D66L4SGPjrvwyw="}],"description":"Line striping on NY 91 both directions between START ROUTE NY 91; NY 13 (Truxton) and Town of Fabius; Town of Truxton Line (Truxton) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:10:16Z"},"road_event_id":"9hYnYLtjcapCEoPx/AsTDJXUwfw=","beginning_cross_street":"START ROUTE NY 91; NY 13","ending_cross_street":"Town of Fabius; Town of Truxton Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.02592,42.712004]]}},{"id":"YwHoEnGVVith3D66L4SGPjrvwyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9hYnYLtjcapCEoPx/AsTDJXUwfw="},{"type":"next-occurrence","id":"1qtHYGpi5iY0Cte/jMKv5J/oJws="}],"description":"Line striping on NY 91 both directions between START ROUTE NY 91; NY 13 (Truxton) and Town of Fabius; Town of Truxton Line (Truxton) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:10:16Z"},"road_event_id":"YwHoEnGVVith3D66L4SGPjrvwyw=","beginning_cross_street":"START ROUTE NY 91; NY 13","ending_cross_street":"Town of Fabius; Town of Truxton Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.02592,42.712004]]}},{"id":"1qtHYGpi5iY0Cte/jMKv5J/oJws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9hYnYLtjcapCEoPx/AsTDJXUwfw="},{"type":"next-occurrence","id":"7ffmSK3fVOAxiW12RdL1gNvFGFA="}],"description":"Line striping on NY 91 both directions between START ROUTE NY 91; NY 13 (Truxton) and Town of Fabius; Town of Truxton Line (Truxton) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:10:16Z"},"road_event_id":"1qtHYGpi5iY0Cte/jMKv5J/oJws=","beginning_cross_street":"START ROUTE NY 91; NY 13","ending_cross_street":"Town of Fabius; Town of Truxton Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.02592,42.712004]]}},{"id":"7ffmSK3fVOAxiW12RdL1gNvFGFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9hYnYLtjcapCEoPx/AsTDJXUwfw="},{"type":"next-occurrence","id":"1/9Xcl8uHCLZ5U89NurwysIb8Ho="}],"description":"Line striping on NY 91 both directions between START ROUTE NY 91; NY 13 (Truxton) and Town of Fabius; Town of Truxton Line (Truxton) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:10:16Z"},"road_event_id":"7ffmSK3fVOAxiW12RdL1gNvFGFA=","beginning_cross_street":"START ROUTE NY 91; NY 13","ending_cross_street":"Town of Fabius; Town of Truxton Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.02592,42.712004]]}},{"id":"1/9Xcl8uHCLZ5U89NurwysIb8Ho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9hYnYLtjcapCEoPx/AsTDJXUwfw="},{"type":"next-occurrence","id":"EVkpee9m4l2Jfna/9PA8GfMa8rE="}],"description":"Line striping on NY 91 both directions between START ROUTE NY 91; NY 13 (Truxton) and Town of Fabius; Town of Truxton Line (Truxton) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:10:16Z"},"road_event_id":"1/9Xcl8uHCLZ5U89NurwysIb8Ho=","beginning_cross_street":"START ROUTE NY 91; NY 13","ending_cross_street":"Town of Fabius; Town of Truxton Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.02592,42.712004]]}},{"id":"EVkpee9m4l2Jfna/9PA8GfMa8rE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9hYnYLtjcapCEoPx/AsTDJXUwfw="}],"description":"Line striping on NY 91 both directions between START ROUTE NY 91; NY 13 (Truxton) and Town of Fabius; Town of Truxton Line (Truxton) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:10:16Z"},"road_event_id":"EVkpee9m4l2Jfna/9PA8GfMa8rE=","beginning_cross_street":"START ROUTE NY 91; NY 13","ending_cross_street":"Town of Fabius; Town of Truxton Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.02592,42.712004]]}},{"id":"W454wSuKgPUIclejsW2aYQTP4T8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 200"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Hg1vP7gy66MuSAsnnxBnhpL+iJM="}],"description":"Line striping on NY 200 both directions between START ROUTE NY 200; NY 38 (Harford) and Railroad Ave (Harford) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:13:03Z"},"road_event_id":"W454wSuKgPUIclejsW2aYQTP4T8=","beginning_cross_street":"START ROUTE NY 200; NY 38","ending_cross_street":"Railroad Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.205735,42.410276]]}},{"id":"Hg1vP7gy66MuSAsnnxBnhpL+iJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 200"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W454wSuKgPUIclejsW2aYQTP4T8="},{"type":"next-occurrence","id":"ThLqow5YJ5uEofJm16jdtqME4EM="}],"description":"Line striping on NY 200 both directions between START ROUTE NY 200; NY 38 (Harford) and Railroad Ave (Harford) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:13:03Z"},"road_event_id":"Hg1vP7gy66MuSAsnnxBnhpL+iJM=","beginning_cross_street":"START ROUTE NY 200; NY 38","ending_cross_street":"Railroad Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.205735,42.410276]]}},{"id":"ThLqow5YJ5uEofJm16jdtqME4EM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 200"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W454wSuKgPUIclejsW2aYQTP4T8="},{"type":"next-occurrence","id":"eL2Vh1VsyZn5gmQINSjgyywjW90="}],"description":"Line striping on NY 200 both directions between START ROUTE NY 200; NY 38 (Harford) and Railroad Ave (Harford) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:13:03Z"},"road_event_id":"ThLqow5YJ5uEofJm16jdtqME4EM=","beginning_cross_street":"START ROUTE NY 200; NY 38","ending_cross_street":"Railroad Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.205735,42.410276]]}},{"id":"eL2Vh1VsyZn5gmQINSjgyywjW90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 200"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W454wSuKgPUIclejsW2aYQTP4T8="},{"type":"next-occurrence","id":"v8GHPA7gLZJklV9w9eXusd19cnU="}],"description":"Line striping on NY 200 both directions between START ROUTE NY 200; NY 38 (Harford) and Railroad Ave (Harford) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:13:03Z"},"road_event_id":"eL2Vh1VsyZn5gmQINSjgyywjW90=","beginning_cross_street":"START ROUTE NY 200; NY 38","ending_cross_street":"Railroad Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.205735,42.410276]]}},{"id":"v8GHPA7gLZJklV9w9eXusd19cnU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 200"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W454wSuKgPUIclejsW2aYQTP4T8="},{"type":"next-occurrence","id":"83s/wSR9MjbK0IN7RB6S79WZhOQ="}],"description":"Line striping on NY 200 both directions between START ROUTE NY 200; NY 38 (Harford) and Railroad Ave (Harford) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:13:03Z"},"road_event_id":"v8GHPA7gLZJklV9w9eXusd19cnU=","beginning_cross_street":"START ROUTE NY 200; NY 38","ending_cross_street":"Railroad Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.205735,42.410276]]}},{"id":"83s/wSR9MjbK0IN7RB6S79WZhOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 200"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W454wSuKgPUIclejsW2aYQTP4T8="}],"description":"Line striping on NY 200 both directions between START ROUTE NY 200; NY 38 (Harford) and Railroad Ave (Harford) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:13:03Z"},"road_event_id":"83s/wSR9MjbK0IN7RB6S79WZhOQ=","beginning_cross_street":"START ROUTE NY 200; NY 38","ending_cross_street":"Railroad Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.205735,42.410276]]}},{"id":"9PIJSn6oLLUckYtB9h7+erhWgAA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 215"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vtSa2RdTCqTbK80C4WLgFPlHmek="}],"description":"Line striping on NY 215 both directions between START ROUTE NY 215; NY 392 (Virgil) and Starr Rd (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:16:15Z"},"road_event_id":"9PIJSn6oLLUckYtB9h7+erhWgAA=","beginning_cross_street":"START ROUTE NY 215; NY 392","ending_cross_street":"Starr Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.194736,42.510605]]}},{"id":"vtSa2RdTCqTbK80C4WLgFPlHmek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 215"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9PIJSn6oLLUckYtB9h7+erhWgAA="},{"type":"next-occurrence","id":"G569mwJu5EWRzpOiMnLSynpxjyM="}],"description":"Line striping on NY 215 both directions between START ROUTE NY 215; NY 392 (Virgil) and Starr Rd (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:16:15Z"},"road_event_id":"vtSa2RdTCqTbK80C4WLgFPlHmek=","beginning_cross_street":"START ROUTE NY 215; NY 392","ending_cross_street":"Starr Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.194736,42.510605]]}},{"id":"G569mwJu5EWRzpOiMnLSynpxjyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 215"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9PIJSn6oLLUckYtB9h7+erhWgAA="},{"type":"next-occurrence","id":"034r6Y3fZV7tIbFYSMJY0FlItpA="}],"description":"Line striping on NY 215 both directions between START ROUTE NY 215; NY 392 (Virgil) and Starr Rd (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:16:15Z"},"road_event_id":"G569mwJu5EWRzpOiMnLSynpxjyM=","beginning_cross_street":"START ROUTE NY 215; NY 392","ending_cross_street":"Starr Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.194736,42.510605]]}},{"id":"034r6Y3fZV7tIbFYSMJY0FlItpA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 215"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9PIJSn6oLLUckYtB9h7+erhWgAA="},{"type":"next-occurrence","id":"vXrpPnrRd34F0jM4TIJr6/93BWM="}],"description":"Line striping on NY 215 both directions between START ROUTE NY 215; NY 392 (Virgil) and Starr Rd (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:16:15Z"},"road_event_id":"034r6Y3fZV7tIbFYSMJY0FlItpA=","beginning_cross_street":"START ROUTE NY 215; NY 392","ending_cross_street":"Starr Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.194736,42.510605]]}},{"id":"vXrpPnrRd34F0jM4TIJr6/93BWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 215"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9PIJSn6oLLUckYtB9h7+erhWgAA="},{"type":"next-occurrence","id":"8ZiqApNEY9jv9wrKCUVSZ2/Lo0g="}],"description":"Line striping on NY 215 both directions between START ROUTE NY 215; NY 392 (Virgil) and Starr Rd (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:16:15Z"},"road_event_id":"vXrpPnrRd34F0jM4TIJr6/93BWM=","beginning_cross_street":"START ROUTE NY 215; NY 392","ending_cross_street":"Starr Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.194736,42.510605]]}},{"id":"8ZiqApNEY9jv9wrKCUVSZ2/Lo0g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 215"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9PIJSn6oLLUckYtB9h7+erhWgAA="}],"description":"Line striping on NY 215 both directions between START ROUTE NY 215; NY 392 (Virgil) and Starr Rd (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:16:15Z"},"road_event_id":"8ZiqApNEY9jv9wrKCUVSZ2/Lo0g=","beginning_cross_street":"START ROUTE NY 215; NY 392","ending_cross_street":"Starr Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.194736,42.510605]]}},{"id":"E37kKR7LM3CT/aRvlg0H0C/1RSk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 221"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pqC2lyvOj7Ey5ctfgQJeY7ToNKY="}],"description":"Line striping on NY 221 both directions between START ROUTE NY 221; NY 38 (Harford) and NY 41; NY 26; END ROUTE (Willet) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:18:54Z"},"road_event_id":"E37kKR7LM3CT/aRvlg0H0C/1RSk=","beginning_cross_street":"START ROUTE NY 221; NY 38","ending_cross_street":"NY 41; NY 26; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.227548,42.425928]]}},{"id":"pqC2lyvOj7Ey5ctfgQJeY7ToNKY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 221"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E37kKR7LM3CT/aRvlg0H0C/1RSk="},{"type":"next-occurrence","id":"/668aq+P+COCQyMFO/c3SPTeshs="}],"description":"Line striping on NY 221 both directions between START ROUTE NY 221; NY 38 (Harford) and NY 41; NY 26; END ROUTE (Willet) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:18:54Z"},"road_event_id":"pqC2lyvOj7Ey5ctfgQJeY7ToNKY=","beginning_cross_street":"START ROUTE NY 221; NY 38","ending_cross_street":"NY 41; NY 26; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.227548,42.425928]]}},{"id":"/668aq+P+COCQyMFO/c3SPTeshs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 221"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E37kKR7LM3CT/aRvlg0H0C/1RSk="},{"type":"next-occurrence","id":"l2ZfIzDLfCbB+i7YDAhDdOYc43Y="}],"description":"Line striping on NY 221 both directions between START ROUTE NY 221; NY 38 (Harford) and NY 41; NY 26; END ROUTE (Willet) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:18:54Z"},"road_event_id":"/668aq+P+COCQyMFO/c3SPTeshs=","beginning_cross_street":"START ROUTE NY 221; NY 38","ending_cross_street":"NY 41; NY 26; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.227548,42.425928]]}},{"id":"l2ZfIzDLfCbB+i7YDAhDdOYc43Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 221"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E37kKR7LM3CT/aRvlg0H0C/1RSk="},{"type":"next-occurrence","id":"t8taWaJGAkqAVBbBmQ63ceOYErc="}],"description":"Line striping on NY 221 both directions between START ROUTE NY 221; NY 38 (Harford) and NY 41; NY 26; END ROUTE (Willet) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:18:54Z"},"road_event_id":"l2ZfIzDLfCbB+i7YDAhDdOYc43Y=","beginning_cross_street":"START ROUTE NY 221; NY 38","ending_cross_street":"NY 41; NY 26; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.227548,42.425928]]}},{"id":"t8taWaJGAkqAVBbBmQ63ceOYErc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 221"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E37kKR7LM3CT/aRvlg0H0C/1RSk="},{"type":"next-occurrence","id":"z9Bii7NwQ6MjvQqkX4FZykyiltQ="}],"description":"Line striping on NY 221 both directions between START ROUTE NY 221; NY 38 (Harford) and NY 41; NY 26; END ROUTE (Willet) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:18:54Z"},"road_event_id":"t8taWaJGAkqAVBbBmQ63ceOYErc=","beginning_cross_street":"START ROUTE NY 221; NY 38","ending_cross_street":"NY 41; NY 26; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.227548,42.425928]]}},{"id":"z9Bii7NwQ6MjvQqkX4FZykyiltQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 221"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E37kKR7LM3CT/aRvlg0H0C/1RSk="}],"description":"Line striping on NY 221 both directions between START ROUTE NY 221; NY 38 (Harford) and NY 41; NY 26; END ROUTE (Willet) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:18:54Z"},"road_event_id":"z9Bii7NwQ6MjvQqkX4FZykyiltQ=","beginning_cross_street":"START ROUTE NY 221; NY 38","ending_cross_street":"NY 41; NY 26; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.227548,42.425928]]}},{"id":"EpL5k5NA9K61eN2sgCBlagHfb1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NOBGAr+cxm/fr9cBVqGI+3vrCyI="}],"description":"Line striping on NY 222 both directions between Old Groton Rd (Cortlandville) and West Road; NY 281 (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:21:21Z"},"road_event_id":"EpL5k5NA9K61eN2sgCBlagHfb1Y=","beginning_cross_street":"Old Groton Rd","ending_cross_street":"West Road; NY 281","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.264994,42.587941]]}},{"id":"NOBGAr+cxm/fr9cBVqGI+3vrCyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EpL5k5NA9K61eN2sgCBlagHfb1Y="},{"type":"next-occurrence","id":"Mx36nnWObf7YSEQJHMV1Svr15Ps="}],"description":"Line striping on NY 222 both directions between Old Groton Rd (Cortlandville) and West Road; NY 281 (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:21:21Z"},"road_event_id":"NOBGAr+cxm/fr9cBVqGI+3vrCyI=","beginning_cross_street":"Old Groton Rd","ending_cross_street":"West Road; NY 281","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.264994,42.587941]]}},{"id":"Mx36nnWObf7YSEQJHMV1Svr15Ps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EpL5k5NA9K61eN2sgCBlagHfb1Y="},{"type":"next-occurrence","id":"ojdZuNZ4rjphtWPiUMhzDV9YOPA="}],"description":"Line striping on NY 222 both directions between Old Groton Rd (Cortlandville) and West Road; NY 281 (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:21:21Z"},"road_event_id":"Mx36nnWObf7YSEQJHMV1Svr15Ps=","beginning_cross_street":"Old Groton Rd","ending_cross_street":"West Road; NY 281","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.264994,42.587941]]}},{"id":"ojdZuNZ4rjphtWPiUMhzDV9YOPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EpL5k5NA9K61eN2sgCBlagHfb1Y="},{"type":"next-occurrence","id":"6TeU4A7grNUSo8EkQ9tuYlMrB6w="}],"description":"Line striping on NY 222 both directions between Old Groton Rd (Cortlandville) and West Road; NY 281 (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:21:21Z"},"road_event_id":"ojdZuNZ4rjphtWPiUMhzDV9YOPA=","beginning_cross_street":"Old Groton Rd","ending_cross_street":"West Road; NY 281","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.264994,42.587941]]}},{"id":"6TeU4A7grNUSo8EkQ9tuYlMrB6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EpL5k5NA9K61eN2sgCBlagHfb1Y="},{"type":"next-occurrence","id":"Nuf9KvWA45ul3E+AwBpNil1Gnpo="}],"description":"Line striping on NY 222 both directions between Old Groton Rd (Cortlandville) and West Road; NY 281 (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:21:21Z"},"road_event_id":"6TeU4A7grNUSo8EkQ9tuYlMrB6w=","beginning_cross_street":"Old Groton Rd","ending_cross_street":"West Road; NY 281","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.264994,42.587941]]}},{"id":"Nuf9KvWA45ul3E+AwBpNil1Gnpo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 222"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EpL5k5NA9K61eN2sgCBlagHfb1Y="}],"description":"Line striping on NY 222 both directions between Old Groton Rd (Cortlandville) and West Road; NY 281 (Cortlandville) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:21:21Z"},"road_event_id":"Nuf9KvWA45ul3E+AwBpNil1Gnpo=","beginning_cross_street":"Old Groton Rd","ending_cross_street":"West Road; NY 281","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.264994,42.587941]]}},{"id":"o+lrtCaOTOlAFVMX9eiUZbVMJKE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 281"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"i8Y45tBn4DkRIDgROOQmFonEWyY="}],"description":"Line striping on NY 281 both directions between START ROUTE NY 281; Lamont Circle; NY 13 (Cortlandville) and Tully Center Rd (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:24:39Z"},"road_event_id":"o+lrtCaOTOlAFVMX9eiUZbVMJKE=","beginning_cross_street":"START ROUTE NY 281; Lamont Circle; NY 13","ending_cross_street":"Tully Center Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.216276,42.576207]]}},{"id":"i8Y45tBn4DkRIDgROOQmFonEWyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 281"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o+lrtCaOTOlAFVMX9eiUZbVMJKE="},{"type":"next-occurrence","id":"ISagLjavdzzgrUOqYMQgihokoxw="}],"description":"Line striping on NY 281 both directions between START ROUTE NY 281; Lamont Circle; NY 13 (Cortlandville) and Tully Center Rd (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:24:39Z"},"road_event_id":"i8Y45tBn4DkRIDgROOQmFonEWyY=","beginning_cross_street":"START ROUTE NY 281; Lamont Circle; NY 13","ending_cross_street":"Tully Center Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.216276,42.576207]]}},{"id":"ISagLjavdzzgrUOqYMQgihokoxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 281"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o+lrtCaOTOlAFVMX9eiUZbVMJKE="},{"type":"next-occurrence","id":"OnXSX+otII3NKSK4Pugfl5VjU+w="}],"description":"Line striping on NY 281 both directions between START ROUTE NY 281; Lamont Circle; NY 13 (Cortlandville) and Tully Center Rd (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:24:39Z"},"road_event_id":"ISagLjavdzzgrUOqYMQgihokoxw=","beginning_cross_street":"START ROUTE NY 281; Lamont Circle; NY 13","ending_cross_street":"Tully Center Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.216276,42.576207]]}},{"id":"OnXSX+otII3NKSK4Pugfl5VjU+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 281"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o+lrtCaOTOlAFVMX9eiUZbVMJKE="},{"type":"next-occurrence","id":"eqYPus8JcbAi0B0Tc//0lx7qjQk="}],"description":"Line striping on NY 281 both directions between START ROUTE NY 281; Lamont Circle; NY 13 (Cortlandville) and Tully Center Rd (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:24:39Z"},"road_event_id":"OnXSX+otII3NKSK4Pugfl5VjU+w=","beginning_cross_street":"START ROUTE NY 281; Lamont Circle; NY 13","ending_cross_street":"Tully Center Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.216276,42.576207]]}},{"id":"eqYPus8JcbAi0B0Tc//0lx7qjQk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 281"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o+lrtCaOTOlAFVMX9eiUZbVMJKE="},{"type":"next-occurrence","id":"DtBXzlLE6s7t5AXIqAhEv4HQ6hg="}],"description":"Line striping on NY 281 both directions between START ROUTE NY 281; Lamont Circle; NY 13 (Cortlandville) and Tully Center Rd (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:24:39Z"},"road_event_id":"eqYPus8JcbAi0B0Tc//0lx7qjQk=","beginning_cross_street":"START ROUTE NY 281; Lamont Circle; NY 13","ending_cross_street":"Tully Center Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.216276,42.576207]]}},{"id":"DtBXzlLE6s7t5AXIqAhEv4HQ6hg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 281"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o+lrtCaOTOlAFVMX9eiUZbVMJKE="}],"description":"Line striping on NY 281 both directions between START ROUTE NY 281; Lamont Circle; NY 13 (Cortlandville) and Tully Center Rd (Preble) ; Mobile lane closure, Wednesday May 27th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-27T23:24:39Z"},"road_event_id":"DtBXzlLE6s7t5AXIqAhEv4HQ6hg=","beginning_cross_street":"START ROUTE NY 281; Lamont Circle; NY 13","ending_cross_street":"Tully Center Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.216276,42.576207]]}},{"id":"VqNL0vkiXfNH77TMyHDlt5ar10g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[],"description":"Bridge painting on NY 208 both directions between Neelytown Road (Montgomery) and Hollis Lane (Montgomery) D265729/NIGHT/32756009 - This work is weather permitting, Plan travel accordingly; delays may exist, Continuous Wednesday May 20th, 2026 8:00 PM thru Monday June 29th, 2026 6:00 AM various lane closures","update_date":"2026-05-28T11:27:15Z"},"road_event_id":"VqNL0vkiXfNH77TMyHDlt5ar10g=","beginning_cross_street":"Neelytown Road","ending_cross_street":"Hollis Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.207095,41.510963]]}},{"id":"fsyT9A0KTnxJbOOhE64MSvmnRhc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"d72MMOZnRrGajt6yKvKup1ni3tc="}],"description":"Bridge painting on NY 208 both directions between Neelytown Road (Montgomery) and Hollis Lane (Montgomery) D265729/DAY/32756109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 13th, 2026 thru Sunday June 14th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 20th, 2026 thru Sunday June 21st, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 27th, 2026 thru Sunday June 28th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 29th, 2026, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:40Z"},"road_event_id":"fsyT9A0KTnxJbOOhE64MSvmnRhc=","beginning_cross_street":"Neelytown Road","ending_cross_street":"Hollis Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.207162,41.511411]]}},{"id":"d72MMOZnRrGajt6yKvKup1ni3tc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fsyT9A0KTnxJbOOhE64MSvmnRhc="},{"type":"next-occurrence","id":"Q7lqQC3LpGOT+1ozPOsLoWjMmFc="}],"description":"Bridge painting on NY 208 both directions between Neelytown Road (Montgomery) and Hollis Lane (Montgomery) D265729/DAY/32756109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 13th, 2026 thru Sunday June 14th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 20th, 2026 thru Sunday June 21st, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 27th, 2026 thru Sunday June 28th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 29th, 2026, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:40Z"},"road_event_id":"d72MMOZnRrGajt6yKvKup1ni3tc=","beginning_cross_street":"Neelytown Road","ending_cross_street":"Hollis Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T10:00:00Z","end_date":"2026-06-07T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.207162,41.511411]]}},{"id":"Q7lqQC3LpGOT+1ozPOsLoWjMmFc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fsyT9A0KTnxJbOOhE64MSvmnRhc="},{"type":"next-occurrence","id":"OODfC/OG7hwlSMWUt0CHjvmuw0c="}],"description":"Bridge painting on NY 208 both directions between Neelytown Road (Montgomery) and Hollis Lane (Montgomery) D265729/DAY/32756109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 13th, 2026 thru Sunday June 14th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 20th, 2026 thru Sunday June 21st, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 27th, 2026 thru Sunday June 28th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 29th, 2026, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:40Z"},"road_event_id":"Q7lqQC3LpGOT+1ozPOsLoWjMmFc=","beginning_cross_street":"Neelytown Road","ending_cross_street":"Hollis Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.207162,41.511411]]}},{"id":"OODfC/OG7hwlSMWUt0CHjvmuw0c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fsyT9A0KTnxJbOOhE64MSvmnRhc="},{"type":"next-occurrence","id":"kA7wm6uyz4vggLsmtM7oXC3U1QQ="}],"description":"Bridge painting on NY 208 both directions between Neelytown Road (Montgomery) and Hollis Lane (Montgomery) D265729/DAY/32756109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 13th, 2026 thru Sunday June 14th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 20th, 2026 thru Sunday June 21st, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 27th, 2026 thru Sunday June 28th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 29th, 2026, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:40Z"},"road_event_id":"OODfC/OG7hwlSMWUt0CHjvmuw0c=","beginning_cross_street":"Neelytown Road","ending_cross_street":"Hollis Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.207162,41.511411]]}},{"id":"kA7wm6uyz4vggLsmtM7oXC3U1QQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fsyT9A0KTnxJbOOhE64MSvmnRhc="},{"type":"next-occurrence","id":"x8nE9h+Tq0rT2HT3DwfUiEONKzY="}],"description":"Bridge painting on NY 208 both directions between Neelytown Road (Montgomery) and Hollis Lane (Montgomery) D265729/DAY/32756109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 13th, 2026 thru Sunday June 14th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 20th, 2026 thru Sunday June 21st, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 27th, 2026 thru Sunday June 28th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 29th, 2026, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:40Z"},"road_event_id":"kA7wm6uyz4vggLsmtM7oXC3U1QQ=","beginning_cross_street":"Neelytown Road","ending_cross_street":"Hollis Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.207162,41.511411]]}},{"id":"x8nE9h+Tq0rT2HT3DwfUiEONKzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fsyT9A0KTnxJbOOhE64MSvmnRhc="},{"type":"next-occurrence","id":"RT8KbeptZIb44ViyqNCFAjuXHS4="}],"description":"Bridge painting on NY 208 both directions between Neelytown Road (Montgomery) and Hollis Lane (Montgomery) D265729/DAY/32756109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 13th, 2026 thru Sunday June 14th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 20th, 2026 thru Sunday June 21st, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 27th, 2026 thru Sunday June 28th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 29th, 2026, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:40Z"},"road_event_id":"x8nE9h+Tq0rT2HT3DwfUiEONKzY=","beginning_cross_street":"Neelytown Road","ending_cross_street":"Hollis Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.207162,41.511411]]}},{"id":"RT8KbeptZIb44ViyqNCFAjuXHS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fsyT9A0KTnxJbOOhE64MSvmnRhc="},{"type":"next-occurrence","id":"LvreSzAliJxM5kIX9Ih6gpzIStY="}],"description":"Bridge painting on NY 208 both directions between Neelytown Road (Montgomery) and Hollis Lane (Montgomery) D265729/DAY/32756109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 13th, 2026 thru Sunday June 14th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 20th, 2026 thru Sunday June 21st, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 27th, 2026 thru Sunday June 28th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 29th, 2026, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:40Z"},"road_event_id":"RT8KbeptZIb44ViyqNCFAjuXHS4=","beginning_cross_street":"Neelytown Road","ending_cross_street":"Hollis Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.207162,41.511411]]}},{"id":"LvreSzAliJxM5kIX9Ih6gpzIStY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fsyT9A0KTnxJbOOhE64MSvmnRhc="},{"type":"next-occurrence","id":"qUsjPd49nenv+ydZ9+H1Kx4M0z8="}],"description":"Bridge painting on NY 208 both directions between Neelytown Road (Montgomery) and Hollis Lane (Montgomery) D265729/DAY/32756109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 13th, 2026 thru Sunday June 14th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 20th, 2026 thru Sunday June 21st, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 27th, 2026 thru Sunday June 28th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 29th, 2026, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:40Z"},"road_event_id":"LvreSzAliJxM5kIX9Ih6gpzIStY=","beginning_cross_street":"Neelytown Road","ending_cross_street":"Hollis Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T10:00:00Z","end_date":"2026-06-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.207162,41.511411]]}},{"id":"qUsjPd49nenv+ydZ9+H1Kx4M0z8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fsyT9A0KTnxJbOOhE64MSvmnRhc="},{"type":"next-occurrence","id":"Llrk1lE8hWqa/UnO96jOBbWGVyQ="}],"description":"Bridge painting on NY 208 both directions between Neelytown Road (Montgomery) and Hollis Lane (Montgomery) D265729/DAY/32756109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 13th, 2026 thru Sunday June 14th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 20th, 2026 thru Sunday June 21st, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 27th, 2026 thru Sunday June 28th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 29th, 2026, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:40Z"},"road_event_id":"qUsjPd49nenv+ydZ9+H1Kx4M0z8=","beginning_cross_street":"Neelytown Road","ending_cross_street":"Hollis Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T10:00:00Z","end_date":"2026-06-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.207162,41.511411]]}},{"id":"Llrk1lE8hWqa/UnO96jOBbWGVyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fsyT9A0KTnxJbOOhE64MSvmnRhc="},{"type":"next-occurrence","id":"Y7yQ3XaUDYvrqHUksBmEoslGfPY="}],"description":"Bridge painting on NY 208 both directions between Neelytown Road (Montgomery) and Hollis Lane (Montgomery) D265729/DAY/32756109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 13th, 2026 thru Sunday June 14th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 20th, 2026 thru Sunday June 21st, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 27th, 2026 thru Sunday June 28th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 29th, 2026, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:40Z"},"road_event_id":"Llrk1lE8hWqa/UnO96jOBbWGVyQ=","beginning_cross_street":"Neelytown Road","ending_cross_street":"Hollis Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.207162,41.511411]]}},{"id":"Y7yQ3XaUDYvrqHUksBmEoslGfPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fsyT9A0KTnxJbOOhE64MSvmnRhc="},{"type":"next-occurrence","id":"DybsNC0U7MElHQqwSOMF53Ivsks="}],"description":"Bridge painting on NY 208 both directions between Neelytown Road (Montgomery) and Hollis Lane (Montgomery) D265729/DAY/32756109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 13th, 2026 thru Sunday June 14th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 20th, 2026 thru Sunday June 21st, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 27th, 2026 thru Sunday June 28th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 29th, 2026, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:40Z"},"road_event_id":"Y7yQ3XaUDYvrqHUksBmEoslGfPY=","beginning_cross_street":"Neelytown Road","ending_cross_street":"Hollis Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.207162,41.511411]]}},{"id":"DybsNC0U7MElHQqwSOMF53Ivsks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fsyT9A0KTnxJbOOhE64MSvmnRhc="},{"type":"next-occurrence","id":"ntxAbdOEphNodeSXWiS5yIsIjlY="}],"description":"Bridge painting on NY 208 both directions between Neelytown Road (Montgomery) and Hollis Lane (Montgomery) D265729/DAY/32756109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 13th, 2026 thru Sunday June 14th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 20th, 2026 thru Sunday June 21st, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 27th, 2026 thru Sunday June 28th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 29th, 2026, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:40Z"},"road_event_id":"DybsNC0U7MElHQqwSOMF53Ivsks=","beginning_cross_street":"Neelytown Road","ending_cross_street":"Hollis Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.207162,41.511411]]}},{"id":"ntxAbdOEphNodeSXWiS5yIsIjlY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fsyT9A0KTnxJbOOhE64MSvmnRhc="},{"type":"next-occurrence","id":"jr8Wpi6KkWvBKI+wLvQWk+JAbdM="}],"description":"Bridge painting on NY 208 both directions between Neelytown Road (Montgomery) and Hollis Lane (Montgomery) D265729/DAY/32756109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 13th, 2026 thru Sunday June 14th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 20th, 2026 thru Sunday June 21st, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 27th, 2026 thru Sunday June 28th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 29th, 2026, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:40Z"},"road_event_id":"ntxAbdOEphNodeSXWiS5yIsIjlY=","beginning_cross_street":"Neelytown Road","ending_cross_street":"Hollis Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.207162,41.511411]]}},{"id":"jr8Wpi6KkWvBKI+wLvQWk+JAbdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fsyT9A0KTnxJbOOhE64MSvmnRhc="}],"description":"Bridge painting on NY 208 both directions between Neelytown Road (Montgomery) and Hollis Lane (Montgomery) D265729/DAY/32756109 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 13th, 2026 thru Sunday June 14th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 20th, 2026 thru Sunday June 21st, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures, Saturday June 27th, 2026 thru Sunday June 28th, 2026, Saturday/Sunday, 06:00 AM thru 02:00 PM, various lane closures, Monday June 29th, 2026, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:40Z"},"road_event_id":"jr8Wpi6KkWvBKI+wLvQWk+JAbdM=","beginning_cross_street":"Neelytown Road","ending_cross_street":"Hollis Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.207162,41.511411]]}},{"id":"y1V3HnLVMMs+PrONCLzg7N9GM/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[],"description":"Bridge painting on NY 208 both directions between Neelytown Road (Montgomery) and Hollis Lane (Montgomery) D265729/32756209 - 24/7 SHOULDER CLOSURE - Plan travel accordingly; delays may exist, Continuous Wednesday May 20th, 2026 12:00 AM thru Monday June 29th, 2026 12:00 AM shoulder closed to traffic","update_date":"2026-05-28T11:52:41Z"},"road_event_id":"y1V3HnLVMMs+PrONCLzg7N9GM/s=","beginning_cross_street":"Neelytown Road","ending_cross_street":"Hollis Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.207265,41.510979]]}},{"id":"3d1SSPO40yPBDX5bfEGmJPlhsQQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"V/hZwJA+0aict+ttxJ+PVWr+Gvs="}],"description":"Guard rail repairs on NY 22 southbound between Cross River Road - NY 35 (Bedford) and Reservoir Road (Bedford) D265183/DAY/32756309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-03T18:10:39Z"},"road_event_id":"3d1SSPO40yPBDX5bfEGmJPlhsQQ=","beginning_cross_street":"Cross River Road - NY 35","ending_cross_street":"Reservoir Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:30:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.676972,41.265199]]}},{"id":"V/hZwJA+0aict+ttxJ+PVWr+Gvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3d1SSPO40yPBDX5bfEGmJPlhsQQ="},{"type":"next-occurrence","id":"OvQuoyl26ordQWcrjtkf7weqvUs="}],"description":"Guard rail repairs on NY 22 southbound between Cross River Road - NY 35 (Bedford) and Reservoir Road (Bedford) D265183/DAY/32756309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-03T18:10:39Z"},"road_event_id":"V/hZwJA+0aict+ttxJ+PVWr+Gvs=","beginning_cross_street":"Cross River Road - NY 35","ending_cross_street":"Reservoir Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.676972,41.265199]]}},{"id":"OvQuoyl26ordQWcrjtkf7weqvUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3d1SSPO40yPBDX5bfEGmJPlhsQQ="},{"type":"next-occurrence","id":"rUkB4YGiFSNfdI9RnWxtkWPhXXY="}],"description":"Guard rail repairs on NY 22 southbound between Cross River Road - NY 35 (Bedford) and Reservoir Road (Bedford) D265183/DAY/32756309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-03T18:10:39Z"},"road_event_id":"OvQuoyl26ordQWcrjtkf7weqvUs=","beginning_cross_street":"Cross River Road - NY 35","ending_cross_street":"Reservoir Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.676972,41.265199]]}},{"id":"rUkB4YGiFSNfdI9RnWxtkWPhXXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3d1SSPO40yPBDX5bfEGmJPlhsQQ="},{"type":"next-occurrence","id":"BvMYvhS5YCZJ3lJeHQ/nlZ4VxVQ="}],"description":"Guard rail repairs on NY 22 southbound between Cross River Road - NY 35 (Bedford) and Reservoir Road (Bedford) D265183/DAY/32756309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-03T18:10:39Z"},"road_event_id":"rUkB4YGiFSNfdI9RnWxtkWPhXXY=","beginning_cross_street":"Cross River Road - NY 35","ending_cross_street":"Reservoir Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.676972,41.265199]]}},{"id":"BvMYvhS5YCZJ3lJeHQ/nlZ4VxVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3d1SSPO40yPBDX5bfEGmJPlhsQQ="},{"type":"next-occurrence","id":"Jd7lxC06n6Kpp4T/Us9LrIMAs6k="}],"description":"Guard rail repairs on NY 22 southbound between Cross River Road - NY 35 (Bedford) and Reservoir Road (Bedford) D265183/DAY/32756309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-03T18:10:39Z"},"road_event_id":"BvMYvhS5YCZJ3lJeHQ/nlZ4VxVQ=","beginning_cross_street":"Cross River Road - NY 35","ending_cross_street":"Reservoir Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.676972,41.265199]]}},{"id":"Jd7lxC06n6Kpp4T/Us9LrIMAs6k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3d1SSPO40yPBDX5bfEGmJPlhsQQ="}],"description":"Guard rail repairs on NY 22 southbound between Cross River Road - NY 35 (Bedford) and Reservoir Road (Bedford) D265183/DAY/32756309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-03T18:10:39Z"},"road_event_id":"Jd7lxC06n6Kpp4T/Us9LrIMAs6k=","beginning_cross_street":"Cross River Road - NY 35","ending_cross_street":"Reservoir Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.676972,41.265199]]}},{"id":"H1OjeZOpnTIRnrP8Pa5dEyRDo4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tY2ARgQPjyZwX++O+rheHdmxzi4="}],"description":"Road rehabilitation on NY 100B eastbound between NY 100A (Greenburgh) and Sciortino Place (Greenburgh) 202408111331-385/32196009 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-28T16:07:22Z"},"road_event_id":"H1OjeZOpnTIRnrP8Pa5dEyRDo4Y=","beginning_cross_street":"NY 100A","ending_cross_street":"Sciortino Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803475,41.039925]]}},{"id":"tY2ARgQPjyZwX++O+rheHdmxzi4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H1OjeZOpnTIRnrP8Pa5dEyRDo4Y="},{"type":"next-occurrence","id":"ftHzDmQYjvZEL/Z22ut/H6DPj48="}],"description":"Road rehabilitation on NY 100B eastbound between NY 100A (Greenburgh) and Sciortino Place (Greenburgh) 202408111331-385/32196009 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-28T16:07:22Z"},"road_event_id":"tY2ARgQPjyZwX++O+rheHdmxzi4=","beginning_cross_street":"NY 100A","ending_cross_street":"Sciortino Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803475,41.039925]]}},{"id":"ftHzDmQYjvZEL/Z22ut/H6DPj48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H1OjeZOpnTIRnrP8Pa5dEyRDo4Y="},{"type":"next-occurrence","id":"0zrTwicYGGL7h+URpFP7sX9Azkg="}],"description":"Road rehabilitation on NY 100B eastbound between NY 100A (Greenburgh) and Sciortino Place (Greenburgh) 202408111331-385/32196009 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-28T16:07:22Z"},"road_event_id":"ftHzDmQYjvZEL/Z22ut/H6DPj48=","beginning_cross_street":"NY 100A","ending_cross_street":"Sciortino Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803475,41.039925]]}},{"id":"0zrTwicYGGL7h+URpFP7sX9Azkg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H1OjeZOpnTIRnrP8Pa5dEyRDo4Y="},{"type":"next-occurrence","id":"3LtADtWNHKMy0ecTpmkxc2955PI="}],"description":"Road rehabilitation on NY 100B eastbound between NY 100A (Greenburgh) and Sciortino Place (Greenburgh) 202408111331-385/32196009 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-28T16:07:22Z"},"road_event_id":"0zrTwicYGGL7h+URpFP7sX9Azkg=","beginning_cross_street":"NY 100A","ending_cross_street":"Sciortino Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803475,41.039925]]}},{"id":"3LtADtWNHKMy0ecTpmkxc2955PI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H1OjeZOpnTIRnrP8Pa5dEyRDo4Y="},{"type":"next-occurrence","id":"EC6UdCI0ab+IeBSMz21JBVvmN9w="}],"description":"Road rehabilitation on NY 100B eastbound between NY 100A (Greenburgh) and Sciortino Place (Greenburgh) 202408111331-385/32196009 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-28T16:07:22Z"},"road_event_id":"3LtADtWNHKMy0ecTpmkxc2955PI=","beginning_cross_street":"NY 100A","ending_cross_street":"Sciortino Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803475,41.039925]]}},{"id":"EC6UdCI0ab+IeBSMz21JBVvmN9w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H1OjeZOpnTIRnrP8Pa5dEyRDo4Y="},{"type":"next-occurrence","id":"Q0VwAbM36AJXGbwvmcO4mqS/r0A="}],"description":"Road rehabilitation on NY 100B eastbound between NY 100A (Greenburgh) and Sciortino Place (Greenburgh) 202408111331-385/32196009 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-28T16:07:22Z"},"road_event_id":"EC6UdCI0ab+IeBSMz21JBVvmN9w=","beginning_cross_street":"NY 100A","ending_cross_street":"Sciortino Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803475,41.039925]]}},{"id":"Q0VwAbM36AJXGbwvmcO4mqS/r0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H1OjeZOpnTIRnrP8Pa5dEyRDo4Y="},{"type":"next-occurrence","id":"jskEbC1f0XsndpFkYysrrykjbIE="}],"description":"Road rehabilitation on NY 100B eastbound between NY 100A (Greenburgh) and Sciortino Place (Greenburgh) 202408111331-385/32196009 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-28T16:07:22Z"},"road_event_id":"Q0VwAbM36AJXGbwvmcO4mqS/r0A=","beginning_cross_street":"NY 100A","ending_cross_street":"Sciortino Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803475,41.039925]]}},{"id":"jskEbC1f0XsndpFkYysrrykjbIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H1OjeZOpnTIRnrP8Pa5dEyRDo4Y="},{"type":"next-occurrence","id":"Lrve6CE4Fm0OypnRbAcMoxUHDjY="}],"description":"Road rehabilitation on NY 100B eastbound between NY 100A (Greenburgh) and Sciortino Place (Greenburgh) 202408111331-385/32196009 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-28T16:07:22Z"},"road_event_id":"jskEbC1f0XsndpFkYysrrykjbIE=","beginning_cross_street":"NY 100A","ending_cross_street":"Sciortino Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803475,41.039925]]}},{"id":"Lrve6CE4Fm0OypnRbAcMoxUHDjY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H1OjeZOpnTIRnrP8Pa5dEyRDo4Y="},{"type":"next-occurrence","id":"9nYtdG+7xMzFur363l+ZfEfsoP4="}],"description":"Road rehabilitation on NY 100B eastbound between NY 100A (Greenburgh) and Sciortino Place (Greenburgh) 202408111331-385/32196009 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-28T16:07:22Z"},"road_event_id":"Lrve6CE4Fm0OypnRbAcMoxUHDjY=","beginning_cross_street":"NY 100A","ending_cross_street":"Sciortino Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803475,41.039925]]}},{"id":"9nYtdG+7xMzFur363l+ZfEfsoP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H1OjeZOpnTIRnrP8Pa5dEyRDo4Y="},{"type":"next-occurrence","id":"zS40zkDDnDX8M+rjk0CiocD7lEw="}],"description":"Road rehabilitation on NY 100B eastbound between NY 100A (Greenburgh) and Sciortino Place (Greenburgh) 202408111331-385/32196009 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-28T16:07:22Z"},"road_event_id":"9nYtdG+7xMzFur363l+ZfEfsoP4=","beginning_cross_street":"NY 100A","ending_cross_street":"Sciortino Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803475,41.039925]]}},{"id":"zS40zkDDnDX8M+rjk0CiocD7lEw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H1OjeZOpnTIRnrP8Pa5dEyRDo4Y="}],"description":"Road rehabilitation on NY 100B eastbound between NY 100A (Greenburgh) and Sciortino Place (Greenburgh) 202408111331-385/32196009 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday July 6th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Tuesday July 7th, 2026 thru Friday July 10th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-05-28T16:07:22Z"},"road_event_id":"zS40zkDDnDX8M+rjk0CiocD7lEw=","beginning_cross_street":"NY 100A","ending_cross_street":"Sciortino Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803475,41.039925]]}},{"id":"ORC32756409","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bear Mountain State Parkway"],"direction":"unknown","description":"Bridge maintenance operations on Bear Mountain State Parkway both directions between US 202/US 6 (Peekskill) and North Division Street (Peekskill) DOT BM/B1071600/32756409 - This work is weather permitting. Plan travel accordingly; delays may exist Not currently scheduled","update_date":"2026-06-04T19:00:12Z"},"road_event_id":"ORC32756409","beginning_cross_street":"US 202/US 6","ending_cross_street":"North Division Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T13:07:33Z","end_date":"2026-06-05T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.920634,41.302287]]}},{"id":"ORC32756509","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","description":"Guard rail repairs on I-84 westbound between Exit 58 - Ludingtonville Road - CR 43 (Kent) and Exit 52 - Taconic Parkway (East Fishkill) Res 8-3 RW/32756509 - This work is weather permitting. Plan travel accordingly; delays may exist Not currently scheduled","update_date":"2026-06-05T18:30:44Z"},"road_event_id":"ORC32756509","beginning_cross_street":"Exit 58 - Ludingtonville Road - CR 43","ending_cross_street":"Exit 52 - Taconic Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T13:57:41Z","end_date":"2026-06-06T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.683159,41.513174]]}},{"id":"JuCeThC6B20TBt7mwE2HmpaIn9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8d/hpmlcBSsPlauvLSwbCElBpP0="}],"description":"Construction on I-278 westbound from Union Street (New York) to Summit Street (New York) Subject to change without notice., Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T15:15:17Z"},"road_event_id":"JuCeThC6B20TBt7mwE2HmpaIn9g=","beginning_cross_street":"Union Street","ending_cross_street":"Summit Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:01:00Z","end_date":"2026-06-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.001821,40.683347]]}},{"id":"8d/hpmlcBSsPlauvLSwbCElBpP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JuCeThC6B20TBt7mwE2HmpaIn9g="},{"type":"next-occurrence","id":"M26ywNLuirLiTQUKCarqzvloZ/s="}],"description":"Construction on I-278 westbound from Union Street (New York) to Summit Street (New York) Subject to change without notice., Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T15:15:17Z"},"road_event_id":"8d/hpmlcBSsPlauvLSwbCElBpP0=","beginning_cross_street":"Union Street","ending_cross_street":"Summit Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T04:01:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.001821,40.683347]]}},{"id":"M26ywNLuirLiTQUKCarqzvloZ/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JuCeThC6B20TBt7mwE2HmpaIn9g="},{"type":"next-occurrence","id":"jE9e1Bl7uYrwdhy0kplvsLtCe7A="}],"description":"Construction on I-278 westbound from Union Street (New York) to Summit Street (New York) Subject to change without notice., Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T15:15:17Z"},"road_event_id":"M26ywNLuirLiTQUKCarqzvloZ/s=","beginning_cross_street":"Union Street","ending_cross_street":"Summit Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T04:01:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.001821,40.683347]]}},{"id":"jE9e1Bl7uYrwdhy0kplvsLtCe7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JuCeThC6B20TBt7mwE2HmpaIn9g="},{"type":"next-occurrence","id":"vbY/8fp3bXwhtOt72d7opTdQ/uI="}],"description":"Construction on I-278 westbound from Union Street (New York) to Summit Street (New York) Subject to change without notice., Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T15:15:17Z"},"road_event_id":"jE9e1Bl7uYrwdhy0kplvsLtCe7A=","beginning_cross_street":"Union Street","ending_cross_street":"Summit Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T04:01:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.001821,40.683347]]}},{"id":"vbY/8fp3bXwhtOt72d7opTdQ/uI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JuCeThC6B20TBt7mwE2HmpaIn9g="}],"description":"Construction on I-278 westbound from Union Street (New York) to Summit Street (New York) Subject to change without notice., Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T15:15:17Z"},"road_event_id":"vbY/8fp3bXwhtOt72d7opTdQ/uI=","beginning_cross_street":"Union Street","ending_cross_street":"Summit Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T04:01:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.001821,40.683347]]}},{"id":"t4Czpf8Fsu7cQb02ne8vewIkC9E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xqsucDwiNNYhMVYc8vun4LTttzM="}],"description":"Construction on I-278 both directions from Grand Central Parkway (New York) to Grand Central Parkway at 49th Street (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM 1 Right lane of 4 lanes closed eastbound; 1 Left lane of 4 lanes closed westbound","update_date":"2026-06-04T15:12:35Z"},"road_event_id":"t4Czpf8Fsu7cQb02ne8vewIkC9E=","beginning_cross_street":"Grand Central Parkway","ending_cross_street":"49th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:30:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907107,40.768615]]}},{"id":"xqsucDwiNNYhMVYc8vun4LTttzM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t4Czpf8Fsu7cQb02ne8vewIkC9E="},{"type":"next-occurrence","id":"C9lUlDf+QaCK7G2k89VXugWtn70="}],"description":"Construction on I-278 both directions from Grand Central Parkway (New York) to Grand Central Parkway at 49th Street (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM 1 Right lane of 4 lanes closed eastbound; 1 Left lane of 4 lanes closed westbound","update_date":"2026-06-04T15:12:35Z"},"road_event_id":"xqsucDwiNNYhMVYc8vun4LTttzM=","beginning_cross_street":"Grand Central Parkway","ending_cross_street":"49th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:30:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907107,40.768615]]}},{"id":"C9lUlDf+QaCK7G2k89VXugWtn70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t4Czpf8Fsu7cQb02ne8vewIkC9E="},{"type":"next-occurrence","id":"9QX2miKTUNJetTIr51FDYfsX4Sg="}],"description":"Construction on I-278 both directions from Grand Central Parkway (New York) to Grand Central Parkway at 49th Street (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM 1 Right lane of 4 lanes closed eastbound; 1 Left lane of 4 lanes closed westbound","update_date":"2026-06-04T15:12:35Z"},"road_event_id":"C9lUlDf+QaCK7G2k89VXugWtn70=","beginning_cross_street":"Grand Central Parkway","ending_cross_street":"49th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:30:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907107,40.768615]]}},{"id":"9QX2miKTUNJetTIr51FDYfsX4Sg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t4Czpf8Fsu7cQb02ne8vewIkC9E="},{"type":"next-occurrence","id":"LBf9Flz9rr2eD/znEOw5G527Jq4="}],"description":"Construction on I-278 both directions from Grand Central Parkway (New York) to Grand Central Parkway at 49th Street (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM 1 Right lane of 4 lanes closed eastbound; 1 Left lane of 4 lanes closed westbound","update_date":"2026-06-04T15:12:35Z"},"road_event_id":"9QX2miKTUNJetTIr51FDYfsX4Sg=","beginning_cross_street":"Grand Central Parkway","ending_cross_street":"49th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:30:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907107,40.768615]]}},{"id":"LBf9Flz9rr2eD/znEOw5G527Jq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t4Czpf8Fsu7cQb02ne8vewIkC9E="},{"type":"next-occurrence","id":"jYKCY6v+dK8SjhoPb6u9OyAzrpc="}],"description":"Construction on I-278 both directions from Grand Central Parkway (New York) to Grand Central Parkway at 49th Street (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM 1 Right lane of 4 lanes closed eastbound; 1 Left lane of 4 lanes closed westbound","update_date":"2026-06-04T15:12:35Z"},"road_event_id":"LBf9Flz9rr2eD/znEOw5G527Jq4=","beginning_cross_street":"Grand Central Parkway","ending_cross_street":"49th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:30:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907107,40.768615]]}},{"id":"jYKCY6v+dK8SjhoPb6u9OyAzrpc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t4Czpf8Fsu7cQb02ne8vewIkC9E="}],"description":"Construction on I-278 both directions from Grand Central Parkway (New York) to Grand Central Parkway at 49th Street (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM 1 Right lane of 4 lanes closed eastbound; 1 Left lane of 4 lanes closed westbound","update_date":"2026-06-04T15:12:35Z"},"road_event_id":"jYKCY6v+dK8SjhoPb6u9OyAzrpc=","beginning_cross_street":"Grand Central Parkway","ending_cross_street":"49th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:30:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907107,40.768615]]}},{"id":"g/qGTgrLcwF3ZBWgnZk5XJ7D2nA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VzxoSRWeghdnb1acMcilbE8xnkw="}],"description":"Construction on I-278 eastbound ramp to Exit 41 - Astoria Boulevard West (New York) Subject to change without notice. Intermittent Closure., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM All lanes closed","update_date":"2026-06-04T15:13:24Z"},"road_event_id":"g/qGTgrLcwF3ZBWgnZk5XJ7D2nA=","beginning_cross_street":"Exit 41 - Astoria Boulevard West","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:30:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904282,40.767807]]}},{"id":"VzxoSRWeghdnb1acMcilbE8xnkw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g/qGTgrLcwF3ZBWgnZk5XJ7D2nA="},{"type":"next-occurrence","id":"CRUYjKajr665WO/0NLojvD4/8Ts="}],"description":"Construction on I-278 eastbound ramp to Exit 41 - Astoria Boulevard West (New York) Subject to change without notice. Intermittent Closure., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM All lanes closed","update_date":"2026-06-04T15:13:24Z"},"road_event_id":"VzxoSRWeghdnb1acMcilbE8xnkw=","beginning_cross_street":"Exit 41 - Astoria Boulevard West","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:30:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904282,40.767807]]}},{"id":"CRUYjKajr665WO/0NLojvD4/8Ts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g/qGTgrLcwF3ZBWgnZk5XJ7D2nA="},{"type":"next-occurrence","id":"se8RMNUG9H2qdjFA9wbtDHPo/GY="}],"description":"Construction on I-278 eastbound ramp to Exit 41 - Astoria Boulevard West (New York) Subject to change without notice. Intermittent Closure., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM All lanes closed","update_date":"2026-06-04T15:13:24Z"},"road_event_id":"CRUYjKajr665WO/0NLojvD4/8Ts=","beginning_cross_street":"Exit 41 - Astoria Boulevard West","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:30:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904282,40.767807]]}},{"id":"se8RMNUG9H2qdjFA9wbtDHPo/GY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g/qGTgrLcwF3ZBWgnZk5XJ7D2nA="},{"type":"next-occurrence","id":"vNbAA8m0T/QrZqYcJxMs2DBTfeo="}],"description":"Construction on I-278 eastbound ramp to Exit 41 - Astoria Boulevard West (New York) Subject to change without notice. Intermittent Closure., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM All lanes closed","update_date":"2026-06-04T15:13:24Z"},"road_event_id":"se8RMNUG9H2qdjFA9wbtDHPo/GY=","beginning_cross_street":"Exit 41 - Astoria Boulevard West","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:30:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904282,40.767807]]}},{"id":"vNbAA8m0T/QrZqYcJxMs2DBTfeo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g/qGTgrLcwF3ZBWgnZk5XJ7D2nA="},{"type":"next-occurrence","id":"EHXqIgdoYVd10dhlfOC28awsjSI="}],"description":"Construction on I-278 eastbound ramp to Exit 41 - Astoria Boulevard West (New York) Subject to change without notice. Intermittent Closure., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM All lanes closed","update_date":"2026-06-04T15:13:24Z"},"road_event_id":"vNbAA8m0T/QrZqYcJxMs2DBTfeo=","beginning_cross_street":"Exit 41 - Astoria Boulevard West","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:30:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904282,40.767807]]}},{"id":"EHXqIgdoYVd10dhlfOC28awsjSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g/qGTgrLcwF3ZBWgnZk5XJ7D2nA="}],"description":"Construction on I-278 eastbound ramp to Exit 41 - Astoria Boulevard West (New York) Subject to change without notice. Intermittent Closure., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM All lanes closed","update_date":"2026-06-04T15:13:24Z"},"road_event_id":"EHXqIgdoYVd10dhlfOC28awsjSI=","beginning_cross_street":"Exit 41 - Astoria Boulevard West","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:30:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904282,40.767807]]}},{"id":"STr8s+tXNeutaFmi3IEzDQR6bvQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+vfgwz2st5edSdZ8nsL2nLrPJ8g="}],"description":"Construction on I-278 eastbound ramp to Grand Central Parkway (New York) Subject to change without notice. Intermittent Closure., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM All lanes closed","update_date":"2026-06-04T15:14:16Z"},"road_event_id":"STr8s+tXNeutaFmi3IEzDQR6bvQ=","beginning_cross_street":"Grand Central Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:30:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90437,40.767754]]}},{"id":"+vfgwz2st5edSdZ8nsL2nLrPJ8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"STr8s+tXNeutaFmi3IEzDQR6bvQ="},{"type":"next-occurrence","id":"JCC7szRDBdfZdX9e+XG1goosmzI="}],"description":"Construction on I-278 eastbound ramp to Grand Central Parkway (New York) Subject to change without notice. Intermittent Closure., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM All lanes closed","update_date":"2026-06-04T15:14:16Z"},"road_event_id":"+vfgwz2st5edSdZ8nsL2nLrPJ8g=","beginning_cross_street":"Grand Central Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:30:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90437,40.767754]]}},{"id":"JCC7szRDBdfZdX9e+XG1goosmzI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"STr8s+tXNeutaFmi3IEzDQR6bvQ="},{"type":"next-occurrence","id":"lREhyPZzPIokrIw6mZ1gv6zTuuE="}],"description":"Construction on I-278 eastbound ramp to Grand Central Parkway (New York) Subject to change without notice. Intermittent Closure., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM All lanes closed","update_date":"2026-06-04T15:14:16Z"},"road_event_id":"JCC7szRDBdfZdX9e+XG1goosmzI=","beginning_cross_street":"Grand Central Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:30:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90437,40.767754]]}},{"id":"lREhyPZzPIokrIw6mZ1gv6zTuuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"STr8s+tXNeutaFmi3IEzDQR6bvQ="},{"type":"next-occurrence","id":"ixKqInN6V2JLQQzsY2cfilrD2z4="}],"description":"Construction on I-278 eastbound ramp to Grand Central Parkway (New York) Subject to change without notice. Intermittent Closure., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM All lanes closed","update_date":"2026-06-04T15:14:16Z"},"road_event_id":"lREhyPZzPIokrIw6mZ1gv6zTuuE=","beginning_cross_street":"Grand Central Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:30:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90437,40.767754]]}},{"id":"ixKqInN6V2JLQQzsY2cfilrD2z4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"STr8s+tXNeutaFmi3IEzDQR6bvQ="},{"type":"next-occurrence","id":"WY3YNqJWCB9ZqVYwuBJmsBiOjSc="}],"description":"Construction on I-278 eastbound ramp to Grand Central Parkway (New York) Subject to change without notice. Intermittent Closure., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM All lanes closed","update_date":"2026-06-04T15:14:16Z"},"road_event_id":"ixKqInN6V2JLQQzsY2cfilrD2z4=","beginning_cross_street":"Grand Central Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:30:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90437,40.767754]]}},{"id":"WY3YNqJWCB9ZqVYwuBJmsBiOjSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"STr8s+tXNeutaFmi3IEzDQR6bvQ="}],"description":"Construction on I-278 eastbound ramp to Grand Central Parkway (New York) Subject to change without notice. Intermittent Closure., Monday June 1st, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM All lanes closed","update_date":"2026-06-04T15:14:16Z"},"road_event_id":"WY3YNqJWCB9ZqVYwuBJmsBiOjSc=","beginning_cross_street":"Grand Central Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:30:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90437,40.767754]]}},{"id":"iY4qYqsxP3ZbQdzAvvk5AKW/U+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 16"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vAaVHiNclShyZMmcCBlceqg+rUo="}],"description":"Bridge work on NY 16 southbound Town of Wales; Town of Holland Line (Holland), Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T01:21:00Z"},"road_event_id":"iY4qYqsxP3ZbQdzAvvk5AKW/U+c=","beginning_cross_street":"Town of Wales; Town of Holland Line","ending_cross_street":"Town of Wales; Town of Holland Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.56863,42.688399]]}},{"id":"vAaVHiNclShyZMmcCBlceqg+rUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 16"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iY4qYqsxP3ZbQdzAvvk5AKW/U+c="},{"type":"next-occurrence","id":"wnHt5sF71NeNN2I3MH1nXNGdCPA="}],"description":"Bridge work on NY 16 southbound Town of Wales; Town of Holland Line (Holland), Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T01:21:00Z"},"road_event_id":"vAaVHiNclShyZMmcCBlceqg+rUo=","beginning_cross_street":"Town of Wales; Town of Holland Line","ending_cross_street":"Town of Wales; Town of Holland Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.56863,42.688399]]}},{"id":"wnHt5sF71NeNN2I3MH1nXNGdCPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 16"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iY4qYqsxP3ZbQdzAvvk5AKW/U+c="},{"type":"next-occurrence","id":"6ZDVoR42GRV+R6pzvzCiUBxay3A="}],"description":"Bridge work on NY 16 southbound Town of Wales; Town of Holland Line (Holland), Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T01:21:00Z"},"road_event_id":"wnHt5sF71NeNN2I3MH1nXNGdCPA=","beginning_cross_street":"Town of Wales; Town of Holland Line","ending_cross_street":"Town of Wales; Town of Holland Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.56863,42.688399]]}},{"id":"6ZDVoR42GRV+R6pzvzCiUBxay3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 16"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iY4qYqsxP3ZbQdzAvvk5AKW/U+c="},{"type":"next-occurrence","id":"yPwQJrwYqfkpkQEYmsldfE0m4hE="}],"description":"Bridge work on NY 16 southbound Town of Wales; Town of Holland Line (Holland), Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T01:21:00Z"},"road_event_id":"6ZDVoR42GRV+R6pzvzCiUBxay3A=","beginning_cross_street":"Town of Wales; Town of Holland Line","ending_cross_street":"Town of Wales; Town of Holland Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.56863,42.688399]]}},{"id":"yPwQJrwYqfkpkQEYmsldfE0m4hE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 16"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iY4qYqsxP3ZbQdzAvvk5AKW/U+c="},{"type":"next-occurrence","id":"QhcKhBubE924dxMx3XbjsmNBUts="}],"description":"Bridge work on NY 16 southbound Town of Wales; Town of Holland Line (Holland), Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T01:21:00Z"},"road_event_id":"yPwQJrwYqfkpkQEYmsldfE0m4hE=","beginning_cross_street":"Town of Wales; Town of Holland Line","ending_cross_street":"Town of Wales; Town of Holland Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.56863,42.688399]]}},{"id":"QhcKhBubE924dxMx3XbjsmNBUts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 16"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iY4qYqsxP3ZbQdzAvvk5AKW/U+c="}],"description":"Bridge work on NY 16 southbound Town of Wales; Town of Holland Line (Holland), Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T01:21:00Z"},"road_event_id":"QhcKhBubE924dxMx3XbjsmNBUts=","beginning_cross_street":"Town of Wales; Town of Holland Line","ending_cross_street":"Town of Wales; Town of Holland Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.56863,42.688399]]}},{"id":"DGuk1QXiEEBEskWgIuLpkPxbe34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on NY 3 both directions between NY 13 (Richland) and Lake St - CR-5 (Richland) ; Alternating lane closures, Wednesday June 10th, 2026, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-05-28T14:56:26Z"},"road_event_id":"DGuk1QXiEEBEskWgIuLpkPxbe34=","beginning_cross_street":"NY 13","ending_cross_street":"Lake St - CR-5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.187527,43.566923]]}},{"id":"Nl036GMQrrRRt9y6nzwX35IXxP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"alb9HXGjCzUdQXzjDgUWUDnb2eo="}],"description":"Construction on I-278 both directions between Fort Hamilton Parkway Extension (New York) and 86th Street (New York) Subject to change without notice., Monday June 8th,2026 thru Tuesday June 9th,2026, Monday/Tuesday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound, service road eastbound, Wednesday June 10th,2026 thru Friday June 12th,2026, Wednesday/Thursday/Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, eastbound, Monday June 8th,2026 thru Tuesday June 9th,2026, Monday/Tuesday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound, service road eastbound, Wednesday June 10th,2026 thru Friday June 12th,2026, Wednesday/Thursday/Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, eastbound","update_date":"2026-06-05T18:00:12Z"},"road_event_id":"Nl036GMQrrRRt9y6nzwX35IXxP0=","beginning_cross_street":"Fort Hamilton Parkway Extension","ending_cross_street":"86th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019636,40.624217]]}},{"id":"alb9HXGjCzUdQXzjDgUWUDnb2eo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Nl036GMQrrRRt9y6nzwX35IXxP0="},{"type":"next-occurrence","id":"o4eb3cBhxYv0tU+PNnsbg3T9dPs="}],"description":"Construction on I-278 both directions between Fort Hamilton Parkway Extension (New York) and 86th Street (New York) Subject to change without notice., Monday June 8th,2026 thru Tuesday June 9th,2026, Monday/Tuesday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound, service road eastbound, Wednesday June 10th,2026 thru Friday June 12th,2026, Wednesday/Thursday/Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, eastbound, Monday June 8th,2026 thru Tuesday June 9th,2026, Monday/Tuesday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound, service road eastbound, Wednesday June 10th,2026 thru Friday June 12th,2026, Wednesday/Thursday/Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, eastbound","update_date":"2026-06-05T18:00:12Z"},"road_event_id":"alb9HXGjCzUdQXzjDgUWUDnb2eo=","beginning_cross_street":"Fort Hamilton Parkway Extension","ending_cross_street":"86th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019636,40.624217]]}},{"id":"o4eb3cBhxYv0tU+PNnsbg3T9dPs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Nl036GMQrrRRt9y6nzwX35IXxP0="},{"type":"next-occurrence","id":"Bga0k38+w5lYMvR2nYNFGg6jV7A="}],"description":"Construction on I-278 both directions between Fort Hamilton Parkway Extension (New York) and 86th Street (New York) Subject to change without notice., Monday June 8th,2026 thru Tuesday June 9th,2026, Monday/Tuesday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound, service road eastbound, Wednesday June 10th,2026 thru Friday June 12th,2026, Wednesday/Thursday/Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, eastbound, Monday June 8th,2026 thru Tuesday June 9th,2026, Monday/Tuesday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound, service road eastbound, Wednesday June 10th,2026 thru Friday June 12th,2026, Wednesday/Thursday/Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, eastbound","update_date":"2026-06-05T18:00:12Z"},"road_event_id":"o4eb3cBhxYv0tU+PNnsbg3T9dPs=","beginning_cross_street":"Fort Hamilton Parkway Extension","ending_cross_street":"86th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019636,40.624217]]}},{"id":"Bga0k38+w5lYMvR2nYNFGg6jV7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Nl036GMQrrRRt9y6nzwX35IXxP0="},{"type":"next-occurrence","id":"bYjCZJoLIy5RZjdfBChSq7zubK8="}],"description":"Construction on I-278 both directions between Fort Hamilton Parkway Extension (New York) and 86th Street (New York) Subject to change without notice., Monday June 8th,2026 thru Tuesday June 9th,2026, Monday/Tuesday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound, service road eastbound, Wednesday June 10th,2026 thru Friday June 12th,2026, Wednesday/Thursday/Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, eastbound, Monday June 8th,2026 thru Tuesday June 9th,2026, Monday/Tuesday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound, service road eastbound, Wednesday June 10th,2026 thru Friday June 12th,2026, Wednesday/Thursday/Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, eastbound","update_date":"2026-06-05T18:00:12Z"},"road_event_id":"Bga0k38+w5lYMvR2nYNFGg6jV7A=","beginning_cross_street":"Fort Hamilton Parkway Extension","ending_cross_street":"86th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019636,40.624217]]}},{"id":"bYjCZJoLIy5RZjdfBChSq7zubK8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Nl036GMQrrRRt9y6nzwX35IXxP0="}],"description":"Construction on I-278 both directions between Fort Hamilton Parkway Extension (New York) and 86th Street (New York) Subject to change without notice., Monday June 8th,2026 thru Tuesday June 9th,2026, Monday/Tuesday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound, service road eastbound, Wednesday June 10th,2026 thru Friday June 12th,2026, Wednesday/Thursday/Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, eastbound, Monday June 8th,2026 thru Tuesday June 9th,2026, Monday/Tuesday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound, service road eastbound, Wednesday June 10th,2026 thru Friday June 12th,2026, Wednesday/Thursday/Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound, eastbound","update_date":"2026-06-05T18:00:12Z"},"road_event_id":"bYjCZJoLIy5RZjdfBChSq7zubK8=","beginning_cross_street":"Fort Hamilton Parkway Extension","ending_cross_street":"86th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019636,40.624217]]}},{"id":"ko8ybAWx9jY5GhXd9tELJf5cyMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UCiHLVsQY2e/ZZklMM7YLDF/TaY="}],"description":"Roadwork on NY 385 eastbound between Main Street (Catskill) and Broad Street (Catskill) - Pavement repairs, Monday June 1st, 2026 thru Monday June 8th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-28T15:45:54Z"},"road_event_id":"ko8ybAWx9jY5GhXd9tELJf5cyMk=","beginning_cross_street":"Main Street","ending_cross_street":"Broad Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.868045,42.217072]]}},{"id":"UCiHLVsQY2e/ZZklMM7YLDF/TaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ko8ybAWx9jY5GhXd9tELJf5cyMk="},{"type":"next-occurrence","id":"PG8Uo8V74d0fNPlgbK/qAFodlBI="}],"description":"Roadwork on NY 385 eastbound between Main Street (Catskill) and Broad Street (Catskill) - Pavement repairs, Monday June 1st, 2026 thru Monday June 8th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-28T15:45:54Z"},"road_event_id":"UCiHLVsQY2e/ZZklMM7YLDF/TaY=","beginning_cross_street":"Main Street","ending_cross_street":"Broad Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.868045,42.217072]]}},{"id":"PG8Uo8V74d0fNPlgbK/qAFodlBI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ko8ybAWx9jY5GhXd9tELJf5cyMk="},{"type":"next-occurrence","id":"EG0I8dWMhjCYcPogyjaKJshs3Rs="}],"description":"Roadwork on NY 385 eastbound between Main Street (Catskill) and Broad Street (Catskill) - Pavement repairs, Monday June 1st, 2026 thru Monday June 8th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-28T15:45:54Z"},"road_event_id":"PG8Uo8V74d0fNPlgbK/qAFodlBI=","beginning_cross_street":"Main Street","ending_cross_street":"Broad Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.868045,42.217072]]}},{"id":"EG0I8dWMhjCYcPogyjaKJshs3Rs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ko8ybAWx9jY5GhXd9tELJf5cyMk="}],"description":"Roadwork on NY 385 eastbound between Main Street (Catskill) and Broad Street (Catskill) - Pavement repairs, Monday June 1st, 2026 thru Monday June 8th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes closed","update_date":"2026-05-28T15:45:54Z"},"road_event_id":"EG0I8dWMhjCYcPogyjaKJshs3Rs=","beginning_cross_street":"Main Street","ending_cross_street":"Broad Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.868045,42.217072]]}},{"id":"7PHzz1I6Qsc5FGfRWsgRvEKQDQE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"o2UTtwbpeJSQrVcXU1BxgXnUsOQ="}],"description":"Bridge work on I-81 southbound ramp to Exit 1A - NB I-481 (Syracuse) Follow Detour, Monday June 8th, 2026 thru Sunday June 14th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-28T16:33:43Z"},"road_event_id":"7PHzz1I6Qsc5FGfRWsgRvEKQDQE=","beginning_cross_street":"Exit 1A - NB I-481","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.134661,43.007731]]}},{"id":"o2UTtwbpeJSQrVcXU1BxgXnUsOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7PHzz1I6Qsc5FGfRWsgRvEKQDQE="},{"type":"next-occurrence","id":"JYJFRu/ygC/fcXpvFwgrAPV+NEw="}],"description":"Bridge work on I-81 southbound ramp to Exit 1A - NB I-481 (Syracuse) Follow Detour, Monday June 8th, 2026 thru Sunday June 14th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-28T16:33:43Z"},"road_event_id":"o2UTtwbpeJSQrVcXU1BxgXnUsOQ=","beginning_cross_street":"Exit 1A - NB I-481","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.134661,43.007731]]}},{"id":"JYJFRu/ygC/fcXpvFwgrAPV+NEw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7PHzz1I6Qsc5FGfRWsgRvEKQDQE="},{"type":"next-occurrence","id":"04UrTGeFkm2Cek7DMwtIxPXPE4k="}],"description":"Bridge work on I-81 southbound ramp to Exit 1A - NB I-481 (Syracuse) Follow Detour, Monday June 8th, 2026 thru Sunday June 14th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-28T16:33:43Z"},"road_event_id":"JYJFRu/ygC/fcXpvFwgrAPV+NEw=","beginning_cross_street":"Exit 1A - NB I-481","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.134661,43.007731]]}},{"id":"04UrTGeFkm2Cek7DMwtIxPXPE4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7PHzz1I6Qsc5FGfRWsgRvEKQDQE="},{"type":"next-occurrence","id":"JIhPYlpZTFDDFW/m5qbetjCy3eo="}],"description":"Bridge work on I-81 southbound ramp to Exit 1A - NB I-481 (Syracuse) Follow Detour, Monday June 8th, 2026 thru Sunday June 14th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-28T16:33:43Z"},"road_event_id":"04UrTGeFkm2Cek7DMwtIxPXPE4k=","beginning_cross_street":"Exit 1A - NB I-481","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.134661,43.007731]]}},{"id":"JIhPYlpZTFDDFW/m5qbetjCy3eo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7PHzz1I6Qsc5FGfRWsgRvEKQDQE="},{"type":"next-occurrence","id":"yix4MbenXFsPHlQZOaIP8DluFCs="}],"description":"Bridge work on I-81 southbound ramp to Exit 1A - NB I-481 (Syracuse) Follow Detour, Monday June 8th, 2026 thru Sunday June 14th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-28T16:33:43Z"},"road_event_id":"JIhPYlpZTFDDFW/m5qbetjCy3eo=","beginning_cross_street":"Exit 1A - NB I-481","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.134661,43.007731]]}},{"id":"yix4MbenXFsPHlQZOaIP8DluFCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7PHzz1I6Qsc5FGfRWsgRvEKQDQE="}],"description":"Bridge work on I-81 southbound ramp to Exit 1A - NB I-481 (Syracuse) Follow Detour, Monday June 8th, 2026 thru Sunday June 14th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-28T16:33:43Z"},"road_event_id":"yix4MbenXFsPHlQZOaIP8DluFCs=","beginning_cross_street":"Exit 1A - NB I-481","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T22:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.134661,43.007731]]}},{"id":"wJqJ5oXvdPcbsP0SHSqJWCuYnTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2H/4ir1CxNhmseq8lkNisD83rc4="}],"description":"Bridge work on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and I-481 (Syracuse) ; Alternating lane closures, Tuesday June 9th, 2026 thru Sunday June 14th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-28T16:41:02Z"},"road_event_id":"wJqJ5oXvdPcbsP0SHSqJWCuYnTk=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":" I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"2H/4ir1CxNhmseq8lkNisD83rc4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wJqJ5oXvdPcbsP0SHSqJWCuYnTk="},{"type":"next-occurrence","id":"Uw1GgijE1y3Z/JF4H7rCFqZb4AM="}],"description":"Bridge work on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and I-481 (Syracuse) ; Alternating lane closures, Tuesday June 9th, 2026 thru Sunday June 14th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-28T16:41:02Z"},"road_event_id":"2H/4ir1CxNhmseq8lkNisD83rc4=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":" I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"Uw1GgijE1y3Z/JF4H7rCFqZb4AM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wJqJ5oXvdPcbsP0SHSqJWCuYnTk="},{"type":"next-occurrence","id":"IU4Ivss+6NH/8fgft6ShLlVwboQ="}],"description":"Bridge work on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and I-481 (Syracuse) ; Alternating lane closures, Tuesday June 9th, 2026 thru Sunday June 14th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-28T16:41:02Z"},"road_event_id":"Uw1GgijE1y3Z/JF4H7rCFqZb4AM=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":" I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"IU4Ivss+6NH/8fgft6ShLlVwboQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wJqJ5oXvdPcbsP0SHSqJWCuYnTk="},{"type":"next-occurrence","id":"3NgToArI4KTQbM9Y9Obv5Ghn41A="}],"description":"Bridge work on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and I-481 (Syracuse) ; Alternating lane closures, Tuesday June 9th, 2026 thru Sunday June 14th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-28T16:41:02Z"},"road_event_id":"IU4Ivss+6NH/8fgft6ShLlVwboQ=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":" I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"3NgToArI4KTQbM9Y9Obv5Ghn41A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wJqJ5oXvdPcbsP0SHSqJWCuYnTk="}],"description":"Bridge work on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and I-481 (Syracuse) ; Alternating lane closures, Tuesday June 9th, 2026 thru Sunday June 14th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-05-28T16:41:02Z"},"road_event_id":"3NgToArI4KTQbM9Y9Obv5Ghn41A=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":" I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T22:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"74qpiPFEj8rIL7m2uBVYMdG0nR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"53ic+c2WiRy0eZTkKF7PPmy+Zcg="}],"description":"Repaving on I-481 southbound ramp to Exit 1 - Brighton Avenue; Rock Cut Road (Syracuse) Follow Detour , Sunday June 14th, 2026 thru Wednesday June 17th, 2026, Sunday/Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-28T16:51:37Z"},"road_event_id":"74qpiPFEj8rIL7m2uBVYMdG0nR4=","beginning_cross_street":"Exit 1 - Brighton Avenue; Rock Cut Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T22:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.126013,43.008183]]}},{"id":"53ic+c2WiRy0eZTkKF7PPmy+Zcg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"74qpiPFEj8rIL7m2uBVYMdG0nR4="},{"type":"next-occurrence","id":"+Oly7sxCHJ/NGo9vTjd9CqWeF/Q="}],"description":"Repaving on I-481 southbound ramp to Exit 1 - Brighton Avenue; Rock Cut Road (Syracuse) Follow Detour , Sunday June 14th, 2026 thru Wednesday June 17th, 2026, Sunday/Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-28T16:51:37Z"},"road_event_id":"53ic+c2WiRy0eZTkKF7PPmy+Zcg=","beginning_cross_street":"Exit 1 - Brighton Avenue; Rock Cut Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.126013,43.008183]]}},{"id":"+Oly7sxCHJ/NGo9vTjd9CqWeF/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"74qpiPFEj8rIL7m2uBVYMdG0nR4="}],"description":"Repaving on I-481 southbound ramp to Exit 1 - Brighton Avenue; Rock Cut Road (Syracuse) Follow Detour , Sunday June 14th, 2026 thru Wednesday June 17th, 2026, Sunday/Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-28T16:51:37Z"},"road_event_id":"+Oly7sxCHJ/NGo9vTjd9CqWeF/Q=","beginning_cross_street":"Exit 1 - Brighton Avenue; Rock Cut Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.126013,43.008183]]}},{"id":"cAHWjGmwpiBbP+UuULmmDzStxto=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["City Zone"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"v7ohm+Cvce5DC4XZVKocr9aOoGQ="}],"description":"Due to Track repairs westbound, City Zone west of Jamaica (New York) Westbound midday trains are scheduled to bypass Kew Gardens, Forest Hills and Woodside . For travel to and from bypassed stations, take the subway, Monday June 1st, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 AM thru 03:00 PM, Friday June 5th, 2026 thru Friday June 12th, 2026, 10:00 AM thru 01:00 PM","update_date":"2026-05-28T16:55:54Z"},"road_event_id":"cAHWjGmwpiBbP+UuULmmDzStxto=","beginning_cross_street":"Jamaica","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.808529,40.699608]]}},{"id":"v7ohm+Cvce5DC4XZVKocr9aOoGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["City Zone"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cAHWjGmwpiBbP+UuULmmDzStxto="},{"type":"next-occurrence","id":"B16V+XXDVCeWCOOqSl7gfq6kq84="}],"description":"Due to Track repairs westbound, City Zone west of Jamaica (New York) Westbound midday trains are scheduled to bypass Kew Gardens, Forest Hills and Woodside . For travel to and from bypassed stations, take the subway, Monday June 1st, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 AM thru 03:00 PM, Friday June 5th, 2026 thru Friday June 12th, 2026, 10:00 AM thru 01:00 PM","update_date":"2026-05-28T16:55:54Z"},"road_event_id":"v7ohm+Cvce5DC4XZVKocr9aOoGQ=","beginning_cross_street":"Jamaica","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.808529,40.699608]]}},{"id":"B16V+XXDVCeWCOOqSl7gfq6kq84=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["City Zone"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cAHWjGmwpiBbP+UuULmmDzStxto="},{"type":"next-occurrence","id":"dFCKR40yhL6149F2yRwz34S+hLw="}],"description":"Due to Track repairs westbound, City Zone west of Jamaica (New York) Westbound midday trains are scheduled to bypass Kew Gardens, Forest Hills and Woodside . For travel to and from bypassed stations, take the subway, Monday June 1st, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 AM thru 03:00 PM, Friday June 5th, 2026 thru Friday June 12th, 2026, 10:00 AM thru 01:00 PM","update_date":"2026-05-28T16:55:54Z"},"road_event_id":"B16V+XXDVCeWCOOqSl7gfq6kq84=","beginning_cross_street":"Jamaica","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.808529,40.699608]]}},{"id":"dFCKR40yhL6149F2yRwz34S+hLw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["City Zone"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cAHWjGmwpiBbP+UuULmmDzStxto="},{"type":"next-occurrence","id":"brVJvV9xsHXwVVghpcMHVRV6+/A="}],"description":"Due to Track repairs westbound, City Zone west of Jamaica (New York) Westbound midday trains are scheduled to bypass Kew Gardens, Forest Hills and Woodside . For travel to and from bypassed stations, take the subway, Monday June 1st, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 AM thru 03:00 PM, Friday June 5th, 2026 thru Friday June 12th, 2026, 10:00 AM thru 01:00 PM","update_date":"2026-05-28T16:55:54Z"},"road_event_id":"dFCKR40yhL6149F2yRwz34S+hLw=","beginning_cross_street":"Jamaica","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.808529,40.699608]]}},{"id":"brVJvV9xsHXwVVghpcMHVRV6+/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["City Zone"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cAHWjGmwpiBbP+UuULmmDzStxto="}],"description":"Due to Track repairs westbound, City Zone west of Jamaica (New York) Westbound midday trains are scheduled to bypass Kew Gardens, Forest Hills and Woodside . For travel to and from bypassed stations, take the subway, Monday June 1st, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 AM thru 03:00 PM, Friday June 5th, 2026 thru Friday June 12th, 2026, 10:00 AM thru 01:00 PM","update_date":"2026-05-28T16:55:54Z"},"road_event_id":"brVJvV9xsHXwVVghpcMHVRV6+/A=","beginning_cross_street":"Jamaica","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.808529,40.699608]]}},{"id":"rKpD0Ur5WnuJrIsmfCfslUWv8dA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kxVgTYc9Z4pyfgGHzrRJhzA82rY="}],"description":"Repaving on I-81 northbound ramp from Exit 1A - E Glen Ave; Brighton Ave (Syracuse) ; follow detour, Wednesday June 10th, 2026 thru Friday June 12th, 2026, Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-28T16:56:57Z"},"road_event_id":"rKpD0Ur5WnuJrIsmfCfslUWv8dA=","beginning_cross_street":"Exit 1A - E Glen Ave; Brighton Ave ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.135778,43.009505]]}},{"id":"kxVgTYc9Z4pyfgGHzrRJhzA82rY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rKpD0Ur5WnuJrIsmfCfslUWv8dA="}],"description":"Repaving on I-81 northbound ramp from Exit 1A - E Glen Ave; Brighton Ave (Syracuse) ; follow detour, Wednesday June 10th, 2026 thru Friday June 12th, 2026, Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-28T16:56:57Z"},"road_event_id":"kxVgTYc9Z4pyfgGHzrRJhzA82rY=","beginning_cross_street":"Exit 1A - E Glen Ave; Brighton Ave ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.135778,43.009505]]}},{"id":"zyYVDg0uYbw3KKR6BjJuj2Lot54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Ggl/q/8ENpWyyNBrb/lNzzOOzDw="}],"description":"Repaving on I-81 southbound ramp to Exit 1B - E Glen Ave (Syracuse) Detour in place, Thursday June 11th, 2026 thru Sunday June 14th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-28T16:59:23Z"},"road_event_id":"zyYVDg0uYbw3KKR6BjJuj2Lot54=","beginning_cross_street":"Exit 1B - E Glen Ave ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.135804,43.009045]]}},{"id":"Ggl/q/8ENpWyyNBrb/lNzzOOzDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zyYVDg0uYbw3KKR6BjJuj2Lot54="},{"type":"next-occurrence","id":"R6TZkBaxT/aQLvM4po6LRLoUUDs="}],"description":"Repaving on I-81 southbound ramp to Exit 1B - E Glen Ave (Syracuse) Detour in place, Thursday June 11th, 2026 thru Sunday June 14th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-28T16:59:23Z"},"road_event_id":"Ggl/q/8ENpWyyNBrb/lNzzOOzDw=","beginning_cross_street":"Exit 1B - E Glen Ave ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T22:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.135804,43.009045]]}},{"id":"R6TZkBaxT/aQLvM4po6LRLoUUDs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zyYVDg0uYbw3KKR6BjJuj2Lot54="}],"description":"Repaving on I-81 southbound ramp to Exit 1B - E Glen Ave (Syracuse) Detour in place, Thursday June 11th, 2026 thru Sunday June 14th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-28T16:59:23Z"},"road_event_id":"R6TZkBaxT/aQLvM4po6LRLoUUDs=","beginning_cross_street":"Exit 1B - E Glen Ave ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T22:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.135804,43.009045]]}},{"id":"04riG4sF3qmrikgtI/oVF+NydWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 252"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Bo46DohGuWzVx6JuKeay3xOMBao="}],"description":"Utility work on NY 252 eastbound Belmanor Dr (Henrietta) to Edgewood Ave (Henrietta) alternating lane closures, Wednesday June 3rd, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T17:36:17Z"},"road_event_id":"04riG4sF3qmrikgtI/oVF+NydWI=","beginning_cross_street":"Belmanor Dr","ending_cross_street":"Edgewood Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.57936,43.087201]]}},{"id":"Bo46DohGuWzVx6JuKeay3xOMBao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 252"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"04riG4sF3qmrikgtI/oVF+NydWI="},{"type":"next-occurrence","id":"4p59JK9IfYSqqk9q4D0HsEF4O2U="}],"description":"Utility work on NY 252 eastbound Belmanor Dr (Henrietta) to Edgewood Ave (Henrietta) alternating lane closures, Wednesday June 3rd, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T17:36:17Z"},"road_event_id":"Bo46DohGuWzVx6JuKeay3xOMBao=","beginning_cross_street":"Belmanor Dr","ending_cross_street":"Edgewood Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.57936,43.087201]]}},{"id":"4p59JK9IfYSqqk9q4D0HsEF4O2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 252"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"04riG4sF3qmrikgtI/oVF+NydWI="},{"type":"next-occurrence","id":"hT2hjB7zhHFfbwQTBa7AXVe4u8E="}],"description":"Utility work on NY 252 eastbound Belmanor Dr (Henrietta) to Edgewood Ave (Henrietta) alternating lane closures, Wednesday June 3rd, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T17:36:17Z"},"road_event_id":"4p59JK9IfYSqqk9q4D0HsEF4O2U=","beginning_cross_street":"Belmanor Dr","ending_cross_street":"Edgewood Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.57936,43.087201]]}},{"id":"hT2hjB7zhHFfbwQTBa7AXVe4u8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 252"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"04riG4sF3qmrikgtI/oVF+NydWI="},{"type":"next-occurrence","id":"geq6cS/+zw3nc05HZFrC4/wthoo="}],"description":"Utility work on NY 252 eastbound Belmanor Dr (Henrietta) to Edgewood Ave (Henrietta) alternating lane closures, Wednesday June 3rd, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T17:36:17Z"},"road_event_id":"hT2hjB7zhHFfbwQTBa7AXVe4u8E=","beginning_cross_street":"Belmanor Dr","ending_cross_street":"Edgewood Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.57936,43.087201]]}},{"id":"geq6cS/+zw3nc05HZFrC4/wthoo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 252"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"04riG4sF3qmrikgtI/oVF+NydWI="},{"type":"next-occurrence","id":"zDGUE7Dfsmm8Wj1hSvcHglDswsM="}],"description":"Utility work on NY 252 eastbound Belmanor Dr (Henrietta) to Edgewood Ave (Henrietta) alternating lane closures, Wednesday June 3rd, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T17:36:17Z"},"road_event_id":"geq6cS/+zw3nc05HZFrC4/wthoo=","beginning_cross_street":"Belmanor Dr","ending_cross_street":"Edgewood Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.57936,43.087201]]}},{"id":"zDGUE7Dfsmm8Wj1hSvcHglDswsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 252"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"04riG4sF3qmrikgtI/oVF+NydWI="}],"description":"Utility work on NY 252 eastbound Belmanor Dr (Henrietta) to Edgewood Ave (Henrietta) alternating lane closures, Wednesday June 3rd, 2026 thru Wednesday June 10th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T17:36:17Z"},"road_event_id":"zDGUE7Dfsmm8Wj1hSvcHglDswsM=","beginning_cross_street":"Belmanor Dr","ending_cross_street":"Edgewood Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.57936,43.087201]]}},{"id":"BqwvQF2+G/vN3QBgxQAhEyQRrYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Cross County Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+7Ve/l+f1o9+u2dPx1Xuc8Gz4pk="}],"description":"Road maintenance operations on Cross County Parkway eastbound between Exit 4N - I-87 NB (Yonkers) and Exit 6 - Bronx River Parkway (Mount Vernon) D265647/NIGHT/32757209 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday June 10th, 2026 thru Saturday June 13th, 2026 Wednesday/ Thursday/ Friday, 11:00 PM thru 05:00 AM, right lane closure","update_date":"2026-06-05T18:38:13Z"},"road_event_id":"BqwvQF2+G/vN3QBgxQAhEyQRrYo=","beginning_cross_street":"Exit 4N - I-87 NB","ending_cross_street":"Exit 6 - Bronx River Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T03:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.804869,41.047595]]}},{"id":"+7Ve/l+f1o9+u2dPx1Xuc8Gz4pk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Cross County Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BqwvQF2+G/vN3QBgxQAhEyQRrYo="},{"type":"next-occurrence","id":"iY9xoou1oMmhmj/m1R+5zgexLSY="}],"description":"Road maintenance operations on Cross County Parkway eastbound between Exit 4N - I-87 NB (Yonkers) and Exit 6 - Bronx River Parkway (Mount Vernon) D265647/NIGHT/32757209 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday June 10th, 2026 thru Saturday June 13th, 2026 Wednesday/ Thursday/ Friday, 11:00 PM thru 05:00 AM, right lane closure","update_date":"2026-06-05T18:38:13Z"},"road_event_id":"+7Ve/l+f1o9+u2dPx1Xuc8Gz4pk=","beginning_cross_street":"Exit 4N - I-87 NB","ending_cross_street":"Exit 6 - Bronx River Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T03:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.804869,41.047595]]}},{"id":"iY9xoou1oMmhmj/m1R+5zgexLSY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Cross County Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BqwvQF2+G/vN3QBgxQAhEyQRrYo="}],"description":"Road maintenance operations on Cross County Parkway eastbound between Exit 4N - I-87 NB (Yonkers) and Exit 6 - Bronx River Parkway (Mount Vernon) D265647/NIGHT/32757209 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday June 10th, 2026 thru Saturday June 13th, 2026 Wednesday/ Thursday/ Friday, 11:00 PM thru 05:00 AM, right lane closure","update_date":"2026-06-05T18:38:13Z"},"road_event_id":"iY9xoou1oMmhmj/m1R+5zgexLSY=","beginning_cross_street":"Exit 4N - I-87 NB","ending_cross_street":"Exit 6 - Bronx River Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T03:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.804869,41.047595]]}},{"id":"sA0i2iRUV2T0Y3e/G2t7zOPPopw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0h0SaJMB9KGplaINzsYhVmN/thM="}],"description":"Utility work on NY 36 both directions between Old State Rd. (York) and YORK RD E (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T17:49:05Z"},"road_event_id":"sA0i2iRUV2T0Y3e/G2t7zOPPopw=","beginning_cross_street":"Old State Rd. ","ending_cross_street":"YORK RD E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.89701,42.820452]]}},{"id":"0h0SaJMB9KGplaINzsYhVmN/thM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sA0i2iRUV2T0Y3e/G2t7zOPPopw="},{"type":"next-occurrence","id":"GjRwv8ESoxxe3QhmrsY1LDHK7ww="}],"description":"Utility work on NY 36 both directions between Old State Rd. (York) and YORK RD E (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T17:49:05Z"},"road_event_id":"0h0SaJMB9KGplaINzsYhVmN/thM=","beginning_cross_street":"Old State Rd. ","ending_cross_street":"YORK RD E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.89701,42.820452]]}},{"id":"GjRwv8ESoxxe3QhmrsY1LDHK7ww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sA0i2iRUV2T0Y3e/G2t7zOPPopw="},{"type":"next-occurrence","id":"tBTkfL944rbROOHAx9Mu7aEKY7Y="}],"description":"Utility work on NY 36 both directions between Old State Rd. (York) and YORK RD E (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T17:49:05Z"},"road_event_id":"GjRwv8ESoxxe3QhmrsY1LDHK7ww=","beginning_cross_street":"Old State Rd. ","ending_cross_street":"YORK RD E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.89701,42.820452]]}},{"id":"tBTkfL944rbROOHAx9Mu7aEKY7Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sA0i2iRUV2T0Y3e/G2t7zOPPopw="},{"type":"next-occurrence","id":"5EgOssPdTV/7cn38lLM6kaoNPAs="}],"description":"Utility work on NY 36 both directions between Old State Rd. (York) and YORK RD E (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T17:49:05Z"},"road_event_id":"tBTkfL944rbROOHAx9Mu7aEKY7Y=","beginning_cross_street":"Old State Rd. ","ending_cross_street":"YORK RD E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.89701,42.820452]]}},{"id":"5EgOssPdTV/7cn38lLM6kaoNPAs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sA0i2iRUV2T0Y3e/G2t7zOPPopw="},{"type":"next-occurrence","id":"YG1Tre4AShYXtCchhoam1jslCgs="}],"description":"Utility work on NY 36 both directions between Old State Rd. (York) and YORK RD E (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T17:49:05Z"},"road_event_id":"5EgOssPdTV/7cn38lLM6kaoNPAs=","beginning_cross_street":"Old State Rd. ","ending_cross_street":"YORK RD E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.89701,42.820452]]}},{"id":"YG1Tre4AShYXtCchhoam1jslCgs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sA0i2iRUV2T0Y3e/G2t7zOPPopw="}],"description":"Utility work on NY 36 both directions between Old State Rd. (York) and YORK RD E (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T17:49:05Z"},"road_event_id":"YG1Tre4AShYXtCchhoam1jslCgs=","beginning_cross_street":"Old State Rd. ","ending_cross_street":"YORK RD E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.89701,42.820452]]}},{"id":"zX7o3Ps3oU/r6pxHuiaXJRUapAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FD+YPQ1/tReQQ8Fl0MU9cC5KgLc="}],"description":"Due to Track repairs southbound, A Line between 125 St (New York) and 59 St - Columbus Circle (New York) skips 116 St, 110 St, 103 St, 96 St, 86 St, 81 St and 72 St. For service to these stations, take the A line to 59 St-Columbus Circle and transfer to an uptown A line local. For service from these stations, take the A line to 125 St and transfer to a downtown A line. Use nearby 1 line instead. Transfer between trains at 168 St or 59 St-Columbus Circle., Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 11:45 PM thru 05:00 AM, Friday June 5th, 2026 thru Tuesday June 9th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-05-28T18:06:57Z"},"road_event_id":"zX7o3Ps3oU/r6pxHuiaXJRUapAw=","beginning_cross_street":"125 St","ending_cross_street":"59 St - Columbus Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:45:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.952343,40.811109]]}},{"id":"FD+YPQ1/tReQQ8Fl0MU9cC5KgLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zX7o3Ps3oU/r6pxHuiaXJRUapAw="},{"type":"next-occurrence","id":"Fh1QCUsmCjJl6cpOiJqot+trPZ8="}],"description":"Due to Track repairs southbound, A Line between 125 St (New York) and 59 St - Columbus Circle (New York) skips 116 St, 110 St, 103 St, 96 St, 86 St, 81 St and 72 St. For service to these stations, take the A line to 59 St-Columbus Circle and transfer to an uptown A line local. For service from these stations, take the A line to 125 St and transfer to a downtown A line. Use nearby 1 line instead. Transfer between trains at 168 St or 59 St-Columbus Circle., Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 11:45 PM thru 05:00 AM, Friday June 5th, 2026 thru Tuesday June 9th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-05-28T18:06:57Z"},"road_event_id":"FD+YPQ1/tReQQ8Fl0MU9cC5KgLc=","beginning_cross_street":"125 St","ending_cross_street":"59 St - Columbus Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T03:45:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.952343,40.811109]]}},{"id":"Fh1QCUsmCjJl6cpOiJqot+trPZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zX7o3Ps3oU/r6pxHuiaXJRUapAw="},{"type":"next-occurrence","id":"4z4KmAFkUWsBNzF4aKRoalps5HM="}],"description":"Due to Track repairs southbound, A Line between 125 St (New York) and 59 St - Columbus Circle (New York) skips 116 St, 110 St, 103 St, 96 St, 86 St, 81 St and 72 St. For service to these stations, take the A line to 59 St-Columbus Circle and transfer to an uptown A line local. For service from these stations, take the A line to 125 St and transfer to a downtown A line. Use nearby 1 line instead. Transfer between trains at 168 St or 59 St-Columbus Circle., Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 11:45 PM thru 05:00 AM, Friday June 5th, 2026 thru Tuesday June 9th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-05-28T18:06:57Z"},"road_event_id":"Fh1QCUsmCjJl6cpOiJqot+trPZ8=","beginning_cross_street":"125 St","ending_cross_street":"59 St - Columbus Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T03:45:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.952343,40.811109]]}},{"id":"4z4KmAFkUWsBNzF4aKRoalps5HM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zX7o3Ps3oU/r6pxHuiaXJRUapAw="}],"description":"Due to Track repairs southbound, A Line between 125 St (New York) and 59 St - Columbus Circle (New York) skips 116 St, 110 St, 103 St, 96 St, 86 St, 81 St and 72 St. For service to these stations, take the A line to 59 St-Columbus Circle and transfer to an uptown A line local. For service from these stations, take the A line to 125 St and transfer to a downtown A line. Use nearby 1 line instead. Transfer between trains at 168 St or 59 St-Columbus Circle., Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 11:45 PM thru 05:00 AM, Friday June 5th, 2026 thru Tuesday June 9th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-05-28T18:06:57Z"},"road_event_id":"4z4KmAFkUWsBNzF4aKRoalps5HM=","beginning_cross_street":"125 St","ending_cross_street":"59 St - Columbus Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T03:45:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.952343,40.811109]]}},{"id":"fN+Q+alyA2F8KResCtPGCKg9Z2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line"],"direction":"unknown","related_road_events":[],"description":"Station Renovations on E Line northbound bypassing Briarwood (New York) For service to this station, take the E line to Kew Gardens-Union Tpke and transfer to a Jamaica Center-bound E line or Jamaica-bound F line. For service from this station, take the E line to Jamaica-Van Wyck and transfer to a Manhattan-bound E line., Continuous Saturday June 6th,2026 06:45 AM thru Sunday June 7th,2026 07:00 PM","update_date":"2026-06-04T09:00:21Z"},"road_event_id":"fN+Q+alyA2F8KResCtPGCKg9Z2A=","beginning_cross_street":"Briarwood","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:45:00Z","end_date":"2026-06-07T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820574,40.709179]]}},{"id":"30kV9/648hkhf2mgfCH3zf/JWOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XTI4k20SJAujZDzhNUCKqARD9aU="}],"description":"Utility work on US 20 both directions between Town of Caledonia and Town of York Line (Caledonia) and to Lowery Rd. (York) alternating lane closures/flaggers as needed, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-02T17:36:34Z"},"road_event_id":"30kV9/648hkhf2mgfCH3zf/JWOU=","beginning_cross_street":"Town of Caledonia and Town of York Line","ending_cross_street":"to Lowery Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.845737,42.91577]]}},{"id":"XTI4k20SJAujZDzhNUCKqARD9aU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"30kV9/648hkhf2mgfCH3zf/JWOU="},{"type":"next-occurrence","id":"OmTiyqOYEUh10arHDwmDAyZkC9g="}],"description":"Utility work on US 20 both directions between Town of Caledonia and Town of York Line (Caledonia) and to Lowery Rd. (York) alternating lane closures/flaggers as needed, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-02T17:36:34Z"},"road_event_id":"XTI4k20SJAujZDzhNUCKqARD9aU=","beginning_cross_street":"Town of Caledonia and Town of York Line","ending_cross_street":"to Lowery Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.845737,42.91577]]}},{"id":"OmTiyqOYEUh10arHDwmDAyZkC9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"30kV9/648hkhf2mgfCH3zf/JWOU="},{"type":"next-occurrence","id":"COEVEzR3F4XmJ2+oz5gD3W5ysQ0="}],"description":"Utility work on US 20 both directions between Town of Caledonia and Town of York Line (Caledonia) and to Lowery Rd. (York) alternating lane closures/flaggers as needed, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-02T17:36:34Z"},"road_event_id":"OmTiyqOYEUh10arHDwmDAyZkC9g=","beginning_cross_street":"Town of Caledonia and Town of York Line","ending_cross_street":"to Lowery Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.845737,42.91577]]}},{"id":"COEVEzR3F4XmJ2+oz5gD3W5ysQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"30kV9/648hkhf2mgfCH3zf/JWOU="},{"type":"next-occurrence","id":"lzrLfgKooqrr2PHo0GsR0AF4uLQ="}],"description":"Utility work on US 20 both directions between Town of Caledonia and Town of York Line (Caledonia) and to Lowery Rd. (York) alternating lane closures/flaggers as needed, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-02T17:36:34Z"},"road_event_id":"COEVEzR3F4XmJ2+oz5gD3W5ysQ0=","beginning_cross_street":"Town of Caledonia and Town of York Line","ending_cross_street":"to Lowery Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.845737,42.91577]]}},{"id":"lzrLfgKooqrr2PHo0GsR0AF4uLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"30kV9/648hkhf2mgfCH3zf/JWOU="},{"type":"next-occurrence","id":"boI3Mun6X/fCIcMRXFiwT2saDeE="}],"description":"Utility work on US 20 both directions between Town of Caledonia and Town of York Line (Caledonia) and to Lowery Rd. (York) alternating lane closures/flaggers as needed, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-02T17:36:34Z"},"road_event_id":"lzrLfgKooqrr2PHo0GsR0AF4uLQ=","beginning_cross_street":"Town of Caledonia and Town of York Line","ending_cross_street":"to Lowery Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.845737,42.91577]]}},{"id":"boI3Mun6X/fCIcMRXFiwT2saDeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"30kV9/648hkhf2mgfCH3zf/JWOU="}],"description":"Utility work on US 20 both directions between Town of Caledonia and Town of York Line (Caledonia) and to Lowery Rd. (York) alternating lane closures/flaggers as needed, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-02T17:36:34Z"},"road_event_id":"boI3Mun6X/fCIcMRXFiwT2saDeE=","beginning_cross_street":"Town of Caledonia and Town of York Line","ending_cross_street":"to Lowery Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.845737,42.91577]]}},{"id":"NLoElDOfgqiEKjbGTd/gsNBAAlg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SfAuvaTojVRqiohJtzL9fzZi8qE="}],"description":"Utility work on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, Flagger Control, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-04T14:28:57Z"},"road_event_id":"NLoElDOfgqiEKjbGTd/gsNBAAlg=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468709,42.526926]]}},{"id":"SfAuvaTojVRqiohJtzL9fzZi8qE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NLoElDOfgqiEKjbGTd/gsNBAAlg="},{"type":"next-occurrence","id":"v69TKFtPGWPgXxfwmQwGTiJmrs4="}],"description":"Utility work on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, Flagger Control, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-04T14:28:57Z"},"road_event_id":"SfAuvaTojVRqiohJtzL9fzZi8qE=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468709,42.526926]]}},{"id":"v69TKFtPGWPgXxfwmQwGTiJmrs4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NLoElDOfgqiEKjbGTd/gsNBAAlg="},{"type":"next-occurrence","id":"XxVPRf9JpPX0WOZxmVvM6sHTkOs="}],"description":"Utility work on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, Flagger Control, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-04T14:28:57Z"},"road_event_id":"v69TKFtPGWPgXxfwmQwGTiJmrs4=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468709,42.526926]]}},{"id":"XxVPRf9JpPX0WOZxmVvM6sHTkOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NLoElDOfgqiEKjbGTd/gsNBAAlg="},{"type":"next-occurrence","id":"KvdH3WnmgZqNTP2xj3oVbTSWVL4="}],"description":"Utility work on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, Flagger Control, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-04T14:28:57Z"},"road_event_id":"XxVPRf9JpPX0WOZxmVvM6sHTkOs=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468709,42.526926]]}},{"id":"KvdH3WnmgZqNTP2xj3oVbTSWVL4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NLoElDOfgqiEKjbGTd/gsNBAAlg="},{"type":"next-occurrence","id":"EHzwLU34RV3LVodIufUtFi3NpTk="}],"description":"Utility work on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, Flagger Control, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-04T14:28:57Z"},"road_event_id":"KvdH3WnmgZqNTP2xj3oVbTSWVL4=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468709,42.526926]]}},{"id":"EHzwLU34RV3LVodIufUtFi3NpTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NLoElDOfgqiEKjbGTd/gsNBAAlg="},{"type":"next-occurrence","id":"qY6DA6nsHfdtj9HtqmlHXVw4vqE="}],"description":"Utility work on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, Flagger Control, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-04T14:28:57Z"},"road_event_id":"EHzwLU34RV3LVodIufUtFi3NpTk=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468709,42.526926]]}},{"id":"qY6DA6nsHfdtj9HtqmlHXVw4vqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NLoElDOfgqiEKjbGTd/gsNBAAlg="}],"description":"Utility work on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, Flagger Control, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-04T14:28:57Z"},"road_event_id":"qY6DA6nsHfdtj9HtqmlHXVw4vqE=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468709,42.526926]]}},{"id":"IUhJJx+2fug0iPNDh3/tMGJmEx4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[],"description":"Due to Track repairs northbound, A Line between Jay St - MetroTech (New York) and W 4 St - Wash Sq (New York) at High St, Fulton St, Chambers St, Canal St and Spring St. Inwood-bound A line run via the F line from Jay St-MetroTech to W 4 St-Wash Sq. For High St, use the nearby York St F line instead. For Fulton St, take the J line via transfer at the Delancey St-Essex St F line. Or, use the nearby World Trade Center E line via transfer at W 4 St-Wash Sq. For Chambers St/World Trade Center, Canal St and Spring St, take the E line or downtown A line via transfer at W 4 St-Wash Sq., Tuesday June 2nd, 2026 thru Saturday June 6th, 2026, Tuesday/Wednesday/Thursday/Friday, 11:45 PM thru 05:00 AM service suspended, Continuous Friday June 5th, 2026 11:45 PM thru Monday June 8th, 2026 05:00 AM service suspended","update_date":"2026-05-28T18:04:38Z"},"road_event_id":"IUhJJx+2fug0iPNDh3/tMGJmEx4=","beginning_cross_street":"Jay St - MetroTech","ending_cross_street":"W 4 St - Wash Sq","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:45:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987342,40.692338]]}},{"id":"70gCIh25XgCmpnlGTjMBOqrYSrw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"I6zBMu7F5BleLiw1JJ5kKVDcmJ8="}],"description":"Utility work on NY 36 both directions area of Genesee Street; NY 63 (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T18:08:37Z"},"road_event_id":"70gCIh25XgCmpnlGTjMBOqrYSrw=","beginning_cross_street":"Genesee Street; NY 63","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.897148,42.829382]]}},{"id":"I6zBMu7F5BleLiw1JJ5kKVDcmJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"70gCIh25XgCmpnlGTjMBOqrYSrw="},{"type":"next-occurrence","id":"jFPvTvyGw94gWzBchM9Ru0RAjkg="}],"description":"Utility work on NY 36 both directions area of Genesee Street; NY 63 (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T18:08:37Z"},"road_event_id":"I6zBMu7F5BleLiw1JJ5kKVDcmJ8=","beginning_cross_street":"Genesee Street; NY 63","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.897148,42.829382]]}},{"id":"jFPvTvyGw94gWzBchM9Ru0RAjkg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"70gCIh25XgCmpnlGTjMBOqrYSrw="},{"type":"next-occurrence","id":"2dP9vtpNHi+Qh9R8EFuDp8gdxio="}],"description":"Utility work on NY 36 both directions area of Genesee Street; NY 63 (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T18:08:37Z"},"road_event_id":"jFPvTvyGw94gWzBchM9Ru0RAjkg=","beginning_cross_street":"Genesee Street; NY 63","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.897148,42.829382]]}},{"id":"2dP9vtpNHi+Qh9R8EFuDp8gdxio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"70gCIh25XgCmpnlGTjMBOqrYSrw="},{"type":"next-occurrence","id":"qDKGXf+vXyesDP7IFb5zX3jKAKM="}],"description":"Utility work on NY 36 both directions area of Genesee Street; NY 63 (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T18:08:37Z"},"road_event_id":"2dP9vtpNHi+Qh9R8EFuDp8gdxio=","beginning_cross_street":"Genesee Street; NY 63","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.897148,42.829382]]}},{"id":"qDKGXf+vXyesDP7IFb5zX3jKAKM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"70gCIh25XgCmpnlGTjMBOqrYSrw="},{"type":"next-occurrence","id":"lBVlqc+2FndwpTI+51PEqAoQHVs="}],"description":"Utility work on NY 36 both directions area of Genesee Street; NY 63 (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T18:08:37Z"},"road_event_id":"qDKGXf+vXyesDP7IFb5zX3jKAKM=","beginning_cross_street":"Genesee Street; NY 63","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.897148,42.829382]]}},{"id":"lBVlqc+2FndwpTI+51PEqAoQHVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"70gCIh25XgCmpnlGTjMBOqrYSrw="}],"description":"Utility work on NY 36 both directions area of Genesee Street; NY 63 (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T18:08:37Z"},"road_event_id":"lBVlqc+2FndwpTI+51PEqAoQHVs=","beginning_cross_street":"Genesee Street; NY 63","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.897148,42.829382]]}},{"id":"ORC300550217","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","description":"Utility work on NY 63 both directions between OTIS AVE (York) and FLATS RD (York) Alternating lane/shoulder closures with flaggers as needed Not currently Scheduled","update_date":"2026-06-05T19:00:33Z"},"road_event_id":"ORC300550217","beginning_cross_street":"OTIS AVE","ending_cross_street":"FLATS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T18:23:14Z","end_date":"2026-06-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-77.866089,42.829928]]}},{"id":"aLmh2yQmjOuqOsha1E6L3qPB0wo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Dlc938ocRgEwFTCBpaaq/yB5hNc="}],"description":"Crack sealing on NY 104 both directions between Culver Road; CR 120 (Irondequoit) and Town of Webster and Town of Ontario Line; Monroe and Wayne County Line (Webster), Thursday June 4th, 2026 thru Monday June 8th, 2026, Sunday/Thursday/Friday/Saturday, 06:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-28T18:23:05Z"},"road_event_id":"aLmh2yQmjOuqOsha1E6L3qPB0wo=","beginning_cross_street":"Culver Road; CR 120","ending_cross_street":"Town of Webster and Town of Ontario Line; Monroe and Wayne County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.562259,43.195864]]}},{"id":"Dlc938ocRgEwFTCBpaaq/yB5hNc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aLmh2yQmjOuqOsha1E6L3qPB0wo="},{"type":"next-occurrence","id":"4uyWzx9U8ULceskJ+LDsQCmC7Jw="}],"description":"Crack sealing on NY 104 both directions between Culver Road; CR 120 (Irondequoit) and Town of Webster and Town of Ontario Line; Monroe and Wayne County Line (Webster), Thursday June 4th, 2026 thru Monday June 8th, 2026, Sunday/Thursday/Friday/Saturday, 06:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-28T18:23:05Z"},"road_event_id":"Dlc938ocRgEwFTCBpaaq/yB5hNc=","beginning_cross_street":"Culver Road; CR 120","ending_cross_street":"Town of Webster and Town of Ontario Line; Monroe and Wayne County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T22:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.562259,43.195864]]}},{"id":"4uyWzx9U8ULceskJ+LDsQCmC7Jw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aLmh2yQmjOuqOsha1E6L3qPB0wo="}],"description":"Crack sealing on NY 104 both directions between Culver Road; CR 120 (Irondequoit) and Town of Webster and Town of Ontario Line; Monroe and Wayne County Line (Webster), Thursday June 4th, 2026 thru Monday June 8th, 2026, Sunday/Thursday/Friday/Saturday, 06:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-28T18:23:05Z"},"road_event_id":"4uyWzx9U8ULceskJ+LDsQCmC7Jw=","beginning_cross_street":"Culver Road; CR 120","ending_cross_street":"Town of Webster and Town of Ontario Line; Monroe and Wayne County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T22:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.562259,43.195864]]}},{"id":"blPwmoHN3siXQf59mE6X7MqrRnA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"E1MEeODlZUow27RjRvbaDXr9P5s="}],"description":"Bridge rehabilitation on NY 17 [Orange] both directions between Exit 122 - East Main Street - CR 67 (Wallkill) and Exit 125 - South Street - NY 17M (Goshen) D265651/NIGHT/32734909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-06-05T10:00:19Z"},"road_event_id":"blPwmoHN3siXQf59mE6X7MqrRnA=","beginning_cross_street":"Exit 122 - East Main Street - CR 67","ending_cross_street":"Exit 125 - South Street - NY 17M","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.362454,41.442505]]}},{"id":"E1MEeODlZUow27RjRvbaDXr9P5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"blPwmoHN3siXQf59mE6X7MqrRnA="},{"type":"next-occurrence","id":"60dxj3zViIuVZIpbLQCwkZ2s5qU="}],"description":"Bridge rehabilitation on NY 17 [Orange] both directions between Exit 122 - East Main Street - CR 67 (Wallkill) and Exit 125 - South Street - NY 17M (Goshen) D265651/NIGHT/32734909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-06-05T10:00:19Z"},"road_event_id":"E1MEeODlZUow27RjRvbaDXr9P5s=","beginning_cross_street":"Exit 122 - East Main Street - CR 67","ending_cross_street":"Exit 125 - South Street - NY 17M","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.362454,41.442505]]}},{"id":"60dxj3zViIuVZIpbLQCwkZ2s5qU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"blPwmoHN3siXQf59mE6X7MqrRnA="},{"type":"next-occurrence","id":"4iscH1KPkdzdItCpcJmwdJ8bf/A="}],"description":"Bridge rehabilitation on NY 17 [Orange] both directions between Exit 122 - East Main Street - CR 67 (Wallkill) and Exit 125 - South Street - NY 17M (Goshen) D265651/NIGHT/32734909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-06-05T10:00:19Z"},"road_event_id":"60dxj3zViIuVZIpbLQCwkZ2s5qU=","beginning_cross_street":"Exit 122 - East Main Street - CR 67","ending_cross_street":"Exit 125 - South Street - NY 17M","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.362454,41.442505]]}},{"id":"4iscH1KPkdzdItCpcJmwdJ8bf/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"blPwmoHN3siXQf59mE6X7MqrRnA="}],"description":"Bridge rehabilitation on NY 17 [Orange] both directions between Exit 122 - East Main Street - CR 67 (Wallkill) and Exit 125 - South Street - NY 17M (Goshen) D265651/NIGHT/32734909 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-06-05T10:00:19Z"},"road_event_id":"4iscH1KPkdzdItCpcJmwdJ8bf/A=","beginning_cross_street":"Exit 122 - East Main Street - CR 67","ending_cross_street":"Exit 125 - South Street - NY 17M","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.362454,41.442505]]}},{"id":"KQz9/7H6DLqj80Fba0c4a/+3iS8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8HNytDgKfNOLT2DbZSK64/IBJTY="}],"description":"Repaving on NY 22 both directions between Blockhouse Road (Essex) and CARSON WAY (Willsboro) alternating lanes , Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-28T19:20:06Z"},"road_event_id":"KQz9/7H6DLqj80Fba0c4a/+3iS8=","beginning_cross_street":"Blockhouse Road","ending_cross_street":"CARSON WAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.349034,44.318955]]}},{"id":"8HNytDgKfNOLT2DbZSK64/IBJTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KQz9/7H6DLqj80Fba0c4a/+3iS8="},{"type":"next-occurrence","id":"nL2VgcX6gfvJlhSCfvVGdVDfZh4="}],"description":"Repaving on NY 22 both directions between Blockhouse Road (Essex) and CARSON WAY (Willsboro) alternating lanes , Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-28T19:20:06Z"},"road_event_id":"8HNytDgKfNOLT2DbZSK64/IBJTY=","beginning_cross_street":"Blockhouse Road","ending_cross_street":"CARSON WAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.349034,44.318955]]}},{"id":"nL2VgcX6gfvJlhSCfvVGdVDfZh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KQz9/7H6DLqj80Fba0c4a/+3iS8="},{"type":"next-occurrence","id":"tQ1X2TWpcVIzCupsBTPbH5AxcVA="}],"description":"Repaving on NY 22 both directions between Blockhouse Road (Essex) and CARSON WAY (Willsboro) alternating lanes , Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-28T19:20:06Z"},"road_event_id":"nL2VgcX6gfvJlhSCfvVGdVDfZh4=","beginning_cross_street":"Blockhouse Road","ending_cross_street":"CARSON WAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T10:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.349034,44.318955]]}},{"id":"tQ1X2TWpcVIzCupsBTPbH5AxcVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KQz9/7H6DLqj80Fba0c4a/+3iS8="},{"type":"next-occurrence","id":"1VIG6BhlExWOdsmjBhHCpPBjJzA="}],"description":"Repaving on NY 22 both directions between Blockhouse Road (Essex) and CARSON WAY (Willsboro) alternating lanes , Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-28T19:20:06Z"},"road_event_id":"tQ1X2TWpcVIzCupsBTPbH5AxcVA=","beginning_cross_street":"Blockhouse Road","ending_cross_street":"CARSON WAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.349034,44.318955]]}},{"id":"1VIG6BhlExWOdsmjBhHCpPBjJzA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KQz9/7H6DLqj80Fba0c4a/+3iS8="},{"type":"next-occurrence","id":"7y/LryGIlpPg7PvkUhf/5TrgBdk="}],"description":"Repaving on NY 22 both directions between Blockhouse Road (Essex) and CARSON WAY (Willsboro) alternating lanes , Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-28T19:20:06Z"},"road_event_id":"1VIG6BhlExWOdsmjBhHCpPBjJzA=","beginning_cross_street":"Blockhouse Road","ending_cross_street":"CARSON WAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.349034,44.318955]]}},{"id":"7y/LryGIlpPg7PvkUhf/5TrgBdk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KQz9/7H6DLqj80Fba0c4a/+3iS8="},{"type":"next-occurrence","id":"R6Snds1d4+8vWaOMydkVCuIqF0U="}],"description":"Repaving on NY 22 both directions between Blockhouse Road (Essex) and CARSON WAY (Willsboro) alternating lanes , Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-28T19:20:06Z"},"road_event_id":"7y/LryGIlpPg7PvkUhf/5TrgBdk=","beginning_cross_street":"Blockhouse Road","ending_cross_street":"CARSON WAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.349034,44.318955]]}},{"id":"R6Snds1d4+8vWaOMydkVCuIqF0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KQz9/7H6DLqj80Fba0c4a/+3iS8="},{"type":"next-occurrence","id":"kB6qbJsOZO+RCf4pq5QV6NGV5vI="}],"description":"Repaving on NY 22 both directions between Blockhouse Road (Essex) and CARSON WAY (Willsboro) alternating lanes , Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-28T19:20:06Z"},"road_event_id":"R6Snds1d4+8vWaOMydkVCuIqF0U=","beginning_cross_street":"Blockhouse Road","ending_cross_street":"CARSON WAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.349034,44.318955]]}},{"id":"kB6qbJsOZO+RCf4pq5QV6NGV5vI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KQz9/7H6DLqj80Fba0c4a/+3iS8="}],"description":"Repaving on NY 22 both directions between Blockhouse Road (Essex) and CARSON WAY (Willsboro) alternating lanes , Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-05-28T19:20:06Z"},"road_event_id":"kB6qbJsOZO+RCf4pq5QV6NGV5vI=","beginning_cross_street":"Blockhouse Road","ending_cross_street":"CARSON WAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.349034,44.318955]]}},{"id":"MZUe4DdQp2jS3Sqy7TOpUbrBYh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[],"description":"Construction on I-495 westbound from Exit 22A - Grand Central Parkwy (New York) to 48th Street; Ramp (New York) Subject to change without notice., Tuesday June 2nd, 2026 thru Saturday June 6th, 2026, Tuesday/Wednesday/Thursday/Friday, 11:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-05-28T19:54:14Z"},"road_event_id":"MZUe4DdQp2jS3Sqy7TOpUbrBYh8=","beginning_cross_street":"Exit 22A - Grand Central Parkwy","ending_cross_street":"48th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.845706,40.739952]]}},{"id":"xWEsaqpJrpcuyQCnzU+vqIxOP5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ifBfDV2d3mnsTOqIf0ztqNsul2o="}],"description":"Construction on I-678 southbound from Foch Boulevard; Ramp (New York) to Belt System - Southern Parkway (New York) Subject to change without notice., Friday June 5th,2026 11:00 PM thru 11:59 PM 1 Right lane of 4 lanes closed southbound, , Friday June 5th,2026 thru Saturday June 6th,2026, Friday, 11:59 PM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Saturday June 6th,2026 05:00 AM thru 08:00 AM 1 Right lane of 4 lanes closed southbound, , Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed southbound,","update_date":"2026-06-05T10:00:08Z"},"road_event_id":"xWEsaqpJrpcuyQCnzU+vqIxOP5Q=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803307,40.677612]]}},{"id":"ifBfDV2d3mnsTOqIf0ztqNsul2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xWEsaqpJrpcuyQCnzU+vqIxOP5Q="},{"type":"next-occurrence","id":"++pjp/tXJ0Iqxlf+iUwhBDg9aLs="}],"description":"Construction on I-678 southbound from Foch Boulevard; Ramp (New York) to Belt System - Southern Parkway (New York) Subject to change without notice., Friday June 5th,2026 11:00 PM thru 11:59 PM 1 Right lane of 4 lanes closed southbound, , Friday June 5th,2026 thru Saturday June 6th,2026, Friday, 11:59 PM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Saturday June 6th,2026 05:00 AM thru 08:00 AM 1 Right lane of 4 lanes closed southbound, , Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed southbound,","update_date":"2026-06-05T10:00:08Z"},"road_event_id":"ifBfDV2d3mnsTOqIf0ztqNsul2o=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803307,40.677612]]}},{"id":"++pjp/tXJ0Iqxlf+iUwhBDg9aLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xWEsaqpJrpcuyQCnzU+vqIxOP5Q="},{"type":"next-occurrence","id":"TKwmY9NA84JUICy9ZT3mDfkGQGU="}],"description":"Construction on I-678 southbound from Foch Boulevard; Ramp (New York) to Belt System - Southern Parkway (New York) Subject to change without notice., Friday June 5th,2026 11:00 PM thru 11:59 PM 1 Right lane of 4 lanes closed southbound, , Friday June 5th,2026 thru Saturday June 6th,2026, Friday, 11:59 PM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Saturday June 6th,2026 05:00 AM thru 08:00 AM 1 Right lane of 4 lanes closed southbound, , Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed southbound,","update_date":"2026-06-05T10:00:08Z"},"road_event_id":"++pjp/tXJ0Iqxlf+iUwhBDg9aLs=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803307,40.677612]]}},{"id":"TKwmY9NA84JUICy9ZT3mDfkGQGU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xWEsaqpJrpcuyQCnzU+vqIxOP5Q="},{"type":"next-occurrence","id":"qB10WZhCEj/jCSKmExvhcWgn1jY="}],"description":"Construction on I-678 southbound from Foch Boulevard; Ramp (New York) to Belt System - Southern Parkway (New York) Subject to change without notice., Friday June 5th,2026 11:00 PM thru 11:59 PM 1 Right lane of 4 lanes closed southbound, , Friday June 5th,2026 thru Saturday June 6th,2026, Friday, 11:59 PM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Saturday June 6th,2026 05:00 AM thru 08:00 AM 1 Right lane of 4 lanes closed southbound, , Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed southbound,","update_date":"2026-06-05T10:00:08Z"},"road_event_id":"TKwmY9NA84JUICy9ZT3mDfkGQGU=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803307,40.677612]]}},{"id":"qB10WZhCEj/jCSKmExvhcWgn1jY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xWEsaqpJrpcuyQCnzU+vqIxOP5Q="},{"type":"next-occurrence","id":"78vsUA8Ce3dizLZ8tjGqDW/wI+s="}],"description":"Construction on I-678 southbound from Foch Boulevard; Ramp (New York) to Belt System - Southern Parkway (New York) Subject to change without notice., Friday June 5th,2026 11:00 PM thru 11:59 PM 1 Right lane of 4 lanes closed southbound, , Friday June 5th,2026 thru Saturday June 6th,2026, Friday, 11:59 PM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Saturday June 6th,2026 05:00 AM thru 08:00 AM 1 Right lane of 4 lanes closed southbound, , Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed southbound,","update_date":"2026-06-05T10:00:08Z"},"road_event_id":"qB10WZhCEj/jCSKmExvhcWgn1jY=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803307,40.677612]]}},{"id":"78vsUA8Ce3dizLZ8tjGqDW/wI+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xWEsaqpJrpcuyQCnzU+vqIxOP5Q="}],"description":"Construction on I-678 southbound from Foch Boulevard; Ramp (New York) to Belt System - Southern Parkway (New York) Subject to change without notice., Friday June 5th,2026 11:00 PM thru 11:59 PM 1 Right lane of 4 lanes closed southbound, , Friday June 5th,2026 thru Saturday June 6th,2026, Friday, 11:59 PM thru 05:00 AM 2 Right lanes of 4 lanes closed southbound, , Saturday June 6th,2026 05:00 AM thru 08:00 AM 1 Right lane of 4 lanes closed southbound, , Monday June 8th,2026 thru Friday June 12th,2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed southbound,","update_date":"2026-06-05T10:00:08Z"},"road_event_id":"78vsUA8Ce3dizLZ8tjGqDW/wI+s=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803307,40.677612]]}},{"id":"k70/ooZ1o5pxljfRGLU2X9xPhHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[],"description":"Construction on I-678 northbound ramp from Archer Avenue (New York) Subject to change without notice., Continuous Thursday May 28th, 2026 12:00 AM thru Tuesday June 30th, 2026 11:59 PM All lanes closed","update_date":"2026-05-28T20:31:37Z"},"road_event_id":"k70/ooZ1o5pxljfRGLU2X9xPhHw=","beginning_cross_street":"Archer Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814402,40.69895]]}},{"id":"fAsxtdehK8FeU+Jou6oT8gQjHmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[],"description":"Construction on I-678 southbound from Nassau Expressway; NY 878 (New York) to Belt System - Southern Parkway (New York) Subject to change without notice., Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-05-28T20:41:04Z"},"road_event_id":"fAsxtdehK8FeU+Jou6oT8gQjHmA=","beginning_cross_street":"Nassau Expressway; NY 878","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802162,40.6652]]}},{"id":"nnX3xDUW8R9HHwfOo25FH01ryXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["G Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9UXl/inalQLYraeSyN4YyIGoP2A="}],"description":"Due to Signal repairs both directions, G Line between Court Sq - 23 St (New York) and Bedford - Nostrand Avs (New York) Free shuttle buses are running between Court Sq and Bedford-Nostrand Avs, making all G line stops. G line are running between Bedford-Nostrand Avs and Church Av, every 10 minutes during the day and evening. Free T403 shuttle buses are running between Court Sq and Bedford-Nostrand Avs. , Continuous Friday June 5th, 2026 09:45 PM thru Monday June 8th, 2026 05:00 AM service suspended, Continuous Friday June 19th, 2026 09:45 PM thru Monday June 22nd, 2026 05:00 AM service suspended, Monday June 15th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM service suspended","update_date":"2026-05-28T21:46:01Z"},"road_event_id":"nnX3xDUW8R9HHwfOo25FH01ryXY=","beginning_cross_street":"Court Sq - 23 St","ending_cross_street":"Bedford - Nostrand Avs","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.943832,40.746554]]}},{"id":"9UXl/inalQLYraeSyN4YyIGoP2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["G Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nnX3xDUW8R9HHwfOo25FH01ryXY="},{"type":"next-occurrence","id":"osD79nA3ovW8yuLtWrdbwpFLQDg="}],"description":"Due to Signal repairs both directions, G Line between Court Sq - 23 St (New York) and Bedford - Nostrand Avs (New York) Free shuttle buses are running between Court Sq and Bedford-Nostrand Avs, making all G line stops. G line are running between Bedford-Nostrand Avs and Church Av, every 10 minutes during the day and evening. Free T403 shuttle buses are running between Court Sq and Bedford-Nostrand Avs. , Continuous Friday June 5th, 2026 09:45 PM thru Monday June 8th, 2026 05:00 AM service suspended, Continuous Friday June 19th, 2026 09:45 PM thru Monday June 22nd, 2026 05:00 AM service suspended, Monday June 15th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM service suspended","update_date":"2026-05-28T21:46:01Z"},"road_event_id":"9UXl/inalQLYraeSyN4YyIGoP2A=","beginning_cross_street":"Court Sq - 23 St","ending_cross_street":"Bedford - Nostrand Avs","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T01:45:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.943832,40.746554]]}},{"id":"osD79nA3ovW8yuLtWrdbwpFLQDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["G Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nnX3xDUW8R9HHwfOo25FH01ryXY="},{"type":"next-occurrence","id":"wx6Ir8yHOZup1/huekEdfreDtXo="}],"description":"Due to Signal repairs both directions, G Line between Court Sq - 23 St (New York) and Bedford - Nostrand Avs (New York) Free shuttle buses are running between Court Sq and Bedford-Nostrand Avs, making all G line stops. G line are running between Bedford-Nostrand Avs and Church Av, every 10 minutes during the day and evening. Free T403 shuttle buses are running between Court Sq and Bedford-Nostrand Avs. , Continuous Friday June 5th, 2026 09:45 PM thru Monday June 8th, 2026 05:00 AM service suspended, Continuous Friday June 19th, 2026 09:45 PM thru Monday June 22nd, 2026 05:00 AM service suspended, Monday June 15th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM service suspended","update_date":"2026-05-28T21:46:01Z"},"road_event_id":"osD79nA3ovW8yuLtWrdbwpFLQDg=","beginning_cross_street":"Court Sq - 23 St","ending_cross_street":"Bedford - Nostrand Avs","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T01:45:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.943832,40.746554]]}},{"id":"wx6Ir8yHOZup1/huekEdfreDtXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["G Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nnX3xDUW8R9HHwfOo25FH01ryXY="},{"type":"next-occurrence","id":"mNcI4EXJyDlNAvzA+JPPRSNHNRU="}],"description":"Due to Signal repairs both directions, G Line between Court Sq - 23 St (New York) and Bedford - Nostrand Avs (New York) Free shuttle buses are running between Court Sq and Bedford-Nostrand Avs, making all G line stops. G line are running between Bedford-Nostrand Avs and Church Av, every 10 minutes during the day and evening. Free T403 shuttle buses are running between Court Sq and Bedford-Nostrand Avs. , Continuous Friday June 5th, 2026 09:45 PM thru Monday June 8th, 2026 05:00 AM service suspended, Continuous Friday June 19th, 2026 09:45 PM thru Monday June 22nd, 2026 05:00 AM service suspended, Monday June 15th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM service suspended","update_date":"2026-05-28T21:46:01Z"},"road_event_id":"wx6Ir8yHOZup1/huekEdfreDtXo=","beginning_cross_street":"Court Sq - 23 St","ending_cross_street":"Bedford - Nostrand Avs","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T01:45:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.943832,40.746554]]}},{"id":"mNcI4EXJyDlNAvzA+JPPRSNHNRU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["G Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nnX3xDUW8R9HHwfOo25FH01ryXY="},{"type":"next-occurrence","id":"u0fvsEJ0EPHxJX6W8/LtdVF5G9Q="}],"description":"Due to Signal repairs both directions, G Line between Court Sq - 23 St (New York) and Bedford - Nostrand Avs (New York) Free shuttle buses are running between Court Sq and Bedford-Nostrand Avs, making all G line stops. G line are running between Bedford-Nostrand Avs and Church Av, every 10 minutes during the day and evening. Free T403 shuttle buses are running between Court Sq and Bedford-Nostrand Avs. , Continuous Friday June 5th, 2026 09:45 PM thru Monday June 8th, 2026 05:00 AM service suspended, Continuous Friday June 19th, 2026 09:45 PM thru Monday June 22nd, 2026 05:00 AM service suspended, Monday June 15th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM service suspended","update_date":"2026-05-28T21:46:01Z"},"road_event_id":"mNcI4EXJyDlNAvzA+JPPRSNHNRU=","beginning_cross_street":"Court Sq - 23 St","ending_cross_street":"Bedford - Nostrand Avs","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T01:45:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.943832,40.746554]]}},{"id":"u0fvsEJ0EPHxJX6W8/LtdVF5G9Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["G Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nnX3xDUW8R9HHwfOo25FH01ryXY="}],"description":"Due to Signal repairs both directions, G Line between Court Sq - 23 St (New York) and Bedford - Nostrand Avs (New York) Free shuttle buses are running between Court Sq and Bedford-Nostrand Avs, making all G line stops. G line are running between Bedford-Nostrand Avs and Church Av, every 10 minutes during the day and evening. Free T403 shuttle buses are running between Court Sq and Bedford-Nostrand Avs. , Continuous Friday June 5th, 2026 09:45 PM thru Monday June 8th, 2026 05:00 AM service suspended, Continuous Friday June 19th, 2026 09:45 PM thru Monday June 22nd, 2026 05:00 AM service suspended, Monday June 15th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM service suspended","update_date":"2026-05-28T21:46:01Z"},"road_event_id":"u0fvsEJ0EPHxJX6W8/LtdVF5G9Q=","beginning_cross_street":"Court Sq - 23 St","ending_cross_street":"Bedford - Nostrand Avs","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T01:45:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.943832,40.746554]]}},{"id":"AdLor6rTuqsMDqWUBRuwiNda9S4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations northbound, D Line between 36 St (New York) and Atlantic Av - Barclays Ctr (New York) skips 25 St, Prospect Av, 4 Av-9 St and Union St. For service to these stations, take the D line to Atlantic Av-Barclays Ctr and transfer to a local Coney Island-bound D line or N line. For service from these stations, take the D line or N line to 36 St and transfer to a Manhattan-bound D line., Tuesday June 2nd, 2026 thru Saturday June 6th, 2026, Tuesday/Wednesday/Thursday/Friday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-05-28T22:01:31Z"},"road_event_id":"AdLor6rTuqsMDqWUBRuwiNda9S4=","beginning_cross_street":"36 St","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:45:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003549,40.655144]]}},{"id":"9g5oN8QEtsPW4gV/qcvU8vqsECg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CdLzdzLQMxh7hbxIuhTfjJCrowI="}],"description":"Utility work on NY 19 both directions between Myrtle St (Le Roy) and West Main Street; NY 5 (Le Roy) Lane / Road closures with flaggers as needed., Monday June 1st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T22:31:51Z"},"road_event_id":"9g5oN8QEtsPW4gV/qcvU8vqsECg=","beginning_cross_street":"Myrtle St","ending_cross_street":"West Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.99231,42.976156]]}},{"id":"CdLzdzLQMxh7hbxIuhTfjJCrowI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9g5oN8QEtsPW4gV/qcvU8vqsECg="},{"type":"next-occurrence","id":"AapYqKikEViJxt5Kpgp6umTlo4I="}],"description":"Utility work on NY 19 both directions between Myrtle St (Le Roy) and West Main Street; NY 5 (Le Roy) Lane / Road closures with flaggers as needed., Monday June 1st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T22:31:51Z"},"road_event_id":"CdLzdzLQMxh7hbxIuhTfjJCrowI=","beginning_cross_street":"Myrtle St","ending_cross_street":"West Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.99231,42.976156]]}},{"id":"AapYqKikEViJxt5Kpgp6umTlo4I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9g5oN8QEtsPW4gV/qcvU8vqsECg="},{"type":"next-occurrence","id":"tMFr7d8Xit2RpgeoYRXnZEH1Ktc="}],"description":"Utility work on NY 19 both directions between Myrtle St (Le Roy) and West Main Street; NY 5 (Le Roy) Lane / Road closures with flaggers as needed., Monday June 1st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T22:31:51Z"},"road_event_id":"AapYqKikEViJxt5Kpgp6umTlo4I=","beginning_cross_street":"Myrtle St","ending_cross_street":"West Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.99231,42.976156]]}},{"id":"tMFr7d8Xit2RpgeoYRXnZEH1Ktc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9g5oN8QEtsPW4gV/qcvU8vqsECg="},{"type":"next-occurrence","id":"bXAyC5DimsNvnZY+TxzSI3ioawo="}],"description":"Utility work on NY 19 both directions between Myrtle St (Le Roy) and West Main Street; NY 5 (Le Roy) Lane / Road closures with flaggers as needed., Monday June 1st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T22:31:51Z"},"road_event_id":"tMFr7d8Xit2RpgeoYRXnZEH1Ktc=","beginning_cross_street":"Myrtle St","ending_cross_street":"West Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.99231,42.976156]]}},{"id":"bXAyC5DimsNvnZY+TxzSI3ioawo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9g5oN8QEtsPW4gV/qcvU8vqsECg="},{"type":"next-occurrence","id":"ueGYq2/GodMRNzdGTHhzuoOsLLk="}],"description":"Utility work on NY 19 both directions between Myrtle St (Le Roy) and West Main Street; NY 5 (Le Roy) Lane / Road closures with flaggers as needed., Monday June 1st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T22:31:51Z"},"road_event_id":"bXAyC5DimsNvnZY+TxzSI3ioawo=","beginning_cross_street":"Myrtle St","ending_cross_street":"West Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.99231,42.976156]]}},{"id":"ueGYq2/GodMRNzdGTHhzuoOsLLk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9g5oN8QEtsPW4gV/qcvU8vqsECg="},{"type":"next-occurrence","id":"gRtxxFQtTPpG7A8jQoySIzVlcjM="}],"description":"Utility work on NY 19 both directions between Myrtle St (Le Roy) and West Main Street; NY 5 (Le Roy) Lane / Road closures with flaggers as needed., Monday June 1st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T22:31:51Z"},"road_event_id":"ueGYq2/GodMRNzdGTHhzuoOsLLk=","beginning_cross_street":"Myrtle St","ending_cross_street":"West Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.99231,42.976156]]}},{"id":"gRtxxFQtTPpG7A8jQoySIzVlcjM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9g5oN8QEtsPW4gV/qcvU8vqsECg="},{"type":"next-occurrence","id":"dM7/eEJ169DUWddRsAKtvmWDAxU="}],"description":"Utility work on NY 19 both directions between Myrtle St (Le Roy) and West Main Street; NY 5 (Le Roy) Lane / Road closures with flaggers as needed., Monday June 1st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T22:31:51Z"},"road_event_id":"gRtxxFQtTPpG7A8jQoySIzVlcjM=","beginning_cross_street":"Myrtle St","ending_cross_street":"West Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.99231,42.976156]]}},{"id":"dM7/eEJ169DUWddRsAKtvmWDAxU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9g5oN8QEtsPW4gV/qcvU8vqsECg="}],"description":"Utility work on NY 19 both directions between Myrtle St (Le Roy) and West Main Street; NY 5 (Le Roy) Lane / Road closures with flaggers as needed., Monday June 1st, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-28T22:31:51Z"},"road_event_id":"dM7/eEJ169DUWddRsAKtvmWDAxU=","beginning_cross_street":"Myrtle St","ending_cross_street":"West Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.99231,42.976156]]}},{"id":"ORC300550252","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","description":"Utility work on NY 5 both directions between Route 19 Leroy (Le Roy) and LINWOOD RD (Le Roy) Lane / Shoulder closures with flaggers as needed. Not currently Scheduled","update_date":"2026-06-05T19:00:16Z"},"road_event_id":"ORC300550252","beginning_cross_street":"Route 19 Leroy","ending_cross_street":"LINWOOD RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-28T22:35:35Z","end_date":"2026-06-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-77.992543,42.977696]]}},{"id":"CidUqWmiV+BZYnsuatgOC5W4gwE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on NY 5 eastbound just past Milton Avenue (Camillus) ; Alternating lane closures, Wednesday June 10th, 2026, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-29T00:19:12Z"},"road_event_id":"CidUqWmiV+BZYnsuatgOC5W4gwE=","beginning_cross_street":"Milton Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.282455,43.05418]]}},{"id":"SCLgD2LNyXejpneB76E8Ms2yxA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on NY 5 westbound between Hinsdale Road (Camillus) and Newport Road; Camillus; Warners (Camillus) ; Alternating lane closures, Wednesday June 10th, 2026, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-29T00:22:58Z"},"road_event_id":"SCLgD2LNyXejpneB76E8Ms2yxA8=","beginning_cross_street":"Hinsdale Road","ending_cross_street":"Newport Road; Camillus; Warners","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.261886,43.054622]]}},{"id":"6bxHpVrvXGc4wJDzy7XULdGXjRY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-81 northbound between Exit 125 - NY 13; Pulaski (Richland) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Alternating lane closures, Thursday June 11th, 2026, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-29T01:06:49Z"},"road_event_id":"6bxHpVrvXGc4wJDzy7XULdGXjRY=","beginning_cross_street":"Exit 125 - NY 13; Pulaski","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.11384,43.552391]]}},{"id":"wAC5NJYDYaXVNIesVX+6ZK1JvOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 126 - NY 13; Pulaski (Richland) ; Alternating lane closures, Thursday June 11th, 2026 thru Thursday June 11th, 2026, 12:00 PM thru 03:00 PM All lanes open","update_date":"2026-05-29T13:23:07Z"},"road_event_id":"wAC5NJYDYaXVNIesVX+6ZK1JvOo=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 126 - NY 13; Pulaski","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T16:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.081012,43.640743]]}},{"id":"lzzditBqqds6oCPQRNImPtLzzHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on NY 36 both directions CR 21 (Canisteo) On Site Detour Expect Delays, Tuesday June 2nd, 2026 thru Friday August 28th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-05-29T11:33:49Z"},"road_event_id":"lzzditBqqds6oCPQRNImPtLzzHI=","beginning_cross_street":"CR 21","ending_cross_street":"CR 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.55048,42.194689]]}},{"id":"KqwzizqRaDUimPqQ8tiVXkJ7jZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 8"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"S6BrEkUCsB+iEP+ydO1GPuHk+sc="}],"description":"Bridge work on NY 8 both directions between Button Falls Road (Brookfield) and Hoxie Road (Brookfield) Motorists may encounter lane closures with flaggers in place. Most work will be off roadway, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:30 PM,","update_date":"2026-06-05T12:50:29Z"},"road_event_id":"KqwzizqRaDUimPqQ8tiVXkJ7jZ4=","beginning_cross_street":"Button Falls Road","ending_cross_street":"Hoxie Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.269162,42.781871]]}},{"id":"S6BrEkUCsB+iEP+ydO1GPuHk+sc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KqwzizqRaDUimPqQ8tiVXkJ7jZ4="},{"type":"next-occurrence","id":"pmCU3/Lx5kQxWprkzKXVcheQqQ0="}],"description":"Bridge work on NY 8 both directions between Button Falls Road (Brookfield) and Hoxie Road (Brookfield) Motorists may encounter lane closures with flaggers in place. Most work will be off roadway, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:30 PM,","update_date":"2026-06-05T12:50:29Z"},"road_event_id":"S6BrEkUCsB+iEP+ydO1GPuHk+sc=","beginning_cross_street":"Button Falls Road","ending_cross_street":"Hoxie Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.269162,42.781871]]}},{"id":"pmCU3/Lx5kQxWprkzKXVcheQqQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KqwzizqRaDUimPqQ8tiVXkJ7jZ4="},{"type":"next-occurrence","id":"SNKBVDnmV4+8RyGjhP/ocAw4QgM="}],"description":"Bridge work on NY 8 both directions between Button Falls Road (Brookfield) and Hoxie Road (Brookfield) Motorists may encounter lane closures with flaggers in place. Most work will be off roadway, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:30 PM,","update_date":"2026-06-05T12:50:29Z"},"road_event_id":"pmCU3/Lx5kQxWprkzKXVcheQqQ0=","beginning_cross_street":"Button Falls Road","ending_cross_street":"Hoxie Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.269162,42.781871]]}},{"id":"SNKBVDnmV4+8RyGjhP/ocAw4QgM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KqwzizqRaDUimPqQ8tiVXkJ7jZ4="},{"type":"next-occurrence","id":"s3L5D3U/Dis+MOyRbOl9jDH4J60="}],"description":"Bridge work on NY 8 both directions between Button Falls Road (Brookfield) and Hoxie Road (Brookfield) Motorists may encounter lane closures with flaggers in place. Most work will be off roadway, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:30 PM,","update_date":"2026-06-05T12:50:29Z"},"road_event_id":"SNKBVDnmV4+8RyGjhP/ocAw4QgM=","beginning_cross_street":"Button Falls Road","ending_cross_street":"Hoxie Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.269162,42.781871]]}},{"id":"s3L5D3U/Dis+MOyRbOl9jDH4J60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KqwzizqRaDUimPqQ8tiVXkJ7jZ4="},{"type":"next-occurrence","id":"/Kdodn6mRSZ/mjxJ4hYr/2tfzKY="}],"description":"Bridge work on NY 8 both directions between Button Falls Road (Brookfield) and Hoxie Road (Brookfield) Motorists may encounter lane closures with flaggers in place. Most work will be off roadway, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:30 PM,","update_date":"2026-06-05T12:50:29Z"},"road_event_id":"s3L5D3U/Dis+MOyRbOl9jDH4J60=","beginning_cross_street":"Button Falls Road","ending_cross_street":"Hoxie Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.269162,42.781871]]}},{"id":"/Kdodn6mRSZ/mjxJ4hYr/2tfzKY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KqwzizqRaDUimPqQ8tiVXkJ7jZ4="}],"description":"Bridge work on NY 8 both directions between Button Falls Road (Brookfield) and Hoxie Road (Brookfield) Motorists may encounter lane closures with flaggers in place. Most work will be off roadway, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:30 PM,","update_date":"2026-06-05T12:50:29Z"},"road_event_id":"/Kdodn6mRSZ/mjxJ4hYr/2tfzKY=","beginning_cross_street":"Button Falls Road","ending_cross_street":"Hoxie Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.269162,42.781871]]}},{"id":"Mx9kNxA0RBxamJhlyd1BvFundzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 49"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JV3/csdnaa7cAsjK5wlXN0eSgtY="}],"description":"Line striping on NY 49 both directions between Lauther Road (Verona) and Drummond Drive (Verona) motorists will encounter lane closures with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:03:45Z"},"road_event_id":"Mx9kNxA0RBxamJhlyd1BvFundzg=","beginning_cross_street":"Lauther Road","ending_cross_street":"Drummond Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.593619,43.22319]]}},{"id":"JV3/csdnaa7cAsjK5wlXN0eSgtY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 49"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mx9kNxA0RBxamJhlyd1BvFundzg="},{"type":"next-occurrence","id":"Q5JtbwROt0u/Q1qDbWMFfcbErLc="}],"description":"Line striping on NY 49 both directions between Lauther Road (Verona) and Drummond Drive (Verona) motorists will encounter lane closures with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:03:45Z"},"road_event_id":"JV3/csdnaa7cAsjK5wlXN0eSgtY=","beginning_cross_street":"Lauther Road","ending_cross_street":"Drummond Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.593619,43.22319]]}},{"id":"Q5JtbwROt0u/Q1qDbWMFfcbErLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 49"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mx9kNxA0RBxamJhlyd1BvFundzg="},{"type":"next-occurrence","id":"WdHzzft0kZl7zOTrpG2VkaB8fWg="}],"description":"Line striping on NY 49 both directions between Lauther Road (Verona) and Drummond Drive (Verona) motorists will encounter lane closures with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:03:45Z"},"road_event_id":"Q5JtbwROt0u/Q1qDbWMFfcbErLc=","beginning_cross_street":"Lauther Road","ending_cross_street":"Drummond Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.593619,43.22319]]}},{"id":"WdHzzft0kZl7zOTrpG2VkaB8fWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 49"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mx9kNxA0RBxamJhlyd1BvFundzg="},{"type":"next-occurrence","id":"174+bAA7f8p99Bqn/LF5CMRcxTM="}],"description":"Line striping on NY 49 both directions between Lauther Road (Verona) and Drummond Drive (Verona) motorists will encounter lane closures with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:03:45Z"},"road_event_id":"WdHzzft0kZl7zOTrpG2VkaB8fWg=","beginning_cross_street":"Lauther Road","ending_cross_street":"Drummond Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.593619,43.22319]]}},{"id":"174+bAA7f8p99Bqn/LF5CMRcxTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 49"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mx9kNxA0RBxamJhlyd1BvFundzg="},{"type":"next-occurrence","id":"QEEdTDdgeucaTdIMyypbXHfMc4M="}],"description":"Line striping on NY 49 both directions between Lauther Road (Verona) and Drummond Drive (Verona) motorists will encounter lane closures with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:03:45Z"},"road_event_id":"174+bAA7f8p99Bqn/LF5CMRcxTM=","beginning_cross_street":"Lauther Road","ending_cross_street":"Drummond Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.593619,43.22319]]}},{"id":"QEEdTDdgeucaTdIMyypbXHfMc4M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 49"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mx9kNxA0RBxamJhlyd1BvFundzg="}],"description":"Line striping on NY 49 both directions between Lauther Road (Verona) and Drummond Drive (Verona) motorists will encounter lane closures with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:03:45Z"},"road_event_id":"QEEdTDdgeucaTdIMyypbXHfMc4M=","beginning_cross_street":"Lauther Road","ending_cross_street":"Drummond Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.593619,43.22319]]}},{"id":"hIQy8Qyk9Q1MsZRyfEYHkdJcgok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5S"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 5S eastbound over Reese Road (Frankfort) Motorists will encounter an east bound lane closure, Continuous Wednesday June 3rd, 2026 7:00 AM thru Wednesday June 17th, 2026 4:00 PM","update_date":"2026-05-29T11:51:41Z"},"road_event_id":"hIQy8Qyk9Q1MsZRyfEYHkdJcgok=","beginning_cross_street":"Reese Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.071451,43.024952]]}},{"id":"q8Wh6o5yoQ62Ce6vvwJGjjlzLwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5S"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+rHP08JpDLu1Jwty+U3P87QA9Ko="}],"description":"Utility work on NY 5S both directions between Prospect Street (Fort Plain) and Rouse Road (Fort Plain) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:23:40Z"},"road_event_id":"q8Wh6o5yoQ62Ce6vvwJGjjlzLwg=","beginning_cross_street":"Prospect Street","ending_cross_street":"Rouse Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.621807,42.930384]]}},{"id":"+rHP08JpDLu1Jwty+U3P87QA9Ko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5S"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q8Wh6o5yoQ62Ce6vvwJGjjlzLwg="},{"type":"next-occurrence","id":"lTHDAKkzNBbtiplR3ehPH1rNA1k="}],"description":"Utility work on NY 5S both directions between Prospect Street (Fort Plain) and Rouse Road (Fort Plain) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:23:40Z"},"road_event_id":"+rHP08JpDLu1Jwty+U3P87QA9Ko=","beginning_cross_street":"Prospect Street","ending_cross_street":"Rouse Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.621807,42.930384]]}},{"id":"lTHDAKkzNBbtiplR3ehPH1rNA1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5S"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q8Wh6o5yoQ62Ce6vvwJGjjlzLwg="},{"type":"next-occurrence","id":"YLsOI1L4rUzEH5SfvFo9aOh+guY="}],"description":"Utility work on NY 5S both directions between Prospect Street (Fort Plain) and Rouse Road (Fort Plain) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:23:40Z"},"road_event_id":"lTHDAKkzNBbtiplR3ehPH1rNA1k=","beginning_cross_street":"Prospect Street","ending_cross_street":"Rouse Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.621807,42.930384]]}},{"id":"YLsOI1L4rUzEH5SfvFo9aOh+guY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5S"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q8Wh6o5yoQ62Ce6vvwJGjjlzLwg="},{"type":"next-occurrence","id":"9tUQf2a6WX7OTT6sQ8Yc5lttD+s="}],"description":"Utility work on NY 5S both directions between Prospect Street (Fort Plain) and Rouse Road (Fort Plain) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:23:40Z"},"road_event_id":"YLsOI1L4rUzEH5SfvFo9aOh+guY=","beginning_cross_street":"Prospect Street","ending_cross_street":"Rouse Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.621807,42.930384]]}},{"id":"9tUQf2a6WX7OTT6sQ8Yc5lttD+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5S"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q8Wh6o5yoQ62Ce6vvwJGjjlzLwg="},{"type":"next-occurrence","id":"dXgHKQ0Sx4PPSzwnvvtAlUccimc="}],"description":"Utility work on NY 5S both directions between Prospect Street (Fort Plain) and Rouse Road (Fort Plain) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:23:40Z"},"road_event_id":"9tUQf2a6WX7OTT6sQ8Yc5lttD+s=","beginning_cross_street":"Prospect Street","ending_cross_street":"Rouse Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.621807,42.930384]]}},{"id":"dXgHKQ0Sx4PPSzwnvvtAlUccimc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5S"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q8Wh6o5yoQ62Ce6vvwJGjjlzLwg="}],"description":"Utility work on NY 5S both directions between Prospect Street (Fort Plain) and Rouse Road (Fort Plain) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:23:40Z"},"road_event_id":"dXgHKQ0Sx4PPSzwnvvtAlUccimc=","beginning_cross_street":"Prospect Street","ending_cross_street":"Rouse Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.621807,42.930384]]}},{"id":"/ehTI9LiwF4sN2F9n8TChwa5Oxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 167"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kRn9BoPUSZI61TRTmrzUioOG9FA="}],"description":"Construction on NY 167 both directions between Faville Ave (Dolgeville) and Slawson Street Motorists will encounter a full road closure for with local traffic only, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:59:08Z"},"road_event_id":"/ehTI9LiwF4sN2F9n8TChwa5Oxw=","beginning_cross_street":"Faville Ave","ending_cross_street":"Slawson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.774325,43.09938]]}},{"id":"kRn9BoPUSZI61TRTmrzUioOG9FA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 167"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/ehTI9LiwF4sN2F9n8TChwa5Oxw="},{"type":"next-occurrence","id":"QIyWDOFE5l4n0ZN6wYk3XR2/B5c="}],"description":"Construction on NY 167 both directions between Faville Ave (Dolgeville) and Slawson Street Motorists will encounter a full road closure for with local traffic only, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:59:08Z"},"road_event_id":"kRn9BoPUSZI61TRTmrzUioOG9FA=","beginning_cross_street":"Faville Ave","ending_cross_street":"Slawson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.774325,43.09938]]}},{"id":"QIyWDOFE5l4n0ZN6wYk3XR2/B5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 167"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/ehTI9LiwF4sN2F9n8TChwa5Oxw="},{"type":"next-occurrence","id":"rRNlI4FeVmUa2gpf1QeRwr0gVC8="}],"description":"Construction on NY 167 both directions between Faville Ave (Dolgeville) and Slawson Street Motorists will encounter a full road closure for with local traffic only, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:59:08Z"},"road_event_id":"QIyWDOFE5l4n0ZN6wYk3XR2/B5c=","beginning_cross_street":"Faville Ave","ending_cross_street":"Slawson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.774325,43.09938]]}},{"id":"rRNlI4FeVmUa2gpf1QeRwr0gVC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 167"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/ehTI9LiwF4sN2F9n8TChwa5Oxw="},{"type":"next-occurrence","id":"YVxAtH/CbjMYAeCpDjZhd1AfHiE="}],"description":"Construction on NY 167 both directions between Faville Ave (Dolgeville) and Slawson Street Motorists will encounter a full road closure for with local traffic only, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:59:08Z"},"road_event_id":"rRNlI4FeVmUa2gpf1QeRwr0gVC8=","beginning_cross_street":"Faville Ave","ending_cross_street":"Slawson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.774325,43.09938]]}},{"id":"YVxAtH/CbjMYAeCpDjZhd1AfHiE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 167"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/ehTI9LiwF4sN2F9n8TChwa5Oxw="},{"type":"next-occurrence","id":"WgzTkWt+U+LEXuaaNdV4zV8wOew="}],"description":"Construction on NY 167 both directions between Faville Ave (Dolgeville) and Slawson Street Motorists will encounter a full road closure for with local traffic only, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:59:08Z"},"road_event_id":"YVxAtH/CbjMYAeCpDjZhd1AfHiE=","beginning_cross_street":"Faville Ave","ending_cross_street":"Slawson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.774325,43.09938]]}},{"id":"WgzTkWt+U+LEXuaaNdV4zV8wOew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 167"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/ehTI9LiwF4sN2F9n8TChwa5Oxw="}],"description":"Construction on NY 167 both directions between Faville Ave (Dolgeville) and Slawson Street Motorists will encounter a full road closure for with local traffic only, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:59:08Z"},"road_event_id":"WgzTkWt+U+LEXuaaNdV4zV8wOew=","beginning_cross_street":"Faville Ave","ending_cross_street":"Slawson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.774325,43.09938]]}},{"id":"k1KxLDmjKAyxxeAV9wWa42K2bpI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 412"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"b+FEyuNL0dz7SlBX1EJeCkFVWb8="}],"description":"Construction on NY 412 both directions between Bristol Road; NY 233; Harding Road; START ROUTE NY 412 (Kirkland) and Franklin Avenue; NY 12B; College Street; END ROUTE (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:37:10Z"},"road_event_id":"k1KxLDmjKAyxxeAV9wWa42K2bpI=","beginning_cross_street":"Bristol Road; NY 233; Harding Road; START ROUTE NY 412","ending_cross_street":"Franklin Avenue; NY 12B; College Street; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.396003,43.0485]]}},{"id":"b+FEyuNL0dz7SlBX1EJeCkFVWb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 412"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k1KxLDmjKAyxxeAV9wWa42K2bpI="},{"type":"next-occurrence","id":"cZ83oqqQWfehKovJhzeB+07OOnA="}],"description":"Construction on NY 412 both directions between Bristol Road; NY 233; Harding Road; START ROUTE NY 412 (Kirkland) and Franklin Avenue; NY 12B; College Street; END ROUTE (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:37:10Z"},"road_event_id":"b+FEyuNL0dz7SlBX1EJeCkFVWb8=","beginning_cross_street":"Bristol Road; NY 233; Harding Road; START ROUTE NY 412","ending_cross_street":"Franklin Avenue; NY 12B; College Street; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.396003,43.0485]]}},{"id":"cZ83oqqQWfehKovJhzeB+07OOnA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 412"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k1KxLDmjKAyxxeAV9wWa42K2bpI="},{"type":"next-occurrence","id":"fQzcse6YcJHaJDcAOKA7Djq/CeY="}],"description":"Construction on NY 412 both directions between Bristol Road; NY 233; Harding Road; START ROUTE NY 412 (Kirkland) and Franklin Avenue; NY 12B; College Street; END ROUTE (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:37:10Z"},"road_event_id":"cZ83oqqQWfehKovJhzeB+07OOnA=","beginning_cross_street":"Bristol Road; NY 233; Harding Road; START ROUTE NY 412","ending_cross_street":"Franklin Avenue; NY 12B; College Street; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.396003,43.0485]]}},{"id":"fQzcse6YcJHaJDcAOKA7Djq/CeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 412"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k1KxLDmjKAyxxeAV9wWa42K2bpI="},{"type":"next-occurrence","id":"nVNbi+4imOLI6nqTHpZH00LGSVs="}],"description":"Construction on NY 412 both directions between Bristol Road; NY 233; Harding Road; START ROUTE NY 412 (Kirkland) and Franklin Avenue; NY 12B; College Street; END ROUTE (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:37:10Z"},"road_event_id":"fQzcse6YcJHaJDcAOKA7Djq/CeY=","beginning_cross_street":"Bristol Road; NY 233; Harding Road; START ROUTE NY 412","ending_cross_street":"Franklin Avenue; NY 12B; College Street; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.396003,43.0485]]}},{"id":"nVNbi+4imOLI6nqTHpZH00LGSVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 412"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k1KxLDmjKAyxxeAV9wWa42K2bpI="},{"type":"next-occurrence","id":"WDvezPvTpLhrW6lohPL6wFH6IIk="}],"description":"Construction on NY 412 both directions between Bristol Road; NY 233; Harding Road; START ROUTE NY 412 (Kirkland) and Franklin Avenue; NY 12B; College Street; END ROUTE (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:37:10Z"},"road_event_id":"nVNbi+4imOLI6nqTHpZH00LGSVs=","beginning_cross_street":"Bristol Road; NY 233; Harding Road; START ROUTE NY 412","ending_cross_street":"Franklin Avenue; NY 12B; College Street; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.396003,43.0485]]}},{"id":"WDvezPvTpLhrW6lohPL6wFH6IIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 412"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k1KxLDmjKAyxxeAV9wWa42K2bpI="}],"description":"Construction on NY 412 both directions between Bristol Road; NY 233; Harding Road; START ROUTE NY 412 (Kirkland) and Franklin Avenue; NY 12B; College Street; END ROUTE (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T11:37:10Z"},"road_event_id":"WDvezPvTpLhrW6lohPL6wFH6IIk=","beginning_cross_street":"Bristol Road; NY 233; Harding Road; START ROUTE NY 412","ending_cross_street":"Franklin Avenue; NY 12B; College Street; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.396003,43.0485]]}},{"id":"VzqP44iA58VfhbsvHxcY/8LKSxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7a6yc4iRj30f639/Ip23kshcTB4="}],"description":"Culvert repairs on NY 26 both directions between Berry Farm Road (Vernon Center) and Skinner Road (Oneida) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:00:48Z"},"road_event_id":"VzqP44iA58VfhbsvHxcY/8LKSxc=","beginning_cross_street":"Berry Farm Road","ending_cross_street":"Skinner Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.502068,43.024074]]}},{"id":"7a6yc4iRj30f639/Ip23kshcTB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VzqP44iA58VfhbsvHxcY/8LKSxc="},{"type":"next-occurrence","id":"tiFTewp/P3Eu6LrW3fooXVkCE48="}],"description":"Culvert repairs on NY 26 both directions between Berry Farm Road (Vernon Center) and Skinner Road (Oneida) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:00:48Z"},"road_event_id":"7a6yc4iRj30f639/Ip23kshcTB4=","beginning_cross_street":"Berry Farm Road","ending_cross_street":"Skinner Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.502068,43.024074]]}},{"id":"tiFTewp/P3Eu6LrW3fooXVkCE48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VzqP44iA58VfhbsvHxcY/8LKSxc="},{"type":"next-occurrence","id":"rpmrzkobH1p1UlQq3uLaLdzRwww="}],"description":"Culvert repairs on NY 26 both directions between Berry Farm Road (Vernon Center) and Skinner Road (Oneida) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:00:48Z"},"road_event_id":"tiFTewp/P3Eu6LrW3fooXVkCE48=","beginning_cross_street":"Berry Farm Road","ending_cross_street":"Skinner Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.502068,43.024074]]}},{"id":"rpmrzkobH1p1UlQq3uLaLdzRwww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VzqP44iA58VfhbsvHxcY/8LKSxc="},{"type":"next-occurrence","id":"wXC4z2+NW+/+PO8Ekbjak49Doos="}],"description":"Culvert repairs on NY 26 both directions between Berry Farm Road (Vernon Center) and Skinner Road (Oneida) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:00:48Z"},"road_event_id":"rpmrzkobH1p1UlQq3uLaLdzRwww=","beginning_cross_street":"Berry Farm Road","ending_cross_street":"Skinner Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.502068,43.024074]]}},{"id":"wXC4z2+NW+/+PO8Ekbjak49Doos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VzqP44iA58VfhbsvHxcY/8LKSxc="},{"type":"next-occurrence","id":"dtucFFu+ZWIlJPmH/INioN/YNf0="}],"description":"Culvert repairs on NY 26 both directions between Berry Farm Road (Vernon Center) and Skinner Road (Oneida) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:00:48Z"},"road_event_id":"wXC4z2+NW+/+PO8Ekbjak49Doos=","beginning_cross_street":"Berry Farm Road","ending_cross_street":"Skinner Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.502068,43.024074]]}},{"id":"dtucFFu+ZWIlJPmH/INioN/YNf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VzqP44iA58VfhbsvHxcY/8LKSxc="}],"description":"Culvert repairs on NY 26 both directions between Berry Farm Road (Vernon Center) and Skinner Road (Oneida) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:00:48Z"},"road_event_id":"dtucFFu+ZWIlJPmH/INioN/YNf0=","beginning_cross_street":"Berry Farm Road","ending_cross_street":"Skinner Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.502068,43.024074]]}},{"id":"mBKNUoMcXabnoCCI7zOwa9j00Bc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-81 northbound between Exit 125 - NY 13; Pulaski (Richland) and Richland Rd (Richland) ; Alternating left and right lane closures, Thursday June 11th, 2026, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-02T22:51:34Z"},"road_event_id":"mBKNUoMcXabnoCCI7zOwa9j00Bc=","beginning_cross_street":"Exit 125 - NY 13; Pulaski","ending_cross_street":"Richland Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.113846,43.552607]]}},{"id":"79JbWusFsYOId48K0BoLCh1M6ps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-81 southbound between Exit 126 - NY 13; Pulaski (Richland) and NY-13; Rome Rd (Richland) ; Alternating left and right lane closures, Friday June 12th, 2026, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-05-29T13:57:46Z"},"road_event_id":"79JbWusFsYOId48K0BoLCh1M6ps=","beginning_cross_street":"Exit 126 - NY 13; Pulaski","ending_cross_street":"NY-13; Rome Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.113761,43.570799]]}},{"id":"NcNt38d5bByDcf6QD+QCF6rRwAo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 325"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"jXM7LcJyPuP4ihWVztq2auur/Lk="}],"description":"Guard rail repairs on NY 325 both directions START ROUTE NY 325; River Road; NY 266 (Tonawanda), Thursday June 4th, 2026 thru Saturday July 4th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-29T14:00:22Z"},"road_event_id":"NcNt38d5bByDcf6QD+QCF6rRwAo=","beginning_cross_street":"START ROUTE NY 325; River Road; NY 266","ending_cross_street":"START ROUTE NY 325; River Road; NY 266","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.921723,42.966533]]}},{"id":"jXM7LcJyPuP4ihWVztq2auur/Lk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 325"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NcNt38d5bByDcf6QD+QCF6rRwAo="},{"type":"next-occurrence","id":"sl8Nwo8E483p22QF2NVXC9hpVCU="}],"description":"Guard rail repairs on NY 325 both directions START ROUTE NY 325; River Road; NY 266 (Tonawanda), Thursday June 4th, 2026 thru Saturday July 4th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-29T14:00:22Z"},"road_event_id":"jXM7LcJyPuP4ihWVztq2auur/Lk=","beginning_cross_street":"START ROUTE NY 325; River Road; NY 266","ending_cross_street":"START ROUTE NY 325; River Road; NY 266","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.921723,42.966533]]}},{"id":"sl8Nwo8E483p22QF2NVXC9hpVCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 325"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NcNt38d5bByDcf6QD+QCF6rRwAo="},{"type":"next-occurrence","id":"Rkoes5AgXg84k92nFcsu3RQXXak="}],"description":"Guard rail repairs on NY 325 both directions START ROUTE NY 325; River Road; NY 266 (Tonawanda), Thursday June 4th, 2026 thru Saturday July 4th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-29T14:00:22Z"},"road_event_id":"sl8Nwo8E483p22QF2NVXC9hpVCU=","beginning_cross_street":"START ROUTE NY 325; River Road; NY 266","ending_cross_street":"START ROUTE NY 325; River Road; NY 266","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.921723,42.966533]]}},{"id":"Rkoes5AgXg84k92nFcsu3RQXXak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 325"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NcNt38d5bByDcf6QD+QCF6rRwAo="},{"type":"next-occurrence","id":"8+sZpow07Zf9+945B+NaGv7Mv5o="}],"description":"Guard rail repairs on NY 325 both directions START ROUTE NY 325; River Road; NY 266 (Tonawanda), Thursday June 4th, 2026 thru Saturday July 4th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-29T14:00:22Z"},"road_event_id":"Rkoes5AgXg84k92nFcsu3RQXXak=","beginning_cross_street":"START ROUTE NY 325; River Road; NY 266","ending_cross_street":"START ROUTE NY 325; River Road; NY 266","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.921723,42.966533]]}},{"id":"8+sZpow07Zf9+945B+NaGv7Mv5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 325"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NcNt38d5bByDcf6QD+QCF6rRwAo="},{"type":"next-occurrence","id":"Br8ov7rSW2iWPCYVUDN+K9PWylE="}],"description":"Guard rail repairs on NY 325 both directions START ROUTE NY 325; River Road; NY 266 (Tonawanda), Thursday June 4th, 2026 thru Saturday July 4th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-29T14:00:22Z"},"road_event_id":"8+sZpow07Zf9+945B+NaGv7Mv5o=","beginning_cross_street":"START ROUTE NY 325; River Road; NY 266","ending_cross_street":"START ROUTE NY 325; River Road; NY 266","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.921723,42.966533]]}},{"id":"Br8ov7rSW2iWPCYVUDN+K9PWylE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 325"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NcNt38d5bByDcf6QD+QCF6rRwAo="},{"type":"next-occurrence","id":"yut9PpJhT2x8VrDLn6e03iGXxNM="}],"description":"Guard rail repairs on NY 325 both directions START ROUTE NY 325; River Road; NY 266 (Tonawanda), Thursday June 4th, 2026 thru Saturday July 4th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-29T14:00:22Z"},"road_event_id":"Br8ov7rSW2iWPCYVUDN+K9PWylE=","beginning_cross_street":"START ROUTE NY 325; River Road; NY 266","ending_cross_street":"START ROUTE NY 325; River Road; NY 266","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.921723,42.966533]]}},{"id":"yut9PpJhT2x8VrDLn6e03iGXxNM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 325"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NcNt38d5bByDcf6QD+QCF6rRwAo="},{"type":"next-occurrence","id":"EsAuB14vmFOqzscn+1mLDAzbig8="}],"description":"Guard rail repairs on NY 325 both directions START ROUTE NY 325; River Road; NY 266 (Tonawanda), Thursday June 4th, 2026 thru Saturday July 4th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-29T14:00:22Z"},"road_event_id":"yut9PpJhT2x8VrDLn6e03iGXxNM=","beginning_cross_street":"START ROUTE NY 325; River Road; NY 266","ending_cross_street":"START ROUTE NY 325; River Road; NY 266","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.921723,42.966533]]}},{"id":"EsAuB14vmFOqzscn+1mLDAzbig8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 325"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NcNt38d5bByDcf6QD+QCF6rRwAo="},{"type":"next-occurrence","id":"Zum3clLTIjXphJkFO4G+tOYGGKc="}],"description":"Guard rail repairs on NY 325 both directions START ROUTE NY 325; River Road; NY 266 (Tonawanda), Thursday June 4th, 2026 thru Saturday July 4th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-29T14:00:22Z"},"road_event_id":"EsAuB14vmFOqzscn+1mLDAzbig8=","beginning_cross_street":"START ROUTE NY 325; River Road; NY 266","ending_cross_street":"START ROUTE NY 325; River Road; NY 266","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.921723,42.966533]]}},{"id":"Zum3clLTIjXphJkFO4G+tOYGGKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 325"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NcNt38d5bByDcf6QD+QCF6rRwAo="},{"type":"next-occurrence","id":"Iu+LUXFIMohmRta8k3jn+1KLzSE="}],"description":"Guard rail repairs on NY 325 both directions START ROUTE NY 325; River Road; NY 266 (Tonawanda), Thursday June 4th, 2026 thru Saturday July 4th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-29T14:00:22Z"},"road_event_id":"Zum3clLTIjXphJkFO4G+tOYGGKc=","beginning_cross_street":"START ROUTE NY 325; River Road; NY 266","ending_cross_street":"START ROUTE NY 325; River Road; NY 266","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.921723,42.966533]]}},{"id":"Iu+LUXFIMohmRta8k3jn+1KLzSE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 325"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NcNt38d5bByDcf6QD+QCF6rRwAo="},{"type":"next-occurrence","id":"CBOkaGQQ6GIGk2IQM4nuwWASIOc="}],"description":"Guard rail repairs on NY 325 both directions START ROUTE NY 325; River Road; NY 266 (Tonawanda), Thursday June 4th, 2026 thru Saturday July 4th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-29T14:00:22Z"},"road_event_id":"Iu+LUXFIMohmRta8k3jn+1KLzSE=","beginning_cross_street":"START ROUTE NY 325; River Road; NY 266","ending_cross_street":"START ROUTE NY 325; River Road; NY 266","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.921723,42.966533]]}},{"id":"CBOkaGQQ6GIGk2IQM4nuwWASIOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 325"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NcNt38d5bByDcf6QD+QCF6rRwAo="},{"type":"next-occurrence","id":"BoNlfmHqZQCvvswKxiiahSMS2zQ="}],"description":"Guard rail repairs on NY 325 both directions START ROUTE NY 325; River Road; NY 266 (Tonawanda), Thursday June 4th, 2026 thru Saturday July 4th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-29T14:00:22Z"},"road_event_id":"CBOkaGQQ6GIGk2IQM4nuwWASIOc=","beginning_cross_street":"START ROUTE NY 325; River Road; NY 266","ending_cross_street":"START ROUTE NY 325; River Road; NY 266","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.921723,42.966533]]}},{"id":"BoNlfmHqZQCvvswKxiiahSMS2zQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 325"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NcNt38d5bByDcf6QD+QCF6rRwAo="},{"type":"next-occurrence","id":"NMLfb9X2MrY2hPfTrGjB28QeA8w="}],"description":"Guard rail repairs on NY 325 both directions START ROUTE NY 325; River Road; NY 266 (Tonawanda), Thursday June 4th, 2026 thru Saturday July 4th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-29T14:00:22Z"},"road_event_id":"BoNlfmHqZQCvvswKxiiahSMS2zQ=","beginning_cross_street":"START ROUTE NY 325; River Road; NY 266","ending_cross_street":"START ROUTE NY 325; River Road; NY 266","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.921723,42.966533]]}},{"id":"NMLfb9X2MrY2hPfTrGjB28QeA8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 325"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NcNt38d5bByDcf6QD+QCF6rRwAo="},{"type":"next-occurrence","id":"hQkNi2KawRs66aM2bhKjgHcMfYw="}],"description":"Guard rail repairs on NY 325 both directions START ROUTE NY 325; River Road; NY 266 (Tonawanda), Thursday June 4th, 2026 thru Saturday July 4th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-29T14:00:22Z"},"road_event_id":"NMLfb9X2MrY2hPfTrGjB28QeA8w=","beginning_cross_street":"START ROUTE NY 325; River Road; NY 266","ending_cross_street":"START ROUTE NY 325; River Road; NY 266","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.921723,42.966533]]}},{"id":"hQkNi2KawRs66aM2bhKjgHcMfYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 325"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NcNt38d5bByDcf6QD+QCF6rRwAo="},{"type":"next-occurrence","id":"HKB0kK1zHtPO2LBGPTOCdSmGx+k="}],"description":"Guard rail repairs on NY 325 both directions START ROUTE NY 325; River Road; NY 266 (Tonawanda), Thursday June 4th, 2026 thru Saturday July 4th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-29T14:00:22Z"},"road_event_id":"hQkNi2KawRs66aM2bhKjgHcMfYw=","beginning_cross_street":"START ROUTE NY 325; River Road; NY 266","ending_cross_street":"START ROUTE NY 325; River Road; NY 266","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.921723,42.966533]]}},{"id":"HKB0kK1zHtPO2LBGPTOCdSmGx+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 325"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NcNt38d5bByDcf6QD+QCF6rRwAo="}],"description":"Guard rail repairs on NY 325 both directions START ROUTE NY 325; River Road; NY 266 (Tonawanda), Thursday June 4th, 2026 thru Saturday July 4th, 2026, Sunday thru Saturday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-05-29T14:00:22Z"},"road_event_id":"HKB0kK1zHtPO2LBGPTOCdSmGx+k=","beginning_cross_street":"START ROUTE NY 325; River Road; NY 266","ending_cross_street":"START ROUTE NY 325; River Road; NY 266","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.921723,42.966533]]}},{"id":"tEwk5FLbTQO2gsPG9eWmSSeQTWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 57"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 57 Eastbound At CR 519/Uniontown Rd (Lopatcong Twp) Friday June 5, 2026 07:00 PM thru Saturday June 6, 2026 06:00 AM, All lanes open","update_date":"2026-05-29T14:06:24Z"},"road_event_id":"tEwk5FLbTQO2gsPG9eWmSSeQTWg=","beginning_cross_street":"CR 519/Uniontown Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.136917,40.702201]]}},{"id":"xxIA2wvaTBkDQAHmS04bEsYZ4mg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations northbound, F Line bypassing 169 St (New York) For service to this station, take the F line to Parsons Blvd and transfer to a Jamaica-bound F line. For service from this station, take the F line to Jamaica-179 St and transfer to a Manhattan-bound F line. For service to 169 St, consider the Q1, Q2, Q3, Q17 or Q36 buses., Wednesday June 3rd, 2026 thru Saturday June 6th, 2026, Wednesday/Thursday/Friday, 11:45 PM thru 05:00 AM","update_date":"2026-05-29T14:13:47Z"},"road_event_id":"xxIA2wvaTBkDQAHmS04bEsYZ4mg=","beginning_cross_street":"169 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:45:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.793604,40.71047]]}},{"id":"mnktZtXCiHXHa/7p3/9rP1vnGM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[],"description":"Station Renovations on N Line northbound between 59 St (New York) and Atlantic Av - Barclays Ctr (New York) skips 53 St, 45 St, 25 St, Prospect Av, 4 Av-9 St and Union St. For service to 53 St and 45 St, take the N line to 36 St and transfer to a Coney Island-bound N line local. For service from these stations, take the N line to 59 St and transfer to a Manhattan-bound N line. For 25 St, Prospect Av, 4 Av-9 St and Union St, take the D line instead. Transfer at 36 St or Atlantic Av-Barclays Ctr., Tuesday June 2nd,2026 thru Saturday June 6th,2026, Tuesday/Wednesday/Thursday/Friday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-06-02T09:00:20Z"},"road_event_id":"mnktZtXCiHXHa/7p3/9rP1vnGM4=","beginning_cross_street":"59 St","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:45:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.017881,40.641362]]}},{"id":"eDMo6ZRanZiqEn4jH9CLwgdtRbg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Putnam Road"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MKPFg5QPk0/Bm6BegOo9fogyS38="}],"description":"Bridge painting on Putnam Road both directions under NY 12 (Trenton) Motorist will encounter lane closures in both directions with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:57:49Z"},"road_event_id":"eDMo6ZRanZiqEn4jH9CLwgdtRbg=","beginning_cross_street":"NY 12","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.176104,43.221996]]}},{"id":"MKPFg5QPk0/Bm6BegOo9fogyS38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Putnam Road"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eDMo6ZRanZiqEn4jH9CLwgdtRbg="},{"type":"next-occurrence","id":"k22es5tzYv/pDLCdf27kWWtSqWc="}],"description":"Bridge painting on Putnam Road both directions under NY 12 (Trenton) Motorist will encounter lane closures in both directions with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:57:49Z"},"road_event_id":"MKPFg5QPk0/Bm6BegOo9fogyS38=","beginning_cross_street":"NY 12","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.176104,43.221996]]}},{"id":"k22es5tzYv/pDLCdf27kWWtSqWc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Putnam Road"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eDMo6ZRanZiqEn4jH9CLwgdtRbg="},{"type":"next-occurrence","id":"lkWKpUfqm4c2Xec1QA6uTZr1+Yk="}],"description":"Bridge painting on Putnam Road both directions under NY 12 (Trenton) Motorist will encounter lane closures in both directions with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:57:49Z"},"road_event_id":"k22es5tzYv/pDLCdf27kWWtSqWc=","beginning_cross_street":"NY 12","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.176104,43.221996]]}},{"id":"lkWKpUfqm4c2Xec1QA6uTZr1+Yk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Putnam Road"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eDMo6ZRanZiqEn4jH9CLwgdtRbg="},{"type":"next-occurrence","id":"g3+CUYp6/UyoBXWetq2EBBqPj/8="}],"description":"Bridge painting on Putnam Road both directions under NY 12 (Trenton) Motorist will encounter lane closures in both directions with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:57:49Z"},"road_event_id":"lkWKpUfqm4c2Xec1QA6uTZr1+Yk=","beginning_cross_street":"NY 12","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.176104,43.221996]]}},{"id":"g3+CUYp6/UyoBXWetq2EBBqPj/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Putnam Road"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eDMo6ZRanZiqEn4jH9CLwgdtRbg="},{"type":"next-occurrence","id":"LO5IL33JrDI7qFOApfG9VfE4Vvc="}],"description":"Bridge painting on Putnam Road both directions under NY 12 (Trenton) Motorist will encounter lane closures in both directions with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:57:49Z"},"road_event_id":"g3+CUYp6/UyoBXWetq2EBBqPj/8=","beginning_cross_street":"NY 12","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.176104,43.221996]]}},{"id":"LO5IL33JrDI7qFOApfG9VfE4Vvc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Putnam Road"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eDMo6ZRanZiqEn4jH9CLwgdtRbg="}],"description":"Bridge painting on Putnam Road both directions under NY 12 (Trenton) Motorist will encounter lane closures in both directions with flaggers in place, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:57:49Z"},"road_event_id":"LO5IL33JrDI7qFOApfG9VfE4Vvc=","beginning_cross_street":"NY 12","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.176104,43.221996]]}},{"id":"e4A2rP7ZH2HHDvFIT9UU/q0e8oA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YguEOpDIkwQDUTgSPLN/bJnAADE="}],"description":"Bridge painting on NY 30 southbound over Cleveland Ave (Amsterdam) Motorists will encounter a south bound shoulder closure, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:11:47Z"},"road_event_id":"e4A2rP7ZH2HHDvFIT9UU/q0e8oA=","beginning_cross_street":"Cleveland Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.195261,42.932873]]}},{"id":"YguEOpDIkwQDUTgSPLN/bJnAADE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e4A2rP7ZH2HHDvFIT9UU/q0e8oA="},{"type":"next-occurrence","id":"6sLJLiJmVhpyB85d20zRsBLherM="}],"description":"Bridge painting on NY 30 southbound over Cleveland Ave (Amsterdam) Motorists will encounter a south bound shoulder closure, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:11:47Z"},"road_event_id":"YguEOpDIkwQDUTgSPLN/bJnAADE=","beginning_cross_street":"Cleveland Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.195261,42.932873]]}},{"id":"6sLJLiJmVhpyB85d20zRsBLherM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e4A2rP7ZH2HHDvFIT9UU/q0e8oA="},{"type":"next-occurrence","id":"gkkyjcswxjmNqhnZgTa46EWZsGY="}],"description":"Bridge painting on NY 30 southbound over Cleveland Ave (Amsterdam) Motorists will encounter a south bound shoulder closure, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:11:47Z"},"road_event_id":"6sLJLiJmVhpyB85d20zRsBLherM=","beginning_cross_street":"Cleveland Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.195261,42.932873]]}},{"id":"gkkyjcswxjmNqhnZgTa46EWZsGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e4A2rP7ZH2HHDvFIT9UU/q0e8oA="},{"type":"next-occurrence","id":"mbvxan/5FWGpLr5oiYfTUeQ7HyY="}],"description":"Bridge painting on NY 30 southbound over Cleveland Ave (Amsterdam) Motorists will encounter a south bound shoulder closure, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:11:47Z"},"road_event_id":"gkkyjcswxjmNqhnZgTa46EWZsGY=","beginning_cross_street":"Cleveland Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.195261,42.932873]]}},{"id":"mbvxan/5FWGpLr5oiYfTUeQ7HyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e4A2rP7ZH2HHDvFIT9UU/q0e8oA="},{"type":"next-occurrence","id":"jJA3/+7PItBaM/sdHm6cBJk0KAo="}],"description":"Bridge painting on NY 30 southbound over Cleveland Ave (Amsterdam) Motorists will encounter a south bound shoulder closure, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:11:47Z"},"road_event_id":"mbvxan/5FWGpLr5oiYfTUeQ7HyY=","beginning_cross_street":"Cleveland Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.195261,42.932873]]}},{"id":"jJA3/+7PItBaM/sdHm6cBJk0KAo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e4A2rP7ZH2HHDvFIT9UU/q0e8oA="}],"description":"Bridge painting on NY 30 southbound over Cleveland Ave (Amsterdam) Motorists will encounter a south bound shoulder closure, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:11:47Z"},"road_event_id":"jJA3/+7PItBaM/sdHm6cBJk0KAo=","beginning_cross_street":"Cleveland Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.195261,42.932873]]}},{"id":"MOownUeJR2+rc4GtdmZ1PZ6+rN8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IuZrCtYa1n6gwdvRIAMX97K6VNw="}],"description":"Bridge painting on NY 80 both directions between Silk Ave (Minden) and Abbot Street (Minden) Motorists will encounter shoulder closures in both directions, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:11:03Z"},"road_event_id":"MOownUeJR2+rc4GtdmZ1PZ6+rN8=","beginning_cross_street":"Silk Ave","ending_cross_street":"Abbot Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632789,42.929357]]}},{"id":"IuZrCtYa1n6gwdvRIAMX97K6VNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MOownUeJR2+rc4GtdmZ1PZ6+rN8="},{"type":"next-occurrence","id":"mYwWqWACtc3gvX2hZOOtWfdU2yA="}],"description":"Bridge painting on NY 80 both directions between Silk Ave (Minden) and Abbot Street (Minden) Motorists will encounter shoulder closures in both directions, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:11:03Z"},"road_event_id":"IuZrCtYa1n6gwdvRIAMX97K6VNw=","beginning_cross_street":"Silk Ave","ending_cross_street":"Abbot Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632789,42.929357]]}},{"id":"mYwWqWACtc3gvX2hZOOtWfdU2yA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MOownUeJR2+rc4GtdmZ1PZ6+rN8="},{"type":"next-occurrence","id":"+qy/fahRsjA3+h+yGPSQAgTy5DU="}],"description":"Bridge painting on NY 80 both directions between Silk Ave (Minden) and Abbot Street (Minden) Motorists will encounter shoulder closures in both directions, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:11:03Z"},"road_event_id":"mYwWqWACtc3gvX2hZOOtWfdU2yA=","beginning_cross_street":"Silk Ave","ending_cross_street":"Abbot Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632789,42.929357]]}},{"id":"+qy/fahRsjA3+h+yGPSQAgTy5DU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MOownUeJR2+rc4GtdmZ1PZ6+rN8="},{"type":"next-occurrence","id":"f7a7lAKKRhxEWD/qj81cwV2r0KY="}],"description":"Bridge painting on NY 80 both directions between Silk Ave (Minden) and Abbot Street (Minden) Motorists will encounter shoulder closures in both directions, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:11:03Z"},"road_event_id":"+qy/fahRsjA3+h+yGPSQAgTy5DU=","beginning_cross_street":"Silk Ave","ending_cross_street":"Abbot Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632789,42.929357]]}},{"id":"f7a7lAKKRhxEWD/qj81cwV2r0KY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MOownUeJR2+rc4GtdmZ1PZ6+rN8="},{"type":"next-occurrence","id":"kLoKe1vr1U1NvUoMB4Pd+sj4Z2k="}],"description":"Bridge painting on NY 80 both directions between Silk Ave (Minden) and Abbot Street (Minden) Motorists will encounter shoulder closures in both directions, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:11:03Z"},"road_event_id":"f7a7lAKKRhxEWD/qj81cwV2r0KY=","beginning_cross_street":"Silk Ave","ending_cross_street":"Abbot Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632789,42.929357]]}},{"id":"kLoKe1vr1U1NvUoMB4Pd+sj4Z2k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MOownUeJR2+rc4GtdmZ1PZ6+rN8="}],"description":"Bridge painting on NY 80 both directions between Silk Ave (Minden) and Abbot Street (Minden) Motorists will encounter shoulder closures in both directions, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-06-05T12:11:03Z"},"road_event_id":"kLoKe1vr1U1NvUoMB4Pd+sj4Z2k=","beginning_cross_street":"Silk Ave","ending_cross_street":"Abbot Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632789,42.929357]]}},{"id":"ooWVthJBhcQ+T5BhYtS/+/Zhtkg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 436"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gM0SFmJ5V4iJmb2m5UwWZRFWkjc="}],"description":"Utility work on NY 436 both directions between TRACY RD (Ossian) and I-390 (North Dansville) Alternating lane/shoulder closures with flaggers as needed. , Saturday May 30th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-29T14:53:14Z"},"road_event_id":"ooWVthJBhcQ+T5BhYtS/+/Zhtkg=","beginning_cross_street":"TRACY RD","ending_cross_street":"I-390","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.786627,42.56015]]}},{"id":"gM0SFmJ5V4iJmb2m5UwWZRFWkjc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 436"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ooWVthJBhcQ+T5BhYtS/+/Zhtkg="},{"type":"next-occurrence","id":"Ys5t4qkkZMvAjJm9fcM3nOtHThk="}],"description":"Utility work on NY 436 both directions between TRACY RD (Ossian) and I-390 (North Dansville) Alternating lane/shoulder closures with flaggers as needed. , Saturday May 30th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-29T14:53:14Z"},"road_event_id":"gM0SFmJ5V4iJmb2m5UwWZRFWkjc=","beginning_cross_street":"TRACY RD","ending_cross_street":"I-390","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.786627,42.56015]]}},{"id":"Ys5t4qkkZMvAjJm9fcM3nOtHThk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 436"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ooWVthJBhcQ+T5BhYtS/+/Zhtkg="},{"type":"next-occurrence","id":"lDCJIuR5NF6dT2rtPuxWTkkEqJA="}],"description":"Utility work on NY 436 both directions between TRACY RD (Ossian) and I-390 (North Dansville) Alternating lane/shoulder closures with flaggers as needed. , Saturday May 30th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-29T14:53:14Z"},"road_event_id":"Ys5t4qkkZMvAjJm9fcM3nOtHThk=","beginning_cross_street":"TRACY RD","ending_cross_street":"I-390","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.786627,42.56015]]}},{"id":"lDCJIuR5NF6dT2rtPuxWTkkEqJA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 436"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ooWVthJBhcQ+T5BhYtS/+/Zhtkg="},{"type":"next-occurrence","id":"yF9pbGXin9Idy1f1wcto8sO1Z7E="}],"description":"Utility work on NY 436 both directions between TRACY RD (Ossian) and I-390 (North Dansville) Alternating lane/shoulder closures with flaggers as needed. , Saturday May 30th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-29T14:53:14Z"},"road_event_id":"lDCJIuR5NF6dT2rtPuxWTkkEqJA=","beginning_cross_street":"TRACY RD","ending_cross_street":"I-390","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.786627,42.56015]]}},{"id":"yF9pbGXin9Idy1f1wcto8sO1Z7E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 436"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ooWVthJBhcQ+T5BhYtS/+/Zhtkg="},{"type":"next-occurrence","id":"NY2INgqYL1b+HlgthYlpdakVtZI="}],"description":"Utility work on NY 436 both directions between TRACY RD (Ossian) and I-390 (North Dansville) Alternating lane/shoulder closures with flaggers as needed. , Saturday May 30th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-29T14:53:14Z"},"road_event_id":"yF9pbGXin9Idy1f1wcto8sO1Z7E=","beginning_cross_street":"TRACY RD","ending_cross_street":"I-390","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.786627,42.56015]]}},{"id":"NY2INgqYL1b+HlgthYlpdakVtZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 436"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ooWVthJBhcQ+T5BhYtS/+/Zhtkg="}],"description":"Utility work on NY 436 both directions between TRACY RD (Ossian) and I-390 (North Dansville) Alternating lane/shoulder closures with flaggers as needed. , Saturday May 30th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-05-29T14:53:14Z"},"road_event_id":"NY2INgqYL1b+HlgthYlpdakVtZI=","beginning_cross_street":"TRACY RD","ending_cross_street":"I-390","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.786627,42.56015]]}},{"id":"f+j12MeS4UMSVdu034R9aviPlK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"moFyGOSi+DlFRo/fhTQi7ZFw9PM="}],"description":"Reconstruction on Wilbur Cross Parkway northbound between Miller Avenue (Meriden) and Paddock Avenue (Meriden) The lane closure on Route 15 Northbound may cause congestion when approaching the Miller Avenue vicinity, and travelers are advised to seek alternate routes, to I-91 Northbound with connections to Route 15 Northbound and I-691:, Continuous Sunday June 7th,2026 06:00 PM thru Friday June 12th,2026 03:00 PM 1 Right lane of 2 lanes closed northbound, , Sunday June 14th,2026 thru Friday June 19th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed northbound,","update_date":"2026-06-05T19:00:11Z"},"road_event_id":"f+j12MeS4UMSVdu034R9aviPlK0=","beginning_cross_street":"Miller Avenue","ending_cross_street":"Paddock Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T22:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.78144,41.512397]]}},{"id":"moFyGOSi+DlFRo/fhTQi7ZFw9PM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f+j12MeS4UMSVdu034R9aviPlK0="},{"type":"next-occurrence","id":"zhAYWxQFnIhUU559R8dHVwmK0uY="}],"description":"Reconstruction on Wilbur Cross Parkway northbound between Miller Avenue (Meriden) and Paddock Avenue (Meriden) The lane closure on Route 15 Northbound may cause congestion when approaching the Miller Avenue vicinity, and travelers are advised to seek alternate routes, to I-91 Northbound with connections to Route 15 Northbound and I-691:, Continuous Sunday June 7th,2026 06:00 PM thru Friday June 12th,2026 03:00 PM 1 Right lane of 2 lanes closed northbound, , Sunday June 14th,2026 thru Friday June 19th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed northbound,","update_date":"2026-06-05T19:00:11Z"},"road_event_id":"moFyGOSi+DlFRo/fhTQi7ZFw9PM=","beginning_cross_street":"Miller Avenue","ending_cross_street":"Paddock Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T22:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.78144,41.512397]]}},{"id":"zhAYWxQFnIhUU559R8dHVwmK0uY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f+j12MeS4UMSVdu034R9aviPlK0="},{"type":"next-occurrence","id":"WYHp6cXJD0Fs0fUgdRj02yGQ0T8="}],"description":"Reconstruction on Wilbur Cross Parkway northbound between Miller Avenue (Meriden) and Paddock Avenue (Meriden) The lane closure on Route 15 Northbound may cause congestion when approaching the Miller Avenue vicinity, and travelers are advised to seek alternate routes, to I-91 Northbound with connections to Route 15 Northbound and I-691:, Continuous Sunday June 7th,2026 06:00 PM thru Friday June 12th,2026 03:00 PM 1 Right lane of 2 lanes closed northbound, , Sunday June 14th,2026 thru Friday June 19th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed northbound,","update_date":"2026-06-05T19:00:11Z"},"road_event_id":"zhAYWxQFnIhUU559R8dHVwmK0uY=","beginning_cross_street":"Miller Avenue","ending_cross_street":"Paddock Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T22:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.78144,41.512397]]}},{"id":"WYHp6cXJD0Fs0fUgdRj02yGQ0T8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f+j12MeS4UMSVdu034R9aviPlK0="},{"type":"next-occurrence","id":"h/XFctivVXWU7R5yBrku9SiQQLQ="}],"description":"Reconstruction on Wilbur Cross Parkway northbound between Miller Avenue (Meriden) and Paddock Avenue (Meriden) The lane closure on Route 15 Northbound may cause congestion when approaching the Miller Avenue vicinity, and travelers are advised to seek alternate routes, to I-91 Northbound with connections to Route 15 Northbound and I-691:, Continuous Sunday June 7th,2026 06:00 PM thru Friday June 12th,2026 03:00 PM 1 Right lane of 2 lanes closed northbound, , Sunday June 14th,2026 thru Friday June 19th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed northbound,","update_date":"2026-06-05T19:00:11Z"},"road_event_id":"WYHp6cXJD0Fs0fUgdRj02yGQ0T8=","beginning_cross_street":"Miller Avenue","ending_cross_street":"Paddock Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T22:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.78144,41.512397]]}},{"id":"h/XFctivVXWU7R5yBrku9SiQQLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f+j12MeS4UMSVdu034R9aviPlK0="},{"type":"next-occurrence","id":"ha3yd/QdGL7VyIZFRa+sd6cWuMA="}],"description":"Reconstruction on Wilbur Cross Parkway northbound between Miller Avenue (Meriden) and Paddock Avenue (Meriden) The lane closure on Route 15 Northbound may cause congestion when approaching the Miller Avenue vicinity, and travelers are advised to seek alternate routes, to I-91 Northbound with connections to Route 15 Northbound and I-691:, Continuous Sunday June 7th,2026 06:00 PM thru Friday June 12th,2026 03:00 PM 1 Right lane of 2 lanes closed northbound, , Sunday June 14th,2026 thru Friday June 19th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed northbound,","update_date":"2026-06-05T19:00:11Z"},"road_event_id":"h/XFctivVXWU7R5yBrku9SiQQLQ=","beginning_cross_street":"Miller Avenue","ending_cross_street":"Paddock Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T22:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.78144,41.512397]]}},{"id":"ha3yd/QdGL7VyIZFRa+sd6cWuMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"f+j12MeS4UMSVdu034R9aviPlK0="}],"description":"Reconstruction on Wilbur Cross Parkway northbound between Miller Avenue (Meriden) and Paddock Avenue (Meriden) The lane closure on Route 15 Northbound may cause congestion when approaching the Miller Avenue vicinity, and travelers are advised to seek alternate routes, to I-91 Northbound with connections to Route 15 Northbound and I-691:, Continuous Sunday June 7th,2026 06:00 PM thru Friday June 12th,2026 03:00 PM 1 Right lane of 2 lanes closed northbound, , Sunday June 14th,2026 thru Friday June 19th,2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed northbound,","update_date":"2026-06-05T19:00:11Z"},"road_event_id":"ha3yd/QdGL7VyIZFRa+sd6cWuMA=","beginning_cross_street":"Miller Avenue","ending_cross_street":"Paddock Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T22:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.78144,41.512397]]}},{"id":"UbmGGWX5pnhypIE+Qr6T3Y40s1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q Line"],"direction":"unknown","related_road_events":[],"description":"Track repairs on Q Line both directions between 57 St - 7 Av (New York) and 96 St (New York) For Lexington Av/63 St, take the F line instead. For 72 St, 86 St and 96 St, consider taking buses instead. The first bus is M15 (along 1 Av and 2 Av). The second bus is M102 and M103 (along 3 Av and Lex Av). Transfer between Q line and F line at 34 St-Herald Sq. For Second Av stations, consider nearby 6 line stops along Lexington Ave. Transfer at 14 St-Union Sq., Wednesday June 3rd,2026 thru Saturday June 6th,2026, Wednesday/Thursday/Friday, 11:30 PM thru 05:00 AM service suspended","update_date":"2026-06-02T09:00:20Z"},"road_event_id":"UbmGGWX5pnhypIE+Qr6T3Y40s1c=","beginning_cross_street":"57 St - 7 Av","ending_cross_street":"96 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:30:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980658,40.764664]]}},{"id":"qtCIJqhrytAFUtW+YUgLPQMrk84=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6uar3ru1ZVWnSl2sjZQJgiXyuI8="}],"description":"Construction on NY 27 eastbound between 4th Avenue (New York) and 5th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-05-29T15:03:06Z"},"road_event_id":"qtCIJqhrytAFUtW+YUgLPQMrk84=","beginning_cross_street":"4th Avenue","ending_cross_street":"5th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992898,40.665229]]}},{"id":"6uar3ru1ZVWnSl2sjZQJgiXyuI8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qtCIJqhrytAFUtW+YUgLPQMrk84="},{"type":"next-occurrence","id":"sdEAF+0sXJGdQ4RAZ9mE1GiNWe8="}],"description":"Construction on NY 27 eastbound between 4th Avenue (New York) and 5th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-05-29T15:03:06Z"},"road_event_id":"6uar3ru1ZVWnSl2sjZQJgiXyuI8=","beginning_cross_street":"4th Avenue","ending_cross_street":"5th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992898,40.665229]]}},{"id":"sdEAF+0sXJGdQ4RAZ9mE1GiNWe8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qtCIJqhrytAFUtW+YUgLPQMrk84="},{"type":"next-occurrence","id":"mI66LVJSgn3tuIc/gEkiMh+N1rY="}],"description":"Construction on NY 27 eastbound between 4th Avenue (New York) and 5th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-05-29T15:03:06Z"},"road_event_id":"sdEAF+0sXJGdQ4RAZ9mE1GiNWe8=","beginning_cross_street":"4th Avenue","ending_cross_street":"5th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992898,40.665229]]}},{"id":"mI66LVJSgn3tuIc/gEkiMh+N1rY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qtCIJqhrytAFUtW+YUgLPQMrk84="},{"type":"next-occurrence","id":"oQw+EGnAeSS6Qrnz9YiIz/Iqvds="}],"description":"Construction on NY 27 eastbound between 4th Avenue (New York) and 5th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-05-29T15:03:06Z"},"road_event_id":"mI66LVJSgn3tuIc/gEkiMh+N1rY=","beginning_cross_street":"4th Avenue","ending_cross_street":"5th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992898,40.665229]]}},{"id":"oQw+EGnAeSS6Qrnz9YiIz/Iqvds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qtCIJqhrytAFUtW+YUgLPQMrk84="},{"type":"next-occurrence","id":"2Eq/mfuirDruFj+hqRHnfIjSSUM="}],"description":"Construction on NY 27 eastbound between 4th Avenue (New York) and 5th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-05-29T15:03:06Z"},"road_event_id":"oQw+EGnAeSS6Qrnz9YiIz/Iqvds=","beginning_cross_street":"4th Avenue","ending_cross_street":"5th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992898,40.665229]]}},{"id":"2Eq/mfuirDruFj+hqRHnfIjSSUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qtCIJqhrytAFUtW+YUgLPQMrk84="}],"description":"Construction on NY 27 eastbound between 4th Avenue (New York) and 5th Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-05-29T15:03:06Z"},"road_event_id":"2Eq/mfuirDruFj+hqRHnfIjSSUM=","beginning_cross_street":"4th Avenue","ending_cross_street":"5th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992898,40.665229]]}},{"id":"tBLL3+fhsXcMdC27IsQNMJLAzig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["R Line"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations both directions, R Line between Whitehall St - South Ferry (New York) and 59 St (New York) R line run in Brooklyn between Bay Ridge-95 St and 59 St, the last stop. For 53 St and 45 St, take a Coney Island-bound N line. For 25 St, Prospect Av, 4 Av-9 St, Union St, take a Coney Island-bound D line or N line. For 36 St and Atlantic Av-Barclays Ctr, take the D line or N line. For DeKalb Av, take the D line, N line, or Q line. For Jay St-MetroTech, Court St and Whitehall St-South Ferry, take the N line or use nearby 4 line or J line Transfer between trains at 59 St N line or R line, 36 St D line or N line, or Atlantic Av-Barclays Ctr 4 line, D line, or N line., Tuesday June 2nd, 2026 thru Saturday June 6th, 2026, Tuesday/Wednesday/Thursday/Friday, 11:45 PM thru 05:00 AM service suspended","update_date":"2026-06-03T16:44:25Z"},"road_event_id":"tBLL3+fhsXcMdC27IsQNMJLAzig=","beginning_cross_street":"Whitehall St - South Ferry","ending_cross_street":"59 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:45:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.012994,40.703087]]}},{"id":"NzXOv7dsC3XXMuqub5VJQDcejAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 878 westbound between Exit 2S - 150th Street (New York) and 142nd Street (New York) Subject to change without notice., Friday June 5th, 2026 thru Saturday June 6th, 2026, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-29T15:15:03Z"},"road_event_id":"NzXOv7dsC3XXMuqub5VJQDcejAk=","beginning_cross_street":"Exit 2S - 150th Street","ending_cross_street":"142nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.790319,40.66516]]}},{"id":"ZQruE1lZ4+KD26rTWW1nC5adQqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["1 Line"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations northbound, 1 Line between Times Sq - 42 St (New York) and 72 St (New York) skips 50 St, 59 St-Columbus Circle and 66 St-Lincoln Center. For service to these stations, take the 1 line to 72 St and transfer to a downtown 1 line or 2 line local. For service from these stations, take the 1 line or 2 line to Times Sq-42 St and transfer to an uptown 1 line., Tuesday June 2nd, 2026 thru Saturday June 6th, 2026, Tuesday/Wednesday/Thursday/Friday, 11:45 PM thru 05:00 AM","update_date":"2026-05-29T15:15:27Z"},"road_event_id":"ZQruE1lZ4+KD26rTWW1nC5adQqQ=","beginning_cross_street":"Times Sq - 42 St","ending_cross_street":"72 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:45:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987495,40.75529]]}},{"id":"s6CRs9keP8g6ttDBQZFDrPYS9qI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["1 Line"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations northbound, 1 Line between 96 St (New York) and 145 St (New York) skips 103 St, 110 St, 116 St, 125 St and 137 St. For service to these stations, take the 1 line to 168 St-Washington Hts and transfer to a downtown 1 line. For service from these stations, take the 1 line to 96 St and transfer to an uptown 1 line., Continuous Friday June 5th, 2026 11:45 PM thru Monday June 8th, 2026 05:00 AM","update_date":"2026-05-29T15:18:34Z"},"road_event_id":"s6CRs9keP8g6ttDBQZFDrPYS9qI=","beginning_cross_street":"96 St","ending_cross_street":"145 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:45:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.972323,40.793919]]}},{"id":"vS4hQIyAvoHczdZfWAjqDoDbghM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[],"description":"Milling and paving operations on CT 8 northbound between Exit 45 (Torrington), Sunday June 7th, 2026 thru Monday June 8th, 2026, 07:00 PM thru 05:00 AM 2 Left lanes of 3 lanes closed","update_date":"2026-05-29T15:18:48Z"},"road_event_id":"vS4hQIyAvoHczdZfWAjqDoDbghM=","beginning_cross_street":"Exit 45","ending_cross_street":"Exit 45","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T23:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107462,41.827438]]}},{"id":"OnV9jN8V1n4/hkQeG0QC7bnLvXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[],"description":"Construction on I-678 northbound ramp from 133rd Avenue (New York) Subject to change without notice., Friday June 5th, 2026 thru Saturday June 6th, 2026, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-29T15:31:06Z"},"road_event_id":"OnV9jN8V1n4/hkQeG0QC7bnLvXk=","beginning_cross_street":"133rd Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80129,40.673724]]}},{"id":"4NfYNNRaY6KGGrQ6h7zgYvabah4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["3 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"k707S2tLLwTm80V3SMjpy4VXymg="}],"description":"Construction on 3 Line both directions into/out of New Lots Av (New York) extended late night 3 line replaces 4 line. 3 line runs to/from New Lots Av days and evenings. 3 line provides alternate service in Brooklyn during planned work on the 4 line., Tuesday June 2nd,2026 thru Saturday June 6th,2026, Tuesday/Wednesday/Thursday/Friday, 11:30 PM thru 05:00 AM, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 11:30 PM thru 05:00 AM","update_date":"2026-06-02T09:00:20Z"},"road_event_id":"4NfYNNRaY6KGGrQ6h7zgYvabah4=","beginning_cross_street":"New Lots Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:30:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884079,40.666235]]}},{"id":"k707S2tLLwTm80V3SMjpy4VXymg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["3 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NfYNNRaY6KGGrQ6h7zgYvabah4="},{"type":"next-occurrence","id":"NkIJVzOZ3lRJ7TNO3yVycXjGnTM="}],"description":"Construction on 3 Line both directions into/out of New Lots Av (New York) extended late night 3 line replaces 4 line. 3 line runs to/from New Lots Av days and evenings. 3 line provides alternate service in Brooklyn during planned work on the 4 line., Tuesday June 2nd,2026 thru Saturday June 6th,2026, Tuesday/Wednesday/Thursday/Friday, 11:30 PM thru 05:00 AM, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 11:30 PM thru 05:00 AM","update_date":"2026-06-02T09:00:20Z"},"road_event_id":"k707S2tLLwTm80V3SMjpy4VXymg=","beginning_cross_street":"New Lots Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T03:30:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884079,40.666235]]}},{"id":"NkIJVzOZ3lRJ7TNO3yVycXjGnTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["3 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NfYNNRaY6KGGrQ6h7zgYvabah4="},{"type":"next-occurrence","id":"KAbUGw1z9chnqhW17b38jnpYV5k="}],"description":"Construction on 3 Line both directions into/out of New Lots Av (New York) extended late night 3 line replaces 4 line. 3 line runs to/from New Lots Av days and evenings. 3 line provides alternate service in Brooklyn during planned work on the 4 line., Tuesday June 2nd,2026 thru Saturday June 6th,2026, Tuesday/Wednesday/Thursday/Friday, 11:30 PM thru 05:00 AM, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 11:30 PM thru 05:00 AM","update_date":"2026-06-02T09:00:20Z"},"road_event_id":"NkIJVzOZ3lRJ7TNO3yVycXjGnTM=","beginning_cross_street":"New Lots Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T03:30:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884079,40.666235]]}},{"id":"KAbUGw1z9chnqhW17b38jnpYV5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["3 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NfYNNRaY6KGGrQ6h7zgYvabah4="},{"type":"next-occurrence","id":"L1QsE7rGyGT4GH1x99O69bd10m8="}],"description":"Construction on 3 Line both directions into/out of New Lots Av (New York) extended late night 3 line replaces 4 line. 3 line runs to/from New Lots Av days and evenings. 3 line provides alternate service in Brooklyn during planned work on the 4 line., Tuesday June 2nd,2026 thru Saturday June 6th,2026, Tuesday/Wednesday/Thursday/Friday, 11:30 PM thru 05:00 AM, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 11:30 PM thru 05:00 AM","update_date":"2026-06-02T09:00:20Z"},"road_event_id":"KAbUGw1z9chnqhW17b38jnpYV5k=","beginning_cross_street":"New Lots Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T03:30:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884079,40.666235]]}},{"id":"L1QsE7rGyGT4GH1x99O69bd10m8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["3 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NfYNNRaY6KGGrQ6h7zgYvabah4="},{"type":"next-occurrence","id":"chxUAsS+VBRxyex2HYlU1BiFzyQ="}],"description":"Construction on 3 Line both directions into/out of New Lots Av (New York) extended late night 3 line replaces 4 line. 3 line runs to/from New Lots Av days and evenings. 3 line provides alternate service in Brooklyn during planned work on the 4 line., Tuesday June 2nd,2026 thru Saturday June 6th,2026, Tuesday/Wednesday/Thursday/Friday, 11:30 PM thru 05:00 AM, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 11:30 PM thru 05:00 AM","update_date":"2026-06-02T09:00:20Z"},"road_event_id":"L1QsE7rGyGT4GH1x99O69bd10m8=","beginning_cross_street":"New Lots Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T03:30:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884079,40.666235]]}},{"id":"chxUAsS+VBRxyex2HYlU1BiFzyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["3 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4NfYNNRaY6KGGrQ6h7zgYvabah4="}],"description":"Construction on 3 Line both directions into/out of New Lots Av (New York) extended late night 3 line replaces 4 line. 3 line runs to/from New Lots Av days and evenings. 3 line provides alternate service in Brooklyn during planned work on the 4 line., Tuesday June 2nd,2026 thru Saturday June 6th,2026, Tuesday/Wednesday/Thursday/Friday, 11:30 PM thru 05:00 AM, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 11:30 PM thru 05:00 AM","update_date":"2026-06-02T09:00:20Z"},"road_event_id":"chxUAsS+VBRxyex2HYlU1BiFzyQ=","beginning_cross_street":"New Lots Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T03:30:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884079,40.666235]]}},{"id":"rT5lTdoMWxd9C0qzCmoeFznjxUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BsxkrYcHvcuV4bKhNYtYLtoupiI="}],"description":"Track replacement on 4 Line both directions between Brooklyn Bridge - City Hall (New York) and New Lots Av (New York) 4 line runs local between 125 St and Brooklyn Bridge-City Hall, the last stop. 3 line runs to/from New Lots Av all weekend. For Fulton St, Wall St and Bowling Green, use nearby J line or R line. For service between Manhattan and Brooklyn, take the N line, Q line, or R line. For service between Borough Hall and Franklin Av-Medgar Evers College, take the 2 line or 3 line. Take the 3 line between Franklin Av-Medgar Evers College and New Lots Av., Tuesday June 2nd,2026 thru Saturday June 6th,2026, Tuesday/Wednesday/Thursday/Friday, 11:30 PM thru 05:00 AM service suspended, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended","update_date":"2026-06-01T09:00:20Z"},"road_event_id":"rT5lTdoMWxd9C0qzCmoeFznjxUM=","beginning_cross_street":"Brooklyn Bridge - City Hall","ending_cross_street":"New Lots Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:30:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.004131,40.713065]]}},{"id":"BsxkrYcHvcuV4bKhNYtYLtoupiI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rT5lTdoMWxd9C0qzCmoeFznjxUM="},{"type":"next-occurrence","id":"6pV9LMx8iXwgWVzjsnddnkUlIwk="}],"description":"Track replacement on 4 Line both directions between Brooklyn Bridge - City Hall (New York) and New Lots Av (New York) 4 line runs local between 125 St and Brooklyn Bridge-City Hall, the last stop. 3 line runs to/from New Lots Av all weekend. For Fulton St, Wall St and Bowling Green, use nearby J line or R line. For service between Manhattan and Brooklyn, take the N line, Q line, or R line. For service between Borough Hall and Franklin Av-Medgar Evers College, take the 2 line or 3 line. Take the 3 line between Franklin Av-Medgar Evers College and New Lots Av., Tuesday June 2nd,2026 thru Saturday June 6th,2026, Tuesday/Wednesday/Thursday/Friday, 11:30 PM thru 05:00 AM service suspended, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended","update_date":"2026-06-01T09:00:20Z"},"road_event_id":"BsxkrYcHvcuV4bKhNYtYLtoupiI=","beginning_cross_street":"Brooklyn Bridge - City Hall","ending_cross_street":"New Lots Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T03:30:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.004131,40.713065]]}},{"id":"6pV9LMx8iXwgWVzjsnddnkUlIwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rT5lTdoMWxd9C0qzCmoeFznjxUM="},{"type":"next-occurrence","id":"yhP9cHYOUd/Ug4/LLro7CmgRidI="}],"description":"Track replacement on 4 Line both directions between Brooklyn Bridge - City Hall (New York) and New Lots Av (New York) 4 line runs local between 125 St and Brooklyn Bridge-City Hall, the last stop. 3 line runs to/from New Lots Av all weekend. For Fulton St, Wall St and Bowling Green, use nearby J line or R line. For service between Manhattan and Brooklyn, take the N line, Q line, or R line. For service between Borough Hall and Franklin Av-Medgar Evers College, take the 2 line or 3 line. Take the 3 line between Franklin Av-Medgar Evers College and New Lots Av., Tuesday June 2nd,2026 thru Saturday June 6th,2026, Tuesday/Wednesday/Thursday/Friday, 11:30 PM thru 05:00 AM service suspended, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended","update_date":"2026-06-01T09:00:20Z"},"road_event_id":"6pV9LMx8iXwgWVzjsnddnkUlIwk=","beginning_cross_street":"Brooklyn Bridge - City Hall","ending_cross_street":"New Lots Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T03:30:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.004131,40.713065]]}},{"id":"yhP9cHYOUd/Ug4/LLro7CmgRidI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rT5lTdoMWxd9C0qzCmoeFznjxUM="},{"type":"next-occurrence","id":"8Etj8GVzUarWLtk5WvBIg2uki8g="}],"description":"Track replacement on 4 Line both directions between Brooklyn Bridge - City Hall (New York) and New Lots Av (New York) 4 line runs local between 125 St and Brooklyn Bridge-City Hall, the last stop. 3 line runs to/from New Lots Av all weekend. For Fulton St, Wall St and Bowling Green, use nearby J line or R line. For service between Manhattan and Brooklyn, take the N line, Q line, or R line. For service between Borough Hall and Franklin Av-Medgar Evers College, take the 2 line or 3 line. Take the 3 line between Franklin Av-Medgar Evers College and New Lots Av., Tuesday June 2nd,2026 thru Saturday June 6th,2026, Tuesday/Wednesday/Thursday/Friday, 11:30 PM thru 05:00 AM service suspended, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended","update_date":"2026-06-01T09:00:20Z"},"road_event_id":"yhP9cHYOUd/Ug4/LLro7CmgRidI=","beginning_cross_street":"Brooklyn Bridge - City Hall","ending_cross_street":"New Lots Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T03:30:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.004131,40.713065]]}},{"id":"8Etj8GVzUarWLtk5WvBIg2uki8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rT5lTdoMWxd9C0qzCmoeFznjxUM="},{"type":"next-occurrence","id":"k1vh7aP5SjRJS4Pj/z+8isIPfbk="}],"description":"Track replacement on 4 Line both directions between Brooklyn Bridge - City Hall (New York) and New Lots Av (New York) 4 line runs local between 125 St and Brooklyn Bridge-City Hall, the last stop. 3 line runs to/from New Lots Av all weekend. For Fulton St, Wall St and Bowling Green, use nearby J line or R line. For service between Manhattan and Brooklyn, take the N line, Q line, or R line. For service between Borough Hall and Franklin Av-Medgar Evers College, take the 2 line or 3 line. Take the 3 line between Franklin Av-Medgar Evers College and New Lots Av., Tuesday June 2nd,2026 thru Saturday June 6th,2026, Tuesday/Wednesday/Thursday/Friday, 11:30 PM thru 05:00 AM service suspended, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended","update_date":"2026-06-01T09:00:20Z"},"road_event_id":"8Etj8GVzUarWLtk5WvBIg2uki8g=","beginning_cross_street":"Brooklyn Bridge - City Hall","ending_cross_street":"New Lots Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T03:30:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.004131,40.713065]]}},{"id":"k1vh7aP5SjRJS4Pj/z+8isIPfbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rT5lTdoMWxd9C0qzCmoeFznjxUM="}],"description":"Track replacement on 4 Line both directions between Brooklyn Bridge - City Hall (New York) and New Lots Av (New York) 4 line runs local between 125 St and Brooklyn Bridge-City Hall, the last stop. 3 line runs to/from New Lots Av all weekend. For Fulton St, Wall St and Bowling Green, use nearby J line or R line. For service between Manhattan and Brooklyn, take the N line, Q line, or R line. For service between Borough Hall and Franklin Av-Medgar Evers College, take the 2 line or 3 line. Take the 3 line between Franklin Av-Medgar Evers College and New Lots Av., Tuesday June 2nd,2026 thru Saturday June 6th,2026, Tuesday/Wednesday/Thursday/Friday, 11:30 PM thru 05:00 AM service suspended, Monday June 8th,2026 thru Saturday June 13th,2026, Monday thru Friday, 11:30 PM thru 05:00 AM service suspended","update_date":"2026-06-01T09:00:20Z"},"road_event_id":"k1vh7aP5SjRJS4Pj/z+8isIPfbk=","beginning_cross_street":"Brooklyn Bridge - City Hall","ending_cross_street":"New Lots Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T03:30:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.004131,40.713065]]}},{"id":"lu87Z4EqYIwCMDvXS2461Xva5hs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zz/gAYcnNYLDS3EKZugsHTUXNwE="}],"description":"Due to Track replacement northbound, 2 Line between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy, Grand Army Plaza and Bergen St. For service to these stations, take the 2 line or 3 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line or a New Lots Av-bound 3 line. For service from these stations, take the 2 line or 3 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 2 line or 3 line., Tuesday June 2nd, 2026 thru Saturday June 6th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM","update_date":"2026-05-29T15:50:01Z"},"road_event_id":"lu87Z4EqYIwCMDvXS2461Xva5hs=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:45:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"zz/gAYcnNYLDS3EKZugsHTUXNwE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lu87Z4EqYIwCMDvXS2461Xva5hs="},{"type":"next-occurrence","id":"6V4e7i43n1Zn5Kbacr5pYFhmVfI="}],"description":"Due to Track replacement northbound, 2 Line between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy, Grand Army Plaza and Bergen St. For service to these stations, take the 2 line or 3 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line or a New Lots Av-bound 3 line. For service from these stations, take the 2 line or 3 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 2 line or 3 line., Tuesday June 2nd, 2026 thru Saturday June 6th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM","update_date":"2026-05-29T15:50:01Z"},"road_event_id":"zz/gAYcnNYLDS3EKZugsHTUXNwE=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:45:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"6V4e7i43n1Zn5Kbacr5pYFhmVfI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lu87Z4EqYIwCMDvXS2461Xva5hs="},{"type":"next-occurrence","id":"gFXbclI+ydhM7bNTuP+KSZPV7bE="}],"description":"Due to Track replacement northbound, 2 Line between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy, Grand Army Plaza and Bergen St. For service to these stations, take the 2 line or 3 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line or a New Lots Av-bound 3 line. For service from these stations, take the 2 line or 3 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 2 line or 3 line., Tuesday June 2nd, 2026 thru Saturday June 6th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM","update_date":"2026-05-29T15:50:01Z"},"road_event_id":"6V4e7i43n1Zn5Kbacr5pYFhmVfI=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:45:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"gFXbclI+ydhM7bNTuP+KSZPV7bE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lu87Z4EqYIwCMDvXS2461Xva5hs="},{"type":"next-occurrence","id":"QGhqFwlOF+jv8qnagS8LIRqdtlI="}],"description":"Due to Track replacement northbound, 2 Line between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy, Grand Army Plaza and Bergen St. For service to these stations, take the 2 line or 3 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line or a New Lots Av-bound 3 line. For service from these stations, take the 2 line or 3 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 2 line or 3 line., Tuesday June 2nd, 2026 thru Saturday June 6th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM","update_date":"2026-05-29T15:50:01Z"},"road_event_id":"gFXbclI+ydhM7bNTuP+KSZPV7bE=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:45:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"QGhqFwlOF+jv8qnagS8LIRqdtlI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lu87Z4EqYIwCMDvXS2461Xva5hs="},{"type":"next-occurrence","id":"8qiUpXFWDkdfHOyHp1UYlmbODiQ="}],"description":"Due to Track replacement northbound, 2 Line between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy, Grand Army Plaza and Bergen St. For service to these stations, take the 2 line or 3 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line or a New Lots Av-bound 3 line. For service from these stations, take the 2 line or 3 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 2 line or 3 line., Tuesday June 2nd, 2026 thru Saturday June 6th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM","update_date":"2026-05-29T15:50:01Z"},"road_event_id":"QGhqFwlOF+jv8qnagS8LIRqdtlI=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:45:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"8qiUpXFWDkdfHOyHp1UYlmbODiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lu87Z4EqYIwCMDvXS2461Xva5hs="}],"description":"Due to Track replacement northbound, 2 Line between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy, Grand Army Plaza and Bergen St. For service to these stations, take the 2 line or 3 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line or a New Lots Av-bound 3 line. For service from these stations, take the 2 line or 3 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 2 line or 3 line., Tuesday June 2nd, 2026 thru Saturday June 6th, 2026, Tuesday/Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM","update_date":"2026-05-29T15:50:01Z"},"road_event_id":"8qiUpXFWDkdfHOyHp1UYlmbODiQ=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T01:45:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"IvFVAEKwhzd+24JYwertK9bHgEU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mkag9x9gx+7jPL0/GE6HWA7Ed0A="}],"description":"Track replacement on 4 Line northbound between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy-Brooklyn Museum, Grand Army Plaza and Bergen St. For service to these stations, take the 4 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line, New Lots Av-bound 3 line, or New Lots Av-bound 4 line local. For service from these stations, take the 2 line, 3 line, or 4 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 4 line., Monday June 8th,2026 thru Thursday June 11th,2026, Monday/Tuesday/Wednesday/Thursday, 10:30 PM thru 11:30 PM local service only, Friday June 5th,2026 thru Tuesday June 9th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only, Friday June 12th,2026 thru Tuesday June 16th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-06-05T03:00:20Z"},"road_event_id":"IvFVAEKwhzd+24JYwertK9bHgEU=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:45:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"mkag9x9gx+7jPL0/GE6HWA7Ed0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IvFVAEKwhzd+24JYwertK9bHgEU="},{"type":"next-occurrence","id":"YxU8K9p0y0tnkVF2AjmDfoNUEzY="}],"description":"Track replacement on 4 Line northbound between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy-Brooklyn Museum, Grand Army Plaza and Bergen St. For service to these stations, take the 4 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line, New Lots Av-bound 3 line, or New Lots Av-bound 4 line local. For service from these stations, take the 2 line, 3 line, or 4 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 4 line., Monday June 8th,2026 thru Thursday June 11th,2026, Monday/Tuesday/Wednesday/Thursday, 10:30 PM thru 11:30 PM local service only, Friday June 5th,2026 thru Tuesday June 9th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only, Friday June 12th,2026 thru Tuesday June 16th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-06-05T03:00:20Z"},"road_event_id":"mkag9x9gx+7jPL0/GE6HWA7Ed0A=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T03:45:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"YxU8K9p0y0tnkVF2AjmDfoNUEzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IvFVAEKwhzd+24JYwertK9bHgEU="},{"type":"next-occurrence","id":"H+S2vtU0F9E/8/XlDFnTx9Fn5ug="}],"description":"Track replacement on 4 Line northbound between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy-Brooklyn Museum, Grand Army Plaza and Bergen St. For service to these stations, take the 4 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line, New Lots Av-bound 3 line, or New Lots Av-bound 4 line local. For service from these stations, take the 2 line, 3 line, or 4 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 4 line., Monday June 8th,2026 thru Thursday June 11th,2026, Monday/Tuesday/Wednesday/Thursday, 10:30 PM thru 11:30 PM local service only, Friday June 5th,2026 thru Tuesday June 9th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only, Friday June 12th,2026 thru Tuesday June 16th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-06-05T03:00:20Z"},"road_event_id":"YxU8K9p0y0tnkVF2AjmDfoNUEzY=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T03:45:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"H+S2vtU0F9E/8/XlDFnTx9Fn5ug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IvFVAEKwhzd+24JYwertK9bHgEU="},{"type":"next-occurrence","id":"KZ8hn2qlwRoDE4dEf93u3jaJ7VU="}],"description":"Track replacement on 4 Line northbound between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy-Brooklyn Museum, Grand Army Plaza and Bergen St. For service to these stations, take the 4 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line, New Lots Av-bound 3 line, or New Lots Av-bound 4 line local. For service from these stations, take the 2 line, 3 line, or 4 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 4 line., Monday June 8th,2026 thru Thursday June 11th,2026, Monday/Tuesday/Wednesday/Thursday, 10:30 PM thru 11:30 PM local service only, Friday June 5th,2026 thru Tuesday June 9th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only, Friday June 12th,2026 thru Tuesday June 16th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-06-05T03:00:20Z"},"road_event_id":"H+S2vtU0F9E/8/XlDFnTx9Fn5ug=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:30:00Z","end_date":"2026-06-09T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"KZ8hn2qlwRoDE4dEf93u3jaJ7VU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IvFVAEKwhzd+24JYwertK9bHgEU="},{"type":"next-occurrence","id":"pj5KWJmsIc6Toy3g2Szpdv/h2e4="}],"description":"Track replacement on 4 Line northbound between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy-Brooklyn Museum, Grand Army Plaza and Bergen St. For service to these stations, take the 4 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line, New Lots Av-bound 3 line, or New Lots Av-bound 4 line local. For service from these stations, take the 2 line, 3 line, or 4 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 4 line., Monday June 8th,2026 thru Thursday June 11th,2026, Monday/Tuesday/Wednesday/Thursday, 10:30 PM thru 11:30 PM local service only, Friday June 5th,2026 thru Tuesday June 9th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only, Friday June 12th,2026 thru Tuesday June 16th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-06-05T03:00:20Z"},"road_event_id":"KZ8hn2qlwRoDE4dEf93u3jaJ7VU=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T03:45:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"pj5KWJmsIc6Toy3g2Szpdv/h2e4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IvFVAEKwhzd+24JYwertK9bHgEU="},{"type":"next-occurrence","id":"rwiQScG4dhJyLqQekR6S6jMh5Lg="}],"description":"Track replacement on 4 Line northbound between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy-Brooklyn Museum, Grand Army Plaza and Bergen St. For service to these stations, take the 4 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line, New Lots Av-bound 3 line, or New Lots Av-bound 4 line local. For service from these stations, take the 2 line, 3 line, or 4 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 4 line., Monday June 8th,2026 thru Thursday June 11th,2026, Monday/Tuesday/Wednesday/Thursday, 10:30 PM thru 11:30 PM local service only, Friday June 5th,2026 thru Tuesday June 9th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only, Friday June 12th,2026 thru Tuesday June 16th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-06-05T03:00:20Z"},"road_event_id":"pj5KWJmsIc6Toy3g2Szpdv/h2e4=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:30:00Z","end_date":"2026-06-10T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"rwiQScG4dhJyLqQekR6S6jMh5Lg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IvFVAEKwhzd+24JYwertK9bHgEU="},{"type":"next-occurrence","id":"UEZcT1hW5J2FZVrwsLZsjpltTpU="}],"description":"Track replacement on 4 Line northbound between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy-Brooklyn Museum, Grand Army Plaza and Bergen St. For service to these stations, take the 4 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line, New Lots Av-bound 3 line, or New Lots Av-bound 4 line local. For service from these stations, take the 2 line, 3 line, or 4 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 4 line., Monday June 8th,2026 thru Thursday June 11th,2026, Monday/Tuesday/Wednesday/Thursday, 10:30 PM thru 11:30 PM local service only, Friday June 5th,2026 thru Tuesday June 9th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only, Friday June 12th,2026 thru Tuesday June 16th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-06-05T03:00:20Z"},"road_event_id":"rwiQScG4dhJyLqQekR6S6jMh5Lg=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:30:00Z","end_date":"2026-06-11T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"UEZcT1hW5J2FZVrwsLZsjpltTpU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IvFVAEKwhzd+24JYwertK9bHgEU="},{"type":"next-occurrence","id":"W48fiZu2lieXpKzk5T/h8pnKMJs="}],"description":"Track replacement on 4 Line northbound between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy-Brooklyn Museum, Grand Army Plaza and Bergen St. For service to these stations, take the 4 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line, New Lots Av-bound 3 line, or New Lots Av-bound 4 line local. For service from these stations, take the 2 line, 3 line, or 4 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 4 line., Monday June 8th,2026 thru Thursday June 11th,2026, Monday/Tuesday/Wednesday/Thursday, 10:30 PM thru 11:30 PM local service only, Friday June 5th,2026 thru Tuesday June 9th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only, Friday June 12th,2026 thru Tuesday June 16th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-06-05T03:00:20Z"},"road_event_id":"UEZcT1hW5J2FZVrwsLZsjpltTpU=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:30:00Z","end_date":"2026-06-12T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"W48fiZu2lieXpKzk5T/h8pnKMJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IvFVAEKwhzd+24JYwertK9bHgEU="},{"type":"next-occurrence","id":"S00jQvDVeysSW/wPI004/COa6GQ="}],"description":"Track replacement on 4 Line northbound between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy-Brooklyn Museum, Grand Army Plaza and Bergen St. For service to these stations, take the 4 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line, New Lots Av-bound 3 line, or New Lots Av-bound 4 line local. For service from these stations, take the 2 line, 3 line, or 4 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 4 line., Monday June 8th,2026 thru Thursday June 11th,2026, Monday/Tuesday/Wednesday/Thursday, 10:30 PM thru 11:30 PM local service only, Friday June 5th,2026 thru Tuesday June 9th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only, Friday June 12th,2026 thru Tuesday June 16th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-06-05T03:00:20Z"},"road_event_id":"W48fiZu2lieXpKzk5T/h8pnKMJs=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T03:45:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"S00jQvDVeysSW/wPI004/COa6GQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IvFVAEKwhzd+24JYwertK9bHgEU="},{"type":"next-occurrence","id":"f6CGcMvAwSUJYuOzfyIvMnrv4TM="}],"description":"Track replacement on 4 Line northbound between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy-Brooklyn Museum, Grand Army Plaza and Bergen St. For service to these stations, take the 4 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line, New Lots Av-bound 3 line, or New Lots Av-bound 4 line local. For service from these stations, take the 2 line, 3 line, or 4 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 4 line., Monday June 8th,2026 thru Thursday June 11th,2026, Monday/Tuesday/Wednesday/Thursday, 10:30 PM thru 11:30 PM local service only, Friday June 5th,2026 thru Tuesday June 9th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only, Friday June 12th,2026 thru Tuesday June 16th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-06-05T03:00:20Z"},"road_event_id":"S00jQvDVeysSW/wPI004/COa6GQ=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T03:45:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"f6CGcMvAwSUJYuOzfyIvMnrv4TM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IvFVAEKwhzd+24JYwertK9bHgEU="},{"type":"next-occurrence","id":"hLtiILUmITGkJM3nDq9CXz9lpUs="}],"description":"Track replacement on 4 Line northbound between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy-Brooklyn Museum, Grand Army Plaza and Bergen St. For service to these stations, take the 4 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line, New Lots Av-bound 3 line, or New Lots Av-bound 4 line local. For service from these stations, take the 2 line, 3 line, or 4 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 4 line., Monday June 8th,2026 thru Thursday June 11th,2026, Monday/Tuesday/Wednesday/Thursday, 10:30 PM thru 11:30 PM local service only, Friday June 5th,2026 thru Tuesday June 9th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only, Friday June 12th,2026 thru Tuesday June 16th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-06-05T03:00:20Z"},"road_event_id":"f6CGcMvAwSUJYuOzfyIvMnrv4TM=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T03:45:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"hLtiILUmITGkJM3nDq9CXz9lpUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IvFVAEKwhzd+24JYwertK9bHgEU="}],"description":"Track replacement on 4 Line northbound between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy-Brooklyn Museum, Grand Army Plaza and Bergen St. For service to these stations, take the 4 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line, New Lots Av-bound 3 line, or New Lots Av-bound 4 line local. For service from these stations, take the 2 line, 3 line, or 4 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 4 line., Monday June 8th,2026 thru Thursday June 11th,2026, Monday/Tuesday/Wednesday/Thursday, 10:30 PM thru 11:30 PM local service only, Friday June 5th,2026 thru Tuesday June 9th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only, Friday June 12th,2026 thru Tuesday June 16th,2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-06-05T03:00:20Z"},"road_event_id":"hLtiILUmITGkJM3nDq9CXz9lpUs=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T03:45:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"hnJ59MHUzUL2UToFIQ2USGyJ62U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"x0Xs8pMx1QQWEcBG4nMmz5ggtnY="}],"description":"Track replacement on 4 Line both directions between 125 St (New York) and Brooklyn Bridge - City Hall (New York) service begins early. Late night 4 line runs local between these stations., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only","update_date":"2026-06-05T09:00:21Z"},"road_event_id":"hnJ59MHUzUL2UToFIQ2USGyJ62U=","beginning_cross_street":"125 St","ending_cross_street":"Brooklyn Bridge - City Hall","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T04:01:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937594,40.804138]]}},{"id":"x0Xs8pMx1QQWEcBG4nMmz5ggtnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hnJ59MHUzUL2UToFIQ2USGyJ62U="},{"type":"next-occurrence","id":"zVrh+8dKRe4w5k1uWpn6+W6a1ho="}],"description":"Track replacement on 4 Line both directions between 125 St (New York) and Brooklyn Bridge - City Hall (New York) service begins early. Late night 4 line runs local between these stations., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only","update_date":"2026-06-05T09:00:21Z"},"road_event_id":"x0Xs8pMx1QQWEcBG4nMmz5ggtnY=","beginning_cross_street":"125 St","ending_cross_street":"Brooklyn Bridge - City Hall","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T04:01:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937594,40.804138]]}},{"id":"zVrh+8dKRe4w5k1uWpn6+W6a1ho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hnJ59MHUzUL2UToFIQ2USGyJ62U="},{"type":"next-occurrence","id":"CQthX9I7/fmbCLGSNZgk01LPPU0="}],"description":"Track replacement on 4 Line both directions between 125 St (New York) and Brooklyn Bridge - City Hall (New York) service begins early. Late night 4 line runs local between these stations., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only","update_date":"2026-06-05T09:00:21Z"},"road_event_id":"zVrh+8dKRe4w5k1uWpn6+W6a1ho=","beginning_cross_street":"125 St","ending_cross_street":"Brooklyn Bridge - City Hall","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T04:01:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937594,40.804138]]}},{"id":"CQthX9I7/fmbCLGSNZgk01LPPU0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hnJ59MHUzUL2UToFIQ2USGyJ62U="}],"description":"Track replacement on 4 Line both directions between 125 St (New York) and Brooklyn Bridge - City Hall (New York) service begins early. Late night 4 line runs local between these stations., Tuesday June 9th,2026 thru Friday June 12th,2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM local service only","update_date":"2026-06-05T09:00:21Z"},"road_event_id":"CQthX9I7/fmbCLGSNZgk01LPPU0=","beginning_cross_street":"125 St","ending_cross_street":"Brooklyn Bridge - City Hall","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T04:01:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937594,40.804138]]}},{"id":"IR83ivwWVfhXG9afW/5+c/q8WDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2 Line and 3 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ucZf4pJtJmGf1OcNYBvhJxmjWc0="}],"description":"Due to Track repairs northbound, 2 Line and 3 Line between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy-Brooklyn Museum, Grand Army Plaza and Bergen St. For service to these stations, take the 2 line or 3 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line or New Lots Av-bound 3 line or 4 line local. For service from these stations, take the 2 line, 3 line, or 4 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 2 line or 3 line., Continuous Friday June 5th, 2026 09:45 PM thru Monday June 8th, 2026 05:00 AM, Continuous Friday June 12th, 2026 09:45 PM thru Monday June 15th, 2026 05:00 AM","update_date":"2026-05-29T16:16:29Z"},"road_event_id":"IR83ivwWVfhXG9afW/5+c/q8WDU=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"ucZf4pJtJmGf1OcNYBvhJxmjWc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2 Line and 3 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IR83ivwWVfhXG9afW/5+c/q8WDU="}],"description":"Due to Track repairs northbound, 2 Line and 3 Line between Franklin Av (New York) and Atlantic Av - Barclays Ctr (New York) skips Eastern Pkwy-Brooklyn Museum, Grand Army Plaza and Bergen St. For service to these stations, take the 2 line or 3 line to Atlantic Av-Barclays Ctr and transfer to a Flatbush Av-bound 2 line or New Lots Av-bound 3 line or 4 line local. For service from these stations, take the 2 line, 3 line, or 4 line to Franklin Av-Medgar Evers College and transfer to a Manhattan-bound 2 line or 3 line., Continuous Friday June 5th, 2026 09:45 PM thru Monday June 8th, 2026 05:00 AM, Continuous Friday June 12th, 2026 09:45 PM thru Monday June 15th, 2026 05:00 AM","update_date":"2026-05-29T16:16:29Z"},"road_event_id":"ucZf4pJtJmGf1OcNYBvhJxmjWc0=","beginning_cross_street":"Franklin Av","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T01:45:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.958131,40.670682]]}},{"id":"UJRufSrkDzUWASXVVc7Bvi8aCh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dkSDw2Ddt6SxaijSRQAZFIi9KpM="}],"description":"Due to Signal repairs both directions, 7 Line between Grand Central - 42 St (New York) and Court Sq (New York) all trains at Vernon Blvd-Jackson Av and Hunters Point Av board from the Manhattan-bound platform., Monday June 1st, 2026 thru Monday July 6th, 2026, 01:30 AM thru 05:00 AM","update_date":"2026-05-29T16:30:07Z"},"road_event_id":"UJRufSrkDzUWASXVVc7Bvi8aCh8=","beginning_cross_street":"Grand Central - 42 St","ending_cross_street":"Court Sq","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T05:30:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976041,40.751431]]}},{"id":"dkSDw2Ddt6SxaijSRQAZFIi9KpM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UJRufSrkDzUWASXVVc7Bvi8aCh8="}],"description":"Due to Signal repairs both directions, 7 Line between Grand Central - 42 St (New York) and Court Sq (New York) all trains at Vernon Blvd-Jackson Av and Hunters Point Av board from the Manhattan-bound platform., Monday June 1st, 2026 thru Monday July 6th, 2026, 01:30 AM thru 05:00 AM","update_date":"2026-05-29T16:30:07Z"},"road_event_id":"dkSDw2Ddt6SxaijSRQAZFIi9KpM=","beginning_cross_street":"Grand Central - 42 St","ending_cross_street":"Court Sq","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T05:30:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976041,40.751431]]}},{"id":"CDF+OlG/PHEcWiz2/TzpoiKtGNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line and 7x Line"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations westbound, 7 Line and 7x Line between 82 St - Jackson Hts (New York) and 69 St (New York) all local/express trains stop at 74 St-Broadway. Flushing-bound 7x line skip 74 St-Broadway. Flushing-bound 7 line local trains will continue to stop at 74 St-Broadway. For service to 74 St-Broadway and/or transfer to Jackson Hts-Roosevelt Av E line, F line, M line, or R line, transfer at Woodside-61 St to a Flushing-bound 7 line local. For service to this station, take the 7x line to Junction Blvd and transfer to a Manhattan-bound 7 line or 7x line., Continuous Saturday May 30th, 2026 12:00 AM thru Saturday May 29th, 2027 11:59 PM","update_date":"2026-05-29T16:36:48Z"},"road_event_id":"CDF+OlG/PHEcWiz2/TzpoiKtGNY=","beginning_cross_street":"82 St - Jackson Hts","ending_cross_street":"69 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883697,40.747659]]}},{"id":"s3up7+x/brybnEQ0dh9eYFYWpp4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"io3+9YhEp/jmvi/fAc8w7rKt9Oo="}],"description":"Utility work on NY 96 northbound between E River St (Fayette) and Huff St (Fayette) ; Alternating one-way traffic with flaggers, Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday/Thursday/Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-05-29T16:38:36Z"},"road_event_id":"s3up7+x/brybnEQ0dh9eYFYWpp4=","beginning_cross_street":"E River St ","ending_cross_street":"Huff St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.86257,42.899952]]}},{"id":"io3+9YhEp/jmvi/fAc8w7rKt9Oo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s3up7+x/brybnEQ0dh9eYFYWpp4="}],"description":"Utility work on NY 96 northbound between E River St (Fayette) and Huff St (Fayette) ; Alternating one-way traffic with flaggers, Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday/Thursday/Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-05-29T16:38:36Z"},"road_event_id":"io3+9YhEp/jmvi/fAc8w7rKt9Oo=","beginning_cross_street":"E River St ","ending_cross_street":"Huff St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T04:00:00Z","end_date":"2026-06-10T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.86257,42.899952]]}},{"id":"UKxz49mhloF/ZhR29OCGCPW2NgU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LEpL8biWDP0AfcwdLIs6nnOXIjk="}],"description":"Roadwork on I-81 southbound ramp to Exit 3B - S Salina St (Syracuse), Friday June 12th, 2026 thru Monday June 15th, 2026, Monday/Friday, 06:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-29T17:21:53Z"},"road_event_id":"UKxz49mhloF/ZhR29OCGCPW2NgU=","beginning_cross_street":"Exit 3B - S Salina St ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153346,43.05548]]}},{"id":"LEpL8biWDP0AfcwdLIs6nnOXIjk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UKxz49mhloF/ZhR29OCGCPW2NgU="}],"description":"Roadwork on I-81 southbound ramp to Exit 3B - S Salina St (Syracuse), Friday June 12th, 2026 thru Monday June 15th, 2026, Monday/Friday, 06:00 AM thru 03:00 PM All lanes closed","update_date":"2026-05-29T17:21:53Z"},"road_event_id":"LEpL8biWDP0AfcwdLIs6nnOXIjk=","beginning_cross_street":"Exit 3B - S Salina St ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153346,43.05548]]}},{"id":"AnZ8ocw5QxCqaKNFb20ori1krMU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY-930B - West Street Arterial"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1wqz2TfCxTy5JV0N1Ac8W8RGnAw="}],"description":"Roadwork on NY-930B - West Street Arterial southbound ramp from Websters Landing (Syracuse) ; follow detour, Monday June 8th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday, 06:00 AM thru 09:00 PM All lanes closed","update_date":"2026-06-05T16:28:16Z"},"road_event_id":"AnZ8ocw5QxCqaKNFb20ori1krMU=","beginning_cross_street":"Websters Landing ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-09T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.155207,43.05467]]}},{"id":"1wqz2TfCxTy5JV0N1Ac8W8RGnAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY-930B - West Street Arterial"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AnZ8ocw5QxCqaKNFb20ori1krMU="}],"description":"Roadwork on NY-930B - West Street Arterial southbound ramp from Websters Landing (Syracuse) ; follow detour, Monday June 8th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday, 06:00 AM thru 09:00 PM All lanes closed","update_date":"2026-06-05T16:28:16Z"},"road_event_id":"1wqz2TfCxTy5JV0N1Ac8W8RGnAw=","beginning_cross_street":"Websters Landing ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-10T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.155207,43.05467]]}},{"id":"j+DSGAjBvm/MFehQ3ZSEyIwzLQQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Hudson County Extension"],"direction":"unknown","related_road_events":[],"description":"Deck work on New Jersey Turnpike - Hudson County Extension eastbound Entrance ramp Interchange 14A - NJ 440/Bayonne Bridge (Jersey City) to Interchange 14A - NJ 440/Bayonne Bridge (Bayonne), Friday June 5th,2026 thru Saturday June 6th,2026, Friday, 10:00 PM thru 06:00 AM All lanes closed eastbound,","update_date":"2026-06-04T09:00:11Z"},"road_event_id":"j+DSGAjBvm/MFehQ3ZSEyIwzLQQ=","beginning_cross_street":"Interchange 14A - NJ 440/Bayonne Bridge","ending_cross_street":"Interchange 14A - NJ 440/Bayonne Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.097176,40.684848]]}},{"id":"tSv2zDcM2hXlc7MoJ5R9PxnQCcU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 290"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JW/63CA20HFFhQRAdxPSdu6S7Xg="}],"description":"Bridge work on NY 290 both directions between I-481 (De Witt) ; Alternating one-way traffic with flaggers, Monday June 8th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-29T17:56:13Z"},"road_event_id":"tSv2zDcM2hXlc7MoJ5R9PxnQCcU=","beginning_cross_street":"I-481","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054139,43.063279]]}},{"id":"JW/63CA20HFFhQRAdxPSdu6S7Xg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 290"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tSv2zDcM2hXlc7MoJ5R9PxnQCcU="}],"description":"Bridge work on NY 290 both directions between I-481 (De Witt) ; Alternating one-way traffic with flaggers, Monday June 8th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-05-29T17:56:13Z"},"road_event_id":"JW/63CA20HFFhQRAdxPSdu6S7Xg=","beginning_cross_street":"I-481","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054139,43.063279]]}},{"id":"cdeui7kxZNbhPx4yBiQnlYEHJGc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mHSUmHq6+HLaaz8pGzSPMAQO45g="}],"description":"Construction on New Jersey Turnpike - Western Spur southbound ramp from Vince Lombardi Service Area (Ridgefield), Friday June 5th, 2026 thru Sunday June 7th, 2026, Friday/Saturday, 07:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-29T17:59:41Z"},"road_event_id":"cdeui7kxZNbhPx4yBiQnlYEHJGc=","beginning_cross_street":"Vince Lombardi Service Area","ending_cross_street":"Vince Lombardi Service Area","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.026023,40.827423]]}},{"id":"mHSUmHq6+HLaaz8pGzSPMAQO45g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cdeui7kxZNbhPx4yBiQnlYEHJGc="}],"description":"Construction on New Jersey Turnpike - Western Spur southbound ramp from Vince Lombardi Service Area (Ridgefield), Friday June 5th, 2026 thru Sunday June 7th, 2026, Friday/Saturday, 07:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-29T17:59:41Z"},"road_event_id":"mHSUmHq6+HLaaz8pGzSPMAQO45g=","beginning_cross_street":"Vince Lombardi Service Area","ending_cross_street":"Vince Lombardi Service Area","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T23:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.026023,40.827423]]}},{"id":"Qo6Fjo3Zo8SWGCweLgOJsuDdFu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike/I-95"],"direction":"unknown","related_road_events":[],"description":"Construction and drainage improvements on New Jersey Turnpike/I-95 Local Lanes northbound between Exit 71 (NB) - NJ 4/Broad Ave (Leonia) and In the vicinity of Exit 72 (NB) - US 9W/US 1&9/US 46 (Leonia), Friday June 5th, 2026 thru Saturday June 6th, 2026, 09:00 PM thru 03:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-05-29T18:08:26Z"},"road_event_id":"Qo6Fjo3Zo8SWGCweLgOJsuDdFu0=","beginning_cross_street":"Exit 71 (NB) - NJ 4/Broad Ave","ending_cross_street":"In the vicinity of Exit 72 (NB) - US 9W/US 1&9/US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98045,40.871989]]}},{"id":"yADSHuD3vstMnufz0YmQXKQY+gM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[],"description":"Milling and paving operations and expansion joint repairs and construction on New Jersey Turnpike - Western Spur northbound between Southern Mixing Bowl (Newark) and South of Northern Mixing Bowl (Ridgefield), Saturday June 6th,2026 thru Sunday June 7th,2026, Saturday, 10:00 PM thru 06:00 AM All lanes closed northbound,","update_date":"2026-06-04T08:00:01Z"},"road_event_id":"yADSHuD3vstMnufz0YmQXKQY+gM=","beginning_cross_street":"Southern Mixing Bowl","ending_cross_street":"South of Northern Mixing Bowl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T02:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.140531,40.713624]]}},{"id":"DdjKQCK0LKo+Nx/DPRdfDY+jn38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Eastern Spur"],"direction":"unknown","related_road_events":[],"description":"Barrier repairs and construction and line striping on New Jersey Turnpike - Eastern Spur northbound between North of Southern Mixing Bowl (Newark) and South of Northern Mixing Bowl (Ridgefield), Friday June 5th,2026 thru Saturday June 6th,2026, Friday, 09:00 PM thru 06:00 AM All lanes closed northbound,","update_date":"2026-06-03T08:00:04Z"},"road_event_id":"DdjKQCK0LKo+Nx/DPRdfDY+jn38=","beginning_cross_street":"North of Southern Mixing Bowl","ending_cross_street":"South of Northern Mixing Bowl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.137857,40.715353]]}},{"id":"H6Iofsch6B+S93yollqnuGNC26Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Barrier repairs and curb work and milling and paving operations on New Jersey Turnpike Outer Roadway northbound between Inner and Outer Roadway Split (Mansfield Twp) and North of Interchange 14 - I-78/US 1&9 (Newark), Friday June 5th, 2026 thru Saturday June 6th, 2026, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-29T18:30:12Z"},"road_event_id":"H6Iofsch6B+S93yollqnuGNC26Y=","beginning_cross_street":"Inner and Outer Roadway Split","ending_cross_street":"North of Interchange 14 - I-78/US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.749725,40.078692]]}},{"id":"WXT1zSir4B1Rp1tbCaZXIRUtOLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[],"description":"Bridge work on New Jersey Turnpike - Western Spur southbound between South of Northern Mixing Bowl (Ridgefield) and North of Interchange 18W - I-80/US 46/George Washington Bridge (Carlstadt), Saturday June 6th, 2026 thru Sunday June 7th, 2026, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-05-29T18:35:12Z"},"road_event_id":"WXT1zSir4B1Rp1tbCaZXIRUtOLs=","beginning_cross_street":"South of Northern Mixing Bowl","ending_cross_street":"North of Interchange 18W - I-80/US 46/George Washington Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T02:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019982,40.837881]]}},{"id":"0xVpxtCDMnDxxwnDsoPGVxet+/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BELL BLVD"],"direction":"unknown","related_road_events":[],"description":"Construction on BELL BLVD both directions between SPENCER AVE (New York), Friday June 5th, 2026 thru Saturday June 6th, 2026, 09:00 PM thru 03:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-05-29T18:39:25Z"},"road_event_id":"0xVpxtCDMnDxxwnDsoPGVxet+/U=","beginning_cross_street":"SPENCER AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.751508,40.728232]]}},{"id":"45RFXhl2I8jTh6Hcz0TFyTtX4hQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[],"description":"Construction on Franklin D. Roosevelt Drive both directions from Exit 8 - Franklin D. Roosevelt Drive (New York) to I-495 Long Island Expressway (New York) Subject to change without notice., Friday June 5th,2026 thru Saturday June 6th,2026, Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed northbound, southbound, Saturday June 6th,2026 12:01 AM thru 06:30 AM 2 Right lanes of 3 lanes closed northbound, southbound","update_date":"2026-06-05T09:00:20Z"},"road_event_id":"45RFXhl2I8jTh6Hcz0TFyTtX4hQ=","beginning_cross_street":"Exit 8 - Franklin D. Roosevelt Drive","ending_cross_street":"I-495 Long Island Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974128,40.737688]]}},{"id":"d2tTVbNIhKJD03e9YF5sIvXaqPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["UTOPIA PKWY"],"direction":"unknown","related_road_events":[],"description":"Construction on UTOPIA PKWY both directions between HORACE HARDING EXPY (New York), Friday June 5th, 2026 thru Saturday June 6th, 2026, 09:00 PM thru 03:00 AM 1 Left lane of 2 lanes closed","update_date":"2026-05-29T18:43:39Z"},"road_event_id":"d2tTVbNIhKJD03e9YF5sIvXaqPw=","beginning_cross_street":"HORACE HARDING EXPY","ending_cross_street":"HORACE HARDING EXPY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.792934,40.738723]]}},{"id":"8D1iEOLIYwltUqXvt+Z7g9SPS8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Brooklyn Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"N5F2+Em/V8bTe6b8/4zSzWULNNk="}],"description":"Construction on Brooklyn Bridge eastbound into Center Span (Manhattan/Brooklyn) Subject to change without notice., Monday June 8th,2026 thru Tuesday June 9th,2026, Monday/Tuesday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound, , Thursday June 11th,2026 thru Friday June 12th,2026, Thursday/Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound,","update_date":"2026-06-05T18:00:08Z"},"road_event_id":"8D1iEOLIYwltUqXvt+Z7g9SPS8U=","beginning_cross_street":"Center Span","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999675,40.708259]]}},{"id":"N5F2+Em/V8bTe6b8/4zSzWULNNk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Brooklyn Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8D1iEOLIYwltUqXvt+Z7g9SPS8U="},{"type":"next-occurrence","id":"p+rbVRF7eDBvoUcCLuo2D1M+92I="}],"description":"Construction on Brooklyn Bridge eastbound into Center Span (Manhattan/Brooklyn) Subject to change without notice., Monday June 8th,2026 thru Tuesday June 9th,2026, Monday/Tuesday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound, , Thursday June 11th,2026 thru Friday June 12th,2026, Thursday/Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound,","update_date":"2026-06-05T18:00:08Z"},"road_event_id":"N5F2+Em/V8bTe6b8/4zSzWULNNk=","beginning_cross_street":"Center Span","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999675,40.708259]]}},{"id":"p+rbVRF7eDBvoUcCLuo2D1M+92I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Brooklyn Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8D1iEOLIYwltUqXvt+Z7g9SPS8U="},{"type":"next-occurrence","id":"Wq0VaZYP7Sa9qNfZbIsUzGjxlJY="}],"description":"Construction on Brooklyn Bridge eastbound into Center Span (Manhattan/Brooklyn) Subject to change without notice., Monday June 8th,2026 thru Tuesday June 9th,2026, Monday/Tuesday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound, , Thursday June 11th,2026 thru Friday June 12th,2026, Thursday/Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound,","update_date":"2026-06-05T18:00:08Z"},"road_event_id":"p+rbVRF7eDBvoUcCLuo2D1M+92I=","beginning_cross_street":"Center Span","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999675,40.708259]]}},{"id":"Wq0VaZYP7Sa9qNfZbIsUzGjxlJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Brooklyn Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8D1iEOLIYwltUqXvt+Z7g9SPS8U="}],"description":"Construction on Brooklyn Bridge eastbound into Center Span (Manhattan/Brooklyn) Subject to change without notice., Monday June 8th,2026 thru Tuesday June 9th,2026, Monday/Tuesday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound, , Thursday June 11th,2026 thru Friday June 12th,2026, Thursday/Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound,","update_date":"2026-06-05T18:00:08Z"},"road_event_id":"Wq0VaZYP7Sa9qNfZbIsUzGjxlJY=","beginning_cross_street":"Center Span","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999675,40.708259]]}},{"id":"ts5u3W+QwhCJ+TjpOg5ptiX884w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 70 Both Directions between NJ 38 (Pennsauken Twp) and CR 673/Springdale Rd (Cherry Hill Twp) Friday June 5, 2026 07:00 PM thru Saturday June 6, 2026 05:00 AM, 1 right lane of 3 lanes closed eastbound; 1 right lane of 3 lanes closed westbound","update_date":"2026-05-29T18:58:10Z"},"road_event_id":"ts5u3W+QwhCJ+TjpOg5ptiX884w=","beginning_cross_street":"NJ 38","ending_cross_street":"CR 673/Springdale Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.072837,39.934337]]}},{"id":"h5vPcUtM+vRo5APNmAXYEwXgVWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 322"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 322 Both Directions between CR 655/Fries Mill Rd (Monroe Twp) and CR 555/Tuckahoe Rd (Monroe Twp) Tuesday June 9, 2026 09:00 AM thru 03:00 PM, 1 left lane of 2 lanes closed eastbound; 1 left lane of 2 lanes closed westbound","update_date":"2026-05-29T19:05:41Z"},"road_event_id":"h5vPcUtM+vRo5APNmAXYEwXgVWs=","beginning_cross_street":"CR 655/Fries Mill Rd","ending_cross_street":"CR 555/Tuckahoe Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.050964,39.694591]]}},{"id":"88othHtXDuLr4A38hbawy3ifbrI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 322"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 322 Both Directions between CR 655/Fries Mill Rd (Monroe Twp) and CR 555/Tuckahoe Rd (Monroe Twp) Monday June 8, 2026 09:00 AM thru 03:00 PM, 1 left lane of 2 lanes closed eastbound; 1 left lane of 2 lanes closed westbound","update_date":"2026-05-29T19:05:33Z"},"road_event_id":"88othHtXDuLr4A38hbawy3ifbrI=","beginning_cross_street":"CR 655/Fries Mill Rd","ending_cross_street":"CR 555/Tuckahoe Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.050964,39.694591]]}},{"id":"6cIdJy88CMOBPNjeGqoN+vEtfLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 322"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 322 Both Directions between CR 655/Fries Mill Rd (Monroe Twp) and CR 555/Tuckahoe Rd (Monroe Twp) Thursday June 11, 2026 09:00 AM thru 03:00 PM, 1 left lane of 2 lanes closed eastbound; 1 left lane of 2 lanes closed westbound","update_date":"2026-05-29T19:06:00Z"},"road_event_id":"6cIdJy88CMOBPNjeGqoN+vEtfLI=","beginning_cross_street":"CR 655/Fries Mill Rd","ending_cross_street":"CR 555/Tuckahoe Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.050964,39.694591]]}},{"id":"eJ1Xm2gH4FlABGtPuKK0rz0kfrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 322"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 322 Both Directions between CR 655/Fries Mill Rd (Monroe Twp) and CR 555/Tuckahoe Rd (Monroe Twp) Wednesday June 10, 2026 09:00 AM thru 03:00 PM, 1 left lane of 2 lanes closed eastbound; 1 left lane of 2 lanes closed westbound","update_date":"2026-05-29T19:05:53Z"},"road_event_id":"eJ1Xm2gH4FlABGtPuKK0rz0kfrU=","beginning_cross_street":"CR 655/Fries Mill Rd","ending_cross_street":"CR 555/Tuckahoe Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.050964,39.694591]]}},{"id":"UoC0g7toIf9lHiTbxh5OkWO/Rb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Gladstone Branch and Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MHT3iyo7K2yeVE+5ZlpWTWHStmw="}],"description":"Due to Track repairs eastbound, Gladstone Branch and Morris & Essex Line east of East Orange (East Orange) eastbound trains operating from South Orange Station through Hoboken Terminal, Secaucus Junction, and Penn Station New York are subject to delays of up to 10 minutes due to track maintenance, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-29T19:31:17Z"},"road_event_id":"UoC0g7toIf9lHiTbxh5OkWO/Rb8=","beginning_cross_street":"East Orange","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.210464,40.760977]]}},{"id":"MHT3iyo7K2yeVE+5ZlpWTWHStmw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Gladstone Branch and Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UoC0g7toIf9lHiTbxh5OkWO/Rb8="},{"type":"next-occurrence","id":"sssjNzl8ilO6gBk3ykMdDHrV9Ao="}],"description":"Due to Track repairs eastbound, Gladstone Branch and Morris & Essex Line east of East Orange (East Orange) eastbound trains operating from South Orange Station through Hoboken Terminal, Secaucus Junction, and Penn Station New York are subject to delays of up to 10 minutes due to track maintenance, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-29T19:31:17Z"},"road_event_id":"MHT3iyo7K2yeVE+5ZlpWTWHStmw=","beginning_cross_street":"East Orange","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.210464,40.760977]]}},{"id":"sssjNzl8ilO6gBk3ykMdDHrV9Ao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Gladstone Branch and Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UoC0g7toIf9lHiTbxh5OkWO/Rb8="},{"type":"next-occurrence","id":"/3jtpTFI71NVRjJAzTw44We9Zyw="}],"description":"Due to Track repairs eastbound, Gladstone Branch and Morris & Essex Line east of East Orange (East Orange) eastbound trains operating from South Orange Station through Hoboken Terminal, Secaucus Junction, and Penn Station New York are subject to delays of up to 10 minutes due to track maintenance, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-29T19:31:17Z"},"road_event_id":"sssjNzl8ilO6gBk3ykMdDHrV9Ao=","beginning_cross_street":"East Orange","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.210464,40.760977]]}},{"id":"/3jtpTFI71NVRjJAzTw44We9Zyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Gladstone Branch and Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UoC0g7toIf9lHiTbxh5OkWO/Rb8="},{"type":"next-occurrence","id":"vPXA1xq1N648j5530AMv0kBWHqY="}],"description":"Due to Track repairs eastbound, Gladstone Branch and Morris & Essex Line east of East Orange (East Orange) eastbound trains operating from South Orange Station through Hoboken Terminal, Secaucus Junction, and Penn Station New York are subject to delays of up to 10 minutes due to track maintenance, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-29T19:31:17Z"},"road_event_id":"/3jtpTFI71NVRjJAzTw44We9Zyw=","beginning_cross_street":"East Orange","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.210464,40.760977]]}},{"id":"vPXA1xq1N648j5530AMv0kBWHqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Gladstone Branch and Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UoC0g7toIf9lHiTbxh5OkWO/Rb8="},{"type":"next-occurrence","id":"QxrqXSn94qroBiRHjplsP9zMXBM="}],"description":"Due to Track repairs eastbound, Gladstone Branch and Morris & Essex Line east of East Orange (East Orange) eastbound trains operating from South Orange Station through Hoboken Terminal, Secaucus Junction, and Penn Station New York are subject to delays of up to 10 minutes due to track maintenance, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-29T19:31:17Z"},"road_event_id":"vPXA1xq1N648j5530AMv0kBWHqY=","beginning_cross_street":"East Orange","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.210464,40.760977]]}},{"id":"QxrqXSn94qroBiRHjplsP9zMXBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Gladstone Branch and Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UoC0g7toIf9lHiTbxh5OkWO/Rb8="}],"description":"Due to Track repairs eastbound, Gladstone Branch and Morris & Essex Line east of East Orange (East Orange) eastbound trains operating from South Orange Station through Hoboken Terminal, Secaucus Junction, and Penn Station New York are subject to delays of up to 10 minutes due to track maintenance, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM","update_date":"2026-05-29T19:31:17Z"},"road_event_id":"QxrqXSn94qroBiRHjplsP9zMXBM=","beginning_cross_street":"East Orange","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.210464,40.760977]]}},{"id":"sKxELWAsWmxCuEzIzzxw//n+uvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 265"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TC7QPdGc2rtYczR4UADWFztalvw="}],"description":"Roadwork on NY 265 northbound Richmond Ave (Niagara Falls) to 1st Ave (Niagara Falls), Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-01T18:51:53Z"},"road_event_id":"sKxELWAsWmxCuEzIzzxw//n+uvo=","beginning_cross_street":"Richmond Ave","ending_cross_street":"1st Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.971332,43.093583]]}},{"id":"TC7QPdGc2rtYczR4UADWFztalvw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 265"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sKxELWAsWmxCuEzIzzxw//n+uvo="},{"type":"next-occurrence","id":"BqsnXXdrIclljBgk5f9ykMNL0sc="}],"description":"Roadwork on NY 265 northbound Richmond Ave (Niagara Falls) to 1st Ave (Niagara Falls), Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-01T18:51:53Z"},"road_event_id":"TC7QPdGc2rtYczR4UADWFztalvw=","beginning_cross_street":"Richmond Ave","ending_cross_street":"1st Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.971332,43.093583]]}},{"id":"BqsnXXdrIclljBgk5f9ykMNL0sc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 265"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sKxELWAsWmxCuEzIzzxw//n+uvo="},{"type":"next-occurrence","id":"jV1Bt+QCkvbPWToiyyhzsR/iWq0="}],"description":"Roadwork on NY 265 northbound Richmond Ave (Niagara Falls) to 1st Ave (Niagara Falls), Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-01T18:51:53Z"},"road_event_id":"BqsnXXdrIclljBgk5f9ykMNL0sc=","beginning_cross_street":"Richmond Ave","ending_cross_street":"1st Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.971332,43.093583]]}},{"id":"jV1Bt+QCkvbPWToiyyhzsR/iWq0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 265"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sKxELWAsWmxCuEzIzzxw//n+uvo="},{"type":"next-occurrence","id":"6AM84+k4VlXGEt7C+m4FoThYU+o="}],"description":"Roadwork on NY 265 northbound Richmond Ave (Niagara Falls) to 1st Ave (Niagara Falls), Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-01T18:51:53Z"},"road_event_id":"jV1Bt+QCkvbPWToiyyhzsR/iWq0=","beginning_cross_street":"Richmond Ave","ending_cross_street":"1st Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.971332,43.093583]]}},{"id":"6AM84+k4VlXGEt7C+m4FoThYU+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 265"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sKxELWAsWmxCuEzIzzxw//n+uvo="},{"type":"next-occurrence","id":"scfQxo1O+wTCVJ1bUtG9erc+Py8="}],"description":"Roadwork on NY 265 northbound Richmond Ave (Niagara Falls) to 1st Ave (Niagara Falls), Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-01T18:51:53Z"},"road_event_id":"6AM84+k4VlXGEt7C+m4FoThYU+o=","beginning_cross_street":"Richmond Ave","ending_cross_street":"1st Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.971332,43.093583]]}},{"id":"scfQxo1O+wTCVJ1bUtG9erc+Py8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 265"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sKxELWAsWmxCuEzIzzxw//n+uvo="}],"description":"Roadwork on NY 265 northbound Richmond Ave (Niagara Falls) to 1st Ave (Niagara Falls), Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-01T18:51:53Z"},"road_event_id":"scfQxo1O+wTCVJ1bUtG9erc+Py8=","beginning_cross_street":"Richmond Ave","ending_cross_street":"1st Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.971332,43.093583]]}},{"id":"0Excj2vW7uewx5kY27kzxu28kUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 6"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZtT0dVoL/WuY0lhbUJns0uMQXOY="}],"description":"Crack sealing on US 6 both directions between Meadowlark Drive (Carmel) and NY 312 (Southeast) D265522/NIGHT/32760709 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Thursday June 11th, 2026 thru Saturday June 13th, 2026 Thursday/ Friday, 08:00 PM thru 05:00 AM, moving operation","update_date":"2026-05-29T19:44:50Z"},"road_event_id":"0Excj2vW7uewx5kY27kzxu28kUo=","beginning_cross_street":"Meadowlark Drive","ending_cross_street":"NY 312","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.693588,41.411163]]}},{"id":"ZtT0dVoL/WuY0lhbUJns0uMQXOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Excj2vW7uewx5kY27kzxu28kUo="}],"description":"Crack sealing on US 6 both directions between Meadowlark Drive (Carmel) and NY 312 (Southeast) D265522/NIGHT/32760709 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Thursday June 11th, 2026 thru Saturday June 13th, 2026 Thursday/ Friday, 08:00 PM thru 05:00 AM, moving operation","update_date":"2026-05-29T19:44:50Z"},"road_event_id":"ZtT0dVoL/WuY0lhbUJns0uMQXOY=","beginning_cross_street":"Meadowlark Drive","ending_cross_street":"NY 312","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.693588,41.411163]]}},{"id":"CtfA8QW5nL9gB7RPbJDbQzysCyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 443"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"n1koUVIumwpu81Q7RNq4UqPInCg="}],"description":"Utility work on NY 443 both directions between Leonard Place and Lincoln Ave (Bethlehem) alternating lane closures, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-05T17:28:56Z"},"road_event_id":"CtfA8QW5nL9gB7RPbJDbQzysCyM=","beginning_cross_street":"between Leonard Place and Lincoln Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.81824,42.627518]]}},{"id":"n1koUVIumwpu81Q7RNq4UqPInCg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 443"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CtfA8QW5nL9gB7RPbJDbQzysCyM="},{"type":"next-occurrence","id":"2tJ55jNGp0XBJKXMAQAALl+oGsI="}],"description":"Utility work on NY 443 both directions between Leonard Place and Lincoln Ave (Bethlehem) alternating lane closures, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-05T17:28:56Z"},"road_event_id":"n1koUVIumwpu81Q7RNq4UqPInCg=","beginning_cross_street":"between Leonard Place and Lincoln Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.81824,42.627518]]}},{"id":"2tJ55jNGp0XBJKXMAQAALl+oGsI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 443"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CtfA8QW5nL9gB7RPbJDbQzysCyM="},{"type":"next-occurrence","id":"eXXGh9FH7MwVxiuaGUiMC/9GbJI="}],"description":"Utility work on NY 443 both directions between Leonard Place and Lincoln Ave (Bethlehem) alternating lane closures, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-05T17:28:56Z"},"road_event_id":"2tJ55jNGp0XBJKXMAQAALl+oGsI=","beginning_cross_street":"between Leonard Place and Lincoln Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.81824,42.627518]]}},{"id":"eXXGh9FH7MwVxiuaGUiMC/9GbJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 443"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CtfA8QW5nL9gB7RPbJDbQzysCyM="},{"type":"next-occurrence","id":"9LgnqYUZ51hToDwvLP18Q70bdgw="}],"description":"Utility work on NY 443 both directions between Leonard Place and Lincoln Ave (Bethlehem) alternating lane closures, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-05T17:28:56Z"},"road_event_id":"eXXGh9FH7MwVxiuaGUiMC/9GbJI=","beginning_cross_street":"between Leonard Place and Lincoln Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.81824,42.627518]]}},{"id":"9LgnqYUZ51hToDwvLP18Q70bdgw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 443"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CtfA8QW5nL9gB7RPbJDbQzysCyM="},{"type":"next-occurrence","id":"/5jvlHCqVrGz3oijIjHTjO+CZLo="}],"description":"Utility work on NY 443 both directions between Leonard Place and Lincoln Ave (Bethlehem) alternating lane closures, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-05T17:28:56Z"},"road_event_id":"9LgnqYUZ51hToDwvLP18Q70bdgw=","beginning_cross_street":"between Leonard Place and Lincoln Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.81824,42.627518]]}},{"id":"/5jvlHCqVrGz3oijIjHTjO+CZLo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 443"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CtfA8QW5nL9gB7RPbJDbQzysCyM="}],"description":"Utility work on NY 443 both directions between Leonard Place and Lincoln Ave (Bethlehem) alternating lane closures, Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-05T17:28:56Z"},"road_event_id":"/5jvlHCqVrGz3oijIjHTjO+CZLo=","beginning_cross_street":"between Leonard Place and Lincoln Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.81824,42.627518]]}},{"id":"nmH6MP5rDsRPawkuh8P+/bWXqYg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"I6wpKItgb7E/si3Azu2KOd3ZcpE="}],"description":"Crack sealing on NY 9D both directions between US 6/202 (Cortlandt) and Mandalay Drive (Philipstown) D265522/NIGHT/32760809 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Wednesday June 10th, 2026 thru Friday June 12th, 2026 Wednesday/ Thursday, 08:00 PM thru 05:00 AM, moving operation","update_date":"2026-05-29T19:48:36Z"},"road_event_id":"nmH6MP5rDsRPawkuh8P+/bWXqYg=","beginning_cross_street":"US 6/202","ending_cross_street":"Mandalay Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975961,41.322623]]}},{"id":"I6wpKItgb7E/si3Azu2KOd3ZcpE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nmH6MP5rDsRPawkuh8P+/bWXqYg="}],"description":"Crack sealing on NY 9D both directions between US 6/202 (Cortlandt) and Mandalay Drive (Philipstown) D265522/NIGHT/32760809 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Wednesday June 10th, 2026 thru Friday June 12th, 2026 Wednesday/ Thursday, 08:00 PM thru 05:00 AM, moving operation","update_date":"2026-05-29T19:48:36Z"},"road_event_id":"I6wpKItgb7E/si3Azu2KOd3ZcpE=","beginning_cross_street":"US 6/202","ending_cross_street":"Mandalay Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975961,41.322623]]}},{"id":"tuIG8rqqSLAsKh+8xp4smz7M7VE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xZO16TAUXqlq2YJSZwdHllzXNp4="}],"description":"Crack sealing on NY 17K both directions between NY 300 (Newburgh) and Stony Brook Court (Newburgh) D265522/NIGHT/32760909 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Thursday June 11th, 2026 Monday/ Tuesday/ Wednesday, 08:00 PM thru 05:00 AM, moving operation","update_date":"2026-05-29T19:53:36Z"},"road_event_id":"tuIG8rqqSLAsKh+8xp4smz7M7VE=","beginning_cross_street":"NY 300","ending_cross_street":"Stony Brook Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.069902,41.504621]]}},{"id":"xZO16TAUXqlq2YJSZwdHllzXNp4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tuIG8rqqSLAsKh+8xp4smz7M7VE="},{"type":"next-occurrence","id":"8T704jRWp6RvEuzwJ9FK4CJ+o1Y="}],"description":"Crack sealing on NY 17K both directions between NY 300 (Newburgh) and Stony Brook Court (Newburgh) D265522/NIGHT/32760909 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Thursday June 11th, 2026 Monday/ Tuesday/ Wednesday, 08:00 PM thru 05:00 AM, moving operation","update_date":"2026-05-29T19:53:36Z"},"road_event_id":"xZO16TAUXqlq2YJSZwdHllzXNp4=","beginning_cross_street":"NY 300","ending_cross_street":"Stony Brook Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.069902,41.504621]]}},{"id":"8T704jRWp6RvEuzwJ9FK4CJ+o1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tuIG8rqqSLAsKh+8xp4smz7M7VE="}],"description":"Crack sealing on NY 17K both directions between NY 300 (Newburgh) and Stony Brook Court (Newburgh) D265522/NIGHT/32760909 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Thursday June 11th, 2026 Monday/ Tuesday/ Wednesday, 08:00 PM thru 05:00 AM, moving operation","update_date":"2026-05-29T19:53:36Z"},"road_event_id":"8T704jRWp6RvEuzwJ9FK4CJ+o1Y=","beginning_cross_street":"NY 300","ending_cross_street":"Stony Brook Court","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.069902,41.504621]]}},{"id":"/fNUwReAVxuTM6dmYd3hcoxf14Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Street sweeping on I-278 both directions from West 9th Street; I-278 (New York) to 92nd Street Bay Ridge Exit (New York) Subject to change without notice., Monday June 8th,2026 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed westbound, 1 Left lane of 4 lanes closed eastbound","update_date":"2026-06-05T19:00:23Z"},"road_event_id":"/fNUwReAVxuTM6dmYd3hcoxf14Q=","beginning_cross_street":"West 9th Street; I-278","ending_cross_street":"92nd Street  Bay Ridge Exit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.000783,40.675114]]}},{"id":"cpVcGrs2b1C5QQtVhLoya8FH9cs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on I-278 both directions between East 138th Street; I-278-Bruckner Expressway (New York) and I-95 at I-695 Throgs Neck Expressway Entrance (New York) Subject to change without notice., Monday June 1st,2026 thru Saturday June 6th,2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed eastbound, westbound","update_date":"2026-06-05T19:00:19Z"},"road_event_id":"cpVcGrs2b1C5QQtVhLoya8FH9cs=","beginning_cross_street":"East 138th Street; I-278-Bruckner Expressway","ending_cross_street":"I-695 Throgs Neck Expressway Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911844,40.804624]]}},{"id":"D6KOBEdYTbb8nbRwCMW0BiZFe8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[],"description":"Construction on Bronx River Parkway both directions between I-278 - Bruckner Expressway (New York) and Watson Avenue (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 2 Right lanes of 3 lanes closed northbound; 2 Left lanes of 3 lanes closed southbound","update_date":"2026-05-29T20:38:46Z"},"road_event_id":"D6KOBEdYTbb8nbRwCMW0BiZFe8Q=","beginning_cross_street":"I-278 - Bruckner Expressway","ending_cross_street":"Watson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87245,40.824305]]}},{"id":"sODJOFisD4tGs/mJE7+x/rRimfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on I-278 both directions between END ROUTE; I-95 (New York) Subject to change without notice., Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-05-29T20:37:21Z"},"road_event_id":"sODJOFisD4tGs/mJE7+x/rRimfA=","beginning_cross_street":"END ROUTE; I-95","ending_cross_street":"END ROUTE; I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835714,40.829118]]}},{"id":"17nFEjTBj9HAUTZjvf8KjVMpPR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Systemwide"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7rRPVOEw48XRAwLg4gq2T+HJsMw="}],"description":"Due to Switch repairs, Systemwide Many early-morning LIRR trains run on revised schedules This service change will occur on most weekends through late August as we replace and install switches near Elmont-UBS Arena., Saturday May 30th, 2026 thru Sunday June 14th, 2026, Saturday/ Sunday, 12:00 AM thru 09:00 AM","update_date":"2026-05-29T20:39:45Z"},"road_event_id":"17nFEjTBj9HAUTZjvf8KjVMpPR4=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T04:00:00Z","end_date":"2026-06-06T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991172,40.75032]]}},{"id":"7rRPVOEw48XRAwLg4gq2T+HJsMw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Systemwide"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"17nFEjTBj9HAUTZjvf8KjVMpPR4="},{"type":"next-occurrence","id":"qUcoec1Cd88e3CRWQnQikrqSA7g="}],"description":"Due to Switch repairs, Systemwide Many early-morning LIRR trains run on revised schedules This service change will occur on most weekends through late August as we replace and install switches near Elmont-UBS Arena., Saturday May 30th, 2026 thru Sunday June 14th, 2026, Saturday/ Sunday, 12:00 AM thru 09:00 AM","update_date":"2026-05-29T20:39:45Z"},"road_event_id":"7rRPVOEw48XRAwLg4gq2T+HJsMw=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T04:00:00Z","end_date":"2026-06-07T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991172,40.75032]]}},{"id":"qUcoec1Cd88e3CRWQnQikrqSA7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Systemwide"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"17nFEjTBj9HAUTZjvf8KjVMpPR4="},{"type":"next-occurrence","id":"OWinVQc6rjYtkywj8kvShAousHw="}],"description":"Due to Switch repairs, Systemwide Many early-morning LIRR trains run on revised schedules This service change will occur on most weekends through late August as we replace and install switches near Elmont-UBS Arena., Saturday May 30th, 2026 thru Sunday June 14th, 2026, Saturday/ Sunday, 12:00 AM thru 09:00 AM","update_date":"2026-05-29T20:39:45Z"},"road_event_id":"qUcoec1Cd88e3CRWQnQikrqSA7g=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T04:00:00Z","end_date":"2026-06-13T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991172,40.75032]]}},{"id":"OWinVQc6rjYtkywj8kvShAousHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Systemwide"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"17nFEjTBj9HAUTZjvf8KjVMpPR4="}],"description":"Due to Switch repairs, Systemwide Many early-morning LIRR trains run on revised schedules This service change will occur on most weekends through late August as we replace and install switches near Elmont-UBS Arena., Saturday May 30th, 2026 thru Sunday June 14th, 2026, Saturday/ Sunday, 12:00 AM thru 09:00 AM","update_date":"2026-05-29T20:39:45Z"},"road_event_id":"OWinVQc6rjYtkywj8kvShAousHw=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T04:00:00Z","end_date":"2026-06-14T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991172,40.75032]]}},{"id":"ym/75mJxolCy3QZAUzNwc2h63Kw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[],"description":"Construction on I-495 both directions between 80th Street; I-495 (New York) and 80th Street; I-495 (New York) Subject to change without notice., Monday June 1st,2026 thru Saturday June 6th,2026, Monday thru Friday, 11:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed eastbound, westbound","update_date":"2026-06-05T19:00:21Z"},"road_event_id":"ym/75mJxolCy3QZAUzNwc2h63Kw=","beginning_cross_street":"80th Street; I-495","ending_cross_street":"80th Street; I-495","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.881988,40.728553]]}},{"id":"1szh2JKDKnMElc2dDDCnyNVzB1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aABNL4f5Gc6WvkE+Jyba7aGMjvo="}],"description":"Switch repairs on Hempstead westbound between Elmont-UBS Arena (Hempstead) and Hollis (New York) Westbound trains skip Elmont-UBS Arena, Queens Village, and Hollis, Monday June 8th,2026 thru Friday June 12th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 03:00 AM","update_date":"2026-06-05T07:00:20Z"},"road_event_id":"1szh2JKDKnMElc2dDDCnyNVzB1c=","beginning_cross_street":"Elmont-UBS Arena","ending_cross_street":"Hollis","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.725549,40.720074]]}},{"id":"aABNL4f5Gc6WvkE+Jyba7aGMjvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1szh2JKDKnMElc2dDDCnyNVzB1c="},{"type":"next-occurrence","id":"b9KW+v6BxhhDMnNsr11PBA7OU5g="}],"description":"Switch repairs on Hempstead westbound between Elmont-UBS Arena (Hempstead) and Hollis (New York) Westbound trains skip Elmont-UBS Arena, Queens Village, and Hollis, Monday June 8th,2026 thru Friday June 12th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 03:00 AM","update_date":"2026-06-05T07:00:20Z"},"road_event_id":"aABNL4f5Gc6WvkE+Jyba7aGMjvo=","beginning_cross_street":"Elmont-UBS Arena","ending_cross_street":"Hollis","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.725549,40.720074]]}},{"id":"b9KW+v6BxhhDMnNsr11PBA7OU5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1szh2JKDKnMElc2dDDCnyNVzB1c="},{"type":"next-occurrence","id":"6GdH8rf5qYO9LIc+zDE6cAoBQaw="}],"description":"Switch repairs on Hempstead westbound between Elmont-UBS Arena (Hempstead) and Hollis (New York) Westbound trains skip Elmont-UBS Arena, Queens Village, and Hollis, Monday June 8th,2026 thru Friday June 12th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 03:00 AM","update_date":"2026-06-05T07:00:20Z"},"road_event_id":"b9KW+v6BxhhDMnNsr11PBA7OU5g=","beginning_cross_street":"Elmont-UBS Arena","ending_cross_street":"Hollis","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.725549,40.720074]]}},{"id":"6GdH8rf5qYO9LIc+zDE6cAoBQaw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1szh2JKDKnMElc2dDDCnyNVzB1c="}],"description":"Switch repairs on Hempstead westbound between Elmont-UBS Arena (Hempstead) and Hollis (New York) Westbound trains skip Elmont-UBS Arena, Queens Village, and Hollis, Monday June 8th,2026 thru Friday June 12th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 03:00 AM","update_date":"2026-06-05T07:00:20Z"},"road_event_id":"6GdH8rf5qYO9LIc+zDE6cAoBQaw=","beginning_cross_street":"Elmont-UBS Arena","ending_cross_street":"Hollis","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.725549,40.720074]]}},{"id":"2zXtBuXSidXdywudzcjnInk6y7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on Garden State Parkway southbound Entrance ramp Exit 156 - US 46 (Clifton), Tuesday June 2nd, 2026 thru Saturday June 6th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-05-29T21:19:46Z"},"road_event_id":"2zXtBuXSidXdywudzcjnInk6y7g=","beginning_cross_street":"Exit 156 - US 46","ending_cross_street":"Exit 156 - US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.131556,40.890342]]}},{"id":"VPku3UPiFxvs2vqd8+hgo8GjGFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on Garden State Parkway southbound between South of Exit 159 - I-80 (Elmwood Park) and South of Exit 156 - US 46 (Clifton), Friday June 5th,2026 thru Saturday June 6th,2026, Friday, 09:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed southbound, , Saturday June 6th,2026 12:00 AM thru 06:00 AM 1 Center lane of 3 lanes closed southbound,","update_date":"2026-06-05T10:00:28Z"},"road_event_id":"VPku3UPiFxvs2vqd8+hgo8GjGFg=","beginning_cross_street":"South of Exit 159 - I-80","ending_cross_street":"South of Exit 156 - US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.10798,40.904086]]}},{"id":"9h4sTeIkLrTdEsw5lTnW3v2ALF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Paving operations and milling on Garden State Parkway southbound between North of Exit 137 - NJ 28 (Cranford Twp) and North of Exit 132 - NJ 27 (Woodbridge Twp), Friday June 5th,2026 thru Saturday June 6th,2026, Friday, 10:00 PM thru 08:00 AM 1 Left lane of 5 lanes closed southbound, , Friday June 5th,2026 thru Saturday June 6th,2026, Friday, 11:00 PM thru 08:00 AM 2 Center lanes of 5 lanes closed southbound,","update_date":"2026-06-05T10:00:27Z"},"road_event_id":"9h4sTeIkLrTdEsw5lTnW3v2ALF8=","beginning_cross_street":"North of Exit 137 - NJ 28","ending_cross_street":"North of Exit 132 - NJ 27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.285879,40.665996]]}},{"id":"wqKOf5UWqyj5NRtyQn6662+8YT0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Expansion joint repairs on Garden State Parkway northbound between North of Exit 156 - US 46 (Elmwood Park) and South of Exit 159 - I-80 (Elmwood Park), Friday June 5th, 2026 thru Saturday June 6th, 2026, 09:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Saturday June 6th, 2026 thru Saturday June 6th, 2026, 12:00 AM thru 06:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-05-29T21:45:28Z"},"road_event_id":"wqKOf5UWqyj5NRtyQn6662+8YT0=","beginning_cross_street":"North of Exit 156 - US 46","ending_cross_street":"South of Exit 159 - I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.128414,40.889809]]}},{"id":"Z6PXsCSNhP+D8gaXYjVai+XwRLo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Milling and paving operations on Garden State Parkway southbound between South of Exit 129 - New Jersey Turnpike (Woodbridge Twp) and Garden State Parkway Express Lanes at North of Exit 124 - Main St (Sayreville), Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:00 PM thru 08:00 AM 3 Left lanes of 4 lanes closed","update_date":"2026-05-29T21:50:22Z"},"road_event_id":"Z6PXsCSNhP+D8gaXYjVai+XwRLo=","beginning_cross_street":"South of Exit 129 - New Jersey Turnpike","ending_cross_street":"North of Exit 124 - Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.302143,40.534752]]}},{"id":"gVU85IffU7JiZBbsnV0/1sTxC6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound between East of Exit 54 - Minnisink Rd (Totowa) and East of Exit 58 - Madison Ave (Paterson), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-30T03:29:03Z"},"road_event_id":"gVU85IffU7JiZBbsnV0/1sTxC6g=","beginning_cross_street":"East of Exit 54 - Minnisink Rd","ending_cross_street":"East of Exit 58 - Madison Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.232299,40.899318]]}},{"id":"fk9v3fWIB/IDe/SHgXkTxYT0d3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near North of Exit 7 - South Randolphville Rd (Piscataway Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, left lane closed","update_date":"2026-05-30T03:29:09Z"},"road_event_id":"fk9v3fWIB/IDe/SHgXkTxYT0d3U=","beginning_cross_street":"North of Exit 7 - South Randolphville Rd","ending_cross_street":"North of Exit 7 - South Randolphville Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.470611,40.556777]]}},{"id":"R5EfU7FYFSLp7Z4INYUR1LWQ7EQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound between East of Exit 54 - Minnisink Rd (Totowa) and West of Exit 58 - Madison Ave (Paterson), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM), (3rd lane closed from 11:00 PM to 04:00 AM)","update_date":"2026-05-30T03:29:12Z"},"road_event_id":"R5EfU7FYFSLp7Z4INYUR1LWQ7EQ=","beginning_cross_street":"East of Exit 54 - Minnisink Rd","ending_cross_street":"West of Exit 58 - Madison Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.232299,40.899318]]}},{"id":"C61u3cMDvCCystGvK+bqeAVO7RM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near In the vicinity of Irish Spring Rd (Randolph Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 05:00 AM, right lane closed","update_date":"2026-05-30T03:29:16Z"},"road_event_id":"C61u3cMDvCCystGvK+bqeAVO7RM=","beginning_cross_street":"In the vicinity of Irish Spring Rd","ending_cross_street":"In the vicinity of CR 617","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.6194,40.857051]]}},{"id":"J7Aene9fIFBDY5sPqvVYI3CJmkY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between East of Exit 58 - Madison Ave (Paterson) and East of Exit 54 - Minnisink Rd (Totowa), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, at least one lane closed","update_date":"2026-05-30T03:28:37Z"},"road_event_id":"J7Aene9fIFBDY5sPqvVYI3CJmkY=","beginning_cross_street":"East of Exit 58 - Madison Ave","ending_cross_street":"East of Exit 54 - Minnisink Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.158363,40.903774]]}},{"id":"uLLQGpo3cQ57YTkGvNor0H0LgZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 5 - CR 529/Stelton Rd (South Plainfield) and New Jersey Turnpike (Edison Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 08:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 07:00 AM), moving operation","update_date":"2026-05-30T03:28:46Z"},"road_event_id":"uLLQGpo3cQ57YTkGvNor0H0LgZ4=","beginning_cross_street":"South of Exit 5 - CR 529/Stelton Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.434799,40.556858]]}},{"id":"GfUaIScRaJKbmM0i2DxZCXQAkj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between West of Exit 58 - Madison Ave (Paterson) and East of Exit 54 - Minnisink Rd (Totowa), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM), (3rd lane closed from 11:00 PM to 05:00 AM)","update_date":"2026-05-30T03:28:42Z"},"road_event_id":"GfUaIScRaJKbmM0i2DxZCXQAkj4=","beginning_cross_street":"West of Exit 58 - Madison Ave","ending_cross_street":"East of Exit 54 - Minnisink Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.166519,40.907058]]}},{"id":"jYUdnOvbH7qB4TfQLK8Leyx6bqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between New Jersey Turnpike (Edison Twp) and South of Exit 5 - CR 529/Stelton Rd (South Plainfield), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 08:00 AM, at least one lane closed, moving operation","update_date":"2026-05-30T03:28:51Z"},"road_event_id":"jYUdnOvbH7qB4TfQLK8Leyx6bqI=","beginning_cross_street":"New Jersey Turnpike","ending_cross_street":"South of Exit 5 - CR 529/Stelton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.336959,40.528419]]}},{"id":"bPMWosOucajKYI86SMljfqSUmsk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between East of Exit 58 - Madison Ave (Paterson) and East of Exit 54 - Minnisink Rd (Totowa), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-05-30T03:28:52Z"},"road_event_id":"bPMWosOucajKYI86SMljfqSUmsk=","beginning_cross_street":"East of Exit 58 - Madison Ave","ending_cross_street":"East of Exit 54 - Minnisink Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.158363,40.903774]]}},{"id":"eckgFMkf42bafyh11G+JmPK2Jis=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 5 - CR 529/Stelton Rd (South Plainfield) and New Jersey Turnpike (Edison Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 08:00 AM, at least one lane closed, moving operation","update_date":"2026-05-30T03:29:00Z"},"road_event_id":"eckgFMkf42bafyh11G+JmPK2Jis=","beginning_cross_street":"South of Exit 5 - CR 529/Stelton Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.434799,40.556858]]}},{"id":"St+tq/Bn9Zy/+2um0JWnDAinZGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of Limekiln Rd (Franklin Twp), Friday June 5, 2026 07:00 PM thru Saturday June 6, 2026 05:00 AM, right shoulder closed, moving operation","update_date":"2026-05-30T03:28:59Z"},"road_event_id":"St+tq/Bn9Zy/+2um0JWnDAinZGE=","beginning_cross_street":"North of Holland Mountain Rd","ending_cross_street":"South of Limekiln Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.529808,41.095325]]}},{"id":"cwci0DSXOI+LGWjHLaUTcP2bcI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound between East of Exit 54 - Minnisink Rd (Totowa) and East of Exit 58 - Madison Ave (Paterson), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-05-30T03:28:58Z"},"road_event_id":"cwci0DSXOI+LGWjHLaUTcP2bcI0=","beginning_cross_street":"East of Exit 54 - Minnisink Rd","ending_cross_street":"East of Exit 58 - Madison Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.232299,40.899318]]}},{"id":"hj8OqxCLHsM5ivTgoKvPf1gYAdg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, right lane closed","update_date":"2026-05-30T03:31:43Z"},"road_event_id":"hj8OqxCLHsM5ivTgoKvPf1gYAdg=","beginning_cross_street":"North of NJ 33","ending_cross_street":"South of CR 614/Dey Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546669,40.263774]]}},{"id":"qQ18PsMw2iS4VBmJHtfkC8vLCbA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Southbound near CR 605/Queen Rd (West Amwell Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, left lane closed","update_date":"2026-05-30T03:32:47Z"},"road_event_id":"qQ18PsMw2iS4VBmJHtfkC8vLCbA=","beginning_cross_street":"CR 605/Queen Rd","ending_cross_street":"South of CR 605/Queen Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.913139,40.402996]]}},{"id":"FTccKDHg/MMcIFdv0la7Smwq0IE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound near North of CR 655/Fries Mill Rd (Washington Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 05:00 AM, right lane closed","update_date":"2026-05-30T03:32:45Z"},"road_event_id":"FTccKDHg/MMcIFdv0la7Smwq0IE=","beginning_cross_street":"North of CR 655/Fries Mill Rd","ending_cross_street":"CR 651/Greentree Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.045402,39.748291]]}},{"id":"4rGRIYDQX7SXRqM+K+pMlRhYAkI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Southbound at Harbor Drive (Jersey City) Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, ramp","update_date":"2026-05-30T03:31:54Z"},"road_event_id":"4rGRIYDQX7SXRqM+K+pMlRhYAkI=","beginning_cross_street":"Harbor Drive","ending_cross_street":"Harbor Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.094879,40.683677]]}},{"id":"qwReBId6Hu5hbSVfgEV8fat21Ak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound between West of CR 677/Morris St (Phillipsburg) and I-78/NJ 173 (Greenwich Twp), Friday June 5, 2026 09:00 PM thru Saturday June 6, 2026 05:00 PM, right lane closed","update_date":"2026-05-30T03:31:52Z"},"road_event_id":"qwReBId6Hu5hbSVfgEV8fat21Ak=","beginning_cross_street":"West of CR 677/Morris St","ending_cross_street":"I-78/NJ 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.194557,40.696632]]}},{"id":"Vkk0C0UnfPqjjCt/DUPTI5mDLCI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9/Tonnelle Avenue"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9/Tonnelle Avenue between North of 44th St (North Bergen Twp) and North of Ridgefield Circle (Ridgefield), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, left lane closed","update_date":"2026-05-30T03:31:57Z"},"road_event_id":"Vkk0C0UnfPqjjCt/DUPTI5mDLCI=","beginning_cross_street":"North of 44th St","ending_cross_street":"North of Ridgefield Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033393,40.784675]]}},{"id":"OgXjJD3HgxxDVdILveND7ixb0wQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between south of Exit 73 - Scotch Rd (Ewing Twp) and south of Exit 76 - NJ 29 (Ewing Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 08:00 AM, , moving operation","update_date":"2026-05-30T03:32:11Z"},"road_event_id":"OgXjJD3HgxxDVdILveND7ixb0wQ=","beginning_cross_street":"south of Exit 73 - Scotch Rd","ending_cross_street":"south of Exit 76 - NJ 29","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.798255,40.289287]]}},{"id":"q++bkV8cU92cjytgXqvlCEEexYA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Southbound between North of Ridgefield Circle (Ridgefield) and North of 44th St (North Bergen Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, left lane closed","update_date":"2026-05-30T03:32:27Z"},"road_event_id":"q++bkV8cU92cjytgXqvlCEEexYA=","beginning_cross_street":"North of Ridgefield Circle","ending_cross_street":"North of 44th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003181,40.840713]]}},{"id":"9KUgn5OTPPH/qqTEHeDXKZB5Jh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, right lane closed","update_date":"2026-05-30T03:32:26Z"},"road_event_id":"9KUgn5OTPPH/qqTEHeDXKZB5Jh4=","beginning_cross_street":"South of CR 614/Dey Rd","ending_cross_street":"North of NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.506538,40.327266]]}},{"id":"LS126OtO7xLywuk0LkAQq3Egl/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 33"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 33 Eastbound between East of CR 622/South Olden Ave (Hamilton Twp) and West of White Horse-Hamilton Square Rd (Hamilton Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, right lane closed","update_date":"2026-05-30T03:33:24Z"},"road_event_id":"LS126OtO7xLywuk0LkAQq3Egl/A=","beginning_cross_street":"East of CR 622/South Olden Ave","ending_cross_street":"West of White Horse-Hamilton Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.732986,40.226043]]}},{"id":"V4kzS53EK626wJ1So0Z7dQ7lw/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of CR 621/Hook Mountain Rd (Montville Twp) and West of I-80 (Denville Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 09:00 AM, right shoulder closed","update_date":"2026-05-30T03:37:41Z"},"road_event_id":"V4kzS53EK626wJ1So0Z7dQ7lw/Y=","beginning_cross_street":"West of CR 621/Hook Mountain Rd","ending_cross_street":"West of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.33995,40.858585]]}},{"id":"DYz+HcV4WHN8KsReeOWQYPBa+Sg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of Garden State Parkway (Clifton) and West of NJ 23/Pompton Av (Wayne Twp), Friday June 5, 2026 09:00 PM thru Saturday June 6, 2026 06:00 AM, right lane closed","update_date":"2026-05-30T03:37:40Z"},"road_event_id":"DYz+HcV4WHN8KsReeOWQYPBa+Sg=","beginning_cross_street":"West of Garden State Parkway","ending_cross_street":"West of NJ 23/Pompton Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.131179,40.889961]]}},{"id":"IGUaEyt2/h1ET3ewrI9KxkDSQuw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of CR 621/Hook Mountain Rd (Montville Twp) and West of I-80 (Denville Twp), Friday June 5, 2026 09:00 PM thru Saturday June 6, 2026 08:00 AM, right lane closed","update_date":"2026-05-30T03:37:44Z"},"road_event_id":"IGUaEyt2/h1ET3ewrI9KxkDSQuw=","beginning_cross_street":"West of CR 621/Hook Mountain Rd","ending_cross_street":"West of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.33995,40.858585]]}},{"id":"LC/h6TKJGxwL/9NYugk57ZQkMps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of NJ 23/Pompton Av (Wayne Twp) and Garden State Parkway (Clifton), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, right lane closed","update_date":"2026-05-30T03:37:47Z"},"road_event_id":"LC/h6TKJGxwL/9NYugk57ZQkMps=","beginning_cross_street":"West of NJ 23/Pompton Av","ending_cross_street":"Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.257308,40.893184]]}},{"id":"XmcnC42bVwXH+hUxgoW/j1LzM34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Westbound between I-78/NJ 173 (Greenwich Twp) and West of CR 677/Morris St (Phillipsburg), Friday June 5, 2026 09:00 PM thru Saturday June 6, 2026 05:00 AM, right lane closed","update_date":"2026-05-30T03:37:54Z"},"road_event_id":"XmcnC42bVwXH+hUxgoW/j1LzM34=","beginning_cross_street":"I-78/NJ 173","ending_cross_street":"West of CR 677/Morris St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.131591,40.670028]]}},{"id":"EhzQwOq37NarMLXOcotdEKfrbhA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0leS2Q7OIYDXIJbqvSspSa3W0GE="}],"description":"Milling on I-87 Northway northbound between Exit 8; Crescent Road (Halfmoon) and Exit 9; NY 146 (Clifton Park), Friday June 5th, 2026 thru Saturday June 6th, 2026, Friday/Saturday, 10:00 PM thru 11:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-05-30T06:36:45Z"},"road_event_id":"EhzQwOq37NarMLXOcotdEKfrbhA=","beginning_cross_street":"Exit 8; Crescent Road","ending_cross_street":"Exit 9; NY 146","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766952,42.816595]]}},{"id":"0leS2Q7OIYDXIJbqvSspSa3W0GE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EhzQwOq37NarMLXOcotdEKfrbhA="}],"description":"Milling on I-87 Northway northbound between Exit 8; Crescent Road (Halfmoon) and Exit 9; NY 146 (Clifton Park), Friday June 5th, 2026 thru Saturday June 6th, 2026, Friday/Saturday, 10:00 PM thru 11:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-05-30T06:36:45Z"},"road_event_id":"0leS2Q7OIYDXIJbqvSspSa3W0GE=","beginning_cross_street":"Exit 8; Crescent Road","ending_cross_street":"Exit 9; NY 146","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T02:00:00Z","end_date":"2026-06-07T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766952,42.816595]]}},{"id":"q3r48jPWWGXQDOsKJcswdoWkOMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Milling on I-87 Northway northbound between Exit 8; Crescent Road (Halfmoon) and Exit 9; NY 146 (Clifton Park), Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:00 PM thru 07:00 AM 2 Left lanes of 4 lanes closed","update_date":"2026-05-30T06:38:05Z"},"road_event_id":"q3r48jPWWGXQDOsKJcswdoWkOMs=","beginning_cross_street":"Exit 8; Crescent Road","ending_cross_street":"Exit 9; NY 146","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766952,42.816595]]}},{"id":"KZXV0qOqvvDNIv972LQIiqHFlEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Van Wyck Expressway"],"direction":"unknown","related_road_events":[],"description":"Scheduled roadwork on Van Wyck Expressway southbound ramp from Federal Circle (New York), Wednesday June 3rd, 2026 thru Saturday June 6th, 2026, Wednesday/Thursday/Friday, 11:00 PM thru 04:00 AM All lanes closed","update_date":"2026-05-31T06:59:10Z"},"road_event_id":"KZXV0qOqvvDNIv972LQIiqHFlEk=","beginning_cross_street":"Federal Circle ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807806,40.656955]]}},{"id":"DRCsTU81kXVS33Igu4DRgqZNwUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Van Wyck EXpressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aAHN9g715381mI/PB6uw2l+c6fY="}],"description":"Scheduled roadwork on Van Wyck EXpressway southbound ramp to Terminal 1 Departures (New York), Thursday June 4th, 2026 thru Sunday June 7th, 2026, Sunday/Thursday/Friday/Saturday, 01:00 AM thru 08:00 AM All lanes closed","update_date":"2026-05-31T07:01:12Z"},"road_event_id":"DRCsTU81kXVS33Igu4DRgqZNwUo=","beginning_cross_street":"Terminal 1 Departures ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T05:00:00Z","end_date":"2026-06-05T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79232,40.64444]]}},{"id":"aAHN9g715381mI/PB6uw2l+c6fY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Van Wyck EXpressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DRCsTU81kXVS33Igu4DRgqZNwUo="},{"type":"next-occurrence","id":"JK2TncwFUKwsGECmEHeuiFeq/rI="}],"description":"Scheduled roadwork on Van Wyck EXpressway southbound ramp to Terminal 1 Departures (New York), Thursday June 4th, 2026 thru Sunday June 7th, 2026, Sunday/Thursday/Friday/Saturday, 01:00 AM thru 08:00 AM All lanes closed","update_date":"2026-05-31T07:01:12Z"},"road_event_id":"aAHN9g715381mI/PB6uw2l+c6fY=","beginning_cross_street":"Terminal 1 Departures ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T05:00:00Z","end_date":"2026-06-06T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79232,40.64444]]}},{"id":"JK2TncwFUKwsGECmEHeuiFeq/rI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Van Wyck EXpressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DRCsTU81kXVS33Igu4DRgqZNwUo="}],"description":"Scheduled roadwork on Van Wyck EXpressway southbound ramp to Terminal 1 Departures (New York), Thursday June 4th, 2026 thru Sunday June 7th, 2026, Sunday/Thursday/Friday/Saturday, 01:00 AM thru 08:00 AM All lanes closed","update_date":"2026-05-31T07:01:12Z"},"road_event_id":"JK2TncwFUKwsGECmEHeuiFeq/rI=","beginning_cross_street":"Terminal 1 Departures ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T05:00:00Z","end_date":"2026-06-07T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79232,40.64444]]}},{"id":"KqozMAZl7YZ5/9iawMPfVXkr7Mw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound between North of Holland Mountain Rd (Hardyston Twp) and South of Limekiln Rd (Franklin Twp), Saturday June 6, 2026 07:00 PM thru Sunday June 7, 2026 05:00 AM, right shoulder closed, moving operation","update_date":"2026-05-31T10:43:36Z"},"road_event_id":"KqozMAZl7YZ5/9iawMPfVXkr7Mw=","beginning_cross_street":"North of Holland Mountain Rd","ending_cross_street":"South of Limekiln Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T23:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.529808,41.095325]]}},{"id":"Rh404R7aGt1qbuksg65v3Sp5tbg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound between West of Kinderkamack Rd (River Edge) and In the vicinity of Spring Valley Rd (Paramus), Wednesday June 17, 2026 10:00 PM thru Thursday June 18, 2026 06:00 AM, right shoulder closed","update_date":"2026-05-31T10:43:40Z"},"road_event_id":"Rh404R7aGt1qbuksg65v3Sp5tbg=","beginning_cross_street":"West of Kinderkamack Rd","ending_cross_street":"In the vicinity of Spring Valley Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T02:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042015,40.912555]]}},{"id":"oxNAHlqyaLeerSke4zoFyeC8fHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between McBride Av/Little Falls Av (Little Falls Twp) and CR 640/Riverview Dr (Totowa), Monday June 15, 2026 10:00 PM thru Tuesday June 16, 2026 06:00 AM, right shoulder closed","update_date":"2026-05-31T10:43:44Z"},"road_event_id":"oxNAHlqyaLeerSke4zoFyeC8fHg=","beginning_cross_street":"McBride Av/Little Falls Av","ending_cross_street":"CR 640/Riverview Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T02:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.218078,40.888603]]}},{"id":"EV7WI/FOfnOKk+JnYqN8u6oSRTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between McBride Av/Little Falls Av (Little Falls Twp) and CR 640/Riverview Dr (Totowa), Tuesday June 16, 2026 10:00 PM thru Wednesday June 17, 2026 06:00 AM, right shoulder closed","update_date":"2026-05-31T10:43:45Z"},"road_event_id":"EV7WI/FOfnOKk+JnYqN8u6oSRTE=","beginning_cross_street":"McBride Av/Little Falls Av","ending_cross_street":"CR 640/Riverview Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T02:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.218078,40.888603]]}},{"id":"XpIhcSgRNhVK/Tr8ZtV7HfK1XrE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of 5th St (Saddle Brook Twp), Monday June 8, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-31T15:28:37Z"},"road_event_id":"XpIhcSgRNhVK/Tr8ZtV7HfK1XrE=","beginning_cross_street":"West of 5th St","ending_cross_street":"East of Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.102333,40.891719]]}},{"id":"jIkquEEhz7yqLmj9EGBgfdM8JgQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound near East of Exit 3 - NJ 173/US 22 (Greenwich Twp), Tuesday June 9, 2026 10:00 AM thru 03:00 PM, left lane closed","update_date":"2026-05-31T17:58:43Z"},"road_event_id":"jIkquEEhz7yqLmj9EGBgfdM8JgQ=","beginning_cross_street":"East of Exit 3 - NJ 173/US 22","ending_cross_street":"West of Exit 4 - CR 637/Stewartsville-Bloomsbury Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.123695,40.671676]]}},{"id":"mbh3HAcdHeR0r6Nkk2hZlVHjjlA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound near West of Exit 4 - CR 637/Stewartsville-Bloomsbury Rd (Greenwich Twp), Thursday June 11, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-05-31T17:58:45Z"},"road_event_id":"mbh3HAcdHeR0r6Nkk2hZlVHjjlA=","beginning_cross_street":"West of Exit 4 - CR 637/Stewartsville-Bloomsbury Rd","ending_cross_street":"East of Exit 3 - NJ 173/US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.112335,40.672348]]}},{"id":"7ClLNfTCVJ+J/p/Ikwkh13PzxVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound near West of Exit 4 - CR 637/Stewartsville-Bloomsbury Rd (Greenwich Twp), Wednesday June 10, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-05-31T17:58:37Z"},"road_event_id":"7ClLNfTCVJ+J/p/Ikwkh13PzxVg=","beginning_cross_street":"West of Exit 4 - CR 637/Stewartsville-Bloomsbury Rd","ending_cross_street":"East of Exit 3 - NJ 173/US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.112335,40.672348]]}},{"id":"VD09brxD0O03C2hVTycAK/85eN8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of 5th St (Saddle Brook Twp), Tuesday June 9, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-05-31T17:58:38Z"},"road_event_id":"VD09brxD0O03C2hVTycAK/85eN8=","beginning_cross_street":"West of 5th St","ending_cross_street":"East of Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.102333,40.891719]]}},{"id":"YUhXcu6j/lXd9DbwbU/VI2iulo8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Westbound between East of CR 646 (Pilesgrove Twp) and West of CR 628/Courses Landing Rd (Carneys Point Twp), Wednesday June 10, 2026 09:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-05-31T17:58:39Z"},"road_event_id":"YUhXcu6j/lXd9DbwbU/VI2iulo8=","beginning_cross_street":"East of CR 646","ending_cross_street":"West of CR 628/Courses Landing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.396499,39.673685999999996]]}},{"id":"yvQZQ9TFSzi7wILFrjbMWa9raKE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound near Allendale Av (Saddle River), Tuesday June 9, 2026 09:00 PM thru Wednesday June 10, 2026 06:00 AM, right shoulder closed","update_date":"2026-05-31T17:58:40Z"},"road_event_id":"yvQZQ9TFSzi7wILFrjbMWa9raKE=","beginning_cross_street":"Allendale Av","ending_cross_street":"North of Allendale Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.111289,41.03247]]}},{"id":"Q4CUNXsCNsPZ4L4YdoL77RZ+HXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound near East of Exit 3 - NJ 173/US 22 (Greenwich Twp), Monday June 8, 2026 10:00 AM thru 03:00 PM, right lane closed","update_date":"2026-05-31T17:58:46Z"},"road_event_id":"Q4CUNXsCNsPZ4L4YdoL77RZ+HXg=","beginning_cross_street":"East of Exit 3 - NJ 173/US 22","ending_cross_street":"West of Exit 4 - CR 637/Stewartsville-Bloomsbury Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.123695,40.671676]]}},{"id":"UuNMdH2wILW/+HzYk90YYBmOdRM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Southbound near North of Allendale Av (Saddle River), Monday June 8, 2026 09:00 PM thru Tuesday June 9, 2026 06:00 AM, right shoulder closed","update_date":"2026-05-31T17:58:47Z"},"road_event_id":"UuNMdH2wILW/+HzYk90YYBmOdRM=","beginning_cross_street":"North of Allendale Av","ending_cross_street":"Allendale Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.111671,41.033767]]}},{"id":"GSODCyl6/BPay+g3zM4w5lsHLoo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Southbound near North of Allendale Av (Saddle River), Tuesday June 9, 2026 09:00 PM thru Wednesday June 10, 2026 06:00 AM, right shoulder closed","update_date":"2026-05-31T17:58:48Z"},"road_event_id":"GSODCyl6/BPay+g3zM4w5lsHLoo=","beginning_cross_street":"North of Allendale Av","ending_cross_street":"Allendale Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.111671,41.033767]]}},{"id":"UqOSrdcNhJ3EuecrZeXzVcQjAjM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound near Allendale Av (Saddle River), Monday June 8, 2026 09:00 PM thru Tuesday June 9, 2026 06:00 AM, right shoulder closed","update_date":"2026-05-31T17:58:50Z"},"road_event_id":"UqOSrdcNhJ3EuecrZeXzVcQjAjM=","beginning_cross_street":"Allendale Av","ending_cross_street":"North of Allendale Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.111289,41.03247]]}},{"id":"oRYRvqFoyEgWMSl5dSe+w6FHcds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound near South of CR 646/Deptford Av (Deptford Twp), Continuous Tuesday June 2, 2026 09:00 PM thru Monday June 8, 2026 12:00 AM, right shoulder closed","update_date":"2026-06-03T17:37:37Z"},"road_event_id":"oRYRvqFoyEgWMSl5dSe+w6FHcds=","beginning_cross_street":"South of CR 646/Deptford Av","ending_cross_street":"South of CR 646/Deptford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-08T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.124938,39.834663]]}},{"id":"ja1iqeLMW+S0Bf3+PeswQDy9MvM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound near West of NJ 159/Bloomfield Av (Montville Twp), Continuous Monday June 8, 2026 07:00 AM thru Friday June 12, 2026 04:00 PM, right shoulder closed","update_date":"2026-05-31T20:01:36Z"},"road_event_id":"ja1iqeLMW+S0Bf3+PeswQDy9MvM=","beginning_cross_street":"West of NJ 159/Bloomfield Av","ending_cross_street":"West of NJ 159/Bloomfield Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.326576,40.859287]]}},{"id":"BhTrwce0NVGkqLeywEgogZk9qrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound at Exit 47A - I-280 (Parsippany-Troy Hills Twp) Friday June 5, 2026 11:00 PM thru Saturday June 6, 2026 05:00 AM, ramp express lane","update_date":"2026-06-01T01:22:36Z"},"road_event_id":"BhTrwce0NVGkqLeywEgogZk9qrM=","beginning_cross_street":"Exit 47A - I-280","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368247,40.860004]]}},{"id":"Em7rgQwMqsDQKRSGSD7x7aWoK8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Outerbridge Crossing"],"direction":"unknown","related_road_events":[],"description":"Bridge construction on Outerbridge Crossing eastbound New Jersey Side (Perth Amboy) to New York Side (Staten Island), Friday June 5th,2026 thru Saturday June 6th,2026, Friday, 11:59 PM thru 08:00 AM 1 Right lane of 2 lanes closed eastbound,","update_date":"2026-06-04T09:00:07Z"},"road_event_id":"Em7rgQwMqsDQKRSGSD7x7aWoK8o=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:59:00Z","end_date":"2026-06-06T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.253828,40.524372]]}},{"id":"G0qdZhDQi3XfYej7ISEN0eYZR0w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Outerbridge Crossing"],"direction":"unknown","related_road_events":[],"description":"Bridge construction on Outerbridge Crossing westbound New York Side (Staten Island) to New Jersey Side (Perth Amboy), Friday June 5th, 2026 thru Saturday June 6th, 2026, 11:59 PM thru 08:00 AM 1 Left lane of 2 lanes closed","update_date":"2026-06-01T02:49:43Z"},"road_event_id":"G0qdZhDQi3XfYej7ISEN0eYZR0w=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:59:00Z","end_date":"2026-06-06T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.239358,40.525256]]}},{"id":"pw0Ke2C1K2wCXpFDZRfbu68J/os=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"B5/izFKe5upXdBWj6jBuADcAZaY="}],"description":"Bridge construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 04:30 PM 1 Right lane of 4 lanes closed","update_date":"2026-06-05T12:50:07Z"},"road_event_id":"pw0Ke2C1K2wCXpFDZRfbu68J/os=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96022,40.853083]]}},{"id":"B5/izFKe5upXdBWj6jBuADcAZaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pw0Ke2C1K2wCXpFDZRfbu68J/os="}],"description":"Bridge construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 04:30 PM 1 Right lane of 4 lanes closed","update_date":"2026-06-05T12:50:07Z"},"road_event_id":"B5/izFKe5upXdBWj6jBuADcAZaY=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T14:00:00Z","end_date":"2026-06-06T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.96022,40.853083]]}},{"id":"ezqYlu1QnV7a7xrrbhkV9ftV17w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[],"description":"Bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Monday June 1st,2026 thru Saturday June 6th,2026, Monday thru Friday, 10:00 PM thru 08:00 AM All lanes closed and detoured westbound,","update_date":"2026-06-05T09:00:02Z"},"road_event_id":"ezqYlu1QnV7a7xrrbhkV9ftV17w=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944876,40.850252]]}},{"id":"w2AuvCrG46zbZ0HuOMkra/IC87w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[],"description":"Bridge construction on George Washington Bridge Lower Level eastbound New Jersey Side (Fort Lee) to New York Side (Manhattan), Friday June 5th,2026 thru Saturday June 6th,2026, Friday, 11:59 PM thru 08:00 AM All lanes closed and detoured eastbound,","update_date":"2026-06-04T09:00:06Z"},"road_event_id":"w2AuvCrG46zbZ0HuOMkra/IC87w=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:59:00Z","end_date":"2026-06-06T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960932,40.853186]]}},{"id":"319M/m8X1ecNk9zMa9+n7bZroic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements and safety improvements and utility work on NY 25 both directions area of DIX Hills Road (Huntington), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-01T04:13:07Z"},"road_event_id":"319M/m8X1ecNk9zMa9+n7bZroic=","beginning_cross_street":"DIX Hills Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.370597,40.835398]]}},{"id":"mACrJA6/+ywhZSxpHIx73trH7kc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[],"description":"Guard rail repairs on Wantagh State Parkway both directions between Exit W6 - Merrick Road (Hempstead) and START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-01T04:15:36Z"},"road_event_id":"mACrJA6/+ywhZSxpHIx73trH7kc=","beginning_cross_street":"Exit W6 - Merrick Road","ending_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.510382,40.662053]]}},{"id":"l9WNsciuyZnDo0K6BEAcRPdEmks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27A"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs on NY 27A both directions between Riverside Avenue (Amityville) and Grand Central Avenue (Amityville), Continuous Monday June 1st, 2026 12:00 AM thru Friday June 5th, 2026 11:59 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-01T05:38:30Z"},"road_event_id":"l9WNsciuyZnDo0K6BEAcRPdEmks=","beginning_cross_street":"Riverside Avenue","ending_cross_street":"Grand Central Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.413009,40.670005]]}},{"id":"jP8qMaYG2blHRmU6KC6oXtFbpQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25A"],"direction":"unknown","related_road_events":[],"description":"Line striping on NY 25A both directions between Lawrence Hill Road; NY 108 (Huntington) and NY 25 at West Main Street (Smithtown), Wednesday June 3rd, 2026 thru Saturday June 6th, 2026, Wednesday/Thursday/Friday, 10:00 PM thru 05:30 AM 1 Right lane of 2 lanes closed eastbound; All lanes closed westbound","update_date":"2026-06-01T05:42:58Z"},"road_event_id":"jP8qMaYG2blHRmU6KC6oXtFbpQU=","beginning_cross_street":"Lawrence Hill Road; NY 108","ending_cross_street":"West Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.46192,40.858391]]}},{"id":"5mCTLXNXZYWTnuVr+fSLFWGeHsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge painting and fence repairs on Wantagh State Parkway both directions between Exit W6 - Merrick Road (Hempstead) and START ROUTE Wantagh State Parkway at Ocean Parkway (Hempstead), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-01T05:45:20Z"},"road_event_id":"5mCTLXNXZYWTnuVr+fSLFWGeHsw=","beginning_cross_street":"Exit W6 - Merrick Road","ending_cross_street":"START ROUTE Wantagh State Parkway at Ocean Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.510382,40.662053]]}},{"id":"YyBGw3mgTyBCARA776TC1KoNMac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge painting and fence repairs on Meadowbrook State Parkway both directions between START ROUTE Meadowbrook State Parkway at Ocean Parkway (Hempstead) and Exit M10 - Loop Parkway (Hempstead), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM 2 Right lanes of 3 lanes closed","update_date":"2026-06-01T05:47:41Z"},"road_event_id":"YyBGw3mgTyBCARA776TC1KoNMac=","beginning_cross_street":"START ROUTE Meadowbrook State Parkway at Ocean Parkway","ending_cross_street":"Exit M10 - Loop Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.537101,40.593613]]}},{"id":"ZvDv5NLnS0ve4wETYdEvhdCA7wc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[],"description":"Bridge work on SUNRISE HWY eastbound between Halley Drive (Brookhaven) and CR-83 (Brookhaven), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-01T06:15:54Z"},"road_event_id":"ZvDv5NLnS0ve4wETYdEvhdCA7wc=","beginning_cross_street":"Halley Drive","ending_cross_street":"CR-83","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.041452,40.773827]]}},{"id":"vPYOfUrey9sIYRsAM0Z55JuhY34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[],"description":"Bridge work on SUNRISE HWY westbound between CR-83 (Brookhaven) and GATEWAY BLVD (Brookhaven), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-01T06:18:13Z"},"road_event_id":"vPYOfUrey9sIYRsAM0Z55JuhY34=","beginning_cross_street":"CR-83","ending_cross_street":"GATEWAY BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.01577,40.779856]]}},{"id":"m8LOhLEx8Du2K7axdXKG6KrIpKk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-495 both directions between Old Country Road (Huntington) and Half Hollow Road (Huntington), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-06-01T06:22:48Z"},"road_event_id":"m8LOhLEx8Du2K7axdXKG6KrIpKk=","beginning_cross_street":"Old Country Road","ending_cross_street":"Half Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.444913,40.78522]]}},{"id":"04sucXSYH9JvaK36BDG5EWhUMug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 110"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 110 southbound between Sweet Hollow Road; CR 3; Pinelawn Road (Huntington) and I-495 South Service Road (Huntington), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 2 Right lanes of 3 lanes closed","update_date":"2026-06-01T06:26:25Z"},"road_event_id":"04sucXSYH9JvaK36BDG5EWhUMug=","beginning_cross_street":"Sweet Hollow Road; CR 3; Pinelawn Road","ending_cross_street":"I-495 South Service Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.415684,40.78864]]}},{"id":"rG69viUd0rvrqPttpkK61ZaHPG4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 347"],"direction":"unknown","related_road_events":[],"description":"Mowing on NY 347 eastbound between Townline Road; Ramp (Islip) and Gibbs Pond Road (Smithtown), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-01T06:28:30Z"},"road_event_id":"rG69viUd0rvrqPttpkK61ZaHPG4=","beginning_cross_street":"Townline Road; Ramp","ending_cross_street":"Gibbs Pond Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210195,40.824794]]}},{"id":"HvIROq80R7Pu17oIWMTIagE59tA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 107"],"direction":"unknown","related_road_events":[],"description":"Mowing on NY 107 both directions between Courtney Lane (Oyster Bay) and South Oyster Bay Road (Oyster Bay), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-01T06:30:47Z"},"road_event_id":"HvIROq80R7Pu17oIWMTIagE59tA=","beginning_cross_street":"Courtney Lane","ending_cross_street":"South Oyster Bay Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.496882,40.742915]]}},{"id":"hOMjT+bCVSw3sftNkzR+6m9Anu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[],"description":"Line striping and road rehabilitation on NY 24 both directions between North Franklin Street (Hempstead) and Munson Ave (Hempstead), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-01T06:38:06Z"},"road_event_id":"hOMjT+bCVSw3sftNkzR+6m9Anu4=","beginning_cross_street":"North Franklin Street","ending_cross_street":"Munson Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.626822,40.707683]]}},{"id":"aqWZ/cA110pAZuWc9DmNIVMYF4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[],"description":"Line striping and milling on SUNRISE HWY westbound between Nicolls Road (Islip) and OAKDALE BOHEMIA RD (Islip), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-01T06:45:49Z"},"road_event_id":"aqWZ/cA110pAZuWc9DmNIVMYF4Q=","beginning_cross_street":"Nicolls Road","ending_cross_street":"OAKDALE BOHEMIA RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.045904,40.772756]]}},{"id":"CgNOydf0Bqrh2ufdhl/fHYOMO38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[],"description":"Line striping and milling on SUNRISE HWY eastbound between Montauk Highway (Islip) and OAKDALE BOHEMIA RD (Islip), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-01T06:49:39Z"},"road_event_id":"CgNOydf0Bqrh2ufdhl/fHYOMO38=","beginning_cross_street":"Montauk Highway","ending_cross_street":"OAKDALE BOHEMIA RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.143834,40.74815]]}},{"id":"YVvM27LN4wcsQJ7h945LdKgvzes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[],"description":"Line striping and milling on SUNRISE HWY eastbound between OAKDALE BOHEMIA RD (Islip) and Nicolls Road (Islip), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-01T06:51:33Z"},"road_event_id":"YVvM27LN4wcsQJ7h945LdKgvzes=","beginning_cross_street":"OAKDALE BOHEMIA RD","ending_cross_street":"Nicolls Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.124917,40.751536]]}},{"id":"GSSw5Rt5xEHU9cNM/UEmbJzLIwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge work on Meadowbrook State Parkway both directions between Exit M9W -Merrick Road (Hempstead) and Exit M10 - Loop Parkway (Hempstead), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 2 Right lanes of 3 lanes closed","update_date":"2026-06-01T07:02:40Z"},"road_event_id":"GSSw5Rt5xEHU9cNM/UEmbJzLIwc=","beginning_cross_street":"Exit M9W -Merrick Road","ending_cross_street":"Exit M10 - Loop Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.567115,40.654366]]}},{"id":"Qe17ttS3/mVNLiD20YTxLDsqliQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 109"],"direction":"unknown","related_road_events":[],"description":"Crack sealing on NY 109 both directions between Potter Street; Morton Street (Babylon) and West Main Street; NY 27A; END ROUTE (Babylon), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-01T07:06:24Z"},"road_event_id":"Qe17ttS3/mVNLiD20YTxLDsqliQ=","beginning_cross_street":"Potter Street; Morton Street","ending_cross_street":"West Main Street; NY 27A; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.432013,40.724455]]}},{"id":"qS/9I6PTTXwIQq8JgM65Gx++NA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 27 westbound between Exit 57 - Horse Block Road; CR 16;Yaphank Avenue (Brookhaven) and Exit 56 - Station Road (Brookhaven), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-01T07:57:48Z"},"road_event_id":"qS/9I6PTTXwIQq8JgM65Gx++NA4=","beginning_cross_street":"Exit 57 - Horse Block Road; CR 16;Yaphank Avenue","ending_cross_street":"Exit 56 - Station Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.910166,40.797009]]}},{"id":"5Zeb5SYbMmfDlvRqaOAEvKdnH9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N SERVICE RD"],"direction":"unknown","related_road_events":[],"description":"Repaving and traffic signal repairs on N SERVICE RD westbound between RT-110 (Huntington) and ROUND SWAMP RD (Huntington), Thursday June 4th, 2026 thru Saturday June 6th, 2026, Thursday/Friday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-01T08:23:09Z"},"road_event_id":"5Zeb5SYbMmfDlvRqaOAEvKdnH9s=","beginning_cross_street":" RT-110","ending_cross_street":"ROUND SWAMP RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.417749,40.782465]]}},{"id":"oQnNAh56RVdjSHO+V5GBIHU/j04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 110"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 110 both directions between RailRoad Street; Broadway (Huntington) and 23rd Street; New York Avenue (Huntington), Monday June 1st, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-01T08:31:42Z"},"road_event_id":"oQnNAh56RVdjSHO+V5GBIHU/j04=","beginning_cross_street":"RailRoad Street; Broadway","ending_cross_street":"23rd Street; New York Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.411597,40.8518]]}},{"id":"j0XcqJQT1FAZgjfPR+FKfLsJiGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[],"description":"Utility work on I-495 westbound between Exit 50 - Bagatelle Road (Huntington) and Exit 49N - NY 110 (Huntington), Tuesday June 2nd, 2026 thru Saturday June 6th, 2026, Tuesday/Wednesday/Thursday/Friday, 10:00 PM thru 06:00 AM 2 Right lanes of 4 lanes closed","update_date":"2026-06-01T08:33:56Z"},"road_event_id":"j0XcqJQT1FAZgjfPR+FKfLsJiGE=","beginning_cross_street":"Exit 50 - Bagatelle Road","ending_cross_street":"Exit 49N - NY 110","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.378954,40.787929]]}},{"id":"uIPn+M1B1qDivzW1y70aBCy6IEA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S SERVICE RD"],"direction":"unknown","related_road_events":[],"description":"Utility work on S SERVICE RD eastbound between Bates Road (Lake Success) and LAKEVILLE RD (Lake Success), Continuous Monday June 1st, 2026 12:00 AM thru Friday June 5th, 2026 11:59 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-01T08:36:20Z"},"road_event_id":"uIPn+M1B1qDivzW1y70aBCy6IEA=","beginning_cross_street":"Bates Road","ending_cross_street":"LAKEVILLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.712112,40.768544]]}},{"id":"smVq6m1cbS5OmV6O6mTrYAaPCws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zMH0ZpYVw8uL2yxtbGBCpq3RMMc="}],"description":"Culvert repairs on NY 117 both directions between Green Lane (Bedford Hills) and Overlook Drive (Bedford Hills) D265424/32760009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-01T11:31:45Z"},"road_event_id":"smVq6m1cbS5OmV6O6mTrYAaPCws=","beginning_cross_street":"Green Lane","ending_cross_street":"Overlook Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758549,41.167526]]}},{"id":"zMH0ZpYVw8uL2yxtbGBCpq3RMMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"smVq6m1cbS5OmV6O6mTrYAaPCws="},{"type":"next-occurrence","id":"RhKpl/KSF863RDJspanx3WTRFHk="}],"description":"Culvert repairs on NY 117 both directions between Green Lane (Bedford Hills) and Overlook Drive (Bedford Hills) D265424/32760009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-01T11:31:45Z"},"road_event_id":"zMH0ZpYVw8uL2yxtbGBCpq3RMMc=","beginning_cross_street":"Green Lane","ending_cross_street":"Overlook Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758549,41.167526]]}},{"id":"RhKpl/KSF863RDJspanx3WTRFHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"smVq6m1cbS5OmV6O6mTrYAaPCws="},{"type":"next-occurrence","id":"m/sZd8e4bYw2j3s3rA3AjQRYPCU="}],"description":"Culvert repairs on NY 117 both directions between Green Lane (Bedford Hills) and Overlook Drive (Bedford Hills) D265424/32760009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-01T11:31:45Z"},"road_event_id":"RhKpl/KSF863RDJspanx3WTRFHk=","beginning_cross_street":"Green Lane","ending_cross_street":"Overlook Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758549,41.167526]]}},{"id":"m/sZd8e4bYw2j3s3rA3AjQRYPCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"smVq6m1cbS5OmV6O6mTrYAaPCws="},{"type":"next-occurrence","id":"GqHIo3zA/45+8Nq0b+T4kZujUy0="}],"description":"Culvert repairs on NY 117 both directions between Green Lane (Bedford Hills) and Overlook Drive (Bedford Hills) D265424/32760009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-01T11:31:45Z"},"road_event_id":"m/sZd8e4bYw2j3s3rA3AjQRYPCU=","beginning_cross_street":"Green Lane","ending_cross_street":"Overlook Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758549,41.167526]]}},{"id":"GqHIo3zA/45+8Nq0b+T4kZujUy0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"smVq6m1cbS5OmV6O6mTrYAaPCws="},{"type":"next-occurrence","id":"MtVbffLzuiohWN7SDDA/rSLUqbM="}],"description":"Culvert repairs on NY 117 both directions between Green Lane (Bedford Hills) and Overlook Drive (Bedford Hills) D265424/32760009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-01T11:31:45Z"},"road_event_id":"GqHIo3zA/45+8Nq0b+T4kZujUy0=","beginning_cross_street":"Green Lane","ending_cross_street":"Overlook Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758549,41.167526]]}},{"id":"MtVbffLzuiohWN7SDDA/rSLUqbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"smVq6m1cbS5OmV6O6mTrYAaPCws="},{"type":"next-occurrence","id":"SLtiBIbPVA1xWolAqoWOZod/nhs="}],"description":"Culvert repairs on NY 117 both directions between Green Lane (Bedford Hills) and Overlook Drive (Bedford Hills) D265424/32760009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-01T11:31:45Z"},"road_event_id":"MtVbffLzuiohWN7SDDA/rSLUqbM=","beginning_cross_street":"Green Lane","ending_cross_street":"Overlook Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758549,41.167526]]}},{"id":"SLtiBIbPVA1xWolAqoWOZod/nhs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"smVq6m1cbS5OmV6O6mTrYAaPCws="},{"type":"next-occurrence","id":"+RxzQCAlXyRKCgV6rbMyt6tt8Wk="}],"description":"Culvert repairs on NY 117 both directions between Green Lane (Bedford Hills) and Overlook Drive (Bedford Hills) D265424/32760009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-01T11:31:45Z"},"road_event_id":"SLtiBIbPVA1xWolAqoWOZod/nhs=","beginning_cross_street":"Green Lane","ending_cross_street":"Overlook Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758549,41.167526]]}},{"id":"+RxzQCAlXyRKCgV6rbMyt6tt8Wk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"smVq6m1cbS5OmV6O6mTrYAaPCws="},{"type":"next-occurrence","id":"PtfMFSdCHUP7h994ZQtBABiywpU="}],"description":"Culvert repairs on NY 117 both directions between Green Lane (Bedford Hills) and Overlook Drive (Bedford Hills) D265424/32760009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-01T11:31:45Z"},"road_event_id":"+RxzQCAlXyRKCgV6rbMyt6tt8Wk=","beginning_cross_street":"Green Lane","ending_cross_street":"Overlook Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758549,41.167526]]}},{"id":"PtfMFSdCHUP7h994ZQtBABiywpU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"smVq6m1cbS5OmV6O6mTrYAaPCws="},{"type":"next-occurrence","id":"SsHmLrRfvuwIK8ADoZHfT1WmZZA="}],"description":"Culvert repairs on NY 117 both directions between Green Lane (Bedford Hills) and Overlook Drive (Bedford Hills) D265424/32760009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-01T11:31:45Z"},"road_event_id":"PtfMFSdCHUP7h994ZQtBABiywpU=","beginning_cross_street":"Green Lane","ending_cross_street":"Overlook Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758549,41.167526]]}},{"id":"SsHmLrRfvuwIK8ADoZHfT1WmZZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"smVq6m1cbS5OmV6O6mTrYAaPCws="},{"type":"next-occurrence","id":"FmSvBNbSAfkxOvyL5OpSxOVaW60="}],"description":"Culvert repairs on NY 117 both directions between Green Lane (Bedford Hills) and Overlook Drive (Bedford Hills) D265424/32760009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-01T11:31:45Z"},"road_event_id":"SsHmLrRfvuwIK8ADoZHfT1WmZZA=","beginning_cross_street":"Green Lane","ending_cross_street":"Overlook Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758549,41.167526]]}},{"id":"FmSvBNbSAfkxOvyL5OpSxOVaW60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"smVq6m1cbS5OmV6O6mTrYAaPCws="}],"description":"Culvert repairs on NY 117 both directions between Green Lane (Bedford Hills) and Overlook Drive (Bedford Hills) D265424/32760009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-01T11:31:45Z"},"road_event_id":"FmSvBNbSAfkxOvyL5OpSxOVaW60=","beginning_cross_street":"Green Lane","ending_cross_street":"Overlook Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758549,41.167526]]}},{"id":"33ypP0RA5r1fNrBa9F3v3lCSGaw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Kl/HcM7QmKWQIP9Qq2gg8TT2ot8="}],"description":"Utility work on US 11 southbound between GILDNER RD (Hastings) and CR-37 (Hastings) ; Alternating one-way traffic with flaggers, Monday June 8th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-01T12:05:37Z"},"road_event_id":"33ypP0RA5r1fNrBa9F3v3lCSGaw=","beginning_cross_street":"GILDNER RD","ending_cross_street":"CR-37","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.143197,43.262976]]}},{"id":"Kl/HcM7QmKWQIP9Qq2gg8TT2ot8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"33ypP0RA5r1fNrBa9F3v3lCSGaw="},{"type":"next-occurrence","id":"lhEDK8rgtcv/i81Pn9cf9lAagGI="}],"description":"Utility work on US 11 southbound between GILDNER RD (Hastings) and CR-37 (Hastings) ; Alternating one-way traffic with flaggers, Monday June 8th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-01T12:05:37Z"},"road_event_id":"Kl/HcM7QmKWQIP9Qq2gg8TT2ot8=","beginning_cross_street":"GILDNER RD","ending_cross_street":"CR-37","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.143197,43.262976]]}},{"id":"lhEDK8rgtcv/i81Pn9cf9lAagGI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"33ypP0RA5r1fNrBa9F3v3lCSGaw="},{"type":"next-occurrence","id":"4h7SwtqE0lSUnIvWsdD3jwR9Xcg="}],"description":"Utility work on US 11 southbound between GILDNER RD (Hastings) and CR-37 (Hastings) ; Alternating one-way traffic with flaggers, Monday June 8th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-01T12:05:37Z"},"road_event_id":"lhEDK8rgtcv/i81Pn9cf9lAagGI=","beginning_cross_street":"GILDNER RD","ending_cross_street":"CR-37","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.143197,43.262976]]}},{"id":"4h7SwtqE0lSUnIvWsdD3jwR9Xcg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"33ypP0RA5r1fNrBa9F3v3lCSGaw="},{"type":"next-occurrence","id":"KUpT1BBMmdDiOIkEOmvhESiCmwk="}],"description":"Utility work on US 11 southbound between GILDNER RD (Hastings) and CR-37 (Hastings) ; Alternating one-way traffic with flaggers, Monday June 8th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-01T12:05:37Z"},"road_event_id":"4h7SwtqE0lSUnIvWsdD3jwR9Xcg=","beginning_cross_street":"GILDNER RD","ending_cross_street":"CR-37","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.143197,43.262976]]}},{"id":"KUpT1BBMmdDiOIkEOmvhESiCmwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"33ypP0RA5r1fNrBa9F3v3lCSGaw="},{"type":"next-occurrence","id":"DGFYWzJA5jkhroSLxQm/nJiK7tQ="}],"description":"Utility work on US 11 southbound between GILDNER RD (Hastings) and CR-37 (Hastings) ; Alternating one-way traffic with flaggers, Monday June 8th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-01T12:05:37Z"},"road_event_id":"KUpT1BBMmdDiOIkEOmvhESiCmwk=","beginning_cross_street":"GILDNER RD","ending_cross_street":"CR-37","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.143197,43.262976]]}},{"id":"DGFYWzJA5jkhroSLxQm/nJiK7tQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"33ypP0RA5r1fNrBa9F3v3lCSGaw="}],"description":"Utility work on US 11 southbound between GILDNER RD (Hastings) and CR-37 (Hastings) ; Alternating one-way traffic with flaggers, Monday June 8th, 2026 thru Monday June 15th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-01T12:05:37Z"},"road_event_id":"DGFYWzJA5jkhroSLxQm/nJiK7tQ=","beginning_cross_street":"GILDNER RD","ending_cross_street":"CR-37","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T12:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.143197,43.262976]]}},{"id":"zPJ2lADOO8fL4fqLD5arNX79ENI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DQ0JB0dCoo6vDxvIVWtQnAO0ccA="}],"description":"Gas main work on NY 208 southbound between Houston Place (Montgomery) and Aristotle Drive (Montgomery) 2026002249/32721609 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-01T12:20:27Z"},"road_event_id":"zPJ2lADOO8fL4fqLD5arNX79ENI=","beginning_cross_street":"Houston Place","ending_cross_street":"Aristotle Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.206722,41.507254]]}},{"id":"DQ0JB0dCoo6vDxvIVWtQnAO0ccA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPJ2lADOO8fL4fqLD5arNX79ENI="},{"type":"next-occurrence","id":"5d3x+D7P+l1XycrGxCaD3A1ILMI="}],"description":"Gas main work on NY 208 southbound between Houston Place (Montgomery) and Aristotle Drive (Montgomery) 2026002249/32721609 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-01T12:20:27Z"},"road_event_id":"DQ0JB0dCoo6vDxvIVWtQnAO0ccA=","beginning_cross_street":"Houston Place","ending_cross_street":"Aristotle Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.206722,41.507254]]}},{"id":"5d3x+D7P+l1XycrGxCaD3A1ILMI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPJ2lADOO8fL4fqLD5arNX79ENI="},{"type":"next-occurrence","id":"uIqCiMXDiVnsLaDad5daRgQ5L2w="}],"description":"Gas main work on NY 208 southbound between Houston Place (Montgomery) and Aristotle Drive (Montgomery) 2026002249/32721609 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-01T12:20:27Z"},"road_event_id":"5d3x+D7P+l1XycrGxCaD3A1ILMI=","beginning_cross_street":"Houston Place","ending_cross_street":"Aristotle Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.206722,41.507254]]}},{"id":"uIqCiMXDiVnsLaDad5daRgQ5L2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPJ2lADOO8fL4fqLD5arNX79ENI="},{"type":"next-occurrence","id":"vAZk4A/0YBQBoFPri2wEk7F1tZw="}],"description":"Gas main work on NY 208 southbound between Houston Place (Montgomery) and Aristotle Drive (Montgomery) 2026002249/32721609 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-01T12:20:27Z"},"road_event_id":"uIqCiMXDiVnsLaDad5daRgQ5L2w=","beginning_cross_street":"Houston Place","ending_cross_street":"Aristotle Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.206722,41.507254]]}},{"id":"vAZk4A/0YBQBoFPri2wEk7F1tZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPJ2lADOO8fL4fqLD5arNX79ENI="},{"type":"next-occurrence","id":"92Hg1QJbu8FRVFCQC8Q3Om5CniU="}],"description":"Gas main work on NY 208 southbound between Houston Place (Montgomery) and Aristotle Drive (Montgomery) 2026002249/32721609 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-01T12:20:27Z"},"road_event_id":"vAZk4A/0YBQBoFPri2wEk7F1tZw=","beginning_cross_street":"Houston Place","ending_cross_street":"Aristotle Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.206722,41.507254]]}},{"id":"92Hg1QJbu8FRVFCQC8Q3Om5CniU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPJ2lADOO8fL4fqLD5arNX79ENI="},{"type":"next-occurrence","id":"fwIlpdSqQnYObJMnbDwYChIEjj8="}],"description":"Gas main work on NY 208 southbound between Houston Place (Montgomery) and Aristotle Drive (Montgomery) 2026002249/32721609 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-01T12:20:27Z"},"road_event_id":"92Hg1QJbu8FRVFCQC8Q3Om5CniU=","beginning_cross_street":"Houston Place","ending_cross_street":"Aristotle Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.206722,41.507254]]}},{"id":"fwIlpdSqQnYObJMnbDwYChIEjj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPJ2lADOO8fL4fqLD5arNX79ENI="},{"type":"next-occurrence","id":"4GbolR/l0vCIm14VS0iv2cdpCiA="}],"description":"Gas main work on NY 208 southbound between Houston Place (Montgomery) and Aristotle Drive (Montgomery) 2026002249/32721609 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-01T12:20:27Z"},"road_event_id":"fwIlpdSqQnYObJMnbDwYChIEjj8=","beginning_cross_street":"Houston Place","ending_cross_street":"Aristotle Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.206722,41.507254]]}},{"id":"4GbolR/l0vCIm14VS0iv2cdpCiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPJ2lADOO8fL4fqLD5arNX79ENI="},{"type":"next-occurrence","id":"mufsNUBaVpbfw7KrH27LeEMjscc="}],"description":"Gas main work on NY 208 southbound between Houston Place (Montgomery) and Aristotle Drive (Montgomery) 2026002249/32721609 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-01T12:20:27Z"},"road_event_id":"4GbolR/l0vCIm14VS0iv2cdpCiA=","beginning_cross_street":"Houston Place","ending_cross_street":"Aristotle Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.206722,41.507254]]}},{"id":"mufsNUBaVpbfw7KrH27LeEMjscc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPJ2lADOO8fL4fqLD5arNX79ENI="},{"type":"next-occurrence","id":"0u4Y0Mm4PvS43gUt3K2hUgF6/k0="}],"description":"Gas main work on NY 208 southbound between Houston Place (Montgomery) and Aristotle Drive (Montgomery) 2026002249/32721609 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-01T12:20:27Z"},"road_event_id":"mufsNUBaVpbfw7KrH27LeEMjscc=","beginning_cross_street":"Houston Place","ending_cross_street":"Aristotle Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.206722,41.507254]]}},{"id":"0u4Y0Mm4PvS43gUt3K2hUgF6/k0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPJ2lADOO8fL4fqLD5arNX79ENI="},{"type":"next-occurrence","id":"nBq56102D4o+/XLPaE69L0rjZxs="}],"description":"Gas main work on NY 208 southbound between Houston Place (Montgomery) and Aristotle Drive (Montgomery) 2026002249/32721609 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-01T12:20:27Z"},"road_event_id":"0u4Y0Mm4PvS43gUt3K2hUgF6/k0=","beginning_cross_street":"Houston Place","ending_cross_street":"Aristotle Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.206722,41.507254]]}},{"id":"nBq56102D4o+/XLPaE69L0rjZxs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zPJ2lADOO8fL4fqLD5arNX79ENI="}],"description":"Gas main work on NY 208 southbound between Houston Place (Montgomery) and Aristotle Drive (Montgomery) 2026002249/32721609 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-01T12:20:27Z"},"road_event_id":"nBq56102D4o+/XLPaE69L0rjZxs=","beginning_cross_street":"Houston Place","ending_cross_street":"Aristotle Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.206722,41.507254]]}},{"id":"vEHgn0An+FKrQZN/M8WY4GCADhg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Rj+h+UIro3wzb/tA9V3VyZ2kX1U="}],"description":"Steel repairs on NY 695 southbound ramp from I-690 West (Geddes), Tuesday June 2nd, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-01T12:41:44Z"},"road_event_id":"vEHgn0An+FKrQZN/M8WY4GCADhg=","beginning_cross_street":"I-690 West ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.220375,43.080897]]}},{"id":"Rj+h+UIro3wzb/tA9V3VyZ2kX1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vEHgn0An+FKrQZN/M8WY4GCADhg="},{"type":"next-occurrence","id":"wUumCAZXyp8lu4JnPdfROTLQu+Q="}],"description":"Steel repairs on NY 695 southbound ramp from I-690 West (Geddes), Tuesday June 2nd, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-01T12:41:44Z"},"road_event_id":"Rj+h+UIro3wzb/tA9V3VyZ2kX1U=","beginning_cross_street":"I-690 West ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.220375,43.080897]]}},{"id":"wUumCAZXyp8lu4JnPdfROTLQu+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vEHgn0An+FKrQZN/M8WY4GCADhg="},{"type":"next-occurrence","id":"H0o6yzws/LMBBWFasOEzFXusH4s="}],"description":"Steel repairs on NY 695 southbound ramp from I-690 West (Geddes), Tuesday June 2nd, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-01T12:41:44Z"},"road_event_id":"wUumCAZXyp8lu4JnPdfROTLQu+Q=","beginning_cross_street":"I-690 West ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.220375,43.080897]]}},{"id":"H0o6yzws/LMBBWFasOEzFXusH4s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vEHgn0An+FKrQZN/M8WY4GCADhg="},{"type":"next-occurrence","id":"FuSoWVoOYQ8otVp6QuojhY2vwHc="}],"description":"Steel repairs on NY 695 southbound ramp from I-690 West (Geddes), Tuesday June 2nd, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-01T12:41:44Z"},"road_event_id":"H0o6yzws/LMBBWFasOEzFXusH4s=","beginning_cross_street":"I-690 West ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.220375,43.080897]]}},{"id":"FuSoWVoOYQ8otVp6QuojhY2vwHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vEHgn0An+FKrQZN/M8WY4GCADhg="},{"type":"next-occurrence","id":"ICo0codDNfpMuycmNloUJZ2dWvw="}],"description":"Steel repairs on NY 695 southbound ramp from I-690 West (Geddes), Tuesday June 2nd, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-01T12:41:44Z"},"road_event_id":"FuSoWVoOYQ8otVp6QuojhY2vwHc=","beginning_cross_street":"I-690 West ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.220375,43.080897]]}},{"id":"ICo0codDNfpMuycmNloUJZ2dWvw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vEHgn0An+FKrQZN/M8WY4GCADhg="},{"type":"next-occurrence","id":"PW5CKuplM8MNcFlwb91Cxykooyk="}],"description":"Steel repairs on NY 695 southbound ramp from I-690 West (Geddes), Tuesday June 2nd, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-01T12:41:44Z"},"road_event_id":"ICo0codDNfpMuycmNloUJZ2dWvw=","beginning_cross_street":"I-690 West ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.220375,43.080897]]}},{"id":"PW5CKuplM8MNcFlwb91Cxykooyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vEHgn0An+FKrQZN/M8WY4GCADhg="}],"description":"Steel repairs on NY 695 southbound ramp from I-690 West (Geddes), Tuesday June 2nd, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-01T12:41:44Z"},"road_event_id":"PW5CKuplM8MNcFlwb91Cxykooyk=","beginning_cross_street":"I-690 West ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.220375,43.080897]]}},{"id":"PrjfPJjM167nHK33BBcTY4qWAEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 13 southbound between 3rd St (Ithaca) and Elmira Rd (Ithaca) ; Alternating lane closures, Tuesday June 2nd, 2026 thru Sunday June 7th, 2026, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-06-01T12:49:15Z"},"road_event_id":"PrjfPJjM167nHK33BBcTY4qWAEc=","beginning_cross_street":"3rd St ","ending_cross_street":"Elmira Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.506711,42.448408]]}},{"id":"EPW4vtcLhn/FbcoE8m6ds+if3OA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 13 northbound between Elmira Rd (Ithaca) and 3rd St (Ithaca) ; Alternating lane closures, Tuesday June 2nd, 2026 thru Sunday June 7th, 2026, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-06-01T12:53:33Z"},"road_event_id":"EPW4vtcLhn/FbcoE8m6ds+if3OA=","beginning_cross_street":"Elmira Rd","ending_cross_street":"3rd St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508062,42.428621]]}},{"id":"lugWirL/cwXgrMOxoruXshEh+p4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between South of Exit 3 - New Durham Rd (Edison Twp) and Exit 6 - CR 665/Washington Ave (Piscataway Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 04:00 AM, left lane closed","update_date":"2026-06-01T13:10:41Z"},"road_event_id":"lugWirL/cwXgrMOxoruXshEh+p4=","beginning_cross_street":"South of Exit 3 - New Durham Rd","ending_cross_street":"Exit 6 - CR 665/Washington Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.388107,40.54058]]}},{"id":"dm1EtNnNJ5z8gfWyrG0yiZP5fSk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between Exit 6 - CR 665/Washington Ave (Piscataway Twp) and South of Exit 3 - New Durham Rd (Edison Twp), Friday June 5, 2026 09:00 PM thru Saturday June 6, 2026 05:00 AM, left lane closed","update_date":"2026-06-01T13:11:30Z"},"road_event_id":"dm1EtNnNJ5z8gfWyrG0yiZP5fSk=","beginning_cross_street":"Exit 6 - CR 665/Washington Ave","ending_cross_street":"South of Exit 3 - New Durham Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.446006,40.555458]]}},{"id":"UBizo1f9pPT6rMqWyL0i52H+TVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound between South of CR 610/Fox Meadow Dr (Maple Shade Twp) and CR 619/Marlton Pike (Evesham Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, right shoulder closed","update_date":"2026-06-01T13:11:06Z"},"road_event_id":"UBizo1f9pPT6rMqWyL0i52H+TVY=","beginning_cross_street":"South of CR 610/Fox Meadow Dr","ending_cross_street":"CR 619/Marlton Pike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.983886,39.94667]]}},{"id":"RnLP1ybh2leoQ8Z2afivdWp+rFk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound between CR 619/Marlton Pike (Evesham Twp) and South of CR 610/Fox Meadow Dr (Maple Shade Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, right shoulder closed","update_date":"2026-06-01T13:11:20Z"},"road_event_id":"RnLP1ybh2leoQ8Z2afivdWp+rFk=","beginning_cross_street":"CR 619/Marlton Pike","ending_cross_street":"South of CR 610/Fox Meadow Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.926025,39.891479]]}},{"id":"ORC30540009","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","description":"Pothole repair on Saw Mill River Parkway northbound between Exit 21E - NY 119 (Greenburgh) and I-684 (Bedford) Res 8-9 RW/30540009 - This is a moving operation. Plan travel accordingly; delays may exist Not currently scheduled","update_date":"2026-06-04T18:30:16Z"},"road_event_id":"ORC30540009","beginning_cross_street":"Exit 21E - Frontage Road","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2023-10-03T13:48:59Z","end_date":"2026-06-05T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.822184,41.062862]]}},{"id":"WTkgYv4a0JCy7cS1H/JkBLrwpvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 19 both directions between Bissel Rd. (Bergen) and SACKETT RD (Bergen) ROAD CLOSED FOLLOW POSTED DETOUR , Continuous Tuesday June 2nd, 2026 07:00 AM thru Wednesday September 30th, 2026 03:30 PM All lanes closed and detoured","update_date":"2026-06-01T14:49:18Z"},"road_event_id":"WTkgYv4a0JCy7cS1H/JkBLrwpvo=","beginning_cross_street":"Bissel Rd. ","ending_cross_street":"SACKETT RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.932421,43.096442]]}},{"id":"vqkFD3Vylahq/Etagn4BF/nPUF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KRHMArj6JR97GNbkMD1HLbHbjc0="}],"description":"Bridge work on Bronx River Parkway southbound between Palmer Avenue (Yonkers) and Exit - Sprain Brook Parkway (Yonkers) � There will be single lane closures , Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T18:04:15Z"},"road_event_id":"vqkFD3Vylahq/Etagn4BF/nPUF4=","beginning_cross_street":"Palmer Avenue","ending_cross_street":"Exit - Sprain Brook Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:30:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.83907,40.9413]]}},{"id":"KRHMArj6JR97GNbkMD1HLbHbjc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vqkFD3Vylahq/Etagn4BF/nPUF4="},{"type":"next-occurrence","id":"qZQDQTEXf1F2gokqOXm0TA2JT3k="}],"description":"Bridge work on Bronx River Parkway southbound between Palmer Avenue (Yonkers) and Exit - Sprain Brook Parkway (Yonkers) � There will be single lane closures , Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T18:04:15Z"},"road_event_id":"KRHMArj6JR97GNbkMD1HLbHbjc0=","beginning_cross_street":"Palmer Avenue","ending_cross_street":"Exit - Sprain Brook Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.83907,40.9413]]}},{"id":"qZQDQTEXf1F2gokqOXm0TA2JT3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vqkFD3Vylahq/Etagn4BF/nPUF4="},{"type":"next-occurrence","id":"vfU2CE2Uc8eWvXUadd/UpFCtr6w="}],"description":"Bridge work on Bronx River Parkway southbound between Palmer Avenue (Yonkers) and Exit - Sprain Brook Parkway (Yonkers) � There will be single lane closures , Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T18:04:15Z"},"road_event_id":"qZQDQTEXf1F2gokqOXm0TA2JT3k=","beginning_cross_street":"Palmer Avenue","ending_cross_street":"Exit - Sprain Brook Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.83907,40.9413]]}},{"id":"vfU2CE2Uc8eWvXUadd/UpFCtr6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vqkFD3Vylahq/Etagn4BF/nPUF4="},{"type":"next-occurrence","id":"Rt3jsPSCNBfxaNHRz4MLAJe2BZ0="}],"description":"Bridge work on Bronx River Parkway southbound between Palmer Avenue (Yonkers) and Exit - Sprain Brook Parkway (Yonkers) � There will be single lane closures , Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T18:04:15Z"},"road_event_id":"vfU2CE2Uc8eWvXUadd/UpFCtr6w=","beginning_cross_street":"Palmer Avenue","ending_cross_street":"Exit - Sprain Brook Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.83907,40.9413]]}},{"id":"Rt3jsPSCNBfxaNHRz4MLAJe2BZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vqkFD3Vylahq/Etagn4BF/nPUF4="},{"type":"next-occurrence","id":"GLHykiBfbE2SPZcwkqwNijDT7po="}],"description":"Bridge work on Bronx River Parkway southbound between Palmer Avenue (Yonkers) and Exit - Sprain Brook Parkway (Yonkers) � There will be single lane closures , Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T18:04:15Z"},"road_event_id":"Rt3jsPSCNBfxaNHRz4MLAJe2BZ0=","beginning_cross_street":"Palmer Avenue","ending_cross_street":"Exit - Sprain Brook Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.83907,40.9413]]}},{"id":"GLHykiBfbE2SPZcwkqwNijDT7po=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vqkFD3Vylahq/Etagn4BF/nPUF4="}],"description":"Bridge work on Bronx River Parkway southbound between Palmer Avenue (Yonkers) and Exit - Sprain Brook Parkway (Yonkers) � There will be single lane closures , Monday June 1st, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T18:04:15Z"},"road_event_id":"GLHykiBfbE2SPZcwkqwNijDT7po=","beginning_cross_street":"Palmer Avenue","ending_cross_street":"Exit - Sprain Brook Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.83907,40.9413]]}},{"id":"Hd/DBAg9AD4p7jI2R4eQZ0lKmr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WkhYqf2q1mhTRas2KNeXDIU2Quk="}],"description":"Utility work on NY 52 both directions between NY-376 (East Fishkill) and Blue Hill Road (East Fishkill) 2025083592928/32763309 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T18:33:01Z"},"road_event_id":"Hd/DBAg9AD4p7jI2R4eQZ0lKmr8=","beginning_cross_street":"NY-376","ending_cross_street":"Blue Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.797246,41.552909]]}},{"id":"WkhYqf2q1mhTRas2KNeXDIU2Quk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hd/DBAg9AD4p7jI2R4eQZ0lKmr8="},{"type":"next-occurrence","id":"GmZS9OxSxtJ4qI3Utquqa9vHvzo="}],"description":"Utility work on NY 52 both directions between NY-376 (East Fishkill) and Blue Hill Road (East Fishkill) 2025083592928/32763309 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T18:33:01Z"},"road_event_id":"WkhYqf2q1mhTRas2KNeXDIU2Quk=","beginning_cross_street":"NY-376","ending_cross_street":"Blue Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.797246,41.552909]]}},{"id":"GmZS9OxSxtJ4qI3Utquqa9vHvzo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hd/DBAg9AD4p7jI2R4eQZ0lKmr8="},{"type":"next-occurrence","id":"vnS61Xdih5or0hcQFuc2DD0a5ng="}],"description":"Utility work on NY 52 both directions between NY-376 (East Fishkill) and Blue Hill Road (East Fishkill) 2025083592928/32763309 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T18:33:01Z"},"road_event_id":"GmZS9OxSxtJ4qI3Utquqa9vHvzo=","beginning_cross_street":"NY-376","ending_cross_street":"Blue Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.797246,41.552909]]}},{"id":"vnS61Xdih5or0hcQFuc2DD0a5ng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hd/DBAg9AD4p7jI2R4eQZ0lKmr8="},{"type":"next-occurrence","id":"fpYIYl7ruGjGoXMmbhlypesZqhc="}],"description":"Utility work on NY 52 both directions between NY-376 (East Fishkill) and Blue Hill Road (East Fishkill) 2025083592928/32763309 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T18:33:01Z"},"road_event_id":"vnS61Xdih5or0hcQFuc2DD0a5ng=","beginning_cross_street":"NY-376","ending_cross_street":"Blue Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.797246,41.552909]]}},{"id":"fpYIYl7ruGjGoXMmbhlypesZqhc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hd/DBAg9AD4p7jI2R4eQZ0lKmr8="},{"type":"next-occurrence","id":"p5jNVMYua3MMKCUju2QgauxE1rg="}],"description":"Utility work on NY 52 both directions between NY-376 (East Fishkill) and Blue Hill Road (East Fishkill) 2025083592928/32763309 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T18:33:01Z"},"road_event_id":"fpYIYl7ruGjGoXMmbhlypesZqhc=","beginning_cross_street":"NY-376","ending_cross_street":"Blue Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.797246,41.552909]]}},{"id":"p5jNVMYua3MMKCUju2QgauxE1rg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hd/DBAg9AD4p7jI2R4eQZ0lKmr8="}],"description":"Utility work on NY 52 both directions between NY-376 (East Fishkill) and Blue Hill Road (East Fishkill) 2025083592928/32763309 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 4th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-05T18:33:01Z"},"road_event_id":"p5jNVMYua3MMKCUju2QgauxE1rg=","beginning_cross_street":"NY-376","ending_cross_street":"Blue Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.797246,41.552909]]}},{"id":"fw4g/WiSRhkZ793A1H7nCiySbOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"31UYkuGiWBi4+HdV0Us+IV99sIM="}],"description":"Road maintenance operations on NY 17 [Rockland] both directions between Suffern Road (Ramapo) and Exit - US 6 (Woodbury) D265400/32437409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Sunday June 1st, 2025 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T15:43:28Z"},"road_event_id":"fw4g/WiSRhkZ793A1H7nCiySbOc=","beginning_cross_street":"Suffern Road","ending_cross_street":"Exit - US 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:30:00Z","end_date":"2026-06-05T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.165749,41.121465]]}},{"id":"31UYkuGiWBi4+HdV0Us+IV99sIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fw4g/WiSRhkZ793A1H7nCiySbOc="},{"type":"next-occurrence","id":"UBlNHpMv98En3OC7KhP9/iVYILM="}],"description":"Road maintenance operations on NY 17 [Rockland] both directions between Suffern Road (Ramapo) and Exit - US 6 (Woodbury) D265400/32437409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Sunday June 1st, 2025 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T15:43:28Z"},"road_event_id":"31UYkuGiWBi4+HdV0Us+IV99sIM=","beginning_cross_street":"Suffern Road","ending_cross_street":"Exit - US 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.165749,41.121465]]}},{"id":"UBlNHpMv98En3OC7KhP9/iVYILM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fw4g/WiSRhkZ793A1H7nCiySbOc="},{"type":"next-occurrence","id":"K8+1EYPJ/KyHV5bV68e9PQDV/vU="}],"description":"Road maintenance operations on NY 17 [Rockland] both directions between Suffern Road (Ramapo) and Exit - US 6 (Woodbury) D265400/32437409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Sunday June 1st, 2025 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T15:43:28Z"},"road_event_id":"UBlNHpMv98En3OC7KhP9/iVYILM=","beginning_cross_street":"Suffern Road","ending_cross_street":"Exit - US 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.165749,41.121465]]}},{"id":"K8+1EYPJ/KyHV5bV68e9PQDV/vU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fw4g/WiSRhkZ793A1H7nCiySbOc="},{"type":"next-occurrence","id":"Tej2JaqL74DfLiHJGmBnKU4MEOQ="}],"description":"Road maintenance operations on NY 17 [Rockland] both directions between Suffern Road (Ramapo) and Exit - US 6 (Woodbury) D265400/32437409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Sunday June 1st, 2025 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T15:43:28Z"},"road_event_id":"K8+1EYPJ/KyHV5bV68e9PQDV/vU=","beginning_cross_street":"Suffern Road","ending_cross_street":"Exit - US 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.165749,41.121465]]}},{"id":"Tej2JaqL74DfLiHJGmBnKU4MEOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fw4g/WiSRhkZ793A1H7nCiySbOc="},{"type":"next-occurrence","id":"ZnQyUukgmDMfsMm/tRI1NXtxBwE="}],"description":"Road maintenance operations on NY 17 [Rockland] both directions between Suffern Road (Ramapo) and Exit - US 6 (Woodbury) D265400/32437409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Sunday June 1st, 2025 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T15:43:28Z"},"road_event_id":"Tej2JaqL74DfLiHJGmBnKU4MEOQ=","beginning_cross_street":"Suffern Road","ending_cross_street":"Exit - US 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.165749,41.121465]]}},{"id":"ZnQyUukgmDMfsMm/tRI1NXtxBwE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fw4g/WiSRhkZ793A1H7nCiySbOc="},{"type":"next-occurrence","id":"qQqlB0aI+OeqcWsw5tbXAy0QdRM="}],"description":"Road maintenance operations on NY 17 [Rockland] both directions between Suffern Road (Ramapo) and Exit - US 6 (Woodbury) D265400/32437409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Sunday June 1st, 2025 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T15:43:28Z"},"road_event_id":"ZnQyUukgmDMfsMm/tRI1NXtxBwE=","beginning_cross_street":"Suffern Road","ending_cross_street":"Exit - US 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.165749,41.121465]]}},{"id":"qQqlB0aI+OeqcWsw5tbXAy0QdRM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fw4g/WiSRhkZ793A1H7nCiySbOc="}],"description":"Road maintenance operations on NY 17 [Rockland] both directions between Suffern Road (Ramapo) and Exit - US 6 (Woodbury) D265400/32437409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Sunday June 1st, 2025 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T15:43:28Z"},"road_event_id":"qQqlB0aI+OeqcWsw5tbXAy0QdRM=","beginning_cross_street":"Suffern Road","ending_cross_street":"Exit - US 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:30:00Z","end_date":"2026-06-15T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.165749,41.121465]]}},{"id":"T9h/nqjKhABbCbprUPyXJtLNV4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pjVQRwKwOloy6g9luVPjWqA1XgA="}],"description":"Road maintenance operations on I-684 northbound between Hutchinson River Parkway (Harrison) and I-287 (Harrison) D265400/32415809 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-06-01T16:51:43Z"},"road_event_id":"T9h/nqjKhABbCbprUPyXJtLNV4w=","beginning_cross_street":"","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715321,41.020143]]}},{"id":"pjVQRwKwOloy6g9luVPjWqA1XgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T9h/nqjKhABbCbprUPyXJtLNV4w="},{"type":"next-occurrence","id":"V8W+9WXK/3Hf7tNMRrKM2WaS2w0="}],"description":"Road maintenance operations on I-684 northbound between Hutchinson River Parkway (Harrison) and I-287 (Harrison) D265400/32415809 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-06-01T16:51:43Z"},"road_event_id":"pjVQRwKwOloy6g9luVPjWqA1XgA=","beginning_cross_street":"","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715321,41.020143]]}},{"id":"V8W+9WXK/3Hf7tNMRrKM2WaS2w0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T9h/nqjKhABbCbprUPyXJtLNV4w="},{"type":"next-occurrence","id":"XoPMkyAW/HXPrhIls56ty70ckDU="}],"description":"Road maintenance operations on I-684 northbound between Hutchinson River Parkway (Harrison) and I-287 (Harrison) D265400/32415809 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-06-01T16:51:43Z"},"road_event_id":"V8W+9WXK/3Hf7tNMRrKM2WaS2w0=","beginning_cross_street":"","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715321,41.020143]]}},{"id":"XoPMkyAW/HXPrhIls56ty70ckDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T9h/nqjKhABbCbprUPyXJtLNV4w="},{"type":"next-occurrence","id":"ddGxO14dRO0Eo4xP9Ke9ioVWnYo="}],"description":"Road maintenance operations on I-684 northbound between Hutchinson River Parkway (Harrison) and I-287 (Harrison) D265400/32415809 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-06-01T16:51:43Z"},"road_event_id":"XoPMkyAW/HXPrhIls56ty70ckDU=","beginning_cross_street":"","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715321,41.020143]]}},{"id":"ddGxO14dRO0Eo4xP9Ke9ioVWnYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T9h/nqjKhABbCbprUPyXJtLNV4w="}],"description":"Road maintenance operations on I-684 northbound between Hutchinson River Parkway (Harrison) and I-287 (Harrison) D265400/32415809 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-06-01T16:51:43Z"},"road_event_id":"ddGxO14dRO0Eo4xP9Ke9ioVWnYo=","beginning_cross_street":"","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715321,41.020143]]}},{"id":"NCLWKV43Ux2XmVm7sc/so8OkQw4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mF71iU8gBruHs3GrY36qOll/Q7s="}],"description":"Road maintenance operations on I-684 southbound between I-287 (Harrison) and Hutchinson River Parkway (Harrison) D265400/32416209 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, shoulder closure","update_date":"2026-06-01T16:53:24Z"},"road_event_id":"NCLWKV43Ux2XmVm7sc/so8OkQw4=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.719213,41.009155]]}},{"id":"mF71iU8gBruHs3GrY36qOll/Q7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NCLWKV43Ux2XmVm7sc/so8OkQw4="},{"type":"next-occurrence","id":"h2FKOfCYPZjXzqgA9rm+Gil+Jwo="}],"description":"Road maintenance operations on I-684 southbound between I-287 (Harrison) and Hutchinson River Parkway (Harrison) D265400/32416209 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, shoulder closure","update_date":"2026-06-01T16:53:24Z"},"road_event_id":"mF71iU8gBruHs3GrY36qOll/Q7s=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.719213,41.009155]]}},{"id":"h2FKOfCYPZjXzqgA9rm+Gil+Jwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NCLWKV43Ux2XmVm7sc/so8OkQw4="},{"type":"next-occurrence","id":"p1Rh046V4ZbAJRDoUIptiPOeKso="}],"description":"Road maintenance operations on I-684 southbound between I-287 (Harrison) and Hutchinson River Parkway (Harrison) D265400/32416209 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, shoulder closure","update_date":"2026-06-01T16:53:24Z"},"road_event_id":"h2FKOfCYPZjXzqgA9rm+Gil+Jwo=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.719213,41.009155]]}},{"id":"p1Rh046V4ZbAJRDoUIptiPOeKso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NCLWKV43Ux2XmVm7sc/so8OkQw4="},{"type":"next-occurrence","id":"wmLKi3Wv2tZ5PKcLVpiiq6049qw="}],"description":"Road maintenance operations on I-684 southbound between I-287 (Harrison) and Hutchinson River Parkway (Harrison) D265400/32416209 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, shoulder closure","update_date":"2026-06-01T16:53:24Z"},"road_event_id":"p1Rh046V4ZbAJRDoUIptiPOeKso=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.719213,41.009155]]}},{"id":"wmLKi3Wv2tZ5PKcLVpiiq6049qw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NCLWKV43Ux2XmVm7sc/so8OkQw4="}],"description":"Road maintenance operations on I-684 southbound between I-287 (Harrison) and Hutchinson River Parkway (Harrison) D265400/32416209 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 05:00 PM, shoulder closure","update_date":"2026-06-01T16:53:24Z"},"road_event_id":"wmLKi3Wv2tZ5PKcLVpiiq6049qw=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.719213,41.009155]]}},{"id":"9ieKz4EFhK9bKJVI5exi/m77coY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BgK0aTz+iU2QPs0MDFqkpebVoZ8="}],"description":"Road maintenance operations on I-84 both directions between Pennsylvania State Line (Port Jervis) and Newburgh - Beacon Bridge (Beacon) D265400/32585409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T17:00:23Z"},"road_event_id":"9ieKz4EFhK9bKJVI5exi/m77coY=","beginning_cross_street":"Pennsylvania State Line","ending_cross_street":"Newburgh - Beacon Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.676632,41.35361]]}},{"id":"BgK0aTz+iU2QPs0MDFqkpebVoZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ieKz4EFhK9bKJVI5exi/m77coY="},{"type":"next-occurrence","id":"hJfB2nCTJUVLFa7vQ1ZIOaczJzw="}],"description":"Road maintenance operations on I-84 both directions between Pennsylvania State Line (Port Jervis) and Newburgh - Beacon Bridge (Beacon) D265400/32585409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T17:00:23Z"},"road_event_id":"BgK0aTz+iU2QPs0MDFqkpebVoZ8=","beginning_cross_street":"Pennsylvania State Line","ending_cross_street":"Newburgh - Beacon Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.676632,41.35361]]}},{"id":"hJfB2nCTJUVLFa7vQ1ZIOaczJzw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ieKz4EFhK9bKJVI5exi/m77coY="},{"type":"next-occurrence","id":"fOOyGoo/iQGN2jFhwK2wUiL7fbE="}],"description":"Road maintenance operations on I-84 both directions between Pennsylvania State Line (Port Jervis) and Newburgh - Beacon Bridge (Beacon) D265400/32585409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T17:00:23Z"},"road_event_id":"hJfB2nCTJUVLFa7vQ1ZIOaczJzw=","beginning_cross_street":"Pennsylvania State Line","ending_cross_street":"Newburgh - Beacon Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.676632,41.35361]]}},{"id":"fOOyGoo/iQGN2jFhwK2wUiL7fbE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ieKz4EFhK9bKJVI5exi/m77coY="},{"type":"next-occurrence","id":"xV+2XgqQW1dQf8fvvlNnb/KdFi0="}],"description":"Road maintenance operations on I-84 both directions between Pennsylvania State Line (Port Jervis) and Newburgh - Beacon Bridge (Beacon) D265400/32585409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T17:00:23Z"},"road_event_id":"fOOyGoo/iQGN2jFhwK2wUiL7fbE=","beginning_cross_street":"Pennsylvania State Line","ending_cross_street":"Newburgh - Beacon Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.676632,41.35361]]}},{"id":"xV+2XgqQW1dQf8fvvlNnb/KdFi0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ieKz4EFhK9bKJVI5exi/m77coY="},{"type":"next-occurrence","id":"FhgLGGN2O8TOkT6hDOWnkJgfuYw="}],"description":"Road maintenance operations on I-84 both directions between Pennsylvania State Line (Port Jervis) and Newburgh - Beacon Bridge (Beacon) D265400/32585409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T17:00:23Z"},"road_event_id":"xV+2XgqQW1dQf8fvvlNnb/KdFi0=","beginning_cross_street":"Pennsylvania State Line","ending_cross_street":"Newburgh - Beacon Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.676632,41.35361]]}},{"id":"FhgLGGN2O8TOkT6hDOWnkJgfuYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ieKz4EFhK9bKJVI5exi/m77coY="}],"description":"Road maintenance operations on I-84 both directions between Pennsylvania State Line (Port Jervis) and Newburgh - Beacon Bridge (Beacon) D265400/32585409 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T17:00:23Z"},"road_event_id":"FhgLGGN2O8TOkT6hDOWnkJgfuYw=","beginning_cross_street":"Pennsylvania State Line","ending_cross_street":"Newburgh - Beacon Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.676632,41.35361]]}},{"id":"wSAlOzuS716JsnyGz7t8rrarPyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Da+cLx0FU1PPdwgaYhq5fv7Jtqc="}],"description":"Road maintenance operations on I-84 both directions between Newburgh - Beacon Bridge (Beacon) and Connecticut State Line (Southeast) D265400/32585309 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T16:59:55Z"},"road_event_id":"wSAlOzuS716JsnyGz7t8rrarPyo=","beginning_cross_street":"Newburgh - Beacon Bridge","ending_cross_street":"Connecticut State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967412,41.519387]]}},{"id":"Da+cLx0FU1PPdwgaYhq5fv7Jtqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wSAlOzuS716JsnyGz7t8rrarPyo="},{"type":"next-occurrence","id":"+RyDLnwMhaEgIGkPFp5Prwju7f8="}],"description":"Road maintenance operations on I-84 both directions between Newburgh - Beacon Bridge (Beacon) and Connecticut State Line (Southeast) D265400/32585309 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T16:59:55Z"},"road_event_id":"Da+cLx0FU1PPdwgaYhq5fv7Jtqc=","beginning_cross_street":"Newburgh - Beacon Bridge","ending_cross_street":"Connecticut State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967412,41.519387]]}},{"id":"+RyDLnwMhaEgIGkPFp5Prwju7f8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wSAlOzuS716JsnyGz7t8rrarPyo="},{"type":"next-occurrence","id":"Fy2C53S62ZpbJd5k37W6RL09zk0="}],"description":"Road maintenance operations on I-84 both directions between Newburgh - Beacon Bridge (Beacon) and Connecticut State Line (Southeast) D265400/32585309 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T16:59:55Z"},"road_event_id":"+RyDLnwMhaEgIGkPFp5Prwju7f8=","beginning_cross_street":"Newburgh - Beacon Bridge","ending_cross_street":"Connecticut State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967412,41.519387]]}},{"id":"Fy2C53S62ZpbJd5k37W6RL09zk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wSAlOzuS716JsnyGz7t8rrarPyo="},{"type":"next-occurrence","id":"sj3Rw8rnGMsyWEVQ1EYqkpJAnzA="}],"description":"Road maintenance operations on I-84 both directions between Newburgh - Beacon Bridge (Beacon) and Connecticut State Line (Southeast) D265400/32585309 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T16:59:55Z"},"road_event_id":"Fy2C53S62ZpbJd5k37W6RL09zk0=","beginning_cross_street":"Newburgh - Beacon Bridge","ending_cross_street":"Connecticut State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967412,41.519387]]}},{"id":"sj3Rw8rnGMsyWEVQ1EYqkpJAnzA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wSAlOzuS716JsnyGz7t8rrarPyo="},{"type":"next-occurrence","id":"C7YonswmgyY5NLsNgFKh/8jzlgU="}],"description":"Road maintenance operations on I-84 both directions between Newburgh - Beacon Bridge (Beacon) and Connecticut State Line (Southeast) D265400/32585309 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T16:59:55Z"},"road_event_id":"sj3Rw8rnGMsyWEVQ1EYqkpJAnzA=","beginning_cross_street":"Newburgh - Beacon Bridge","ending_cross_street":"Connecticut State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967412,41.519387]]}},{"id":"C7YonswmgyY5NLsNgFKh/8jzlgU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wSAlOzuS716JsnyGz7t8rrarPyo="}],"description":"Road maintenance operations on I-84 both directions between Newburgh - Beacon Bridge (Beacon) and Connecticut State Line (Southeast) D265400/32585309 - This work is weather permitting. This is a moving operation. Plan travel accordingly; delays may exist, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closure","update_date":"2026-06-01T16:59:55Z"},"road_event_id":"C7YonswmgyY5NLsNgFKh/8jzlgU=","beginning_cross_street":"Newburgh - Beacon Bridge","ending_cross_street":"Connecticut State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967412,41.519387]]}},{"id":"Gzw3w5CuzPkEu1n4VwDcnMbu/gE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OqqIrRBCodmCSF8GHVGKPt9hNGY="}],"description":"Guard rail repairs on NY 414 both directions COOLEY RD (Dix) to CR 17 (Dix) 1 Lane, 2 Way, Flagger Control, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:30 AM thru 03:30 PM All lanes open","update_date":"2026-06-01T17:08:28Z"},"road_event_id":"Gzw3w5CuzPkEu1n4VwDcnMbu/gE=","beginning_cross_street":"COOLEY RD","ending_cross_street":"CR 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.937131,42.313507]]}},{"id":"OqqIrRBCodmCSF8GHVGKPt9hNGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Gzw3w5CuzPkEu1n4VwDcnMbu/gE="},{"type":"next-occurrence","id":"1PwA2UwpmIOVc8z+RnvKdnNH7m4="}],"description":"Guard rail repairs on NY 414 both directions COOLEY RD (Dix) to CR 17 (Dix) 1 Lane, 2 Way, Flagger Control, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:30 AM thru 03:30 PM All lanes open","update_date":"2026-06-01T17:08:28Z"},"road_event_id":"OqqIrRBCodmCSF8GHVGKPt9hNGY=","beginning_cross_street":"COOLEY RD","ending_cross_street":"CR 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:30:00Z","end_date":"2026-06-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.937131,42.313507]]}},{"id":"1PwA2UwpmIOVc8z+RnvKdnNH7m4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Gzw3w5CuzPkEu1n4VwDcnMbu/gE="},{"type":"next-occurrence","id":"HFwyp68dLsE8Ad0SU0p54gzRqeY="}],"description":"Guard rail repairs on NY 414 both directions COOLEY RD (Dix) to CR 17 (Dix) 1 Lane, 2 Way, Flagger Control, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:30 AM thru 03:30 PM All lanes open","update_date":"2026-06-01T17:08:28Z"},"road_event_id":"1PwA2UwpmIOVc8z+RnvKdnNH7m4=","beginning_cross_street":"COOLEY RD","ending_cross_street":"CR 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T10:30:00Z","end_date":"2026-06-07T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.937131,42.313507]]}},{"id":"HFwyp68dLsE8Ad0SU0p54gzRqeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Gzw3w5CuzPkEu1n4VwDcnMbu/gE="},{"type":"next-occurrence","id":"L5IAju7VIWZk/aRr2GuyhovNzoI="}],"description":"Guard rail repairs on NY 414 both directions COOLEY RD (Dix) to CR 17 (Dix) 1 Lane, 2 Way, Flagger Control, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:30 AM thru 03:30 PM All lanes open","update_date":"2026-06-01T17:08:28Z"},"road_event_id":"HFwyp68dLsE8Ad0SU0p54gzRqeY=","beginning_cross_street":"COOLEY RD","ending_cross_street":"CR 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.937131,42.313507]]}},{"id":"L5IAju7VIWZk/aRr2GuyhovNzoI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Gzw3w5CuzPkEu1n4VwDcnMbu/gE="},{"type":"next-occurrence","id":"49m6Smf123sx3chqjir5EyXqycI="}],"description":"Guard rail repairs on NY 414 both directions COOLEY RD (Dix) to CR 17 (Dix) 1 Lane, 2 Way, Flagger Control, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:30 AM thru 03:30 PM All lanes open","update_date":"2026-06-01T17:08:28Z"},"road_event_id":"L5IAju7VIWZk/aRr2GuyhovNzoI=","beginning_cross_street":"COOLEY RD","ending_cross_street":"CR 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.937131,42.313507]]}},{"id":"49m6Smf123sx3chqjir5EyXqycI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Gzw3w5CuzPkEu1n4VwDcnMbu/gE="},{"type":"next-occurrence","id":"rgsWWE3BVIyAcFGBnaFUxlvi4rw="}],"description":"Guard rail repairs on NY 414 both directions COOLEY RD (Dix) to CR 17 (Dix) 1 Lane, 2 Way, Flagger Control, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:30 AM thru 03:30 PM All lanes open","update_date":"2026-06-01T17:08:28Z"},"road_event_id":"49m6Smf123sx3chqjir5EyXqycI=","beginning_cross_street":"COOLEY RD","ending_cross_street":"CR 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.937131,42.313507]]}},{"id":"rgsWWE3BVIyAcFGBnaFUxlvi4rw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Gzw3w5CuzPkEu1n4VwDcnMbu/gE="},{"type":"next-occurrence","id":"qgQll3gcVOoZoj8Ise6weQ1YeI8="}],"description":"Guard rail repairs on NY 414 both directions COOLEY RD (Dix) to CR 17 (Dix) 1 Lane, 2 Way, Flagger Control, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:30 AM thru 03:30 PM All lanes open","update_date":"2026-06-01T17:08:28Z"},"road_event_id":"rgsWWE3BVIyAcFGBnaFUxlvi4rw=","beginning_cross_street":"COOLEY RD","ending_cross_street":"CR 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.937131,42.313507]]}},{"id":"qgQll3gcVOoZoj8Ise6weQ1YeI8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Gzw3w5CuzPkEu1n4VwDcnMbu/gE="}],"description":"Guard rail repairs on NY 414 both directions COOLEY RD (Dix) to CR 17 (Dix) 1 Lane, 2 Way, Flagger Control, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:30 AM thru 03:30 PM All lanes open","update_date":"2026-06-01T17:08:28Z"},"road_event_id":"qgQll3gcVOoZoj8Ise6weQ1YeI8=","beginning_cross_street":"COOLEY RD","ending_cross_street":"CR 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.937131,42.313507]]}},{"id":"mnyWdkCHPT7Xy8xdcnD0dXt0AiU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Rm9cxeBIIFoItj8bp1HmIVqtB+k="}],"description":"Utility work on WATER ST eastbound RT-14A (Dundee) to southbound NY 14A at Highland Drive (Starkey) 2 Lanes reduced to 1 Lane with flaggers, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-01T17:42:52Z"},"road_event_id":"mnyWdkCHPT7Xy8xdcnD0dXt0AiU=","beginning_cross_street":"RT-14A","ending_cross_street":"Highland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.976855,42.525566]]}},{"id":"Rm9cxeBIIFoItj8bp1HmIVqtB+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mnyWdkCHPT7Xy8xdcnD0dXt0AiU="},{"type":"next-occurrence","id":"4hV9zGhg4AoHcu71XOxmH6TjLlA="}],"description":"Utility work on WATER ST eastbound RT-14A (Dundee) to southbound NY 14A at Highland Drive (Starkey) 2 Lanes reduced to 1 Lane with flaggers, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-01T17:42:52Z"},"road_event_id":"Rm9cxeBIIFoItj8bp1HmIVqtB+k=","beginning_cross_street":"RT-14A","ending_cross_street":"Highland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.976855,42.525566]]}},{"id":"4hV9zGhg4AoHcu71XOxmH6TjLlA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mnyWdkCHPT7Xy8xdcnD0dXt0AiU="},{"type":"next-occurrence","id":"17NOf697BlIgP3VaX/l6jvXjWZ4="}],"description":"Utility work on WATER ST eastbound RT-14A (Dundee) to southbound NY 14A at Highland Drive (Starkey) 2 Lanes reduced to 1 Lane with flaggers, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-01T17:42:52Z"},"road_event_id":"4hV9zGhg4AoHcu71XOxmH6TjLlA=","beginning_cross_street":"RT-14A","ending_cross_street":"Highland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.976855,42.525566]]}},{"id":"17NOf697BlIgP3VaX/l6jvXjWZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mnyWdkCHPT7Xy8xdcnD0dXt0AiU="},{"type":"next-occurrence","id":"2h+5MkxE3VMS5JevsPBLqnW2Nxc="}],"description":"Utility work on WATER ST eastbound RT-14A (Dundee) to southbound NY 14A at Highland Drive (Starkey) 2 Lanes reduced to 1 Lane with flaggers, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-01T17:42:52Z"},"road_event_id":"17NOf697BlIgP3VaX/l6jvXjWZ4=","beginning_cross_street":"RT-14A","ending_cross_street":"Highland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.976855,42.525566]]}},{"id":"2h+5MkxE3VMS5JevsPBLqnW2Nxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mnyWdkCHPT7Xy8xdcnD0dXt0AiU="},{"type":"next-occurrence","id":"Ci2toup5xSMAzSO1a9uloQHJXBs="}],"description":"Utility work on WATER ST eastbound RT-14A (Dundee) to southbound NY 14A at Highland Drive (Starkey) 2 Lanes reduced to 1 Lane with flaggers, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-01T17:42:52Z"},"road_event_id":"2h+5MkxE3VMS5JevsPBLqnW2Nxc=","beginning_cross_street":"RT-14A","ending_cross_street":"Highland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.976855,42.525566]]}},{"id":"Ci2toup5xSMAzSO1a9uloQHJXBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mnyWdkCHPT7Xy8xdcnD0dXt0AiU="},{"type":"next-occurrence","id":"jxBc/7DNWY7ksZRGbATUHOjyxdE="}],"description":"Utility work on WATER ST eastbound RT-14A (Dundee) to southbound NY 14A at Highland Drive (Starkey) 2 Lanes reduced to 1 Lane with flaggers, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-01T17:42:52Z"},"road_event_id":"Ci2toup5xSMAzSO1a9uloQHJXBs=","beginning_cross_street":"RT-14A","ending_cross_street":"Highland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.976855,42.525566]]}},{"id":"jxBc/7DNWY7ksZRGbATUHOjyxdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mnyWdkCHPT7Xy8xdcnD0dXt0AiU="},{"type":"next-occurrence","id":"Hfm9dwUaGXuQtQP1p1yX5clWdIs="}],"description":"Utility work on WATER ST eastbound RT-14A (Dundee) to southbound NY 14A at Highland Drive (Starkey) 2 Lanes reduced to 1 Lane with flaggers, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-01T17:42:52Z"},"road_event_id":"jxBc/7DNWY7ksZRGbATUHOjyxdE=","beginning_cross_street":"RT-14A","ending_cross_street":"Highland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.976855,42.525566]]}},{"id":"Hfm9dwUaGXuQtQP1p1yX5clWdIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mnyWdkCHPT7Xy8xdcnD0dXt0AiU="}],"description":"Utility work on WATER ST eastbound RT-14A (Dundee) to southbound NY 14A at Highland Drive (Starkey) 2 Lanes reduced to 1 Lane with flaggers, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-01T17:42:52Z"},"road_event_id":"Hfm9dwUaGXuQtQP1p1yX5clWdIs=","beginning_cross_street":"RT-14A","ending_cross_street":"Highland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.976855,42.525566]]}},{"id":"uX2S1t13bNacWFBFPlXL4rbiGYA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 204"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"F+IfteU1iJnMJfLrhQrur1SmnIg="}],"description":"Utility work on NY 204 eastbound between Start NY 204 at I-490 (Gates) and Exit; Chili Avenue; NY 204; NY 33A (Gates) Alternating Right/Left Lane closures as needed., Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-01T18:24:16Z"},"road_event_id":"uX2S1t13bNacWFBFPlXL4rbiGYA=","beginning_cross_street":"Start NY 204 at I-490","ending_cross_street":"Exit; Chili Avenue; NY 204; NY 33A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.714915,43.131962]]}},{"id":"F+IfteU1iJnMJfLrhQrur1SmnIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 204"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uX2S1t13bNacWFBFPlXL4rbiGYA="},{"type":"next-occurrence","id":"Eiunu+NoFH3x1hnsPyjg5Gar9Xs="}],"description":"Utility work on NY 204 eastbound between Start NY 204 at I-490 (Gates) and Exit; Chili Avenue; NY 204; NY 33A (Gates) Alternating Right/Left Lane closures as needed., Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-01T18:24:16Z"},"road_event_id":"F+IfteU1iJnMJfLrhQrur1SmnIg=","beginning_cross_street":"Start NY 204 at I-490","ending_cross_street":"Exit; Chili Avenue; NY 204; NY 33A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.714915,43.131962]]}},{"id":"Eiunu+NoFH3x1hnsPyjg5Gar9Xs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 204"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uX2S1t13bNacWFBFPlXL4rbiGYA="},{"type":"next-occurrence","id":"BzCquxEpcZnDy+138zS18tGgifM="}],"description":"Utility work on NY 204 eastbound between Start NY 204 at I-490 (Gates) and Exit; Chili Avenue; NY 204; NY 33A (Gates) Alternating Right/Left Lane closures as needed., Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-01T18:24:16Z"},"road_event_id":"Eiunu+NoFH3x1hnsPyjg5Gar9Xs=","beginning_cross_street":"Start NY 204 at I-490","ending_cross_street":"Exit; Chili Avenue; NY 204; NY 33A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.714915,43.131962]]}},{"id":"BzCquxEpcZnDy+138zS18tGgifM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 204"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uX2S1t13bNacWFBFPlXL4rbiGYA="},{"type":"next-occurrence","id":"sxy/91Xr6WPWKeRpLuIn3A1kEEE="}],"description":"Utility work on NY 204 eastbound between Start NY 204 at I-490 (Gates) and Exit; Chili Avenue; NY 204; NY 33A (Gates) Alternating Right/Left Lane closures as needed., Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-01T18:24:16Z"},"road_event_id":"BzCquxEpcZnDy+138zS18tGgifM=","beginning_cross_street":"Start NY 204 at I-490","ending_cross_street":"Exit; Chili Avenue; NY 204; NY 33A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.714915,43.131962]]}},{"id":"sxy/91Xr6WPWKeRpLuIn3A1kEEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 204"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uX2S1t13bNacWFBFPlXL4rbiGYA="},{"type":"next-occurrence","id":"Ke1WSboxJRT+m4NWtC3t+QTlekk="}],"description":"Utility work on NY 204 eastbound between Start NY 204 at I-490 (Gates) and Exit; Chili Avenue; NY 204; NY 33A (Gates) Alternating Right/Left Lane closures as needed., Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-01T18:24:16Z"},"road_event_id":"sxy/91Xr6WPWKeRpLuIn3A1kEEE=","beginning_cross_street":"Start NY 204 at I-490","ending_cross_street":"Exit; Chili Avenue; NY 204; NY 33A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.714915,43.131962]]}},{"id":"Ke1WSboxJRT+m4NWtC3t+QTlekk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 204"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uX2S1t13bNacWFBFPlXL4rbiGYA="},{"type":"next-occurrence","id":"KfZajwgjF+il+VekKtnzLEkO6FE="}],"description":"Utility work on NY 204 eastbound between Start NY 204 at I-490 (Gates) and Exit; Chili Avenue; NY 204; NY 33A (Gates) Alternating Right/Left Lane closures as needed., Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-01T18:24:16Z"},"road_event_id":"Ke1WSboxJRT+m4NWtC3t+QTlekk=","beginning_cross_street":"Start NY 204 at I-490","ending_cross_street":"Exit; Chili Avenue; NY 204; NY 33A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.714915,43.131962]]}},{"id":"KfZajwgjF+il+VekKtnzLEkO6FE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 204"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uX2S1t13bNacWFBFPlXL4rbiGYA="},{"type":"next-occurrence","id":"n7VHKZPSrXPzxYffyQMxXHOiU70="}],"description":"Utility work on NY 204 eastbound between Start NY 204 at I-490 (Gates) and Exit; Chili Avenue; NY 204; NY 33A (Gates) Alternating Right/Left Lane closures as needed., Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-01T18:24:16Z"},"road_event_id":"KfZajwgjF+il+VekKtnzLEkO6FE=","beginning_cross_street":"Start NY 204 at I-490","ending_cross_street":"Exit; Chili Avenue; NY 204; NY 33A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.714915,43.131962]]}},{"id":"n7VHKZPSrXPzxYffyQMxXHOiU70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 204"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uX2S1t13bNacWFBFPlXL4rbiGYA="}],"description":"Utility work on NY 204 eastbound between Start NY 204 at I-490 (Gates) and Exit; Chili Avenue; NY 204; NY 33A (Gates) Alternating Right/Left Lane closures as needed., Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-01T18:24:16Z"},"road_event_id":"n7VHKZPSrXPzxYffyQMxXHOiU70=","beginning_cross_street":"Start NY 204 at I-490","ending_cross_street":"Exit; Chili Avenue; NY 204; NY 33A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.714915,43.131962]]}},{"id":"iWKJfF8sN8mHojl96ZbcY7b44Yk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Tor0QI37SAqlb4I9frnGLu7NJTk="}],"description":"Installation of traffic management systems on NY 33A both directions at Buell Road; CR 162 (Gates) Alternating lane/shoulder closures with flaggers as needed, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes","update_date":"2026-06-01T18:35:11Z"},"road_event_id":"iWKJfF8sN8mHojl96ZbcY7b44Yk=","beginning_cross_street":"Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666432,43.140072]]}},{"id":"Tor0QI37SAqlb4I9frnGLu7NJTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iWKJfF8sN8mHojl96ZbcY7b44Yk="},{"type":"next-occurrence","id":"/V8pDH3HGiB40nza/l/ZwixVfZ0="}],"description":"Installation of traffic management systems on NY 33A both directions at Buell Road; CR 162 (Gates) Alternating lane/shoulder closures with flaggers as needed, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes","update_date":"2026-06-01T18:35:11Z"},"road_event_id":"Tor0QI37SAqlb4I9frnGLu7NJTk=","beginning_cross_street":"Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666432,43.140072]]}},{"id":"/V8pDH3HGiB40nza/l/ZwixVfZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iWKJfF8sN8mHojl96ZbcY7b44Yk="},{"type":"next-occurrence","id":"Ktr9AmO7EVUvP6O+LN6Y4nzL6mE="}],"description":"Installation of traffic management systems on NY 33A both directions at Buell Road; CR 162 (Gates) Alternating lane/shoulder closures with flaggers as needed, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes","update_date":"2026-06-01T18:35:11Z"},"road_event_id":"/V8pDH3HGiB40nza/l/ZwixVfZ0=","beginning_cross_street":"Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666432,43.140072]]}},{"id":"Ktr9AmO7EVUvP6O+LN6Y4nzL6mE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iWKJfF8sN8mHojl96ZbcY7b44Yk="},{"type":"next-occurrence","id":"v3rmnKXx4lqua4wp0i0BvXLKLqA="}],"description":"Installation of traffic management systems on NY 33A both directions at Buell Road; CR 162 (Gates) Alternating lane/shoulder closures with flaggers as needed, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes","update_date":"2026-06-01T18:35:11Z"},"road_event_id":"Ktr9AmO7EVUvP6O+LN6Y4nzL6mE=","beginning_cross_street":"Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666432,43.140072]]}},{"id":"v3rmnKXx4lqua4wp0i0BvXLKLqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iWKJfF8sN8mHojl96ZbcY7b44Yk="},{"type":"next-occurrence","id":"rMCBIK8nyIc7qU7c9btwUjYDeTw="}],"description":"Installation of traffic management systems on NY 33A both directions at Buell Road; CR 162 (Gates) Alternating lane/shoulder closures with flaggers as needed, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes","update_date":"2026-06-01T18:35:11Z"},"road_event_id":"v3rmnKXx4lqua4wp0i0BvXLKLqA=","beginning_cross_street":"Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666432,43.140072]]}},{"id":"rMCBIK8nyIc7qU7c9btwUjYDeTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iWKJfF8sN8mHojl96ZbcY7b44Yk="}],"description":"Installation of traffic management systems on NY 33A both directions at Buell Road; CR 162 (Gates) Alternating lane/shoulder closures with flaggers as needed, Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes","update_date":"2026-06-01T18:35:11Z"},"road_event_id":"rMCBIK8nyIc7qU7c9btwUjYDeTw=","beginning_cross_street":"Buell Road; CR 162","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.666432,43.140072]]}},{"id":"0CyVBtymqYA9yX5FllvTyK8FJgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound at Exit 16E - Essex St (Harrison) Friday June 5, 2026 11:00 PM thru Saturday June 6, 2026 05:00 AM, ramp","update_date":"2026-06-01T18:50:01Z"},"road_event_id":"0CyVBtymqYA9yX5FllvTyK8FJgA=","beginning_cross_street":"Exit 16E - Essex St","ending_cross_street":"Exit 16E - Essex St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.156005,40.742782]]}},{"id":"tsiu78AGhJoLu+c90d1vc8Harcc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound near North of Exit 43 - CR 838/Creek Rd (Mount Laurel Twp), Saturday June 6, 2026 06:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-01T21:34:58Z"},"road_event_id":"tsiu78AGhJoLu+c90d1vc8Harcc=","beginning_cross_street":"North of Exit 43 - CR 838/Creek Rd","ending_cross_street":"Exit 43 - CR 838/Creek Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.875938,39.992515]]}},{"id":"GZDrpnEBZjn20g1rRPW1QnVyfa8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Southbound near North of Old Post Rd-North (Edison Twp), Friday June 5, 2026 10:00 PM thru Saturday June 6, 2026 05:00 AM, right lane closed","update_date":"2026-06-01T21:34:55Z"},"road_event_id":"GZDrpnEBZjn20g1rRPW1QnVyfa8=","beginning_cross_street":"North of Old Post Rd-North","ending_cross_street":"North of Old Post Rd-North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368965,40.517791]]}},{"id":"awY/01Iq1MV1N0yVe2SGThkdRzE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"W5GsQaibro7TSwwTFfIhnYnYruw="}],"description":"Utility work on NY 15 northbound between Commerce Dr (Henrietta) and Jefferson Road; NY 252 (Henrietta) alternating lane closures, Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-06-04T18:21:06Z"},"road_event_id":"awY/01Iq1MV1N0yVe2SGThkdRzE=","beginning_cross_street":"Commerce Dr","ending_cross_street":"Jefferson Road; NY 252","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.640203,43.0808]]}},{"id":"W5GsQaibro7TSwwTFfIhnYnYruw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"awY/01Iq1MV1N0yVe2SGThkdRzE="},{"type":"next-occurrence","id":"RRdqjtfdyGAPtuZzmZAtHCB7coo="}],"description":"Utility work on NY 15 northbound between Commerce Dr (Henrietta) and Jefferson Road; NY 252 (Henrietta) alternating lane closures, Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-06-04T18:21:06Z"},"road_event_id":"W5GsQaibro7TSwwTFfIhnYnYruw=","beginning_cross_street":"Commerce Dr","ending_cross_street":"Jefferson Road; NY 252","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.640203,43.0808]]}},{"id":"RRdqjtfdyGAPtuZzmZAtHCB7coo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"awY/01Iq1MV1N0yVe2SGThkdRzE="},{"type":"next-occurrence","id":"G/woVQ4bQb+Hi2kZjVIiHfuVp+8="}],"description":"Utility work on NY 15 northbound between Commerce Dr (Henrietta) and Jefferson Road; NY 252 (Henrietta) alternating lane closures, Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-06-04T18:21:06Z"},"road_event_id":"RRdqjtfdyGAPtuZzmZAtHCB7coo=","beginning_cross_street":"Commerce Dr","ending_cross_street":"Jefferson Road; NY 252","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.640203,43.0808]]}},{"id":"G/woVQ4bQb+Hi2kZjVIiHfuVp+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"awY/01Iq1MV1N0yVe2SGThkdRzE="}],"description":"Utility work on NY 15 northbound between Commerce Dr (Henrietta) and Jefferson Road; NY 252 (Henrietta) alternating lane closures, Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 02:00 PM All lanes","update_date":"2026-06-04T18:21:06Z"},"road_event_id":"G/woVQ4bQb+Hi2kZjVIiHfuVp+8=","beginning_cross_street":"Commerce Dr","ending_cross_street":"Jefferson Road; NY 252","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.640203,43.0808]]}},{"id":"AH1wCDJjUd7iWXJsVH4ueDMOHzk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Repaving on I-87 Northway southbound between Exit 2W; NY 5 westbound (Colonie) and Exit 1E/1W (Guilderland), Friday June 5th,2026 thru Saturday June 6th,2026, Friday, 08:00 PM thru 06:00 AM 2 Right lanes of 3 lanes closed southbound,","update_date":"2026-06-05T10:00:05Z"},"road_event_id":"AH1wCDJjUd7iWXJsVH4ueDMOHzk=","beginning_cross_street":"Exit 2W; NY 5 westbound","ending_cross_street":"Exit 1E/1W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820228,42.713667]]}},{"id":"E9AVXgpUNRaIHzKqt0qQi92h6OQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ADIRONDACK NORTHWAY"],"direction":"unknown","related_road_events":[],"description":"Repaving on ADIRONDACK NORTHWAY northbound between Exit 1E (Albany) and I-87 Northway at Exit 2E; NY 5 eastbound; Wolf Road (Colonie), Saturday June 6th, 2026 thru Sunday June 7th, 2026, 10:00 PM thru 06:00 PM 2 Left lanes of 3 lanes closed","update_date":"2026-06-01T22:49:55Z"},"road_event_id":"E9AVXgpUNRaIHzKqt0qQi92h6OQ=","beginning_cross_street":"Exit 1E","ending_cross_street":"Exit 2E; NY 5 eastbound; Wolf Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T02:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.840969,42.691241]]}},{"id":"DOTwEp0Is58DGBq53jZqWnoPtZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near West of Exit 63 - NJ 17 North (Saddle Brook Twp), Monday June 8, 2026 11:00 AM thru 01:00 PM, right shoulder closed local lane","update_date":"2026-06-02T00:28:43Z"},"road_event_id":"DOTwEp0Is58DGBq53jZqWnoPtZM=","beginning_cross_street":"West of Exit 63 - NJ 17 North","ending_cross_street":"West of Exit 63 - NJ 17 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T15:00:00Z","end_date":"2026-06-08T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.086456,40.901943]]}},{"id":"FgzQh/kyGmTWm+2n5Xznw9Ko9YQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near West of Exit 63 - NJ 17 North (Saddle Brook Twp), Monday June 8, 2026 01:00 PM thru 03:00 PM, right shoulder closed","update_date":"2026-06-02T00:28:44Z"},"road_event_id":"FgzQh/kyGmTWm+2n5Xznw9Ko9YQ=","beginning_cross_street":"West of Exit 63 - NJ 17 North","ending_cross_street":"West of Exit 63 - NJ 17 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T17:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.083068,40.900634]]}},{"id":"ef+AP4IyxmK36WIh1a2j/9aSk58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 29"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 29 Northbound near North of NJ 129 (Trenton), Monday June 8, 2026 09:00 PM thru Tuesday June 9, 2026 05:00 AM, right lane closed","update_date":"2026-06-02T00:28:45Z"},"road_event_id":"ef+AP4IyxmK36WIh1a2j/9aSk58=","beginning_cross_street":"North of NJ 129","ending_cross_street":"South of Lalor St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.753623,40.191841]]}},{"id":"BatQ7NQcmUsM/CGwUWx9f6ZQFhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Northbound near South of I-287 (Franklin Lakes), Monday June 8, 2026 09:00 AM thru 11:00 AM, right shoulder closed","update_date":"2026-06-02T00:28:47Z"},"road_event_id":"BatQ7NQcmUsM/CGwUWx9f6ZQFhw=","beginning_cross_street":"South of I-287","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.222702,41.020599]]}},{"id":"9by9srhjhzSh90pk07h80e+t1fw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near South of CR 522/Throckmorton St (Freehold Twp), Monday June 8, 2026 08:00 PM thru Tuesday June 9, 2026 05:00 AM, right lane closed","update_date":"2026-06-02T00:28:48Z"},"road_event_id":"9by9srhjhzSh90pk07h80e+t1fw=","beginning_cross_street":"South of CR 522/Throckmorton St","ending_cross_street":"North of CR 522/Throckmorton St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.293777,40.26583]]}},{"id":"AzHi+xCo37lPvtrAw841uRvV+QM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Os3/u9++i+lmkgX8lec1VIYk7AM="}],"description":"Line striping on NY 305 both directions Water Street; NY 446 (Cuba) to I-86 (Cuba) 1 Lane, 2 Way, Flagger Control, Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T11:18:19Z"},"road_event_id":"AzHi+xCo37lPvtrAw841uRvV+QM=","beginning_cross_street":"Water Street; NY 446","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.276113,42.21814]]}},{"id":"Os3/u9++i+lmkgX8lec1VIYk7AM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzHi+xCo37lPvtrAw841uRvV+QM="},{"type":"next-occurrence","id":"jMKbWetlZI2BsSGDazX2zk3YBPo="}],"description":"Line striping on NY 305 both directions Water Street; NY 446 (Cuba) to I-86 (Cuba) 1 Lane, 2 Way, Flagger Control, Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T11:18:19Z"},"road_event_id":"Os3/u9++i+lmkgX8lec1VIYk7AM=","beginning_cross_street":"Water Street; NY 446","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.276113,42.21814]]}},{"id":"jMKbWetlZI2BsSGDazX2zk3YBPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzHi+xCo37lPvtrAw841uRvV+QM="},{"type":"next-occurrence","id":"mrfSwcEAd/nZFb7qPeRr8AVzINo="}],"description":"Line striping on NY 305 both directions Water Street; NY 446 (Cuba) to I-86 (Cuba) 1 Lane, 2 Way, Flagger Control, Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T11:18:19Z"},"road_event_id":"jMKbWetlZI2BsSGDazX2zk3YBPo=","beginning_cross_street":"Water Street; NY 446","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T10:00:00Z","end_date":"2026-06-07T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.276113,42.21814]]}},{"id":"mrfSwcEAd/nZFb7qPeRr8AVzINo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzHi+xCo37lPvtrAw841uRvV+QM="},{"type":"next-occurrence","id":"oXHMjSIeWgyH09D0sOFd1Z3A/Sg="}],"description":"Line striping on NY 305 both directions Water Street; NY 446 (Cuba) to I-86 (Cuba) 1 Lane, 2 Way, Flagger Control, Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T11:18:19Z"},"road_event_id":"mrfSwcEAd/nZFb7qPeRr8AVzINo=","beginning_cross_street":"Water Street; NY 446","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.276113,42.21814]]}},{"id":"oXHMjSIeWgyH09D0sOFd1Z3A/Sg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzHi+xCo37lPvtrAw841uRvV+QM="},{"type":"next-occurrence","id":"ubuasMi3e4fXwH1fxpPk1HlRPnE="}],"description":"Line striping on NY 305 both directions Water Street; NY 446 (Cuba) to I-86 (Cuba) 1 Lane, 2 Way, Flagger Control, Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T11:18:19Z"},"road_event_id":"oXHMjSIeWgyH09D0sOFd1Z3A/Sg=","beginning_cross_street":"Water Street; NY 446","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.276113,42.21814]]}},{"id":"ubuasMi3e4fXwH1fxpPk1HlRPnE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzHi+xCo37lPvtrAw841uRvV+QM="},{"type":"next-occurrence","id":"H7+9q1pq/jdcxnczrwFx+4xOgys="}],"description":"Line striping on NY 305 both directions Water Street; NY 446 (Cuba) to I-86 (Cuba) 1 Lane, 2 Way, Flagger Control, Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T11:18:19Z"},"road_event_id":"ubuasMi3e4fXwH1fxpPk1HlRPnE=","beginning_cross_street":"Water Street; NY 446","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.276113,42.21814]]}},{"id":"H7+9q1pq/jdcxnczrwFx+4xOgys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzHi+xCo37lPvtrAw841uRvV+QM="},{"type":"next-occurrence","id":"AsoaFTUaegZdnpzo5eWUgAJfNhY="}],"description":"Line striping on NY 305 both directions Water Street; NY 446 (Cuba) to I-86 (Cuba) 1 Lane, 2 Way, Flagger Control, Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T11:18:19Z"},"road_event_id":"H7+9q1pq/jdcxnczrwFx+4xOgys=","beginning_cross_street":"Water Street; NY 446","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.276113,42.21814]]}},{"id":"AsoaFTUaegZdnpzo5eWUgAJfNhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AzHi+xCo37lPvtrAw841uRvV+QM="}],"description":"Line striping on NY 305 both directions Water Street; NY 446 (Cuba) to I-86 (Cuba) 1 Lane, 2 Way, Flagger Control, Wednesday June 3rd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T11:18:19Z"},"road_event_id":"AsoaFTUaegZdnpzo5eWUgAJfNhY=","beginning_cross_street":"Water Street; NY 446","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.276113,42.21814]]}},{"id":"iaj2CmP46vN1g48soMHLGcZ51Cw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Southbound between South of W 63rd St (Bayonne) and South of Kennedy Boulevard (Bayonne), Monday June 8, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-02T12:10:38Z"},"road_event_id":"iaj2CmP46vN1g48soMHLGcZ51Cw=","beginning_cross_street":"South of W 63rd St","ending_cross_street":"South of Kennedy Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.109947,40.693672]]}},{"id":"MVUHoErlGjn9RrQZxjWFGIrKR/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Southbound between South of W 63rd St (Bayonne) and South of Kennedy Boulevard (Bayonne), Tuesday June 9, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-02T12:10:41Z"},"road_event_id":"MVUHoErlGjn9RrQZxjWFGIrKR/c=","beginning_cross_street":"South of W 63rd St","ending_cross_street":"South of Kennedy Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.109947,40.693672]]}},{"id":"kSDu9WN4MdCodPNSTVFUUxV7nT8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yRLS2NSdy8i+a2B/pAtYsSAh7SU="}],"description":"Repaving and road rehabilitation on I-390 northbound between Steuben-Livingston County Line (Dansville) and Exit 5 - McWhorter Road (North Dansville), Wednesday June 3rd, 2026 thru Saturday June 6th, 2026, Wednesday/Thursday/Friday/Saturday, 06:00 AM thru 07:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-02T13:07:24Z"},"road_event_id":"kSDu9WN4MdCodPNSTVFUUxV7nT8=","beginning_cross_street":"Steuben-Livingston County Line","ending_cross_street":"Exit 5 - McWhorter Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.679621,42.535586]]}},{"id":"yRLS2NSdy8i+a2B/pAtYsSAh7SU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSDu9WN4MdCodPNSTVFUUxV7nT8="}],"description":"Repaving and road rehabilitation on I-390 northbound between Steuben-Livingston County Line (Dansville) and Exit 5 - McWhorter Road (North Dansville), Wednesday June 3rd, 2026 thru Saturday June 6th, 2026, Wednesday/Thursday/Friday/Saturday, 06:00 AM thru 07:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-02T13:07:24Z"},"road_event_id":"yRLS2NSdy8i+a2B/pAtYsSAh7SU=","beginning_cross_street":"Steuben-Livingston County Line","ending_cross_street":"Exit 5 - McWhorter Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.679621,42.535586]]}},{"id":"0tRZ/8UlGpuus/PU8RGPC/vLulA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RsdaFI7xCBp8HluJt/AiwPHxAzM="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T13:49:05Z"},"road_event_id":"0tRZ/8UlGpuus/PU8RGPC/vLulA=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"RsdaFI7xCBp8HluJt/AiwPHxAzM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0tRZ/8UlGpuus/PU8RGPC/vLulA="},{"type":"next-occurrence","id":"mVi+nYksHrFHX9HfDXSpPnyXR1I="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T13:49:05Z"},"road_event_id":"RsdaFI7xCBp8HluJt/AiwPHxAzM=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"mVi+nYksHrFHX9HfDXSpPnyXR1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0tRZ/8UlGpuus/PU8RGPC/vLulA="},{"type":"next-occurrence","id":"vHqqS0ObGVim3CgLUXlGyu3jKr0="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T13:49:05Z"},"road_event_id":"mVi+nYksHrFHX9HfDXSpPnyXR1I=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"vHqqS0ObGVim3CgLUXlGyu3jKr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0tRZ/8UlGpuus/PU8RGPC/vLulA="},{"type":"next-occurrence","id":"IYQyu0OfeEnGUQmbhFWWJWBTc5Q="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T13:49:05Z"},"road_event_id":"vHqqS0ObGVim3CgLUXlGyu3jKr0=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"IYQyu0OfeEnGUQmbhFWWJWBTc5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0tRZ/8UlGpuus/PU8RGPC/vLulA="},{"type":"next-occurrence","id":"R8PCwZbfZ22GzA5mIoWAaa7kIMk="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T13:49:05Z"},"road_event_id":"IYQyu0OfeEnGUQmbhFWWJWBTc5Q=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"R8PCwZbfZ22GzA5mIoWAaa7kIMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0tRZ/8UlGpuus/PU8RGPC/vLulA="},{"type":"next-occurrence","id":"7WGmFWNiAimWXtnru1M0sPsTodk="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T13:49:05Z"},"road_event_id":"R8PCwZbfZ22GzA5mIoWAaa7kIMk=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"7WGmFWNiAimWXtnru1M0sPsTodk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0tRZ/8UlGpuus/PU8RGPC/vLulA="},{"type":"next-occurrence","id":"ttvkoC8CeMYFjdnziUTOMBPx+Os="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T13:49:05Z"},"road_event_id":"7WGmFWNiAimWXtnru1M0sPsTodk=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"ttvkoC8CeMYFjdnziUTOMBPx+Os=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0tRZ/8UlGpuus/PU8RGPC/vLulA="},{"type":"next-occurrence","id":"CdDGRCHb6OKn2JM+oejzKxNc55c="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T13:49:05Z"},"road_event_id":"ttvkoC8CeMYFjdnziUTOMBPx+Os=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"CdDGRCHb6OKn2JM+oejzKxNc55c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0tRZ/8UlGpuus/PU8RGPC/vLulA="},{"type":"next-occurrence","id":"1jQn7405qQozP2NvhedpIO1/Mso="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T13:49:05Z"},"road_event_id":"CdDGRCHb6OKn2JM+oejzKxNc55c=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"1jQn7405qQozP2NvhedpIO1/Mso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0tRZ/8UlGpuus/PU8RGPC/vLulA="},{"type":"next-occurrence","id":"xGYI9EZlJ/DaxT/T23hQ0KJWCfU="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T13:49:05Z"},"road_event_id":"1jQn7405qQozP2NvhedpIO1/Mso=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"xGYI9EZlJ/DaxT/T23hQ0KJWCfU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0tRZ/8UlGpuus/PU8RGPC/vLulA="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T13:49:05Z"},"road_event_id":"xGYI9EZlJ/DaxT/T23hQ0KJWCfU=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"RCYFcj5eTLIJRrvBbW4VUEoq3qQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hgWqaw9UjbIaI9ncHccVWSbfq/I="}],"description":"Bridge rehabilitation on NY 17 [Orange] eastbound between Exit 116 - NY 17K (Wallkill) and Exit 118 - Fair Oaks (Wallkill) D265594/B1013909/32703109 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:34Z"},"road_event_id":"RCYFcj5eTLIJRrvBbW4VUEoq3qQ=","beginning_cross_street":"Exit 116 - NY 17K","ending_cross_street":"Exit 118 - Fair Oaks","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425472,41.552026]]}},{"id":"hgWqaw9UjbIaI9ncHccVWSbfq/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RCYFcj5eTLIJRrvBbW4VUEoq3qQ="},{"type":"next-occurrence","id":"m5bdjR6tl+9ER0q9C49bEIFkNJM="}],"description":"Bridge rehabilitation on NY 17 [Orange] eastbound between Exit 116 - NY 17K (Wallkill) and Exit 118 - Fair Oaks (Wallkill) D265594/B1013909/32703109 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:34Z"},"road_event_id":"hgWqaw9UjbIaI9ncHccVWSbfq/I=","beginning_cross_street":"Exit 116 - NY 17K","ending_cross_street":"Exit 118 - Fair Oaks","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425472,41.552026]]}},{"id":"m5bdjR6tl+9ER0q9C49bEIFkNJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RCYFcj5eTLIJRrvBbW4VUEoq3qQ="},{"type":"next-occurrence","id":"zm5yGHPYpDJbJC8Ybwf6vKsh5TA="}],"description":"Bridge rehabilitation on NY 17 [Orange] eastbound between Exit 116 - NY 17K (Wallkill) and Exit 118 - Fair Oaks (Wallkill) D265594/B1013909/32703109 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:34Z"},"road_event_id":"m5bdjR6tl+9ER0q9C49bEIFkNJM=","beginning_cross_street":"Exit 116 - NY 17K","ending_cross_street":"Exit 118 - Fair Oaks","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425472,41.552026]]}},{"id":"zm5yGHPYpDJbJC8Ybwf6vKsh5TA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RCYFcj5eTLIJRrvBbW4VUEoq3qQ="},{"type":"next-occurrence","id":"vzA+CyhdzPq5HIXDTIZti1CL4kA="}],"description":"Bridge rehabilitation on NY 17 [Orange] eastbound between Exit 116 - NY 17K (Wallkill) and Exit 118 - Fair Oaks (Wallkill) D265594/B1013909/32703109 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:34Z"},"road_event_id":"zm5yGHPYpDJbJC8Ybwf6vKsh5TA=","beginning_cross_street":"Exit 116 - NY 17K","ending_cross_street":"Exit 118 - Fair Oaks","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425472,41.552026]]}},{"id":"vzA+CyhdzPq5HIXDTIZti1CL4kA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RCYFcj5eTLIJRrvBbW4VUEoq3qQ="},{"type":"next-occurrence","id":"HTZdpAicu+S3l00WSUd+6/8LRfE="}],"description":"Bridge rehabilitation on NY 17 [Orange] eastbound between Exit 116 - NY 17K (Wallkill) and Exit 118 - Fair Oaks (Wallkill) D265594/B1013909/32703109 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:34Z"},"road_event_id":"vzA+CyhdzPq5HIXDTIZti1CL4kA=","beginning_cross_street":"Exit 116 - NY 17K","ending_cross_street":"Exit 118 - Fair Oaks","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425472,41.552026]]}},{"id":"HTZdpAicu+S3l00WSUd+6/8LRfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RCYFcj5eTLIJRrvBbW4VUEoq3qQ="}],"description":"Bridge rehabilitation on NY 17 [Orange] eastbound between Exit 116 - NY 17K (Wallkill) and Exit 118 - Fair Oaks (Wallkill) D265594/B1013909/32703109 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 06:00 AM thru 02:00 PM, various lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-05T20:00:34Z"},"road_event_id":"HTZdpAicu+S3l00WSUd+6/8LRfE=","beginning_cross_street":"Exit 116 - NY 17K","ending_cross_street":"Exit 118 - Fair Oaks","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425472,41.552026]]}},{"id":"zx3gEBG+7FnhLamJ8Xv4Ss8GYSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OfHNlvTxhs8pS3vPx/Gweo0ymlk="}],"description":"Utility work on US 20A both directions between Town of Perry and Town of Leicester Line; Livingston and Wyoming County Line (Perry) and NY 39; Pine Tavern (Leicester), Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday/Thursday/Friday, 09:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-06-02T13:33:15Z"},"road_event_id":"zx3gEBG+7FnhLamJ8Xv4Ss8GYSI=","beginning_cross_street":"Town of Perry and Town of Leicester Line; Livingston and Wyoming County Line","ending_cross_street":"NY 39; Pine Tavern","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.944651,42.752686]]}},{"id":"OfHNlvTxhs8pS3vPx/Gweo0ymlk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zx3gEBG+7FnhLamJ8Xv4Ss8GYSI="},{"type":"next-occurrence","id":"z+sO4ew4w1OCzKcFT9pFlHawBZ0="}],"description":"Utility work on US 20A both directions between Town of Perry and Town of Leicester Line; Livingston and Wyoming County Line (Perry) and NY 39; Pine Tavern (Leicester), Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday/Thursday/Friday, 09:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-06-02T13:33:15Z"},"road_event_id":"OfHNlvTxhs8pS3vPx/Gweo0ymlk=","beginning_cross_street":"Town of Perry and Town of Leicester Line; Livingston and Wyoming County Line","ending_cross_street":"NY 39; Pine Tavern","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.944651,42.752686]]}},{"id":"z+sO4ew4w1OCzKcFT9pFlHawBZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zx3gEBG+7FnhLamJ8Xv4Ss8GYSI="}],"description":"Utility work on US 20A both directions between Town of Perry and Town of Leicester Line; Livingston and Wyoming County Line (Perry) and NY 39; Pine Tavern (Leicester), Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday/Thursday/Friday, 09:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-06-02T13:33:15Z"},"road_event_id":"z+sO4ew4w1OCzKcFT9pFlHawBZ0=","beginning_cross_street":"Town of Perry and Town of Leicester Line; Livingston and Wyoming County Line","ending_cross_street":"NY 39; Pine Tavern","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.944651,42.752686]]}},{"id":"+SMPb4JyoutFaqyhT/LbKCefhYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-53"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HDyz+H2bbyKaDw8SYvoliSNIAvQ="}],"description":"Roadwork on CR-53 both directions between CR-66 (Mendon) and RT-64 (Mendon) ROAD CLOSED, FOLLOW POSTED DETOUR, Monday June 15th, 2026 thru Wednesday July 8th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed and detoured","update_date":"2026-06-02T13:37:43Z"},"road_event_id":"+SMPb4JyoutFaqyhT/LbKCefhYc=","beginning_cross_street":"CR-66","ending_cross_street":"RT-64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.532831,42.961668]]}},{"id":"HDyz+H2bbyKaDw8SYvoliSNIAvQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-53"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+SMPb4JyoutFaqyhT/LbKCefhYc="},{"type":"next-occurrence","id":"fS+ayiaahjw9+u2xNm2OFDwdtGM="}],"description":"Roadwork on CR-53 both directions between CR-66 (Mendon) and RT-64 (Mendon) ROAD CLOSED, FOLLOW POSTED DETOUR, Monday June 15th, 2026 thru Wednesday July 8th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed and detoured","update_date":"2026-06-02T13:37:43Z"},"road_event_id":"HDyz+H2bbyKaDw8SYvoliSNIAvQ=","beginning_cross_street":"CR-66","ending_cross_street":"RT-64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.532831,42.961668]]}},{"id":"fS+ayiaahjw9+u2xNm2OFDwdtGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-53"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+SMPb4JyoutFaqyhT/LbKCefhYc="},{"type":"next-occurrence","id":"wzJ5hILS4WQhnyJNnAOb/VHD12Q="}],"description":"Roadwork on CR-53 both directions between CR-66 (Mendon) and RT-64 (Mendon) ROAD CLOSED, FOLLOW POSTED DETOUR, Monday June 15th, 2026 thru Wednesday July 8th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed and detoured","update_date":"2026-06-02T13:37:43Z"},"road_event_id":"fS+ayiaahjw9+u2xNm2OFDwdtGM=","beginning_cross_street":"CR-66","ending_cross_street":"RT-64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.532831,42.961668]]}},{"id":"wzJ5hILS4WQhnyJNnAOb/VHD12Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-53"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+SMPb4JyoutFaqyhT/LbKCefhYc="},{"type":"next-occurrence","id":"JeDZoCF6hIA+0Lk83G4vcIo2V0g="}],"description":"Roadwork on CR-53 both directions between CR-66 (Mendon) and RT-64 (Mendon) ROAD CLOSED, FOLLOW POSTED DETOUR, Monday June 15th, 2026 thru Wednesday July 8th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed and detoured","update_date":"2026-06-02T13:37:43Z"},"road_event_id":"wzJ5hILS4WQhnyJNnAOb/VHD12Q=","beginning_cross_street":"CR-66","ending_cross_street":"RT-64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.532831,42.961668]]}},{"id":"JeDZoCF6hIA+0Lk83G4vcIo2V0g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-53"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+SMPb4JyoutFaqyhT/LbKCefhYc="}],"description":"Roadwork on CR-53 both directions between CR-66 (Mendon) and RT-64 (Mendon) ROAD CLOSED, FOLLOW POSTED DETOUR, Monday June 15th, 2026 thru Wednesday July 8th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed and detoured","update_date":"2026-06-02T13:37:43Z"},"road_event_id":"JeDZoCF6hIA+0Lk83G4vcIo2V0g=","beginning_cross_street":"CR-66","ending_cross_street":"RT-64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.532831,42.961668]]}},{"id":"gk49T+Ob4ilt+clShVyjq+MyOf8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sszsT4+gxI6QUXScOZt/OuZembk="}],"description":"Road rehabilitation on NY 33 westbound Holtz Drive (Cheektowaga) to Cayuga Rd (Cheektowaga), Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-02T15:14:57Z"},"road_event_id":"gk49T+Ob4ilt+clShVyjq+MyOf8=","beginning_cross_street":"Holtz Drive","ending_cross_street":"Cayuga Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.717039,42.934431]]}},{"id":"sszsT4+gxI6QUXScOZt/OuZembk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gk49T+Ob4ilt+clShVyjq+MyOf8="},{"type":"next-occurrence","id":"jGVXsGQtbcAKM/zKsiniLO/YMrk="}],"description":"Road rehabilitation on NY 33 westbound Holtz Drive (Cheektowaga) to Cayuga Rd (Cheektowaga), Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-02T15:14:57Z"},"road_event_id":"sszsT4+gxI6QUXScOZt/OuZembk=","beginning_cross_street":"Holtz Drive","ending_cross_street":"Cayuga Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.717039,42.934431]]}},{"id":"jGVXsGQtbcAKM/zKsiniLO/YMrk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gk49T+Ob4ilt+clShVyjq+MyOf8="},{"type":"next-occurrence","id":"5qFicoPiYknhBF5Suqoa8wLhwaQ="}],"description":"Road rehabilitation on NY 33 westbound Holtz Drive (Cheektowaga) to Cayuga Rd (Cheektowaga), Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-02T15:14:57Z"},"road_event_id":"jGVXsGQtbcAKM/zKsiniLO/YMrk=","beginning_cross_street":"Holtz Drive","ending_cross_street":"Cayuga Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.717039,42.934431]]}},{"id":"5qFicoPiYknhBF5Suqoa8wLhwaQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gk49T+Ob4ilt+clShVyjq+MyOf8="},{"type":"next-occurrence","id":"qyc2DID/XzELG6t/JQC20ybzcOY="}],"description":"Road rehabilitation on NY 33 westbound Holtz Drive (Cheektowaga) to Cayuga Rd (Cheektowaga), Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-02T15:14:57Z"},"road_event_id":"5qFicoPiYknhBF5Suqoa8wLhwaQ=","beginning_cross_street":"Holtz Drive","ending_cross_street":"Cayuga Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.717039,42.934431]]}},{"id":"qyc2DID/XzELG6t/JQC20ybzcOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gk49T+Ob4ilt+clShVyjq+MyOf8="},{"type":"next-occurrence","id":"iCNUfKR1fJXC8qa2B7u7iWQmtlM="}],"description":"Road rehabilitation on NY 33 westbound Holtz Drive (Cheektowaga) to Cayuga Rd (Cheektowaga), Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-02T15:14:57Z"},"road_event_id":"qyc2DID/XzELG6t/JQC20ybzcOY=","beginning_cross_street":"Holtz Drive","ending_cross_street":"Cayuga Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.717039,42.934431]]}},{"id":"iCNUfKR1fJXC8qa2B7u7iWQmtlM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gk49T+Ob4ilt+clShVyjq+MyOf8="}],"description":"Road rehabilitation on NY 33 westbound Holtz Drive (Cheektowaga) to Cayuga Rd (Cheektowaga), Tuesday June 2nd, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-02T15:14:57Z"},"road_event_id":"iCNUfKR1fJXC8qa2B7u7iWQmtlM=","beginning_cross_street":"Holtz Drive","ending_cross_street":"Cayuga Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.717039,42.934431]]}},{"id":"ORC32764609","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","description":"Road maintenance operations on Taconic State Parkway southbound between Exit 3 - Saw Mill River Parkway (Mount Pleasant) and Bronx River Parkway (North Castle) Res 8-9 RW/NIGHT/32764609 - This work is weather permitting. Plan travel accordingly; delays may exist Not currently scheduled","update_date":"2026-06-05T09:00:17Z"},"road_event_id":"ORC32764609","beginning_cross_street":"Exit 3 - Saw Mill River Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-02T16:06:16Z","end_date":"2026-06-06T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.806354,41.116735]]}},{"id":"XQR+KRTTIt58UKpgNWKZ6CJSDCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WWbte7smLC4n7sVrAzT2OSu9+V4="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/NIGHT/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closure-ahead, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:41:03Z"},"road_event_id":"XQR+KRTTIt58UKpgNWKZ6CJSDCs=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936831,41.695852]]}},{"id":"WWbte7smLC4n7sVrAzT2OSu9+V4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XQR+KRTTIt58UKpgNWKZ6CJSDCs="},{"type":"next-occurrence","id":"0MnxH1Pz2IP5TQJn4UMYmgcqAzY="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/NIGHT/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closure-ahead, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:41:03Z"},"road_event_id":"WWbte7smLC4n7sVrAzT2OSu9+V4=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936831,41.695852]]}},{"id":"0MnxH1Pz2IP5TQJn4UMYmgcqAzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XQR+KRTTIt58UKpgNWKZ6CJSDCs="},{"type":"next-occurrence","id":"JV3hxfe4MPwbmmitNBkjnkt4ZD8="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/NIGHT/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closure-ahead, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:41:03Z"},"road_event_id":"0MnxH1Pz2IP5TQJn4UMYmgcqAzY=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936831,41.695852]]}},{"id":"JV3hxfe4MPwbmmitNBkjnkt4ZD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XQR+KRTTIt58UKpgNWKZ6CJSDCs="},{"type":"next-occurrence","id":"hVgcL9WTF2Vh3610iYXVg8GqhH8="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/NIGHT/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closure-ahead, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:41:03Z"},"road_event_id":"JV3hxfe4MPwbmmitNBkjnkt4ZD8=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936831,41.695852]]}},{"id":"hVgcL9WTF2Vh3610iYXVg8GqhH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XQR+KRTTIt58UKpgNWKZ6CJSDCs="},{"type":"next-occurrence","id":"EEcSWRLc8mGjgsuk28455MLcJ+s="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/NIGHT/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closure-ahead, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:41:03Z"},"road_event_id":"hVgcL9WTF2Vh3610iYXVg8GqhH8=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936831,41.695852]]}},{"id":"EEcSWRLc8mGjgsuk28455MLcJ+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XQR+KRTTIt58UKpgNWKZ6CJSDCs="},{"type":"next-occurrence","id":"qbvGb9dZMfQ6aev4tWrS4yagoxI="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/NIGHT/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closure-ahead, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:41:03Z"},"road_event_id":"EEcSWRLc8mGjgsuk28455MLcJ+s=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936831,41.695852]]}},{"id":"qbvGb9dZMfQ6aev4tWrS4yagoxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XQR+KRTTIt58UKpgNWKZ6CJSDCs="},{"type":"next-occurrence","id":"yb8lfYRjWP39qR9h4TiaXLgZh4c="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/NIGHT/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closure-ahead, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:41:03Z"},"road_event_id":"qbvGb9dZMfQ6aev4tWrS4yagoxI=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936831,41.695852]]}},{"id":"yb8lfYRjWP39qR9h4TiaXLgZh4c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XQR+KRTTIt58UKpgNWKZ6CJSDCs="},{"type":"next-occurrence","id":"YEDJm0YKxoJTjqIr8ESkp+hiTTE="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/NIGHT/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closure-ahead, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:41:03Z"},"road_event_id":"yb8lfYRjWP39qR9h4TiaXLgZh4c=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936831,41.695852]]}},{"id":"YEDJm0YKxoJTjqIr8ESkp+hiTTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XQR+KRTTIt58UKpgNWKZ6CJSDCs="},{"type":"next-occurrence","id":"iIrhiQ4/UZ89i4Ps9PtN0oX1i+Q="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/NIGHT/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closure-ahead, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:41:03Z"},"road_event_id":"YEDJm0YKxoJTjqIr8ESkp+hiTTE=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936831,41.695852]]}},{"id":"iIrhiQ4/UZ89i4Ps9PtN0oX1i+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XQR+KRTTIt58UKpgNWKZ6CJSDCs="},{"type":"next-occurrence","id":"pAed3REkdy9GT6uHypenoppAb9o="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/NIGHT/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closure-ahead, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:41:03Z"},"road_event_id":"iIrhiQ4/UZ89i4Ps9PtN0oX1i+Q=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936831,41.695852]]}},{"id":"pAed3REkdy9GT6uHypenoppAb9o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XQR+KRTTIt58UKpgNWKZ6CJSDCs="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/NIGHT/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closure-ahead, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:41:03Z"},"road_event_id":"pAed3REkdy9GT6uHypenoppAb9o=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936831,41.695852]]}},{"id":"xHNSHrcm89yESoN82Yvmba+Jviw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MYNu/laTB/up/rUyqwp8R8D9G14="}],"description":"Roadwork on I-690 westbound between Exit 15A - Off ramp to West Street (Syracuse) and Exit 15A On ramp from West St (Syracuse), Thursday June 4th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-02T16:32:44Z"},"road_event_id":"xHNSHrcm89yESoN82Yvmba+Jviw=","beginning_cross_street":"Exit 15A - Off ramp to West Street","ending_cross_street":"Exit 15A On ramp from West St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153818,43.054201]]}},{"id":"MYNu/laTB/up/rUyqwp8R8D9G14=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xHNSHrcm89yESoN82Yvmba+Jviw="},{"type":"next-occurrence","id":"9ByN/5oARqDmULDaoNB/HVmkblg="}],"description":"Roadwork on I-690 westbound between Exit 15A - Off ramp to West Street (Syracuse) and Exit 15A On ramp from West St (Syracuse), Thursday June 4th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-02T16:32:44Z"},"road_event_id":"MYNu/laTB/up/rUyqwp8R8D9G14=","beginning_cross_street":"Exit 15A - Off ramp to West Street","ending_cross_street":"Exit 15A On ramp from West St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153818,43.054201]]}},{"id":"9ByN/5oARqDmULDaoNB/HVmkblg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xHNSHrcm89yESoN82Yvmba+Jviw="},{"type":"next-occurrence","id":"y1ut1uYi465VB/gj75ziawYWKpM="}],"description":"Roadwork on I-690 westbound between Exit 15A - Off ramp to West Street (Syracuse) and Exit 15A On ramp from West St (Syracuse), Thursday June 4th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-02T16:32:44Z"},"road_event_id":"9ByN/5oARqDmULDaoNB/HVmkblg=","beginning_cross_street":"Exit 15A - Off ramp to West Street","ending_cross_street":"Exit 15A On ramp from West St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153818,43.054201]]}},{"id":"y1ut1uYi465VB/gj75ziawYWKpM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xHNSHrcm89yESoN82Yvmba+Jviw="}],"description":"Roadwork on I-690 westbound between Exit 15A - Off ramp to West Street (Syracuse) and Exit 15A On ramp from West St (Syracuse), Thursday June 4th, 2026 thru Wednesday June 10th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-02T16:32:44Z"},"road_event_id":"y1ut1uYi465VB/gj75ziawYWKpM=","beginning_cross_street":"Exit 15A - Off ramp to West Street","ending_cross_street":"Exit 15A On ramp from West St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153818,43.054201]]}},{"id":"KBMbhiktsGwQx400Izqw46UnLAg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ew4EeQQ+egxwsKUkwE50BrEwD/Y="}],"description":"Sign work on I-684 both directions between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/NIGHT/32765009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:43:27Z"},"road_event_id":"KBMbhiktsGwQx400Izqw46UnLAg=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715377,41.020309]]}},{"id":"ew4EeQQ+egxwsKUkwE50BrEwD/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KBMbhiktsGwQx400Izqw46UnLAg="},{"type":"next-occurrence","id":"hKQP6kY+D003qPrnEQySjvUF3nk="}],"description":"Sign work on I-684 both directions between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/NIGHT/32765009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:43:27Z"},"road_event_id":"ew4EeQQ+egxwsKUkwE50BrEwD/Y=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715377,41.020309]]}},{"id":"hKQP6kY+D003qPrnEQySjvUF3nk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KBMbhiktsGwQx400Izqw46UnLAg="},{"type":"next-occurrence","id":"ysp13JlNzAflJkIJ0VWuJHHoTDo="}],"description":"Sign work on I-684 both directions between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/NIGHT/32765009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:43:27Z"},"road_event_id":"hKQP6kY+D003qPrnEQySjvUF3nk=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715377,41.020309]]}},{"id":"ysp13JlNzAflJkIJ0VWuJHHoTDo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KBMbhiktsGwQx400Izqw46UnLAg="},{"type":"next-occurrence","id":"ZTDi4x3sEvUvSfy8hiDU8IrsmWU="}],"description":"Sign work on I-684 both directions between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/NIGHT/32765009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:43:27Z"},"road_event_id":"ysp13JlNzAflJkIJ0VWuJHHoTDo=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715377,41.020309]]}},{"id":"ZTDi4x3sEvUvSfy8hiDU8IrsmWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KBMbhiktsGwQx400Izqw46UnLAg="},{"type":"next-occurrence","id":"pmw+w20huzE17+HVze44lzD42uQ="}],"description":"Sign work on I-684 both directions between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/NIGHT/32765009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:43:27Z"},"road_event_id":"ZTDi4x3sEvUvSfy8hiDU8IrsmWU=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715377,41.020309]]}},{"id":"pmw+w20huzE17+HVze44lzD42uQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KBMbhiktsGwQx400Izqw46UnLAg="},{"type":"next-occurrence","id":"rAX7/++LrhSDPiIAtNmTW/3aZ40="}],"description":"Sign work on I-684 both directions between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/NIGHT/32765009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:43:27Z"},"road_event_id":"pmw+w20huzE17+HVze44lzD42uQ=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715377,41.020309]]}},{"id":"rAX7/++LrhSDPiIAtNmTW/3aZ40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KBMbhiktsGwQx400Izqw46UnLAg="},{"type":"next-occurrence","id":"eGvZByEAYZVcbLEUmXvFFJN5dC0="}],"description":"Sign work on I-684 both directions between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/NIGHT/32765009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:43:27Z"},"road_event_id":"rAX7/++LrhSDPiIAtNmTW/3aZ40=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715377,41.020309]]}},{"id":"eGvZByEAYZVcbLEUmXvFFJN5dC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KBMbhiktsGwQx400Izqw46UnLAg="},{"type":"next-occurrence","id":"/Fs1JH0kaL/nHR+UkymRSyBL9sc="}],"description":"Sign work on I-684 both directions between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/NIGHT/32765009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:43:27Z"},"road_event_id":"eGvZByEAYZVcbLEUmXvFFJN5dC0=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715377,41.020309]]}},{"id":"/Fs1JH0kaL/nHR+UkymRSyBL9sc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KBMbhiktsGwQx400Izqw46UnLAg="},{"type":"next-occurrence","id":"txIyZDvfARQg6L4xTNg45utiTVM="}],"description":"Sign work on I-684 both directions between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/NIGHT/32765009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:43:27Z"},"road_event_id":"/Fs1JH0kaL/nHR+UkymRSyBL9sc=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715377,41.020309]]}},{"id":"txIyZDvfARQg6L4xTNg45utiTVM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KBMbhiktsGwQx400Izqw46UnLAg="},{"type":"next-occurrence","id":"2OsBerqsRCvM7kaTGiHRpsx3Fgo="}],"description":"Sign work on I-684 both directions between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/NIGHT/32765009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:43:27Z"},"road_event_id":"txIyZDvfARQg6L4xTNg45utiTVM=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715377,41.020309]]}},{"id":"2OsBerqsRCvM7kaTGiHRpsx3Fgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KBMbhiktsGwQx400Izqw46UnLAg="}],"description":"Sign work on I-684 both directions between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/NIGHT/32765009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:43:27Z"},"road_event_id":"2OsBerqsRCvM7kaTGiHRpsx3Fgo=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715377,41.020309]]}},{"id":"6uu74TGRL7To9/l7Xj3gM9M5y40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lZRppWckdfM9GALkW/6WoJmDl2w="}],"description":"Sign work on I-684 both directions between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/NIGHT/32765109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:48:12Z"},"road_event_id":"6uu74TGRL7To9/l7Xj3gM9M5y40=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684097,41.263999]]}},{"id":"lZRppWckdfM9GALkW/6WoJmDl2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6uu74TGRL7To9/l7Xj3gM9M5y40="},{"type":"next-occurrence","id":"qeZm3HDekv83Bb4UVitDxJmOJps="}],"description":"Sign work on I-684 both directions between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/NIGHT/32765109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:48:12Z"},"road_event_id":"lZRppWckdfM9GALkW/6WoJmDl2w=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684097,41.263999]]}},{"id":"qeZm3HDekv83Bb4UVitDxJmOJps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6uu74TGRL7To9/l7Xj3gM9M5y40="},{"type":"next-occurrence","id":"akuncnt/GqmthP0S2PgKmBxPEXs="}],"description":"Sign work on I-684 both directions between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/NIGHT/32765109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:48:12Z"},"road_event_id":"qeZm3HDekv83Bb4UVitDxJmOJps=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684097,41.263999]]}},{"id":"akuncnt/GqmthP0S2PgKmBxPEXs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6uu74TGRL7To9/l7Xj3gM9M5y40="},{"type":"next-occurrence","id":"ibv2jQCD/bEIQjasxwCQwDfxJFM="}],"description":"Sign work on I-684 both directions between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/NIGHT/32765109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:48:12Z"},"road_event_id":"akuncnt/GqmthP0S2PgKmBxPEXs=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684097,41.263999]]}},{"id":"ibv2jQCD/bEIQjasxwCQwDfxJFM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6uu74TGRL7To9/l7Xj3gM9M5y40="},{"type":"next-occurrence","id":"vKVd4yRCyaAb2/YQ6oSDJu3JXrE="}],"description":"Sign work on I-684 both directions between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/NIGHT/32765109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:48:12Z"},"road_event_id":"ibv2jQCD/bEIQjasxwCQwDfxJFM=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684097,41.263999]]}},{"id":"vKVd4yRCyaAb2/YQ6oSDJu3JXrE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6uu74TGRL7To9/l7Xj3gM9M5y40="},{"type":"next-occurrence","id":"pGnPL//BnZKOR5LO/EL3T5GrRok="}],"description":"Sign work on I-684 both directions between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/NIGHT/32765109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:48:12Z"},"road_event_id":"vKVd4yRCyaAb2/YQ6oSDJu3JXrE=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684097,41.263999]]}},{"id":"pGnPL//BnZKOR5LO/EL3T5GrRok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6uu74TGRL7To9/l7Xj3gM9M5y40="},{"type":"next-occurrence","id":"UwjvTqXuS/nWUncrHSDWvVV2RUw="}],"description":"Sign work on I-684 both directions between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/NIGHT/32765109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:48:12Z"},"road_event_id":"pGnPL//BnZKOR5LO/EL3T5GrRok=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684097,41.263999]]}},{"id":"UwjvTqXuS/nWUncrHSDWvVV2RUw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6uu74TGRL7To9/l7Xj3gM9M5y40="},{"type":"next-occurrence","id":"pXjnNhJuz7MIBW+ezx3SeZrDTqQ="}],"description":"Sign work on I-684 both directions between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/NIGHT/32765109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:48:12Z"},"road_event_id":"UwjvTqXuS/nWUncrHSDWvVV2RUw=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684097,41.263999]]}},{"id":"pXjnNhJuz7MIBW+ezx3SeZrDTqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6uu74TGRL7To9/l7Xj3gM9M5y40="},{"type":"next-occurrence","id":"XBrDl28wZ15qX1EwnN+Om19tBvo="}],"description":"Sign work on I-684 both directions between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/NIGHT/32765109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:48:12Z"},"road_event_id":"pXjnNhJuz7MIBW+ezx3SeZrDTqQ=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684097,41.263999]]}},{"id":"XBrDl28wZ15qX1EwnN+Om19tBvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6uu74TGRL7To9/l7Xj3gM9M5y40="},{"type":"next-occurrence","id":"dbsM6FfemnvIyfqgOHoRuSvewy8="}],"description":"Sign work on I-684 both directions between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/NIGHT/32765109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:48:12Z"},"road_event_id":"XBrDl28wZ15qX1EwnN+Om19tBvo=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684097,41.263999]]}},{"id":"dbsM6FfemnvIyfqgOHoRuSvewy8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6uu74TGRL7To9/l7Xj3gM9M5y40="}],"description":"Sign work on I-684 both directions between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/NIGHT/32765109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:48:12Z"},"road_event_id":"dbsM6FfemnvIyfqgOHoRuSvewy8=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684097,41.263999]]}},{"id":"dz4dQYCLZFPMaJh/L9f/OpPBqt4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"l7eLURwP6yIqp93nxc4nRVVg074="}],"description":"Sign work on Saw Mill River Parkway both directions between Exit 42 - NY 117 (Bedford) and I-684 (Bedford) D265342/NIGHT/32765209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:53:26Z"},"road_event_id":"dz4dQYCLZFPMaJh/L9f/OpPBqt4=","beginning_cross_street":"Exit 42 - NY 117","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.687026,41.244636]]}},{"id":"l7eLURwP6yIqp93nxc4nRVVg074=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dz4dQYCLZFPMaJh/L9f/OpPBqt4="},{"type":"next-occurrence","id":"W9WZJBJq5iago9lAXhjKGTUP12E="}],"description":"Sign work on Saw Mill River Parkway both directions between Exit 42 - NY 117 (Bedford) and I-684 (Bedford) D265342/NIGHT/32765209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:53:26Z"},"road_event_id":"l7eLURwP6yIqp93nxc4nRVVg074=","beginning_cross_street":"Exit 42 - NY 117","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.687026,41.244636]]}},{"id":"W9WZJBJq5iago9lAXhjKGTUP12E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dz4dQYCLZFPMaJh/L9f/OpPBqt4="},{"type":"next-occurrence","id":"udjf/96zIZP7+29bb4iJoAWzlms="}],"description":"Sign work on Saw Mill River Parkway both directions between Exit 42 - NY 117 (Bedford) and I-684 (Bedford) D265342/NIGHT/32765209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:53:26Z"},"road_event_id":"W9WZJBJq5iago9lAXhjKGTUP12E=","beginning_cross_street":"Exit 42 - NY 117","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.687026,41.244636]]}},{"id":"udjf/96zIZP7+29bb4iJoAWzlms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dz4dQYCLZFPMaJh/L9f/OpPBqt4="},{"type":"next-occurrence","id":"iYwr8MkIMuiZUBo+Krst/bHAFxM="}],"description":"Sign work on Saw Mill River Parkway both directions between Exit 42 - NY 117 (Bedford) and I-684 (Bedford) D265342/NIGHT/32765209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:53:26Z"},"road_event_id":"udjf/96zIZP7+29bb4iJoAWzlms=","beginning_cross_street":"Exit 42 - NY 117","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.687026,41.244636]]}},{"id":"iYwr8MkIMuiZUBo+Krst/bHAFxM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dz4dQYCLZFPMaJh/L9f/OpPBqt4="},{"type":"next-occurrence","id":"RY3X1smCVcP3oqI3LzYPBPIpIGc="}],"description":"Sign work on Saw Mill River Parkway both directions between Exit 42 - NY 117 (Bedford) and I-684 (Bedford) D265342/NIGHT/32765209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:53:26Z"},"road_event_id":"iYwr8MkIMuiZUBo+Krst/bHAFxM=","beginning_cross_street":"Exit 42 - NY 117","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.687026,41.244636]]}},{"id":"RY3X1smCVcP3oqI3LzYPBPIpIGc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dz4dQYCLZFPMaJh/L9f/OpPBqt4="},{"type":"next-occurrence","id":"bcl/VtmxZlb6WGmlMOyY1i/lpsU="}],"description":"Sign work on Saw Mill River Parkway both directions between Exit 42 - NY 117 (Bedford) and I-684 (Bedford) D265342/NIGHT/32765209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:53:26Z"},"road_event_id":"RY3X1smCVcP3oqI3LzYPBPIpIGc=","beginning_cross_street":"Exit 42 - NY 117","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.687026,41.244636]]}},{"id":"bcl/VtmxZlb6WGmlMOyY1i/lpsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dz4dQYCLZFPMaJh/L9f/OpPBqt4="},{"type":"next-occurrence","id":"TWdnVQFrpsgIxPfuiGJA7GG3SXg="}],"description":"Sign work on Saw Mill River Parkway both directions between Exit 42 - NY 117 (Bedford) and I-684 (Bedford) D265342/NIGHT/32765209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:53:26Z"},"road_event_id":"bcl/VtmxZlb6WGmlMOyY1i/lpsU=","beginning_cross_street":"Exit 42 - NY 117","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T23:00:00Z","end_date":"2026-06-16T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.687026,41.244636]]}},{"id":"TWdnVQFrpsgIxPfuiGJA7GG3SXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dz4dQYCLZFPMaJh/L9f/OpPBqt4="},{"type":"next-occurrence","id":"hgoBItcCk0mpoaCpwW7ykx17Yek="}],"description":"Sign work on Saw Mill River Parkway both directions between Exit 42 - NY 117 (Bedford) and I-684 (Bedford) D265342/NIGHT/32765209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:53:26Z"},"road_event_id":"TWdnVQFrpsgIxPfuiGJA7GG3SXg=","beginning_cross_street":"Exit 42 - NY 117","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T23:00:00Z","end_date":"2026-06-17T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.687026,41.244636]]}},{"id":"hgoBItcCk0mpoaCpwW7ykx17Yek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dz4dQYCLZFPMaJh/L9f/OpPBqt4="},{"type":"next-occurrence","id":"Hqr7x9Kj4By70a/WYvyDYU7K+E0="}],"description":"Sign work on Saw Mill River Parkway both directions between Exit 42 - NY 117 (Bedford) and I-684 (Bedford) D265342/NIGHT/32765209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:53:26Z"},"road_event_id":"hgoBItcCk0mpoaCpwW7ykx17Yek=","beginning_cross_street":"Exit 42 - NY 117","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T23:00:00Z","end_date":"2026-06-18T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.687026,41.244636]]}},{"id":"Hqr7x9Kj4By70a/WYvyDYU7K+E0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dz4dQYCLZFPMaJh/L9f/OpPBqt4="},{"type":"next-occurrence","id":"4ERMsSNQPHNOAuA0S6gnL4H4UuM="}],"description":"Sign work on Saw Mill River Parkway both directions between Exit 42 - NY 117 (Bedford) and I-684 (Bedford) D265342/NIGHT/32765209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:53:26Z"},"road_event_id":"Hqr7x9Kj4By70a/WYvyDYU7K+E0=","beginning_cross_street":"Exit 42 - NY 117","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T23:00:00Z","end_date":"2026-06-19T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.687026,41.244636]]}},{"id":"4ERMsSNQPHNOAuA0S6gnL4H4UuM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dz4dQYCLZFPMaJh/L9f/OpPBqt4="}],"description":"Sign work on Saw Mill River Parkway both directions between Exit 42 - NY 117 (Bedford) and I-684 (Bedford) D265342/NIGHT/32765209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Tuesday June 16th, 2026, Monday thru Friday, 07:00 PM thru 04:00 AM, various lane closures, Wednesday June 17th, 2026 thru Monday June 22nd, 2026 Wednesday/ Thursday/ Friday, 07:00 PM thru 04:00 AM, various lane closures, Tuesday June 23rd, 2026 thru Thursday June 25th, 2026 Tuesday/ Wednesday, 07:00 PM thru 04:00 AM, various lane closures, Friday June 26th, 2026 thru Tuesday June 30th, 2026 Monday/ Friday, 07:00 PM thru 04:00 AM, various lane closures","update_date":"2026-06-02T16:53:26Z"},"road_event_id":"4ERMsSNQPHNOAuA0S6gnL4H4UuM=","beginning_cross_street":"Exit 42 - NY 117","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T23:00:00Z","end_date":"2026-06-20T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.687026,41.244636]]}},{"id":"wK0e6c4x5ckC+1235ulXJA26GHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"J/7YpoqZzGHdZjtooblBKLPU6o8="}],"description":"Utility work on NY 36 both directions between Genesee Street; NY 63 (York) and Telephone Road; US 20 (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-02T17:14:40Z"},"road_event_id":"wK0e6c4x5ckC+1235ulXJA26GHQ=","beginning_cross_street":"Genesee Street; NY 63","ending_cross_street":"Telephone Road; US 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.89701,42.820634]]}},{"id":"J/7YpoqZzGHdZjtooblBKLPU6o8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wK0e6c4x5ckC+1235ulXJA26GHQ="},{"type":"next-occurrence","id":"scNY4B5nK+hWVCQ4hxOQysnw4L4="}],"description":"Utility work on NY 36 both directions between Genesee Street; NY 63 (York) and Telephone Road; US 20 (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-02T17:14:40Z"},"road_event_id":"J/7YpoqZzGHdZjtooblBKLPU6o8=","beginning_cross_street":"Genesee Street; NY 63","ending_cross_street":"Telephone Road; US 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.89701,42.820634]]}},{"id":"scNY4B5nK+hWVCQ4hxOQysnw4L4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wK0e6c4x5ckC+1235ulXJA26GHQ="},{"type":"next-occurrence","id":"Z5y7/2+T6mv6z8M/oJBxE38eBMY="}],"description":"Utility work on NY 36 both directions between Genesee Street; NY 63 (York) and Telephone Road; US 20 (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-02T17:14:40Z"},"road_event_id":"scNY4B5nK+hWVCQ4hxOQysnw4L4=","beginning_cross_street":"Genesee Street; NY 63","ending_cross_street":"Telephone Road; US 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.89701,42.820634]]}},{"id":"Z5y7/2+T6mv6z8M/oJBxE38eBMY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wK0e6c4x5ckC+1235ulXJA26GHQ="},{"type":"next-occurrence","id":"wTKfiqtKFkTxqS6oY2Xncinu96g="}],"description":"Utility work on NY 36 both directions between Genesee Street; NY 63 (York) and Telephone Road; US 20 (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-02T17:14:40Z"},"road_event_id":"Z5y7/2+T6mv6z8M/oJBxE38eBMY=","beginning_cross_street":"Genesee Street; NY 63","ending_cross_street":"Telephone Road; US 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.89701,42.820634]]}},{"id":"wTKfiqtKFkTxqS6oY2Xncinu96g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wK0e6c4x5ckC+1235ulXJA26GHQ="},{"type":"next-occurrence","id":"+48hqcIl8Wj87d2lOkToN3iFtT0="}],"description":"Utility work on NY 36 both directions between Genesee Street; NY 63 (York) and Telephone Road; US 20 (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-02T17:14:40Z"},"road_event_id":"wTKfiqtKFkTxqS6oY2Xncinu96g=","beginning_cross_street":"Genesee Street; NY 63","ending_cross_street":"Telephone Road; US 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.89701,42.820634]]}},{"id":"+48hqcIl8Wj87d2lOkToN3iFtT0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wK0e6c4x5ckC+1235ulXJA26GHQ="}],"description":"Utility work on NY 36 both directions between Genesee Street; NY 63 (York) and Telephone Road; US 20 (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-02T17:14:40Z"},"road_event_id":"+48hqcIl8Wj87d2lOkToN3iFtT0=","beginning_cross_street":"Genesee Street; NY 63","ending_cross_street":"Telephone Road; US 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.89701,42.820634]]}},{"id":"7UFJsPcTmNQPUakQnAw3iZpBekA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VVWpF63Y7Ty+H/scK0+gybNdcyk="}],"description":"Utility work on NY 63 both directions area of Federal Rd. (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-02T17:29:14Z"},"road_event_id":"7UFJsPcTmNQPUakQnAw3iZpBekA=","beginning_cross_street":"Federal Rd. ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.915223,42.831173]]}},{"id":"VVWpF63Y7Ty+H/scK0+gybNdcyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UFJsPcTmNQPUakQnAw3iZpBekA="},{"type":"next-occurrence","id":"Bxws+SZW7Vg68Jj0SsLPitq8KQw="}],"description":"Utility work on NY 63 both directions area of Federal Rd. (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-02T17:29:14Z"},"road_event_id":"VVWpF63Y7Ty+H/scK0+gybNdcyk=","beginning_cross_street":"Federal Rd. ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.915223,42.831173]]}},{"id":"Bxws+SZW7Vg68Jj0SsLPitq8KQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UFJsPcTmNQPUakQnAw3iZpBekA="},{"type":"next-occurrence","id":"IwBGF+C6ZRNQh4FN7ehZ05YNHH0="}],"description":"Utility work on NY 63 both directions area of Federal Rd. (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-02T17:29:14Z"},"road_event_id":"Bxws+SZW7Vg68Jj0SsLPitq8KQw=","beginning_cross_street":"Federal Rd. ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.915223,42.831173]]}},{"id":"IwBGF+C6ZRNQh4FN7ehZ05YNHH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UFJsPcTmNQPUakQnAw3iZpBekA="},{"type":"next-occurrence","id":"xpGxQTbnojNtIg1KpougoGIELzg="}],"description":"Utility work on NY 63 both directions area of Federal Rd. (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-02T17:29:14Z"},"road_event_id":"IwBGF+C6ZRNQh4FN7ehZ05YNHH0=","beginning_cross_street":"Federal Rd. ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.915223,42.831173]]}},{"id":"xpGxQTbnojNtIg1KpougoGIELzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UFJsPcTmNQPUakQnAw3iZpBekA="},{"type":"next-occurrence","id":"TGIS/7pLXDn5DyViTHQbg4f12Vg="}],"description":"Utility work on NY 63 both directions area of Federal Rd. (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-02T17:29:14Z"},"road_event_id":"xpGxQTbnojNtIg1KpougoGIELzg=","beginning_cross_street":"Federal Rd. ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.915223,42.831173]]}},{"id":"TGIS/7pLXDn5DyViTHQbg4f12Vg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7UFJsPcTmNQPUakQnAw3iZpBekA="}],"description":"Utility work on NY 63 both directions area of Federal Rd. (York) Alternating lane/shoulder closures with flaggers as needed, Friday May 29th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-02T17:29:14Z"},"road_event_id":"TGIS/7pLXDn5DyViTHQbg4f12Vg=","beginning_cross_street":"Federal Rd. ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.915223,42.831173]]}},{"id":"/kymEYYBapTAwLRskI87XsQbKu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/kWRnRRCpsl+vQBVjljw4gd3gtw="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/DAY/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:30 AM thru 03:30 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T18:06:42Z"},"road_event_id":"/kymEYYBapTAwLRskI87XsQbKu0=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:30:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936759,41.696094]]}},{"id":"/kWRnRRCpsl+vQBVjljw4gd3gtw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/kymEYYBapTAwLRskI87XsQbKu0="},{"type":"next-occurrence","id":"+O+z9q8X860oSr+zqkwr1pPsW8k="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/DAY/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:30 AM thru 03:30 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T18:06:42Z"},"road_event_id":"/kWRnRRCpsl+vQBVjljw4gd3gtw=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936759,41.696094]]}},{"id":"+O+z9q8X860oSr+zqkwr1pPsW8k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/kymEYYBapTAwLRskI87XsQbKu0="},{"type":"next-occurrence","id":"Fom7MKv/IwgQZ0X9lfDiCq2TE1E="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/DAY/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:30 AM thru 03:30 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T18:06:42Z"},"road_event_id":"+O+z9q8X860oSr+zqkwr1pPsW8k=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936759,41.696094]]}},{"id":"Fom7MKv/IwgQZ0X9lfDiCq2TE1E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/kymEYYBapTAwLRskI87XsQbKu0="},{"type":"next-occurrence","id":"aV6LGHVrk8MwmEG3Jmn34B1WvdQ="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/DAY/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:30 AM thru 03:30 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T18:06:42Z"},"road_event_id":"Fom7MKv/IwgQZ0X9lfDiCq2TE1E=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936759,41.696094]]}},{"id":"aV6LGHVrk8MwmEG3Jmn34B1WvdQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/kymEYYBapTAwLRskI87XsQbKu0="},{"type":"next-occurrence","id":"iWmtcD9PxSrdOIvh7DZ+ZosL3nM="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/DAY/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:30 AM thru 03:30 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T18:06:42Z"},"road_event_id":"aV6LGHVrk8MwmEG3Jmn34B1WvdQ=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936759,41.696094]]}},{"id":"iWmtcD9PxSrdOIvh7DZ+ZosL3nM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/kymEYYBapTAwLRskI87XsQbKu0="},{"type":"next-occurrence","id":"U1C5Xxx2K8nmfPKBbRBe3gWJ4og="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/DAY/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:30 AM thru 03:30 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T18:06:42Z"},"road_event_id":"iWmtcD9PxSrdOIvh7DZ+ZosL3nM=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936759,41.696094]]}},{"id":"U1C5Xxx2K8nmfPKBbRBe3gWJ4og=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/kymEYYBapTAwLRskI87XsQbKu0="},{"type":"next-occurrence","id":"INT1mnjN+n0gzJMSfdRqvZGjK1U="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/DAY/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:30 AM thru 03:30 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T18:06:42Z"},"road_event_id":"U1C5Xxx2K8nmfPKBbRBe3gWJ4og=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:30:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936759,41.696094]]}},{"id":"INT1mnjN+n0gzJMSfdRqvZGjK1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/kymEYYBapTAwLRskI87XsQbKu0="},{"type":"next-occurrence","id":"Njb8Gj9UW3m7XLdjj+0TtaqEve8="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/DAY/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:30 AM thru 03:30 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T18:06:42Z"},"road_event_id":"INT1mnjN+n0gzJMSfdRqvZGjK1U=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:30:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936759,41.696094]]}},{"id":"Njb8Gj9UW3m7XLdjj+0TtaqEve8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/kymEYYBapTAwLRskI87XsQbKu0="},{"type":"next-occurrence","id":"NkaHEI+YRUPI6scclTPKkaPkhfM="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/DAY/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:30 AM thru 03:30 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T18:06:42Z"},"road_event_id":"Njb8Gj9UW3m7XLdjj+0TtaqEve8=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:30:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936759,41.696094]]}},{"id":"NkaHEI+YRUPI6scclTPKkaPkhfM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/kymEYYBapTAwLRskI87XsQbKu0="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street - US 44 (Poughkeepsie) D265342/DAY/32764909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:30 AM thru 03:30 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-06-02T18:06:42Z"},"road_event_id":"NkaHEI+YRUPI6scclTPKkaPkhfM=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:30:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936759,41.696094]]}},{"id":"2OQyvIuoJxpteACAfQvY3+F+JRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VsI8bI+ZYs7Z+rsHZqVEUr3wFhY="}],"description":"Sign work on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and Hutchinson River Pkwy (Harrison) D265342/DAY/32765409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:18Z"},"road_event_id":"2OQyvIuoJxpteACAfQvY3+F+JRk=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.718323,41.079448]]}},{"id":"VsI8bI+ZYs7Z+rsHZqVEUr3wFhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2OQyvIuoJxpteACAfQvY3+F+JRk="},{"type":"next-occurrence","id":"CGKwEwosQxhc7U8fIW04KNZ0N7g="}],"description":"Sign work on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and Hutchinson River Pkwy (Harrison) D265342/DAY/32765409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:18Z"},"road_event_id":"VsI8bI+ZYs7Z+rsHZqVEUr3wFhY=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.718323,41.079448]]}},{"id":"CGKwEwosQxhc7U8fIW04KNZ0N7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2OQyvIuoJxpteACAfQvY3+F+JRk="},{"type":"next-occurrence","id":"ZdH/3wuQPIJT7FQhN414fPKBT1Y="}],"description":"Sign work on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and Hutchinson River Pkwy (Harrison) D265342/DAY/32765409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:18Z"},"road_event_id":"CGKwEwosQxhc7U8fIW04KNZ0N7g=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.718323,41.079448]]}},{"id":"ZdH/3wuQPIJT7FQhN414fPKBT1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2OQyvIuoJxpteACAfQvY3+F+JRk="},{"type":"next-occurrence","id":"OWEuEjVb7KudxIZWOtWygXignRs="}],"description":"Sign work on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and Hutchinson River Pkwy (Harrison) D265342/DAY/32765409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:18Z"},"road_event_id":"ZdH/3wuQPIJT7FQhN414fPKBT1Y=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.718323,41.079448]]}},{"id":"OWEuEjVb7KudxIZWOtWygXignRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2OQyvIuoJxpteACAfQvY3+F+JRk="},{"type":"next-occurrence","id":"LdfajZEij2pnlcmK453IhXaIVk0="}],"description":"Sign work on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and Hutchinson River Pkwy (Harrison) D265342/DAY/32765409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:18Z"},"road_event_id":"OWEuEjVb7KudxIZWOtWygXignRs=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.718323,41.079448]]}},{"id":"LdfajZEij2pnlcmK453IhXaIVk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2OQyvIuoJxpteACAfQvY3+F+JRk="},{"type":"next-occurrence","id":"JN3hLPejKq4lsIyCliwil2v97k8="}],"description":"Sign work on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and Hutchinson River Pkwy (Harrison) D265342/DAY/32765409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:18Z"},"road_event_id":"LdfajZEij2pnlcmK453IhXaIVk0=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.718323,41.079448]]}},{"id":"JN3hLPejKq4lsIyCliwil2v97k8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2OQyvIuoJxpteACAfQvY3+F+JRk="},{"type":"next-occurrence","id":"FJNgCZYCGhbb3inB6yf1vOed3+Y="}],"description":"Sign work on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and Hutchinson River Pkwy (Harrison) D265342/DAY/32765409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:18Z"},"road_event_id":"JN3hLPejKq4lsIyCliwil2v97k8=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T14:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.718323,41.079448]]}},{"id":"FJNgCZYCGhbb3inB6yf1vOed3+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2OQyvIuoJxpteACAfQvY3+F+JRk="},{"type":"next-occurrence","id":"fCWnzyDbCRTE3U8vzhoUBgsHtJs="}],"description":"Sign work on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and Hutchinson River Pkwy (Harrison) D265342/DAY/32765409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:18Z"},"road_event_id":"FJNgCZYCGhbb3inB6yf1vOed3+Y=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T14:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.718323,41.079448]]}},{"id":"fCWnzyDbCRTE3U8vzhoUBgsHtJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2OQyvIuoJxpteACAfQvY3+F+JRk="},{"type":"next-occurrence","id":"z6G1QzFvZ/LeN+YPmiiL5iSNH5s="}],"description":"Sign work on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and Hutchinson River Pkwy (Harrison) D265342/DAY/32765409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:18Z"},"road_event_id":"fCWnzyDbCRTE3U8vzhoUBgsHtJs=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T14:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.718323,41.079448]]}},{"id":"z6G1QzFvZ/LeN+YPmiiL5iSNH5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2OQyvIuoJxpteACAfQvY3+F+JRk="}],"description":"Sign work on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and Hutchinson River Pkwy (Harrison) D265342/DAY/32765409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:18Z"},"road_event_id":"z6G1QzFvZ/LeN+YPmiiL5iSNH5s=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T14:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.718323,41.079448]]}},{"id":"ewaizrf+vd6h7RtDiiAXqFi5kEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nK4SuEbe6Tl/Sz6JCSwA59hMLJk="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/DAY/32765509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:49Z"},"road_event_id":"ewaizrf+vd6h7RtDiiAXqFi5kEg=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715677,41.020919]]}},{"id":"nK4SuEbe6Tl/Sz6JCSwA59hMLJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ewaizrf+vd6h7RtDiiAXqFi5kEg="},{"type":"next-occurrence","id":"RRAdUftXvupVZ+d6vc/VdXIcffI="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/DAY/32765509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:49Z"},"road_event_id":"nK4SuEbe6Tl/Sz6JCSwA59hMLJk=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715677,41.020919]]}},{"id":"RRAdUftXvupVZ+d6vc/VdXIcffI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ewaizrf+vd6h7RtDiiAXqFi5kEg="},{"type":"next-occurrence","id":"OSaOmNN5B7MLVCOq9jgUOLJ0Hl8="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/DAY/32765509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:49Z"},"road_event_id":"RRAdUftXvupVZ+d6vc/VdXIcffI=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715677,41.020919]]}},{"id":"OSaOmNN5B7MLVCOq9jgUOLJ0Hl8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ewaizrf+vd6h7RtDiiAXqFi5kEg="},{"type":"next-occurrence","id":"tKWCoCc4f0FU4SzqCoqGZuzceqY="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/DAY/32765509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:49Z"},"road_event_id":"OSaOmNN5B7MLVCOq9jgUOLJ0Hl8=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715677,41.020919]]}},{"id":"tKWCoCc4f0FU4SzqCoqGZuzceqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ewaizrf+vd6h7RtDiiAXqFi5kEg="},{"type":"next-occurrence","id":"LkPSAe5e81O6qDJzQhAaolc1Kyw="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/DAY/32765509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:49Z"},"road_event_id":"tKWCoCc4f0FU4SzqCoqGZuzceqY=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715677,41.020919]]}},{"id":"LkPSAe5e81O6qDJzQhAaolc1Kyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ewaizrf+vd6h7RtDiiAXqFi5kEg="},{"type":"next-occurrence","id":"MGEQAgtO4u2i1o/ppBoOrdqqSV4="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/DAY/32765509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:49Z"},"road_event_id":"LkPSAe5e81O6qDJzQhAaolc1Kyw=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715677,41.020919]]}},{"id":"MGEQAgtO4u2i1o/ppBoOrdqqSV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ewaizrf+vd6h7RtDiiAXqFi5kEg="},{"type":"next-occurrence","id":"WuEIpVg211cK93ASG/jrWRlYbN4="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/DAY/32765509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:49Z"},"road_event_id":"MGEQAgtO4u2i1o/ppBoOrdqqSV4=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T14:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715677,41.020919]]}},{"id":"WuEIpVg211cK93ASG/jrWRlYbN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ewaizrf+vd6h7RtDiiAXqFi5kEg="},{"type":"next-occurrence","id":"2Ncts1/d4EkqYMCVoax/Pl/Fy6U="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/DAY/32765509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:49Z"},"road_event_id":"WuEIpVg211cK93ASG/jrWRlYbN4=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T14:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715677,41.020919]]}},{"id":"2Ncts1/d4EkqYMCVoax/Pl/Fy6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ewaizrf+vd6h7RtDiiAXqFi5kEg="},{"type":"next-occurrence","id":"fuU+mhVoFSk+DwBs7LoPwAX0/E8="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/DAY/32765509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:49Z"},"road_event_id":"2Ncts1/d4EkqYMCVoax/Pl/Fy6U=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T14:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715677,41.020919]]}},{"id":"fuU+mhVoFSk+DwBs7LoPwAX0/E8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ewaizrf+vd6h7RtDiiAXqFi5kEg="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D265342/DAY/32765509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 04:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 04:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-02T18:20:49Z"},"road_event_id":"fuU+mhVoFSk+DwBs7LoPwAX0/E8=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T14:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715677,41.020919]]}},{"id":"oIgG0xLpCx7Kpr1zTdCEUWdUUq8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2l6pYA9clWmwV2qwn0og7AfNgco="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 - Katonah - Cross River (Bedford) D265342/DAY/32765609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closure-ahead, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:25:13Z"},"road_event_id":"oIgG0xLpCx7Kpr1zTdCEUWdUUq8=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.651802,41.345699]]}},{"id":"2l6pYA9clWmwV2qwn0og7AfNgco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oIgG0xLpCx7Kpr1zTdCEUWdUUq8="},{"type":"next-occurrence","id":"7iC2GTOUrDZ3338zpkPdGe2qucg="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 - Katonah - Cross River (Bedford) D265342/DAY/32765609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closure-ahead, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:25:13Z"},"road_event_id":"2l6pYA9clWmwV2qwn0og7AfNgco=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.651802,41.345699]]}},{"id":"7iC2GTOUrDZ3338zpkPdGe2qucg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oIgG0xLpCx7Kpr1zTdCEUWdUUq8="},{"type":"next-occurrence","id":"PT34YHQDWjKndQN1g61F6ozrrtA="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 - Katonah - Cross River (Bedford) D265342/DAY/32765609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closure-ahead, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:25:13Z"},"road_event_id":"7iC2GTOUrDZ3338zpkPdGe2qucg=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.651802,41.345699]]}},{"id":"PT34YHQDWjKndQN1g61F6ozrrtA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oIgG0xLpCx7Kpr1zTdCEUWdUUq8="},{"type":"next-occurrence","id":"yV6AnVIXm9AWYeZvLqOfwOStG6A="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 - Katonah - Cross River (Bedford) D265342/DAY/32765609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closure-ahead, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:25:13Z"},"road_event_id":"PT34YHQDWjKndQN1g61F6ozrrtA=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.651802,41.345699]]}},{"id":"yV6AnVIXm9AWYeZvLqOfwOStG6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oIgG0xLpCx7Kpr1zTdCEUWdUUq8="},{"type":"next-occurrence","id":"E+m3ZF4BySb44MumFGDaMRWwVGE="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 - Katonah - Cross River (Bedford) D265342/DAY/32765609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closure-ahead, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:25:13Z"},"road_event_id":"yV6AnVIXm9AWYeZvLqOfwOStG6A=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.651802,41.345699]]}},{"id":"E+m3ZF4BySb44MumFGDaMRWwVGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oIgG0xLpCx7Kpr1zTdCEUWdUUq8="},{"type":"next-occurrence","id":"D4gSGALucdq6V4bo5ydNi/zMnJE="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 - Katonah - Cross River (Bedford) D265342/DAY/32765609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closure-ahead, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:25:13Z"},"road_event_id":"E+m3ZF4BySb44MumFGDaMRWwVGE=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.651802,41.345699]]}},{"id":"D4gSGALucdq6V4bo5ydNi/zMnJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oIgG0xLpCx7Kpr1zTdCEUWdUUq8="},{"type":"next-occurrence","id":"Tl2qmBwsL4YUTvODztaNuuX1TMM="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 - Katonah - Cross River (Bedford) D265342/DAY/32765609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closure-ahead, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:25:13Z"},"road_event_id":"D4gSGALucdq6V4bo5ydNi/zMnJE=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T14:00:00Z","end_date":"2026-06-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.651802,41.345699]]}},{"id":"Tl2qmBwsL4YUTvODztaNuuX1TMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oIgG0xLpCx7Kpr1zTdCEUWdUUq8="},{"type":"next-occurrence","id":"BgHTUTTE/FqkYB4EDIsOVfRD8W8="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 - Katonah - Cross River (Bedford) D265342/DAY/32765609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closure-ahead, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:25:13Z"},"road_event_id":"Tl2qmBwsL4YUTvODztaNuuX1TMM=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T14:00:00Z","end_date":"2026-06-17T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.651802,41.345699]]}},{"id":"BgHTUTTE/FqkYB4EDIsOVfRD8W8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oIgG0xLpCx7Kpr1zTdCEUWdUUq8="},{"type":"next-occurrence","id":"omeFRsN41Edq2HTuKuPkguzSiD8="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 - Katonah - Cross River (Bedford) D265342/DAY/32765609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closure-ahead, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:25:13Z"},"road_event_id":"BgHTUTTE/FqkYB4EDIsOVfRD8W8=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T14:00:00Z","end_date":"2026-06-18T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.651802,41.345699]]}},{"id":"omeFRsN41Edq2HTuKuPkguzSiD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oIgG0xLpCx7Kpr1zTdCEUWdUUq8="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 - Katonah - Cross River (Bedford) D265342/DAY/32765609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closure-ahead, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:25:13Z"},"road_event_id":"omeFRsN41Edq2HTuKuPkguzSiD8=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T14:00:00Z","end_date":"2026-06-19T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.651802,41.345699]]}},{"id":"JV3SdrhtIqo3dQTPXFOAbCBQybw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"I52HGdaJ14yuYe5qiEtdYYrLtfE="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/DAY/32765709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:27:45Z"},"road_event_id":"JV3SdrhtIqo3dQTPXFOAbCBQybw=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684712,41.265032]]}},{"id":"I52HGdaJ14yuYe5qiEtdYYrLtfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JV3SdrhtIqo3dQTPXFOAbCBQybw="},{"type":"next-occurrence","id":"WIOJcOr716nocd8jFc3z3Cs1cc4="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/DAY/32765709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:27:45Z"},"road_event_id":"I52HGdaJ14yuYe5qiEtdYYrLtfE=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684712,41.265032]]}},{"id":"WIOJcOr716nocd8jFc3z3Cs1cc4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JV3SdrhtIqo3dQTPXFOAbCBQybw="},{"type":"next-occurrence","id":"zhMtcZ9ilQ93zqaNvjLDXrtexHE="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/DAY/32765709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:27:45Z"},"road_event_id":"WIOJcOr716nocd8jFc3z3Cs1cc4=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684712,41.265032]]}},{"id":"zhMtcZ9ilQ93zqaNvjLDXrtexHE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JV3SdrhtIqo3dQTPXFOAbCBQybw="},{"type":"next-occurrence","id":"cp28hnLphXLayjJR0jl01BE1fEA="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/DAY/32765709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:27:45Z"},"road_event_id":"zhMtcZ9ilQ93zqaNvjLDXrtexHE=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684712,41.265032]]}},{"id":"cp28hnLphXLayjJR0jl01BE1fEA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JV3SdrhtIqo3dQTPXFOAbCBQybw="},{"type":"next-occurrence","id":"DrFpUa5UkEGSECDoplzzHO1B1iY="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/DAY/32765709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:27:45Z"},"road_event_id":"cp28hnLphXLayjJR0jl01BE1fEA=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684712,41.265032]]}},{"id":"DrFpUa5UkEGSECDoplzzHO1B1iY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JV3SdrhtIqo3dQTPXFOAbCBQybw="},{"type":"next-occurrence","id":"IzBQ5wzgzGhe0O3Gv/lJ8rl85gE="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/DAY/32765709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:27:45Z"},"road_event_id":"DrFpUa5UkEGSECDoplzzHO1B1iY=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684712,41.265032]]}},{"id":"IzBQ5wzgzGhe0O3Gv/lJ8rl85gE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JV3SdrhtIqo3dQTPXFOAbCBQybw="},{"type":"next-occurrence","id":"CsRQ008YWnVoGTICl8LA5x+5tAo="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/DAY/32765709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:27:45Z"},"road_event_id":"IzBQ5wzgzGhe0O3Gv/lJ8rl85gE=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684712,41.265032]]}},{"id":"CsRQ008YWnVoGTICl8LA5x+5tAo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JV3SdrhtIqo3dQTPXFOAbCBQybw="},{"type":"next-occurrence","id":"lJAmoNlYzVsuINSnZADCjPw9BVA="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/DAY/32765709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:27:45Z"},"road_event_id":"CsRQ008YWnVoGTICl8LA5x+5tAo=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684712,41.265032]]}},{"id":"lJAmoNlYzVsuINSnZADCjPw9BVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JV3SdrhtIqo3dQTPXFOAbCBQybw="},{"type":"next-occurrence","id":"Jos+DPOwz3bcJ2ygHH3BEjyZ5fQ="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/DAY/32765709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:27:45Z"},"road_event_id":"lJAmoNlYzVsuINSnZADCjPw9BVA=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684712,41.265032]]}},{"id":"Jos+DPOwz3bcJ2ygHH3BEjyZ5fQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JV3SdrhtIqo3dQTPXFOAbCBQybw="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265342/DAY/32765709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 09:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:27:45Z"},"road_event_id":"Jos+DPOwz3bcJ2ygHH3BEjyZ5fQ=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.684712,41.265032]]}},{"id":"yB8IhwF95UK4OJLNr37Qupn5fro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zOzq8FSy2ynQYUvqPTqPu6L7ShM="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - NY 117 (Bedford) D265342/DAY/32765809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:42:01Z"},"road_event_id":"yB8IhwF95UK4OJLNr37Qupn5fro=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677285,41.250012]]}},{"id":"zOzq8FSy2ynQYUvqPTqPu6L7ShM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yB8IhwF95UK4OJLNr37Qupn5fro="},{"type":"next-occurrence","id":"vMwGdveGpzp4+/p/XDuy1w6GkdE="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - NY 117 (Bedford) D265342/DAY/32765809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:42:01Z"},"road_event_id":"zOzq8FSy2ynQYUvqPTqPu6L7ShM=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677285,41.250012]]}},{"id":"vMwGdveGpzp4+/p/XDuy1w6GkdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yB8IhwF95UK4OJLNr37Qupn5fro="},{"type":"next-occurrence","id":"dcA0WoUabmMvi5HAr0JuSzI+yY8="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - NY 117 (Bedford) D265342/DAY/32765809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:42:01Z"},"road_event_id":"vMwGdveGpzp4+/p/XDuy1w6GkdE=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677285,41.250012]]}},{"id":"dcA0WoUabmMvi5HAr0JuSzI+yY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yB8IhwF95UK4OJLNr37Qupn5fro="},{"type":"next-occurrence","id":"G5gC3olfKe776aVtl43v+m2/6LY="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - NY 117 (Bedford) D265342/DAY/32765809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:42:01Z"},"road_event_id":"dcA0WoUabmMvi5HAr0JuSzI+yY8=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677285,41.250012]]}},{"id":"G5gC3olfKe776aVtl43v+m2/6LY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yB8IhwF95UK4OJLNr37Qupn5fro="},{"type":"next-occurrence","id":"SP3LO0o4IzinuUMVgNNvlLPguKE="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - NY 117 (Bedford) D265342/DAY/32765809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:42:01Z"},"road_event_id":"G5gC3olfKe776aVtl43v+m2/6LY=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677285,41.250012]]}},{"id":"SP3LO0o4IzinuUMVgNNvlLPguKE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yB8IhwF95UK4OJLNr37Qupn5fro="},{"type":"next-occurrence","id":"uLMt+JDcRKoLChVkzD664AbA04g="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - NY 117 (Bedford) D265342/DAY/32765809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:42:01Z"},"road_event_id":"SP3LO0o4IzinuUMVgNNvlLPguKE=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677285,41.250012]]}},{"id":"uLMt+JDcRKoLChVkzD664AbA04g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yB8IhwF95UK4OJLNr37Qupn5fro="},{"type":"next-occurrence","id":"yQn03dxuJGuvaC58/UE8Q72fsi0="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - NY 117 (Bedford) D265342/DAY/32765809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:42:01Z"},"road_event_id":"uLMt+JDcRKoLChVkzD664AbA04g=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T14:00:00Z","end_date":"2026-06-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677285,41.250012]]}},{"id":"yQn03dxuJGuvaC58/UE8Q72fsi0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yB8IhwF95UK4OJLNr37Qupn5fro="},{"type":"next-occurrence","id":"vzaOFZcy1FCI+7MCPI/pDEWODsQ="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - NY 117 (Bedford) D265342/DAY/32765809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:42:01Z"},"road_event_id":"yQn03dxuJGuvaC58/UE8Q72fsi0=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T14:00:00Z","end_date":"2026-06-17T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677285,41.250012]]}},{"id":"vzaOFZcy1FCI+7MCPI/pDEWODsQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yB8IhwF95UK4OJLNr37Qupn5fro="},{"type":"next-occurrence","id":"EFwMVAPqzf4V3GClfrJZx1SrKs0="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - NY 117 (Bedford) D265342/DAY/32765809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:42:01Z"},"road_event_id":"vzaOFZcy1FCI+7MCPI/pDEWODsQ=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T14:00:00Z","end_date":"2026-06-18T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677285,41.250012]]}},{"id":"EFwMVAPqzf4V3GClfrJZx1SrKs0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yB8IhwF95UK4OJLNr37Qupn5fro="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - NY 117 (Bedford) D265342/DAY/32765809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 10:00 AM thru 07:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 10:00 AM thru 07:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-06-02T18:42:01Z"},"road_event_id":"EFwMVAPqzf4V3GClfrJZx1SrKs0=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T14:00:00Z","end_date":"2026-06-19T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677285,41.250012]]}},{"id":"+unJhn9VXiyyJjBBeZ8Agj8kYAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ca/7+7C74qAEecMi+/ipEa8OWvg="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/DAY/32765909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 07:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:46:15Z"},"road_event_id":"+unJhn9VXiyyJjBBeZ8Agj8kYAc=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.694665,41.240654]]}},{"id":"ca/7+7C74qAEecMi+/ipEa8OWvg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+unJhn9VXiyyJjBBeZ8Agj8kYAc="},{"type":"next-occurrence","id":"6GgfliRxrU1WgJATSI6Aec4++/s="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/DAY/32765909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 07:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:46:15Z"},"road_event_id":"ca/7+7C74qAEecMi+/ipEa8OWvg=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.694665,41.240654]]}},{"id":"6GgfliRxrU1WgJATSI6Aec4++/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+unJhn9VXiyyJjBBeZ8Agj8kYAc="},{"type":"next-occurrence","id":"RTHYWPRy4GtFQz0b+/WMMQdIxMc="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/DAY/32765909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 07:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:46:15Z"},"road_event_id":"6GgfliRxrU1WgJATSI6Aec4++/s=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.694665,41.240654]]}},{"id":"RTHYWPRy4GtFQz0b+/WMMQdIxMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+unJhn9VXiyyJjBBeZ8Agj8kYAc="},{"type":"next-occurrence","id":"b1Jq2Vt2L80otv6i0bOqDsRdGK4="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/DAY/32765909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 07:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:46:15Z"},"road_event_id":"RTHYWPRy4GtFQz0b+/WMMQdIxMc=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.694665,41.240654]]}},{"id":"b1Jq2Vt2L80otv6i0bOqDsRdGK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+unJhn9VXiyyJjBBeZ8Agj8kYAc="},{"type":"next-occurrence","id":"SIrettT6XTbS8eCCYvBC40CMP30="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/DAY/32765909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 07:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:46:15Z"},"road_event_id":"b1Jq2Vt2L80otv6i0bOqDsRdGK4=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.694665,41.240654]]}},{"id":"SIrettT6XTbS8eCCYvBC40CMP30=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+unJhn9VXiyyJjBBeZ8Agj8kYAc="},{"type":"next-occurrence","id":"mNCfEfeWDa0qyKNR47p3bcyF7lE="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/DAY/32765909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 07:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:46:15Z"},"road_event_id":"SIrettT6XTbS8eCCYvBC40CMP30=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.694665,41.240654]]}},{"id":"mNCfEfeWDa0qyKNR47p3bcyF7lE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+unJhn9VXiyyJjBBeZ8Agj8kYAc="},{"type":"next-occurrence","id":"sRJ4sgSPQzXaAl7DQbLJeXO91VI="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/DAY/32765909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 07:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:46:15Z"},"road_event_id":"mNCfEfeWDa0qyKNR47p3bcyF7lE=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.694665,41.240654]]}},{"id":"sRJ4sgSPQzXaAl7DQbLJeXO91VI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+unJhn9VXiyyJjBBeZ8Agj8kYAc="},{"type":"next-occurrence","id":"dzYszqcho19a0YxQp+awHxX/o7Q="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/DAY/32765909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 07:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:46:15Z"},"road_event_id":"sRJ4sgSPQzXaAl7DQbLJeXO91VI=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.694665,41.240654]]}},{"id":"dzYszqcho19a0YxQp+awHxX/o7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+unJhn9VXiyyJjBBeZ8Agj8kYAc="},{"type":"next-occurrence","id":"0w+10iNmmhbAcIroBivQ/GYYNAw="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/DAY/32765909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 07:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:46:15Z"},"road_event_id":"dzYszqcho19a0YxQp+awHxX/o7Q=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.694665,41.240654]]}},{"id":"0w+10iNmmhbAcIroBivQ/GYYNAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+unJhn9VXiyyJjBBeZ8Agj8kYAc="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/DAY/32765909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 1st, 2026 thru Monday June 15th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 07:00 AM thru 03:00 PM, various lane closures, Tuesday June 23rd, 2026 thru Wednesday June 24th, 2026 Tuesday/ Wednesday, 07:00 AM thru 03:00 PM, various lane closures, Friday June 26th, 2026 thru Monday June 29th, 2026 Monday/ Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-06-02T18:46:15Z"},"road_event_id":"0w+10iNmmhbAcIroBivQ/GYYNAw=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.694665,41.240654]]}},{"id":"241JuczPyyfgnYKQ5MC4vzF8riE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 11TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xNE3/f0ELEfF1JCvzRjDOISqPuc="}],"description":"Construction on E 11TH ST westbound between BROADWAY (New York) and UNIVERSITY PL (New York), Tuesday June 2nd, 2026 thru Sunday June 7th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:18:52Z"},"road_event_id":"241JuczPyyfgnYKQ5MC4vzF8riE=","beginning_cross_street":"BROADWAY","ending_cross_street":"UNIVERSITY PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991348,40.732482]]}},{"id":"xNE3/f0ELEfF1JCvzRjDOISqPuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 11TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"241JuczPyyfgnYKQ5MC4vzF8riE="}],"description":"Construction on E 11TH ST westbound between BROADWAY (New York) and UNIVERSITY PL (New York), Tuesday June 2nd, 2026 thru Sunday June 7th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:18:52Z"},"road_event_id":"xNE3/f0ELEfF1JCvzRjDOISqPuc=","beginning_cross_street":"BROADWAY","ending_cross_street":"UNIVERSITY PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991348,40.732482]]}},{"id":"zmG77DvCt3+2ZRzDJ2a/RVCESH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"m6bZR8UnS51x13bvpUzbNdX35pY="}],"description":"Construction on W 28TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 21st, 2026, 07:00 AM thru 05:00 PM All lanes closed","update_date":"2026-06-02T19:22:02Z"},"road_event_id":"zmG77DvCt3+2ZRzDJ2a/RVCESH8=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996094,40.748389]]}},{"id":"m6bZR8UnS51x13bvpUzbNdX35pY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmG77DvCt3+2ZRzDJ2a/RVCESH8="}],"description":"Construction on W 28TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 21st, 2026, 07:00 AM thru 05:00 PM All lanes closed","update_date":"2026-06-02T19:22:02Z"},"road_event_id":"m6bZR8UnS51x13bvpUzbNdX35pY=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996094,40.748389]]}},{"id":"sewwesVjG2+kuoYJ0WoMQurAW+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GA4AAsHe9voiEtxBLJleDXpDk+c="}],"description":"Construction on W 28TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 28th, 2026, 05:00 AM thru 03:00 AM All lanes closed","update_date":"2026-06-02T19:23:50Z"},"road_event_id":"sewwesVjG2+kuoYJ0WoMQurAW+k=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T09:00:00Z","end_date":"2026-06-07T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.001838,40.750817]]}},{"id":"GA4AAsHe9voiEtxBLJleDXpDk+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sewwesVjG2+kuoYJ0WoMQurAW+k="}],"description":"Construction on W 28TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 28th, 2026, 05:00 AM thru 03:00 AM All lanes closed","update_date":"2026-06-02T19:23:50Z"},"road_event_id":"GA4AAsHe9voiEtxBLJleDXpDk+c=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T09:00:00Z","end_date":"2026-06-14T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.001838,40.750817]]}},{"id":"ZgmdAXFklrUYvdfPJO4NY6GKTYg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 37TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"D/5QScQstaSp/UEbDmO+K3M3RrU="}],"description":"Construction on W 37TH ST westbound between BROADWAY (New York) and 8TH AVE (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-06-02T19:27:03Z"},"road_event_id":"ZgmdAXFklrUYvdfPJO4NY6GKTYg=","beginning_cross_street":"BROADWAY","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T03:30:00Z","end_date":"2026-06-08T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987536,40.752185]]}},{"id":"D/5QScQstaSp/UEbDmO+K3M3RrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 37TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZgmdAXFklrUYvdfPJO4NY6GKTYg="}],"description":"Construction on W 37TH ST westbound between BROADWAY (New York) and 8TH AVE (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-06-02T19:27:03Z"},"road_event_id":"D/5QScQstaSp/UEbDmO+K3M3RrU=","beginning_cross_street":"BROADWAY","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T03:30:00Z","end_date":"2026-06-15T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987536,40.752185]]}},{"id":"U+rRMDD4uDqOEqNPDq/1J5edZJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 53RD ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Y4GC1ndp+PlCKWQ4LW/psqQRM6o="}],"description":"Construction on E 53RD ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:29:52Z"},"road_event_id":"U+rRMDD4uDqOEqNPDq/1J5edZJU=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974292,40.75977]]}},{"id":"Y4GC1ndp+PlCKWQ4LW/psqQRM6o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 53RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+rRMDD4uDqOEqNPDq/1J5edZJU="},{"type":"next-occurrence","id":"B95rxBN66tn5gEUyOL4Fk5ged5I="}],"description":"Construction on E 53RD ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:29:52Z"},"road_event_id":"Y4GC1ndp+PlCKWQ4LW/psqQRM6o=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T03:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974292,40.75977]]}},{"id":"B95rxBN66tn5gEUyOL4Fk5ged5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 53RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+rRMDD4uDqOEqNPDq/1J5edZJU="},{"type":"next-occurrence","id":"OG2vc3h9ynE/yhNEaA0IAvX0uTg="}],"description":"Construction on E 53RD ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:29:52Z"},"road_event_id":"B95rxBN66tn5gEUyOL4Fk5ged5I=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T03:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974292,40.75977]]}},{"id":"OG2vc3h9ynE/yhNEaA0IAvX0uTg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 53RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+rRMDD4uDqOEqNPDq/1J5edZJU="},{"type":"next-occurrence","id":"uigcfueApYYfCovhp06Z7e3FSIw="}],"description":"Construction on E 53RD ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:29:52Z"},"road_event_id":"OG2vc3h9ynE/yhNEaA0IAvX0uTg=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T03:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974292,40.75977]]}},{"id":"uigcfueApYYfCovhp06Z7e3FSIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 53RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+rRMDD4uDqOEqNPDq/1J5edZJU="},{"type":"next-occurrence","id":"Kpr8suypxl/UmuYyh03Abo5yYb4="}],"description":"Construction on E 53RD ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:29:52Z"},"road_event_id":"uigcfueApYYfCovhp06Z7e3FSIw=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T03:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974292,40.75977]]}},{"id":"Kpr8suypxl/UmuYyh03Abo5yYb4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 53RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+rRMDD4uDqOEqNPDq/1J5edZJU="},{"type":"next-occurrence","id":"AhYNSDxKRrnvFCVto8GJrIbFBB0="}],"description":"Construction on E 53RD ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:29:52Z"},"road_event_id":"Kpr8suypxl/UmuYyh03Abo5yYb4=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T03:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974292,40.75977]]}},{"id":"AhYNSDxKRrnvFCVto8GJrIbFBB0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 53RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+rRMDD4uDqOEqNPDq/1J5edZJU="},{"type":"next-occurrence","id":"BaGvN9v7bfmpIe4M0wKTU71b6fc="}],"description":"Construction on E 53RD ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:29:52Z"},"road_event_id":"AhYNSDxKRrnvFCVto8GJrIbFBB0=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T03:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974292,40.75977]]}},{"id":"BaGvN9v7bfmpIe4M0wKTU71b6fc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 53RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+rRMDD4uDqOEqNPDq/1J5edZJU="},{"type":"next-occurrence","id":"4W2Ap6TpIQKRuOf1KZIOvbDgzFI="}],"description":"Construction on E 53RD ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:29:52Z"},"road_event_id":"BaGvN9v7bfmpIe4M0wKTU71b6fc=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T03:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974292,40.75977]]}},{"id":"4W2Ap6TpIQKRuOf1KZIOvbDgzFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 53RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+rRMDD4uDqOEqNPDq/1J5edZJU="},{"type":"next-occurrence","id":"O/+xJF+bz/HgxwEuN4Be4b0F9QM="}],"description":"Construction on E 53RD ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:29:52Z"},"road_event_id":"4W2Ap6TpIQKRuOf1KZIOvbDgzFI=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T03:00:00Z","end_date":"2026-06-14T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974292,40.75977]]}},{"id":"O/+xJF+bz/HgxwEuN4Be4b0F9QM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 53RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+rRMDD4uDqOEqNPDq/1J5edZJU="},{"type":"next-occurrence","id":"eWNJkWNWU+c99EEazue0DkJtLuc="}],"description":"Construction on E 53RD ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:29:52Z"},"road_event_id":"O/+xJF+bz/HgxwEuN4Be4b0F9QM=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T03:00:00Z","end_date":"2026-06-15T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974292,40.75977]]}},{"id":"eWNJkWNWU+c99EEazue0DkJtLuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 53RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+rRMDD4uDqOEqNPDq/1J5edZJU="},{"type":"next-occurrence","id":"9Dl/HE8kAq1aeHhu6t8FEiL5YIw="}],"description":"Construction on E 53RD ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:29:52Z"},"road_event_id":"eWNJkWNWU+c99EEazue0DkJtLuc=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T03:00:00Z","end_date":"2026-06-16T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974292,40.75977]]}},{"id":"9Dl/HE8kAq1aeHhu6t8FEiL5YIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 53RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+rRMDD4uDqOEqNPDq/1J5edZJU="},{"type":"next-occurrence","id":"z7VMg9I9F8bm7T4Ytvb6WWpkEYM="}],"description":"Construction on E 53RD ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:29:52Z"},"road_event_id":"9Dl/HE8kAq1aeHhu6t8FEiL5YIw=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T03:00:00Z","end_date":"2026-06-17T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974292,40.75977]]}},{"id":"z7VMg9I9F8bm7T4Ytvb6WWpkEYM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 53RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+rRMDD4uDqOEqNPDq/1J5edZJU="},{"type":"next-occurrence","id":"Qfdefjk5LeKtaXxk7WrAVPI3Kq4="}],"description":"Construction on E 53RD ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:29:52Z"},"road_event_id":"z7VMg9I9F8bm7T4Ytvb6WWpkEYM=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T03:00:00Z","end_date":"2026-06-18T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974292,40.75977]]}},{"id":"Qfdefjk5LeKtaXxk7WrAVPI3Kq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 53RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+rRMDD4uDqOEqNPDq/1J5edZJU="},{"type":"next-occurrence","id":"nTZm2PgKYBtkbfb0crkbsgVzkms="}],"description":"Construction on E 53RD ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:29:52Z"},"road_event_id":"Qfdefjk5LeKtaXxk7WrAVPI3Kq4=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T03:00:00Z","end_date":"2026-06-19T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974292,40.75977]]}},{"id":"nTZm2PgKYBtkbfb0crkbsgVzkms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 53RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U+rRMDD4uDqOEqNPDq/1J5edZJU="}],"description":"Construction on E 53RD ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:29:52Z"},"road_event_id":"nTZm2PgKYBtkbfb0crkbsgVzkms=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T03:00:00Z","end_date":"2026-06-20T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974292,40.75977]]}},{"id":"O0O8YOnub5nisT8heOcjo3xyo3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 55TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EEBKCCu0t4mClIr7gteLCr3gJgE="}],"description":"Construction on E 55TH ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, Saturday/ Sunday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:32:19Z"},"road_event_id":"O0O8YOnub5nisT8heOcjo3xyo3A=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.973394,40.76103]]}},{"id":"EEBKCCu0t4mClIr7gteLCr3gJgE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 55TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O0O8YOnub5nisT8heOcjo3xyo3A="},{"type":"next-occurrence","id":"Nr48XYqQscvLHZrt7jBtENplUhM="}],"description":"Construction on E 55TH ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, Saturday/ Sunday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:32:19Z"},"road_event_id":"EEBKCCu0t4mClIr7gteLCr3gJgE=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T12:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.973394,40.76103]]}},{"id":"Nr48XYqQscvLHZrt7jBtENplUhM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 55TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O0O8YOnub5nisT8heOcjo3xyo3A="},{"type":"next-occurrence","id":"nZmFjXPxVhipoXq3QT0kQGOToZg="}],"description":"Construction on E 55TH ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, Saturday/ Sunday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:32:19Z"},"road_event_id":"Nr48XYqQscvLHZrt7jBtENplUhM=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.973394,40.76103]]}},{"id":"nZmFjXPxVhipoXq3QT0kQGOToZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 55TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O0O8YOnub5nisT8heOcjo3xyo3A="}],"description":"Construction on E 55TH ST westbound between MADISON AVE (New York) and 5TH AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, Saturday/ Sunday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:32:19Z"},"road_event_id":"nZmFjXPxVhipoXq3QT0kQGOToZg=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T12:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.973394,40.76103]]}},{"id":"DJbCEq4x8957H5oHipF9mtZ3qwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 60TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4YyKY8VV35LuX0kGejV/+AfbVSA="}],"description":"Construction on E 60TH ST westbound between PARK AVE (New York) and MADISON AVE (New York), Tuesday June 2nd, 2026 thru Thursday June 11th, 2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:35:22Z"},"road_event_id":"DJbCEq4x8957H5oHipF9mtZ3qwk=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.969516,40.763613]]}},{"id":"4YyKY8VV35LuX0kGejV/+AfbVSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 60TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DJbCEq4x8957H5oHipF9mtZ3qwk="},{"type":"next-occurrence","id":"O8Zzh/r5ZmXFl9VUm7WBgA2VpWU="}],"description":"Construction on E 60TH ST westbound between PARK AVE (New York) and MADISON AVE (New York), Tuesday June 2nd, 2026 thru Thursday June 11th, 2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:35:22Z"},"road_event_id":"4YyKY8VV35LuX0kGejV/+AfbVSA=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T02:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.969516,40.763613]]}},{"id":"O8Zzh/r5ZmXFl9VUm7WBgA2VpWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 60TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DJbCEq4x8957H5oHipF9mtZ3qwk="},{"type":"next-occurrence","id":"S/U5qx/xrWre8xSriiln68qaiqQ="}],"description":"Construction on E 60TH ST westbound between PARK AVE (New York) and MADISON AVE (New York), Tuesday June 2nd, 2026 thru Thursday June 11th, 2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:35:22Z"},"road_event_id":"O8Zzh/r5ZmXFl9VUm7WBgA2VpWU=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T02:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.969516,40.763613]]}},{"id":"S/U5qx/xrWre8xSriiln68qaiqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 60TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DJbCEq4x8957H5oHipF9mtZ3qwk="},{"type":"next-occurrence","id":"2jUf0n7I1QlTNc/PufTmw743Jq4="}],"description":"Construction on E 60TH ST westbound between PARK AVE (New York) and MADISON AVE (New York), Tuesday June 2nd, 2026 thru Thursday June 11th, 2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:35:22Z"},"road_event_id":"S/U5qx/xrWre8xSriiln68qaiqQ=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.969516,40.763613]]}},{"id":"2jUf0n7I1QlTNc/PufTmw743Jq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 60TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DJbCEq4x8957H5oHipF9mtZ3qwk="},{"type":"next-occurrence","id":"1lWJhR6rsHNW1C7Bfg35zWyUZ5g="}],"description":"Construction on E 60TH ST westbound between PARK AVE (New York) and MADISON AVE (New York), Tuesday June 2nd, 2026 thru Thursday June 11th, 2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:35:22Z"},"road_event_id":"2jUf0n7I1QlTNc/PufTmw743Jq4=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.969516,40.763613]]}},{"id":"1lWJhR6rsHNW1C7Bfg35zWyUZ5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 60TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DJbCEq4x8957H5oHipF9mtZ3qwk="},{"type":"next-occurrence","id":"Tb5yZ58zbtbYY10F5J97BzZ+DKo="}],"description":"Construction on E 60TH ST westbound between PARK AVE (New York) and MADISON AVE (New York), Tuesday June 2nd, 2026 thru Thursday June 11th, 2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:35:22Z"},"road_event_id":"1lWJhR6rsHNW1C7Bfg35zWyUZ5g=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.969516,40.763613]]}},{"id":"Tb5yZ58zbtbYY10F5J97BzZ+DKo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 60TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DJbCEq4x8957H5oHipF9mtZ3qwk="}],"description":"Construction on E 60TH ST westbound between PARK AVE (New York) and MADISON AVE (New York), Tuesday June 2nd, 2026 thru Thursday June 11th, 2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-02T19:35:22Z"},"road_event_id":"Tb5yZ58zbtbYY10F5J97BzZ+DKo=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.969516,40.763613]]}},{"id":"4REn/wrQ51XGqYPzVGQudupjahI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 67TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FKgVzounweLleqf6rvBQjZzI0hU="}],"description":"Construction on W 67TH ST westbound between BROADWAY (New York) and AMSTERDAM AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:39:26Z"},"road_event_id":"4REn/wrQ51XGqYPzVGQudupjahI=","beginning_cross_street":"BROADWAY","ending_cross_street":"AMSTERDAM AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982384,40.774768]]}},{"id":"FKgVzounweLleqf6rvBQjZzI0hU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 67TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4REn/wrQ51XGqYPzVGQudupjahI="},{"type":"next-occurrence","id":"vgTEjaJGxT9uBHOOWOnF/S89XdM="}],"description":"Construction on W 67TH ST westbound between BROADWAY (New York) and AMSTERDAM AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:39:26Z"},"road_event_id":"FKgVzounweLleqf6rvBQjZzI0hU=","beginning_cross_street":"BROADWAY","ending_cross_street":"AMSTERDAM AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982384,40.774768]]}},{"id":"vgTEjaJGxT9uBHOOWOnF/S89XdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 67TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4REn/wrQ51XGqYPzVGQudupjahI="},{"type":"next-occurrence","id":"2Ppt2wwwzy2OO3hbRWFKQNA1jas="}],"description":"Construction on W 67TH ST westbound between BROADWAY (New York) and AMSTERDAM AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:39:26Z"},"road_event_id":"vgTEjaJGxT9uBHOOWOnF/S89XdM=","beginning_cross_street":"BROADWAY","ending_cross_street":"AMSTERDAM AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982384,40.774768]]}},{"id":"2Ppt2wwwzy2OO3hbRWFKQNA1jas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 67TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4REn/wrQ51XGqYPzVGQudupjahI="}],"description":"Construction on W 67TH ST westbound between BROADWAY (New York) and AMSTERDAM AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:39:26Z"},"road_event_id":"2Ppt2wwwzy2OO3hbRWFKQNA1jas=","beginning_cross_street":"BROADWAY","ending_cross_street":"AMSTERDAM AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982384,40.774768]]}},{"id":"5AnzlsHO2g7a82pr0b43q2/NF9w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 74TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cspx+eNAs/tIgIOmd6ICLK0Eyyw="}],"description":"Construction on E 74TH ST eastbound between PARK AVE (New York) and LEXINGTON AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 7th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:45:17Z"},"road_event_id":"5AnzlsHO2g7a82pr0b43q2/NF9w=","beginning_cross_street":"PARK AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962701,40.772359]]}},{"id":"cspx+eNAs/tIgIOmd6ICLK0Eyyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 74TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5AnzlsHO2g7a82pr0b43q2/NF9w="}],"description":"Construction on E 74TH ST eastbound between PARK AVE (New York) and LEXINGTON AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 7th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:45:17Z"},"road_event_id":"cspx+eNAs/tIgIOmd6ICLK0Eyyw=","beginning_cross_street":"PARK AVE","ending_cross_street":"LEXINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962701,40.772359]]}},{"id":"+EV8udQlPTr2L6Xyv5CQ1GUbQs0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 69TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"boJ7thgyzwEVl2J+oGb4Swn5sfE="}],"description":"Construction on E 69TH ST westbound between PARK AVE (New York) and MADISON AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 7th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:51:55Z"},"road_event_id":"+EV8udQlPTr2L6Xyv5CQ1GUbQs0=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965428,40.76925]]}},{"id":"boJ7thgyzwEVl2J+oGb4Swn5sfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 69TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+EV8udQlPTr2L6Xyv5CQ1GUbQs0="}],"description":"Construction on E 69TH ST westbound between PARK AVE (New York) and MADISON AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 7th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:51:55Z"},"road_event_id":"boJ7thgyzwEVl2J+oGb4Swn5sfE=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965428,40.76925]]}},{"id":"RLmXZoyiiu7VGT/JddaUUDbsDgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4tWgvmP9FnqqxIJREpA8vnqrY0U="}],"description":"Construction on W 91ST ST westbound between AMSTERDAM AVE (New York) and BROADWAY (New York), Tuesday June 2nd, 2026 thru Sunday June 21st, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:56:40Z"},"road_event_id":"RLmXZoyiiu7VGT/JddaUUDbsDgo=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.972738,40.79089]]}},{"id":"4tWgvmP9FnqqxIJREpA8vnqrY0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RLmXZoyiiu7VGT/JddaUUDbsDgo="},{"type":"next-occurrence","id":"u0OJlV2RKVmt7ivTWsNeCHQWEPA="}],"description":"Construction on W 91ST ST westbound between AMSTERDAM AVE (New York) and BROADWAY (New York), Tuesday June 2nd, 2026 thru Sunday June 21st, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:56:40Z"},"road_event_id":"4tWgvmP9FnqqxIJREpA8vnqrY0U=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.972738,40.79089]]}},{"id":"u0OJlV2RKVmt7ivTWsNeCHQWEPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RLmXZoyiiu7VGT/JddaUUDbsDgo="},{"type":"next-occurrence","id":"XYpHGcZBZ1gP0M4M20EDlJBlUcA="}],"description":"Construction on W 91ST ST westbound between AMSTERDAM AVE (New York) and BROADWAY (New York), Tuesday June 2nd, 2026 thru Sunday June 21st, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:56:40Z"},"road_event_id":"u0OJlV2RKVmt7ivTWsNeCHQWEPA=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.972738,40.79089]]}},{"id":"XYpHGcZBZ1gP0M4M20EDlJBlUcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RLmXZoyiiu7VGT/JddaUUDbsDgo="}],"description":"Construction on W 91ST ST westbound between AMSTERDAM AVE (New York) and BROADWAY (New York), Tuesday June 2nd, 2026 thru Sunday June 21st, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T19:56:40Z"},"road_event_id":"XYpHGcZBZ1gP0M4M20EDlJBlUcA=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.972738,40.79089]]}},{"id":"Vh4zNyH0aOvPViugBogEuSJcQFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 93RD ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"87VIFeWrSUeAdLFv9hFu9O3FoP0="}],"description":"Construction on E 93RD ST westbound between LEXINGTON AVE (New York) and PARK AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T20:01:48Z"},"road_event_id":"Vh4zNyH0aOvPViugBogEuSJcQFQ=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.952379,40.783956]]}},{"id":"87VIFeWrSUeAdLFv9hFu9O3FoP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 93RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vh4zNyH0aOvPViugBogEuSJcQFQ="},{"type":"next-occurrence","id":"qJEIPmqds6xkVRtRewhXN4Y1Yoc="}],"description":"Construction on E 93RD ST westbound between LEXINGTON AVE (New York) and PARK AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T20:01:48Z"},"road_event_id":"87VIFeWrSUeAdLFv9hFu9O3FoP0=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.952379,40.783956]]}},{"id":"qJEIPmqds6xkVRtRewhXN4Y1Yoc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 93RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vh4zNyH0aOvPViugBogEuSJcQFQ="},{"type":"next-occurrence","id":"oUTVDQnSf3yIf+vJqSqehQoWHOg="}],"description":"Construction on E 93RD ST westbound between LEXINGTON AVE (New York) and PARK AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T20:01:48Z"},"road_event_id":"qJEIPmqds6xkVRtRewhXN4Y1Yoc=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.952379,40.783956]]}},{"id":"oUTVDQnSf3yIf+vJqSqehQoWHOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 93RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vh4zNyH0aOvPViugBogEuSJcQFQ="}],"description":"Construction on E 93RD ST westbound between LEXINGTON AVE (New York) and PARK AVE (New York), Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T20:01:48Z"},"road_event_id":"oUTVDQnSf3yIf+vJqSqehQoWHOg=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.952379,40.783956]]}},{"id":"fWP2BEc6lLWFp6lPpRBc4qu+f68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 111TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fD+iJdYvjDaLBh0h+Pb71wdD8xk="}],"description":"Construction on W 111TH ST westbound between BROADWAY (New York) and RIVERSIDE DR (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-02T20:03:49Z"},"road_event_id":"fWP2BEc6lLWFp6lPpRBc4qu+f68=","beginning_cross_street":"BROADWAY","ending_cross_street":"RIVERSIDE DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.966345,40.804879]]}},{"id":"fD+iJdYvjDaLBh0h+Pb71wdD8xk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 111TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fWP2BEc6lLWFp6lPpRBc4qu+f68="},{"type":"next-occurrence","id":"HFfLzjos8XfX/1tDhNgECeA8TJ8="}],"description":"Construction on W 111TH ST westbound between BROADWAY (New York) and RIVERSIDE DR (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-02T20:03:49Z"},"road_event_id":"fD+iJdYvjDaLBh0h+Pb71wdD8xk=","beginning_cross_street":"BROADWAY","ending_cross_street":"RIVERSIDE DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.966345,40.804879]]}},{"id":"HFfLzjos8XfX/1tDhNgECeA8TJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 111TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fWP2BEc6lLWFp6lPpRBc4qu+f68="}],"description":"Construction on W 111TH ST westbound between BROADWAY (New York) and RIVERSIDE DR (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-02T20:03:49Z"},"road_event_id":"HFfLzjos8XfX/1tDhNgECeA8TJ8=","beginning_cross_street":"BROADWAY","ending_cross_street":"RIVERSIDE DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.966345,40.804879]]}},{"id":"IFU0BdvqKwwNeFIR6/7hqElqxUw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 112TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CTScS8Yas4FNXIw1Aei8ua9voPA="}],"description":"Construction on W 112TH ST eastbound between RIVERSIDE DR (New York) and BROADWAY (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-02T20:09:40Z"},"road_event_id":"IFU0BdvqKwwNeFIR6/7hqElqxUw=","beginning_cross_street":"RIVERSIDE DR","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967302,40.806101]]}},{"id":"CTScS8Yas4FNXIw1Aei8ua9voPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 112TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IFU0BdvqKwwNeFIR6/7hqElqxUw="},{"type":"next-occurrence","id":"CldTOrzAHWUTinFTqhHs8AfhX/Y="}],"description":"Construction on W 112TH ST eastbound between RIVERSIDE DR (New York) and BROADWAY (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-02T20:09:40Z"},"road_event_id":"CTScS8Yas4FNXIw1Aei8ua9voPA=","beginning_cross_street":"RIVERSIDE DR","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967302,40.806101]]}},{"id":"CldTOrzAHWUTinFTqhHs8AfhX/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 112TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IFU0BdvqKwwNeFIR6/7hqElqxUw="}],"description":"Construction on W 112TH ST eastbound between RIVERSIDE DR (New York) and BROADWAY (New York), Tuesday June 2nd, 2026 thru Tuesday June 30th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-02T20:09:40Z"},"road_event_id":"CldTOrzAHWUTinFTqhHs8AfhX/Y=","beginning_cross_street":"RIVERSIDE DR","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967302,40.806101]]}},{"id":"/nh/ppHf1Q2ctMwy3pn1a9zPhsc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LISPENARD ST"],"direction":"unknown","related_road_events":[],"description":"Construction on LISPENARD ST eastbound between 6TH AVE (New York) and CHURCH ST (New York), Tuesday June 2nd, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T20:13:52Z"},"road_event_id":"/nh/ppHf1Q2ctMwy3pn1a9zPhsc=","beginning_cross_street":"6TH AVE","ending_cross_street":"CHURCH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005166,40.720559]]}},{"id":"b4xlnQCTeALk/lU10VEnuLq0OKE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AQE2MZTZfUgSgA5H33RB2/sjJvA="}],"description":"Construction on GROVE ST eastbound between HUDSON ST (New York) and BEDFORD ST (New York), Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T20:22:35Z"},"road_event_id":"b4xlnQCTeALk/lU10VEnuLq0OKE=","beginning_cross_street":"HUDSON ST","ending_cross_street":"BEDFORD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006436,40.732413]]}},{"id":"AQE2MZTZfUgSgA5H33RB2/sjJvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"b4xlnQCTeALk/lU10VEnuLq0OKE="},{"type":"next-occurrence","id":"BMneAdPHPJmhHE8wnbEQkkfpdfE="}],"description":"Construction on GROVE ST eastbound between HUDSON ST (New York) and BEDFORD ST (New York), Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T20:22:35Z"},"road_event_id":"AQE2MZTZfUgSgA5H33RB2/sjJvA=","beginning_cross_street":"HUDSON ST","ending_cross_street":"BEDFORD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006436,40.732413]]}},{"id":"BMneAdPHPJmhHE8wnbEQkkfpdfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"b4xlnQCTeALk/lU10VEnuLq0OKE="},{"type":"next-occurrence","id":"3AgmbPAEqpkkERHrDK9uClYvtQo="}],"description":"Construction on GROVE ST eastbound between HUDSON ST (New York) and BEDFORD ST (New York), Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T20:22:35Z"},"road_event_id":"BMneAdPHPJmhHE8wnbEQkkfpdfE=","beginning_cross_street":"HUDSON ST","ending_cross_street":"BEDFORD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006436,40.732413]]}},{"id":"3AgmbPAEqpkkERHrDK9uClYvtQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"b4xlnQCTeALk/lU10VEnuLq0OKE="}],"description":"Construction on GROVE ST eastbound between HUDSON ST (New York) and BEDFORD ST (New York), Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday June 2nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-02T20:22:35Z"},"road_event_id":"3AgmbPAEqpkkERHrDK9uClYvtQo=","beginning_cross_street":"HUDSON ST","ending_cross_street":"BEDFORD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006436,40.732413]]}},{"id":"04imhV33ZOgxWBUM38WjEhF8qKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2fVfmGmuIxhIXNbwjIgQn0uYUM4="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York), Tuesday June 2nd, 2026 thru Thursday July 30th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-02T20:28:13Z"},"road_event_id":"04imhV33ZOgxWBUM38WjEhF8qKI=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008407,40.734794]]}},{"id":"2fVfmGmuIxhIXNbwjIgQn0uYUM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"04imhV33ZOgxWBUM38WjEhF8qKI="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York), Tuesday June 2nd, 2026 thru Thursday July 30th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-02T20:28:13Z"},"road_event_id":"2fVfmGmuIxhIXNbwjIgQn0uYUM4=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008407,40.734794]]}},{"id":"FYwfhhpzyAYiXpPcjTcOcaOybpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 118"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1x17kayegrybkjJpe9Xpl7l1980="}],"description":"Road rehabilitation on NY 118 both directions between Old Country Way (Yorktown) and Allan Avenue (Yorktown) 202508113720/32766409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-03T16:50:48Z"},"road_event_id":"FYwfhhpzyAYiXpPcjTcOcaOybpw=","beginning_cross_street":"Old Country Way","ending_cross_street":"Allan Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.782998,41.268703]]}},{"id":"1x17kayegrybkjJpe9Xpl7l1980=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 118"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYwfhhpzyAYiXpPcjTcOcaOybpw="},{"type":"next-occurrence","id":"tucgLk859k/LcNvVaaNq/2LrR+E="}],"description":"Road rehabilitation on NY 118 both directions between Old Country Way (Yorktown) and Allan Avenue (Yorktown) 202508113720/32766409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-03T16:50:48Z"},"road_event_id":"1x17kayegrybkjJpe9Xpl7l1980=","beginning_cross_street":"Old Country Way","ending_cross_street":"Allan Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.782998,41.268703]]}},{"id":"tucgLk859k/LcNvVaaNq/2LrR+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 118"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYwfhhpzyAYiXpPcjTcOcaOybpw="},{"type":"next-occurrence","id":"ZeQtdxCBjotlw5LRo6Zg/AOWGw4="}],"description":"Road rehabilitation on NY 118 both directions between Old Country Way (Yorktown) and Allan Avenue (Yorktown) 202508113720/32766409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-03T16:50:48Z"},"road_event_id":"tucgLk859k/LcNvVaaNq/2LrR+E=","beginning_cross_street":"Old Country Way","ending_cross_street":"Allan Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.782998,41.268703]]}},{"id":"ZeQtdxCBjotlw5LRo6Zg/AOWGw4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 118"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYwfhhpzyAYiXpPcjTcOcaOybpw="},{"type":"next-occurrence","id":"7wdXwxTzxNFrq47v2KexwBLkBVU="}],"description":"Road rehabilitation on NY 118 both directions between Old Country Way (Yorktown) and Allan Avenue (Yorktown) 202508113720/32766409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-03T16:50:48Z"},"road_event_id":"ZeQtdxCBjotlw5LRo6Zg/AOWGw4=","beginning_cross_street":"Old Country Way","ending_cross_street":"Allan Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.782998,41.268703]]}},{"id":"7wdXwxTzxNFrq47v2KexwBLkBVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 118"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYwfhhpzyAYiXpPcjTcOcaOybpw="},{"type":"next-occurrence","id":"ktrfn5E1GhIr3upyIWvzDHhtGzc="}],"description":"Road rehabilitation on NY 118 both directions between Old Country Way (Yorktown) and Allan Avenue (Yorktown) 202508113720/32766409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-03T16:50:48Z"},"road_event_id":"7wdXwxTzxNFrq47v2KexwBLkBVU=","beginning_cross_street":"Old Country Way","ending_cross_street":"Allan Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.782998,41.268703]]}},{"id":"ktrfn5E1GhIr3upyIWvzDHhtGzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 118"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYwfhhpzyAYiXpPcjTcOcaOybpw="},{"type":"next-occurrence","id":"NxQ6VEaU9/dafYXhxxYLK05qnhQ="}],"description":"Road rehabilitation on NY 118 both directions between Old Country Way (Yorktown) and Allan Avenue (Yorktown) 202508113720/32766409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-03T16:50:48Z"},"road_event_id":"ktrfn5E1GhIr3upyIWvzDHhtGzc=","beginning_cross_street":"Old Country Way","ending_cross_street":"Allan Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.782998,41.268703]]}},{"id":"NxQ6VEaU9/dafYXhxxYLK05qnhQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 118"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYwfhhpzyAYiXpPcjTcOcaOybpw="},{"type":"next-occurrence","id":"H2tOJAu47i2R0bUSs0y7dOGd0pY="}],"description":"Road rehabilitation on NY 118 both directions between Old Country Way (Yorktown) and Allan Avenue (Yorktown) 202508113720/32766409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-03T16:50:48Z"},"road_event_id":"NxQ6VEaU9/dafYXhxxYLK05qnhQ=","beginning_cross_street":"Old Country Way","ending_cross_street":"Allan Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.782998,41.268703]]}},{"id":"H2tOJAu47i2R0bUSs0y7dOGd0pY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 118"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYwfhhpzyAYiXpPcjTcOcaOybpw="},{"type":"next-occurrence","id":"IS4M0+UMwXrcSah+ICDLIz57CQg="}],"description":"Road rehabilitation on NY 118 both directions between Old Country Way (Yorktown) and Allan Avenue (Yorktown) 202508113720/32766409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-03T16:50:48Z"},"road_event_id":"H2tOJAu47i2R0bUSs0y7dOGd0pY=","beginning_cross_street":"Old Country Way","ending_cross_street":"Allan Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.782998,41.268703]]}},{"id":"IS4M0+UMwXrcSah+ICDLIz57CQg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 118"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYwfhhpzyAYiXpPcjTcOcaOybpw="},{"type":"next-occurrence","id":"CQvI28MQrEwpq5J1ui++omVqWZE="}],"description":"Road rehabilitation on NY 118 both directions between Old Country Way (Yorktown) and Allan Avenue (Yorktown) 202508113720/32766409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-03T16:50:48Z"},"road_event_id":"IS4M0+UMwXrcSah+ICDLIz57CQg=","beginning_cross_street":"Old Country Way","ending_cross_street":"Allan Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.782998,41.268703]]}},{"id":"CQvI28MQrEwpq5J1ui++omVqWZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 118"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FYwfhhpzyAYiXpPcjTcOcaOybpw="}],"description":"Road rehabilitation on NY 118 both directions between Old Country Way (Yorktown) and Allan Avenue (Yorktown) 202508113720/32766409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-03T16:50:48Z"},"road_event_id":"CQvI28MQrEwpq5J1ui++omVqWZE=","beginning_cross_street":"Old Country Way","ending_cross_street":"Allan Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.782998,41.268703]]}},{"id":"ZSidQ684dC0Uqn+yD2uZnL8WOjw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1W3Uhnq20/mDHdQ6GkMAwzugiuY="}],"description":"Repaving on US 11 both directions Start of NY 26 OLAP; CR 46 Evans Mills (Le Ray) to ROCKBROOK RD (Le Ray) US Route 11 will be reduced to a single lane with traffic controlled by flaggers. , Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-02T23:06:31Z"},"road_event_id":"ZSidQ684dC0Uqn+yD2uZnL8WOjw=","beginning_cross_street":"Start of NY 26 OLAP; CR 46  Evans Mills","ending_cross_street":"ROCKBROOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.796215,44.08442]]}},{"id":"1W3Uhnq20/mDHdQ6GkMAwzugiuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZSidQ684dC0Uqn+yD2uZnL8WOjw="},{"type":"next-occurrence","id":"ErUytkXEgSqNKLGpVL1mGI/ZPR8="}],"description":"Repaving on US 11 both directions Start of NY 26 OLAP; CR 46 Evans Mills (Le Ray) to ROCKBROOK RD (Le Ray) US Route 11 will be reduced to a single lane with traffic controlled by flaggers. , Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-02T23:06:31Z"},"road_event_id":"1W3Uhnq20/mDHdQ6GkMAwzugiuY=","beginning_cross_street":"Start of NY 26 OLAP; CR 46  Evans Mills","ending_cross_street":"ROCKBROOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.796215,44.08442]]}},{"id":"ErUytkXEgSqNKLGpVL1mGI/ZPR8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZSidQ684dC0Uqn+yD2uZnL8WOjw="}],"description":"Repaving on US 11 both directions Start of NY 26 OLAP; CR 46 Evans Mills (Le Ray) to ROCKBROOK RD (Le Ray) US Route 11 will be reduced to a single lane with traffic controlled by flaggers. , Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-02T23:06:31Z"},"road_event_id":"ErUytkXEgSqNKLGpVL1mGI/ZPR8=","beginning_cross_street":"Start of NY 26 OLAP; CR 46  Evans Mills","ending_cross_street":"ROCKBROOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.796215,44.08442]]}},{"id":"kSzwrSOD/z0eKa2Ql9ukCFUYObQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8W80QtwvESAVbN9xJb4h13yICPw="}],"description":"Milling and repaving on NY 5 eastbound between W. Genesee Turnpike (Camillus) and Route 695 (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-02T23:20:18Z"},"road_event_id":"kSzwrSOD/z0eKa2Ql9ukCFUYObQ=","beginning_cross_street":"W. Genesee Turnpike","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.322599,43.035136]]}},{"id":"8W80QtwvESAVbN9xJb4h13yICPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSzwrSOD/z0eKa2Ql9ukCFUYObQ="},{"type":"next-occurrence","id":"frm7+sIilKjZ5Ho02qQbDONKE/c="}],"description":"Milling and repaving on NY 5 eastbound between W. Genesee Turnpike (Camillus) and Route 695 (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-02T23:20:18Z"},"road_event_id":"8W80QtwvESAVbN9xJb4h13yICPw=","beginning_cross_street":"W. Genesee Turnpike","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.322599,43.035136]]}},{"id":"frm7+sIilKjZ5Ho02qQbDONKE/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSzwrSOD/z0eKa2Ql9ukCFUYObQ="},{"type":"next-occurrence","id":"JoQnY2ANA7VG+cgDCSoZDeaR1XE="}],"description":"Milling and repaving on NY 5 eastbound between W. Genesee Turnpike (Camillus) and Route 695 (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-02T23:20:18Z"},"road_event_id":"frm7+sIilKjZ5Ho02qQbDONKE/c=","beginning_cross_street":"W. Genesee Turnpike","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.322599,43.035136]]}},{"id":"JoQnY2ANA7VG+cgDCSoZDeaR1XE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSzwrSOD/z0eKa2Ql9ukCFUYObQ="},{"type":"next-occurrence","id":"1nkzL9IZ+f4m+GWrVt9Cw9s3Uxs="}],"description":"Milling and repaving on NY 5 eastbound between W. Genesee Turnpike (Camillus) and Route 695 (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-02T23:20:18Z"},"road_event_id":"JoQnY2ANA7VG+cgDCSoZDeaR1XE=","beginning_cross_street":"W. Genesee Turnpike","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.322599,43.035136]]}},{"id":"1nkzL9IZ+f4m+GWrVt9Cw9s3Uxs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSzwrSOD/z0eKa2Ql9ukCFUYObQ="},{"type":"next-occurrence","id":"m1B6U2sDjngKFqA1NVM+qyYgYh8="}],"description":"Milling and repaving on NY 5 eastbound between W. Genesee Turnpike (Camillus) and Route 695 (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-02T23:20:18Z"},"road_event_id":"1nkzL9IZ+f4m+GWrVt9Cw9s3Uxs=","beginning_cross_street":"W. Genesee Turnpike","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.322599,43.035136]]}},{"id":"m1B6U2sDjngKFqA1NVM+qyYgYh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSzwrSOD/z0eKa2Ql9ukCFUYObQ="},{"type":"next-occurrence","id":"lJG7oSWDaDEnu1+dzEEeZ4R2Bx4="}],"description":"Milling and repaving on NY 5 eastbound between W. Genesee Turnpike (Camillus) and Route 695 (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-02T23:20:18Z"},"road_event_id":"m1B6U2sDjngKFqA1NVM+qyYgYh8=","beginning_cross_street":"W. Genesee Turnpike","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.322599,43.035136]]}},{"id":"lJG7oSWDaDEnu1+dzEEeZ4R2Bx4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSzwrSOD/z0eKa2Ql9ukCFUYObQ="},{"type":"next-occurrence","id":"BDQ67Qj8SkdMYl4Og7YceryRR1o="}],"description":"Milling and repaving on NY 5 eastbound between W. Genesee Turnpike (Camillus) and Route 695 (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-02T23:20:18Z"},"road_event_id":"lJG7oSWDaDEnu1+dzEEeZ4R2Bx4=","beginning_cross_street":"W. Genesee Turnpike","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.322599,43.035136]]}},{"id":"BDQ67Qj8SkdMYl4Og7YceryRR1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSzwrSOD/z0eKa2Ql9ukCFUYObQ="},{"type":"next-occurrence","id":"nlJr2dZWnC7Z/x6st/AM+z4fKqU="}],"description":"Milling and repaving on NY 5 eastbound between W. Genesee Turnpike (Camillus) and Route 695 (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-02T23:20:18Z"},"road_event_id":"BDQ67Qj8SkdMYl4Og7YceryRR1o=","beginning_cross_street":"W. Genesee Turnpike","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.322599,43.035136]]}},{"id":"nlJr2dZWnC7Z/x6st/AM+z4fKqU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSzwrSOD/z0eKa2Ql9ukCFUYObQ="},{"type":"next-occurrence","id":"q267+gJkS2QoOJbTMDE4CtUNmHI="}],"description":"Milling and repaving on NY 5 eastbound between W. Genesee Turnpike (Camillus) and Route 695 (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-02T23:20:18Z"},"road_event_id":"nlJr2dZWnC7Z/x6st/AM+z4fKqU=","beginning_cross_street":"W. Genesee Turnpike","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.322599,43.035136]]}},{"id":"q267+gJkS2QoOJbTMDE4CtUNmHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSzwrSOD/z0eKa2Ql9ukCFUYObQ="},{"type":"next-occurrence","id":"EBjyUStXX6dQCoNEGiX3Il00ezA="}],"description":"Milling and repaving on NY 5 eastbound between W. Genesee Turnpike (Camillus) and Route 695 (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-02T23:20:18Z"},"road_event_id":"q267+gJkS2QoOJbTMDE4CtUNmHI=","beginning_cross_street":"W. Genesee Turnpike","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.322599,43.035136]]}},{"id":"EBjyUStXX6dQCoNEGiX3Il00ezA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSzwrSOD/z0eKa2Ql9ukCFUYObQ="}],"description":"Milling and repaving on NY 5 eastbound between W. Genesee Turnpike (Camillus) and Route 695 (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-02T23:20:18Z"},"road_event_id":"EBjyUStXX6dQCoNEGiX3Il00ezA=","beginning_cross_street":"W. Genesee Turnpike","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.322599,43.035136]]}},{"id":"4UVdw1cSJnrwTfYcE6tA005CoL0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+yAMACmmpv7+Vs3gkAQ+AXZ12A8="}],"description":"Milling and repaving on NY 5 westbound between Route 695 (Camillus) and W. Genesee Turnpike (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-02T23:22:40Z"},"road_event_id":"4UVdw1cSJnrwTfYcE6tA005CoL0=","beginning_cross_street":"Route 695","ending_cross_street":"W. Genesee Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.239959,43.054621]]}},{"id":"+yAMACmmpv7+Vs3gkAQ+AXZ12A8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4UVdw1cSJnrwTfYcE6tA005CoL0="},{"type":"next-occurrence","id":"IVdfHeT1/7ws+oTQxFLVNjHXc3U="}],"description":"Milling and repaving on NY 5 westbound between Route 695 (Camillus) and W. Genesee Turnpike (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-02T23:22:40Z"},"road_event_id":"+yAMACmmpv7+Vs3gkAQ+AXZ12A8=","beginning_cross_street":"Route 695","ending_cross_street":"W. Genesee Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.239959,43.054621]]}},{"id":"IVdfHeT1/7ws+oTQxFLVNjHXc3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4UVdw1cSJnrwTfYcE6tA005CoL0="},{"type":"next-occurrence","id":"asCF5YaNDGVARtkJBL+jWXzpH3g="}],"description":"Milling and repaving on NY 5 westbound between Route 695 (Camillus) and W. Genesee Turnpike (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-02T23:22:40Z"},"road_event_id":"IVdfHeT1/7ws+oTQxFLVNjHXc3U=","beginning_cross_street":"Route 695","ending_cross_street":"W. Genesee Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.239959,43.054621]]}},{"id":"asCF5YaNDGVARtkJBL+jWXzpH3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4UVdw1cSJnrwTfYcE6tA005CoL0="},{"type":"next-occurrence","id":"hWVZlyqWjsVb6akdZc+3KsIH0o4="}],"description":"Milling and repaving on NY 5 westbound between Route 695 (Camillus) and W. Genesee Turnpike (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-02T23:22:40Z"},"road_event_id":"asCF5YaNDGVARtkJBL+jWXzpH3g=","beginning_cross_street":"Route 695","ending_cross_street":"W. Genesee Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.239959,43.054621]]}},{"id":"hWVZlyqWjsVb6akdZc+3KsIH0o4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4UVdw1cSJnrwTfYcE6tA005CoL0="},{"type":"next-occurrence","id":"+h+q1j4JBoGcYlyHIZJRPDvUoII="}],"description":"Milling and repaving on NY 5 westbound between Route 695 (Camillus) and W. Genesee Turnpike (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-02T23:22:40Z"},"road_event_id":"hWVZlyqWjsVb6akdZc+3KsIH0o4=","beginning_cross_street":"Route 695","ending_cross_street":"W. Genesee Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.239959,43.054621]]}},{"id":"+h+q1j4JBoGcYlyHIZJRPDvUoII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4UVdw1cSJnrwTfYcE6tA005CoL0="},{"type":"next-occurrence","id":"9MVgqnz9Quh4y7CAmsu4oRHxMO0="}],"description":"Milling and repaving on NY 5 westbound between Route 695 (Camillus) and W. Genesee Turnpike (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-02T23:22:40Z"},"road_event_id":"+h+q1j4JBoGcYlyHIZJRPDvUoII=","beginning_cross_street":"Route 695","ending_cross_street":"W. Genesee Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.239959,43.054621]]}},{"id":"9MVgqnz9Quh4y7CAmsu4oRHxMO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4UVdw1cSJnrwTfYcE6tA005CoL0="},{"type":"next-occurrence","id":"K1h+O76FSvBgTUWt0TNEHy2/iA4="}],"description":"Milling and repaving on NY 5 westbound between Route 695 (Camillus) and W. Genesee Turnpike (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-02T23:22:40Z"},"road_event_id":"9MVgqnz9Quh4y7CAmsu4oRHxMO0=","beginning_cross_street":"Route 695","ending_cross_street":"W. Genesee Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.239959,43.054621]]}},{"id":"K1h+O76FSvBgTUWt0TNEHy2/iA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4UVdw1cSJnrwTfYcE6tA005CoL0="},{"type":"next-occurrence","id":"mA2h5IhZdF+whil/7YldQT30DVM="}],"description":"Milling and repaving on NY 5 westbound between Route 695 (Camillus) and W. Genesee Turnpike (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-02T23:22:40Z"},"road_event_id":"K1h+O76FSvBgTUWt0TNEHy2/iA4=","beginning_cross_street":"Route 695","ending_cross_street":"W. Genesee Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.239959,43.054621]]}},{"id":"mA2h5IhZdF+whil/7YldQT30DVM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4UVdw1cSJnrwTfYcE6tA005CoL0="},{"type":"next-occurrence","id":"/+lnWoE9WvMVvGsrPxVMxsdPl4Q="}],"description":"Milling and repaving on NY 5 westbound between Route 695 (Camillus) and W. Genesee Turnpike (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-02T23:22:40Z"},"road_event_id":"mA2h5IhZdF+whil/7YldQT30DVM=","beginning_cross_street":"Route 695","ending_cross_street":"W. Genesee Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.239959,43.054621]]}},{"id":"/+lnWoE9WvMVvGsrPxVMxsdPl4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4UVdw1cSJnrwTfYcE6tA005CoL0="},{"type":"next-occurrence","id":"VmKmA9vIiApKTar+cWZ8qMCDboI="}],"description":"Milling and repaving on NY 5 westbound between Route 695 (Camillus) and W. Genesee Turnpike (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-02T23:22:40Z"},"road_event_id":"/+lnWoE9WvMVvGsrPxVMxsdPl4Q=","beginning_cross_street":"Route 695","ending_cross_street":"W. Genesee Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.239959,43.054621]]}},{"id":"VmKmA9vIiApKTar+cWZ8qMCDboI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4UVdw1cSJnrwTfYcE6tA005CoL0="}],"description":"Milling and repaving on NY 5 westbound between Route 695 (Camillus) and W. Genesee Turnpike (Camillus) ; Alternating lane closures, Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-02T23:22:40Z"},"road_event_id":"VmKmA9vIiApKTar+cWZ8qMCDboI=","beginning_cross_street":"Route 695","ending_cross_street":"W. Genesee Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.239959,43.054621]]}},{"id":"enX2Yug38FSGgz+DalSfyGQmLGI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"D05rKuOPs8hXpqhYsQmvvN86PSs="}],"description":"Roadwork on NY 481 northbound between South 1st Street; NY 481 (Fulton) and CR-57 (Volney) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T23:50:00Z"},"road_event_id":"enX2Yug38FSGgz+DalSfyGQmLGI=","beginning_cross_street":"South 1st Street; NY 481","ending_cross_street":"CR-57","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.397723,43.307931]]}},{"id":"D05rKuOPs8hXpqhYsQmvvN86PSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"enX2Yug38FSGgz+DalSfyGQmLGI="},{"type":"next-occurrence","id":"IQKAlD3UlVAJlTXIL1RbU0M2KVs="}],"description":"Roadwork on NY 481 northbound between South 1st Street; NY 481 (Fulton) and CR-57 (Volney) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T23:50:00Z"},"road_event_id":"D05rKuOPs8hXpqhYsQmvvN86PSs=","beginning_cross_street":"South 1st Street; NY 481","ending_cross_street":"CR-57","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.397723,43.307931]]}},{"id":"IQKAlD3UlVAJlTXIL1RbU0M2KVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"enX2Yug38FSGgz+DalSfyGQmLGI="},{"type":"next-occurrence","id":"h47YD9hlzyPEqCXLWbcz65PCHzs="}],"description":"Roadwork on NY 481 northbound between South 1st Street; NY 481 (Fulton) and CR-57 (Volney) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T23:50:00Z"},"road_event_id":"IQKAlD3UlVAJlTXIL1RbU0M2KVs=","beginning_cross_street":"South 1st Street; NY 481","ending_cross_street":"CR-57","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.397723,43.307931]]}},{"id":"h47YD9hlzyPEqCXLWbcz65PCHzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"enX2Yug38FSGgz+DalSfyGQmLGI="},{"type":"next-occurrence","id":"1+KEGMvnUPeVy11/yApHZ8J9Avs="}],"description":"Roadwork on NY 481 northbound between South 1st Street; NY 481 (Fulton) and CR-57 (Volney) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T23:50:00Z"},"road_event_id":"h47YD9hlzyPEqCXLWbcz65PCHzs=","beginning_cross_street":"South 1st Street; NY 481","ending_cross_street":"CR-57","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.397723,43.307931]]}},{"id":"1+KEGMvnUPeVy11/yApHZ8J9Avs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"enX2Yug38FSGgz+DalSfyGQmLGI="},{"type":"next-occurrence","id":"z3201VuGBb/P3r6cl4dvEfLTWAg="}],"description":"Roadwork on NY 481 northbound between South 1st Street; NY 481 (Fulton) and CR-57 (Volney) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T23:50:00Z"},"road_event_id":"1+KEGMvnUPeVy11/yApHZ8J9Avs=","beginning_cross_street":"South 1st Street; NY 481","ending_cross_street":"CR-57","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.397723,43.307931]]}},{"id":"z3201VuGBb/P3r6cl4dvEfLTWAg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"enX2Yug38FSGgz+DalSfyGQmLGI="},{"type":"next-occurrence","id":"1Rtl6B9o9NMQ2ZFP72AQG2XsjAE="}],"description":"Roadwork on NY 481 northbound between South 1st Street; NY 481 (Fulton) and CR-57 (Volney) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T23:50:00Z"},"road_event_id":"z3201VuGBb/P3r6cl4dvEfLTWAg=","beginning_cross_street":"South 1st Street; NY 481","ending_cross_street":"CR-57","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.397723,43.307931]]}},{"id":"1Rtl6B9o9NMQ2ZFP72AQG2XsjAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"enX2Yug38FSGgz+DalSfyGQmLGI="},{"type":"next-occurrence","id":"8CW51qLhe0Xb9Sn8REbDiW7xAsU="}],"description":"Roadwork on NY 481 northbound between South 1st Street; NY 481 (Fulton) and CR-57 (Volney) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T23:50:00Z"},"road_event_id":"1Rtl6B9o9NMQ2ZFP72AQG2XsjAE=","beginning_cross_street":"South 1st Street; NY 481","ending_cross_street":"CR-57","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.397723,43.307931]]}},{"id":"8CW51qLhe0Xb9Sn8REbDiW7xAsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"enX2Yug38FSGgz+DalSfyGQmLGI="},{"type":"next-occurrence","id":"z+3sQ4Ti31YHg+FYHn1Gf0TWqSs="}],"description":"Roadwork on NY 481 northbound between South 1st Street; NY 481 (Fulton) and CR-57 (Volney) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T23:50:00Z"},"road_event_id":"8CW51qLhe0Xb9Sn8REbDiW7xAsU=","beginning_cross_street":"South 1st Street; NY 481","ending_cross_street":"CR-57","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.397723,43.307931]]}},{"id":"z+3sQ4Ti31YHg+FYHn1Gf0TWqSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"enX2Yug38FSGgz+DalSfyGQmLGI="}],"description":"Roadwork on NY 481 northbound between South 1st Street; NY 481 (Fulton) and CR-57 (Volney) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T23:50:00Z"},"road_event_id":"z+3sQ4Ti31YHg+FYHn1Gf0TWqSs=","beginning_cross_street":"South 1st Street; NY 481","ending_cross_street":"CR-57","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.397723,43.307931]]}},{"id":"U/vP1UexQKfJCFgwVgKvh+J94l4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gluN+Dquv2kU44mN8ht2uP/AAIo="}],"description":"Roadwork on NY 481 southbound between CR-57 (Volney) and South 1st Street; NY 481 (Fulton) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T23:52:17Z"},"road_event_id":"U/vP1UexQKfJCFgwVgKvh+J94l4=","beginning_cross_street":"CR-57","ending_cross_street":"South 1st Street; NY 481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.437587,43.373399]]}},{"id":"gluN+Dquv2kU44mN8ht2uP/AAIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U/vP1UexQKfJCFgwVgKvh+J94l4="},{"type":"next-occurrence","id":"QO8MxNw4VaTptQ0C/zHsCsnuaPI="}],"description":"Roadwork on NY 481 southbound between CR-57 (Volney) and South 1st Street; NY 481 (Fulton) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T23:52:17Z"},"road_event_id":"gluN+Dquv2kU44mN8ht2uP/AAIo=","beginning_cross_street":"CR-57","ending_cross_street":"South 1st Street; NY 481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.437587,43.373399]]}},{"id":"QO8MxNw4VaTptQ0C/zHsCsnuaPI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U/vP1UexQKfJCFgwVgKvh+J94l4="},{"type":"next-occurrence","id":"3Mk2yopZKUpmN7HJqSTtoblzUlA="}],"description":"Roadwork on NY 481 southbound between CR-57 (Volney) and South 1st Street; NY 481 (Fulton) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T23:52:17Z"},"road_event_id":"QO8MxNw4VaTptQ0C/zHsCsnuaPI=","beginning_cross_street":"CR-57","ending_cross_street":"South 1st Street; NY 481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.437587,43.373399]]}},{"id":"3Mk2yopZKUpmN7HJqSTtoblzUlA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U/vP1UexQKfJCFgwVgKvh+J94l4="},{"type":"next-occurrence","id":"UAXIuuhCqewHvaPf+wxDgGm8S0s="}],"description":"Roadwork on NY 481 southbound between CR-57 (Volney) and South 1st Street; NY 481 (Fulton) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T23:52:17Z"},"road_event_id":"3Mk2yopZKUpmN7HJqSTtoblzUlA=","beginning_cross_street":"CR-57","ending_cross_street":"South 1st Street; NY 481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.437587,43.373399]]}},{"id":"UAXIuuhCqewHvaPf+wxDgGm8S0s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U/vP1UexQKfJCFgwVgKvh+J94l4="},{"type":"next-occurrence","id":"cse0gZeh8R97LndkDlyyFOVGzlE="}],"description":"Roadwork on NY 481 southbound between CR-57 (Volney) and South 1st Street; NY 481 (Fulton) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T23:52:17Z"},"road_event_id":"UAXIuuhCqewHvaPf+wxDgGm8S0s=","beginning_cross_street":"CR-57","ending_cross_street":"South 1st Street; NY 481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.437587,43.373399]]}},{"id":"cse0gZeh8R97LndkDlyyFOVGzlE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U/vP1UexQKfJCFgwVgKvh+J94l4="},{"type":"next-occurrence","id":"0I1oP/uAKzehJIOHlKg/OMp4NlY="}],"description":"Roadwork on NY 481 southbound between CR-57 (Volney) and South 1st Street; NY 481 (Fulton) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T23:52:17Z"},"road_event_id":"cse0gZeh8R97LndkDlyyFOVGzlE=","beginning_cross_street":"CR-57","ending_cross_street":"South 1st Street; NY 481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.437587,43.373399]]}},{"id":"0I1oP/uAKzehJIOHlKg/OMp4NlY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U/vP1UexQKfJCFgwVgKvh+J94l4="},{"type":"next-occurrence","id":"URnUimXDfKpjna9XSocH8kmHSFg="}],"description":"Roadwork on NY 481 southbound between CR-57 (Volney) and South 1st Street; NY 481 (Fulton) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T23:52:17Z"},"road_event_id":"0I1oP/uAKzehJIOHlKg/OMp4NlY=","beginning_cross_street":"CR-57","ending_cross_street":"South 1st Street; NY 481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.437587,43.373399]]}},{"id":"URnUimXDfKpjna9XSocH8kmHSFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U/vP1UexQKfJCFgwVgKvh+J94l4="},{"type":"next-occurrence","id":"umyAsH8Qc1zcjnMK7TavgV6ATug="}],"description":"Roadwork on NY 481 southbound between CR-57 (Volney) and South 1st Street; NY 481 (Fulton) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T23:52:17Z"},"road_event_id":"URnUimXDfKpjna9XSocH8kmHSFg=","beginning_cross_street":"CR-57","ending_cross_street":"South 1st Street; NY 481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.437587,43.373399]]}},{"id":"umyAsH8Qc1zcjnMK7TavgV6ATug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U/vP1UexQKfJCFgwVgKvh+J94l4="}],"description":"Roadwork on NY 481 southbound between CR-57 (Volney) and South 1st Street; NY 481 (Fulton) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday July 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-02T23:52:17Z"},"road_event_id":"umyAsH8Qc1zcjnMK7TavgV6ATug=","beginning_cross_street":"CR-57","ending_cross_street":"South 1st Street; NY 481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.437587,43.373399]]}},{"id":"3hGyoIM9oISu3C4OYcsSs6VwIEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Express Lanes Westbound from West of Exit 50 - CR 630/Vaux Hall Rd (Union Twp) to West of Exit 48 - NJ 24 West (Springfield Twp) Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, All lanes closed and detoured","update_date":"2026-06-03T03:44:42Z"},"road_event_id":"3hGyoIM9oISu3C4OYcsSs6VwIEg=","beginning_cross_street":"West of Exit 50 - CR 630/Vaux Hall Rd","ending_cross_street":"West of Exit 48 - NJ 24 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.286338,40.714168]]}},{"id":"gs0p/e/DBSXCGI2sSDRb/4FdK8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EAJxmlrC7g5gKbfSXDb0WV8fV/g="}],"description":"Due to Construction, Newark AirTrain P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak. until 3:00 P.M., Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday/Thursday/Friday, 05:30 AM thru 03:00 PM","update_date":"2026-06-03T09:10:28Z"},"road_event_id":"gs0p/e/DBSXCGI2sSDRb/4FdK8s=","beginning_cross_street":"P4 Daily Parking Garage/Courtesy Vans","ending_cross_street":"Newark Liberty Airport Station","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T09:30:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.17719,40.691859]]}},{"id":"EAJxmlrC7g5gKbfSXDb0WV8fV/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gs0p/e/DBSXCGI2sSDRb/4FdK8s="},{"type":"next-occurrence","id":"OtY9ePaAherwZTZamBtboHoTTmY="}],"description":"Due to Construction, Newark AirTrain P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak. until 3:00 P.M., Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday/Thursday/Friday, 05:30 AM thru 03:00 PM","update_date":"2026-06-03T09:10:28Z"},"road_event_id":"EAJxmlrC7g5gKbfSXDb0WV8fV/g=","beginning_cross_street":"P4 Daily Parking Garage/Courtesy Vans","ending_cross_street":"Newark Liberty Airport Station","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T09:30:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.17719,40.691859]]}},{"id":"OtY9ePaAherwZTZamBtboHoTTmY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gs0p/e/DBSXCGI2sSDRb/4FdK8s="}],"description":"Due to Construction, Newark AirTrain P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak. until 3:00 P.M., Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday/Thursday/Friday, 05:30 AM thru 03:00 PM","update_date":"2026-06-03T09:10:28Z"},"road_event_id":"OtY9ePaAherwZTZamBtboHoTTmY=","beginning_cross_street":"P4 Daily Parking Garage/Courtesy Vans","ending_cross_street":"Newark Liberty Airport Station","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T09:30:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.17719,40.691859]]}},{"id":"LinYJ6OJcxwEzgBk4ByMvF83+yM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-87 Northway southbound between Exit 2W; NY 5 westbound (Colonie) and City of Albany; Town of Guilderland Line (Guilderland), Friday June 5th, 2026 thru Saturday June 6th, 2026, 09:00 PM thru 07:00 AM 1 Left lane of 4 lanes closed","update_date":"2026-06-03T09:29:41Z"},"road_event_id":"LinYJ6OJcxwEzgBk4ByMvF83+yM=","beginning_cross_street":"Exit 2W; NY 5 westbound","ending_cross_street":"City of Albany; Town of Guilderland Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819162,42.714426]]}},{"id":"ScBerhDc+IaX2eXOrGDq+KSblXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ADIRONDACK NORTHWAY"],"direction":"unknown","related_road_events":[],"description":"Roadwork on ADIRONDACK NORTHWAY northbound between Exit 1E (Guilderland) and I-87 Northway at Exit 2E; NY 5 eastbound; Wolf Road (Colonie), Friday June 5th, 2026 thru Saturday June 6th, 2026, 10:00 PM thru 08:00 AM 2 Left lanes of 3 lanes closed","update_date":"2026-06-03T09:31:53Z"},"road_event_id":"ScBerhDc+IaX2eXOrGDq+KSblXc=","beginning_cross_street":"Exit 1E","ending_cross_street":"Exit 2E; NY 5 eastbound; Wolf Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.842625,42.688568]]}},{"id":"1HvLptli04O45NzZ7AxkXrVO9MA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near South of CR 522/Throckmorton St (Freehold Twp), Tuesday June 9, 2026 08:00 PM thru Wednesday June 10, 2026 05:00 AM, right lane closed","update_date":"2026-06-03T09:37:41Z"},"road_event_id":"1HvLptli04O45NzZ7AxkXrVO9MA=","beginning_cross_street":"South of CR 522/Throckmorton St","ending_cross_street":"North of CR 522/Throckmorton St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.293777,40.26583]]}},{"id":"stcGxiUuumpinD7An8N4U4wNiBY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound between North of CR 537/Main St (Maple Shade Twp) and North of I-295 (Maple Shade Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, right lane closed","update_date":"2026-06-03T09:37:42Z"},"road_event_id":"stcGxiUuumpinD7An8N4U4wNiBY=","beginning_cross_street":"North of CR 537/Main St","ending_cross_street":"North of I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.989624,39.959983]]}},{"id":"qoU99uYTPFSM3DIxAMQbt3Bh4TA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 29"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 29 Northbound near North of NJ 129 (Trenton), Tuesday June 9, 2026 09:00 PM thru Wednesday June 10, 2026 05:00 AM, right lane closed","update_date":"2026-06-03T09:37:36Z"},"road_event_id":"qoU99uYTPFSM3DIxAMQbt3Bh4TA=","beginning_cross_street":"North of NJ 129","ending_cross_street":"South of Lalor St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.753623,40.191841]]}},{"id":"afWS4B3Q4y3774ew9boGjrzuTlo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between South of Exit 10 - Center Square Rd (Logan Twp) and North of Exit 7 (Oldmans Twp), Tuesday June 9, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-06-03T09:37:44Z"},"road_event_id":"afWS4B3Q4y3774ew9boGjrzuTlo=","beginning_cross_street":"South of Exit 10 - Center Square Rd","ending_cross_street":"North of Exit 7","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.378631,39.748832]]}},{"id":"Flrbmf6Hmh5doaTknnDtX4cYog8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between South of Exit 11 - US 322 (Logan Twp) and North of Exit 7 (Oldmans Twp), Monday June 8, 2026 07:00 AM thru 04:00 PM, right shoulder closed, moving operation","update_date":"2026-06-03T09:37:45Z"},"road_event_id":"Flrbmf6Hmh5doaTknnDtX4cYog8=","beginning_cross_street":"South of Exit 11 - US 322","ending_cross_street":"North of Exit 7","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.350189,39.769935]]}},{"id":"8RxtCEmlU3n1mnb+p12FKvmE598=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound between North of I-295 (Maple Shade Twp) and North of CR 537/Main St (Maple Shade Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, right lane closed","update_date":"2026-06-03T09:40:46Z"},"road_event_id":"8RxtCEmlU3n1mnb+p12FKvmE598=","beginning_cross_street":"North of I-295","ending_cross_street":"North of CR 537/Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.969581,39.937286]]}},{"id":"/qb7qVd44Vll7+kM/Ds32HkDuqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Southbound between South of W 63rd St (Bayonne) and South of Kennedy Boulevard (Bayonne), Wednesday June 10, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-03T11:16:38Z"},"road_event_id":"/qb7qVd44Vll7+kM/Ds32HkDuqo=","beginning_cross_street":"South of W 63rd St","ending_cross_street":"South of Kennedy Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.109947,40.693672]]}},{"id":"UceuhScYDkHMvkn7XKlsAThk+F8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[],"description":"Due to Repairs both directions, Newark AirTrain between Newark Liberty Airport Station (Newark) and P3 Daily Parking/Airport Rental Cars (Newark) The AirTrain system will be completely shut down for required maintenance. Shuttle bus service will be provided.The AirTrain system will be completely shut down for required maintenance. Shuttle bus service will be provided.., Saturday June 6th, 2026 thru Sunday June 7th, 2026, 08:00 PM thru 07:00 AM","update_date":"2026-06-03T12:17:29Z"},"road_event_id":"UceuhScYDkHMvkn7XKlsAThk+F8=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P3 Daily Parking/Airport Rental Cars","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"wTCVnDYgof3TQ5HvnHbWdl0NraY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 4 both directions between Bloomingrove Dr (North Greenbush) and NY 43 (North Greenbush), Saturday June 13th, 2026 thru Saturday June 13th, 2026, 12:00 AM thru 11:59 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-03T12:40:35Z"},"road_event_id":"wTCVnDYgof3TQ5HvnHbWdl0NraY=","beginning_cross_street":"Bloomingrove Dr","ending_cross_street":"NY 43","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T04:00:00Z","end_date":"2026-06-14T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.69634,42.650714]]}},{"id":"Jru5P0zLq32b63dE9vg4voFOM5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Westbound between East of Old Hwy 28 (Readington Twp) and East of I-78/NJ 173 (Clinton Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 04:59 AM, left lane closed, moving operation","update_date":"2026-06-03T13:19:38Z"},"road_event_id":"Jru5P0zLq32b63dE9vg4voFOM5A=","beginning_cross_street":"East of Old Hwy 28","ending_cross_street":"East of I-78/NJ 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T08:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.762329,40.6208]]}},{"id":"NWGbVS8KmzpYimr2OBXBf+Lg1RE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound between East of I-78/NJ 173 (Clinton Twp) and East of Old Hwy 28 (Readington Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 05:00 AM, left lane closed, moving operation","update_date":"2026-06-03T13:19:40Z"},"road_event_id":"NWGbVS8KmzpYimr2OBXBf+Lg1RE=","beginning_cross_street":"East of I-78/NJ 173","ending_cross_street":"East of Old Hwy 28","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.868644,40.641929]]}},{"id":"2SN0XAK4cnRrWSfyZJv7e9N/Ezw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I86"],"direction":"unknown","related_road_events":[],"description":"Milling and repaving on I86 eastbound Rest area (Friendship) portions of parking closed, Continuous Monday June 8th, 2026 11:59 PM thru Sunday June 14th, 2026 12:00 AM All lanes open","update_date":"2026-06-03T13:51:25Z"},"road_event_id":"2SN0XAK4cnRrWSfyZJv7e9N/Ezw=","beginning_cross_street":"Rest area","ending_cross_street":"Rest area","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T03:59:00Z","end_date":"2026-06-14T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.103737,42.223489]]}},{"id":"wnu2aJlfYztgl2U+895YjS224hU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 396"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"w1bSFYuM4WQSnWRJhekK6nRIeyw="}],"description":"Roadwork on NY 396 both directions between Cottage Ln (Bethlehem) and Thatcher St (Bethlehem) alternating lane closures, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open, Monday June 15th, 2026 thru Saturday June 20th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T14:15:06Z"},"road_event_id":"wnu2aJlfYztgl2U+895YjS224hU=","beginning_cross_street":"Cottage Ln","ending_cross_street":"Thatcher St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803093,42.54161]]}},{"id":"w1bSFYuM4WQSnWRJhekK6nRIeyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 396"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnu2aJlfYztgl2U+895YjS224hU="},{"type":"next-occurrence","id":"YqjdU2FT+XgYRJUEZU98pTFAXcY="}],"description":"Roadwork on NY 396 both directions between Cottage Ln (Bethlehem) and Thatcher St (Bethlehem) alternating lane closures, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open, Monday June 15th, 2026 thru Saturday June 20th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T14:15:06Z"},"road_event_id":"w1bSFYuM4WQSnWRJhekK6nRIeyw=","beginning_cross_street":"Cottage Ln","ending_cross_street":"Thatcher St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803093,42.54161]]}},{"id":"YqjdU2FT+XgYRJUEZU98pTFAXcY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 396"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnu2aJlfYztgl2U+895YjS224hU="},{"type":"next-occurrence","id":"hWqFmWbCerGy3oFCIGF/xhl22xo="}],"description":"Roadwork on NY 396 both directions between Cottage Ln (Bethlehem) and Thatcher St (Bethlehem) alternating lane closures, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open, Monday June 15th, 2026 thru Saturday June 20th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T14:15:06Z"},"road_event_id":"YqjdU2FT+XgYRJUEZU98pTFAXcY=","beginning_cross_street":"Cottage Ln","ending_cross_street":"Thatcher St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803093,42.54161]]}},{"id":"hWqFmWbCerGy3oFCIGF/xhl22xo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 396"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnu2aJlfYztgl2U+895YjS224hU="},{"type":"next-occurrence","id":"eSPrG5ZeKn3dCJgkaHfJuWKylDM="}],"description":"Roadwork on NY 396 both directions between Cottage Ln (Bethlehem) and Thatcher St (Bethlehem) alternating lane closures, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open, Monday June 15th, 2026 thru Saturday June 20th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T14:15:06Z"},"road_event_id":"hWqFmWbCerGy3oFCIGF/xhl22xo=","beginning_cross_street":"Cottage Ln","ending_cross_street":"Thatcher St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803093,42.54161]]}},{"id":"eSPrG5ZeKn3dCJgkaHfJuWKylDM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 396"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnu2aJlfYztgl2U+895YjS224hU="},{"type":"next-occurrence","id":"XQTgu8IHAxJvcisSBy4uNvUoccw="}],"description":"Roadwork on NY 396 both directions between Cottage Ln (Bethlehem) and Thatcher St (Bethlehem) alternating lane closures, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open, Monday June 15th, 2026 thru Saturday June 20th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T14:15:06Z"},"road_event_id":"eSPrG5ZeKn3dCJgkaHfJuWKylDM=","beginning_cross_street":"Cottage Ln","ending_cross_street":"Thatcher St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803093,42.54161]]}},{"id":"XQTgu8IHAxJvcisSBy4uNvUoccw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 396"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnu2aJlfYztgl2U+895YjS224hU="},{"type":"next-occurrence","id":"/xZRrYY5bEpi+GRrul/nb88v0yg="}],"description":"Roadwork on NY 396 both directions between Cottage Ln (Bethlehem) and Thatcher St (Bethlehem) alternating lane closures, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open, Monday June 15th, 2026 thru Saturday June 20th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T14:15:06Z"},"road_event_id":"XQTgu8IHAxJvcisSBy4uNvUoccw=","beginning_cross_street":"Cottage Ln","ending_cross_street":"Thatcher St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803093,42.54161]]}},{"id":"/xZRrYY5bEpi+GRrul/nb88v0yg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 396"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnu2aJlfYztgl2U+895YjS224hU="},{"type":"next-occurrence","id":"q11+Sul5dA/v8f+4rwDqPJwaHAk="}],"description":"Roadwork on NY 396 both directions between Cottage Ln (Bethlehem) and Thatcher St (Bethlehem) alternating lane closures, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open, Monday June 15th, 2026 thru Saturday June 20th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T14:15:06Z"},"road_event_id":"/xZRrYY5bEpi+GRrul/nb88v0yg=","beginning_cross_street":"Cottage Ln","ending_cross_street":"Thatcher St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803093,42.54161]]}},{"id":"q11+Sul5dA/v8f+4rwDqPJwaHAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 396"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnu2aJlfYztgl2U+895YjS224hU="},{"type":"next-occurrence","id":"/G7ngMRQUEbxba3G+0Dp9sPOjwg="}],"description":"Roadwork on NY 396 both directions between Cottage Ln (Bethlehem) and Thatcher St (Bethlehem) alternating lane closures, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open, Monday June 15th, 2026 thru Saturday June 20th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T14:15:06Z"},"road_event_id":"q11+Sul5dA/v8f+4rwDqPJwaHAk=","beginning_cross_street":"Cottage Ln","ending_cross_street":"Thatcher St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803093,42.54161]]}},{"id":"/G7ngMRQUEbxba3G+0Dp9sPOjwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 396"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnu2aJlfYztgl2U+895YjS224hU="},{"type":"next-occurrence","id":"rUXXI422Nbix0nyWI0Ka+mtb0Es="}],"description":"Roadwork on NY 396 both directions between Cottage Ln (Bethlehem) and Thatcher St (Bethlehem) alternating lane closures, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open, Monday June 15th, 2026 thru Saturday June 20th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T14:15:06Z"},"road_event_id":"/G7ngMRQUEbxba3G+0Dp9sPOjwg=","beginning_cross_street":"Cottage Ln","ending_cross_street":"Thatcher St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803093,42.54161]]}},{"id":"rUXXI422Nbix0nyWI0Ka+mtb0Es=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 396"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnu2aJlfYztgl2U+895YjS224hU="},{"type":"next-occurrence","id":"YRnmDKLo+U74hcbU4+uM/g+zwhM="}],"description":"Roadwork on NY 396 both directions between Cottage Ln (Bethlehem) and Thatcher St (Bethlehem) alternating lane closures, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open, Monday June 15th, 2026 thru Saturday June 20th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T14:15:06Z"},"road_event_id":"rUXXI422Nbix0nyWI0Ka+mtb0Es=","beginning_cross_street":"Cottage Ln","ending_cross_street":"Thatcher St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803093,42.54161]]}},{"id":"YRnmDKLo+U74hcbU4+uM/g+zwhM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 396"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wnu2aJlfYztgl2U+895YjS224hU="}],"description":"Roadwork on NY 396 both directions between Cottage Ln (Bethlehem) and Thatcher St (Bethlehem) alternating lane closures, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open, Monday June 15th, 2026 thru Saturday June 20th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T14:15:06Z"},"road_event_id":"YRnmDKLo+U74hcbU4+uM/g+zwhM=","beginning_cross_street":"Cottage Ln","ending_cross_street":"Thatcher St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803093,42.54161]]}},{"id":"A225rnksG3FU7oYyOVomAfRH0kA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 31 both directions east of Washington Street (Ogden) lternating lane/shoulder closures with flaggers as needed, Monday June 8th, 2026, 09:00 AM thru 01:00 PM All lanes","update_date":"2026-06-03T14:35:13Z"},"road_event_id":"A225rnksG3FU7oYyOVomAfRH0kA=","beginning_cross_street":"Washington Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.848743,43.188041]]}},{"id":"XtK/eBJJPv06Gr0ySuUHDtLvpno=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S WILLIAM ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"f7AznkAPfFV5jqzRAG7x7m2m66M="}],"description":"Construction on S WILLIAM ST northbound between MILL LN (New York) and BEAVER ST (New York), Wednesday June 3rd, 2026 thru Sunday June 21st, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday June 3rd, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-03T14:50:53Z"},"road_event_id":"XtK/eBJJPv06Gr0ySuUHDtLvpno=","beginning_cross_street":"MILL LN","ending_cross_street":"BEAVER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.010302,40.704779]]}},{"id":"f7AznkAPfFV5jqzRAG7x7m2m66M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S WILLIAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XtK/eBJJPv06Gr0ySuUHDtLvpno="},{"type":"next-occurrence","id":"QKysbkoLuVyoOXdgQXwmFxvT1A0="}],"description":"Construction on S WILLIAM ST northbound between MILL LN (New York) and BEAVER ST (New York), Wednesday June 3rd, 2026 thru Sunday June 21st, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday June 3rd, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-03T14:50:53Z"},"road_event_id":"f7AznkAPfFV5jqzRAG7x7m2m66M=","beginning_cross_street":"MILL LN","ending_cross_street":"BEAVER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.010302,40.704779]]}},{"id":"QKysbkoLuVyoOXdgQXwmFxvT1A0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S WILLIAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XtK/eBJJPv06Gr0ySuUHDtLvpno="},{"type":"next-occurrence","id":"Um9XSdzioHhl2ait0JE3zhAsz1A="}],"description":"Construction on S WILLIAM ST northbound between MILL LN (New York) and BEAVER ST (New York), Wednesday June 3rd, 2026 thru Sunday June 21st, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday June 3rd, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-03T14:50:53Z"},"road_event_id":"QKysbkoLuVyoOXdgQXwmFxvT1A0=","beginning_cross_street":"MILL LN","ending_cross_street":"BEAVER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T12:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.010302,40.704779]]}},{"id":"Um9XSdzioHhl2ait0JE3zhAsz1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S WILLIAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XtK/eBJJPv06Gr0ySuUHDtLvpno="}],"description":"Construction on S WILLIAM ST northbound between MILL LN (New York) and BEAVER ST (New York), Wednesday June 3rd, 2026 thru Sunday June 21st, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday June 3rd, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-03T14:50:53Z"},"road_event_id":"Um9XSdzioHhl2ait0JE3zhAsz1A=","beginning_cross_street":"MILL LN","ending_cross_street":"BEAVER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.010302,40.704779]]}},{"id":"g4sdpXueDfRNuOwnbrT3eue1caI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/Gx6796GwItDKdl4sCbmoJf7hN0="}],"description":"Utility work on NY 18 both directions east of N Greece Rd. (Greece) Alternating lane/shoulder closures with flaggers as needed, Monday June 8th, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday/Wednesday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-03T14:53:16Z"},"road_event_id":"g4sdpXueDfRNuOwnbrT3eue1caI=","beginning_cross_street":"N Greece Rd. ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.727477,43.253509]]}},{"id":"/Gx6796GwItDKdl4sCbmoJf7hN0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g4sdpXueDfRNuOwnbrT3eue1caI="},{"type":"next-occurrence","id":"ABhAvvSP20mkSHdfa+xqnUQ9+c8="}],"description":"Utility work on NY 18 both directions east of N Greece Rd. (Greece) Alternating lane/shoulder closures with flaggers as needed, Monday June 8th, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday/Wednesday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-03T14:53:16Z"},"road_event_id":"/Gx6796GwItDKdl4sCbmoJf7hN0=","beginning_cross_street":"N Greece Rd. ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.727477,43.253509]]}},{"id":"ABhAvvSP20mkSHdfa+xqnUQ9+c8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g4sdpXueDfRNuOwnbrT3eue1caI="}],"description":"Utility work on NY 18 both directions east of N Greece Rd. (Greece) Alternating lane/shoulder closures with flaggers as needed, Monday June 8th, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday/Wednesday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-03T14:53:16Z"},"road_event_id":"ABhAvvSP20mkSHdfa+xqnUQ9+c8=","beginning_cross_street":"N Greece Rd. ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.727477,43.253509]]}},{"id":"6mQ36K5h+eadsulvKrbMPPakDWY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["THOMPSON ST"],"direction":"unknown","related_road_events":[],"description":"Construction on THOMPSON ST southbound between GRAND ST (New York) and 6TH AVE (New York), Continuous Wednesday June 3rd, 2026 12:00 AM thru Tuesday September 1st, 2026 11:59 PM All lanes closed","update_date":"2026-06-03T14:56:45Z"},"road_event_id":"6mQ36K5h+eadsulvKrbMPPakDWY=","beginning_cross_street":"GRAND ST","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.004446,40.722699]]}},{"id":"AOTC+wkefP5mNJXBdvRqhsicsKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FORT HAMILTON PKWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hcOQWYlelQSP2CqA+Ac+BvRhQew="}],"description":"Construction on FORT HAMILTON PKWY eastbound from 7TH AVE (New York) Subject to change without notice., Thursday June 11th, 2026 thru Friday June 12th, 2026, 10:00 PM thru 05:00 AM All lanes closed, Friday June 12th, 2026 thru Saturday June 13th, 2026, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-03T14:58:57Z"},"road_event_id":"AOTC+wkefP5mNJXBdvRqhsicsKU=","beginning_cross_street":"7TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021856,40.622145]]}},{"id":"hcOQWYlelQSP2CqA+Ac+BvRhQew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FORT HAMILTON PKWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AOTC+wkefP5mNJXBdvRqhsicsKU="}],"description":"Construction on FORT HAMILTON PKWY eastbound from 7TH AVE (New York) Subject to change without notice., Thursday June 11th, 2026 thru Friday June 12th, 2026, 10:00 PM thru 05:00 AM All lanes closed, Friday June 12th, 2026 thru Saturday June 13th, 2026, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-03T14:58:57Z"},"road_event_id":"hcOQWYlelQSP2CqA+Ac+BvRhQew=","beginning_cross_street":"7TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021856,40.622145]]}},{"id":"mi1M3FoJ1LVQa34GH4t/MwkwTF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AFeWWgwr+M0y7Dy6ev77SjsEH2g="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York), Wednesday June 3rd, 2026 thru Friday August 7th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T15:01:07Z"},"road_event_id":"mi1M3FoJ1LVQa34GH4t/MwkwTF8=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003195,40.734884]]}},{"id":"AFeWWgwr+M0y7Dy6ev77SjsEH2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mi1M3FoJ1LVQa34GH4t/MwkwTF8="},{"type":"next-occurrence","id":"joKlwMiCHFzCoSJjMNKK9GGmKXg="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York), Wednesday June 3rd, 2026 thru Friday August 7th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T15:01:07Z"},"road_event_id":"AFeWWgwr+M0y7Dy6ev77SjsEH2g=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003195,40.734884]]}},{"id":"joKlwMiCHFzCoSJjMNKK9GGmKXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHARLES ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mi1M3FoJ1LVQa34GH4t/MwkwTF8="}],"description":"Construction on CHARLES ST westbound between W 4TH ST (New York) and BLEECKER ST (New York), Wednesday June 3rd, 2026 thru Friday August 7th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T15:01:07Z"},"road_event_id":"joKlwMiCHFzCoSJjMNKK9GGmKXg=","beginning_cross_street":"W 4TH ST","ending_cross_street":"BLEECKER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003195,40.734884]]}},{"id":"vcueV2mgOduFD/P8SzLK8EYVHV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hkJyLSWeBB1Tg4VXrNo3j6td2+M="}],"description":"Construction on BRIDGE ST eastbound between WHITEHALL ST (New York) and BROAD ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T15:03:34Z"},"road_event_id":"vcueV2mgOduFD/P8SzLK8EYVHV4=","beginning_cross_street":"WHITEHALL ST","ending_cross_street":"BROAD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013097,40.703579]]}},{"id":"hkJyLSWeBB1Tg4VXrNo3j6td2+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vcueV2mgOduFD/P8SzLK8EYVHV4="},{"type":"next-occurrence","id":"leQtnME3/Nw7zbNffr3c4nu6vbI="}],"description":"Construction on BRIDGE ST eastbound between WHITEHALL ST (New York) and BROAD ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T15:03:34Z"},"road_event_id":"hkJyLSWeBB1Tg4VXrNo3j6td2+M=","beginning_cross_street":"WHITEHALL ST","ending_cross_street":"BROAD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013097,40.703579]]}},{"id":"leQtnME3/Nw7zbNffr3c4nu6vbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vcueV2mgOduFD/P8SzLK8EYVHV4="}],"description":"Construction on BRIDGE ST eastbound between WHITEHALL ST (New York) and BROAD ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T15:03:34Z"},"road_event_id":"leQtnME3/Nw7zbNffr3c4nu6vbI=","beginning_cross_street":"WHITEHALL ST","ending_cross_street":"BROAD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013097,40.703579]]}},{"id":"1K/uUEPfZQebFS6H/cl3seSZPjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVERSIDE DR"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MQprMqWgBzxO0l3Gcr+nK6OT9uQ="}],"description":"Construction on RIVERSIDE DR northbound between W 110TH ST (New York) and W 113TH ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T15:07:50Z"},"road_event_id":"1K/uUEPfZQebFS6H/cl3seSZPjI=","beginning_cross_street":"W 110TH ST","ending_cross_street":"W 113TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967991,40.804736]]}},{"id":"MQprMqWgBzxO0l3Gcr+nK6OT9uQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVERSIDE DR"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1K/uUEPfZQebFS6H/cl3seSZPjI="},{"type":"next-occurrence","id":"1OibqmFEEj0wIqWRrfOPXtfG0/4="}],"description":"Construction on RIVERSIDE DR northbound between W 110TH ST (New York) and W 113TH ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T15:07:50Z"},"road_event_id":"MQprMqWgBzxO0l3Gcr+nK6OT9uQ=","beginning_cross_street":"W 110TH ST","ending_cross_street":"W 113TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967991,40.804736]]}},{"id":"1OibqmFEEj0wIqWRrfOPXtfG0/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVERSIDE DR"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1K/uUEPfZQebFS6H/cl3seSZPjI="}],"description":"Construction on RIVERSIDE DR northbound between W 110TH ST (New York) and W 113TH ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T15:07:50Z"},"road_event_id":"1OibqmFEEj0wIqWRrfOPXtfG0/4=","beginning_cross_street":"W 110TH ST","ending_cross_street":"W 113TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967991,40.804736]]}},{"id":"c7na1nZEG0jbK5KynDwQ8rdvRHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 201ST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MWHHvGxBsZorG5HGSxa528wxC9g="}],"description":"Construction on E 201ST ST westbound between VALENTINE AVE (New York) and GRAND CONCOURSE (New York), Wednesday June 3rd, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-06-03T15:11:34Z"},"road_event_id":"c7na1nZEG0jbK5KynDwQ8rdvRHo=","beginning_cross_street":"VALENTINE AVE","ending_cross_street":"GRAND CONCOURSE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.885665,40.872283]]}},{"id":"MWHHvGxBsZorG5HGSxa528wxC9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 201ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7na1nZEG0jbK5KynDwQ8rdvRHo="},{"type":"next-occurrence","id":"v27sUQe5O7lM9Stvrp+K0IZviYk="}],"description":"Construction on E 201ST ST westbound between VALENTINE AVE (New York) and GRAND CONCOURSE (New York), Wednesday June 3rd, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-06-03T15:11:34Z"},"road_event_id":"MWHHvGxBsZorG5HGSxa528wxC9g=","beginning_cross_street":"VALENTINE AVE","ending_cross_street":"GRAND CONCOURSE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.885665,40.872283]]}},{"id":"v27sUQe5O7lM9Stvrp+K0IZviYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 201ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7na1nZEG0jbK5KynDwQ8rdvRHo="},{"type":"next-occurrence","id":"PUDf+R+tmaKhJoO27aSaS5k/ujQ="}],"description":"Construction on E 201ST ST westbound between VALENTINE AVE (New York) and GRAND CONCOURSE (New York), Wednesday June 3rd, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-06-03T15:11:34Z"},"road_event_id":"v27sUQe5O7lM9Stvrp+K0IZviYk=","beginning_cross_street":"VALENTINE AVE","ending_cross_street":"GRAND CONCOURSE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.885665,40.872283]]}},{"id":"PUDf+R+tmaKhJoO27aSaS5k/ujQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 201ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7na1nZEG0jbK5KynDwQ8rdvRHo="},{"type":"next-occurrence","id":"VD+sKKkmgvu6ENdZRA9e1EKDLaM="}],"description":"Construction on E 201ST ST westbound between VALENTINE AVE (New York) and GRAND CONCOURSE (New York), Wednesday June 3rd, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-06-03T15:11:34Z"},"road_event_id":"PUDf+R+tmaKhJoO27aSaS5k/ujQ=","beginning_cross_street":"VALENTINE AVE","ending_cross_street":"GRAND CONCOURSE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.885665,40.872283]]}},{"id":"VD+sKKkmgvu6ENdZRA9e1EKDLaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 201ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7na1nZEG0jbK5KynDwQ8rdvRHo="},{"type":"next-occurrence","id":"5onfleIrsbpYgSMyPxAM3UVoU9s="}],"description":"Construction on E 201ST ST westbound between VALENTINE AVE (New York) and GRAND CONCOURSE (New York), Wednesday June 3rd, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-06-03T15:11:34Z"},"road_event_id":"VD+sKKkmgvu6ENdZRA9e1EKDLaM=","beginning_cross_street":"VALENTINE AVE","ending_cross_street":"GRAND CONCOURSE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.885665,40.872283]]}},{"id":"5onfleIrsbpYgSMyPxAM3UVoU9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 201ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7na1nZEG0jbK5KynDwQ8rdvRHo="},{"type":"next-occurrence","id":"Mjg6hjMqZSOw8eOOWkRL5NGPbKw="}],"description":"Construction on E 201ST ST westbound between VALENTINE AVE (New York) and GRAND CONCOURSE (New York), Wednesday June 3rd, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-06-03T15:11:34Z"},"road_event_id":"5onfleIrsbpYgSMyPxAM3UVoU9s=","beginning_cross_street":"VALENTINE AVE","ending_cross_street":"GRAND CONCOURSE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.885665,40.872283]]}},{"id":"Mjg6hjMqZSOw8eOOWkRL5NGPbKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 201ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7na1nZEG0jbK5KynDwQ8rdvRHo="},{"type":"next-occurrence","id":"UFHK7XQVTRkiT4a3++sv4QRpz04="}],"description":"Construction on E 201ST ST westbound between VALENTINE AVE (New York) and GRAND CONCOURSE (New York), Wednesday June 3rd, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-06-03T15:11:34Z"},"road_event_id":"Mjg6hjMqZSOw8eOOWkRL5NGPbKw=","beginning_cross_street":"VALENTINE AVE","ending_cross_street":"GRAND CONCOURSE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.885665,40.872283]]}},{"id":"UFHK7XQVTRkiT4a3++sv4QRpz04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 201ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7na1nZEG0jbK5KynDwQ8rdvRHo="},{"type":"next-occurrence","id":"HjFXCdXy1xA7ChUSxkWsgbhv+kY="}],"description":"Construction on E 201ST ST westbound between VALENTINE AVE (New York) and GRAND CONCOURSE (New York), Wednesday June 3rd, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-06-03T15:11:34Z"},"road_event_id":"UFHK7XQVTRkiT4a3++sv4QRpz04=","beginning_cross_street":"VALENTINE AVE","ending_cross_street":"GRAND CONCOURSE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.885665,40.872283]]}},{"id":"HjFXCdXy1xA7ChUSxkWsgbhv+kY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 201ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7na1nZEG0jbK5KynDwQ8rdvRHo="},{"type":"next-occurrence","id":"L+QYTnx/oKFFdzbXmfygZq29ZvI="}],"description":"Construction on E 201ST ST westbound between VALENTINE AVE (New York) and GRAND CONCOURSE (New York), Wednesday June 3rd, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-06-03T15:11:34Z"},"road_event_id":"HjFXCdXy1xA7ChUSxkWsgbhv+kY=","beginning_cross_street":"VALENTINE AVE","ending_cross_street":"GRAND CONCOURSE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.885665,40.872283]]}},{"id":"L+QYTnx/oKFFdzbXmfygZq29ZvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 201ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7na1nZEG0jbK5KynDwQ8rdvRHo="},{"type":"next-occurrence","id":"xCCLSlA1awRUw+JqX//eC/EhKXw="}],"description":"Construction on E 201ST ST westbound between VALENTINE AVE (New York) and GRAND CONCOURSE (New York), Wednesday June 3rd, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-06-03T15:11:34Z"},"road_event_id":"L+QYTnx/oKFFdzbXmfygZq29ZvI=","beginning_cross_street":"VALENTINE AVE","ending_cross_street":"GRAND CONCOURSE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.885665,40.872283]]}},{"id":"xCCLSlA1awRUw+JqX//eC/EhKXw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 201ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c7na1nZEG0jbK5KynDwQ8rdvRHo="}],"description":"Construction on E 201ST ST westbound between VALENTINE AVE (New York) and GRAND CONCOURSE (New York), Wednesday June 3rd, 2026 thru Thursday June 25th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-06-03T15:11:34Z"},"road_event_id":"xCCLSlA1awRUw+JqX//eC/EhKXw=","beginning_cross_street":"VALENTINE AVE","ending_cross_street":"GRAND CONCOURSE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.885665,40.872283]]}},{"id":"UNrFaVdZLniLFeNYLHEn5yOnjCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MT HOPE PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XUWgHAPaYNUieLYNorw0PqglN4o="}],"description":"Construction on MT HOPE PL westbound between WALTON AVE (New York) and JEROME AVE (New York), Wednesday June 3rd, 2026 thru Monday July 6th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T15:17:18Z"},"road_event_id":"UNrFaVdZLniLFeNYLHEn5yOnjCc=","beginning_cross_street":"WALTON AVE","ending_cross_street":"JEROME AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909473,40.849084]]}},{"id":"XUWgHAPaYNUieLYNorw0PqglN4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MT HOPE PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UNrFaVdZLniLFeNYLHEn5yOnjCc="},{"type":"next-occurrence","id":"dr8TQNi0SFeHb/XUnC2bl0r/uJ8="}],"description":"Construction on MT HOPE PL westbound between WALTON AVE (New York) and JEROME AVE (New York), Wednesday June 3rd, 2026 thru Monday July 6th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T15:17:18Z"},"road_event_id":"XUWgHAPaYNUieLYNorw0PqglN4o=","beginning_cross_street":"WALTON AVE","ending_cross_street":"JEROME AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909473,40.849084]]}},{"id":"dr8TQNi0SFeHb/XUnC2bl0r/uJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MT HOPE PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UNrFaVdZLniLFeNYLHEn5yOnjCc="}],"description":"Construction on MT HOPE PL westbound between WALTON AVE (New York) and JEROME AVE (New York), Wednesday June 3rd, 2026 thru Monday July 6th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T15:17:18Z"},"road_event_id":"dr8TQNi0SFeHb/XUnC2bl0r/uJ8=","beginning_cross_street":"WALTON AVE","ending_cross_street":"JEROME AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909473,40.849084]]}},{"id":"0eyBf6aURXYicx8VEf9NZX1IQek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[],"description":"Due to Switch repairs westbound, Hempstead west of Hempstead (Hempstead) Hempstead, Country Life Press, Garden City, Nassau Boulevard and Stewart Manor customers There is no direct service between these stations and points west:, Continuous Saturday June 6th, 2026 12:15 AM thru Monday June 8th, 2026 03:30 AM","update_date":"2026-06-03T15:22:43Z"},"road_event_id":"0eyBf6aURXYicx8VEf9NZX1IQek=","beginning_cross_street":"Hempstead","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T04:15:00Z","end_date":"2026-06-08T07:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.625032,40.713296]]}},{"id":"0I9SEhTe0MWiODjTr00L1iZmxdg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 15TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bwuWdV5QRfvxeQWvRW/JV39ToKI="}],"description":"Construction on N 15TH ST westbound between BANKER ST (New York) and WYTHE AVE (New York), Wednesday June 3rd, 2026 thru Friday June 12th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T15:23:41Z"},"road_event_id":"0I9SEhTe0MWiODjTr00L1iZmxdg=","beginning_cross_street":"BANKER ST","ending_cross_street":"WYTHE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954567,40.723258]]}},{"id":"bwuWdV5QRfvxeQWvRW/JV39ToKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N 15TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0I9SEhTe0MWiODjTr00L1iZmxdg="}],"description":"Construction on N 15TH ST westbound between BANKER ST (New York) and WYTHE AVE (New York), Wednesday June 3rd, 2026 thru Friday June 12th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T15:23:41Z"},"road_event_id":"bwuWdV5QRfvxeQWvRW/JV39ToKI=","beginning_cross_street":"BANKER ST","ending_cross_street":"WYTHE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954567,40.723258]]}},{"id":"J8tF6BU4saCXBVtEU5qmztI8Cwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[],"description":"Due to Switch repairs both directions, Hempstead between Hempstead (Hempstead) and Floral Park (Floral Park) Eastbound: Take a Huntington or Ronkonkoma train to Floral Park and transfer for train service to Stewart Manor, Nassau Boulevard, Garden City, Country Life Press and Hempstead Westbound: Board a train from Hempstead, Country Life Press, Garden City, Nassau Boulevard and Stewart Manor to Floral Park, then transfer to a westbound train at Floral Park There will be hourly train service between Hempstead and Floral Park in both directions, Continuous Saturday June 6th, 2026 12:15 AM thru Monday June 8th, 2026 03:30 AM","update_date":"2026-06-03T15:26:02Z"},"road_event_id":"J8tF6BU4saCXBVtEU5qmztI8Cwc=","beginning_cross_street":"Hempstead","ending_cross_street":"Floral Park","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T04:15:00Z","end_date":"2026-06-08T07:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.625032,40.713296]]}},{"id":"Bl1jpWnNUP0Bt7oYchoJFNdV9WA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["22ND ST"],"direction":"unknown","related_road_events":[],"description":"Construction on 22ND ST westbound between 5TH AVE (New York) and 4TH AVE (New York), Wednesday June 3rd, 2026 thru Monday June 8th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T15:27:56Z"},"road_event_id":"Bl1jpWnNUP0Bt7oYchoJFNdV9WA=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994059,40.6608]]}},{"id":"MTHQM8I6WaxsJIe0zMvekAp0seg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[],"description":"Due to Switch repairs both directions, Hempstead between Hollis (New York) and Elmont-UBS Arena (Hempstead) � There will be hourly train service to/from Hollis, Queens Village, and Elmont-UBS Arena, Continuous Saturday June 6th, 2026 12:15 AM thru Monday June 8th, 2026 03:30 AM","update_date":"2026-06-03T15:28:39Z"},"road_event_id":"MTHQM8I6WaxsJIe0zMvekAp0seg=","beginning_cross_street":"Hollis","ending_cross_street":"Elmont-UBS Arena","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T04:15:00Z","end_date":"2026-06-08T07:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766752,40.710181]]}},{"id":"qBcajyqV1Btd+qqRQNEhSBv+O0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[],"description":"Due to Switch repairs both directions, Hempstead at Bellerose (Floral Park) � There will be no train or bus service at Bellerose. Bellerose customers may wish to consider using the Floral Park Station this weekend. , Continuous Saturday June 6th, 2026 12:15 AM thru Monday June 8th, 2026 03:30 AM","update_date":"2026-06-03T15:30:25Z"},"road_event_id":"qBcajyqV1Btd+qqRQNEhSBv+O0I=","beginning_cross_street":"Bellerose","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T04:15:00Z","end_date":"2026-06-08T07:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.716652,40.722204]]}},{"id":"l2d+QrMAslniUK5EyfH2d3ujOwU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[],"description":"Due to Switch repairs both directions, Hempstead between Bellerose (Floral Park) and Elmont-UBS Arena (Hempstead) Bus Alternatives at Bellerose and Elmont-UBS Arena: LIRR tickets will be honored on nearby NICE Bus routes, N24 on Jericho Turnpike for Bellerose, and N6 on Hempstead Turnpike for Elmont-UBS Arena. , Continuous Saturday June 6th, 2026 12:15 AM thru Monday June 8th, 2026 03:30 AM","update_date":"2026-06-03T15:32:44Z"},"road_event_id":"l2d+QrMAslniUK5EyfH2d3ujOwU=","beginning_cross_street":"Bellerose","ending_cross_street":"Elmont-UBS Arena","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T04:15:00Z","end_date":"2026-06-08T07:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.716652,40.722204]]}},{"id":"s1I3d0hL9pWe0OPHiz7eGxtei4U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mY4JzWAukpTioPwBJnLMo03iEzs="}],"description":"Utility work on NY 63 both directions south of Stamp Dr. (Alabama) Alternating lane/shoulder closures with flaggers as needed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-06-03T15:36:32Z"},"road_event_id":"s1I3d0hL9pWe0OPHiz7eGxtei4U=","beginning_cross_street":"Stamp Dr.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.391377,43.082831]]}},{"id":"mY4JzWAukpTioPwBJnLMo03iEzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s1I3d0hL9pWe0OPHiz7eGxtei4U="},{"type":"next-occurrence","id":"Ft8AFhmXmqFG2m/QIJJRfwEY/M8="}],"description":"Utility work on NY 63 both directions south of Stamp Dr. (Alabama) Alternating lane/shoulder closures with flaggers as needed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-06-03T15:36:32Z"},"road_event_id":"mY4JzWAukpTioPwBJnLMo03iEzs=","beginning_cross_street":"Stamp Dr.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.391377,43.082831]]}},{"id":"Ft8AFhmXmqFG2m/QIJJRfwEY/M8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s1I3d0hL9pWe0OPHiz7eGxtei4U="},{"type":"next-occurrence","id":"h65l7wyza05UIz+ocJZuU29ApB8="}],"description":"Utility work on NY 63 both directions south of Stamp Dr. (Alabama) Alternating lane/shoulder closures with flaggers as needed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-06-03T15:36:32Z"},"road_event_id":"Ft8AFhmXmqFG2m/QIJJRfwEY/M8=","beginning_cross_street":"Stamp Dr.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.391377,43.082831]]}},{"id":"h65l7wyza05UIz+ocJZuU29ApB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s1I3d0hL9pWe0OPHiz7eGxtei4U="},{"type":"next-occurrence","id":"5eFfdOJJairh6lfNTe4kAIjAaOA="}],"description":"Utility work on NY 63 both directions south of Stamp Dr. (Alabama) Alternating lane/shoulder closures with flaggers as needed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-06-03T15:36:32Z"},"road_event_id":"h65l7wyza05UIz+ocJZuU29ApB8=","beginning_cross_street":"Stamp Dr.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.391377,43.082831]]}},{"id":"5eFfdOJJairh6lfNTe4kAIjAaOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s1I3d0hL9pWe0OPHiz7eGxtei4U="}],"description":"Utility work on NY 63 both directions south of Stamp Dr. (Alabama) Alternating lane/shoulder closures with flaggers as needed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-06-03T15:36:32Z"},"road_event_id":"5eFfdOJJairh6lfNTe4kAIjAaOA=","beginning_cross_street":"Stamp Dr.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.391377,43.082831]]}},{"id":"pK0CLzcvyDE0Lk11Lw2wvHDsXjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yJH65+GLi/BwQAXStDRf3+biJOk="}],"description":"Guard rail repairs on I-84 westbound between Exit 69 - US 6/202 - NY 121 (Southeast) and Exit 65 - NY 312 - Carmel (Southeast) Res 8-3 RW/32767109 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday June 10th, 2026, 10:00 AM thru 02:30 PM, left lane closure, Friday June 12th, 2026, 10:00 AM thru 02:30 PM, left lane closure","update_date":"2026-06-03T16:06:29Z"},"road_event_id":"pK0CLzcvyDE0Lk11Lw2wvHDsXjE=","beginning_cross_street":"Exit 69 - US 6/202 - NY 121","ending_cross_street":"Exit 65 - NY 312 - Carmel","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.582193,41.383904]]}},{"id":"yJH65+GLi/BwQAXStDRf3+biJOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pK0CLzcvyDE0Lk11Lw2wvHDsXjE="}],"description":"Guard rail repairs on I-84 westbound between Exit 69 - US 6/202 - NY 121 (Southeast) and Exit 65 - NY 312 - Carmel (Southeast) Res 8-3 RW/32767109 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday June 10th, 2026, 10:00 AM thru 02:30 PM, left lane closure, Friday June 12th, 2026, 10:00 AM thru 02:30 PM, left lane closure","update_date":"2026-06-03T16:06:29Z"},"road_event_id":"yJH65+GLi/BwQAXStDRf3+biJOk=","beginning_cross_street":"Exit 69 - US 6/202 - NY 121","ending_cross_street":"Exit 65 - NY 312 - Carmel","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.582193,41.383904]]}},{"id":"CRcIYR1gmCveAZ4xA1cnmNnswQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[],"description":"Guard rail repairs on I-84 eastbound between Exit 68 - I-684 - Pawling - White Plains (Southeast) and Connecticut State Line (Southeast) Res 8-3 RW/32767209 - This work is weather permitting. Delays may exist; plan travel accordingly., Thursday June 11th, 2026, 10:00 AM thru 02:30 PM, left lane closure","update_date":"2026-06-03T16:09:08Z"},"road_event_id":"CRcIYR1gmCveAZ4xA1cnmNnswQc=","beginning_cross_street":"Exit 68 - I-684 - Pawling - White Plains","ending_cross_street":"Connecticut State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.549698,41.386829]]}},{"id":"B7Egx5L0/Vau1+kaTG1BlQcEeu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QoCcc7SCgap1nsHT9EmUkBqwFOE="}],"description":"Guard rail repairs on Taconic State Parkway both directions between Exit 23 - Bryant Pond Road (Putnam Valley) and Exit 25 - Peekskill Hollow Road (Putnam Valley) Res 8-3 RW/32767509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026, 10:00 AM thru 02:30 PM, left lane closures, Tuesday June 9th, 2026, 09:00 AM thru 02:59 PM, right lane closure","update_date":"2026-06-03T16:20:09Z"},"road_event_id":"B7Egx5L0/Vau1+kaTG1BlQcEeu4=","beginning_cross_street":"Exit 23 - Bryant Pond Road","ending_cross_street":"Exit 25 - Peekskill Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786332,41.41106]]}},{"id":"QoCcc7SCgap1nsHT9EmUkBqwFOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B7Egx5L0/Vau1+kaTG1BlQcEeu4="}],"description":"Guard rail repairs on Taconic State Parkway both directions between Exit 23 - Bryant Pond Road (Putnam Valley) and Exit 25 - Peekskill Hollow Road (Putnam Valley) Res 8-3 RW/32767509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026, 10:00 AM thru 02:30 PM, left lane closures, Tuesday June 9th, 2026, 09:00 AM thru 02:59 PM, right lane closure","update_date":"2026-06-03T16:20:09Z"},"road_event_id":"QoCcc7SCgap1nsHT9EmUkBqwFOE=","beginning_cross_street":"Exit 23 - Bryant Pond Road","ending_cross_street":"Exit 25 - Peekskill Hollow Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786332,41.41106]]}},{"id":"gGTVg6Nhcz8fcyTSKeqFEmIRpQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[],"description":"Guard rail repairs on Taconic State Parkway southbound between Exit 35 - Miller Hill Road (East Fishkill) and Exit 31 - NY 301 (Putnam Valley) Res 8-3 RW/32767609 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday June 6th, 2026, 07:30 AM thru 01:00 PM, right lane closure","update_date":"2026-06-03T16:24:16Z"},"road_event_id":"gGTVg6Nhcz8fcyTSKeqFEmIRpQw=","beginning_cross_street":"Exit 35 - Miller Hill Road","ending_cross_street":"Exit 31 - NY 301","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:30:00Z","end_date":"2026-06-06T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.800083,41.496523]]}},{"id":"8x0CY/C1TuP2MRUiXsPXKmNPgls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson Bergen Light Rail"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FkZhIMeYV1cEDUN/9NyXYjYA13Y="}],"description":"Due to Track repairs both directions, Hudson Bergen Light Rail between 9th Street Light Rail Station (Hoboken) and Port Imperial Hblr Station (Weehawken Twp) Track R2 will be out of service between 9th Street and Port Imperial Stations. All trains will be arriving and departing on Track R1 at Lincoln Harbor Station. , Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 06:00 AM thru 08:00 PM","update_date":"2026-06-03T16:21:15Z"},"road_event_id":"8x0CY/C1TuP2MRUiXsPXKmNPgls=","beginning_cross_street":"9th Street Light Rail Station","ending_cross_street":"Port Imperial Hblr Station","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-07T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.038522,40.748867]]}},{"id":"FkZhIMeYV1cEDUN/9NyXYjYA13Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson Bergen Light Rail"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8x0CY/C1TuP2MRUiXsPXKmNPgls="}],"description":"Due to Track repairs both directions, Hudson Bergen Light Rail between 9th Street Light Rail Station (Hoboken) and Port Imperial Hblr Station (Weehawken Twp) Track R2 will be out of service between 9th Street and Port Imperial Stations. All trains will be arriving and departing on Track R1 at Lincoln Harbor Station. , Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 06:00 AM thru 08:00 PM","update_date":"2026-06-03T16:21:15Z"},"road_event_id":"FkZhIMeYV1cEDUN/9NyXYjYA13Y=","beginning_cross_street":"9th Street Light Rail Station","ending_cross_street":"Port Imperial Hblr Station","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T10:00:00Z","end_date":"2026-06-08T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.038522,40.748867]]}},{"id":"gqDt5yqOx4b7XjLzWwp3I4v2DhE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between East of Exit 49 - NJ 124/Springfield Ave (Union Twp) and East of Exit 48 - NJ 24 West (Springfield Twp), Tuesday June 9, 2026 08:00 PM thru Wednesday June 10, 2026 06:00 AM, at least one lane closed local lane , (2nd lane closed from 11:00 PM to 05:00 AM) local lanes","update_date":"2026-06-03T16:31:37Z"},"road_event_id":"gqDt5yqOx4b7XjLzWwp3I4v2DhE=","beginning_cross_street":"East of Exit 49 - NJ 124/Springfield Ave","ending_cross_street":"East of Exit 48 - NJ 24 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T03:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.28968,40.714336]]}},{"id":"+txaUmsPN/ZVfHqztK8udktfJD0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between East of Exit 49 - NJ 124/Springfield Ave (Union Twp) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Monday June 8, 2026 08:00 PM thru Tuesday June 9, 2026 06:00 AM, at least one lane closed local lane","update_date":"2026-06-03T16:31:38Z"},"road_event_id":"+txaUmsPN/ZVfHqztK8udktfJD0=","beginning_cross_street":"East of Exit 49 - NJ 124/Springfield Ave","ending_cross_street":"West of Exit 41 - Dale Rd to Plainfield Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.28968,40.714336]]}},{"id":"0ARkGcL2Uqlucb6BL17ZUjhYNU0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between East of Exit 49 - NJ 124/Springfield Ave (Union Twp) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Tuesday June 9, 2026 08:00 PM thru Wednesday June 10, 2026 06:00 AM, at least one lane closed local lane","update_date":"2026-06-03T16:31:39Z"},"road_event_id":"0ARkGcL2Uqlucb6BL17ZUjhYNU0=","beginning_cross_street":"East of Exit 49 - NJ 124/Springfield Ave","ending_cross_street":"West of Exit 41 - Dale Rd to Plainfield Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.28968,40.714336]]}},{"id":"MTYDAMVB2GYncJwiS/izbzRZ6sk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between East of Exit 49 - NJ 124/Springfield Ave (Union Twp) and East of Exit 48 - NJ 24 West (Springfield Twp), Monday June 8, 2026 08:00 PM thru Tuesday June 9, 2026 06:00 AM, at least one lane closed local lane , (2nd lane closed from 11:00 PM to 05:00 AM) local lanes","update_date":"2026-06-03T16:31:45Z"},"road_event_id":"MTYDAMVB2GYncJwiS/izbzRZ6sk=","beginning_cross_street":"East of Exit 49 - NJ 124/Springfield Ave","ending_cross_street":"East of Exit 48 - NJ 24 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T03:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.28968,40.714336]]}},{"id":"XixAE6heAlOTOjtIOn9nwIMYvdU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between West of Exit 48 - NJ 24 West (Springfield Twp) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Monday June 8, 2026 08:00 PM thru Tuesday June 9, 2026 06:00 AM, at least one lane closed local lane , (2nd lane closed from 11:00 PM to 05:00 AM)","update_date":"2026-06-03T16:31:50Z"},"road_event_id":"XixAE6heAlOTOjtIOn9nwIMYvdU=","beginning_cross_street":"West of Exit 48 - NJ 24 West","ending_cross_street":"West of Exit 41 - Dale Rd to Plainfield Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T03:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.325942,40.711555]]}},{"id":"0qVdar7x4aQONrMFr47EtMLK42g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound at Exit 1W - New Rd (Parsippany-Troy Hills Twp) Friday June 5, 2026 11:00 PM thru Saturday June 6, 2026 05:00 AM, ramp","update_date":"2026-06-03T16:31:51Z"},"road_event_id":"0qVdar7x4aQONrMFr47EtMLK42g=","beginning_cross_street":"Exit 1W - New Rd","ending_cross_street":"Exit 1W - New Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.352912,40.848426]]}},{"id":"WiCGOHLhOMMAc0z0eTrRs4u3Hp8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound at Exit 1W - New Rd (Parsippany-Troy Hills Twp) Friday June 5, 2026 11:00 PM thru Saturday June 6, 2026 05:00 AM, ramp","update_date":"2026-06-03T16:31:52Z"},"road_event_id":"WiCGOHLhOMMAc0z0eTrRs4u3Hp8=","beginning_cross_street":"Exit 1W - New Rd","ending_cross_street":"Exit 1W - New Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.352912,40.848426]]}},{"id":"wZ0IFwVpE5xt7zh8AWfX0ePKDb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between West of Exit 48 - NJ 24 West (Springfield Twp) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Tuesday June 9, 2026 08:00 PM thru Wednesday June 10, 2026 06:00 AM, at least one lane closed local lane , (2nd lane closed from 11:00 PM to 05:00 AM)","update_date":"2026-06-03T16:31:48Z"},"road_event_id":"wZ0IFwVpE5xt7zh8AWfX0ePKDb8=","beginning_cross_street":"West of Exit 48 - NJ 24 West","ending_cross_street":"West of Exit 41 - Dale Rd to Plainfield Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T03:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.325942,40.711555]]}},{"id":"tORPzG24JK9BanR/k1ciDOALiag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WALgJVWfAA3ZzIUKwy4a28nGCS0="}],"description":"Drainage improvements on Taconic State Parkway northbound between Exit 37 - I-84 (East Fishkill) and Exit 47 - NY 55 (La Grange) Res 8-3 RW/32767709 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday June 9th, 2026 thru Friday June 12th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 02:30 PM, moving operation","update_date":"2026-06-03T16:38:47Z"},"road_event_id":"tORPzG24JK9BanR/k1ciDOALiag=","beginning_cross_street":"Exit 37 - I-84","ending_cross_street":"Exit 47 - NY 55","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.774664,41.544922]]}},{"id":"WALgJVWfAA3ZzIUKwy4a28nGCS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tORPzG24JK9BanR/k1ciDOALiag="},{"type":"next-occurrence","id":"MtpxR7GJBvda258tyuZwdhp5NZw="}],"description":"Drainage improvements on Taconic State Parkway northbound between Exit 37 - I-84 (East Fishkill) and Exit 47 - NY 55 (La Grange) Res 8-3 RW/32767709 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday June 9th, 2026 thru Friday June 12th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 02:30 PM, moving operation","update_date":"2026-06-03T16:38:47Z"},"road_event_id":"WALgJVWfAA3ZzIUKwy4a28nGCS0=","beginning_cross_street":"Exit 37 - I-84","ending_cross_street":"Exit 47 - NY 55","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.774664,41.544922]]}},{"id":"MtpxR7GJBvda258tyuZwdhp5NZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tORPzG24JK9BanR/k1ciDOALiag="},{"type":"next-occurrence","id":"KRa0iAMk8h5F+KFkX/8s9E3UnUc="}],"description":"Drainage improvements on Taconic State Parkway northbound between Exit 37 - I-84 (East Fishkill) and Exit 47 - NY 55 (La Grange) Res 8-3 RW/32767709 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday June 9th, 2026 thru Friday June 12th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 02:30 PM, moving operation","update_date":"2026-06-03T16:38:47Z"},"road_event_id":"MtpxR7GJBvda258tyuZwdhp5NZw=","beginning_cross_street":"Exit 37 - I-84","ending_cross_street":"Exit 47 - NY 55","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.774664,41.544922]]}},{"id":"KRa0iAMk8h5F+KFkX/8s9E3UnUc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tORPzG24JK9BanR/k1ciDOALiag="}],"description":"Drainage improvements on Taconic State Parkway northbound between Exit 37 - I-84 (East Fishkill) and Exit 47 - NY 55 (La Grange) Res 8-3 RW/32767709 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday June 9th, 2026 thru Friday June 12th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 09:00 AM thru 02:30 PM, moving operation","update_date":"2026-06-03T16:38:47Z"},"road_event_id":"KRa0iAMk8h5F+KFkX/8s9E3UnUc=","beginning_cross_street":"Exit 37 - I-84","ending_cross_street":"Exit 47 - NY 55","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.774664,41.544922]]}},{"id":"NThUZCBNiimCoBATNettEGq3i/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rCluf156r5McxaD85HwlesFFWMg="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Wednesday June 3rd, 2026 thru Wednesday August 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:40:51Z"},"road_event_id":"NThUZCBNiimCoBATNettEGq3i/w=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981779,40.692023]]}},{"id":"rCluf156r5McxaD85HwlesFFWMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NThUZCBNiimCoBATNettEGq3i/w="},{"type":"next-occurrence","id":"8NUN0aKMgQtDV7oTMGLdhSsxpYE="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Wednesday June 3rd, 2026 thru Wednesday August 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:40:51Z"},"road_event_id":"rCluf156r5McxaD85HwlesFFWMg=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981779,40.692023]]}},{"id":"8NUN0aKMgQtDV7oTMGLdhSsxpYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NThUZCBNiimCoBATNettEGq3i/w="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Wednesday June 3rd, 2026 thru Wednesday August 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:40:51Z"},"road_event_id":"8NUN0aKMgQtDV7oTMGLdhSsxpYE=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981779,40.692023]]}},{"id":"/vlY+Q5FFtugrZp4tiFtTLWavQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8NjpqjeACAMdIGf/X5xwgf4kyi0="}],"description":"Mowing on I-84 both directions between Exit 41 - NY 9D (Fishkill) and Exit 52 - Taconic State Parkway (Kent) Res 8-3 RW/32767809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closures","update_date":"2026-06-03T16:44:27Z"},"road_event_id":"/vlY+Q5FFtugrZp4tiFtTLWavQI=","beginning_cross_street":"Exit 41 - NY 9D","ending_cross_street":"Exit 52 - Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968995,41.518761]]}},{"id":"8NjpqjeACAMdIGf/X5xwgf4kyi0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/vlY+Q5FFtugrZp4tiFtTLWavQI="},{"type":"next-occurrence","id":"vwlM3JJzksxF8q489xSd7387mUI="}],"description":"Mowing on I-84 both directions between Exit 41 - NY 9D (Fishkill) and Exit 52 - Taconic State Parkway (Kent) Res 8-3 RW/32767809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closures","update_date":"2026-06-03T16:44:27Z"},"road_event_id":"8NjpqjeACAMdIGf/X5xwgf4kyi0=","beginning_cross_street":"Exit 41 - NY 9D","ending_cross_street":"Exit 52 - Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968995,41.518761]]}},{"id":"vwlM3JJzksxF8q489xSd7387mUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/vlY+Q5FFtugrZp4tiFtTLWavQI="},{"type":"next-occurrence","id":"/Ih2pQWa5SORXaeJP8AYiWnZdvo="}],"description":"Mowing on I-84 both directions between Exit 41 - NY 9D (Fishkill) and Exit 52 - Taconic State Parkway (Kent) Res 8-3 RW/32767809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closures","update_date":"2026-06-03T16:44:27Z"},"road_event_id":"vwlM3JJzksxF8q489xSd7387mUI=","beginning_cross_street":"Exit 41 - NY 9D","ending_cross_street":"Exit 52 - Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968995,41.518761]]}},{"id":"/Ih2pQWa5SORXaeJP8AYiWnZdvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/vlY+Q5FFtugrZp4tiFtTLWavQI="},{"type":"next-occurrence","id":"GjYgbavuzPt5KSeyiXV3hm8Wr44="}],"description":"Mowing on I-84 both directions between Exit 41 - NY 9D (Fishkill) and Exit 52 - Taconic State Parkway (Kent) Res 8-3 RW/32767809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closures","update_date":"2026-06-03T16:44:27Z"},"road_event_id":"/Ih2pQWa5SORXaeJP8AYiWnZdvo=","beginning_cross_street":"Exit 41 - NY 9D","ending_cross_street":"Exit 52 - Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968995,41.518761]]}},{"id":"GjYgbavuzPt5KSeyiXV3hm8Wr44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/vlY+Q5FFtugrZp4tiFtTLWavQI="}],"description":"Mowing on I-84 both directions between Exit 41 - NY 9D (Fishkill) and Exit 52 - Taconic State Parkway (Kent) Res 8-3 RW/32767809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closures","update_date":"2026-06-03T16:44:27Z"},"road_event_id":"GjYgbavuzPt5KSeyiXV3hm8Wr44=","beginning_cross_street":"Exit 41 - NY 9D","ending_cross_street":"Exit 52 - Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968995,41.518761]]}},{"id":"EDaMCH1EFfVjhW+BjCKAXGCjHnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SihktQ5MQuZPagFxdR+7BT1kQnI="}],"description":"Construction on WILLOUGHBY AVE northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:45:12Z"},"road_event_id":"EDaMCH1EFfVjhW+BjCKAXGCjHnw=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93304,40.695821]]}},{"id":"SihktQ5MQuZPagFxdR+7BT1kQnI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EDaMCH1EFfVjhW+BjCKAXGCjHnw="},{"type":"next-occurrence","id":"2uxUZCSZMisBGxFM+f8yWcV3+l0="}],"description":"Construction on WILLOUGHBY AVE northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:45:12Z"},"road_event_id":"SihktQ5MQuZPagFxdR+7BT1kQnI=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93304,40.695821]]}},{"id":"2uxUZCSZMisBGxFM+f8yWcV3+l0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EDaMCH1EFfVjhW+BjCKAXGCjHnw="},{"type":"next-occurrence","id":"2gY6mVH37gCaejrDEI1UxdBE2Uw="}],"description":"Construction on WILLOUGHBY AVE northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:45:12Z"},"road_event_id":"2uxUZCSZMisBGxFM+f8yWcV3+l0=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93304,40.695821]]}},{"id":"2gY6mVH37gCaejrDEI1UxdBE2Uw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EDaMCH1EFfVjhW+BjCKAXGCjHnw="},{"type":"next-occurrence","id":"gj5QP4a3/H2aXK7LJ9+kmXUJqjQ="}],"description":"Construction on WILLOUGHBY AVE northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:45:12Z"},"road_event_id":"2gY6mVH37gCaejrDEI1UxdBE2Uw=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93304,40.695821]]}},{"id":"gj5QP4a3/H2aXK7LJ9+kmXUJqjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EDaMCH1EFfVjhW+BjCKAXGCjHnw="},{"type":"next-occurrence","id":"Zgv7ZujihGeLLn9NbFSoZIitkvw="}],"description":"Construction on WILLOUGHBY AVE northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:45:12Z"},"road_event_id":"gj5QP4a3/H2aXK7LJ9+kmXUJqjQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93304,40.695821]]}},{"id":"Zgv7ZujihGeLLn9NbFSoZIitkvw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EDaMCH1EFfVjhW+BjCKAXGCjHnw="},{"type":"next-occurrence","id":"jc4ayX8JOENU+ZXXbF9Tf/eAde0="}],"description":"Construction on WILLOUGHBY AVE northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:45:12Z"},"road_event_id":"Zgv7ZujihGeLLn9NbFSoZIitkvw=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93304,40.695821]]}},{"id":"jc4ayX8JOENU+ZXXbF9Tf/eAde0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EDaMCH1EFfVjhW+BjCKAXGCjHnw="},{"type":"next-occurrence","id":"D6jEuaJFgtESiXOJd5OYntFR6EY="}],"description":"Construction on WILLOUGHBY AVE northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:45:12Z"},"road_event_id":"jc4ayX8JOENU+ZXXbF9Tf/eAde0=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93304,40.695821]]}},{"id":"D6jEuaJFgtESiXOJd5OYntFR6EY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EDaMCH1EFfVjhW+BjCKAXGCjHnw="},{"type":"next-occurrence","id":"VNQqlKyRkXGS5nxYxiqmAXb0Yxo="}],"description":"Construction on WILLOUGHBY AVE northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:45:12Z"},"road_event_id":"D6jEuaJFgtESiXOJd5OYntFR6EY=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93304,40.695821]]}},{"id":"VNQqlKyRkXGS5nxYxiqmAXb0Yxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EDaMCH1EFfVjhW+BjCKAXGCjHnw="},{"type":"next-occurrence","id":"/EdPyhW8jItiDniBDQIeY2yskJQ="}],"description":"Construction on WILLOUGHBY AVE northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:45:12Z"},"road_event_id":"VNQqlKyRkXGS5nxYxiqmAXb0Yxo=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93304,40.695821]]}},{"id":"/EdPyhW8jItiDniBDQIeY2yskJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EDaMCH1EFfVjhW+BjCKAXGCjHnw="},{"type":"next-occurrence","id":"pOysVVee2wK6QIcLUeY3wDy0/G0="}],"description":"Construction on WILLOUGHBY AVE northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:45:12Z"},"road_event_id":"/EdPyhW8jItiDniBDQIeY2yskJQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93304,40.695821]]}},{"id":"pOysVVee2wK6QIcLUeY3wDy0/G0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EDaMCH1EFfVjhW+BjCKAXGCjHnw="}],"description":"Construction on WILLOUGHBY AVE northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:45:12Z"},"road_event_id":"pOysVVee2wK6QIcLUeY3wDy0/G0=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93304,40.695821]]}},{"id":"ujX9LGibyY3ayzuT2HuFazY4z1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["UNION ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hzqmUPdQJEGoeezrldLHmsNf0h0="}],"description":"Construction on UNION ST southbound between SUTTER AVE (New York) and BLAKE AVE (New York), Wednesday June 3rd, 2026 thru Sunday July 5th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:48:06Z"},"road_event_id":"ujX9LGibyY3ayzuT2HuFazY4z1c=","beginning_cross_street":"SUTTER AVE","ending_cross_street":"BLAKE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921345,40.665472]]}},{"id":"hzqmUPdQJEGoeezrldLHmsNf0h0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["UNION ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ujX9LGibyY3ayzuT2HuFazY4z1c="},{"type":"next-occurrence","id":"BWK7jLKLrIGfo7TYtn0Rp+5h9U8="}],"description":"Construction on UNION ST southbound between SUTTER AVE (New York) and BLAKE AVE (New York), Wednesday June 3rd, 2026 thru Sunday July 5th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:48:06Z"},"road_event_id":"hzqmUPdQJEGoeezrldLHmsNf0h0=","beginning_cross_street":"SUTTER AVE","ending_cross_street":"BLAKE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921345,40.665472]]}},{"id":"BWK7jLKLrIGfo7TYtn0Rp+5h9U8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["UNION ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ujX9LGibyY3ayzuT2HuFazY4z1c="}],"description":"Construction on UNION ST southbound between SUTTER AVE (New York) and BLAKE AVE (New York), Wednesday June 3rd, 2026 thru Sunday July 5th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:48:06Z"},"road_event_id":"BWK7jLKLrIGfo7TYtn0Rp+5h9U8=","beginning_cross_street":"SUTTER AVE","ending_cross_street":"BLAKE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921345,40.665472]]}},{"id":"tA4OnfCJ8iRMnl+PDGjWMVVbAxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[],"description":"Construction on I-495 westbound from 80th Street; I-495 (New York) Subject to change without noticed., Wednesday June 3rd, 2026 thru Saturday June 6th, 2026, Wednesday/Thursday/Friday, 10:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T16:51:59Z"},"road_event_id":"tA4OnfCJ8iRMnl+PDGjWMVVbAxE=","beginning_cross_street":"80th Street; I-495","ending_cross_street":"80th Street; I-495","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.880209,40.728959]]}},{"id":"ZEEs7jM7XwYXr8QyQp4HRutcKsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUYDAM ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ehEQRRhxA58XF4bZ/uHx2JUYlLc="}],"description":"Construction on SUYDAM ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:55:37Z"},"road_event_id":"ZEEs7jM7XwYXr8QyQp4HRutcKsU=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931128,40.696621]]}},{"id":"ehEQRRhxA58XF4bZ/uHx2JUYlLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUYDAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZEEs7jM7XwYXr8QyQp4HRutcKsU="},{"type":"next-occurrence","id":"KeDXGSF3QdjNxyqSOuSkny9J3SA="}],"description":"Construction on SUYDAM ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:55:37Z"},"road_event_id":"ehEQRRhxA58XF4bZ/uHx2JUYlLc=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931128,40.696621]]}},{"id":"KeDXGSF3QdjNxyqSOuSkny9J3SA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUYDAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZEEs7jM7XwYXr8QyQp4HRutcKsU="},{"type":"next-occurrence","id":"9YtjMDXDXi2E+9X4AzBUQzxRMHs="}],"description":"Construction on SUYDAM ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:55:37Z"},"road_event_id":"KeDXGSF3QdjNxyqSOuSkny9J3SA=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931128,40.696621]]}},{"id":"9YtjMDXDXi2E+9X4AzBUQzxRMHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUYDAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZEEs7jM7XwYXr8QyQp4HRutcKsU="},{"type":"next-occurrence","id":"qy+bpqQ/ZBaep7g8/Oxb0PpbE3c="}],"description":"Construction on SUYDAM ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:55:37Z"},"road_event_id":"9YtjMDXDXi2E+9X4AzBUQzxRMHs=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931128,40.696621]]}},{"id":"qy+bpqQ/ZBaep7g8/Oxb0PpbE3c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUYDAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZEEs7jM7XwYXr8QyQp4HRutcKsU="},{"type":"next-occurrence","id":"v8tZUXRO/Idx3D+KcjM3/c/7JvA="}],"description":"Construction on SUYDAM ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:55:37Z"},"road_event_id":"qy+bpqQ/ZBaep7g8/Oxb0PpbE3c=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931128,40.696621]]}},{"id":"v8tZUXRO/Idx3D+KcjM3/c/7JvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUYDAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZEEs7jM7XwYXr8QyQp4HRutcKsU="},{"type":"next-occurrence","id":"arJpJ2J/WxO6l/pU1yCN6RabY04="}],"description":"Construction on SUYDAM ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:55:37Z"},"road_event_id":"v8tZUXRO/Idx3D+KcjM3/c/7JvA=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931128,40.696621]]}},{"id":"arJpJ2J/WxO6l/pU1yCN6RabY04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUYDAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZEEs7jM7XwYXr8QyQp4HRutcKsU="},{"type":"next-occurrence","id":"QDePU+FPiN+V/ZMTBlrlQh+uPdI="}],"description":"Construction on SUYDAM ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:55:37Z"},"road_event_id":"arJpJ2J/WxO6l/pU1yCN6RabY04=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931128,40.696621]]}},{"id":"QDePU+FPiN+V/ZMTBlrlQh+uPdI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUYDAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZEEs7jM7XwYXr8QyQp4HRutcKsU="},{"type":"next-occurrence","id":"tLwb5uAhga2bQiaRYGjsYTodw8Y="}],"description":"Construction on SUYDAM ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:55:37Z"},"road_event_id":"QDePU+FPiN+V/ZMTBlrlQh+uPdI=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931128,40.696621]]}},{"id":"tLwb5uAhga2bQiaRYGjsYTodw8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUYDAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZEEs7jM7XwYXr8QyQp4HRutcKsU="},{"type":"next-occurrence","id":"fL3r9o2vOl7qnUUJUSgIeuGSp9E="}],"description":"Construction on SUYDAM ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:55:37Z"},"road_event_id":"tLwb5uAhga2bQiaRYGjsYTodw8Y=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931128,40.696621]]}},{"id":"fL3r9o2vOl7qnUUJUSgIeuGSp9E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUYDAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZEEs7jM7XwYXr8QyQp4HRutcKsU="},{"type":"next-occurrence","id":"gTONUTxrqFL9cTVKOpr0vFhoTN0="}],"description":"Construction on SUYDAM ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:55:37Z"},"road_event_id":"fL3r9o2vOl7qnUUJUSgIeuGSp9E=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931128,40.696621]]}},{"id":"gTONUTxrqFL9cTVKOpr0vFhoTN0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUYDAM ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZEEs7jM7XwYXr8QyQp4HRutcKsU="}],"description":"Construction on SUYDAM ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:55:37Z"},"road_event_id":"gTONUTxrqFL9cTVKOpr0vFhoTN0=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931128,40.696621]]}},{"id":"6PuDqI0Xxp5MtjjW/0aQ1XMNpaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HART ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HAn+S/E4WK0ObTNya0DRmjoATew="}],"description":"Construction on HART ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:59:34Z"},"road_event_id":"6PuDqI0Xxp5MtjjW/0aQ1XMNpaY=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.930521,40.696297]]}},{"id":"HAn+S/E4WK0ObTNya0DRmjoATew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HART ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PuDqI0Xxp5MtjjW/0aQ1XMNpaY="},{"type":"next-occurrence","id":"slOiz52FovoU2OcH7pZhCyzBs98="}],"description":"Construction on HART ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:59:34Z"},"road_event_id":"HAn+S/E4WK0ObTNya0DRmjoATew=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.930521,40.696297]]}},{"id":"slOiz52FovoU2OcH7pZhCyzBs98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HART ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PuDqI0Xxp5MtjjW/0aQ1XMNpaY="},{"type":"next-occurrence","id":"s10OQuiCEDgAR/M+FU89tgqEvsE="}],"description":"Construction on HART ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:59:34Z"},"road_event_id":"slOiz52FovoU2OcH7pZhCyzBs98=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.930521,40.696297]]}},{"id":"s10OQuiCEDgAR/M+FU89tgqEvsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HART ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PuDqI0Xxp5MtjjW/0aQ1XMNpaY="},{"type":"next-occurrence","id":"dyu2EsoIF5ZAnwyJtbsVJMj1t+0="}],"description":"Construction on HART ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:59:34Z"},"road_event_id":"s10OQuiCEDgAR/M+FU89tgqEvsE=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.930521,40.696297]]}},{"id":"dyu2EsoIF5ZAnwyJtbsVJMj1t+0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HART ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PuDqI0Xxp5MtjjW/0aQ1XMNpaY="},{"type":"next-occurrence","id":"tiyzMjgc0IMl7xo30n+V61jlEYo="}],"description":"Construction on HART ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:59:34Z"},"road_event_id":"dyu2EsoIF5ZAnwyJtbsVJMj1t+0=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.930521,40.696297]]}},{"id":"tiyzMjgc0IMl7xo30n+V61jlEYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HART ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PuDqI0Xxp5MtjjW/0aQ1XMNpaY="},{"type":"next-occurrence","id":"7R7LfATpqpXOG6zVVY6Jd5t2PAU="}],"description":"Construction on HART ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:59:34Z"},"road_event_id":"tiyzMjgc0IMl7xo30n+V61jlEYo=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.930521,40.696297]]}},{"id":"7R7LfATpqpXOG6zVVY6Jd5t2PAU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HART ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PuDqI0Xxp5MtjjW/0aQ1XMNpaY="},{"type":"next-occurrence","id":"UnQXJmjnLphMvCXUtFEhj7WPVR0="}],"description":"Construction on HART ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:59:34Z"},"road_event_id":"7R7LfATpqpXOG6zVVY6Jd5t2PAU=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.930521,40.696297]]}},{"id":"UnQXJmjnLphMvCXUtFEhj7WPVR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HART ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PuDqI0Xxp5MtjjW/0aQ1XMNpaY="},{"type":"next-occurrence","id":"A+7kGDkOJr/lh4lQR9R9mmpIkm8="}],"description":"Construction on HART ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:59:34Z"},"road_event_id":"UnQXJmjnLphMvCXUtFEhj7WPVR0=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.930521,40.696297]]}},{"id":"A+7kGDkOJr/lh4lQR9R9mmpIkm8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HART ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PuDqI0Xxp5MtjjW/0aQ1XMNpaY="},{"type":"next-occurrence","id":"8uPiSiNK/0Ex3uWES2d2otS9+cU="}],"description":"Construction on HART ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:59:34Z"},"road_event_id":"A+7kGDkOJr/lh4lQR9R9mmpIkm8=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.930521,40.696297]]}},{"id":"8uPiSiNK/0Ex3uWES2d2otS9+cU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HART ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PuDqI0Xxp5MtjjW/0aQ1XMNpaY="},{"type":"next-occurrence","id":"dBIu1Jxi+erAU66fXmyLCoLboY4="}],"description":"Construction on HART ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:59:34Z"},"road_event_id":"8uPiSiNK/0Ex3uWES2d2otS9+cU=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.930521,40.696297]]}},{"id":"dBIu1Jxi+erAU66fXmyLCoLboY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HART ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PuDqI0Xxp5MtjjW/0aQ1XMNpaY="}],"description":"Construction on HART ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Wednesday June 3rd, 2026 thru Friday July 3rd, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T16:59:34Z"},"road_event_id":"dBIu1Jxi+erAU66fXmyLCoLboY4=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.930521,40.696297]]}},{"id":"yUaxwK8xy3BjGGQymzvbeO/90XY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Southbound near US 46 (White Twp), Tuesday June 9, 2026 09:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-06-03T17:01:37Z"},"road_event_id":"yUaxwK8xy3BjGGQymzvbeO/90XY=","beginning_cross_street":"US 46","ending_cross_street":"South of US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.000984,40.832092]]}},{"id":"zx8PIotkB5TZCGLoi8NQf2E1c3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Southbound near US 46 (White Twp), Wednesday June 10, 2026 09:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-06-03T17:01:39Z"},"road_event_id":"zx8PIotkB5TZCGLoi8NQf2E1c3M=","beginning_cross_street":"US 46","ending_cross_street":"South of US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.000984,40.832092]]}},{"id":"DZM9XeZWC+sylyAey+vp+2jZpoY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of CR 611/Hope Rd (Liberty Twp), Wednesday June 10, 2026 09:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-06-03T17:01:38Z"},"road_event_id":"DZM9XeZWC+sylyAey+vp+2jZpoY=","beginning_cross_street":"West of CR 611/Hope Rd","ending_cross_street":"West of CR 611/Hope Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.917762,40.867584]]}},{"id":"OoRsfGmOeABdUcMUpXddaZV6n4A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of CR 611/Hope Rd (Liberty Twp), Tuesday June 9, 2026 09:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-06-03T17:01:42Z"},"road_event_id":"OoRsfGmOeABdUcMUpXddaZV6n4A=","beginning_cross_street":"West of CR 611/Hope Rd","ending_cross_street":"West of CR 611/Hope Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.917762,40.867584]]}},{"id":"WoXHrbTT77LgnfwttVktgyj1NGU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Southbound near US 46 (White Twp), Monday June 8, 2026 09:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-06-03T17:01:40Z"},"road_event_id":"WoXHrbTT77LgnfwttVktgyj1NGU=","beginning_cross_street":"US 46","ending_cross_street":"South of US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.000984,40.832092]]}},{"id":"h4/nYVyGGnNlFbOrr40u4TPGUCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ARLINGTON AVE"],"direction":"unknown","related_road_events":[],"description":"Construction on ARLINGTON AVE westbound between FULTON ST (New York) and HALE AVE (New York), Continuous Wednesday June 3rd, 2026 12:00 AM thru Monday June 15th, 2026 11:59 PM All lanes closed","update_date":"2026-06-03T17:09:11Z"},"road_event_id":"h4/nYVyGGnNlFbOrr40u4TPGUCo=","beginning_cross_street":"FULTON ST","ending_cross_street":"HALE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.879229,40.681675]]}},{"id":"UIGMNX+QEAz+XdXL5wJ9EcAoblk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[],"description":"Milling and paving operations on Bronx River Parkway both directions between Exit 26 - Virginia Road; Town of Greenburgh (White Plains) and VIRGINIA RD at LAFAYETTE AVE (North Castle), Continuous Friday June 5th, 2026 12:00 AM thru Sunday June 7th, 2026 11:59 PM All lanes closed","update_date":"2026-06-03T17:30:29Z"},"road_event_id":"UIGMNX+QEAz+XdXL5wJ9EcAoblk=","beginning_cross_street":"Exit 26 - Virginia Road; Town of Greenburgh","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-08T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.774232,41.062216]]}},{"id":"/fJNup0Miv5nFTj+jA5OZ2+MLr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHESTNUT ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kjRvq8ExQPf7makP1ThcrMDmtG8="}],"description":"Construction on CHESTNUT ST northbound between DINSMORE PL (New York) and FULTON ST (New York), Wednesday June 3rd, 2026 thru Sunday June 7th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday June 3rd, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-03T17:33:34Z"},"road_event_id":"/fJNup0Miv5nFTj+jA5OZ2+MLr0=","beginning_cross_street":"DINSMORE PL","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.875057,40.68148]]}},{"id":"kjRvq8ExQPf7makP1ThcrMDmtG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHESTNUT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/fJNup0Miv5nFTj+jA5OZ2+MLr0="}],"description":"Construction on CHESTNUT ST northbound between DINSMORE PL (New York) and FULTON ST (New York), Wednesday June 3rd, 2026 thru Sunday June 7th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Wednesday June 3rd, 2026 thru Sunday June 7th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-03T17:33:34Z"},"road_event_id":"kjRvq8ExQPf7makP1ThcrMDmtG8=","beginning_cross_street":"DINSMORE PL","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.875057,40.68148]]}},{"id":"FeYFn6q3iCreTuxAAcq86+ERU2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between South of Exit 10 - Center Square Rd (Logan Twp) and North of Exit 7 (Oldmans Twp), Continuous Tuesday June 9, 2026 07:00 AM thru Wednesday June 24, 2026 02:00 PM, right shoulder closed","update_date":"2026-06-03T17:37:38Z"},"road_event_id":"FeYFn6q3iCreTuxAAcq86+ERU2w=","beginning_cross_street":"South of Exit 10 - Center Square Rd","ending_cross_street":"North of Exit 7","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.378631,39.748832]]}},{"id":"DrDVGqAjXos5Hgf7KldBWycPavY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Goethals Bridge"],"direction":"unknown","related_road_events":[],"description":"Street sweeping on Goethals Bridge both directions from Exit 4- Forest Avenue; I-278 (New York) to Verrazano-Narrows Bridge Upper Level at Fingerboard Road; Verrazano Narrows Bridge (New York) Subject to change without notice., Tuesday June 9th, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed eastbound; 1 Left lane of 4 lanes closed westbound","update_date":"2026-06-03T17:37:23Z"},"road_event_id":"DrDVGqAjXos5Hgf7KldBWycPavY=","beginning_cross_street":"Exit 4- Forest Avenue; I-278","ending_cross_street":"Fingerboard Road; Verrazano Narrows Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.179505,40.626186]]}},{"id":"kJey6VdDxGVQ4Z8FFaLMxA3Vzvw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[],"description":"Street sweeping on NY 27 both directions from Belt System - Shore Parkway (New York) to NY 878 at Rock Hall Road (Hempstead) Subject to change without notice., Wednesday June 10th, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound","update_date":"2026-06-03T17:40:41Z"},"road_event_id":"kJey6VdDxGVQ4Z8FFaLMxA3Vzvw=","beginning_cross_street":"Belt System - Shore Parkway","ending_cross_street":"Rock Hall Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.83895,40.666991]]}},{"id":"K6FqhObH1bD32qKhwV8zfsVu3U4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Jackie Robinson Parkway"],"direction":"unknown","related_road_events":[],"description":"Street sweeping on Jackie Robinson Parkway both directions from START ROUTE Jackie Robinson Parkway; Pennsylvania Avenue; Jamaica Avenue (New York) to Interborough Parkway; Exit 7 - I-678; END ROUTE; Ramp (New York) Subject to change without notice., Thursday June 11th, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed eastbound; 1 Left lane of 2 lanes closed westbound","update_date":"2026-06-03T17:45:14Z"},"road_event_id":"K6FqhObH1bD32qKhwV8zfsVu3U4=","beginning_cross_street":"START ROUTE Jackie Robinson Parkway; Pennsylvania Avenue; Jamaica Avenue","ending_cross_street":"Interborough Parkway; Exit 7 - I-678; END ROUTE; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.897464,40.678231]]}},{"id":"UgHK6ZLZC2igaxM1JcJSaZW7+Yg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ygXBZWPOHhpTJVE5+l2vsOX+SdY="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Wednesday June 3rd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-06-03T17:46:13Z"},"road_event_id":"UgHK6ZLZC2igaxM1JcJSaZW7+Yg=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T14:00:00Z","end_date":"2026-06-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996264,40.69073]]}},{"id":"ygXBZWPOHhpTJVE5+l2vsOX+SdY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UgHK6ZLZC2igaxM1JcJSaZW7+Yg="},{"type":"next-occurrence","id":"Mltd88ftB3DgjkjTvE0sNtLqXKQ="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Wednesday June 3rd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-06-03T17:46:13Z"},"road_event_id":"ygXBZWPOHhpTJVE5+l2vsOX+SdY=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996264,40.69073]]}},{"id":"Mltd88ftB3DgjkjTvE0sNtLqXKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UgHK6ZLZC2igaxM1JcJSaZW7+Yg="},{"type":"next-occurrence","id":"2Ao7/uShW1g1NGZQIeiC43jwPCM="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Wednesday June 3rd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-06-03T17:46:13Z"},"road_event_id":"Mltd88ftB3DgjkjTvE0sNtLqXKQ=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996264,40.69073]]}},{"id":"2Ao7/uShW1g1NGZQIeiC43jwPCM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UgHK6ZLZC2igaxM1JcJSaZW7+Yg="},{"type":"next-occurrence","id":"QUMTQhWPpvaN+W1Bt4pRLgZubbo="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Wednesday June 3rd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-06-03T17:46:13Z"},"road_event_id":"2Ao7/uShW1g1NGZQIeiC43jwPCM=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996264,40.69073]]}},{"id":"QUMTQhWPpvaN+W1Bt4pRLgZubbo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UgHK6ZLZC2igaxM1JcJSaZW7+Yg="},{"type":"next-occurrence","id":"xGSP+v5J+SUT1KMvS83nGLOXEf0="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Wednesday June 3rd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-06-03T17:46:13Z"},"road_event_id":"QUMTQhWPpvaN+W1Bt4pRLgZubbo=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996264,40.69073]]}},{"id":"xGSP+v5J+SUT1KMvS83nGLOXEf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UgHK6ZLZC2igaxM1JcJSaZW7+Yg="},{"type":"next-occurrence","id":"gKlXRLhrg3shNolrOYMQ0uFGEcY="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Wednesday June 3rd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-06-03T17:46:13Z"},"road_event_id":"xGSP+v5J+SUT1KMvS83nGLOXEf0=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996264,40.69073]]}},{"id":"gKlXRLhrg3shNolrOYMQ0uFGEcY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UgHK6ZLZC2igaxM1JcJSaZW7+Yg="},{"type":"next-occurrence","id":"YY/eYxaFABscU8fHIkvJsmsd9T0="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Wednesday June 3rd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-06-03T17:46:13Z"},"road_event_id":"gKlXRLhrg3shNolrOYMQ0uFGEcY=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T14:00:00Z","end_date":"2026-06-15T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996264,40.69073]]}},{"id":"YY/eYxaFABscU8fHIkvJsmsd9T0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UgHK6ZLZC2igaxM1JcJSaZW7+Yg="},{"type":"next-occurrence","id":"qrjqc8xb6der7+ch1g/8ky1lWnQ="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Wednesday June 3rd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-06-03T17:46:13Z"},"road_event_id":"YY/eYxaFABscU8fHIkvJsmsd9T0=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T14:00:00Z","end_date":"2026-06-16T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996264,40.69073]]}},{"id":"qrjqc8xb6der7+ch1g/8ky1lWnQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UgHK6ZLZC2igaxM1JcJSaZW7+Yg="},{"type":"next-occurrence","id":"3Ttf785q9N4CeSeUkAV+g14Vy04="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Wednesday June 3rd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-06-03T17:46:13Z"},"road_event_id":"qrjqc8xb6der7+ch1g/8ky1lWnQ=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T14:00:00Z","end_date":"2026-06-17T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996264,40.69073]]}},{"id":"3Ttf785q9N4CeSeUkAV+g14Vy04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UgHK6ZLZC2igaxM1JcJSaZW7+Yg="},{"type":"next-occurrence","id":"/69fLiRu63esbl4oQBip9kGwBt8="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Wednesday June 3rd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-06-03T17:46:13Z"},"road_event_id":"3Ttf785q9N4CeSeUkAV+g14Vy04=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T14:00:00Z","end_date":"2026-06-18T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996264,40.69073]]}},{"id":"/69fLiRu63esbl4oQBip9kGwBt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UgHK6ZLZC2igaxM1JcJSaZW7+Yg="}],"description":"Construction on HENRY ST southbound between ATLANTIC AVE (New York) and PACIFIC ST (New York), Wednesday June 3rd, 2026 thru Monday June 22nd, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM All lanes closed","update_date":"2026-06-03T17:46:13Z"},"road_event_id":"/69fLiRu63esbl4oQBip9kGwBt8=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"PACIFIC ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T14:00:00Z","end_date":"2026-06-19T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996264,40.69073]]}},{"id":"EUTWkC4WSAdNFc3ygJakwBjWtb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[],"description":"Street sweeping on I-678 both directions from Grand Central Parkway (New York) to Whitestone Expressway; Ramp (New York) Subject to change without notice., Friday June 12th, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-06-03T17:47:10Z"},"road_event_id":"EUTWkC4WSAdNFc3ygJakwBjWtb0=","beginning_cross_street":"Grand Central Parkway","ending_cross_street":"Whitestone Expressway; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825846,40.716459]]}},{"id":"HornGdz5YY8rBuoe4WP4cId8X3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 70"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6XDzndNGXs26u4azURM+KLOm5GI="}],"description":"Line striping on NY 70 both directions West Avenue/Canaseraga Road (Burns) to DEPOT ST (Canaseraga) 1 lane 2 way flagger, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:02:18Z"},"road_event_id":"HornGdz5YY8rBuoe4WP4cId8X3g=","beginning_cross_street":"West Avenue/Canaseraga Road","ending_cross_street":"DEPOT ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.771639,42.461648]]}},{"id":"6XDzndNGXs26u4azURM+KLOm5GI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 70"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HornGdz5YY8rBuoe4WP4cId8X3g="},{"type":"next-occurrence","id":"mZEZGni5Wvu6XymQyCFSBP1OKkc="}],"description":"Line striping on NY 70 both directions West Avenue/Canaseraga Road (Burns) to DEPOT ST (Canaseraga) 1 lane 2 way flagger, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:02:18Z"},"road_event_id":"6XDzndNGXs26u4azURM+KLOm5GI=","beginning_cross_street":"West Avenue/Canaseraga Road","ending_cross_street":"DEPOT ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.771639,42.461648]]}},{"id":"mZEZGni5Wvu6XymQyCFSBP1OKkc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 70"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HornGdz5YY8rBuoe4WP4cId8X3g="},{"type":"next-occurrence","id":"EVWU3ZwPzE5uMV4d78c4bRIjkk4="}],"description":"Line striping on NY 70 both directions West Avenue/Canaseraga Road (Burns) to DEPOT ST (Canaseraga) 1 lane 2 way flagger, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:02:18Z"},"road_event_id":"mZEZGni5Wvu6XymQyCFSBP1OKkc=","beginning_cross_street":"West Avenue/Canaseraga Road","ending_cross_street":"DEPOT ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T10:00:00Z","end_date":"2026-06-07T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.771639,42.461648]]}},{"id":"EVWU3ZwPzE5uMV4d78c4bRIjkk4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 70"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HornGdz5YY8rBuoe4WP4cId8X3g="},{"type":"next-occurrence","id":"LKCvWU3OuJwy3ihSAJ0VrmLH5Cs="}],"description":"Line striping on NY 70 both directions West Avenue/Canaseraga Road (Burns) to DEPOT ST (Canaseraga) 1 lane 2 way flagger, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:02:18Z"},"road_event_id":"EVWU3ZwPzE5uMV4d78c4bRIjkk4=","beginning_cross_street":"West Avenue/Canaseraga Road","ending_cross_street":"DEPOT ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.771639,42.461648]]}},{"id":"LKCvWU3OuJwy3ihSAJ0VrmLH5Cs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 70"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HornGdz5YY8rBuoe4WP4cId8X3g="},{"type":"next-occurrence","id":"5iG+XDtCjG6DyY9m3frjc5IngCw="}],"description":"Line striping on NY 70 both directions West Avenue/Canaseraga Road (Burns) to DEPOT ST (Canaseraga) 1 lane 2 way flagger, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:02:18Z"},"road_event_id":"LKCvWU3OuJwy3ihSAJ0VrmLH5Cs=","beginning_cross_street":"West Avenue/Canaseraga Road","ending_cross_street":"DEPOT ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.771639,42.461648]]}},{"id":"5iG+XDtCjG6DyY9m3frjc5IngCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 70"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HornGdz5YY8rBuoe4WP4cId8X3g="},{"type":"next-occurrence","id":"zZ9nUUGpxMwq9UE1OWT4YRQr3ec="}],"description":"Line striping on NY 70 both directions West Avenue/Canaseraga Road (Burns) to DEPOT ST (Canaseraga) 1 lane 2 way flagger, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:02:18Z"},"road_event_id":"5iG+XDtCjG6DyY9m3frjc5IngCw=","beginning_cross_street":"West Avenue/Canaseraga Road","ending_cross_street":"DEPOT ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.771639,42.461648]]}},{"id":"zZ9nUUGpxMwq9UE1OWT4YRQr3ec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 70"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HornGdz5YY8rBuoe4WP4cId8X3g="},{"type":"next-occurrence","id":"oppx3Gqaw2MAAIpJ1BrNFlVIjDg="}],"description":"Line striping on NY 70 both directions West Avenue/Canaseraga Road (Burns) to DEPOT ST (Canaseraga) 1 lane 2 way flagger, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:02:18Z"},"road_event_id":"zZ9nUUGpxMwq9UE1OWT4YRQr3ec=","beginning_cross_street":"West Avenue/Canaseraga Road","ending_cross_street":"DEPOT ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.771639,42.461648]]}},{"id":"oppx3Gqaw2MAAIpJ1BrNFlVIjDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 70"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HornGdz5YY8rBuoe4WP4cId8X3g="}],"description":"Line striping on NY 70 both directions West Avenue/Canaseraga Road (Burns) to DEPOT ST (Canaseraga) 1 lane 2 way flagger, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:02:18Z"},"road_event_id":"oppx3Gqaw2MAAIpJ1BrNFlVIjDg=","beginning_cross_street":"West Avenue/Canaseraga Road","ending_cross_street":"DEPOT ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.771639,42.461648]]}},{"id":"XSkuxOOcN+ynUMCWBzXjl/HhDqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 244"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"01F68UtrrOkra87uvpUEBWaEmGo="}],"description":"Milling and repaving on NY 244 both directions Willets Avenue; NY 19; START ROUTE NY 244; Belmont (Amity) 2 Lanes reduced to 1 Lane W/ flaggers, Friday June 5th, 2026 thru Wednesday June 10th, 2026, Sunday/Monday/Tuesday/Wednesday/Friday/Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-03T18:03:37Z"},"road_event_id":"XSkuxOOcN+ynUMCWBzXjl/HhDqM=","beginning_cross_street":"Willets Avenue; NY 19; START ROUTE NY 244; Belmont","ending_cross_street":"Willets Avenue; NY 19; START ROUTE NY 244; Belmont","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.033211,42.227686]]}},{"id":"01F68UtrrOkra87uvpUEBWaEmGo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 244"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XSkuxOOcN+ynUMCWBzXjl/HhDqM="},{"type":"next-occurrence","id":"Dld2zGPeJjRaEVykUQAAXRX2sIg="}],"description":"Milling and repaving on NY 244 both directions Willets Avenue; NY 19; START ROUTE NY 244; Belmont (Amity) 2 Lanes reduced to 1 Lane W/ flaggers, Friday June 5th, 2026 thru Wednesday June 10th, 2026, Sunday/Monday/Tuesday/Wednesday/Friday/Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-03T18:03:37Z"},"road_event_id":"01F68UtrrOkra87uvpUEBWaEmGo=","beginning_cross_street":"Willets Avenue; NY 19; START ROUTE NY 244; Belmont","ending_cross_street":"Willets Avenue; NY 19; START ROUTE NY 244; Belmont","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.033211,42.227686]]}},{"id":"Dld2zGPeJjRaEVykUQAAXRX2sIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 244"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XSkuxOOcN+ynUMCWBzXjl/HhDqM="},{"type":"next-occurrence","id":"Rzo9IqiTcCIdLl1KXC3bGXvBO/4="}],"description":"Milling and repaving on NY 244 both directions Willets Avenue; NY 19; START ROUTE NY 244; Belmont (Amity) 2 Lanes reduced to 1 Lane W/ flaggers, Friday June 5th, 2026 thru Wednesday June 10th, 2026, Sunday/Monday/Tuesday/Wednesday/Friday/Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-03T18:03:37Z"},"road_event_id":"Dld2zGPeJjRaEVykUQAAXRX2sIg=","beginning_cross_street":"Willets Avenue; NY 19; START ROUTE NY 244; Belmont","ending_cross_street":"Willets Avenue; NY 19; START ROUTE NY 244; Belmont","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T10:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.033211,42.227686]]}},{"id":"Rzo9IqiTcCIdLl1KXC3bGXvBO/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 244"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XSkuxOOcN+ynUMCWBzXjl/HhDqM="},{"type":"next-occurrence","id":"gG+rJ5KP70pEbY2UsaMekyFnb8c="}],"description":"Milling and repaving on NY 244 both directions Willets Avenue; NY 19; START ROUTE NY 244; Belmont (Amity) 2 Lanes reduced to 1 Lane W/ flaggers, Friday June 5th, 2026 thru Wednesday June 10th, 2026, Sunday/Monday/Tuesday/Wednesday/Friday/Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-03T18:03:37Z"},"road_event_id":"Rzo9IqiTcCIdLl1KXC3bGXvBO/4=","beginning_cross_street":"Willets Avenue; NY 19; START ROUTE NY 244; Belmont","ending_cross_street":"Willets Avenue; NY 19; START ROUTE NY 244; Belmont","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.033211,42.227686]]}},{"id":"gG+rJ5KP70pEbY2UsaMekyFnb8c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 244"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XSkuxOOcN+ynUMCWBzXjl/HhDqM="},{"type":"next-occurrence","id":"4/GAYvAjxpA6Bq5DewogBeC+7H0="}],"description":"Milling and repaving on NY 244 both directions Willets Avenue; NY 19; START ROUTE NY 244; Belmont (Amity) 2 Lanes reduced to 1 Lane W/ flaggers, Friday June 5th, 2026 thru Wednesday June 10th, 2026, Sunday/Monday/Tuesday/Wednesday/Friday/Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-03T18:03:37Z"},"road_event_id":"gG+rJ5KP70pEbY2UsaMekyFnb8c=","beginning_cross_street":"Willets Avenue; NY 19; START ROUTE NY 244; Belmont","ending_cross_street":"Willets Avenue; NY 19; START ROUTE NY 244; Belmont","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.033211,42.227686]]}},{"id":"4/GAYvAjxpA6Bq5DewogBeC+7H0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 244"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XSkuxOOcN+ynUMCWBzXjl/HhDqM="}],"description":"Milling and repaving on NY 244 both directions Willets Avenue; NY 19; START ROUTE NY 244; Belmont (Amity) 2 Lanes reduced to 1 Lane W/ flaggers, Friday June 5th, 2026 thru Wednesday June 10th, 2026, Sunday/Monday/Tuesday/Wednesday/Friday/Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-03T18:03:37Z"},"road_event_id":"4/GAYvAjxpA6Bq5DewogBeC+7H0=","beginning_cross_street":"Willets Avenue; NY 19; START ROUTE NY 244; Belmont","ending_cross_street":"Willets Avenue; NY 19; START ROUTE NY 244; Belmont","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.033211,42.227686]]}},{"id":"rZcvEcRvL3mmI4geUu7ihXKPI30=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+zHdppFRcvxeTm6nbAC9lKmmAfE="}],"description":"Guard rail repairs on NY 117 northbound between Harris Road (Bedford) and Saw Mill River Parkway (Bedford) D265183/NIGHT/32723209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, alternating traffic","update_date":"2026-06-03T18:09:09Z"},"road_event_id":"rZcvEcRvL3mmI4geUu7ihXKPI30=","beginning_cross_street":"Harris Road","ending_cross_street":"Saw Mill River Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.68521,41.245646]]}},{"id":"+zHdppFRcvxeTm6nbAC9lKmmAfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rZcvEcRvL3mmI4geUu7ihXKPI30="},{"type":"next-occurrence","id":"0kTlF05joTaY4DsSxg9vcNLmajE="}],"description":"Guard rail repairs on NY 117 northbound between Harris Road (Bedford) and Saw Mill River Parkway (Bedford) D265183/NIGHT/32723209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, alternating traffic","update_date":"2026-06-03T18:09:09Z"},"road_event_id":"+zHdppFRcvxeTm6nbAC9lKmmAfE=","beginning_cross_street":"Harris Road","ending_cross_street":"Saw Mill River Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.68521,41.245646]]}},{"id":"0kTlF05joTaY4DsSxg9vcNLmajE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rZcvEcRvL3mmI4geUu7ihXKPI30="},{"type":"next-occurrence","id":"s6OcvnYWCN7GGrtLG28fJTJJgJY="}],"description":"Guard rail repairs on NY 117 northbound between Harris Road (Bedford) and Saw Mill River Parkway (Bedford) D265183/NIGHT/32723209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, alternating traffic","update_date":"2026-06-03T18:09:09Z"},"road_event_id":"0kTlF05joTaY4DsSxg9vcNLmajE=","beginning_cross_street":"Harris Road","ending_cross_street":"Saw Mill River Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.68521,41.245646]]}},{"id":"s6OcvnYWCN7GGrtLG28fJTJJgJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rZcvEcRvL3mmI4geUu7ihXKPI30="},{"type":"next-occurrence","id":"QCfSA7Xnd5/w5wuhGMqI46ET9V0="}],"description":"Guard rail repairs on NY 117 northbound between Harris Road (Bedford) and Saw Mill River Parkway (Bedford) D265183/NIGHT/32723209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, alternating traffic","update_date":"2026-06-03T18:09:09Z"},"road_event_id":"s6OcvnYWCN7GGrtLG28fJTJJgJY=","beginning_cross_street":"Harris Road","ending_cross_street":"Saw Mill River Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.68521,41.245646]]}},{"id":"QCfSA7Xnd5/w5wuhGMqI46ET9V0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rZcvEcRvL3mmI4geUu7ihXKPI30="}],"description":"Guard rail repairs on NY 117 northbound between Harris Road (Bedford) and Saw Mill River Parkway (Bedford) D265183/NIGHT/32723209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, alternating traffic","update_date":"2026-06-03T18:09:09Z"},"road_event_id":"QCfSA7Xnd5/w5wuhGMqI46ET9V0=","beginning_cross_street":"Harris Road","ending_cross_street":"Saw Mill River Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.68521,41.245646]]}},{"id":"Ckmt0O30RGKvnIhs11tfOcUW1yg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ucY4D7QVYUVEpWGgEGKc/FeDN3w="}],"description":"Line striping on NY 19A both directions South Genesee Street; NY 19; START ROUTE NY 19A; West Main Street; Fillmore (Hume) to CR 27; Rossburg (Hume) 1 Lane 2 way flaggers, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 05:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:11:14Z"},"road_event_id":"Ckmt0O30RGKvnIhs11tfOcUW1yg=","beginning_cross_street":"South Genesee Street; NY 19; START ROUTE NY 19A; West Main Street; Fillmore","ending_cross_street":"CR 27; Rossburg","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T09:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.112092,42.465974]]}},{"id":"ucY4D7QVYUVEpWGgEGKc/FeDN3w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ckmt0O30RGKvnIhs11tfOcUW1yg="},{"type":"next-occurrence","id":"BVBWx5OKOUk3zCFce2epwNbd7Bo="}],"description":"Line striping on NY 19A both directions South Genesee Street; NY 19; START ROUTE NY 19A; West Main Street; Fillmore (Hume) to CR 27; Rossburg (Hume) 1 Lane 2 way flaggers, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 05:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:11:14Z"},"road_event_id":"ucY4D7QVYUVEpWGgEGKc/FeDN3w=","beginning_cross_street":"South Genesee Street; NY 19; START ROUTE NY 19A; West Main Street; Fillmore","ending_cross_street":"CR 27; Rossburg","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T09:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.112092,42.465974]]}},{"id":"BVBWx5OKOUk3zCFce2epwNbd7Bo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ckmt0O30RGKvnIhs11tfOcUW1yg="},{"type":"next-occurrence","id":"2noZJ3OLGu2RuF0nhTdszcohELk="}],"description":"Line striping on NY 19A both directions South Genesee Street; NY 19; START ROUTE NY 19A; West Main Street; Fillmore (Hume) to CR 27; Rossburg (Hume) 1 Lane 2 way flaggers, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 05:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:11:14Z"},"road_event_id":"BVBWx5OKOUk3zCFce2epwNbd7Bo=","beginning_cross_street":"South Genesee Street; NY 19; START ROUTE NY 19A; West Main Street; Fillmore","ending_cross_street":"CR 27; Rossburg","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T09:00:00Z","end_date":"2026-06-07T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.112092,42.465974]]}},{"id":"2noZJ3OLGu2RuF0nhTdszcohELk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ckmt0O30RGKvnIhs11tfOcUW1yg="},{"type":"next-occurrence","id":"GFrigvOQTmOXBhSUuKYKw1isUCk="}],"description":"Line striping on NY 19A both directions South Genesee Street; NY 19; START ROUTE NY 19A; West Main Street; Fillmore (Hume) to CR 27; Rossburg (Hume) 1 Lane 2 way flaggers, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 05:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:11:14Z"},"road_event_id":"2noZJ3OLGu2RuF0nhTdszcohELk=","beginning_cross_street":"South Genesee Street; NY 19; START ROUTE NY 19A; West Main Street; Fillmore","ending_cross_street":"CR 27; Rossburg","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T09:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.112092,42.465974]]}},{"id":"GFrigvOQTmOXBhSUuKYKw1isUCk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ckmt0O30RGKvnIhs11tfOcUW1yg="},{"type":"next-occurrence","id":"YWvPQ5gIErcr7ZrG+HY9QvXHJU8="}],"description":"Line striping on NY 19A both directions South Genesee Street; NY 19; START ROUTE NY 19A; West Main Street; Fillmore (Hume) to CR 27; Rossburg (Hume) 1 Lane 2 way flaggers, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 05:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:11:14Z"},"road_event_id":"GFrigvOQTmOXBhSUuKYKw1isUCk=","beginning_cross_street":"South Genesee Street; NY 19; START ROUTE NY 19A; West Main Street; Fillmore","ending_cross_street":"CR 27; Rossburg","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T09:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.112092,42.465974]]}},{"id":"YWvPQ5gIErcr7ZrG+HY9QvXHJU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ckmt0O30RGKvnIhs11tfOcUW1yg="},{"type":"next-occurrence","id":"uMM4OVSSdOjrKGRjbAdtAHJMifg="}],"description":"Line striping on NY 19A both directions South Genesee Street; NY 19; START ROUTE NY 19A; West Main Street; Fillmore (Hume) to CR 27; Rossburg (Hume) 1 Lane 2 way flaggers, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 05:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:11:14Z"},"road_event_id":"YWvPQ5gIErcr7ZrG+HY9QvXHJU8=","beginning_cross_street":"South Genesee Street; NY 19; START ROUTE NY 19A; West Main Street; Fillmore","ending_cross_street":"CR 27; Rossburg","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T09:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.112092,42.465974]]}},{"id":"uMM4OVSSdOjrKGRjbAdtAHJMifg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ckmt0O30RGKvnIhs11tfOcUW1yg="},{"type":"next-occurrence","id":"ZBav5L+LJm3viosUOSH/8E6ktVw="}],"description":"Line striping on NY 19A both directions South Genesee Street; NY 19; START ROUTE NY 19A; West Main Street; Fillmore (Hume) to CR 27; Rossburg (Hume) 1 Lane 2 way flaggers, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 05:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:11:14Z"},"road_event_id":"uMM4OVSSdOjrKGRjbAdtAHJMifg=","beginning_cross_street":"South Genesee Street; NY 19; START ROUTE NY 19A; West Main Street; Fillmore","ending_cross_street":"CR 27; Rossburg","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T09:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.112092,42.465974]]}},{"id":"ZBav5L+LJm3viosUOSH/8E6ktVw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ckmt0O30RGKvnIhs11tfOcUW1yg="}],"description":"Line striping on NY 19A both directions South Genesee Street; NY 19; START ROUTE NY 19A; West Main Street; Fillmore (Hume) to CR 27; Rossburg (Hume) 1 Lane 2 way flaggers, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 05:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:11:14Z"},"road_event_id":"ZBav5L+LJm3viosUOSH/8E6ktVw=","beginning_cross_street":"South Genesee Street; NY 19; START ROUTE NY 19A; West Main Street; Fillmore","ending_cross_street":"CR 27; Rossburg","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T09:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.112092,42.465974]]}},{"id":"pZF0igysZr6gbcvaQ0tC7p+nMIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gTZDTlvcWVXGM2ILZGiCcQvwyYY="}],"description":"Guard rail repairs on NY 22 both directions between Close Hill Road (North Salem) and US 202 (North Salem) D265183/NIGHT/32767909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 08:00 PM thru 05:00 PM, alternating traffic","update_date":"2026-06-03T18:13:39Z"},"road_event_id":"pZF0igysZr6gbcvaQ0tC7p+nMIk=","beginning_cross_street":"Close Hill Road","ending_cross_street":"US 202","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.657374,41.22141]]}},{"id":"gTZDTlvcWVXGM2ILZGiCcQvwyYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pZF0igysZr6gbcvaQ0tC7p+nMIk="},{"type":"next-occurrence","id":"QQGSTdr/yIDTaC2ACT1KxtXovGg="}],"description":"Guard rail repairs on NY 22 both directions between Close Hill Road (North Salem) and US 202 (North Salem) D265183/NIGHT/32767909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 08:00 PM thru 05:00 PM, alternating traffic","update_date":"2026-06-03T18:13:39Z"},"road_event_id":"gTZDTlvcWVXGM2ILZGiCcQvwyYY=","beginning_cross_street":"Close Hill Road","ending_cross_street":"US 202","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.657374,41.22141]]}},{"id":"QQGSTdr/yIDTaC2ACT1KxtXovGg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pZF0igysZr6gbcvaQ0tC7p+nMIk="},{"type":"next-occurrence","id":"9cSjZpi7w5KAAh6+ulgKLOp6hrs="}],"description":"Guard rail repairs on NY 22 both directions between Close Hill Road (North Salem) and US 202 (North Salem) D265183/NIGHT/32767909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 08:00 PM thru 05:00 PM, alternating traffic","update_date":"2026-06-03T18:13:39Z"},"road_event_id":"QQGSTdr/yIDTaC2ACT1KxtXovGg=","beginning_cross_street":"Close Hill Road","ending_cross_street":"US 202","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.657374,41.22141]]}},{"id":"9cSjZpi7w5KAAh6+ulgKLOp6hrs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pZF0igysZr6gbcvaQ0tC7p+nMIk="},{"type":"next-occurrence","id":"kMOY5CQ3PhnP1D2v6RN4Lz6mcd4="}],"description":"Guard rail repairs on NY 22 both directions between Close Hill Road (North Salem) and US 202 (North Salem) D265183/NIGHT/32767909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 08:00 PM thru 05:00 PM, alternating traffic","update_date":"2026-06-03T18:13:39Z"},"road_event_id":"9cSjZpi7w5KAAh6+ulgKLOp6hrs=","beginning_cross_street":"Close Hill Road","ending_cross_street":"US 202","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.657374,41.22141]]}},{"id":"kMOY5CQ3PhnP1D2v6RN4Lz6mcd4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pZF0igysZr6gbcvaQ0tC7p+nMIk="}],"description":"Guard rail repairs on NY 22 both directions between Close Hill Road (North Salem) and US 202 (North Salem) D265183/NIGHT/32767909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 08:00 PM thru 05:00 PM, alternating traffic","update_date":"2026-06-03T18:13:39Z"},"road_event_id":"kMOY5CQ3PhnP1D2v6RN4Lz6mcd4=","beginning_cross_street":"Close Hill Road","ending_cross_street":"US 202","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.657374,41.22141]]}},{"id":"xVw04DQXvhw9q4VVTCAY4bxxVTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FR2R9j5CL5nrErGi2ANeg/wJ1HE="}],"description":"Guard rail repairs on Taconic State Parkway southbound between Exit 17B - Bear Mountain State Parkway (Yorktown) and Exit 17A - US 202 - NY 35 - Crompond Road (Yorktown) D265183/DAY/32419509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 06:00 PM, right lane closures","update_date":"2026-06-03T18:18:58Z"},"road_event_id":"xVw04DQXvhw9q4VVTCAY4bxxVTk=","beginning_cross_street":"Exit 17B - Bear Mountain State Parkway","ending_cross_street":"Exit 17A - US 202 - NY 35 - Crompond Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822597,41.295454]]}},{"id":"FR2R9j5CL5nrErGi2ANeg/wJ1HE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xVw04DQXvhw9q4VVTCAY4bxxVTk="},{"type":"next-occurrence","id":"r54f+NNLD4R2Yq8p27N64PgBkC8="}],"description":"Guard rail repairs on Taconic State Parkway southbound between Exit 17B - Bear Mountain State Parkway (Yorktown) and Exit 17A - US 202 - NY 35 - Crompond Road (Yorktown) D265183/DAY/32419509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 06:00 PM, right lane closures","update_date":"2026-06-03T18:18:58Z"},"road_event_id":"FR2R9j5CL5nrErGi2ANeg/wJ1HE=","beginning_cross_street":"Exit 17B - Bear Mountain State Parkway","ending_cross_street":"Exit 17A - US 202 - NY 35 - Crompond Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822597,41.295454]]}},{"id":"r54f+NNLD4R2Yq8p27N64PgBkC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xVw04DQXvhw9q4VVTCAY4bxxVTk="},{"type":"next-occurrence","id":"zaVPT0LezNlmfmEZUYMt7BhJ1jE="}],"description":"Guard rail repairs on Taconic State Parkway southbound between Exit 17B - Bear Mountain State Parkway (Yorktown) and Exit 17A - US 202 - NY 35 - Crompond Road (Yorktown) D265183/DAY/32419509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 06:00 PM, right lane closures","update_date":"2026-06-03T18:18:58Z"},"road_event_id":"r54f+NNLD4R2Yq8p27N64PgBkC8=","beginning_cross_street":"Exit 17B - Bear Mountain State Parkway","ending_cross_street":"Exit 17A - US 202 - NY 35 - Crompond Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822597,41.295454]]}},{"id":"zaVPT0LezNlmfmEZUYMt7BhJ1jE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xVw04DQXvhw9q4VVTCAY4bxxVTk="},{"type":"next-occurrence","id":"EamgKb5WMS/oya74lSJZma807sA="}],"description":"Guard rail repairs on Taconic State Parkway southbound between Exit 17B - Bear Mountain State Parkway (Yorktown) and Exit 17A - US 202 - NY 35 - Crompond Road (Yorktown) D265183/DAY/32419509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 06:00 PM, right lane closures","update_date":"2026-06-03T18:18:58Z"},"road_event_id":"zaVPT0LezNlmfmEZUYMt7BhJ1jE=","beginning_cross_street":"Exit 17B - Bear Mountain State Parkway","ending_cross_street":"Exit 17A - US 202 - NY 35 - Crompond Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822597,41.295454]]}},{"id":"EamgKb5WMS/oya74lSJZma807sA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xVw04DQXvhw9q4VVTCAY4bxxVTk="}],"description":"Guard rail repairs on Taconic State Parkway southbound between Exit 17B - Bear Mountain State Parkway (Yorktown) and Exit 17A - US 202 - NY 35 - Crompond Road (Yorktown) D265183/DAY/32419509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 06:00 PM, right lane closures","update_date":"2026-06-03T18:18:58Z"},"road_event_id":"EamgKb5WMS/oya74lSJZma807sA=","beginning_cross_street":"Exit 17B - Bear Mountain State Parkway","ending_cross_street":"Exit 17A - US 202 - NY 35 - Crompond Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822597,41.295454]]}},{"id":"gzDo85TiADdx6eEnduoiISuvbDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XdJdlC3viG8xJAmA1wzF3driK8M="}],"description":"Line striping on NY 19 both directions Town of Hume; Town of Caneadea Line (Hume) Mobile Work zone \" Caution Wet Paint\", Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:16:48Z"},"road_event_id":"gzDo85TiADdx6eEnduoiISuvbDU=","beginning_cross_street":"Town of Hume; Town of Caneadea Line","ending_cross_street":"Town of Hume; Town of Caneadea Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.149777,42.427256]]}},{"id":"XdJdlC3viG8xJAmA1wzF3driK8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gzDo85TiADdx6eEnduoiISuvbDU="},{"type":"next-occurrence","id":"b9/tDudbUGnfOIJRevxQgVAAQ3I="}],"description":"Line striping on NY 19 both directions Town of Hume; Town of Caneadea Line (Hume) Mobile Work zone \" Caution Wet Paint\", Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:16:48Z"},"road_event_id":"XdJdlC3viG8xJAmA1wzF3driK8M=","beginning_cross_street":"Town of Hume; Town of Caneadea Line","ending_cross_street":"Town of Hume; Town of Caneadea Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.149777,42.427256]]}},{"id":"b9/tDudbUGnfOIJRevxQgVAAQ3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gzDo85TiADdx6eEnduoiISuvbDU="},{"type":"next-occurrence","id":"6PNqwU1+XBb/IliUkb9B9Y9AnGM="}],"description":"Line striping on NY 19 both directions Town of Hume; Town of Caneadea Line (Hume) Mobile Work zone \" Caution Wet Paint\", Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:16:48Z"},"road_event_id":"b9/tDudbUGnfOIJRevxQgVAAQ3I=","beginning_cross_street":"Town of Hume; Town of Caneadea Line","ending_cross_street":"Town of Hume; Town of Caneadea Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T10:00:00Z","end_date":"2026-06-07T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.149777,42.427256]]}},{"id":"6PNqwU1+XBb/IliUkb9B9Y9AnGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gzDo85TiADdx6eEnduoiISuvbDU="},{"type":"next-occurrence","id":"NFyXBDptplflX1yTfl9TLLTRpz8="}],"description":"Line striping on NY 19 both directions Town of Hume; Town of Caneadea Line (Hume) Mobile Work zone \" Caution Wet Paint\", Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:16:48Z"},"road_event_id":"6PNqwU1+XBb/IliUkb9B9Y9AnGM=","beginning_cross_street":"Town of Hume; Town of Caneadea Line","ending_cross_street":"Town of Hume; Town of Caneadea Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.149777,42.427256]]}},{"id":"NFyXBDptplflX1yTfl9TLLTRpz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gzDo85TiADdx6eEnduoiISuvbDU="},{"type":"next-occurrence","id":"G7S0u1omcCqGC2WKfHg/xee9a6U="}],"description":"Line striping on NY 19 both directions Town of Hume; Town of Caneadea Line (Hume) Mobile Work zone \" Caution Wet Paint\", Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:16:48Z"},"road_event_id":"NFyXBDptplflX1yTfl9TLLTRpz8=","beginning_cross_street":"Town of Hume; Town of Caneadea Line","ending_cross_street":"Town of Hume; Town of Caneadea Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.149777,42.427256]]}},{"id":"G7S0u1omcCqGC2WKfHg/xee9a6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gzDo85TiADdx6eEnduoiISuvbDU="},{"type":"next-occurrence","id":"VTkZ1iabjZzt1qX8ghb/u1IZbss="}],"description":"Line striping on NY 19 both directions Town of Hume; Town of Caneadea Line (Hume) Mobile Work zone \" Caution Wet Paint\", Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:16:48Z"},"road_event_id":"G7S0u1omcCqGC2WKfHg/xee9a6U=","beginning_cross_street":"Town of Hume; Town of Caneadea Line","ending_cross_street":"Town of Hume; Town of Caneadea Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.149777,42.427256]]}},{"id":"VTkZ1iabjZzt1qX8ghb/u1IZbss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gzDo85TiADdx6eEnduoiISuvbDU="},{"type":"next-occurrence","id":"/XuAzo+Js9HerFPBDesYX8vlPYQ="}],"description":"Line striping on NY 19 both directions Town of Hume; Town of Caneadea Line (Hume) Mobile Work zone \" Caution Wet Paint\", Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:16:48Z"},"road_event_id":"VTkZ1iabjZzt1qX8ghb/u1IZbss=","beginning_cross_street":"Town of Hume; Town of Caneadea Line","ending_cross_street":"Town of Hume; Town of Caneadea Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.149777,42.427256]]}},{"id":"/XuAzo+Js9HerFPBDesYX8vlPYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gzDo85TiADdx6eEnduoiISuvbDU="}],"description":"Line striping on NY 19 both directions Town of Hume; Town of Caneadea Line (Hume) Mobile Work zone \" Caution Wet Paint\", Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:16:48Z"},"road_event_id":"/XuAzo+Js9HerFPBDesYX8vlPYQ=","beginning_cross_street":"Town of Hume; Town of Caneadea Line","ending_cross_street":"Town of Hume; Town of Caneadea Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.149777,42.427256]]}},{"id":"kLRkDyZLRLXIYicVY+/KJ8OH2dI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANSON PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OZ4lbLl7E+guF2AnL/s6F/bk8c0="}],"description":"Construction on HANSON PL eastbound ST FELIX ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-03T18:19:11Z"},"road_event_id":"kLRkDyZLRLXIYicVY+/KJ8OH2dI=","beginning_cross_street":"ST FELIX ST","ending_cross_street":"ST FELIX ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977938,40.685063]]}},{"id":"OZ4lbLl7E+guF2AnL/s6F/bk8c0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLRkDyZLRLXIYicVY+/KJ8OH2dI="},{"type":"next-occurrence","id":"mMLg1P/LsIQMK1YIkP6VDpVtzJY="}],"description":"Construction on HANSON PL eastbound ST FELIX ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-03T18:19:11Z"},"road_event_id":"OZ4lbLl7E+guF2AnL/s6F/bk8c0=","beginning_cross_street":"ST FELIX ST","ending_cross_street":"ST FELIX ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T03:00:00Z","end_date":"2026-06-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977938,40.685063]]}},{"id":"mMLg1P/LsIQMK1YIkP6VDpVtzJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLRkDyZLRLXIYicVY+/KJ8OH2dI="},{"type":"next-occurrence","id":"CL/U/Pc2sFFKh1+5hV/mDgZG9aA="}],"description":"Construction on HANSON PL eastbound ST FELIX ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-03T18:19:11Z"},"road_event_id":"mMLg1P/LsIQMK1YIkP6VDpVtzJY=","beginning_cross_street":"ST FELIX ST","ending_cross_street":"ST FELIX ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T03:00:00Z","end_date":"2026-06-08T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977938,40.685063]]}},{"id":"CL/U/Pc2sFFKh1+5hV/mDgZG9aA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLRkDyZLRLXIYicVY+/KJ8OH2dI="},{"type":"next-occurrence","id":"Th7qcsT3eyiOvMOOhMmBfqLIjKE="}],"description":"Construction on HANSON PL eastbound ST FELIX ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-03T18:19:11Z"},"road_event_id":"CL/U/Pc2sFFKh1+5hV/mDgZG9aA=","beginning_cross_street":"ST FELIX ST","ending_cross_street":"ST FELIX ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T03:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977938,40.685063]]}},{"id":"Th7qcsT3eyiOvMOOhMmBfqLIjKE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLRkDyZLRLXIYicVY+/KJ8OH2dI="},{"type":"next-occurrence","id":"yyke58yesL+m2LaIYOTEqb9NkYs="}],"description":"Construction on HANSON PL eastbound ST FELIX ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-03T18:19:11Z"},"road_event_id":"Th7qcsT3eyiOvMOOhMmBfqLIjKE=","beginning_cross_street":"ST FELIX ST","ending_cross_street":"ST FELIX ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T03:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977938,40.685063]]}},{"id":"yyke58yesL+m2LaIYOTEqb9NkYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLRkDyZLRLXIYicVY+/KJ8OH2dI="},{"type":"next-occurrence","id":"4QODQFq5BzqBIy8xvS8gumd38Go="}],"description":"Construction on HANSON PL eastbound ST FELIX ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-03T18:19:11Z"},"road_event_id":"yyke58yesL+m2LaIYOTEqb9NkYs=","beginning_cross_street":"ST FELIX ST","ending_cross_street":"ST FELIX ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T03:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977938,40.685063]]}},{"id":"4QODQFq5BzqBIy8xvS8gumd38Go=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLRkDyZLRLXIYicVY+/KJ8OH2dI="},{"type":"next-occurrence","id":"tr7ikiGe9V8tj4hppsV6uFtB2oU="}],"description":"Construction on HANSON PL eastbound ST FELIX ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-03T18:19:11Z"},"road_event_id":"4QODQFq5BzqBIy8xvS8gumd38Go=","beginning_cross_street":"ST FELIX ST","ending_cross_street":"ST FELIX ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T03:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977938,40.685063]]}},{"id":"tr7ikiGe9V8tj4hppsV6uFtB2oU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLRkDyZLRLXIYicVY+/KJ8OH2dI="},{"type":"next-occurrence","id":"xa5HgVwI3zC+lWHmx0+HBR9a9m4="}],"description":"Construction on HANSON PL eastbound ST FELIX ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-03T18:19:11Z"},"road_event_id":"tr7ikiGe9V8tj4hppsV6uFtB2oU=","beginning_cross_street":"ST FELIX ST","ending_cross_street":"ST FELIX ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T03:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977938,40.685063]]}},{"id":"xa5HgVwI3zC+lWHmx0+HBR9a9m4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLRkDyZLRLXIYicVY+/KJ8OH2dI="},{"type":"next-occurrence","id":"j+JAhY11eMo5rwPDV3Un2HpPOvw="}],"description":"Construction on HANSON PL eastbound ST FELIX ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-03T18:19:11Z"},"road_event_id":"xa5HgVwI3zC+lWHmx0+HBR9a9m4=","beginning_cross_street":"ST FELIX ST","ending_cross_street":"ST FELIX ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T03:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977938,40.685063]]}},{"id":"j+JAhY11eMo5rwPDV3Un2HpPOvw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLRkDyZLRLXIYicVY+/KJ8OH2dI="},{"type":"next-occurrence","id":"JdbIHR3Bf7ABXmrmi2ESsckRJ+A="}],"description":"Construction on HANSON PL eastbound ST FELIX ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-03T18:19:11Z"},"road_event_id":"j+JAhY11eMo5rwPDV3Un2HpPOvw=","beginning_cross_street":"ST FELIX ST","ending_cross_street":"ST FELIX ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T03:00:00Z","end_date":"2026-06-15T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977938,40.685063]]}},{"id":"JdbIHR3Bf7ABXmrmi2ESsckRJ+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLRkDyZLRLXIYicVY+/KJ8OH2dI="},{"type":"next-occurrence","id":"ekbkXeNGZgor2+nz4Mqrf7tb4AA="}],"description":"Construction on HANSON PL eastbound ST FELIX ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-03T18:19:11Z"},"road_event_id":"JdbIHR3Bf7ABXmrmi2ESsckRJ+A=","beginning_cross_street":"ST FELIX ST","ending_cross_street":"ST FELIX ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T03:00:00Z","end_date":"2026-06-16T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977938,40.685063]]}},{"id":"ekbkXeNGZgor2+nz4Mqrf7tb4AA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLRkDyZLRLXIYicVY+/KJ8OH2dI="},{"type":"next-occurrence","id":"OnlsTbYu51gc8UqqPk+rKza0eZo="}],"description":"Construction on HANSON PL eastbound ST FELIX ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-03T18:19:11Z"},"road_event_id":"ekbkXeNGZgor2+nz4Mqrf7tb4AA=","beginning_cross_street":"ST FELIX ST","ending_cross_street":"ST FELIX ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T03:00:00Z","end_date":"2026-06-17T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977938,40.685063]]}},{"id":"OnlsTbYu51gc8UqqPk+rKza0eZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLRkDyZLRLXIYicVY+/KJ8OH2dI="},{"type":"next-occurrence","id":"aubwxHOsgdATvSRpmxYKpR0i0wo="}],"description":"Construction on HANSON PL eastbound ST FELIX ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-03T18:19:11Z"},"road_event_id":"OnlsTbYu51gc8UqqPk+rKza0eZo=","beginning_cross_street":"ST FELIX ST","ending_cross_street":"ST FELIX ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T03:00:00Z","end_date":"2026-06-18T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977938,40.685063]]}},{"id":"aubwxHOsgdATvSRpmxYKpR0i0wo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLRkDyZLRLXIYicVY+/KJ8OH2dI="},{"type":"next-occurrence","id":"6tY8CO++zzBIp6aTvE9u8oSeCIs="}],"description":"Construction on HANSON PL eastbound ST FELIX ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-03T18:19:11Z"},"road_event_id":"aubwxHOsgdATvSRpmxYKpR0i0wo=","beginning_cross_street":"ST FELIX ST","ending_cross_street":"ST FELIX ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T03:00:00Z","end_date":"2026-06-19T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977938,40.685063]]}},{"id":"6tY8CO++zzBIp6aTvE9u8oSeCIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HANSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLRkDyZLRLXIYicVY+/KJ8OH2dI="}],"description":"Construction on HANSON PL eastbound ST FELIX ST (New York), Wednesday June 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-03T18:19:11Z"},"road_event_id":"6tY8CO++zzBIp6aTvE9u8oSeCIs=","beginning_cross_street":"ST FELIX ST","ending_cross_street":"ST FELIX ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-20T03:00:00Z","end_date":"2026-06-20T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977938,40.685063]]}},{"id":"ojDeUa+y0sGXBTu3PZt3LfqVZyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"x4Ilj7dSlgFzMa2a/GOMX842QZg="}],"description":"Line striping on NY 19 both directions North Genesee Street; NY 19A (Hume) Mobile Work zone \"Caution Wet Paint\" 1 Lane 2 way flagger, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:22:20Z"},"road_event_id":"ojDeUa+y0sGXBTu3PZt3LfqVZyk=","beginning_cross_street":"North Genesee Street; NY 19A","ending_cross_street":"North Genesee Street; NY 19A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.112347,42.465783]]}},{"id":"x4Ilj7dSlgFzMa2a/GOMX842QZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojDeUa+y0sGXBTu3PZt3LfqVZyk="},{"type":"next-occurrence","id":"c/TxTiSi2I7ssLdPTRqN+XIOlrY="}],"description":"Line striping on NY 19 both directions North Genesee Street; NY 19A (Hume) Mobile Work zone \"Caution Wet Paint\" 1 Lane 2 way flagger, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:22:20Z"},"road_event_id":"x4Ilj7dSlgFzMa2a/GOMX842QZg=","beginning_cross_street":"North Genesee Street; NY 19A","ending_cross_street":"North Genesee Street; NY 19A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.112347,42.465783]]}},{"id":"c/TxTiSi2I7ssLdPTRqN+XIOlrY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojDeUa+y0sGXBTu3PZt3LfqVZyk="},{"type":"next-occurrence","id":"jsHGwr2Y+HxnptyYx2SaUn4h2wI="}],"description":"Line striping on NY 19 both directions North Genesee Street; NY 19A (Hume) Mobile Work zone \"Caution Wet Paint\" 1 Lane 2 way flagger, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:22:20Z"},"road_event_id":"c/TxTiSi2I7ssLdPTRqN+XIOlrY=","beginning_cross_street":"North Genesee Street; NY 19A","ending_cross_street":"North Genesee Street; NY 19A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T10:00:00Z","end_date":"2026-06-07T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.112347,42.465783]]}},{"id":"jsHGwr2Y+HxnptyYx2SaUn4h2wI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojDeUa+y0sGXBTu3PZt3LfqVZyk="},{"type":"next-occurrence","id":"saQDOU7WW7i9I7dQR0AQBM/Z16U="}],"description":"Line striping on NY 19 both directions North Genesee Street; NY 19A (Hume) Mobile Work zone \"Caution Wet Paint\" 1 Lane 2 way flagger, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:22:20Z"},"road_event_id":"jsHGwr2Y+HxnptyYx2SaUn4h2wI=","beginning_cross_street":"North Genesee Street; NY 19A","ending_cross_street":"North Genesee Street; NY 19A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.112347,42.465783]]}},{"id":"saQDOU7WW7i9I7dQR0AQBM/Z16U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojDeUa+y0sGXBTu3PZt3LfqVZyk="},{"type":"next-occurrence","id":"ZtZM1jnKehUC+NFvaUb+puO62jc="}],"description":"Line striping on NY 19 both directions North Genesee Street; NY 19A (Hume) Mobile Work zone \"Caution Wet Paint\" 1 Lane 2 way flagger, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:22:20Z"},"road_event_id":"saQDOU7WW7i9I7dQR0AQBM/Z16U=","beginning_cross_street":"North Genesee Street; NY 19A","ending_cross_street":"North Genesee Street; NY 19A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.112347,42.465783]]}},{"id":"ZtZM1jnKehUC+NFvaUb+puO62jc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojDeUa+y0sGXBTu3PZt3LfqVZyk="},{"type":"next-occurrence","id":"w3IwHIoXRLscfKzfnoy1HCm0F6g="}],"description":"Line striping on NY 19 both directions North Genesee Street; NY 19A (Hume) Mobile Work zone \"Caution Wet Paint\" 1 Lane 2 way flagger, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:22:20Z"},"road_event_id":"ZtZM1jnKehUC+NFvaUb+puO62jc=","beginning_cross_street":"North Genesee Street; NY 19A","ending_cross_street":"North Genesee Street; NY 19A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.112347,42.465783]]}},{"id":"w3IwHIoXRLscfKzfnoy1HCm0F6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojDeUa+y0sGXBTu3PZt3LfqVZyk="},{"type":"next-occurrence","id":"HN+y7zNabzVRTaksYJDisQkyDMI="}],"description":"Line striping on NY 19 both directions North Genesee Street; NY 19A (Hume) Mobile Work zone \"Caution Wet Paint\" 1 Lane 2 way flagger, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:22:20Z"},"road_event_id":"w3IwHIoXRLscfKzfnoy1HCm0F6g=","beginning_cross_street":"North Genesee Street; NY 19A","ending_cross_street":"North Genesee Street; NY 19A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.112347,42.465783]]}},{"id":"HN+y7zNabzVRTaksYJDisQkyDMI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ojDeUa+y0sGXBTu3PZt3LfqVZyk="}],"description":"Line striping on NY 19 both directions North Genesee Street; NY 19A (Hume) Mobile Work zone \"Caution Wet Paint\" 1 Lane 2 way flagger, Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:22:20Z"},"road_event_id":"HN+y7zNabzVRTaksYJDisQkyDMI=","beginning_cross_street":"North Genesee Street; NY 19A","ending_cross_street":"North Genesee Street; NY 19A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.112347,42.465783]]}},{"id":"BNCw+ZiYtPOLodC27VcO1PNSj+U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"D1DVukzrE0D0OhGW9fm/zPALqk8="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York), Wednesday June 3rd, 2026 thru Wednesday July 1st, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:29:52Z"},"road_event_id":"BNCw+ZiYtPOLodC27VcO1PNSj+U=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998131,40.684601]]}},{"id":"D1DVukzrE0D0OhGW9fm/zPALqk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BNCw+ZiYtPOLodC27VcO1PNSj+U="},{"type":"next-occurrence","id":"9ZJOV5ZFULuNInFyv1MWZDmfAqE="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York), Wednesday June 3rd, 2026 thru Wednesday July 1st, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:29:52Z"},"road_event_id":"D1DVukzrE0D0OhGW9fm/zPALqk8=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998131,40.684601]]}},{"id":"9ZJOV5ZFULuNInFyv1MWZDmfAqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BNCw+ZiYtPOLodC27VcO1PNSj+U="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York), Wednesday June 3rd, 2026 thru Wednesday July 1st, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:29:52Z"},"road_event_id":"9ZJOV5ZFULuNInFyv1MWZDmfAqE=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998131,40.684601]]}},{"id":"EBcrjQMCgerLpS3I6+PyQl4GIkY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CvAZMMFy5FAb/DEctVsYRSa5Ftg="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York), Wednesday June 3rd, 2026 thru Monday June 29th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:34:06Z"},"road_event_id":"EBcrjQMCgerLpS3I6+PyQl4GIkY=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984615,40.679614]]}},{"id":"CvAZMMFy5FAb/DEctVsYRSa5Ftg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EBcrjQMCgerLpS3I6+PyQl4GIkY="},{"type":"next-occurrence","id":"7SylKHU/Gcnr8EOc5g2IImbflwk="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York), Wednesday June 3rd, 2026 thru Monday June 29th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:34:06Z"},"road_event_id":"CvAZMMFy5FAb/DEctVsYRSa5Ftg=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984615,40.679614]]}},{"id":"7SylKHU/Gcnr8EOc5g2IImbflwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EBcrjQMCgerLpS3I6+PyQl4GIkY="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York), Wednesday June 3rd, 2026 thru Monday June 29th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:34:06Z"},"road_event_id":"7SylKHU/Gcnr8EOc5g2IImbflwk=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984615,40.679614]]}},{"id":"RuPPgfOolMjGL3G4Ea5nzgqXzCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xv6Pvz3g41yS+pkY6KOdnjlcgKI="}],"description":"Line striping on NY 19 both directions CR 26 (Belfast) to NY 305 (Belfast) Mobile Zone \"Caution Wet Paint\", Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:36:38Z"},"road_event_id":"RuPPgfOolMjGL3G4Ea5nzgqXzCU=","beginning_cross_street":"CR 26","ending_cross_street":"NY 305","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.11518,42.344837]]}},{"id":"xv6Pvz3g41yS+pkY6KOdnjlcgKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RuPPgfOolMjGL3G4Ea5nzgqXzCU="},{"type":"next-occurrence","id":"mvna4BmPjbPWdoNpZyk5+9xBD7k="}],"description":"Line striping on NY 19 both directions CR 26 (Belfast) to NY 305 (Belfast) Mobile Zone \"Caution Wet Paint\", Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:36:38Z"},"road_event_id":"xv6Pvz3g41yS+pkY6KOdnjlcgKI=","beginning_cross_street":"CR 26","ending_cross_street":"NY 305","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.11518,42.344837]]}},{"id":"mvna4BmPjbPWdoNpZyk5+9xBD7k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RuPPgfOolMjGL3G4Ea5nzgqXzCU="},{"type":"next-occurrence","id":"du+lZrLLQOUwtqns7rHT6SxiGnw="}],"description":"Line striping on NY 19 both directions CR 26 (Belfast) to NY 305 (Belfast) Mobile Zone \"Caution Wet Paint\", Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:36:38Z"},"road_event_id":"mvna4BmPjbPWdoNpZyk5+9xBD7k=","beginning_cross_street":"CR 26","ending_cross_street":"NY 305","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T10:00:00Z","end_date":"2026-06-07T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.11518,42.344837]]}},{"id":"du+lZrLLQOUwtqns7rHT6SxiGnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RuPPgfOolMjGL3G4Ea5nzgqXzCU="},{"type":"next-occurrence","id":"PvVtlDATOcTdAfuE+01Ei+q1IB8="}],"description":"Line striping on NY 19 both directions CR 26 (Belfast) to NY 305 (Belfast) Mobile Zone \"Caution Wet Paint\", Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:36:38Z"},"road_event_id":"du+lZrLLQOUwtqns7rHT6SxiGnw=","beginning_cross_street":"CR 26","ending_cross_street":"NY 305","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.11518,42.344837]]}},{"id":"PvVtlDATOcTdAfuE+01Ei+q1IB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RuPPgfOolMjGL3G4Ea5nzgqXzCU="},{"type":"next-occurrence","id":"LnjqFtgrVOHw1B17SXZkzBJldJ8="}],"description":"Line striping on NY 19 both directions CR 26 (Belfast) to NY 305 (Belfast) Mobile Zone \"Caution Wet Paint\", Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:36:38Z"},"road_event_id":"PvVtlDATOcTdAfuE+01Ei+q1IB8=","beginning_cross_street":"CR 26","ending_cross_street":"NY 305","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.11518,42.344837]]}},{"id":"LnjqFtgrVOHw1B17SXZkzBJldJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RuPPgfOolMjGL3G4Ea5nzgqXzCU="},{"type":"next-occurrence","id":"BBSeeFKWbW6QadNuOgIkvAEXSMw="}],"description":"Line striping on NY 19 both directions CR 26 (Belfast) to NY 305 (Belfast) Mobile Zone \"Caution Wet Paint\", Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:36:38Z"},"road_event_id":"LnjqFtgrVOHw1B17SXZkzBJldJ8=","beginning_cross_street":"CR 26","ending_cross_street":"NY 305","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.11518,42.344837]]}},{"id":"BBSeeFKWbW6QadNuOgIkvAEXSMw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RuPPgfOolMjGL3G4Ea5nzgqXzCU="},{"type":"next-occurrence","id":"tS+yNiVS5Ebs8I+Sot2HmMp8/fw="}],"description":"Line striping on NY 19 both directions CR 26 (Belfast) to NY 305 (Belfast) Mobile Zone \"Caution Wet Paint\", Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:36:38Z"},"road_event_id":"BBSeeFKWbW6QadNuOgIkvAEXSMw=","beginning_cross_street":"CR 26","ending_cross_street":"NY 305","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.11518,42.344837]]}},{"id":"tS+yNiVS5Ebs8I+Sot2HmMp8/fw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RuPPgfOolMjGL3G4Ea5nzgqXzCU="}],"description":"Line striping on NY 19 both directions CR 26 (Belfast) to NY 305 (Belfast) Mobile Zone \"Caution Wet Paint\", Thursday June 4th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-03T18:36:38Z"},"road_event_id":"tS+yNiVS5Ebs8I+Sot2HmMp8/fw=","beginning_cross_street":"CR 26","ending_cross_street":"NY 305","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.11518,42.344837]]}},{"id":"nVE6TD6P+QZMF9/8u9uXve5S0Tc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sUS0dmXiTzSFGgQoSimBqsCBy4o="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York), Wednesday June 3rd, 2026 thru Monday June 29th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:36:44Z"},"road_event_id":"nVE6TD6P+QZMF9/8u9uXve5S0Tc=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986925,40.679726]]}},{"id":"sUS0dmXiTzSFGgQoSimBqsCBy4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nVE6TD6P+QZMF9/8u9uXve5S0Tc="},{"type":"next-occurrence","id":"M+ZEPHDtqF8D2+lfze43F0UbDHE="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York), Wednesday June 3rd, 2026 thru Monday June 29th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:36:44Z"},"road_event_id":"sUS0dmXiTzSFGgQoSimBqsCBy4o=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986925,40.679726]]}},{"id":"M+ZEPHDtqF8D2+lfze43F0UbDHE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nVE6TD6P+QZMF9/8u9uXve5S0Tc="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York), Wednesday June 3rd, 2026 thru Monday June 29th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:36:44Z"},"road_event_id":"M+ZEPHDtqF8D2+lfze43F0UbDHE=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986925,40.679726]]}},{"id":"HnACFQ7VbGPBQUWTeViSG4kl0L0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["163RD ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"J6zsZ0MAPVBj2Jpf25n1NZTDzX4="}],"description":"Construction on 163RD ST northbound between 89TH AVE (New York) and RT-25 (New York), Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:44:27Z"},"road_event_id":"HnACFQ7VbGPBQUWTeViSG4kl0L0=","beginning_cross_street":"89TH AVE","ending_cross_street":"RT-25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.798308,40.707095]]}},{"id":"J6zsZ0MAPVBj2Jpf25n1NZTDzX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["163RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HnACFQ7VbGPBQUWTeViSG4kl0L0="},{"type":"next-occurrence","id":"pHdUJCbezMnKDSiNmPI4raQYtHU="}],"description":"Construction on 163RD ST northbound between 89TH AVE (New York) and RT-25 (New York), Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:44:27Z"},"road_event_id":"J6zsZ0MAPVBj2Jpf25n1NZTDzX4=","beginning_cross_street":"89TH AVE","ending_cross_street":"RT-25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.798308,40.707095]]}},{"id":"pHdUJCbezMnKDSiNmPI4raQYtHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["163RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HnACFQ7VbGPBQUWTeViSG4kl0L0="},{"type":"next-occurrence","id":"r6NGarChsTLRiARnDmdeYP/pTOo="}],"description":"Construction on 163RD ST northbound between 89TH AVE (New York) and RT-25 (New York), Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:44:27Z"},"road_event_id":"pHdUJCbezMnKDSiNmPI4raQYtHU=","beginning_cross_street":"89TH AVE","ending_cross_street":"RT-25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.798308,40.707095]]}},{"id":"r6NGarChsTLRiARnDmdeYP/pTOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["163RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HnACFQ7VbGPBQUWTeViSG4kl0L0="},{"type":"next-occurrence","id":"eqOePcuz4NVMkRNDawLlgD/FTPA="}],"description":"Construction on 163RD ST northbound between 89TH AVE (New York) and RT-25 (New York), Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:44:27Z"},"road_event_id":"r6NGarChsTLRiARnDmdeYP/pTOo=","beginning_cross_street":"89TH AVE","ending_cross_street":"RT-25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.798308,40.707095]]}},{"id":"eqOePcuz4NVMkRNDawLlgD/FTPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["163RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HnACFQ7VbGPBQUWTeViSG4kl0L0="},{"type":"next-occurrence","id":"WfY0adGFgrPkyU8WKJIxG5mpNbo="}],"description":"Construction on 163RD ST northbound between 89TH AVE (New York) and RT-25 (New York), Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:44:27Z"},"road_event_id":"eqOePcuz4NVMkRNDawLlgD/FTPA=","beginning_cross_street":"89TH AVE","ending_cross_street":"RT-25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.798308,40.707095]]}},{"id":"WfY0adGFgrPkyU8WKJIxG5mpNbo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["163RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HnACFQ7VbGPBQUWTeViSG4kl0L0="},{"type":"next-occurrence","id":"sbtu7o3rZp1sm17p8UzNHRjeq3E="}],"description":"Construction on 163RD ST northbound between 89TH AVE (New York) and RT-25 (New York), Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:44:27Z"},"road_event_id":"WfY0adGFgrPkyU8WKJIxG5mpNbo=","beginning_cross_street":"89TH AVE","ending_cross_street":"RT-25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.798308,40.707095]]}},{"id":"sbtu7o3rZp1sm17p8UzNHRjeq3E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["163RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HnACFQ7VbGPBQUWTeViSG4kl0L0="},{"type":"next-occurrence","id":"o9HmLD+mrvOhyT7MLKf1mvqylYQ="}],"description":"Construction on 163RD ST northbound between 89TH AVE (New York) and RT-25 (New York), Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:44:27Z"},"road_event_id":"sbtu7o3rZp1sm17p8UzNHRjeq3E=","beginning_cross_street":"89TH AVE","ending_cross_street":"RT-25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.798308,40.707095]]}},{"id":"o9HmLD+mrvOhyT7MLKf1mvqylYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["163RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HnACFQ7VbGPBQUWTeViSG4kl0L0="},{"type":"next-occurrence","id":"cJpXVwP1tCyqwH2ztDtUWTVNVGE="}],"description":"Construction on 163RD ST northbound between 89TH AVE (New York) and RT-25 (New York), Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:44:27Z"},"road_event_id":"o9HmLD+mrvOhyT7MLKf1mvqylYQ=","beginning_cross_street":"89TH AVE","ending_cross_street":"RT-25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.798308,40.707095]]}},{"id":"cJpXVwP1tCyqwH2ztDtUWTVNVGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["163RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HnACFQ7VbGPBQUWTeViSG4kl0L0="},{"type":"next-occurrence","id":"yvPSl4R2gORjuZm0Ms2vWBClnCw="}],"description":"Construction on 163RD ST northbound between 89TH AVE (New York) and RT-25 (New York), Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:44:27Z"},"road_event_id":"cJpXVwP1tCyqwH2ztDtUWTVNVGE=","beginning_cross_street":"89TH AVE","ending_cross_street":"RT-25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.798308,40.707095]]}},{"id":"yvPSl4R2gORjuZm0Ms2vWBClnCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["163RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HnACFQ7VbGPBQUWTeViSG4kl0L0="},{"type":"next-occurrence","id":"G5zzZi5BZVh5+91nEbx5tu/Pzsk="}],"description":"Construction on 163RD ST northbound between 89TH AVE (New York) and RT-25 (New York), Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:44:27Z"},"road_event_id":"yvPSl4R2gORjuZm0Ms2vWBClnCw=","beginning_cross_street":"89TH AVE","ending_cross_street":"RT-25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.798308,40.707095]]}},{"id":"G5zzZi5BZVh5+91nEbx5tu/Pzsk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["163RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HnACFQ7VbGPBQUWTeViSG4kl0L0="}],"description":"Construction on 163RD ST northbound between 89TH AVE (New York) and RT-25 (New York), Wednesday June 3rd, 2026 thru Thursday July 2nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:44:27Z"},"road_event_id":"G5zzZi5BZVh5+91nEbx5tu/Pzsk=","beginning_cross_street":"89TH AVE","ending_cross_street":"RT-25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.798308,40.707095]]}},{"id":"pkiZ+pcMxrCx6WFNmaABab8ihI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BROADWAY"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair on BROADWAY southbound between PRUYN ST (Albany) and Church St varying left or right lane closures, Monday June 8th, 2026, 09:00 AM thru 02:30 PM All lanes open","update_date":"2026-06-03T18:50:16Z"},"road_event_id":"pkiZ+pcMxrCx6WFNmaABab8ihI0=","beginning_cross_street":"PRUYN ST","ending_cross_street":"Church St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.749727,42.64586]]}},{"id":"CPDP78KoPBWQooe2B/fRXUH8Dak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"df6Z0uuwAchHtTsuoKLtGBI8J8U="}],"description":"Overhead sign repair on I-87 Northway northbound between Exit 2E; NY 5 eastbound; Wolf Road (Colonie) and Exit 2W; NY 5 westbound (Colonie), Monday June 15th, 2026 thru Tuesday June 16th, 2026, Monday/Tuesday, 07:00 AM thru 10:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-06-03T18:50:04Z"},"road_event_id":"CPDP78KoPBWQooe2B/fRXUH8Dak=","beginning_cross_street":"Exit 2E; NY 5 eastbound; Wolf Road","ending_cross_street":"Exit 2W; NY 5 westbound","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830795,42.706394]]}},{"id":"df6Z0uuwAchHtTsuoKLtGBI8J8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CPDP78KoPBWQooe2B/fRXUH8Dak="}],"description":"Overhead sign repair on I-87 Northway northbound between Exit 2E; NY 5 eastbound; Wolf Road (Colonie) and Exit 2W; NY 5 westbound (Colonie), Monday June 15th, 2026 thru Tuesday June 16th, 2026, Monday/Tuesday, 07:00 AM thru 10:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-06-03T18:50:04Z"},"road_event_id":"df6Z0uuwAchHtTsuoKLtGBI8J8U=","beginning_cross_street":"Exit 2E; NY 5 eastbound; Wolf Road","ending_cross_street":"Exit 2W; NY 5 westbound","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830795,42.706394]]}},{"id":"utmHu6MIFEsu779bvfHbT7zb8fA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"78eG9CFwwU2t9EL4UeRzJIrnbqo="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York), Wednesday June 3rd, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:53:34Z"},"road_event_id":"utmHu6MIFEsu779bvfHbT7zb8fA=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787061,40.712849]]}},{"id":"78eG9CFwwU2t9EL4UeRzJIrnbqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"utmHu6MIFEsu779bvfHbT7zb8fA="},{"type":"next-occurrence","id":"8M+neDlrIqLZwl/ySL/wx+/gorE="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York), Wednesday June 3rd, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:53:34Z"},"road_event_id":"78eG9CFwwU2t9EL4UeRzJIrnbqo=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787061,40.712849]]}},{"id":"8M+neDlrIqLZwl/ySL/wx+/gorE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"utmHu6MIFEsu779bvfHbT7zb8fA="},{"type":"next-occurrence","id":"wI5hspAZ7vE7yqWTJ6p8yiyqiL0="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York), Wednesday June 3rd, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:53:34Z"},"road_event_id":"8M+neDlrIqLZwl/ySL/wx+/gorE=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787061,40.712849]]}},{"id":"wI5hspAZ7vE7yqWTJ6p8yiyqiL0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"utmHu6MIFEsu779bvfHbT7zb8fA="},{"type":"next-occurrence","id":"DJ/Y5bgDk3Yamf6aW7G5czAggM0="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York), Wednesday June 3rd, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:53:34Z"},"road_event_id":"wI5hspAZ7vE7yqWTJ6p8yiyqiL0=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787061,40.712849]]}},{"id":"DJ/Y5bgDk3Yamf6aW7G5czAggM0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"utmHu6MIFEsu779bvfHbT7zb8fA="},{"type":"next-occurrence","id":"ruOdogSpGckmZVbKPHxh11kYU+o="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York), Wednesday June 3rd, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:53:34Z"},"road_event_id":"DJ/Y5bgDk3Yamf6aW7G5czAggM0=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787061,40.712849]]}},{"id":"ruOdogSpGckmZVbKPHxh11kYU+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"utmHu6MIFEsu779bvfHbT7zb8fA="},{"type":"next-occurrence","id":"Ymv41Wss6M+wvnnv0u/FaWzvZ8E="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York), Wednesday June 3rd, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:53:34Z"},"road_event_id":"ruOdogSpGckmZVbKPHxh11kYU+o=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787061,40.712849]]}},{"id":"Ymv41Wss6M+wvnnv0u/FaWzvZ8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"utmHu6MIFEsu779bvfHbT7zb8fA="},{"type":"next-occurrence","id":"XiSQkElEJs+oQ6UWLaUAOBubLTQ="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York), Wednesday June 3rd, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:53:34Z"},"road_event_id":"Ymv41Wss6M+wvnnv0u/FaWzvZ8E=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787061,40.712849]]}},{"id":"XiSQkElEJs+oQ6UWLaUAOBubLTQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"utmHu6MIFEsu779bvfHbT7zb8fA="},{"type":"next-occurrence","id":"WeK7LFn/qWZFTpDB7uyHKk+kT6c="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York), Wednesday June 3rd, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:53:34Z"},"road_event_id":"XiSQkElEJs+oQ6UWLaUAOBubLTQ=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787061,40.712849]]}},{"id":"WeK7LFn/qWZFTpDB7uyHKk+kT6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"utmHu6MIFEsu779bvfHbT7zb8fA="},{"type":"next-occurrence","id":"RmpYfeMDBTJDC5yb7q+44nWJu9E="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York), Wednesday June 3rd, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:53:34Z"},"road_event_id":"WeK7LFn/qWZFTpDB7uyHKk+kT6c=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787061,40.712849]]}},{"id":"RmpYfeMDBTJDC5yb7q+44nWJu9E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"utmHu6MIFEsu779bvfHbT7zb8fA="},{"type":"next-occurrence","id":"4yLIs6M1ozmwsWOTJiLRRUYBbGg="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York), Wednesday June 3rd, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:53:34Z"},"road_event_id":"RmpYfeMDBTJDC5yb7q+44nWJu9E=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787061,40.712849]]}},{"id":"4yLIs6M1ozmwsWOTJiLRRUYBbGg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEXFORD TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"utmHu6MIFEsu779bvfHbT7zb8fA="}],"description":"Construction on WEXFORD TER eastbound between DALNY RD (New York) and EDGERTON BLVD (New York), Wednesday June 3rd, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-03T18:53:34Z"},"road_event_id":"4yLIs6M1ozmwsWOTJiLRRUYBbGg=","beginning_cross_street":"DALNY RD","ending_cross_street":"EDGERTON BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.787061,40.712849]]}},{"id":"kklyeoegvwCDVFdmyuesr2pJaXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-90"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair on I-90 eastbound between Exit 4; NY 85 (Albany) and Exit 5; Everett Road (Albany) right ramp lane closure, Tuesday June 9th, 2026, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-06-03T18:55:39Z"},"road_event_id":"kklyeoegvwCDVFdmyuesr2pJaXc=","beginning_cross_street":"Exit 4; NY 85","ending_cross_street":"Exit 5; Everett Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.809182,42.687386]]}},{"id":"pbrppbatjq/8bpic4ZFIypmed18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 49"],"direction":"unknown","related_road_events":[],"description":"Roving Repairs on NJ 49 Both Directions between West of CR 632/Lighthouse Rd (Pennsville Twp) and East of CR 657/Griffith Rd (Salem) Monday June 8, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-06-03T18:56:42Z"},"road_event_id":"pbrppbatjq/8bpic4ZFIypmed18=","beginning_cross_street":"West of CR 632/Lighthouse Rd","ending_cross_street":"East of CR 657/Griffith Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.499557,39.607421]]}},{"id":"0/ulQRZ9sS3AnefbXw6BL92KhQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 49"],"direction":"unknown","related_road_events":[],"description":"Roving Repairs on NJ 49 Both Directions between West of CR 632/Lighthouse Rd (Pennsville Twp) and East of CR 657/Griffith Rd (Salem) Tuesday June 9, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-06-03T18:56:47Z"},"road_event_id":"0/ulQRZ9sS3AnefbXw6BL92KhQI=","beginning_cross_street":"West of CR 632/Lighthouse Rd","ending_cross_street":"East of CR 657/Griffith Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.499557,39.607421]]}},{"id":"KqHcfd+SFykCNzO2RDEUUJhuuLU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 49"],"direction":"unknown","related_road_events":[],"description":"Roving Repairs on NJ 49 Both Directions between West of CR 632/Lighthouse Rd (Pennsville Twp) and East of CR 657/Griffith Rd (Salem) Wednesday June 10, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-06-03T18:56:53Z"},"road_event_id":"KqHcfd+SFykCNzO2RDEUUJhuuLU=","beginning_cross_street":"West of CR 632/Lighthouse Rd","ending_cross_street":"East of CR 657/Griffith Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.499557,39.607421]]}},{"id":"NnnYor+t0Y726o8ofBBoAqrn3zI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 49"],"direction":"unknown","related_road_events":[],"description":"Roving Repairs on NJ 49 Both Directions between West of CR 632/Lighthouse Rd (Pennsville Twp) and East of CR 657/Griffith Rd (Salem) Thursday June 11, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-06-03T18:57:00Z"},"road_event_id":"NnnYor+t0Y726o8ofBBoAqrn3zI=","beginning_cross_street":"West of CR 632/Lighthouse Rd","ending_cross_street":"East of CR 657/Griffith Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.499557,39.607421]]}},{"id":"rIyXSOozGa0/InsXoI/7PlLPSSQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 49"],"direction":"unknown","related_road_events":[],"description":"Roving Repairs on NJ 49 Both Directions between West of CR 632/Lighthouse Rd (Pennsville Twp) and East of CR 657/Griffith Rd (Salem) Friday June 12, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-06-03T18:57:06Z"},"road_event_id":"rIyXSOozGa0/InsXoI/7PlLPSSQ=","beginning_cross_street":"West of CR 632/Lighthouse Rd","ending_cross_street":"East of CR 657/Griffith Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.499557,39.607421]]}},{"id":"oyE0D86yoxdbIzJfLplWiQEQdwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 49"],"direction":"unknown","related_road_events":[],"description":"Roving Repairs on NJ 49 Both Directions between West of CR 632/Lighthouse Rd (Pennsville Twp) and East of CR 657/Griffith Rd (Salem) Monday June 15, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-06-03T18:57:12Z"},"road_event_id":"oyE0D86yoxdbIzJfLplWiQEQdwc=","beginning_cross_street":"West of CR 632/Lighthouse Rd","ending_cross_street":"East of CR 657/Griffith Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.499557,39.607421]]}},{"id":"NqeUDOs6GzbAzi0rDYWgAVvLWiE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEACH 47TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6bAt3e4BeIjKPf3jxqL71O25A5s="}],"description":"Construction on BEACH 47TH ST southbound between ROCKAWAY FWY (New York) and BEACH 54TH ST at ROCKAWAY FWY (New York), Wednesday June 3rd, 2026 thru Sunday June 7th, 2026, Sunday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-06-03T18:59:00Z"},"road_event_id":"NqeUDOs6GzbAzi0rDYWgAVvLWiE=","beginning_cross_street":"ROCKAWAY FWY","ending_cross_street":"ROCKAWAY FWY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.777866,40.592862]]}},{"id":"6bAt3e4BeIjKPf3jxqL71O25A5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEACH 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NqeUDOs6GzbAzi0rDYWgAVvLWiE="},{"type":"next-occurrence","id":"/fCORkgxRpVYo4OlYzimwfCcyls="}],"description":"Construction on BEACH 47TH ST southbound between ROCKAWAY FWY (New York) and BEACH 54TH ST at ROCKAWAY FWY (New York), Wednesday June 3rd, 2026 thru Sunday June 7th, 2026, Sunday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-06-03T18:59:00Z"},"road_event_id":"6bAt3e4BeIjKPf3jxqL71O25A5s=","beginning_cross_street":"ROCKAWAY FWY","ending_cross_street":"ROCKAWAY FWY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.777866,40.592862]]}},{"id":"/fCORkgxRpVYo4OlYzimwfCcyls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEACH 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NqeUDOs6GzbAzi0rDYWgAVvLWiE="}],"description":"Construction on BEACH 47TH ST southbound between ROCKAWAY FWY (New York) and BEACH 54TH ST at ROCKAWAY FWY (New York), Wednesday June 3rd, 2026 thru Sunday June 7th, 2026, Sunday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-06-03T18:59:00Z"},"road_event_id":"/fCORkgxRpVYo4OlYzimwfCcyls=","beginning_cross_street":"ROCKAWAY FWY","ending_cross_street":"ROCKAWAY FWY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.777866,40.592862]]}},{"id":"zukdk8mvxCtEtpWXmKVjms/q5qk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 384"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on NY 384 both directions at Junction I-290 Youngmann Expressway (Tonawanda), Friday June 12th, 2026, 09:00 AM thru 12:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-03T19:08:11Z"},"road_event_id":"zukdk8mvxCtEtpWXmKVjms/q5qk=","beginning_cross_street":"Junction I-290 Youngmann Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.874532,42.995918]]}},{"id":"mwsL/h9HMJ9Q1s2WJpovta55wXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[],"description":"Bridge maintenance operations on I-84 eastbound between Exit 65 - NY 312 - Carmel (Southeast) and Exit 68 - I-684 - Pawling - White Plains (Southeast) DOT BM/B1052842/32768209 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday June 12th, 2026, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-06-03T19:15:03Z"},"road_event_id":"mwsL/h9HMJ9Q1s2WJpovta55wXQ=","beginning_cross_street":"Exit 65 - NY 312 - Carmel","ending_cross_street":"Exit 68 - I-684 - Pawling - White Plains","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.601106,41.398096]]}},{"id":"uG6bMMFsXyCQ8mVziog/VD3Nb8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KAS4QG9rXZ4jn+9A5/fcMa+7zRw="}],"description":"Bridge maintenance operations on Taconic State Parkway southbound between Exit 72 - Jackson Corners Road (Taghkanic) and Ferris Lane (Milan) DOT BM/B5502479/32768309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday June 9th, 2026 thru Wednesday June 10th, 2026 Tuesday/ Wednesday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-06-03T19:16:11Z"},"road_event_id":"uG6bMMFsXyCQ8mVziog/VD3Nb8A=","beginning_cross_street":"Exit 72 - Jackson Corners Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.739327,42.012329]]}},{"id":"KAS4QG9rXZ4jn+9A5/fcMa+7zRw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uG6bMMFsXyCQ8mVziog/VD3Nb8A="}],"description":"Bridge maintenance operations on Taconic State Parkway southbound between Exit 72 - Jackson Corners Road (Taghkanic) and Ferris Lane (Milan) DOT BM/B5502479/32768309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday June 9th, 2026 thru Wednesday June 10th, 2026 Tuesday/ Wednesday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-06-03T19:16:11Z"},"road_event_id":"KAS4QG9rXZ4jn+9A5/fcMa+7zRw=","beginning_cross_street":"Exit 72 - Jackson Corners Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.739327,42.012329]]}},{"id":"5GYJf4BtOAU2j/7Fd0kGb30viO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[],"description":"Bridge maintenance operations on I-84 eastbound at Exit 58 - Ludingtonville Road - CR 43 (Kent) DOT BM/B1052742/32768409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-06-03T19:22:55Z"},"road_event_id":"5GYJf4BtOAU2j/7Fd0kGb30viO0=","beginning_cross_street":"Exit 58 - Ludingtonville Road - CR 43","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.681818,41.508431]]}},{"id":"No8yHP4hCGXBLQ6gT59b5ByTr6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Port Street"],"direction":"unknown","related_road_events":[],"description":"Scheduled roadwork on Port Street both directions between Marlin Street (Newark) and Doremus Avenue (Newark), Wednesday June 3rd, 2026 thru Saturday June 6th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 04:00 AM All lanes closed","update_date":"2026-06-03T21:58:55Z"},"road_event_id":"No8yHP4hCGXBLQ6gT59b5ByTr6Y=","beginning_cross_street":"Marlin Street","ending_cross_street":"Doremus Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T22:00:00Z","end_date":"2026-06-06T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.144499,40.702295]]}},{"id":"HrpGModh2vKHmHRyJKjXyrAdI70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"o7uqANllwVnNH+oKzUpgSkj8qcc="}],"description":"Safety improvements on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/329145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-03T20:24:36Z"},"road_event_id":"HrpGModh2vKHmHRyJKjXyrAdI70=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"o7uqANllwVnNH+oKzUpgSkj8qcc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrpGModh2vKHmHRyJKjXyrAdI70="},{"type":"next-occurrence","id":"uCaS/47wQhmYD1ciSBkcRD2w7w4="}],"description":"Safety improvements on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/329145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-03T20:24:36Z"},"road_event_id":"o7uqANllwVnNH+oKzUpgSkj8qcc=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"uCaS/47wQhmYD1ciSBkcRD2w7w4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrpGModh2vKHmHRyJKjXyrAdI70="},{"type":"next-occurrence","id":"v8oWY/UmI2JUFjUH0zzdg+wj35M="}],"description":"Safety improvements on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/329145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-03T20:24:36Z"},"road_event_id":"uCaS/47wQhmYD1ciSBkcRD2w7w4=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"v8oWY/UmI2JUFjUH0zzdg+wj35M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrpGModh2vKHmHRyJKjXyrAdI70="},{"type":"next-occurrence","id":"IEvAq9idDzJc4t8dp2A3ncZVbD0="}],"description":"Safety improvements on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/329145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-03T20:24:36Z"},"road_event_id":"v8oWY/UmI2JUFjUH0zzdg+wj35M=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"IEvAq9idDzJc4t8dp2A3ncZVbD0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrpGModh2vKHmHRyJKjXyrAdI70="},{"type":"next-occurrence","id":"lZwdwI9cpWCUZ1qdrdSdWxWXyVA="}],"description":"Safety improvements on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/329145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-03T20:24:36Z"},"road_event_id":"IEvAq9idDzJc4t8dp2A3ncZVbD0=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"lZwdwI9cpWCUZ1qdrdSdWxWXyVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrpGModh2vKHmHRyJKjXyrAdI70="},{"type":"next-occurrence","id":"aFbEvFrCfDja5sDXON68ihYcK+8="}],"description":"Safety improvements on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/329145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-03T20:24:36Z"},"road_event_id":"lZwdwI9cpWCUZ1qdrdSdWxWXyVA=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"aFbEvFrCfDja5sDXON68ihYcK+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrpGModh2vKHmHRyJKjXyrAdI70="},{"type":"next-occurrence","id":"eG3pxPEEAjATmz7YfSk+obl1EGA="}],"description":"Safety improvements on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/329145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-03T20:24:36Z"},"road_event_id":"aFbEvFrCfDja5sDXON68ihYcK+8=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"eG3pxPEEAjATmz7YfSk+obl1EGA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrpGModh2vKHmHRyJKjXyrAdI70="},{"type":"next-occurrence","id":"awhM7hhK/MirTMEvh6flkaCQnSU="}],"description":"Safety improvements on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/329145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-03T20:24:36Z"},"road_event_id":"eG3pxPEEAjATmz7YfSk+obl1EGA=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"awhM7hhK/MirTMEvh6flkaCQnSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrpGModh2vKHmHRyJKjXyrAdI70="},{"type":"next-occurrence","id":"C1S0oAsOItaqGxkUNGvo/uV6f04="}],"description":"Safety improvements on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/329145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-03T20:24:36Z"},"road_event_id":"awhM7hhK/MirTMEvh6flkaCQnSU=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"C1S0oAsOItaqGxkUNGvo/uV6f04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HrpGModh2vKHmHRyJKjXyrAdI70="}],"description":"Safety improvements on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/329145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-03T20:24:36Z"},"road_event_id":"C1S0oAsOItaqGxkUNGvo/uV6f04=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"7WQ4rssSznAD+DgKFNpmfvaflgs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Port Street"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"D5Wr8NbuIX/r7xCyazx+6uNMz2c="}],"description":"Scheduled roadwork on Port Street eastbound between Brewster Road (Newark) and Marlin Street (Newark), Friday June 5th, 2026 thru Monday June 8th, 2026, Sunday/Friday/Saturday, 08:00 PM thru 04:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T20:21:52Z"},"road_event_id":"7WQ4rssSznAD+DgKFNpmfvaflgs=","beginning_cross_street":"Brewster Road","ending_cross_street":"Marlin Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.158252,40.707574]]}},{"id":"D5Wr8NbuIX/r7xCyazx+6uNMz2c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Port Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7WQ4rssSznAD+DgKFNpmfvaflgs="},{"type":"next-occurrence","id":"k4a03nV7ZtB7I+wxPv2pb+MZQcQ="}],"description":"Scheduled roadwork on Port Street eastbound between Brewster Road (Newark) and Marlin Street (Newark), Friday June 5th, 2026 thru Monday June 8th, 2026, Sunday/Friday/Saturday, 08:00 PM thru 04:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T20:21:52Z"},"road_event_id":"D5Wr8NbuIX/r7xCyazx+6uNMz2c=","beginning_cross_street":"Brewster Road","ending_cross_street":"Marlin Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T00:00:00Z","end_date":"2026-06-07T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.158252,40.707574]]}},{"id":"k4a03nV7ZtB7I+wxPv2pb+MZQcQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Port Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7WQ4rssSznAD+DgKFNpmfvaflgs="}],"description":"Scheduled roadwork on Port Street eastbound between Brewster Road (Newark) and Marlin Street (Newark), Friday June 5th, 2026 thru Monday June 8th, 2026, Sunday/Friday/Saturday, 08:00 PM thru 04:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-03T20:21:52Z"},"road_event_id":"k4a03nV7ZtB7I+wxPv2pb+MZQcQ=","beginning_cross_street":"Brewster Road","ending_cross_street":"Marlin Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T00:00:00Z","end_date":"2026-06-08T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.158252,40.707574]]}},{"id":"enyhelXQjgRa647TAPfcxmYjZ58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Port Street"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"56gmM8sEQ5riPQGdO4DjpGRQJnQ="}],"description":"Scheduled roadwork on Port Street westbound Marlin Street (Newark) to Outer Port Street (Newark), Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-03T20:24:24Z"},"road_event_id":"enyhelXQjgRa647TAPfcxmYjZ58=","beginning_cross_street":"Marlin Street","ending_cross_street":"Outer Port Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.144588,40.702326]]}},{"id":"56gmM8sEQ5riPQGdO4DjpGRQJnQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Port Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"enyhelXQjgRa647TAPfcxmYjZ58="}],"description":"Scheduled roadwork on Port Street westbound Marlin Street (Newark) to Outer Port Street (Newark), Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-03T20:24:24Z"},"road_event_id":"56gmM8sEQ5riPQGdO4DjpGRQJnQ=","beginning_cross_street":"Marlin Street","ending_cross_street":"Outer Port Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.144588,40.702326]]}},{"id":"wiq0b2zyQZTWHufFu1gndTjCCnM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Southbound near Garden State Parkway (Woodbridge Twp), Tuesday June 9, 2026 09:00 PM thru Wednesday June 10, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-06-03T20:31:44Z"},"road_event_id":"wiq0b2zyQZTWHufFu1gndTjCCnM=","beginning_cross_street":"Garden State Parkway","ending_cross_street":"Ford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31781,40.552402]]}},{"id":"XFcAa7kfK11gqtWqM56MTw5JsLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Southbound near Garden State Parkway (Woodbridge Twp), Monday June 8, 2026 09:00 PM thru Tuesday June 9, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-06-03T20:31:46Z"},"road_event_id":"XFcAa7kfK11gqtWqM56MTw5JsLc=","beginning_cross_street":"Garden State Parkway","ending_cross_street":"Ford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31781,40.552402]]}},{"id":"m1xrBFRljCGGmkltlinWvlIlJOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MTcPfKD/S5jHYHcrA9WjYNkN/pA="}],"description":"Culvert repairs on NY 31 both directions between Harwood Rd. to Kirkgate Dr. (Ogden), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-06-03T20:44:19Z"},"road_event_id":"m1xrBFRljCGGmkltlinWvlIlJOk=","beginning_cross_street":"Harwood Rd. to Kirkgate Dr.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.814772,43.186122]]}},{"id":"MTcPfKD/S5jHYHcrA9WjYNkN/pA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m1xrBFRljCGGmkltlinWvlIlJOk="},{"type":"next-occurrence","id":"4xHo+MWj+Yqe29FVQYYnnZ7JC8s="}],"description":"Culvert repairs on NY 31 both directions between Harwood Rd. to Kirkgate Dr. (Ogden), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-06-03T20:44:19Z"},"road_event_id":"MTcPfKD/S5jHYHcrA9WjYNkN/pA=","beginning_cross_street":"Harwood Rd. to Kirkgate Dr.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.814772,43.186122]]}},{"id":"4xHo+MWj+Yqe29FVQYYnnZ7JC8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m1xrBFRljCGGmkltlinWvlIlJOk="},{"type":"next-occurrence","id":"2BNqWYBUTb1iyyo+XK9x9fqNBVc="}],"description":"Culvert repairs on NY 31 both directions between Harwood Rd. to Kirkgate Dr. (Ogden), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-06-03T20:44:19Z"},"road_event_id":"4xHo+MWj+Yqe29FVQYYnnZ7JC8s=","beginning_cross_street":"Harwood Rd. to Kirkgate Dr.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.814772,43.186122]]}},{"id":"2BNqWYBUTb1iyyo+XK9x9fqNBVc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m1xrBFRljCGGmkltlinWvlIlJOk="},{"type":"next-occurrence","id":"1dkpBMTCGROfsK5lSwf5oCTAIkU="}],"description":"Culvert repairs on NY 31 both directions between Harwood Rd. to Kirkgate Dr. (Ogden), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-06-03T20:44:19Z"},"road_event_id":"2BNqWYBUTb1iyyo+XK9x9fqNBVc=","beginning_cross_street":"Harwood Rd. to Kirkgate Dr.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.814772,43.186122]]}},{"id":"1dkpBMTCGROfsK5lSwf5oCTAIkU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m1xrBFRljCGGmkltlinWvlIlJOk="}],"description":"Culvert repairs on NY 31 both directions between Harwood Rd. to Kirkgate Dr. (Ogden), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-06-03T20:44:19Z"},"road_event_id":"1dkpBMTCGROfsK5lSwf5oCTAIkU=","beginning_cross_street":"Harwood Rd. to Kirkgate Dr.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.814772,43.186122]]}},{"id":"WFXpklDWN1NWMxqcNIW/cEVoZWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[],"description":"Due to Signal repairs northbound, A Line between 14 St (New York) and 59 St - Columbus Circle (New York) stops at 23 St and 50 St. Late night A line also serves these stations., Continuous Saturday June 6th, 2026 12:00 AM thru Sunday June 7th, 2026 11:59 PM local service only","update_date":"2026-06-03T21:48:03Z"},"road_event_id":"WFXpklDWN1NWMxqcNIW/cEVoZWI=","beginning_cross_street":"14 St","ending_cross_street":"59 St - Columbus Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T04:00:00Z","end_date":"2026-06-08T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00169,40.740893]]}},{"id":"T3VKL5xFB66ycuHSP6IoJYKUzBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["C Line"],"direction":"unknown","related_road_events":[],"description":"Due to Signal repairs northbound, C Line between Hoyt - Schermerhorn Sts (New York) and 42 St - Port Authority Bus Terminal (New York) from Jay St-MetroTech to 34 St-Herald Sq and via the D line to 59 St-Columbus Circle. No 168 St-bound C line at High St, Fulton St, Chambers St, Canal St, Spring St, 14 St, 23 St, 34 St-Penn Station, 42 St-Port Authority and 50 St. For High St, use the nearby York St F line instead. For Fulton St, use the nearby World Trade Center E line via transfer at W 4 St-Wash Sq. For Chambers St/World Trade Center and Canal St, take the E line or downtown A line or C line. For service to Spring St, take the C line to W 4 St-Wash Sq and transfer to a downtown C line or E line. For service from Spring St, take the E line to W 4 St-Wash Sq and transfer to an uptown C line. For 14 St, 34 St-Penn Station and 42 St-Port Authority, take the A line or E line instead. For 23 St and 50 St, take an uptown A line or C line instead via transfer at W 4 St-Wash Sq., Continuous Saturday June 6th, 2026 12:00 AM thru Sunday June 7th, 2026 11:59 PM runs via F line","update_date":"2026-06-03T21:52:50Z"},"road_event_id":"T3VKL5xFB66ycuHSP6IoJYKUzBc=","beginning_cross_street":"Hoyt - Schermerhorn Sts","ending_cross_street":"42 St - Port Authority Bus Terminal","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T04:00:00Z","end_date":"2026-06-08T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985001,40.688484]]}},{"id":"YgVgn4HO8FEG09IFgw0tub6vBcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4jh+ThFgcmPZYBOnUUuevGNVXuE="}],"description":"Construction on NY 33 westbound between Wegman Road; CR 156 (Gates) and I-490 ramp (Gates) Shoulder work with flaggers when needed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM both shoulder closed","update_date":"2026-06-04T12:33:26Z"},"road_event_id":"YgVgn4HO8FEG09IFgw0tub6vBcA=","beginning_cross_street":"Wegman Road; CR 156","ending_cross_street":"I-490 ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.712278,43.146802]]}},{"id":"4jh+ThFgcmPZYBOnUUuevGNVXuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YgVgn4HO8FEG09IFgw0tub6vBcA="},{"type":"next-occurrence","id":"NO22e44a9kuKXOhNXI52UuX8d0A="}],"description":"Construction on NY 33 westbound between Wegman Road; CR 156 (Gates) and I-490 ramp (Gates) Shoulder work with flaggers when needed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM both shoulder closed","update_date":"2026-06-04T12:33:26Z"},"road_event_id":"4jh+ThFgcmPZYBOnUUuevGNVXuE=","beginning_cross_street":"Wegman Road; CR 156","ending_cross_street":"I-490 ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.712278,43.146802]]}},{"id":"NO22e44a9kuKXOhNXI52UuX8d0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YgVgn4HO8FEG09IFgw0tub6vBcA="},{"type":"next-occurrence","id":"LZqx4aa7f64CssX7Yjl54L0yzqY="}],"description":"Construction on NY 33 westbound between Wegman Road; CR 156 (Gates) and I-490 ramp (Gates) Shoulder work with flaggers when needed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM both shoulder closed","update_date":"2026-06-04T12:33:26Z"},"road_event_id":"NO22e44a9kuKXOhNXI52UuX8d0A=","beginning_cross_street":"Wegman Road; CR 156","ending_cross_street":"I-490 ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.712278,43.146802]]}},{"id":"LZqx4aa7f64CssX7Yjl54L0yzqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YgVgn4HO8FEG09IFgw0tub6vBcA="},{"type":"next-occurrence","id":"ZYkwNAKf3eeUNBWSh655QMAtxfg="}],"description":"Construction on NY 33 westbound between Wegman Road; CR 156 (Gates) and I-490 ramp (Gates) Shoulder work with flaggers when needed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM both shoulder closed","update_date":"2026-06-04T12:33:26Z"},"road_event_id":"LZqx4aa7f64CssX7Yjl54L0yzqY=","beginning_cross_street":"Wegman Road; CR 156","ending_cross_street":"I-490 ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.712278,43.146802]]}},{"id":"ZYkwNAKf3eeUNBWSh655QMAtxfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YgVgn4HO8FEG09IFgw0tub6vBcA="}],"description":"Construction on NY 33 westbound between Wegman Road; CR 156 (Gates) and I-490 ramp (Gates) Shoulder work with flaggers when needed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM both shoulder closed","update_date":"2026-06-04T12:33:26Z"},"road_event_id":"ZYkwNAKf3eeUNBWSh655QMAtxfg=","beginning_cross_street":"Wegman Road; CR 156","ending_cross_street":"I-490 ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.712278,43.146802]]}},{"id":"WnNa+gO2kTgYaPFWKR8XUBsvBQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["C Line"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations southbound, C Line between 125 St (New York) and 59 St - Columbus Circle (New York) skips 116 St, 110 St, 103 St, 96 St, 86 St, 81 St and 72 St. For service to these stations, take the C line to 59 St-Columbus Circle and transfer to an uptown C line. For service from these stations, take the C line to 125 St and transfer to a downtown C line. Use nearby 1 line instead. Transfer between trains at 168 St or 59 St-Columbus Circle., Continuous Saturday June 6th, 2026 12:00 AM thru Sunday June 7th, 2026 11:59 PM","update_date":"2026-06-03T21:59:44Z"},"road_event_id":"WnNa+gO2kTgYaPFWKR8XUBsvBQs=","beginning_cross_street":"125 St","ending_cross_street":"59 St - Columbus Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T04:00:00Z","end_date":"2026-06-08T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.952343,40.811109]]}},{"id":"ASs+ml+8EJ2fJzxJGeV8bOcWnvY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 33 eastbound between I-90; Thruway (Cheektowaga) and Union Road; NY 277 (Cheektowaga), Saturday June 13th, 2026, 07:00 AM thru 05:00 PM 2 Left lanes of 3 lanes closed","update_date":"2026-06-03T22:51:58Z"},"road_event_id":"ASs+ml+8EJ2fJzxJGeV8bOcWnvY=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"Union Road; NY 277","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.770222,42.932551]]}},{"id":"v52c72BLTPAhjugiJ/5njAZVZrI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2Cutqt7SyWUe9q/GH6E8JV9P7zc="}],"description":"Survey work on I-690 westbound between Exit 15A - West Street (Syracuse) and Exit 14 - N. Geddes Street (Syracuse), Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday/Thursday/Friday, 06:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-03T22:58:47Z"},"road_event_id":"v52c72BLTPAhjugiJ/5njAZVZrI=","beginning_cross_street":"Exit 15A - West Street","ending_cross_street":"Exit 14 - N. Geddes Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.154029,43.054232]]}},{"id":"2Cutqt7SyWUe9q/GH6E8JV9P7zc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v52c72BLTPAhjugiJ/5njAZVZrI="},{"type":"next-occurrence","id":"4XSaDr1nkyKucyozPuVi+rgE+qI="}],"description":"Survey work on I-690 westbound between Exit 15A - West Street (Syracuse) and Exit 14 - N. Geddes Street (Syracuse), Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday/Thursday/Friday, 06:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-03T22:58:47Z"},"road_event_id":"2Cutqt7SyWUe9q/GH6E8JV9P7zc=","beginning_cross_street":"Exit 15A - West Street","ending_cross_street":"Exit 14 - N. Geddes Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.154029,43.054232]]}},{"id":"4XSaDr1nkyKucyozPuVi+rgE+qI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v52c72BLTPAhjugiJ/5njAZVZrI="}],"description":"Survey work on I-690 westbound between Exit 15A - West Street (Syracuse) and Exit 14 - N. Geddes Street (Syracuse), Thursday June 4th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday/Thursday/Friday, 06:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-03T22:58:47Z"},"road_event_id":"4XSaDr1nkyKucyozPuVi+rgE+qI=","beginning_cross_street":"Exit 15A - West Street","ending_cross_street":"Exit 14 - N. Geddes Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.154029,43.054232]]}},{"id":"slagRsRr5ImD7c5GUoC7IUFbA68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-690 eastbound just past Exit 11 - ROUTE 297; Solvay-Fairgrounds (Geddes), Monday June 15th, 2026, 09:00 AM thru 12:00 PM both shoulder closed","update_date":"2026-06-03T23:16:03Z"},"road_event_id":"slagRsRr5ImD7c5GUoC7IUFbA68=","beginning_cross_street":"Exit 11 - ROUTE 297; Solvay-Fairgrounds","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.213176,43.075626]]}},{"id":"izjM+Dm04RHdG686qEB8rvzVv7w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-690 westbound at Exit 12B - NY 695 (Geddes), Monday June 15th, 2026, 09:00 AM thru 12:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-05T13:54:50Z"},"road_event_id":"izjM+Dm04RHdG686qEB8rvzVv7w=","beginning_cross_street":"Exit 12B - NY 695","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.211807,43.074944]]}},{"id":"ZlSf4qewv6VruRSCpQ3gd2Qhc8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N WEST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"u568ZKFsEg2kbbLSE2gJVnYJu/I="}],"description":"Overhead sign repair on N WEST ST northbound between WEST FAYETTE ST (Syracuse) and I-690 (Syracuse) ; Alternating lane closures, Monday June 8th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-03T23:33:36Z"},"road_event_id":"ZlSf4qewv6VruRSCpQ3gd2Qhc8Q=","beginning_cross_street":"WEST FAYETTE ST","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158866,43.050578]]}},{"id":"u568ZKFsEg2kbbLSE2gJVnYJu/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZlSf4qewv6VruRSCpQ3gd2Qhc8Q="}],"description":"Overhead sign repair on N WEST ST northbound between WEST FAYETTE ST (Syracuse) and I-690 (Syracuse) ; Alternating lane closures, Monday June 8th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-03T23:33:36Z"},"road_event_id":"u568ZKFsEg2kbbLSE2gJVnYJu/I=","beginning_cross_street":"WEST FAYETTE ST","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158866,43.050578]]}},{"id":"S1GJv/Bu5oz2057wjgCEaRMVhcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WinvvBY4fyoHchztFntTvWEKXB4="}],"description":"Overhead sign repair on NY 5 both directions between I-481 (De Witt) and Route 92 Junction Lyndon (De Witt) ; Alternating lane closures, Tuesday June 9th, 2026 thru Wednesday June 10th, 2026, Tuesday/Wednesday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-03T23:47:12Z"},"road_event_id":"S1GJv/Bu5oz2057wjgCEaRMVhcA=","beginning_cross_street":"I-481","ending_cross_street":"Route 92 Junction Lyndon","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056456,43.032692]]}},{"id":"WinvvBY4fyoHchztFntTvWEKXB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S1GJv/Bu5oz2057wjgCEaRMVhcA="}],"description":"Overhead sign repair on NY 5 both directions between I-481 (De Witt) and Route 92 Junction Lyndon (De Witt) ; Alternating lane closures, Tuesday June 9th, 2026 thru Wednesday June 10th, 2026, Tuesday/Wednesday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-03T23:47:12Z"},"road_event_id":"WinvvBY4fyoHchztFntTvWEKXB4=","beginning_cross_street":"I-481","ending_cross_street":"Route 92 Junction Lyndon","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056456,43.032692]]}},{"id":"Z+IvD3T+CekOu+sfSUh0Bwc78bs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound near North of Bridge Av (Bay Head), Tuesday June 9, 2026 09:00 AM thru 02:00 PM, right shoulder closed","update_date":"2026-06-04T08:43:36Z"},"road_event_id":"Z+IvD3T+CekOu+sfSUh0Bwc78bs=","beginning_cross_street":"North of Bridge Av","ending_cross_street":"Bridge Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042961,40.073284]]}},{"id":"tLfmd+37jsg9NWguQXs2a6KcrHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of I-295/US 40 (Pennsville Twp) and US 322 (Logan Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, , moving operation","update_date":"2026-06-04T08:43:37Z"},"road_event_id":"tLfmd+37jsg9NWguQXs2a6KcrHU=","beginning_cross_street":"North of I-295/US 40","ending_cross_street":"US 322","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.492034,39.681301]]}},{"id":"YWOLKJyIFx1dvbwSdK7w/rlAMOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between Exit 18 - CR 667 (Paulsboro) and South of Exit 23 - US 130 (West Deptford Twp), Wednesday June 10, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-04T08:43:38Z"},"road_event_id":"YWOLKJyIFx1dvbwSdK7w/rlAMOY=","beginning_cross_street":"Exit 18 - CR 667","ending_cross_street":"South of Exit 23 - US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.235542,39.822017]]}},{"id":"Kwy+3khcUk/V9NbwA5hl8YI57OA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between South of Exit 23 - US 130 (West Deptford Twp) and Exit 18 - CR 667 (Paulsboro), Tuesday June 9, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-04T08:43:39Z"},"road_event_id":"Kwy+3khcUk/V9NbwA5hl8YI57OA=","beginning_cross_street":"South of Exit 23 - US 130","ending_cross_street":"Exit 18 - CR 667","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.155509,39.859924]]}},{"id":"gySNZg4CS5IFg96d1abnmcRe454=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 29"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 29 Northbound near North of NJ 129 (Trenton), Wednesday June 10, 2026 09:00 PM thru Thursday June 11, 2026 05:00 AM, right lane closed","update_date":"2026-06-04T08:43:46Z"},"road_event_id":"gySNZg4CS5IFg96d1abnmcRe454=","beginning_cross_street":"North of NJ 129","ending_cross_street":"South of Lalor St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.753623,40.191841]]}},{"id":"zZYYrWkdxvwBcBVrrs/F70i0ezc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between South of Exit 23 - US 130 (West Deptford Twp) and Exit 18 - CR 667 (Paulsboro), Thursday June 11, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-04T08:43:48Z"},"road_event_id":"zZYYrWkdxvwBcBVrrs/F70i0ezc=","beginning_cross_street":"South of Exit 23 - US 130","ending_cross_street":"Exit 18 - CR 667","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.155509,39.859924]]}},{"id":"zXA/ZwreKK8PvMazvww0BrdyNlY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between Exit 18 - CR 667 (Paulsboro) and South of Exit 23 - US 130 (West Deptford Twp), Monday June 8, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-04T08:43:43Z"},"road_event_id":"zXA/ZwreKK8PvMazvww0BrdyNlY=","beginning_cross_street":"Exit 18 - CR 667","ending_cross_street":"South of Exit 23 - US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.235542,39.822017]]}},{"id":"MOOWB2fKOqh4DwJNyb/NU/O4jKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound near North of Bridge Av (Bay Head), Monday June 8, 2026 09:00 AM thru 02:00 PM, right shoulder closed","update_date":"2026-06-04T08:43:50Z"},"road_event_id":"MOOWB2fKOqh4DwJNyb/NU/O4jKc=","beginning_cross_street":"North of Bridge Av","ending_cross_street":"Bridge Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042961,40.073284]]}},{"id":"k5/fPddyqraegCcBIeGlvEgZmLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between South of Exit 23 - US 130 (West Deptford Twp) and Exit 18 - CR 667 (Paulsboro), Wednesday June 10, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-04T08:43:51Z"},"road_event_id":"k5/fPddyqraegCcBIeGlvEgZmLA=","beginning_cross_street":"South of Exit 23 - US 130","ending_cross_street":"Exit 18 - CR 667","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.155509,39.859924]]}},{"id":"lL+vVubt3d8uBhM6/NjMyr5hetI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Northbound near North of CR 622/Olden Ave (Ewing Twp), Wednesday June 10, 2026 08:00 PM thru Thursday June 11, 2026 06:00 AM, right lane closed","update_date":"2026-06-04T08:43:58Z"},"road_event_id":"lL+vVubt3d8uBhM6/NjMyr5hetI=","beginning_cross_street":"North of CR 622/Olden Ave","ending_cross_street":"North of CR 622/Olden Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.779037,40.25774]]}},{"id":"YPhwZOS6NhT0r6boLKPsIuJYhhI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between Exit 18 - CR 667 (Paulsboro) and South of Exit 23 - US 130 (West Deptford Twp), Thursday June 11, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-04T08:44:01Z"},"road_event_id":"YPhwZOS6NhT0r6boLKPsIuJYhhI=","beginning_cross_street":"Exit 18 - CR 667","ending_cross_street":"South of Exit 23 - US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.235542,39.822017]]}},{"id":"yb42XNi+agoqfpEI0eKVKUAfiwE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 38 near West of CR 635/Ark Rd (Mount Laurel Twp), Tuesday June 9, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-04T08:43:54Z"},"road_event_id":"yb42XNi+agoqfpEI0eKVKUAfiwE=","beginning_cross_street":"West of CR 635/Ark Rd","ending_cross_street":"East of Larchmont Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.872146,39.970859]]}},{"id":"AT8/1BcNF0bWy+PHpbgS3r/atys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 322"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 322 Westbound near East of CR 655/Fries Mill Rd (Monroe Twp), left shoulder, moving operation","update_date":"2026-06-04T08:43:55Z"},"road_event_id":"AT8/1BcNF0bWy+PHpbgS3r/atys=","beginning_cross_street":"East of CR 655/Fries Mill Rd","ending_cross_street":"West of CR 655/Fries Mill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.043792,39.693527]]}},{"id":"zwiBdpW7wmbfhT+O+sIQPuG8VpU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 168"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 168 Southbound near South of CR 650/Newtown Creek (Audubon Park), Wednesday June 10, 2026 09:00 AM thru 03:00 PM, at least one lane closed","update_date":"2026-06-04T08:43:56Z"},"road_event_id":"zwiBdpW7wmbfhT+O+sIQPuG8VpU=","beginning_cross_street":"South of CR 650/Newtown Creek","ending_cross_street":"North of CR 635/Nicholson Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.093078,39.897949]]}},{"id":"+dZwu6TVOHQG74UmBEczeyCn7wQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 52"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 52 Northbound near North of 9th St/Palen St (Ocean City), Tuesday June 9, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-04T08:43:57Z"},"road_event_id":"+dZwu6TVOHQG74UmBEczeyCn7wQ=","beginning_cross_street":"North of 9th St/Palen St","ending_cross_street":"South of CR 585/Shore Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.585456,39.291717]]}},{"id":"WilUu2FqCirHIlGiD/qriVjdPco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 52"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 52 Southbound between CR 559/Somers Point Rd (Somers Point) and South of CR 585/Shore Rd (Ocean City), Thursday June 11, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-04T08:44:03Z"},"road_event_id":"WilUu2FqCirHIlGiD/qriVjdPco=","beginning_cross_street":"CR 559/Somers Point Rd","ending_cross_street":"South of CR 585/Shore Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.599487,39.309391]]}},{"id":"+2Cg4vweLOayLsIWjTIFJDj4HMY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 52"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 52 Northbound near 9th St/Palen St (Ocean City), Monday June 8, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-04T08:44:04Z"},"road_event_id":"+2Cg4vweLOayLsIWjTIFJDj4HMY=","beginning_cross_street":"9th St/Palen St","ending_cross_street":"North of 9th St/Palen St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.580535,39.282245]]}},{"id":"CmxXTdNEb2xV3iAAtJt4K9lrHZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between Exit 18 - CR 667 (Paulsboro) and South of Exit 23 - US 130 (West Deptford Twp), Tuesday June 9, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-04T08:44:05Z"},"road_event_id":"CmxXTdNEb2xV3iAAtJt4K9lrHZ4=","beginning_cross_street":"Exit 18 - CR 667","ending_cross_street":"South of Exit 23 - US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.235542,39.822017]]}},{"id":"EQsNsNWPvKm9gFALdbmfQ2udNVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between US 322 (Logan Twp) and North of I-295/US 40 (Pennsville Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, , moving operation","update_date":"2026-06-04T08:44:11Z"},"road_event_id":"EQsNsNWPvKm9gFALdbmfQ2udNVU=","beginning_cross_street":"US 322","ending_cross_street":"North of I-295/US 40","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.349075,39.80278]]}},{"id":"HaLfC9XFGnxoG0EY/itL9XSlKTs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound at Eighteenth Av (Wall Twp) Saturday June 6, 2026 08:00 AM thru 01:00 PM, intersection","update_date":"2026-06-04T08:44:06Z"},"road_event_id":"HaLfC9XFGnxoG0EY/itL9XSlKTs=","beginning_cross_street":"Eighteenth Av","ending_cross_street":"Eighteenth Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.04776,40.167526]]}},{"id":"+AYIgoVwLt2G+ex4nio0jp+sLtI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 52"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 52 Northbound near South of CR 585/Shore Rd (Ocean City), Wednesday June 10, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-04T08:44:07Z"},"road_event_id":"+AYIgoVwLt2G+ex4nio0jp+sLtI=","beginning_cross_street":"South of CR 585/Shore Rd","ending_cross_street":"CR 559/Somers Point Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.592132,39.300781]]}},{"id":"DESaDSmgW259dFICtN7olxezIsY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near South of CR 522/Throckmorton St (Freehold Twp), Wednesday June 10, 2026 08:00 PM thru Thursday June 11, 2026 05:00 AM, right lane closed","update_date":"2026-06-04T08:44:08Z"},"road_event_id":"DESaDSmgW259dFICtN7olxezIsY=","beginning_cross_street":"South of CR 522/Throckmorton St","ending_cross_street":"North of CR 522/Throckmorton St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.293777,40.26583]]}},{"id":"LSKU3e+5TLR+w5ztoNGymxHnllA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between South of Exit 23 - US 130 (West Deptford Twp) and Exit 18 - CR 667 (Paulsboro), Monday June 8, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-04T08:43:49Z"},"road_event_id":"LSKU3e+5TLR+w5ztoNGymxHnllA=","beginning_cross_street":"South of Exit 23 - US 130","ending_cross_street":"Exit 18 - CR 667","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.155509,39.859924]]}},{"id":"NQqB8EkjkKcc/4q6nnnjBp6zudA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TZY1eux+5tV65iw87ORGud8uE78="}],"description":"Repaving on I-86 eastbound Exit 24 - West Fivemile Road (Allegany) to Exit 26 - NY 16 Connector (Olean), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-04T10:54:43Z"},"road_event_id":"NQqB8EkjkKcc/4q6nnnjBp6zudA=","beginning_cross_street":"Exit 24 -  West Fivemile Road","ending_cross_street":"Exit 26 - NY 16 Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.512965,42.102583]]}},{"id":"TZY1eux+5tV65iw87ORGud8uE78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NQqB8EkjkKcc/4q6nnnjBp6zudA="},{"type":"next-occurrence","id":"0qyaTVoXgiBGjgdzJxuWV18bOTU="}],"description":"Repaving on I-86 eastbound Exit 24 - West Fivemile Road (Allegany) to Exit 26 - NY 16 Connector (Olean), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-04T10:54:43Z"},"road_event_id":"TZY1eux+5tV65iw87ORGud8uE78=","beginning_cross_street":"Exit 24 -  West Fivemile Road","ending_cross_street":"Exit 26 - NY 16 Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.512965,42.102583]]}},{"id":"0qyaTVoXgiBGjgdzJxuWV18bOTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NQqB8EkjkKcc/4q6nnnjBp6zudA="},{"type":"next-occurrence","id":"Y05qZRT9WrPYu4cGHLnh81Hiqxg="}],"description":"Repaving on I-86 eastbound Exit 24 - West Fivemile Road (Allegany) to Exit 26 - NY 16 Connector (Olean), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-04T10:54:43Z"},"road_event_id":"0qyaTVoXgiBGjgdzJxuWV18bOTU=","beginning_cross_street":"Exit 24 -  West Fivemile Road","ending_cross_street":"Exit 26 - NY 16 Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.512965,42.102583]]}},{"id":"Y05qZRT9WrPYu4cGHLnh81Hiqxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NQqB8EkjkKcc/4q6nnnjBp6zudA="},{"type":"next-occurrence","id":"CQtIyvVm2fX7RYGxU4CmUGX2gy8="}],"description":"Repaving on I-86 eastbound Exit 24 - West Fivemile Road (Allegany) to Exit 26 - NY 16 Connector (Olean), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-04T10:54:43Z"},"road_event_id":"Y05qZRT9WrPYu4cGHLnh81Hiqxg=","beginning_cross_street":"Exit 24 -  West Fivemile Road","ending_cross_street":"Exit 26 - NY 16 Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.512965,42.102583]]}},{"id":"CQtIyvVm2fX7RYGxU4CmUGX2gy8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NQqB8EkjkKcc/4q6nnnjBp6zudA="}],"description":"Repaving on I-86 eastbound Exit 24 - West Fivemile Road (Allegany) to Exit 26 - NY 16 Connector (Olean), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-04T10:54:43Z"},"road_event_id":"CQtIyvVm2fX7RYGxU4CmUGX2gy8=","beginning_cross_street":"Exit 24 -  West Fivemile Road","ending_cross_street":"Exit 26 - NY 16 Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.512965,42.102583]]}},{"id":"CRBuCnb23QY+o4ddbV3Sgg+5I1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of CR 611/Hope Rd (Liberty Twp), Thursday June 11, 2026 09:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-06-04T11:28:41Z"},"road_event_id":"CRBuCnb23QY+o4ddbV3Sgg+5I1Y=","beginning_cross_street":"West of CR 611/Hope Rd","ending_cross_street":"West of CR 611/Hope Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.917762,40.867584]]}},{"id":"csqS8KVT4CKb4oOFn8TO9H2D+Hc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 28"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 28 Eastbound near East of Garden State Parkway (Cranford Twp), Tuesday June 9, 2026 10:00 AM thru 02:00 PM, right lane closed","update_date":"2026-06-04T11:28:43Z"},"road_event_id":"csqS8KVT4CKb4oOFn8TO9H2D+Hc=","beginning_cross_street":"East of Garden State Parkway","ending_cross_street":"East of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.288085,40.658344]]}},{"id":"Fpmgrh3U82bLuaKXTZMBkpEo1Ys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Southbound between South of W 63rd St (Bayonne) and South of Kennedy Boulevard (Bayonne), Thursday June 11, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-04T11:28:50Z"},"road_event_id":"Fpmgrh3U82bLuaKXTZMBkpEo1Ys=","beginning_cross_street":"South of W 63rd St","ending_cross_street":"South of Kennedy Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.109947,40.693672]]}},{"id":"LZApCh9Ky8RSnyAXj1Py8ntpVNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between East of Exit 49 - NJ 124/Springfield Ave (Union Twp) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Wednesday June 10, 2026 08:00 PM thru Thursday June 11, 2026 06:00 AM, at least one lane closed local lane","update_date":"2026-06-04T11:28:36Z"},"road_event_id":"LZApCh9Ky8RSnyAXj1Py8ntpVNw=","beginning_cross_street":"East of Exit 49 - NJ 124/Springfield Ave","ending_cross_street":"West of Exit 41 - Dale Rd to Plainfield Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.28968,40.714336]]}},{"id":"iRq61kv6Luvmaepxd4e7T+LjWLk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between West of Exit 48 - NJ 24 West (Springfield Twp) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Wednesday June 10, 2026 08:00 PM thru Thursday June 11, 2026 06:00 AM, at least one lane closed local lane , (2nd lane closed from 11:00 PM to 05:00 AM)","update_date":"2026-06-04T11:28:37Z"},"road_event_id":"iRq61kv6Luvmaepxd4e7T+LjWLk=","beginning_cross_street":"West of Exit 48 - NJ 24 West","ending_cross_street":"West of Exit 41 - Dale Rd to Plainfield Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T03:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.325942,40.711555]]}},{"id":"Bzcm5CJodwUi7lIrk5+1V4Lh50s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near Okner Pkwy (Livingston Twp), Saturday June 6, 2026 06:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-04T11:28:39Z"},"road_event_id":"Bzcm5CJodwUi7lIrk5+1V4Lh50s=","beginning_cross_street":"Okner Pkwy","ending_cross_street":"In the vicinity of River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.356948,40.799343]]}},{"id":"DIJ8C6upRrndpo1EB3WVooXeDa0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between East of Exit 49 - NJ 124/Springfield Ave (Union Twp) and East of Exit 48 - NJ 24 West (Springfield Twp), Wednesday June 10, 2026 08:00 PM thru Thursday June 11, 2026 06:00 AM, at least one lane closed local lane , (2nd lane closed from 11:00 PM to 05:00 AM) local lanes","update_date":"2026-06-04T11:28:49Z"},"road_event_id":"DIJ8C6upRrndpo1EB3WVooXeDa0=","beginning_cross_street":"East of Exit 49 - NJ 124/Springfield Ave","ending_cross_street":"East of Exit 48 - NJ 24 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T03:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.28968,40.714336]]}},{"id":"O0Ys6yQt9peQJvE2IR7W8WtMMsc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Southbound near US 46 (White Twp), Thursday June 11, 2026 09:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-06-04T11:28:46Z"},"road_event_id":"O0Ys6yQt9peQJvE2IR7W8WtMMsc=","beginning_cross_street":"US 46","ending_cross_street":"South of US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.000984,40.832092]]}},{"id":"6EV55v2WyrO/DNr58TFEvPP4DgE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near Okner Pkwy (Livingston Twp), Friday June 5, 2026 09:00 PM thru Saturday June 6, 2026 07:00 AM, right lane closed","update_date":"2026-06-04T11:28:45Z"},"road_event_id":"6EV55v2WyrO/DNr58TFEvPP4DgE=","beginning_cross_street":"Okner Pkwy","ending_cross_street":"In the vicinity of River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.356948,40.799343]]}},{"id":"54hSwIFGfSvs7qz16Xd4shCdjGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction eastbound, B65 Bus between Dean St/4 Av (New York) and Bergen St/Carlton Av (New York) stops are closed, please use the stops on Atlantic Ave at Flatbush Ave or Carlton Ave, Continuous Thursday June 4th, 2026 12:00 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-06-04T11:38:29Z"},"road_event_id":"54hSwIFGfSvs7qz16Xd4shCdjGE=","beginning_cross_street":"Dean St/4 Av","ending_cross_street":"Bergen St/Carlton Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-20T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979412,40.683165]]}},{"id":"ORC32768609","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","description":"Street sweeping on Taconic State Parkway southbound between Exit 8 - Saw Mill River Road; NY 100 (New Castle) and Exit 4 - NY 117 (Mount Pleasant) Res 8-8 RW/32768609 - This is a moving operation. Plan travel accordingly; delays may exist Not currently scheduled","update_date":"2026-06-04T17:00:39Z"},"road_event_id":"ORC32768609","beginning_cross_street":"Exit 8 - Saw Mill River Road; NY 100","ending_cross_street":"Exit 4 - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-04T12:46:45Z","end_date":"2026-06-05T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.810456,41.176267]]}},{"id":"1lDiK5QryPq/4q+/Zb5aPhEMlH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xO1nmUqk4Cszu7c31Fna3Z6IwxA="}],"description":"Paving operations on US 20 both directions between Nelson Road (Nelson) and Reservoir Road (Eaton) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-06-04T13:02:48Z"},"road_event_id":"1lDiK5QryPq/4q+/Zb5aPhEMlH0=","beginning_cross_street":"Nelson Road","ending_cross_street":"Reservoir Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:00:00Z","end_date":"2026-06-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.681428,42.906214]]}},{"id":"xO1nmUqk4Cszu7c31Fna3Z6IwxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1lDiK5QryPq/4q+/Zb5aPhEMlH0="},{"type":"next-occurrence","id":"zgUCj7N9TRubeBrGhmfn1UUL5UE="}],"description":"Paving operations on US 20 both directions between Nelson Road (Nelson) and Reservoir Road (Eaton) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-06-04T13:02:48Z"},"road_event_id":"xO1nmUqk4Cszu7c31Fna3Z6IwxA=","beginning_cross_street":"Nelson Road","ending_cross_street":"Reservoir Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.681428,42.906214]]}},{"id":"zgUCj7N9TRubeBrGhmfn1UUL5UE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1lDiK5QryPq/4q+/Zb5aPhEMlH0="},{"type":"next-occurrence","id":"7hotrtLY2XIhABrO5uzgfPNIgxg="}],"description":"Paving operations on US 20 both directions between Nelson Road (Nelson) and Reservoir Road (Eaton) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-06-04T13:02:48Z"},"road_event_id":"zgUCj7N9TRubeBrGhmfn1UUL5UE=","beginning_cross_street":"Nelson Road","ending_cross_street":"Reservoir Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.681428,42.906214]]}},{"id":"7hotrtLY2XIhABrO5uzgfPNIgxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1lDiK5QryPq/4q+/Zb5aPhEMlH0="},{"type":"next-occurrence","id":"qFZHLlvK0ndUi5besFa8wseHGA0="}],"description":"Paving operations on US 20 both directions between Nelson Road (Nelson) and Reservoir Road (Eaton) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-06-04T13:02:48Z"},"road_event_id":"7hotrtLY2XIhABrO5uzgfPNIgxg=","beginning_cross_street":"Nelson Road","ending_cross_street":"Reservoir Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.681428,42.906214]]}},{"id":"qFZHLlvK0ndUi5besFa8wseHGA0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1lDiK5QryPq/4q+/Zb5aPhEMlH0="},{"type":"next-occurrence","id":"QRgiow8rlkt3GrB2zZ2OTh91Qng="}],"description":"Paving operations on US 20 both directions between Nelson Road (Nelson) and Reservoir Road (Eaton) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-06-04T13:02:48Z"},"road_event_id":"qFZHLlvK0ndUi5besFa8wseHGA0=","beginning_cross_street":"Nelson Road","ending_cross_street":"Reservoir Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.681428,42.906214]]}},{"id":"QRgiow8rlkt3GrB2zZ2OTh91Qng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1lDiK5QryPq/4q+/Zb5aPhEMlH0="}],"description":"Paving operations on US 20 both directions between Nelson Road (Nelson) and Reservoir Road (Eaton) Motorists will encounter lane closures in both directions with flaggers in place, Monday May 18th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-06-04T13:02:48Z"},"road_event_id":"QRgiow8rlkt3GrB2zZ2OTh91Qng=","beginning_cross_street":"Nelson Road","ending_cross_street":"Reservoir Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.681428,42.906214]]}},{"id":"f6BKMDS1T94Xak6FHETaucpUVq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D042080/B1091440/32768809 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 11th, 2026, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-04T13:33:20Z"},"road_event_id":"f6BKMDS1T94Xak6FHETaucpUVq4=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812915,41.239737]]}},{"id":"r0N3V4ItdeqmD1tDGgTvwvHLDVM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 117"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on NY 117 both directions between NY 9A (Mount Pleasant) and Taconic State Pkwy Ramp (Mount Pleasant) D042080/B5523850/32768909 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 11th, 2026, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-04T13:58:10Z"},"road_event_id":"r0N3V4ItdeqmD1tDGgTvwvHLDVM=","beginning_cross_street":" NY 9A","ending_cross_street":"Taconic State Pkwy Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80855,41.123873]]}},{"id":"gWaoJcCOppLWPDwgCTCLO8gHXDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound between East of Exit 15 - NJ 21 (Newark) and West of Exit 13 - Orange St/1st St (Newark), Friday June 5, 2026 10:00 PM thru Saturday June 6, 2026 10:00 AM, left lane closed","update_date":"2026-06-04T13:37:39Z"},"road_event_id":"gWaoJcCOppLWPDwgCTCLO8gHXDw=","beginning_cross_street":"East of Exit 15 - NJ 21","ending_cross_street":"West of Exit 13 - Orange St/1st St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.172897,40.748104]]}},{"id":"ORC300552013","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broadway"],"direction":"unknown","description":"Emergency repairs on Broadway both directions between 178th Street (New York) and 179th Street (New York) Under the Port Authority GWB Bus Terminal. Not currently Scheduled","update_date":"2026-06-05T09:00:01Z"},"road_event_id":"ORC300552013","beginning_cross_street":"178th Street","ending_cross_street":"179th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-04T13:48:42Z","end_date":"2026-06-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.937079,40.848939]]}},{"id":"ORC32769109","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","description":"Pothole repair on Hutchinson River Parkway [Westchester] northbound between Exit 16A - I-684 (Harrison) and Connecticut State Line (Rye) Res 8-9 RW/32769109 - This is a moving operation. Plan travel accordingly; delays may exist Not currently scheduled","update_date":"2026-06-04T18:00:22Z"},"road_event_id":"ORC32769109","beginning_cross_street":"Exit 16A  - I-684","ending_cross_street":"Connecticut State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-04T14:08:17Z","end_date":"2026-06-05T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.713974,41.020477]]}},{"id":"IhX0kftt321dyxrDLlyj15Q0/vI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near South of Morgan Drawbridge (Old Bridge Twp), Monday June 8, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-06-04T14:43:37Z"},"road_event_id":"IhX0kftt321dyxrDLlyj15Q0/vI=","beginning_cross_street":"South of Morgan Drawbridge","ending_cross_street":"Morgan Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.25373,40.460311]]}},{"id":"4z4PECeRKJEw/s7+yFBjeFnHxNE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near Morgan Drawbridge (Sayreville), Wednesday June 10, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-06-04T14:43:39Z"},"road_event_id":"4z4PECeRKJEw/s7+yFBjeFnHxNE=","beginning_cross_street":"Morgan Drawbridge","ending_cross_street":"Ernston Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.260292,40.463428]]}},{"id":"9+G4siAu3Bjt5ohv5FnrmpwiBqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near South of Morgan Drawbridge (Old Bridge Twp), Tuesday June 9, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-06-04T14:43:40Z"},"road_event_id":"9+G4siAu3Bjt5ohv5FnrmpwiBqM=","beginning_cross_street":"South of Morgan Drawbridge","ending_cross_street":"Morgan Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.25373,40.460311]]}},{"id":"px8BBLGKYXq8sEyAAh/DxWaXyBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near South of Morgan Drawbridge (Old Bridge Twp), Thursday June 11, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-06-04T14:43:41Z"},"road_event_id":"px8BBLGKYXq8sEyAAh/DxWaXyBc=","beginning_cross_street":"South of Morgan Drawbridge","ending_cross_street":"Morgan Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.25373,40.460311]]}},{"id":"3Z7rZX+RVMyvMjloiuIlB9kWUc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between South of Morgan Drawbridge (Old Bridge Twp) and North of Birchwood Dr (Old Bridge Twp), Thursday June 11, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-06-04T14:43:36Z"},"road_event_id":"3Z7rZX+RVMyvMjloiuIlB9kWUc8=","beginning_cross_street":"South of Morgan Drawbridge","ending_cross_street":"North of Birchwood Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.25373,40.460311]]}},{"id":"RD/lOPOFbPy8fnveQoUsPDZrcdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between South of Morgan Drawbridge (Old Bridge Twp) and North of Birchwood Dr (Old Bridge Twp), Monday June 8, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-06-04T14:43:43Z"},"road_event_id":"RD/lOPOFbPy8fnveQoUsPDZrcdM=","beginning_cross_street":"South of Morgan Drawbridge","ending_cross_street":"North of Birchwood Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.25373,40.460311]]}},{"id":"tbpdaI36THIVTPo/DGtYX/XbxUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between South of Morgan Drawbridge (Old Bridge Twp) and North of Birchwood Dr (Old Bridge Twp), Tuesday June 9, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-06-04T14:43:44Z"},"road_event_id":"tbpdaI36THIVTPo/DGtYX/XbxUo=","beginning_cross_street":"South of Morgan Drawbridge","ending_cross_street":"North of Birchwood Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.25373,40.460311]]}},{"id":"yCmefO1kZjuy+zJNpnXcPOo4s4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near South of Morgan Drawbridge (Old Bridge Twp), Wednesday June 10, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-06-04T14:43:46Z"},"road_event_id":"yCmefO1kZjuy+zJNpnXcPOo4s4E=","beginning_cross_street":"South of Morgan Drawbridge","ending_cross_street":"Morgan Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.25373,40.460311]]}},{"id":"umCytl1u2oH5a9HWZwO+7IIpF8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near Morgan Drawbridge (Sayreville), Monday June 8, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-06-04T14:43:47Z"},"road_event_id":"umCytl1u2oH5a9HWZwO+7IIpF8M=","beginning_cross_street":"Morgan Drawbridge","ending_cross_street":"Ernston Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.260292,40.463428]]}},{"id":"+Nteva0PUzQGG2U/pRl2HNATgjw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near Morgan Drawbridge (Sayreville), Tuesday June 9, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-06-04T14:43:48Z"},"road_event_id":"+Nteva0PUzQGG2U/pRl2HNATgjw=","beginning_cross_street":"Morgan Drawbridge","ending_cross_street":"Ernston Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.260292,40.463428]]}},{"id":"n3Hd8e/yQgC+r3YPlpN9Tefo1o8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between South of Morgan Drawbridge (Old Bridge Twp) and North of Birchwood Dr (Old Bridge Twp), Wednesday June 10, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-06-04T14:43:50Z"},"road_event_id":"n3Hd8e/yQgC+r3YPlpN9Tefo1o8=","beginning_cross_street":"South of Morgan Drawbridge","ending_cross_street":"North of Birchwood Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.25373,40.460311]]}},{"id":"YlWu7ESOWl7Bwdobg5arRB4PeKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near Morgan Drawbridge (Sayreville), Thursday June 11, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-06-04T14:43:51Z"},"road_event_id":"YlWu7ESOWl7Bwdobg5arRB4PeKA=","beginning_cross_street":"Morgan Drawbridge","ending_cross_street":"Ernston Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.260292,40.463428]]}},{"id":"L4LjnlDez3R4r3pftycoEtkcKzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gQ7vu8v+WDdtAUrK8PVNRkia0aM="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32769209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-04T17:23:54Z"},"road_event_id":"L4LjnlDez3R4r3pftycoEtkcKzs=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"gQ7vu8v+WDdtAUrK8PVNRkia0aM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L4LjnlDez3R4r3pftycoEtkcKzs="},{"type":"next-occurrence","id":"CqUvKuk+ivHqesj+KZakk2LR+tw="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32769209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-04T17:23:54Z"},"road_event_id":"gQ7vu8v+WDdtAUrK8PVNRkia0aM=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"CqUvKuk+ivHqesj+KZakk2LR+tw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L4LjnlDez3R4r3pftycoEtkcKzs="},{"type":"next-occurrence","id":"sMap2Gd9EPE7ix7+t9Ma0ko6w+s="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32769209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-04T17:23:54Z"},"road_event_id":"CqUvKuk+ivHqesj+KZakk2LR+tw=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"sMap2Gd9EPE7ix7+t9Ma0ko6w+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L4LjnlDez3R4r3pftycoEtkcKzs="},{"type":"next-occurrence","id":"WTSgz44a1lQkEjs3jwo92VOeZy4="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32769209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-04T17:23:54Z"},"road_event_id":"sMap2Gd9EPE7ix7+t9Ma0ko6w+s=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"WTSgz44a1lQkEjs3jwo92VOeZy4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L4LjnlDez3R4r3pftycoEtkcKzs="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32769209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-04T17:23:54Z"},"road_event_id":"WTSgz44a1lQkEjs3jwo92VOeZy4=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"DygNhllBJ+8bC0/mvMPjVQEuSGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4YRSivyEjiRtfGYLRP65jTeHHM0="}],"description":"Utility work on NY 218 both directions between Villa Pkwy (Highlands) and Satterlee Road (Highlands) 2025MO3381214/32769309 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday June 10th, 2026 thru Friday June 12th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-06-04T15:12:28Z"},"road_event_id":"DygNhllBJ+8bC0/mvMPjVQEuSGs=","beginning_cross_street":"Villa Pkwy","ending_cross_street":"Satterlee Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967777,41.36166]]}},{"id":"4YRSivyEjiRtfGYLRP65jTeHHM0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DygNhllBJ+8bC0/mvMPjVQEuSGs="},{"type":"next-occurrence","id":"3O55LJDY4X7ZHicO/PVHADLkLrc="}],"description":"Utility work on NY 218 both directions between Villa Pkwy (Highlands) and Satterlee Road (Highlands) 2025MO3381214/32769309 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday June 10th, 2026 thru Friday June 12th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-06-04T15:12:28Z"},"road_event_id":"4YRSivyEjiRtfGYLRP65jTeHHM0=","beginning_cross_street":"Villa Pkwy","ending_cross_street":"Satterlee Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967777,41.36166]]}},{"id":"3O55LJDY4X7ZHicO/PVHADLkLrc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DygNhllBJ+8bC0/mvMPjVQEuSGs="}],"description":"Utility work on NY 218 both directions between Villa Pkwy (Highlands) and Satterlee Road (Highlands) 2025MO3381214/32769309 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday June 10th, 2026 thru Friday June 12th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-06-04T15:12:28Z"},"road_event_id":"3O55LJDY4X7ZHicO/PVHADLkLrc=","beginning_cross_street":"Villa Pkwy","ending_cross_street":"Satterlee Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967777,41.36166]]}},{"id":"1zb/3hbRKh79dqcDukIHv342Ltc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 354"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VDp/E2rDNj5RtLtePHfaJmgVtWk="}],"description":"Bridge inspection on NY 354 both directions area of Alleghany Road; NY 77 Bennington Center (Bennington) lane closures flaggers as needed , Monday June 8th, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday/Wednesday, 08:00 AM thru 05:00 PM All lanes","update_date":"2026-06-04T15:07:15Z"},"road_event_id":"1zb/3hbRKh79dqcDukIHv342Ltc=","beginning_cross_street":"Alleghany Road; NY 77 Bennington Center","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.399724,42.836833]]}},{"id":"VDp/E2rDNj5RtLtePHfaJmgVtWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 354"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1zb/3hbRKh79dqcDukIHv342Ltc="},{"type":"next-occurrence","id":"9LvtDYtoy6GMpNS7JwgVoaErj50="}],"description":"Bridge inspection on NY 354 both directions area of Alleghany Road; NY 77 Bennington Center (Bennington) lane closures flaggers as needed , Monday June 8th, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday/Wednesday, 08:00 AM thru 05:00 PM All lanes","update_date":"2026-06-04T15:07:15Z"},"road_event_id":"VDp/E2rDNj5RtLtePHfaJmgVtWk=","beginning_cross_street":"Alleghany Road; NY 77 Bennington Center","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.399724,42.836833]]}},{"id":"9LvtDYtoy6GMpNS7JwgVoaErj50=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 354"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1zb/3hbRKh79dqcDukIHv342Ltc="}],"description":"Bridge inspection on NY 354 both directions area of Alleghany Road; NY 77 Bennington Center (Bennington) lane closures flaggers as needed , Monday June 8th, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday/Wednesday, 08:00 AM thru 05:00 PM All lanes","update_date":"2026-06-04T15:07:15Z"},"road_event_id":"9LvtDYtoy6GMpNS7JwgVoaErj50=","beginning_cross_street":"Alleghany Road; NY 77 Bennington Center","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.399724,42.836833]]}},{"id":"AqgOSWHa4cCRJhq2LQ0vljZS7PM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7SdBsHFYc/SQZQ1Be3ebOFfKtjs="}],"description":"Roadwork on NY 32 both directions Game Farm Road (Catskill) to Cairo Junction Road; CR 46 (Catskill), Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-04T15:18:40Z"},"road_event_id":"AqgOSWHa4cCRJhq2LQ0vljZS7PM=","beginning_cross_street":"Game Farm Road","ending_cross_street":"Cairo Junction Road; CR 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984224,42.225849]]}},{"id":"7SdBsHFYc/SQZQ1Be3ebOFfKtjs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqgOSWHa4cCRJhq2LQ0vljZS7PM="},{"type":"next-occurrence","id":"+L+q3PXxxY03wnWV1vvQnefKYkU="}],"description":"Roadwork on NY 32 both directions Game Farm Road (Catskill) to Cairo Junction Road; CR 46 (Catskill), Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-04T15:18:40Z"},"road_event_id":"7SdBsHFYc/SQZQ1Be3ebOFfKtjs=","beginning_cross_street":"Game Farm Road","ending_cross_street":"Cairo Junction Road; CR 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984224,42.225849]]}},{"id":"+L+q3PXxxY03wnWV1vvQnefKYkU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqgOSWHa4cCRJhq2LQ0vljZS7PM="},{"type":"next-occurrence","id":"myOm8Hfgk7rBEAhzySJ9szGzL2M="}],"description":"Roadwork on NY 32 both directions Game Farm Road (Catskill) to Cairo Junction Road; CR 46 (Catskill), Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-04T15:18:40Z"},"road_event_id":"+L+q3PXxxY03wnWV1vvQnefKYkU=","beginning_cross_street":"Game Farm Road","ending_cross_street":"Cairo Junction Road; CR 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984224,42.225849]]}},{"id":"myOm8Hfgk7rBEAhzySJ9szGzL2M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AqgOSWHa4cCRJhq2LQ0vljZS7PM="}],"description":"Roadwork on NY 32 both directions Game Farm Road (Catskill) to Cairo Junction Road; CR 46 (Catskill), Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-04T15:18:40Z"},"road_event_id":"myOm8Hfgk7rBEAhzySJ9szGzL2M=","beginning_cross_street":"Game Farm Road","ending_cross_street":"Cairo Junction Road; CR 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984224,42.225849]]}},{"id":"JqMuQvjMLUs4kfTq7lrVLgRhYig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 208 northbound between Shannon Lane (Monroe) and Clove Road (Monroe) 2025084500874/32769509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-04T15:32:58Z"},"road_event_id":"JqMuQvjMLUs4kfTq7lrVLgRhYig=","beginning_cross_street":"Shannon Lane","ending_cross_street":"Clove Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.177195,41.376793]]}},{"id":"wIQmWsSleXJaOs2dhOtA4cSixlQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vUg0Hg9/n22E4USk70txMB4qTHg="}],"description":"Utility work on NY 52 westbound between Bank Street (Montgomery) and Walker Street (Montgomery) 2025084500874/32769609 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday June 9th, 2026 thru Wednesday June 10th, 2026 Tuesday/ Wednesday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-04T15:46:26Z"},"road_event_id":"wIQmWsSleXJaOs2dhOtA4cSixlQ=","beginning_cross_street":"Bank Street","ending_cross_street":"Walker Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.190854,41.560772]]}},{"id":"vUg0Hg9/n22E4USk70txMB4qTHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wIQmWsSleXJaOs2dhOtA4cSixlQ="}],"description":"Utility work on NY 52 westbound between Bank Street (Montgomery) and Walker Street (Montgomery) 2025084500874/32769609 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday June 9th, 2026 thru Wednesday June 10th, 2026 Tuesday/ Wednesday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-04T15:46:26Z"},"road_event_id":"vUg0Hg9/n22E4USk70txMB4qTHg=","beginning_cross_street":"Bank Street","ending_cross_street":"Walker Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.190854,41.560772]]}},{"id":"c651lW/HA8BHRGIWpv5zmf3W89g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound near South of CR 643/Mill St (Sussex), Monday June 8, 2026 09:00 AM thru 03:30 PM, right shoulder closed, moving operation","update_date":"2026-06-04T15:40:38Z"},"road_event_id":"c651lW/HA8BHRGIWpv5zmf3W89g=","beginning_cross_street":"South of CR 643/Mill St","ending_cross_street":"North of CR 643/Mill St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.608558,41.208019]]}},{"id":"8UN/hQJWIoK/w8lQ0B26FJYKZDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["12TH AVE"],"direction":"unknown","related_road_events":[],"description":"Construction on 12TH AVE both directions from RIVERSIDE DR (New York) to W 135TH ST (New York) Subject to change without notice., Tuesday June 9th, 2026 thru Wednesday June 10th, 2026, 10:00 PM thru 04:00 AM 1 Right lane of 3 lanes closed northbound; 1 Left lane of 3 lanes closed southbound","update_date":"2026-06-04T15:42:45Z"},"road_event_id":"8UN/hQJWIoK/w8lQ0B26FJYKZDU=","beginning_cross_street":"RIVERSIDE DR","ending_cross_street":"W 135TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960628,40.817522]]}},{"id":"PsSjqVtnVBvdSP01cetVZtbm0Zg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FDR DR SERVICE RD E"],"direction":"unknown","related_road_events":[],"description":"Construction on FDR DR SERVICE RD E both directions from E 34TH ST (New York) to FDR DR SERVICE RD W (New York) Subject to change without notice. Under Franklin D. Roosevelt Drive Viaduct., Wednesday June 10th, 2026 thru Thursday June 11th, 2026, 10:00 PM thru 04:00 AM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T15:46:18Z"},"road_event_id":"PsSjqVtnVBvdSP01cetVZtbm0Zg=","beginning_cross_street":"E 34TH ST","ending_cross_street":"FDR DR SERVICE RD W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.972029,40.743235]]}},{"id":"LKUG+M/YxDCQclzVsvzALpG5c+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between West of Exit 36 - CR 651 (Warren Twp) and East of Exit 33 - CR 525/Liberty Corner Rd/Martinsville (Warren Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, at least one lane closed","update_date":"2026-06-04T15:46:37Z"},"road_event_id":"LKUG+M/YxDCQclzVsvzALpG5c+Y=","beginning_cross_street":"West of Exit 36 - CR 651","ending_cross_street":"East of Exit 33 - CR 525/Liberty Corner Rd/Martinsville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.533447,40.647079]]}},{"id":"gCWxQfqxrMyGbsGc/uOp9BcEin8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between West of Exit 36 - CR 651 (Warren Twp) and East of Exit 33 - CR 525/Liberty Corner Rd/Martinsville (Warren Twp), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 06:00 AM)","update_date":"2026-06-04T15:46:39Z"},"road_event_id":"gCWxQfqxrMyGbsGc/uOp9BcEin8=","beginning_cross_street":"West of Exit 36 - CR 651","ending_cross_street":"East of Exit 33 - CR 525/Liberty Corner Rd/Martinsville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.533447,40.647079]]}},{"id":"VVPSpBYm9fnGKXQwpRNQS+kQK3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRANKFORT ST"],"direction":"unknown","related_road_events":[],"description":"Construction on FRANKFORT ST both directions between GOLD ST (New York) Subject to change without notice., Tuesday June 9th, 2026, 10:00 AM thru 02:00 PM right shoulder closed","update_date":"2026-06-04T15:48:55Z"},"road_event_id":"VVPSpBYm9fnGKXQwpRNQS+kQK3A=","beginning_cross_street":"GOLD ST","ending_cross_street":"GOLD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003569,40.710956]]}},{"id":"RP08O5D8AvOIsXSZPB5XaKi+1aQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Palisades Interstate Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gduhOIxFEx/sJFLAg0EbjgN1ouQ="}],"description":"Drainage improvements on Palisades Interstate Parkway northbound between Exit 14 -Willow Grove Road (Haverstraw) and Exit 15 - Old Gate Hill Road (Stony Point) D265386/32744709 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 06:00 AM thru 02:00 PM, left lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026 Monday/ Wednesday/ Friday, 06:00 AM thru 02:00 PM, left lane closure","update_date":"2026-06-04T16:56:24Z"},"road_event_id":"RP08O5D8AvOIsXSZPB5XaKi+1aQ=","beginning_cross_street":"Exit 14 -Willow Grove Road","ending_cross_street":"Exit 15 - Old Gate Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033922,41.221437]]}},{"id":"gduhOIxFEx/sJFLAg0EbjgN1ouQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Palisades Interstate Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RP08O5D8AvOIsXSZPB5XaKi+1aQ="},{"type":"next-occurrence","id":"d87+YYyMMcFwjLrtIDxI/zqJ4MY="}],"description":"Drainage improvements on Palisades Interstate Parkway northbound between Exit 14 -Willow Grove Road (Haverstraw) and Exit 15 - Old Gate Hill Road (Stony Point) D265386/32744709 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 06:00 AM thru 02:00 PM, left lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026 Monday/ Wednesday/ Friday, 06:00 AM thru 02:00 PM, left lane closure","update_date":"2026-06-04T16:56:24Z"},"road_event_id":"gduhOIxFEx/sJFLAg0EbjgN1ouQ=","beginning_cross_street":"Exit 14 -Willow Grove Road","ending_cross_street":"Exit 15 - Old Gate Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033922,41.221437]]}},{"id":"d87+YYyMMcFwjLrtIDxI/zqJ4MY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Palisades Interstate Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RP08O5D8AvOIsXSZPB5XaKi+1aQ="}],"description":"Drainage improvements on Palisades Interstate Parkway northbound between Exit 14 -Willow Grove Road (Haverstraw) and Exit 15 - Old Gate Hill Road (Stony Point) D265386/32744709 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 06:00 AM thru 02:00 PM, left lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026 Monday/ Wednesday/ Friday, 06:00 AM thru 02:00 PM, left lane closure","update_date":"2026-06-04T16:56:24Z"},"road_event_id":"d87+YYyMMcFwjLrtIDxI/zqJ4MY=","beginning_cross_street":"Exit 14 -Willow Grove Road","ending_cross_street":"Exit 15 - Old Gate Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033922,41.221437]]}},{"id":"+NHfD26i/1tE1E+ZvzCKeZvIP3E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["150TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1qGpiLQFBESYokU7Tqx5hn6Oqks="}],"description":"Construction on 150TH ST southbound from 133RD AVE (New York) to 148TH ST at 150TH AVE (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-06-04T15:54:28Z"},"road_event_id":"+NHfD26i/1tE1E+ZvzCKeZvIP3E=","beginning_cross_street":"133RD AVE","ending_cross_street":"150TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.78919,40.668277]]}},{"id":"1qGpiLQFBESYokU7Tqx5hn6Oqks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["150TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+NHfD26i/1tE1E+ZvzCKeZvIP3E="},{"type":"next-occurrence","id":"4ml+DXYs5A0QKJgIdf4N+ym0PIw="}],"description":"Construction on 150TH ST southbound from 133RD AVE (New York) to 148TH ST at 150TH AVE (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-06-04T15:54:28Z"},"road_event_id":"1qGpiLQFBESYokU7Tqx5hn6Oqks=","beginning_cross_street":"133RD AVE","ending_cross_street":"150TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.78919,40.668277]]}},{"id":"4ml+DXYs5A0QKJgIdf4N+ym0PIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["150TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+NHfD26i/1tE1E+ZvzCKeZvIP3E="},{"type":"next-occurrence","id":"jPCI6b6CbfN+3Il4DUaJtQMS0p0="}],"description":"Construction on 150TH ST southbound from 133RD AVE (New York) to 148TH ST at 150TH AVE (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-06-04T15:54:28Z"},"road_event_id":"4ml+DXYs5A0QKJgIdf4N+ym0PIw=","beginning_cross_street":"133RD AVE","ending_cross_street":"150TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.78919,40.668277]]}},{"id":"jPCI6b6CbfN+3Il4DUaJtQMS0p0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["150TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+NHfD26i/1tE1E+ZvzCKeZvIP3E="},{"type":"next-occurrence","id":"qWqeABuaMW33IUderRA3FviUb7Y="}],"description":"Construction on 150TH ST southbound from 133RD AVE (New York) to 148TH ST at 150TH AVE (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-06-04T15:54:28Z"},"road_event_id":"jPCI6b6CbfN+3Il4DUaJtQMS0p0=","beginning_cross_street":"133RD AVE","ending_cross_street":"150TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.78919,40.668277]]}},{"id":"qWqeABuaMW33IUderRA3FviUb7Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["150TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+NHfD26i/1tE1E+ZvzCKeZvIP3E="}],"description":"Construction on 150TH ST southbound from 133RD AVE (New York) to 148TH ST at 150TH AVE (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-06-04T15:54:28Z"},"road_event_id":"qWqeABuaMW33IUderRA3FviUb7Y=","beginning_cross_street":"133RD AVE","ending_cross_street":"150TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.78919,40.668277]]}},{"id":"wEyBHrB6Efyf1sf04yXNmwjk1dQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JFK EXPY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wpWDmlQc+lYILfwpbvmOYAB2nHo="}],"description":"Construction on JFK EXPY southbound from 2N (New York) to 2S (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T15:56:53Z"},"road_event_id":"wEyBHrB6Efyf1sf04yXNmwjk1dQ=","beginning_cross_street":"2N","ending_cross_street":"2S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.790018,40.664081]]}},{"id":"wpWDmlQc+lYILfwpbvmOYAB2nHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JFK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wEyBHrB6Efyf1sf04yXNmwjk1dQ="},{"type":"next-occurrence","id":"HP3PUL6POxHI5B9xK0MVKftIXY8="}],"description":"Construction on JFK EXPY southbound from 2N (New York) to 2S (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T15:56:53Z"},"road_event_id":"wpWDmlQc+lYILfwpbvmOYAB2nHo=","beginning_cross_street":"2N","ending_cross_street":"2S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.790018,40.664081]]}},{"id":"HP3PUL6POxHI5B9xK0MVKftIXY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JFK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wEyBHrB6Efyf1sf04yXNmwjk1dQ="},{"type":"next-occurrence","id":"pBcDsZdS+oE6iK28dEablvt5J1c="}],"description":"Construction on JFK EXPY southbound from 2N (New York) to 2S (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T15:56:53Z"},"road_event_id":"HP3PUL6POxHI5B9xK0MVKftIXY8=","beginning_cross_street":"2N","ending_cross_street":"2S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.790018,40.664081]]}},{"id":"pBcDsZdS+oE6iK28dEablvt5J1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JFK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wEyBHrB6Efyf1sf04yXNmwjk1dQ="},{"type":"next-occurrence","id":"mObeRNXhlGV9/vyJuOwIWIPWhRs="}],"description":"Construction on JFK EXPY southbound from 2N (New York) to 2S (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T15:56:53Z"},"road_event_id":"pBcDsZdS+oE6iK28dEablvt5J1c=","beginning_cross_street":"2N","ending_cross_street":"2S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.790018,40.664081]]}},{"id":"mObeRNXhlGV9/vyJuOwIWIPWhRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JFK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wEyBHrB6Efyf1sf04yXNmwjk1dQ="}],"description":"Construction on JFK EXPY southbound from 2N (New York) to 2S (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T15:56:53Z"},"road_event_id":"mObeRNXhlGV9/vyJuOwIWIPWhRs=","beginning_cross_street":"2N","ending_cross_street":"2S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.790018,40.664081]]}},{"id":"42mTPBfUdp5YbwxK9XQFI4nSnfY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AmETuT57PYkOpPjJ/YnrJx/Kkis="}],"description":"Bridge inspection on NY 441 both directions at Panorama Trail South; NY 153 (Penfield) Panorama Trail , Tuesday June 9th, 2026 thru Wednesday June 10th, 2026, Tuesday/Wednesday, 08:30 AM thru 04:00 PM right shoulder closed westbound; All lanes open eastbound, Thursday June 11th, 2026, 08:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-04T17:44:07Z"},"road_event_id":"42mTPBfUdp5YbwxK9XQFI4nSnfY=","beginning_cross_street":"Panorama Trail  South; NY 153","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:30:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.490724,43.127939]]}},{"id":"AmETuT57PYkOpPjJ/YnrJx/Kkis=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"42mTPBfUdp5YbwxK9XQFI4nSnfY="},{"type":"next-occurrence","id":"uNKWfVRcWZhZJXCQPgOFaMwMXHo="}],"description":"Bridge inspection on NY 441 both directions at Panorama Trail South; NY 153 (Penfield) Panorama Trail , Tuesday June 9th, 2026 thru Wednesday June 10th, 2026, Tuesday/Wednesday, 08:30 AM thru 04:00 PM right shoulder closed westbound; All lanes open eastbound, Thursday June 11th, 2026, 08:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-04T17:44:07Z"},"road_event_id":"AmETuT57PYkOpPjJ/YnrJx/Kkis=","beginning_cross_street":"Panorama Trail  South; NY 153","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:30:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.490724,43.127939]]}},{"id":"uNKWfVRcWZhZJXCQPgOFaMwMXHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"42mTPBfUdp5YbwxK9XQFI4nSnfY="}],"description":"Bridge inspection on NY 441 both directions at Panorama Trail South; NY 153 (Penfield) Panorama Trail , Tuesday June 9th, 2026 thru Wednesday June 10th, 2026, Tuesday/Wednesday, 08:30 AM thru 04:00 PM right shoulder closed westbound; All lanes open eastbound, Thursday June 11th, 2026, 08:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-04T17:44:07Z"},"road_event_id":"uNKWfVRcWZhZJXCQPgOFaMwMXHo=","beginning_cross_street":"Panorama Trail  South; NY 153","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.490724,43.127939]]}},{"id":"lYRyT5vvoc16sJ94EOou+vw2E5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Palisades Interstate Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5h77xoTABo79t/xL4DnLvqKsrII="}],"description":"Drainage improvements on Palisades Interstate Parkway southbound between Exit 16 - Lake Welch Parkway (Stony Point) and Exit 15 - Old Gate Hill Road (Stony Point) D265386/32744609 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, left lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026 Monday/ Wednesday/ Friday, 09:00 AM thru 04:00 PM, left lane closure","update_date":"2026-06-04T16:56:03Z"},"road_event_id":"lYRyT5vvoc16sJ94EOou+vw2E5o=","beginning_cross_street":"Exit 16 - Lake Welch Parkway","ending_cross_street":"Exit 15 - Old Gate Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042323,41.250318]]}},{"id":"5h77xoTABo79t/xL4DnLvqKsrII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Palisades Interstate Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lYRyT5vvoc16sJ94EOou+vw2E5o="},{"type":"next-occurrence","id":"2z289JcAueuUYgLM/nfi1+zguUc="}],"description":"Drainage improvements on Palisades Interstate Parkway southbound between Exit 16 - Lake Welch Parkway (Stony Point) and Exit 15 - Old Gate Hill Road (Stony Point) D265386/32744609 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, left lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026 Monday/ Wednesday/ Friday, 09:00 AM thru 04:00 PM, left lane closure","update_date":"2026-06-04T16:56:03Z"},"road_event_id":"5h77xoTABo79t/xL4DnLvqKsrII=","beginning_cross_street":"Exit 16 - Lake Welch Parkway","ending_cross_street":"Exit 15 - Old Gate Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042323,41.250318]]}},{"id":"2z289JcAueuUYgLM/nfi1+zguUc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Palisades Interstate Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lYRyT5vvoc16sJ94EOou+vw2E5o="}],"description":"Drainage improvements on Palisades Interstate Parkway southbound between Exit 16 - Lake Welch Parkway (Stony Point) and Exit 15 - Old Gate Hill Road (Stony Point) D265386/32744609 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday June 17th, 2026 thru Friday June 19th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, left lane closure, Monday June 22nd, 2026 thru Friday June 26th, 2026 Monday/ Wednesday/ Friday, 09:00 AM thru 04:00 PM, left lane closure","update_date":"2026-06-04T16:56:03Z"},"road_event_id":"2z289JcAueuUYgLM/nfi1+zguUc=","beginning_cross_street":"Exit 16 - Lake Welch Parkway","ending_cross_street":"Exit 15 - Old Gate Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042323,41.250318]]}},{"id":"KU2vRV49vMomzX9s1TR7M2ugUYU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PvC53BywCpcnY7TBgJ31WyfZ/TU="}],"description":"Bridge inspection on I-490 both directions under South Landing Rd. (Brighton), Monday June 8th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday, 07:30 AM thru 05:00 PM 1 Left lane and right shoulder of 3 lanes closed intermittently westbound; right shoulder closed eastbound","update_date":"2026-06-04T18:26:04Z"},"road_event_id":"KU2vRV49vMomzX9s1TR7M2ugUYU=","beginning_cross_street":"South Landing Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:30:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.52863,43.132872]]}},{"id":"PvC53BywCpcnY7TBgJ31WyfZ/TU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KU2vRV49vMomzX9s1TR7M2ugUYU="}],"description":"Bridge inspection on I-490 both directions under South Landing Rd. (Brighton), Monday June 8th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday, 07:30 AM thru 05:00 PM 1 Left lane and right shoulder of 3 lanes closed intermittently westbound; right shoulder closed eastbound","update_date":"2026-06-04T18:26:04Z"},"road_event_id":"PvC53BywCpcnY7TBgJ31WyfZ/TU=","beginning_cross_street":"South Landing Rd.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:30:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.52863,43.132872]]}},{"id":"KAG4hS7qjmHfYV3ebe/FwMmUGLg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Wednesday June 10, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-06-04T16:40:43Z"},"road_event_id":"KAG4hS7qjmHfYV3ebe/FwMmUGLg=","beginning_cross_street":"In the vicinity of Garden State Parkway","ending_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078071,40.922229]]}},{"id":"VrSQXEiVOZ7AZXAz71diiHzuHWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Monday June 8, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-06-04T16:40:41Z"},"road_event_id":"VrSQXEiVOZ7AZXAz71diiHzuHWA=","beginning_cross_street":"In the vicinity of Garden State Parkway","ending_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078071,40.922229]]}},{"id":"isGBa4v6kW88hP8usiZe8TZPNQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between New Jersey Turnpike (Edison Twp) and South of Exit 5 - CR 529/Stelton Rd (South Plainfield), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, at least one lane closed","update_date":"2026-06-04T16:43:42Z"},"road_event_id":"isGBa4v6kW88hP8usiZe8TZPNQY=","beginning_cross_street":"New Jersey Turnpike","ending_cross_street":"South of Exit 5 - CR 529/Stelton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.336959,40.528419]]}},{"id":"xA2JEIPwB1XgIoeAkOSHVx5WGoU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Wednesday June 10, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-04T16:43:43Z"},"road_event_id":"xA2JEIPwB1XgIoeAkOSHVx5WGoU=","beginning_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","ending_cross_street":"In the vicinity of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975257,40.862434]]}},{"id":"MC/XaeF+9T1FJ6YrVtUxxOgNYlM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Southbound near South of Woodschurch Rd (Raritan Twp), Wednesday June 10, 2026 09:00 AM thru 02:00 PM, right shoulder closed","update_date":"2026-06-04T16:43:44Z"},"road_event_id":"MC/XaeF+9T1FJ6YrVtUxxOgNYlM=","beginning_cross_street":"South of Woodschurch Rd","ending_cross_street":"North of CR 612/Sand Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.855239,40.548622]]}},{"id":"JDCnSO06TSN37Zr8CtLWLAylnGg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between New Jersey Turnpike (Edison Twp) and South of Exit 5 - CR 529/Stelton Rd (South Plainfield), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-06-04T16:43:40Z"},"road_event_id":"JDCnSO06TSN37Zr8CtLWLAylnGg=","beginning_cross_street":"New Jersey Turnpike","ending_cross_street":"South of Exit 5 - CR 529/Stelton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.336959,40.528419]]}},{"id":"suPbuY5RcTpHOgDG74RYNT8b4cM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Monday June 8, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-04T16:43:47Z"},"road_event_id":"suPbuY5RcTpHOgDG74RYNT8b4cM=","beginning_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","ending_cross_street":"In the vicinity of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975257,40.862434]]}},{"id":"HaD9egDCw6eqHn2pF4l/Go8WwN0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Thursday June 11, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-04T16:43:48Z"},"road_event_id":"HaD9egDCw6eqHn2pF4l/Go8WwN0=","beginning_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","ending_cross_street":"In the vicinity of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975257,40.862434]]}},{"id":"FufRIB3C+kf/3qayPRp3LnEZD+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Thursday June 11, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-06-04T16:43:49Z"},"road_event_id":"FufRIB3C+kf/3qayPRp3LnEZD+M=","beginning_cross_street":"In the vicinity of Garden State Parkway","ending_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078071,40.922229]]}},{"id":"OMd46maOk46JXApdnV+XYZzRoL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Tuesday June 9, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-06-04T16:43:38Z"},"road_event_id":"OMd46maOk46JXApdnV+XYZzRoL8=","beginning_cross_street":"In the vicinity of Garden State Parkway","ending_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078071,40.922229]]}},{"id":"yl+LCtLBSboo/j8/t5ISNCcOMl0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Tuesday June 9, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-04T16:43:39Z"},"road_event_id":"yl+LCtLBSboo/j8/t5ISNCcOMl0=","beginning_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","ending_cross_street":"In the vicinity of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975257,40.862434]]}},{"id":"Jl1nVQYe9YMg8hS6JZVRaT1+VyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"P/nqkNfRx0R55ScpQculp+1h+DI="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to Belt System - Southern Parkway (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T16:56:22Z"},"road_event_id":"Jl1nVQYe9YMg8hS6JZVRaT1+VyY=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813662,40.697072]]}},{"id":"P/nqkNfRx0R55ScpQculp+1h+DI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Jl1nVQYe9YMg8hS6JZVRaT1+VyY="},{"type":"next-occurrence","id":"eOVn4+yBBwFxHjhVOS09NkeOVso="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to Belt System - Southern Parkway (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T16:56:22Z"},"road_event_id":"P/nqkNfRx0R55ScpQculp+1h+DI=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813662,40.697072]]}},{"id":"eOVn4+yBBwFxHjhVOS09NkeOVso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Jl1nVQYe9YMg8hS6JZVRaT1+VyY="},{"type":"next-occurrence","id":"q0Ai6nAAAOJ8s/Dj2qhu2vrgdg4="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to Belt System - Southern Parkway (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T16:56:22Z"},"road_event_id":"eOVn4+yBBwFxHjhVOS09NkeOVso=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813662,40.697072]]}},{"id":"q0Ai6nAAAOJ8s/Dj2qhu2vrgdg4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Jl1nVQYe9YMg8hS6JZVRaT1+VyY="},{"type":"next-occurrence","id":"ujqMsi2Vc7J/nAfQsmtZIy7NT9A="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to Belt System - Southern Parkway (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T16:56:22Z"},"road_event_id":"q0Ai6nAAAOJ8s/Dj2qhu2vrgdg4=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813662,40.697072]]}},{"id":"ujqMsi2Vc7J/nAfQsmtZIy7NT9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Jl1nVQYe9YMg8hS6JZVRaT1+VyY="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to Belt System - Southern Parkway (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T16:56:22Z"},"road_event_id":"ujqMsi2Vc7J/nAfQsmtZIy7NT9A=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813662,40.697072]]}},{"id":"e9MC1Bsg3eTlprQxN42rGsVxC2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hvXc9lPKLvBysbbwebGwpirsC2I="}],"description":"Construction on I-678 northbound from Exit 5 - 101st Avenue (New York) to Hillside Avenue (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-06-04T16:58:22Z"},"road_event_id":"e9MC1Bsg3eTlprQxN42rGsVxC2Y=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Hillside Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811783,40.694185]]}},{"id":"hvXc9lPKLvBysbbwebGwpirsC2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e9MC1Bsg3eTlprQxN42rGsVxC2Y="},{"type":"next-occurrence","id":"qWMIiZnKmJE0pQZlZWVXC9lcZLA="}],"description":"Construction on I-678 northbound from Exit 5 - 101st Avenue (New York) to Hillside Avenue (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-06-04T16:58:22Z"},"road_event_id":"hvXc9lPKLvBysbbwebGwpirsC2I=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Hillside Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811783,40.694185]]}},{"id":"qWMIiZnKmJE0pQZlZWVXC9lcZLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e9MC1Bsg3eTlprQxN42rGsVxC2Y="},{"type":"next-occurrence","id":"BBAM31HtrOQsS3kTMN5dHWtmtoE="}],"description":"Construction on I-678 northbound from Exit 5 - 101st Avenue (New York) to Hillside Avenue (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-06-04T16:58:22Z"},"road_event_id":"qWMIiZnKmJE0pQZlZWVXC9lcZLA=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Hillside Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811783,40.694185]]}},{"id":"BBAM31HtrOQsS3kTMN5dHWtmtoE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e9MC1Bsg3eTlprQxN42rGsVxC2Y="},{"type":"next-occurrence","id":"q8O2U7TsHX8tN2ZoxUTnYY7XpN0="}],"description":"Construction on I-678 northbound from Exit 5 - 101st Avenue (New York) to Hillside Avenue (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-06-04T16:58:22Z"},"road_event_id":"BBAM31HtrOQsS3kTMN5dHWtmtoE=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Hillside Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811783,40.694185]]}},{"id":"q8O2U7TsHX8tN2ZoxUTnYY7XpN0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e9MC1Bsg3eTlprQxN42rGsVxC2Y="}],"description":"Construction on I-678 northbound from Exit 5 - 101st Avenue (New York) to Hillside Avenue (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-06-04T16:58:22Z"},"road_event_id":"q8O2U7TsHX8tN2ZoxUTnYY7XpN0=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Hillside Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811783,40.694185]]}},{"id":"mJW76mXE3EwLY7sFedAP0YMRyLE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HRoV54SLrfp0dD4NieYUkGYO6r8="}],"description":"Construction on I-678 northbound from Exit - Federal Cirle; Ramp (New York) to Exit 5 - 101st Avenue (New York) Subject to change without notice., Monday June 8th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday, 10:00 PM thru 11:00 PM 1 Right lane of 3 lanes closed, Monday June 8th, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday, 11:00 PM thru 04:00 AM 2 Right lanes of 3 lanes closed, Tuesday June 9th, 2026 thru Wednesday June 10th, 2026, Tuesday/Wednesday, 04:00 AM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T17:02:16Z"},"road_event_id":"mJW76mXE3EwLY7sFedAP0YMRyLE=","beginning_cross_street":"Exit   - Federal Cirle; Ramp","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807235,40.65752]]}},{"id":"HRoV54SLrfp0dD4NieYUkGYO6r8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mJW76mXE3EwLY7sFedAP0YMRyLE="}],"description":"Construction on I-678 northbound from Exit - Federal Cirle; Ramp (New York) to Exit 5 - 101st Avenue (New York) Subject to change without notice., Monday June 8th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday, 10:00 PM thru 11:00 PM 1 Right lane of 3 lanes closed, Monday June 8th, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday, 11:00 PM thru 04:00 AM 2 Right lanes of 3 lanes closed, Tuesday June 9th, 2026 thru Wednesday June 10th, 2026, Tuesday/Wednesday, 04:00 AM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T17:02:16Z"},"road_event_id":"HRoV54SLrfp0dD4NieYUkGYO6r8=","beginning_cross_street":"Exit   - Federal Cirle; Ramp","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807235,40.65752]]}},{"id":"SV3U+sHD4mjMwwX5N3pyUpOV4i0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 15"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on US 15 southbound Addison Road; NY 417 (Erwin) to Exit - NY 417; Ramp (Erwin) 2 lanes reduced to 1, Thursday June 11th, 2026, 07:00 AM thru 10:30 AM All lanes open","update_date":"2026-06-04T17:05:03Z"},"road_event_id":"SV3U+sHD4mjMwwX5N3pyUpOV4i0=","beginning_cross_street":"Addison Road; NY 417","ending_cross_street":"Exit - NY 417; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T14:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.153694,42.109458]]}},{"id":"zTU+VxRiFVtO2sVsPOAcL/5FxaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Uu90aO6L2AT8oLZYZTbv1/B7mM0="}],"description":"Utility work on NY 64 northbound Parrish Rd (West Bloomfield) to Taylor Road (Mendon) alternating lane closures, Wednesday April 22nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:05:42Z"},"road_event_id":"zTU+VxRiFVtO2sVsPOAcL/5FxaM=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.49448,42.953796]]}},{"id":"Uu90aO6L2AT8oLZYZTbv1/B7mM0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zTU+VxRiFVtO2sVsPOAcL/5FxaM="},{"type":"next-occurrence","id":"W8iEkSawkCAg00TzXUxPPlzdKxw="}],"description":"Utility work on NY 64 northbound Parrish Rd (West Bloomfield) to Taylor Road (Mendon) alternating lane closures, Wednesday April 22nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:05:42Z"},"road_event_id":"Uu90aO6L2AT8oLZYZTbv1/B7mM0=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.49448,42.953796]]}},{"id":"W8iEkSawkCAg00TzXUxPPlzdKxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zTU+VxRiFVtO2sVsPOAcL/5FxaM="},{"type":"next-occurrence","id":"awWjcDCl9Q9a62Qi+8uyBYUMFjg="}],"description":"Utility work on NY 64 northbound Parrish Rd (West Bloomfield) to Taylor Road (Mendon) alternating lane closures, Wednesday April 22nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:05:42Z"},"road_event_id":"W8iEkSawkCAg00TzXUxPPlzdKxw=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.49448,42.953796]]}},{"id":"awWjcDCl9Q9a62Qi+8uyBYUMFjg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zTU+VxRiFVtO2sVsPOAcL/5FxaM="},{"type":"next-occurrence","id":"VcxCJwAZ48aCnR+vJE9VlEUa7P4="}],"description":"Utility work on NY 64 northbound Parrish Rd (West Bloomfield) to Taylor Road (Mendon) alternating lane closures, Wednesday April 22nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:05:42Z"},"road_event_id":"awWjcDCl9Q9a62Qi+8uyBYUMFjg=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.49448,42.953796]]}},{"id":"VcxCJwAZ48aCnR+vJE9VlEUa7P4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zTU+VxRiFVtO2sVsPOAcL/5FxaM="},{"type":"next-occurrence","id":"DdMplG20U4kdQelpvFB5CI5BRAE="}],"description":"Utility work on NY 64 northbound Parrish Rd (West Bloomfield) to Taylor Road (Mendon) alternating lane closures, Wednesday April 22nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:05:42Z"},"road_event_id":"VcxCJwAZ48aCnR+vJE9VlEUa7P4=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.49448,42.953796]]}},{"id":"DdMplG20U4kdQelpvFB5CI5BRAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zTU+VxRiFVtO2sVsPOAcL/5FxaM="},{"type":"next-occurrence","id":"s46MgsSFXbNUl4013NErC014qAc="}],"description":"Utility work on NY 64 northbound Parrish Rd (West Bloomfield) to Taylor Road (Mendon) alternating lane closures, Wednesday April 22nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:05:42Z"},"road_event_id":"DdMplG20U4kdQelpvFB5CI5BRAE=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.49448,42.953796]]}},{"id":"s46MgsSFXbNUl4013NErC014qAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zTU+VxRiFVtO2sVsPOAcL/5FxaM="},{"type":"next-occurrence","id":"CoL4deV2Y33do6ZE5I8bsT+GA1c="}],"description":"Utility work on NY 64 northbound Parrish Rd (West Bloomfield) to Taylor Road (Mendon) alternating lane closures, Wednesday April 22nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:05:42Z"},"road_event_id":"s46MgsSFXbNUl4013NErC014qAc=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.49448,42.953796]]}},{"id":"CoL4deV2Y33do6ZE5I8bsT+GA1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zTU+VxRiFVtO2sVsPOAcL/5FxaM="}],"description":"Utility work on NY 64 northbound Parrish Rd (West Bloomfield) to Taylor Road (Mendon) alternating lane closures, Wednesday April 22nd, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:05:42Z"},"road_event_id":"CoL4deV2Y33do6ZE5I8bsT+GA1c=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.49448,42.953796]]}},{"id":"Q5UTs0/m7tukdKZaF8iYRFk0M0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HPwTWeGQ/pYcVnCm4CnJr8hvH84="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to Nassau Expressway; NY 878 (New York) Subject to change without notice., Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 11:00 PM 1 Left lane of 3 lanes closed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 04:00 AM 2 Left lanes of 3 lanes closed, Tuesday June 9th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday June 12th, 2026, 11:00 PM thru 11:59 PM 1 Right lane of 3 lanes closed, Friday June 12th, 2026 thru Saturday June 13th, 2026, 11:59 PM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday June 13th, 2026, 05:00 AM thru 08:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T17:05:53Z"},"road_event_id":"Q5UTs0/m7tukdKZaF8iYRFk0M0E=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Nassau Expressway; NY 878","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810665,40.691877]]}},{"id":"HPwTWeGQ/pYcVnCm4CnJr8hvH84=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q5UTs0/m7tukdKZaF8iYRFk0M0E="},{"type":"next-occurrence","id":"Qe/vYTtjNyam6AcUusC6aOfzXw8="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to Nassau Expressway; NY 878 (New York) Subject to change without notice., Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 11:00 PM 1 Left lane of 3 lanes closed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 04:00 AM 2 Left lanes of 3 lanes closed, Tuesday June 9th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday June 12th, 2026, 11:00 PM thru 11:59 PM 1 Right lane of 3 lanes closed, Friday June 12th, 2026 thru Saturday June 13th, 2026, 11:59 PM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday June 13th, 2026, 05:00 AM thru 08:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T17:05:53Z"},"road_event_id":"HPwTWeGQ/pYcVnCm4CnJr8hvH84=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Nassau Expressway; NY 878","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810665,40.691877]]}},{"id":"Qe/vYTtjNyam6AcUusC6aOfzXw8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q5UTs0/m7tukdKZaF8iYRFk0M0E="},{"type":"next-occurrence","id":"r4D3WOKjAbPggfD31T6jmhgGAhY="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to Nassau Expressway; NY 878 (New York) Subject to change without notice., Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 11:00 PM 1 Left lane of 3 lanes closed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 04:00 AM 2 Left lanes of 3 lanes closed, Tuesday June 9th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday June 12th, 2026, 11:00 PM thru 11:59 PM 1 Right lane of 3 lanes closed, Friday June 12th, 2026 thru Saturday June 13th, 2026, 11:59 PM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday June 13th, 2026, 05:00 AM thru 08:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T17:05:53Z"},"road_event_id":"Qe/vYTtjNyam6AcUusC6aOfzXw8=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Nassau Expressway; NY 878","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810665,40.691877]]}},{"id":"r4D3WOKjAbPggfD31T6jmhgGAhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q5UTs0/m7tukdKZaF8iYRFk0M0E="},{"type":"next-occurrence","id":"I214RawhVD2H4dQQVd4s5a8g+DU="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to Nassau Expressway; NY 878 (New York) Subject to change without notice., Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 11:00 PM 1 Left lane of 3 lanes closed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 04:00 AM 2 Left lanes of 3 lanes closed, Tuesday June 9th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday June 12th, 2026, 11:00 PM thru 11:59 PM 1 Right lane of 3 lanes closed, Friday June 12th, 2026 thru Saturday June 13th, 2026, 11:59 PM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday June 13th, 2026, 05:00 AM thru 08:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T17:05:53Z"},"road_event_id":"r4D3WOKjAbPggfD31T6jmhgGAhY=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Nassau Expressway; NY 878","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810665,40.691877]]}},{"id":"I214RawhVD2H4dQQVd4s5a8g+DU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q5UTs0/m7tukdKZaF8iYRFk0M0E="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to Nassau Expressway; NY 878 (New York) Subject to change without notice., Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 11:00 PM 1 Left lane of 3 lanes closed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 04:00 AM 2 Left lanes of 3 lanes closed, Tuesday June 9th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday June 12th, 2026, 11:00 PM thru 11:59 PM 1 Right lane of 3 lanes closed, Friday June 12th, 2026 thru Saturday June 13th, 2026, 11:59 PM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday June 13th, 2026, 05:00 AM thru 08:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T17:05:53Z"},"road_event_id":"I214RawhVD2H4dQQVd4s5a8g+DU=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Nassau Expressway; NY 878","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T03:00:00Z","end_date":"2026-06-13T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810665,40.691877]]}},{"id":"D1WgKACR20ttdLHKFW1YNvb6zcI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 15"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on US 15 northbound Addison Road; NY 417 (Erwin) 2 lanes reduced to 1 , Thursday June 11th, 2026, 10:00 AM thru 01:30 PM All lanes open","update_date":"2026-06-04T17:07:58Z"},"road_event_id":"D1WgKACR20ttdLHKFW1YNvb6zcI=","beginning_cross_street":"Addison Road; NY 417","ending_cross_street":"Addison Road; NY 417","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T17:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.153418,42.109318]]}},{"id":"UUQwbQLLS4LsRUqCEBwbnJGIMhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-86 (Erwin) 2 Lanes reduced to 1, Wednesday June 10th, 2026, 08:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T17:13:19Z"},"road_event_id":"UUQwbQLLS4LsRUqCEBwbnJGIMhw=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.09744,42.15509]]}},{"id":"Ni5RhN/M/rfUW98Cm3rWOuXy0as=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QYTEnQ1EqQqv+UUE0XIkgwzxw6Q="}],"description":"Utility work on NY 63 northbound Anderson Rd (Sparta) to 6897 SR-63 (Groveland) alternating lane closures, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:14:51Z"},"road_event_id":"Ni5RhN/M/rfUW98Cm3rWOuXy0as=","beginning_cross_street":"Anderson Rd","ending_cross_street":"6897 SR-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.756406,42.655016]]}},{"id":"QYTEnQ1EqQqv+UUE0XIkgwzxw6Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ni5RhN/M/rfUW98Cm3rWOuXy0as="},{"type":"next-occurrence","id":"MdZIftueTdYMdymtGEforQV8dlk="}],"description":"Utility work on NY 63 northbound Anderson Rd (Sparta) to 6897 SR-63 (Groveland) alternating lane closures, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:14:51Z"},"road_event_id":"QYTEnQ1EqQqv+UUE0XIkgwzxw6Q=","beginning_cross_street":"Anderson Rd","ending_cross_street":"6897 SR-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.756406,42.655016]]}},{"id":"MdZIftueTdYMdymtGEforQV8dlk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ni5RhN/M/rfUW98Cm3rWOuXy0as="},{"type":"next-occurrence","id":"QjuqRJ1jZtCPQICBePB2HLAU4Cw="}],"description":"Utility work on NY 63 northbound Anderson Rd (Sparta) to 6897 SR-63 (Groveland) alternating lane closures, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:14:51Z"},"road_event_id":"MdZIftueTdYMdymtGEforQV8dlk=","beginning_cross_street":"Anderson Rd","ending_cross_street":"6897 SR-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.756406,42.655016]]}},{"id":"QjuqRJ1jZtCPQICBePB2HLAU4Cw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ni5RhN/M/rfUW98Cm3rWOuXy0as="},{"type":"next-occurrence","id":"2VpKN9QWD4Gbb9Q2N6Mja2zjYmA="}],"description":"Utility work on NY 63 northbound Anderson Rd (Sparta) to 6897 SR-63 (Groveland) alternating lane closures, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:14:51Z"},"road_event_id":"QjuqRJ1jZtCPQICBePB2HLAU4Cw=","beginning_cross_street":"Anderson Rd","ending_cross_street":"6897 SR-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.756406,42.655016]]}},{"id":"2VpKN9QWD4Gbb9Q2N6Mja2zjYmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ni5RhN/M/rfUW98Cm3rWOuXy0as="},{"type":"next-occurrence","id":"Pg3x6NK9RuMAENgGPwEIJCWfIaM="}],"description":"Utility work on NY 63 northbound Anderson Rd (Sparta) to 6897 SR-63 (Groveland) alternating lane closures, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:14:51Z"},"road_event_id":"2VpKN9QWD4Gbb9Q2N6Mja2zjYmA=","beginning_cross_street":"Anderson Rd","ending_cross_street":"6897 SR-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.756406,42.655016]]}},{"id":"Pg3x6NK9RuMAENgGPwEIJCWfIaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ni5RhN/M/rfUW98Cm3rWOuXy0as="},{"type":"next-occurrence","id":"2YEV1LDAlUkTubadpZxAvuSH8Eg="}],"description":"Utility work on NY 63 northbound Anderson Rd (Sparta) to 6897 SR-63 (Groveland) alternating lane closures, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:14:51Z"},"road_event_id":"Pg3x6NK9RuMAENgGPwEIJCWfIaM=","beginning_cross_street":"Anderson Rd","ending_cross_street":"6897 SR-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.756406,42.655016]]}},{"id":"2YEV1LDAlUkTubadpZxAvuSH8Eg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ni5RhN/M/rfUW98Cm3rWOuXy0as="},{"type":"next-occurrence","id":"JTf3zuX6jeSTffX1YVYrqVswQKs="}],"description":"Utility work on NY 63 northbound Anderson Rd (Sparta) to 6897 SR-63 (Groveland) alternating lane closures, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:14:51Z"},"road_event_id":"2YEV1LDAlUkTubadpZxAvuSH8Eg=","beginning_cross_street":"Anderson Rd","ending_cross_street":"6897 SR-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.756406,42.655016]]}},{"id":"JTf3zuX6jeSTffX1YVYrqVswQKs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ni5RhN/M/rfUW98Cm3rWOuXy0as="}],"description":"Utility work on NY 63 northbound Anderson Rd (Sparta) to 6897 SR-63 (Groveland) alternating lane closures, Tuesday May 26th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:14:51Z"},"road_event_id":"JTf3zuX6jeSTffX1YVYrqVswQKs=","beginning_cross_street":"Anderson Rd","ending_cross_street":"6897 SR-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.756406,42.655016]]}},{"id":"/rPnxNCv9i/6Ur71IoM8WggiexY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 417"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on NY 417 eastbound Robert Dann Boulevard; END ROUTE (Erwin) 2 Lane reduced to 1, Tuesday June 9th, 2026, 10:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-04T17:21:06Z"},"road_event_id":"/rPnxNCv9i/6Ur71IoM8WggiexY=","beginning_cross_street":"Robert Dann Boulevard; END ROUTE","ending_cross_street":"Robert Dann Boulevard; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.099176,42.155075]]}},{"id":"FtpMdbTbaG9ZgDCniTuIavv0xUw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CnkCiY2RHQCKVACVKyHjB1uN+WY="}],"description":"Construction on NY 27 both directions between 11th Avenue (New York) and Exit 5 - East 5th Street (New York) Subject to change without notice., Monday June 8th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound","update_date":"2026-06-04T17:21:22Z"},"road_event_id":"FtpMdbTbaG9ZgDCniTuIavv0xUw=","beginning_cross_street":"11th Avenue","ending_cross_street":"Exit 5 - East 5th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.978773,40.65465]]}},{"id":"CnkCiY2RHQCKVACVKyHjB1uN+WY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FtpMdbTbaG9ZgDCniTuIavv0xUw="}],"description":"Construction on NY 27 both directions between 11th Avenue (New York) and Exit 5 - East 5th Street (New York) Subject to change without notice., Monday June 8th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound","update_date":"2026-06-04T17:21:22Z"},"road_event_id":"CnkCiY2RHQCKVACVKyHjB1uN+WY=","beginning_cross_street":"11th Avenue","ending_cross_street":"Exit 5 - East 5th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.978773,40.65465]]}},{"id":"CcIgzcKBNH6ZwKPktnLvyz+W4yA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Belt System - Shore Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tsU8xP19ZQ4FSRy2xgwE34ElB54="}],"description":"Construction on Belt System - Shore Parkway both directions between Stillwell Avenue (New York) and Cropsey Avenue (New York) Subject to change without notice., Wednesday June 10th, 2026 thru Thursday June 11th, 2026, Wednesday/Thursday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound; 1 Left lane of 3 lanes closed eastbound","update_date":"2026-06-04T17:23:29Z"},"road_event_id":"CcIgzcKBNH6ZwKPktnLvyz+W4yA=","beginning_cross_street":"Stillwell Avenue","ending_cross_street":"Cropsey Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982945,40.583408]]}},{"id":"tsU8xP19ZQ4FSRy2xgwE34ElB54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Belt System - Shore Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CcIgzcKBNH6ZwKPktnLvyz+W4yA="}],"description":"Construction on Belt System - Shore Parkway both directions between Stillwell Avenue (New York) and Cropsey Avenue (New York) Subject to change without notice., Wednesday June 10th, 2026 thru Thursday June 11th, 2026, Wednesday/Thursday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed westbound; 1 Left lane of 3 lanes closed eastbound","update_date":"2026-06-04T17:23:29Z"},"road_event_id":"tsU8xP19ZQ4FSRy2xgwE34ElB54=","beginning_cross_street":"Stillwell Avenue","ending_cross_street":"Cropsey Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982945,40.583408]]}},{"id":"jGA2PUWQrb2KoUMx2yeDEYZWdHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 138"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on NY 138 both directions between Plum Brook Road (Lewisboro) and Old Bedford Road (Lewisboro) D042080/B1037970/32769009 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 11th, 2026, 09:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-04T17:27:23Z"},"road_event_id":"jGA2PUWQrb2KoUMx2yeDEYZWdHk=","beginning_cross_street":"Plum Brook Road","ending_cross_street":"Old Bedford Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682004,41.297797]]}},{"id":"8FqqVFJOw6A0xNjErjxp3UpKU/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"w6pWPdoiH41hk5dmC7q90FEvz/M="}],"description":"Utility work on NY 15A northbound Monroe Street (Mendon) to Keyes Rd (Rush) alternating lane closures, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:26:04Z"},"road_event_id":"8FqqVFJOw6A0xNjErjxp3UpKU/E=","beginning_cross_street":"Monroe Street","ending_cross_street":"Keyes Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.62018,42.960338]]}},{"id":"w6pWPdoiH41hk5dmC7q90FEvz/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8FqqVFJOw6A0xNjErjxp3UpKU/E="},{"type":"next-occurrence","id":"rCY3QsptYxGRC8Pq5YbSDdEVrlg="}],"description":"Utility work on NY 15A northbound Monroe Street (Mendon) to Keyes Rd (Rush) alternating lane closures, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:26:04Z"},"road_event_id":"w6pWPdoiH41hk5dmC7q90FEvz/M=","beginning_cross_street":"Monroe Street","ending_cross_street":"Keyes Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.62018,42.960338]]}},{"id":"rCY3QsptYxGRC8Pq5YbSDdEVrlg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8FqqVFJOw6A0xNjErjxp3UpKU/E="},{"type":"next-occurrence","id":"z8kACP/P6QYgpMM9/DsjfsC2+tE="}],"description":"Utility work on NY 15A northbound Monroe Street (Mendon) to Keyes Rd (Rush) alternating lane closures, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:26:04Z"},"road_event_id":"rCY3QsptYxGRC8Pq5YbSDdEVrlg=","beginning_cross_street":"Monroe Street","ending_cross_street":"Keyes Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.62018,42.960338]]}},{"id":"z8kACP/P6QYgpMM9/DsjfsC2+tE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8FqqVFJOw6A0xNjErjxp3UpKU/E="},{"type":"next-occurrence","id":"RawrnggwqYcAW8zgi1TRJCP9sss="}],"description":"Utility work on NY 15A northbound Monroe Street (Mendon) to Keyes Rd (Rush) alternating lane closures, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:26:04Z"},"road_event_id":"z8kACP/P6QYgpMM9/DsjfsC2+tE=","beginning_cross_street":"Monroe Street","ending_cross_street":"Keyes Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.62018,42.960338]]}},{"id":"RawrnggwqYcAW8zgi1TRJCP9sss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8FqqVFJOw6A0xNjErjxp3UpKU/E="},{"type":"next-occurrence","id":"6IR21+5WxLpC0HbgtSwl2fXi930="}],"description":"Utility work on NY 15A northbound Monroe Street (Mendon) to Keyes Rd (Rush) alternating lane closures, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:26:04Z"},"road_event_id":"RawrnggwqYcAW8zgi1TRJCP9sss=","beginning_cross_street":"Monroe Street","ending_cross_street":"Keyes Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.62018,42.960338]]}},{"id":"6IR21+5WxLpC0HbgtSwl2fXi930=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8FqqVFJOw6A0xNjErjxp3UpKU/E="},{"type":"next-occurrence","id":"loIIO+aJXOBaY6aGCsoJqXoxGBs="}],"description":"Utility work on NY 15A northbound Monroe Street (Mendon) to Keyes Rd (Rush) alternating lane closures, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:26:04Z"},"road_event_id":"6IR21+5WxLpC0HbgtSwl2fXi930=","beginning_cross_street":"Monroe Street","ending_cross_street":"Keyes Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.62018,42.960338]]}},{"id":"loIIO+aJXOBaY6aGCsoJqXoxGBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8FqqVFJOw6A0xNjErjxp3UpKU/E="},{"type":"next-occurrence","id":"WKZczd4cI+NRAuTb4410Ul3r1oY="}],"description":"Utility work on NY 15A northbound Monroe Street (Mendon) to Keyes Rd (Rush) alternating lane closures, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:26:04Z"},"road_event_id":"loIIO+aJXOBaY6aGCsoJqXoxGBs=","beginning_cross_street":"Monroe Street","ending_cross_street":"Keyes Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.62018,42.960338]]}},{"id":"WKZczd4cI+NRAuTb4410Ul3r1oY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8FqqVFJOw6A0xNjErjxp3UpKU/E="},{"type":"next-occurrence","id":"gniWaAzrkl+i74LfYAK6QZQlY/o="}],"description":"Utility work on NY 15A northbound Monroe Street (Mendon) to Keyes Rd (Rush) alternating lane closures, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:26:04Z"},"road_event_id":"WKZczd4cI+NRAuTb4410Ul3r1oY=","beginning_cross_street":"Monroe Street","ending_cross_street":"Keyes Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.62018,42.960338]]}},{"id":"gniWaAzrkl+i74LfYAK6QZQlY/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8FqqVFJOw6A0xNjErjxp3UpKU/E="},{"type":"next-occurrence","id":"mzFsDkMn7YYyjZfbqxt6P/2+hv4="}],"description":"Utility work on NY 15A northbound Monroe Street (Mendon) to Keyes Rd (Rush) alternating lane closures, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:26:04Z"},"road_event_id":"gniWaAzrkl+i74LfYAK6QZQlY/o=","beginning_cross_street":"Monroe Street","ending_cross_street":"Keyes Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.62018,42.960338]]}},{"id":"mzFsDkMn7YYyjZfbqxt6P/2+hv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8FqqVFJOw6A0xNjErjxp3UpKU/E="},{"type":"next-occurrence","id":"K31+rKUIODXu58CfKdiBvVKjZIY="}],"description":"Utility work on NY 15A northbound Monroe Street (Mendon) to Keyes Rd (Rush) alternating lane closures, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:26:04Z"},"road_event_id":"mzFsDkMn7YYyjZfbqxt6P/2+hv4=","beginning_cross_street":"Monroe Street","ending_cross_street":"Keyes Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.62018,42.960338]]}},{"id":"K31+rKUIODXu58CfKdiBvVKjZIY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8FqqVFJOw6A0xNjErjxp3UpKU/E="},{"type":"next-occurrence","id":"lw9pGodRkDUfPT/Avv9VIOzBFAk="}],"description":"Utility work on NY 15A northbound Monroe Street (Mendon) to Keyes Rd (Rush) alternating lane closures, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:26:04Z"},"road_event_id":"K31+rKUIODXu58CfKdiBvVKjZIY=","beginning_cross_street":"Monroe Street","ending_cross_street":"Keyes Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.62018,42.960338]]}},{"id":"lw9pGodRkDUfPT/Avv9VIOzBFAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8FqqVFJOw6A0xNjErjxp3UpKU/E="}],"description":"Utility work on NY 15A northbound Monroe Street (Mendon) to Keyes Rd (Rush) alternating lane closures, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T17:26:04Z"},"road_event_id":"lw9pGodRkDUfPT/Avv9VIOzBFAk=","beginning_cross_street":"Monroe Street","ending_cross_street":"Keyes Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.62018,42.960338]]}},{"id":"YFgyRyclmxY0N0gIAcYddyDGoSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on US 9 both directions at NY 117 (Mount Pleasant) D042080/B1091331/29770709 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday June 10th, 2026, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-04T17:28:58Z"},"road_event_id":"YFgyRyclmxY0N0gIAcYddyDGoSU=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.858407,41.110281]]}},{"id":"sl+IGnQM2uxMBvRQ9CqpYXopUWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OV9as4JD9/TP9AZbwrnnFfnxMbo="}],"description":"Construction on I-278 both directions between Morgan Avenue (New York) and 54th Avenue (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound","update_date":"2026-06-04T17:28:03Z"},"road_event_id":"sl+IGnQM2uxMBvRQ9CqpYXopUWM=","beginning_cross_street":"Morgan Avenue","ending_cross_street":"54th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939213,40.723174]]}},{"id":"OV9as4JD9/TP9AZbwrnnFfnxMbo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sl+IGnQM2uxMBvRQ9CqpYXopUWM="},{"type":"next-occurrence","id":"y/4tSXDSJiqmExoB8+wPO+cc5fo="}],"description":"Construction on I-278 both directions between Morgan Avenue (New York) and 54th Avenue (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound","update_date":"2026-06-04T17:28:03Z"},"road_event_id":"OV9as4JD9/TP9AZbwrnnFfnxMbo=","beginning_cross_street":"Morgan Avenue","ending_cross_street":"54th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939213,40.723174]]}},{"id":"y/4tSXDSJiqmExoB8+wPO+cc5fo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sl+IGnQM2uxMBvRQ9CqpYXopUWM="},{"type":"next-occurrence","id":"SGoVF/dsnGThZIAhQKNtjSAKeiQ="}],"description":"Construction on I-278 both directions between Morgan Avenue (New York) and 54th Avenue (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound","update_date":"2026-06-04T17:28:03Z"},"road_event_id":"y/4tSXDSJiqmExoB8+wPO+cc5fo=","beginning_cross_street":"Morgan Avenue","ending_cross_street":"54th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939213,40.723174]]}},{"id":"SGoVF/dsnGThZIAhQKNtjSAKeiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sl+IGnQM2uxMBvRQ9CqpYXopUWM="},{"type":"next-occurrence","id":"3VSfIQcxV6nt5DYCFRPVnJCLlZs="}],"description":"Construction on I-278 both directions between Morgan Avenue (New York) and 54th Avenue (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound","update_date":"2026-06-04T17:28:03Z"},"road_event_id":"SGoVF/dsnGThZIAhQKNtjSAKeiQ=","beginning_cross_street":"Morgan Avenue","ending_cross_street":"54th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939213,40.723174]]}},{"id":"3VSfIQcxV6nt5DYCFRPVnJCLlZs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sl+IGnQM2uxMBvRQ9CqpYXopUWM="}],"description":"Construction on I-278 both directions between Morgan Avenue (New York) and 54th Avenue (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound","update_date":"2026-06-04T17:28:03Z"},"road_event_id":"3VSfIQcxV6nt5DYCFRPVnJCLlZs=","beginning_cross_street":"Morgan Avenue","ending_cross_street":"54th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939213,40.723174]]}},{"id":"BLivOe22Ov/D6klasXhnrIKVo+U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on I-278 both directions between Exit 18 - Fort Hamilton Parkway (New York) and Fort Hamilton Parkway Extension (New York) Subject to change without notice., Tuesday June 9th, 2026, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound","update_date":"2026-06-04T17:29:56Z"},"road_event_id":"BLivOe22Ov/D6klasXhnrIKVo+U=","beginning_cross_street":"Exit 18 - Fort Hamilton Parkway","ending_cross_street":"Fort Hamilton Parkway Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.022056,40.620985]]}},{"id":"2MPCmV+rZ8/kGmXb89p7l5vYXt0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0LVLN/e80MN03OllGJNT7fdjihk="}],"description":"Bridge inspection on Sprain Brook State Pkwy northbound between Hospital Road (Mount Pleasant) and Taconic State Parkway (Mount Pleasant) D042080/B1091110/32769809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Tuesday June 9th, 2026 Monday/ Tuesday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-04T17:38:21Z"},"road_event_id":"2MPCmV+rZ8/kGmXb89p7l5vYXt0=","beginning_cross_street":"Exit   - CR 301","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802413,41.09503]]}},{"id":"0LVLN/e80MN03OllGJNT7fdjihk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2MPCmV+rZ8/kGmXb89p7l5vYXt0="}],"description":"Bridge inspection on Sprain Brook State Pkwy northbound between Hospital Road (Mount Pleasant) and Taconic State Parkway (Mount Pleasant) D042080/B1091110/32769809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Tuesday June 9th, 2026 Monday/ Tuesday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-04T17:38:21Z"},"road_event_id":"0LVLN/e80MN03OllGJNT7fdjihk=","beginning_cross_street":"Exit   - CR 301","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802413,41.09503]]}},{"id":"V5Ppt276EpDs2OwAI7CO1XgMdis=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Hhw5ZvKNE0l9c0xUz6hySIadXaI="}],"description":"Bridge inspection on Sprain Brook State Pkwy southbound between Taconic State Parkway (Mount Pleasant) and Bradhurst Avenue - NY 100 (Mount Pleasant) D042080/B1091110/32769709 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Tuesday June 9th, 2026 Monday/ Tuesday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-04T17:36:52Z"},"road_event_id":"V5Ppt276EpDs2OwAI7CO1XgMdis=","beginning_cross_street":"Taconic State Parkway","ending_cross_street":"Bradhurst Avenue - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801877,41.096097]]}},{"id":"Hhw5ZvKNE0l9c0xUz6hySIadXaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V5Ppt276EpDs2OwAI7CO1XgMdis="}],"description":"Bridge inspection on Sprain Brook State Pkwy southbound between Taconic State Parkway (Mount Pleasant) and Bradhurst Avenue - NY 100 (Mount Pleasant) D042080/B1091110/32769709 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Tuesday June 9th, 2026 Monday/ Tuesday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-04T17:36:52Z"},"road_event_id":"Hhw5ZvKNE0l9c0xUz6hySIadXaI=","beginning_cross_street":"Taconic State Parkway","ending_cross_street":"Bradhurst Avenue - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801877,41.096097]]}},{"id":"jEkO0wKH4A5OlKUKf4kzZTBNNjc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Verrazano-Narrows Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xzsxVB6ZU5jnjBLQ9OogXx7FJVQ="}],"description":"Construction on Verrazano-Narrows Bridge both directions between 94th Street (New York) and I-278 at 92nd Street Bay Ridge Exit (New York) Subject to change without notice., Wednesday June 10th, 2026 thru Thursday June 11th, 2026, Wednesday/Thursday, 10:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed eastbound; 1 Left lane of 2 lanes closed westbound","update_date":"2026-06-04T17:33:03Z"},"road_event_id":"jEkO0wKH4A5OlKUKf4kzZTBNNjc=","beginning_cross_street":"94th Street ","ending_cross_street":"92nd Street  Bay Ridge Exit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.027003,40.614975]]}},{"id":"xzsxVB6ZU5jnjBLQ9OogXx7FJVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Verrazano-Narrows Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jEkO0wKH4A5OlKUKf4kzZTBNNjc="}],"description":"Construction on Verrazano-Narrows Bridge both directions between 94th Street (New York) and I-278 at 92nd Street Bay Ridge Exit (New York) Subject to change without notice., Wednesday June 10th, 2026 thru Thursday June 11th, 2026, Wednesday/Thursday, 10:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed eastbound; 1 Left lane of 2 lanes closed westbound","update_date":"2026-06-04T17:33:03Z"},"road_event_id":"xzsxVB6ZU5jnjBLQ9OogXx7FJVQ=","beginning_cross_street":"94th Street ","ending_cross_street":"92nd Street  Bay Ridge Exit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.027003,40.614975]]}},{"id":"Hq+yyAmzfwilN3jPW20sa9aUu94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"z+JHiKAqWaugICTR/Se9G48QMX4="}],"description":"Mowing on I-86 both directions Steuben-Chemung County Line (Corning) Right shoulder closure , Thursday June 4th, 2026 thru Wednesday June 17th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-04T17:33:21Z"},"road_event_id":"Hq+yyAmzfwilN3jPW20sa9aUu94=","beginning_cross_street":"Steuben-Chemung County Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T11:00:00Z","end_date":"2026-06-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.965611,42.134201]]}},{"id":"z+JHiKAqWaugICTR/Se9G48QMX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hq+yyAmzfwilN3jPW20sa9aUu94="},{"type":"next-occurrence","id":"C7DqL1bLOpqJEySoUUdhTf0VNtU="}],"description":"Mowing on I-86 both directions Steuben-Chemung County Line (Corning) Right shoulder closure , Thursday June 4th, 2026 thru Wednesday June 17th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-04T17:33:21Z"},"road_event_id":"z+JHiKAqWaugICTR/Se9G48QMX4=","beginning_cross_street":"Steuben-Chemung County Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.965611,42.134201]]}},{"id":"C7DqL1bLOpqJEySoUUdhTf0VNtU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hq+yyAmzfwilN3jPW20sa9aUu94="},{"type":"next-occurrence","id":"NO/+B00z37nzx8qxVGvBHCog45c="}],"description":"Mowing on I-86 both directions Steuben-Chemung County Line (Corning) Right shoulder closure , Thursday June 4th, 2026 thru Wednesday June 17th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-04T17:33:21Z"},"road_event_id":"C7DqL1bLOpqJEySoUUdhTf0VNtU=","beginning_cross_street":"Steuben-Chemung County Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.965611,42.134201]]}},{"id":"NO/+B00z37nzx8qxVGvBHCog45c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hq+yyAmzfwilN3jPW20sa9aUu94="},{"type":"next-occurrence","id":"8bEo5shMijX4TtvMjmhKtFqurXE="}],"description":"Mowing on I-86 both directions Steuben-Chemung County Line (Corning) Right shoulder closure , Thursday June 4th, 2026 thru Wednesday June 17th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-04T17:33:21Z"},"road_event_id":"NO/+B00z37nzx8qxVGvBHCog45c=","beginning_cross_street":"Steuben-Chemung County Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.965611,42.134201]]}},{"id":"8bEo5shMijX4TtvMjmhKtFqurXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hq+yyAmzfwilN3jPW20sa9aUu94="},{"type":"next-occurrence","id":"NyRFcWLr9NAyv4GmisLXT3vtcpg="}],"description":"Mowing on I-86 both directions Steuben-Chemung County Line (Corning) Right shoulder closure , Thursday June 4th, 2026 thru Wednesday June 17th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-04T17:33:21Z"},"road_event_id":"8bEo5shMijX4TtvMjmhKtFqurXE=","beginning_cross_street":"Steuben-Chemung County Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.965611,42.134201]]}},{"id":"NyRFcWLr9NAyv4GmisLXT3vtcpg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hq+yyAmzfwilN3jPW20sa9aUu94="},{"type":"next-occurrence","id":"YvQ148oDua2ONOd69DhpNlyK5ZA="}],"description":"Mowing on I-86 both directions Steuben-Chemung County Line (Corning) Right shoulder closure , Thursday June 4th, 2026 thru Wednesday June 17th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-04T17:33:21Z"},"road_event_id":"NyRFcWLr9NAyv4GmisLXT3vtcpg=","beginning_cross_street":"Steuben-Chemung County Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.965611,42.134201]]}},{"id":"YvQ148oDua2ONOd69DhpNlyK5ZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hq+yyAmzfwilN3jPW20sa9aUu94="},{"type":"next-occurrence","id":"pZFxzlMJ17eiVqpNrNYhi4s/YDo="}],"description":"Mowing on I-86 both directions Steuben-Chemung County Line (Corning) Right shoulder closure , Thursday June 4th, 2026 thru Wednesday June 17th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-04T17:33:21Z"},"road_event_id":"YvQ148oDua2ONOd69DhpNlyK5ZA=","beginning_cross_street":"Steuben-Chemung County Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.965611,42.134201]]}},{"id":"pZFxzlMJ17eiVqpNrNYhi4s/YDo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hq+yyAmzfwilN3jPW20sa9aUu94="},{"type":"next-occurrence","id":"CzwLO7z5t5ApAJshEAbizGUNc7o="}],"description":"Mowing on I-86 both directions Steuben-Chemung County Line (Corning) Right shoulder closure , Thursday June 4th, 2026 thru Wednesday June 17th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-04T17:33:21Z"},"road_event_id":"pZFxzlMJ17eiVqpNrNYhi4s/YDo=","beginning_cross_street":"Steuben-Chemung County Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.965611,42.134201]]}},{"id":"CzwLO7z5t5ApAJshEAbizGUNc7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hq+yyAmzfwilN3jPW20sa9aUu94="},{"type":"next-occurrence","id":"a6P9Wp+s+m7B73TJehJGzjBldM8="}],"description":"Mowing on I-86 both directions Steuben-Chemung County Line (Corning) Right shoulder closure , Thursday June 4th, 2026 thru Wednesday June 17th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-04T17:33:21Z"},"road_event_id":"CzwLO7z5t5ApAJshEAbizGUNc7o=","beginning_cross_street":"Steuben-Chemung County Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.965611,42.134201]]}},{"id":"a6P9Wp+s+m7B73TJehJGzjBldM8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hq+yyAmzfwilN3jPW20sa9aUu94="},{"type":"next-occurrence","id":"pCrq/SeACMYuSFWGVEnh65VpbRM="}],"description":"Mowing on I-86 both directions Steuben-Chemung County Line (Corning) Right shoulder closure , Thursday June 4th, 2026 thru Wednesday June 17th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-04T17:33:21Z"},"road_event_id":"a6P9Wp+s+m7B73TJehJGzjBldM8=","beginning_cross_street":"Steuben-Chemung County Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.965611,42.134201]]}},{"id":"pCrq/SeACMYuSFWGVEnh65VpbRM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hq+yyAmzfwilN3jPW20sa9aUu94="},{"type":"next-occurrence","id":"VAEkXF+n70wN8RBhlHd2AsU3Gzc="}],"description":"Mowing on I-86 both directions Steuben-Chemung County Line (Corning) Right shoulder closure , Thursday June 4th, 2026 thru Wednesday June 17th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-04T17:33:21Z"},"road_event_id":"pCrq/SeACMYuSFWGVEnh65VpbRM=","beginning_cross_street":"Steuben-Chemung County Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.965611,42.134201]]}},{"id":"VAEkXF+n70wN8RBhlHd2AsU3Gzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hq+yyAmzfwilN3jPW20sa9aUu94="},{"type":"next-occurrence","id":"nDHtgo8x2Z/wdQep1SOyG/qL/rk="}],"description":"Mowing on I-86 both directions Steuben-Chemung County Line (Corning) Right shoulder closure , Thursday June 4th, 2026 thru Wednesday June 17th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-04T17:33:21Z"},"road_event_id":"VAEkXF+n70wN8RBhlHd2AsU3Gzc=","beginning_cross_street":"Steuben-Chemung County Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.965611,42.134201]]}},{"id":"nDHtgo8x2Z/wdQep1SOyG/qL/rk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hq+yyAmzfwilN3jPW20sa9aUu94="}],"description":"Mowing on I-86 both directions Steuben-Chemung County Line (Corning) Right shoulder closure , Thursday June 4th, 2026 thru Wednesday June 17th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-04T17:33:21Z"},"road_event_id":"nDHtgo8x2Z/wdQep1SOyG/qL/rk=","beginning_cross_street":"Steuben-Chemung County Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.965611,42.134201]]}},{"id":"41klktNznG12XnKWKda7r+FZUxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on Taconic State Parkway northbound between Exit 2 - Cross Street West (Mount Pleasant) and Exit 3 - Saw Mill River Parkway (Mount Pleasant) D042080/B5502059/32769909 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday June 9th, 2026, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-04T17:42:35Z"},"road_event_id":"41klktNznG12XnKWKda7r+FZUxk=","beginning_cross_street":"Exit 2 - Cross Street West","ending_cross_street":"Exit 3 - Saw Mill River Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.799218,41.107631]]}},{"id":"Llms4U1cxmjYvRicVwe0uJdbfIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and Exit 1 - I-287 (Harrison) D042080/B1052950/32770009 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 8th, 2026, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-04T17:48:16Z"},"road_event_id":"Llms4U1cxmjYvRicVwe0uJdbfIM=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"Exit 1 - I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.720467,41.066616]]}},{"id":"zh70FPm8/wlLI82avcatMi6tQ5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-684 northbound between I-287 (Harrison) and Exit 2 - NY 120 - Westchester County Airport (North Castle) D042080/B1052950/32770109 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 8th, 2026, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-04T17:51:40Z"},"road_event_id":"zh70FPm8/wlLI82avcatMi6tQ5g=","beginning_cross_street":"I-287","ending_cross_street":"Exit 2 - NY 120 - Westchester County Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.720365,41.066396]]}},{"id":"t+hGf1XOlJoyRA2Os20+1fYLk28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-390 both directions under Martin Rd (Henrietta) Alternating Right/Left Lane closures as needed., Friday June 12th, 2026, 08:00 AM thru 03:30 PM All lanes","update_date":"2026-06-04T17:49:16Z"},"road_event_id":"t+hGf1XOlJoyRA2Os20+1fYLk28=","beginning_cross_street":"Martin Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.656124,43.026866]]}},{"id":"OXxUQeNFpsj966f2qbO65aOUk+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-684 southbound between Exit 5 - Saw Mill River Parkway (Bedford) and Exit 4 - NY 172 - Mount Kisco - Bedford (Bedford) D042080/B1053101/32770209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 8th, 2026, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-04T17:53:47Z"},"road_event_id":"OXxUQeNFpsj966f2qbO65aOUk+Q=","beginning_cross_street":"Exit 5 - Saw Mill River Parkway","ending_cross_street":"Exit 4 - NY 172 - Mount Kisco - Bedford","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.683644,41.226016]]}},{"id":"Cb083RV5yg70zBqjT6UhBtfiohE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-6"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on CR-6 both directions north of EVANS RD (Bergen) Alternating lane/shoulder closures with flaggers as needed, Wednesday June 10th, 2026, 07:30 AM thru 04:30 PM All lanes","update_date":"2026-06-04T17:53:40Z"},"road_event_id":"Cb083RV5yg70zBqjT6UhBtfiohE=","beginning_cross_street":"EVANS RD","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:30:00Z","end_date":"2026-06-10T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.98689,43.106474]]}},{"id":"i+viKOwD1PiQTdViwCnAvwSyxkI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 77"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lX2i8hR0oGjTwDdBsAOATpvJOPU="}],"description":"Bridge inspection on NY 77 both directions under Clinton Street Road; NY 354 (Bennington) Alternating lane/shoulder closures with flaggers as needed, Wednesday June 10th, 2026 thru Thursday June 11th, 2026, Wednesday/Thursday, 08:00 AM thru 05:00 PM All lanes","update_date":"2026-06-04T18:26:50Z"},"road_event_id":"i+viKOwD1PiQTdViwCnAvwSyxkI=","beginning_cross_street":"Clinton Street Road; NY 354","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.398338,42.837161]]}},{"id":"lX2i8hR0oGjTwDdBsAOATpvJOPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 77"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i+viKOwD1PiQTdViwCnAvwSyxkI="}],"description":"Bridge inspection on NY 77 both directions under Clinton Street Road; NY 354 (Bennington) Alternating lane/shoulder closures with flaggers as needed, Wednesday June 10th, 2026 thru Thursday June 11th, 2026, Wednesday/Thursday, 08:00 AM thru 05:00 PM All lanes","update_date":"2026-06-04T18:26:50Z"},"road_event_id":"lX2i8hR0oGjTwDdBsAOATpvJOPU=","beginning_cross_street":"Clinton Street Road; NY 354","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.398338,42.837161]]}},{"id":"scRTJXAO9QNmeJvzbLg4JlyF8c4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on US 20 eastbound under South Main Street; NY 14 (Geneva), Friday June 12th, 2026, 08:30 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-04T18:04:26Z"},"road_event_id":"scRTJXAO9QNmeJvzbLg4JlyF8c4=","beginning_cross_street":"South Main Street; NY 14","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:30:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.982932,42.861264]]}},{"id":"p4mcA3gdQC1ogkSKPkjAIL7QLX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 121"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on NY 121 both directions under I-84 (Southeast) D042080/B1032612/32770309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday June 8th, 2026, 09:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-06-04T18:13:22Z"},"road_event_id":"p4mcA3gdQC1ogkSKPkjAIL7QLX0=","beginning_cross_street":"I-84","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.58233,41.383139]]}},{"id":"IveRkIVWx3dGRPv+3zKV2GetSCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"J/6ULgl8cmFbWJ85YYDa+5zyLck="}],"description":"Construction on I-495 both directions from Exit 22A - Grand Central Parkwy (New York) to 48th Street; Ramp (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM 2 Left lanes of 3 lanes closed westbound, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 11:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed eastbound","update_date":"2026-06-04T18:13:09Z"},"road_event_id":"IveRkIVWx3dGRPv+3zKV2GetSCA=","beginning_cross_street":"Exit 22A - Grand Central Parkwy","ending_cross_street":"48th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T03:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.845485,40.740057]]}},{"id":"J/6ULgl8cmFbWJ85YYDa+5zyLck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IveRkIVWx3dGRPv+3zKV2GetSCA="},{"type":"next-occurrence","id":"nZVJPMUxRK1mLbgqIM9ytFPLidg="}],"description":"Construction on I-495 both directions from Exit 22A - Grand Central Parkwy (New York) to 48th Street; Ramp (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM 2 Left lanes of 3 lanes closed westbound, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 11:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed eastbound","update_date":"2026-06-04T18:13:09Z"},"road_event_id":"J/6ULgl8cmFbWJ85YYDa+5zyLck=","beginning_cross_street":"Exit 22A - Grand Central Parkwy","ending_cross_street":"48th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T03:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.845485,40.740057]]}},{"id":"nZVJPMUxRK1mLbgqIM9ytFPLidg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IveRkIVWx3dGRPv+3zKV2GetSCA="},{"type":"next-occurrence","id":"ZcmbhcsZY2SkrsAvRZ5nOq00Q1g="}],"description":"Construction on I-495 both directions from Exit 22A - Grand Central Parkwy (New York) to 48th Street; Ramp (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM 2 Left lanes of 3 lanes closed westbound, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 11:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed eastbound","update_date":"2026-06-04T18:13:09Z"},"road_event_id":"nZVJPMUxRK1mLbgqIM9ytFPLidg=","beginning_cross_street":"Exit 22A - Grand Central Parkwy","ending_cross_street":"48th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T03:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.845485,40.740057]]}},{"id":"ZcmbhcsZY2SkrsAvRZ5nOq00Q1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IveRkIVWx3dGRPv+3zKV2GetSCA="},{"type":"next-occurrence","id":"f5WQOnIrI01aQA5QIFXANvnYMLo="}],"description":"Construction on I-495 both directions from Exit 22A - Grand Central Parkwy (New York) to 48th Street; Ramp (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM 2 Left lanes of 3 lanes closed westbound, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 11:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed eastbound","update_date":"2026-06-04T18:13:09Z"},"road_event_id":"ZcmbhcsZY2SkrsAvRZ5nOq00Q1g=","beginning_cross_street":"Exit 22A - Grand Central Parkwy","ending_cross_street":"48th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T03:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.845485,40.740057]]}},{"id":"f5WQOnIrI01aQA5QIFXANvnYMLo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IveRkIVWx3dGRPv+3zKV2GetSCA="}],"description":"Construction on I-495 both directions from Exit 22A - Grand Central Parkwy (New York) to 48th Street; Ramp (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM 2 Left lanes of 3 lanes closed westbound, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 11:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed eastbound","update_date":"2026-06-04T18:13:09Z"},"road_event_id":"f5WQOnIrI01aQA5QIFXANvnYMLo=","beginning_cross_street":"Exit 22A - Grand Central Parkwy","ending_cross_street":"48th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T03:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.845485,40.740057]]}},{"id":"9K3S/pN8hqtB9Wba+gIKhOOdGeo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-84 eastbound between Exit 68 - I-684 (Southeast) and Connecticut State Line (Southeast) D042080/B1032612/32693409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-04T18:15:35Z"},"road_event_id":"9K3S/pN8hqtB9Wba+gIKhOOdGeo=","beginning_cross_street":"Exit 68 - I-684","ending_cross_street":"Connecticut State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.582383,41.383245]]}},{"id":"V5/wEUjmhuCjKe57qIzK8Z/OZzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[],"description":"Bridge demolition on I-86 both directions Exit 7 - CR 33 Panama-Stedman Road (North Harmony) to Exit 11 - Strunk Road; Ramp (Ellicott), Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 12:00 AM thru 11:59 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-04T18:41:53Z"},"road_event_id":"V5/wEUjmhuCjKe57qIzK8Z/OZzs=","beginning_cross_street":"Exit 7 - CR 33 Panama-Stedman Road","ending_cross_street":"Exit 11 -  Strunk Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T04:00:00Z","end_date":"2026-06-14T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.468912,42.156506]]}},{"id":"HX+XiEKjJzMBknWGOzInPJQU+L0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 33 both directions Genesee Street; Cayuga Road; Dick Road (Cheektowaga) to I-90; Thruway (Cheektowaga), Monday June 8th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-06-04T18:40:20Z"},"road_event_id":"HX+XiEKjJzMBknWGOzInPJQU+L0=","beginning_cross_street":"Genesee Street; Cayuga Road; Dick Road","ending_cross_street":"I-90; Thruway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.738953,42.930099]]}},{"id":"IRMfDTPqJYkB3C5Qy57mzJe1l8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 270"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fcZXfiUeC9qFQTk7Gaqi76e0kww="}],"description":"Drainage improvements on NY 270 both directions North French Road (Amherst) to Landings Drive (Amherst), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T18:46:06Z"},"road_event_id":"IRMfDTPqJYkB3C5Qy57mzJe1l8o=","beginning_cross_street":"North French Road","ending_cross_street":"Landings Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.76782,43.034767]]}},{"id":"fcZXfiUeC9qFQTk7Gaqi76e0kww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 270"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IRMfDTPqJYkB3C5Qy57mzJe1l8o="},{"type":"next-occurrence","id":"7aL6nqcUqju1SgEb5juUhM6FMTM="}],"description":"Drainage improvements on NY 270 both directions North French Road (Amherst) to Landings Drive (Amherst), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T18:46:06Z"},"road_event_id":"fcZXfiUeC9qFQTk7Gaqi76e0kww=","beginning_cross_street":"North French Road","ending_cross_street":"Landings Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.76782,43.034767]]}},{"id":"7aL6nqcUqju1SgEb5juUhM6FMTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 270"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IRMfDTPqJYkB3C5Qy57mzJe1l8o="},{"type":"next-occurrence","id":"uhsmKtoUdhP2fXiaVZgqpWv6Wp8="}],"description":"Drainage improvements on NY 270 both directions North French Road (Amherst) to Landings Drive (Amherst), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T18:46:06Z"},"road_event_id":"7aL6nqcUqju1SgEb5juUhM6FMTM=","beginning_cross_street":"North French Road","ending_cross_street":"Landings Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.76782,43.034767]]}},{"id":"uhsmKtoUdhP2fXiaVZgqpWv6Wp8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 270"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IRMfDTPqJYkB3C5Qy57mzJe1l8o="},{"type":"next-occurrence","id":"wLV0QsYmFZ/ZYuXJK0DoDRrQfts="}],"description":"Drainage improvements on NY 270 both directions North French Road (Amherst) to Landings Drive (Amherst), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T18:46:06Z"},"road_event_id":"uhsmKtoUdhP2fXiaVZgqpWv6Wp8=","beginning_cross_street":"North French Road","ending_cross_street":"Landings Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.76782,43.034767]]}},{"id":"wLV0QsYmFZ/ZYuXJK0DoDRrQfts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 270"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IRMfDTPqJYkB3C5Qy57mzJe1l8o="}],"description":"Drainage improvements on NY 270 both directions North French Road (Amherst) to Landings Drive (Amherst), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-06-04T18:46:06Z"},"road_event_id":"wLV0QsYmFZ/ZYuXJK0DoDRrQfts=","beginning_cross_street":"North French Road","ending_cross_street":"Landings Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.76782,43.034767]]}},{"id":"7e1qzTplwUFyPJljygjxezM81pE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-290"],"direction":"unknown","related_road_events":[],"description":"Guard rail repairs on I-290 both directions Town of Tonawanda; Town of Amherst Line; Niagara Falls Boulevard; US 62 (Tonawanda) to NY 384 Delaware Avenue (Tonawanda), Saturday June 13th, 2026, 06:00 AM thru 12:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-06-04T18:47:51Z"},"road_event_id":"7e1qzTplwUFyPJljygjxezM81pE=","beginning_cross_street":"Town of Tonawanda; Town of Amherst Line; Niagara Falls Boulevard; US 62","ending_cross_street":"NY 384 Delaware Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T10:00:00Z","end_date":"2026-06-13T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.822449,43.004282]]}},{"id":"rBDiS+E2JiUPjQHCRgj8IipBaf4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[],"description":"Line striping on NY 19 both directions Genesee Street; NY 244 (Amity) to Bolivar Road; end NY 417 overlap (Wellsville) Mobile Work Zone \"Caution Wet Paint\", Monday June 8th, 2026, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-04T18:48:49Z"},"road_event_id":"rBDiS+E2JiUPjQHCRgj8IipBaf4=","beginning_cross_street":"Genesee Street; NY 244","ending_cross_street":"Bolivar Road; end NY 417 overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.034866,42.223399]]}},{"id":"FM2o/brWEdR2BBiIerrrG+GPHHA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between North of Exit 30 - North Maple Ave (Harding Twp) and North of Exit 21 - I-78 (Bedminster Twp), Monday June 8, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-06-04T18:49:38Z"},"road_event_id":"FM2o/brWEdR2BBiIerrrG+GPHHA=","beginning_cross_street":"North of Exit 30 - North Maple Ave","ending_cross_street":"North of Exit 21 - I-78","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.536544,40.73521]]}},{"id":"BiJZwM1U+Zr6+Q+QmdJ6gS2NW1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between North of Exit 30 - North Maple Ave (Harding Twp) and North of Exit 21 - I-78 (Bedminster Twp), Thursday June 11, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-06-04T18:49:44Z"},"road_event_id":"BiJZwM1U+Zr6+Q+QmdJ6gS2NW1I=","beginning_cross_street":"North of Exit 30 - North Maple Ave","ending_cross_street":"North of Exit 21 - I-78","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.536544,40.73521]]}},{"id":"zCdcxokTrfb0zUnYAXo62x6TSw0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between North of Exit 30 - North Maple Ave (Harding Twp) and North of Exit 21 - I-78 (Bedminster Twp), Tuesday June 9, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-06-04T18:49:46Z"},"road_event_id":"zCdcxokTrfb0zUnYAXo62x6TSw0=","beginning_cross_street":"North of Exit 30 - North Maple Ave","ending_cross_street":"North of Exit 21 - I-78","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.536544,40.73521]]}},{"id":"8XMGZq0miZXL2b6d/Q76BqIZlxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between North of Exit 30 - North Maple Ave (Harding Twp) and North of Exit 21 - I-78 (Bedminster Twp), Wednesday June 10, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-06-04T18:49:43Z"},"road_event_id":"8XMGZq0miZXL2b6d/Q76BqIZlxE=","beginning_cross_street":"North of Exit 30 - North Maple Ave","ending_cross_street":"North of Exit 21 - I-78","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.536544,40.73521]]}},{"id":"RbJ0NjYcxqnIiRwwGSvkVgzFRYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/ZsI3CLMPH2Jp/ofarqRg+ZjqtM="}],"description":"Installation of traffic management systems on NY 52 both directions between Munro Street (Crawford) and Albany Post Road (Crawford) D265291/32727109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-04T18:51:46Z"},"road_event_id":"RbJ0NjYcxqnIiRwwGSvkVgzFRYw=","beginning_cross_street":"Munro Street","ending_cross_street":"Albany Post Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.263509,41.593213]]}},{"id":"/ZsI3CLMPH2Jp/ofarqRg+ZjqtM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RbJ0NjYcxqnIiRwwGSvkVgzFRYw="},{"type":"next-occurrence","id":"p2mIqYyMkd82BvYLnqd/DYxzOBA="}],"description":"Installation of traffic management systems on NY 52 both directions between Munro Street (Crawford) and Albany Post Road (Crawford) D265291/32727109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-04T18:51:46Z"},"road_event_id":"/ZsI3CLMPH2Jp/ofarqRg+ZjqtM=","beginning_cross_street":"Munro Street","ending_cross_street":"Albany Post Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.263509,41.593213]]}},{"id":"p2mIqYyMkd82BvYLnqd/DYxzOBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RbJ0NjYcxqnIiRwwGSvkVgzFRYw="},{"type":"next-occurrence","id":"EtEG88S2XgTfJnsaMEU6gLmYoCo="}],"description":"Installation of traffic management systems on NY 52 both directions between Munro Street (Crawford) and Albany Post Road (Crawford) D265291/32727109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-04T18:51:46Z"},"road_event_id":"p2mIqYyMkd82BvYLnqd/DYxzOBA=","beginning_cross_street":"Munro Street","ending_cross_street":"Albany Post Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.263509,41.593213]]}},{"id":"EtEG88S2XgTfJnsaMEU6gLmYoCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RbJ0NjYcxqnIiRwwGSvkVgzFRYw="},{"type":"next-occurrence","id":"SqDBwy6+zdkPIUtFUL0DJnm4XhI="}],"description":"Installation of traffic management systems on NY 52 both directions between Munro Street (Crawford) and Albany Post Road (Crawford) D265291/32727109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-04T18:51:46Z"},"road_event_id":"EtEG88S2XgTfJnsaMEU6gLmYoCo=","beginning_cross_street":"Munro Street","ending_cross_street":"Albany Post Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.263509,41.593213]]}},{"id":"SqDBwy6+zdkPIUtFUL0DJnm4XhI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RbJ0NjYcxqnIiRwwGSvkVgzFRYw="}],"description":"Installation of traffic management systems on NY 52 both directions between Munro Street (Crawford) and Albany Post Road (Crawford) D265291/32727109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-04T18:51:46Z"},"road_event_id":"SqDBwy6+zdkPIUtFUL0DJnm4XhI=","beginning_cross_street":"Munro Street","ending_cross_street":"Albany Post Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.263509,41.593213]]}},{"id":"/CYjc3tiVit3cO0LTwPDBTOEggU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"46Vu6Holesw5Q+S2Xulo6r2bUac="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:59 PM, alternating traffic","update_date":"2026-06-04T18:53:47Z"},"road_event_id":"/CYjc3tiVit3cO0LTwPDBTOEggU=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"46Vu6Holesw5Q+S2Xulo6r2bUac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/CYjc3tiVit3cO0LTwPDBTOEggU="},{"type":"next-occurrence","id":"Q94QXqFs7CRPBEgfncOtxecV4Sc="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:59 PM, alternating traffic","update_date":"2026-06-04T18:53:47Z"},"road_event_id":"46Vu6Holesw5Q+S2Xulo6r2bUac=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"Q94QXqFs7CRPBEgfncOtxecV4Sc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/CYjc3tiVit3cO0LTwPDBTOEggU="},{"type":"next-occurrence","id":"9k2cCbKRKBUa+NVgxQ8N1ERQ1iI="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:59 PM, alternating traffic","update_date":"2026-06-04T18:53:47Z"},"road_event_id":"Q94QXqFs7CRPBEgfncOtxecV4Sc=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"9k2cCbKRKBUa+NVgxQ8N1ERQ1iI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/CYjc3tiVit3cO0LTwPDBTOEggU="},{"type":"next-occurrence","id":"EOIp5KjCX1v1OHAS2jHMfWEq1RY="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:59 PM, alternating traffic","update_date":"2026-06-04T18:53:47Z"},"road_event_id":"9k2cCbKRKBUa+NVgxQ8N1ERQ1iI=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"EOIp5KjCX1v1OHAS2jHMfWEq1RY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/CYjc3tiVit3cO0LTwPDBTOEggU="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:59 PM, alternating traffic","update_date":"2026-06-04T18:53:47Z"},"road_event_id":"EOIp5KjCX1v1OHAS2jHMfWEq1RY=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"9mNSZESb5uxCOBmpNFLCsUJYDqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UZZr3qd8nbpa1hqdudzGfK3nYGk="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32770709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-04T18:57:00Z"},"road_event_id":"9mNSZESb5uxCOBmpNFLCsUJYDqc=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"UZZr3qd8nbpa1hqdudzGfK3nYGk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9mNSZESb5uxCOBmpNFLCsUJYDqc="},{"type":"next-occurrence","id":"M6KngMrVEbfnBLlLPniWytgxNYo="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32770709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-04T18:57:00Z"},"road_event_id":"UZZr3qd8nbpa1hqdudzGfK3nYGk=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"M6KngMrVEbfnBLlLPniWytgxNYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9mNSZESb5uxCOBmpNFLCsUJYDqc="},{"type":"next-occurrence","id":"+l6rN1S1xfXTK9sFDXxXJqkhBPQ="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32770709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-04T18:57:00Z"},"road_event_id":"M6KngMrVEbfnBLlLPniWytgxNYo=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"+l6rN1S1xfXTK9sFDXxXJqkhBPQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9mNSZESb5uxCOBmpNFLCsUJYDqc="},{"type":"next-occurrence","id":"w09NKrfeHy1f6VUsJeNWSWxeWxM="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32770709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-04T18:57:00Z"},"road_event_id":"+l6rN1S1xfXTK9sFDXxXJqkhBPQ=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"w09NKrfeHy1f6VUsJeNWSWxeWxM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9mNSZESb5uxCOBmpNFLCsUJYDqc="},{"type":"next-occurrence","id":"TiR3qqOOwnDm7Agj6GgbMsiz264="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32770709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-04T18:57:00Z"},"road_event_id":"w09NKrfeHy1f6VUsJeNWSWxeWxM=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"TiR3qqOOwnDm7Agj6GgbMsiz264=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9mNSZESb5uxCOBmpNFLCsUJYDqc="},{"type":"next-occurrence","id":"VsxXClSZs5DMt046IKsh4bC4w/Y="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32770709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-04T18:57:00Z"},"road_event_id":"TiR3qqOOwnDm7Agj6GgbMsiz264=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"VsxXClSZs5DMt046IKsh4bC4w/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9mNSZESb5uxCOBmpNFLCsUJYDqc="},{"type":"next-occurrence","id":"eRAAhM6vt2dBiiuFcYjNbcbXD9g="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32770709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-04T18:57:00Z"},"road_event_id":"VsxXClSZs5DMt046IKsh4bC4w/Y=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"eRAAhM6vt2dBiiuFcYjNbcbXD9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9mNSZESb5uxCOBmpNFLCsUJYDqc="},{"type":"next-occurrence","id":"X7YU8ZXorMu6nVJ4FEGpxubPVJY="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32770709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-04T18:57:00Z"},"road_event_id":"eRAAhM6vt2dBiiuFcYjNbcbXD9g=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"X7YU8ZXorMu6nVJ4FEGpxubPVJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9mNSZESb5uxCOBmpNFLCsUJYDqc="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32770709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Thursday June 18th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-06-04T18:57:00Z"},"road_event_id":"X7YU8ZXorMu6nVJ4FEGpxubPVJY=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"5rR4+kOkg1/r5atfRWlfqzdOI+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6SIDMZGC6WjhDGFh3uCFCpLUotI="}],"description":"Overhead sign inspection on NY 304 both directions between W Washington Avenue (Orangetown) and NY 59 (Clarkstown) D041200/32770809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:19:46Z"},"road_event_id":"5rR4+kOkg1/r5atfRWlfqzdOI+E=","beginning_cross_street":"W Washington Avenue","ending_cross_street":"NY 59","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.022253,41.070198]]}},{"id":"6SIDMZGC6WjhDGFh3uCFCpLUotI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5rR4+kOkg1/r5atfRWlfqzdOI+E="},{"type":"next-occurrence","id":"shX/6iP01tr4DHtlmjTgjKwzOW8="}],"description":"Overhead sign inspection on NY 304 both directions between W Washington Avenue (Orangetown) and NY 59 (Clarkstown) D041200/32770809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:19:46Z"},"road_event_id":"6SIDMZGC6WjhDGFh3uCFCpLUotI=","beginning_cross_street":"W Washington Avenue","ending_cross_street":"NY 59","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.022253,41.070198]]}},{"id":"shX/6iP01tr4DHtlmjTgjKwzOW8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5rR4+kOkg1/r5atfRWlfqzdOI+E="},{"type":"next-occurrence","id":"v/r7YZ+6+KAOE3lIFCOeJoNAfcg="}],"description":"Overhead sign inspection on NY 304 both directions between W Washington Avenue (Orangetown) and NY 59 (Clarkstown) D041200/32770809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:19:46Z"},"road_event_id":"shX/6iP01tr4DHtlmjTgjKwzOW8=","beginning_cross_street":"W Washington Avenue","ending_cross_street":"NY 59","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.022253,41.070198]]}},{"id":"v/r7YZ+6+KAOE3lIFCOeJoNAfcg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5rR4+kOkg1/r5atfRWlfqzdOI+E="},{"type":"next-occurrence","id":"oQ9Clpy+s4QF+OkIqdUoGgIpH14="}],"description":"Overhead sign inspection on NY 304 both directions between W Washington Avenue (Orangetown) and NY 59 (Clarkstown) D041200/32770809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:19:46Z"},"road_event_id":"v/r7YZ+6+KAOE3lIFCOeJoNAfcg=","beginning_cross_street":"W Washington Avenue","ending_cross_street":"NY 59","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.022253,41.070198]]}},{"id":"oQ9Clpy+s4QF+OkIqdUoGgIpH14=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5rR4+kOkg1/r5atfRWlfqzdOI+E="}],"description":"Overhead sign inspection on NY 304 both directions between W Washington Avenue (Orangetown) and NY 59 (Clarkstown) D041200/32770809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:19:46Z"},"road_event_id":"oQ9Clpy+s4QF+OkIqdUoGgIpH14=","beginning_cross_street":"W Washington Avenue","ending_cross_street":"NY 59","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.022253,41.070198]]}},{"id":"ZwxWVoSfhO4MlD4w06ohFW127T4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/R/Ozs3ea1xNn092lTsoTbxg11Y="}],"description":"Overhead sign inspection on NY 303 both directions at (Clarkstown) D041200/32770909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:22:51Z"},"road_event_id":"ZwxWVoSfhO4MlD4w06ohFW127T4=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.952182,41.102337]]}},{"id":"/R/Ozs3ea1xNn092lTsoTbxg11Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZwxWVoSfhO4MlD4w06ohFW127T4="},{"type":"next-occurrence","id":"n8G7PK3+BfGmRrshviA+6ixnhWI="}],"description":"Overhead sign inspection on NY 303 both directions at (Clarkstown) D041200/32770909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:22:51Z"},"road_event_id":"/R/Ozs3ea1xNn092lTsoTbxg11Y=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.952182,41.102337]]}},{"id":"n8G7PK3+BfGmRrshviA+6ixnhWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZwxWVoSfhO4MlD4w06ohFW127T4="},{"type":"next-occurrence","id":"W9cGE6+i06+gdo73pzq7axCZA14="}],"description":"Overhead sign inspection on NY 303 both directions at (Clarkstown) D041200/32770909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:22:51Z"},"road_event_id":"n8G7PK3+BfGmRrshviA+6ixnhWI=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.952182,41.102337]]}},{"id":"W9cGE6+i06+gdo73pzq7axCZA14=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZwxWVoSfhO4MlD4w06ohFW127T4="},{"type":"next-occurrence","id":"MTNiGSOZT17px9jS6kLBXF8pDg4="}],"description":"Overhead sign inspection on NY 303 both directions at (Clarkstown) D041200/32770909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:22:51Z"},"road_event_id":"W9cGE6+i06+gdo73pzq7axCZA14=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.952182,41.102337]]}},{"id":"MTNiGSOZT17px9jS6kLBXF8pDg4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZwxWVoSfhO4MlD4w06ohFW127T4="}],"description":"Overhead sign inspection on NY 303 both directions at (Clarkstown) D041200/32770909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:22:51Z"},"road_event_id":"MTNiGSOZT17px9jS6kLBXF8pDg4=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.952182,41.102337]]}},{"id":"N68jwxLlqZsdSs9za59h4yP1GKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 306"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iVh8TkJYudrdmohVTOK8avqDJBI="}],"description":"Overhead sign inspection on NY 306 both directions at NY 59 (Ramapo) D041200/32771109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:37:57Z"},"road_event_id":"N68jwxLlqZsdSs9za59h4yP1GKQ=","beginning_cross_street":"NY 59","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.069533,41.107275]]}},{"id":"iVh8TkJYudrdmohVTOK8avqDJBI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 306"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N68jwxLlqZsdSs9za59h4yP1GKQ="},{"type":"next-occurrence","id":"a31ds1G6cwGgJAkOwHUlacFH54I="}],"description":"Overhead sign inspection on NY 306 both directions at NY 59 (Ramapo) D041200/32771109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:37:57Z"},"road_event_id":"iVh8TkJYudrdmohVTOK8avqDJBI=","beginning_cross_street":"NY 59","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.069533,41.107275]]}},{"id":"a31ds1G6cwGgJAkOwHUlacFH54I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 306"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N68jwxLlqZsdSs9za59h4yP1GKQ="},{"type":"next-occurrence","id":"ik+J1CGcuL6zfRwq2HmOGIkbnFQ="}],"description":"Overhead sign inspection on NY 306 both directions at NY 59 (Ramapo) D041200/32771109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:37:57Z"},"road_event_id":"a31ds1G6cwGgJAkOwHUlacFH54I=","beginning_cross_street":"NY 59","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.069533,41.107275]]}},{"id":"ik+J1CGcuL6zfRwq2HmOGIkbnFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 306"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N68jwxLlqZsdSs9za59h4yP1GKQ="},{"type":"next-occurrence","id":"rwr/7FbsN/i4eKZadsMwC9CNOiQ="}],"description":"Overhead sign inspection on NY 306 both directions at NY 59 (Ramapo) D041200/32771109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:37:57Z"},"road_event_id":"ik+J1CGcuL6zfRwq2HmOGIkbnFQ=","beginning_cross_street":"NY 59","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.069533,41.107275]]}},{"id":"rwr/7FbsN/i4eKZadsMwC9CNOiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 306"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N68jwxLlqZsdSs9za59h4yP1GKQ="}],"description":"Overhead sign inspection on NY 306 both directions at NY 59 (Ramapo) D041200/32771109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:37:57Z"},"road_event_id":"rwr/7FbsN/i4eKZadsMwC9CNOiQ=","beginning_cross_street":"NY 59","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.069533,41.107275]]}},{"id":"ngUY8bON3Rt0Z2I8Yei4zXrbEwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qcvQWYB15uwgsvrQFUzHtDgRz6w="}],"description":"Overhead sign inspection on NY 94 westbound between North Street (Washingtonville) and Goshen Avenue - NY 208 (Washingtonville) D041200/32771309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:42:48Z"},"road_event_id":"ngUY8bON3Rt0Z2I8Yei4zXrbEwM=","beginning_cross_street":"North Street","ending_cross_street":"Goshen Avenue - NY 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.166097,41.427848]]}},{"id":"qcvQWYB15uwgsvrQFUzHtDgRz6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ngUY8bON3Rt0Z2I8Yei4zXrbEwM="},{"type":"next-occurrence","id":"nC3gaaSQKKoUMg86JNfIzU+rvR0="}],"description":"Overhead sign inspection on NY 94 westbound between North Street (Washingtonville) and Goshen Avenue - NY 208 (Washingtonville) D041200/32771309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:42:48Z"},"road_event_id":"qcvQWYB15uwgsvrQFUzHtDgRz6w=","beginning_cross_street":"North Street","ending_cross_street":"Goshen Avenue - NY 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.166097,41.427848]]}},{"id":"nC3gaaSQKKoUMg86JNfIzU+rvR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ngUY8bON3Rt0Z2I8Yei4zXrbEwM="},{"type":"next-occurrence","id":"aX58Yir67Qex2/cPHsQXb4K81QM="}],"description":"Overhead sign inspection on NY 94 westbound between North Street (Washingtonville) and Goshen Avenue - NY 208 (Washingtonville) D041200/32771309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:42:48Z"},"road_event_id":"nC3gaaSQKKoUMg86JNfIzU+rvR0=","beginning_cross_street":"North Street","ending_cross_street":"Goshen Avenue - NY 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.166097,41.427848]]}},{"id":"aX58Yir67Qex2/cPHsQXb4K81QM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ngUY8bON3Rt0Z2I8Yei4zXrbEwM="},{"type":"next-occurrence","id":"pTMOHlV0r5Eea5UYJZJbznjD3xk="}],"description":"Overhead sign inspection on NY 94 westbound between North Street (Washingtonville) and Goshen Avenue - NY 208 (Washingtonville) D041200/32771309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:42:48Z"},"road_event_id":"aX58Yir67Qex2/cPHsQXb4K81QM=","beginning_cross_street":"North Street","ending_cross_street":"Goshen Avenue - NY 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.166097,41.427848]]}},{"id":"pTMOHlV0r5Eea5UYJZJbznjD3xk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ngUY8bON3Rt0Z2I8Yei4zXrbEwM="}],"description":"Overhead sign inspection on NY 94 westbound between North Street (Washingtonville) and Goshen Avenue - NY 208 (Washingtonville) D041200/32771309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:42:48Z"},"road_event_id":"pTMOHlV0r5Eea5UYJZJbznjD3xk=","beginning_cross_street":"North Street","ending_cross_street":"Goshen Avenue - NY 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.166097,41.427848]]}},{"id":"Mesc6pBvmYmHcqvWXEOWRJdPSGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Q8QKygn94azSoNvguFRpyGwmhtw="}],"description":"Overhead sign inspection on NY 208 southbound between Lark Drive (Blooming Grove) and NY 94 (Blooming Grove) D041200/32771409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:49:58Z"},"road_event_id":"Mesc6pBvmYmHcqvWXEOWRJdPSGs=","beginning_cross_street":"Lark Drive","ending_cross_street":"NY 94","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.167299,41.428188]]}},{"id":"Q8QKygn94azSoNvguFRpyGwmhtw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mesc6pBvmYmHcqvWXEOWRJdPSGs="},{"type":"next-occurrence","id":"PzIQFcOTkeY6gczTwSPCI8UKoqY="}],"description":"Overhead sign inspection on NY 208 southbound between Lark Drive (Blooming Grove) and NY 94 (Blooming Grove) D041200/32771409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:49:58Z"},"road_event_id":"Q8QKygn94azSoNvguFRpyGwmhtw=","beginning_cross_street":"Lark Drive","ending_cross_street":"NY 94","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.167299,41.428188]]}},{"id":"PzIQFcOTkeY6gczTwSPCI8UKoqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mesc6pBvmYmHcqvWXEOWRJdPSGs="},{"type":"next-occurrence","id":"vf4N+qkHeVms8EAHhtb3Y0I9/jg="}],"description":"Overhead sign inspection on NY 208 southbound between Lark Drive (Blooming Grove) and NY 94 (Blooming Grove) D041200/32771409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:49:58Z"},"road_event_id":"PzIQFcOTkeY6gczTwSPCI8UKoqY=","beginning_cross_street":"Lark Drive","ending_cross_street":"NY 94","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.167299,41.428188]]}},{"id":"vf4N+qkHeVms8EAHhtb3Y0I9/jg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mesc6pBvmYmHcqvWXEOWRJdPSGs="},{"type":"next-occurrence","id":"k0nSuZAE49UVL7bSHamWjPXZ7+w="}],"description":"Overhead sign inspection on NY 208 southbound between Lark Drive (Blooming Grove) and NY 94 (Blooming Grove) D041200/32771409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:49:58Z"},"road_event_id":"vf4N+qkHeVms8EAHhtb3Y0I9/jg=","beginning_cross_street":"Lark Drive","ending_cross_street":"NY 94","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.167299,41.428188]]}},{"id":"k0nSuZAE49UVL7bSHamWjPXZ7+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mesc6pBvmYmHcqvWXEOWRJdPSGs="}],"description":"Overhead sign inspection on NY 208 southbound between Lark Drive (Blooming Grove) and NY 94 (Blooming Grove) D041200/32771409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:49:58Z"},"road_event_id":"k0nSuZAE49UVL7bSHamWjPXZ7+w=","beginning_cross_street":"Lark Drive","ending_cross_street":"NY 94","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.167299,41.428188]]}},{"id":"LO4dbxL6s7ernw6GBGxkvESwRXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dCSxXWo2aDq/4JxlUgGMffZK+PE="}],"description":"Overhead sign inspection on NY 52 eastbound between NY 208 (Montgomery) and Holiday Park Road (Montgomery) D041200/32771509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:53:21Z"},"road_event_id":"LO4dbxL6s7ernw6GBGxkvESwRXA=","beginning_cross_street":"NY 208","ending_cross_street":"Holiday Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.1873,41.560687]]}},{"id":"dCSxXWo2aDq/4JxlUgGMffZK+PE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LO4dbxL6s7ernw6GBGxkvESwRXA="},{"type":"next-occurrence","id":"fjy2iHOl3xvudPVA2fSlBwwsXL8="}],"description":"Overhead sign inspection on NY 52 eastbound between NY 208 (Montgomery) and Holiday Park Road (Montgomery) D041200/32771509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:53:21Z"},"road_event_id":"dCSxXWo2aDq/4JxlUgGMffZK+PE=","beginning_cross_street":"NY 208","ending_cross_street":"Holiday Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.1873,41.560687]]}},{"id":"fjy2iHOl3xvudPVA2fSlBwwsXL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LO4dbxL6s7ernw6GBGxkvESwRXA="},{"type":"next-occurrence","id":"s7kMRrT8hlQpf/AQbeNSRs5wqJ4="}],"description":"Overhead sign inspection on NY 52 eastbound between NY 208 (Montgomery) and Holiday Park Road (Montgomery) D041200/32771509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:53:21Z"},"road_event_id":"fjy2iHOl3xvudPVA2fSlBwwsXL8=","beginning_cross_street":"NY 208","ending_cross_street":"Holiday Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.1873,41.560687]]}},{"id":"s7kMRrT8hlQpf/AQbeNSRs5wqJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LO4dbxL6s7ernw6GBGxkvESwRXA="},{"type":"next-occurrence","id":"hd4011QcS4J5O8JXvXAQuNkYfBg="}],"description":"Overhead sign inspection on NY 52 eastbound between NY 208 (Montgomery) and Holiday Park Road (Montgomery) D041200/32771509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:53:21Z"},"road_event_id":"s7kMRrT8hlQpf/AQbeNSRs5wqJ4=","beginning_cross_street":"NY 208","ending_cross_street":"Holiday Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.1873,41.560687]]}},{"id":"hd4011QcS4J5O8JXvXAQuNkYfBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LO4dbxL6s7ernw6GBGxkvESwRXA="}],"description":"Overhead sign inspection on NY 52 eastbound between NY 208 (Montgomery) and Holiday Park Road (Montgomery) D041200/32771509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-06-04T19:53:21Z"},"road_event_id":"hd4011QcS4J5O8JXvXAQuNkYfBg=","beginning_cross_street":"NY 208","ending_cross_street":"Holiday Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.1873,41.560687]]}},{"id":"y4g01FkFfTp6B2lgSKr2gznjpyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Northbound North of CR 508 (Kearny) Wednesday June 10, 2026 09:00 AM thru 03:30 PM, 1 left lane of 2 lanes closed","update_date":"2026-06-04T19:54:12Z"},"road_event_id":"y4g01FkFfTp6B2lgSKr2gznjpyQ=","beginning_cross_street":"North of CR 508","ending_cross_street":"North of CR 508","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.100448,40.74765]]}},{"id":"uO7nI38jYdrgEcvHO+2H6BC+XHM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"y2O1c2IWz3nPEN4MAuG543d01IQ="}],"description":"Safety improvements on NY 32 both directions between St James Court (Kingston) and Flatbush Avenue - US 9W (Ulster) D265433/32771609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-04T20:00:10Z"},"road_event_id":"uO7nI38jYdrgEcvHO+2H6BC+XHM=","beginning_cross_street":"St James Court","ending_cross_street":"Flatbush Avenue - US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070157,41.786328]]}},{"id":"y2O1c2IWz3nPEN4MAuG543d01IQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uO7nI38jYdrgEcvHO+2H6BC+XHM="},{"type":"next-occurrence","id":"hK4onnAyJfHMH3JspVUK3pxMfDY="}],"description":"Safety improvements on NY 32 both directions between St James Court (Kingston) and Flatbush Avenue - US 9W (Ulster) D265433/32771609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-04T20:00:10Z"},"road_event_id":"y2O1c2IWz3nPEN4MAuG543d01IQ=","beginning_cross_street":"St James Court","ending_cross_street":"Flatbush Avenue - US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070157,41.786328]]}},{"id":"hK4onnAyJfHMH3JspVUK3pxMfDY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uO7nI38jYdrgEcvHO+2H6BC+XHM="},{"type":"next-occurrence","id":"U/rNJzEex1DOFi8EvdvvVw78ybc="}],"description":"Safety improvements on NY 32 both directions between St James Court (Kingston) and Flatbush Avenue - US 9W (Ulster) D265433/32771609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-04T20:00:10Z"},"road_event_id":"hK4onnAyJfHMH3JspVUK3pxMfDY=","beginning_cross_street":"St James Court","ending_cross_street":"Flatbush Avenue - US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070157,41.786328]]}},{"id":"U/rNJzEex1DOFi8EvdvvVw78ybc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uO7nI38jYdrgEcvHO+2H6BC+XHM="},{"type":"next-occurrence","id":"hDojdGexTKvIT3HzSbbAy1Dw99Q="}],"description":"Safety improvements on NY 32 both directions between St James Court (Kingston) and Flatbush Avenue - US 9W (Ulster) D265433/32771609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-04T20:00:10Z"},"road_event_id":"U/rNJzEex1DOFi8EvdvvVw78ybc=","beginning_cross_street":"St James Court","ending_cross_street":"Flatbush Avenue - US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070157,41.786328]]}},{"id":"hDojdGexTKvIT3HzSbbAy1Dw99Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uO7nI38jYdrgEcvHO+2H6BC+XHM="}],"description":"Safety improvements on NY 32 both directions between St James Court (Kingston) and Flatbush Avenue - US 9W (Ulster) D265433/32771609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-06-04T20:00:10Z"},"road_event_id":"hDojdGexTKvIT3HzSbbAy1Dw99Q=","beginning_cross_street":"St James Court","ending_cross_street":"Flatbush Avenue - US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070157,41.786328]]}},{"id":"ORC32771709","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","description":"Survey work on NY 32 northbound between South Putt Corners Road - CR 17 (New Paltz) and Lincoln Place (New Paltz) 202408110791-2/32250309 - This work is weather permitting Not currently scheduled","update_date":"2026-06-04T20:01:34Z"},"road_event_id":"ORC32771709","beginning_cross_street":"South Putt Corners Road - CR 17","ending_cross_street":"Lincoln Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-04T20:01:34Z","end_date":"2025-02-01T04:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.083345,41.721458]]}},{"id":"w/gvfJ1HMKk5luJhtdLZh4rhPo0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Port Jefferson"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fC9BSez4Zl9TzwQA+G1dFeA6AA8="}],"description":"Due to Repairs and Track repairs both directions, Port Jefferson between Huntington (Huntington) and Port Jefferson (Port Jefferson) buses will replace midday weekday trains Westbound buses will depart earlier than usual train times, Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:30 AM thru 03:15 PM, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 08:30 AM thru 04:00 PM","update_date":"2026-06-04T21:35:23Z"},"road_event_id":"w/gvfJ1HMKk5luJhtdLZh4rhPo0=","beginning_cross_street":"Huntington","ending_cross_street":"Port Jefferson","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:30:00Z","end_date":"2026-06-08T19:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.409525,40.853009]]}},{"id":"fC9BSez4Zl9TzwQA+G1dFeA6AA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Port Jefferson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/gvfJ1HMKk5luJhtdLZh4rhPo0="},{"type":"next-occurrence","id":"s8FgCToqZeR7HEVWAeO9kK3jG5E="}],"description":"Due to Repairs and Track repairs both directions, Port Jefferson between Huntington (Huntington) and Port Jefferson (Port Jefferson) buses will replace midday weekday trains Westbound buses will depart earlier than usual train times, Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:30 AM thru 03:15 PM, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 08:30 AM thru 04:00 PM","update_date":"2026-06-04T21:35:23Z"},"road_event_id":"fC9BSez4Zl9TzwQA+G1dFeA6AA8=","beginning_cross_street":"Huntington","ending_cross_street":"Port Jefferson","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:30:00Z","end_date":"2026-06-09T19:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.409525,40.853009]]}},{"id":"s8FgCToqZeR7HEVWAeO9kK3jG5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Port Jefferson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/gvfJ1HMKk5luJhtdLZh4rhPo0="},{"type":"next-occurrence","id":"ZPOmRAxc8DC1tneLr80Pk1NRedw="}],"description":"Due to Repairs and Track repairs both directions, Port Jefferson between Huntington (Huntington) and Port Jefferson (Port Jefferson) buses will replace midday weekday trains Westbound buses will depart earlier than usual train times, Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:30 AM thru 03:15 PM, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 08:30 AM thru 04:00 PM","update_date":"2026-06-04T21:35:23Z"},"road_event_id":"s8FgCToqZeR7HEVWAeO9kK3jG5E=","beginning_cross_street":"Huntington","ending_cross_street":"Port Jefferson","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:30:00Z","end_date":"2026-06-10T19:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.409525,40.853009]]}},{"id":"ZPOmRAxc8DC1tneLr80Pk1NRedw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Port Jefferson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/gvfJ1HMKk5luJhtdLZh4rhPo0="},{"type":"next-occurrence","id":"Mx1qT/PcDFulZgDfOtCfgkWjI54="}],"description":"Due to Repairs and Track repairs both directions, Port Jefferson between Huntington (Huntington) and Port Jefferson (Port Jefferson) buses will replace midday weekday trains Westbound buses will depart earlier than usual train times, Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:30 AM thru 03:15 PM, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 08:30 AM thru 04:00 PM","update_date":"2026-06-04T21:35:23Z"},"road_event_id":"ZPOmRAxc8DC1tneLr80Pk1NRedw=","beginning_cross_street":"Huntington","ending_cross_street":"Port Jefferson","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:30:00Z","end_date":"2026-06-11T19:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.409525,40.853009]]}},{"id":"Mx1qT/PcDFulZgDfOtCfgkWjI54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Port Jefferson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/gvfJ1HMKk5luJhtdLZh4rhPo0="},{"type":"next-occurrence","id":"+gupsuMmKHAKzfHCqZ5+2eQ0gkY="}],"description":"Due to Repairs and Track repairs both directions, Port Jefferson between Huntington (Huntington) and Port Jefferson (Port Jefferson) buses will replace midday weekday trains Westbound buses will depart earlier than usual train times, Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:30 AM thru 03:15 PM, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 08:30 AM thru 04:00 PM","update_date":"2026-06-04T21:35:23Z"},"road_event_id":"Mx1qT/PcDFulZgDfOtCfgkWjI54=","beginning_cross_street":"Huntington","ending_cross_street":"Port Jefferson","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T12:30:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.409525,40.853009]]}},{"id":"+gupsuMmKHAKzfHCqZ5+2eQ0gkY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Port Jefferson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/gvfJ1HMKk5luJhtdLZh4rhPo0="},{"type":"next-occurrence","id":"RicO694kuRYAyze2wsAyDCkV4Kg="}],"description":"Due to Repairs and Track repairs both directions, Port Jefferson between Huntington (Huntington) and Port Jefferson (Port Jefferson) buses will replace midday weekday trains Westbound buses will depart earlier than usual train times, Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:30 AM thru 03:15 PM, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 08:30 AM thru 04:00 PM","update_date":"2026-06-04T21:35:23Z"},"road_event_id":"+gupsuMmKHAKzfHCqZ5+2eQ0gkY=","beginning_cross_street":"Huntington","ending_cross_street":"Port Jefferson","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T12:30:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.409525,40.853009]]}},{"id":"RicO694kuRYAyze2wsAyDCkV4Kg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Port Jefferson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/gvfJ1HMKk5luJhtdLZh4rhPo0="},{"type":"next-occurrence","id":"8PMWw4cf1NU5FX5J3yK9HdDXkSY="}],"description":"Due to Repairs and Track repairs both directions, Port Jefferson between Huntington (Huntington) and Port Jefferson (Port Jefferson) buses will replace midday weekday trains Westbound buses will depart earlier than usual train times, Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:30 AM thru 03:15 PM, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 08:30 AM thru 04:00 PM","update_date":"2026-06-04T21:35:23Z"},"road_event_id":"RicO694kuRYAyze2wsAyDCkV4Kg=","beginning_cross_street":"Huntington","ending_cross_street":"Port Jefferson","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T12:30:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.409525,40.853009]]}},{"id":"8PMWw4cf1NU5FX5J3yK9HdDXkSY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Port Jefferson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/gvfJ1HMKk5luJhtdLZh4rhPo0="},{"type":"next-occurrence","id":"3QP/Ejfe3eZgrVpi83xtpufFbF0="}],"description":"Due to Repairs and Track repairs both directions, Port Jefferson between Huntington (Huntington) and Port Jefferson (Port Jefferson) buses will replace midday weekday trains Westbound buses will depart earlier than usual train times, Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:30 AM thru 03:15 PM, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 08:30 AM thru 04:00 PM","update_date":"2026-06-04T21:35:23Z"},"road_event_id":"8PMWw4cf1NU5FX5J3yK9HdDXkSY=","beginning_cross_street":"Huntington","ending_cross_street":"Port Jefferson","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T12:30:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.409525,40.853009]]}},{"id":"3QP/Ejfe3eZgrVpi83xtpufFbF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Port Jefferson"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w/gvfJ1HMKk5luJhtdLZh4rhPo0="}],"description":"Due to Repairs and Track repairs both directions, Port Jefferson between Huntington (Huntington) and Port Jefferson (Port Jefferson) buses will replace midday weekday trains Westbound buses will depart earlier than usual train times, Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:30 AM thru 03:15 PM, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 08:30 AM thru 04:00 PM","update_date":"2026-06-04T21:35:23Z"},"road_event_id":"3QP/Ejfe3eZgrVpi83xtpufFbF0=","beginning_cross_street":"Huntington","ending_cross_street":"Port Jefferson","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T12:30:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.409525,40.853009]]}},{"id":"cQyiM5eaqvUdrMmkMsNfO+YFYQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Southbound between South of NJ 94 (Hamburg) and North of Holland Mountain Rd (Hardyston Twp), Wednesday June 10, 2026 07:00 PM thru Thursday June 11, 2026 05:00 AM, right shoulder closed, moving operation","update_date":"2026-06-04T22:04:40Z"},"road_event_id":"cQyiM5eaqvUdrMmkMsNfO+YFYQo=","beginning_cross_street":"South of NJ 94","ending_cross_street":"North of Holland Mountain Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.574012,41.148109]]}},{"id":"acxO6x9UrsqFIjyJ6CIxT1pIogQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near CR 617 (Roxbury Twp), Tuesday June 9, 2026 08:00 PM thru Wednesday June 10, 2026 05:00 AM, right lane closed","update_date":"2026-06-04T22:04:41Z"},"road_event_id":"acxO6x9UrsqFIjyJ6CIxT1pIogQ=","beginning_cross_street":"CR 617","ending_cross_street":"In the vicinity of Eyland Pl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.628799,40.861652]]}},{"id":"vp3iobIHdNngMoi1ZduVdH+zfcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near CR 617 (Roxbury Twp), Wednesday June 10, 2026 08:00 PM thru Thursday June 11, 2026 05:00 AM, right lane closed","update_date":"2026-06-04T22:04:42Z"},"road_event_id":"vp3iobIHdNngMoi1ZduVdH+zfcA=","beginning_cross_street":"CR 617","ending_cross_street":"In the vicinity of Eyland Pl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.628799,40.861652]]}},{"id":"k/Q3gT1dXxDTIxyObC9HFCZD6mg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Southbound between South of NJ 94 (Hamburg) and North of Holland Mountain Rd (Hardyston Twp), Tuesday June 9, 2026 07:00 PM thru Wednesday June 10, 2026 05:00 AM, right shoulder closed, moving operation","update_date":"2026-06-04T22:04:44Z"},"road_event_id":"k/Q3gT1dXxDTIxyObC9HFCZD6mg=","beginning_cross_street":"South of NJ 94","ending_cross_street":"North of Holland Mountain Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.574012,41.148109]]}},{"id":"g0H9C57IBc93eSMAqaQ3VuLikNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between East of I-287 (Parsippany-Troy Hills Twp) and East of CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp), Thursday June 11, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-06-04T22:07:39Z"},"road_event_id":"g0H9C57IBc93eSMAqaQ3VuLikNQ=","beginning_cross_street":"East of I-287","ending_cross_street":"East of CR 637/Beverwyck Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.40953,40.866123]]}},{"id":"AVxuC2xo+2MHoAHUB4QmLjFjJoE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound between East of West End Av (North Plainfield) and West of Gray St (North Plainfield), Monday June 8, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-04T22:07:43Z"},"road_event_id":"AVxuC2xo+2MHoAHUB4QmLjFjJoE=","beginning_cross_street":"East of West End Av","ending_cross_street":"West of Gray St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.448837,40.620475]]}},{"id":"2FJJk2JhdsN42ingEvdqHSp7FBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of Main St (Roxbury Twp), Tuesday June 9, 2026 08:00 PM thru Wednesday June 10, 2026 05:00 AM, right lane closed","update_date":"2026-06-04T22:07:37Z"},"road_event_id":"2FJJk2JhdsN42ingEvdqHSp7FBs=","beginning_cross_street":"West of Main St","ending_cross_street":"West of Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.663009,40.88866]]}},{"id":"LxsJu/PwJZ1IG5ZmpbERbC7RGqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of Main St (Roxbury Twp), Wednesday June 10, 2026 08:00 PM thru Thursday June 11, 2026 05:00 AM, right lane closed","update_date":"2026-06-04T22:07:38Z"},"road_event_id":"LxsJu/PwJZ1IG5ZmpbERbC7RGqk=","beginning_cross_street":"West of Main St","ending_cross_street":"West of Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.663009,40.88866]]}},{"id":"soFt14j0QvT67wv0IDWt31p5BGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound near West of Exit 1W - New Rd (Parsippany-Troy Hills Twp), Friday June 5, 2026 10:30 PM thru Saturday June 6, 2026 06:00 AM, deceleration lane closed","update_date":"2026-06-04T22:08:01Z"},"road_event_id":"soFt14j0QvT67wv0IDWt31p5BGQ=","beginning_cross_street":"West of Exit 1W - New Rd","ending_cross_street":"Exit 1W - New Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:30:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.353935,40.849781]]}},{"id":"u8+dolzCb6iekyfvYj/3HfLOBHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound between East of West End Av (North Plainfield) and West of Gray St (North Plainfield), Wednesday June 10, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-04T22:08:00Z"},"road_event_id":"u8+dolzCb6iekyfvYj/3HfLOBHU=","beginning_cross_street":"East of West End Av","ending_cross_street":"West of Gray St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.448837,40.620475]]}},{"id":"+9VUEGcqCcyCOoVgVKr37xw8KvM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Southbound between South of NJ 94 (Hamburg) and North of Holland Mountain Rd (Hardyston Twp), Monday June 8, 2026 07:00 PM thru Tuesday June 9, 2026 05:00 AM, right shoulder closed, moving operation","update_date":"2026-06-04T22:07:54Z"},"road_event_id":"+9VUEGcqCcyCOoVgVKr37xw8KvM=","beginning_cross_street":"South of NJ 94","ending_cross_street":"North of Holland Mountain Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T23:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.574012,41.148109]]}},{"id":"3g8gWhzX/zXMgrIvGMRHOAKU3gc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound between East of West End Av (North Plainfield) and West of Gray St (North Plainfield), Thursday June 11, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-04T22:07:53Z"},"road_event_id":"3g8gWhzX/zXMgrIvGMRHOAKU3gc=","beginning_cross_street":"East of West End Av","ending_cross_street":"West of Gray St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.448837,40.620475]]}},{"id":"DQpLe5LgOmS5tesCX1rSlB4nPyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near CR 617 (Roxbury Twp), Monday June 8, 2026 08:00 PM thru Tuesday June 9, 2026 05:00 AM, right lane closed","update_date":"2026-06-04T22:07:51Z"},"road_event_id":"DQpLe5LgOmS5tesCX1rSlB4nPyQ=","beginning_cross_street":"CR 617","ending_cross_street":"In the vicinity of Eyland Pl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.628799,40.861652]]}},{"id":"4Mn1mkjrWKTkMorWbUACCErjn6M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between East of I-287 (Parsippany-Troy Hills Twp) and East of CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp), Wednesday June 10, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-06-04T22:07:59Z"},"road_event_id":"4Mn1mkjrWKTkMorWbUACCErjn6M=","beginning_cross_street":"East of I-287","ending_cross_street":"East of CR 637/Beverwyck Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.40953,40.866123]]}},{"id":"Rax5Dxpnu8g0kmRIFkFuXv0og6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between South of Arthur St (East Brunswick Twp) and West Prospect St (East Brunswick Twp), Friday June 5, 2026 09:00 PM thru Saturday June 6, 2026 06:00 AM, right lane closed","update_date":"2026-06-04T22:07:56Z"},"road_event_id":"Rax5Dxpnu8g0kmRIFkFuXv0og6Y=","beginning_cross_street":"South of Arthur St","ending_cross_street":"West Prospect St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.387733,40.433139]]}},{"id":"mu7AWS8sV/BkGUldctaY8P3ZtWc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between East of I-287 (Parsippany-Troy Hills Twp) and East of CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp), Tuesday June 9, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-04T22:07:55Z"},"road_event_id":"mu7AWS8sV/BkGUldctaY8P3ZtWc=","beginning_cross_street":"East of I-287","ending_cross_street":"East of CR 637/Beverwyck Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.40953,40.866123]]}},{"id":"tkMBxJSPJUfL/B8J8n0QQQXher0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of Main St (Roxbury Twp), Monday June 8, 2026 08:00 PM thru Tuesday June 9, 2026 05:00 AM, right lane closed","update_date":"2026-06-04T22:07:49Z"},"road_event_id":"tkMBxJSPJUfL/B8J8n0QQQXher0=","beginning_cross_street":"West of Main St","ending_cross_street":"West of Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.668037,40.890239]]}},{"id":"j8RY9nQTj6AJnTJ3lYdvK+mt0RY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound between East of West End Av (North Plainfield) and West of Gray St (North Plainfield), Tuesday June 9, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-04T22:07:48Z"},"road_event_id":"j8RY9nQTj6AJnTJ3lYdvK+mt0RY=","beginning_cross_street":"East of West End Av","ending_cross_street":"West of Gray St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.448837,40.620475]]}},{"id":"7xnIa2IjwM5ykT+hM7dO6J559vY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between East of I-287 (Parsippany-Troy Hills Twp) and East of CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp), Tuesday June 9, 2026 07:00 AM thru 05:30 PM, right shoulder closed","update_date":"2026-06-04T22:07:47Z"},"road_event_id":"7xnIa2IjwM5ykT+hM7dO6J559vY=","beginning_cross_street":"East of I-287","ending_cross_street":"East of CR 637/Beverwyck Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.40953,40.866123]]}},{"id":"062OuU52ePnnGCDdHaUiVZk/TeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound at Exit 62 - Garden State Parkway (Saddle Brook Twp) Friday June 5, 2026 11:00 PM thru Saturday June 6, 2026 05:00 AM, ramp","update_date":"2026-06-04T22:07:46Z"},"road_event_id":"062OuU52ePnnGCDdHaUiVZk/TeY=","beginning_cross_street":"Exit 62 - Garden State Parkway","ending_cross_street":"Exit 62 - Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T03:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.101676,40.903633]]}},{"id":"s3Bf6YkylKYMTp8AW4g77piOTr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Milling on NY 5 eastbound ramp from Hinsdale Road (Camillus) ; follow detour, Monday June 8th, 2026, 10:30 AM thru 02:00 PM All lanes closed","update_date":"2026-06-04T22:18:39Z"},"road_event_id":"s3Bf6YkylKYMTp8AW4g77piOTr4=","beginning_cross_street":"Hinsdale Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:30:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.265323,43.054384]]}},{"id":"1JitFHHo8Gj1oeRWTyiqwhG4I0s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"X5TnVL+QpGU8z3hXWfXtWyAIzyE="}],"description":"Utility work on NY 31 eastbound at 94 W Genesee St (Galen) Flaggers, Tuesday June 9th, 2026 thru Wednesday June 10th, 2026, Tuesday/Wednesday, 08:00 AM thru 04:00 PM All lanes","update_date":"2026-06-04T22:25:16Z"},"road_event_id":"1JitFHHo8Gj1oeRWTyiqwhG4I0s=","beginning_cross_street":"94 W Genesee St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.876077,43.085919]]}},{"id":"X5TnVL+QpGU8z3hXWfXtWyAIzyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1JitFHHo8Gj1oeRWTyiqwhG4I0s="}],"description":"Utility work on NY 31 eastbound at 94 W Genesee St (Galen) Flaggers, Tuesday June 9th, 2026 thru Wednesday June 10th, 2026, Tuesday/Wednesday, 08:00 AM thru 04:00 PM All lanes","update_date":"2026-06-04T22:25:16Z"},"road_event_id":"X5TnVL+QpGU8z3hXWfXtWyAIzyE=","beginning_cross_street":"94 W Genesee St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.876077,43.085919]]}},{"id":"HOZGvhlTemyTJZpxCrtfptgfjjw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0eADYWcrKJ1xoA+5dT9uAsxghng="}],"description":"Utility work on NY 21 southbound at 299 Canandaigua St (Palmyra) Flaggers, Monday June 8th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday, 08:00 AM thru 04:00 PM All lanes","update_date":"2026-06-04T22:28:38Z"},"road_event_id":"HOZGvhlTemyTJZpxCrtfptgfjjw=","beginning_cross_street":"299 Canandaigua St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.23343,43.05873]]}},{"id":"0eADYWcrKJ1xoA+5dT9uAsxghng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HOZGvhlTemyTJZpxCrtfptgfjjw="}],"description":"Utility work on NY 21 southbound at 299 Canandaigua St (Palmyra) Flaggers, Monday June 8th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday, 08:00 AM thru 04:00 PM All lanes","update_date":"2026-06-04T22:28:38Z"},"road_event_id":"0eADYWcrKJ1xoA+5dT9uAsxghng=","beginning_cross_street":"299 Canandaigua St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.23343,43.05873]]}},{"id":"aNC8j+5zG9mLq58GjRt22tcjPl8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MyfKkPgSvHkGBDdrjN0v5jPdxBM="}],"description":"Utility work on NY 250 both directions between Penfield Road; NY 441 (Penfield) and New Whickham Dr, Flaggers as needed (Perinton) alternating lane closures, Friday June 12th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T00:46:22Z"},"road_event_id":"aNC8j+5zG9mLq58GjRt22tcjPl8=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"New Whickham Dr, Flaggers as needed","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441379,43.131574]]}},{"id":"MyfKkPgSvHkGBDdrjN0v5jPdxBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aNC8j+5zG9mLq58GjRt22tcjPl8="},{"type":"next-occurrence","id":"JX59X4hpiYcAax7RFkgAVlOIA5E="}],"description":"Utility work on NY 250 both directions between Penfield Road; NY 441 (Penfield) and New Whickham Dr, Flaggers as needed (Perinton) alternating lane closures, Friday June 12th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T00:46:22Z"},"road_event_id":"MyfKkPgSvHkGBDdrjN0v5jPdxBM=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"New Whickham Dr, Flaggers as needed","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441379,43.131574]]}},{"id":"JX59X4hpiYcAax7RFkgAVlOIA5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aNC8j+5zG9mLq58GjRt22tcjPl8="},{"type":"next-occurrence","id":"nZ5QPGu5tHPfG3nqeF5d7HTq19o="}],"description":"Utility work on NY 250 both directions between Penfield Road; NY 441 (Penfield) and New Whickham Dr, Flaggers as needed (Perinton) alternating lane closures, Friday June 12th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T00:46:22Z"},"road_event_id":"JX59X4hpiYcAax7RFkgAVlOIA5E=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"New Whickham Dr, Flaggers as needed","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441379,43.131574]]}},{"id":"nZ5QPGu5tHPfG3nqeF5d7HTq19o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aNC8j+5zG9mLq58GjRt22tcjPl8="},{"type":"next-occurrence","id":"BrdZfPw8R/ueE4ADBl00yh72Td8="}],"description":"Utility work on NY 250 both directions between Penfield Road; NY 441 (Penfield) and New Whickham Dr, Flaggers as needed (Perinton) alternating lane closures, Friday June 12th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T00:46:22Z"},"road_event_id":"nZ5QPGu5tHPfG3nqeF5d7HTq19o=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"New Whickham Dr, Flaggers as needed","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441379,43.131574]]}},{"id":"BrdZfPw8R/ueE4ADBl00yh72Td8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aNC8j+5zG9mLq58GjRt22tcjPl8="},{"type":"next-occurrence","id":"U8bPQZoglntDtiS9riLPXNI6Fvk="}],"description":"Utility work on NY 250 both directions between Penfield Road; NY 441 (Penfield) and New Whickham Dr, Flaggers as needed (Perinton) alternating lane closures, Friday June 12th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T00:46:22Z"},"road_event_id":"BrdZfPw8R/ueE4ADBl00yh72Td8=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"New Whickham Dr, Flaggers as needed","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441379,43.131574]]}},{"id":"U8bPQZoglntDtiS9riLPXNI6Fvk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aNC8j+5zG9mLq58GjRt22tcjPl8="},{"type":"next-occurrence","id":"o8QMcmb8puHUr/1dUNcTQZG8FfU="}],"description":"Utility work on NY 250 both directions between Penfield Road; NY 441 (Penfield) and New Whickham Dr, Flaggers as needed (Perinton) alternating lane closures, Friday June 12th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T00:46:22Z"},"road_event_id":"U8bPQZoglntDtiS9riLPXNI6Fvk=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"New Whickham Dr, Flaggers as needed","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441379,43.131574]]}},{"id":"o8QMcmb8puHUr/1dUNcTQZG8FfU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aNC8j+5zG9mLq58GjRt22tcjPl8="},{"type":"next-occurrence","id":"EgLe+SkAIZ6s2C+WgN+DfiqxIvs="}],"description":"Utility work on NY 250 both directions between Penfield Road; NY 441 (Penfield) and New Whickham Dr, Flaggers as needed (Perinton) alternating lane closures, Friday June 12th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T00:46:22Z"},"road_event_id":"o8QMcmb8puHUr/1dUNcTQZG8FfU=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"New Whickham Dr, Flaggers as needed","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441379,43.131574]]}},{"id":"EgLe+SkAIZ6s2C+WgN+DfiqxIvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aNC8j+5zG9mLq58GjRt22tcjPl8="}],"description":"Utility work on NY 250 both directions between Penfield Road; NY 441 (Penfield) and New Whickham Dr, Flaggers as needed (Perinton) alternating lane closures, Friday June 12th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T00:46:22Z"},"road_event_id":"EgLe+SkAIZ6s2C+WgN+DfiqxIvs=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"New Whickham Dr, Flaggers as needed","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441379,43.131574]]}},{"id":"TUQYmvNCoKVdd19wtFl3q1W+t80=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Repaving on NY 5 westbound between Newport Road; Camillus; Warners exit (Camillus) and Route 174 Camillus; W. Genesee Turnpike (Camillus) ; follow detour, Tuesday June 9th, 2026, 10:30 AM thru 02:00 PM All lanes closed","update_date":"2026-06-04T22:40:32Z"},"road_event_id":"TUQYmvNCoKVdd19wtFl3q1W+t80=","beginning_cross_street":"Newport Road; Camillus; Warners exit","ending_cross_street":"Route 174 Camillus; W. Genesee Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:30:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.301237,43.049989]]}},{"id":"h6qZ6xSO554RD3eLGDYJ23wWe0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Milling on NY 5 eastbound ramp from Route 174 Camillus (Camillus) ; follow detour, Wednesday June 10th, 2026, 07:00 AM thru 12:00 PM All lanes closed","update_date":"2026-06-04T22:54:45Z"},"road_event_id":"h6qZ6xSO554RD3eLGDYJ23wWe0U=","beginning_cross_street":"Route 174 Camillus","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.322695,43.03499]]}},{"id":"+PTtZ6FRa2WetTXLWyGrzGDvtBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Repaving on NY 5 eastbound ramp from Newport Road (Camillus) ; follow detour, Thursday June 11th, 2026, 07:00 AM thru 02:00 PM All lanes closed","update_date":"2026-06-04T23:12:38Z"},"road_event_id":"+PTtZ6FRa2WetTXLWyGrzGDvtBM=","beginning_cross_street":"Newport Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.30429,43.048532]]}},{"id":"ED/KU8L3XGJx2nUht6kdLC9L1Yk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Milling on NY 5 westbound ramp to Route 173 (Camillus) ; follow detour, Thursday June 11th, 2026, 01:00 PM thru 05:00 PM All lanes closed","update_date":"2026-06-04T23:11:46Z"},"road_event_id":"ED/KU8L3XGJx2nUht6kdLC9L1Yk=","beginning_cross_street":"Route 173","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T17:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.248787,43.05296]]}},{"id":"s8cu9BMD2JrZePGNJB2vwDunoYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Milling on NY 5 westbound ramp from Route 173 (Camillus) ; follow detour, Thursday June 11th, 2026, 01:00 PM thru 05:00 PM All lanes closed","update_date":"2026-06-04T23:13:30Z"},"road_event_id":"s8cu9BMD2JrZePGNJB2vwDunoYo=","beginning_cross_street":"Route 173","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T17:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.250703,43.052978]]}},{"id":"ctnzzCuBghmI88dwXymSjXUKHAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Milling on NY 5 eastbound ramp to MIlton Avenue (Camillus) ; follow detour, Wednesday June 10th, 2026, 11:00 AM thru 02:00 PM All lanes closed","update_date":"2026-06-04T23:18:22Z"},"road_event_id":"ctnzzCuBghmI88dwXymSjXUKHAc=","beginning_cross_street":"MIlton Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T15:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.282691,43.054105]]}},{"id":"DbMdX3AP6o8jQxAjPvFy9g/selI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Repaving on NY 5 eastbound Off-ramp (Camillus) to Milton Ave (Camillus) ; follow detour, Friday June 12th, 2026, 07:00 AM thru 11:00 AM All lanes closed","update_date":"2026-06-04T23:25:27Z"},"road_event_id":"DbMdX3AP6o8jQxAjPvFy9g/selI=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.282796,43.05411]]}},{"id":"+EYYPvJY+bjjp/aaVgITekvPk0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Hnv792Flt8UkI/aEAtjALHD9Ffg="}],"description":"Utility work on NY 441 both directions between Willow Pond Way (Penfield) and Nine Mile Point Road; NY 250, Flaggers (Penfield) alternating lane closures, Friday June 12th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:25:55Z"},"road_event_id":"+EYYPvJY+bjjp/aaVgITekvPk0Y=","beginning_cross_street":"Willow Pond Way","ending_cross_street":"Nine Mile Point Road; NY 250, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.45152,43.130938]]}},{"id":"Hnv792Flt8UkI/aEAtjALHD9Ffg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+EYYPvJY+bjjp/aaVgITekvPk0Y="},{"type":"next-occurrence","id":"TlCFGhgx83bNi9NiBt0tauub4IM="}],"description":"Utility work on NY 441 both directions between Willow Pond Way (Penfield) and Nine Mile Point Road; NY 250, Flaggers (Penfield) alternating lane closures, Friday June 12th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:25:55Z"},"road_event_id":"Hnv792Flt8UkI/aEAtjALHD9Ffg=","beginning_cross_street":"Willow Pond Way","ending_cross_street":"Nine Mile Point Road; NY 250, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T13:00:00Z","end_date":"2026-06-13T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.45152,43.130938]]}},{"id":"TlCFGhgx83bNi9NiBt0tauub4IM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+EYYPvJY+bjjp/aaVgITekvPk0Y="},{"type":"next-occurrence","id":"SD6U/olkzulJzvT1F9eymdvzMog="}],"description":"Utility work on NY 441 both directions between Willow Pond Way (Penfield) and Nine Mile Point Road; NY 250, Flaggers (Penfield) alternating lane closures, Friday June 12th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:25:55Z"},"road_event_id":"TlCFGhgx83bNi9NiBt0tauub4IM=","beginning_cross_street":"Willow Pond Way","ending_cross_street":"Nine Mile Point Road; NY 250, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T13:00:00Z","end_date":"2026-06-14T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.45152,43.130938]]}},{"id":"SD6U/olkzulJzvT1F9eymdvzMog=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+EYYPvJY+bjjp/aaVgITekvPk0Y="},{"type":"next-occurrence","id":"M+UCDxE0aarO6rES2N4Cijs2oaQ="}],"description":"Utility work on NY 441 both directions between Willow Pond Way (Penfield) and Nine Mile Point Road; NY 250, Flaggers (Penfield) alternating lane closures, Friday June 12th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:25:55Z"},"road_event_id":"SD6U/olkzulJzvT1F9eymdvzMog=","beginning_cross_street":"Willow Pond Way","ending_cross_street":"Nine Mile Point Road; NY 250, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.45152,43.130938]]}},{"id":"M+UCDxE0aarO6rES2N4Cijs2oaQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+EYYPvJY+bjjp/aaVgITekvPk0Y="},{"type":"next-occurrence","id":"Tjlfmi074K3MnYwOk4eRlOhU4Gs="}],"description":"Utility work on NY 441 both directions between Willow Pond Way (Penfield) and Nine Mile Point Road; NY 250, Flaggers (Penfield) alternating lane closures, Friday June 12th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:25:55Z"},"road_event_id":"M+UCDxE0aarO6rES2N4Cijs2oaQ=","beginning_cross_street":"Willow Pond Way","ending_cross_street":"Nine Mile Point Road; NY 250, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.45152,43.130938]]}},{"id":"Tjlfmi074K3MnYwOk4eRlOhU4Gs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+EYYPvJY+bjjp/aaVgITekvPk0Y="},{"type":"next-occurrence","id":"SVkZr7Dr3ctGKE/tpn5dA7MY3c8="}],"description":"Utility work on NY 441 both directions between Willow Pond Way (Penfield) and Nine Mile Point Road; NY 250, Flaggers (Penfield) alternating lane closures, Friday June 12th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:25:55Z"},"road_event_id":"Tjlfmi074K3MnYwOk4eRlOhU4Gs=","beginning_cross_street":"Willow Pond Way","ending_cross_street":"Nine Mile Point Road; NY 250, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.45152,43.130938]]}},{"id":"SVkZr7Dr3ctGKE/tpn5dA7MY3c8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+EYYPvJY+bjjp/aaVgITekvPk0Y="},{"type":"next-occurrence","id":"vxY0hh4Z7m3PY+2UZt9tx9AS9Fs="}],"description":"Utility work on NY 441 both directions between Willow Pond Way (Penfield) and Nine Mile Point Road; NY 250, Flaggers (Penfield) alternating lane closures, Friday June 12th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:25:55Z"},"road_event_id":"SVkZr7Dr3ctGKE/tpn5dA7MY3c8=","beginning_cross_street":"Willow Pond Way","ending_cross_street":"Nine Mile Point Road; NY 250, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.45152,43.130938]]}},{"id":"vxY0hh4Z7m3PY+2UZt9tx9AS9Fs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+EYYPvJY+bjjp/aaVgITekvPk0Y="}],"description":"Utility work on NY 441 both directions between Willow Pond Way (Penfield) and Nine Mile Point Road; NY 250, Flaggers (Penfield) alternating lane closures, Friday June 12th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:25:55Z"},"road_event_id":"vxY0hh4Z7m3PY+2UZt9tx9AS9Fs=","beginning_cross_street":"Willow Pond Way","ending_cross_street":"Nine Mile Point Road; NY 250, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.45152,43.130938]]}},{"id":"7xhjy1RzzQQ9rK9hhautDHntwl4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Repaving on NY 5 eastbound ramp from Route 174 Camillus (Camillus) ; follow detour, Friday June 12th, 2026 thru Friday June 12th, 2026, 12:00 PM thru 03:00 PM All lanes closed","update_date":"2026-06-04T23:29:06Z"},"road_event_id":"7xhjy1RzzQQ9rK9hhautDHntwl4=","beginning_cross_street":"Route 174 Camillus","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T16:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.322334,43.034808]]}},{"id":"ihFFEquSlOn+H1gxZBuEH10G6VI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"we/YN3qfNTxZ7rj/HLpOkKqkAos="}],"description":"Utility work on US 20A both directions between Pennemite Rd (Livonia) and Longview Blvd, Flaggers (Livonia) alternating lane closures, Wednesday April 29th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:32:28Z"},"road_event_id":"ihFFEquSlOn+H1gxZBuEH10G6VI=","beginning_cross_street":"Pennemite Rd","ending_cross_street":"Longview Blvd, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.686837,42.826293]]}},{"id":"we/YN3qfNTxZ7rj/HLpOkKqkAos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihFFEquSlOn+H1gxZBuEH10G6VI="},{"type":"next-occurrence","id":"9u1wAS7yQW9HEKmNxTyfwuWOx0Q="}],"description":"Utility work on US 20A both directions between Pennemite Rd (Livonia) and Longview Blvd, Flaggers (Livonia) alternating lane closures, Wednesday April 29th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:32:28Z"},"road_event_id":"we/YN3qfNTxZ7rj/HLpOkKqkAos=","beginning_cross_street":"Pennemite Rd","ending_cross_street":"Longview Blvd, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.686837,42.826293]]}},{"id":"9u1wAS7yQW9HEKmNxTyfwuWOx0Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihFFEquSlOn+H1gxZBuEH10G6VI="},{"type":"next-occurrence","id":"CUlLce18aEtzKoc+lb34x1ooK2Q="}],"description":"Utility work on US 20A both directions between Pennemite Rd (Livonia) and Longview Blvd, Flaggers (Livonia) alternating lane closures, Wednesday April 29th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:32:28Z"},"road_event_id":"9u1wAS7yQW9HEKmNxTyfwuWOx0Q=","beginning_cross_street":"Pennemite Rd","ending_cross_street":"Longview Blvd, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.686837,42.826293]]}},{"id":"CUlLce18aEtzKoc+lb34x1ooK2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihFFEquSlOn+H1gxZBuEH10G6VI="},{"type":"next-occurrence","id":"2QjNu5l0Ln4TErRJ9+gX6JqWE7A="}],"description":"Utility work on US 20A both directions between Pennemite Rd (Livonia) and Longview Blvd, Flaggers (Livonia) alternating lane closures, Wednesday April 29th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:32:28Z"},"road_event_id":"CUlLce18aEtzKoc+lb34x1ooK2Q=","beginning_cross_street":"Pennemite Rd","ending_cross_street":"Longview Blvd, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.686837,42.826293]]}},{"id":"2QjNu5l0Ln4TErRJ9+gX6JqWE7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihFFEquSlOn+H1gxZBuEH10G6VI="},{"type":"next-occurrence","id":"NRPRyAXdqRUTaRTorN0+wIx445Y="}],"description":"Utility work on US 20A both directions between Pennemite Rd (Livonia) and Longview Blvd, Flaggers (Livonia) alternating lane closures, Wednesday April 29th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:32:28Z"},"road_event_id":"2QjNu5l0Ln4TErRJ9+gX6JqWE7A=","beginning_cross_street":"Pennemite Rd","ending_cross_street":"Longview Blvd, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.686837,42.826293]]}},{"id":"NRPRyAXdqRUTaRTorN0+wIx445Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihFFEquSlOn+H1gxZBuEH10G6VI="},{"type":"next-occurrence","id":"42QkYGUkC1duMied0xQdEURMg+c="}],"description":"Utility work on US 20A both directions between Pennemite Rd (Livonia) and Longview Blvd, Flaggers (Livonia) alternating lane closures, Wednesday April 29th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:32:28Z"},"road_event_id":"NRPRyAXdqRUTaRTorN0+wIx445Y=","beginning_cross_street":"Pennemite Rd","ending_cross_street":"Longview Blvd, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.686837,42.826293]]}},{"id":"42QkYGUkC1duMied0xQdEURMg+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihFFEquSlOn+H1gxZBuEH10G6VI="},{"type":"next-occurrence","id":"4C+PQcpS0HqROFztj2nANrTYCFY="}],"description":"Utility work on US 20A both directions between Pennemite Rd (Livonia) and Longview Blvd, Flaggers (Livonia) alternating lane closures, Wednesday April 29th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:32:28Z"},"road_event_id":"42QkYGUkC1duMied0xQdEURMg+c=","beginning_cross_street":"Pennemite Rd","ending_cross_street":"Longview Blvd, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.686837,42.826293]]}},{"id":"4C+PQcpS0HqROFztj2nANrTYCFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihFFEquSlOn+H1gxZBuEH10G6VI="}],"description":"Utility work on US 20A both directions between Pennemite Rd (Livonia) and Longview Blvd, Flaggers (Livonia) alternating lane closures, Wednesday April 29th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:32:28Z"},"road_event_id":"4C+PQcpS0HqROFztj2nANrTYCFY=","beginning_cross_street":"Pennemite Rd","ending_cross_street":"Longview Blvd, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.686837,42.826293]]}},{"id":"Co0d8TUmONXIZMA4wI5ZB9J12uQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kUtrfi396reklqqOcFVfITZg6wY="}],"description":"Utility work on NY 286 both directions between Fairport Nine Mile Point Road; NY 250 (Penfield) and 3330 NY-286, Flaggers (Penfield) alternating lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:38:04Z"},"road_event_id":"Co0d8TUmONXIZMA4wI5ZB9J12uQ=","beginning_cross_street":"Fairport Nine Mile Point Road; NY 250","ending_cross_street":"3330 NY-286, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.43184,43.160015]]}},{"id":"kUtrfi396reklqqOcFVfITZg6wY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Co0d8TUmONXIZMA4wI5ZB9J12uQ="},{"type":"next-occurrence","id":"DATcrH/2STEl0tz8SFbBdKhUZAw="}],"description":"Utility work on NY 286 both directions between Fairport Nine Mile Point Road; NY 250 (Penfield) and 3330 NY-286, Flaggers (Penfield) alternating lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:38:04Z"},"road_event_id":"kUtrfi396reklqqOcFVfITZg6wY=","beginning_cross_street":"Fairport Nine Mile Point Road; NY 250","ending_cross_street":"3330 NY-286, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.43184,43.160015]]}},{"id":"DATcrH/2STEl0tz8SFbBdKhUZAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Co0d8TUmONXIZMA4wI5ZB9J12uQ="},{"type":"next-occurrence","id":"UIyyhbY4k/+MhAzbuqbX9MxU2DE="}],"description":"Utility work on NY 286 both directions between Fairport Nine Mile Point Road; NY 250 (Penfield) and 3330 NY-286, Flaggers (Penfield) alternating lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:38:04Z"},"road_event_id":"DATcrH/2STEl0tz8SFbBdKhUZAw=","beginning_cross_street":"Fairport Nine Mile Point Road; NY 250","ending_cross_street":"3330 NY-286, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.43184,43.160015]]}},{"id":"UIyyhbY4k/+MhAzbuqbX9MxU2DE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Co0d8TUmONXIZMA4wI5ZB9J12uQ="},{"type":"next-occurrence","id":"Apei16bJ1PLGVbvzUINDFsohANE="}],"description":"Utility work on NY 286 both directions between Fairport Nine Mile Point Road; NY 250 (Penfield) and 3330 NY-286, Flaggers (Penfield) alternating lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:38:04Z"},"road_event_id":"UIyyhbY4k/+MhAzbuqbX9MxU2DE=","beginning_cross_street":"Fairport Nine Mile Point Road; NY 250","ending_cross_street":"3330 NY-286, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.43184,43.160015]]}},{"id":"Apei16bJ1PLGVbvzUINDFsohANE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Co0d8TUmONXIZMA4wI5ZB9J12uQ="}],"description":"Utility work on NY 286 both directions between Fairport Nine Mile Point Road; NY 250 (Penfield) and 3330 NY-286, Flaggers (Penfield) alternating lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-04T23:38:04Z"},"road_event_id":"Apei16bJ1PLGVbvzUINDFsohANE=","beginning_cross_street":"Fairport Nine Mile Point Road; NY 250","ending_cross_street":"3330 NY-286, Flaggers","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.43184,43.160015]]}},{"id":"zepMDnBLVBurzo70oT3o+eL9D4M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[],"description":"Line striping on NY 9N both directions between US 9 (Saratoga Springs) and US 9 at Warren County Line (Moreau) slow moving operations, Thursday June 4th, 2026 thru Saturday June 6th, 2026, Thursday/Friday, 07:00 PM thru 04:00 AM All lanes open","update_date":"2026-06-04T23:51:55Z"},"road_event_id":"zepMDnBLVBurzo70oT3o+eL9D4M=","beginning_cross_street":"US 9","ending_cross_street":"Warren County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.783522,43.086287]]}},{"id":"upHSAAKTHtKHnsVwO1TGfg0wVL0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["POAGS HOLE RD"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on POAGS HOLE RD eastbound on Poads Hole Rd bridge (North Dansville) BIN 3316940 WZTC signage / tapers will extend 1.2 mile upstream / downstream , Tuesday June 16th, 2026 thru Tuesday June 16th, 2026, 12:00 PM thru 05:00 PM All lanes","update_date":"2026-06-05T00:34:50Z"},"road_event_id":"upHSAAKTHtKHnsVwO1TGfg0wVL0=","beginning_cross_street":"Poads Hole Rd bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T16:00:00Z","end_date":"2026-06-16T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.701745,42.542546]]}},{"id":"WTFeQcI3kGSXCYU8fQMln2x+J4s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 436"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on NY 436 westbound over Genesee River (Portage) Bin 1064250 WZTC signage / tapers will extend 1/2 mile upstream / downstream , Wednesday June 17th, 2026, 08:00 AM thru 05:00 PM All lanes","update_date":"2026-06-05T00:40:52Z"},"road_event_id":"WTFeQcI3kGSXCYU8fQMln2x+J4s=","beginning_cross_street":"Genesee River","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T12:00:00Z","end_date":"2026-06-17T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.040594,42.571359]]}},{"id":"nBCbFCeFkhQLyCqxZffXYEMVW2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sjFvu33fk6+LOh/4SrkOp4GHXck="}],"description":"Utility work on NY 250 both directions between 1672 NY-250 (Penfield) and 1972 NY-250, Flaggers as needed (Penfield) alternating lane closures, Saturday June 6th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T00:47:42Z"},"road_event_id":"nBCbFCeFkhQLyCqxZffXYEMVW2I=","beginning_cross_street":"1672 NY-250","ending_cross_street":"1972 NY-250, Flaggers as needed","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.431484,43.161944]]}},{"id":"sjFvu33fk6+LOh/4SrkOp4GHXck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nBCbFCeFkhQLyCqxZffXYEMVW2I="},{"type":"next-occurrence","id":"Gkr6G9rKy+nx3VgCK5dI0np176Y="}],"description":"Utility work on NY 250 both directions between 1672 NY-250 (Penfield) and 1972 NY-250, Flaggers as needed (Penfield) alternating lane closures, Saturday June 6th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T00:47:42Z"},"road_event_id":"sjFvu33fk6+LOh/4SrkOp4GHXck=","beginning_cross_street":"1672 NY-250","ending_cross_street":"1972 NY-250, Flaggers as needed","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.431484,43.161944]]}},{"id":"Gkr6G9rKy+nx3VgCK5dI0np176Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nBCbFCeFkhQLyCqxZffXYEMVW2I="},{"type":"next-occurrence","id":"3LjiMQgJvg/1iIsjbcDmHZzHj2U="}],"description":"Utility work on NY 250 both directions between 1672 NY-250 (Penfield) and 1972 NY-250, Flaggers as needed (Penfield) alternating lane closures, Saturday June 6th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T00:47:42Z"},"road_event_id":"Gkr6G9rKy+nx3VgCK5dI0np176Y=","beginning_cross_street":"1672 NY-250","ending_cross_street":"1972 NY-250, Flaggers as needed","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.431484,43.161944]]}},{"id":"3LjiMQgJvg/1iIsjbcDmHZzHj2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nBCbFCeFkhQLyCqxZffXYEMVW2I="},{"type":"next-occurrence","id":"ReGL/pFEiIBIy59XBP4XcohLBis="}],"description":"Utility work on NY 250 both directions between 1672 NY-250 (Penfield) and 1972 NY-250, Flaggers as needed (Penfield) alternating lane closures, Saturday June 6th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T00:47:42Z"},"road_event_id":"3LjiMQgJvg/1iIsjbcDmHZzHj2U=","beginning_cross_street":"1672 NY-250","ending_cross_street":"1972 NY-250, Flaggers as needed","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.431484,43.161944]]}},{"id":"ReGL/pFEiIBIy59XBP4XcohLBis=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nBCbFCeFkhQLyCqxZffXYEMVW2I="},{"type":"next-occurrence","id":"zeLbd46qFsBLS6M6SI217eyMPBU="}],"description":"Utility work on NY 250 both directions between 1672 NY-250 (Penfield) and 1972 NY-250, Flaggers as needed (Penfield) alternating lane closures, Saturday June 6th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T00:47:42Z"},"road_event_id":"ReGL/pFEiIBIy59XBP4XcohLBis=","beginning_cross_street":"1672 NY-250","ending_cross_street":"1972 NY-250, Flaggers as needed","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.431484,43.161944]]}},{"id":"zeLbd46qFsBLS6M6SI217eyMPBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nBCbFCeFkhQLyCqxZffXYEMVW2I="},{"type":"next-occurrence","id":"YiRwOU078TSGaJJrRJRY07bRnoU="}],"description":"Utility work on NY 250 both directions between 1672 NY-250 (Penfield) and 1972 NY-250, Flaggers as needed (Penfield) alternating lane closures, Saturday June 6th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T00:47:42Z"},"road_event_id":"zeLbd46qFsBLS6M6SI217eyMPBU=","beginning_cross_street":"1672 NY-250","ending_cross_street":"1972 NY-250, Flaggers as needed","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.431484,43.161944]]}},{"id":"YiRwOU078TSGaJJrRJRY07bRnoU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nBCbFCeFkhQLyCqxZffXYEMVW2I="}],"description":"Utility work on NY 250 both directions between 1672 NY-250 (Penfield) and 1972 NY-250, Flaggers as needed (Penfield) alternating lane closures, Saturday June 6th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T00:47:42Z"},"road_event_id":"YiRwOU078TSGaJJrRJRY07bRnoU=","beginning_cross_street":"1672 NY-250","ending_cross_street":"1972 NY-250, Flaggers as needed","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.431484,43.161944]]}},{"id":"kAxl/SZpGyXluTK/MiT+01EWjZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-26/Bullis Rd"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on CR-26/Bullis Rd eastbound over Cayuga Creek (Bennington) Bin 3319650 WZTC signage /tapers will extend 1/2 mile upstream/downstream , Tuesday June 16th, 2026, 08:00 AM thru 02:00 PM All lanes","update_date":"2026-06-05T00:46:39Z"},"road_event_id":"kAxl/SZpGyXluTK/MiT+01EWjZI=","beginning_cross_street":"Cayuga Creek","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T12:00:00Z","end_date":"2026-06-16T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.472474,42.842828]]}},{"id":"PLDpYuzvRzUSO9vLJNz/ZVPr2W4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+zgiJYMiCIavMW5kb3NCrvO5flI="}],"description":"Construction and overnight roadwork on NY 13 both directions between West Green Street; NY 79 (Ithaca) and Elmira Road; NY 13 (Ithaca) ; Alternating left and right lane closures, Monday June 8th, 2026 thru Sunday June 14th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-06-05T00:51:24Z"},"road_event_id":"PLDpYuzvRzUSO9vLJNz/ZVPr2W4=","beginning_cross_street":"West Green Street; NY 79","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.509911,42.438128]]}},{"id":"+zgiJYMiCIavMW5kb3NCrvO5flI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLDpYuzvRzUSO9vLJNz/ZVPr2W4="},{"type":"next-occurrence","id":"/2PHKGTjfPTjYQeDwPbxobI1vIE="}],"description":"Construction and overnight roadwork on NY 13 both directions between West Green Street; NY 79 (Ithaca) and Elmira Road; NY 13 (Ithaca) ; Alternating left and right lane closures, Monday June 8th, 2026 thru Sunday June 14th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-06-05T00:51:24Z"},"road_event_id":"+zgiJYMiCIavMW5kb3NCrvO5flI=","beginning_cross_street":"West Green Street; NY 79","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.509911,42.438128]]}},{"id":"/2PHKGTjfPTjYQeDwPbxobI1vIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLDpYuzvRzUSO9vLJNz/ZVPr2W4="},{"type":"next-occurrence","id":"5QCQyguzJWX0NHSwlPOfZH2D0F8="}],"description":"Construction and overnight roadwork on NY 13 both directions between West Green Street; NY 79 (Ithaca) and Elmira Road; NY 13 (Ithaca) ; Alternating left and right lane closures, Monday June 8th, 2026 thru Sunday June 14th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-06-05T00:51:24Z"},"road_event_id":"/2PHKGTjfPTjYQeDwPbxobI1vIE=","beginning_cross_street":"West Green Street; NY 79","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.509911,42.438128]]}},{"id":"5QCQyguzJWX0NHSwlPOfZH2D0F8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLDpYuzvRzUSO9vLJNz/ZVPr2W4="},{"type":"next-occurrence","id":"iPQZJhmYJbN0KVg/S+lSjdFIclI="}],"description":"Construction and overnight roadwork on NY 13 both directions between West Green Street; NY 79 (Ithaca) and Elmira Road; NY 13 (Ithaca) ; Alternating left and right lane closures, Monday June 8th, 2026 thru Sunday June 14th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-06-05T00:51:24Z"},"road_event_id":"5QCQyguzJWX0NHSwlPOfZH2D0F8=","beginning_cross_street":"West Green Street; NY 79","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.509911,42.438128]]}},{"id":"iPQZJhmYJbN0KVg/S+lSjdFIclI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLDpYuzvRzUSO9vLJNz/ZVPr2W4="},{"type":"next-occurrence","id":"oaPMQKz/MGNvxNBGqyDgt+A6bYc="}],"description":"Construction and overnight roadwork on NY 13 both directions between West Green Street; NY 79 (Ithaca) and Elmira Road; NY 13 (Ithaca) ; Alternating left and right lane closures, Monday June 8th, 2026 thru Sunday June 14th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-06-05T00:51:24Z"},"road_event_id":"iPQZJhmYJbN0KVg/S+lSjdFIclI=","beginning_cross_street":"West Green Street; NY 79","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.509911,42.438128]]}},{"id":"oaPMQKz/MGNvxNBGqyDgt+A6bYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLDpYuzvRzUSO9vLJNz/ZVPr2W4="}],"description":"Construction and overnight roadwork on NY 13 both directions between West Green Street; NY 79 (Ithaca) and Elmira Road; NY 13 (Ithaca) ; Alternating left and right lane closures, Monday June 8th, 2026 thru Sunday June 14th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-06-05T00:51:24Z"},"road_event_id":"oaPMQKz/MGNvxNBGqyDgt+A6bYc=","beginning_cross_street":"West Green Street; NY 79","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T00:00:00Z","end_date":"2026-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.509911,42.438128]]}},{"id":"VZ2IiV9SfR3vKqI1x0Pbz4QJqpI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"B9cHlNFP8vVq2QWcJjcxWUk78vc="}],"description":"Drainage improvements on NY 13 southbound at Cascadilla Street (Ithaca), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM right shoulder closed","update_date":"2026-06-05T00:55:32Z"},"road_event_id":"VZ2IiV9SfR3vKqI1x0Pbz4QJqpI=","beginning_cross_street":"Cascadilla Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.510048,42.444281]]}},{"id":"B9cHlNFP8vVq2QWcJjcxWUk78vc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VZ2IiV9SfR3vKqI1x0Pbz4QJqpI="},{"type":"next-occurrence","id":"ih+Yame4wt1wgYkrT0azlWtGQMI="}],"description":"Drainage improvements on NY 13 southbound at Cascadilla Street (Ithaca), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM right shoulder closed","update_date":"2026-06-05T00:55:32Z"},"road_event_id":"B9cHlNFP8vVq2QWcJjcxWUk78vc=","beginning_cross_street":"Cascadilla Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.510048,42.444281]]}},{"id":"ih+Yame4wt1wgYkrT0azlWtGQMI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VZ2IiV9SfR3vKqI1x0Pbz4QJqpI="},{"type":"next-occurrence","id":"4zqmbJRSsmxkKpuRM7YzikVQUT8="}],"description":"Drainage improvements on NY 13 southbound at Cascadilla Street (Ithaca), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM right shoulder closed","update_date":"2026-06-05T00:55:32Z"},"road_event_id":"ih+Yame4wt1wgYkrT0azlWtGQMI=","beginning_cross_street":"Cascadilla Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.510048,42.444281]]}},{"id":"4zqmbJRSsmxkKpuRM7YzikVQUT8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VZ2IiV9SfR3vKqI1x0Pbz4QJqpI="},{"type":"next-occurrence","id":"B42FH3UaBH1htx3Vz6y0y4/SVzw="}],"description":"Drainage improvements on NY 13 southbound at Cascadilla Street (Ithaca), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM right shoulder closed","update_date":"2026-06-05T00:55:32Z"},"road_event_id":"4zqmbJRSsmxkKpuRM7YzikVQUT8=","beginning_cross_street":"Cascadilla Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.510048,42.444281]]}},{"id":"B42FH3UaBH1htx3Vz6y0y4/SVzw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VZ2IiV9SfR3vKqI1x0Pbz4QJqpI="}],"description":"Drainage improvements on NY 13 southbound at Cascadilla Street (Ithaca), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM right shoulder closed","update_date":"2026-06-05T00:55:32Z"},"road_event_id":"B42FH3UaBH1htx3Vz6y0y4/SVzw=","beginning_cross_street":"Cascadilla Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.510048,42.444281]]}},{"id":"vOfTiw1pJinYPKZmKbu6hpLWa0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MAIDEN LN"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on MAIDEN LN both directions under NY 390 (Greece) alternating lane closures, flaggers when needed, Tuesday June 16th, 2026, 08:00 AM thru 02:00 PM All lanes","update_date":"2026-06-05T11:33:37Z"},"road_event_id":"vOfTiw1pJinYPKZmKbu6hpLWa0U=","beginning_cross_street":"NY 390","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T12:00:00Z","end_date":"2026-06-16T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.674295,43.22368]]}},{"id":"LNj5jMfntq0Qr7dqCW0B7hlwP7Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 277"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 277 northbound Seneca Creek Rd (West Seneca) to Clinton Street; NY 354 (West Seneca), Continuous Sunday June 7th, 2026 07:00 AM thru Saturday June 13th, 2026 07:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T01:19:43Z"},"road_event_id":"LNj5jMfntq0Qr7dqCW0B7hlwP7Y=","beginning_cross_street":"Seneca Creek Rd","ending_cross_street":"Clinton Street; NY 354","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.754534,42.851016]]}},{"id":"JHMzIupMcoKO1rLy5xmYel0nbbg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on NY 96 both directions under Exit - I-490 BIN# 1052329 (Victor) alternating lane closures, Monday June 15th, 2026, 08:00 AM thru 05:00 PM All lanes","update_date":"2026-06-05T01:20:50Z"},"road_event_id":"JHMzIupMcoKO1rLy5xmYel0nbbg=","beginning_cross_street":"Exit   - I-490 BIN# 1052329","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T12:00:00Z","end_date":"2026-06-15T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.439854,43.015864]]}},{"id":"ZkL4PBvQhMlywB1OT25xu5sRJGw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NIAGARA FALLS BLVD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5RH0x5x9M1wm6oFordJHdBbnioA="}],"description":"Repaving on NIAGARA FALLS BLVD both directions CR-307 (Tonawanda) to RT-324 (Amherst), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-06-05T01:23:52Z"},"road_event_id":"ZkL4PBvQhMlywB1OT25xu5sRJGw=","beginning_cross_street":"CR-307","ending_cross_street":"RT-324","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.823857,42.958384]]}},{"id":"5RH0x5x9M1wm6oFordJHdBbnioA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NIAGARA FALLS BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkL4PBvQhMlywB1OT25xu5sRJGw="},{"type":"next-occurrence","id":"EKo0oWPbXfLn5yZFGPAKm0bNOEc="}],"description":"Repaving on NIAGARA FALLS BLVD both directions CR-307 (Tonawanda) to RT-324 (Amherst), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-06-05T01:23:52Z"},"road_event_id":"5RH0x5x9M1wm6oFordJHdBbnioA=","beginning_cross_street":"CR-307","ending_cross_street":"RT-324","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.823857,42.958384]]}},{"id":"EKo0oWPbXfLn5yZFGPAKm0bNOEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NIAGARA FALLS BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkL4PBvQhMlywB1OT25xu5sRJGw="},{"type":"next-occurrence","id":"LLUFnGr5c7LfvTzN08ehlyfo5Vw="}],"description":"Repaving on NIAGARA FALLS BLVD both directions CR-307 (Tonawanda) to RT-324 (Amherst), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-06-05T01:23:52Z"},"road_event_id":"EKo0oWPbXfLn5yZFGPAKm0bNOEc=","beginning_cross_street":"CR-307","ending_cross_street":"RT-324","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.823857,42.958384]]}},{"id":"LLUFnGr5c7LfvTzN08ehlyfo5Vw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NIAGARA FALLS BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkL4PBvQhMlywB1OT25xu5sRJGw="},{"type":"next-occurrence","id":"bPv66Dpv6xNO6av6RzB46y13SOA="}],"description":"Repaving on NIAGARA FALLS BLVD both directions CR-307 (Tonawanda) to RT-324 (Amherst), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-06-05T01:23:52Z"},"road_event_id":"LLUFnGr5c7LfvTzN08ehlyfo5Vw=","beginning_cross_street":"CR-307","ending_cross_street":"RT-324","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.823857,42.958384]]}},{"id":"bPv66Dpv6xNO6av6RzB46y13SOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NIAGARA FALLS BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkL4PBvQhMlywB1OT25xu5sRJGw="}],"description":"Repaving on NIAGARA FALLS BLVD both directions CR-307 (Tonawanda) to RT-324 (Amherst), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-06-05T01:23:52Z"},"road_event_id":"bPv66Dpv6xNO6av6RzB46y13SOA=","beginning_cross_street":"CR-307","ending_cross_street":"RT-324","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.823857,42.958384]]}},{"id":"Xq0meZn1veMkT6ARq9JZk1wkvXs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-279"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on RT-279 both directions CR-49 over Oak Orchard Creek (Carlton) alternating lane closures, Thursday June 18th, 2026, 08:00 AM thru 05:00 PM All lanes","update_date":"2026-06-05T02:02:09Z"},"road_event_id":"Xq0meZn1veMkT6ARq9JZk1wkvXs=","beginning_cross_street":"CR-49 over Oak Orchard Creek","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T12:00:00Z","end_date":"2026-06-18T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25149,43.322707]]}},{"id":"/iTD5JBejyxYs0XDW56vDBHW9eo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-81 northbound between Exit 106 - NY 49; Central Square (Hastings) and Exit 114 - NY 69; Parish (Parish) ; Alternating lane closures, Tuesday June 16th, 2026, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-05T02:14:13Z"},"road_event_id":"/iTD5JBejyxYs0XDW56vDBHW9eo=","beginning_cross_street":"Exit 106 - NY 49; Central Square","ending_cross_street":"Exit 114 - NY 69; Parish","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125281,43.283548]]}},{"id":"+p99fjrHhXT5huHc9zDasd/x9Gs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-81 southbound between Exit 114 - NY 69; Parish (Parish) and Exit 106 - NY 49; Central Square (Hastings) ; Alternating lane closures, Tuesday June 16th, 2026, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-05T02:17:34Z"},"road_event_id":"+p99fjrHhXT5huHc9zDasd/x9Gs=","beginning_cross_street":"Exit 114 - NY 69; Parish","ending_cross_street":"Exit 106 - NY 49; Central Square","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.11632,43.407931]]}},{"id":"MEgUeEUq5PWXi4FSLdwmD7BL26E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between North of Exit 30 - North Maple Ave (Harding Twp) and North of Exit 21 - I-78 (Bedminster Twp), Friday June 12, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-06-05T11:07:35Z"},"road_event_id":"MEgUeEUq5PWXi4FSLdwmD7BL26E=","beginning_cross_street":"North of Exit 30 - North Maple Ave","ending_cross_street":"North of Exit 21 - I-78","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.536544,40.73521]]}},{"id":"qsKX58/h+eYbGlMrx0k41cO58Yg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound between North of Garden State Parkway (Paramus) and New York State Line (Mahwah Twp), Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T11:10:37Z"},"road_event_id":"qsKX58/h+eYbGlMrx0k41cO58Yg=","beginning_cross_street":"North of Garden State Parkway","ending_cross_street":"New York State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.071823,40.94469]]}},{"id":"2IZgkLshSnCyXG07ellbBTq859g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound between North of Garden State Parkway (Paramus) and New York State Line (Mahwah Twp), Wednesday June 10, 2026 08:00 PM thru Thursday June 11, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T11:10:38Z"},"road_event_id":"2IZgkLshSnCyXG07ellbBTq859g=","beginning_cross_street":"North of Garden State Parkway","ending_cross_street":"New York State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.071823,40.94469]]}},{"id":"5MBaut1cExtLq0CUBYEDvXMDtdI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between East of Exit 49 - NJ 124/Springfield Ave (Union Twp) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 06:00 AM, at least one lane closed local lane","update_date":"2026-06-05T11:10:40Z"},"road_event_id":"5MBaut1cExtLq0CUBYEDvXMDtdI=","beginning_cross_street":"East of Exit 49 - NJ 124/Springfield Ave","ending_cross_street":"West of Exit 41 - Dale Rd to Plainfield Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.28968,40.714336]]}},{"id":"GcMGlZk22M7e0WPFJE0tu7EVwEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound at Exit 45 - CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp) Thursday June 11, 2026 11:00 PM thru Friday June 12, 2026 05:00 AM, ramp local lane","update_date":"2026-06-05T11:10:35Z"},"road_event_id":"GcMGlZk22M7e0WPFJE0tu7EVwEk=","beginning_cross_street":"Exit 45 - CR 637/Beverwyck Rd","ending_cross_street":"Exit 45 - CR 637/Beverwyck Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T03:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.388374,40.860641]]}},{"id":"IgJaaYBtS+HglDs/LBAee6bGEQk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound at Exit 45 - CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp) Monday June 8, 2026 11:00 PM thru Tuesday June 9, 2026 05:00 AM, ramp local lane","update_date":"2026-06-05T11:10:41Z"},"road_event_id":"IgJaaYBtS+HglDs/LBAee6bGEQk=","beginning_cross_street":"Exit 45 - CR 637/Beverwyck Rd","ending_cross_street":"Exit 45 - CR 637/Beverwyck Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T03:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.388374,40.860641]]}},{"id":"JvdMgeCBDFBIr0vB1ZVJN5L826E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound between North of Garden State Parkway (Paramus) and New York State Line (Mahwah Twp), Monday June 8, 2026 08:00 PM thru Tuesday June 9, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T11:10:42Z"},"road_event_id":"JvdMgeCBDFBIr0vB1ZVJN5L826E=","beginning_cross_street":"North of Garden State Parkway","ending_cross_street":"New York State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.071823,40.94469]]}},{"id":"YsAIruBYTknxtwbbTyJsxuUnSQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound at Exit 45 - CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp) Wednesday June 10, 2026 11:00 PM thru Thursday June 11, 2026 05:00 AM, ramp local lane","update_date":"2026-06-05T11:10:46Z"},"road_event_id":"YsAIruBYTknxtwbbTyJsxuUnSQc=","beginning_cross_street":"Exit 45 - CR 637/Beverwyck Rd","ending_cross_street":"Exit 45 - CR 637/Beverwyck Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T03:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.388374,40.860641]]}},{"id":"RZJlhpPZ6qTqP/DmkPIHyHrOBVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between East of Exit 49 - NJ 124/Springfield Ave (Union Twp) and East of Exit 48 - NJ 24 West (Springfield Twp), Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 06:00 AM, at least one lane closed local lane , (2nd lane closed from 11:00 PM to 05:00 AM) local lanes","update_date":"2026-06-05T11:10:52Z"},"road_event_id":"RZJlhpPZ6qTqP/DmkPIHyHrOBVg=","beginning_cross_street":"East of Exit 49 - NJ 124/Springfield Ave","ending_cross_street":"East of Exit 48 - NJ 24 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T03:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.28968,40.714336]]}},{"id":"x8S4L/02y3uOz5N/kNFywEel1mw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between West of Exit 48 - NJ 24 West (Springfield Twp) and West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 06:00 AM, at least one lane closed local lane , (2nd lane closed from 11:00 PM to 05:00 AM)","update_date":"2026-06-05T11:10:53Z"},"road_event_id":"x8S4L/02y3uOz5N/kNFywEel1mw=","beginning_cross_street":"West of Exit 48 - NJ 24 West","ending_cross_street":"West of Exit 41 - Dale Rd to Plainfield Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T03:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.325942,40.711555]]}},{"id":"8GJYSUkx2psQWKxsv9g/XzPNBJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound between North of Garden State Parkway (Paramus) and New York State Line (Mahwah Twp), Tuesday June 9, 2026 08:00 PM thru Wednesday June 10, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T11:10:55Z"},"road_event_id":"8GJYSUkx2psQWKxsv9g/XzPNBJQ=","beginning_cross_street":"North of Garden State Parkway","ending_cross_street":"New York State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.071823,40.94469]]}},{"id":"BnCowkdsjeak1oXFcSqkM6bMGXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound at Exit 45 - CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp) Tuesday June 9, 2026 11:00 PM thru Wednesday June 10, 2026 05:00 AM, ramp local lane","update_date":"2026-06-05T11:10:56Z"},"road_event_id":"BnCowkdsjeak1oXFcSqkM6bMGXo=","beginning_cross_street":"Exit 45 - CR 637/Beverwyck Rd","ending_cross_street":"Exit 45 - CR 637/Beverwyck Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T03:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.388374,40.860641]]}},{"id":"OrtFrFIUi0piXfCo6U4D1BRiR90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near CR 617 (Roxbury Twp), Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 05:00 AM, right lane closed","update_date":"2026-06-05T11:10:50Z"},"road_event_id":"OrtFrFIUi0piXfCo6U4D1BRiR90=","beginning_cross_street":"CR 617","ending_cross_street":"In the vicinity of Eyland Pl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.628799,40.861652]]}},{"id":"fNmovP2A3wve60+h7enPmM2IPzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 365A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DgYqVUAcpYMGM06XSoufrkNZk1s="}],"description":"Utility work on NY 365A both directions between Main Street; NY 46; City of Oneida (Oneida) and S Warner Street (Madison) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Thursday June 11th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 05:30 PM,","update_date":"2026-06-05T11:13:22Z"},"road_event_id":"fNmovP2A3wve60+h7enPmM2IPzQ=","beginning_cross_street":"Main Street; NY 46; City of Oneida","ending_cross_street":"S Warner Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.654947,43.092774]]}},{"id":"DgYqVUAcpYMGM06XSoufrkNZk1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 365A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fNmovP2A3wve60+h7enPmM2IPzQ="},{"type":"next-occurrence","id":"QOFXBSN7qW0RVkcKhKDiv6gpgl0="}],"description":"Utility work on NY 365A both directions between Main Street; NY 46; City of Oneida (Oneida) and S Warner Street (Madison) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Thursday June 11th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 05:30 PM,","update_date":"2026-06-05T11:13:22Z"},"road_event_id":"DgYqVUAcpYMGM06XSoufrkNZk1s=","beginning_cross_street":"Main Street; NY 46; City of Oneida","ending_cross_street":"S Warner Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.654947,43.092774]]}},{"id":"QOFXBSN7qW0RVkcKhKDiv6gpgl0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 365A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fNmovP2A3wve60+h7enPmM2IPzQ="},{"type":"next-occurrence","id":"nLXl1WfhNE+gavJrkhJi/tSWAHc="}],"description":"Utility work on NY 365A both directions between Main Street; NY 46; City of Oneida (Oneida) and S Warner Street (Madison) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Thursday June 11th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 05:30 PM,","update_date":"2026-06-05T11:13:22Z"},"road_event_id":"QOFXBSN7qW0RVkcKhKDiv6gpgl0=","beginning_cross_street":"Main Street; NY 46; City of Oneida","ending_cross_street":"S Warner Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.654947,43.092774]]}},{"id":"nLXl1WfhNE+gavJrkhJi/tSWAHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 365A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fNmovP2A3wve60+h7enPmM2IPzQ="}],"description":"Utility work on NY 365A both directions between Main Street; NY 46; City of Oneida (Oneida) and S Warner Street (Madison) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Thursday June 11th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 05:30 PM,","update_date":"2026-06-05T11:13:22Z"},"road_event_id":"nLXl1WfhNE+gavJrkhJi/tSWAHc=","beginning_cross_street":"Main Street; NY 46; City of Oneida","ending_cross_street":"S Warner Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.654947,43.092774]]}},{"id":"+MGFl5BRDcHrULDyLL+u13OidJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5KokbHyo+V1yfAMi12CMfbUXSOQ="}],"description":"Safety improvements on NY 248 both directions Fenton Avenue (Greenwood) 1 Lane, 2 Way, temp signal or STOP sign, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T11:23:02Z"},"road_event_id":"+MGFl5BRDcHrULDyLL+u13OidJY=","beginning_cross_street":"Fenton Avenue","ending_cross_street":"Fenton Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.647147,42.139089]]}},{"id":"5KokbHyo+V1yfAMi12CMfbUXSOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+MGFl5BRDcHrULDyLL+u13OidJY="},{"type":"next-occurrence","id":"vBcJP8zzvTMj04AySXZaDMyuryo="}],"description":"Safety improvements on NY 248 both directions Fenton Avenue (Greenwood) 1 Lane, 2 Way, temp signal or STOP sign, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T11:23:02Z"},"road_event_id":"5KokbHyo+V1yfAMi12CMfbUXSOQ=","beginning_cross_street":"Fenton Avenue","ending_cross_street":"Fenton Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.647147,42.139089]]}},{"id":"vBcJP8zzvTMj04AySXZaDMyuryo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+MGFl5BRDcHrULDyLL+u13OidJY="},{"type":"next-occurrence","id":"j+vsxZFr8SkDuQgG2oXW8uKjIZA="}],"description":"Safety improvements on NY 248 both directions Fenton Avenue (Greenwood) 1 Lane, 2 Way, temp signal or STOP sign, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T11:23:02Z"},"road_event_id":"vBcJP8zzvTMj04AySXZaDMyuryo=","beginning_cross_street":"Fenton Avenue","ending_cross_street":"Fenton Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.647147,42.139089]]}},{"id":"j+vsxZFr8SkDuQgG2oXW8uKjIZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+MGFl5BRDcHrULDyLL+u13OidJY="},{"type":"next-occurrence","id":"AoB3sT6fEHhBizYrYAZmUf6iLKc="}],"description":"Safety improvements on NY 248 both directions Fenton Avenue (Greenwood) 1 Lane, 2 Way, temp signal or STOP sign, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T11:23:02Z"},"road_event_id":"j+vsxZFr8SkDuQgG2oXW8uKjIZA=","beginning_cross_street":"Fenton Avenue","ending_cross_street":"Fenton Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.647147,42.139089]]}},{"id":"AoB3sT6fEHhBizYrYAZmUf6iLKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+MGFl5BRDcHrULDyLL+u13OidJY="}],"description":"Safety improvements on NY 248 both directions Fenton Avenue (Greenwood) 1 Lane, 2 Way, temp signal or STOP sign, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T11:23:02Z"},"road_event_id":"AoB3sT6fEHhBizYrYAZmUf6iLKc=","beginning_cross_street":"Fenton Avenue","ending_cross_street":"Fenton Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.647147,42.139089]]}},{"id":"qERzsFfCF5k3MturkoftAOpcv+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 69"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KPp1QzqZ5X/cl2/G6WaNl1GiMTg="}],"description":"Tree trimming on NY 69 both directions between North Street (Oriskany) and Monument Drive (Oriskany) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Thursday June 11th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 04:30 PM,","update_date":"2026-06-05T11:28:49Z"},"road_event_id":"qERzsFfCF5k3MturkoftAOpcv+8=","beginning_cross_street":"North Street","ending_cross_street":"Monument Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.344402,43.167941]]}},{"id":"KPp1QzqZ5X/cl2/G6WaNl1GiMTg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 69"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qERzsFfCF5k3MturkoftAOpcv+8="},{"type":"next-occurrence","id":"IGYrL6QW9PcJkxSll6kEkj9vLoY="}],"description":"Tree trimming on NY 69 both directions between North Street (Oriskany) and Monument Drive (Oriskany) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Thursday June 11th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 04:30 PM,","update_date":"2026-06-05T11:28:49Z"},"road_event_id":"KPp1QzqZ5X/cl2/G6WaNl1GiMTg=","beginning_cross_street":"North Street","ending_cross_street":"Monument Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.344402,43.167941]]}},{"id":"IGYrL6QW9PcJkxSll6kEkj9vLoY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 69"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qERzsFfCF5k3MturkoftAOpcv+8="},{"type":"next-occurrence","id":"vtKhhz3wsK5ifKkqtWmtMKhaLLQ="}],"description":"Tree trimming on NY 69 both directions between North Street (Oriskany) and Monument Drive (Oriskany) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Thursday June 11th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 04:30 PM,","update_date":"2026-06-05T11:28:49Z"},"road_event_id":"IGYrL6QW9PcJkxSll6kEkj9vLoY=","beginning_cross_street":"North Street","ending_cross_street":"Monument Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.344402,43.167941]]}},{"id":"vtKhhz3wsK5ifKkqtWmtMKhaLLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 69"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qERzsFfCF5k3MturkoftAOpcv+8="}],"description":"Tree trimming on NY 69 both directions between North Street (Oriskany) and Monument Drive (Oriskany) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Thursday June 11th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 07:00 AM thru 04:30 PM,","update_date":"2026-06-05T11:28:49Z"},"road_event_id":"vtKhhz3wsK5ifKkqtWmtMKhaLLQ=","beginning_cross_street":"North Street","ending_cross_street":"Monument Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.344402,43.167941]]}},{"id":"eU2y5U91kpPpDC62F3MZYyo66Ys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W Main Street"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"axRUCplnqFVsTSXWGdTUdxTvmZQ="}],"description":"Construction on W Main Street both directions at Barringer Road/Route 5S ramp eastbound (Ilion) Motorists will encounter lane closures in both directions with flaggers in place, Sunday June 8th, 2025 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:40:23Z"},"road_event_id":"eU2y5U91kpPpDC62F3MZYyo66Ys=","beginning_cross_street":"Barringer Road/Route 5S ramp eastbound","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T10:30:00Z","end_date":"2026-06-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.048002,43.020523]]}},{"id":"axRUCplnqFVsTSXWGdTUdxTvmZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W Main Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eU2y5U91kpPpDC62F3MZYyo66Ys="},{"type":"next-occurrence","id":"d2oJSrvBQ1sUvsnnAWhGNHht6mI="}],"description":"Construction on W Main Street both directions at Barringer Road/Route 5S ramp eastbound (Ilion) Motorists will encounter lane closures in both directions with flaggers in place, Sunday June 8th, 2025 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:40:23Z"},"road_event_id":"axRUCplnqFVsTSXWGdTUdxTvmZQ=","beginning_cross_street":"Barringer Road/Route 5S ramp eastbound","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.048002,43.020523]]}},{"id":"d2oJSrvBQ1sUvsnnAWhGNHht6mI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W Main Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eU2y5U91kpPpDC62F3MZYyo66Ys="},{"type":"next-occurrence","id":"+yxQgzR1eA25tf0xA2H4b2XdPEI="}],"description":"Construction on W Main Street both directions at Barringer Road/Route 5S ramp eastbound (Ilion) Motorists will encounter lane closures in both directions with flaggers in place, Sunday June 8th, 2025 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:40:23Z"},"road_event_id":"d2oJSrvBQ1sUvsnnAWhGNHht6mI=","beginning_cross_street":"Barringer Road/Route 5S ramp eastbound","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.048002,43.020523]]}},{"id":"+yxQgzR1eA25tf0xA2H4b2XdPEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W Main Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eU2y5U91kpPpDC62F3MZYyo66Ys="},{"type":"next-occurrence","id":"Q36r4av14Coj+IxH57kwP6fQ/Ts="}],"description":"Construction on W Main Street both directions at Barringer Road/Route 5S ramp eastbound (Ilion) Motorists will encounter lane closures in both directions with flaggers in place, Sunday June 8th, 2025 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:40:23Z"},"road_event_id":"+yxQgzR1eA25tf0xA2H4b2XdPEI=","beginning_cross_street":"Barringer Road/Route 5S ramp eastbound","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.048002,43.020523]]}},{"id":"Q36r4av14Coj+IxH57kwP6fQ/Ts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W Main Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eU2y5U91kpPpDC62F3MZYyo66Ys="},{"type":"next-occurrence","id":"Gk1W8/09xYzUFhXp25Cl/AeG1qY="}],"description":"Construction on W Main Street both directions at Barringer Road/Route 5S ramp eastbound (Ilion) Motorists will encounter lane closures in both directions with flaggers in place, Sunday June 8th, 2025 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:40:23Z"},"road_event_id":"Q36r4av14Coj+IxH57kwP6fQ/Ts=","beginning_cross_street":"Barringer Road/Route 5S ramp eastbound","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.048002,43.020523]]}},{"id":"Gk1W8/09xYzUFhXp25Cl/AeG1qY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W Main Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eU2y5U91kpPpDC62F3MZYyo66Ys="}],"description":"Construction on W Main Street both directions at Barringer Road/Route 5S ramp eastbound (Ilion) Motorists will encounter lane closures in both directions with flaggers in place, Sunday June 8th, 2025 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:40:23Z"},"road_event_id":"Gk1W8/09xYzUFhXp25Cl/AeG1qY=","beginning_cross_street":"Barringer Road/Route 5S ramp eastbound","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.048002,43.020523]]}},{"id":"J39RdQ3SM8wkq4y9InA0zMhLQyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"jAJLdPxoo2/C5h9NMpEak5Zl26E="}],"description":"Bridge work on I-87 Northway southbound Exit 8; Crescent Road (Halfmoon) to Twin Bridges; Town of Halfmoon; Town of Colonie Line (Colonie), Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 08:00 PM 1 Right lane of 3 lanes closed, Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday, 08:00 PM thru 05:00 AM 2 Right lanes of 3 lanes closed","update_date":"2026-06-05T11:41:35Z"},"road_event_id":"J39RdQ3SM8wkq4y9InA0zMhLQyM=","beginning_cross_street":"Exit 8; Crescent Road","ending_cross_street":"Twin Bridges; Town of Halfmoon; Town of Colonie Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.768645,42.822314]]}},{"id":"jAJLdPxoo2/C5h9NMpEak5Zl26E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J39RdQ3SM8wkq4y9InA0zMhLQyM="},{"type":"next-occurrence","id":"P5FVR+kNoOz/ql2OS3j1TMV89zM="}],"description":"Bridge work on I-87 Northway southbound Exit 8; Crescent Road (Halfmoon) to Twin Bridges; Town of Halfmoon; Town of Colonie Line (Colonie), Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 08:00 PM 1 Right lane of 3 lanes closed, Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday, 08:00 PM thru 05:00 AM 2 Right lanes of 3 lanes closed","update_date":"2026-06-05T11:41:35Z"},"road_event_id":"jAJLdPxoo2/C5h9NMpEak5Zl26E=","beginning_cross_street":"Exit 8; Crescent Road","ending_cross_street":"Twin Bridges; Town of Halfmoon; Town of Colonie Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.768645,42.822314]]}},{"id":"P5FVR+kNoOz/ql2OS3j1TMV89zM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J39RdQ3SM8wkq4y9InA0zMhLQyM="}],"description":"Bridge work on I-87 Northway southbound Exit 8; Crescent Road (Halfmoon) to Twin Bridges; Town of Halfmoon; Town of Colonie Line (Colonie), Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 08:00 PM 1 Right lane of 3 lanes closed, Monday June 8th, 2026 thru Thursday June 11th, 2026, Monday/Tuesday/Wednesday, 08:00 PM thru 05:00 AM 2 Right lanes of 3 lanes closed","update_date":"2026-06-05T11:41:35Z"},"road_event_id":"P5FVR+kNoOz/ql2OS3j1TMV89zM=","beginning_cross_street":"Exit 8; Crescent Road","ending_cross_street":"Twin Bridges; Town of Halfmoon; Town of Colonie Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.768645,42.822314]]}},{"id":"8UQAd+bPlE5KQnO3br2xazPtetU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 365"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mZeKY5msbd4xCkONbeNYGX/7nWE="}],"description":"Construction on NY 365 both directions at CR 52; Blackman Corners Road (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:43:38Z"},"road_event_id":"8UQAd+bPlE5KQnO3br2xazPtetU=","beginning_cross_street":"CR 52; Blackman Corners Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.5522,43.1608]]}},{"id":"mZeKY5msbd4xCkONbeNYGX/7nWE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 365"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8UQAd+bPlE5KQnO3br2xazPtetU="},{"type":"next-occurrence","id":"UccREMJlB5IiojEkgJgRL8KYYUQ="}],"description":"Construction on NY 365 both directions at CR 52; Blackman Corners Road (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:43:38Z"},"road_event_id":"mZeKY5msbd4xCkONbeNYGX/7nWE=","beginning_cross_street":"CR 52; Blackman Corners Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.5522,43.1608]]}},{"id":"UccREMJlB5IiojEkgJgRL8KYYUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 365"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8UQAd+bPlE5KQnO3br2xazPtetU="},{"type":"next-occurrence","id":"slk5VyuQNgpOR0aAvFm2DF+xa58="}],"description":"Construction on NY 365 both directions at CR 52; Blackman Corners Road (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:43:38Z"},"road_event_id":"UccREMJlB5IiojEkgJgRL8KYYUQ=","beginning_cross_street":"CR 52; Blackman Corners Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.5522,43.1608]]}},{"id":"slk5VyuQNgpOR0aAvFm2DF+xa58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 365"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8UQAd+bPlE5KQnO3br2xazPtetU="},{"type":"next-occurrence","id":"j/W2/vFgsTpWoJ45KUTwJkF8izY="}],"description":"Construction on NY 365 both directions at CR 52; Blackman Corners Road (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:43:38Z"},"road_event_id":"slk5VyuQNgpOR0aAvFm2DF+xa58=","beginning_cross_street":"CR 52; Blackman Corners Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.5522,43.1608]]}},{"id":"j/W2/vFgsTpWoJ45KUTwJkF8izY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 365"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8UQAd+bPlE5KQnO3br2xazPtetU="}],"description":"Construction on NY 365 both directions at CR 52; Blackman Corners Road (Verona) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-06-05T11:43:38Z"},"road_event_id":"j/W2/vFgsTpWoJ45KUTwJkF8izY=","beginning_cross_street":"CR 52; Blackman Corners Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.5522,43.1608]]}},{"id":"3TClI2rMbTAMMP1iBwr4EkvyU68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5LWViQLvEVQexwtUZJFkx6KjZns="}],"description":"Bridge work on I-87 Northway northbound Twin Bridges; Town of Halfmoon; Town of Colonie Line (Colonie) to Exit 8; Crescent Road (Halfmoon), Thursday June 11th, 2026 thru Saturday June 13th, 2026, Thursday/Friday/Saturday, 07:00 PM thru 10:00 PM 1 Right lane of 3 lanes closed, Thursday June 11th, 2026 thru Saturday June 13th, 2026, Thursday/Friday, 10:00 PM thru 08:00 AM 2 Right lanes of 3 lanes closed","update_date":"2026-06-05T11:44:35Z"},"road_event_id":"3TClI2rMbTAMMP1iBwr4EkvyU68=","beginning_cross_street":"Twin Bridges; Town of Halfmoon; Town of Colonie Line","ending_cross_street":"Exit 8; Crescent Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.761952,42.792292]]}},{"id":"5LWViQLvEVQexwtUZJFkx6KjZns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3TClI2rMbTAMMP1iBwr4EkvyU68="},{"type":"next-occurrence","id":"EfryxzVta5JfSPgh8ul/z42/Uiw="}],"description":"Bridge work on I-87 Northway northbound Twin Bridges; Town of Halfmoon; Town of Colonie Line (Colonie) to Exit 8; Crescent Road (Halfmoon), Thursday June 11th, 2026 thru Saturday June 13th, 2026, Thursday/Friday/Saturday, 07:00 PM thru 10:00 PM 1 Right lane of 3 lanes closed, Thursday June 11th, 2026 thru Saturday June 13th, 2026, Thursday/Friday, 10:00 PM thru 08:00 AM 2 Right lanes of 3 lanes closed","update_date":"2026-06-05T11:44:35Z"},"road_event_id":"5LWViQLvEVQexwtUZJFkx6KjZns=","beginning_cross_street":"Twin Bridges; Town of Halfmoon; Town of Colonie Line","ending_cross_street":"Exit 8; Crescent Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T23:00:00Z","end_date":"2026-06-13T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.761952,42.792292]]}},{"id":"EfryxzVta5JfSPgh8ul/z42/Uiw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3TClI2rMbTAMMP1iBwr4EkvyU68="}],"description":"Bridge work on I-87 Northway northbound Twin Bridges; Town of Halfmoon; Town of Colonie Line (Colonie) to Exit 8; Crescent Road (Halfmoon), Thursday June 11th, 2026 thru Saturday June 13th, 2026, Thursday/Friday/Saturday, 07:00 PM thru 10:00 PM 1 Right lane of 3 lanes closed, Thursday June 11th, 2026 thru Saturday June 13th, 2026, Thursday/Friday, 10:00 PM thru 08:00 AM 2 Right lanes of 3 lanes closed","update_date":"2026-06-05T11:44:35Z"},"road_event_id":"EfryxzVta5JfSPgh8ul/z42/Uiw=","beginning_cross_street":"Twin Bridges; Town of Halfmoon; Town of Colonie Line","ending_cross_street":"Exit 8; Crescent Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T23:00:00Z","end_date":"2026-06-14T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.761952,42.792292]]}},{"id":"bHcp7FNUurjb0pVgiQfU+nNtJR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xf9dK46PhbR4vxWSVztYc2mrIzQ="}],"description":"Utility work on US 20 eastbound at 1248 Waterloo Geneva Rd. (Waterloo) ; Alternating one-way traffic with flaggers, Wednesday June 10th, 2026 thru Friday June 12th, 2026, Wednesday/Thursday/Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-05T11:54:17Z"},"road_event_id":"bHcp7FNUurjb0pVgiQfU+nNtJR4=","beginning_cross_street":"1248 Waterloo Geneva Rd.  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.881918,42.902375]]}},{"id":"xf9dK46PhbR4vxWSVztYc2mrIzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bHcp7FNUurjb0pVgiQfU+nNtJR4="},{"type":"next-occurrence","id":"Waf+j4woEOp7lAIbarrITJNw4Dc="}],"description":"Utility work on US 20 eastbound at 1248 Waterloo Geneva Rd. (Waterloo) ; Alternating one-way traffic with flaggers, Wednesday June 10th, 2026 thru Friday June 12th, 2026, Wednesday/Thursday/Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-05T11:54:17Z"},"road_event_id":"xf9dK46PhbR4vxWSVztYc2mrIzQ=","beginning_cross_street":"1248 Waterloo Geneva Rd.  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.881918,42.902375]]}},{"id":"Waf+j4woEOp7lAIbarrITJNw4Dc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bHcp7FNUurjb0pVgiQfU+nNtJR4="}],"description":"Utility work on US 20 eastbound at 1248 Waterloo Geneva Rd. (Waterloo) ; Alternating one-way traffic with flaggers, Wednesday June 10th, 2026 thru Friday June 12th, 2026, Wednesday/Thursday/Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-05T11:54:17Z"},"road_event_id":"Waf+j4woEOp7lAIbarrITJNw4Dc=","beginning_cross_street":"1248 Waterloo Geneva Rd.  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.881918,42.902375]]}},{"id":"kKMAIfUGxaRGtf4IPtQock2ZkkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GsUnumip29OnwYQqAEEeSaGSRnc="}],"description":"Drainage improvements on NY 5 both directions between Mary Street (Palatine) and Eastside Drive (Palatine) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-06-05T11:58:21Z"},"road_event_id":"kKMAIfUGxaRGtf4IPtQock2ZkkM=","beginning_cross_street":"Mary Street","ending_cross_street":"Eastside Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.58566,42.914346]]}},{"id":"GsUnumip29OnwYQqAEEeSaGSRnc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kKMAIfUGxaRGtf4IPtQock2ZkkM="},{"type":"next-occurrence","id":"9lZqgJY45OPvys0k5aL3HYPaTMA="}],"description":"Drainage improvements on NY 5 both directions between Mary Street (Palatine) and Eastside Drive (Palatine) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-06-05T11:58:21Z"},"road_event_id":"GsUnumip29OnwYQqAEEeSaGSRnc=","beginning_cross_street":"Mary Street","ending_cross_street":"Eastside Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.58566,42.914346]]}},{"id":"9lZqgJY45OPvys0k5aL3HYPaTMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kKMAIfUGxaRGtf4IPtQock2ZkkM="},{"type":"next-occurrence","id":"D2564+XZHbCxEQIseXjbQtrV2VA="}],"description":"Drainage improvements on NY 5 both directions between Mary Street (Palatine) and Eastside Drive (Palatine) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-06-05T11:58:21Z"},"road_event_id":"9lZqgJY45OPvys0k5aL3HYPaTMA=","beginning_cross_street":"Mary Street","ending_cross_street":"Eastside Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.58566,42.914346]]}},{"id":"D2564+XZHbCxEQIseXjbQtrV2VA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kKMAIfUGxaRGtf4IPtQock2ZkkM="},{"type":"next-occurrence","id":"9Lf1Kw7NfG1xs/6RgNA44xesUBE="}],"description":"Drainage improvements on NY 5 both directions between Mary Street (Palatine) and Eastside Drive (Palatine) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-06-05T11:58:21Z"},"road_event_id":"D2564+XZHbCxEQIseXjbQtrV2VA=","beginning_cross_street":"Mary Street","ending_cross_street":"Eastside Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.58566,42.914346]]}},{"id":"9Lf1Kw7NfG1xs/6RgNA44xesUBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kKMAIfUGxaRGtf4IPtQock2ZkkM="}],"description":"Drainage improvements on NY 5 both directions between Mary Street (Palatine) and Eastside Drive (Palatine) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-06-05T11:58:21Z"},"road_event_id":"9Lf1Kw7NfG1xs/6RgNA44xesUBE=","beginning_cross_street":"Mary Street","ending_cross_street":"Eastside Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.58566,42.914346]]}},{"id":"ORC300552214","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","description":"Roadwork on I-87 Northway both directions Exit 2W; NY 5 westbound (Colonie) to Twin Bridges; Town of Halfmoon; Town of Colonie Line (Colonie) Not currently Scheduled","update_date":"2026-06-05T15:00:01Z"},"road_event_id":"ORC300552214","beginning_cross_street":"Exit 2W; NY 5 westbound","ending_cross_street":"Twin Bridges; Town of Halfmoon; Town of Colonie Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T12:03:28Z","end_date":"2026-06-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.818072,42.715292]]}},{"id":"lDmTGmH00kK0iZKOqpD4LvdTAlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lO0kcNzihzAHxpXCYnV25X+qepM="}],"description":"Construction on NY 12 both directions between I-90 (Utica) and City of Utica; Town of Deerfield Line (Utica) motorists will encounter lane closures in both directions for median cleaning, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:30 PM,","update_date":"2026-06-05T12:09:40Z"},"road_event_id":"lDmTGmH00kK0iZKOqpD4LvdTAlc=","beginning_cross_street":"I-90","ending_cross_street":"City of Utica; Town of Deerfield Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.230499,43.121898]]}},{"id":"lO0kcNzihzAHxpXCYnV25X+qepM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lDmTGmH00kK0iZKOqpD4LvdTAlc="},{"type":"next-occurrence","id":"rAnXedFHD4eHxZfzcT8pie7imcc="}],"description":"Construction on NY 12 both directions between I-90 (Utica) and City of Utica; Town of Deerfield Line (Utica) motorists will encounter lane closures in both directions for median cleaning, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:30 PM,","update_date":"2026-06-05T12:09:40Z"},"road_event_id":"lO0kcNzihzAHxpXCYnV25X+qepM=","beginning_cross_street":"I-90","ending_cross_street":"City of Utica; Town of Deerfield Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.230499,43.121898]]}},{"id":"rAnXedFHD4eHxZfzcT8pie7imcc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lDmTGmH00kK0iZKOqpD4LvdTAlc="},{"type":"next-occurrence","id":"3SENSK9Iwcdye0pDUNPi7ismApU="}],"description":"Construction on NY 12 both directions between I-90 (Utica) and City of Utica; Town of Deerfield Line (Utica) motorists will encounter lane closures in both directions for median cleaning, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:30 PM,","update_date":"2026-06-05T12:09:40Z"},"road_event_id":"rAnXedFHD4eHxZfzcT8pie7imcc=","beginning_cross_street":"I-90","ending_cross_street":"City of Utica; Town of Deerfield Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.230499,43.121898]]}},{"id":"3SENSK9Iwcdye0pDUNPi7ismApU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lDmTGmH00kK0iZKOqpD4LvdTAlc="},{"type":"next-occurrence","id":"uc44j9uSqN1ydr4h2fUYXUp5o78="}],"description":"Construction on NY 12 both directions between I-90 (Utica) and City of Utica; Town of Deerfield Line (Utica) motorists will encounter lane closures in both directions for median cleaning, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:30 PM,","update_date":"2026-06-05T12:09:40Z"},"road_event_id":"3SENSK9Iwcdye0pDUNPi7ismApU=","beginning_cross_street":"I-90","ending_cross_street":"City of Utica; Town of Deerfield Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.230499,43.121898]]}},{"id":"uc44j9uSqN1ydr4h2fUYXUp5o78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lDmTGmH00kK0iZKOqpD4LvdTAlc="}],"description":"Construction on NY 12 both directions between I-90 (Utica) and City of Utica; Town of Deerfield Line (Utica) motorists will encounter lane closures in both directions for median cleaning, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 04:30 PM,","update_date":"2026-06-05T12:09:40Z"},"road_event_id":"uc44j9uSqN1ydr4h2fUYXUp5o78=","beginning_cross_street":"I-90","ending_cross_street":"City of Utica; Town of Deerfield Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.230499,43.121898]]}},{"id":"7l8l37ytUgAZXGqFfs1faY92SWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 254"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MQohLv4IlDJCVKRjTQndZYCl6QM="}],"description":"Roadwork on NY 254 both directions I-87 Exit 19; Aviation Road (Queensbury), Friday June 5th, 2026 thru Monday June 8th, 2026, Monday/Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T18:03:10Z"},"road_event_id":"7l8l37ytUgAZXGqFfs1faY92SWI=","beginning_cross_street":"I-87 Exit 19; Aviation Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T13:00:00Z","end_date":"2026-06-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.683698,43.32978]]}},{"id":"MQohLv4IlDJCVKRjTQndZYCl6QM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 254"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7l8l37ytUgAZXGqFfs1faY92SWI="}],"description":"Roadwork on NY 254 both directions I-87 Exit 19; Aviation Road (Queensbury), Friday June 5th, 2026 thru Monday June 8th, 2026, Monday/Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T18:03:10Z"},"road_event_id":"MQohLv4IlDJCVKRjTQndZYCl6QM=","beginning_cross_street":"I-87 Exit 19; Aviation Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.683698,43.32978]]}},{"id":"OUpLv2ZS/j2v0xIHUbY8M2W3zdI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-87 Northway both directions Exit 8; Crescent Road (Halfmoon) to Twin Bridges; Town of Halfmoon; Town of Colonie Line (Colonie) ROLLING CLOSURE, Saturday June 6th, 2026, 04:00 AM thru 08:00 AM All lanes open","update_date":"2026-06-05T12:14:30Z"},"road_event_id":"OUpLv2ZS/j2v0xIHUbY8M2W3zdI=","beginning_cross_street":"Exit 8; Crescent Road","ending_cross_street":"Twin Bridges; Town of Halfmoon; Town of Colonie Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T08:00:00Z","end_date":"2026-06-06T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.768659,42.822362]]}},{"id":"ntPUMIz0QQeP8muN/h79pB+V7ao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Thursday June 11, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T12:26:12Z"},"road_event_id":"ntPUMIz0QQeP8muN/h79pB+V7ao=","beginning_cross_street":"North of NJ 33","ending_cross_street":"South of CR 614/Dey Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546669,40.263774]]}},{"id":"qFz0E7tcQIUcw75kEBdYXuW7008=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 33"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 33 Westbound between East of I-295 (Hamilton Twp) and East of CR 622/South Olden Ave (Hamilton Twp), Tuesday June 9, 2026 08:00 PM thru Wednesday June 10, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T12:26:15Z"},"road_event_id":"qFz0E7tcQIUcw75kEBdYXuW7008=","beginning_cross_street":"East of I-295","ending_cross_street":"East of CR 622/South Olden Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.699501,40.233776]]}},{"id":"+baNA1rHI+OpdmVVy1K5mbehA4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["West Street Arterial"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kv9LJZsF8qYJkcHIYsmyAuie290="}],"description":"Roadwork on West Street Arterial northbound ramp to I-690 EB (Syracuse), Tuesday June 16th, 2026 thru Friday June 19th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-05T12:25:43Z"},"road_event_id":"+baNA1rHI+OpdmVVy1K5mbehA4o=","beginning_cross_street":"I-690 EB","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.157432,43.054057]]}},{"id":"kv9LJZsF8qYJkcHIYsmyAuie290=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["West Street Arterial"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+baNA1rHI+OpdmVVy1K5mbehA4o="},{"type":"next-occurrence","id":"vpren3to/YvET27wSlmEYIvLges="}],"description":"Roadwork on West Street Arterial northbound ramp to I-690 EB (Syracuse), Tuesday June 16th, 2026 thru Friday June 19th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-05T12:25:43Z"},"road_event_id":"kv9LJZsF8qYJkcHIYsmyAuie290=","beginning_cross_street":"I-690 EB","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.157432,43.054057]]}},{"id":"vpren3to/YvET27wSlmEYIvLges=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["West Street Arterial"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+baNA1rHI+OpdmVVy1K5mbehA4o="},{"type":"next-occurrence","id":"M4HS+f9iz0i/yeclSqpdWilMOVg="}],"description":"Roadwork on West Street Arterial northbound ramp to I-690 EB (Syracuse), Tuesday June 16th, 2026 thru Friday June 19th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-05T12:25:43Z"},"road_event_id":"vpren3to/YvET27wSlmEYIvLges=","beginning_cross_street":"I-690 EB","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.157432,43.054057]]}},{"id":"M4HS+f9iz0i/yeclSqpdWilMOVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["West Street Arterial"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+baNA1rHI+OpdmVVy1K5mbehA4o="}],"description":"Roadwork on West Street Arterial northbound ramp to I-690 EB (Syracuse), Tuesday June 16th, 2026 thru Friday June 19th, 2026, Tuesday/Wednesday/Thursday/Friday, 06:00 AM thru 06:00 PM All lanes closed","update_date":"2026-06-05T12:25:43Z"},"road_event_id":"M4HS+f9iz0i/yeclSqpdWilMOVg=","beginning_cross_street":"I-690 EB","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.157432,43.054057]]}},{"id":"cJqErv9PXA7fMSR8SDejk6L9tks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between South of Exit 52 - Columbus Rd (Mansfield Twp) and North of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp), Friday June 12, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T12:26:04Z"},"road_event_id":"cJqErv9PXA7fMSR8SDejk6L9tks=","beginning_cross_street":"South of Exit 52 - Columbus Rd","ending_cross_street":"North of Exit 45 - Mount Holly Rd/Rancocas Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.764533,40.081165]]}},{"id":"vMOKjmQFUXXyvR+68l+3wD5yycM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near CR 620/Center Square Rd (Logan Twp), Wednesday June 10, 2026 07:00 AM thru 05:00 PM, right shoulder closed, moving operation","update_date":"2026-06-05T12:26:08Z"},"road_event_id":"vMOKjmQFUXXyvR+68l+3wD5yycM=","beginning_cross_street":"CR 620/Center Square Rd","ending_cross_street":"North of CR 620/Center Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.397491,39.787948]]}},{"id":"ORC300552227","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","description":"Roadwork on US 130 Northbound near CR 620/Center Square Rd (Logan Twp), Tuesday June 9, 2026 07:00 AM thru 05:00 PM, right shoulder closed, moving operation","update_date":"2026-06-05T12:26:27Z"},"road_event_id":"ORC300552227","beginning_cross_street":"CR 620/Center Square Rd","ending_cross_street":"North of CR 620/Center Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-75.397491,39.787948]]}},{"id":"ORC300552228","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","description":"Roadwork on US 130 Northbound near CR 620/Center Square Rd (Logan Twp), Wednesday June 10, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation","update_date":"2026-06-05T12:26:30Z"},"road_event_id":"ORC300552228","beginning_cross_street":"CR 620/Center Square Rd","ending_cross_street":"North of CR 620/Center Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-75.397491,39.787948]]}},{"id":"ORC300552229","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 29"],"direction":"unknown","description":"Roadwork on NJ 29 Southbound near South of Lalor St (Trenton), Friday June 12, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-06-05T12:26:34Z"},"road_event_id":"ORC300552229","beginning_cross_street":"South of Lalor St","ending_cross_street":"South of Lalor St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.75856,40.200199]]}},{"id":"ORC300552230","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","description":"Roadwork on NJ 35 Northbound near North of Bethany Rd/Pool Av (Hazlet Twp), Thursday June 11, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T12:26:39Z"},"road_event_id":"ORC300552230","beginning_cross_street":"North of Bethany Rd/Pool Av","ending_cross_street":"South of CR 4/Holmdel Rd/Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.18074,40.419506]]}},{"id":"hQtkvvRtHbVx+7/Wnkd1tHepJbY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Eastbound near West of CR 537/Federal St (Camden), Monday June 8, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T12:26:19Z"},"road_event_id":"hQtkvvRtHbVx+7/Wnkd1tHepJbY=","beginning_cross_street":"West of CR 537/Federal St","ending_cross_street":"East of CR 537/Federal St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.108619,39.94522]]}},{"id":"+Sa7HUNalWJbsla29Moz61DWF3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between South of Exit 52 - Columbus Rd (Mansfield Twp) and North of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp), Monday June 8, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T12:26:23Z"},"road_event_id":"+Sa7HUNalWJbsla29Moz61DWF3M=","beginning_cross_street":"South of Exit 52 - Columbus Rd","ending_cross_street":"North of Exit 45 - Mount Holly Rd/Rancocas Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.764533,40.081165]]}},{"id":"xZ25N+JLA8f9edi4YrB8f0zNtzA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between North of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp) and South of Exit 52 - Columbus Rd (Mansfield Twp), Monday June 8, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T12:27:09Z"},"road_event_id":"xZ25N+JLA8f9edi4YrB8f0zNtzA=","beginning_cross_street":"North of Exit 45 - Mount Holly Rd/Rancocas Rd","ending_cross_street":"South of Exit 52 - Columbus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.84983,40.010925]]}},{"id":"lPJ1eO1gb+eaBygSXpiKtSzePdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between South of Exit 52 - Columbus Rd (Mansfield Twp) and North of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp), Tuesday June 9, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T12:27:14Z"},"road_event_id":"lPJ1eO1gb+eaBygSXpiKtSzePdA=","beginning_cross_street":"South of Exit 52 - Columbus Rd","ending_cross_street":"North of Exit 45 - Mount Holly Rd/Rancocas Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.764533,40.081165]]}},{"id":"xuKCpQYOea1GRCu9pnM5Z4ARwJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 55"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 55 Southbound near South of Exit 45 - Buck Rd (Elk Twp), Monday June 8, 2026 08:00 PM thru Tuesday June 9, 2026 05:00 AM, left lane closed","update_date":"2026-06-05T12:27:18Z"},"road_event_id":"xuKCpQYOea1GRCu9pnM5Z4ARwJQ=","beginning_cross_street":"South of Exit 45 - Buck Rd","ending_cross_street":"South of Exit 45 - Buck Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.115127,39.648014]]}},{"id":"M+S/vcLP5Q1D36jg3tXZ8I8zCFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near North of Bethany Rd/Pool Av (Hazlet Twp), Tuesday June 9, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T12:27:22Z"},"road_event_id":"M+S/vcLP5Q1D36jg3tXZ8I8zCFA=","beginning_cross_street":"North of Bethany Rd/Pool Av","ending_cross_street":"South of CR 4/Holmdel Rd/Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.18074,40.419506]]}},{"id":"jiiD+xfxUxWOoVFZqAUFznWCFVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between North of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp) and South of Exit 52 - Columbus Rd (Mansfield Twp), Wednesday June 10, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T12:26:44Z"},"road_event_id":"jiiD+xfxUxWOoVFZqAUFznWCFVA=","beginning_cross_street":"North of Exit 45 - Mount Holly Rd/Rancocas Rd","ending_cross_street":"South of Exit 52 - Columbus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.84983,40.010925]]}},{"id":"L+BA/dwSCGJOpQL78xlQBwyqoQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between South of Exit 52 - Columbus Rd (Mansfield Twp) and North of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp), Thursday June 11, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T12:26:59Z"},"road_event_id":"L+BA/dwSCGJOpQL78xlQBwyqoQM=","beginning_cross_street":"South of Exit 52 - Columbus Rd","ending_cross_street":"North of Exit 45 - Mount Holly Rd/Rancocas Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.764533,40.081165]]}},{"id":"+MYk7wyk8hFBHo4Dn/6F1v0/Uhk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 55"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 55 Southbound near South of Exit 45 - Buck Rd (Elk Twp), Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 05:00 AM, left lane closed","update_date":"2026-06-05T12:27:05Z"},"road_event_id":"+MYk7wyk8hFBHo4Dn/6F1v0/Uhk=","beginning_cross_street":"South of Exit 45 - Buck Rd","ending_cross_street":"South of Exit 45 - Buck Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.115127,39.648014]]}},{"id":"GkNWLbsTJg9XNcuJIrN4r5aHE+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Tuesday June 9, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T12:27:26Z"},"road_event_id":"GkNWLbsTJg9XNcuJIrN4r5aHE+c=","beginning_cross_street":"North of NJ 33","ending_cross_street":"South of CR 614/Dey Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546669,40.263774]]}},{"id":"lWKdW1b+jG6oayJgLoCPgCNDSWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between South of Exit 52 - Columbus Rd (Mansfield Twp) and North of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp), Wednesday June 10, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T12:28:00Z"},"road_event_id":"lWKdW1b+jG6oayJgLoCPgCNDSWk=","beginning_cross_street":"South of Exit 52 - Columbus Rd","ending_cross_street":"North of Exit 45 - Mount Holly Rd/Rancocas Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.764533,40.081165]]}},{"id":"d9vP7vp2MnKuGSXQpR7SdA/iKv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 29"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 29 Southbound near South of Lalor St (Trenton), Tuesday June 9, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-06-05T12:28:04Z"},"road_event_id":"d9vP7vp2MnKuGSXQpR7SdA/iKv0=","beginning_cross_street":"South of Lalor St","ending_cross_street":"South of Lalor St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.75856,40.200199]]}},{"id":"ImSpJiHC4j24MHFxqgjKu3vgXvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Northbound near North of CR 622/Olden Ave (Ewing Twp), Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T12:28:08Z"},"road_event_id":"ImSpJiHC4j24MHFxqgjKu3vgXvo=","beginning_cross_street":"North of CR 622/Olden Ave","ending_cross_street":"North of CR 622/Olden Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.779037,40.25774]]}},{"id":"LOP/Iy1PAX79vTD/DBBr4LigLiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 29"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 29 Southbound near South of Lalor St (Trenton), Thursday June 11, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-06-05T12:28:12Z"},"road_event_id":"LOP/Iy1PAX79vTD/DBBr4LigLiA=","beginning_cross_street":"South of Lalor St","ending_cross_street":"South of Lalor St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.75856,40.200199]]}},{"id":"i0Vc4lHB8qQH0TrCZWOfqxfPfQQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 33"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 33 Eastbound between East of CR 622/South Olden Ave (Hamilton Twp) and East of I-295 (Hamilton Twp), Wednesday June 10, 2026 08:00 PM thru Thursday June 11, 2026 06:00 AM, left lane closed","update_date":"2026-06-05T12:27:41Z"},"road_event_id":"i0Vc4lHB8qQH0TrCZWOfqxfPfQQ=","beginning_cross_street":"East of CR 622/South Olden Ave","ending_cross_street":"East of I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.732986,40.226043]]}},{"id":"/SQoxRmkwbliHDvuL0+Yp431OLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between South of Exit 23 - US 130 (West Deptford Twp) and Exit 18 - CR 667 (Paulsboro), Friday June 12, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T12:27:46Z"},"road_event_id":"/SQoxRmkwbliHDvuL0+Yp431OLA=","beginning_cross_street":"South of Exit 23 - US 130","ending_cross_street":"Exit 18 - CR 667","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.155509,39.859924]]}},{"id":"Z3u9ORtbpnJdDBfvgxu6pn36h1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near North of Bethany Rd/Pool Av (Hazlet Twp), Friday June 12, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T12:27:51Z"},"road_event_id":"Z3u9ORtbpnJdDBfvgxu6pn36h1k=","beginning_cross_street":"North of Bethany Rd/Pool Av","ending_cross_street":"South of CR 4/Holmdel Rd/Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.18074,40.419506]]}},{"id":"5KSsGSFXpveNjmr6/OZkNyiMkE0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near NJ 88 (Point Pleasant Beach), Friday June 12, 2026 08:00 AM thru 04:00 PM, left lane closed","update_date":"2026-06-05T12:27:56Z"},"road_event_id":"5KSsGSFXpveNjmr6/OZkNyiMkE0=","beginning_cross_street":"NJ 88","ending_cross_street":"CR 69/Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047195,40.081211]]}},{"id":"eHFMtV06nuEfI0J/G9aJYRH3c+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 55"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 55 Southbound near South of Exit 45 - Buck Rd (Elk Twp), Wednesday June 10, 2026 08:00 PM thru Thursday June 11, 2026 05:00 AM, left lane closed","update_date":"2026-06-05T12:28:18Z"},"road_event_id":"eHFMtV06nuEfI0J/G9aJYRH3c+o=","beginning_cross_street":"South of Exit 45 - Buck Rd","ending_cross_street":"South of Exit 45 - Buck Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.115127,39.648014]]}},{"id":"BY7CTRASpKcbFtJBkqNGMO2kQyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 29"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 29 Southbound near South of Lalor St (Trenton), Wednesday June 10, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-06-05T12:28:27Z"},"road_event_id":"BY7CTRASpKcbFtJBkqNGMO2kQyg=","beginning_cross_street":"South of Lalor St","ending_cross_street":"South of Lalor St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.75856,40.200199]]}},{"id":"Cf4wWfnpZZ2BR1rTzpa8Y2sJKz0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 29"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 29 Southbound near South of Lalor St (Trenton), Monday June 8, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-06-05T12:28:51Z"},"road_event_id":"Cf4wWfnpZZ2BR1rTzpa8Y2sJKz0=","beginning_cross_street":"South of Lalor St","ending_cross_street":"South of Lalor St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.75856,40.200199]]}},{"id":"rIhicNqi4gMgZQiZFvvimy59DR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Monday June 8, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T12:28:55Z"},"road_event_id":"rIhicNqi4gMgZQiZFvvimy59DR0=","beginning_cross_street":"North of NJ 33","ending_cross_street":"South of CR 614/Dey Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546669,40.263774]]}},{"id":"zfxKuEXqnAKWGpdWvqy64iRGma0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near South of CR 522/Throckmorton St (Freehold Twp), Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 05:00 AM, right lane closed","update_date":"2026-06-05T12:28:31Z"},"road_event_id":"zfxKuEXqnAKWGpdWvqy64iRGma0=","beginning_cross_street":"South of CR 522/Throckmorton St","ending_cross_street":"North of CR 522/Throckmorton St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.293777,40.26583]]}},{"id":"Xg8HW6gfL1Rczay0+JWZ7hkUNPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near CR 620/Center Square Rd (Logan Twp), Friday June 12, 2026 07:00 AM thru 05:00 PM, right shoulder closed, moving operation","update_date":"2026-06-05T12:28:35Z"},"road_event_id":"Xg8HW6gfL1Rczay0+JWZ7hkUNPY=","beginning_cross_street":"CR 620/Center Square Rd","ending_cross_street":"North of CR 620/Center Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.397491,39.787948]]}},{"id":"POPt6hZEZuUNsgH5pRqVCESSflc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near NJ 88 (Point Pleasant Beach), Wednesday June 10, 2026 08:00 AM thru 04:00 PM, left lane closed","update_date":"2026-06-05T12:29:22Z"},"road_event_id":"POPt6hZEZuUNsgH5pRqVCESSflc=","beginning_cross_street":"NJ 88","ending_cross_street":"CR 69/Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047195,40.081211]]}},{"id":"uOPgLl20iilIB5ER294T6zGirjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between North of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp) and South of Exit 52 - Columbus Rd (Mansfield Twp), Friday June 12, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T12:29:32Z"},"road_event_id":"uOPgLl20iilIB5ER294T6zGirjE=","beginning_cross_street":"North of Exit 45 - Mount Holly Rd/Rancocas Rd","ending_cross_street":"South of Exit 52 - Columbus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.84983,40.010925]]}},{"id":"mRhvIDyC7nChH5PJjNn5MoUVmNk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound near South of CR 3/Broadway (Keyport), Thursday June 11, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-06-05T12:29:37Z"},"road_event_id":"mRhvIDyC7nChH5PJjNn5MoUVmNk=","beginning_cross_street":"South of CR 3/Broadway","ending_cross_street":"South of NJ 36","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.210403,40.428283]]}},{"id":"K62jf/6idUHQj/1zJ5Kz3bhuCTs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near NJ 88 (Point Pleasant Beach), Tuesday June 9, 2026 08:00 AM thru 04:00 PM, left lane closed","update_date":"2026-06-05T12:29:56Z"},"road_event_id":"K62jf/6idUHQj/1zJ5Kz3bhuCTs=","beginning_cross_street":"NJ 88","ending_cross_street":"CR 69/Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047195,40.081211]]}},{"id":"iuGl1NWBlTVXYlJJ8jnStN3vlrQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near CR 620/Center Square Rd (Logan Twp), Friday June 12, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation","update_date":"2026-06-05T12:30:00Z"},"road_event_id":"iuGl1NWBlTVXYlJJ8jnStN3vlrQ=","beginning_cross_street":"CR 620/Center Square Rd","ending_cross_street":"North of CR 620/Center Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.397491,39.787948]]}},{"id":"IQjnlvOmf4quObjzfpVTl7aqG4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near CR 620/Center Square Rd (Logan Twp), Monday June 8, 2026 09:00 AM thru 03:00 PM, left lane closed, moving operation","update_date":"2026-06-05T12:30:04Z"},"road_event_id":"IQjnlvOmf4quObjzfpVTl7aqG4Y=","beginning_cross_street":"CR 620/Center Square Rd","ending_cross_street":"North of CR 620/Center Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.397491,39.787948]]}},{"id":"CLpPLUxtsLPzmUakupXy/dvSAT0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between Exit 18 - CR 667 (Paulsboro) and South of Exit 23 - US 130 (West Deptford Twp), Friday June 12, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T12:29:41Z"},"road_event_id":"CLpPLUxtsLPzmUakupXy/dvSAT0=","beginning_cross_street":"Exit 18 - CR 667","ending_cross_street":"South of Exit 23 - US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.235542,39.822017]]}},{"id":"bZ9ZNqpCgQBe4xo8PCup84iJEdw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near CR 620/Center Square Rd (Logan Twp), Thursday June 11, 2026 07:00 AM thru 05:00 PM, right shoulder closed, moving operation","update_date":"2026-06-05T12:29:44Z"},"road_event_id":"bZ9ZNqpCgQBe4xo8PCup84iJEdw=","beginning_cross_street":"CR 620/Center Square Rd","ending_cross_street":"North of CR 620/Center Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.397491,39.787948]]}},{"id":"YjdFSj3hX5yMWHKcyVyVp08wYmU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near North of Bethany Rd/Pool Av (Hazlet Twp), Monday June 8, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T12:29:48Z"},"road_event_id":"YjdFSj3hX5yMWHKcyVyVp08wYmU=","beginning_cross_street":"North of Bethany Rd/Pool Av","ending_cross_street":"South of CR 4/Holmdel Rd/Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.18074,40.419506]]}},{"id":"tBPCZygZMCZqTpYB3B19LlhH0uY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 33"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 33 Eastbound between East of CR 622/South Olden Ave (Hamilton Twp) and East of I-295 (Hamilton Twp), Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 06:00 AM, left lane closed","update_date":"2026-06-05T12:29:52Z"},"road_event_id":"tBPCZygZMCZqTpYB3B19LlhH0uY=","beginning_cross_street":"East of CR 622/South Olden Ave","ending_cross_street":"East of I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.732986,40.226043]]}},{"id":"R84UvSYENwQrqmORsp0D1/y1lBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 29"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 29 Northbound near North of NJ 129 (Trenton), Thursday June 11, 2026 09:00 PM thru Friday June 12, 2026 05:00 AM, right lane closed","update_date":"2026-06-05T12:30:07Z"},"road_event_id":"R84UvSYENwQrqmORsp0D1/y1lBc=","beginning_cross_street":"North of NJ 129","ending_cross_street":"South of Lalor St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.753623,40.191841]]}},{"id":"Rl7QVl149Li88x2tStfHHaziHs4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Friday June 12, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T12:30:11Z"},"road_event_id":"Rl7QVl149Li88x2tStfHHaziHs4=","beginning_cross_street":"North of NJ 33","ending_cross_street":"South of CR 614/Dey Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546669,40.263774]]}},{"id":"hAnbycFc+BfqB5tVAggQLZjTDs8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near CR 620/Center Square Rd (Logan Twp), Thursday June 11, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation","update_date":"2026-06-05T12:30:15Z"},"road_event_id":"hAnbycFc+BfqB5tVAggQLZjTDs8=","beginning_cross_street":"CR 620/Center Square Rd","ending_cross_street":"North of CR 620/Center Square Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.397491,39.787948]]}},{"id":"nOJYuQcaKHZzyn1d+sUh/1siCPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between North of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp) and South of Exit 52 - Columbus Rd (Mansfield Twp), Thursday June 11, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T12:30:18Z"},"road_event_id":"nOJYuQcaKHZzyn1d+sUh/1siCPY=","beginning_cross_street":"North of Exit 45 - Mount Holly Rd/Rancocas Rd","ending_cross_street":"South of Exit 52 - Columbus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.84983,40.010925]]}},{"id":"dRXao4ptyAlh1eoqZPbRqRH0BXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between North of Exit 45 - Mount Holly Rd/Rancocas Rd (Westampton Twp) and South of Exit 52 - Columbus Rd (Mansfield Twp), Tuesday June 9, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T12:30:22Z"},"road_event_id":"dRXao4ptyAlh1eoqZPbRqRH0BXQ=","beginning_cross_street":"North of Exit 45 - Mount Holly Rd/Rancocas Rd","ending_cross_street":"South of Exit 52 - Columbus Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.84983,40.010925]]}},{"id":"nW+kYNsqV6TKK+w9eLIJ0gYA2Mo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 55"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 55 Southbound near South of Exit 45 - Buck Rd (Elk Twp), Tuesday June 9, 2026 08:00 PM thru Wednesday June 10, 2026 05:00 AM, left lane closed","update_date":"2026-06-05T12:30:26Z"},"road_event_id":"nW+kYNsqV6TKK+w9eLIJ0gYA2Mo=","beginning_cross_street":"South of Exit 45 - Buck Rd","ending_cross_street":"South of Exit 45 - Buck Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.115127,39.648014]]}},{"id":"HoOsFHNIG+UNHH2fu657bVkK66I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near NJ 88 (Point Pleasant Beach), Monday June 8, 2026 08:00 AM thru 04:00 PM, left lane closed","update_date":"2026-06-05T12:30:30Z"},"road_event_id":"HoOsFHNIG+UNHH2fu657bVkK66I=","beginning_cross_street":"NJ 88","ending_cross_street":"CR 69/Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047195,40.081211]]}},{"id":"aeepNQuJyRWjTq8uBYYu58t3rCk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 33"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 33 Westbound between East of I-295 (Hamilton Twp) and East of CR 622/South Olden Ave (Hamilton Twp), Monday June 8, 2026 08:00 PM thru Tuesday June 9, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T12:30:32Z"},"road_event_id":"aeepNQuJyRWjTq8uBYYu58t3rCk=","beginning_cross_street":"East of I-295","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.699501,40.233776]]}},{"id":"0sO773n97a9YGCuFPEz/JkmvsIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound at North of Exit 47 - CR 541/Burlington-Mount Holly Rd (Burlington Twp) Tuesday June 9, 2026 09:00 AM thru 03:00 PM, ramp","update_date":"2026-06-05T12:29:05Z"},"road_event_id":"0sO773n97a9YGCuFPEz/JkmvsIE=","beginning_cross_street":"North of Exit 47 - CR 541/Burlington-Mount Holly Rd","ending_cross_street":"NJ 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.831497,40.047107]]}},{"id":"XX9GU5jkQtvJiDt1XgCGyaiy6/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 52"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 52 Southbound between South of CR 585/Shore Rd (Ocean City) and 9th St/Palen St (Ocean City), Friday June 12, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T12:30:49Z"},"road_event_id":"XX9GU5jkQtvJiDt1XgCGyaiy6/s=","beginning_cross_street":"South of CR 585/Shore Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.588317,39.2956]]}},{"id":"cS7cz2zhnei5HBeZckAUPW32Eyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near North of Bethany Rd/Pool Av (Hazlet Twp), Wednesday June 10, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T12:30:53Z"},"road_event_id":"cS7cz2zhnei5HBeZckAUPW32Eyk=","beginning_cross_street":"North of Bethany Rd/Pool Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.18074,40.419506]]}},{"id":"OLOww6tyC1zpjbiB7KT/77J5lcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound near South of CR 3/Broadway (Keyport), Friday June 12, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-06-05T12:30:59Z"},"road_event_id":"OLOww6tyC1zpjbiB7KT/77J5lcA=","beginning_cross_street":"South of CR 3/Broadway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.210403,40.428283]]}},{"id":"BwHh5IZeeKfVOFsud6kXLhR7ZfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near NJ 88 (Point Pleasant Beach), Thursday June 11, 2026 08:00 AM thru 04:00 PM, left lane closed","update_date":"2026-06-05T12:30:44Z"},"road_event_id":"BwHh5IZeeKfVOFsud6kXLhR7ZfA=","beginning_cross_street":"NJ 88","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047195,40.081211]]}},{"id":"f3WGDGwnDMQ60Zy/c0CrliO8Xo0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Wednesday June 10, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T12:31:21Z"},"road_event_id":"f3WGDGwnDMQ60Zy/c0CrliO8Xo0=","beginning_cross_street":"North of NJ 33","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546669,40.263774]]}},{"id":"7EixNwpt/dfHIR0iZHJPK7Rj+HU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near CR 620/Center Square Rd (Logan Twp), Tuesday June 9, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation","update_date":"2026-06-05T12:30:38Z"},"road_event_id":"7EixNwpt/dfHIR0iZHJPK7Rj+HU=","beginning_cross_street":"CR 620/Center Square Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.397491,39.787948]]}},{"id":"/6W/P6L8mmfpy/2F6XOtTdTFxaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near North of CR 620/Center Square Rd (Logan Twp), Monday June 8, 2026 09:00 AM thru 03:00 PM, left lane closed, moving operation","update_date":"2026-06-05T12:30:41Z"},"road_event_id":"/6W/P6L8mmfpy/2F6XOtTdTFxaM=","beginning_cross_street":"North of CR 620/Center Square Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.390373,39.789733]]}},{"id":"BLjkG+6BSunuY8vXy2UU2MAgyds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S42 Bus and S52 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, S42 Bus and S52 Bus at St Marks Pl/Hamilton Av (New York) are detoured at this location. Buses will not serve stops from Westervelt Ave/Hamilton Ave to Bay St/Borough Pl. While detoured, stops will be made along Richmond Terr as requested. Note: Bus arrival information may not be available/accurate while buses are detoured, Continuous Friday June 5th, 2026 08:30 AM thru Monday June 15th, 2026 11:59 PM","update_date":"2026-06-05T12:30:29Z"},"road_event_id":"BLjkG+6BSunuY8vXy2UU2MAgyds=","beginning_cross_street":"St Marks Pl/Hamilton Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T04:00:00Z","end_date":"2026-06-16T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.080433,40.645091]]}},{"id":"V9376YqkUe2gMe7qMZhRGcltX4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Leland Ave"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on Leland Ave both directions over Barge Canal (Utica) Motorists will encounter lane closures in both directions with flaggers in place, Thursday June 11th, 2026, 07:00 AM thru 12:00 PM,","update_date":"2026-06-05T12:53:57Z"},"road_event_id":"V9376YqkUe2gMe7qMZhRGcltX4Y=","beginning_cross_street":"Barge Canal","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.209627,43.109798]]}},{"id":"LZB0NqHxQoYD2mXsIf22h4zkDmU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyke Road"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on Dyke Road both directions over Barge Canal (Schuyler) Motorists will encounter lane closures in both directions with flaggers in place, Friday June 12th, 2026, 07:00 AM thru 12:00 PM,","update_date":"2026-06-05T12:56:21Z"},"road_event_id":"LZB0NqHxQoYD2mXsIf22h4zkDmU=","beginning_cross_street":"Barge Canal","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.15534,43.093637]]}},{"id":"MV2qtjAieJ1zId6uEYv0260xaKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Shore Line East Train"],"direction":"unknown","related_road_events":[],"description":"Due to Track repairs both directions, Shore Line East Train area of New Haven State Street Station (New Haven), Continuous Saturday June 13th, 2026 12:00 AM thru Sunday June 14th, 2026 11:59 PM","update_date":"2026-06-05T13:09:33Z"},"road_event_id":"MV2qtjAieJ1zId6uEYv0260xaKg=","beginning_cross_street":"New Haven State Street Station","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T04:00:00Z","end_date":"2026-06-15T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.921763,41.304984]]}},{"id":"G0N6yktYsB3WyttQuLhWkULVhts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Shore Line East Train"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, Shore Line East Train Branford (Branford) all trains at Branford Station will board on Track 2, and trains may experience delays of up to 15 minutes., Continuous Saturday June 13th, 2026 12:00 AM thru Sunday June 14th, 2026 11:59 PM","update_date":"2026-06-05T13:10:50Z"},"road_event_id":"G0N6yktYsB3WyttQuLhWkULVhts=","beginning_cross_street":"Branford","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T04:00:00Z","end_date":"2026-06-15T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.817246,41.274627]]}},{"id":"03Zy+QI+cApB2NkzbkU+47Rkn5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hartford Line"],"direction":"unknown","related_road_events":[],"description":"Due to Track repairs both directions, Hartford Line area of State Street Station (New Haven) track work near New Haven State Street may cause delays of up to 15 minutes for all CTrail Hartford Line and Amtrak Hartford Line trains. Visit hartfordline.com for details. , Continuous Saturday June 13th, 2026 12:00 AM thru Sunday June 14th, 2026 11:59 PM","update_date":"2026-06-05T13:12:52Z"},"road_event_id":"03Zy+QI+cApB2NkzbkU+47Rkn5g=","beginning_cross_street":"State Street Station","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T04:00:00Z","end_date":"2026-06-15T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.921211,41.304924]]}},{"id":"mnQ855BrPePmlId6DmMf6w2Cth0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GQfrVxQZ6LJmYmTrbrM1S8g8KiY="}],"description":"Drainage improvements on NY 414 both directions South Franklin Street; NY 14 (Dix) to CR 16 (Dix) 3 lanes reduced to 2, Monday June 8th, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday/Wednesday, 07:30 AM thru 02:30 PM All lanes open","update_date":"2026-06-05T13:32:55Z"},"road_event_id":"mnQ855BrPePmlId6DmMf6w2Cth0=","beginning_cross_street":"South Franklin Street; NY 14","ending_cross_street":"CR 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:30:00Z","end_date":"2026-06-08T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.868818,42.370445]]}},{"id":"GQfrVxQZ6LJmYmTrbrM1S8g8KiY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mnQ855BrPePmlId6DmMf6w2Cth0="},{"type":"next-occurrence","id":"g3zp5wXNg9pOE/f40o08JKJfvyw="}],"description":"Drainage improvements on NY 414 both directions South Franklin Street; NY 14 (Dix) to CR 16 (Dix) 3 lanes reduced to 2, Monday June 8th, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday/Wednesday, 07:30 AM thru 02:30 PM All lanes open","update_date":"2026-06-05T13:32:55Z"},"road_event_id":"GQfrVxQZ6LJmYmTrbrM1S8g8KiY=","beginning_cross_street":"South Franklin Street; NY 14","ending_cross_street":"CR 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:30:00Z","end_date":"2026-06-09T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.868818,42.370445]]}},{"id":"g3zp5wXNg9pOE/f40o08JKJfvyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mnQ855BrPePmlId6DmMf6w2Cth0="}],"description":"Drainage improvements on NY 414 both directions South Franklin Street; NY 14 (Dix) to CR 16 (Dix) 3 lanes reduced to 2, Monday June 8th, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday/Wednesday, 07:30 AM thru 02:30 PM All lanes open","update_date":"2026-06-05T13:32:55Z"},"road_event_id":"g3zp5wXNg9pOE/f40o08JKJfvyw=","beginning_cross_street":"South Franklin Street; NY 14","ending_cross_street":"CR 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:30:00Z","end_date":"2026-06-10T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.868818,42.370445]]}},{"id":"OceLi1i6QyPCqMCAOUy50WvQR2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iNk7Aa2aj0fH1sU62RQ3xrRsNHs="}],"description":"Mowing on NY 14 both directions Town of Reading; Town of Dix Line (Reading) to Town of Starkey; Town of Reading Line (Starkey) Right shoulder closure, Monday June 8th, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday/Wednesday, 07:30 AM thru 03:30 PM All lanes open southbound; right shoulder closed northbound","update_date":"2026-06-05T13:36:45Z"},"road_event_id":"OceLi1i6QyPCqMCAOUy50WvQR2Y=","beginning_cross_street":"Town of Reading; Town of Dix Line","ending_cross_street":"Town of Starkey; Town of Reading Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:30:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.880984,42.389829]]}},{"id":"iNk7Aa2aj0fH1sU62RQ3xrRsNHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OceLi1i6QyPCqMCAOUy50WvQR2Y="},{"type":"next-occurrence","id":"5MjrItFhXph1CHfJhHbDCo5N9u4="}],"description":"Mowing on NY 14 both directions Town of Reading; Town of Dix Line (Reading) to Town of Starkey; Town of Reading Line (Starkey) Right shoulder closure, Monday June 8th, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday/Wednesday, 07:30 AM thru 03:30 PM All lanes open southbound; right shoulder closed northbound","update_date":"2026-06-05T13:36:45Z"},"road_event_id":"iNk7Aa2aj0fH1sU62RQ3xrRsNHs=","beginning_cross_street":"Town of Reading; Town of Dix Line","ending_cross_street":"Town of Starkey; Town of Reading Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:30:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.880984,42.389829]]}},{"id":"5MjrItFhXph1CHfJhHbDCo5N9u4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OceLi1i6QyPCqMCAOUy50WvQR2Y="}],"description":"Mowing on NY 14 both directions Town of Reading; Town of Dix Line (Reading) to Town of Starkey; Town of Reading Line (Starkey) Right shoulder closure, Monday June 8th, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday/Wednesday, 07:30 AM thru 03:30 PM All lanes open southbound; right shoulder closed northbound","update_date":"2026-06-05T13:36:45Z"},"road_event_id":"5MjrItFhXph1CHfJhHbDCo5N9u4=","beginning_cross_street":"Town of Reading; Town of Dix Line","ending_cross_street":"Town of Starkey; Town of Reading Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:30:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.880984,42.389829]]}},{"id":"z29wEAcEnizOFVJU5s8ckMRRxzw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near South of Exit 44 - US 202 (Boonton), Monday June 8, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T13:38:47Z"},"road_event_id":"z29wEAcEnizOFVJU5s8ckMRRxzw=","beginning_cross_street":"South of Exit 44 - US 202","ending_cross_street":"South of Exit 44 - US 202","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.411689,40.90118]]}},{"id":"D/k538uIoc7nNC8vtwh6K9nfpz0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 42 - US 46 (Parsippany-Troy Hills Twp), Monday June 8, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T13:38:48Z"},"road_event_id":"D/k538uIoc7nNC8vtwh6K9nfpz0=","beginning_cross_street":"North of Exit 42 - US 46","ending_cross_street":"Exit 42 - US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.420036,40.87247]]}},{"id":"POan8C9N0OnXmbEDLkYdhKWDRsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 47 - US 202 (Montville Twp) and Exit 45 - Vreeland Ave (Boonton), Monday June 8, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T13:38:49Z"},"road_event_id":"POan8C9N0OnXmbEDLkYdhKWDRsw=","beginning_cross_street":"South of Exit 47 - US 202","ending_cross_street":"Exit 45 - Vreeland Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.37712,40.913227]]}},{"id":"pztoLwKNoCfySIF6X+niz+LWqk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near South of Exit 37 - NJ 24 (Morris Twp), Monday June 8, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T13:38:50Z"},"road_event_id":"pztoLwKNoCfySIF6X+niz+LWqk8=","beginning_cross_street":"South of Exit 37 - NJ 24","ending_cross_street":"South of Exit 37 - NJ 24","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.458641,40.803741]]}},{"id":"48X34HgDHf0xMa+oZnK3gvKX41o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 39 - NJ 10 (Hanover Twp), Monday June 8, 2026 10:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T13:38:52Z"},"road_event_id":"48X34HgDHf0xMa+oZnK3gvKX41o=","beginning_cross_street":"North of Exit 39 - NJ 10","ending_cross_street":"South of Exit 39 - NJ 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.436042,40.835765]]}},{"id":"DL/T4UDFhy/biAlvPl1E1GcdoIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 37 - CR 513/Hibernia Ave (Denville Twp), Tuesday June 9, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T13:41:50Z"},"road_event_id":"DL/T4UDFhy/biAlvPl1E1GcdoIk=","beginning_cross_street":"West of Exit 42 - US 202/Littleton Rd","ending_cross_street":"East of Exit 37 - CR 513/Hibernia Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.459274,40.869297]]}},{"id":"/RFAhNW+mpuDM0+iY12paALVgLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near East of Exit 63 - NJ 17 North (Lodi), Thursday June 11, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T13:41:52Z"},"road_event_id":"/RFAhNW+mpuDM0+iY12paALVgLs=","beginning_cross_street":"East of Exit 63 - NJ 17 North","ending_cross_street":"East of Exit 63 - NJ 17 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.074417,40.891452]]}},{"id":"+/aKXEZ9MKzZgkX3W3RFLLwWoQ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near East of Exit 63 - NJ 17 North (Lodi), Wednesday June 10, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T13:41:54Z"},"road_event_id":"+/aKXEZ9MKzZgkX3W3RFLLwWoQ8=","beginning_cross_street":"East of Exit 63 - NJ 17 North","ending_cross_street":"East of Exit 63 - NJ 17 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.074417,40.891452]]}},{"id":"SrsXxQc9Rma6cRa6Eds1qcirotU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 37 - CR 513/Hibernia Ave (Denville Twp), Thursday June 11, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T13:41:55Z"},"road_event_id":"SrsXxQc9Rma6cRa6Eds1qcirotU=","beginning_cross_street":"West of Exit 42 - US 202/Littleton Rd","ending_cross_street":"East of Exit 37 - CR 513/Hibernia Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.459274,40.869297]]}},{"id":"F/R1v3nUVeKNtF7Lfn0pXZXDkd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near East of Exit 63 - NJ 17 North (Lodi), Monday June 8, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T13:41:56Z"},"road_event_id":"F/R1v3nUVeKNtF7Lfn0pXZXDkd8=","beginning_cross_street":"East of Exit 63 - NJ 17 North","ending_cross_street":"East of Exit 63 - NJ 17 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.074417,40.891452]]}},{"id":"fKVN651qcOIzjtewYZsOjMt3s2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near East of Exit 63 - NJ 17 North (Lodi), Friday June 12, 2026 09:00 AM thru 02:59 PM, right shoulder closed","update_date":"2026-06-05T13:41:58Z"},"road_event_id":"fKVN651qcOIzjtewYZsOjMt3s2o=","beginning_cross_street":"East of Exit 63 - NJ 17 North","ending_cross_street":"East of Exit 63 - NJ 17 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.074417,40.891452]]}},{"id":"rt5n9ai0GqM/DfaIeCY4uiO0cwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near East of Exit 63 - NJ 17 North (Lodi), Tuesday June 9, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T13:42:04Z"},"road_event_id":"rt5n9ai0GqM/DfaIeCY4uiO0cwc=","beginning_cross_street":"East of Exit 63 - NJ 17 North","ending_cross_street":"East of Exit 63 - NJ 17 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.074417,40.891452]]}},{"id":"wJcNY/GTHt/UuusEeltoQ4A6P7E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 37 - CR 513/Hibernia Ave (Denville Twp), Monday June 8, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T13:41:59Z"},"road_event_id":"wJcNY/GTHt/UuusEeltoQ4A6P7E=","beginning_cross_street":"West of Exit 42 - US 202/Littleton Rd","ending_cross_street":"East of Exit 37 - CR 513/Hibernia Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.459274,40.869297]]}},{"id":"J+/tDKQqGH5pvPhkylAf4nfkv+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 37 - CR 513/Hibernia Ave (Denville Twp), Friday June 12, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T13:42:00Z"},"road_event_id":"J+/tDKQqGH5pvPhkylAf4nfkv+4=","beginning_cross_street":"West of Exit 42 - US 202/Littleton Rd","ending_cross_street":"East of Exit 37 - CR 513/Hibernia Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.459274,40.869297]]}},{"id":"Q2VwA8GG+oq9D2XQXEiW4Xi7tLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp) and East of Exit 37 - CR 513/Hibernia Ave (Denville Twp), Wednesday June 10, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T13:42:03Z"},"road_event_id":"Q2VwA8GG+oq9D2XQXEiW4Xi7tLs=","beginning_cross_street":"West of Exit 42 - US 202/Littleton Rd","ending_cross_street":"East of Exit 37 - CR 513/Hibernia Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.459274,40.869297]]}},{"id":"faz/xad93ZSbL/tpT5owFyMSoMw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3hntsXvYcmIfHvDAr3waB8qVm6g="}],"description":"Paving operations on NY 5 both directions between Windfall Road (Schuyler) and Elmwood Road (Schuyler) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:30 PM,","update_date":"2026-06-05T13:46:26Z"},"road_event_id":"faz/xad93ZSbL/tpT5owFyMSoMw=","beginning_cross_street":"Windfall Road","ending_cross_street":"Elmwood Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.124105,43.086464]]}},{"id":"3hntsXvYcmIfHvDAr3waB8qVm6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"faz/xad93ZSbL/tpT5owFyMSoMw="},{"type":"next-occurrence","id":"4wIGQ3KihuphxdY2Fc/UOjRJTFs="}],"description":"Paving operations on NY 5 both directions between Windfall Road (Schuyler) and Elmwood Road (Schuyler) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:30 PM,","update_date":"2026-06-05T13:46:26Z"},"road_event_id":"3hntsXvYcmIfHvDAr3waB8qVm6g=","beginning_cross_street":"Windfall Road","ending_cross_street":"Elmwood Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:30:00Z","end_date":"2026-06-09T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.124105,43.086464]]}},{"id":"4wIGQ3KihuphxdY2Fc/UOjRJTFs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"faz/xad93ZSbL/tpT5owFyMSoMw="},{"type":"next-occurrence","id":"+vvA3CSRh5GIxKUy7e4sOhSqnkc="}],"description":"Paving operations on NY 5 both directions between Windfall Road (Schuyler) and Elmwood Road (Schuyler) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:30 PM,","update_date":"2026-06-05T13:46:26Z"},"road_event_id":"4wIGQ3KihuphxdY2Fc/UOjRJTFs=","beginning_cross_street":"Windfall Road","ending_cross_street":"Elmwood Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:30:00Z","end_date":"2026-06-10T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.124105,43.086464]]}},{"id":"+vvA3CSRh5GIxKUy7e4sOhSqnkc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"faz/xad93ZSbL/tpT5owFyMSoMw="},{"type":"next-occurrence","id":"4ea3h83Joq/wgk/Cs4DAbMO2v7g="}],"description":"Paving operations on NY 5 both directions between Windfall Road (Schuyler) and Elmwood Road (Schuyler) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:30 PM,","update_date":"2026-06-05T13:46:26Z"},"road_event_id":"+vvA3CSRh5GIxKUy7e4sOhSqnkc=","beginning_cross_street":"Windfall Road","ending_cross_street":"Elmwood Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:30:00Z","end_date":"2026-06-11T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.124105,43.086464]]}},{"id":"4ea3h83Joq/wgk/Cs4DAbMO2v7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"faz/xad93ZSbL/tpT5owFyMSoMw="}],"description":"Paving operations on NY 5 both directions between Windfall Road (Schuyler) and Elmwood Road (Schuyler) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 06:30 AM thru 05:30 PM,","update_date":"2026-06-05T13:46:26Z"},"road_event_id":"4ea3h83Joq/wgk/Cs4DAbMO2v7g=","beginning_cross_street":"Windfall Road","ending_cross_street":"Elmwood Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:30:00Z","end_date":"2026-06-12T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.124105,43.086464]]}},{"id":"uGeLQ7IOl/PodsgiLpGMxYSKhO8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9R"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"el7h4ZqCOEqmOTGGFqCZmdIZBIs="}],"description":"Repaving on NY 9R both directions Columbia Street; NY 470; Street Agnes Highway (Colonie) Alternating Lanes, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-05T13:45:51Z"},"road_event_id":"uGeLQ7IOl/PodsgiLpGMxYSKhO8=","beginning_cross_street":"Columbia Street; NY 470; Street Agnes Highway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.728877,42.771776]]}},{"id":"el7h4ZqCOEqmOTGGFqCZmdIZBIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9R"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uGeLQ7IOl/PodsgiLpGMxYSKhO8="},{"type":"next-occurrence","id":"RSnWOOqQvMSVPEnHPapyRPwRqpU="}],"description":"Repaving on NY 9R both directions Columbia Street; NY 470; Street Agnes Highway (Colonie) Alternating Lanes, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-05T13:45:51Z"},"road_event_id":"el7h4ZqCOEqmOTGGFqCZmdIZBIs=","beginning_cross_street":"Columbia Street; NY 470; Street Agnes Highway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.728877,42.771776]]}},{"id":"RSnWOOqQvMSVPEnHPapyRPwRqpU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9R"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uGeLQ7IOl/PodsgiLpGMxYSKhO8="},{"type":"next-occurrence","id":"0JYUQqEBgOde7Hk+ewcbJE31c9I="}],"description":"Repaving on NY 9R both directions Columbia Street; NY 470; Street Agnes Highway (Colonie) Alternating Lanes, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-05T13:45:51Z"},"road_event_id":"RSnWOOqQvMSVPEnHPapyRPwRqpU=","beginning_cross_street":"Columbia Street; NY 470; Street Agnes Highway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.728877,42.771776]]}},{"id":"0JYUQqEBgOde7Hk+ewcbJE31c9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9R"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uGeLQ7IOl/PodsgiLpGMxYSKhO8="},{"type":"next-occurrence","id":"TXBBH8KA6V3gCGRCJub5VqMPNt8="}],"description":"Repaving on NY 9R both directions Columbia Street; NY 470; Street Agnes Highway (Colonie) Alternating Lanes, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-05T13:45:51Z"},"road_event_id":"0JYUQqEBgOde7Hk+ewcbJE31c9I=","beginning_cross_street":"Columbia Street; NY 470; Street Agnes Highway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.728877,42.771776]]}},{"id":"TXBBH8KA6V3gCGRCJub5VqMPNt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9R"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uGeLQ7IOl/PodsgiLpGMxYSKhO8="}],"description":"Repaving on NY 9R both directions Columbia Street; NY 470; Street Agnes Highway (Colonie) Alternating Lanes, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-05T13:45:51Z"},"road_event_id":"TXBBH8KA6V3gCGRCJub5VqMPNt8=","beginning_cross_street":"Columbia Street; NY 470; Street Agnes Highway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.728877,42.771776]]}},{"id":"8cXmpDCQOYzy0uLbKiR5C5An7lU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 54A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sZxlLSm4a9aFHFHQfwchTQqLCiI="}],"description":"Installation of fiber optics on NY 54A both directions PARKER HILL RD (Pulteney) to MOUNTAIN RISE DR (Pulteney) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday, 07:00 AM thru 04:30 PM All lanes open","update_date":"2026-06-05T13:46:41Z"},"road_event_id":"8cXmpDCQOYzy0uLbKiR5C5An7lU=","beginning_cross_street":"PARKER HILL RD","ending_cross_street":"MOUNTAIN RISE DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.153902,42.538336]]}},{"id":"sZxlLSm4a9aFHFHQfwchTQqLCiI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 54A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8cXmpDCQOYzy0uLbKiR5C5An7lU="}],"description":"Installation of fiber optics on NY 54A both directions PARKER HILL RD (Pulteney) to MOUNTAIN RISE DR (Pulteney) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday, 07:00 AM thru 04:30 PM All lanes open","update_date":"2026-06-05T13:46:41Z"},"road_event_id":"sZxlLSm4a9aFHFHQfwchTQqLCiI=","beginning_cross_street":"PARKER HILL RD","ending_cross_street":"MOUNTAIN RISE DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.153902,42.538336]]}},{"id":"JjxdGESiCppgtS+74JqZxeXLAbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 54A"],"direction":"unknown","related_road_events":[],"description":"Installation of fiber optics on NY 54A both directions Gibson Landing (Pulteney) 1 Lane, 2 Way, Flagger Control, Tuesday June 9th, 2026, 07:00 AM thru 04:30 PM All lanes open","update_date":"2026-06-05T13:50:18Z"},"road_event_id":"JjxdGESiCppgtS+74JqZxeXLAbU=","beginning_cross_street":"Gibson Landing","ending_cross_street":"Gibson Landing","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.159541,42.496301]]}},{"id":"SXDOC7BZEesZnN6HXDH7J91uYow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Y+Rpz/kUAxSx1I3Y9849s5y2Bl8="}],"description":"Utility work on NY 5 both directions between NY 5B (New Hartford) and Route 5B Junction Kirkland (Kirkland) Motorists will encounter rolling lane closures with flaggers, Monday June 8th, 2026 thru Thursday June 11th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 06:00 AM thru 11:30 AM,","update_date":"2026-06-05T13:54:55Z"},"road_event_id":"SXDOC7BZEesZnN6HXDH7J91uYow=","beginning_cross_street":"NY 5B","ending_cross_street":"Route 5B Junction Kirkland","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T15:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.353793,43.083779]]}},{"id":"Y+Rpz/kUAxSx1I3Y9849s5y2Bl8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SXDOC7BZEesZnN6HXDH7J91uYow="},{"type":"next-occurrence","id":"YzrXVtu4Xb1P0HmYPVGSpOjbuNg="}],"description":"Utility work on NY 5 both directions between NY 5B (New Hartford) and Route 5B Junction Kirkland (Kirkland) Motorists will encounter rolling lane closures with flaggers, Monday June 8th, 2026 thru Thursday June 11th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 06:00 AM thru 11:30 AM,","update_date":"2026-06-05T13:54:55Z"},"road_event_id":"Y+Rpz/kUAxSx1I3Y9849s5y2Bl8=","beginning_cross_street":"NY 5B","ending_cross_street":"Route 5B Junction Kirkland","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T15:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.353793,43.083779]]}},{"id":"YzrXVtu4Xb1P0HmYPVGSpOjbuNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SXDOC7BZEesZnN6HXDH7J91uYow="},{"type":"next-occurrence","id":"AHcX8mae++PpIK4FQKgeC36LI4w="}],"description":"Utility work on NY 5 both directions between NY 5B (New Hartford) and Route 5B Junction Kirkland (Kirkland) Motorists will encounter rolling lane closures with flaggers, Monday June 8th, 2026 thru Thursday June 11th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 06:00 AM thru 11:30 AM,","update_date":"2026-06-05T13:54:55Z"},"road_event_id":"YzrXVtu4Xb1P0HmYPVGSpOjbuNg=","beginning_cross_street":"NY 5B","ending_cross_street":"Route 5B Junction Kirkland","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T15:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.353793,43.083779]]}},{"id":"AHcX8mae++PpIK4FQKgeC36LI4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SXDOC7BZEesZnN6HXDH7J91uYow="}],"description":"Utility work on NY 5 both directions between NY 5B (New Hartford) and Route 5B Junction Kirkland (Kirkland) Motorists will encounter rolling lane closures with flaggers, Monday June 8th, 2026 thru Thursday June 11th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 06:00 AM thru 11:30 AM,","update_date":"2026-06-05T13:54:55Z"},"road_event_id":"AHcX8mae++PpIK4FQKgeC36LI4w=","beginning_cross_street":"NY 5B","ending_cross_street":"Route 5B Junction Kirkland","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T15:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.353793,43.083779]]}},{"id":"xOITcaBcJwGD2kp4GYMbJNqF6cM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5KI5me3MU3pX/fUovpulmYUlcIk="}],"description":"Bridge inspection on NY 12 both directions between NY 5S; NY 5A (Utica) and NY 49; NY I790 on ramp (Utica) Motorists will encounter lane closures in both directions, Thursday June 11th, 2026 thru Friday June 12th, 2026 Thursday/ Friday, 12:00 PM thru 03:00 PM,","update_date":"2026-06-05T14:01:57Z"},"road_event_id":"xOITcaBcJwGD2kp4GYMbJNqF6cM=","beginning_cross_street":"NY 5S; NY 5A","ending_cross_street":"NY 49; NY I790 on ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T16:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.238899,43.105998]]}},{"id":"5KI5me3MU3pX/fUovpulmYUlcIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xOITcaBcJwGD2kp4GYMbJNqF6cM="}],"description":"Bridge inspection on NY 12 both directions between NY 5S; NY 5A (Utica) and NY 49; NY I790 on ramp (Utica) Motorists will encounter lane closures in both directions, Thursday June 11th, 2026 thru Friday June 12th, 2026 Thursday/ Friday, 12:00 PM thru 03:00 PM,","update_date":"2026-06-05T14:01:57Z"},"road_event_id":"5KI5me3MU3pX/fUovpulmYUlcIk=","beginning_cross_street":"NY 5S; NY 5A","ending_cross_street":"NY 49; NY I790 on ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T16:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.238899,43.105998]]}},{"id":"UB3C3Ce/vMMVx300uLpMHerBSG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Y7gb8qxV4lo+h+Mw64//S9UTWTY="}],"description":"Construction on NY 80 both directions between Honey Hill Road (Fort Plain) and NY 5S; Willet Street (Fort Plain) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Saturday June 13th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 06:00 PM,","update_date":"2026-06-05T14:09:30Z"},"road_event_id":"UB3C3Ce/vMMVx300uLpMHerBSG8=","beginning_cross_street":"Honey Hill Road","ending_cross_street":"NY 5S; Willet Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.630419,42.929878]]}},{"id":"Y7gb8qxV4lo+h+Mw64//S9UTWTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UB3C3Ce/vMMVx300uLpMHerBSG8="},{"type":"next-occurrence","id":"z+BfRmPG0tOTb8y69mCJFP8Hfy8="}],"description":"Construction on NY 80 both directions between Honey Hill Road (Fort Plain) and NY 5S; Willet Street (Fort Plain) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Saturday June 13th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 06:00 PM,","update_date":"2026-06-05T14:09:30Z"},"road_event_id":"Y7gb8qxV4lo+h+Mw64//S9UTWTY=","beginning_cross_street":"Honey Hill Road","ending_cross_street":"NY 5S; Willet Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.630419,42.929878]]}},{"id":"z+BfRmPG0tOTb8y69mCJFP8Hfy8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UB3C3Ce/vMMVx300uLpMHerBSG8="},{"type":"next-occurrence","id":"nGOrESUH37zg8swy5gG/5hUVsF8="}],"description":"Construction on NY 80 both directions between Honey Hill Road (Fort Plain) and NY 5S; Willet Street (Fort Plain) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Saturday June 13th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 06:00 PM,","update_date":"2026-06-05T14:09:30Z"},"road_event_id":"z+BfRmPG0tOTb8y69mCJFP8Hfy8=","beginning_cross_street":"Honey Hill Road","ending_cross_street":"NY 5S; Willet Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.630419,42.929878]]}},{"id":"nGOrESUH37zg8swy5gG/5hUVsF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UB3C3Ce/vMMVx300uLpMHerBSG8="},{"type":"next-occurrence","id":"BvTZ7R3TedcAwgB0YSIlU9DGi5s="}],"description":"Construction on NY 80 both directions between Honey Hill Road (Fort Plain) and NY 5S; Willet Street (Fort Plain) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Saturday June 13th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 06:00 PM,","update_date":"2026-06-05T14:09:30Z"},"road_event_id":"nGOrESUH37zg8swy5gG/5hUVsF8=","beginning_cross_street":"Honey Hill Road","ending_cross_street":"NY 5S; Willet Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.630419,42.929878]]}},{"id":"BvTZ7R3TedcAwgB0YSIlU9DGi5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UB3C3Ce/vMMVx300uLpMHerBSG8="},{"type":"next-occurrence","id":"zO/O8iyRl486eBVLQCaPvChSQO0="}],"description":"Construction on NY 80 both directions between Honey Hill Road (Fort Plain) and NY 5S; Willet Street (Fort Plain) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Saturday June 13th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 06:00 PM,","update_date":"2026-06-05T14:09:30Z"},"road_event_id":"BvTZ7R3TedcAwgB0YSIlU9DGi5s=","beginning_cross_street":"Honey Hill Road","ending_cross_street":"NY 5S; Willet Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.630419,42.929878]]}},{"id":"zO/O8iyRl486eBVLQCaPvChSQO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UB3C3Ce/vMMVx300uLpMHerBSG8="}],"description":"Construction on NY 80 both directions between Honey Hill Road (Fort Plain) and NY 5S; Willet Street (Fort Plain) Motorists will encounter lane closures in both directions with flaggers in place, Monday June 8th, 2026 thru Saturday June 13th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 06:00 PM,","update_date":"2026-06-05T14:09:30Z"},"road_event_id":"zO/O8iyRl486eBVLQCaPvChSQO0=","beginning_cross_street":"Honey Hill Road","ending_cross_street":"NY 5S; Willet Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T10:00:00Z","end_date":"2026-06-13T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.630419,42.929878]]}},{"id":"89TE2Vv0xCuGNgyoIk+xkEAmgNI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"H/D/XSPw3QDru9tjoF14fenE/FE="}],"description":"Drainage improvements on NY 14A both directions Highland Drive (Starkey) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-06-05T14:15:34Z"},"road_event_id":"89TE2Vv0xCuGNgyoIk+xkEAmgNI=","beginning_cross_street":"Highland Drive","ending_cross_street":"Highland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.974591,42.516863]]}},{"id":"H/D/XSPw3QDru9tjoF14fenE/FE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"89TE2Vv0xCuGNgyoIk+xkEAmgNI="},{"type":"next-occurrence","id":"V1MJjxYXawAgrPRZ3WXcBwIeZeM="}],"description":"Drainage improvements on NY 14A both directions Highland Drive (Starkey) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-06-05T14:15:34Z"},"road_event_id":"H/D/XSPw3QDru9tjoF14fenE/FE=","beginning_cross_street":"Highland Drive","ending_cross_street":"Highland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.974591,42.516863]]}},{"id":"V1MJjxYXawAgrPRZ3WXcBwIeZeM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"89TE2Vv0xCuGNgyoIk+xkEAmgNI="},{"type":"next-occurrence","id":"OK6d+Nqz7XefXlA/WRV60+DxXjU="}],"description":"Drainage improvements on NY 14A both directions Highland Drive (Starkey) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-06-05T14:15:34Z"},"road_event_id":"V1MJjxYXawAgrPRZ3WXcBwIeZeM=","beginning_cross_street":"Highland Drive","ending_cross_street":"Highland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.974591,42.516863]]}},{"id":"OK6d+Nqz7XefXlA/WRV60+DxXjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"89TE2Vv0xCuGNgyoIk+xkEAmgNI="},{"type":"next-occurrence","id":"QH7HKNScqaqqYCwoFTlIhYirhWY="}],"description":"Drainage improvements on NY 14A both directions Highland Drive (Starkey) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-06-05T14:15:34Z"},"road_event_id":"OK6d+Nqz7XefXlA/WRV60+DxXjU=","beginning_cross_street":"Highland Drive","ending_cross_street":"Highland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.974591,42.516863]]}},{"id":"QH7HKNScqaqqYCwoFTlIhYirhWY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"89TE2Vv0xCuGNgyoIk+xkEAmgNI="}],"description":"Drainage improvements on NY 14A both directions Highland Drive (Starkey) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-06-05T14:15:34Z"},"road_event_id":"QH7HKNScqaqqYCwoFTlIhYirhWY=","beginning_cross_street":"Highland Drive","ending_cross_street":"Highland Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.974591,42.516863]]}},{"id":"e9H8UsVcLUOlOXWrkDJRh9c+qp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near West of Exit 58 - Madison Ave (Paterson), Tuesday June 9, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T14:17:52Z"},"road_event_id":"e9H8UsVcLUOlOXWrkDJRh9c+qp0=","beginning_cross_street":"West of Exit 58 - Madison Ave","ending_cross_street":"Exit 58 - Madison Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.162811,40.906356]]}},{"id":"SUGWNcCni68OkloGt0vBHT9tbCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near West of Exit 58 - Madison Ave (Paterson), Wednesday June 10, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T14:17:50Z"},"road_event_id":"SUGWNcCni68OkloGt0vBHT9tbCo=","beginning_cross_street":"West of Exit 58 - Madison Ave","ending_cross_street":"Exit 58 - Madison Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.162811,40.906356]]}},{"id":"qI+8xuKA25pd2TjBwbPuCZsVKOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near Morgan Drawbridge (Sayreville), Friday June 12, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-06-05T14:17:53Z"},"road_event_id":"qI+8xuKA25pd2TjBwbPuCZsVKOo=","beginning_cross_street":"Morgan Drawbridge","ending_cross_street":"Ernston Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.260292,40.463428]]}},{"id":"nOcfGEpkC0yEZo1xbKZVNHV8z7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near West of Exit 58 - Madison Ave (Paterson), Thursday June 11, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T14:17:49Z"},"road_event_id":"nOcfGEpkC0yEZo1xbKZVNHV8z7U=","beginning_cross_street":"West of Exit 58 - Madison Ave","ending_cross_street":"Exit 58 - Madison Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.162811,40.906356]]}},{"id":"y9fmXgt2AGuM+y/MvPaqKfQh19g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near South of Exit 57 - Skyline Drive (Wanaque), Monday June 8, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-06-05T14:17:46Z"},"road_event_id":"y9fmXgt2AGuM+y/MvPaqKfQh19g=","beginning_cross_street":"South of Exit 57 - Skyline Drive","ending_cross_street":"South of Exit 57 - Skyline Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.270713,41.02367]]}},{"id":"MaqsODET8pjq3wmJQVZNL+z4Gug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near West of Exit 58 - Madison Ave (Paterson), Friday June 12, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T14:17:48Z"},"road_event_id":"MaqsODET8pjq3wmJQVZNL+z4Gug=","beginning_cross_street":"West of Exit 58 - Madison Ave","ending_cross_street":"Exit 58 - Madison Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.162811,40.906356]]}},{"id":"UADeFyJVuy9hMIeyJoTq3l7MnnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 252"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 252 both directions east of Brighton Henrietta Town Line Road; CR 85 (Henrietta) Alternating lane/shoulder closures with flaggers as needed, Monday June 8th, 2026, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T14:19:24Z"},"road_event_id":"UADeFyJVuy9hMIeyJoTq3l7MnnY=","beginning_cross_street":"Brighton Henrietta Town Line Road; CR 85","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.646819,43.090915]]}},{"id":"6LWZ0wT2s+uhSr6XYP5GUG0nKEM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Southbound between South of NJ 94 (Hamburg) and North of Holland Mountain Rd (Hardyston Twp), Thursday June 11, 2026 07:00 PM thru Friday June 12, 2026 05:00 AM, right shoulder closed, moving operation","update_date":"2026-06-05T14:21:06Z"},"road_event_id":"6LWZ0wT2s+uhSr6XYP5GUG0nKEM=","beginning_cross_street":"South of NJ 94","ending_cross_street":"North of Holland Mountain Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T23:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.574012,41.148109]]}},{"id":"Fi12HAjn9HgWCDasBzHVAjyiTGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound at Exit 35 - Mount Hope Av (Rockaway Twp) Monday June 8, 2026 09:00 AM thru 03:00 PM, ramp","update_date":"2026-06-05T14:21:07Z"},"road_event_id":"Fi12HAjn9HgWCDasBzHVAjyiTGY=","beginning_cross_street":"Exit 35 - Mount Hope Av","ending_cross_street":"Exit 35 - Mount Hope Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.549758,40.910537]]}},{"id":"lYdbZ5YSbsKm/7kMIJq/30Ymj2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound near North of I-287 (Riverdale), Wednesday June 10, 2026 08:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T14:21:08Z"},"road_event_id":"lYdbZ5YSbsKm/7kMIJq/30Ymj2o=","beginning_cross_street":"North of I-287","ending_cross_street":"South of Cotluss Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.318855,40.991348]]}},{"id":"ltq07CcJROKqqEvbAItJ6ERiT8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound near West of Hackensack Av (Hackensack), Wednesday June 10, 2026 10:00 PM thru Thursday June 11, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T14:21:09Z"},"road_event_id":"ltq07CcJROKqqEvbAItJ6ERiT8Q=","beginning_cross_street":"West of Hackensack Av","ending_cross_street":"River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033966,40.906692]]}},{"id":"zkuiVZy4eOvoZn45LJdrv5dqT6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Southbound near North of Maple Lake Rd (Kinnelon), Wednesday June 10, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T14:20:46Z"},"road_event_id":"zkuiVZy4eOvoZn45LJdrv5dqT6A=","beginning_cross_street":"North of Maple Lake Rd","ending_cross_street":"South of Maple Lake Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.367607,41.010635]]}},{"id":"F/l3MShCsjHK48a9pfn52WOG8AA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Southbound near North of Maple Lake Rd (Kinnelon), Thursday June 11, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T14:20:47Z"},"road_event_id":"F/l3MShCsjHK48a9pfn52WOG8AA=","beginning_cross_street":"North of Maple Lake Rd","ending_cross_street":"South of Maple Lake Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.367607,41.010635]]}},{"id":"RW4pz9NwR07hg/f4d8Wwg2JdFj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Friday June 12, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-06-05T14:20:49Z"},"road_event_id":"RW4pz9NwR07hg/f4d8Wwg2JdFj8=","beginning_cross_street":"In the vicinity of Garden State Parkway","ending_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078071,40.922229]]}},{"id":"ZNbVqJTP3h/tTIFoYH765yNqQDI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound between Meadowlands Parkway (Secaucus) and East of Berrys Creek Bridge (East Rutherford), Friday June 5, 2026 09:00 PM thru Saturday June 6, 2026 03:00 AM, right lane closed","update_date":"2026-06-05T14:20:50Z"},"road_event_id":"ZNbVqJTP3h/tTIFoYH765yNqQDI=","beginning_cross_street":"Meadowlands Parkway","ending_cross_street":"East of Berrys Creek Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.066108,40.798763]]}},{"id":"SOb/7kHPq6eBZYevPs2HXjfdCC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between West of Hackensack Av (Hackensack) and River Rd (Teaneck Twp), Thursday June 11, 2026 11:00 PM thru Friday June 12, 2026 05:00 AM, at least one lane closed","update_date":"2026-06-05T14:20:51Z"},"road_event_id":"SOb/7kHPq6eBZYevPs2HXjfdCC8=","beginning_cross_street":"West of Hackensack Av","ending_cross_street":"River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T03:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033966,40.906692]]}},{"id":"VqafcJ8f11mhGIz5bbC53nDo1JQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound near North of I-287 (Riverdale), Monday June 8, 2026 08:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T14:20:52Z"},"road_event_id":"VqafcJ8f11mhGIz5bbC53nDo1JQ=","beginning_cross_street":"North of I-287","ending_cross_street":"South of Cotluss Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.318855,40.991348]]}},{"id":"P6Ct9XjhLbXtF8Im+WUmkEYyCmo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near South of Morgan Drawbridge (Old Bridge Twp), Friday June 12, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-06-05T14:20:57Z"},"road_event_id":"P6Ct9XjhLbXtF8Im+WUmkEYyCmo=","beginning_cross_street":"South of Morgan Drawbridge","ending_cross_street":"Morgan Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.25373,40.460311]]}},{"id":"7NfkdfXeYO+H6enqGT4ClGH7z9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Southbound near North of Maple Lake Rd (Kinnelon), Friday June 12, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T14:21:00Z"},"road_event_id":"7NfkdfXeYO+H6enqGT4ClGH7z9k=","beginning_cross_street":"North of Maple Lake Rd","ending_cross_street":"South of Maple Lake Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.367607,41.010635]]}},{"id":"azdujv2xGrGYfJgU9iIjPGiWX8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Southbound near US 46 (White Twp), Friday June 12, 2026 09:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-06-05T14:20:58Z"},"road_event_id":"azdujv2xGrGYfJgU9iIjPGiWX8o=","beginning_cross_street":"US 46","ending_cross_street":"South of US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.000984,40.832092]]}},{"id":"//m4D2avIvmunAmmRfOn1Jvsy2s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound near North of I-287 (Riverdale), Thursday June 11, 2026 08:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T14:21:01Z"},"road_event_id":"//m4D2avIvmunAmmRfOn1Jvsy2s=","beginning_cross_street":"North of I-287","ending_cross_street":"South of Cotluss Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.318855,40.991348]]}},{"id":"X16v2Ur2m8fqQ8OW3meXnYCvCV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Southbound near North of Maple Lake Rd (Kinnelon), Tuesday June 9, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T14:20:54Z"},"road_event_id":"X16v2Ur2m8fqQ8OW3meXnYCvCV0=","beginning_cross_street":"North of Maple Lake Rd","ending_cross_street":"South of Maple Lake Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.367607,41.010635]]}},{"id":"59+1Rg1V5grhjYzE6ThitTIAb8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Southbound near North of Maple Lake Rd (Kinnelon), Monday June 8, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T14:20:55Z"},"road_event_id":"59+1Rg1V5grhjYzE6ThitTIAb8Y=","beginning_cross_street":"North of Maple Lake Rd","ending_cross_street":"South of Maple Lake Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.367607,41.010635]]}},{"id":"J6Vba+aweoY1pw8oeBfL+Y+vKG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound near West of Hackensack Av (Hackensack), Thursday June 11, 2026 11:00 PM thru Friday June 12, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM)","update_date":"2026-06-05T14:20:56Z"},"road_event_id":"J6Vba+aweoY1pw8oeBfL+Y+vKG8=","beginning_cross_street":"West of Hackensack Av","ending_cross_street":"River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T03:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033966,40.906692]]}},{"id":"krwpGgRgHAiZtCd5Ba4LogGm/EU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between South of Morgan Drawbridge (Old Bridge Twp) and North of Birchwood Dr (Old Bridge Twp), Friday June 12, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-06-05T14:21:02Z"},"road_event_id":"krwpGgRgHAiZtCd5Ba4LogGm/EU=","beginning_cross_street":"South of Morgan Drawbridge","ending_cross_street":"North of Birchwood Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.25373,40.460311]]}},{"id":"VYWG2d27+WPiIjvaEV+G456fFRw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound near North of I-287 (Riverdale), Friday June 12, 2026 08:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T14:21:03Z"},"road_event_id":"VYWG2d27+WPiIjvaEV+G456fFRw=","beginning_cross_street":"North of I-287","ending_cross_street":"South of Cotluss Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.318855,40.991348]]}},{"id":"EUG+FFmHYwWFadhzYFPrw/AJkok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound near North of I-287 (Riverdale), Tuesday June 9, 2026 08:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T14:21:05Z"},"road_event_id":"EUG+FFmHYwWFadhzYFPrw/AJkok=","beginning_cross_street":"North of I-287","ending_cross_street":"South of Cotluss Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.318855,40.991348]]}},{"id":"OWc9WHxgbNah6hymmubWMDVOy6M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Southbound near North of Charlotte Circle (Jersey City), Monday June 8, 2026 09:00 PM thru Tuesday June 9, 2026 05:00 AM, right lane closed","update_date":"2026-06-05T14:24:08Z"},"road_event_id":"OWc9WHxgbNah6hymmubWMDVOy6M=","beginning_cross_street":"North of Charlotte Circle","ending_cross_street":"North of Charlotte Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078453,40.739608]]}},{"id":"DwgF5lZAvs/nFPXu3As3VYX3hJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Pulaski Skyway"],"direction":"unknown","related_road_events":[],"description":"Roadwork on Pulaski Skyway at South Kearny (South Kearny) Wednesday June 10, 2026 09:00 AM thru 03:00 PM, ramp","update_date":"2026-06-05T14:24:09Z"},"road_event_id":"DwgF5lZAvs/nFPXu3As3VYX3hJY=","beginning_cross_street":"South Kearny","ending_cross_street":"South Kearny","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.104087,40.734439]]}},{"id":"Rmj+RMXdSt5y/HECOiVXQByFt9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound between East of West End Av (North Plainfield) and West of Gray St (North Plainfield), Friday June 12, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T14:24:11Z"},"road_event_id":"Rmj+RMXdSt5y/HECOiVXQByFt9I=","beginning_cross_street":"East of West End Av","ending_cross_street":"West of Gray St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.448837,40.620475]]}},{"id":"vvsVeJmkKNT1UdNkSHPBuD6NJbc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Thursday June 11, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T14:24:12Z"},"road_event_id":"vvsVeJmkKNT1UdNkSHPBuD6NJbc=","beginning_cross_street":"South of CR 614/Dey Rd","ending_cross_street":"North of NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.506538,40.327266]]}},{"id":"OrbxxOjST/tZzFJwj/tP/5jsUVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Friday June 12, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T14:23:47Z"},"road_event_id":"OrbxxOjST/tZzFJwj/tP/5jsUVs=","beginning_cross_street":"South of CR 614/Dey Rd","ending_cross_street":"North of NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.506538,40.327266]]}},{"id":"EJcZp3OBUh57g4sYdGFI11kjKh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Pulaski Skyway"],"direction":"unknown","related_road_events":[],"description":"Roadwork on Pulaski Skyway at South Kearny (South Kearny) Monday June 8, 2026 09:00 AM thru 03:00 PM, ramp","update_date":"2026-06-05T14:23:48Z"},"road_event_id":"EJcZp3OBUh57g4sYdGFI11kjKh4=","beginning_cross_street":"South Kearny","ending_cross_street":"South Kearny","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.104087,40.734439]]}},{"id":"Ik022YJ+6O8XhQgk6wMc0+vwWL0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Friday June 12, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T14:23:49Z"},"road_event_id":"Ik022YJ+6O8XhQgk6wMc0+vwWL0=","beginning_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","ending_cross_street":"In the vicinity of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975257,40.862434]]}},{"id":"PtURc9PSdA/YFCOv2PjjHENJq2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Wednesday June 10, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T14:23:51Z"},"road_event_id":"PtURc9PSdA/YFCOv2PjjHENJq2E=","beginning_cross_street":"South of CR 614/Dey Rd","ending_cross_street":"North of NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.506538,40.327266]]}},{"id":"61EndqowIQmeaeDYw+qlYR77XR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Pulaski Skyway"],"direction":"unknown","related_road_events":[],"description":"Roadwork on Pulaski Skyway between South Kearny (South Kearny) and South of Carlton Av (Jersey City), Tuesday June 9, 2026 09:30 AM thru 02:00 PM, right lane closed","update_date":"2026-06-05T14:23:52Z"},"road_event_id":"61EndqowIQmeaeDYw+qlYR77XR4=","beginning_cross_street":"South Kearny","ending_cross_street":"South of Carlton Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.104087,40.734439]]}},{"id":"Vztb/FMkNtqYrzyHGlAvvQZ72lg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Pulaski Skyway"],"direction":"unknown","related_road_events":[],"description":"Roadwork on Pulaski Skyway between South Kearny (South Kearny) and South of Carlton Av (Jersey City), Thursday June 11, 2026 09:30 AM thru 02:00 PM, right lane closed","update_date":"2026-06-05T14:23:54Z"},"road_event_id":"Vztb/FMkNtqYrzyHGlAvvQZ72lg=","beginning_cross_street":"South Kearny","ending_cross_street":"South of Carlton Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.104087,40.734439]]}},{"id":"3WrCSOTfMZ0NuyZL/kTRxlha4ks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Pulaski Skyway"],"direction":"unknown","related_road_events":[],"description":"Roadwork on Pulaski Skyway at South Kearny (South Kearny) Friday June 12, 2026 09:00 AM thru 03:00 PM, ramp","update_date":"2026-06-05T14:23:55Z"},"road_event_id":"3WrCSOTfMZ0NuyZL/kTRxlha4ks=","beginning_cross_street":"South Kearny","ending_cross_street":"South Kearny","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.104087,40.734439]]}},{"id":"50l7Qw1RDR56iq2AyEpbQePj6oU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Pulaski Skyway"],"direction":"unknown","related_road_events":[],"description":"Roadwork on Pulaski Skyway at South Kearny (South Kearny) Tuesday June 9, 2026 09:00 AM thru 03:00 PM, ramp","update_date":"2026-06-05T14:24:02Z"},"road_event_id":"50l7Qw1RDR56iq2AyEpbQePj6oU=","beginning_cross_street":"South Kearny","ending_cross_street":"South Kearny","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.104087,40.734439]]}},{"id":"FQiKoCEpa4vNfr570iOL9eS+xq0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Tuesday June 9, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T14:24:03Z"},"road_event_id":"FQiKoCEpa4vNfr570iOL9eS+xq0=","beginning_cross_street":"South of CR 614/Dey Rd","ending_cross_street":"North of NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.506538,40.327266]]}},{"id":"xu80M94Rp2k9guAveoNDUsmK0UA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Southbound near Belleville Drawbridge (Kearny), Wednesday June 10, 2026 09:00 PM thru Thursday June 11, 2026 05:00 AM, right lane closed","update_date":"2026-06-05T14:24:04Z"},"road_event_id":"xu80M94Rp2k9guAveoNDUsmK0UA=","beginning_cross_street":"Belleville Drawbridge","ending_cross_street":"CR 699/CR 507","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.146568,40.786052]]}},{"id":"UjoRAwZB9m3vxOIcw8KUaEKpTw4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near CR 518/Washington St (Montgomery Twp), Monday June 8, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T14:24:06Z"},"road_event_id":"UjoRAwZB9m3vxOIcw8KUaEKpTw4=","beginning_cross_street":"CR 518/Washington St","ending_cross_street":"South of CR 518/Washington St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.649543,40.403152]]}},{"id":"qkw4su8YZVVBOcxNIu8VWBinGUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Monday June 8, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T14:23:57Z"},"road_event_id":"qkw4su8YZVVBOcxNIu8VWBinGUI=","beginning_cross_street":"South of CR 614/Dey Rd","ending_cross_street":"North of NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.506538,40.327266]]}},{"id":"Q3kaCfJ0DuHQA0Pd70uDN4Xl07U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Pulaski Skyway"],"direction":"unknown","related_road_events":[],"description":"Roadwork on Pulaski Skyway at South Kearny (South Kearny) Thursday June 11, 2026 09:00 AM thru 03:00 PM, ramp","update_date":"2026-06-05T14:23:58Z"},"road_event_id":"Q3kaCfJ0DuHQA0Pd70uDN4Xl07U=","beginning_cross_street":"South Kearny","ending_cross_street":"South Kearny","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.104087,40.734439]]}},{"id":"lJAJ3xCMUn8Bi4vxv3NWp+ZbKxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Southbound near North of Charlotte Circle (Jersey City), Tuesday June 9, 2026 09:00 PM thru Wednesday June 10, 2026 05:00 AM, right lane closed","update_date":"2026-06-05T14:23:59Z"},"road_event_id":"lJAJ3xCMUn8Bi4vxv3NWp+ZbKxQ=","beginning_cross_street":"North of Charlotte Circle","ending_cross_street":"North of Charlotte Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078453,40.739608]]}},{"id":"ariMS07k3rIZmYPlcEcjb49iyFc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Southbound near Belleville Drawbridge (Kearny), Thursday June 11, 2026 09:00 PM thru Friday June 12, 2026 05:00 AM, right lane closed","update_date":"2026-06-05T14:24:00Z"},"road_event_id":"ariMS07k3rIZmYPlcEcjb49iyFc=","beginning_cross_street":"Belleville Drawbridge","ending_cross_street":"CR 699/CR 507","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.146568,40.786052]]}},{"id":"2Bsm+FGBQHdvwiTRVmQhN0diudg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Southbound between South of W 63rd St (Bayonne) and South of Kennedy Boulevard (Bayonne), Friday June 12, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T14:24:07Z"},"road_event_id":"2Bsm+FGBQHdvwiTRVmQhN0diudg=","beginning_cross_street":"South of W 63rd St","ending_cross_street":"South of Kennedy Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.109947,40.693672]]}},{"id":"vEc10iDgusX8LHDflJASofvatE0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near North of South Bridge St (Somerville), Monday June 8, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-06-05T14:26:48Z"},"road_event_id":"vEc10iDgusX8LHDflJASofvatE0=","beginning_cross_street":"North of South Bridge St","ending_cross_street":"South of CR 626/Somerset St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.62088,40.562755]]}},{"id":"z3oVBnkHZ4Mfbi8BfoNV4AJLYb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near North of South Bridge St (Somerville), Thursday June 11, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-06-05T14:26:50Z"},"road_event_id":"z3oVBnkHZ4Mfbi8BfoNV4AJLYb0=","beginning_cross_street":"North of South Bridge St","ending_cross_street":"South of CR 626/Somerset St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.62088,40.562755]]}},{"id":"YfLlCl+CPigwRj+2R/xk7mus788=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between East of I-287 (Parsippany-Troy Hills Twp) and East of CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp), Friday June 12, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T14:26:52Z"},"road_event_id":"YfLlCl+CPigwRj+2R/xk7mus788=","beginning_cross_street":"East of I-287","ending_cross_street":"East of CR 637/Beverwyck Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.40953,40.866123]]}},{"id":"o+SZPwn4JFh8YaCogM4NELMo/Zc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Southbound at Broadway (Jersey City) Wednesday June 10, 2026 10:00 AM thru 02:00 PM, ramp","update_date":"2026-06-05T14:26:53Z"},"road_event_id":"o+SZPwn4JFh8YaCogM4NELMo/Zc=","beginning_cross_street":"Broadway","ending_cross_street":"Broadway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.076042,40.737293]]}},{"id":"iuQ10r2sXvUad6Tut9vaNNGiuTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound near East of CR 61/Main St (Lodi), Thursday June 11, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-06-05T14:26:47Z"},"road_event_id":"iuQ10r2sXvUad6Tut9vaNNGiuTU=","beginning_cross_street":"East of CR 61/Main St","ending_cross_street":"West of Summit Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075271,40.877967]]}},{"id":"q9uS0mf9RSGNUeES3C7ojhK4D/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near North of South Bridge St (Somerville), Friday June 12, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-06-05T14:26:49Z"},"road_event_id":"q9uS0mf9RSGNUeES3C7ojhK4D/Y=","beginning_cross_street":"North of South Bridge St","ending_cross_street":"South of CR 626/Somerset St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.62088,40.562755]]}},{"id":"0DljqVUpaKprtHEI/Awk7f+xCkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound near East of CR 61/Main St (Lodi), Monday June 8, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-06-05T14:26:55Z"},"road_event_id":"0DljqVUpaKprtHEI/Awk7f+xCkM=","beginning_cross_street":"East of CR 61/Main St","ending_cross_street":"West of Summit Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075271,40.877967]]}},{"id":"ijFzNbQ6hne7QtwRn+PZNfEe8f4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between I-80 (Mount Olive Twp) and South of CR 521/Montague River Rd (Montague Twp), Tuesday June 9, 2026 08:00 PM thru Wednesday June 10, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T14:26:56Z"},"road_event_id":"ijFzNbQ6hne7QtwRn+PZNfEe8f4=","beginning_cross_street":"I-80","ending_cross_street":"South of CR 521/Montague River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.722282,40.90417]]}},{"id":"YAZy8YdanWLd6Z1yZLm6QQIrxtM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound near East of CR 61/Main St (Lodi), Friday June 12, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-06-05T14:26:57Z"},"road_event_id":"YAZy8YdanWLd6Z1yZLm6QQIrxtM=","beginning_cross_street":"East of CR 61/Main St","ending_cross_street":"West of Summit Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075271,40.877967]]}},{"id":"kUemQ/db3IEMoWCGjsxvlszxI5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near North of South Bridge St (Somerville), Tuesday June 9, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-06-05T14:27:03Z"},"road_event_id":"kUemQ/db3IEMoWCGjsxvlszxI5Y=","beginning_cross_street":"North of South Bridge St","ending_cross_street":"South of CR 626/Somerset St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.62088,40.562755]]}},{"id":"PFtc+2qUW+XKuFj1WiM0fWB1AMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between I-80 (Mount Olive Twp) and South of CR 521/Montague River Rd (Montague Twp), Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T14:27:04Z"},"road_event_id":"PFtc+2qUW+XKuFj1WiM0fWB1AMQ=","beginning_cross_street":"I-80","ending_cross_street":"South of CR 521/Montague River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.722282,40.90417]]}},{"id":"Co2simGMuvh6yC7HqaxK46/Ozxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between I-80 (Mount Olive Twp) and South of CR 521/Montague River Rd (Montague Twp), Wednesday June 10, 2026 08:00 PM thru Thursday June 11, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T14:27:05Z"},"road_event_id":"Co2simGMuvh6yC7HqaxK46/Ozxk=","beginning_cross_street":"I-80","ending_cross_street":"South of CR 521/Montague River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.722282,40.90417]]}},{"id":"+JPkyHqQ6PJrulXskJfGstMsz4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of Main St (Roxbury Twp), Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 05:00 AM, right lane closed","update_date":"2026-06-05T14:26:58Z"},"road_event_id":"+JPkyHqQ6PJrulXskJfGstMsz4k=","beginning_cross_street":"West of Main St","ending_cross_street":"West of Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.663009,40.88866]]}},{"id":"zNoDQG3rfUU5kYC6YppEK6pSg8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between East of I-287 (Parsippany-Troy Hills Twp) and East of CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp), Friday June 12, 2026 07:00 AM thru 05:30 PM, right shoulder closed","update_date":"2026-06-05T14:26:59Z"},"road_event_id":"zNoDQG3rfUU5kYC6YppEK6pSg8Q=","beginning_cross_street":"East of I-287","ending_cross_street":"East of CR 637/Beverwyck Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.40953,40.866123]]}},{"id":"Oe4gXGCWQsYNIPnneUY5IwdTJIc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near North of South Bridge St (Somerville), Wednesday June 10, 2026 07:00 AM thru 07:00 PM, right shoulder closed","update_date":"2026-06-05T14:27:01Z"},"road_event_id":"Oe4gXGCWQsYNIPnneUY5IwdTJIc=","beginning_cross_street":"North of South Bridge St","ending_cross_street":"South of CR 626/Somerset St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.62088,40.562755]]}},{"id":"1Nreia5YGZxhiu5kWxR90sqCFCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of CR 611/Hope Rd (Liberty Twp), Friday June 12, 2026 09:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-06-05T14:27:02Z"},"road_event_id":"1Nreia5YGZxhiu5kWxR90sqCFCE=","beginning_cross_street":"West of CR 611/Hope Rd","ending_cross_street":"West of CR 611/Hope Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.917762,40.867584]]}},{"id":"y4q/IBg8Gl9y4haJefKe6SoSX14=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"znfskpIAraXnt3U5jRGaZPUz/L4="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy southbound between NY 100 (Yonkers) and Bronx River Parkway (Eastchester) D265367/DAY/B5501520/32772909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, right lane closure","update_date":"2026-06-05T14:32:42Z"},"road_event_id":"y4q/IBg8Gl9y4haJefKe6SoSX14=","beginning_cross_street":"NY 100","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.837528,40.937401]]}},{"id":"znfskpIAraXnt3U5jRGaZPUz/L4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y4q/IBg8Gl9y4haJefKe6SoSX14="},{"type":"next-occurrence","id":"Q4y5g7352L0Cp3hREqfjyVEEDdo="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy southbound between NY 100 (Yonkers) and Bronx River Parkway (Eastchester) D265367/DAY/B5501520/32772909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, right lane closure","update_date":"2026-06-05T14:32:42Z"},"road_event_id":"znfskpIAraXnt3U5jRGaZPUz/L4=","beginning_cross_street":"NY 100","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.837528,40.937401]]}},{"id":"Q4y5g7352L0Cp3hREqfjyVEEDdo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y4q/IBg8Gl9y4haJefKe6SoSX14="},{"type":"next-occurrence","id":"6lvtl3WdFZSyNkJ6S1yQtH4ESxg="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy southbound between NY 100 (Yonkers) and Bronx River Parkway (Eastchester) D265367/DAY/B5501520/32772909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, right lane closure","update_date":"2026-06-05T14:32:42Z"},"road_event_id":"Q4y5g7352L0Cp3hREqfjyVEEDdo=","beginning_cross_street":"NY 100","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.837528,40.937401]]}},{"id":"6lvtl3WdFZSyNkJ6S1yQtH4ESxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y4q/IBg8Gl9y4haJefKe6SoSX14="},{"type":"next-occurrence","id":"E/d56DW1JQJrqeG7yPAY+QETQyM="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy southbound between NY 100 (Yonkers) and Bronx River Parkway (Eastchester) D265367/DAY/B5501520/32772909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, right lane closure","update_date":"2026-06-05T14:32:42Z"},"road_event_id":"6lvtl3WdFZSyNkJ6S1yQtH4ESxg=","beginning_cross_street":"NY 100","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.837528,40.937401]]}},{"id":"E/d56DW1JQJrqeG7yPAY+QETQyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y4q/IBg8Gl9y4haJefKe6SoSX14="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy southbound between NY 100 (Yonkers) and Bronx River Parkway (Eastchester) D265367/DAY/B5501520/32772909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, right lane closure","update_date":"2026-06-05T14:32:42Z"},"road_event_id":"E/d56DW1JQJrqeG7yPAY+QETQyM=","beginning_cross_street":"NY 100","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.837528,40.937401]]}},{"id":"X6QQ21HDp78+yKqWOUCHHIy+Pug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0Fozs/FGjxXgjpYQnMy7Ey2/Glg="}],"description":"Utility work on NY 5 both directions between Smith Rd. (Hopewell) and CR 47 (Hopewell) Alternating lane/shoulder closures with flaggers as needed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T14:35:53Z"},"road_event_id":"X6QQ21HDp78+yKqWOUCHHIy+Pug=","beginning_cross_street":"Smith Rd.","ending_cross_street":"CR 47 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.231991,42.868399]]}},{"id":"0Fozs/FGjxXgjpYQnMy7Ey2/Glg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6QQ21HDp78+yKqWOUCHHIy+Pug="},{"type":"next-occurrence","id":"blv2U6huEZjrlFB4M0eaN70dqVE="}],"description":"Utility work on NY 5 both directions between Smith Rd. (Hopewell) and CR 47 (Hopewell) Alternating lane/shoulder closures with flaggers as needed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T14:35:53Z"},"road_event_id":"0Fozs/FGjxXgjpYQnMy7Ey2/Glg=","beginning_cross_street":"Smith Rd.","ending_cross_street":"CR 47 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.231991,42.868399]]}},{"id":"blv2U6huEZjrlFB4M0eaN70dqVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6QQ21HDp78+yKqWOUCHHIy+Pug="},{"type":"next-occurrence","id":"cUAHh463/VwRqdCeD149oI2C1RI="}],"description":"Utility work on NY 5 both directions between Smith Rd. (Hopewell) and CR 47 (Hopewell) Alternating lane/shoulder closures with flaggers as needed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T14:35:53Z"},"road_event_id":"blv2U6huEZjrlFB4M0eaN70dqVE=","beginning_cross_street":"Smith Rd.","ending_cross_street":"CR 47 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.231991,42.868399]]}},{"id":"cUAHh463/VwRqdCeD149oI2C1RI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6QQ21HDp78+yKqWOUCHHIy+Pug="},{"type":"next-occurrence","id":"RjqtT4TjQQK27sHyGIQZEaB3W5k="}],"description":"Utility work on NY 5 both directions between Smith Rd. (Hopewell) and CR 47 (Hopewell) Alternating lane/shoulder closures with flaggers as needed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T14:35:53Z"},"road_event_id":"cUAHh463/VwRqdCeD149oI2C1RI=","beginning_cross_street":"Smith Rd.","ending_cross_street":"CR 47 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.231991,42.868399]]}},{"id":"RjqtT4TjQQK27sHyGIQZEaB3W5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X6QQ21HDp78+yKqWOUCHHIy+Pug="}],"description":"Utility work on NY 5 both directions between Smith Rd. (Hopewell) and CR 47 (Hopewell) Alternating lane/shoulder closures with flaggers as needed, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T14:35:53Z"},"road_event_id":"RjqtT4TjQQK27sHyGIQZEaB3W5k=","beginning_cross_street":"Smith Rd.","ending_cross_street":"CR 47 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.231991,42.868399]]}},{"id":"vyvu9GVSTD0NQKdwQqx12LGfpa4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"peMz/tePE2i6opFdeSmf3qmKd6U="}],"description":"Safety improvements on NY 32 southbound between Gardnertown Road (Newburgh) and US 9W (Saugerties) 202508113730/32773009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closures","update_date":"2026-06-05T14:38:25Z"},"road_event_id":"vyvu9GVSTD0NQKdwQqx12LGfpa4=","beginning_cross_street":"Gardnertown Road","ending_cross_street":"US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.02798,41.522538]]}},{"id":"peMz/tePE2i6opFdeSmf3qmKd6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vyvu9GVSTD0NQKdwQqx12LGfpa4="},{"type":"next-occurrence","id":"FQORyxA2H9iMQ0ZPV84GZIaAmD4="}],"description":"Safety improvements on NY 32 southbound between Gardnertown Road (Newburgh) and US 9W (Saugerties) 202508113730/32773009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closures","update_date":"2026-06-05T14:38:25Z"},"road_event_id":"peMz/tePE2i6opFdeSmf3qmKd6U=","beginning_cross_street":"Gardnertown Road","ending_cross_street":"US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.02798,41.522538]]}},{"id":"FQORyxA2H9iMQ0ZPV84GZIaAmD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vyvu9GVSTD0NQKdwQqx12LGfpa4="},{"type":"next-occurrence","id":"G+IhGb2xIxHNfiKNa+QFCeaOyvs="}],"description":"Safety improvements on NY 32 southbound between Gardnertown Road (Newburgh) and US 9W (Saugerties) 202508113730/32773009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closures","update_date":"2026-06-05T14:38:25Z"},"road_event_id":"FQORyxA2H9iMQ0ZPV84GZIaAmD4=","beginning_cross_street":"Gardnertown Road","ending_cross_street":"US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.02798,41.522538]]}},{"id":"G+IhGb2xIxHNfiKNa+QFCeaOyvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vyvu9GVSTD0NQKdwQqx12LGfpa4="},{"type":"next-occurrence","id":"Gof7REF5cpTpMhrESmXjsYfWYp8="}],"description":"Safety improvements on NY 32 southbound between Gardnertown Road (Newburgh) and US 9W (Saugerties) 202508113730/32773009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closures","update_date":"2026-06-05T14:38:25Z"},"road_event_id":"G+IhGb2xIxHNfiKNa+QFCeaOyvs=","beginning_cross_street":"Gardnertown Road","ending_cross_street":"US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.02798,41.522538]]}},{"id":"Gof7REF5cpTpMhrESmXjsYfWYp8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vyvu9GVSTD0NQKdwQqx12LGfpa4="}],"description":"Safety improvements on NY 32 southbound between Gardnertown Road (Newburgh) and US 9W (Saugerties) 202508113730/32773009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closures","update_date":"2026-06-05T14:38:25Z"},"road_event_id":"Gof7REF5cpTpMhrESmXjsYfWYp8=","beginning_cross_street":"Gardnertown Road","ending_cross_street":"US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.02798,41.522538]]}},{"id":"rsf+HJpbo7hOY3YjFgHCIuyg948=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of CR 611/Hope Rd (Liberty Twp), Monday June 8, 2026 09:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-06-05T14:38:47Z"},"road_event_id":"rsf+HJpbo7hOY3YjFgHCIuyg948=","beginning_cross_street":"West of CR 611/Hope Rd","ending_cross_street":"West of CR 611/Hope Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.917762,40.867584]]}},{"id":"ObEwb+zlGyWWAYoEglKcHgIigdo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Northbound between South of Harter Rd (Harding Twp) and North of Harter Rd (Morris Twp), Monday June 8, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T14:38:48Z"},"road_event_id":"ObEwb+zlGyWWAYoEglKcHgIigdo=","beginning_cross_street":"South of Harter Rd","ending_cross_street":"North of Harter Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.513626,40.765625]]}},{"id":"DWP2zKZdtEOpnde5AjgzxjyDz3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Road maintenance operations on US 9 both directions between Senasqua Road (Croton on Hudson) and NY 9A (New York) Res 8-8 RW/32773109 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 11th, 2026, 08:00 PM thru 11:30 PM, left lane closures","update_date":"2026-06-05T14:48:06Z"},"road_event_id":"DWP2zKZdtEOpnde5AjgzxjyDz3U=","beginning_cross_street":"Senasqua Road","ending_cross_street":"NY 9A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.900331,41.211266]]}},{"id":"5UId4yFm1mkuMlweEbXOFewqjQQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 86"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 86 both directions Old Military Road; CR 35 (North Elba) to West Valley Road (North Elba) ALTERNATING LANES, Monday June 8th, 2026, 07:00 AM thru 09:30 AM All lanes open","update_date":"2026-06-05T14:55:44Z"},"road_event_id":"5UId4yFm1mkuMlweEbXOFewqjQQ=","beginning_cross_street":"Old Military Road; CR 35","ending_cross_street":"West Valley Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T13:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013483,44.291191]]}},{"id":"T9aPRf+occ0Elu920l5VI6bC4yw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[],"description":"Mowing on NY 22 both directions Fort Ticonderoga Road; NY 74; Montcalm Street (Ticonderoga) Moving Operations BE PREPARED TO STOP, Monday June 8th, 2026, 06:45 AM thru 03:00 PM All lanes open","update_date":"2026-06-05T14:55:05Z"},"road_event_id":"T9aPRf+occ0Elu920l5VI6bC4yw=","beginning_cross_street":"Fort Ticonderoga Road; NY 74; Montcalm Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:45:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.407181,43.843732]]}},{"id":"fB6HjunVGRKchlz4QwY6j+FIvN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fztORXZ1+f8Bqa0MquknxMhB5rM="}],"description":"Crack sealing and overnight roadwork on NY 404 both directions Town of Webster; Town of Penfield Line; Ramp (Penfield) to START ROUTE NY 404; Empire Boulevard (Irondequoit) Mobile operation with short-term alternating closures as needed., Sunday June 7th, 2026 thru Wednesday June 10th, 2026, Sunday/Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes","update_date":"2026-06-05T14:56:31Z"},"road_event_id":"fB6HjunVGRKchlz4QwY6j+FIvN4=","beginning_cross_street":"Town of Webster; Town of Penfield Line; Ramp","ending_cross_street":"START ROUTE NY 404; Empire Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T22:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.498364,43.200312]]}},{"id":"fztORXZ1+f8Bqa0MquknxMhB5rM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fB6HjunVGRKchlz4QwY6j+FIvN4="},{"type":"next-occurrence","id":"XCAjU5svA37CG7RAdGkW7xUDlsE="}],"description":"Crack sealing and overnight roadwork on NY 404 both directions Town of Webster; Town of Penfield Line; Ramp (Penfield) to START ROUTE NY 404; Empire Boulevard (Irondequoit) Mobile operation with short-term alternating closures as needed., Sunday June 7th, 2026 thru Wednesday June 10th, 2026, Sunday/Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes","update_date":"2026-06-05T14:56:31Z"},"road_event_id":"fztORXZ1+f8Bqa0MquknxMhB5rM=","beginning_cross_street":"Town of Webster; Town of Penfield Line; Ramp","ending_cross_street":"START ROUTE NY 404; Empire Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.498364,43.200312]]}},{"id":"XCAjU5svA37CG7RAdGkW7xUDlsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fB6HjunVGRKchlz4QwY6j+FIvN4="}],"description":"Crack sealing and overnight roadwork on NY 404 both directions Town of Webster; Town of Penfield Line; Ramp (Penfield) to START ROUTE NY 404; Empire Boulevard (Irondequoit) Mobile operation with short-term alternating closures as needed., Sunday June 7th, 2026 thru Wednesday June 10th, 2026, Sunday/Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes","update_date":"2026-06-05T14:56:31Z"},"road_event_id":"XCAjU5svA37CG7RAdGkW7xUDlsE=","beginning_cross_street":"Town of Webster; Town of Penfield Line; Ramp","ending_cross_street":"START ROUTE NY 404; Empire Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.498364,43.200312]]}},{"id":"/OtB7pGkYpuKBWguF8JlpPUkZVc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Southbound near North of Barley Sheaf Rd/River Rd (Readington Twp), Wednesday June 10, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-06-05T14:59:47Z"},"road_event_id":"/OtB7pGkYpuKBWguF8JlpPUkZVc=","beginning_cross_street":"North of Barley Sheaf Rd/River Rd","ending_cross_street":"North of Barley Sheaf Rd/River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.813049,40.51926]]}},{"id":"W2+uGhjvA1TnY0b6BIbtk6ADa3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Southbound near North of Barley Sheaf Rd/River Rd (Readington Twp), Tuesday June 9, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-06-05T14:59:48Z"},"road_event_id":"W2+uGhjvA1TnY0b6BIbtk6ADa3I=","beginning_cross_street":"North of Barley Sheaf Rd/River Rd","ending_cross_street":"North of Barley Sheaf Rd/River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.813049,40.51926]]}},{"id":"hn5AVNuXmf1vxx9k5QwxxGjf/Xg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Tuesday June 9, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-06-05T15:02:47Z"},"road_event_id":"hn5AVNuXmf1vxx9k5QwxxGjf/Xg=","beginning_cross_street":"North of CR 514/Amwell Rd","ending_cross_street":"South of Brooks Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632385,40.51324]]}},{"id":"Bcr6i9VLcHaCZQF2QYt4j11K6ZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Thursday June 11, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T15:02:53Z"},"road_event_id":"Bcr6i9VLcHaCZQF2QYt4j11K6ZA=","beginning_cross_street":"South of Brooks Blvd","ending_cross_street":"North of CR 514/Amwell Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.620437,40.533859]]}},{"id":"sR7/RZUP6snosbpVpLyCdLbpTsA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Wednesday June 10, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-06-05T15:02:48Z"},"road_event_id":"sR7/RZUP6snosbpVpLyCdLbpTsA=","beginning_cross_street":"North of CR 514/Amwell Rd","ending_cross_street":"South of Brooks Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632385,40.51324]]}},{"id":"aMp5YJIWgWaLjIxCzjCh6iXtFds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Tuesday June 9, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T15:02:49Z"},"road_event_id":"aMp5YJIWgWaLjIxCzjCh6iXtFds=","beginning_cross_street":"South of Brooks Blvd","ending_cross_street":"North of CR 514/Amwell Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.620437,40.533859]]}},{"id":"ghAtBPkiKJppgOfuP/AWCGlSIr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Monday June 8, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-06-05T15:02:50Z"},"road_event_id":"ghAtBPkiKJppgOfuP/AWCGlSIr8=","beginning_cross_street":"North of CR 514/Amwell Rd","ending_cross_street":"South of Brooks Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632385,40.51324]]}},{"id":"NyxyXDiLp19rvj5cGasMpDEebHA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Friday June 12, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T15:02:51Z"},"road_event_id":"NyxyXDiLp19rvj5cGasMpDEebHA=","beginning_cross_street":"South of Brooks Blvd","ending_cross_street":"North of CR 514/Amwell Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.620437,40.533859]]}},{"id":"1kw3P4zMdoUYT7oxLAaRWi6hp5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Thursday June 11, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-06-05T15:02:54Z"},"road_event_id":"1kw3P4zMdoUYT7oxLAaRWi6hp5U=","beginning_cross_street":"North of CR 514/Amwell Rd","ending_cross_street":"South of Brooks Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632385,40.51324]]}},{"id":"0StJpKYUjxY+WBfm/I3Qij//Wzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound between South of CR 643/Mill St (Sussex) and Sawmill Rd (Montague Twp), Wednesday June 10, 2026 08:00 PM thru Thursday June 11, 2026 06:00 AM, right shoulder closed","update_date":"2026-06-05T15:02:55Z"},"road_event_id":"0StJpKYUjxY+WBfm/I3Qij//Wzs=","beginning_cross_street":"South of CR 643/Mill St","ending_cross_street":"Sawmill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.608558,41.208019]]}},{"id":"ykQieJUTVNJu7+sTj62ypvygiRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound between South of CR 643/Mill St (Sussex) and Sawmill Rd (Montague Twp), Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 06:00 AM, right shoulder closed","update_date":"2026-06-05T15:02:56Z"},"road_event_id":"ykQieJUTVNJu7+sTj62ypvygiRk=","beginning_cross_street":"South of CR 643/Mill St","ending_cross_street":"Sawmill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.608558,41.208019]]}},{"id":"5L5oUbPnvfSs+o41gm70hzAKVQ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Friday June 12, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-06-05T15:02:58Z"},"road_event_id":"5L5oUbPnvfSs+o41gm70hzAKVQ8=","beginning_cross_street":"North of CR 514/Amwell Rd","ending_cross_street":"South of Brooks Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632385,40.51324]]}},{"id":"P76s7mfTLZlsKbnD0BT6Qk591to=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Wednesday June 10, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T15:02:59Z"},"road_event_id":"P76s7mfTLZlsKbnD0BT6Qk591to=","beginning_cross_street":"South of Brooks Blvd","ending_cross_street":"North of CR 514/Amwell Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.620437,40.533859]]}},{"id":"jwRDx9EFaxNnZKqMtdbKc7nGIKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound between South of CR 643/Mill St (Sussex) and Sawmill Rd (Montague Twp), Tuesday June 9, 2026 08:00 PM thru Wednesday June 10, 2026 06:00 AM, right shoulder closed","update_date":"2026-06-05T15:03:00Z"},"road_event_id":"jwRDx9EFaxNnZKqMtdbKc7nGIKQ=","beginning_cross_street":"South of CR 643/Mill St","ending_cross_street":"Sawmill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.608558,41.208019]]}},{"id":"jlkExZFYLlBF1tHd7+K44hwN3GQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 74"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 74 both directions Corduroy Road; CR 2 (Ticonderoga) ALTERNATING LANES, Monday June 8th, 2026, 06:30 AM thru 03:00 PM All lanes open","update_date":"2026-06-05T15:05:14Z"},"road_event_id":"jlkExZFYLlBF1tHd7+K44hwN3GQ=","beginning_cross_street":"Corduroy Road; CR 2","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:30:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.538783,43.878178]]}},{"id":"wEHSYFmRMi5gp4KzVzuIoF89VMo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 73 both directions Wilmington Road; Main Street; NY 86 (North Elba) to Averyville Lane (North Elba) ALTERNATING LANES, Monday June 8th, 2026, 10:00 AM thru 02:00 PM All lanes open","update_date":"2026-06-05T15:07:58Z"},"road_event_id":"wEHSYFmRMi5gp4KzVzuIoF89VMo=","beginning_cross_street":"Wilmington Road; Main Street; NY 86","ending_cross_street":"Averyville Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980251,44.279538]]}},{"id":"JcG40KMD3GPwlWxAH69y5LhAKG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of NJ 23/Pompton Av (Wayne Twp) and West of Garden State Parkway (Clifton), Monday June 8, 2026 08:00 PM thru Tuesday June 9, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T15:08:47Z"},"road_event_id":"JcG40KMD3GPwlWxAH69y5LhAKG8=","beginning_cross_street":"West of NJ 23/Pompton Av","ending_cross_street":"West of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.257308,40.893184]]}},{"id":"H5LzolHjea1brSfduX7ltTyVDhU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Monday June 8, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T15:08:48Z"},"road_event_id":"H5LzolHjea1brSfduX7ltTyVDhU=","beginning_cross_street":"South of Brooks Blvd","ending_cross_street":"North of CR 514/Amwell Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.620437,40.533859]]}},{"id":"KYCGe31NihzmM9yYzEmz374F98Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nzOx2jLHkSSVJLYu3QMOzPHhy4U="}],"description":"Repaving on NY 9N both directions NY 74; NY 22 (Ticonderoga) to Town of Crown Point; Town of Ticonderoga Line (Ticonderoga) ALTERNATING LANES, Thursday June 11th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-06-05T15:14:36Z"},"road_event_id":"KYCGe31NihzmM9yYzEmz374F98Y=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Town of Crown Point; Town of Ticonderoga Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437998,43.858583]]}},{"id":"nzOx2jLHkSSVJLYu3QMOzPHhy4U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KYCGe31NihzmM9yYzEmz374F98Y="},{"type":"next-occurrence","id":"cHT7883TUFNQuuDCs1H1ENiR7lc="}],"description":"Repaving on NY 9N both directions NY 74; NY 22 (Ticonderoga) to Town of Crown Point; Town of Ticonderoga Line (Ticonderoga) ALTERNATING LANES, Thursday June 11th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-06-05T15:14:36Z"},"road_event_id":"nzOx2jLHkSSVJLYu3QMOzPHhy4U=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Town of Crown Point; Town of Ticonderoga Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437998,43.858583]]}},{"id":"cHT7883TUFNQuuDCs1H1ENiR7lc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KYCGe31NihzmM9yYzEmz374F98Y="},{"type":"next-occurrence","id":"EkBKhe9UCyz0JSE68fT62X+JX+U="}],"description":"Repaving on NY 9N both directions NY 74; NY 22 (Ticonderoga) to Town of Crown Point; Town of Ticonderoga Line (Ticonderoga) ALTERNATING LANES, Thursday June 11th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-06-05T15:14:36Z"},"road_event_id":"cHT7883TUFNQuuDCs1H1ENiR7lc=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Town of Crown Point; Town of Ticonderoga Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437998,43.858583]]}},{"id":"EkBKhe9UCyz0JSE68fT62X+JX+U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KYCGe31NihzmM9yYzEmz374F98Y="},{"type":"next-occurrence","id":"wYxWyzmoRvP8rgMmkFYXceHf92A="}],"description":"Repaving on NY 9N both directions NY 74; NY 22 (Ticonderoga) to Town of Crown Point; Town of Ticonderoga Line (Ticonderoga) ALTERNATING LANES, Thursday June 11th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-06-05T15:14:36Z"},"road_event_id":"EkBKhe9UCyz0JSE68fT62X+JX+U=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Town of Crown Point; Town of Ticonderoga Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437998,43.858583]]}},{"id":"wYxWyzmoRvP8rgMmkFYXceHf92A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KYCGe31NihzmM9yYzEmz374F98Y="},{"type":"next-occurrence","id":"jMx5icb7+XVRDhalyEzxn8kklcE="}],"description":"Repaving on NY 9N both directions NY 74; NY 22 (Ticonderoga) to Town of Crown Point; Town of Ticonderoga Line (Ticonderoga) ALTERNATING LANES, Thursday June 11th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-06-05T15:14:36Z"},"road_event_id":"wYxWyzmoRvP8rgMmkFYXceHf92A=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Town of Crown Point; Town of Ticonderoga Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437998,43.858583]]}},{"id":"jMx5icb7+XVRDhalyEzxn8kklcE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KYCGe31NihzmM9yYzEmz374F98Y="},{"type":"next-occurrence","id":"SHgkcVjL99DQ0tM9r+5+74lk0nY="}],"description":"Repaving on NY 9N both directions NY 74; NY 22 (Ticonderoga) to Town of Crown Point; Town of Ticonderoga Line (Ticonderoga) ALTERNATING LANES, Thursday June 11th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-06-05T15:14:36Z"},"road_event_id":"jMx5icb7+XVRDhalyEzxn8kklcE=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Town of Crown Point; Town of Ticonderoga Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437998,43.858583]]}},{"id":"SHgkcVjL99DQ0tM9r+5+74lk0nY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KYCGe31NihzmM9yYzEmz374F98Y="},{"type":"next-occurrence","id":"26zXJA5Miuy5ZWfeg/7oucDIAyM="}],"description":"Repaving on NY 9N both directions NY 74; NY 22 (Ticonderoga) to Town of Crown Point; Town of Ticonderoga Line (Ticonderoga) ALTERNATING LANES, Thursday June 11th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-06-05T15:14:36Z"},"road_event_id":"SHgkcVjL99DQ0tM9r+5+74lk0nY=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Town of Crown Point; Town of Ticonderoga Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437998,43.858583]]}},{"id":"26zXJA5Miuy5ZWfeg/7oucDIAyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KYCGe31NihzmM9yYzEmz374F98Y="},{"type":"next-occurrence","id":"Z32VCYddtGB0tRZioJCDML1fyn8="}],"description":"Repaving on NY 9N both directions NY 74; NY 22 (Ticonderoga) to Town of Crown Point; Town of Ticonderoga Line (Ticonderoga) ALTERNATING LANES, Thursday June 11th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-06-05T15:14:36Z"},"road_event_id":"26zXJA5Miuy5ZWfeg/7oucDIAyM=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Town of Crown Point; Town of Ticonderoga Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437998,43.858583]]}},{"id":"Z32VCYddtGB0tRZioJCDML1fyn8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KYCGe31NihzmM9yYzEmz374F98Y="}],"description":"Repaving on NY 9N both directions NY 74; NY 22 (Ticonderoga) to Town of Crown Point; Town of Ticonderoga Line (Ticonderoga) ALTERNATING LANES, Thursday June 11th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-06-05T15:14:36Z"},"road_event_id":"Z32VCYddtGB0tRZioJCDML1fyn8=","beginning_cross_street":"NY 74; NY 22","ending_cross_street":"Town of Crown Point; Town of Ticonderoga Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.437998,43.858583]]}},{"id":"E5+BwpMMDZ0RjEgD6USR6vrufdU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 417"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Bm9Ryo16ZAYLqgM3yF404gBZb08="}],"description":"Culvert repairs and drainage improvements on NY 417 both directions Town of Greenwood; Town of Jasper Line (Jasper) to TIMMERMAN RD (Jasper) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T15:20:49Z"},"road_event_id":"E5+BwpMMDZ0RjEgD6USR6vrufdU=","beginning_cross_street":"Town of Greenwood; Town of Jasper Line","ending_cross_street":"TIMMERMAN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.606945,42.119152]]}},{"id":"Bm9Ryo16ZAYLqgM3yF404gBZb08=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 417"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E5+BwpMMDZ0RjEgD6USR6vrufdU="},{"type":"next-occurrence","id":"z9Y/ro6TkGK0n6Xp7PsE5KcsObY="}],"description":"Culvert repairs and drainage improvements on NY 417 both directions Town of Greenwood; Town of Jasper Line (Jasper) to TIMMERMAN RD (Jasper) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T15:20:49Z"},"road_event_id":"Bm9Ryo16ZAYLqgM3yF404gBZb08=","beginning_cross_street":"Town of Greenwood; Town of Jasper Line","ending_cross_street":"TIMMERMAN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.606945,42.119152]]}},{"id":"z9Y/ro6TkGK0n6Xp7PsE5KcsObY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 417"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E5+BwpMMDZ0RjEgD6USR6vrufdU="},{"type":"next-occurrence","id":"/TUJt8F/7NjjkaCmaVU0Fykkyqk="}],"description":"Culvert repairs and drainage improvements on NY 417 both directions Town of Greenwood; Town of Jasper Line (Jasper) to TIMMERMAN RD (Jasper) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T15:20:49Z"},"road_event_id":"z9Y/ro6TkGK0n6Xp7PsE5KcsObY=","beginning_cross_street":"Town of Greenwood; Town of Jasper Line","ending_cross_street":"TIMMERMAN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.606945,42.119152]]}},{"id":"/TUJt8F/7NjjkaCmaVU0Fykkyqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 417"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E5+BwpMMDZ0RjEgD6USR6vrufdU="},{"type":"next-occurrence","id":"nQsMplsQIlxwDyxPXth0k/409Kg="}],"description":"Culvert repairs and drainage improvements on NY 417 both directions Town of Greenwood; Town of Jasper Line (Jasper) to TIMMERMAN RD (Jasper) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T15:20:49Z"},"road_event_id":"/TUJt8F/7NjjkaCmaVU0Fykkyqk=","beginning_cross_street":"Town of Greenwood; Town of Jasper Line","ending_cross_street":"TIMMERMAN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.606945,42.119152]]}},{"id":"nQsMplsQIlxwDyxPXth0k/409Kg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 417"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E5+BwpMMDZ0RjEgD6USR6vrufdU="},{"type":"next-occurrence","id":"CUD6Qo7vS4YAWrb3bH9xy2joDpU="}],"description":"Culvert repairs and drainage improvements on NY 417 both directions Town of Greenwood; Town of Jasper Line (Jasper) to TIMMERMAN RD (Jasper) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T15:20:49Z"},"road_event_id":"nQsMplsQIlxwDyxPXth0k/409Kg=","beginning_cross_street":"Town of Greenwood; Town of Jasper Line","ending_cross_street":"TIMMERMAN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.606945,42.119152]]}},{"id":"CUD6Qo7vS4YAWrb3bH9xy2joDpU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 417"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E5+BwpMMDZ0RjEgD6USR6vrufdU="},{"type":"next-occurrence","id":"LqWm0DHj+xgpjFV65Ae6azYYi6E="}],"description":"Culvert repairs and drainage improvements on NY 417 both directions Town of Greenwood; Town of Jasper Line (Jasper) to TIMMERMAN RD (Jasper) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T15:20:49Z"},"road_event_id":"CUD6Qo7vS4YAWrb3bH9xy2joDpU=","beginning_cross_street":"Town of Greenwood; Town of Jasper Line","ending_cross_street":"TIMMERMAN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.606945,42.119152]]}},{"id":"LqWm0DHj+xgpjFV65Ae6azYYi6E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 417"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E5+BwpMMDZ0RjEgD6USR6vrufdU="},{"type":"next-occurrence","id":"5X8XRavyo6KPcQMtoBki7ZMGKPc="}],"description":"Culvert repairs and drainage improvements on NY 417 both directions Town of Greenwood; Town of Jasper Line (Jasper) to TIMMERMAN RD (Jasper) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T15:20:49Z"},"road_event_id":"LqWm0DHj+xgpjFV65Ae6azYYi6E=","beginning_cross_street":"Town of Greenwood; Town of Jasper Line","ending_cross_street":"TIMMERMAN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.606945,42.119152]]}},{"id":"5X8XRavyo6KPcQMtoBki7ZMGKPc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 417"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E5+BwpMMDZ0RjEgD6USR6vrufdU="},{"type":"next-occurrence","id":"+cWqTCTJ5IgoG4f7cFs5r7MzKEQ="}],"description":"Culvert repairs and drainage improvements on NY 417 both directions Town of Greenwood; Town of Jasper Line (Jasper) to TIMMERMAN RD (Jasper) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T15:20:49Z"},"road_event_id":"5X8XRavyo6KPcQMtoBki7ZMGKPc=","beginning_cross_street":"Town of Greenwood; Town of Jasper Line","ending_cross_street":"TIMMERMAN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.606945,42.119152]]}},{"id":"+cWqTCTJ5IgoG4f7cFs5r7MzKEQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 417"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E5+BwpMMDZ0RjEgD6USR6vrufdU="},{"type":"next-occurrence","id":"A2A3Ec6ihCn4Tu1ZY7sMy9skWvQ="}],"description":"Culvert repairs and drainage improvements on NY 417 both directions Town of Greenwood; Town of Jasper Line (Jasper) to TIMMERMAN RD (Jasper) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T15:20:49Z"},"road_event_id":"+cWqTCTJ5IgoG4f7cFs5r7MzKEQ=","beginning_cross_street":"Town of Greenwood; Town of Jasper Line","ending_cross_street":"TIMMERMAN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.606945,42.119152]]}},{"id":"A2A3Ec6ihCn4Tu1ZY7sMy9skWvQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 417"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E5+BwpMMDZ0RjEgD6USR6vrufdU="},{"type":"next-occurrence","id":"SPJe6mksAMZk7UCJstLf0LCcD30="}],"description":"Culvert repairs and drainage improvements on NY 417 both directions Town of Greenwood; Town of Jasper Line (Jasper) to TIMMERMAN RD (Jasper) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T15:20:49Z"},"road_event_id":"A2A3Ec6ihCn4Tu1ZY7sMy9skWvQ=","beginning_cross_street":"Town of Greenwood; Town of Jasper Line","ending_cross_street":"TIMMERMAN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.606945,42.119152]]}},{"id":"SPJe6mksAMZk7UCJstLf0LCcD30=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 417"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E5+BwpMMDZ0RjEgD6USR6vrufdU="},{"type":"next-occurrence","id":"SKcPtUQCrtkmglRB5FRlQ3Okbqg="}],"description":"Culvert repairs and drainage improvements on NY 417 both directions Town of Greenwood; Town of Jasper Line (Jasper) to TIMMERMAN RD (Jasper) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T15:20:49Z"},"road_event_id":"SPJe6mksAMZk7UCJstLf0LCcD30=","beginning_cross_street":"Town of Greenwood; Town of Jasper Line","ending_cross_street":"TIMMERMAN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.606945,42.119152]]}},{"id":"SKcPtUQCrtkmglRB5FRlQ3Okbqg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 417"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E5+BwpMMDZ0RjEgD6USR6vrufdU="}],"description":"Culvert repairs and drainage improvements on NY 417 both directions Town of Greenwood; Town of Jasper Line (Jasper) to TIMMERMAN RD (Jasper) 1 Lane, 2 Way, Flagger Control, Monday June 8th, 2026 thru Friday July 10th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T15:20:49Z"},"road_event_id":"SKcPtUQCrtkmglRB5FRlQ3Okbqg=","beginning_cross_street":"Town of Greenwood; Town of Jasper Line","ending_cross_street":"TIMMERMAN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.606945,42.119152]]}},{"id":"k9JloxY+Gf/Wnm0VLhZx+Mppmyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[],"description":"Crack sealing and overnight roadwork on NY 31 both directions at Sweden Walker Road; NY 260 (Sweden) Mobile operation with short-term alternating closures as needed., Thursday June 11th, 2026 thru Friday June 12th, 2026, 06:30 PM thru 06:00 AM All lanes","update_date":"2026-06-05T15:30:33Z"},"road_event_id":"k9JloxY+Gf/Wnm0VLhZx+Mppmyg=","beginning_cross_street":"Sweden Walker Road; NY 260","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T22:30:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.899691,43.198023]]}},{"id":"PQHdcsjuXLxQ0eiJRlNyDcwf984=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8A5UXgIE/ZnTdnbooTA8I8JoXiw="}],"description":"Bridge replacement on I-86 both directions Exit 8 - NY 394 West Lake Road (North Harmony) to Exit 10 - NY 17; Ramp (Ellery), Friday June 5th, 2026 thru Saturday June 13th, 2026, Thursday/Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-05T15:40:31Z"},"road_event_id":"PQHdcsjuXLxQ0eiJRlNyDcwf984=","beginning_cross_street":"Exit 8 - NY 394 West Lake Road","ending_cross_street":"Exit 10 - NY 17; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.410955,42.15158]]}},{"id":"8A5UXgIE/ZnTdnbooTA8I8JoXiw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PQHdcsjuXLxQ0eiJRlNyDcwf984="},{"type":"next-occurrence","id":"/dVynaSQvy3H88VQDuhDnsb6V1g="}],"description":"Bridge replacement on I-86 both directions Exit 8 - NY 394 West Lake Road (North Harmony) to Exit 10 - NY 17; Ramp (Ellery), Friday June 5th, 2026 thru Saturday June 13th, 2026, Thursday/Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-05T15:40:31Z"},"road_event_id":"8A5UXgIE/ZnTdnbooTA8I8JoXiw=","beginning_cross_street":"Exit 8 - NY 394 West Lake Road","ending_cross_street":"Exit 10 - NY 17; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.410955,42.15158]]}},{"id":"/dVynaSQvy3H88VQDuhDnsb6V1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PQHdcsjuXLxQ0eiJRlNyDcwf984="}],"description":"Bridge replacement on I-86 both directions Exit 8 - NY 394 West Lake Road (North Harmony) to Exit 10 - NY 17; Ramp (Ellery), Friday June 5th, 2026 thru Saturday June 13th, 2026, Thursday/Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-05T15:40:31Z"},"road_event_id":"/dVynaSQvy3H88VQDuhDnsb6V1g=","beginning_cross_street":"Exit 8 - NY 394 West Lake Road","ending_cross_street":"Exit 10 - NY 17; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T01:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.410955,42.15158]]}},{"id":"QDVTM1ABXMWw1uasXupufCY3Xxs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984H - Riverdale Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mOJDHZjqeymsoO1yJ1S/aAAlep0="}],"description":"Installation of traffic management systems on NY 984H - Riverdale Avenue at Vark Street (Yonkers) D265523/32726709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:13:09Z"},"road_event_id":"QDVTM1ABXMWw1uasXupufCY3Xxs=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90064,40.929168]]}},{"id":"mOJDHZjqeymsoO1yJ1S/aAAlep0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984H - Riverdale Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QDVTM1ABXMWw1uasXupufCY3Xxs="},{"type":"next-occurrence","id":"yTFX5da6I/KeBrSQJDO7YH64lCU="}],"description":"Installation of traffic management systems on NY 984H - Riverdale Avenue at Vark Street (Yonkers) D265523/32726709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:13:09Z"},"road_event_id":"mOJDHZjqeymsoO1yJ1S/aAAlep0=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90064,40.929168]]}},{"id":"yTFX5da6I/KeBrSQJDO7YH64lCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984H - Riverdale Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QDVTM1ABXMWw1uasXupufCY3Xxs="},{"type":"next-occurrence","id":"vV7rMUm830UKYSJD9Iom+pCkOfg="}],"description":"Installation of traffic management systems on NY 984H - Riverdale Avenue at Vark Street (Yonkers) D265523/32726709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:13:09Z"},"road_event_id":"yTFX5da6I/KeBrSQJDO7YH64lCU=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90064,40.929168]]}},{"id":"vV7rMUm830UKYSJD9Iom+pCkOfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984H - Riverdale Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QDVTM1ABXMWw1uasXupufCY3Xxs="},{"type":"next-occurrence","id":"BYzB7zGDTVZxAXfJAyhS4R4Acd4="}],"description":"Installation of traffic management systems on NY 984H - Riverdale Avenue at Vark Street (Yonkers) D265523/32726709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:13:09Z"},"road_event_id":"vV7rMUm830UKYSJD9Iom+pCkOfg=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90064,40.929168]]}},{"id":"BYzB7zGDTVZxAXfJAyhS4R4Acd4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984H - Riverdale Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QDVTM1ABXMWw1uasXupufCY3Xxs="}],"description":"Installation of traffic management systems on NY 984H - Riverdale Avenue at Vark Street (Yonkers) D265523/32726709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:13:09Z"},"road_event_id":"BYzB7zGDTVZxAXfJAyhS4R4Acd4=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90064,40.929168]]}},{"id":"9qw3jq6ZEGogiAFrNI5fnTWh5ZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"URFL/1Q8vTFYBxPPnaMJ+WkJIuI="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue at Vernon Place (Yonkers) D265523/32773409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:23:05Z"},"road_event_id":"9qw3jq6ZEGogiAFrNI5fnTWh5ZU=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.851515,40.914981]]}},{"id":"URFL/1Q8vTFYBxPPnaMJ+WkJIuI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9qw3jq6ZEGogiAFrNI5fnTWh5ZU="},{"type":"next-occurrence","id":"ppmzz54/4PHxFwzock8HTJNZR1w="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue at Vernon Place (Yonkers) D265523/32773409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:23:05Z"},"road_event_id":"URFL/1Q8vTFYBxPPnaMJ+WkJIuI=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.851515,40.914981]]}},{"id":"ppmzz54/4PHxFwzock8HTJNZR1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9qw3jq6ZEGogiAFrNI5fnTWh5ZU="},{"type":"next-occurrence","id":"jOUZzArj60UiEbeSgkXJhIzWr9g="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue at Vernon Place (Yonkers) D265523/32773409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:23:05Z"},"road_event_id":"ppmzz54/4PHxFwzock8HTJNZR1w=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.851515,40.914981]]}},{"id":"jOUZzArj60UiEbeSgkXJhIzWr9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9qw3jq6ZEGogiAFrNI5fnTWh5ZU="},{"type":"next-occurrence","id":"7hrJ8hdSnqNieNgFvRzw1qBT6QI="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue at Vernon Place (Yonkers) D265523/32773409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:23:05Z"},"road_event_id":"jOUZzArj60UiEbeSgkXJhIzWr9g=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.851515,40.914981]]}},{"id":"7hrJ8hdSnqNieNgFvRzw1qBT6QI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9qw3jq6ZEGogiAFrNI5fnTWh5ZU="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue at Vernon Place (Yonkers) D265523/32773409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:23:05Z"},"road_event_id":"7hrJ8hdSnqNieNgFvRzw1qBT6QI=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.851515,40.914981]]}},{"id":"i3q0h07LOdVnVIioQk9rdyk8xHA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+BwNEsmmbqgUoWdL0uRbBIXZ/2E="}],"description":"Installation of traffic management systems on US 9 both directions at Ashford Avenue (Dobbs Ferry) D265523/32773609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:25:01Z"},"road_event_id":"i3q0h07LOdVnVIioQk9rdyk8xHA=","beginning_cross_street":"Ashford Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869114,41.015475]]}},{"id":"+BwNEsmmbqgUoWdL0uRbBIXZ/2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i3q0h07LOdVnVIioQk9rdyk8xHA="},{"type":"next-occurrence","id":"HJ37evCbZ/Ljcnx9h6gwHHGA5nA="}],"description":"Installation of traffic management systems on US 9 both directions at Ashford Avenue (Dobbs Ferry) D265523/32773609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:25:01Z"},"road_event_id":"+BwNEsmmbqgUoWdL0uRbBIXZ/2E=","beginning_cross_street":"Ashford Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869114,41.015475]]}},{"id":"HJ37evCbZ/Ljcnx9h6gwHHGA5nA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i3q0h07LOdVnVIioQk9rdyk8xHA="},{"type":"next-occurrence","id":"BX0NChv+57YuN13gqkEmb/2C/W0="}],"description":"Installation of traffic management systems on US 9 both directions at Ashford Avenue (Dobbs Ferry) D265523/32773609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:25:01Z"},"road_event_id":"HJ37evCbZ/Ljcnx9h6gwHHGA5nA=","beginning_cross_street":"Ashford Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869114,41.015475]]}},{"id":"BX0NChv+57YuN13gqkEmb/2C/W0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i3q0h07LOdVnVIioQk9rdyk8xHA="},{"type":"next-occurrence","id":"V+MaHHBJ/imgPTFNTJxSLnuP+Lc="}],"description":"Installation of traffic management systems on US 9 both directions at Ashford Avenue (Dobbs Ferry) D265523/32773609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:25:01Z"},"road_event_id":"BX0NChv+57YuN13gqkEmb/2C/W0=","beginning_cross_street":"Ashford Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869114,41.015475]]}},{"id":"V+MaHHBJ/imgPTFNTJxSLnuP+Lc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i3q0h07LOdVnVIioQk9rdyk8xHA="}],"description":"Installation of traffic management systems on US 9 both directions at Ashford Avenue (Dobbs Ferry) D265523/32773609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:25:01Z"},"road_event_id":"V+MaHHBJ/imgPTFNTJxSLnuP+Lc=","beginning_cross_street":"Ashford Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869114,41.015475]]}},{"id":"uH4RZpWK7FCdpFU8YjeXFS0SKDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kQyILD9zuqnDl1oJ3tug98BuGSw="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue at Ashburton Avenue (Yonkers) D265523/32773509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:26:30Z"},"road_event_id":"uH4RZpWK7FCdpFU8YjeXFS0SKDU=","beginning_cross_street":"Ashburton Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.880905,40.935061]]}},{"id":"kQyILD9zuqnDl1oJ3tug98BuGSw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uH4RZpWK7FCdpFU8YjeXFS0SKDU="},{"type":"next-occurrence","id":"dTMlQ6f6mBLSsW3R4ABXo5w0H4Y="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue at Ashburton Avenue (Yonkers) D265523/32773509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:26:30Z"},"road_event_id":"kQyILD9zuqnDl1oJ3tug98BuGSw=","beginning_cross_street":"Ashburton Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.880905,40.935061]]}},{"id":"dTMlQ6f6mBLSsW3R4ABXo5w0H4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uH4RZpWK7FCdpFU8YjeXFS0SKDU="},{"type":"next-occurrence","id":"cizsKBpqSJznCIoAszofcZqlEa0="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue at Ashburton Avenue (Yonkers) D265523/32773509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:26:30Z"},"road_event_id":"dTMlQ6f6mBLSsW3R4ABXo5w0H4Y=","beginning_cross_street":"Ashburton Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.880905,40.935061]]}},{"id":"cizsKBpqSJznCIoAszofcZqlEa0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uH4RZpWK7FCdpFU8YjeXFS0SKDU="},{"type":"next-occurrence","id":"t2XySM4+EVjVjqa4+uJHr/cQ6KY="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue at Ashburton Avenue (Yonkers) D265523/32773509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:26:30Z"},"road_event_id":"cizsKBpqSJznCIoAszofcZqlEa0=","beginning_cross_street":"Ashburton Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.880905,40.935061]]}},{"id":"t2XySM4+EVjVjqa4+uJHr/cQ6KY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uH4RZpWK7FCdpFU8YjeXFS0SKDU="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue at Ashburton Avenue (Yonkers) D265523/32773509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:26:30Z"},"road_event_id":"t2XySM4+EVjVjqa4+uJHr/cQ6KY=","beginning_cross_street":"Ashburton Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.880905,40.935061]]}},{"id":"r77Lii8BOn+gusgmTMZk1SCFeOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JV47c32AgCv2icIce/o+v0fqLl4="}],"description":"Installation of traffic management systems on NY 100 southbound between Fountain Lane (Greenburgh) and Fort Hill Avenue (Yonkers) D265523/32773709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:29:21Z"},"road_event_id":"r77Lii8BOn+gusgmTMZk1SCFeOc=","beginning_cross_street":"Fountain Lane","ending_cross_street":"Fort Hill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.829474,40.981319]]}},{"id":"JV47c32AgCv2icIce/o+v0fqLl4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r77Lii8BOn+gusgmTMZk1SCFeOc="},{"type":"next-occurrence","id":"4E8sVW1NWZGDDGXFYQMEpLYqkII="}],"description":"Installation of traffic management systems on NY 100 southbound between Fountain Lane (Greenburgh) and Fort Hill Avenue (Yonkers) D265523/32773709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:29:21Z"},"road_event_id":"JV47c32AgCv2icIce/o+v0fqLl4=","beginning_cross_street":"Fountain Lane","ending_cross_street":"Fort Hill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.829474,40.981319]]}},{"id":"4E8sVW1NWZGDDGXFYQMEpLYqkII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r77Lii8BOn+gusgmTMZk1SCFeOc="},{"type":"next-occurrence","id":"7GwBE7I/utMPOQ5ILEgZn/e0yw4="}],"description":"Installation of traffic management systems on NY 100 southbound between Fountain Lane (Greenburgh) and Fort Hill Avenue (Yonkers) D265523/32773709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:29:21Z"},"road_event_id":"4E8sVW1NWZGDDGXFYQMEpLYqkII=","beginning_cross_street":"Fountain Lane","ending_cross_street":"Fort Hill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.829474,40.981319]]}},{"id":"7GwBE7I/utMPOQ5ILEgZn/e0yw4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r77Lii8BOn+gusgmTMZk1SCFeOc="},{"type":"next-occurrence","id":"J/3gbyVHZUBLFXhK6oTT+9syP94="}],"description":"Installation of traffic management systems on NY 100 southbound between Fountain Lane (Greenburgh) and Fort Hill Avenue (Yonkers) D265523/32773709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:29:21Z"},"road_event_id":"7GwBE7I/utMPOQ5ILEgZn/e0yw4=","beginning_cross_street":"Fountain Lane","ending_cross_street":"Fort Hill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.829474,40.981319]]}},{"id":"J/3gbyVHZUBLFXhK6oTT+9syP94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r77Lii8BOn+gusgmTMZk1SCFeOc="}],"description":"Installation of traffic management systems on NY 100 southbound between Fountain Lane (Greenburgh) and Fort Hill Avenue (Yonkers) D265523/32773709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:29:21Z"},"road_event_id":"J/3gbyVHZUBLFXhK6oTT+9syP94=","beginning_cross_street":"Fountain Lane","ending_cross_street":"Fort Hill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.829474,40.981319]]}},{"id":"6wKily5dS5QW0rRi50kF3YoSY1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 27 both directions area of 11th Avenue (New York), Monday June 8th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-05T16:29:20Z"},"road_event_id":"6wKily5dS5QW0rRi50kF3YoSY1c=","beginning_cross_street":"11th Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.978891,40.654894]]}},{"id":"YjTGxdL3Rzbo1YyG9isr/H1x2hg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"e8mafJHjEWQRlIUcWeT300XACP8="}],"description":"Installation of traffic management systems on US 9W both directions at Boices Lane (Kingston) D265523/32773809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:33:27Z"},"road_event_id":"YjTGxdL3Rzbo1YyG9isr/H1x2hg=","beginning_cross_street":"Boices Lane","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99006,41.962545]]}},{"id":"e8mafJHjEWQRlIUcWeT300XACP8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YjTGxdL3Rzbo1YyG9isr/H1x2hg="},{"type":"next-occurrence","id":"PObT+VyBuTBnVtALkzCjGgdjeS0="}],"description":"Installation of traffic management systems on US 9W both directions at Boices Lane (Kingston) D265523/32773809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:33:27Z"},"road_event_id":"e8mafJHjEWQRlIUcWeT300XACP8=","beginning_cross_street":"Boices Lane","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99006,41.962545]]}},{"id":"PObT+VyBuTBnVtALkzCjGgdjeS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YjTGxdL3Rzbo1YyG9isr/H1x2hg="},{"type":"next-occurrence","id":"DCNmQlbqkr7A01QB72b8g9lUvwM="}],"description":"Installation of traffic management systems on US 9W both directions at Boices Lane (Kingston) D265523/32773809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:33:27Z"},"road_event_id":"PObT+VyBuTBnVtALkzCjGgdjeS0=","beginning_cross_street":"Boices Lane","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99006,41.962545]]}},{"id":"DCNmQlbqkr7A01QB72b8g9lUvwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YjTGxdL3Rzbo1YyG9isr/H1x2hg="},{"type":"next-occurrence","id":"1ot2sC748f/wT7y+zm/JqSa1S00="}],"description":"Installation of traffic management systems on US 9W both directions at Boices Lane (Kingston) D265523/32773809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:33:27Z"},"road_event_id":"DCNmQlbqkr7A01QB72b8g9lUvwM=","beginning_cross_street":"Boices Lane","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99006,41.962545]]}},{"id":"1ot2sC748f/wT7y+zm/JqSa1S00=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YjTGxdL3Rzbo1YyG9isr/H1x2hg="}],"description":"Installation of traffic management systems on US 9W both directions at Boices Lane (Kingston) D265523/32773809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:33:27Z"},"road_event_id":"1ot2sC748f/wT7y+zm/JqSa1S00=","beginning_cross_street":"Boices Lane","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99006,41.962545]]}},{"id":"5fnKaVbG/YImkZIb7UlGLgbUV3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hYbdS9XRVa58QvDEEn6jxjn/IVs="}],"description":"Installation of traffic management systems on US 9 southbound at Joslen Blvd (Hudson) D265523/32773909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:34:14Z"},"road_event_id":"5fnKaVbG/YImkZIb7UlGLgbUV3g=","beginning_cross_street":"Joslen Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766419,42.257104]]}},{"id":"hYbdS9XRVa58QvDEEn6jxjn/IVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5fnKaVbG/YImkZIb7UlGLgbUV3g="},{"type":"next-occurrence","id":"HatWQzhQM3q5tjM80avAxDVIO74="}],"description":"Installation of traffic management systems on US 9 southbound at Joslen Blvd (Hudson) D265523/32773909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:34:14Z"},"road_event_id":"hYbdS9XRVa58QvDEEn6jxjn/IVs=","beginning_cross_street":"Joslen Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766419,42.257104]]}},{"id":"HatWQzhQM3q5tjM80avAxDVIO74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5fnKaVbG/YImkZIb7UlGLgbUV3g="},{"type":"next-occurrence","id":"/I0h25vjndW2tWaY2szm4IFr6ww="}],"description":"Installation of traffic management systems on US 9 southbound at Joslen Blvd (Hudson) D265523/32773909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:34:14Z"},"road_event_id":"HatWQzhQM3q5tjM80avAxDVIO74=","beginning_cross_street":"Joslen Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766419,42.257104]]}},{"id":"/I0h25vjndW2tWaY2szm4IFr6ww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5fnKaVbG/YImkZIb7UlGLgbUV3g="},{"type":"next-occurrence","id":"NrVFpKko7NOV0cpZ1BvmWmsFk/o="}],"description":"Installation of traffic management systems on US 9 southbound at Joslen Blvd (Hudson) D265523/32773909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:34:14Z"},"road_event_id":"/I0h25vjndW2tWaY2szm4IFr6ww=","beginning_cross_street":"Joslen Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766419,42.257104]]}},{"id":"NrVFpKko7NOV0cpZ1BvmWmsFk/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5fnKaVbG/YImkZIb7UlGLgbUV3g="}],"description":"Installation of traffic management systems on US 9 southbound at Joslen Blvd (Hudson) D265523/32773909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:34:14Z"},"road_event_id":"NrVFpKko7NOV0cpZ1BvmWmsFk/o=","beginning_cross_street":"Joslen Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.766419,42.257104]]}},{"id":"Hr/n6roeLXb2AaJ4/Cr8ENukHEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 27 both directions area of Exit 4 - John P Devaney Boulevard (New York), Tuesday June 9th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-05T16:33:17Z"},"road_event_id":"Hr/n6roeLXb2AaJ4/Cr8ENukHEE=","beginning_cross_street":"Exit 4 - John P Devaney Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985276,40.658801]]}},{"id":"OYOv8Bz9nWkN1tbUCd6r6SLClA0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"P6GG2c90EA2Cx5rhgXadhXozOFk="}],"description":"Installation of traffic management systems on US 44 eastbound between Academy Street (Poughkeepsie) and South Hamilton Street (Poughkeepsie) D265523/32774009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:37:17Z"},"road_event_id":"OYOv8Bz9nWkN1tbUCd6r6SLClA0=","beginning_cross_street":"Academy Street","ending_cross_street":"South Hamilton Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:30:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.9256,41.700611]]}},{"id":"P6GG2c90EA2Cx5rhgXadhXozOFk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OYOv8Bz9nWkN1tbUCd6r6SLClA0="},{"type":"next-occurrence","id":"XOmpADsIlUhPsRMvb0SBw8anKEk="}],"description":"Installation of traffic management systems on US 44 eastbound between Academy Street (Poughkeepsie) and South Hamilton Street (Poughkeepsie) D265523/32774009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:37:17Z"},"road_event_id":"P6GG2c90EA2Cx5rhgXadhXozOFk=","beginning_cross_street":"Academy Street","ending_cross_street":"South Hamilton Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:30:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.9256,41.700611]]}},{"id":"XOmpADsIlUhPsRMvb0SBw8anKEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OYOv8Bz9nWkN1tbUCd6r6SLClA0="},{"type":"next-occurrence","id":"uQIMPZkfjrC2Ii0KpAbi8t4ADr0="}],"description":"Installation of traffic management systems on US 44 eastbound between Academy Street (Poughkeepsie) and South Hamilton Street (Poughkeepsie) D265523/32774009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:37:17Z"},"road_event_id":"XOmpADsIlUhPsRMvb0SBw8anKEk=","beginning_cross_street":"Academy Street","ending_cross_street":"South Hamilton Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:30:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.9256,41.700611]]}},{"id":"uQIMPZkfjrC2Ii0KpAbi8t4ADr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OYOv8Bz9nWkN1tbUCd6r6SLClA0="},{"type":"next-occurrence","id":"YMCfEHc8lPAaBWa1bu+FAhsAMB4="}],"description":"Installation of traffic management systems on US 44 eastbound between Academy Street (Poughkeepsie) and South Hamilton Street (Poughkeepsie) D265523/32774009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:37:17Z"},"road_event_id":"uQIMPZkfjrC2Ii0KpAbi8t4ADr0=","beginning_cross_street":"Academy Street","ending_cross_street":"South Hamilton Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:30:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.9256,41.700611]]}},{"id":"YMCfEHc8lPAaBWa1bu+FAhsAMB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OYOv8Bz9nWkN1tbUCd6r6SLClA0="}],"description":"Installation of traffic management systems on US 44 eastbound between Academy Street (Poughkeepsie) and South Hamilton Street (Poughkeepsie) D265523/32774009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lane closures","update_date":"2026-06-05T16:37:17Z"},"road_event_id":"YMCfEHc8lPAaBWa1bu+FAhsAMB4=","beginning_cross_street":"Academy Street","ending_cross_street":"South Hamilton Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:30:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.9256,41.700611]]}},{"id":"2jKXjowhzVXHOs6p702/cHRIs20=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound between Exit 64 - Summit Ave/NJ 17 (Hackensack) and West of Exit 67 - River Rd (Hackensack), Wednesday June 10, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-06-05T16:35:47Z"},"road_event_id":"2jKXjowhzVXHOs6p702/cHRIs20=","beginning_cross_street":"Exit 64 - Summit Ave/NJ 17","ending_cross_street":"West of Exit 67 - River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.065162,40.88058]]}},{"id":"hrKB603i8ATcDuTybzxkgOfPFJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound between Exit 64 - Summit Ave/NJ 17 (Hackensack) and West of Exit 67 - River Rd (Hackensack), Friday June 12, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-06-05T16:35:48Z"},"road_event_id":"hrKB603i8ATcDuTybzxkgOfPFJY=","beginning_cross_street":"Exit 64 - Summit Ave/NJ 17","ending_cross_street":"West of Exit 67 - River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.065162,40.88058]]}},{"id":"/rB0BC9fy78M8WLM52+Z7k8pbNs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound near North of CR 606/Milltown Rd (East Brunswick Twp), Monday June 8, 2026 07:00 AM thru 05:00 PM, left lane closed","update_date":"2026-06-05T16:35:49Z"},"road_event_id":"/rB0BC9fy78M8WLM52+Z7k8pbNs=","beginning_cross_street":"North of CR 606/Milltown Rd","ending_cross_street":"North of West Ferris St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.395797,40.446044]]}},{"id":"fOpZ9ROwNKRlfLnsk9VMhmS52NE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 252"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2xMTqYNUcrDBEjfRyIJ/D9MMKck="}],"description":"Crack sealing and overnight roadwork on NY 252 both directions between Winton Road South; CR 98 (Henrietta) and Lowenthal Rd. (Brighton) Mobile operation with short-term alternating closures as needed., Sunday June 7th, 2026 thru Tuesday June 9th, 2026, Sunday/Monday, 06:00 PM thru 06:00 AM All lanes","update_date":"2026-06-05T17:18:53Z"},"road_event_id":"fOpZ9ROwNKRlfLnsk9VMhmS52NE=","beginning_cross_street":"Winton Road  South; CR 98","ending_cross_street":"Lowenthal Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T22:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.58203,43.087109]]}},{"id":"2xMTqYNUcrDBEjfRyIJ/D9MMKck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 252"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fOpZ9ROwNKRlfLnsk9VMhmS52NE="}],"description":"Crack sealing and overnight roadwork on NY 252 both directions between Winton Road South; CR 98 (Henrietta) and Lowenthal Rd. (Brighton) Mobile operation with short-term alternating closures as needed., Sunday June 7th, 2026 thru Tuesday June 9th, 2026, Sunday/Monday, 06:00 PM thru 06:00 AM All lanes","update_date":"2026-06-05T17:18:53Z"},"road_event_id":"2xMTqYNUcrDBEjfRyIJ/D9MMKck=","beginning_cross_street":"Winton Road  South; CR 98","ending_cross_street":"Lowenthal Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.58203,43.087109]]}},{"id":"KeLFbA8GuPRqFrrgCpg24ET+elU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between South of CR 617/Rues Ln (East Brunswick Twp) and Racetrack Rd (East Brunswick Twp), Monday June 8, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-06-05T16:35:50Z"},"road_event_id":"KeLFbA8GuPRqFrrgCpg24ET+elU=","beginning_cross_street":"South of CR 617/Rues Ln","ending_cross_street":"Racetrack Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.373168,40.417987]]}},{"id":"cV4+Sh8n6JwjC5SaRNWFTbjiWic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound between Exit 64 - Summit Ave/NJ 17 (Hackensack) and West of Exit 67 - River Rd (Hackensack), Thursday June 11, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-06-05T16:35:52Z"},"road_event_id":"cV4+Sh8n6JwjC5SaRNWFTbjiWic=","beginning_cross_street":"Exit 64 - Summit Ave/NJ 17","ending_cross_street":"West of Exit 67 - River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.065162,40.88058]]}},{"id":"b4i/AkV1b6LjUYxuzR7kYtFJoc4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Southbound near Wittpenn Bridge (Jersey City), Monday June 8, 2026 10:00 AM thru 02:00 PM, right lane closed","update_date":"2026-06-05T16:39:15Z"},"road_event_id":"b4i/AkV1b6LjUYxuzR7kYtFJoc4=","beginning_cross_street":"Wittpenn Bridge","ending_cross_street":"Charlotte Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.08184,40.741405]]}},{"id":"A8vqZdqs0q9NSZYnjcSECgpu270=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Southbound near Wittpenn Bridge (Jersey City), Friday June 12, 2026 10:00 AM thru 02:00 PM, right lane closed","update_date":"2026-06-05T16:38:53Z"},"road_event_id":"A8vqZdqs0q9NSZYnjcSECgpu270=","beginning_cross_street":"Wittpenn Bridge","ending_cross_street":"Charlotte Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.08184,40.741405]]}},{"id":"wxjuaG7e2lSRO46ZKHx65EPbZAo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9/Tonnelle Avenue"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9/Tonnelle Avenue between North of 44th St (North Bergen Twp) and North of Ridgefield Circle (Ridgefield), Wednesday June 10, 2026 08:00 PM thru Thursday June 11, 2026 06:00 AM, left lane closed","update_date":"2026-06-05T16:38:54Z"},"road_event_id":"wxjuaG7e2lSRO46ZKHx65EPbZAo=","beginning_cross_street":"North of 44th St","ending_cross_street":"North of Ridgefield Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033393,40.784675]]}},{"id":"rifAyC/fWcyoBYssyhI6oadMglk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Southbound near Wittpenn Bridge (Jersey City), Wednesday June 10, 2026 10:00 AM thru 02:00 PM, right lane closed","update_date":"2026-06-05T16:38:55Z"},"road_event_id":"rifAyC/fWcyoBYssyhI6oadMglk=","beginning_cross_street":"Wittpenn Bridge","ending_cross_street":"Charlotte Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.08184,40.741405]]}},{"id":"/c2vCxs+P1eAezPGRjWPqmMQGHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound between Exit 64 - Summit Ave/NJ 17 (Hackensack) and West of Exit 67 - River Rd (Hackensack), Tuesday June 9, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-06-05T16:38:57Z"},"road_event_id":"/c2vCxs+P1eAezPGRjWPqmMQGHU=","beginning_cross_street":"Exit 64 - Summit Ave/NJ 17","ending_cross_street":"West of Exit 67 - River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.065162,40.88058]]}},{"id":"AUILZRPaaofwj8oeYt5sTYG6yao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Southbound between North of Ridgefield Circle (Ridgefield) and North of 44th St (North Bergen Twp), Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 06:00 AM, right shoulder closed","update_date":"2026-06-05T16:38:50Z"},"road_event_id":"AUILZRPaaofwj8oeYt5sTYG6yao=","beginning_cross_street":"North of Ridgefield Circle","ending_cross_street":"North of 44th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003181,40.840713]]}},{"id":"GRXO4q+V+A4VABdr4vSWcKb8YzI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9/Tonnelle Avenue"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9/Tonnelle Avenue between North of 44th St (North Bergen Twp) and North of Ridgefield Circle (Ridgefield), Monday June 8, 2026 08:00 PM thru Tuesday June 9, 2026 06:00 AM, left lane closed","update_date":"2026-06-05T16:38:51Z"},"road_event_id":"GRXO4q+V+A4VABdr4vSWcKb8YzI=","beginning_cross_street":"North of 44th St","ending_cross_street":"North of Ridgefield Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033393,40.784675]]}},{"id":"wQ7/aOY2F9Ti5jxIQlKxE6KiGpU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 27 both directions area of 4th Avenue (New York), Wednesday June 10th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-05T16:38:52Z"},"road_event_id":"wQ7/aOY2F9Ti5jxIQlKxE6KiGpU=","beginning_cross_street":"4th Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99403,40.666066]]}},{"id":"8lfXZGQL7KSafXLVcUY+3XKl3MI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near East of Exit 35 - Mount Hope Av (Rockaway Twp), Monday June 8, 2026 06:00 AM thru 02:00 PM, right shoulder closed","update_date":"2026-06-05T16:38:58Z"},"road_event_id":"8lfXZGQL7KSafXLVcUY+3XKl3MI=","beginning_cross_street":"East of Exit 35 - Mount Hope Av","ending_cross_street":"East of Exit 35 - Mount Hope Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.532669,40.91093]]}},{"id":"LfN9FQ1KVOqM2ayJ/vt8Uuy7/S8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near East of Exit 60 - NJ 20 (Paterson), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 06:00 AM)","update_date":"2026-06-05T16:38:59Z"},"road_event_id":"LfN9FQ1KVOqM2ayJ/vt8Uuy7/S8=","beginning_cross_street":"East of Exit 60 - NJ 20","ending_cross_street":"East of Exit 60 - NJ 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.136749,40.901809]]}},{"id":"XUnGATgCshr2W/PXzS4bajE5T4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound between Exit 64 - Summit Ave/NJ 17 (Hackensack) and West of Exit 67 - River Rd (Hackensack), Monday June 8, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-06-05T16:39:00Z"},"road_event_id":"XUnGATgCshr2W/PXzS4bajE5T4Q=","beginning_cross_street":"Exit 64 - Summit Ave/NJ 17","ending_cross_street":"West of Exit 67 - River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.065162,40.88058]]}},{"id":"1vj0QpiNLlYs+T0Ugw6hVnvzH+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9/Tonnelle Avenue"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9/Tonnelle Avenue between North of 44th St (North Bergen Twp) and North of Ridgefield Circle (Ridgefield), Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T16:39:06Z"},"road_event_id":"1vj0QpiNLlYs+T0Ugw6hVnvzH+M=","beginning_cross_street":"North of 44th St","ending_cross_street":"North of Ridgefield Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033393,40.784675]]}},{"id":"8TZaaeqSEC3Z+JJcwsStVwhF6PI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Southbound near Wittpenn Bridge (Jersey City), Thursday June 11, 2026 10:00 AM thru 02:00 PM, right lane closed","update_date":"2026-06-05T16:39:08Z"},"road_event_id":"8TZaaeqSEC3Z+JJcwsStVwhF6PI=","beginning_cross_street":"Wittpenn Bridge","ending_cross_street":"Charlotte Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.08184,40.741405]]}},{"id":"0fcbdRvExiwfyfOU4Hiyjbyx1GI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9/Tonnelle Avenue"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9/Tonnelle Avenue between North of 44th St (North Bergen Twp) and North of Ridgefield Circle (Ridgefield), Tuesday June 9, 2026 08:00 PM thru Wednesday June 10, 2026 06:00 AM, left lane closed","update_date":"2026-06-05T16:39:09Z"},"road_event_id":"0fcbdRvExiwfyfOU4Hiyjbyx1GI=","beginning_cross_street":"North of 44th St","ending_cross_street":"North of Ridgefield Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033393,40.784675]]}},{"id":"79PHsuW+4XRnsINP3NERGBTfmAI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near East of Exit 60 - NJ 20 (Paterson), Friday June 5, 2026 08:00 PM thru Saturday June 6, 2026 06:00 AM, at least one lane closed","update_date":"2026-06-05T16:39:10Z"},"road_event_id":"79PHsuW+4XRnsINP3NERGBTfmAI=","beginning_cross_street":"East of Exit 60 - NJ 20","ending_cross_street":"East of Exit 60 - NJ 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.136749,40.901809]]}},{"id":"kkRJdiHYaWQjH3YIIfuY4AdLkEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Southbound between North of Ridgefield Circle (Ridgefield) and North of 44th St (North Bergen Twp), Monday June 8, 2026 08:00 PM thru Tuesday June 9, 2026 06:00 AM, left lane closed","update_date":"2026-06-05T16:39:01Z"},"road_event_id":"kkRJdiHYaWQjH3YIIfuY4AdLkEY=","beginning_cross_street":"North of Ridgefield Circle","ending_cross_street":"North of 44th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003181,40.840713]]}},{"id":"kk0Eg14CJNhxppwNi+3fQ5uJK/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Southbound between North of Ridgefield Circle (Ridgefield) and North of 44th St (North Bergen Twp), Wednesday June 10, 2026 08:00 PM thru Thursday June 11, 2026 06:00 AM, left lane closed","update_date":"2026-06-05T16:39:03Z"},"road_event_id":"kk0Eg14CJNhxppwNi+3fQ5uJK/w=","beginning_cross_street":"North of Ridgefield Circle","ending_cross_street":"North of 44th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003181,40.840713]]}},{"id":"mG+rLCKR3hLNwuhpnFj4qDwF180=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Southbound between North of Ridgefield Circle (Ridgefield) and North of 44th St (North Bergen Twp), Tuesday June 9, 2026 08:00 PM thru Wednesday June 10, 2026 06:00 AM, left lane closed","update_date":"2026-06-05T16:39:04Z"},"road_event_id":"mG+rLCKR3hLNwuhpnFj4qDwF180=","beginning_cross_street":"North of Ridgefield Circle","ending_cross_street":"North of 44th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003181,40.840713]]}},{"id":"CIC57RbvoGJKpRSd8sOawQcj4Ho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Southbound near Wittpenn Bridge (Jersey City), Tuesday June 9, 2026 10:00 AM thru 02:00 PM, right lane closed","update_date":"2026-06-05T16:39:05Z"},"road_event_id":"CIC57RbvoGJKpRSd8sOawQcj4Ho=","beginning_cross_street":"Wittpenn Bridge","ending_cross_street":"Charlotte Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.08184,40.741405]]}},{"id":"6ampX/BE2Z2CJFcbSYvYUXrlqd4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 20"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 20 Northbound near To CR 652 (Paterson), Monday June 8, 2026 12:00 AM thru 12:15 AM, , moving operation","update_date":"2026-06-05T16:39:12Z"},"road_event_id":"6ampX/BE2Z2CJFcbSYvYUXrlqd4=","beginning_cross_street":"To CR 652","ending_cross_street":"CR 652","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T04:00:00Z","end_date":"2026-06-08T05:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.14257,40.930557]]}},{"id":"nTJsWiBGYkZMR52JKUJ4nmB+nhk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Southbound between North of Ridgefield Circle (Ridgefield) and North of 44th St (North Bergen Twp), Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T16:39:13Z"},"road_event_id":"nTJsWiBGYkZMR52JKUJ4nmB+nhk=","beginning_cross_street":"North of Ridgefield Circle","ending_cross_street":"North of 44th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003181,40.840713]]}},{"id":"nodTo5zT9JoUswv+swcBDsE/Ax8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9/Tonnelle Avenue"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9/Tonnelle Avenue between North of 44th St (North Bergen Twp) and North of Ridgefield Circle (Ridgefield), Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 06:00 AM, right shoulder closed","update_date":"2026-06-05T16:38:47Z"},"road_event_id":"nodTo5zT9JoUswv+swcBDsE/Ax8=","beginning_cross_street":"North of 44th St","ending_cross_street":"North of Ridgefield Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033393,40.784675]]}},{"id":"vbmyO+mkcytDHQSmousMXfXEw1M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound at North of CR 617/Rues Ln (East Brunswick Twp) Monday June 8, 2026 09:00 AM thru 03:00 PM, ramp, right partial lane","update_date":"2026-06-05T16:38:48Z"},"road_event_id":"vbmyO+mkcytDHQSmousMXfXEw1M=","beginning_cross_street":"North of CR 617/Rues Ln","ending_cross_street":"North of CR 617/Rues Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.38005,40.42488]]}},{"id":"vgr3hS6J6TpmicFL16eOVEj6xqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FEURA BUSH RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"suVHO+wbcrqJoQtWcIjLb53+fSE="}],"description":"Safety improvements on FEURA BUSH RD eastbound between Murray Ave and Elsmere Ave (Bethlehem) alternating lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-05T16:40:52Z"},"road_event_id":"vgr3hS6J6TpmicFL16eOVEj6xqo=","beginning_cross_street":"between Murray Ave and Elsmere Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822102,42.600252]]}},{"id":"suVHO+wbcrqJoQtWcIjLb53+fSE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FEURA BUSH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vgr3hS6J6TpmicFL16eOVEj6xqo="},{"type":"next-occurrence","id":"1703Xepntx+kSMxXk/4+rdBJ6WE="}],"description":"Safety improvements on FEURA BUSH RD eastbound between Murray Ave and Elsmere Ave (Bethlehem) alternating lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-05T16:40:52Z"},"road_event_id":"suVHO+wbcrqJoQtWcIjLb53+fSE=","beginning_cross_street":"between Murray Ave and Elsmere Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822102,42.600252]]}},{"id":"1703Xepntx+kSMxXk/4+rdBJ6WE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FEURA BUSH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vgr3hS6J6TpmicFL16eOVEj6xqo="},{"type":"next-occurrence","id":"9Fcax+5pKnFbyFfbeYqqVw6Wh1Q="}],"description":"Safety improvements on FEURA BUSH RD eastbound between Murray Ave and Elsmere Ave (Bethlehem) alternating lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-05T16:40:52Z"},"road_event_id":"1703Xepntx+kSMxXk/4+rdBJ6WE=","beginning_cross_street":"between Murray Ave and Elsmere Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822102,42.600252]]}},{"id":"9Fcax+5pKnFbyFfbeYqqVw6Wh1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FEURA BUSH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vgr3hS6J6TpmicFL16eOVEj6xqo="},{"type":"next-occurrence","id":"MXMs+eszSLqFK5f77hI2NjrVjfg="}],"description":"Safety improvements on FEURA BUSH RD eastbound between Murray Ave and Elsmere Ave (Bethlehem) alternating lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-05T16:40:52Z"},"road_event_id":"9Fcax+5pKnFbyFfbeYqqVw6Wh1Q=","beginning_cross_street":"between Murray Ave and Elsmere Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822102,42.600252]]}},{"id":"MXMs+eszSLqFK5f77hI2NjrVjfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FEURA BUSH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vgr3hS6J6TpmicFL16eOVEj6xqo="}],"description":"Safety improvements on FEURA BUSH RD eastbound between Murray Ave and Elsmere Ave (Bethlehem) alternating lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-05T16:40:52Z"},"road_event_id":"MXMs+eszSLqFK5f77hI2NjrVjfg=","beginning_cross_street":"between Murray Ave and Elsmere Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822102,42.600252]]}},{"id":"lp6PwJXArr+D73ZdmcuHq0a1DTA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of Garden State Parkway (Clifton) and West of NJ 23/Pompton Av (Wayne Twp), Thursday June 11, 2026 09:00 PM thru Friday June 12, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T16:41:51Z"},"road_event_id":"lp6PwJXArr+D73ZdmcuHq0a1DTA=","beginning_cross_street":"West of Garden State Parkway","ending_cross_street":"West of NJ 23/Pompton Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.131179,40.889961]]}},{"id":"6xdI6FsjUQ4zsD4IeZWO1eKWfIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp) and West of I-80 (Denville Twp), Monday June 8, 2026 08:00 PM thru Tuesday June 9, 2026 06:00 AM, right shoulder closed","update_date":"2026-06-05T16:41:53Z"},"road_event_id":"6xdI6FsjUQ4zsD4IeZWO1eKWfIU=","beginning_cross_street":"West of US 202/CR 511/Parsippany Blvd","ending_cross_street":"West of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.42678,40.87215]]}},{"id":"ykfMGlX46JOkL/WeptxfLYFKOjk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of I-80 (Parsippany-Troy Hills Twp) and East of I-287 (Parsippany-Troy Hills Twp), Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 06:00 AM, left lane closed","update_date":"2026-06-05T16:41:54Z"},"road_event_id":"ykfMGlX46JOkL/WeptxfLYFKOjk=","beginning_cross_street":"West of I-80","ending_cross_street":"East of I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.37178,40.861789]]}},{"id":"g2RCWXysPCETC8yPP4IrRrp7Exc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of NJ 23/Pompton Av (Wayne Twp) and West of Garden State Parkway (Clifton), Tuesday June 9, 2026 08:00 PM thru Wednesday June 10, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T16:41:55Z"},"road_event_id":"g2RCWXysPCETC8yPP4IrRrp7Exc=","beginning_cross_street":"West of NJ 23/Pompton Av","ending_cross_street":"West of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.257308,40.893184]]}},{"id":"QbXosGiWMmVBj0rXeddHHeNBS3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp) and West of I-80 (Denville Twp), Tuesday June 9, 2026 08:00 PM thru Wednesday June 10, 2026 06:00 AM, right shoulder closed","update_date":"2026-06-05T16:41:47Z"},"road_event_id":"QbXosGiWMmVBj0rXeddHHeNBS3U=","beginning_cross_street":"West of US 202/CR 511/Parsippany Blvd","ending_cross_street":"West of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.42678,40.87215]]}},{"id":"UVf2VM2a+c/Jp43mlZVygz8G8K4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of Garden State Parkway (Clifton) and West of NJ 23/Pompton Av (Wayne Twp), Monday June 8, 2026 09:00 PM thru Tuesday June 9, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T16:41:49Z"},"road_event_id":"UVf2VM2a+c/Jp43mlZVygz8G8K4=","beginning_cross_street":"West of Garden State Parkway","ending_cross_street":"West of NJ 23/Pompton Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.131179,40.889961]]}},{"id":"iH92UConn9TlYxcfzCfd7DyN2sg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp) and West of I-80 (Denville Twp), Wednesday June 10, 2026 08:00 PM thru Thursday June 11, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T16:41:50Z"},"road_event_id":"iH92UConn9TlYxcfzCfd7DyN2sg=","beginning_cross_street":"West of US 202/CR 511/Parsippany Blvd","ending_cross_street":"West of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.42678,40.87215]]}},{"id":"OwBw4KIn37q/Mex5ZD9ULRLSJiY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp) and West of I-80 (Denville Twp), Monday June 8, 2026 08:00 PM thru Tuesday June 9, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T16:41:57Z"},"road_event_id":"OwBw4KIn37q/Mex5ZD9ULRLSJiY=","beginning_cross_street":"West of US 202/CR 511/Parsippany Blvd","ending_cross_street":"West of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.42678,40.87215]]}},{"id":"KNJzx0TqSKYijbvzK7rvfZ753+0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of Garden State Parkway (Clifton) and West of NJ 23/Pompton Av (Wayne Twp), Wednesday June 10, 2026 09:00 PM thru Thursday June 11, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T16:41:58Z"},"road_event_id":"KNJzx0TqSKYijbvzK7rvfZ753+0=","beginning_cross_street":"West of Garden State Parkway","ending_cross_street":"West of NJ 23/Pompton Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.131179,40.889961]]}},{"id":"NxUe/g2GvknZNbu3q6fnkEp50cg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of Garden State Parkway (Clifton) and West of NJ 23/Pompton Av (Wayne Twp), Tuesday June 9, 2026 09:00 PM thru Wednesday June 10, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T16:41:59Z"},"road_event_id":"NxUe/g2GvknZNbu3q6fnkEp50cg=","beginning_cross_street":"West of Garden State Parkway","ending_cross_street":"West of NJ 23/Pompton Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.131179,40.889961]]}},{"id":"xHuNo19u5bJOpfHPvu467h636NY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp) and West of I-80 (Denville Twp), Tuesday June 9, 2026 08:00 PM thru Wednesday June 10, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T16:42:06Z"},"road_event_id":"xHuNo19u5bJOpfHPvu467h636NY=","beginning_cross_street":"West of US 202/CR 511/Parsippany Blvd","ending_cross_street":"West of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.42678,40.87215]]}},{"id":"umD/SBieotyExhCUOgbcLbMw5II=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"X5vmMM6jjq+NQDKa8EtTzpfYqMY="}],"description":"Line striping on NY 248 both directions CR 19 (Independence) 1 Lane, 2 Way, Flagger Control- WET PAINT use caution., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 05:30 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T16:42:07Z"},"road_event_id":"umD/SBieotyExhCUOgbcLbMw5II=","beginning_cross_street":"CR 19","ending_cross_street":"CR 19","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T09:30:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.764147,42.03771]]}},{"id":"X5vmMM6jjq+NQDKa8EtTzpfYqMY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"umD/SBieotyExhCUOgbcLbMw5II="},{"type":"next-occurrence","id":"UprY6SezMBWqgSzNcwonpvToWRI="}],"description":"Line striping on NY 248 both directions CR 19 (Independence) 1 Lane, 2 Way, Flagger Control- WET PAINT use caution., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 05:30 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T16:42:07Z"},"road_event_id":"X5vmMM6jjq+NQDKa8EtTzpfYqMY=","beginning_cross_street":"CR 19","ending_cross_street":"CR 19","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T09:30:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.764147,42.03771]]}},{"id":"UprY6SezMBWqgSzNcwonpvToWRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"umD/SBieotyExhCUOgbcLbMw5II="},{"type":"next-occurrence","id":"NE5sdyO3WV40r/OdKIr3WsjzBwo="}],"description":"Line striping on NY 248 both directions CR 19 (Independence) 1 Lane, 2 Way, Flagger Control- WET PAINT use caution., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 05:30 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T16:42:07Z"},"road_event_id":"UprY6SezMBWqgSzNcwonpvToWRI=","beginning_cross_street":"CR 19","ending_cross_street":"CR 19","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T09:30:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.764147,42.03771]]}},{"id":"NE5sdyO3WV40r/OdKIr3WsjzBwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"umD/SBieotyExhCUOgbcLbMw5II="},{"type":"next-occurrence","id":"UAv0OFRYOk6ImGpopEP5oCJ+ceY="}],"description":"Line striping on NY 248 both directions CR 19 (Independence) 1 Lane, 2 Way, Flagger Control- WET PAINT use caution., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 05:30 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T16:42:07Z"},"road_event_id":"NE5sdyO3WV40r/OdKIr3WsjzBwo=","beginning_cross_street":"CR 19","ending_cross_street":"CR 19","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T09:30:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.764147,42.03771]]}},{"id":"UAv0OFRYOk6ImGpopEP5oCJ+ceY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"umD/SBieotyExhCUOgbcLbMw5II="}],"description":"Line striping on NY 248 both directions CR 19 (Independence) 1 Lane, 2 Way, Flagger Control- WET PAINT use caution., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 05:30 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T16:42:07Z"},"road_event_id":"UAv0OFRYOk6ImGpopEP5oCJ+ceY=","beginning_cross_street":"CR 19","ending_cross_street":"CR 19","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T09:30:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.764147,42.03771]]}},{"id":"3bivB4pFage5eLE46S9Dl8+5JDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of NJ 23/Pompton Av (Wayne Twp) and West of Garden State Parkway (Clifton), Wednesday June 10, 2026 08:00 PM thru Thursday June 11, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T16:42:01Z"},"road_event_id":"3bivB4pFage5eLE46S9Dl8+5JDU=","beginning_cross_street":"West of NJ 23/Pompton Av","ending_cross_street":"West of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.257308,40.893184]]}},{"id":"s9TfQme3otrVQb0PvEGZ6x+VM1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of NJ 23/Pompton Av (Wayne Twp) and West of Garden State Parkway (Clifton), Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 06:00 AM, right lane closed","update_date":"2026-06-05T16:42:02Z"},"road_event_id":"s9TfQme3otrVQb0PvEGZ6x+VM1U=","beginning_cross_street":"West of NJ 23/Pompton Av","ending_cross_street":"West of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.257308,40.893184]]}},{"id":"ACjPbo1aVEnYc3ybXS1HmFPBAKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp) and West of I-80 (Denville Twp), Wednesday June 10, 2026 08:00 PM thru Thursday June 11, 2026 06:00 AM, right shoulder closed","update_date":"2026-06-05T16:42:03Z"},"road_event_id":"ACjPbo1aVEnYc3ybXS1HmFPBAKA=","beginning_cross_street":"West of US 202/CR 511/Parsippany Blvd","ending_cross_street":"West of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.42678,40.87215]]}},{"id":"LEW+w80DbOnf1AUHpEzR5K4eALQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound at East of I-80 (Denville Twp) Wednesday June 10, 2026 11:00 PM thru Thursday June 11, 2026 05:00 AM, ramp","update_date":"2026-06-05T16:42:04Z"},"road_event_id":"LEW+w80DbOnf1AUHpEzR5K4eALQ=","beginning_cross_street":"East of I-80","ending_cross_street":"East of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T03:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.48664,40.896499]]}},{"id":"cDIdYhH4C7DcVSIk/rTYRFDkmac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EUMRoL9YtzjlA1L355lp9BQrQ90="}],"description":"Road widening on NY 52 both directions between Harts Lane (Montgomery) and Holiday Park Lane (Montgomery) 2026083561803/32774109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T16:47:22Z"},"road_event_id":"cDIdYhH4C7DcVSIk/rTYRFDkmac=","beginning_cross_street":"Harts Lane","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.143343,41.554617]]}},{"id":"EUMRoL9YtzjlA1L355lp9BQrQ90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cDIdYhH4C7DcVSIk/rTYRFDkmac="},{"type":"next-occurrence","id":"B2O1d4V0mdeEFJy/h64w/Xe/4XE="}],"description":"Road widening on NY 52 both directions between Harts Lane (Montgomery) and Holiday Park Lane (Montgomery) 2026083561803/32774109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T16:47:22Z"},"road_event_id":"EUMRoL9YtzjlA1L355lp9BQrQ90=","beginning_cross_street":"Harts Lane","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.143343,41.554617]]}},{"id":"B2O1d4V0mdeEFJy/h64w/Xe/4XE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cDIdYhH4C7DcVSIk/rTYRFDkmac="},{"type":"next-occurrence","id":"JT9DFXqssQOvSOKx7RB604mtIjI="}],"description":"Road widening on NY 52 both directions between Harts Lane (Montgomery) and Holiday Park Lane (Montgomery) 2026083561803/32774109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T16:47:22Z"},"road_event_id":"B2O1d4V0mdeEFJy/h64w/Xe/4XE=","beginning_cross_street":"Harts Lane","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.143343,41.554617]]}},{"id":"JT9DFXqssQOvSOKx7RB604mtIjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cDIdYhH4C7DcVSIk/rTYRFDkmac="},{"type":"next-occurrence","id":"W8ZuxE+nddwhypkBf4TgkGhruqk="}],"description":"Road widening on NY 52 both directions between Harts Lane (Montgomery) and Holiday Park Lane (Montgomery) 2026083561803/32774109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T16:47:22Z"},"road_event_id":"JT9DFXqssQOvSOKx7RB604mtIjI=","beginning_cross_street":"Harts Lane","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.143343,41.554617]]}},{"id":"W8ZuxE+nddwhypkBf4TgkGhruqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cDIdYhH4C7DcVSIk/rTYRFDkmac="},{"type":"next-occurrence","id":"Wmfcef8VIv75WXSPimzewO1N8fw="}],"description":"Road widening on NY 52 both directions between Harts Lane (Montgomery) and Holiday Park Lane (Montgomery) 2026083561803/32774109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T16:47:22Z"},"road_event_id":"W8ZuxE+nddwhypkBf4TgkGhruqk=","beginning_cross_street":"Harts Lane","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.143343,41.554617]]}},{"id":"Wmfcef8VIv75WXSPimzewO1N8fw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cDIdYhH4C7DcVSIk/rTYRFDkmac="},{"type":"next-occurrence","id":"0rfaT/S9xmeJG5kvA8mDmTunkt0="}],"description":"Road widening on NY 52 both directions between Harts Lane (Montgomery) and Holiday Park Lane (Montgomery) 2026083561803/32774109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T16:47:22Z"},"road_event_id":"Wmfcef8VIv75WXSPimzewO1N8fw=","beginning_cross_street":"Harts Lane","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.143343,41.554617]]}},{"id":"0rfaT/S9xmeJG5kvA8mDmTunkt0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cDIdYhH4C7DcVSIk/rTYRFDkmac="},{"type":"next-occurrence","id":"NvCDS57LYODyB7M+i7gXhgVQ2fc="}],"description":"Road widening on NY 52 both directions between Harts Lane (Montgomery) and Holiday Park Lane (Montgomery) 2026083561803/32774109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T16:47:22Z"},"road_event_id":"0rfaT/S9xmeJG5kvA8mDmTunkt0=","beginning_cross_street":"Harts Lane","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T13:00:00Z","end_date":"2026-06-16T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.143343,41.554617]]}},{"id":"NvCDS57LYODyB7M+i7gXhgVQ2fc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cDIdYhH4C7DcVSIk/rTYRFDkmac="},{"type":"next-occurrence","id":"CJIZ0VfmLmRmh1uwVzeAVb39N1w="}],"description":"Road widening on NY 52 both directions between Harts Lane (Montgomery) and Holiday Park Lane (Montgomery) 2026083561803/32774109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T16:47:22Z"},"road_event_id":"NvCDS57LYODyB7M+i7gXhgVQ2fc=","beginning_cross_street":"Harts Lane","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.143343,41.554617]]}},{"id":"CJIZ0VfmLmRmh1uwVzeAVb39N1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cDIdYhH4C7DcVSIk/rTYRFDkmac="},{"type":"next-occurrence","id":"vSeYJ39vQ+sRqOFQU0oR/M6kKn4="}],"description":"Road widening on NY 52 both directions between Harts Lane (Montgomery) and Holiday Park Lane (Montgomery) 2026083561803/32774109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T16:47:22Z"},"road_event_id":"CJIZ0VfmLmRmh1uwVzeAVb39N1w=","beginning_cross_street":"Harts Lane","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.143343,41.554617]]}},{"id":"vSeYJ39vQ+sRqOFQU0oR/M6kKn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cDIdYhH4C7DcVSIk/rTYRFDkmac="}],"description":"Road widening on NY 52 both directions between Harts Lane (Montgomery) and Holiday Park Lane (Montgomery) 2026083561803/32774109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Monday June 29th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-06-05T16:47:22Z"},"road_event_id":"vSeYJ39vQ+sRqOFQU0oR/M6kKn4=","beginning_cross_street":"Harts Lane","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T13:00:00Z","end_date":"2026-06-19T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.143343,41.554617]]}},{"id":"YL/S4l0dqfGRqGiBNfEnMpPbmeQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 70 Westbound from East of CR 644/Grove St/Haddonfield Rd (Cherry Hill Twp) to East of CR 627/Cooper Landing Rd (Cherry Hill Twp) Wednesday June 10, 2026 08:00 PM thru Thursday June 11, 2026 06:00 AM, 1 right lane of 2 lanes closed","update_date":"2026-06-05T16:44:09Z"},"road_event_id":"YL/S4l0dqfGRqGiBNfEnMpPbmeQ=","beginning_cross_street":"East of CR 644/Grove St/Haddonfield Rd","ending_cross_street":"East of CR 627/Cooper Landing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.031341,39.918151]]}},{"id":"G+7xVLpJ9HEJJ8biWLzAL8/4z2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 70 Westbound from East of CR 644/Grove St/Haddonfield Rd (Cherry Hill Twp) to East of CR 627/Cooper Landing Rd (Cherry Hill Twp) Thursday June 11, 2026 08:00 PM thru Friday June 12, 2026 06:00 AM, 1 right lane of 2 lanes closed","update_date":"2026-06-05T16:44:16Z"},"road_event_id":"G+7xVLpJ9HEJJ8biWLzAL8/4z2E=","beginning_cross_street":"East of CR 644/Grove St/Haddonfield Rd","ending_cross_street":"East of CR 627/Cooper Landing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.031341,39.918151]]}},{"id":"hwtOaUskiP+Rrf63DKERAupYLj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 70 Westbound from East of CR 644/Grove St/Haddonfield Rd (Cherry Hill Twp) to East of CR 627/Cooper Landing Rd (Cherry Hill Twp) Monday June 8, 2026 08:00 PM thru Tuesday June 9, 2026 06:00 AM, 1 right lane of 2 lanes closed","update_date":"2026-06-05T16:43:48Z"},"road_event_id":"hwtOaUskiP+Rrf63DKERAupYLj0=","beginning_cross_street":"East of CR 644/Grove St/Haddonfield Rd","ending_cross_street":"East of CR 627/Cooper Landing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.031341,39.918151]]}},{"id":"GA0VpwkcvTdvBxjpmi0r8jQXMBQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 70 Westbound from East of CR 644/Grove St/Haddonfield Rd (Cherry Hill Twp) to East of CR 627/Cooper Landing Rd (Cherry Hill Twp) Tuesday June 9, 2026 08:00 PM thru Wednesday June 10, 2026 06:00 AM, 1 right lane of 2 lanes closed","update_date":"2026-06-05T16:43:58Z"},"road_event_id":"GA0VpwkcvTdvBxjpmi0r8jQXMBQ=","beginning_cross_street":"East of CR 644/Grove St/Haddonfield Rd","ending_cross_street":"East of CR 627/Cooper Landing Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.031341,39.918151]]}},{"id":"vTsamEBoIYsAuXEOBJWoKhLQhS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 50"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 50 Both Directions At CR 686/Aloe St (Galloway Twp) Tuesday June 9, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed eastbound; 1 right lane of 2 lanes closed westbound","update_date":"2026-06-05T16:45:37Z"},"road_event_id":"vTsamEBoIYsAuXEOBJWoKhLQhS0=","beginning_cross_street":"CR 686/Aloe St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.651611,39.525318]]}},{"id":"yCM5SXrDP1gjUACP04+FM4aEV74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/H0JXPziSgTykEPiyJnyMiRP1c0="}],"description":"Line striping on NY 19 northbound Bolivar Road; end NY 417 overlap (Wellsville) to Genesee Street; NY 244 (Amity) Mobile Work Zone \"Caution Wet Paint\" 1 Lane 2 way flagger , Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 05:30 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T16:47:35Z"},"road_event_id":"yCM5SXrDP1gjUACP04+FM4aEV74=","beginning_cross_street":"Bolivar Road; end NY 417 overlap","ending_cross_street":"Genesee Street; NY 244","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T09:30:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.959413,42.128861]]}},{"id":"/H0JXPziSgTykEPiyJnyMiRP1c0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yCM5SXrDP1gjUACP04+FM4aEV74="},{"type":"next-occurrence","id":"E77cp3xqCIGwN9U6bnEub8ayQPc="}],"description":"Line striping on NY 19 northbound Bolivar Road; end NY 417 overlap (Wellsville) to Genesee Street; NY 244 (Amity) Mobile Work Zone \"Caution Wet Paint\" 1 Lane 2 way flagger , Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 05:30 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T16:47:35Z"},"road_event_id":"/H0JXPziSgTykEPiyJnyMiRP1c0=","beginning_cross_street":"Bolivar Road; end NY 417 overlap","ending_cross_street":"Genesee Street; NY 244","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T09:30:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.959413,42.128861]]}},{"id":"E77cp3xqCIGwN9U6bnEub8ayQPc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yCM5SXrDP1gjUACP04+FM4aEV74="},{"type":"next-occurrence","id":"y48llfWsSIBR9uUkS2wYo7mPxAo="}],"description":"Line striping on NY 19 northbound Bolivar Road; end NY 417 overlap (Wellsville) to Genesee Street; NY 244 (Amity) Mobile Work Zone \"Caution Wet Paint\" 1 Lane 2 way flagger , Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 05:30 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T16:47:35Z"},"road_event_id":"E77cp3xqCIGwN9U6bnEub8ayQPc=","beginning_cross_street":"Bolivar Road; end NY 417 overlap","ending_cross_street":"Genesee Street; NY 244","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T09:30:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.959413,42.128861]]}},{"id":"y48llfWsSIBR9uUkS2wYo7mPxAo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yCM5SXrDP1gjUACP04+FM4aEV74="},{"type":"next-occurrence","id":"/5vIi1hpN69pYGklbo41sHsvLQ8="}],"description":"Line striping on NY 19 northbound Bolivar Road; end NY 417 overlap (Wellsville) to Genesee Street; NY 244 (Amity) Mobile Work Zone \"Caution Wet Paint\" 1 Lane 2 way flagger , Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 05:30 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T16:47:35Z"},"road_event_id":"y48llfWsSIBR9uUkS2wYo7mPxAo=","beginning_cross_street":"Bolivar Road; end NY 417 overlap","ending_cross_street":"Genesee Street; NY 244","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T09:30:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.959413,42.128861]]}},{"id":"/5vIi1hpN69pYGklbo41sHsvLQ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yCM5SXrDP1gjUACP04+FM4aEV74="}],"description":"Line striping on NY 19 northbound Bolivar Road; end NY 417 overlap (Wellsville) to Genesee Street; NY 244 (Amity) Mobile Work Zone \"Caution Wet Paint\" 1 Lane 2 way flagger , Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 05:30 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T16:47:35Z"},"road_event_id":"/5vIi1hpN69pYGklbo41sHsvLQ8=","beginning_cross_street":"Bolivar Road; end NY 417 overlap","ending_cross_street":"Genesee Street; NY 244","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T09:30:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.959413,42.128861]]}},{"id":"j9Ink6fLJvUtLT3ApoUTq88gG7E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark Light Rail"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, Newark Light Rail between Grove Street Light Rail Station (Bloomfield Twp) and Broad Street Light Rail Station (Newark) trains will operate on a modified Sunday schedule. Trains will depart Grove Street 10 minutes earlier than regularly scheduled, and will depart Broad Street 6 minutes later than regularly scheduled., Saturday June 6th, 2026 thru Saturday June 6th, 2026, 12:00 AM thru 11:59 PM","update_date":"2026-06-05T16:50:10Z"},"road_event_id":"j9Ink6fLJvUtLT3ApoUTq88gG7E=","beginning_cross_street":"Grove Street Light Rail Station","ending_cross_street":"Broad Street Light Rail Station","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T04:00:00Z","end_date":"2026-06-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187931,40.780317]]}},{"id":"Gu9r2IIeRQbqPe7d5lJ3Py7eAyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark Light Rail"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, Newark Light Rail between Orange Street Light Rail Station (Newark) and Davenport Avenue Light Rail Station (Newark) All trains will arrive on the inbound platforms (to Newark Penn Station) at Orange Street, Park Avenue, Bloomfield Avenue, and Davenport Avenue stations. The outbound platforms (to Grove Street Station) at these stations will be closed, Saturday June 6th, 2026, 06:00 AM thru 06:00 PM","update_date":"2026-06-05T16:52:10Z"},"road_event_id":"Gu9r2IIeRQbqPe7d5lJ3Py7eAyM=","beginning_cross_street":"Orange Street Light Rail Station","ending_cross_street":"Davenport Avenue Light Rail Station","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.184951,40.750629]]}},{"id":"ANZlIl+ckS/GX6HY2vuJvVWPtVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SMITH RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"D3rv4WnjmlZR1hYKe8weyY8EFmQ="}],"description":"Utility work on SMITH RD northbound RT-5 (Hopewell) to NY 47 (Hopewell) Alternating lane/shoulder closures with flaggers as needed, Saturday June 6th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T16:51:43Z"},"road_event_id":"ANZlIl+ckS/GX6HY2vuJvVWPtVE=","beginning_cross_street":"RT-5","ending_cross_street":"NY 47 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T13:00:00Z","end_date":"2026-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.23185,42.868423]]}},{"id":"D3rv4WnjmlZR1hYKe8weyY8EFmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SMITH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ANZlIl+ckS/GX6HY2vuJvVWPtVE="},{"type":"next-occurrence","id":"8ff1tb7yx0bDnz7f550hC5ZyHzY="}],"description":"Utility work on SMITH RD northbound RT-5 (Hopewell) to NY 47 (Hopewell) Alternating lane/shoulder closures with flaggers as needed, Saturday June 6th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T16:51:43Z"},"road_event_id":"D3rv4WnjmlZR1hYKe8weyY8EFmQ=","beginning_cross_street":"RT-5","ending_cross_street":"NY 47 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T13:00:00Z","end_date":"2026-06-07T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.23185,42.868423]]}},{"id":"8ff1tb7yx0bDnz7f550hC5ZyHzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SMITH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ANZlIl+ckS/GX6HY2vuJvVWPtVE="},{"type":"next-occurrence","id":"L2gB5CQ8TE2kQJPe0gTJ/cWomC8="}],"description":"Utility work on SMITH RD northbound RT-5 (Hopewell) to NY 47 (Hopewell) Alternating lane/shoulder closures with flaggers as needed, Saturday June 6th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T16:51:43Z"},"road_event_id":"8ff1tb7yx0bDnz7f550hC5ZyHzY=","beginning_cross_street":"RT-5","ending_cross_street":"NY 47 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.23185,42.868423]]}},{"id":"L2gB5CQ8TE2kQJPe0gTJ/cWomC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SMITH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ANZlIl+ckS/GX6HY2vuJvVWPtVE="},{"type":"next-occurrence","id":"zbOBqn0E2lBpnyMCwMCj0CaAFSo="}],"description":"Utility work on SMITH RD northbound RT-5 (Hopewell) to NY 47 (Hopewell) Alternating lane/shoulder closures with flaggers as needed, Saturday June 6th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T16:51:43Z"},"road_event_id":"L2gB5CQ8TE2kQJPe0gTJ/cWomC8=","beginning_cross_street":"RT-5","ending_cross_street":"NY 47 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.23185,42.868423]]}},{"id":"zbOBqn0E2lBpnyMCwMCj0CaAFSo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SMITH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ANZlIl+ckS/GX6HY2vuJvVWPtVE="},{"type":"next-occurrence","id":"wmffoiTv/+M5IH2Wc3a63IXseMM="}],"description":"Utility work on SMITH RD northbound RT-5 (Hopewell) to NY 47 (Hopewell) Alternating lane/shoulder closures with flaggers as needed, Saturday June 6th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T16:51:43Z"},"road_event_id":"zbOBqn0E2lBpnyMCwMCj0CaAFSo=","beginning_cross_street":"RT-5","ending_cross_street":"NY 47 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.23185,42.868423]]}},{"id":"wmffoiTv/+M5IH2Wc3a63IXseMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SMITH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ANZlIl+ckS/GX6HY2vuJvVWPtVE="},{"type":"next-occurrence","id":"sxf356mSuS12fx266WqdaYo7gtY="}],"description":"Utility work on SMITH RD northbound RT-5 (Hopewell) to NY 47 (Hopewell) Alternating lane/shoulder closures with flaggers as needed, Saturday June 6th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T16:51:43Z"},"road_event_id":"wmffoiTv/+M5IH2Wc3a63IXseMM=","beginning_cross_street":"RT-5","ending_cross_street":"NY 47 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.23185,42.868423]]}},{"id":"sxf356mSuS12fx266WqdaYo7gtY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SMITH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ANZlIl+ckS/GX6HY2vuJvVWPtVE="}],"description":"Utility work on SMITH RD northbound RT-5 (Hopewell) to NY 47 (Hopewell) Alternating lane/shoulder closures with flaggers as needed, Saturday June 6th, 2026 thru Friday June 12th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T16:51:43Z"},"road_event_id":"sxf356mSuS12fx266WqdaYo7gtY=","beginning_cross_street":"RT-5","ending_cross_street":"NY 47 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.23185,42.868423]]}},{"id":"V13gAjB4me6RfsAyfdAv1BiO9YA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"920YZTMdCXdCZgX9jR7yH1cTKR0="}],"description":"Guard rail repairs on NY 394 westbound Main Street; West Main Street (Randolph), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T16:52:56Z"},"road_event_id":"V13gAjB4me6RfsAyfdAv1BiO9YA=","beginning_cross_street":"Main Street; West Main Street","ending_cross_street":"Main Street; West Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.974362,42.162399]]}},{"id":"920YZTMdCXdCZgX9jR7yH1cTKR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V13gAjB4me6RfsAyfdAv1BiO9YA="},{"type":"next-occurrence","id":"Ysv/+HlbXKJWVN8I5hj+I7hfOPg="}],"description":"Guard rail repairs on NY 394 westbound Main Street; West Main Street (Randolph), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T16:52:56Z"},"road_event_id":"920YZTMdCXdCZgX9jR7yH1cTKR0=","beginning_cross_street":"Main Street; West Main Street","ending_cross_street":"Main Street; West Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.974362,42.162399]]}},{"id":"Ysv/+HlbXKJWVN8I5hj+I7hfOPg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V13gAjB4me6RfsAyfdAv1BiO9YA="},{"type":"next-occurrence","id":"1X7N/tnO55gLkSbRJj2N9j4MHsU="}],"description":"Guard rail repairs on NY 394 westbound Main Street; West Main Street (Randolph), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T16:52:56Z"},"road_event_id":"Ysv/+HlbXKJWVN8I5hj+I7hfOPg=","beginning_cross_street":"Main Street; West Main Street","ending_cross_street":"Main Street; West Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.974362,42.162399]]}},{"id":"1X7N/tnO55gLkSbRJj2N9j4MHsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V13gAjB4me6RfsAyfdAv1BiO9YA="},{"type":"next-occurrence","id":"hbePW2iRQ4PsBgMplr2ohqVLc98="}],"description":"Guard rail repairs on NY 394 westbound Main Street; West Main Street (Randolph), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T16:52:56Z"},"road_event_id":"1X7N/tnO55gLkSbRJj2N9j4MHsU=","beginning_cross_street":"Main Street; West Main Street","ending_cross_street":"Main Street; West Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.974362,42.162399]]}},{"id":"hbePW2iRQ4PsBgMplr2ohqVLc98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V13gAjB4me6RfsAyfdAv1BiO9YA="}],"description":"Guard rail repairs on NY 394 westbound Main Street; West Main Street (Randolph), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T16:52:56Z"},"road_event_id":"hbePW2iRQ4PsBgMplr2ohqVLc98=","beginning_cross_street":"Main Street; West Main Street","ending_cross_street":"Main Street; West Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.974362,42.162399]]}},{"id":"X2BvkZy78o24Ftkklttx8D0gDUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark Light Rail"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, Newark Light Rail between Norfolk Street Light Rail Station (Newark) and Park Avenue Newark Light Rail Station (Newark) All trains will arrive on the outbound platforms (to Grove Street Station) at Orange Street and Park Avenue stations. The inbound platforms (to Newark Penn Station) at these stations and Norfolk Street Station will be closed. Please check all destination signs before boarding and allow for extra travel time. , Sunday June 7th, 2026, 06:00 AM thru 06:00 PM","update_date":"2026-06-05T16:53:50Z"},"road_event_id":"X2BvkZy78o24Ftkklttx8D0gDUk=","beginning_cross_street":"Norfolk Street Light Rail Station","ending_cross_street":"Park Avenue Newark Light Rail Station","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T10:00:00Z","end_date":"2026-06-07T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.183033,40.745319]]}},{"id":"9ENDuWj4ljsuhTBgYTsvEw1t6tw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Montclair-Boonton Line and Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hRwH4F9QSOfA6z830uSOLCsBBIU="}],"description":"Due to Track repairs both directions, Montclair-Boonton Line and Morris & Essex Line area of Newark Broad St (Newark) Morristown Line (Midtown Direct) and Montclair Line trains are subject to delays of up to 10 minutes in both directions due to track maintenance near Newark Broad Street Station. In addition, all Midtown Direct trains continuing to Secaucus and New York will operate on Track 1 (Track 2 will be closed during this period). , Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 07:00 AM thru 05:00 PM","update_date":"2026-06-05T16:57:42Z"},"road_event_id":"9ENDuWj4ljsuhTBgYTsvEw1t6tw=","beginning_cross_street":"Newark Broad St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T11:00:00Z","end_date":"2026-06-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.171943,40.747621]]}},{"id":"hRwH4F9QSOfA6z830uSOLCsBBIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Montclair-Boonton Line and Morris & Essex Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9ENDuWj4ljsuhTBgYTsvEw1t6tw="}],"description":"Due to Track repairs both directions, Montclair-Boonton Line and Morris & Essex Line area of Newark Broad St (Newark) Morristown Line (Midtown Direct) and Montclair Line trains are subject to delays of up to 10 minutes in both directions due to track maintenance near Newark Broad Street Station. In addition, all Midtown Direct trains continuing to Secaucus and New York will operate on Track 1 (Track 2 will be closed during this period). , Saturday June 6th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 07:00 AM thru 05:00 PM","update_date":"2026-06-05T16:57:42Z"},"road_event_id":"hRwH4F9QSOfA6z830uSOLCsBBIU=","beginning_cross_street":"Newark Broad St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.171943,40.747621]]}},{"id":"VhOkKskvmjN7CVEkiITnTA3KOQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Kp/CsxiquE0w6cIHfWD8wyIpKac="}],"description":"Culvert repairs on NY 23 both directions between Old South Durham Hwy and Morrison Rd (Cairo) alternating lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T16:59:03Z"},"road_event_id":"VhOkKskvmjN7CVEkiITnTA3KOQc=","beginning_cross_street":"between Old South Durham Hwy and Morrison Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.110915,42.326617]]}},{"id":"Kp/CsxiquE0w6cIHfWD8wyIpKac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VhOkKskvmjN7CVEkiITnTA3KOQc="},{"type":"next-occurrence","id":"/wRoOcw3uWz6kM2xjh/3ie95LHo="}],"description":"Culvert repairs on NY 23 both directions between Old South Durham Hwy and Morrison Rd (Cairo) alternating lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T16:59:03Z"},"road_event_id":"Kp/CsxiquE0w6cIHfWD8wyIpKac=","beginning_cross_street":"between Old South Durham Hwy and Morrison Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.110915,42.326617]]}},{"id":"/wRoOcw3uWz6kM2xjh/3ie95LHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VhOkKskvmjN7CVEkiITnTA3KOQc="},{"type":"next-occurrence","id":"5mYpy4vVNLpJTVn/N0B7tuxq4w4="}],"description":"Culvert repairs on NY 23 both directions between Old South Durham Hwy and Morrison Rd (Cairo) alternating lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T16:59:03Z"},"road_event_id":"/wRoOcw3uWz6kM2xjh/3ie95LHo=","beginning_cross_street":"between Old South Durham Hwy and Morrison Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.110915,42.326617]]}},{"id":"5mYpy4vVNLpJTVn/N0B7tuxq4w4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VhOkKskvmjN7CVEkiITnTA3KOQc="},{"type":"next-occurrence","id":"+ykJg6/cPBP9lR9Gca1GLa9axL8="}],"description":"Culvert repairs on NY 23 both directions between Old South Durham Hwy and Morrison Rd (Cairo) alternating lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T16:59:03Z"},"road_event_id":"5mYpy4vVNLpJTVn/N0B7tuxq4w4=","beginning_cross_street":"between Old South Durham Hwy and Morrison Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.110915,42.326617]]}},{"id":"+ykJg6/cPBP9lR9Gca1GLa9axL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 23"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VhOkKskvmjN7CVEkiITnTA3KOQc="}],"description":"Culvert repairs on NY 23 both directions between Old South Durham Hwy and Morrison Rd (Cairo) alternating lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T16:59:03Z"},"road_event_id":"+ykJg6/cPBP9lR9Gca1GLa9axL8=","beginning_cross_street":"between Old South Durham Hwy and Morrison Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.110915,42.326617]]}},{"id":"jXl0n9mQbbyX0rabYnKGy64/WSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Raritan Valley Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nNm3b41w2tW+gDsrfuBLuS7DSw0="}],"description":"Due to Track repairs westbound, Raritan Valley Line between Bridgewater (Bridgewater Twp) and Raritan (Raritan) westbound trains to Raritan are subject to delays of up to 15 minutes due to track maintenance near Bridgewater Station. , Monday June 15th, 2026 thru Thursday June 18th, 2026, Monday/Wednesday/Thursday, 09:00 AM thru 03:30 PM","update_date":"2026-06-05T17:04:29Z"},"road_event_id":"jXl0n9mQbbyX0rabYnKGy64/WSI=","beginning_cross_street":"Bridgewater","ending_cross_street":"Raritan","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T13:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.551741,40.559904]]}},{"id":"nNm3b41w2tW+gDsrfuBLuS7DSw0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Raritan Valley Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jXl0n9mQbbyX0rabYnKGy64/WSI="},{"type":"next-occurrence","id":"UaOAVD/U7IVCcyxP7Vvvzi8l4Yg="}],"description":"Due to Track repairs westbound, Raritan Valley Line between Bridgewater (Bridgewater Twp) and Raritan (Raritan) westbound trains to Raritan are subject to delays of up to 15 minutes due to track maintenance near Bridgewater Station. , Monday June 15th, 2026 thru Thursday June 18th, 2026, Monday/Wednesday/Thursday, 09:00 AM thru 03:30 PM","update_date":"2026-06-05T17:04:29Z"},"road_event_id":"nNm3b41w2tW+gDsrfuBLuS7DSw0=","beginning_cross_street":"Bridgewater","ending_cross_street":"Raritan","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.551741,40.559904]]}},{"id":"UaOAVD/U7IVCcyxP7Vvvzi8l4Yg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Raritan Valley Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jXl0n9mQbbyX0rabYnKGy64/WSI="}],"description":"Due to Track repairs westbound, Raritan Valley Line between Bridgewater (Bridgewater Twp) and Raritan (Raritan) westbound trains to Raritan are subject to delays of up to 15 minutes due to track maintenance near Bridgewater Station. , Monday June 15th, 2026 thru Thursday June 18th, 2026, Monday/Wednesday/Thursday, 09:00 AM thru 03:30 PM","update_date":"2026-06-05T17:04:29Z"},"road_event_id":"UaOAVD/U7IVCcyxP7Vvvzi8l4Yg=","beginning_cross_street":"Bridgewater","ending_cross_street":"Raritan","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T13:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.551741,40.559904]]}},{"id":"uwzT5nD4nDxepQOYgLK5DkjKXKE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Repaving on NY 5 westbound ramp to Warners Rd (Camillus), Saturday June 13th, 2026, 07:00 AM thru 10:00 PM All lanes closed","update_date":"2026-06-05T17:04:15Z"},"road_event_id":"uwzT5nD4nDxepQOYgLK5DkjKXKE=","beginning_cross_street":"Warners Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-14T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.24887,43.052975]]}},{"id":"JrTshlrFmDqOiiqhujlu7AC8YcQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MFm5MQCauuTlLen4V9qHzju47ag="}],"description":"Crack sealing and overnight roadwork on NY 96 both directions between Garnsey Rd. (Perinton) and Ramps to 490 (Perinton) obile operation with short-term alternating closures as needed., Tuesday June 9th, 2026 thru Wednesday June 10th, 2026, Tuesday/Wednesday, 06:00 PM thru 06:00 PM All lanes","update_date":"2026-06-05T17:11:33Z"},"road_event_id":"JrTshlrFmDqOiiqhujlu7AC8YcQ=","beginning_cross_street":"Garnsey Rd. ","ending_cross_street":"Ramps to 490","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T22:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.470286,43.051665]]}},{"id":"MFm5MQCauuTlLen4V9qHzju47ag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JrTshlrFmDqOiiqhujlu7AC8YcQ="}],"description":"Crack sealing and overnight roadwork on NY 96 both directions between Garnsey Rd. (Perinton) and Ramps to 490 (Perinton) obile operation with short-term alternating closures as needed., Tuesday June 9th, 2026 thru Wednesday June 10th, 2026, Tuesday/Wednesday, 06:00 PM thru 06:00 PM All lanes","update_date":"2026-06-05T17:11:33Z"},"road_event_id":"MFm5MQCauuTlLen4V9qHzju47ag=","beginning_cross_street":"Garnsey Rd. ","ending_cross_street":"Ramps to 490","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.470286,43.051665]]}},{"id":"4R+kNbrTulC+MpKx1NiG1/RdEUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Repaving on NY 5 westbound ramp from Warners Rd (Camillus), Saturday June 13th, 2026, 10:00 AM thru 01:00 PM All lanes open","update_date":"2026-06-05T17:09:57Z"},"road_event_id":"4R+kNbrTulC+MpKx1NiG1/RdEUU=","beginning_cross_street":"Warners Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T14:00:00Z","end_date":"2026-06-13T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.250088,43.053071]]}},{"id":"NQXZXJP3qW42JdLeGsuqdbC9ocA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Repaving on New Jersey Turnpike Outer Roadway northbound Entrance ramp Interchange 8 - NJ 33 (East Windsor Twp), Friday June 5th, 2026 thru Saturday June 6th, 2026, 08:00 PM thru 04:00 AM All lanes closed","update_date":"2026-06-05T17:16:35Z"},"road_event_id":"NQXZXJP3qW42JdLeGsuqdbC9ocA=","beginning_cross_street":"Interchange 8 - NJ 33","ending_cross_street":"Interchange 8 - NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.511726,40.261352]]}},{"id":"hyrGDIPGN3GD3M8W8ezoVEV3t6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Construction on New Jersey Turnpike Outer Roadway northbound Entrance ramp Interchange 9 - NJ 18 (East Brunswick Twp), Friday June 5th, 2026 thru Saturday June 6th, 2026, 07:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-05T17:18:14Z"},"road_event_id":"hyrGDIPGN3GD3M8W8ezoVEV3t6I=","beginning_cross_street":"Interchange 9 - NJ 18","ending_cross_street":"Interchange 9 - NJ 18","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T23:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.402866,40.477367]]}},{"id":"s42SxlVfGCpwH+9DfBRDVVAvc24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Deck work and paving operations on New Jersey Turnpike Outer Roadway northbound Entrance ramp Interchange 12 - Carteret-Rahway (Carteret), Friday June 5th, 2026 thru Saturday June 6th, 2026, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-06-05T17:19:52Z"},"road_event_id":"s42SxlVfGCpwH+9DfBRDVVAvc24=","beginning_cross_street":"Interchange 12 - Carteret-Rahway","ending_cross_street":"Interchange 12 - Carteret-Rahway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T00:00:00Z","end_date":"2026-06-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.2326,40.594733]]}},{"id":"ORC300552494","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","description":"Bridge painting on I-495 westbound from Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only (New York) to Exit 27 - Clearview Expwy I-295 / Throgs Neck Bridge (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday June 9th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Friday June 12th, 2026 thru Saturday June 13th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday June 13th, 2026, 01:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed, Saturday June 13th, 2026 thru Sunday June 14th, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday June 14th, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 3 lanes closed","update_date":"2026-06-05T17:21:32Z"},"road_event_id":"ORC300552494","beginning_cross_street":"Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only","ending_cross_street":"Exit 27 - Clearview Expwy I-295 / Throgs Neck Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T03:00:00Z","end_date":"2026-06-15T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.768744,40.745575]]}},{"id":"fcklJd9u3aD0EPyQrWJWc0SSCtg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nI9Id4c7inyN8cth7eAj3k0bvAw="}],"description":"Repaving on NY 9N both directions between Pilfershire Rd and Worman Ln (Moriah) alternating lane closures, Tuesday June 9th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-05T17:23:32Z"},"road_event_id":"fcklJd9u3aD0EPyQrWJWc0SSCtg=","beginning_cross_street":"between Pilfershire Rd and Worman Ln","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.454074,44.08971]]}},{"id":"nI9Id4c7inyN8cth7eAj3k0bvAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fcklJd9u3aD0EPyQrWJWc0SSCtg="},{"type":"next-occurrence","id":"K9ebRH4JphUzXvMZQh5MtRsoz5Y="}],"description":"Repaving on NY 9N both directions between Pilfershire Rd and Worman Ln (Moriah) alternating lane closures, Tuesday June 9th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-05T17:23:32Z"},"road_event_id":"nI9Id4c7inyN8cth7eAj3k0bvAw=","beginning_cross_street":"between Pilfershire Rd and Worman Ln","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T10:00:00Z","end_date":"2026-06-10T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.454074,44.08971]]}},{"id":"K9ebRH4JphUzXvMZQh5MtRsoz5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fcklJd9u3aD0EPyQrWJWc0SSCtg="},{"type":"next-occurrence","id":"EbHOF5t9bztolVkGJLMGWaLq6ZU="}],"description":"Repaving on NY 9N both directions between Pilfershire Rd and Worman Ln (Moriah) alternating lane closures, Tuesday June 9th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-05T17:23:32Z"},"road_event_id":"K9ebRH4JphUzXvMZQh5MtRsoz5Y=","beginning_cross_street":"between Pilfershire Rd and Worman Ln","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T10:00:00Z","end_date":"2026-06-11T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.454074,44.08971]]}},{"id":"EbHOF5t9bztolVkGJLMGWaLq6ZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fcklJd9u3aD0EPyQrWJWc0SSCtg="},{"type":"next-occurrence","id":"b7fdXVh71cfnO5cCln6KTkGLUME="}],"description":"Repaving on NY 9N both directions between Pilfershire Rd and Worman Ln (Moriah) alternating lane closures, Tuesday June 9th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-05T17:23:32Z"},"road_event_id":"EbHOF5t9bztolVkGJLMGWaLq6ZU=","beginning_cross_street":"between Pilfershire Rd and Worman Ln","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T10:00:00Z","end_date":"2026-06-12T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.454074,44.08971]]}},{"id":"b7fdXVh71cfnO5cCln6KTkGLUME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fcklJd9u3aD0EPyQrWJWc0SSCtg="},{"type":"next-occurrence","id":"AyN6JL7YzpK1Wf35jvZQOdnLYbo="}],"description":"Repaving on NY 9N both directions between Pilfershire Rd and Worman Ln (Moriah) alternating lane closures, Tuesday June 9th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-05T17:23:32Z"},"road_event_id":"b7fdXVh71cfnO5cCln6KTkGLUME=","beginning_cross_street":"between Pilfershire Rd and Worman Ln","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T10:00:00Z","end_date":"2026-06-15T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.454074,44.08971]]}},{"id":"AyN6JL7YzpK1Wf35jvZQOdnLYbo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fcklJd9u3aD0EPyQrWJWc0SSCtg="},{"type":"next-occurrence","id":"Ux6xYQH9nyhG0NAuou0rFkiCutg="}],"description":"Repaving on NY 9N both directions between Pilfershire Rd and Worman Ln (Moriah) alternating lane closures, Tuesday June 9th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-05T17:23:32Z"},"road_event_id":"AyN6JL7YzpK1Wf35jvZQOdnLYbo=","beginning_cross_street":"between Pilfershire Rd and Worman Ln","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T10:00:00Z","end_date":"2026-06-16T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.454074,44.08971]]}},{"id":"Ux6xYQH9nyhG0NAuou0rFkiCutg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fcklJd9u3aD0EPyQrWJWc0SSCtg="},{"type":"next-occurrence","id":"TKb5QzhZp1mYIZBITbT3B0d0goI="}],"description":"Repaving on NY 9N both directions between Pilfershire Rd and Worman Ln (Moriah) alternating lane closures, Tuesday June 9th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-05T17:23:32Z"},"road_event_id":"Ux6xYQH9nyhG0NAuou0rFkiCutg=","beginning_cross_street":"between Pilfershire Rd and Worman Ln","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T10:00:00Z","end_date":"2026-06-17T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.454074,44.08971]]}},{"id":"TKb5QzhZp1mYIZBITbT3B0d0goI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fcklJd9u3aD0EPyQrWJWc0SSCtg="},{"type":"next-occurrence","id":"6Yz/bqP1pzL5tl2bbRSDrcFxxyY="}],"description":"Repaving on NY 9N both directions between Pilfershire Rd and Worman Ln (Moriah) alternating lane closures, Tuesday June 9th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-05T17:23:32Z"},"road_event_id":"TKb5QzhZp1mYIZBITbT3B0d0goI=","beginning_cross_street":"between Pilfershire Rd and Worman Ln","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T10:00:00Z","end_date":"2026-06-18T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.454074,44.08971]]}},{"id":"6Yz/bqP1pzL5tl2bbRSDrcFxxyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fcklJd9u3aD0EPyQrWJWc0SSCtg="}],"description":"Repaving on NY 9N both directions between Pilfershire Rd and Worman Ln (Moriah) alternating lane closures, Tuesday June 9th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-05T17:23:32Z"},"road_event_id":"6Yz/bqP1pzL5tl2bbRSDrcFxxyY=","beginning_cross_street":"between Pilfershire Rd and Worman Ln","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T10:00:00Z","end_date":"2026-06-19T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.454074,44.08971]]}},{"id":"KENfByjkltve4Y9HqsuPOTCZmHY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on Gowanus Expressway/I-278 HOV Lane both directions area of 2nd Avenue (New York), Wednesday June 10th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-05T17:25:01Z"},"road_event_id":"KENfByjkltve4Y9HqsuPOTCZmHY=","beginning_cross_street":"2nd Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996627,40.668791]]}},{"id":"L+Roym3jO8zr2sAXiw5HKTz/DFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9LTZEf3oG/ydcjmnunpwBP7mkbc="}],"description":"Bridge painting on I-295 southbound ramp to Exit 4 - I-495 Long Island Expressway (New York) Subject to change without notice., Wednesday June 10th, 2026 thru Friday June 12th, 2026, Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed, Friday June 12th, 2026 thru Saturday June 13th, 2026, 10:00 PM thru 06:00 AM All lanes closed, Saturday June 13th, 2026 thru Sunday June 14th, 2026, 10:00 PM thru 09:00 AM All lanes closed","update_date":"2026-06-05T17:26:35Z"},"road_event_id":"L+Roym3jO8zr2sAXiw5HKTz/DFA=","beginning_cross_street":"Exit 4 - I-495 Long Island Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T03:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.774272,40.744057]]}},{"id":"9LTZEf3oG/ydcjmnunpwBP7mkbc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L+Roym3jO8zr2sAXiw5HKTz/DFA="},{"type":"next-occurrence","id":"j/NSvBgvzIXEGVCdhqwo3On7D/U="}],"description":"Bridge painting on I-295 southbound ramp to Exit 4 - I-495 Long Island Expressway (New York) Subject to change without notice., Wednesday June 10th, 2026 thru Friday June 12th, 2026, Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed, Friday June 12th, 2026 thru Saturday June 13th, 2026, 10:00 PM thru 06:00 AM All lanes closed, Saturday June 13th, 2026 thru Sunday June 14th, 2026, 10:00 PM thru 09:00 AM All lanes closed","update_date":"2026-06-05T17:26:35Z"},"road_event_id":"9LTZEf3oG/ydcjmnunpwBP7mkbc=","beginning_cross_street":"Exit 4 - I-495 Long Island Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T03:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.774272,40.744057]]}},{"id":"j/NSvBgvzIXEGVCdhqwo3On7D/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L+Roym3jO8zr2sAXiw5HKTz/DFA="},{"type":"next-occurrence","id":"uH6ZoKtKpuJhMBfY+idVm9NboWo="}],"description":"Bridge painting on I-295 southbound ramp to Exit 4 - I-495 Long Island Expressway (New York) Subject to change without notice., Wednesday June 10th, 2026 thru Friday June 12th, 2026, Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed, Friday June 12th, 2026 thru Saturday June 13th, 2026, 10:00 PM thru 06:00 AM All lanes closed, Saturday June 13th, 2026 thru Sunday June 14th, 2026, 10:00 PM thru 09:00 AM All lanes closed","update_date":"2026-06-05T17:26:35Z"},"road_event_id":"j/NSvBgvzIXEGVCdhqwo3On7D/U=","beginning_cross_street":"Exit 4 - I-495 Long Island Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.774272,40.744057]]}},{"id":"uH6ZoKtKpuJhMBfY+idVm9NboWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L+Roym3jO8zr2sAXiw5HKTz/DFA="}],"description":"Bridge painting on I-295 southbound ramp to Exit 4 - I-495 Long Island Expressway (New York) Subject to change without notice., Wednesday June 10th, 2026 thru Friday June 12th, 2026, Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed, Friday June 12th, 2026 thru Saturday June 13th, 2026, 10:00 PM thru 06:00 AM All lanes closed, Saturday June 13th, 2026 thru Sunday June 14th, 2026, 10:00 PM thru 09:00 AM All lanes closed","update_date":"2026-06-05T17:26:35Z"},"road_event_id":"uH6ZoKtKpuJhMBfY+idVm9NboWo=","beginning_cross_street":"Exit 4 - I-495 Long Island Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T02:00:00Z","end_date":"2026-06-14T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.774272,40.744057]]}},{"id":"BiJakTkO7Dc0ut1dx7way+Ns4rU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound at Exit 8 - CR 577 (West Orange Twp) Tuesday June 9, 2026 11:00 PM thru Wednesday June 10, 2026 06:00 AM, ramp","update_date":"2026-06-05T17:29:51Z"},"road_event_id":"BiJakTkO7Dc0ut1dx7way+Ns4rU=","beginning_cross_street":"Exit 8 - CR 577","ending_cross_street":"Exit 8 - CR 577","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T03:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.252471,40.797573]]}},{"id":"hABZe7oRlmhUqoh/Y3VqIS9MlqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound between West of Exit 4 - Eisenhower Pkwy/CR 609 (East Hanover Twp) and East of Exit 4 - Eisenhower Pkwy/CR 609 (Roseland), Thursday June 11, 2026 10:00 PM thru Friday June 12, 2026 05:00 AM, right lane closed","update_date":"2026-06-05T17:29:52Z"},"road_event_id":"hABZe7oRlmhUqoh/Y3VqIS9MlqM=","beginning_cross_street":"West of Exit 4 - Eisenhower Pkwy/CR 609","ending_cross_street":"East of Exit 4 - Eisenhower Pkwy/CR 609","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.334503,40.834114]]}},{"id":"wlaNqw2ksEMV6eh1/5cM72PO68E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound between West of Exit 4 - Eisenhower Pkwy/CR 609 (East Hanover Twp) and East of Exit 4 - Eisenhower Pkwy/CR 609 (Roseland), Monday June 8, 2026 10:00 PM thru Tuesday June 9, 2026 05:00 AM, right lane closed","update_date":"2026-06-05T17:29:59Z"},"road_event_id":"wlaNqw2ksEMV6eh1/5cM72PO68E=","beginning_cross_street":"West of Exit 4 - Eisenhower Pkwy/CR 609","ending_cross_street":"East of Exit 4 - Eisenhower Pkwy/CR 609","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.334503,40.834114]]}},{"id":"PA2g62eeWcLEi7uiyHxbOx/euro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound at Exit 6 - Laurel Ave (Livingston Twp) Monday June 8, 2026 10:00 PM thru Tuesday June 9, 2026 06:00 AM, ramp","update_date":"2026-06-05T17:30:00Z"},"road_event_id":"PA2g62eeWcLEi7uiyHxbOx/euro=","beginning_cross_street":"Exit 6 - Laurel Ave","ending_cross_street":"Exit 6 - Laurel Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.287185,40.807022]]}},{"id":"uoS7OQaH7WVAiRj/JETCuaHV/n0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 15"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 15 Northbound between South of Blue Heron Dr (Sparta Twp) and North of Blue Heron Dr (Sparta Twp), Monday June 8, 2026 10:00 PM thru Tuesday June 9, 2026 05:00 AM, right lane closed","update_date":"2026-06-05T17:30:02Z"},"road_event_id":"uoS7OQaH7WVAiRj/JETCuaHV/n0=","beginning_cross_street":"South of Blue Heron Dr","ending_cross_street":"North of Blue Heron Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.615341,41.011009]]}},{"id":"NdJz5ibQeC1KlSx2l8r70Pg9110=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound between West of Exit 4 - Eisenhower Pkwy/CR 609 (East Hanover Twp) and East of Exit 4 - Eisenhower Pkwy/CR 609 (Roseland), Tuesday June 9, 2026 10:00 PM thru Wednesday June 10, 2026 05:00 AM, right lane closed","update_date":"2026-06-05T17:30:03Z"},"road_event_id":"NdJz5ibQeC1KlSx2l8r70Pg9110=","beginning_cross_street":"West of Exit 4 - Eisenhower Pkwy/CR 609","ending_cross_street":"East of Exit 4 - Eisenhower Pkwy/CR 609","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.334503,40.834114]]}},{"id":"tJsklc4VlfqLT+YfRDRzBAXyc7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound at Exit 10 - Northfield Ave/CR 508 (West Orange Twp) Thursday June 11, 2026 10:30 PM thru Friday June 12, 2026 05:00 AM, ramp","update_date":"2026-06-05T17:29:54Z"},"road_event_id":"tJsklc4VlfqLT+YfRDRzBAXyc7U=","beginning_cross_street":"Exit 10 - Northfield Ave/CR 508","ending_cross_street":"Exit 10 - Northfield Ave/CR 508","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:30:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.241485,40.775211]]}},{"id":"AE8R0rVgMYTo+bXKuOEAAo7TjHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound at Exit 8 - CR 577 (West Orange Twp) Tuesday June 9, 2026 11:00 PM thru Wednesday June 10, 2026 06:00 AM, ramp","update_date":"2026-06-05T17:29:56Z"},"road_event_id":"AE8R0rVgMYTo+bXKuOEAAo7TjHo=","beginning_cross_street":"Exit 8 - CR 577","ending_cross_street":"Exit 8 - CR 577","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T03:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.252471,40.797573]]}},{"id":"3hH5xfa2Mb11rHY9v2uh/OMSrz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound at Exit 6 - Laurel Ave (Livingston Twp) Monday June 8, 2026 10:00 PM thru Tuesday June 9, 2026 06:00 AM, ramp","update_date":"2026-06-05T17:29:57Z"},"road_event_id":"3hH5xfa2Mb11rHY9v2uh/OMSrz8=","beginning_cross_street":"Exit 6 - Laurel Ave","ending_cross_street":"Exit 6 - Laurel Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.287185,40.807022]]}},{"id":"CfB8uyQDgkrU+atN+DR68eRfNQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 15"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 15 Southbound between South of Main St (Sparta Twp) and North of Blue Heron Dr (Sparta Twp), Wednesday June 10, 2026 09:00 PM thru Thursday June 11, 2026 05:00 AM, right lane closed","update_date":"2026-06-05T17:29:58Z"},"road_event_id":"CfB8uyQDgkrU+atN+DR68eRfNQs=","beginning_cross_street":"South of Main St","ending_cross_street":"North of Blue Heron Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.625389,41.036945]]}},{"id":"Ng/z/RPCE2qBlOzJQ73w9pe0uBk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 15"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 15 Southbound between North of Blue Heron Dr (Sparta Twp) and South of Blue Heron Dr (Sparta Twp), Tuesday June 9, 2026 09:00 PM thru Wednesday June 10, 2026 05:00 AM, right lane closed","update_date":"2026-06-05T17:30:05Z"},"road_event_id":"Ng/z/RPCE2qBlOzJQ73w9pe0uBk=","beginning_cross_street":"North of Blue Heron Dr","ending_cross_street":"South of Blue Heron Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.620918,41.023189]]}},{"id":"zXD6nTz+CIFeO/Xjk3b4ZCz//7k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound between West of Exit 4 - Eisenhower Pkwy/CR 609 (East Hanover Twp) and East of Exit 4 - Eisenhower Pkwy/CR 609 (Roseland), Wednesday June 10, 2026 10:00 PM thru Thursday June 11, 2026 05:00 AM, right lane closed","update_date":"2026-06-05T17:30:06Z"},"road_event_id":"zXD6nTz+CIFeO/Xjk3b4ZCz//7k=","beginning_cross_street":"West of Exit 4 - Eisenhower Pkwy/CR 609","ending_cross_street":"East of Exit 4 - Eisenhower Pkwy/CR 609","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.334503,40.834114]]}},{"id":"1N/okwbWmKhLKIu6wzWZEJLG8a4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound at Exit 10 - Northfield Ave/CR 508 (West Orange Twp) Thursday June 11, 2026 10:30 PM thru Friday June 12, 2026 05:00 AM, ramp","update_date":"2026-06-05T17:30:07Z"},"road_event_id":"1N/okwbWmKhLKIu6wzWZEJLG8a4=","beginning_cross_street":"Exit 10 - Northfield Ave/CR 508","ending_cross_street":"Exit 10 - Northfield Ave/CR 508","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:30:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.241485,40.775211]]}},{"id":"FjAkl9aTM0v6iBL3N53hevuYt6k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound at Exit 9 - Pleasant Avenue/CR 660 (West Orange Twp) Wednesday June 10, 2026 10:00 PM thru Thursday June 11, 2026 06:00 AM, ramp","update_date":"2026-06-05T17:29:48Z"},"road_event_id":"FjAkl9aTM0v6iBL3N53hevuYt6k=","beginning_cross_street":"Exit 9 - Pleasant Avenue/CR 660","ending_cross_street":"Exit 9 - Pleasant Avenue/CR 660","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.242156,40.779479]]}},{"id":"ipQ1cQdx/JNT8GWNKqJAABP/+yQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound at Exit 9 - Pleasant Avenue/CR 660 (West Orange Twp) Wednesday June 10, 2026 10:00 PM thru Thursday June 11, 2026 06:00 AM, ramp","update_date":"2026-06-05T17:29:50Z"},"road_event_id":"ipQ1cQdx/JNT8GWNKqJAABP/+yQ=","beginning_cross_street":"Exit 9 - Pleasant Avenue/CR 660","ending_cross_street":"Exit 9 - Pleasant Avenue/CR 660","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.242156,40.779479]]}},{"id":"q2zxxFHQI5c2RyJeeMXMPzRdO6s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Hudson County Extension"],"direction":"unknown","related_road_events":[],"description":"Traffic shift on New Jersey Turnpike - Hudson County Extension eastbound between West of Newark Bay Bridge (Newark) and East of Interchange 14A - NJ 440/Bayonne Bridge (Jersey City), Saturday June 6th, 2026 thru Sunday June 7th, 2026, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday June 7th, 2026, 01:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-06-05T17:32:08Z"},"road_event_id":"q2zxxFHQI5c2RyJeeMXMPzRdO6s=","beginning_cross_street":"West of Newark Bay Bridge","ending_cross_street":"East of Interchange 14A - NJ 440/Bayonne Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T02:00:00Z","end_date":"2026-06-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.126225,40.697666]]}},{"id":"NSOsRcyyP6Gb9+lD36gUc868KN0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on I-278 both directions area of 2nd Avenue (New York), Thursday June 11th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-05T17:34:20Z"},"road_event_id":"NSOsRcyyP6Gb9+lD36gUc868KN0=","beginning_cross_street":"2nd Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996326,40.668317]]}},{"id":"g4biZhRS5h7KuKEHyvNS0ljVo3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[],"description":"Crack sealing and overnight roadwork on NY 15 both directions between I 390 (Brighton) and Highland Avenue (Rochester) Mobile operation with short-term alternating closures as needed., Wednesday June 10th, 2026 thru Thursday June 11th, 2026, 06:00 PM thru 06:00 AM All lanes","update_date":"2026-06-05T17:40:13Z"},"road_event_id":"g4biZhRS5h7KuKEHyvNS0ljVo3A=","beginning_cross_street":"I 390 ","ending_cross_street":"Highland Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T22:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.623386,43.112797]]}},{"id":"fdnFmTlKlWQJr6G5ozZ0K8AShBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Barrier repairs on Garden State Parkway northbound Exit ramp Exit 155-A - NJ 19 (northbound exit only) (Clifton), Friday June 5th, 2026 thru Saturday June 6th, 2026, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-05T17:40:19Z"},"road_event_id":"fdnFmTlKlWQJr6G5ozZ0K8AShBA=","beginning_cross_street":"Exit 155-A - NJ 19 (northbound exit only)","ending_cross_street":"Exit 155-A - NJ 19 (northbound exit only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T02:00:00Z","end_date":"2026-06-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.16634,40.874986]]}},{"id":"MbLcQiT6QVGyO03kyaCEm5oNhhs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound near West of Exit 36 - CR 651 (Warren Twp), Tuesday June 9, 2026 10:00 AM thru 12:00 PM, left lane closed","update_date":"2026-06-05T17:41:51Z"},"road_event_id":"MbLcQiT6QVGyO03kyaCEm5oNhhs=","beginning_cross_street":"West of Exit 36 - CR 651","ending_cross_street":"East of Exit 36 - CR 651","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.527755,40.647266]]}},{"id":"vREk8Hz2mKMB/Gip85pjbSGydZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near West of Exit 52 - CR 613/Passaic Ave (Fairfield Twp), Friday June 12, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T17:41:53Z"},"road_event_id":"vREk8Hz2mKMB/Gip85pjbSGydZQ=","beginning_cross_street":"West of Exit 52 - CR 613/Passaic Ave","ending_cross_street":"West of Exit 52 - CR 613/Passaic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.309188,40.891773]]}},{"id":"SBTey0x9sgjaXvtABgUtKNR9bY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on I-278 both directions area of Union Street (New York), Friday June 12th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-05T17:42:39Z"},"road_event_id":"SBTey0x9sgjaXvtABgUtKNR9bY4=","beginning_cross_street":"Union Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002206,40.682268]]}},{"id":"0lXsajXhNgop/FPadIYUfa6eMjo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound near West of Exit 41 - Dale Rd to Plainfield Ave (Watchung), Monday June 8, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T17:41:48Z"},"road_event_id":"0lXsajXhNgop/FPadIYUfa6eMjo=","beginning_cross_street":"West of Exit 41 - Dale Rd to Plainfield Ave","ending_cross_street":"West of Exit 41 - Dale Rd to Plainfield Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.439476,40.658046]]}},{"id":"o/7FwYvxxDna+Sro6HPvofIaFGI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 21 - I-78 (Bridgewater Twp) and North of US 206 (Bridgewater Twp), left shoulder local lane","update_date":"2026-06-05T17:41:49Z"},"road_event_id":"o/7FwYvxxDna+Sro6HPvofIaFGI=","beginning_cross_street":"South of Exit 21 - I-78","ending_cross_street":"North of US 206","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.64151,40.627525]]}},{"id":"2F9K2GMLHHRDujVIg6mBRsha4dI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near West of Exit 52 - CR 613/Passaic Ave (Fairfield Twp), Thursday June 11, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T17:41:50Z"},"road_event_id":"2F9K2GMLHHRDujVIg6mBRsha4dI=","beginning_cross_street":"West of Exit 52 - CR 613/Passaic Ave","ending_cross_street":"West of Exit 52 - CR 613/Passaic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.309188,40.891773]]}},{"id":"ZccP90Qoac25P+BocCMj338wDWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Street sweeping on I-490 westbound between Exit 15 - Rochester Inner Loop Highway (Rochester) and City of Rochester; Town of Gates Line; Ramp (Rochester) Mobile operation, Saturday June 6th, 2026, 08:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-06-05T17:44:02Z"},"road_event_id":"ZccP90Qoac25P+BocCMj338wDWs=","beginning_cross_street":"Exit 15 - Rochester Inner Loop Highway","ending_cross_street":"City of Rochester; Town of Gates Line; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T12:00:00Z","end_date":"2026-06-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.609195,43.151141]]}},{"id":"3CyE2hm5FmtEsrl69ktYasEOJLk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near East of I-80 (Parsippany-Troy Hills Twp), Wednesday June 10, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T17:44:47Z"},"road_event_id":"3CyE2hm5FmtEsrl69ktYasEOJLk=","beginning_cross_street":"East of I-80","ending_cross_street":"East of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.360771,40.859477]]}},{"id":"RQeeMmYLylLGJuhcvswHX0xgTSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near East of I-80 (Parsippany-Troy Hills Twp), Monday June 8, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T17:44:49Z"},"road_event_id":"RQeeMmYLylLGJuhcvswHX0xgTSA=","beginning_cross_street":"East of I-80","ending_cross_street":"East of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.360771,40.859477]]}},{"id":"bR/Z+qLp4H+h3NgYUJmMoAAZRt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near East of I-80 (Parsippany-Troy Hills Twp), Tuesday June 9, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-06-05T17:44:50Z"},"road_event_id":"bR/Z+qLp4H+h3NgYUJmMoAAZRt8=","beginning_cross_street":"East of I-80","ending_cross_street":"East of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.360771,40.859477]]}},{"id":"Q4cn0hvPgVrBYNeWq63SgDU0ZLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Barrier repairs and guard rail repairs on Garden State Parkway northbound at Bergen Toll Plaza (Saddle Brook Twp), Sunday June 7th, 2026 thru Monday June 8th, 2026, 09:00 PM thru 06:00 AM 2 Right toll lanes of 10 lanes closed","update_date":"2026-06-05T17:45:20Z"},"road_event_id":"Q4cn0hvPgVrBYNeWq63SgDU0ZLQ=","beginning_cross_street":"Bergen Toll Plaza","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T01:00:00Z","end_date":"2026-06-08T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.097578,40.90841]]}},{"id":"NDw+z7hhNX5vtIW6jf9uRM3Xjkc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[],"description":"Construction on I-495 both directions at 80th Street; I-495 (New York), Friday June 12th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-05T17:49:56Z"},"road_event_id":"NDw+z7hhNX5vtIW6jf9uRM3Xjkc=","beginning_cross_street":"80th Street; I-495","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.882325,40.728526]]}},{"id":"QqlH6MXRBAJRU25nEc0WnPaGG1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[],"description":"Construction on I-495 both directions area of Exit 27 - Clearview Expwy I-295 / Throgs Neck Bridge (New York), Friday June 12th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-06-05T17:52:18Z"},"road_event_id":"QqlH6MXRBAJRU25nEc0WnPaGG1A=","beginning_cross_street":"Exit 27 - Clearview Expwy I-295 / Throgs Neck Bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.776067,40.743214]]}},{"id":"MicF0TmZE0Bt7hFURBJU8Qdb6AY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DW/wroRxBjtE05HfqeQGUYMPqyI="}],"description":"Bridge work on I-390 both directions between I-590; Ramp (Brighton) and US 20 (Avon) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T17:59:27Z"},"road_event_id":"MicF0TmZE0Bt7hFURBJU8Qdb6AY=","beginning_cross_street":"I-590; Ramp","ending_cross_street":"US 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.601201,43.106492]]}},{"id":"DW/wroRxBjtE05HfqeQGUYMPqyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MicF0TmZE0Bt7hFURBJU8Qdb6AY="},{"type":"next-occurrence","id":"qVJh4J1IRqxmtSCXnDjTKRmzIj4="}],"description":"Bridge work on I-390 both directions between I-590; Ramp (Brighton) and US 20 (Avon) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T17:59:27Z"},"road_event_id":"DW/wroRxBjtE05HfqeQGUYMPqyI=","beginning_cross_street":"I-590; Ramp","ending_cross_street":"US 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.601201,43.106492]]}},{"id":"qVJh4J1IRqxmtSCXnDjTKRmzIj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MicF0TmZE0Bt7hFURBJU8Qdb6AY="},{"type":"next-occurrence","id":"2B41d437jcfCyc0QSnQLwDnXXy0="}],"description":"Bridge work on I-390 both directions between I-590; Ramp (Brighton) and US 20 (Avon) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T17:59:27Z"},"road_event_id":"qVJh4J1IRqxmtSCXnDjTKRmzIj4=","beginning_cross_street":"I-590; Ramp","ending_cross_street":"US 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.601201,43.106492]]}},{"id":"2B41d437jcfCyc0QSnQLwDnXXy0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MicF0TmZE0Bt7hFURBJU8Qdb6AY="},{"type":"next-occurrence","id":"QL3EWAbosPGAMe5I703bEg2NKt8="}],"description":"Bridge work on I-390 both directions between I-590; Ramp (Brighton) and US 20 (Avon) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T17:59:27Z"},"road_event_id":"2B41d437jcfCyc0QSnQLwDnXXy0=","beginning_cross_street":"I-590; Ramp","ending_cross_street":"US 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.601201,43.106492]]}},{"id":"QL3EWAbosPGAMe5I703bEg2NKt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MicF0TmZE0Bt7hFURBJU8Qdb6AY="}],"description":"Bridge work on I-390 both directions between I-590; Ramp (Brighton) and US 20 (Avon) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T17:59:27Z"},"road_event_id":"QL3EWAbosPGAMe5I703bEg2NKt8=","beginning_cross_street":"I-590; Ramp","ending_cross_street":"US 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.601201,43.106492]]}},{"id":"RLYl/rJ57Evo2ePa/uJibLUD9iA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7zoYvTgeMHMBqRlwnBKSKUV9uKI="}],"description":"Roadwork on US 9 southbound Dunning Street; NY 67; CR 108 (Malta), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM right shoulder closed","update_date":"2026-06-05T18:00:55Z"},"road_event_id":"RLYl/rJ57Evo2ePa/uJibLUD9iA=","beginning_cross_street":"Dunning Street; NY 67; CR 108","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.792777,42.96967]]}},{"id":"7zoYvTgeMHMBqRlwnBKSKUV9uKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RLYl/rJ57Evo2ePa/uJibLUD9iA="},{"type":"next-occurrence","id":"Z3dLUyLrkcPzFSb8NkiMAPCg43A="}],"description":"Roadwork on US 9 southbound Dunning Street; NY 67; CR 108 (Malta), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM right shoulder closed","update_date":"2026-06-05T18:00:55Z"},"road_event_id":"7zoYvTgeMHMBqRlwnBKSKUV9uKI=","beginning_cross_street":"Dunning Street; NY 67; CR 108","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.792777,42.96967]]}},{"id":"Z3dLUyLrkcPzFSb8NkiMAPCg43A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RLYl/rJ57Evo2ePa/uJibLUD9iA="},{"type":"next-occurrence","id":"tiWYMvL6KHjpE8O7XyYNI7PXldo="}],"description":"Roadwork on US 9 southbound Dunning Street; NY 67; CR 108 (Malta), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM right shoulder closed","update_date":"2026-06-05T18:00:55Z"},"road_event_id":"Z3dLUyLrkcPzFSb8NkiMAPCg43A=","beginning_cross_street":"Dunning Street; NY 67; CR 108","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.792777,42.96967]]}},{"id":"tiWYMvL6KHjpE8O7XyYNI7PXldo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RLYl/rJ57Evo2ePa/uJibLUD9iA="},{"type":"next-occurrence","id":"+hQ19LjzdHnbS6Lg12mngTSDz7g="}],"description":"Roadwork on US 9 southbound Dunning Street; NY 67; CR 108 (Malta), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM right shoulder closed","update_date":"2026-06-05T18:00:55Z"},"road_event_id":"tiWYMvL6KHjpE8O7XyYNI7PXldo=","beginning_cross_street":"Dunning Street; NY 67; CR 108","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.792777,42.96967]]}},{"id":"+hQ19LjzdHnbS6Lg12mngTSDz7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RLYl/rJ57Evo2ePa/uJibLUD9iA="}],"description":"Roadwork on US 9 southbound Dunning Street; NY 67; CR 108 (Malta), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM right shoulder closed","update_date":"2026-06-05T18:00:55Z"},"road_event_id":"+hQ19LjzdHnbS6Lg12mngTSDz7g=","beginning_cross_street":"Dunning Street; NY 67; CR 108","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.792777,42.96967]]}},{"id":"hIzuWsVRAQ72WcRhb/4CTlyMXB0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"jX+UOQMlK+qA53aq+oa/Gd4eLxE="}],"description":"Bridge work on I-590 both directions between I-490 (Rochester) and NY 590 at Exit 10A - NY 104 (Irondequoit) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T18:01:51Z"},"road_event_id":"hIzuWsVRAQ72WcRhb/4CTlyMXB0=","beginning_cross_street":"I-490","ending_cross_street":"Exit 10A - NY 104","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.548631,43.142933]]}},{"id":"jX+UOQMlK+qA53aq+oa/Gd4eLxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hIzuWsVRAQ72WcRhb/4CTlyMXB0="},{"type":"next-occurrence","id":"nNuzKHW0jZDBXQlmYSQEtEmX04o="}],"description":"Bridge work on I-590 both directions between I-490 (Rochester) and NY 590 at Exit 10A - NY 104 (Irondequoit) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T18:01:51Z"},"road_event_id":"jX+UOQMlK+qA53aq+oa/Gd4eLxE=","beginning_cross_street":"I-490","ending_cross_street":"Exit 10A - NY 104","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.548631,43.142933]]}},{"id":"nNuzKHW0jZDBXQlmYSQEtEmX04o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hIzuWsVRAQ72WcRhb/4CTlyMXB0="},{"type":"next-occurrence","id":"Sm1ML1MECUUDi532s0jRw6MyTM4="}],"description":"Bridge work on I-590 both directions between I-490 (Rochester) and NY 590 at Exit 10A - NY 104 (Irondequoit) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T18:01:51Z"},"road_event_id":"nNuzKHW0jZDBXQlmYSQEtEmX04o=","beginning_cross_street":"I-490","ending_cross_street":"Exit 10A - NY 104","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.548631,43.142933]]}},{"id":"Sm1ML1MECUUDi532s0jRw6MyTM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hIzuWsVRAQ72WcRhb/4CTlyMXB0="},{"type":"next-occurrence","id":"CXQ9nw9k5EYFO0LAHeOY/pihgGw="}],"description":"Bridge work on I-590 both directions between I-490 (Rochester) and NY 590 at Exit 10A - NY 104 (Irondequoit) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T18:01:51Z"},"road_event_id":"Sm1ML1MECUUDi532s0jRw6MyTM4=","beginning_cross_street":"I-490","ending_cross_street":"Exit 10A - NY 104","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.548631,43.142933]]}},{"id":"CXQ9nw9k5EYFO0LAHeOY/pihgGw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hIzuWsVRAQ72WcRhb/4CTlyMXB0="}],"description":"Bridge work on I-590 both directions between I-490 (Rochester) and NY 590 at Exit 10A - NY 104 (Irondequoit) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T18:01:51Z"},"road_event_id":"CXQ9nw9k5EYFO0LAHeOY/pihgGw=","beginning_cross_street":"I-490","ending_cross_street":"Exit 10A - NY 104","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.548631,43.142933]]}},{"id":"d9SSByxd6z7eXSGsjJk1Ix4A21o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 29"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 29 both directions Saratoga; Fulton County Line (Broadalbin) to Broadway Village of Schuylerville; US 4; NY 32 (Saratoga) Slow Moving, Lane Closure as Needed, Friday June 5th, 2026 thru Saturday June 6th, 2026, 09:00 PM thru 02:00 AM All lanes open","update_date":"2026-06-05T18:04:24Z"},"road_event_id":"d9SSByxd6z7eXSGsjJk1Ix4A21o=","beginning_cross_street":"Saratoga; Fulton County Line","ending_cross_street":"Broadway Village of Schuylerville; US 4; NY 32","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T01:00:00Z","end_date":"2026-06-06T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.110027,43.062349]]}},{"id":"i6x0lJwp6uasj3/hzui4awy5Axs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RSyTI8cwwNuBfGIGlm6vcqP8K+4="}],"description":"Bridge work on NY 104 both directions between NY 390 (Greece) and Exit; CR 6 (Webster) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T18:04:46Z"},"road_event_id":"i6x0lJwp6uasj3/hzui4awy5Axs=","beginning_cross_street":"NY 390","ending_cross_street":"Exit; CR 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.676057,43.206597]]}},{"id":"RSyTI8cwwNuBfGIGlm6vcqP8K+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i6x0lJwp6uasj3/hzui4awy5Axs="},{"type":"next-occurrence","id":"RFzxlKYR/egic2MVKxjb9ikVLio="}],"description":"Bridge work on NY 104 both directions between NY 390 (Greece) and Exit; CR 6 (Webster) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T18:04:46Z"},"road_event_id":"RSyTI8cwwNuBfGIGlm6vcqP8K+4=","beginning_cross_street":"NY 390","ending_cross_street":"Exit; CR 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.676057,43.206597]]}},{"id":"RFzxlKYR/egic2MVKxjb9ikVLio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i6x0lJwp6uasj3/hzui4awy5Axs="},{"type":"next-occurrence","id":"F1XlFiIjqLJDs5fuU0bm4lMve+s="}],"description":"Bridge work on NY 104 both directions between NY 390 (Greece) and Exit; CR 6 (Webster) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T18:04:46Z"},"road_event_id":"RFzxlKYR/egic2MVKxjb9ikVLio=","beginning_cross_street":"NY 390","ending_cross_street":"Exit; CR 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.676057,43.206597]]}},{"id":"F1XlFiIjqLJDs5fuU0bm4lMve+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i6x0lJwp6uasj3/hzui4awy5Axs="},{"type":"next-occurrence","id":"qDUsiwp7zhVYZBznimDUVW5i3wU="}],"description":"Bridge work on NY 104 both directions between NY 390 (Greece) and Exit; CR 6 (Webster) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T18:04:46Z"},"road_event_id":"F1XlFiIjqLJDs5fuU0bm4lMve+s=","beginning_cross_street":"NY 390","ending_cross_street":"Exit; CR 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.676057,43.206597]]}},{"id":"qDUsiwp7zhVYZBznimDUVW5i3wU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i6x0lJwp6uasj3/hzui4awy5Axs="}],"description":"Bridge work on NY 104 both directions between NY 390 (Greece) and Exit; CR 6 (Webster) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T18:04:46Z"},"road_event_id":"qDUsiwp7zhVYZBznimDUVW5i3wU=","beginning_cross_street":"NY 390","ending_cross_street":"Exit; CR 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.676057,43.206597]]}},{"id":"mq6+Ak8IVewc9D36y/4Z+MYqvLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"u+nxE2w+3k4LxLJ6sMwmn9ENvy8="}],"description":"Bridge work on I-490 both directions between I-590 (Rochester) and Pittsford Palmyra Road; NY 31 (Perinton) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T18:07:33Z"},"road_event_id":"mq6+Ak8IVewc9D36y/4Z+MYqvLM=","beginning_cross_street":"I-590","ending_cross_street":"Pittsford Palmyra Road; NY 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.547722,43.143153]]}},{"id":"u+nxE2w+3k4LxLJ6sMwmn9ENvy8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mq6+Ak8IVewc9D36y/4Z+MYqvLM="},{"type":"next-occurrence","id":"8ek5aZUxNsghiEQnQYJtDHpuaj8="}],"description":"Bridge work on I-490 both directions between I-590 (Rochester) and Pittsford Palmyra Road; NY 31 (Perinton) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T18:07:33Z"},"road_event_id":"u+nxE2w+3k4LxLJ6sMwmn9ENvy8=","beginning_cross_street":"I-590","ending_cross_street":"Pittsford Palmyra Road; NY 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.547722,43.143153]]}},{"id":"8ek5aZUxNsghiEQnQYJtDHpuaj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mq6+Ak8IVewc9D36y/4Z+MYqvLM="},{"type":"next-occurrence","id":"FjgJkhMlKPu4ekC9CEE6B/7OQJE="}],"description":"Bridge work on I-490 both directions between I-590 (Rochester) and Pittsford Palmyra Road; NY 31 (Perinton) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T18:07:33Z"},"road_event_id":"8ek5aZUxNsghiEQnQYJtDHpuaj8=","beginning_cross_street":"I-590","ending_cross_street":"Pittsford Palmyra Road; NY 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.547722,43.143153]]}},{"id":"FjgJkhMlKPu4ekC9CEE6B/7OQJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mq6+Ak8IVewc9D36y/4Z+MYqvLM="},{"type":"next-occurrence","id":"D+xZrcAg8iGLP3G6NSfpGGpCdkU="}],"description":"Bridge work on I-490 both directions between I-590 (Rochester) and Pittsford Palmyra Road; NY 31 (Perinton) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T18:07:33Z"},"road_event_id":"FjgJkhMlKPu4ekC9CEE6B/7OQJE=","beginning_cross_street":"I-590","ending_cross_street":"Pittsford Palmyra Road; NY 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.547722,43.143153]]}},{"id":"D+xZrcAg8iGLP3G6NSfpGGpCdkU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mq6+Ak8IVewc9D36y/4Z+MYqvLM="}],"description":"Bridge work on I-490 both directions between I-590 (Rochester) and Pittsford Palmyra Road; NY 31 (Perinton) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-06-05T18:07:33Z"},"road_event_id":"D+xZrcAg8iGLP3G6NSfpGGpCdkU=","beginning_cross_street":"I-590","ending_cross_street":"Pittsford Palmyra Road; NY 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.547722,43.143153]]}},{"id":"73HGyJtltoZ2VFfXN6FQ8kpU8Rc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qiK87u15gnDFq9aQ4kpcHJf7S3s="}],"description":"Bridge work on NY 18 both directions between Hilton Parma Road; NY 259 (Parma) and Roosevelt Highway (Connector from NY 98 to NY 18) (Carlton) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-06-05T18:10:45Z"},"road_event_id":"73HGyJtltoZ2VFfXN6FQ8kpU8Rc=","beginning_cross_street":"Hilton Parma Road; NY 259","ending_cross_street":"Roosevelt Highway (Connector from NY 98 to NY 18)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.790849,43.259207]]}},{"id":"qiK87u15gnDFq9aQ4kpcHJf7S3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"73HGyJtltoZ2VFfXN6FQ8kpU8Rc="},{"type":"next-occurrence","id":"8jL2qHoTyzLetF/qGGLnyR7fyb4="}],"description":"Bridge work on NY 18 both directions between Hilton Parma Road; NY 259 (Parma) and Roosevelt Highway (Connector from NY 98 to NY 18) (Carlton) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-06-05T18:10:45Z"},"road_event_id":"qiK87u15gnDFq9aQ4kpcHJf7S3s=","beginning_cross_street":"Hilton Parma Road; NY 259","ending_cross_street":"Roosevelt Highway (Connector from NY 98 to NY 18)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.790849,43.259207]]}},{"id":"8jL2qHoTyzLetF/qGGLnyR7fyb4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"73HGyJtltoZ2VFfXN6FQ8kpU8Rc="},{"type":"next-occurrence","id":"8u/p9yNaC6NE8kHLPXExjk3bZ54="}],"description":"Bridge work on NY 18 both directions between Hilton Parma Road; NY 259 (Parma) and Roosevelt Highway (Connector from NY 98 to NY 18) (Carlton) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-06-05T18:10:45Z"},"road_event_id":"8jL2qHoTyzLetF/qGGLnyR7fyb4=","beginning_cross_street":"Hilton Parma Road; NY 259","ending_cross_street":"Roosevelt Highway (Connector from NY 98 to NY 18)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.790849,43.259207]]}},{"id":"8u/p9yNaC6NE8kHLPXExjk3bZ54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"73HGyJtltoZ2VFfXN6FQ8kpU8Rc="},{"type":"next-occurrence","id":"0xJQy2D5imxybWEy1CTmwbmHnaU="}],"description":"Bridge work on NY 18 both directions between Hilton Parma Road; NY 259 (Parma) and Roosevelt Highway (Connector from NY 98 to NY 18) (Carlton) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-06-05T18:10:45Z"},"road_event_id":"8u/p9yNaC6NE8kHLPXExjk3bZ54=","beginning_cross_street":"Hilton Parma Road; NY 259","ending_cross_street":"Roosevelt Highway (Connector from NY 98 to NY 18)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.790849,43.259207]]}},{"id":"0xJQy2D5imxybWEy1CTmwbmHnaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"73HGyJtltoZ2VFfXN6FQ8kpU8Rc="}],"description":"Bridge work on NY 18 both directions between Hilton Parma Road; NY 259 (Parma) and Roosevelt Highway (Connector from NY 98 to NY 18) (Carlton) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-06-05T18:10:45Z"},"road_event_id":"0xJQy2D5imxybWEy1CTmwbmHnaU=","beginning_cross_street":"Hilton Parma Road; NY 259","ending_cross_street":"Roosevelt Highway (Connector from NY 98 to NY 18)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.790849,43.259207]]}},{"id":"GXzTa/9crL1yaqzUOxdf9Ga3DTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 260"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1NrzKl2LZpZJVkS0YhCEQd1b//I="}],"description":"Bridge work on NY 260 both directions between Ridge Road West; NY 104 (Clarkson) and Lake Ontario State Parkway East (Hamlin) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-06-05T18:13:12Z"},"road_event_id":"GXzTa/9crL1yaqzUOxdf9Ga3DTw=","beginning_cross_street":"Ridge Road  West; NY 104","ending_cross_street":"Lake Ontario State Parkway  East","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.890056,43.225599]]}},{"id":"1NrzKl2LZpZJVkS0YhCEQd1b//I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 260"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GXzTa/9crL1yaqzUOxdf9Ga3DTw="},{"type":"next-occurrence","id":"4muQv3In8M1T+K/6p2FZtR6mygo="}],"description":"Bridge work on NY 260 both directions between Ridge Road West; NY 104 (Clarkson) and Lake Ontario State Parkway East (Hamlin) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-06-05T18:13:12Z"},"road_event_id":"1NrzKl2LZpZJVkS0YhCEQd1b//I=","beginning_cross_street":"Ridge Road  West; NY 104","ending_cross_street":"Lake Ontario State Parkway  East","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.890056,43.225599]]}},{"id":"4muQv3In8M1T+K/6p2FZtR6mygo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 260"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GXzTa/9crL1yaqzUOxdf9Ga3DTw="},{"type":"next-occurrence","id":"qcIcGAWBP0eAaGpHnQRHap0/iek="}],"description":"Bridge work on NY 260 both directions between Ridge Road West; NY 104 (Clarkson) and Lake Ontario State Parkway East (Hamlin) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-06-05T18:13:12Z"},"road_event_id":"4muQv3In8M1T+K/6p2FZtR6mygo=","beginning_cross_street":"Ridge Road  West; NY 104","ending_cross_street":"Lake Ontario State Parkway  East","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.890056,43.225599]]}},{"id":"qcIcGAWBP0eAaGpHnQRHap0/iek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 260"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GXzTa/9crL1yaqzUOxdf9Ga3DTw="},{"type":"next-occurrence","id":"BrUZl+OvN5Bkh3I9UrZ0Ny0LTWM="}],"description":"Bridge work on NY 260 both directions between Ridge Road West; NY 104 (Clarkson) and Lake Ontario State Parkway East (Hamlin) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-06-05T18:13:12Z"},"road_event_id":"qcIcGAWBP0eAaGpHnQRHap0/iek=","beginning_cross_street":"Ridge Road  West; NY 104","ending_cross_street":"Lake Ontario State Parkway  East","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.890056,43.225599]]}},{"id":"BrUZl+OvN5Bkh3I9UrZ0Ny0LTWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 260"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GXzTa/9crL1yaqzUOxdf9Ga3DTw="}],"description":"Bridge work on NY 260 both directions between Ridge Road West; NY 104 (Clarkson) and Lake Ontario State Parkway East (Hamlin) Mobile operation for bridge washing, short duration alternating lane closures as needed., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes","update_date":"2026-06-05T18:13:12Z"},"road_event_id":"BrUZl+OvN5Bkh3I9UrZ0Ny0LTWM=","beginning_cross_street":"Ridge Road  West; NY 104","ending_cross_street":"Lake Ontario State Parkway  East","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.890056,43.225599]]}},{"id":"kwpMF6/gPek6f3Qjbj1s/01ezgU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[],"description":"Construction on Grand Central Parkway both directions area of Union Turnpike (New York), Monday June 8th, 2026 thru Tuesday June 9th, 2026, 09:00 PM thru 03:00 AM 1 Left lane of 2 lanes closed","update_date":"2026-06-05T18:15:03Z"},"road_event_id":"kwpMF6/gPek6f3Qjbj1s/01ezgU=","beginning_cross_street":"Union Turnpike","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.829155,40.716668]]}},{"id":"Wl8qrfDzPU0cWmDmRs7rJ6IRf5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["946D; NY 104 WB service road"],"direction":"unknown","related_road_events":[],"description":"Milling and repaving on 946D; NY 104 WB service road westbound Entrance ramp NY 104 Westbound (Webster) RAMP CLOSED, Monday June 8th, 2026, 09:00 AM thru 02:30 PM All lanes closed ramp","update_date":"2026-06-05T18:17:29Z"},"road_event_id":"Wl8qrfDzPU0cWmDmRs7rJ6IRf5k=","beginning_cross_street":"NY 104 Westbound","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.470415,43.214188]]}},{"id":"0YWNk03SxJciGAnGqadshCek5Y0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JphBwIKkMe8mMym5jgXAMC0CEpo="}],"description":"Safety improvements on US 44 both directions between Niagara Road (Pleasant Valley) and Creek Road (Pleasant Valley) D265496/32774209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-05T18:22:42Z"},"road_event_id":"0YWNk03SxJciGAnGqadshCek5Y0=","beginning_cross_street":"Niagara Road","ending_cross_street":"Creek Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.827605,41.743756]]}},{"id":"JphBwIKkMe8mMym5jgXAMC0CEpo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0YWNk03SxJciGAnGqadshCek5Y0="},{"type":"next-occurrence","id":"919Rh7QOlqZb+pb+nDX3b2iLGlk="}],"description":"Safety improvements on US 44 both directions between Niagara Road (Pleasant Valley) and Creek Road (Pleasant Valley) D265496/32774209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-05T18:22:42Z"},"road_event_id":"JphBwIKkMe8mMym5jgXAMC0CEpo=","beginning_cross_street":"Niagara Road","ending_cross_street":"Creek Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.827605,41.743756]]}},{"id":"919Rh7QOlqZb+pb+nDX3b2iLGlk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0YWNk03SxJciGAnGqadshCek5Y0="},{"type":"next-occurrence","id":"DNIjMQM2tPdPYbqW+pDAfaCk2/Y="}],"description":"Safety improvements on US 44 both directions between Niagara Road (Pleasant Valley) and Creek Road (Pleasant Valley) D265496/32774209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-05T18:22:42Z"},"road_event_id":"919Rh7QOlqZb+pb+nDX3b2iLGlk=","beginning_cross_street":"Niagara Road","ending_cross_street":"Creek Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.827605,41.743756]]}},{"id":"DNIjMQM2tPdPYbqW+pDAfaCk2/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0YWNk03SxJciGAnGqadshCek5Y0="},{"type":"next-occurrence","id":"gwnN/Jx8NZ65nT4ms4fI9/PbmsY="}],"description":"Safety improvements on US 44 both directions between Niagara Road (Pleasant Valley) and Creek Road (Pleasant Valley) D265496/32774209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-05T18:22:42Z"},"road_event_id":"DNIjMQM2tPdPYbqW+pDAfaCk2/Y=","beginning_cross_street":"Niagara Road","ending_cross_street":"Creek Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.827605,41.743756]]}},{"id":"gwnN/Jx8NZ65nT4ms4fI9/PbmsY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0YWNk03SxJciGAnGqadshCek5Y0="},{"type":"next-occurrence","id":"KHdXzMRGXGT7xfZl8VGcEDAfUXY="}],"description":"Safety improvements on US 44 both directions between Niagara Road (Pleasant Valley) and Creek Road (Pleasant Valley) D265496/32774209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-05T18:22:42Z"},"road_event_id":"gwnN/Jx8NZ65nT4ms4fI9/PbmsY=","beginning_cross_street":"Niagara Road","ending_cross_street":"Creek Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.827605,41.743756]]}},{"id":"KHdXzMRGXGT7xfZl8VGcEDAfUXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0YWNk03SxJciGAnGqadshCek5Y0="},{"type":"next-occurrence","id":"pjqGsR69j0igKm1XqUljf+YmTsI="}],"description":"Safety improvements on US 44 both directions between Niagara Road (Pleasant Valley) and Creek Road (Pleasant Valley) D265496/32774209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-05T18:22:42Z"},"road_event_id":"KHdXzMRGXGT7xfZl8VGcEDAfUXY=","beginning_cross_street":"Niagara Road","ending_cross_street":"Creek Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T12:00:00Z","end_date":"2026-06-15T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.827605,41.743756]]}},{"id":"pjqGsR69j0igKm1XqUljf+YmTsI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0YWNk03SxJciGAnGqadshCek5Y0="},{"type":"next-occurrence","id":"9NJA/5yavmfjkNpuay2ylIFjaVo="}],"description":"Safety improvements on US 44 both directions between Niagara Road (Pleasant Valley) and Creek Road (Pleasant Valley) D265496/32774209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-05T18:22:42Z"},"road_event_id":"pjqGsR69j0igKm1XqUljf+YmTsI=","beginning_cross_street":"Niagara Road","ending_cross_street":"Creek Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T12:00:00Z","end_date":"2026-06-16T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.827605,41.743756]]}},{"id":"9NJA/5yavmfjkNpuay2ylIFjaVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0YWNk03SxJciGAnGqadshCek5Y0="},{"type":"next-occurrence","id":"EeKm9h3RHQVZg7ZUXh625rM36x8="}],"description":"Safety improvements on US 44 both directions between Niagara Road (Pleasant Valley) and Creek Road (Pleasant Valley) D265496/32774209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-05T18:22:42Z"},"road_event_id":"9NJA/5yavmfjkNpuay2ylIFjaVo=","beginning_cross_street":"Niagara Road","ending_cross_street":"Creek Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T12:00:00Z","end_date":"2026-06-17T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.827605,41.743756]]}},{"id":"EeKm9h3RHQVZg7ZUXh625rM36x8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0YWNk03SxJciGAnGqadshCek5Y0="},{"type":"next-occurrence","id":"tpHoFWBROrX2ylbB5wL6PQsauGM="}],"description":"Safety improvements on US 44 both directions between Niagara Road (Pleasant Valley) and Creek Road (Pleasant Valley) D265496/32774209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-05T18:22:42Z"},"road_event_id":"EeKm9h3RHQVZg7ZUXh625rM36x8=","beginning_cross_street":"Niagara Road","ending_cross_street":"Creek Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T12:00:00Z","end_date":"2026-06-18T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.827605,41.743756]]}},{"id":"tpHoFWBROrX2ylbB5wL6PQsauGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0YWNk03SxJciGAnGqadshCek5Y0="}],"description":"Safety improvements on US 44 both directions between Niagara Road (Pleasant Valley) and Creek Road (Pleasant Valley) D265496/32774209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday June 8th, 2026 thru Friday June 26th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, various lane closures","update_date":"2026-06-05T18:22:42Z"},"road_event_id":"tpHoFWBROrX2ylbB5wL6PQsauGM=","beginning_cross_street":"Niagara Road","ending_cross_street":"Creek Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T12:00:00Z","end_date":"2026-06-19T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.827605,41.743756]]}},{"id":"F7LIj5pTz10Aj6THzXmIO8mOb3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[],"description":"Mowing on I-86 westbound Steuben-Chemung County Line (Corning) to Center Way; NY 414 (Corning) right shoulder closure, Monday June 8th, 2026, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-05T18:24:24Z"},"road_event_id":"F7LIj5pTz10Aj6THzXmIO8mOb3Y=","beginning_cross_street":"Steuben-Chemung County Line","ending_cross_street":"Center Way; NY 414","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.9659,42.134289]]}},{"id":"U+Tcx5pgXoFhitgiwVbNwkP+grc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[],"description":"Mowing on I-86 westbound City of Corning; Town of Corning Line (Corning) to Center Way; NY 414 (Corning) shoulder closed, Monday June 8th, 2026, 07:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-06-05T18:31:25Z"},"road_event_id":"U+Tcx5pgXoFhitgiwVbNwkP+grc=","beginning_cross_street":"City of Corning; Town of Corning Line","ending_cross_street":"Center Way; NY 414","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.042725,42.151312]]}},{"id":"8mZVksSxLI1B0k4Xi3TqFkD59C0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qYIRoW5ckyv18zDv3+obR7EzD1c="}],"description":"Crack sealing on I-86 westbound Exit 39 - NY 960U; Babcock Hollow Road; Ramp (Bath) to Exit 37 - NY 53; Ramp (Bath) 2 lanes reduced to 1, Monday June 8th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday, 06:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-05T18:52:16Z"},"road_event_id":"8mZVksSxLI1B0k4Xi3TqFkD59C0=","beginning_cross_street":"Exit 39 - NY 960U; Babcock Hollow Road; Ramp","ending_cross_street":"Exit 37 - NY 53; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T10:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.309344,42.326282]]}},{"id":"qYIRoW5ckyv18zDv3+obR7EzD1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8mZVksSxLI1B0k4Xi3TqFkD59C0="}],"description":"Crack sealing on I-86 westbound Exit 39 - NY 960U; Babcock Hollow Road; Ramp (Bath) to Exit 37 - NY 53; Ramp (Bath) 2 lanes reduced to 1, Monday June 8th, 2026 thru Tuesday June 9th, 2026, Monday/Tuesday, 06:00 AM thru 04:00 PM All lanes open","update_date":"2026-06-05T18:52:16Z"},"road_event_id":"qYIRoW5ckyv18zDv3+obR7EzD1c=","beginning_cross_street":"Exit 39 - NY 960U; Babcock Hollow Road; Ramp","ending_cross_street":"Exit 37 - NY 53; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T10:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.309344,42.326282]]}},{"id":"94BoyfOTfCgg8JS4QnYdv+EJ5GE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 7"],"direction":"unknown","related_road_events":[],"description":"Repaving on NY 7 eastbound Grange Road; NY 142 (Brunswick) to City of Troy; Town of Brunswick Line (Troy) Alternating Lanes, Tuesday June 9th, 2026, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T19:04:42Z"},"road_event_id":"94BoyfOTfCgg8JS4QnYdv+EJ5GE=","beginning_cross_street":"Grange Road; NY 142","ending_cross_street":"City of Troy; Town of Brunswick Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.628096,42.751887]]}},{"id":"LB4/Mgko7WbMY4WAoHVUq3XKJKk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 278"],"direction":"unknown","related_road_events":[],"description":"Mowing on NY 278 both directions NY 7 (Brunswick) to NY 2 (Brunswick) Alternating Lanes, Tuesday June 9th, 2026, 07:00 AM thru 11:00 AM All lanes open","update_date":"2026-06-05T19:11:03Z"},"road_event_id":"LB4/Mgko7WbMY4WAoHVUq3XKJKk=","beginning_cross_street":"NY 7","ending_cross_street":"NY 2","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.596949,42.761272]]}},{"id":"UNFxHQFJD2LEPRtysTIg6XUzY3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 278"],"direction":"unknown","related_road_events":[],"description":"Mowing on NY 278 both directions NY 2 (Brunswick) Alternating Lanes, Tuesday June 9th, 2026, 11:00 AM thru 03:30 PM All lanes open","update_date":"2026-06-05T19:14:07Z"},"road_event_id":"UNFxHQFJD2LEPRtysTIg6XUzY3U=","beginning_cross_street":"NY 2","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T15:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.5723,42.750145]]}},{"id":"6hBj6k8PvTcYNz05HghFjMC4Ewc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Pennsylvania Ext."],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rC2kwLaNZ52+8O3aHoDCd26VVGw="}],"description":"Line striping on New Jersey Turnpike - Pennsylvania Ext. eastbound between East of Delaware River Bridge (Florence Twp) and East of Toll Plaza (Florence Twp), Monday June 8th, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday, 09:00 PM thru 03:00 AM 2 Left lanes of 3 lanes closed","update_date":"2026-06-05T19:23:36Z"},"road_event_id":"6hBj6k8PvTcYNz05HghFjMC4Ewc=","beginning_cross_street":"East of Delaware River Bridge","ending_cross_street":"East of Toll Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.814474,40.112464]]}},{"id":"rC2kwLaNZ52+8O3aHoDCd26VVGw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Pennsylvania Ext."],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6hBj6k8PvTcYNz05HghFjMC4Ewc="}],"description":"Line striping on New Jersey Turnpike - Pennsylvania Ext. eastbound between East of Delaware River Bridge (Florence Twp) and East of Toll Plaza (Florence Twp), Monday June 8th, 2026 thru Wednesday June 10th, 2026, Monday/Tuesday, 09:00 PM thru 03:00 AM 2 Left lanes of 3 lanes closed","update_date":"2026-06-05T19:23:36Z"},"road_event_id":"rC2kwLaNZ52+8O3aHoDCd26VVGw=","beginning_cross_street":"East of Delaware River Bridge","ending_cross_street":"East of Toll Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T01:00:00Z","end_date":"2026-06-10T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.814474,40.112464]]}},{"id":"fM1sPYWVORcjIGrS0XPv9j785nY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Construction on New Jersey Turnpike Outer Roadway southbound Entrance ramp Interchange 8 - NJ 33 (East Windsor Twp), Monday June 8th, 2026 thru Tuesday June 9th, 2026, 09:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-05T19:25:33Z"},"road_event_id":"fM1sPYWVORcjIGrS0XPv9j785nY=","beginning_cross_street":"Interchange 8 - NJ 33","ending_cross_street":"Interchange 8 - NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.513449,40.26474]]}},{"id":"DGY4Utl7qAGuFSTI4s0IpuaDhqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"O4EkAw03nbs5717VZGd9kdArbVI="}],"description":"Crack sealing and expansion joint repairs on New Jersey Turnpike - Western Spur northbound between South of Interchange 15E - US 1&9 (Newark) and Interchange 15W - I-280 (Kearny), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Thursday, 09:00 PM thru 04:00 AM 2 Left lanes of 5 lanes closed","update_date":"2026-06-05T19:28:16Z"},"road_event_id":"DGY4Utl7qAGuFSTI4s0IpuaDhqI=","beginning_cross_street":"South of Interchange 15E - US 1&9","ending_cross_street":"Interchange 15W - I-280","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.133165,40.724557]]}},{"id":"O4EkAw03nbs5717VZGd9kdArbVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DGY4Utl7qAGuFSTI4s0IpuaDhqI="}],"description":"Crack sealing and expansion joint repairs on New Jersey Turnpike - Western Spur northbound between South of Interchange 15E - US 1&9 (Newark) and Interchange 15W - I-280 (Kearny), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Thursday, 09:00 PM thru 04:00 AM 2 Left lanes of 5 lanes closed","update_date":"2026-06-05T19:28:16Z"},"road_event_id":"O4EkAw03nbs5717VZGd9kdArbVI=","beginning_cross_street":"South of Interchange 15E - US 1&9","ending_cross_street":"Interchange 15W - I-280","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.133165,40.724557]]}},{"id":"DbAVy9vvR44DlwHr/0y2pO5B2I0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6+KyAIwouMZWhWzyrAEDqaCxtss="}],"description":"Steel repairs on New Jersey Turnpike - Western Spur northbound Entrance ramp From Interchange 15W to the Eastern Spur (Kearny), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-05T19:30:24Z"},"road_event_id":"DbAVy9vvR44DlwHr/0y2pO5B2I0=","beginning_cross_street":"From Interchange 15W to the Eastern Spur","ending_cross_street":"From Interchange 15W to the Eastern Spur","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.121066,40.754539]]}},{"id":"6+KyAIwouMZWhWzyrAEDqaCxtss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DbAVy9vvR44DlwHr/0y2pO5B2I0="},{"type":"next-occurrence","id":"Vx85AcTYmtBFohOIDZLLmMXWWn4="}],"description":"Steel repairs on New Jersey Turnpike - Western Spur northbound Entrance ramp From Interchange 15W to the Eastern Spur (Kearny), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-05T19:30:24Z"},"road_event_id":"6+KyAIwouMZWhWzyrAEDqaCxtss=","beginning_cross_street":"From Interchange 15W to the Eastern Spur","ending_cross_street":"From Interchange 15W to the Eastern Spur","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.121066,40.754539]]}},{"id":"Vx85AcTYmtBFohOIDZLLmMXWWn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DbAVy9vvR44DlwHr/0y2pO5B2I0="},{"type":"next-occurrence","id":"ZQeRwpBnWe/HqrRKyzaM0KQf2Lw="}],"description":"Steel repairs on New Jersey Turnpike - Western Spur northbound Entrance ramp From Interchange 15W to the Eastern Spur (Kearny), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-05T19:30:24Z"},"road_event_id":"Vx85AcTYmtBFohOIDZLLmMXWWn4=","beginning_cross_street":"From Interchange 15W to the Eastern Spur","ending_cross_street":"From Interchange 15W to the Eastern Spur","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.121066,40.754539]]}},{"id":"ZQeRwpBnWe/HqrRKyzaM0KQf2Lw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DbAVy9vvR44DlwHr/0y2pO5B2I0="},{"type":"next-occurrence","id":"jNbTF6Zyf9nN68yRfjPwdl7Uk2s="}],"description":"Steel repairs on New Jersey Turnpike - Western Spur northbound Entrance ramp From Interchange 15W to the Eastern Spur (Kearny), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-05T19:30:24Z"},"road_event_id":"ZQeRwpBnWe/HqrRKyzaM0KQf2Lw=","beginning_cross_street":"From Interchange 15W to the Eastern Spur","ending_cross_street":"From Interchange 15W to the Eastern Spur","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.121066,40.754539]]}},{"id":"jNbTF6Zyf9nN68yRfjPwdl7Uk2s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DbAVy9vvR44DlwHr/0y2pO5B2I0="}],"description":"Steel repairs on New Jersey Turnpike - Western Spur northbound Entrance ramp From Interchange 15W to the Eastern Spur (Kearny), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-06-05T19:30:24Z"},"road_event_id":"jNbTF6Zyf9nN68yRfjPwdl7Uk2s=","beginning_cross_street":"From Interchange 15W to the Eastern Spur","ending_cross_street":"From Interchange 15W to the Eastern Spur","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.121066,40.754539]]}},{"id":"+Slye9Totg9q0zzid3Qba0fLOXw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"euzVsje2mauQHVRUj1yf0t8UNwM="}],"description":"Construction on I-278 both directions between East 138th Street; I-278-Bruckner Expressway (New York) and I-95 at I-695 Throgs Neck Expressway Entrance (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed eastbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed eastbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed westbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed westbound","update_date":"2026-06-05T19:32:06Z"},"road_event_id":"+Slye9Totg9q0zzid3Qba0fLOXw=","beginning_cross_street":"East 138th Street; I-278-Bruckner Expressway","ending_cross_street":"I-695 Throgs Neck Expressway Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911977,40.804553]]}},{"id":"euzVsje2mauQHVRUj1yf0t8UNwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Slye9Totg9q0zzid3Qba0fLOXw="},{"type":"next-occurrence","id":"oXAwpj6KzC1SglVNLKowlSxGQH4="}],"description":"Construction on I-278 both directions between East 138th Street; I-278-Bruckner Expressway (New York) and I-95 at I-695 Throgs Neck Expressway Entrance (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed eastbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed eastbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed westbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed westbound","update_date":"2026-06-05T19:32:06Z"},"road_event_id":"euzVsje2mauQHVRUj1yf0t8UNwM=","beginning_cross_street":"East 138th Street; I-278-Bruckner Expressway","ending_cross_street":"I-695 Throgs Neck Expressway Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911977,40.804553]]}},{"id":"oXAwpj6KzC1SglVNLKowlSxGQH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Slye9Totg9q0zzid3Qba0fLOXw="},{"type":"next-occurrence","id":"nrNL+zLD94oBd/ak9wRo1MjYEAE="}],"description":"Construction on I-278 both directions between East 138th Street; I-278-Bruckner Expressway (New York) and I-95 at I-695 Throgs Neck Expressway Entrance (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed eastbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed eastbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed westbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed westbound","update_date":"2026-06-05T19:32:06Z"},"road_event_id":"oXAwpj6KzC1SglVNLKowlSxGQH4=","beginning_cross_street":"East 138th Street; I-278-Bruckner Expressway","ending_cross_street":"I-695 Throgs Neck Expressway Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911977,40.804553]]}},{"id":"nrNL+zLD94oBd/ak9wRo1MjYEAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Slye9Totg9q0zzid3Qba0fLOXw="},{"type":"next-occurrence","id":"Lx+fgFXIyGlQzx8l7qJlWjaqHGw="}],"description":"Construction on I-278 both directions between East 138th Street; I-278-Bruckner Expressway (New York) and I-95 at I-695 Throgs Neck Expressway Entrance (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed eastbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed eastbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed westbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed westbound","update_date":"2026-06-05T19:32:06Z"},"road_event_id":"nrNL+zLD94oBd/ak9wRo1MjYEAE=","beginning_cross_street":"East 138th Street; I-278-Bruckner Expressway","ending_cross_street":"I-695 Throgs Neck Expressway Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911977,40.804553]]}},{"id":"Lx+fgFXIyGlQzx8l7qJlWjaqHGw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Slye9Totg9q0zzid3Qba0fLOXw="},{"type":"next-occurrence","id":"Mc+m5HSRsIWZx7FlPwaTFE0L8vw="}],"description":"Construction on I-278 both directions between East 138th Street; I-278-Bruckner Expressway (New York) and I-95 at I-695 Throgs Neck Expressway Entrance (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed eastbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed eastbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed westbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed westbound","update_date":"2026-06-05T19:32:06Z"},"road_event_id":"Lx+fgFXIyGlQzx8l7qJlWjaqHGw=","beginning_cross_street":"East 138th Street; I-278-Bruckner Expressway","ending_cross_street":"I-695 Throgs Neck Expressway Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911977,40.804553]]}},{"id":"Mc+m5HSRsIWZx7FlPwaTFE0L8vw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Slye9Totg9q0zzid3Qba0fLOXw="},{"type":"next-occurrence","id":"ujUNiprGFENodWUFuIg6SSHYSRg="}],"description":"Construction on I-278 both directions between East 138th Street; I-278-Bruckner Expressway (New York) and I-95 at I-695 Throgs Neck Expressway Entrance (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed eastbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed eastbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed westbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed westbound","update_date":"2026-06-05T19:32:06Z"},"road_event_id":"Mc+m5HSRsIWZx7FlPwaTFE0L8vw=","beginning_cross_street":"East 138th Street; I-278-Bruckner Expressway","ending_cross_street":"I-695 Throgs Neck Expressway Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911977,40.804553]]}},{"id":"ujUNiprGFENodWUFuIg6SSHYSRg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Slye9Totg9q0zzid3Qba0fLOXw="},{"type":"next-occurrence","id":"atBHLHJv3v4gMSE2yjW0+S7cE94="}],"description":"Construction on I-278 both directions between East 138th Street; I-278-Bruckner Expressway (New York) and I-95 at I-695 Throgs Neck Expressway Entrance (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed eastbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed eastbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed westbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed westbound","update_date":"2026-06-05T19:32:06Z"},"road_event_id":"ujUNiprGFENodWUFuIg6SSHYSRg=","beginning_cross_street":"East 138th Street; I-278-Bruckner Expressway","ending_cross_street":"I-695 Throgs Neck Expressway Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911977,40.804553]]}},{"id":"atBHLHJv3v4gMSE2yjW0+S7cE94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Slye9Totg9q0zzid3Qba0fLOXw="},{"type":"next-occurrence","id":"JqiZ2nVodh23r3k6FdRKvMI6jwQ="}],"description":"Construction on I-278 both directions between East 138th Street; I-278-Bruckner Expressway (New York) and I-95 at I-695 Throgs Neck Expressway Entrance (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed eastbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed eastbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed westbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed westbound","update_date":"2026-06-05T19:32:06Z"},"road_event_id":"atBHLHJv3v4gMSE2yjW0+S7cE94=","beginning_cross_street":"East 138th Street; I-278-Bruckner Expressway","ending_cross_street":"I-695 Throgs Neck Expressway Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911977,40.804553]]}},{"id":"JqiZ2nVodh23r3k6FdRKvMI6jwQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Slye9Totg9q0zzid3Qba0fLOXw="}],"description":"Construction on I-278 both directions between East 138th Street; I-278-Bruckner Expressway (New York) and I-95 at I-695 Throgs Neck Expressway Entrance (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed eastbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed eastbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed westbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed westbound","update_date":"2026-06-05T19:32:06Z"},"road_event_id":"JqiZ2nVodh23r3k6FdRKvMI6jwQ=","beginning_cross_street":"East 138th Street; I-278-Bruckner Expressway","ending_cross_street":"I-695 Throgs Neck Expressway Entrance","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911977,40.804553]]}},{"id":"KAmgsCB4xIjwgCJrixdrUHZ7tgc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[],"description":"Installation of sign structure on New Jersey Turnpike - Western Spur westbound Entrance ramp From NJ 3 to Interchange 16W (East Rutherford), Monday June 8th, 2026 thru Tuesday June 9th, 2026, 09:00 PM thru 04:00 AM All lanes closed","update_date":"2026-06-05T19:35:41Z"},"road_event_id":"KAmgsCB4xIjwgCJrixdrUHZ7tgc=","beginning_cross_street":"From NJ 3 to Interchange 16W","ending_cross_street":"From NJ 3 to Interchange 16W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.079914,40.808906]]}},{"id":"LL7enW91ap/QKWBB9uCBRTgzEj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qYE4q2yU6JCNj4qdV2bVWcXkSqg="}],"description":"Construction on I-95 both directions between East Tremont Avenue; Ramp (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed southbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound","update_date":"2026-06-05T19:36:24Z"},"road_event_id":"LL7enW91ap/QKWBB9uCBRTgzEj4=","beginning_cross_street":"East Tremont Avenue; Ramp","ending_cross_street":"East Tremont Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830539,40.831673]]}},{"id":"qYE4q2yU6JCNj4qdV2bVWcXkSqg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LL7enW91ap/QKWBB9uCBRTgzEj4="},{"type":"next-occurrence","id":"mCsA0/+BXWukIfDTKBG+5YVGfnI="}],"description":"Construction on I-95 both directions between East Tremont Avenue; Ramp (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed southbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound","update_date":"2026-06-05T19:36:24Z"},"road_event_id":"qYE4q2yU6JCNj4qdV2bVWcXkSqg=","beginning_cross_street":"East Tremont Avenue; Ramp","ending_cross_street":"East Tremont Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830539,40.831673]]}},{"id":"mCsA0/+BXWukIfDTKBG+5YVGfnI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LL7enW91ap/QKWBB9uCBRTgzEj4="},{"type":"next-occurrence","id":"xNsb/AjKedczaRTaEvVCWIO59EE="}],"description":"Construction on I-95 both directions between East Tremont Avenue; Ramp (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed southbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound","update_date":"2026-06-05T19:36:24Z"},"road_event_id":"mCsA0/+BXWukIfDTKBG+5YVGfnI=","beginning_cross_street":"East Tremont Avenue; Ramp","ending_cross_street":"East Tremont Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830539,40.831673]]}},{"id":"xNsb/AjKedczaRTaEvVCWIO59EE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LL7enW91ap/QKWBB9uCBRTgzEj4="},{"type":"next-occurrence","id":"zQLQF0lEGTesJ30+feGN+pNbnlY="}],"description":"Construction on I-95 both directions between East Tremont Avenue; Ramp (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed southbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound","update_date":"2026-06-05T19:36:24Z"},"road_event_id":"xNsb/AjKedczaRTaEvVCWIO59EE=","beginning_cross_street":"East Tremont Avenue; Ramp","ending_cross_street":"East Tremont Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830539,40.831673]]}},{"id":"zQLQF0lEGTesJ30+feGN+pNbnlY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LL7enW91ap/QKWBB9uCBRTgzEj4="}],"description":"Construction on I-95 both directions between East Tremont Avenue; Ramp (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed southbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound","update_date":"2026-06-05T19:36:24Z"},"road_event_id":"zQLQF0lEGTesJ30+feGN+pNbnlY=","beginning_cross_street":"East Tremont Avenue; Ramp","ending_cross_street":"East Tremont Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830539,40.831673]]}},{"id":"vLXubeJZDotlA7tl0Bhzj9jO+nI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[],"description":"Bridge maintenance operations on NY 17 [Orange] eastbound between Exit 122A - Fletcher Street (Goshen) and Exit 124 - NY 17A (Goshen) DOT BM/NIGHT/B1003159/32774309 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday June 11th, 2026 thru Friday June 12th, 2026, 08:00 PM thru 04:00 PM, right lane closure","update_date":"2026-06-05T19:37:35Z"},"road_event_id":"vLXubeJZDotlA7tl0Bhzj9jO+nI=","beginning_cross_street":"","ending_cross_street":"Exit 124 - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.340038,41.398498]]}},{"id":"H4F9hDDTi7Dftp/QXxPHsNfNz6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cQxt+apBffs5Rq9OhmGUoeHer90="}],"description":"Crack sealing on New Jersey Turnpike - Western Spur southbound between North of Interchange 15W - I-280 (Kearny) and North of Interchange 15E - US 1&9 (Newark), Tuesday June 9th, 2026 thru Thursday June 11th, 2026, Tuesday/Wednesday, 07:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Tuesday June 9th, 2026 thru Thursday June 11th, 2026, Tuesday/Wednesday, 09:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-06-05T19:38:24Z"},"road_event_id":"H4F9hDDTi7Dftp/QXxPHsNfNz6A=","beginning_cross_street":"North of Interchange 15W - I-280","ending_cross_street":"North of Interchange 15E - US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T23:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.109403,40.767092]]}},{"id":"cQxt+apBffs5Rq9OhmGUoeHer90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H4F9hDDTi7Dftp/QXxPHsNfNz6A="}],"description":"Crack sealing on New Jersey Turnpike - Western Spur southbound between North of Interchange 15W - I-280 (Kearny) and North of Interchange 15E - US 1&9 (Newark), Tuesday June 9th, 2026 thru Thursday June 11th, 2026, Tuesday/Wednesday, 07:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Tuesday June 9th, 2026 thru Thursday June 11th, 2026, Tuesday/Wednesday, 09:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-06-05T19:38:24Z"},"road_event_id":"cQxt+apBffs5Rq9OhmGUoeHer90=","beginning_cross_street":"North of Interchange 15W - I-280","ending_cross_street":"North of Interchange 15E - US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T23:00:00Z","end_date":"2026-06-11T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.109403,40.767092]]}},{"id":"x5qnUI/kdIy7Xqt8sOwv/cAXIOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Gf9R7sXOw6glVoojWZgzVIMrU2A="}],"description":"Construction on New Jersey Turnpike southbound from US 206 to Interchange 7 (Bordentown Twp), Wednesday June 10th, 2026 thru Friday June 12th, 2026, Wednesday/Thursday, 09:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-05T19:40:19Z"},"road_event_id":"x5qnUI/kdIy7Xqt8sOwv/cAXIOU=","beginning_cross_street":"from US 206 to Interchange 7","ending_cross_street":"from US 206 to Interchange 7","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.706304,40.125571]]}},{"id":"Gf9R7sXOw6glVoojWZgzVIMrU2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x5qnUI/kdIy7Xqt8sOwv/cAXIOU="}],"description":"Construction on New Jersey Turnpike southbound from US 206 to Interchange 7 (Bordentown Twp), Wednesday June 10th, 2026 thru Friday June 12th, 2026, Wednesday/Thursday, 09:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-05T19:40:19Z"},"road_event_id":"Gf9R7sXOw6glVoojWZgzVIMrU2A=","beginning_cross_street":"from US 206 to Interchange 7","ending_cross_street":"from US 206 to Interchange 7","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.706304,40.125571]]}},{"id":"N4XkJ+NGy/WLKBCJYHawDnIQP7E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9CspYdvogTv9gT7mck07122xmro="}],"description":"Construction on I-278 both directions between END ROUTE; I-95 (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T19:41:18Z"},"road_event_id":"N4XkJ+NGy/WLKBCJYHawDnIQP7E=","beginning_cross_street":"END ROUTE; I-95","ending_cross_street":"END ROUTE; I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.833837,40.829893]]}},{"id":"9CspYdvogTv9gT7mck07122xmro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4XkJ+NGy/WLKBCJYHawDnIQP7E="},{"type":"next-occurrence","id":"UsQ/FFSKQ5aIUPHsTISjgnzUZpk="}],"description":"Construction on I-278 both directions between END ROUTE; I-95 (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T19:41:18Z"},"road_event_id":"9CspYdvogTv9gT7mck07122xmro=","beginning_cross_street":"END ROUTE; I-95","ending_cross_street":"END ROUTE; I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.833837,40.829893]]}},{"id":"UsQ/FFSKQ5aIUPHsTISjgnzUZpk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4XkJ+NGy/WLKBCJYHawDnIQP7E="},{"type":"next-occurrence","id":"aQJ4pJXecAQBzU4xANQC8tQ5/iA="}],"description":"Construction on I-278 both directions between END ROUTE; I-95 (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T19:41:18Z"},"road_event_id":"UsQ/FFSKQ5aIUPHsTISjgnzUZpk=","beginning_cross_street":"END ROUTE; I-95","ending_cross_street":"END ROUTE; I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.833837,40.829893]]}},{"id":"aQJ4pJXecAQBzU4xANQC8tQ5/iA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4XkJ+NGy/WLKBCJYHawDnIQP7E="},{"type":"next-occurrence","id":"hGpQaxtlAnwm5kMrnGCvKVdghXg="}],"description":"Construction on I-278 both directions between END ROUTE; I-95 (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T19:41:18Z"},"road_event_id":"aQJ4pJXecAQBzU4xANQC8tQ5/iA=","beginning_cross_street":"END ROUTE; I-95","ending_cross_street":"END ROUTE; I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.833837,40.829893]]}},{"id":"hGpQaxtlAnwm5kMrnGCvKVdghXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N4XkJ+NGy/WLKBCJYHawDnIQP7E="}],"description":"Construction on I-278 both directions between END ROUTE; I-95 (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T19:41:18Z"},"road_event_id":"hGpQaxtlAnwm5kMrnGCvKVdghXg=","beginning_cross_street":"END ROUTE; I-95","ending_cross_street":"END ROUTE; I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.833837,40.829893]]}},{"id":"M2AQp/u/k1fFC2RTGlRdZnzqe00=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Construction on New Jersey Turnpike Inner Roadway northbound ramp from Woodrow Wilson Service Area (Hamilton Twp), Wednesday June 10th, 2026 thru Thursday June 11th, 2026, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-05T19:42:11Z"},"road_event_id":"M2AQp/u/k1fFC2RTGlRdZnzqe00=","beginning_cross_street":"Woodrow Wilson Service Area","ending_cross_street":"Woodrow Wilson Service Area","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.625297,40.179099]]}},{"id":"wETvHn/ps8zbkO16vvSTE2RrFo4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"W9pIwaZDl0mKzKF1KTbZJsKsuZw="}],"description":"Construction on I-95 southbound ramp to I-87 Major Deegan Expressway (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T19:43:26Z"},"road_event_id":"wETvHn/ps8zbkO16vvSTE2RrFo4=","beginning_cross_street":"I-87 Major Deegan Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919825,40.84516]]}},{"id":"W9pIwaZDl0mKzKF1KTbZJsKsuZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wETvHn/ps8zbkO16vvSTE2RrFo4="},{"type":"next-occurrence","id":"bs2cGZIQqR8ZCNnH07QJC3Z9iIk="}],"description":"Construction on I-95 southbound ramp to I-87 Major Deegan Expressway (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T19:43:26Z"},"road_event_id":"W9pIwaZDl0mKzKF1KTbZJsKsuZw=","beginning_cross_street":"I-87 Major Deegan Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919825,40.84516]]}},{"id":"bs2cGZIQqR8ZCNnH07QJC3Z9iIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wETvHn/ps8zbkO16vvSTE2RrFo4="},{"type":"next-occurrence","id":"y/Z/DlfWuggM3cjU/W1mPRD8rV0="}],"description":"Construction on I-95 southbound ramp to I-87 Major Deegan Expressway (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T19:43:26Z"},"road_event_id":"bs2cGZIQqR8ZCNnH07QJC3Z9iIk=","beginning_cross_street":"I-87 Major Deegan Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919825,40.84516]]}},{"id":"y/Z/DlfWuggM3cjU/W1mPRD8rV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wETvHn/ps8zbkO16vvSTE2RrFo4="},{"type":"next-occurrence","id":"fgn05MK7PKvutfFzQpPyCcJgEoc="}],"description":"Construction on I-95 southbound ramp to I-87 Major Deegan Expressway (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T19:43:26Z"},"road_event_id":"y/Z/DlfWuggM3cjU/W1mPRD8rV0=","beginning_cross_street":"I-87 Major Deegan Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919825,40.84516]]}},{"id":"fgn05MK7PKvutfFzQpPyCcJgEoc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wETvHn/ps8zbkO16vvSTE2RrFo4="}],"description":"Construction on I-95 southbound ramp to I-87 Major Deegan Expressway (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T19:43:26Z"},"road_event_id":"fgn05MK7PKvutfFzQpPyCcJgEoc=","beginning_cross_street":"I-87 Major Deegan Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919825,40.84516]]}},{"id":"bS80qsPl8XGMDkC/e3/OUEttThY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike/I-95"],"direction":"unknown","related_road_events":[],"description":"Construction on New Jersey Turnpike/I-95 Local Lanes southbound between Exit 70B - Teaneck (Teaneck Twp) and New Jersey Turnpike/I-95 at North of US 46 (Ridgefield Park), Wednesday June 10th, 2026 thru Thursday June 11th, 2026, 10:00 PM thru 04:00 AM 2 Right lanes of 3 lanes closed","update_date":"2026-06-05T19:44:03Z"},"road_event_id":"bS80qsPl8XGMDkC/e3/OUEttThY=","beginning_cross_street":"Exit 70B - Teaneck","ending_cross_street":"North of US 46 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008822,40.865798]]}},{"id":"q6CstZDU+IchOhbhm7T8fXJKRJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9Z7xv0Jik2+d/Yk6ct2u6ES3Nvc="}],"description":"Construction on I-95 southbound between Hutchinson River Parkway (New York) and Zerega Avenue (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T19:46:45Z"},"road_event_id":"q6CstZDU+IchOhbhm7T8fXJKRJ8=","beginning_cross_street":"Hutchinson River Parkway","ending_cross_street":"Zerega Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.838517,40.829713]]}},{"id":"9Z7xv0Jik2+d/Yk6ct2u6ES3Nvc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q6CstZDU+IchOhbhm7T8fXJKRJ8="},{"type":"next-occurrence","id":"rQtZdl/K5Hl90lrz0vUlQwxw/1Y="}],"description":"Construction on I-95 southbound between Hutchinson River Parkway (New York) and Zerega Avenue (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T19:46:45Z"},"road_event_id":"9Z7xv0Jik2+d/Yk6ct2u6ES3Nvc=","beginning_cross_street":"Hutchinson River Parkway","ending_cross_street":"Zerega Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.838517,40.829713]]}},{"id":"rQtZdl/K5Hl90lrz0vUlQwxw/1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q6CstZDU+IchOhbhm7T8fXJKRJ8="},{"type":"next-occurrence","id":"Pf54V/nCzrT25j774o3WHi5yQmM="}],"description":"Construction on I-95 southbound between Hutchinson River Parkway (New York) and Zerega Avenue (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T19:46:45Z"},"road_event_id":"rQtZdl/K5Hl90lrz0vUlQwxw/1Y=","beginning_cross_street":"Hutchinson River Parkway","ending_cross_street":"Zerega Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.838517,40.829713]]}},{"id":"Pf54V/nCzrT25j774o3WHi5yQmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q6CstZDU+IchOhbhm7T8fXJKRJ8="},{"type":"next-occurrence","id":"rdJC7eD3A6E2IVDzE1nrDulAEII="}],"description":"Construction on I-95 southbound between Hutchinson River Parkway (New York) and Zerega Avenue (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T19:46:45Z"},"road_event_id":"Pf54V/nCzrT25j774o3WHi5yQmM=","beginning_cross_street":"Hutchinson River Parkway","ending_cross_street":"Zerega Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.838517,40.829713]]}},{"id":"rdJC7eD3A6E2IVDzE1nrDulAEII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q6CstZDU+IchOhbhm7T8fXJKRJ8="}],"description":"Construction on I-95 southbound between Hutchinson River Parkway (New York) and Zerega Avenue (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T19:46:45Z"},"road_event_id":"rdJC7eD3A6E2IVDzE1nrDulAEII=","beginning_cross_street":"Hutchinson River Parkway","ending_cross_street":"Zerega Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.838517,40.829713]]}},{"id":"Pp7ebkXGDgi484InrEYbcax/pzU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike/I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DcDUemYdW90mdWLCkGzqloUUzSc="}],"description":"Curb work on New Jersey Turnpike/I-95 Local Lanes southbound Entrance ramp Exit 71 (NB) - NJ 4/Broad Ave (Englewood) to South of Exit 71 (NB) - NJ 4/Broad Ave (Leonia), Wednesday June 10th, 2026 thru Friday June 12th, 2026, Wednesday/Thursday, 09:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-05T19:53:05Z"},"road_event_id":"Pp7ebkXGDgi484InrEYbcax/pzU=","beginning_cross_street":"Exit 71 (NB) - NJ 4/Broad Ave","ending_cross_street":"South of Exit 71 (NB) - NJ 4/Broad Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T01:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980123,40.872754]]}},{"id":"DcDUemYdW90mdWLCkGzqloUUzSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike/I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Pp7ebkXGDgi484InrEYbcax/pzU="}],"description":"Curb work on New Jersey Turnpike/I-95 Local Lanes southbound Entrance ramp Exit 71 (NB) - NJ 4/Broad Ave (Englewood) to South of Exit 71 (NB) - NJ 4/Broad Ave (Leonia), Wednesday June 10th, 2026 thru Friday June 12th, 2026, Wednesday/Thursday, 09:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-05T19:53:05Z"},"road_event_id":"DcDUemYdW90mdWLCkGzqloUUzSc=","beginning_cross_street":"Exit 71 (NB) - NJ 4/Broad Ave","ending_cross_street":"South of Exit 71 (NB) - NJ 4/Broad Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980123,40.872754]]}},{"id":"ps/WjiEcUTpefzNVm0lZ2McpPFk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rimyOSmjzYHHLakh/Ra88sKQgFM="}],"description":"Construction on I-95 both directions between East 174th Street (New York) and West Farms Road (New York) Subject to change without notice., Tuesday June 9th, 2026 thru Wednesday June 10th, 2026, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed northbound, Wednesday June 10th, 2026, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed northbound, Wednesday June 10th, 2026, 05:00 AM thru 06:00 AM 1 Right lane of 3 lanes closed northbound, Thursday June 11th, 2026 thru Friday June 12th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, Friday June 12th, 2026, 01:00 AM thru 05:00 AM 2 Left lanes of 3 lanes closed northbound, Friday June 12th, 2026, 05:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed northbound, Tuesday June 9th, 2026 thru Wednesday June 10th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Wednesday June 10th, 2026, 01:00 AM thru 05:00 AM 2 Left lanes of 3 lanes closed southbound, Wednesday June 10th, 2026, 05:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed southbound, Thursday June 11th, 2026 thru Friday June 12th, 2026, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed southbound, Friday June 12th, 2026, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed southbound, Friday June 12th, 2026, 05:00 AM thru 06:00 AM 1 Right lane of 3 lanes closed southbound","update_date":"2026-06-05T19:54:11Z"},"road_event_id":"ps/WjiEcUTpefzNVm0lZ2McpPFk=","beginning_cross_street":"East 174th Street","ending_cross_street":"West Farms Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.914078,40.845124]]}},{"id":"rimyOSmjzYHHLakh/Ra88sKQgFM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ps/WjiEcUTpefzNVm0lZ2McpPFk="}],"description":"Construction on I-95 both directions between East 174th Street (New York) and West Farms Road (New York) Subject to change without notice., Tuesday June 9th, 2026 thru Wednesday June 10th, 2026, 11:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed northbound, Wednesday June 10th, 2026, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed northbound, Wednesday June 10th, 2026, 05:00 AM thru 06:00 AM 1 Right lane of 3 lanes closed northbound, Thursday June 11th, 2026 thru Friday June 12th, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, Friday June 12th, 2026, 01:00 AM thru 05:00 AM 2 Left lanes of 3 lanes closed northbound, Friday June 12th, 2026, 05:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed northbound, Tuesday June 9th, 2026 thru Wednesday June 10th, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed southbound, Wednesday June 10th, 2026, 01:00 AM thru 05:00 AM 2 Left lanes of 3 lanes closed southbound, Wednesday June 10th, 2026, 05:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed southbound, Thursday June 11th, 2026 thru Friday June 12th, 2026, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed southbound, Friday June 12th, 2026, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed southbound, Friday June 12th, 2026, 05:00 AM thru 06:00 AM 1 Right lane of 3 lanes closed southbound","update_date":"2026-06-05T19:54:11Z"},"road_event_id":"rimyOSmjzYHHLakh/Ra88sKQgFM=","beginning_cross_street":"East 174th Street","ending_cross_street":"West Farms Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.914078,40.845124]]}},{"id":"nZiIB0XOBcGdKMPZmjF3lMF+tOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike/I-95"],"direction":"unknown","related_road_events":[],"description":"Construction on New Jersey Turnpike/I-95 Express Lanes southbound between Exit 70B - Teaneck (Teaneck Twp) and New Jersey Turnpike/I-95 at North of US 46 (Ridgefield Park), Thursday June 11th, 2026 thru Friday June 12th, 2026, 10:00 PM thru 04:00 PM 1 Left lane of 3 lanes closed, Thursday June 11th, 2026 thru Friday June 12th, 2026, 11:00 PM thru 04:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-06-05T19:55:01Z"},"road_event_id":"nZiIB0XOBcGdKMPZmjF3lMF+tOI=","beginning_cross_street":"Exit 70B - Teaneck","ending_cross_street":"North of US 46 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008683,40.865832]]}},{"id":"+LvGZnEUv0rUhXR5h0b4I/nudOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KNxFPPaqXl1lDVjkv4S6T0zOWeU="}],"description":"Barrier repairs and line striping and milling and paving operations on New Jersey Turnpike Inner Roadway northbound between Inner and Outer Roadway Split (Mansfield Twp) and North of Interchange 14 - I-78/US 1&9 (Newark), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Wednesday/Thursday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-05T19:57:03Z"},"road_event_id":"+LvGZnEUv0rUhXR5h0b4I/nudOo=","beginning_cross_street":"Inner and Outer Roadway Split","ending_cross_street":"North of Interchange 14 - I-78/US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.749715,40.078704]]}},{"id":"KNxFPPaqXl1lDVjkv4S6T0zOWeU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+LvGZnEUv0rUhXR5h0b4I/nudOo="},{"type":"next-occurrence","id":"LFiyD08ZcKpSkFoR8SKYIC/64a4="}],"description":"Barrier repairs and line striping and milling and paving operations on New Jersey Turnpike Inner Roadway northbound between Inner and Outer Roadway Split (Mansfield Twp) and North of Interchange 14 - I-78/US 1&9 (Newark), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Wednesday/Thursday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-05T19:57:03Z"},"road_event_id":"KNxFPPaqXl1lDVjkv4S6T0zOWeU=","beginning_cross_street":"Inner and Outer Roadway Split","ending_cross_street":"North of Interchange 14 - I-78/US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T00:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.749715,40.078704]]}},{"id":"LFiyD08ZcKpSkFoR8SKYIC/64a4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+LvGZnEUv0rUhXR5h0b4I/nudOo="}],"description":"Barrier repairs and line striping and milling and paving operations on New Jersey Turnpike Inner Roadway northbound between Inner and Outer Roadway Split (Mansfield Twp) and North of Interchange 14 - I-78/US 1&9 (Newark), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Wednesday/Thursday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-05T19:57:03Z"},"road_event_id":"LFiyD08ZcKpSkFoR8SKYIC/64a4=","beginning_cross_street":"Inner and Outer Roadway Split","ending_cross_street":"North of Interchange 14 - I-78/US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T00:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.749715,40.078704]]}},{"id":"zMxPBKLNUELU7aFHQeGcQuvaS8c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Mid Hudson Bridge"],"direction":"unknown","related_road_events":[],"description":"Roadwork on Mid Hudson Bridge both directions (Highland) expect delays, Saturday June 6th, 2026, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-06-05T19:58:55Z"},"road_event_id":"zMxPBKLNUELU7aFHQeGcQuvaS8c=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-06T10:00:00Z","end_date":"2026-06-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950274,41.703345]]}},{"id":"bBK/WjruSZMwV8gN3oe2Oqj7StM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Barrier repairs and drainage improvements and milling and paving operations on New Jersey Turnpike Inner Roadway southbound between North of Interchange 14 - I-78/US 1&9 (Newark) and Interchange 6 - Pennsylvania Turnpike (Mansfield Twp), Monday June 8th, 2026 thru Tuesday June 9th, 2026, 09:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-05T19:58:58Z"},"road_event_id":"bBK/WjruSZMwV8gN3oe2Oqj7StM=","beginning_cross_street":"North of Interchange 14 - I-78/US 1&9","ending_cross_street":"Interchange 6 - Pennsylvania Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T01:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.144248,40.71233]]}},{"id":"bHQYGiFfQkyM/JiGwoy0mxao/rw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Northbound from North of West Lake Av (Rahway) to South of CR 613/Westfield Av/West Grand Ave (Rahway) Monday June 8, 2026 03:59 PM thru 05:59 PM, 1 right lane of 4 lanes closed","update_date":"2026-06-05T20:00:31Z"},"road_event_id":"bHQYGiFfQkyM/JiGwoy0mxao/rw=","beginning_cross_street":"North of West Lake Av","ending_cross_street":"South of CR 613/Westfield Av/West Grand Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T19:59:00Z","end_date":"2026-06-08T21:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.289482,40.604629]]}},{"id":"RQpdFOL31tGu79I3ROEbLY2rZyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Northbound from North of West Lake Av (Rahway) to South of CR 613/Westfield Av/West Grand Ave (Rahway) Tuesday June 9, 2026 03:59 PM thru 05:59 PM, 1 right lane of 4 lanes closed","update_date":"2026-06-05T20:00:35Z"},"road_event_id":"RQpdFOL31tGu79I3ROEbLY2rZyY=","beginning_cross_street":"North of West Lake Av","ending_cross_street":"South of CR 613/Westfield Av/West Grand Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T19:59:00Z","end_date":"2026-06-09T21:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.289482,40.604629]]}},{"id":"9UXgg39oCGU2ux2mnG7BfyL+mNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Northbound from North of West Lake Av (Rahway) to South of CR 613/Westfield Av/West Grand Ave (Rahway) Wednesday June 10, 2026 03:59 PM thru 05:59 PM, 1 right lane of 4 lanes closed","update_date":"2026-06-05T20:00:39Z"},"road_event_id":"9UXgg39oCGU2ux2mnG7BfyL+mNw=","beginning_cross_street":"North of West Lake Av","ending_cross_street":"South of CR 613/Westfield Av/West Grand Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T19:59:00Z","end_date":"2026-06-10T21:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.289482,40.604629]]}},{"id":"kSvATi+svQYpPRDmbVjT6ZatH0o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Northbound from North of West Lake Av (Rahway) to South of CR 613/Westfield Av/West Grand Ave (Rahway) Thursday June 11, 2026 03:59 PM thru 05:59 PM, 1 right lane of 4 lanes closed","update_date":"2026-06-05T20:00:44Z"},"road_event_id":"kSvATi+svQYpPRDmbVjT6ZatH0o=","beginning_cross_street":"North of West Lake Av","ending_cross_street":"South of CR 613/Westfield Av/West Grand Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T19:59:00Z","end_date":"2026-06-11T21:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.289482,40.604629]]}},{"id":"RcljgCXAgp8RzOQgMOYzsZX4RHA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"p9T3yL2d4vg7MH3U2T27k8npBaw="}],"description":"Barrier repairs and drainage improvements and milling and paving operations on New Jersey Turnpike Outer Roadway northbound between Inner and Outer Roadway Split (Mansfield Twp) and North of Interchange 14 - I-78/US 1&9 (Newark), Tuesday June 9th, 2026 thru Saturday June 13th, 2026, Tuesday/Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-05T20:01:03Z"},"road_event_id":"RcljgCXAgp8RzOQgMOYzsZX4RHA=","beginning_cross_street":"Inner and Outer Roadway Split","ending_cross_street":"North of Interchange 14 - I-78/US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T00:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.749725,40.078692]]}},{"id":"p9T3yL2d4vg7MH3U2T27k8npBaw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RcljgCXAgp8RzOQgMOYzsZX4RHA="}],"description":"Barrier repairs and drainage improvements and milling and paving operations on New Jersey Turnpike Outer Roadway northbound between Inner and Outer Roadway Split (Mansfield Twp) and North of Interchange 14 - I-78/US 1&9 (Newark), Tuesday June 9th, 2026 thru Saturday June 13th, 2026, Tuesday/Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-06-05T20:01:03Z"},"road_event_id":"p9T3yL2d4vg7MH3U2T27k8npBaw=","beginning_cross_street":"Inner and Outer Roadway Split","ending_cross_street":"North of Interchange 14 - I-78/US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T00:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.749725,40.078692]]}},{"id":"/inCtOqXO7KYCUeGR2BBpgPUQHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Northbound from North of West Lake Av (Rahway) to South of CR 613/Westfield Av/West Grand Ave (Rahway) Friday June 12, 2026 03:59 PM thru 05:59 PM, 1 right lane of 4 lanes closed","update_date":"2026-06-05T20:00:49Z"},"road_event_id":"/inCtOqXO7KYCUeGR2BBpgPUQHk=","beginning_cross_street":"North of West Lake Av","ending_cross_street":"South of CR 613/Westfield Av/West Grand Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T19:59:00Z","end_date":"2026-06-12T21:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.289482,40.604629]]}},{"id":"ORC300552577","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Eastern Spur"],"direction":"unknown","description":"Construction and line striping on New Jersey Turnpike - Eastern Spur northbound between North of Southern Mixing Bowl (Newark) and Northern Mixing Bowl (Ridgefield), Tuesday June 9th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday, 09:00 PM thru 04:00 AM All lanes closed","update_date":"2026-06-05T20:03:06Z"},"road_event_id":"ORC300552577","beginning_cross_street":"North of Southern Mixing Bowl","ending_cross_street":"Northern Mixing Bowl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T20:03:06Z","end_date":"2026-06-13T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.137857,40.715353]]}},{"id":"caWhfJ2Zfyq+RgPOGCqqaVynSmw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Eastern Spur"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0HsiJCQTFzjz0PnGXfMNrfQSZ/c="}],"description":"Construction on New Jersey Turnpike - Eastern Spur southbound between Northern Mixing Bowl (Ridgefield) and North of Southern Mixing Bowl (Newark), Thursday June 11th, 2026 thru Saturday June 13th, 2026, Thursday/Friday, 09:00 PM thru 04:00 AM All lanes closed","update_date":"2026-06-05T20:04:46Z"},"road_event_id":"caWhfJ2Zfyq+RgPOGCqqaVynSmw=","beginning_cross_street":"Northern Mixing Bowl","ending_cross_street":"North of Southern Mixing Bowl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T01:00:00Z","end_date":"2026-06-12T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.022705,40.831627]]}},{"id":"0HsiJCQTFzjz0PnGXfMNrfQSZ/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Eastern Spur"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"caWhfJ2Zfyq+RgPOGCqqaVynSmw="}],"description":"Construction on New Jersey Turnpike - Eastern Spur southbound between Northern Mixing Bowl (Ridgefield) and North of Southern Mixing Bowl (Newark), Thursday June 11th, 2026 thru Saturday June 13th, 2026, Thursday/Friday, 09:00 PM thru 04:00 AM All lanes closed","update_date":"2026-06-05T20:04:46Z"},"road_event_id":"0HsiJCQTFzjz0PnGXfMNrfQSZ/c=","beginning_cross_street":"Northern Mixing Bowl","ending_cross_street":"North of Southern Mixing Bowl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T01:00:00Z","end_date":"2026-06-13T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.022705,40.831627]]}},{"id":"vgE9SJUQhhJcxF4D8Dt6PeGLj/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 94"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 94 Both Directions between North of CR 659/Spring Valley Rd (Frelinghuysen Twp) and South of CR 661/Ramsey Rd (Frelinghuysen Twp) Tuesday June 9, 2026 09:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-06-05T20:05:54Z"},"road_event_id":"vgE9SJUQhhJcxF4D8Dt6PeGLj/k=","beginning_cross_street":"North of CR 659/Spring Valley Rd","ending_cross_street":"South of CR 661/Ramsey Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.900772,40.989799]]}},{"id":"FuV62Xsx3p87wmULb7Pu1m1q8dU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BIilNV0MCj+kJmINzcdCaGxczhY="}],"description":"Construction on Hutchinson River Parkway [NYC] both directions between START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-06-05T20:06:44Z"},"road_event_id":"FuV62Xsx3p87wmULb7Pu1m1q8dU=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822421]]}},{"id":"BIilNV0MCj+kJmINzcdCaGxczhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FuV62Xsx3p87wmULb7Pu1m1q8dU="},{"type":"next-occurrence","id":"Smmn/w0d7SNSh3WVqsU8xbgxzmc="}],"description":"Construction on Hutchinson River Parkway [NYC] both directions between START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-06-05T20:06:44Z"},"road_event_id":"BIilNV0MCj+kJmINzcdCaGxczhY=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822421]]}},{"id":"Smmn/w0d7SNSh3WVqsU8xbgxzmc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FuV62Xsx3p87wmULb7Pu1m1q8dU="},{"type":"next-occurrence","id":"gii8pfg4EOhYQPcQr0sQCXiy/qU="}],"description":"Construction on Hutchinson River Parkway [NYC] both directions between START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-06-05T20:06:44Z"},"road_event_id":"Smmn/w0d7SNSh3WVqsU8xbgxzmc=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822421]]}},{"id":"gii8pfg4EOhYQPcQr0sQCXiy/qU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FuV62Xsx3p87wmULb7Pu1m1q8dU="},{"type":"next-occurrence","id":"BtmbAFHIYoeJnWJ4UMlTmTqXtSE="}],"description":"Construction on Hutchinson River Parkway [NYC] both directions between START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-06-05T20:06:44Z"},"road_event_id":"gii8pfg4EOhYQPcQr0sQCXiy/qU=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822421]]}},{"id":"BtmbAFHIYoeJnWJ4UMlTmTqXtSE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FuV62Xsx3p87wmULb7Pu1m1q8dU="},{"type":"next-occurrence","id":"1ZY+QRIYmocnEdKyadOtPqffPcM="}],"description":"Construction on Hutchinson River Parkway [NYC] both directions between START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-06-05T20:06:44Z"},"road_event_id":"BtmbAFHIYoeJnWJ4UMlTmTqXtSE=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822421]]}},{"id":"1ZY+QRIYmocnEdKyadOtPqffPcM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FuV62Xsx3p87wmULb7Pu1m1q8dU="},{"type":"next-occurrence","id":"r5U/qC+K3YurnUCK7icp8D1hZhQ="}],"description":"Construction on Hutchinson River Parkway [NYC] both directions between START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-06-05T20:06:44Z"},"road_event_id":"1ZY+QRIYmocnEdKyadOtPqffPcM=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822421]]}},{"id":"r5U/qC+K3YurnUCK7icp8D1hZhQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FuV62Xsx3p87wmULb7Pu1m1q8dU="},{"type":"next-occurrence","id":"61wMhxJ8dNo+sHR2JFby3/cwNWg="}],"description":"Construction on Hutchinson River Parkway [NYC] both directions between START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-06-05T20:06:44Z"},"road_event_id":"r5U/qC+K3YurnUCK7icp8D1hZhQ=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822421]]}},{"id":"61wMhxJ8dNo+sHR2JFby3/cwNWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FuV62Xsx3p87wmULb7Pu1m1q8dU="},{"type":"next-occurrence","id":"yWBz36+ItVz8lvk1Arhwm1P5a3I="}],"description":"Construction on Hutchinson River Parkway [NYC] both directions between START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-06-05T20:06:44Z"},"road_event_id":"61wMhxJ8dNo+sHR2JFby3/cwNWg=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822421]]}},{"id":"yWBz36+ItVz8lvk1Arhwm1P5a3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FuV62Xsx3p87wmULb7Pu1m1q8dU="},{"type":"next-occurrence","id":"H+0AnS7yUTyryiQj/uFciDHV9gQ="}],"description":"Construction on Hutchinson River Parkway [NYC] both directions between START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-06-05T20:06:44Z"},"road_event_id":"yWBz36+ItVz8lvk1Arhwm1P5a3I=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822421]]}},{"id":"H+0AnS7yUTyryiQj/uFciDHV9gQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FuV62Xsx3p87wmULb7Pu1m1q8dU="}],"description":"Construction on Hutchinson River Parkway [NYC] both directions between START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-06-05T20:06:44Z"},"road_event_id":"H+0AnS7yUTyryiQj/uFciDHV9gQ=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822421]]}},{"id":"zj6PuKQx8XvwkfPHfA5jQDBXk/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 181"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 181 Both Directions between CR 605/Stanhope Rd (Sparta Twp) and North of CR 517/Sparta Av (Sparta Twp) Tuesday June 9, 2026 09:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-06-05T20:09:20Z"},"road_event_id":"zj6PuKQx8XvwkfPHfA5jQDBXk/8=","beginning_cross_street":"CR 605/Stanhope Rd","ending_cross_street":"North of CR 517/Sparta Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.63694,41.031021]]}},{"id":"AXcaQWydG8djEp4KB2Quyw0REhQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 284"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 284 Both Directions between North of Sally Harden Rd (Wantage Twp) and New York State Line (Wantage Twp) Tuesday June 9, 2026 09:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-06-05T20:11:47Z"},"road_event_id":"AXcaQWydG8djEp4KB2Quyw0REhQ=","beginning_cross_street":"North of Sally Harden Rd","ending_cross_street":"New York State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.578689,41.24459]]}},{"id":"nJ3qJzO1XKC5vQ70rst3kYLZ6tU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 284"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 284 Both Directions between North of Sally Harden Rd (Wantage Twp) and New York State Line (Wantage Twp) Wednesday June 10, 2026 09:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-06-05T20:11:52Z"},"road_event_id":"nJ3qJzO1XKC5vQ70rst3kYLZ6tU=","beginning_cross_street":"North of Sally Harden Rd","ending_cross_street":"New York State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.578689,41.24459]]}},{"id":"OdYS8obN9YAaKJN+BhJkFMeR+p8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 284"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 284 Both Directions between North of Sally Harden Rd (Wantage Twp) and New York State Line (Wantage Twp) Thursday June 11, 2026 09:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-06-05T20:11:56Z"},"road_event_id":"OdYS8obN9YAaKJN+BhJkFMeR+p8=","beginning_cross_street":"North of Sally Harden Rd","ending_cross_street":"New York State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.578689,41.24459]]}},{"id":"U37KydFKkYw3zrv8ifv5z3Dhz2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 284"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 284 Both Directions between North of Sally Harden Rd (Wantage Twp) and New York State Line (Wantage Twp) Friday June 12, 2026 09:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-06-05T20:12:01Z"},"road_event_id":"U37KydFKkYw3zrv8ifv5z3Dhz2E=","beginning_cross_street":"North of Sally Harden Rd","ending_cross_street":"New York State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.578689,41.24459]]}},{"id":"ORO500047449","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","description":"Due to Construction westbound, Hempstead between Elmont-UBS Arena (Hempstead) and Hollis (New York) Westbound trains skip Elmont-UBS Arena, Queens Village, and Hollis, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 03:00 AM bypassing","update_date":"2026-06-05T20:16:28Z"},"road_event_id":"ORO500047449","beginning_cross_street":"Elmont-UBS Arena","ending_cross_street":"Hollis","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-05T20:16:28Z","end_date":"2026-06-13T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.725549,40.720074]]}},{"id":"EPzgeaHDIzXHHDgzC3a6KQGI75o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 12"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 12 Westbound At In the vicinity of CR 523 (Flemington) Monday June 8, 2026 08:00 AM thru 03:00 PM, All lanes open","update_date":"2026-06-05T20:16:14Z"},"road_event_id":"EPzgeaHDIzXHHDgzC3a6KQGI75o=","beginning_cross_street":"In the vicinity of CR 523","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.866706,40.502769]]}},{"id":"T9tPCcMt6kSTsWJ1GxXPG1hzIPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 12"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 12 Westbound At In the vicinity of CR 523 (Flemington) Tuesday June 9, 2026 08:00 AM thru 03:00 PM, All lanes open","update_date":"2026-06-05T20:16:18Z"},"road_event_id":"T9tPCcMt6kSTsWJ1GxXPG1hzIPo=","beginning_cross_street":"In the vicinity of CR 523","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T12:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.866706,40.502769]]}},{"id":"h1LB6j59PQMaG/yFlr20Tgz/NGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"waJrBbEo2OrZ69b2lCvBRoHGcNw="}],"description":"Due to Construction westbound, Hempstead between Elmont-UBS Arena (Hempstead) and Hollis (New York) Westbound trains skip Elmont-UBS Arena, Queens Village, and Hollis, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 03:00 AM bypassing","update_date":"2026-06-05T20:16:52Z"},"road_event_id":"h1LB6j59PQMaG/yFlr20Tgz/NGM=","beginning_cross_street":"Elmont-UBS Arena","ending_cross_street":"Hollis","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.725549,40.720074]]}},{"id":"waJrBbEo2OrZ69b2lCvBRoHGcNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"h1LB6j59PQMaG/yFlr20Tgz/NGM="},{"type":"next-occurrence","id":"wEcOnrrt0C3MfbF/AGN1cztHuzE="}],"description":"Due to Construction westbound, Hempstead between Elmont-UBS Arena (Hempstead) and Hollis (New York) Westbound trains skip Elmont-UBS Arena, Queens Village, and Hollis, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 03:00 AM bypassing","update_date":"2026-06-05T20:16:52Z"},"road_event_id":"waJrBbEo2OrZ69b2lCvBRoHGcNw=","beginning_cross_street":"Elmont-UBS Arena","ending_cross_street":"Hollis","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.725549,40.720074]]}},{"id":"wEcOnrrt0C3MfbF/AGN1cztHuzE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"h1LB6j59PQMaG/yFlr20Tgz/NGM="},{"type":"next-occurrence","id":"waIEMo7Y6gl7bjxKkNusF5v1GiA="}],"description":"Due to Construction westbound, Hempstead between Elmont-UBS Arena (Hempstead) and Hollis (New York) Westbound trains skip Elmont-UBS Arena, Queens Village, and Hollis, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 03:00 AM bypassing","update_date":"2026-06-05T20:16:52Z"},"road_event_id":"wEcOnrrt0C3MfbF/AGN1cztHuzE=","beginning_cross_street":"Elmont-UBS Arena","ending_cross_street":"Hollis","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.725549,40.720074]]}},{"id":"waIEMo7Y6gl7bjxKkNusF5v1GiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"h1LB6j59PQMaG/yFlr20Tgz/NGM="}],"description":"Due to Construction westbound, Hempstead between Elmont-UBS Arena (Hempstead) and Hollis (New York) Westbound trains skip Elmont-UBS Arena, Queens Village, and Hollis, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 03:00 AM bypassing","update_date":"2026-06-05T20:16:52Z"},"road_event_id":"waIEMo7Y6gl7bjxKkNusF5v1GiA=","beginning_cross_street":"Elmont-UBS Arena","ending_cross_street":"Hollis","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.725549,40.720074]]}},{"id":"n9t/rdg/u86k8y3bIxSG04R3LQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 12"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 12 Westbound At In the vicinity of CR 523 (Flemington) Wednesday June 10, 2026 08:00 AM thru 03:00 PM, All lanes open","update_date":"2026-06-05T20:16:22Z"},"road_event_id":"n9t/rdg/u86k8y3bIxSG04R3LQ0=","beginning_cross_street":"In the vicinity of CR 523","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T12:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.866706,40.502769]]}},{"id":"fiy+oVjwuLuM8Yh3yF9fb1fN0sw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 12"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 12 Westbound At In the vicinity of CR 523 (Flemington) Thursday June 11, 2026 08:00 AM thru 03:00 PM, All lanes open","update_date":"2026-06-05T20:16:27Z"},"road_event_id":"fiy+oVjwuLuM8Yh3yF9fb1fN0sw=","beginning_cross_street":"In the vicinity of CR 523","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T12:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.866706,40.502769]]}},{"id":"DnEdJHayjrClxWzdW7L6hY6Qm6s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 12"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 12 Westbound At In the vicinity of CR 523 (Flemington) Friday June 12, 2026 08:00 AM thru 03:00 PM, All lanes open","update_date":"2026-06-05T20:16:33Z"},"road_event_id":"DnEdJHayjrClxWzdW7L6hY6Qm6s=","beginning_cross_street":"In the vicinity of CR 523","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T12:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.866706,40.502769]]}},{"id":"AQO5GbvkcTrv0npKMzR9KtFyXWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"amjA6nZzQPwbPTjb1+cQcfJP3DE="}],"description":"Construction on I-87 Major Deegan Expressway both directions between West 234th Street (New York) and West 238th Street (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-05T20:16:56Z"},"road_event_id":"AQO5GbvkcTrv0npKMzR9KtFyXWk=","beginning_cross_street":"West 234th Street","ending_cross_street":"West 238th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901431,40.880875]]}},{"id":"amjA6nZzQPwbPTjb1+cQcfJP3DE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AQO5GbvkcTrv0npKMzR9KtFyXWk="},{"type":"next-occurrence","id":"smmqP5b9OFCtxIesVKGFPR6JR2A="}],"description":"Construction on I-87 Major Deegan Expressway both directions between West 234th Street (New York) and West 238th Street (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-05T20:16:56Z"},"road_event_id":"amjA6nZzQPwbPTjb1+cQcfJP3DE=","beginning_cross_street":"West 234th Street","ending_cross_street":"West 238th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901431,40.880875]]}},{"id":"smmqP5b9OFCtxIesVKGFPR6JR2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AQO5GbvkcTrv0npKMzR9KtFyXWk="},{"type":"next-occurrence","id":"iQgVV7KS25/nMAscXAerytRzRCI="}],"description":"Construction on I-87 Major Deegan Expressway both directions between West 234th Street (New York) and West 238th Street (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-05T20:16:56Z"},"road_event_id":"smmqP5b9OFCtxIesVKGFPR6JR2A=","beginning_cross_street":"West 234th Street","ending_cross_street":"West 238th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901431,40.880875]]}},{"id":"iQgVV7KS25/nMAscXAerytRzRCI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AQO5GbvkcTrv0npKMzR9KtFyXWk="},{"type":"next-occurrence","id":"F82DjedxmhDcvjUCR9dHiJD38B8="}],"description":"Construction on I-87 Major Deegan Expressway both directions between West 234th Street (New York) and West 238th Street (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-05T20:16:56Z"},"road_event_id":"iQgVV7KS25/nMAscXAerytRzRCI=","beginning_cross_street":"West 234th Street","ending_cross_street":"West 238th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901431,40.880875]]}},{"id":"F82DjedxmhDcvjUCR9dHiJD38B8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AQO5GbvkcTrv0npKMzR9KtFyXWk="}],"description":"Construction on I-87 Major Deegan Expressway both directions between West 234th Street (New York) and West 238th Street (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-06-05T20:16:56Z"},"road_event_id":"F82DjedxmhDcvjUCR9dHiJD38B8=","beginning_cross_street":"West 234th Street","ending_cross_street":"West 238th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901431,40.880875]]}},{"id":"ZZSoNo/u+WUYlUict91tVg1GhgU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Morris & Essex Line"],"direction":"unknown","related_road_events":[],"description":"Due to Construction westbound, Morris & Essex Line between Morris Plains (Morris Plains) and Dover (Dover) westbound trains operating from Morris Plains through Mount Tabor, Denville and Dover Stations are subject to delays of up to 30 minutes due to tree-trimming along the railroad right-of-way near Dover station., Sunday June 7th, 2026, 07:00 AM thru 04:00 PM","update_date":"2026-06-05T20:24:58Z"},"road_event_id":"ZZSoNo/u+WUYlUict91tVg1GhgU=","beginning_cross_street":"Morris Plains","ending_cross_street":"Dover","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-07T11:00:00Z","end_date":"2026-06-07T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.478197,40.828637]]}},{"id":"X5io/F3NybR59pEx81vdut/snVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nuy1TzKFHJA9un/vMya1xCFumsw="}],"description":"Construction on I-87 Major Deegan Expressway both directions between Exit 7N-7S 7N & - I-95-Cross Bronx Expressway (New York) and Westchester-Bronx County Line (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed southbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed northbound","update_date":"2026-06-05T20:48:26Z"},"road_event_id":"X5io/F3NybR59pEx81vdut/snVY=","beginning_cross_street":"Exit 7N-7S 7N & - I-95-Cross Bronx Expressway","ending_cross_street":"Westchester-Bronx County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929313,40.839608]]}},{"id":"nuy1TzKFHJA9un/vMya1xCFumsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X5io/F3NybR59pEx81vdut/snVY="},{"type":"next-occurrence","id":"ROHg7KNnB6or7rdPc6vOxsh097M="}],"description":"Construction on I-87 Major Deegan Expressway both directions between Exit 7N-7S 7N & - I-95-Cross Bronx Expressway (New York) and Westchester-Bronx County Line (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed southbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed northbound","update_date":"2026-06-05T20:48:26Z"},"road_event_id":"nuy1TzKFHJA9un/vMya1xCFumsw=","beginning_cross_street":"Exit 7N-7S 7N & - I-95-Cross Bronx Expressway","ending_cross_street":"Westchester-Bronx County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929313,40.839608]]}},{"id":"ROHg7KNnB6or7rdPc6vOxsh097M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X5io/F3NybR59pEx81vdut/snVY="},{"type":"next-occurrence","id":"EKigAYo8w97p/UGaFZri1l55MhE="}],"description":"Construction on I-87 Major Deegan Expressway both directions between Exit 7N-7S 7N & - I-95-Cross Bronx Expressway (New York) and Westchester-Bronx County Line (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed southbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed northbound","update_date":"2026-06-05T20:48:26Z"},"road_event_id":"ROHg7KNnB6or7rdPc6vOxsh097M=","beginning_cross_street":"Exit 7N-7S 7N & - I-95-Cross Bronx Expressway","ending_cross_street":"Westchester-Bronx County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929313,40.839608]]}},{"id":"EKigAYo8w97p/UGaFZri1l55MhE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X5io/F3NybR59pEx81vdut/snVY="},{"type":"next-occurrence","id":"wlnqHleHjPxSAqOwGI1ebhait8U="}],"description":"Construction on I-87 Major Deegan Expressway both directions between Exit 7N-7S 7N & - I-95-Cross Bronx Expressway (New York) and Westchester-Bronx County Line (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed southbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed northbound","update_date":"2026-06-05T20:48:26Z"},"road_event_id":"EKigAYo8w97p/UGaFZri1l55MhE=","beginning_cross_street":"Exit 7N-7S 7N & - I-95-Cross Bronx Expressway","ending_cross_street":"Westchester-Bronx County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929313,40.839608]]}},{"id":"wlnqHleHjPxSAqOwGI1ebhait8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X5io/F3NybR59pEx81vdut/snVY="}],"description":"Construction on I-87 Major Deegan Expressway both directions between Exit 7N-7S 7N & - I-95-Cross Bronx Expressway (New York) and Westchester-Bronx County Line (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed southbound, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed northbound","update_date":"2026-06-05T20:48:26Z"},"road_event_id":"wlnqHleHjPxSAqOwGI1ebhait8U=","beginning_cross_street":"Exit 7N-7S 7N & - I-95-Cross Bronx Expressway","ending_cross_street":"Westchester-Bronx County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929313,40.839608]]}},{"id":"WHrzS9g2+PgzN4VYWCE2pBl6ArM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lXDVm8IUIFNUONFYdrn1jbG4iRs="}],"description":"Construction on I-87 Major Deegan Expressway both directions between I-95; Ramp (New York) and Exit 2 - East 135th Street; Ramp (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T20:52:51Z"},"road_event_id":"WHrzS9g2+PgzN4VYWCE2pBl6ArM=","beginning_cross_street":"I-95; Ramp","ending_cross_street":"Exit 2 - East 135th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T14:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926884,40.844947]]}},{"id":"lXDVm8IUIFNUONFYdrn1jbG4iRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WHrzS9g2+PgzN4VYWCE2pBl6ArM="},{"type":"next-occurrence","id":"Aw0FJiiXt51LIKzH28wyp7xhRqw="}],"description":"Construction on I-87 Major Deegan Expressway both directions between I-95; Ramp (New York) and Exit 2 - East 135th Street; Ramp (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T20:52:51Z"},"road_event_id":"lXDVm8IUIFNUONFYdrn1jbG4iRs=","beginning_cross_street":"I-95; Ramp","ending_cross_street":"Exit 2 - East 135th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T14:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926884,40.844947]]}},{"id":"Aw0FJiiXt51LIKzH28wyp7xhRqw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WHrzS9g2+PgzN4VYWCE2pBl6ArM="},{"type":"next-occurrence","id":"2IQB1cK/CyAnxRg+OKhFCdK8PIo="}],"description":"Construction on I-87 Major Deegan Expressway both directions between I-95; Ramp (New York) and Exit 2 - East 135th Street; Ramp (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T20:52:51Z"},"road_event_id":"Aw0FJiiXt51LIKzH28wyp7xhRqw=","beginning_cross_street":"I-95; Ramp","ending_cross_street":"Exit 2 - East 135th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T14:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926884,40.844947]]}},{"id":"2IQB1cK/CyAnxRg+OKhFCdK8PIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WHrzS9g2+PgzN4VYWCE2pBl6ArM="},{"type":"next-occurrence","id":"OwW1sTlfXUl5Y5jD/dvnshQ/0U8="}],"description":"Construction on I-87 Major Deegan Expressway both directions between I-95; Ramp (New York) and Exit 2 - East 135th Street; Ramp (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T20:52:51Z"},"road_event_id":"2IQB1cK/CyAnxRg+OKhFCdK8PIo=","beginning_cross_street":"I-95; Ramp","ending_cross_street":"Exit 2 - East 135th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T14:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926884,40.844947]]}},{"id":"OwW1sTlfXUl5Y5jD/dvnshQ/0U8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WHrzS9g2+PgzN4VYWCE2pBl6ArM="}],"description":"Construction on I-87 Major Deegan Expressway both directions between I-95; Ramp (New York) and Exit 2 - East 135th Street; Ramp (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T20:52:51Z"},"road_event_id":"OwW1sTlfXUl5Y5jD/dvnshQ/0U8=","beginning_cross_street":"I-95; Ramp","ending_cross_street":"Exit 2 - East 135th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T14:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926884,40.844947]]}},{"id":"ORC300552597","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 - NYS Thruway"],"direction":"unknown","description":"Construction on I-87 - NYS Thruway both directions between Westchester-Bronx County Line (Yonkers) and I-87 Major Deegan Expressway at Exit 2 - East 135th Street; Ramp (New York) Subject to change without notice., Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-06-05T20:55:36Z"},"road_event_id":"ORC300552597","beginning_cross_street":"Westchester-Bronx County Line","ending_cross_street":"Exit 2 - East 135th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-13T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.877744,40.908696]]}},{"id":"vOAsqcWNOckiWfldyK7bOwGhFjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6nTGY0PG+0PgOtp8StK86PZJTpg="}],"description":"Construction on I-87 Major Deegan Expressway southbound ramp to Exit 7N-7S 7N & - I-95-Cross Bronx Expressway (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T20:57:37Z"},"road_event_id":"vOAsqcWNOckiWfldyK7bOwGhFjQ=","beginning_cross_street":"Exit 7N-7S 7N & - I-95-Cross Bronx Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T02:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925904,40.846871]]}},{"id":"6nTGY0PG+0PgOtp8StK86PZJTpg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vOAsqcWNOckiWfldyK7bOwGhFjQ="},{"type":"next-occurrence","id":"XB5OB/dlf5iNwpKnar34NaB9k0Q="}],"description":"Construction on I-87 Major Deegan Expressway southbound ramp to Exit 7N-7S 7N & - I-95-Cross Bronx Expressway (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T20:57:37Z"},"road_event_id":"6nTGY0PG+0PgOtp8StK86PZJTpg=","beginning_cross_street":"Exit 7N-7S 7N & - I-95-Cross Bronx Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T02:00:00Z","end_date":"2026-06-10T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925904,40.846871]]}},{"id":"XB5OB/dlf5iNwpKnar34NaB9k0Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vOAsqcWNOckiWfldyK7bOwGhFjQ="},{"type":"next-occurrence","id":"2rE0pREzLOGMIKWmqnrpIZwzVUo="}],"description":"Construction on I-87 Major Deegan Expressway southbound ramp to Exit 7N-7S 7N & - I-95-Cross Bronx Expressway (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T20:57:37Z"},"road_event_id":"XB5OB/dlf5iNwpKnar34NaB9k0Q=","beginning_cross_street":"Exit 7N-7S 7N & - I-95-Cross Bronx Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T02:00:00Z","end_date":"2026-06-11T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925904,40.846871]]}},{"id":"2rE0pREzLOGMIKWmqnrpIZwzVUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vOAsqcWNOckiWfldyK7bOwGhFjQ="},{"type":"next-occurrence","id":"7H6vQ/3Ovr14ZNm+UcgSrwNLWO4="}],"description":"Construction on I-87 Major Deegan Expressway southbound ramp to Exit 7N-7S 7N & - I-95-Cross Bronx Expressway (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T20:57:37Z"},"road_event_id":"2rE0pREzLOGMIKWmqnrpIZwzVUo=","beginning_cross_street":"Exit 7N-7S 7N & - I-95-Cross Bronx Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T02:00:00Z","end_date":"2026-06-12T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925904,40.846871]]}},{"id":"7H6vQ/3Ovr14ZNm+UcgSrwNLWO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vOAsqcWNOckiWfldyK7bOwGhFjQ="}],"description":"Construction on I-87 Major Deegan Expressway southbound ramp to Exit 7N-7S 7N & - I-95-Cross Bronx Expressway (New York) Subject to change without notice., Monday June 8th, 2026 thru Saturday June 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T20:57:37Z"},"road_event_id":"7H6vQ/3Ovr14ZNm+UcgSrwNLWO4=","beginning_cross_street":"Exit 7N-7S 7N & - I-95-Cross Bronx Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T02:00:00Z","end_date":"2026-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925904,40.846871]]}},{"id":"uhzgt0PlNMs41khLt17inBu+wZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OnwN2BafhhyG9xY9rTUsdw4gmkk="}],"description":"Roadwork on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, temp signal or STOP sign, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-06-05T21:01:57Z"},"road_event_id":"uhzgt0PlNMs41khLt17inBu+wZo=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.466599,42.530938]]}},{"id":"OnwN2BafhhyG9xY9rTUsdw4gmkk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhzgt0PlNMs41khLt17inBu+wZo="},{"type":"next-occurrence","id":"1WISzGVrKTXjdpaxsqjs0AuQDSE="}],"description":"Roadwork on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, temp signal or STOP sign, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-06-05T21:01:57Z"},"road_event_id":"OnwN2BafhhyG9xY9rTUsdw4gmkk=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.466599,42.530938]]}},{"id":"1WISzGVrKTXjdpaxsqjs0AuQDSE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhzgt0PlNMs41khLt17inBu+wZo="},{"type":"next-occurrence","id":"pY9pqaLKKG/zkikb5jKcomGQ+vA="}],"description":"Roadwork on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, temp signal or STOP sign, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-06-05T21:01:57Z"},"road_event_id":"1WISzGVrKTXjdpaxsqjs0AuQDSE=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.466599,42.530938]]}},{"id":"pY9pqaLKKG/zkikb5jKcomGQ+vA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhzgt0PlNMs41khLt17inBu+wZo="},{"type":"next-occurrence","id":"3covaYYlsxj0xVDlV7n80YSmd2Y="}],"description":"Roadwork on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, temp signal or STOP sign, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-06-05T21:01:57Z"},"road_event_id":"pY9pqaLKKG/zkikb5jKcomGQ+vA=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.466599,42.530938]]}},{"id":"3covaYYlsxj0xVDlV7n80YSmd2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhzgt0PlNMs41khLt17inBu+wZo="},{"type":"next-occurrence","id":"6lWSJiphmhYfgSqhGC1eCR+K5lQ="}],"description":"Roadwork on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, temp signal or STOP sign, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-06-05T21:01:57Z"},"road_event_id":"3covaYYlsxj0xVDlV7n80YSmd2Y=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.466599,42.530938]]}},{"id":"6lWSJiphmhYfgSqhGC1eCR+K5lQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhzgt0PlNMs41khLt17inBu+wZo="},{"type":"next-occurrence","id":"jmC1W4EnbCmADqSGe7S9KDQ+FxA="}],"description":"Roadwork on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, temp signal or STOP sign, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-06-05T21:01:57Z"},"road_event_id":"6lWSJiphmhYfgSqhGC1eCR+K5lQ=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-13T11:00:00Z","end_date":"2026-06-13T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.466599,42.530938]]}},{"id":"jmC1W4EnbCmADqSGe7S9KDQ+FxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhzgt0PlNMs41khLt17inBu+wZo="},{"type":"next-occurrence","id":"X0+sYVxKjiMlj4dWEiY0Ru8GhoQ="}],"description":"Roadwork on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, temp signal or STOP sign, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-06-05T21:01:57Z"},"road_event_id":"jmC1W4EnbCmADqSGe7S9KDQ+FxA=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-14T11:00:00Z","end_date":"2026-06-14T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.466599,42.530938]]}},{"id":"X0+sYVxKjiMlj4dWEiY0Ru8GhoQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhzgt0PlNMs41khLt17inBu+wZo="},{"type":"next-occurrence","id":"1rTV9djxsij3tktyFZuOLyF6VYE="}],"description":"Roadwork on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, temp signal or STOP sign, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-06-05T21:01:57Z"},"road_event_id":"X0+sYVxKjiMlj4dWEiY0Ru8GhoQ=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-15T11:00:00Z","end_date":"2026-06-15T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.466599,42.530938]]}},{"id":"1rTV9djxsij3tktyFZuOLyF6VYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhzgt0PlNMs41khLt17inBu+wZo="},{"type":"next-occurrence","id":"KHbcn84ivrxkUWXFD/ImdFbqbaQ="}],"description":"Roadwork on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, temp signal or STOP sign, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-06-05T21:01:57Z"},"road_event_id":"1rTV9djxsij3tktyFZuOLyF6VYE=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-16T11:00:00Z","end_date":"2026-06-16T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.466599,42.530938]]}},{"id":"KHbcn84ivrxkUWXFD/ImdFbqbaQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhzgt0PlNMs41khLt17inBu+wZo="},{"type":"next-occurrence","id":"Kh1LY9ZRvllL/y2HGOXYn7e1s0Y="}],"description":"Roadwork on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, temp signal or STOP sign, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-06-05T21:01:57Z"},"road_event_id":"KHbcn84ivrxkUWXFD/ImdFbqbaQ=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T11:00:00Z","end_date":"2026-06-17T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.466599,42.530938]]}},{"id":"Kh1LY9ZRvllL/y2HGOXYn7e1s0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhzgt0PlNMs41khLt17inBu+wZo="},{"type":"next-occurrence","id":"JY1ZCaeayTjdOsJkSAPyl11dL44="}],"description":"Roadwork on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, temp signal or STOP sign, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-06-05T21:01:57Z"},"road_event_id":"Kh1LY9ZRvllL/y2HGOXYn7e1s0Y=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-18T11:00:00Z","end_date":"2026-06-18T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.466599,42.530938]]}},{"id":"JY1ZCaeayTjdOsJkSAPyl11dL44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 371"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uhzgt0PlNMs41khLt17inBu+wZo="}],"description":"Roadwork on NY 371 both directions CR-35 (Cohocton) 1 Lane, 2 Way, temp signal or STOP sign, Monday June 8th, 2026 thru Friday June 19th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-06-05T21:01:57Z"},"road_event_id":"JY1ZCaeayTjdOsJkSAPyl11dL44=","beginning_cross_street":"CR-35","ending_cross_street":"CR-35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-19T11:00:00Z","end_date":"2026-06-19T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.466599,42.530938]]}},{"id":"ORC300552600","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","description":"Drainage improvements on I-390 both directions between Scottsville Road; NY 383 (Chili) and East Henrietta Road; NY 15A (Brighton) alternating lane closures, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 07:00 AM All lanes","update_date":"2026-06-05T22:35:21Z"},"road_event_id":"ORC300552600","beginning_cross_street":"Scottsville Road; NY 383","ending_cross_street":"East Henrietta Road; NY 15A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T22:00:00Z","end_date":"2026-06-13T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-77.647958,43.122341]]}},{"id":"BKNnVdYZ4+NDaDWwzWJ2W8Qp3+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[],"description":"Bridge work and deck work on NY 481 southbound between Exit 1B; I-81 SB (Cicero) and Exit 1A; I-81 NB (Cicero), Friday June 12th, 2026, 09:00 AM thru 03:00 PM 2 Left lanes of 3 lanes closed","update_date":"2026-06-05T22:45:22Z"},"road_event_id":"BKNnVdYZ4+NDaDWwzWJ2W8Qp3+I=","beginning_cross_street":"Exit 1B; I-81 SB","ending_cross_street":"Exit 1A; I-81 NB","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.117667,43.1421]]}},{"id":"zi0/EgVyoPE8j2LDrUcLSPZpfos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E COLVIN ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ynLWo8Iw7u+kRY8OHQvHdyEnokM="}],"description":"Utility work on E COLVIN ST eastbound between GARFIELD AVE (Syracuse) and MOORE AVE (Syracuse) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T22:36:49Z"},"road_event_id":"zi0/EgVyoPE8j2LDrUcLSPZpfos=","beginning_cross_street":"GARFIELD AVE","ending_cross_street":"MOORE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.14131,43.026199]]}},{"id":"ynLWo8Iw7u+kRY8OHQvHdyEnokM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E COLVIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zi0/EgVyoPE8j2LDrUcLSPZpfos="},{"type":"next-occurrence","id":"6w7hWi2vlcuIkO0BEz7UAHS8UOk="}],"description":"Utility work on E COLVIN ST eastbound between GARFIELD AVE (Syracuse) and MOORE AVE (Syracuse) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T22:36:49Z"},"road_event_id":"ynLWo8Iw7u+kRY8OHQvHdyEnokM=","beginning_cross_street":"GARFIELD AVE","ending_cross_street":"MOORE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.14131,43.026199]]}},{"id":"6w7hWi2vlcuIkO0BEz7UAHS8UOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E COLVIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zi0/EgVyoPE8j2LDrUcLSPZpfos="},{"type":"next-occurrence","id":"JFKizdBsmAwh9yhTY28tn6afWPE="}],"description":"Utility work on E COLVIN ST eastbound between GARFIELD AVE (Syracuse) and MOORE AVE (Syracuse) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T22:36:49Z"},"road_event_id":"6w7hWi2vlcuIkO0BEz7UAHS8UOk=","beginning_cross_street":"GARFIELD AVE","ending_cross_street":"MOORE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.14131,43.026199]]}},{"id":"JFKizdBsmAwh9yhTY28tn6afWPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E COLVIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zi0/EgVyoPE8j2LDrUcLSPZpfos="}],"description":"Utility work on E COLVIN ST eastbound between GARFIELD AVE (Syracuse) and MOORE AVE (Syracuse) ; Alternating one-way traffic with flaggers, Tuesday June 9th, 2026 thru Friday June 12th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-06-05T22:36:49Z"},"road_event_id":"JFKizdBsmAwh9yhTY28tn6afWPE=","beginning_cross_street":"GARFIELD AVE","ending_cross_street":"MOORE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.14131,43.026199]]}},{"id":"dL7dx1UOsLuZUD8SnvH5gmitDy8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 98"],"direction":"unknown","related_road_events":[],"description":"Milling on NY 98 both directions Morgan Hollow Rd (Humphrey) to JARECKI RD (Franklinville), Friday June 12th, 2026, 07:00 AM thru 04:00 PM right shoulder closed","update_date":"2026-06-05T22:37:39Z"},"road_event_id":"dL7dx1UOsLuZUD8SnvH5gmitDy8=","beginning_cross_street":"Morgan Hollow Rd","ending_cross_street":"JARECKI RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.55669,42.258379]]}},{"id":"x3HHqTHp5BRIwVk/HMlTKM4TfuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+fQPI8RwpAB0LyglsWjjXUG5Ef0="}],"description":"Drainage improvements on I-390 both directions between Exit 19 - NY 33A (Gates) and Scottsville Road; NY 383 (Chili), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane and shoulder of 4 lanes closed southbound; 1 Right lane and shoulder of 4 lanes northbound","update_date":"2026-06-05T22:38:15Z"},"road_event_id":"x3HHqTHp5BRIwVk/HMlTKM4TfuY=","beginning_cross_street":"Exit 19 - NY 33A","ending_cross_street":"Scottsville Road; NY 383","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T13:00:00Z","end_date":"2026-06-08T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.668479,43.139886]]}},{"id":"+fQPI8RwpAB0LyglsWjjXUG5Ef0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x3HHqTHp5BRIwVk/HMlTKM4TfuY="},{"type":"next-occurrence","id":"nVKDmk/qhZRNCkGk1B6ZRDn/UMg="}],"description":"Drainage improvements on I-390 both directions between Exit 19 - NY 33A (Gates) and Scottsville Road; NY 383 (Chili), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane and shoulder of 4 lanes closed southbound; 1 Right lane and shoulder of 4 lanes northbound","update_date":"2026-06-05T22:38:15Z"},"road_event_id":"+fQPI8RwpAB0LyglsWjjXUG5Ef0=","beginning_cross_street":"Exit 19 - NY 33A","ending_cross_street":"Scottsville Road; NY 383","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.668479,43.139886]]}},{"id":"nVKDmk/qhZRNCkGk1B6ZRDn/UMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x3HHqTHp5BRIwVk/HMlTKM4TfuY="},{"type":"next-occurrence","id":"FaQjQHVBPirMMfwlt1dtn3HjjL0="}],"description":"Drainage improvements on I-390 both directions between Exit 19 - NY 33A (Gates) and Scottsville Road; NY 383 (Chili), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane and shoulder of 4 lanes closed southbound; 1 Right lane and shoulder of 4 lanes northbound","update_date":"2026-06-05T22:38:15Z"},"road_event_id":"nVKDmk/qhZRNCkGk1B6ZRDn/UMg=","beginning_cross_street":"Exit 19 - NY 33A","ending_cross_street":"Scottsville Road; NY 383","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.668479,43.139886]]}},{"id":"FaQjQHVBPirMMfwlt1dtn3HjjL0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x3HHqTHp5BRIwVk/HMlTKM4TfuY="},{"type":"next-occurrence","id":"RbI/77kd+0EvXMPUK+JNFVyeYsI="}],"description":"Drainage improvements on I-390 both directions between Exit 19 - NY 33A (Gates) and Scottsville Road; NY 383 (Chili), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane and shoulder of 4 lanes closed southbound; 1 Right lane and shoulder of 4 lanes northbound","update_date":"2026-06-05T22:38:15Z"},"road_event_id":"FaQjQHVBPirMMfwlt1dtn3HjjL0=","beginning_cross_street":"Exit 19 - NY 33A","ending_cross_street":"Scottsville Road; NY 383","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.668479,43.139886]]}},{"id":"RbI/77kd+0EvXMPUK+JNFVyeYsI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x3HHqTHp5BRIwVk/HMlTKM4TfuY="}],"description":"Drainage improvements on I-390 both directions between Exit 19 - NY 33A (Gates) and Scottsville Road; NY 383 (Chili), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane and shoulder of 4 lanes closed southbound; 1 Right lane and shoulder of 4 lanes northbound","update_date":"2026-06-05T22:38:15Z"},"road_event_id":"RbI/77kd+0EvXMPUK+JNFVyeYsI=","beginning_cross_street":"Exit 19 - NY 33A","ending_cross_street":"Scottsville Road; NY 383","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T13:00:00Z","end_date":"2026-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.668479,43.139886]]}},{"id":"gxJSfsTIHGZvOukcU0pPtqti4rQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LJBR7O0nPbtxjA9yfz6cj1mSh/8="}],"description":"Roadwork on US 219 both directions at Peters Road; Old Route 219 (Ashford), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T22:46:15Z"},"road_event_id":"gxJSfsTIHGZvOukcU0pPtqti4rQ=","beginning_cross_street":"Peters Road; Old Route 219","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T11:00:00Z","end_date":"2026-06-08T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.700358,42.460071]]}},{"id":"LJBR7O0nPbtxjA9yfz6cj1mSh/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gxJSfsTIHGZvOukcU0pPtqti4rQ="},{"type":"next-occurrence","id":"zRdbczUMvwmupwnpGwmaTeHoXQM="}],"description":"Roadwork on US 219 both directions at Peters Road; Old Route 219 (Ashford), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T22:46:15Z"},"road_event_id":"LJBR7O0nPbtxjA9yfz6cj1mSh/8=","beginning_cross_street":"Peters Road; Old Route 219","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T11:00:00Z","end_date":"2026-06-09T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.700358,42.460071]]}},{"id":"zRdbczUMvwmupwnpGwmaTeHoXQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gxJSfsTIHGZvOukcU0pPtqti4rQ="},{"type":"next-occurrence","id":"2XXFiSvzz1nZ6CavIFBfVix0YDk="}],"description":"Roadwork on US 219 both directions at Peters Road; Old Route 219 (Ashford), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T22:46:15Z"},"road_event_id":"zRdbczUMvwmupwnpGwmaTeHoXQM=","beginning_cross_street":"Peters Road; Old Route 219","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T11:00:00Z","end_date":"2026-06-10T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.700358,42.460071]]}},{"id":"2XXFiSvzz1nZ6CavIFBfVix0YDk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gxJSfsTIHGZvOukcU0pPtqti4rQ="},{"type":"next-occurrence","id":"8yu5IBXErAuWybAb2n9q3SqMOIU="}],"description":"Roadwork on US 219 both directions at Peters Road; Old Route 219 (Ashford), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T22:46:15Z"},"road_event_id":"2XXFiSvzz1nZ6CavIFBfVix0YDk=","beginning_cross_street":"Peters Road; Old Route 219","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T11:00:00Z","end_date":"2026-06-11T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.700358,42.460071]]}},{"id":"8yu5IBXErAuWybAb2n9q3SqMOIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gxJSfsTIHGZvOukcU0pPtqti4rQ="}],"description":"Roadwork on US 219 both directions at Peters Road; Old Route 219 (Ashford), Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-06-05T22:46:15Z"},"road_event_id":"8yu5IBXErAuWybAb2n9q3SqMOIU=","beginning_cross_street":"Peters Road; Old Route 219","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-12T11:00:00Z","end_date":"2026-06-12T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.700358,42.460071]]}},{"id":"ZO1TyBf7LuJ33MYEnqIrJ7T8MHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6Cw7t4sBE5NsS8OVO1LlG4o22hM="}],"description":"Bridge work and deck work on I-81 northbound ramp from Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Tuesday June 9th, 2026 thru Wednesday June 10th, 2026, Tuesday/Wednesday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-05T22:57:03Z"},"road_event_id":"ZO1TyBf7LuJ33MYEnqIrJ7T8MHk=","beginning_cross_street":"Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T13:00:00Z","end_date":"2026-06-09T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167638,43.070912]]}},{"id":"6Cw7t4sBE5NsS8OVO1LlG4o22hM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZO1TyBf7LuJ33MYEnqIrJ7T8MHk="}],"description":"Bridge work and deck work on I-81 northbound ramp from Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Tuesday June 9th, 2026 thru Wednesday June 10th, 2026, Tuesday/Wednesday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-06-05T22:57:03Z"},"road_event_id":"6Cw7t4sBE5NsS8OVO1LlG4o22hM=","beginning_cross_street":"Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-10T13:00:00Z","end_date":"2026-06-10T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167638,43.070912]]}},{"id":"apILwZTxsU7z3ltzGgey2Rg3ymE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Bridge work and deck work on I-81 northbound between Exit 8 - US 11; Mattydale (Salina) and Exit 9A- Syracuse Airport (Salina), Thursday June 11th, 2026, 09:00 AM thru 03:00 PM 2 Right lanes of 3 lanes closed","update_date":"2026-06-05T23:03:44Z"},"road_event_id":"apILwZTxsU7z3ltzGgey2Rg3ymE=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"Exit 9A- Syracuse Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-11T13:00:00Z","end_date":"2026-06-11T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151337,43.106113]]}},{"id":"i0flqfGecrpVHceGHXbjOYnOSko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-81 southbound between Exit 121 (Old Exit 35) - US 11; Tinker Tavern Road (Richland) and Exit 118 (Old Exit 34) - NY 104; Mexico (Parish) ; Alternating lane closures, Wednesday June 17th, 2026, 09:00 AM thru 12:00 PM All lanes open","update_date":"2026-06-05T23:18:29Z"},"road_event_id":"i0flqfGecrpVHceGHXbjOYnOSko=","beginning_cross_street":"Exit 121 (Old Exit 35) - US 11; Tinker Tavern Road","ending_cross_street":"Exit 118 (Old Exit 34) - NY 104; Mexico","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-17T13:00:00Z","end_date":"2026-06-17T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12123,43.50358]]}},{"id":"Sgra56wTHVTBMoxc6/TTmXVflcw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 66"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 66 Eastbound At Green Grove Rd (Neptune Twp) Monday June 8, 2026 08:00 AM thru 04:30 PM, right shoulder closed","update_date":"2026-06-05T23:52:24Z"},"road_event_id":"Sgra56wTHVTBMoxc6/TTmXVflcw=","beginning_cross_street":"Green Grove Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-08T12:00:00Z","end_date":"2026-06-08T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.073448,40.226535]]}},{"id":"R3mm2e+W9mEDs0FcDVS6qTfRHP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound near West of Exit 16 - NJ 31 North (Clinton Twp), Monday June 8, 2026 08:00 PM thru Tuesday June 9, 2026 05:00 AM, at least one lane closed","update_date":"2026-06-06T00:59:46Z"},"road_event_id":"R3mm2e+W9mEDs0FcDVS6qTfRHP0=","beginning_cross_street":"West of Exit 16 - NJ 31 North","ending_cross_street":"West of Exit 16 - NJ 31 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T00:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.901664,40.636581]]}},{"id":"jwh4rqVZSoIz2++Lwhb9p9MJ+6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound near West of Exit 16 - NJ 31 North (Clinton Twp), Monday June 8, 2026 08:00 PM thru Tuesday June 9, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM)","update_date":"2026-06-06T00:59:47Z"},"road_event_id":"jwh4rqVZSoIz2++Lwhb9p9MJ+6w=","beginning_cross_street":"West of Exit 16 - NJ 31 North","ending_cross_street":"West of Exit 16 - NJ 31 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-06-09T03:00:00Z","end_date":"2026-06-09T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.901664,40.636581]]}}]}